Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
Meiring Naudé Road - Brummeria - Pretoria - 0184
Organization Type
GOVERNMENT
Published
05 Nov 2026
OCDS Reference
ocds-9t57fa-176984
The national research foundation requires an independent service provider to design, develop or configure, and implement a fit-for-purpose partnership management and fundraising system through to go-live, with ongoing support and training, over a 12-month contract. The system must cover partner management, fundraising pipeline, marketing, financial visibility, governance and integration, and reporting and analytics, including popia-compliant data handling. Bidders must submit a company profile, a project design proposal of NO more than 20 pages, a system demonstration video, and at least three client reference letters on official letterheads; the bid closes on 19 november 2026 at 11:00 via the national treasury e-tenders portal only. The most consequential consideration is that the 80/20 preference point system applies, with 20 points for specific goals, so a valid b-bbee certificate or sworn affidavit is needed to claim those points.
Submission method: Only electronic submissions via the National Treasury e-tenders portal (https://admin.etenders.gov.za) using CSD login details; search for tender RIISA/RFQ 2026/27:144 and start e-submission. Bids submitted by any other method will not be accepted.
Closing deadline: 19 November 2026 at 11:00 (NRF systems time). Late bids are rejected.
Mandatory returnable documents: Signed SBD 1 including SBD 4, SBD 6.1 and Bid Submission Certificate; completed SBD 3.1 pricing schedule; company profile; project design proposal (max 20 pages); system demonstration video or link; minimum three client reference letters on official letterheads. Omitting any mandatory document results in automatic disqualification.
B-BBEE and preference points: 80/20 system applies. To claim the 20 specific-goals points, submit a valid B-BBEE certificate or sworn affidavit. Points: Level 1–3 = 8, Level 4–6 = 6, Level 7–8 = 2; 51% Black-owned = 3; 51% Black female-owned = 3; 51% Black youth-owned = 1; 51% owned by people with disabilities = 1; EME/QSE = 4.
CSD and tax compliance: Proof of CSD registration (Master Registration Number) and SARS tax compliance status PIN or CSD number required. Consortium/joint venture parties must each submit separately.
Evaluation stages: Stage 1 compliance check; Stage 2 technical evaluation against specifications with a minimum threshold to proceed; Stage 3 price (80 points) and preference (20 points); Stage 4 tax verification; Stage 5 award to highest combined score. Shortlisted bidders may be required to attend due diligence interviews or provide proof of concept.
Disqualification risks: Bids from persons in service of the state or companies with directors in service of the state; false declarations on SBD 4 or SBD 9; failure to disprove fronting within 7 days of notification; non-compliance with mandatory documents. Bid validity period is 90 days from closing.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Date & Time
Thursday, 19 November 2026 - 11:00
Venue
null
Categories
Request for Quotation
Meiring Naudé Road - Brummeria - Pretoria - 0184
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: IITPSA Membership, ISO 27001 (Information Security Management), ISO 20000 (IT Service Management), CISSP
AI Document Analysis Stages
Description
Source: RFQ 144.pdfProcurement: National Research Foundation (NRF) seeks an independent external service provider to design, develop or configure, and implement a fit-for-purpose Partnership Management and Fundraising System through to Go-Live stage.
Context: Business Advancement (BA) Directorate at NRF Head Office drives stakeholder-centred approach aligned to NRF strategic priorities. Partnerships critical for resource mobilisation, fundraising, co-creation of research programmes nationally, regionally, internationally. Need system to support effective management, automation, scaling of partnership and fundraising activities with robust analytics, reporting, flexibility to integrate with existing systems, and customisation for evolving requirements.
Contract period: 12 months from final signature on award letter; possible follow-up enhancements and new modules at Management's discretion.
System capabilities detailed across six functional areas: Partner management, Fundraising pipeline, Marketing, Financial visibility and fund management, Governance and integration, Reporting and analytics (see technicalSpecifications for full detail).
Support and training: user training, system manuals, documentation, ongoing customer support, technical assistance.
Note: NRF has signed agreement with international partner to facilitate receipt of funding in USA.
05 Nov
2026
Tender Published
Tender was published
19 Nov
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
RFQ 144.pdf
The National Research Foundation requires an independent external service provider to design, develop or configure, and implement a fit-for-purpose partnership management and fundraising system through to the Go-Live stage. The system must support partner management, fundraising pipelines, marketing, financial visibility, governance and reporting for the NRF's Business Advancement unit.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
National Research FoundationMatched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubWe refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Important Dates
Source: RFQ 144.pdf (RFQ)Closing date and time: 19 November 2026 at 11:00 (NRF systems time).
No compulsory briefing or site visit mentioned.
Clarification deadline: not specified; enquiries to be directed to [email protected] (do not submit bids to this address).
Contact Information
Source: RFQ 144.pdf (RFQ)Enquiries (technical and SCM):
Submission portal: National Treasury e-tenders portal (https://admin.etenders.gov.za)
Fraud reporting: toll-free 0800 701 701 or SMS 39772
NRF Head Office (service delivery context): Business Advancement Directorate, NRF Head Office (exact address not specified in document).
