Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Jetty's Street,Port of Port Elizabeth - Port Elizabeth - Port Elizabeth - 6001
Organization Type
GOVERNMENT
Published
13 Aug 2026
OCDS Reference
ocds-9t57fa-165554
TRANSNET soc ltd is seeking a service provider to provide scaffolding services at port of port elizabeth and ngqura container terminals on an as and when required basis for a period of thirty-six months. The successful bidder must have a CIDB contractor grading designation of 3sl or higher and meet the specified eligibility criteria.
Bidders must have a CIDB contractor grading designation of 3SL or higher.
Bidders must submit a valid tax clearance certificate and a B-BBEE certificate.
Bidders must have a minimum functionality score of 70 to be considered for further evaluation.
Bidders must comply with the Construction Industry Development Regulations and the Preferential Procurement Regulations.
Bidders must register on the National Treasury's Central Supplier Database.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Friday, 28 August 2026 - 16:00
Venue
Port Elizabeth Terminal, SCM Boardroom, NRE Garage, Greet Street
Categories
Request for Bid(Open-Tender)
Jetty's Street,Port of Port Elizabeth - Port Elizabeth - Port Elizabeth - 6001
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
Description
13 Aug
2026
Tender Published
Tender was published
28 Aug
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Provision for the Scaffolding Services for a period of 36 months (CIDB Project).zip
Transnet Port Terminals is procuring scaffolding services for a period of thirty-six months at Port of Port Elizabeth and Ngqura Container Terminals. The services are required on an as and when needed basis.
To download these documents and access AI-powered analysis, visit the main tender page.
Secure Transnet tenders using AI Matching & Recommendations, logistics infrastructure intelligence, compliance analysis, and application support for rail, ports, and pipelines.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Median Estimate
R 3 138 708
Range
Based on 16 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Provision of scaffolding services for TRANSNET soc ltd
(Registration NO.1990/000900/30) operating as TRANSNET port terminals (hereinafter referred
To as “tpt”) at port of port elizabeth and ngqura container terminals on an as and when
Required basis for a period of thirty-six (36)
Months___________________________________________________________________
Of the works: provision of scaffolding services for TRANSNET soc ltd
(Registration NO 1990/000900/30) operating as TRANSNET port terminals
(Hereinafter referredto as “tpt”) at port of port elizabeth and ngqura
Provision of scaffolding services for Transnet SOC Ltd (Registration no. 1990/000900/30) operating as Transnet Port Terminals
(hereinafter referred to as “TPT”) at Port of Port Elizabeth and Ngqura Container Terminals on an as and when required basis for
a period of thirty-six (36) months.
Returnable Document used for
Scoring
Key Personnel Team SCORING
Provision of scaffolding services for Transnet SOC Ltd (Registration no. 1990/000900/30) operating as Transnet Port Terminals
(hereinafter referred to as “TPT”) at Port of Port Elizabeth and Ngqura Container Terminals on an as and when required basis for
a period of thirty-six (36) months.
Returnable Document used for
Scoring
Track record SCORING Return
Provision of scaffolding services for Transnet SOC Ltd (Registration no. 1990/000900/30) operating as Transnet Port Terminals
(hereinafter referred to as “TPT”) at Port of Port Elizabeth and Ngqura Container Terminals on an as and when required basis for
a period of thirty-six (36) months.
