Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Standerton and Bethal Roads - Standerton - Standerton - 2430
Organization Type
GOVERNMENT
Published
02 Oct 2026
OCDS Reference
ocds-9t57fa-172597
ESKOM requires a contractor to provide maintenance services for air and flue gas ducts and metallic expansion joints at tutuka power station in mpumalanga for a period of five years. The contract will be awarded under the nec term service contract, with evaluation based on functionality (minimum 70% threshold) and price under the 90/10 preference point system. Bidders must hold a CIDB grading of 5me or higher and submit all mandatory returnables electronically by the closing deadline. The most consequential consideration is meeting the functionality threshold, which includes compliance with eskom's welding standard, verifiable reference experience, and submission of five inspection test plans.
Closing: 19 October 2026 at 10:00; electronic submission only via Eskom E-tendering site; no hard copies; upload under Technical, Commercial, Financial, and Other folders; PDF format with price list also in Excel; max 500 MB per document, 4 GB total; no zip files.
Mandatory briefing: Non-compulsory clarification meeting on 05 October 2026 at 10:00 via MS Teams (link in tender); email full name, ID, car registration, and company name to [email protected] for permit access.
Eligibility: CIDB grading 5ME or higher; proof of CSD registration; no restriction from doing business with Eskom or State-Owned Companies; no conflict of interest; tender signed by authorised person; no subcontracting 100% of scope.
Functionality threshold: Must score at least 70% on functionality; criteria include compliance with Eskom welding standard 240-106628253 (30%), verifiable reference list of similar duct repair/fabrication work in last 5 years (20%), staff experience and qualifications (20%), list of welders qualified to WPS (10%), and submission of 5 inspection test plans (ITPs) for specified repairs (20%).
Evaluation: 90/10 preference point system; price scored out of 90 points, specific goals out of 10; prices evaluated inclusive of VAT, corrected for arithmetical errors, excluding contingencies, and compared on Net Present Value basis; unconditional discounts considered.
Mandatory returnables at closing (disqualifiable if missing): Annexures A, B, C, D, E, F (if applicable), G1-G4, H (SBD 1), J (SBD 4); also tax clearance certificate if not on CSD or no SARS PIN; CIDB proof within 21 working days; NEC Term Service Contract completed in full; pricing schedule in PDF and Excel.
Prior to award: Must submit proof of CSD registration, CIDB 5ME, safety documents (COIDA, OHS risk assessment, SHE plan, OHS costing, letter of good standing, OHS policy), quality documents (ISO 9001 or QMS evidence, quality plan, ITPs), environmental documents (Environmental Management Plan, policy), and latest approved annual financial statements; failure to submit within 7 working days may render tender non-responsive.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Date & Time
Monday, 19 October 2026 - 10:00
Venue
https://teams.microsoft.com/meet/387234314610922?p=B7hhot4tAgM1axJ9GH
Categories
Request for Bid(Open-Tender)
Standerton and Bethal Roads - Standerton - Standerton - 2430
AI Document Analysis Stages
Description
02 Oct
2026
Tender Published
Tender was published
26 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
TSC3 The Provision of Maintenance Services for Air and Flue Gas Ducts - Final.pdf
Eskom requires a contractor to provide maintenance services for air and flue gas ducts and metallic expansion joints at Tutuka Power Station in Mpumalanga for a 60-month period, under an NEC3 Term Service Contract (TSC3) with a priced contract (Option A). The contract includes a price list covering preliminaries and vertical flue gas duct work, with services such as access door operations, window patching, weld build-up, and replacement of protective channels and stay pipes.
Maintenance of Air and Flue Gas Ducts and Metallic Expansion Joints OHS Specifications.pdf
Eskom requires a contractor for the maintenance of air and flue gas ducts and metallic expansion joints at Tutuka Power Station in Mpumalanga over a five-year period. The work covers repair and replacement of duct casings, turning vanes, dampers, bracings, and expansion joints during planned outages (IN, IR, and GO). The contractor must comply with a detailed OHS specification and Eskom's welding and quality standards.
15ENG GEN-1441 Technical evaluation strategy for Duct.pdf
Eskom requires a contractor to provide maintenance services for air and flue gas ducts and metallic expansion joints at Tutuka Power Station in Mpumalanga over a five-year period. The work addresses erosion and corrosion damage to duct walls, stays, turning vanes, dampers, and expansion joints, with repairs planned during outages. The tender is evaluated technically against a 70% minimum weighted score, with criteria covering welding standards, references, personnel experience, welder lists, and inspection test plans.
240-68099512 Form A_Cat 1_ Rev 9.pdf
Eskom requires maintenance services for air and flue gas ducts and metallic expansion joints at Tutuka Power Station in Mpumalanga, for a period of five years. The contract includes pre- and post-award quality requirements aligned with ISO 9001, with the tenderer required to acknowledge and accept Eskom's Supplier Quality Requirements.
Maintenance of Air and Flue Gas Ducts-SOW.pdf
Eskom requires a service provider for the maintenance of air and flue gas ducts and metallic expansion joints at Tutuka Power Station in Mpumalanga, covering inspection, repair, and replacement of duct components during planned outages over a five-year period.
