Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
2 Megawatt Park Maxwell Drive - Sunninghill - Sandton - 2157
Organization Type
GOVERNMENT
Published
03 Nov 2026
OCDS Reference
ocds-9t57fa-176895
ESKOM requires the supply and delivery of a skid-mounted, fuel (petrol or diesel) driven air compressor delivering 5-7 bar and a minimum of 150 cfm, complete with all connections, 10 m pressure pipes and nozzles, to its rt&d premises. The work is contracted under the nec3 supply short contract (april 2013) with a two-item lump-sum price schedule covering the compressor and its transport and delivery. Bidders must price both items inclusive of all work and VAT at 15%, and should note the contract's zero caps on indirect and consequential loss liability, the 8-week defects period after delivery, and the requirement to carry the specified insurance from the starting date through to the defects date.
Closing: 18 November 2026 at 08:00.
Technical scope: skid-mounted, petrol or diesel driven air compressor delivering 5-7 bar and a minimum of 150 CFM, supplied with all connections, 10 m pressure pipes and nozzles.
Pricing: two lump-sum items - the compressor supply and its transport and delivery to the RT&D premises; rates and prices must cover all work needed to supply each item, and VAT is charged at 15%.
Delivery and defects: delivery is to the Eskom RT&D premises; the defects date is 8 weeks after delivery and the period for correcting defects is 2 weeks after delivery.
Payment and invoicing: amounts are assessed on the 25th of each month, every tax invoice must show Eskom's VAT number 4740101508, and a late tax invoice postpones payment by an equal period.
Insurance and liability: the supplier must hold the Insurance Table A cover from the starting date until delivery and for risks carried through to the defects date, and provide insurer or broker certificates on request; liability for indirect or consequential loss is capped at zero and for damage to Eskom property at R0.00 per event.
B-BBEE and conduct: notify Eskom within 7 days of any change in B-BBEE status and submit an updated verification certificate within 30 days, with a decrease potentially leading to renegotiation or termination; corrupt, fraudulent, collusive, coercive or obstructive action can end the contract without a court finding, and no rights may be ceded or assigned without Eskom's written consent.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Date & Time
Wednesday, 18 November 2026 - 10:00
Venue
https://teams.microsoft.com/meet
Categories
Request for Bid(Open-Tender)
2 Megawatt Park Maxwell Drive - Sunninghill - Sandton - 2157
Recommended Certifications
Having these can improve your winning chances: SABS Product Certification, NRCS Certification
AI Document Analysis Stages
Description
Source: Invitation to Tender (ITT) AIR COMPRESSOR.pdf03 Nov
2026
Tender Published
Tender was published
18 Nov
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Invitation to Tender (ITT) AIR COMPRESSOR.pdf
Eskom Holdings SOC Ltd is procuring the supply of a skid-mounted, fuel (petrol/diesel) driven air compressor that must deliver 5-7 bar and a minimum of 150 CFM. The scope includes all related connections, 10 metres of pressure pipes, and nozzles. The contract will be governed by the NEC conditions, and the successful bidder must be registered on the Central Supplier Database (CSD).
Acknowledgement Form Life-saving Rules.pdf
Supply and delivery of a skid mounted, fuel (petrol/diesel) driven air compressor capable of 5-7 bar and a minimum of 150 CFM, including all relative connections, 10m pressure pipes and nozzles, for Eskom in Gauteng.
37-2 agreement form .pdf
Eskom requires the supply of a skid-mounted, fuel-driven (petrol/diesel) air compressor capable of delivering 5-7 bar and a minimum of 150 CFM, including all connections, 10m pressure pipes, and nozzles. The tender is issued by Eskom in Gauteng, with a closing date of 18 November 2026 at 10:00.
NEC Scope of work Draft compressor SSC.pdf
Eskom Holdings SOC Ltd requires the supply of a skid mounted, fuel (petrol/diesel) driven air compressor capable of delivering 5-7 bar and a minimum of 150 CFM, including all connections, 10 m pressure pipes and nozzles. The contract is based on the NEC3 Supply Short Contract (SSC3) and includes delivery to Eskom RT&D premises.
