ESKOM requires the once-off supply of G3-PLC/GSM data concentrators for its gauteng operating unit in the distribution division. This is a closed tender open only to teap-listed suppliers, with electronic submission via eskom's e-tendering site by 23 october 2026 at 10:00 sast. The award may go to up to five suppliers, with price and b-bbee preference points determining ranking. The most consequential consideration is that bidders must already be teap-listed and their products must integrate with eskom's approved smart metering hes, with interoperability testing required if not already achieved.
Key Requirements
Eligibility: Only TEAP-listed suppliers may bid; this is a closed tender. Bidders must not be under restriction from doing business with Eskom, on National Treasury's restricted list, or on the Tender Defaulters list.
Submission: Electronic only via https://etendering.eskom.co.za/ before 23 October 2026 at 10:00 SAST. No hard copies or zip files; PDF format (price list PDF and/or Excel). Upload limit 500 MB per document, 4 GB total. Ensure submission status is 'complete'.
Mandatory returnables at closing (disqualifiable): Annexure A (Authorisation Form), Annexure D (Integrity Declaration), SBD 4 (Bidders Disclosure), and completed Price Schedule. Missing any disqualifies.
Non-disqualifiable returnables (SBD 1, SBD 6.1, acceptance of terms, E-tendering acknowledgement) may be requested within 5 working days after closing; failure to submit within that period disqualifies.
Functionality: Products must be fully integrated to an approved Eskom smart Metering HES. Submit a commitment letter for comprehensive training on meters and DCs. If the DC is not interoperable with other OEM metering devices, Eskom will procure 5 DCs for testing; supplier has 2 months to achieve interoperability, else Eskom may terminate.
Preference points: B-BBEE status level determines points (80/20 or 90/10 system). Provide valid B-BBEE certificate (SANAS accredited), sworn affidavit, or CIPC certificate for EMEs. Missing evidence means 0 points for specific goals but not disqualification.
CSD registration: Valid CSD number required prior to award. Tax clearance certificate required if not providing SARS e-filing PIN or CSD number. Designated employers must provide Employment Equity compliance proof.
Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
Compliance review. The working summary is checked against South African procurement standards — PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement — so nothing critical is missed before you start your bid response.
DocumentSDL&I REQUIREMENTS.zipReview complete
Description
Source: SDL&I REQUIREMENTS.zip (unknown)
Important Dates
16 Oct
2026
PUBLICATION
Tender Published
Tender was published
23 Oct
2026
DEADLINE
Closing Date
Tender closing date
Procurement Rules & Compliance ContextThis tender may be governed by South African public procurement rules covering fairness, transparency, preferential procurement, anti-corruption, administrative justice and access to information.
10 rules
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Core procurement rules
These rules commonly apply to South African public-sector procurement.
7
Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
high
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Constitution of the Republic of South Africa, 1996 – Section 217
Act 108 of 1996 (s217)
high
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Eskom's Gauteng Distribution Division requires the once-off supply of Interface: Data Concentrator G3-PLC/GSM units, with a contract duration of three years. The tender enforces strict local production and content thresholds, B-BBEE preferences, and Supplier Development and Localisation (SD&L) obligations.
Supply of Interface: Data Concentrator G3-PLC/GSM units to Eskom's Gauteng Distribution Division on a once-off basis. The tender includes mandatory quality requirements under Eskom's Supplier Quality Management specification, with Category 3 quality requirements applying.
Supply and delivery of Interface: Data Concentrator G3-PLC/GSM units for Eskom's Gauteng Distribution Division, on a once-off basis. Bidders must submit their tender documents electronically through Eskom's eTendering system.
Eskom General Conditions of Purchase - 31 May 2024.pdf
Supply and delivery of interface data concentrators (G3-PLC/GSM) to Eskom's Gauteng Distribution Division on a once-off basis, governed by Eskom's General Conditions of Purchase.
Supply and delivery of interface data concentrators (G3-PLC/GSM) for Eskom's Gauteng Distribution Division, on a once-off basis. The tender includes a mandatory environmental evaluation covering policy, risk assessment, roles, training, communication, document control, emergency preparedness, site rehabilitation, non-conformance, waste management, and an environmental management plan.
Annexure K- eTendering Training Acknowledgement Form - 27 January 2025.pdf
Supply and delivery of interface data concentrators (G3-PLC/GSM) to Eskom's Gauteng Distribution Division on a once-off basis. The tender is managed through Eskom's e-Tendering system, and bidders must acknowledge completion of e-Tendering training as a mandatory returnable.
Eskom requires the once-off supply of interface data concentrators (G3-PLC/GSM) for its Gauteng Distribution Division. The tender is issued under a confidentiality agreement that bidders must sign before receiving any confidential information.
Supply and delivery of 10,000 units of Interface: Data Concentrator G3-PLC/GSM to Eskom's Gauteng Distribution Division, on a once-off basis. The procurement is a single-item price schedule with estimated quantities, and bidders must quote a unit price and total price excluding VAT.
Eskom - Standard Conditions of Tender - 30 January 2025.pdf
Eskom requires the once-off supply of interface data concentrators (G3-PLC/GSM) for its Gauteng Distribution Division. The tender is governed by Eskom's Standard Conditions of Tender, which set out the procedural and compliance obligations for bidders.
E3695DXGOU Invitation to Tender - Data Concentrator_ Multiple Sourcing.pdf
Eskom requires the once-off supply of G3-PLC/GSM data concentrators for its Gauteng Distribution Division, with delivery to the Gauteng Operating Unit. The tender is a closed invitation, open only to TEAP-listed suppliers, and will result in a single order placed with one to five successful suppliers.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Similar Tenders
Matched by category & region
Supplier Readiness Hub
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Supplies: GeneralFind supplies: general tenders and contract opportunities in South Africa. Browse active government procurement opportunities updated daily.
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Document read
Compliance review
Bid-ready summary
Supply of interface data concentrator G3-PLC/GSM for the Gauteng Distribution Division on a once-off basis.
The SDL&I requirements document accompanying the bid describes the supply of smart meters for the Gauteng Distribution Division, also on a once-off basis, with a contract duration of three (3) years.
The requirement is known and will result in once-off order placement.