Supplier Development Localisation Industrialisation (SDLI) Strategy .pdf
Provision of maintenance services for air and flue gas ducts and metallic expansion joints at Tutuka Power Station, Mpumalanga, for a period of 5 years. The contract is awarded under the 90/10 preference point system, with up to 10 points for B-BBEE status and 90 for price. Bidders must commit to SDL&I objectives including local procurement, black-owned enterprise spend, job creation, and skills development, with a 2.5% retention on invoices as security.
240-12248652_List of Tender Returnables_Cat 1_ Rev 7.pdf
Eskom requires maintenance services for air and flue gas ducts and metallic expansion joints at Tutuka Power Station in Mpumalanga, for a contract period of five years. Bidders must meet quality management system requirements and submit a range of quality-related returnables.
Special instructions to bidders.pdf
Provision of maintenance services for air and flue gas ducts and metallic expansion joints at Tutuka Power Station, Mpumalanga, for a period of 5 years, issued by Eskom.
Invitation to Tender (ITT) Ducting Template Rev. 28_- 2 October.pdf
Eskom requires maintenance services for air and flue gas ducts and metallic expansion joints at Tutuka Power Station in Mpumalanga for a five-year period. The contract will be awarded under the NEC Term Service Contract, with a 90/10 preference point system and a mandatory functionality threshold of 70%.
Acknowledgement Form for Eskom SHE Rules and other Requirements.pdf
Provision of maintenance services for air and flue gas ducts and metallic expansion joints at Tutuka Power Station for a period of five years, for Eskom in Mpumalanga.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 7 579 340
Range
Based on 12 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Eskom requires maintenance services for air and flue gas ducts and metallic expansion joints at Tutuka Power Station, Mpumalanga, for a period of 5 years. The contract is an NEC3 Term Service Contract (TSC3) with a priced price list (Option A).
Important Dates
Source: TSC3 The Provision of Maintenance Services for Air and Flue Gas Ducts - Final.pdf (unknown)Closing date: 19 October 2026 at 10:00.
No briefing or site visit dates are stated in the document.
Contact Information
Source: TSC3 The Provision of Maintenance Services for Air and Flue Gas Ducts - Final.pdf (unknown)No named contacts are provided in the document.
The NEC3 TSC3 contract is available from Engineering Contract Strategies:
Employer: Eskom Holdings SOC Ltd
Submission Guidelines
Source: TSC3 The Provision of Maintenance Services for Air and Flue Gas Ducts - Final.pdf (unknown)Returnable documents:
Submission method: not stated in the document.
Submission address: not stated in the document.
Closing time: 19 October 2026 at 10:00 (from tender record).
Evaluation Criteria
Source: TSC3 The Provision of Maintenance Services for Air and Flue Gas Ducts - Final.pdf (unknown)The document does not state an evaluation scoring split, minimum qualifying score, or preference point system (80/20 or 90/10).
Contract conditions that affect evaluation or award:
Technical Specifications
Source: TSC3 The Provision of Maintenance Services for Air and Flue Gas Ducts - Final.pdf (unknown)Scope: Provision of maintenance services for air and flue gas ducts and metallic expansion joints at Tutuka Power Station, Mpumalanga, for a period of 5 years (60 months).
Contract type: NEC3 Term Service Contract (TSC3), Option A (priced contract with price list).
Key risk register items:
Work includes (from price list):
Quantities are estimated per outage and for 5 years; bidders must price the full price list.
Experience & Qualifications
Source: TSC3 The Provision of Maintenance Services for Air and Flue Gas Ducts - Final.pdfThe Contract Data requires the Contractor to provide key people with names, jobs, responsibilities, qualifications, and experience. CVs for key people must be submitted. No minimum experience or qualification levels are stated in the document.
Quality Management
Source: TSC3 The Provision of Maintenance Services for Air and Flue Gas Ducts - Final.pdfQuality requirements are implied through the price list items for Quality Inspector level 1 (normal time and overtime) and the requirement to comply with the Service Information. No specific quality management system or certification is stated.
Pricing Schedule
Source: TSC3 The Provision of Maintenance Services for Air and Flue Gas Ducts - Final.pdfPricing is via a price list (C2.2) under Option A. The price list includes items for preliminaries (site establishment, travel, accommodation, supervisor, safety officers, quality inspectors, schedulers, PPE, tractor, forklift) and for vertical flue gas ducts (access doors, window patches of various sizes, weld build-up, protecting channels, stay pipes). Quantities are estimated per outage and for 5 years. Bidders must enter rates and totals. Lump sum items are not adjusted for quantity changes; only compensation events change prices.
Financial Requirements
Source: TSC3 The Provision of Maintenance Services for Air and Flue Gas Ducts - Final.pdf (unknown)Pricing: Priced contract with price list (Option A). Prices are either lump sums or rates multiplied by quantities.
Payment terms:
Liability:
Insurance (Contractor to provide):
Employer provides insurance per Insurance Table B (Assets All Risk, Contract Works, Environmental Liability, etc.).
Compliance Requirements
Source: TSC3 The Provision of Maintenance Services for Air and Flue Gas Ducts - Final.pdf (unknown)CIDB: Tenderer's CIDB registration number must be provided on the Form of Offer and Acceptance. No minimum grade is stated.