Technical Evaluation Criteria FOR PURCHASE OF COMPRESSOR.pdf
Supply and delivery of a skid-mounted, fuel-driven (petrol/diesel) air compressor capable of delivering 5-7 bar and a minimum of 150 CFM, including all connections, 10 metres of pressure pipes, and nozzles, for Eskom in Gauteng.
Acknowledgement Form for Eskom SHE Rules and other Requirements.pdf
Eskom requires the supply of a skid-mounted, fuel-driven (petrol/diesel) air compressor capable of delivering 5–7 bar and a minimum of 150 CFM, including all relative connections, 10 metres of pressure pipes, and nozzles. The tender is issued by Eskom in Gauteng, with a closing date of 18 November 2026 at 10:00.
OHS Evaluation.pdf
Eskom requires the supply of a skid-mounted, fuel-driven air compressor capable of delivering 5-7 bar and a minimum of 150 CFM, including all connections, 10m pressure pipes, and nozzles. The tender includes an OHS evaluation with mandatory returnable documents.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
EskomWin Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 435 990
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Procurement: supply of a skid mounted, fuel (petrol/diesel) driven air compressor by Eskom Holdings SOC Ltd.
Technical requirement: compressor must offer 5-7 bar and a minimum of 150 CFM coverage.
Included: all related connections, pressure pipes (10 metres) and nozzles.
Tender type: open Invitation to Tender.
Tender number: E3789CXMWP.
Issue date: 03 November 2026.
Important Dates
Source: Invitation to Tender (ITT) AIR COMPRESSOR.pdf (TENDER)Issue date: 03 November 2026.
Clarification meeting (non-compulsory): 11 November 2026 at 10h00 (SAST), held via Microsoft Teams; tenderers must confirm attendance to the Eskom Representative with the name, position and contact details of each attendee.
Clarification queries: must be submitted five (5) working days before the tender submission deadline.
Closing date and time: 18 November 2026 at 10h00 (SAST).
Tender validity period: 180 days from the closing date and time.
Contact Information
Source: Invitation to Tender (ITT) AIR COMPRESSOR.pdf (TENDER)Eskom Representative
Submission channel
Fraud and corruption reporting
Submission Guidelines
Source: Invitation to Tender (ITT) AIR COMPRESSOR.pdf (TENDER)Submission method: electronic upload only via the Eskom E-tendering site at https://eTendering.eskom.co.za; no hard copies will be accepted.
File format: all documents in PDF; the price list must be submitted in PDF and a copy in Excel format.
Upload limits: maximum 500 megabytes per document; total submission restricted to 4 gigabytes.
No Zip or condensed files may be uploaded.
Folders: upload documents under Technical, Commercial, Financial and other.
Resubmission: if resubmitted, only the latest version is accepted and all previous submissions are null and void.
Submission status must be indicated as complete.
Closing: 18 November 2026 at 10h00 (SAST); late tenders will not be accepted.
Returnable forms required with the tender:
Disqualification risks: late submission; unsigned or omitted mandatory returnables; more than one tender; conflict of interest; signature by a non-authorised person; restriction by National Treasury or Eskom; listing on the Tender Defaulters list; nationality on an international sanctions list; joint venture without joint and several liability; subcontracting 100% of the scope of work.
Evaluation Criteria
Source: Invitation to Tender (ITT) AIR COMPRESSOR.pdf (TENDER)Evaluation stages: functionality or technical evaluation first, then price and specific goals scoring.
Functionality: technical criterion weighted at 100%; minimum threshold 75%; tenderers below the threshold are disqualified.
Price: scored out of 80 points under the 80/20 preferential point system; prices are inclusive of VAT, corrected for arithmetical errors, excluding contingencies, compared using Net Present Value where applicable, with unconditional discounts taken into account and conditional discounts excluded from evaluation.
Specific goals: scored out of 20 points; failure to submit evidence for a specific goal is not disqualification but awards zero points for that goal.
Ranking: tenderers ranked from highest to lowest combined price and specific goals score.
Objective criteria: apply; Eskom may award to a tenderer other than the highest scorer if objective criteria justify it.
Reverse e-auction: not applicable.
Alternative tenders: not allowed.
Contractual requirements, including CSD registration, are assessed after evaluation and ranking; failure to meet them by the stipulated deadline may render the tenderer non-responsive and ineligible for award.