Returnable documents — all must be completed, signed and submitted with the bid:
SBD 6.2 (Declaration Certificate for Local Production and Content): declares the local and imported content of the goods offered; must be signed by the bidder's CFO or another legally responsible person nominated in writing by the CEO. The duty cannot be delegated to an external representative, auditor or third party.
Annexure C, D and E: completed and signed.
Preference Point Claim form: completed and signed.
Valid B-BBEE certificate.
Proof of the SARB exchange rate used, where the bid includes imported content.
Written DTI exemption, where the designated local content thresholds cannot be met; the exemption must be applied for and approved before the bid closes.
Disqualification risks:
Failing to reach the stipulated minimum local content threshold.
Omitting the SBD 6.2 declaration certificate from the bid.
Submitting incorrect or unverifiable local content data.
Evaluation Criteria
Source: SDL&I REQUIREMENTS.zip (unknown)
Preference point system: 90/10 (price 90, B-BBEE 10), applied through Eskom's B-BBEE Evaluation Scorecard.
Two-stage evaluation: stage one tests the stipulated minimum local content threshold; stage two scores price and B-BBEE.
Objective criteria (PPPFA section 2(1)(d–f)):
Transform the industry by appointing small emerging black businesses with 51% black ownership, with further preference for Black Youth Owned and Black People Living with Disability.
Create jobs for previously disadvantaged people.
Award routes:
Appoint a company with 51% black ownership; or
Where a generic firm wins, sub-contract or incubate 20% to an emerging BYO/BPLwD entity (100% shareholding) for supplier development; or
A joint venture in which the lead firm is 51% black owned.
Permitted joint venture structures: black-owned with black-owned; black-owned majority with non-black-owned; black women-owned with black-owned; or black women-owned majority with non-black-owned.
Preference is given to suppliers that are more than 50% black owned and rated B-BBEE Level 1 to 3.
Technical Specifications
Source: SDL&I REQUIREMENTS.zip (unknown)
Scope: supply of interface data concentrator G3-PLC/GSM for the Gauteng Distribution Division on a once-off basis.
The accompanying SDL&I requirements document describes the supply of smart meters for the Gauteng Distribution Division, also on a once-off basis, with a contract duration of three (3) years.
Local content thresholds by commodity:
Smart meters: 50%
Fabricated steel (enclosure and related items): 100%
Cables: 90%
Assembling: 100%
Manufacturing activities that must take place within South Africa: printed circuit board sourcing; PC board circulation; sourcing of connecting cables; sourcing of enclosures; final meter assembly.
Localisation: suppliers must buy all materials, products and services within South Africa; local content to South Africa is set at 100% as no imported skills are expected.
Industrialisation: no requirement, as all resources are sourced locally.
Skills development: the successful supplier must train one candidate for every R3 million cumulated through task orders awarded, for the duration of the contract. Candidates are unemployed graduates from FET colleges and universities and/or matriculants, drawn from previously disadvantaged groups and representative of South Africa's population demographics. Training may be delivered directly, through the supply network, or through SETA-accredited providers.
Skills to be developed (one candidate each): technicians/electricians (undergraduate); smart meter data analyst/capture (undergraduate); project engineer's/manager (undergraduate).
Skills development deliverables: a training programme; signed contracts with the selected candidates; a completion certificate at the end of the project.
Job creation: bidders must propose the number of jobs created and retained as a direct result of the contract, recorded on the SDL&I compliance matrices. Targets: general workers 100% local-to-site; semi-skilled 20%.
Financial Requirements
Source: SDL&I REQUIREMENTS.zip (unknown)
Enterprise development: the main contractor must spend 2% of NPAT and propose development support (business support, equipment and/or finance) to an incubated SME from the designated groups.
Enterprise development programme and agreement: to be drafted within eight weeks of contract award, signed with the beneficiary and submitted to Eskom for review and acceptance.
SDL&I non-compliance: failure to meet contracted SDL&I obligations triggers a 2% penalty at the end of the contract.
Skills development ratio: one training candidate per R3 million cumulated through task orders awarded.
Compliance Requirements
Source: SDL&I REQUIREMENTS.zip (unknown)
B-bbee
A valid B-BBEE certificate is mandatory; Eskom will not contract with a supplier without one.
Preference is given to suppliers that are more than 50% black owned, including Black Woman Owned, Black Youth Owned and Black People Living with Disability.
Preferred B-BBEE rating: Level 1 to 3.
Existing panel members must maintain or improve to Level 1 to 3 for the life of the contract, and those below 51% black ownership must improve their black ownership.
A new certificate must be submitted if ownership changes during the contract.
Bidders that do not meet the preferred rating must submit a migration plan, which becomes a contractual obligation; terms are negotiated before award.
Local content
SBD 6.2 Local Content Declaration Certificate is a mandatory returnable.
Minimum thresholds: smart meters 50%; fabricated steel (enclosure and related items) 100%; cables 90%; assembling 100%.
A bid is disqualified if the threshold is not met or the declaration is not submitted.
Where local sourcing cannot meet the threshold, written DTI exemption must be obtained before the bid closes.
Proof of the SARB exchange rate is required where imported content is declared.
Other returnables: Annexure C, D and E, and the Preference Point Claim form.
SDL&I obligations: suppliers must contribute to B-BBEE, localisation, industrialisation, skills development, job creation and supplier development for the duration of the contract, and report progress quarterly.
Section
Source: SDL&I REQUIREMENTS.zip (unknown)
Preference point system: 90/10, scored on Eskom's B-BBEE Evaluation Scorecard.
Objective criteria applied under PPPFA section 2(1)(d–f): appointing small emerging black businesses with 51% black ownership (further preference to Black Youth Owned and Black People Living with Disability), and job creation for previously disadvantaged people.
Award routes: a 51% black-owned company; or a generic firm sub-contracting or incubating 20% to an emerging BYO/BPLwD entity (100% shareholding); or a joint venture led by a 51% black-owned firm.
Permitted joint venture structures: black-owned with black-owned; black-owned majority with non-black-owned; black women-owned with black-owned; or black women-owned majority with non-black-owned.
Preference is given to suppliers that are more than 50% black owned and rated B-BBEE Level 1 to 3.
Form A (Tender & Contract Quality Requirements, Doc 240-68099512 Rev 9): completed, signed and dated by the bidder's quality representative, with the applicable clauses, category and site-assessment selection marked.