Returnable Document used for
Scoring
Scaffolding Team
Work
Of the works: the refurbishment of substation 102 at the port elizabeth
OF THE WORKS: Provision of Scaffolding Services for Transnet Soc Ltd (Registration No 1990/000900/30)
Construction
Industry Development Regulations, for a 3SL CIDB Grading or Higher class of
construction work
Of the works: provision of scaffolding services for TRANSNET soc ltd
(Registration NO. 1990/000900/30) operating as TRANSNET port terminals (hereinafter referred
OF THE WORKS: Provision of Scaffolding Services for Transnet Soc Ltd (Registration No 1990/000900/30)
Date of next review: 01/03 2010
Details contents
Title Page
of 14
of 14
Table of Contents
Introduction....................................................................................................................... 1
Definitions ........................................................................................................................ 1
Applicable Documents..................................................................................................... 2
3.1 General..................................................................................................................... 2
3.2 Statutory Regulations ............................................................................................... 2
3.3 Codes and Standards............................................................................................... 2
4.1 General..................................................................................................................... 3
4.2 Supplier/Contractor Quality System Requirements .................................................. 3
4.3 Supplier/Contractor Documentation Requirements.................................................. 3
5.1 Project Quality Plan .................................................................................................. 3
5.2 Procedures .............................................................................................................. 4
5.2.1 Document Control .......................................................................................... 4
5.2.2 Design Control ............................................................................................... 5
5.2.3 Procurement................................................................................................... 5
5.3 Supplier/Contractor Audits........................................................................................ 5
5.4 Transnet Port Terminals Audit.................................................................................. 5
6.1 General..................................................................................................................... 5
6.2 Quality Control Plans ............................................................................................... 6
6.3 Inspection Points ...................................................................................................... 6
6.4 Revision to Quality Control Plans ............................................................................ 6
6.5 Kick Off Meeting ....................................................................................................... 7
6.6 Schedule of Inspection ............................................................................................. 7
6.7 Field Inspection Checklists....................................................................................... 7
6.8 Inspection Notification ............................................................................................. 7
6.9 Inspection and Testing ............................................................................................. 7
6.10 Inspection Release................................................................................................... 8
6.11 Special Processes .................................................................................................... 8
6.12 Welding Procedures................................................................................................. 8
6.13 Material Traceability ................................................................................................. 9
6.14 Material Certification ................................................................................................ 9
7.1 General..................................................................................................................... 10
7.2 Corrective and Preventative Action .......................................................................... 10
8.1 Concession Requests .............................................................................................. 10
8.2 Technical Queries..................................................................................................... 10
9.1 Calibration ............................................................................................................... 11
9.2 Use of Inspection, Measuring and Test Equipment.................................................. 11
9.3 Verification of Previous Test Results........................................................................ 11
Annexure A - Sample Quality Control Plan ............................................................................ 13
Annexure B – Request for Concession .................................................................................. 13
of 14
This Specification outlines the minimum requirements to ensure that products and services
supplied to Transnet Port Terminals are manufactured, provided, constructed or installed in
accordance with all specified requirements as defined in the Contract, all associated specifications,
drawings, codes and standards.
Term, Abbreviation Meaning
Data All drawings/documents/data/information and DP's required to be
supplied under the Contract
Data Pack (DP) A compilation of manufacturing data, certification, inspection and
testing records prepared by the Supplier/Contractor to verify
compliance with the Contractual requirements.
Employer For the purposes of this document, the term Employer has the same
meaning as applied to the term Client.
Field Inspection Checklist A document that details the checks, requirements and test
(FIC) parameters for each type of equipment to permit field installation and
pre- commissioning of the equipment.
TPT Transnet Port Terminals is the Employer's Nominated Agent in terms
of the Conditions of Contract.
Inspection Release Report A document issued to the Supplier/Contractor by TPT advising
(IRR) release of the Materials for shipment. This does not relieve the
Supplier/Contractor of its obligations in accordance with the Terms
and Conditions of the Contract.
Inspection Waiver Report A document issued to the Supplier/Contractor by TPT advising that
(IWR) TPT has waived final inspection for the materials listed in this
document. The issue of this Report does not preclude further
inspection by TPT, is issued without prejudice and does not relieve
the Supplier/ Contractor from the guarantees and obligations included
in the Contract/ Contract.
A document prepared by the Supplier/Contractor providing relevant
information applicable to the installation and maintenance of the
specific equipment, including consumables (eg. oils etc)
Project Quality Plan (PQP) A document that outlines the Supplier/Contractor's strategy,
methodology, resources allocation, Quality Assurance and Quality
Control coordination activities to ensure that Goods and Services
supplied meet or exceed the requirements defined in the Contract,
drawings, codes and standards.
Quality Control Plan (QCP* A document outlining specific manufacturing / construction inspection
and testing requirements, including responsibilities, test acceptance
criteria, nomination of witness and hold points.