B-bbee:
Ethics (Z11):
Other compliance:
Health & Safety
Source: TSC3 The Provision of Maintenance Services for Air and Flue Gas Ducts - Final.pdfHealth and safety obligations:
Environmental
Source: TSC3 The Provision of Maintenance Services for Air and Flue Gas Ducts - Final.pdfContractor must comply with all applicable environmental laws and regulations, and ensure subcontractors do the same. No specific environmental management plan is required beyond this.
Contractual Terms
Source: TSC3 The Provision of Maintenance Services for Air and Flue Gas Ducts - Final.pdfContract type: NEC3 TSC3 with main Option A (priced contract with price list), dispute resolution Option W1 (adjudication, then arbitration in Standerton), and secondary Options X1 (price adjustment for inflation), X2 (changes in law), X17 (low service damages), X18 (limitation of liability), X19 (Task Order), X20 (Key Performance Indicators), and Z (additional conditions Z1-Z14).
Key terms:
Section
Source: TSC3 The Provision of Maintenance Services for Air and Flue Gas Ducts - Final.pdfNo evaluation criteria are stated beyond the contract conditions. The price list includes rates for quality inspectors and other roles, but no scoring methodology is provided.
Description
Source: 240-12248652_List of Tender Returnables_Cat 1_ Rev 7.pdfProvision of maintenance services for air and flue gas ducts and metallic expansion joints at Tutuka Power Station for a period of 5 years.
Important Dates
Source: 240-12248652_List of Tender Returnables_Cat 1_ Rev 7.pdf (TENDER)Closing date: 19 October 2026 at 10:00 (per tender record).
Document issue date: 04 June 2026.
Contact Information
Source: 240-12248652_List of Tender Returnables_Cat 1_ Rev 7.pdf (TENDER)Eskom representative (quality): Dimpho Mnisi
Submission Guidelines
Source: 240-12248652_List of Tender Returnables_Cat 1_ Rev 7.pdf (TENDER)Returnable documents (Category 1 – Quality Requirements):
Evaluation Criteria
Source: 240-12248652_List of Tender Returnables_Cat 1_ Rev 7.pdf (TENDER)Quality requirements are evaluated as Category 1 deliverables with an indicator of 1 (i.e. mandatory). Bidders must either:
Scoring sections (each item scores 1 if compliant):
Total possible score: 13 (Option 1) or 9 (Option 2, without Section A).
Quality Management
Source: 240-12248652_List of Tender Returnables_Cat 1_ Rev 7.pdf (TENDER)Form A must be completed and signed. Additional quality requirements as per the scope of work and/or specification may be listed and evaluated.
Compliance Requirements
Source: 240-12248652_List of Tender Returnables_Cat 1_ Rev 7.pdf (TENDER)No specific compliance requirements beyond the quality management system requirements listed in the returnable documents.
Section
Source: 240-12248652_List of Tender Returnables_Cat 1_ Rev 7.pdfQuality requirements are evaluated as Category 1 deliverables with an indicator of 1 (mandatory). Bidders must either hold a valid ISO 9001 certificate (Option 1) or demonstrate an operational QMS (Option 2). Scoring sections: A (ISO 9001 certificate, max 4), B (QMS evidence, max 5), C (Draft Contract Quality Plan, max 1), D (Draft ITP/QCP, max 1), E (Form A and other requirements, max 2). Total possible score: 13 (Option 1) or 9 (Option 2).
Description
Source: Maintenance of Air and Flue Gas Ducts-SOW.pdfThe air and flue gas ducts at Tutuka Power Station erode during operation. Flue gas ducts from the flue gas hoods to the precipitator inlet ducts suffer erosion of walls/casings, stays/bracings, turning vanes, dampers, and associated protection channels/angle irons, cover plates, and expansion joint sleeves/covers. Air duct walls erode around control air dampers, especially hot air recirculating and secondary air dampers. Metallic expansion joints are subject to cracking, corrosion, and erosion when sleeves are eroded. Access doors leak under pressure or allow air ingress under suction.
Consequences of duct failure include:
The scope covers maintenance of boiler air and flue gas ducts, including casings/walls, turning vanes, dampers, bracings, protection channels/angle irons, covers, metallic compensators, and metallic expansion joints during IN, IR, and GO outages at Tutuka Power Station. The flue gas ducts run from boiler flue gas hoods to smokestacks; air ducts run from FD fan suctions to secondary air dampers and to hot air mills for primary air.
Applicability: All units 1-6 at Tutuka Power Station.
Normative references: 15ENG STR 001 (Draught Plant Maintenance Execution Strategy) and 240-56241933 (Standard for Welding Requirements on Eskom Plants). Informative reference: ISO 9001.
Roles: Boiler Plant Engineering compiles scope and issues repair instructions; Outage coordinator issues scope to service provider, reserves spares, and orders non-stock items.
Monitoring: Inspection reports and repair/cutting instructions are used to monitor duct repairs.
Evaluation Criteria
Source: Maintenance of Air and Flue Gas Ducts-SOW.pdf (unknown)Mandatory accreditation and approvals:
Technical Specifications
Source: Maintenance of Air and Flue Gas Ducts-SOW.pdf (unknown)Scope of work:
Typical repair activities (quantities in Appendix A):
Outage coverage:
Materials and scaffolding:
Method statement:
Methodology
Source: Maintenance of Air and Flue Gas Ducts-SOW.pdfBrief method statement:
Quality Management
Source: Maintenance of Air and Flue Gas Ducts-SOW.pdfQuality requirements:
Welding requirements:
Data book (delivered to Eskom on completion) must include:
Ndt:
Important Dates
Source: Invitation to Tender (ITT) Ducting Template Rev. 28_- 2 October.pdf (TENDER)Closing date: 19 October 2026 at 10:00
Clarification meeting (non-compulsory): 05 October 2026 at 10:00 via MS Teams
Clarification queries deadline: 5 working days before the tender closing date.