Submission Guidelines
Source: RFQ 144.pdf (RFQ)Submission method: National Treasury e-tenders portal (https://admin.etenders.gov.za) using CSD login details. Search by tender number RIISA/RFQ 2026/27:144 and start e-submission. No other submission method accepted.
Closing: 19 November 2026 at 11:00 (NRF systems time).
Returnable documents (all mandatory unless marked optional):
Disqualification risks: any mandatory document omitted or unsigned; late submission; bids from persons in service of the state or companies with directors in service of the state; false declarations on SBD 4 or SBD 9; fronting not disproved within 7 days of notification.
Validity period: 90 days from closing date.
Number of electronic bid documents for contract signing: 1.
Evaluation Criteria
Source: RFQ 144.pdf (RFQ)Evaluation stages:
Stage 1 – Compliance: verification of all mandatory returnable documents and administrative requirements. Non-compliant bids disqualified.
Stage 2 – Technical evaluation against specifications:
Stage 2A – Written response evaluated against published criteria (Section D). Minimum threshold required to proceed.
Stage 2B – Due diligence interviews or proof of concept for shortlisted bidders (if justified).
Stage 2C – Reference checks with referees.
Stage 3 – Price/Preference evaluation (80/20 system):
Price: 80 points (lowest acceptable price scores maximum; formula Ps = 80(1 - (Pt-Pmin)/Pmin)).
Specific Goals: 20 points allocated as follows:
B-BBEE Status Level 1-3: 8 points
B-BBEE Status Level 4-6: 6 points
B-BBEE Status Level 7-8: 2 points
At least 51% Black-owned: 3 points
At least 51% Black female-owned: 3 points
At least 51% Black youth-owned: 1 point
At least 51% owned by People with Disabilities: 1 point
EME or QSE: 4 points
Total: 100 points. No minimum qualifying score stated for price/preference stage.
Stage 4 – Tax compliance verification: recommended bidder given 7 working days to prove compliance if non-compliant.
Stage 5 – Award to highest combined score subject to administrative documentation.
Fair pricing tests applied; NRF may negotiate price only with highest-ranked bidder (or next ranked if refused) until market-related price achieved.
Technical Specifications
Source: RFQ 144.pdf (RFQ)Scope: Design, development or configuration, and implementation of a fit-for-purpose Partnership Management and Fundraising System through to Go-Live stage. Contract period: 12 months from date of final signature on award letter; possible follow-up enhancements and new modules at Management's discretion.
System capabilities required:
Partner management:
Fundraising pipeline:
Marketing:
Financial visibility and fund management:
Governance and integration:
Reporting and analytics:
Support and training:
Note: NRF has signed agreement with international partner to facilitate receipt of funding in USA.
Minimum bidder requirements (go/no-go):
Methodology
Source: RFQ 144.pdfBidder must submit a comprehensive project design proposal (maximum 20 pages) outlining:
Additionally, bidder must submit a video or video link (demonstration) showcasing the system's capabilities and demonstrating alignment with the Detailed Specification requirements.
No prescribed methodology framework; bidder defines own approach.
Experience & Qualifications
Source: RFQ 144.pdfMandatory experience evidence (go/no-go criteria):
No specific years of experience, number of projects, or key personnel qualifications explicitly stated beyond the above.
Quality Management
Source: RFQ 144.pdfQuality requirements embedded in performance levels:
Project methodology deliverables (from minimum requirements):
No explicit ISO or other quality certification requirements stated.
Pricing Schedule
Source: RFQ 144.pdfPricing schedule (SBD 3.1) for: Design, Development or Configuration and Implementation of Partnership Management and Fundraising System through to Go-Live stage.
Breakdown items:
Quantity: 1 Each (indicative only; does not imply each requirement will be undertaken in specified quantities).
Bidders must submit comprehensive price quotation covering all deliverables and associated work for successful design, development/configuration, implementation, and deployment.
Quotation in both bidder's home currency and South African Rand (ZAR).
Total contract value (ceiling price) inclusive of 15% VAT.
Price basis: firm quantities over contract period; ceiling price includes firm and potential future quantities. NRF manages contract within ceiling price; pays only for verified deliveries/performances. Cumulative invoices at expiry = actual total contract price.
Price adjustments per Special Conditions clause 17.1 (NRF and contractor share risk equally).
Price inclusive of all costs: delivery to NRF price delivery point, 15% VAT, income tax, UIF contributions, skills development levies.
Written purchase orders issued for actual quantities ordered, guaranteeing funding availability.
No bid security, bonds, guarantees, or retention specified.
Payment terms not explicitly detailed beyond purchase order process.
Financial Requirements
Source: RFQ 144.pdf (RFQ)Pricing format: SBD 3.1 pricing schedule. Quotation for design, development/configuration, implementation through Go-Live, broken into: consultation/need analysis, design, implementation, testing. Quantities indicative only; bidders must submit comprehensive price quotation covering all deliverables and associated work.
