Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
Megawatt Park and Various Clusters Nationally - Sunninghill - Sunninghill - 2000
Organization Type
GOVERNMENT
Published
22 Oct 2026
OCDS Reference
ocds-9t57fa-175233
ESKOM requires the refurbishment of block a's east ground floor, between the atrium and the northern façade (pillar 30 to pillar 34) at megawatt park, sunninghill, johannesburg, for use by the distribution (dx) nerve centre. The contract is an nec3 engineering and construction contract (april 2013) under main option b (priced contract with bill of quantities). Bidders must price the bill of quantities, provide a 10% performance bond, and accept delay damages of r25,000 per day capped at 10% of the contract value. The most consequential consideration is the strict contractual and financial obligations, including a 5% retention, liability limits, and compliance with health, safety, and environmental regulations.
Closing: 12 November 2026 at 08:00 (submission method/address not stated in the document).
Contract form: NEC3 ECC3 (April 2013), main Option B (Priced Contract with bill of quantities) – the bill of quantities is a pricing document only; Works Information is in Part C3 and Site Information in Part C4.
Returnable documents: C1.1 Form of Offer and Acceptance (signed, with Schedule of Deviations if any), C1.2b Contract Data provided by the Contractor (complete details, key persons, proposed completion date), C2.1/C2.2 Pricing Data (priced bill of quantities and tendered total excluding VAT), and pro forma Performance Bond (Option X13) and Retention Money Guarantee (Option X16) if applicable.
Financial security: Performance bond of 10% of the Contract Price; retention of 5% of contract value (unless a Retention Money Guarantee is provided and accepted); delay damages of R25,000 per day, capped at 10% of Contract Value.
Payment and invoicing: Assessments on the 25th of each month; payments due within four weeks; contractor must submit a tax invoice within one week of a payment certificate, including Eskom VAT number 4740101508.
Insurance and liability: Employer provides insurances per Format A (contract value up to R350M inclusive of VAT); contractor provides additional insurances as necessary; minimum limit for employee injury/death is not less than R500,000 per event per COIDA; contractor's liability for indirect/consequential loss is limited to R0.00.
Compliance: Provide CIDB registration number if applicable; comply with B-BBEE status change obligations (notify within 7 days, submit updated certificate within 30 days); comply with Construction Regulations 2014, environmental laws, and COVID-19 compliance officer requirements; SHE files must be approved before site access and drawings approved by local authority before construction commencement.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Date & Time
Thursday, 12 November 2026 - 10:00
Venue
No 1 Maxwell Road Sunninghill, Eskom Megawatt Park, Ground Floor
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Categories
Request for Quotation
Megawatt Park and Various Clusters Nationally - Sunninghill - Sunninghill - 2000
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
Description
Source: Commercial.zip (RFP)22 Oct
2026
Tender Published
Tender was published
12 Nov
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
SDL&I.zip
Eskom requires the refurbishment of Block A, East Ground Floor between the Atrium and the Northern Façade at Megawatt Park, for use by the Distribution (Dx) Nerve Centre. The 7-month project covers building works including partitions, ceilings, flooring, painting, plumbing, electrical, HVAC, fire systems, and ICT cabling, with mandatory SDL&I commitments on local content, subcontracting to black-owned enterprises, job creation, and skills development.
SHEQ.zip
Eskom requires the engineering, design, procurement and construction refurbishment of Block A East, ground floor at Megawatt Park, Sunninghill, for use as the Distribution (Dx) Nerve Centre. The work is categorised as medium risk and includes demolition, asbestos management, electrical installations, and full SHEQ compliance. Bidders must submit a range of quality, safety, and environmental documents with their tender.
Commercial.zip
Refurbishment of Block "A", East Ground Floor between the Atrium and the Northern Façade of the building at Megawatt Park, Sunninghill, for use by the Distribution (Dx) Nerve Centre. The contract runs for seven months. Tenders must be submitted electronically via the Eskom eTendering system by 12 November 2026 at 10:00.
TECHNICAL EVALUATION CRITERIA- DX NERVE CENTRE.xlsx
Refurbishment of Block A, East Ground Floor between the Atrium and the Northern Façade at Megawatt Park, for use by the Distribution (Dx) Nerve Centre. The project covers building works, electrical installation, ICT, HVAC and fire installations, and requires a professional project manager and registered engineers.