Technical Specifications
Source: Invitation to Tender (ITT) AIR COMPRESSOR.pdf (TENDER)Item: skid mounted, fuel (petrol/diesel) driven air compressor.
Pressure: 5-7 bar.
Capacity: minimum 150 CFM coverage.
Included items: all related connections, pressure pipes (10 metres) and nozzles.
Category: Supplies: General.
Pricing Schedule
Source: Invitation to Tender (ITT) AIR COMPRESSOR.pdfPricing schedule or BOQ: required; completed pricing schedule submitted if not already contained in the NEC or other contract.
Format: PDF and a copy in Excel format.
Upload limits: 500 megabytes per document; total submission restricted to 4 gigabytes.
Price basis: inclusive of VAT.
Cataloguing: if required, the Pricing Schedule must include a line item for cataloguing, which tenderers must quote for; Eskom will pay for cataloguing.
Price scoring: out of 80 points under the 80/20 system.
Reverse e-auction: not applicable.
Financial Requirements
Source: Invitation to Tender (ITT) AIR COMPRESSOR.pdf (TENDER)Pricing format: completed pricing schedule submitted in PDF and a copy in Excel format.
Price basis: prices inclusive of VAT.
Upload limits: 500 megabytes per document; total submission restricted to 4 gigabytes.
Payment terms: for contracts below R50 000 000 including VAT, payment within 30 days of receipt of undisputed invoices; for contracts above R50 000 000 including VAT, payment within 60 days of receipt of undisputed invoices.
Price negotiation: Eskom reserves the right to negotiate with preferred bidders if tendered prices are not market-related.
Cataloguing: the successful tenderer may be required to provide cataloguing information per item after award and label materials per Eskom specifications; a cataloguing line item must be included in the Pricing Schedule and Eskom will pay for it.
Security for performance: not applicable.
Tender validity: 180 days from closing.
Compliance Requirements
Source: Invitation to Tender (ITT) AIR COMPRESSOR.pdf (TENDER)CSD registration: proof of valid and current CSD registration (CSD number or CSD report) is a mandatory contractual requirement.
Tax compliance: SARS e-filing PIN or tax clearance certificate; foreign tenderers with a South African footprint but not on CSD require a certified tax clearance certificate; foreign suppliers with no South African footprint complete SBD 1 only and no tax compliance proof is required.
Employment Equity Act: designated employers (South African tenderers only) must furnish proof of compliance, including submission of the Employment Equity report to the Department of Labour.
B-BBEE or specific goals evidence: B-BBEE status level certificate issued by an authorised body, a sworn affidavit as prescribed by the B-BBEE Codes of Good Practice, or any other prescribed requirement.
COIDA: original certificate of good standing or proof of application from the Compensation Fund or licensed insurer (South African tenderers only).
OHS documents: OHS Acknowledgement Form, 37(2) Eskom Agreement, Acknowledgement Form for Eskom SHE Rules and other Requirements.
CIDB grading: not applicable.
Contract Skills Development Goals: not applicable.
Contract Participation Goals: not applicable.
Local content: SBD 6.2 and Annexures G1 to G4 apply only if designated materials are included.
Health & Safety
Source: Invitation to Tender (ITT) AIR COMPRESSOR.pdfSHEQ requirements may apply as additional contractual requirements.
COIDA: original certificate of good standing or proof of application issued by the Compensation Fund or a licensed compensation insurer (South African tenderers only).
Quality requirements: exempted.
OHS documents forming part of tender evaluation: OHS Acknowledgement Form, Life-saving Rules, 37(2) Eskom Agreement, Acknowledgement Form for Eskom SHE Rules and other Requirements.
Environmental: not applicable.
Due diligence or financial analysis: not applicable.
Contractual Terms
Source: Invitation to Tender (ITT) AIR COMPRESSOR.pdfContract conditions: the NEC conditions of contract apply.
Tender validity: 180 days from the closing date and time.
Alternative tenders: not allowed.
Security for performance: not applicable.
Contract Skills Development Goals: not applicable.
Contract Participation Goals: not applicable.
CIDB requirements: not applicable.
Payment terms: 30 days for contracts below R50 000 000 including VAT; 60 days for contracts above R50 000 000 including VAT, from receipt of undisputed invoices.