Currency: quotation in both bidder's home currency and South African Rand (ZAR).
Price basis: firm quantities over contract period; ceiling price includes firm and potential future quantities. NRF guarantees procurement only from contracted party. Price inclusive of all costs (delivery to NRF price delivery point, 15% VAT, income tax, UIF, skills development levies).
Price adjustments: governed by Special Conditions of Contract clause 17.1; NRF and contractor share price risk equally. No changes, extensions, or ad hoc costs accepted except authorised adjustments.
Payment: written purchase orders issued for actual quantities ordered, guaranteeing funding availability. Contract managed within ceiling price; payment only for verified deliveries/performances. Cumulative invoices at contract expiry = actual total contract price.
Bid security/bonds/guarantees: not specified.
Retention: not specified.
Payment terms: not explicitly stated beyond purchase order process.
Financial capacity thresholds: not specified.
Tax compliance: SARS TCS PIN or CSD number required; non-compliant recommended bidder gets 7 working days to provide proof of compliance or arrangement with SARS.
Compliance Requirements
Source: RFQ 144.pdf (RFQ)Mandatory eligibility:
B-bbee:
Fronting:
OHS (when working on NRF sites):
Performance levels:
Termination:
General Conditions of Contract: National Treasury GCC applies (available on NRF website); Special Conditions of Contract prevail in case of conflict.
Health & Safety
Source: RFQ 144.pdfApplicable when personnel work on NRF sites:
No OHS requirements specified for off-site work.
Contractual Terms
Source: RFQ 144.pdfContract period: 12 months from date of final signature on award letter.
Governing contract: National Treasury General Conditions of Contract (GCC) as filed on NRF website (http://www.nrf.ac.za/procurement/General-Conditions-of-Contract), amended by Special Conditions of Contract (SCC) in this document. SCC prevails over GCC in case of unintended conflict.
Service provider obligations: exercise reasonable skill, care, diligence; deliver services during normal working hours (Mon-Fri 08:30-17:00 excluding public holidays) unless mutually agreed otherwise; not prejudice NRF operations; submit specified information/reports; comply with applicable legislation; correspond and deliver services only to NRF and its end users.
Communication: in writing (mail, delivery, email) referencing contract number and purchase order number; no action without contract number or verification with NRF contract manager.
OHS on NRF sites: safety induction; compliance with OHS Act and regulations; PPE mandatory; obey site signage, restricted access, speed limits; Letter of Good Standing (COID Act) valid for contract duration; Compensation Commissioner registration; Section 37.2 agreement; health and safety plan maintained; signed indemnity forms for all personnel before site entry.
Performance levels: delivery KPIs (time from purchase order to delivery; proactive corrective actions mandatory for late delivery); quality of services (requirements not achieved = X% of invoice value penalty, X unspecified). Both parties monitor; failure to measure deemed failure to meet levels.
Termination for operational reasons: NRF may terminate whole or part with ≥60 calendar days' written notice (e.g., adoption of nationally sourced facilities management model). No compensation/damages except payment for services satisfactorily rendered up to effective date. Orderly handover and transition required.
Fronting: NRF may investigate per DTI Guidelines; bidder must prove no fronting within 7 days of notification; failure invalidates bid/contract and may result in restriction from public sector business up to 10 years.
Disclaimers: NRF produces document in good faith; no warranty of accuracy/completeness; no liability to responding service providers.
Cancellation prior to award: NRF may cancel if procurement no longer needed, no acceptable bids, material irregularity in bid process, insufficient funds, or quotations not within fair price range. Fair pricing tests applied; price negotiation only with highest-ranked bidder (or next ranked) until market-related price achieved.
Collusion/fraud/corruption: any effort to influence evaluation/award results in rejection and disqualification.
Response preparation costs: NRF not liable for any bidder costs.
Acknowledgement: bidder warrants by signature to have read and accepted each page.
Authority to sign: proof of authority (e.g., company resolution) must be submitted.
Section
Source: RFQ 144.pdfEvaluation stages and criteria (see evaluationCriteria for full detail):
Stage 1: Compliance with mandatory returnable documents and administrative requirements.
Stage 2: Technical evaluation against specifications:
Stage 3: Price/Preference (80/20 system):
Stage 4: Tax compliance verification (7 working days to remedy non-compliance).
Stage 5: Award to highest combined score subject to administrative documentation.
Fair pricing tests applied; price negotiation only with highest-ranked bidder (or next ranked) until market-related price achieved.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Meiring Naudé Road - Brummeria - Pretoria - 0184
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
1
Last checked
06 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Median Estimate
R 3 421 969
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Get deep intelligence on Information service activities. Unlock full pricing strategies, bid frequency, and historical win rates.
Learn how to submit a winning bid with these related articles
💡 Want more tendering tips and strategies?
Explore Our Blog