Section A — ISO 9001 certification (Option 1): valid certificate from an approved and authorised certification authority holding recognised international accreditation, with product/service scoping defined and relevant to the scope.
Section B — evidence of a QMS in operation: organisation chart and responsibility matrix covering the quality management function (ISO 9001 clause 5.3); documented control of externally provided processes, products and services with evaluation, selection, monitoring and re-evaluation criteria (clause 8.4); latest internal management system audit report with nonconformity and corrective action reports (clause 9.2); latest certification management system audit report not older than 12 months; records of management review meetings.
Section C — draft Contract/Project Quality Plan specific to the scope of work (ISO 10005).
Section D — draft or example Inspection and Test Plan (ITP) or Quality Control Plan (QCP) for similar or previous work (ISO 10005).
Section E — Form A completed and signed, plus any additional customer-specific requirements per the scope of work.
Evaluation Criteria
Source: QUALITY REQUIREMENTS.zip (unknown)
Quality evaluation of the returnable documents (Category 3, evaluation indicator 1):
Section A — ISO 9001 certification (Option 1): four sub-items scored (product/service scoping, approved certification authority, recognised international accreditation, certificate validity); Section A score 0.
Section B — evidence of QMS in operation: five items scored (roles and responsibilities, control of external providers, internal audit report, certification audit report not older than 12 months, management review records); Section B score 2.
Section C — draft Contract/Project Quality Plan: Section C score 1.
Section D — draft ITP or QCP: Section D score 1.
Section E — Form A signed plus additional requirements: Section E score 2.
Total quality score: 6.
ISO 9001 clauses 4 to 10 and quality principles 1 to 7 are all marked applicable.
Technical Specifications
Source: QUALITY REQUIREMENTS.zip (unknown)
Scope
Supply of Interface: Data Concentrator G3-PLC/GSM for the Gauteng Distribution Division, on a once-off basis.
Enquiry/PR No: 1076310255A.
Specification: 240-105658000.
Quality requirements
Category 3 quality requirements apply; only one category may be selected.
Pre-contract award quality requirements apply (clause 3).
Post-contract award: contract execution, supplier quality performance monitoring, Eskom rights of access, Eskom rights to information, preservation, quality audits, management of nonconformities and nonconforming outputs, and special processes all apply.
ISO 9001 clauses 4 to 10 apply.
Quality principles 1 to 7 apply.
Compliance Requirements
Source: QUALITY REQUIREMENTS.zip (unknown)
Quality management system
Category 3 pre-contract award quality requirements apply.
Bidders must hold a valid ISO 9001 certificate from an approved and authorised certification authority with recognised international accreditation, with product/service scoping defined and relevant; alternatively they must demonstrate a QMS in operation through the Section B evidence.
Form A must be completed, signed and dated by the bidder's quality representative.
A draft Contract/Project Quality Plan and a draft ITP or QCP must be submitted.
Section
Source: QUALITY REQUIREMENTS.zip
Quality deliverables are evaluated under Category 3 (evaluation indicator 1):
Section A — ISO 9001 certification (Option 1): four sub-items; Section A score 0.
Section B — evidence of QMS in operation: five items; Section B score 2.
Section C — draft Contract/Project Quality Plan: score 1.
Section D — draft ITP or QCP: score 1.
Section E — Form A signed plus additional requirements: score 2.
Total quality score: 6.
ISO 9001 clauses 4 to 10 and quality principles 1 to 7 are all marked applicable.
Price Schedule E3695DXGOU: bidders must complete the unit price/rate and the total price excluding VAT against each item listed.
Pricing lines to be completed
Item 1, SAP number 0750636 — Interface: Data Concentrator G3-PLC/GSM, unit of measure: each, estimated quantity: 10 000.
Financial Requirements
Source: PRICE SCHEDULE E3695DXGOU.xlsx (unknown)
Pricing format
Priced on the Price Schedule (E3695DXGOU).
Unit price/rate and total price must be quoted excluding VAT.
Estimated quantity for pricing: 10 000 units of Interface: Data Concentrator G3-PLC/GSM.
DocumentEskom - Standard Conditions of Tender - 30 January 2025.pdfReview complete
Important Dates
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)
Closing date: 23 October 2026 at 10:00 SAST.
Compulsory site visit/clarification meeting: details in Tender Data; attendance mandatory, failure disqualifies.
Contact Information
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)
Enquiries: only to the Eskom Representative identified in the Invitation to Tender.
All communication in writing, English.
Queries published on the advertising platform; no other Eskom official may be contacted.
Submission address: as stated in Tender Data (not provided in this document).
Submission Guidelines
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)
Submission method: paper or e-tender as specified in the Tender Data.
Paper: original plus one complete hard copy, each in separate sealed packages marked "ORIGINAL" and "COPY". Outer package marked "Confidential" with tender number, bidder details.
E-tender: upload and finalise via Eskom Tender Bulletin site; no paper deposit.
Closing time: 23 October 2026 at 10:00 SAST (GMT+2).
Late tenders not accepted; proof of posting not proof of delivery.
Returnables: Acknowledgement Form, completed forms, certificates, and any mandatory documents must be submitted by closing.
All documents must be completed, signed, and valid for the tender validity period.
Tenders must be in English, written in ink.
No alterations except to correct errors, initialled by all signatories; no correction fluid.
If agent submits, authenticated proof of authority required.
Disqualification: missing original or copy, missing mandatory returnables, unsigned tender, late submission.
Evaluation Criteria
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)
Evaluation stages:
Basic compliance: must meet all basic requirements; failure renders tender non-responsive.
Mandatory returnables: all required documents must be present by closing.
Pre-qualification criteria (if any): must comply; no double counting of criteria.
Functionality (if applicable): scored against criteria; must meet minimum threshold stated in Tender Data.
Financial analysis: Eskom assesses financial risk; insufficient mitigation may exclude.
B-BBEE and Specific Goals: scored under 90/10 or 80/20 system; missing proof scores zero but not disqualified (unless pre-qualification).
Ranking: price + specific goals points added, highest ranked.
Arithmetical errors: words prevail over figures; errors corrected per rules; failure to accept corrections rejects tender.