NEC.zip
Refurbishment of Block A, East Ground Floor (between Pillar 30 and Pillar 34) at Megawatt Park, Sunninghill, Johannesburg, for use by the Distribution (Dx) Nerve Centre. The contract is an NEC3 Engineering and Construction Contract (April 2013) under main Option B (Priced contract with bill of quantities), with dispute resolution Option W1 and secondary options including X7 (delay damages), X13 (performance bond), X16 (retention), X18 (limitation of liability), and additional conditions Z1 to Z12.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubWe refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Eskom invites tenders for the refurbishment of Block "A", East Ground Floor between the Atrium and the Northern Façade at Megawatt Park for use by the Distribution (Dx) Nerve Centre. The contract period is seven (7) months. The tender documents are free of charge. All queries must be addressed in writing to the Eskom Representative. The submission of a tender constitutes acceptance of Eskom's Standard Conditions of Tender.
Important Dates
Source: Commercial.zip (RFP)Compulsory clarification meeting: 30 October 2026 at 10h00, at Eskom Megawatt Park, No 1 Maxwell Road, Sunninghill, Ground Floor.
Closing date and time: 12 November 2026 at 10h00.
Tender validity: 90 days from the closing date.
Contact Information
Source: Commercial.zip (RFP)Procurement Manager: Pumezile Makeba
Role: Procurement Manager
Eskom Representative: name and contact details are in the Tender Data (not provided in the extract).
Fraud and corruption reporting: 0800 11 2722, [email protected]
Submission: electronic via https://eTendering.eskom.co.za
Site address: Megawatt Park, No 1 Maxwell Road, Sunninghill
Submission Guidelines
Source: Commercial.zip (RFP)Submission method: electronic only, via the Eskom eTendering site (https://eTendering.eskom.co.za); no tender box deposits accepted.
Closing: 12 November 2026 at 10h00 SAST; the system will not accept submissions after this time.
Eligibility to access the system: a CSD number is required to log in and submit.
File limits: each file up to 50MB; total upload up to 900MB.
Upload documents under the correct category (Technical, Commercial, Financial); the tender must be finalised before the deadline.
Returnables: all mandatory forms must be fully completed, signed where required, and submitted with the tender at closing; otherwise Eskom may request them within 5 working days, and failure to submit within that period leads to disqualification.
Mandatory returnables (Annexures A to G):
Disqualification risks:
Tender validity: 90 days from the closing date and time.
Evaluation Criteria
Source: Commercial.zip (RFP)Evaluation stages:
Functionality scoring (100 points total):
Mandatory key personnel (CVs and qualifications required):
Minimum B-Tech degree and 5 years' experience in the relevant field, plus professional registration, for each role.
B-BBEE preference points (80/20 system):
Required to claim B-BBEE points: valid B-BBEE certificate/affidavit, proof of ownership/shareholding (CIPC documents), certified ID copies of shareholders, proof of disability where applicable.
Technical Specifications
Source: Commercial.zip (RFP)Scope: refurbishment of Block "A", East Ground Floor between the Atrium and the Northern Façade of the building at Megawatt Park, for use by the Distribution (Dx) Nerve Centre.
Contract period: 7 months.
Works include: building works, electrical installation, ICT, HVAC, fire installation.
NEC3 Engineering and Construction Contract – Option B: Priced contract with bill of quantities (Third edition, June 2005 with amendments June 2006) is the intended form of contract.
Work is to be executed while the building remains occupied – bidders must address risk management and business continuity in their proposals.
Financial Requirements
Source: Commercial.zip (RFP)Payment terms:
Pricing: rates and prices fixed for the contract duration, stated in South African Rand, including all duties, taxes and VAT.
Financial analysis: bidders must submit their latest approved annual financial statements (no draft statements), including a signed director's report, auditor's/reviewer's report, statement of financial position, comprehensive income, changes in equity, cash flows, and notes; plus a public interest score (if applicable) and ITA34C tax assessments for the current and previous years (if not audited).
For unincorporated JV or SPV, each partner must submit its own annual financial statements.
Security for performance: if required, the bidder must indicate at least two financial institutions it will approach; Eskom may reject unsuitable institutions.
Compliance Requirements
Source: Commercial.zip (RFP)CSD registration: required to access the eTendering system and for B-BBEE level verification.
Tax compliance: valid tax clearance / CSD report must be provided at closing if B-BBEE level is a pre-qualification criterion.
B-BBEE: valid certificate/affidavit required; if not submitted at closing, the bidder scores zero under PPPFA but is not disqualified (unless fraudulent/expired).