For the purposes of this document, the term Supplier/Contractor has
the same meaning as applied to the term Sub-Supplier/Sub-
Contractor
Supplier/Contractor This refers to the documentation required to be submitted by the
relevant Supplier / Contractor in terms of the Contract.
Supplier/Contractor Data These requirements are generally tailored to suit the particular Scope
Requirements of Work, although it also addresses the manner in which the
documentation is required to be submitted, eg Hard copy, Electronic
copy etc
Technical Query Note This refers to a document used by the Supplier/Contractor to formally
(TQN) clarify a Technical Query related to the scope of supply. This should
not be used where a non-conformance has already been initiated.
of 14
3.1 General
All work performed shall comply with the requirements of this Specification, the documentation
referenced in the Contract and the latest revision/edition of the relevant Codes and Standards
referenced herein.
3.2 Statutory Regulations
Occupational Health & Safety Act, Act No 85, of 1993 and Regulations as amended.
3.3 Codes and Standards
Document No. Title
ISO 9001 International Standard Series Quality Systems
EEAM-Q-013 Punch Listing Standard
4.1 General
The Supplier/Contractor shall be responsible for all quality activities necessary to ensure the Work
meets the requirements specified in the Contract, and shall manage and coordinate all Quality
aspects of Work in accordance with the requirements of this Specification, and the
Supplier/Contractor's PQP and QCP's once reviewed and approved by TPT.
The Supplier/Contractor shall ensure that all Sub-Suppliers/Sub-Contractors also conform with the
requirements of this Specification.
4.2 Supplier/Contractor Quality System Requirements
The Supplier/Contractor shall have, maintain and demonstrate its use to TPT, it's documented
Quality Management System. The Supplier/Contractors Quality Management System should be in
accordance with the International Standard ISO 9001.
The Supplier/Contractor shall submit its Quality System documentation to TPT at the time of tender
and at Contract Phases as detailed below:
Project Quality Plan
Quality Policy
Index of Procedures to be used
Programme of internal and external audits
4.3 Supplier/Contractor Documentation Requirements
The Supplier/Contractor shall develop and maintain a comprehensive register of documents that will
be generated throughout the project, and shall include all quality related documents. The register
shall be submitted to TPT for review.
TPT shall indicate those documents required to be submitted for information/review and/or
acceptance and this shall be indicated in the Supplier/Contractors' Document Register. The register
shall indicate the dates of issue of the documents taking into account sufficient time to allow TPT
review/acceptance cycle prior to the document being required for use.
of 14
Appointments and training
provision made for Trained First Aiders?
8.3 Are employees trained on the emergency plan/procedure and business continuity plan?
9.1 Are you able to demonstrate that work
Construction Work ~ Department Of Labour (If
Applicable)
4 Appointments
5 Induction: Employees And Visitors: Staff Medical Certificates
6 Principal Contractor’s SHEQ Policy
7 Health & Safety Plan, Integrated Legal Register, Client Specification.
8 Fall Protection Plan (If Applicable)
9 Risk Assessments: Method Statements: Safe Operating Procedures
10 i
provisions of the regulation of the harbours of
the Republic of South Africa and such other relevant regulations as may be published from time to time.
Entry conditions: general rules:
. No firearm or ammunition permitted 1. Personal protective clothing must be worn at all times.
. No drugs &/or alcohol permitted 2. Obey speed limit (30 KPH) & all traff
Of the works: provision of scaffolding services for TRANSNET soc ltd
(Registration NO 1990/000900/30) operating as TRANSNET port terminals (hereinafter
Provision of scaffolding services for Transnet SOC Ltd (Registration no. 1990/000900/30) operating as Transnet Port Terminals (hereinafter referred to
as “TPT”) at Port of Port Elizabeth and Ngqura Container Terminals on an as and when required basis for a period of thirty-six (36) months.
Evaluation Returnable
Description Scoring principal Criteria Wei
of the Affected Property and its surroundings
1.1. General description
of the service ....................................................................................................... 5
1.1 Executive overview ............................................................................................................ 5
1.2 Employers Objective ......................................................................................................... 5
1.3 Employer’s requirements for the service ........................................................................... 5
1.4 The Contractor shall provide the following types of scaffold: ............................................ 7
1.5 Tests and inspections before and during the Provision of the Service as per Service
Information .................................................................................................................................. 7
2 list of reference specifications ............................................................................... 7
3 Management strategy and start up ......................................................................................... 8
3.1 Management Meetings ....................................................................
of the Service: Provision of Scaffolding Services for Transnet SOC Ltd (registration no.