Objective criteria may be used only per PPPFA s2(1)(f), not functionality or B-BBEE.
Reverse e-auction may be used; if so, tender must exclude prices.
Technical Specifications
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)
Supply of interface: data concentrator G3-PLC/GSM for Gauteng Distribution Division, once off.
Scope: supply only, no installation specified.
Quantities and delivery location: not stated in this document; refer to Tender Data.
Cataloguing: successful bidder may need to provide cataloguing info and label materials per Eskom specifications; pricing schedule must include cataloguing line item.
Quality Management
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf
Quality requirements not detailed in this document; refer to Tender Data and SHEQ proof requirements.
Pricing Schedule
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf
Pricing must include all duties, taxes (including VAT), and levies.
Rates and prices fixed for contract duration.
State in South African Rand unless instructed otherwise.
Include cataloguing line item if required.
Arithmetical errors corrected per rules; words prevail over figures.
Financial Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)
Pricing:
Include all duties, taxes (including VAT), and levies in rates and prices.
Rates and prices fixed for contract duration unless otherwise provided.
State in South African Rand unless instructed otherwise.
Prices based on exchange rate and base date in Invitation to Tender.
Security for performance: if required, name at least two financial institutions; Eskom may reject unsuitable ones.
Insurance: Eskom's cover may be insufficient; bidder should seek advice.
No compensation for tender preparation costs.
Compliance Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)
Eligibility:
Must be eligible to do business with Eskom and not under restriction with Eskom or State-Owned Companies.
No 100% sub-contracting of scope.
Comply with NT instructions, CIDB regulations, PPPFA, B-BBEE Codes, COIDA, OHS Act, Eskom SHEQ requirements.
Proof of SHEQ systems, policies, capabilities required at closing or contract award; costs included in tender.
CIDB: if stipulated, registration required at closing or within 21 working days; proof mandatory at closing, actual printout by contract award.
B-BBEE: if pre-qualification, proof (certificate/CSD report) at closing or disqualification; otherwise missing proof scores zero.
SDL&I Undertaking: complete and submit by contract award; otherwise not considered.
Designated materials and thresholds: submit information by contract award.
CSDG and CPG goals apply to certain contracts (12+ months, R5m+, grade 7+).
Misrepresentation or fraud leads to disqualification, suspension up to 10 years, possible jail.
B-BBEE Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)
B-BBEE level scored from CSD report or certificate/affidavit.
If pre-qualification, proof required at closing or disqualification.
If sub-contracting to designated groups, sub-contractor's B-BBEE status and CSD number/certificate required at closing.
Missing or fraudulent proof: not disqualified but scores zero under PPPFA.
Health & Safety
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf
Proof of SHEQ systems, policies, capabilities required at closing or contract award.
All SHEQ costs and personnel must be included in tender.
Comply with OHS Act and Eskom SHEQ requirements.
Contractual Terms
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf
Eskom may cancel tender before contract; no liability for participation losses.
Eskom may negotiate with selected tenderers.
Tender validity: must remain valid for acceptance; extension may be requested; refusal excludes.
Confidentiality: treat all procurement matters as confidential; use documents only for tender.
Contract documents revised to include addenda, returnables, negotiated changes.
Form of Agreement signed by authorised signatories of both parties.
Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf (TENDER)
Eligibility: must not be restricted from doing business with Eskom or SOCs; no 100% sub-contracting.
Submission: original plus one copy, or e-tender; late tenders rejected.
Validity: must remain valid for acceptance; extension may be requested.
Compulsory site visit/clarification meeting: attendance mandatory.
Insurance: seek advice; Eskom cover may be insufficient.
Alterations: only to correct errors, initialled; no correction fluid.
Alternative tenders: only with main tender and if permitted.
Sign Form of Agreement.
Proof of authority for agents.
CIDB registration if applicable.
CSDG and CPG goals for certain contracts.
Misrepresentation leads to disqualification and penalties.
SDL&I Undertaking required by contract award.
Cataloguing information and labelling required.
Security for performance: name at least two financial institutions.
Section
Source: Eskom - Standard Conditions of Tender - 30 January 2025.pdf
Clarification and correction of prices: mandatory returnables cannot be submitted after closing; corrections only for arithmetical errors.
Tender opening: public or electronic; names published.
Prices may be announced if stated.
Non-disclosure until award.
Grounds for rejection: influence, collusion, fraud.
Basic compliance: failure renders non-responsive.
Mandatory returnables: missing leads to disqualification.
Pre-qualification criteria: must comply; no double counting.
Designated materials info by contract award.
Functionality: minimum threshold required.
Financial analysis: risk assessment.
Price evaluation per Tender Data.
Arithmetical errors: corrected per rules.
Specific Goals: missing proof scores zero.
Ranking: price + specific goals.
Objective criteria per PPPFA s2(1)(f).
Reverse e-auction: if used, tender must exclude prices.
Web-based platform through which suppliers upload bid documents for tenders advertised on the Tender Bulletin, replacing physical lodgement at Eskom tender offices.
Access requires supplier registration, with a one-time PIN sent to the registered cellphone number and email address.
A CSD number is needed to use the portal.
Public tender information is viewed on the Tender Bulletin site, which links to the eTendering portal for document upload.
A separate function allows closed tenders, which are not listed publicly, to be sent by email link to selected suppliers who meet the buyer's selection and evaluation criteria, for private bidding.
Portal difficulties are reported to the buyer responsible for the published tender.
Bids are submitted electronically through the Eskom eTendering portal at https://eTendering.eskom.co.za; submission at Eskom tender offices has been replaced by this portal.
A CSD number is required before access to the eTendering portal is granted.
Registration requires verification of both email address and cellphone number; a one-time PIN is sent to each.
Uploaded documents must be filed under the correct category (technical, commercial, finance).
File size limit: 50MB per file; 900MB in total across all uploaded files.
The submission must be finalised and closed on the portal; a confirmation email containing the submission ID is issued and should be retained for later enquiries.
System problems: contact the buyer responsible for the published tender.
A valid CSD number is required to gain access to the Eskom eTendering portal and to submit a bid.
DocumentEskom General Conditions of Purchase - 31 May 2024.pdfReview complete
Quality Management
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)
Inspection and acceptance
Goods, works, services and workmanship are subject to Eskom's approval and may be inspected or tested at any stage.