Tender validity period: 120 days from closing date.
Contact Information
Source: Invitation to Tender (ITT) Ducting Template Rev. 28_- 2 October.pdf (TENDER)Eskom Representative (SCM contact):
Fraud and corruption reporting:
All queries and clarifications must be addressed in writing to the Eskom Representative.
Submission Guidelines
Source: Invitation to Tender (ITT) Ducting Template Rev. 28_- 2 October.pdf (TENDER)Submission method: electronic only, via the Eskom E-tendering site (Eskom Tender Bulletin). No hard copies accepted.
Returnable forms (disqualifiable if not submitted at closing):
Returnable forms (non-disqualifiable, but must be submitted within 5 working days if requested):
Returnable forms (for evaluation, score zero if not submitted):
Returnable forms (prior to contract award):
Disqualification risks:
Returnable Documents
Source: Invitation to Tender (ITT) Ducting Template Rev. 28_- 2 October.pdf (TENDER)Tender returnables required at closing (disqualifiable): Annexure A Authorization Form, Annexure B Acknowledgement Form, Annexure C Tenderers Particulars, Annexure D Integrity Pact Declaration form, Annexure E CPA for local goods/services (if applicable), Annexure F CPA(IG) for imported goods/services (if applicable), Annexure G1-G4 SBD 6.2 Declaration certificate for local production and content, Annexure H SBD 1, Annexure J SBD 4 Bidders Disclosure. Returnables required at closing (non-disqualifiable): Tax Clearance Certificate, Tax Evaluation Questionnaire (if applicable), Compliance with Employment Equity Act proof, CIDB grading proof (within 21 working days), NEC or other contract (NECTSC), Pricing schedule (PDF and Excel). Returnables required at closing for evaluation: Annexure I SBD 6.1 Preference Points Claim Form. Returnables required prior to award: Mandatory contractual requirements (CSD registration, CIDB 5ME or higher), Safety documents (COIDA, Annexure B, baseline OHS risk assessment, SHE Plan, OHS costing, letter of good standing, OHS policy, SHE competency), Quality documents (ISO 9001 certification or QMS evidence, quality method statement, quality policy, quality objectives, organization chart, documented information for control of externally provided processes, Form A), Environmental documents (Annexure B, Environmental Management Plan, environmental aspects and impacts identification, environmental policy), Due diligence financial statements (annual financial statements, public interest score). Additional documents for JV: letter of intent, JV agreement, confirmation of single business entity, single designated bank account. Additional documents required (ECSA/SACPCMP/CVs/permits/licenses) if applicable.
Evaluation Criteria
Source: Invitation to Tender (ITT) Ducting Template Rev. 28_- 2 October.pdf (TENDER)Evaluation stages:
Preference point system: 90/10 (price 90, specific goals 10).
Objective criteria: not applicable.
Reverse e-auction: not applicable.
Technical Specifications
Source: Invitation to Tender (ITT) Ducting Template Rev. 28_- 2 October.pdf (TENDER)Scope: Provision of maintenance services for air and flue gas ducts and metallic expansion joints at Tutuka Power Station.
Contract period: 5 years.
Key technical requirements:
Quality requirements:
Methodology
Source: Invitation to Tender (ITT) Ducting Template Rev. 28_- 2 October.pdf (TENDER)Mandatory Technical Evaluation Criteria:
Experience & Qualifications
Source: Invitation to Tender (ITT) Ducting Template Rev. 28_- 2 October.pdfFunctionality criteria include:
Quality Management
Source: Invitation to Tender (ITT) Ducting Template Rev. 28_- 2 October.pdfQuality requirements:
Pricing Schedule
Source: Invitation to Tender (ITT) Ducting Template Rev. 28_- 2 October.pdfPricing schedule/BOQ must be submitted in PDF and Excel format.
Upload size per document: 500 MB; total submission: 4 GB.
Prices evaluated inclusive of VAT, corrected for arithmetical errors, excluding contingencies, adjusted for variations, NPV comparison.
Unconditional discounts considered; conditional discounts applied at payment.
Prices scored out of 90 points.
Cataloguing line item must be included if required.
Financial Requirements
Source: Invitation to Tender (ITT) Ducting Template Rev. 28_- 2 October.pdf (TENDER)Pricing format: Pricing Schedule/BOQ, submitted in PDF and Excel format.
Upload size per document: 500 MB; total submission: 4 GB.
Price evaluation:
Payment terms:
Security for performance:
Cataloguing:
Compliance Requirements
Source: Invitation to Tender (ITT) Ducting Template Rev. 28_- 2 October.pdf (TENDER)Mandatory eligibility:
Tax compliance:
B-bbee:
Employment Equity:
Safety (prior to award):
Environmental (prior to award):
Financial viability (prior to award):
Health & Safety
Source: Invitation to Tender (ITT) Ducting Template Rev. 28_- 2 October.pdfSafety requirements (prior to contract award):
Environmental
Source: Invitation to Tender (ITT) Ducting Template Rev. 28_- 2 October.pdfEnvironmental requirements (prior to contract award):
Contractual Terms
Source: Invitation to Tender (ITT) Ducting Template Rev. 28_- 2 October.pdfContract type: NEC Term Service Contract.