CIDB: where stipulated, proof of registration is mandatory at closing; if only an application is available, submit it at closing and the actual proof by contract award.
COIDA: original certificate of good standing or proof of application from the Compensation Fund (South African tenderers only) – required at closing.
SHEQ: proof of safety, health, environmental and quality systems must be provided at closing; all costs reflected in the tender.
SDL&I Undertaking: must be completed and submitted by contract award; otherwise the tender will not be considered for award.
Designated materials and thresholds: information must be submitted by contract award; otherwise the tender will not be considered for award.
No restriction to do business with Eskom or State-Owned Companies.
100% subcontracting is not permitted.
Section
Source: Commercial.zip (RFP)In addition to the standard evaluation: functionality threshold is 80 out of 100. Functionality is scored on company experience (35%), references (30%), method statement and schedule (25%), and risk management/business continuity (10%). Bidders must meet the 80-point threshold to have their financial proposals and B-BBEE status evaluated. No interviews will be conducted; no changes to technical proposals after the deadline.
Description
Source: SHEQ.zip (unknown)Refurbishment of Block A East, Ground Floor at Megawatt Park between the Atrium and the Northern Façade for use by the Distribution (Dx) Nerve Centre. Work includes engineering, design, procurement and construction. Classified as medium risk work. Requires compliance with Eskom SHEQ rules and quality systems (ISO 9001, ISO 14001).
Contact Information
Source: SHEQ.zip (unknown)Eskom Quality Representative:
SHEQ Officer:
Project Manager (Distribution):
Address (site):
Submission Guidelines
Source: SHEQ.zip (unknown)Returnable documents:
Disqualification:
Evaluation Criteria
Source: SHEQ.zip (unknown)SHE evaluation (Part A and Part B): each KPI scored Y (Yes = 1) or N (No = 0) or N/A. A score of 0 is given if a document is not submitted or does not satisfy minimum requirements; 1 if it does. The tender is approved or not approved based on the total.
Quality evaluation (Category 3 - Pre-Contract Award Quality Requirements):
No explicit minimum qualifying score is stated in the SHE or quality evaluation. The preference point system (80/20 or 90/10) is not detailed in the provided documents.
Technical Specifications
Source: SHEQ.zip (unknown)Scope of work: Engineering, design, procurement and construction work for the refurbishment of Block A East, Ground Floor at Megawatt Park, between the Atrium and the Northern Façade, for use by the Distribution (Dx) Nerve Centre.
Site address: 1 Maxwell Drive, Sunninghill 2191.
Work is classified as medium risk.
Key requirements from SHE specification:
Quality requirements per specification 240-105658000, Category 3:
Environmental requirements (medium risk):
Compliance Requirements
Source: SHEQ.zip (unknown)CSD registration: implied (Eskom requires bidders to be registered on the Central Supplier Database).
Tax: valid tax clearance (SARS TCS) required.
Compensation Fund: valid Letter of Good Standing under COIDA required.
B-BBEE: minimum Level 6 (noted).
ISO 14001:2015 certificate required.
ISO 9001:2015 quality management system required (evidenced by QMS documentation).
OHS compliance: signed Section 37(2) agreement with Eskom, SHEQ policy, and compliance with OHS Act, Construction Regulations, and Eskom SHE requirements.
Asbestos: registered asbestos contractor required if asbestos is present.
Returnable forms/declarations:
No specific CIDB grading stated.
Description
Source: SDL&I.zip (unknown)The contract covers the refurbishment of Block 'A', East Ground Floor between the Atrium and the Northern Façade of the building at Megawatt Park, for use by the Distribution (Dx) Nerve Centre. The project duration is 7 months. The bid is evaluated under the 80/20 preference point system, with a maximum of 20 points for specific goals (B-BBEE) added to price points, and the contract awarded to the highest scoring bidder.
Important Dates
Source: SDL&I.zip (unknown)Closing date: 12 November 2026 at 08:00
Contact Information
Source: SDL&I.zip (unknown)DTIC contacts for local content exemption applications:
Email: [email protected]
Telephone: 012 394 5598 / 066 471 8982
Email: [email protected]
Telephone: 012 394 3500 / 073 497 2051
Email: [email protected]
Telephone: 012 394 1213 / 060 705 0677
Email: [email protected]
Telephone: 012 394 1412 / 060 705 1690
Email: [email protected]
Telephone: 012 394 1664
Email: [email protected]
Telephone: 012 394 1394
Submission Guidelines
Source: SDL&I.zip (unknown)Returnable documents - all must be completed, signed and submitted with the quotation:
Disqualification risks:
Evaluation Criteria
Source: SDL&I.zip (unknown)Evaluation under the 80/20 preference point system:
B-BBEE points (80/20 system):
If preference-point documentation is not submitted, the bidder is not disqualified but scores a maximum of 80 (price only) and 0 for specific goals.