If Eskom does not notify the supplier of acceptance, the goods, works or services are deemed accepted.
Rejection and non-conformance
Eskom may reject any part of the goods by written notice stating the reason and whether replacement or rework is required.
Rejected goods may be returned to the supplier at the supplier's risk and expense.
Money already paid for goods not replaced within the required time, the cost of returning rejected goods and the cost of sourcing replacements from a third party are payable by the supplier to Eskom.
For works and services, the supplier must correct non-conformances and defects identified by Eskom; if the supplier delays, Eskom may have them corrected by a third party at the supplier's cost.
Pricing Schedule
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)
Pricing basis
Prices or rates for the items in the agreement may include a price adjustment, calculated using the formula stated in the agreement.
Payment may be made in any currency, converted to South African Rand at a single exchange rate, and payment in a currency other than ZAR may not exceed the amounts stated in the agreement.
Delivery cost is deemed included in the price unless the bidder states otherwise in its tender.
Financial Requirements
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)
Payment terms
Eskom pays within 30 days of receiving a correct tax invoice.
Eskom's VAT registration number 4740101508 must appear on the tax invoice before any payment is released.
Payment may be made in a currency other than ZAR, converted at a single exchange rate; payment in a foreign currency may not exceed the amount stated in the agreement.
Prices or rates may include a price adjustment calculated on the formula set out in the agreement.
Eskom's CPA (IG) form must be completed by the supplier.
Costs carried by the supplier
No payment is made for containers or packing materials, or for returning them.
Delivery cost is treated as included in the price unless the bidder states otherwise in its tender.
Late delivery of goods or late completion of works/services may attract a penalty as stated in the agreement.
No payment is made where the supplier fails to provide the goods, services or works as agreed.
Compliance Requirements
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)
Statutory and legal
The supplier must comply with all statutory requirements relevant to the agreement.
The agreement is governed by South African law and the parties submit to the jurisdiction of the South African courts.
Cession, delegation or subcontracting requires the other party's written consent; Eskom may cede and delegate to its subsidiaries or divisions on written notice.
Forms and acceptance
Eskom's CPA (IG) form must be completed by the supplier.
Eskom's General Conditions of Purchase are deemed accepted unless the bidder records non-acceptance in writing in its bid; no oral variation is valid and conflicting supplier terms are excluded unless Eskom agrees in writing.
Contractual Terms
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)
Contract basis
The order is concluded on Eskom's General Conditions of Purchase (Doc 240-59385009 Rev 3, effective 31 May 2024, review May 2029).
These conditions are deemed accepted unless the bidder objects in writing in its bid; no oral variation is valid and conflicting supplier terms are excluded unless Eskom agrees in writing.
Delivery and documents
Delivery means goods delivered or work completed at the point specified in the agreement on or before the agreed date; late delivery or late completion may attract a penalty.
Each consignment must be marked on the outside with the supplier's name and full destination details and must include a packing note listing the contents.
An advice note stating the means of transport, weight or volume, and the point and date of dispatch must be sent to Eskom at the delivery address.
A detailed tax invoice must be sent after delivery or completion, and the agreement number must appear on all communications.
Delivery cost is deemed included in the price unless the bidder tenders it separately.
Acceptance, risk and ownership
Eskom may inspect and test the goods, works, services and workmanship at any stage; if Eskom does not notify the supplier of acceptance, the goods, works or services are deemed accepted.
Risk passes to Eskom on proof of delivery to the correct destination and acceptance; ownership passes on payment or as otherwise stated in the agreement.
Rejection and defects
Eskom may reject goods by written notice stating the reason and whether replacement or rework is required; rejected goods may be returned at the supplier's risk and expense.
Money paid for goods not replaced in time, the cost of returning rejected goods and the cost of obtaining replacements from a third party are recoverable from the supplier.
Non-conformances or defects in works or services must be corrected by the supplier; if the supplier delays, Eskom may have the work corrected by a third party at the supplier's cost.
Liability and warranty
The supplier indemnifies Eskom against all actions, claims, demands, costs and expenses arising from its negligence, infringement of intellectual or legal rights, breach of statutory duty, or defective design, materials or workmanship, including those of its subcontractors, agents or servants.
Goods, works and services must be fit for their intended purpose and free from defects for one year from acceptance unless otherwise stated; defects must be rectified free of charge within an agreed period.
Termination and breach
Either party may terminate after a breach that is not remedied following written notice from the non-defaulting party.
Eskom may terminate at any time if the supplier defaults, becomes bankrupt, or is in financial circumstances that in Eskom's opinion prejudice proper performance.
Ethics
Eskom expects the highest standard of ethical behaviour from its suppliers.
The Gauteng Operating Unit requires an environmental scope of works for the specification covering the once-off supply of interface: data concentrator G3-PLC/GSM for the Gauteng Distribution Division.
Contact Information
Source: ENVIRONMENTAL REQUIREMENTS.zip (unknown)
Document contacts
Compiled by: Ivy Sibiya
Authorised by: Shamaine Thulasaie
Evaluation Criteria
Source: ENVIRONMENTAL REQUIREMENTS.zip (unknown)
Environmental evaluation
Environmental criteria carry 50% of the total evaluation weight.
Environmental management policy accounts for 100% of the environmental criteria weight, split equally at 33.3% each across three sub-items:
Company environmental policy, whether integrated with safety or standalone.
Policy commitment to compliance with all relevant environmental legislation, pollution prevention and continual improvement.
Policy signed off by a senior company member (MD/CEO).
Further environmental items assessed: environmental aspects identified, environmental roles and responsibilities, competence and training, communication, document control, emergency preparedness, site rehabilitation method statement, non-conformity and corrective action, waste management, and the Environmental Management Plan.
Each item is scored with a weighted score and a pass rate; evaluation is run in two rounds, with the first and second round evaluators recording date and signature.
Technical Specifications
Source: ENVIRONMENTAL REQUIREMENTS.zip (unknown)
Procurement
Once-off supply of interface: data concentrator G3-PLC/GSM for the Gauteng Distribution Division.
Environmental scope of works applies to the Gauteng Operating Unit specification.
Template review dates: 01/10/2029 for the final criteria and 09/02/2026 for the criteria guidelines.