Contract period: 5 years.
Contract Skills Development Goals (CSDG): 0.25%.
Payment terms: 30 days for contracts below R50 million (incl. VAT); 60 days for contracts above R50 million (incl. VAT).
Eskom reserves the right to negotiate with preferred bidders if tendered prices are not market-related.
Main contractors are discouraged from subcontracting with subsidiaries; if doing so, must declare in tender.
Security for performance: if required, tenderer must select at least two financial institutions from Eskom-approved list.
Cataloguing: successful tenderer may be required to provide cataloguing information; pricing schedule must include a line item for cataloguing.
SHE, quality and environmental provisions become contractual; SHEQ file must be approved before work commences.
Special Conditions
Source: Invitation to Tender (ITT) Ducting Template Rev. 28_- 2 October.pdf (TENDER)Contractual requirements: Mandatory: Proof of CSD registration, CIDB 5ME or higher. Additional: SHEQ requirements, financial viability (financial statements). SHE, Quality and Environmental provisions will be made contractual. Suppliers given one opportunity to submit outstanding documents within 7 working days. SHEQ file must be approved before work commences. Contractual requirements are not evaluation criteria; assessed after evaluation and ranking. Proof must be submitted prior to contract award. Contract conditions: NEC Term Service Contract. CIDB Requirements: 5ME or Higher. Contract Skills Development Goals: 0.25%. Payment terms: 30 days for contracts below R50 million, 60 days for above R50 million. Eskom reserves right to negotiate with preferred bidders. Main contractors discouraged from subcontracting with subsidiaries; must declare if doing so.
Requirements
Source: Invitation to Tender (ITT) Ducting Template Rev. 28_- 2 October.pdf (TENDER)Eligibility criteria: Tenderers must not be under any restriction to do business with Eskom or State-Owned Companies. Ineligible if: nationality of a country on international sanctions list; submitting more than one tender (except e-tendering size limits); JV/consortium agreement lacking joint and several liability; conflict of interest; tender signed by non-authorised persons; restricted by National Treasury; on Tender Defaulters list; restricted by Eskom; sub-contracting 100% of scope. Basic compliance requires: meet eligibility, submit complete tender, submit mandatory commercial returnables, CIDB 5ME or higher.
Section
Source: Invitation to Tender (ITT) Ducting Template Rev. 28_- 2 October.pdfFunctionality requirements applicable with criteria: Compliance to Standard for Welding requirements on Eskom Plant 240-106628253 (30%), Verifiable reference list of similar work (repair of ducts or fabrication) within Eskom and/or any other industry in last 5 years (20%), Experience and qualifications of Company staff for maintenance work done for Eskom Power Plant and/or any other industry (20%), List of welders qualified to WPS as provided in mandatory Technical Evaluation Criteria (10%), Submit general inspection test plans (ITPs) for window patch, stay pipe, protecting channel, multi-convoluted metallic expansion joint and gusset repairs and for weld build up (20%). Tenderers not meeting 70% functionality threshold will be disqualified. Prices scored out of 90 points, specific goals scored out of 10 points, using 90/10 preferential point system. Prices evaluated inclusive of VAT, corrected for arithmetical errors, excluding contingencies, adjusted for variations, NPV comparison, unconditional discounts considered. Objective criteria not applicable. Reverse e-auction not applicable.
Evaluation Criteria
Source: Acknowledgement Form for Eskom SHE Rules and other Requirements.pdf (unknown)The supplier must acknowledge understanding of and compliance with the Eskom OHS legal and other requirements by signing the Acknowledgement Form (Annexure B). The supplier must be able to demonstrate compliance with the listed OHS standards and regulations. The main supplier is accountable for the OHS compliance of its subcontractors and must provide grounds for termination of subcontractor work if required.
Compliance Requirements
Source: Acknowledgement Form for Eskom SHE Rules and other Requirements.pdf (unknown)The supplier/contractor/tenderer must comply with the following OHS documents when working at or rendering a service to Eskom:
After contract award, the supplier is responsible for fully aligning company processes to Eskom's OHS requirements (policies, procedures, standards).
Penalties will be enforced on the main supplier for non-conformance to Eskom and/or statutory OHS requirements (identified for the main supplier and/or its contractor and/or supplier).
All employees (contractors/suppliers) must undergo the relevant Eskom induction and the company's induction.
The main contractor/supplier must:
Eskom reserves the right to verify this when deemed necessary. The contractor may be instructed to provide copies of testimonials/references and the contact details of clients (including Eskom) for whom the Company has done previous work of a similar nature.
The Acknowledgement Form (Annexure B) must be signed by an authorised person (CEO/Director/Managing Director) and witnessed by two witnesses.
Health & Safety
Source: Acknowledgement Form for Eskom SHE Rules and other Requirements.pdfThe supplier/contractor/tenderer must comply with the following OHS documents when working at or rendering a service to Eskom:
After contract award, the supplier is responsible for fully aligning company processes to Eskom's OHS requirements (policies, procedures, standards).