Cataloguing: successful tenderer may be required to provide cataloguing information per item after award; Eskom pays for cataloguing.
Post-award returnables may include training plans, interim and completion reports, and supervisor agreements under the Contract Skills Development Goals Standard.
Section
Source: Invitation to Tender (ITT) AIR COMPRESSOR.pdfFunctionality requirements apply; technical criterion weighted at 100% with a minimum threshold of 75%; tenderers below the threshold are disqualified.
Price scored out of 80 points; specific goals scored out of 20 points under the PPPFA 80/20 system.
Failure to submit specific goal evidence is not disqualification but results in zero points for that goal.
Ranking by combined price and specific goals score from highest to lowest.
Objective criteria apply; Eskom may award to other than the highest scorer if justified.
Reverse e-auction not applicable; alternative tenders not allowed.
Contractual requirements assessed after evaluation and ranking.
Evaluation Criteria
Source: Technical Evaluation Criteria FOR PURCHASE OF COMPRESSOR.pdf (unknown)Technical evaluation
Minimum qualifying score
Technical Specifications
Source: Technical Evaluation Criteria FOR PURCHASE OF COMPRESSOR.pdf (unknown)Required equipment
Quality Management
Source: Technical Evaluation Criteria FOR PURCHASE OF COMPRESSOR.pdfQuality management
Evaluation Criteria
Source: Acknowledgement Form Life-saving Rules.pdf (unknown)Bidders must acknowledge and adhere to Eskom's Life-saving Rules. The acknowledgement form (reference 240-63942960 Rev 3) must be signed and dated. Failure to submit the signed form disqualifies the bid.
Compliance Requirements
Source: Acknowledgement Form Life-saving Rules.pdf (unknown)Eskom's Life-saving Rules must be adhered to by all bidder personnel.
Zero tolerance policy applies to rule violations.
Rules apply to all employees, subsidiaries, agents, consultants, contractors and persons entering Eskom sites.
Six mandatory rules: 1) Open, Isolate, test, earth, and create an equipotential zone before touch. 2) Hook up at height. 3) Buckle up. 4) Be sober. 5) Ensure that you have a permit to work. 6) Ensure Safe Live Working. Bidder must ensure compliance by all site personnel. Signed acknowledgement form (240-63942960 Rev 3) must be submitted with bid.
Health & Safety
Source: Acknowledgement Form Life-saving Rules.pdfEskom Life-saving Rules require strict adherence by all personnel.
Zero tolerance policy applies to violations.
Rules apply to all Eskom employees, subsidiaries, agents, consultants, contractors and persons entering Eskom sites.
Six mandatory rules: 1) Open, Isolate, test, earth, and create an equipotential zone before touch. 2) Hook up at height. 3) Buckle up. 4) Be sober. 5) Ensure that you have a permit to work. 6) Ensure Safe Live Working. Bidder must ensure compliance by all personnel. Signed acknowledgement form required.
Submission Guidelines
Source: Acknowledgement Form for Eskom SHE Rules and other Requirements.pdf (unknown)Returnable documents
Technical Specifications
Source: Acknowledgement Form for Eskom SHE Rules and other Requirements.pdf (unknown)Goods to be supplied
Compliance Requirements
Source: Acknowledgement Form for Eskom SHE Rules and other Requirements.pdf (unknown)OHS documents to comply with
Induction and alignment
Penalties
Management of contractors and suppliers
Acknowledgement
Health & Safety
Source: Acknowledgement Form for Eskom SHE Rules and other Requirements.pdfOHS legal and other requirements
Contractual Terms
Source: Acknowledgement Form for Eskom SHE Rules and other Requirements.pdfManagement of contractors and suppliers
Description
Source: OHS Evaluation.pdfProcurement description:
Submission Guidelines
Source: OHS Evaluation.pdf (unknown)Returnable OHS documents required with the bid:
All returnables must be completed, signed and submitted; missing or unsigned documents may lead to disqualification. No submission method, copies, packaging or closing time specified in this document.
Evaluation Criteria
Source: OHS Evaluation.pdf (unknown)OHS compliance is evaluated on a pass/fail basis using the following checklist:
Failure to meet any requirement may result in the bid being disqualified on OHS grounds. No scoring split, minimum qualifying score, or preference point system (80/20 or 90/10) is specified in this document.