Compliance Requirements
Source: ENVIRONMENTAL REQUIREMENTS.zip (unknown)
Environmental management system
Compliance with ISO 14001:2015 is required; certification is not required from suppliers.
Environmental policy must be signed off by the MD/CEO and must commit to compliance with all relevant environmental legislation, pollution prevention and continual improvement.
Environmental risk assessment register, identified environmental controls and compliance obligations must be documented.
Signed appointment letters setting out environmental roles and responsibilities.
Evidence of environmental law training, or an environmentally related certificate, diploma or degree.
Environmental communication plan, controlled documentation, emergency response procedures (bees, wildlife interaction, hydrocarbon spills), non-conformance and corrective action procedure, waste management plan, and a site rehabilitation method statement covering water courses, wetlands, slopes and road reserves.
Environmental Management Plan must address access control, landowner liaison, monitoring, environmental incident log, site establishment, sanitation, protection of water resources, storm water management, vegetation management, fencing, stockpiling, erosion, hazardous substances management, heritage resources, protection of fauna, noise control, dust and waste management.
DocumentAnnexure K- eTendering Training Acknowledgement Form - 27 January 2025.pdfReview complete
Submission Guidelines
Source: Annexure K- eTendering Training Acknowledgement Form - 27 January 2025.pdf (unknown)
Returnable document
E-Tendering Training Acknowledgement Form (Annexure K): a mandatory returnable for e-tendering. It must be completed in full, signed by an authorised signatory and submitted to Eskom within the prescribed period.
Consequence of non-submission: the bid is treated as non-responsive and the bidder is disqualified from the procurement process.
Information the form requires: business name or joint venture, contact person, landline, cellphone and email address.
The signatory confirms that self-training on Eskom's e-Tendering solution has been completed through the Noddy Guide, the training video or a clarification meeting, and that the bidder is able to operate the e-Tendering solution.
Returnable Documents
Source: Annexure K- eTendering Training Acknowledgement Form - 27 January 2025.pdf (unknown)
Mandatory returnable
E-Tendering Training Acknowledgement Form (Annexure K): must be completed in full, signed and submitted to Eskom within the prescribed period.
The form captures the bidder's business name or joint venture, contact person, landline, cellphone and email address.
The signatory confirms completion of e-Tendering self-training via the Noddy Guide, video or clarification meeting and confirms the ability to operate the e-Tendering solution.
Failure to complete the form fully and return it in time renders the bid non-responsive and disqualifies the bidder.
Evaluation Criteria
Source: Annexure K- eTendering Training Acknowledgement Form - 27 January 2025.pdf (unknown)
Responsiveness gate
A fully completed E-Tendering Training Acknowledgement Form is a mandatory condition of responsiveness. A bid submitted without it is disqualified.
No price, functionality or preference point scoring is set out in this annexure.
Compliance Requirements
Source: Annexure K- eTendering Training Acknowledgement Form - 27 January 2025.pdf (unknown)
Mandatory returnable
E-Tendering Training Acknowledgement Form (Annexure K): must be fully completed and signed; the bidder confirms it has completed e-Tendering self-training and can operate Eskom's e-Tendering solution. Failure to submit it within the prescribed period disqualifies the bid.
No CSD registration, tax compliance, B-BBEE or CIDB requirements are set out in this annexure.
DocumentAnnexure M Non-Disclosure Agreement (NDA).pdfReview complete
Description
Source: Annexure M Non-Disclosure Agreement (NDA).pdf (unknown)
The annexure is a confidentiality agreement between Eskom Holdings SOC Ltd (disclosing party) and the supplier or tenderer (receiving party).
Project title recorded in the agreement: installation of smart meters to reduce the number of customers affected by load reduction, for a period of one year on an as-and-when required basis.
The agreement governs how Eskom's confidential information may be handled during tender discussions and any resulting project.
Contact Information
Source: Annexure M Non-Disclosure Agreement (NDA).pdf (unknown)
Eskom domicilium address for notices under the NDA
Megawatt Park
Maxwell Drive
Sunninghill Ext 3
Sandton
Postal address
PO Box 1091
Johannesburg
2000
Submission Guidelines
Source: Annexure M Non-Disclosure Agreement (NDA).pdf (unknown)
Returnable document
Annexure M (Non-Disclosure Agreement): must be completed, signed by a duly authorised representative of the bidder and witnessed, and submitted with the bid.
No submission method, submission address, closing time or other returnable document is set out in this annexure.
Returnable Documents
Source: Annexure M Non-Disclosure Agreement (NDA).pdf (unknown)
Annexure M — Non-Disclosure Agreement (NDA)
To be signed by a duly authorised representative of the bidder and witnessed, and submitted with the bid.
Binds the bidder to keep Eskom's confidential information secret, to use it only for the project, and to return or destroy it on request.
Compliance Requirements
Source: Annexure M Non-Disclosure Agreement (NDA).pdf (unknown)
Non-Disclosure Agreement (Annexure M)
Signing the agreement is a precondition to receiving Eskom's confidential information.
The bidder must be a registered legal entity, with its registered address and registration number recorded in the agreement.
The signatory must be duly authorised to bind the bidder; the signature must be witnessed.
Contractual Terms
Source: Annexure M Non-Disclosure Agreement (NDA).pdf (unknown)
Confidential information
Covers all technical, commercial, financial, marketing, operational and technical specification material disclosed by Eskom in written, graphic, electronic or oral form, whether or not marked confidential.
May be shared only with the bidder's own employees, officers, directors, advisers, affiliates and shareholders on a need-to-know basis for the project, and only if those persons are bound to the same confidentiality terms.
May not be disclosed to any third party or used for any purpose other than the project without Eskom's prior written consent.
Must be protected with at least the same care the bidder applies to its own confidential information, and never less than a reasonable standard of care.
Ownership stays with Eskom; no licence or ownership right passes to the bidder.
Exclusions
Information already known to the bidder, publicly available without breach, independently developed, received from a third party without breach, disclosed with Eskom's written authorisation, or disclosed to satisfy a court order or law (with notice to Eskom and disclosure limited to what is legally required).
Return or destruction
On Eskom's request, material containing confidential information must be returned, or destroyed and permanently erased from all systems, within 7 business days.