Penalties will be enforced on the main supplier for non-conformance to Eskom and/or statutory OHS requirements (identified for the main supplier and/or its contractor and/or supplier).
All employees (contractors/suppliers) must undergo the relevant Eskom induction and the company's induction.
Contractual Terms
Source: Acknowledgement Form for Eskom SHE Rules and other Requirements.pdfThe main contractor/supplier must:
Eskom reserves the right to verify this when deemed necessary. The contractor may be instructed to provide copies of testimonials/references and the contact details of clients (including Eskom) for whom the Company has done previous work of a similar nature.
Contact Information
Source: Special instructions to bidders.pdf (TENDER)Contact: Tembakazi Kwakweni
Role: Procurement Officer
Submission Guidelines
Source: Special instructions to bidders.pdf (TENDER)Supporting documents must be organised into clearly labelled folders:
Each folder must contain only the relevant information.
Evaluation Criteria
Source: Special instructions to bidders.pdf (TENDER)Bidders must submit a valid BBBEE affidavit or certificate, COIDA registration, SARS Tax PIN, CIPC registration, a bank letter, current and previous year financials, IT34, public interest score, company profile, CSD report, and IDs of directors. These are mandatory supporting documents.
Experience & Qualifications
Source: Special instructions to bidders.pdfTechnical folder must include CVs and relevant certificates of compliance.
Compliance Requirements
Source: Special instructions to bidders.pdf (TENDER)Mandatory supporting documents:
Health & Safety
Source: Special instructions to bidders.pdfSHEQ documents (safety, environmental and quality) must be submitted, either combined or in separate folders.
Section
Source: Special instructions to bidders.pdfPublic interest score must be submitted as part of the financial folder.
Important Dates
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy .pdf (TENDER)Closing date: 19 October 2026 at 10:00 (from tender record).
No briefing or site visit dates are stated in the document.
Contact Information
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy .pdf (TENDER)Buyer: Tembakazi Kwakweni
Business Unit: Tutuka Power Station
No email, telephone, or address provided in the document.
Submission Guidelines
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy .pdf (TENDER)Returnable documents:
Disqualification risks:
Evaluation Criteria
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy .pdf (TENDER)Evaluation is under the 90/10 preference point system.
Technical Specifications
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy .pdf (TENDER)Scope: Provision of maintenance services for air and flue gas ducts and metallic expansion joints at Tutuka Power Station.
Duration: 5 years.
Location: Tutuka Power Station, Mpumalanga.
SDL&I objectives (commitments become contractual obligations):
Methodology
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy .pdfSkills development methodology: Tenderers must participate directly and through their supply network in developing skills. SETA-accredited training providers may be approached to participate. Skills development targets exclude Eskom employees and registered learners. Tenderers bear full cost; Eskom makes no financial contribution. Tenderers are advised to approach relevant SETAs for grants, subsidies, and incentives, and SARS for tax rebates earmarked for skills development initiatives.
Financial Requirements
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy .pdf (TENDER)Pricing: Tender response must be separated into components as per the Price Schedule included with the tender documents. Local procurement content is total spending minus the imported component.
SDL&I penalty and performance security:
NIPP: Applicable for contracts with foreign content of USD 5 million or more. Winning bidder must negotiate and enter into a NIPP obligation agreement with the dtic before signing the contract with Eskom.
Compliance Requirements
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy .pdf (TENDER)B-bbee:
CIDB:
Designated sectors:
Sworn affidavit validity requirements:
B-BBEE Requirements
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy .pdf (TENDER)Specific goals: maximum 10 points for B-BBEE status level under 90/10 system (Level 1: 10, Level 2: 9, Level 3: 6, Level 4: 5, Level 5: 4, Level 6: 3, Level 7: 2, Level 8: 1, non-compliant: 0). Documents required to claim preference points: valid B-BBEE certificate from SANAS accredited agency or sworn affidavit/CIPS affidavit, proof of ownership/shareholding (CIPC), certified ID copies of shareholders, proof of disability where applicable, and consolidated B-BBEE certificate for trusts/consortia/JVs. Tenderers failing to provide documentation may only score out of 90 for price and 0 for specific goals.
SDL&I objectives: Transformation - B-BBEE improvement or retention plan. Tenderers must submit a B-BBEE improvement or retention plan within 30 days of contract signing. Level 4 tenderers must achieve Level 3 by end of first year; Level 5-8 or non-compliant must achieve Level 4 by end of first year and improve one level each subsequent year. Valid B-BBEE certificate or sworn affidavit is a condition for contract award.
Local procurement content: refers to value added in South Africa; tenderers must submit proposals in the provided table. Eskom target is 100%.
Procurement spend on entities with minimum 51% black ownership: winning tenderer encouraged to procure from designated groups for indirect expenses and direct subcontractor spend. Eskom target for black-owned enterprises is 10%.
Jobs: tenderers must submit proposals for type and number of jobs created and retained in South Africa as a result of the contract.
Skills development: tenderers must submit proposals for developing skills of unemployed candidates. Required learners: 3 Mechanical Technicians (S1 or S2, National Diploma Mechanical), 3 Welders (N3 or equivalent, Trade Test Certificate), 2 Riggers (N3 or equivalent, Trade Test Certificate), total 10. Tenderers bear full cost; Eskom makes no financial contribution.