Technical Specifications
Source: OHS Evaluation.pdf (unknown)Scope of supply:
Compliance Requirements
Source: OHS Evaluation.pdf (unknown)OHS compliance requirements (mandatory for tender evaluation):
All documents must be submitted with the bid; missing or incomplete returnables may disqualify the bid.
Health & Safety
Source: OHS Evaluation.pdfHealth and safety requirements for the contract:
All documents are mandatory returnables for tender evaluation.
Section
Source: OHS Evaluation.pdfOHS evaluation criteria (pass/fail checklist):
Non-compliance with any item may lead to disqualification.
Important Dates
Source: 37-2 agreement form .pdf (unknown)Closing date: 18 November 2026 at 08:00
Technical Specifications
Source: 37-2 agreement form .pdf (unknown)Skid-mounted construction
Petrol or diesel fuel source
Pressure capability: 5-7 bar
Minimum airflow: 150 CFM
Includes all relative connections
Includes 10-metre pressure pipes
Includes nozzles
Description
Source: NEC Scope of work Draft compressor SSC.pdfGeneral specifications referenced but not detailed in this document. Health and Safety requirements and Environmental requirements are noted as applicable but not specified. Technical specification is the compressor as described in technicalSpecifications.
Contact Information
Source: NEC Scope of work Draft compressor SSC.pdf (unknown)Purchaser: Eskom Holdings SOC Ltd
Address: Megawatt Park, Maxwell Drive, Sandton, Johannesburg
Tel: [not specified]
Fax: [not specified]
Email: [not specified]
NEC3 Contract Documents: Engineering Contract Strategies
Tel: 011 803 3008
Fax: 086 539 1902
Website: www.ecs.co.za
Technical Specifications
Source: NEC Scope of work Draft compressor SSC.pdf (unknown)Scope: Supply of a skid-mounted, fuel (petrol/diesel) driven air compressor.
Performance: 5–7 bar pressure, minimum 150 CFM free air delivery.
Inclusions: All connections, pressure pipes (10 m), and nozzles.
Delivery: To Eskom RT&D premises (exact location to be confirmed).
Health & Safety: Compliance with Eskom’s Health and Safety requirements (referenced, not detailed).
Environmental: Compliance with Eskom’s Environmental requirements (referenced, not detailed).
Subcontracting: No specific controls stated; to be confirmed.
Invoicing: Tax invoice must show supplier name/address, contract number/title, supplier VAT number, purchaser VAT number (4740101508), prices per lump-sum item or rate×quantity, other amounts, deductions, VAT-exclusive/inclusive totals.
Programme: Requirements not specified.
Purchaser-provided services: Not specified.
Supply requirements: Delivery place, access hours, delivery note with actual delivery date; international trade requirements if applicable.
Batch orders: Goods may be instructed via Batch Order referencing Price Schedule items.
Pricing Schedule
Source: NEC Scope of work Draft compressor SSC.pdfPrice Schedule (C2.2) contains two lump-sum items:
Item 1: Supply of skid-mounted, fuel-driven air compressor (5–7 bar, min 150 CFM) with all connections, pressure pipes (10 m), nozzles – Unit: Sum, Quantity: 1.
Item 2: Transport and delivery of equipment to RT&D premises – Unit: Sum, Quantity: 1.
Total of Prices = sum of both items.
Pricing assumptions (C2.1): Rates/prices include all work necessary to supply each item. For lump-sum items, enter amount in Price column only; Unit, Quantity, Rate columns left blank. For rate-based items, enter rate and multiply by quantity to produce Price.
Financial Requirements
Source: NEC Scope of work Draft compressor SSC.pdf (unknown)Pricing format: Two lump-sum items in Price Schedule:
Pricing assumptions: Rates/prices include all work necessary to supply each item; lump-sum items entered in Price column only.
Payment terms: Assessment day is the 25th of each month. Interest on late payment at [●]% per complete week of delay (only if agreed rate < 0.5% per week).
Delay damages: Not applicable unless goods are instructed by Batch Order (then amount appropriate to batch).
Defects: Correction period 2 weeks after Delivery; defects date 8 weeks after Delivery.