SDL&I objectives do not form part of scoring; commitments become contractual obligations.
Technical Specifications
Source: SDL&I.zip (unknown)Scope: Refurbishment of Block "A", East Ground Floor between the Atrium and the Northern Façade of the building at Megawatt Park, for use by the Distribution (Dx) Nerve Centre.
Project duration: 7 months.
Work includes (as typical for such refurbishment): partitions, ceilings, flooring, painting, builders' works, affected plumbing, consumables, and specialist installations such as electrical, HVAC, fire-system, security/access control, and structured ICT cabling.
Local procurement content requirement: 100% (the construction is within South Africa). Tender responses must separate local vs imported components per the price schedule. If imported raw materials/inputs are unavoidable, a written exemption from the DTIC is required.
Financial Requirements
Source: SDL&I.zip (unknown)Retention for SDL&I obligations:
Bidder bears all costs of skills development; Eskom makes no financial contribution.
Compliance Requirements
Source: SDL&I.zip (unknown)CSD registration and valid tax clearance (SARS TCS or tax PIN) are required.
B-BBEE evidence - conditions and thresholds:
Sworn affidavit content requirements:
Local content / designated sectors:
Additional preference-point documents (condition for contract award):
Description
Source: NEC.zip (unknown)Refurbishment of Block A, East Ground Floor between the Atrium and the Northern Façade of the building at Megawatt Park, for use by the Distribution (Dx) Nerve Centre. Site boundaries: Pillar 30 to Pillar 34, Maxwell Drive, Sunninghill, Johannesburg.
Important Dates
Source: NEC.zip (unknown)Closing: 12 November 2026 at 08:00 (from tender record).
Programme milestones:
No briefing or site visit dates stated.
Contact Information
Source: NEC.zip (unknown)Project Manager:
Employer address:
Eskom Holdings SOC Ltd
Megawatt Park
Maxwell Drive
Sandton
Johannesburg
Site: Megawatt Park, Block A, East Ground Floor (Pillar 30 to Pillar 34), Maxwell Drive, Sunninghill, Johannesburg
Submission Guidelines
Source: NEC.zip (unknown)Returnable documents - all must be completed, signed and submitted with the bid:
Submission method and closing time are not stated in the provided text. The invitation to bid is an RFQ, closing at the date/time in the tender record.
Evaluation Criteria
Source: NEC.zip (unknown)Evaluation criteria are not stated in the provided document. The tender is a quotation; the document is primarily a contract form, not a specification of evaluation method. Preference point system (80/20 or 90/10) not specified.
Technical Specifications
Source: NEC.zip (unknown)Scope: Refurbishment of Block "A", East Ground Floor between the Atrium and the Northern Façade of the building at Megawatt Park, for use by the Distribution (Dx) Nerve Centre.
Site boundaries: Eskom MWP, Block A, East Ground Floor, Pillar 30 to Pillar 34, Maxwell Drive, Sunninghill, Johannesburg.
Contract form: NEC3 Engineering and Construction Contract, April 2013 (ECC3), main Option B (Priced Contract with bill of quantities).
Key conditions:
Works Information and Site Information are in Part C3 (Scope of Work) and Part C4 (Site Information) respectively.
Experience & Qualifications
Source: NEC.zip (unknown)Contractor must provide key persons with details of name, job, responsibilities, qualifications and experience. CVs are to be appended to the Tender Schedule.
Quality Management
Source: NEC.zip (unknown)Quality management requirements are not explicitly detailed in the provided text. The contract includes defect correction provisions: the defects date is 52 weeks after Completion, and the correction period is one week.
Pricing Schedule
Source: NEC.zip (unknown)Pricing is under NEC3 Option B (Priced Contract with bill of quantities). The bill of quantities is for pricing only; work is measured and paid based on quantities completed. Tendered total must be stated excluding VAT. Pricing assumptions: rates are inclusive of all work, risks, liabilities, overheads, profit. Time-related items use rates per unit of time.
Financial Requirements
Source: NEC.zip (unknown)Pricing: Priced contract with bill of quantities (Option B). The bill of quantities is a pricing document only; it is not Works Information or Site Information.