A written statement confirming destruction, signed by a director or duly authorised senior officer, must be provided.
Breach and indemnity
The bidder indemnifies Eskom against all losses, claims, damages and costs arising from unauthorised use or disclosure.
If a breach is not remedied within 7 business days of written notice, Eskom may pursue all legal remedies, including urgent court proceedings and damages.
Term and general
The agreement starts on the signature date and continues for 3 years after the relationship between the parties ends.
It does not oblige either party to continue negotiations or to enter into any further business relationship, and creates no partnership, joint venture or employment relationship.
Amendments and waivers are valid only if in writing and signed by both parties.
Neither party may assign its rights without the other's prior written consent, but Eskom may cede its rights to its subsidiaries or divisions.
No public announcement may be made without the other party's prior written consent.
Governed by South African law.
Notices
Each party chooses a domicilium address for service; a change requires 30 business days' prior written notice.
Notices are deemed received on delivery if hand-delivered, on the 7th business day after registered post, or on receipt if sent by fax.
DocumentE3695DXGOU Invitation to Tender - Data Concentrator_ Multiple Sourcing.pdfReview complete
Description
Source: E3695DXGOU Invitation to Tender - Data Concentrator_ Multiple Sourcing.pdf (TENDER)
Eskom Holdings SOC Ltd invites tenders for the Supply of Data Concentrators for the Gauteng Operating Unit within the Distribution Division on a once-off basis. The requirement is known and will result in once-off order placement. Tender number E3695DXGOU, issue date 16 October 2026, closing date 23 October 2026 at 10h00 SAST, validity period 120 days. Clarification meeting not applicable – TEAP Listed Suppliers. Tenders must be submitted electronically via Eskom E-tendering site.
Important Dates
Source: E3695DXGOU Invitation to Tender - Data Concentrator_ Multiple Sourcing.pdf (TENDER)
Closing date: 23 October 2026 at 10:00 SAST
Tender validity: 120 days from closing date
Clarification queries deadline: 3 working days before tender closing
Clarification meeting: Not applicable (TEAP Listed Suppliers)
Contact Information
Source: E3695DXGOU Invitation to Tender - Data Concentrator_ Multiple Sourcing.pdf (TENDER)
Source: E3695DXGOU Invitation to Tender - Data Concentrator_ Multiple Sourcing.pdf (TENDER)
Submission method: electronic only via Eskom E-tendering site (https://etendering.eskom.co.za/). No hard copies, no zip files. Documents must be PDF (price list PDF and/or Excel). Upload size: 500 MB per document, 4 GB total. If resubmitted, latest version prevails; ensure submission status is 'complete'. Tenders must be submitted by closing date and time; late tenders not accepted.
Returnable forms (all must be completed, signed and submitted):
Annexure A (Authorisation Form): authorises the signatory to bind the bidder; certified resolution/power of attorney required.
Annexure B (Acknowledgement Form): acknowledges receipt and understanding of tender documents.
Annexure C (Tenderer's Particulars): bidder details.
Annexure D (Integrity Declaration Form): declares adherence to the Supplier Integrity Pact.
SBD 1 (Invitation to Bid): bidder and contact details, signed as offer cover page.
SBD 4 (Bidders Disclosure): discloses any state employment or connection to Eskom officials.
SBD 6.2 (Declaration for Local Production and Content) with Annexures G1-G4: only if designated materials are included.
E-tendering Help Manual acknowledgement form.
Completed Price Schedule (PDF and/or Excel; PDF version prevails if differences).
Disqualification risks:
Missing any disqualifiable returnable (Annexure A, Annexure D, SBD 4, Price Schedule) at closing.
Non-disqualifiable returnables (SBD 1, SBD 6.1, acceptance of terms, E-tendering acknowledgement) may be requested within 5 working days; failure to submit within that period disqualifies.
Tenders signed by non-authorised persons.
Submitting more than one tender (except as JV partner with joint and several liability).
Conflict of interest, being on National Treasury restriction or Tender Defaulters list.
Subcontracting 100% of the scope.
Evaluation Criteria
Source: E3695DXGOU Invitation to Tender - Data Concentrator_ Multiple Sourcing.pdf (TENDER)
Evaluation stages:
Basic compliance: meet eligibility criteria and submit complete tender.
Functionality: not evaluated (TEAP Listed suppliers already deemed technically acceptable), but must meet three functionality requirements (see technical specifications).
Price: scored out of 90/80 points depending on line items and total value. Prices evaluated inclusive of VAT, corrected for arithmetical errors, excluding contingencies, adjusted for variations, NPV comparison, unconditional discounts considered, conditional discounts not considered for evaluation.
Specific goals (B-BBEE): scored out of 10/20 points per PPPFA.
Preference point system:
90/10 for tenders above R50 million; 80/20 for R50 million or below.
Add price and specific goals scores; rank highest to lowest.
Award to minimum 1 and maximum 5 suppliers.
Option 1: negotiate standardised rates with top 5; if achieved, equal split award.
Option 2: if no standardised rates, pro rata allocation with highest ranked receiving highest percentage.
Minimum qualifying score: not stated.
Technical Specifications
Source: E3695DXGOU Invitation to Tender - Data Concentrator_ Multiple Sourcing.pdf (TENDER)
Scope: Supply of Data Concentrators (G3-PLC/GSM) for the Gauteng Operating Unit, Distribution Division, on a once-off basis. Once-off order placement.
Functionality requirements (mandatory for TEAP Listed suppliers):
Products must be fully integrated to one of the approved Eskom smart Metering HES.
Submit a commitment letter to provide comprehensive training on meters and DCs.
If the Data Concentrator (DC) is not interoperable with metering devices from other OEMs, Eskom will procure 5 DCs from the supplier for integration testing; supplier has 2 months to achieve interoperability; failure may lead to termination of agreement.
Methodology
Source: E3695DXGOU Invitation to Tender - Data Concentrator_ Multiple Sourcing.pdf (TENDER)
No specific methodology or execution plan required beyond the functionality requirements for TEAP Listed suppliers.
Quality Management
Source: E3695DXGOU Invitation to Tender - Data Concentrator_ Multiple Sourcing.pdf (TENDER)
Quality requirements are listed as additional requirements that may be included if applicable. No specific quality standards or certifications stated beyond the functionality requirements.