Insurance (Supplier): From starting date until Delivery and until defects date for risks carried:
Insurance (Purchaser): Provides Assets All Risk, Contract Works, Environmental Liability, General & Public Liability, Transportation (Marine), Motor Fleet & Mobile Plant, Terrorism, Cyber Liability, Nuclear Material Damage & Business Interruption, Nuclear Material Damage Terrorism – all per policy documents.
Liability limits:
VAT: Supplier must include purchaser’s VAT number 4740101508 on each invoice.
Tax invoice timing: Late submission extends purchaser’s payment date by equal period; interest calculated from delayed date.
Compliance Requirements
Source: NEC Scope of work Draft compressor SSC.pdf (unknown)B-BBEE: Supplier must notify purchaser within 7 days of any change in B-BBEE status (legal status, ownership, business composition). Updated verification certificate and supporting documentation due within 30 days of notification. Decrease in B-BBEE status may trigger renegotiation or termination. Failure to notify is grounds for termination.
Ethics: Prohibited actions (corrupt, fraudulent, collusive, coercive, obstructive) during procurement and execution. Purchaser may terminate for prohibited action without court conviction; supplier must ensure subcontractors cooperate with investigations.
Asbestos: Compliance with Occupational Health and Safety Act Asbestos Regulations (GNR February 2002). OEL 0.2 fibres/ml (4-hour TWA); short-term exposure limit 0.6 fibres/ml (10-minute TWA). Purchaser ensures ambient air meets standards; supplier may request certification. Supplier may perform parallel measurements at own cost. Work stoppage permitted if airborne concentration exceeds action level (0.1 fibres/ml). Asbestos removal/disposal by registered contractor at purchaser’s expense.
Nuclear liability: Purchaser (Koeberg Nuclear Power Station operator) indemnifies supplier against nuclear damage liabilities, except where caused by supplier’s unlawful intent or unauthorised presence on site. Purchaser waives recourse rights subject to same exceptions. Protection lasts until KNPS decommissioning.
Insurance: Supplier must provide certificates of insurance when requested.
Cession/assignment: Supplier may not cede, delegate, or assign rights/obligations without purchaser’s written consent. Purchaser may cede to subsidiaries or restructured entities.
Waiver/estoppel: No extension, concession, or waiver constitutes waiver of rights unless agreed in writing.
Termination additions: Judicial management order triggers termination. Delay damages reaching contract limits allow termination under Reason 3 procedures.
CSD registration, tax clearance, CIDB grading, local content: Not mentioned in this document.
Health & Safety
Source: NEC Scope of work Draft compressor SSC.pdfAsbestos management per Z11: Purchaser ensures ambient air meets South African standards (OEL 0.2 fibres/ml 4-hr TWA, STEL 0.6 fibres/ml 10-min TWA). Measurements by SANAS-accredited AAIA. Supplier may perform parallel measurements at own cost. If asbestos identified, risk assessment and control measures implemented; air monitoring to declare area safe. Supplier personnel may stop work and leave contaminated area until declared safe. Contract dates extended by regulatory notification periods. Asbestos removal/disposal by registered contractor at purchaser expense. Health and Safety requirements referenced in Goods Information but not detailed.
Environmental
Source: NEC Scope of work Draft compressor SSC.pdfEnvironmental requirements referenced in Goods Information but not detailed. Insurance Table B includes Environmental Liability insurance per policy document. Nuclear liability clause (Z10) addresses environmental nuclear damage indemnity. Asbestos management (Z11) includes environmental controls for asbestos-containing materials. No specific environmental performance standards or sustainability requirements stated.
Contractual Terms
Source: NEC Scope of work Draft compressor SSC.pdfContract basis: NEC3 Supply Short Contract (April 2013) with additional Z-clauses.
Contract data: Purchaser is Eskom Holdings SOC Ltd (reg 2002/015527/30). Law of contract: South African law. Period for reply: 2 weeks. Premises: Eskom RT&D. No batch orders required unless instructed. Starting date: signature of contract. Defects date: 8 weeks after Delivery. Assessment day: 25th of each month. Delay damages: N/A (unless batch order). Interest on late payment: [●]% per week (if <0.5% agreed). Supplier liability for indirect/consequential loss: Zero. Supplier liability for property damage: R0.00 per event. Adjudicator: selected from ICE-SA Division panel; if no agreement, appointed by Arbitration Foundation of Southern Africa. Tribunal: arbitration under latest Rules for Conduct of Arbitrations by Association of Arbitrators (Southern Africa). Additional conditions: Z-clauses as below.