Tendered total of the Prices is to be completed by the bidder, excluding VAT; VAT at 15% is added for budgeting.
Performance bond: 10% of the Contract Price.
Retention: 5% of the contract value, unless a Retention Money Guarantee is provided and accepted.
Delay damages: R25,000 per day, capped at 10% of Contract Value.
Payment: assessment on the 25th of each month; payments due within four weeks of the payment certificate. Interest on late payment at the prime rate of Standard Bank (365-day year).
Tax invoice: contractor must submit a tax invoice within one week of receiving a payment certificate; include Eskom VAT number 4740101508.
Insurance: Employer provides insurances per "Format A" (for contract value up to R350M inclusive of VAT), available at the Eskom insurance page. Contractor provides additional insurances as necessary. Minimum limit for employee injury/death: not less than R500,000 per event per COIDA.
Liability limits: Contractor's liability for indirect or consequential loss limited to R0.00; total liability limited to the total of the Prices, except for certain excluded matters which are unlimited.
Compliance Requirements
Source: NEC.zip (unknown)The tenderer's CIDB registration number must be provided if applicable.
B-BBEE: Contract includes B-BBEE status change obligations - notify the Employer within seven days of any change; submit updated verification certificate within thirty days. A decrease in B-BBEE status may lead to renegotiation or termination.
Additional conditions Z1-Z12 include:
No CSD registration or tax clearance requirements stated in the document; standard requirements may apply per tender conditions.
Health & Safety
Source: NEC.zip (unknown)Contractor must take all reasonable precautions for health and safety. Employer may appoint the Contractor as "Principal Contractor" under the Construction Regulations 2014. The bid price must include sufficient amount for compliance with all applicable health and safety laws. Must comply with Consolidated Directions on OHS Measures (Disaster Management Act), including appointing a COVID-19 compliance officer.
Environmental
Source: NEC.zip (unknown)Contractor must comply with all applicable environmental laws and regulations, and ensure subcontractors, employees and others under its control do the same.
Contractual Terms
Source: NEC.zip (unknown)Contract: NEC3 ECC (April 2013), main Option B (Priced Contract with bill of quantities), dispute resolution W1, secondary Options X1 (n/a), X2, X5 (n/a), X7, X13, X16, X18, and Z1-Z12. Law: South African. Language: English. Reply period: one week.
Special Conditions
Source: NEC.zip (unknown)Key dates and conditions:
Section
Source: NEC.zip (unknown)Project Manager: Solly Gumede, Email: [email protected], Telephone: +27 11 800 8000. Address: Megawatt Park, Maxwell Drive, Sandton, Johannesburg.
Description
Source: TECHNICAL EVALUATION CRITERIA- DX NERVE CENTRE.xlsx (unknown)Refurbishment of Block A, East Ground Floor between the Atrium and the Northern Façade at Megawatt Park, for use by the Distribution (Dx) Nerve Centre.
Evaluation Criteria
Source: TECHNICAL EVALUATION CRITERIA- DX NERVE CENTRE.xlsx (unknown)Technical/functionality evaluation is pass/fail gate: bidders must score at least 80 out of 100 before financial and B-BBEE proposals are considered.
Scoring split (total 100):
No alterations to technical/functionality proposals allowed after bid deadline. Clarifications may be requested in writing; no interviews.
Compliance Requirements
Source: TECHNICAL EVALUATION CRITERIA- DX NERVE CENTRE.xlsx (unknown)Mandatory key personnel qualifications and registrations:
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Address
Megawatt Park and Various Clusters Nationally - Sunninghill - Sunninghill - 2000
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
5
Last checked
23 Oct 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
Everything South African construction contractors need to know about how procurement officers verify cidb grades: what gauteng contractors must ensure is correct — april 2026 update — covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
How established construction firms use Joint Ventures with EMEs and QSEs to meet B-BBEE preferential procurement targets and access set-aside contracts.
Everything South African construction contractors need to know about cidb grading system explained: what every gauteng contractor must know in 2026 — april 2026 update — covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Everything South African construction contractors need to know about cidb vs nhbrc: understanding dual registration requirements for residential projects in gauteng — april 2026 update — covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
💡 Want more tendering tips and strategies?
Explore Our BlogMedian Estimate
R 560 204
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Get deep intelligence on Construction of buildings. Unlock full pricing strategies, bid frequency, and historical win rates.