Special Conditions
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy .pdf (TENDER)National Industrial Participation Programme (NIPP): applicable for contracts with foreign content of USD 5 million or more. Winning bidder must negotiate and enter into a NIPP obligation agreement with the dtic before signing the contract with Eskom.
SDL&I penalty and performance security: Eskom will apply a penalty of 2.5% of contract value for failure to meet SDL&I obligations. Eskom will retain 2.5% of every invoice (excluding VAT) as security, released only upon fulfilment of all SDL&I obligations.
Reporting and monitoring: suppliers must submit quarterly reports on SDL&I compliance; Eskom reviews within 30 days; corrective measures required if obligations not met; SDL&I Implementation Schedule must be completed and returned within 28 days after contract award.
Requirements
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy .pdf (TENDER)Objective criteria: Designated sectors - this commodity is not a designated sector; SBD 6.2 and Annex C are returnable if applicable. CIDB skills development: compulsory training required, Construction Skills Development Goal % is 0.25%; failure to meet this mandatory % renders tender non-responsive.
Market research: Current suppliers providing the services: None; potential suppliers: Open market.
Validity of sworn affidavits: Affidavits must include deponent's name as per ID, identity number, designation (director/owner/member), enterprise name and address, percentage of black ownership and designated group, total revenue and basis, financial year end, B-BBEE status level, empowering supplier status, same signature date for deponent and Commissioner of Oath, and Commissioner cannot be an employee or ex officio of the enterprise.
Section
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy .pdfSection 1: Specific Goals - A maximum of 10 points may be awarded to a tenderer for the specific goal specified for the tender. The points scored for the specific goal must be added to the points scored for price and the total must be rounded off to the nearest two decimal places. Subject to section 2(1)(f) of the Preferential Procurement Policy Framework Act, the contract must be awarded to the tenderer scoring the highest points. Tenderer failing to provide documentation for the allocation of preference points will not be disqualified, but may only score point out of 90 for price and scores 0 points out of 10 for specific goals.
Description
Source: Maintenance of Air and Flue Gas Ducts and Metallic Expansion Joints OHS Specifications.pdfThe OHS Specification outlines the minimum occupational health and safety requirements for the maintenance of boiler air and flue gas ducts, including casings/walls, turning vanes, dampers, bracings, protection channels/angle iron, covers, metallic compensators, and metallic expansion joints during philosophy outages (IN, IR, and GO outages) at Tutuka Power Station. The flue gas ducts run from the boiler flue gas hoods to the smokestacks, and the air ducts from the FD fan suctions to the secondary air dampers and to the hot air mills for the primary air.
Contact Information
Source: Maintenance of Air and Flue Gas Ducts and Metallic Expansion Joints OHS Specifications.pdf (unknown)Eskom Contract's Manager
Eskom Health and Safety Manager
Eskom Safety Officer
Evaluation Criteria
Source: Maintenance of Air and Flue Gas Ducts and Metallic Expansion Joints OHS Specifications.pdf (unknown)Mandatory requirements:
Technical Specifications
Source: Maintenance of Air and Flue Gas Ducts and Metallic Expansion Joints OHS Specifications.pdf (unknown)Scope of work:
Specific tasks include:
Method statement:
Experience & Qualifications
Source: Maintenance of Air and Flue Gas Ducts and Metallic Expansion Joints OHS Specifications.pdfKey personnel qualifications:
Quality Management
Source: Maintenance of Air and Flue Gas Ducts and Metallic Expansion Joints OHS Specifications.pdfWelding requirements:
Quality requirements:
Health & Safety
Source: Maintenance of Air and Flue Gas Ducts and Metallic Expansion Joints OHS Specifications.pdfLegal compliance:
Life-Saving Rules:
Substance abuse:
Organisational structure:
Roles and responsibilities:
Contractor site supervisor:
Roof work:
Fire equipment:
Flammable liquids and hazardous chemical agents:
First aid:
OHS communication:
Risk assessment:
Safe work procedures / method statements:
Site establishment:
Auditing:
Smoking:
Cellular phones:
Occupational health, hygiene and rehabilitation:
Working at heights:
PPE:
Incident investigation:
Emergency management:
Non-conformance and compliance:
OHS files:
Work stoppage:
Hours of work:
Omissions:
Contractor performance monitoring:
Contract sign off:
Right to terminate:
Barricading:
Description
Source: 15ENG GEN-1441 Technical evaluation strategy for Duct.pdfThe air and flue gas ducts at Tutuka Power Station erode during operation. The flue gas ducts from the flue gas hoods to the precipitator inlet ducts suffer erosion of walls/casings, stays/bracings, turning vanes, dampers, protecting channels/angle irons, cover plates and expansion joint sleeves/covers. The precipitator flue gas outlet ducts to the smoke stack have minor erosion but may corrode. Air duct walls erode around control air dampers, especially hot air recirculating and secondary air dampers. Metallic expansion joints are subject to cracking, corrosion and erosion of sleeves. Failure of ducts leads to fan capacity issues, high motor currents, load losses, and potential unit shutdowns. Maintenance is contracted out through open tender, performed during outages.
Evaluation Criteria
Source: 15ENG GEN-1441 Technical evaluation strategy for Duct.pdf (unknown)Minimum weighted technical score to be considered: 70%.