Z1 Cession/assignment: Supplier cannot cede without consent; purchaser may cede to subsidiaries/restructured entities.
Z2 B-BBEE status change: Notify within 7 days; submit updated certificate within 30 days; decrease may lead to renegotiation/termination; failure to notify is termination ground.
Z3 Waiver/estoppel: No waiver unless written agreement.
Z4 Tax invoice: Supplier must provide tax invoice per purchaser procedures with VAT number 4740101508; late invoice extends payment date equally; interest from delayed date.
Z5 Purchaser liability limit: Indirect/consequential loss limited to R0.00.
Z6 Termination: Adds judicial management order as termination reason.
Z7 Delay damages limit: If reached, purchaser may terminate under Reason 3 procedures.
Z8 Ethics: Prohibited actions defined; purchaser may terminate for prohibited action; cooperation with investigations required.
Z9 Insurance: Replaces core clause 84. Supplier provides insurances per Table A from starting date to Delivery and until defects date. Purchaser provides insurances per Table B. Certificates on request.
Z10 Nuclear liability: Purchaser indemnifies supplier for nuclear damage at Koeberg NPS; exceptions for unlawful intent/unauthorised presence; waiver of recourse with same exceptions; rights under Nuclear Energy Act section 30(7) reserved; protection until decommissioning.
Z11 Asbestos: Compliance with Asbestos Regulations; OEL 0.2 fibres/ml (4-hr TWA), STEL 0.6 fibres/ml (10-min TWA). Purchaser certifies ambient air on request; supplier may parallel measure. Work stoppage above action level (0.1 fibres/ml). Removal by registered contractor at purchaser expense.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
2 Megawatt Park Maxwell Drive - Sunninghill - Sandton - 2157
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
7
Last checked
04 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Get deep intelligence on Supplies: General. Unlock full pricing strategies, bid frequency, and historical win rates.
Learn how to submit a winning bid with these related articles
Everything South African general contractors need to know about how to write a winning tender proposal without an in-house bid team in gauteng — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Your meticulously crafted General sector tender submission can be disqualified for a single, seemingly minor compliance oversight. The reality for South African contractors is that technical competence is no longer sufficient; it is underpinned by a non-negotiable framework of documentary compliance. This regulatory guide: mastering CSD and BBBEE compliance for general sector tenders in south africa provides a comprehensive, step-by-step breakdown of the mandatory registrations and certificates you must secure and present. We detail the precise requirements for CSD, BBBEE, SARS TCS, CIPC, and COIDA, explaining their function within the procurement ecosystem governed by the PFMA and PPPFA. Learn the actionable steps to prepare your business, avoid the most common disqualifying errors, and leverage technology to streamline your compliance process for successful bidding in 2026 and beyond.
For South African General contractors, the path to government procurement is paved with non-negotiable regulatory requirements. The most common barrier to entry is not a lack of capability, but a failure to master the foundational compliance frameworks that govern every bid. This complete regulatory guide to CSD and BBBEE compliance for General sector tender suppliers in South Africa demystifies the process. It provides a meticulous, step-by-step field manual for ensuring your company is fully compliant and audit-ready, enabling you to confidently access the R billions in opportunities across infrastructure maintenance, facilities management, and service delivery within the General sector.
This definitive guide provides General sector contractors with the precise, actionable steps required to achieve and maintain CSD and BBBEE compliance for South African public tenders in 2026. Authored by Dr. Sarah Mokwena, a Legal Compliance Specialist, it meticulously walks through the regulatory framework, mandatory registrations, and the critical documentation needed to avoid disqualification. We dissect the common, costly errors made during submission and provide a clear checklist to ensure your bid is responsive and competitive. Learn how to navigate the Central Supplier Database, validate your BBBEE status, and integrate compliance into your tender preparation process.
💡 Want more tendering tips and strategies?
Explore Our Blog