Pricing Schedule
Source: E3695DXGOU Invitation to Tender - Data Concentrator_ Multiple Sourcing.pdf (TENDER)
Price Schedule must be submitted in PDF and/or Excel format. PDF version prevails if differences. Prices inclusive of VAT. Award split: Option 1 - negotiate standardised rates with top 5, equal split; Option 2 - pro rata allocation with highest ranked receiving highest percentage.
Financial Requirements
Source: E3695DXGOU Invitation to Tender - Data Concentrator_ Multiple Sourcing.pdf (TENDER)
Payment terms:
Contracts below R50 million (incl. VAT): payment within 30 days of receipt of undisputed invoices.
Contracts above R50 million (incl. VAT): payment within 60 days.
Security:
Performance Bond may be required.
Parent Company Guarantee (PCG) or Performance Bond from bank, on Eskom Legal approved templates.
Financial evaluation:
Latest 2 years comparative financial statements required, including PIS score, signed auditors/reviewers report, directors report, statement of financial position, comprehensive income, changes in equity, cash flows, notes.
For close corporations: signed accounting officers report, members report, similar statements.
For JVs: signed JV agreement with percentage shareholding.
For new entities (<1 year): owner's 5-year tax returns and financial position.
If subsidiary uses holding company financials, signed guarantee letter required.
If no holding company or bank cannot provide bond, owners must provide 5 years tax returns and personal financial position.
Mitigating factors for unfavourable financial viability: performance bond, parent company guarantee, reduced contract, or milestone payments.
Compliance Requirements
Source: E3695DXGOU Invitation to Tender - Data Concentrator_ Multiple Sourcing.pdf (TENDER)
Eligibility:
Must be TEAP Listed supplier (closed tender).
Must not be under restriction to do business with Eskom or State-Owned Companies.
Must not have nationality of a country on international sanctions list.
Must not be restricted by National Treasury or on Tender Defaulters list.
Must not have conflict of interest.
Must not subcontract 100% of scope.
Mandatory prior to award:
Valid CSD registration (CSD number).
Tax compliance:
Certified tax clearance certificate required from foreign tenderers with SA footprint not on CSD, and local tenderers not providing SARS e-filing PIN.
Foreign suppliers with no SA footprint: no proof of tax compliance required.
Employment Equity:
Designated employers must provide proof of compliance with Employment Equity Act, including submission of EE report to Department of Labour.
B-BBEE evidence:
Valid B-BBEE certificate (SANAS accredited), sworn affidavit, or CIPC certificate for EMEs.
Supporting documents may be requested: proof of ownership/shareholding, ID copies, proof of disability.
Quality and environmental:
Approved Environmental Policy required.
Financial statements as per financial requirements.
Environmental
Source: E3695DXGOU Invitation to Tender - Data Concentrator_ Multiple Sourcing.pdf (TENDER)
Environmental requirement: Approved Environmental Policy must be submitted.
Contractual Terms
Source: E3695DXGOU Invitation to Tender - Data Concentrator_ Multiple Sourcing.pdf (TENDER)
Eskom's Conditions of Purchase apply. Performance Bond may be required. NIPP (National Industrial Participation Programme) applies to contracts with foreign content of USD 5 million or more; winning bidder must sign NIPP obligation agreement with dtic before contract signing. Payment terms: 30 days for contracts below R50 million, 60 days for above. Eskom reserves right to negotiate with preferred bidders if prices not market-related. Main contractors discouraged from subcontracting with subsidiaries; must declare if doing so.
Special Conditions
Source: E3695DXGOU Invitation to Tender - Data Concentrator_ Multiple Sourcing.pdf (TENDER)
Special conditions: This is a closed tender. Tenderers must submit in parts: Part One - Commercial Requirements, Part Two - Price, Part Three - Quality Contractual Requirements, Part Four - Environmental Contractual Requirements, Part Five - Financial Requirements. Alternative tenders not allowed. No public opening of tenders; prices not read out. Tender validity 120 days. Clarification queries must be submitted 3 working days before deadline. Submission via E-tendering only, no hard copies, no zip files, PDF format (price list PDF and/or Excel), upload size limits (500MB per document, 4GB total). If resubmitted, latest version prevails.
Requirements
Source: E3695DXGOU Invitation to Tender - Data Concentrator_ Multiple Sourcing.pdf (TENDER)
Eligibility criteria: Tenderers must not be under restriction to do business with Eskom or State-Owned Companies. Ineligible if: (1) nationality of a country on international sanctions list; (2) submitting more than one tender individually or as JV partner (except where E-tendering size limits apply); (3) JV/consortium agreement does not state joint and several liability; (4) conflict of interest (e.g., common controlling partner, access to another tenderer's information); (5) tenders signed by non-authorised persons; (6) restricted by National Treasury; (7) on Tender Defaulters list; (8) subcontracting 100% of scope. Eskom will disqualify tenderers not meeting eligibility criteria.
Section
Source: E3695DXGOU Invitation to Tender - Data Concentrator_ Multiple Sourcing.pdf (TENDER)
Evaluation: Prices evaluated inclusive of VAT, corrected for arithmetical errors, excluding contingencies, adjusted for variations, NPV comparison, unconditional discounts considered, conditional discounts not considered for evaluation. Prices scored out of 90/80 points depending on line items and total value. Specific goals scored out of 10/20 points per PPPFA. 90/10 system for tenders above R50 million, 80/20 for R50 million or below. Ranking: add price and specific goals scores, rank highest to lowest. Award to minimum 1 and maximum 5 suppliers. Option 1: negotiate standardised rates with top 5, equal split award. Option 2: if no standardised rates, pro rata allocation with highest ranked receiving highest percentage. B-BBEE points table: Level 1 = 10/20, Level 2 = 9/18, Level 3 = 6/14, Level 4 = 5/12, Level 5 = 4/8, Level 6 = 3/6, Level 7 = 2/4, Level 8 = 1/2, Non-compliant = 0. Documents required to claim preference points: valid B-BBEE certificate (SANAS accredited, sworn affidavit, or CIPC for EMEs), proof of ownership/shareholding, ID copies, proof of disability where applicable. Failure to provide documentation results in 0 points for specific goals but not disqualification.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.