Qualitative criteria (total 100%):
Scoring scale: 5 = 100% compliant; 4 = 80% compliant with acceptable risks/exceptions/conditions; 2 = 40% non-compliant; 0 = 0% totally deficient or non-responsive. Scores of 1 and 3 are not used.
Acceptable technical risks:
Unacceptable technical risks:
Acceptable exceptions/conditions:
Unacceptable exceptions/conditions:
Technical Specifications
Source: 15ENG GEN-1441 Technical evaluation strategy for Duct.pdf (unknown)Scope: Maintenance of air and flue gas ducts and metallic expansion joints at Tutuka Power Station.
Areas subject to erosion/corrosion:
Consequences of duct failure:
Maintenance is contracted out through open tender/enquiry, performed during outages.
Related documents:
Experience & Qualifications
Source: 15ENG GEN-1441 Technical evaluation strategy for Duct.pdfStaff experience and qualifications are evaluated as follows:
Acceptable exception: staff have no relevant Eskom power plant outage work but have experience on similar scope outside Eskom.
Unacceptable exception: no relevant experience on Eskom power plant outages or other industry, or no certified copies of qualifications submitted.
Quality Management
Source: 15ENG GEN-1441 Technical evaluation strategy for Duct.pdfBidders must submit approved general Inspection Test Plans (ITPs) covering window patch, stay pipe, protecting channel, multi-convoluted metallic expansion joint, gusset repairs and weld build-up. The ITPs must demonstrate a good understanding of the scope of work. ISO 9001 is listed as an informative reference.
Section
Source: 15ENG GEN-1441 Technical evaluation strategy for Duct.pdfMinimum weighted technical score to be considered: 70%. Qualitative criteria as detailed in the main evaluation section. No mandatory technical evaluation criteria are listed (Table 2 is N/A).
Important Dates
Source: 240-68099512 Form A_Cat 1_ Rev 9.pdf (unknown)Closing date: 04 June 2026
Submission Guidelines
Source: 240-68099512 Form A_Cat 1_ Rev 9.pdf (unknown)Returnable documents:
Evaluation Criteria
Source: 240-68099512 Form A_Cat 1_ Rev 9.pdf (unknown)The tenderer must complete and sign Form A to acknowledge and accept Eskom Supplier Quality Requirements. The tenderer must indicate applicability of each clause with an X or -. The tenderer must select only one pre-contract award quality category (Category 1 applies). The tenderer must provide its Quality Representative's name, designation, date, and signature.
Methodology
Source: 240-68099512 Form A_Cat 1_ Rev 9.pdfISO 9001 clauses and quality principles apply, including context of the organisation, leadership, planning, support, operation, performance evaluation, and improvement.
Quality Management
Source: 240-68099512 Form A_Cat 1_ Rev 9.pdfQuality requirements per specification 240-105658000 and ISO 9001 apply. Post-contract award conditions include contract execution, supplier quality performance monitoring, Eskom rights of access and information, preservation, quality audits, management of nonconformities, and special processes. The tenderer must complete and sign Form A to acknowledge and accept these requirements.
Compliance Requirements
Source: 240-68099512 Form A_Cat 1_ Rev 9.pdf (unknown)No specific requirements found
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Standerton and Bethal Roads - Standerton - Standerton - 2430
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
10
Last checked
16 Oct 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
Everything South African general contractors need to know about how to write a winning tender proposal without an in-house bid team in gauteng — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Your meticulously crafted General sector tender submission can be disqualified for a single, seemingly minor compliance oversight. The reality for South African contractors is that technical competence is no longer sufficient; it is underpinned by a non-negotiable framework of documentary compliance. This regulatory guide: mastering CSD and BBBEE compliance for general sector tenders in south africa provides a comprehensive, step-by-step breakdown of the mandatory registrations and certificates you must secure and present. We detail the precise requirements for CSD, BBBEE, SARS TCS, CIPC, and COIDA, explaining their function within the procurement ecosystem governed by the PFMA and PPPFA. Learn the actionable steps to prepare your business, avoid the most common disqualifying errors, and leverage technology to streamline your compliance process for successful bidding in 2026 and beyond.
For South African General contractors, the path to government procurement is paved with non-negotiable regulatory requirements. The most common barrier to entry is not a lack of capability, but a failure to master the foundational compliance frameworks that govern every bid. This complete regulatory guide to CSD and BBBEE compliance for General sector tender suppliers in South Africa demystifies the process. It provides a meticulous, step-by-step field manual for ensuring your company is fully compliant and audit-ready, enabling you to confidently access the R billions in opportunities across infrastructure maintenance, facilities management, and service delivery within the General sector.
This definitive guide provides General sector contractors with the precise, actionable steps required to achieve and maintain CSD and BBBEE compliance for South African public tenders in 2026. Authored by Dr. Sarah Mokwena, a Legal Compliance Specialist, it meticulously walks through the regulatory framework, mandatory registrations, and the critical documentation needed to avoid disqualification. We dissect the common, costly errors made during submission and provide a clear checklist to ensure your bid is responsive and competitive. Learn how to navigate the Central Supplier Database, validate your BBBEE status, and integrate compliance into your tender preparation process.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Services: General. Unlock full pricing strategies, bid frequency, and historical win rates.