1990/000900/30) operating as Transnet Port Terminals (hereinafter referred to as “TPT”) at Port of Port
Elizabeth and Ngqura Container Terminals on an as and when required basis for a period of thirty-six
(36) months.
Part c2: pricing data
TSC3 Option A
Construction Industry
Z5: Contract Hedging
Z6: Anti-Corruption Warranty
Z7: TPT Indemnity
Z8: Right Reserved by the Employer to Conduct
Vetting through SSA
Z9: Protection of Personal Information Act
Z10: Additional obligations in respect of
Termination
Z11: Obligations in respect of Subcontracting
10.1 The Employer is: Transnet SOC Ltd
CPM 2020 Rev 02 Part C1
C1.2: Contract Data provided by the Employer
TRANSNET port terminals
Tender number: iclm pe 802/TPT
Provision of scaffolding services
Of the works: provision of scaffolding services for TRANSNET soc ltd (registration
NO. 1990/000900/30) operating as TRANSNET port terminals (hereinafter referred to as “tpt”) at port
Of the works: provision of scaffolding services for TRANSNET soc ltd
(Registration NO. 1990/000900/30) operating as TRANSNET port terminals (hereinafter referred
Of the works:provision of scaffolding services for TRANSNET soc ltd
(Registration NO. 1990/000900/30) operating as TRANSNET port terminals (hereinafter referred
Of the works: provision of scaffolding services for TRANSNET soc ltd
(Registration NO. 1990/000900/30) operating as TRANSNET port terminals (hereinafter
Of the works: provision of scaffolding services for TRANSNET soc ltd
(Registration NO. 1990/000900/30) operating as TRANSNET port terminals (hereinafter referred
Of the works: description: for the rental of 500kva mobile generators for TRANSNET soc ltd (reg NO.
1990/000900/30) operating as TRANSNET port terminals (hereinafter referred as “tpt”) for ngqura container
Of the works: provision of scaffolding services for TRANSNET soc ltd (registration
NO.1990/000900/30) operating as TRANSNET port terminals (hereinafter referred to as “tpt”) at
Of the works: provision of scaffolding services for TRANSNET soc ltd
(Registration NO. 1990/000900/30) operating as TRANSNET port terminals (hereinafter referred
Provision of scaffolding services for TRANSNET soc ltd
(Registration NO. 1990/000900/30) operating as TRANSNET port terminals (hereinafter referred
To as “tpt”) at port of port elizabeth and ngqura container terminals on an as and when
Required basis for a period of thirty-six (36) months.
T2.2-11: Schedule of Proposed Subcontractors
The tenderer is required to provide details of all the sub-contractors that will be utilised in the
execution of the works
Of the works: provision of scaffolding services for TRANSNET soc ltd
(Registration NO.1990/000900/30) operating as TRANSNET port terminals (hereinafter referred
Of the works: provision of scaffolding services for TRANSNET soc ltd
(Registration NO.1990/000900/30) operating as TRANSNET port terminals (hereinafter referred
Important Dates
Source: Provision for the Scaffolding Services for a period of 36 months (CIDB Project).zip (unknown){"closingDate":"28 August 2026","closingTime":"16:00pm","briefingSession":"{"date":"21 August 2026","time":"11:00am","venue":"Port of Port Elizabeth, SCM Boardroom, NRE Garage, Jetty's Street, Port Elizabeth","is_compulsory":false}"}
Contact Information
Source: Provision for the Scaffolding Services for a period of 36 months (CIDB Project).zip (unknown){"name":"Ayanda Zokwana","email":"[email protected]","phone":"041 - 507 2092","department":"Commodity Specialist"}
Submission Guidelines
Source: Provision for the Scaffolding Services for a period of 36 months (CIDB Project).zip (unknown)Bidders must submit their tenders electronically through the Transnet e-Tender Submission Portal. The portal can be accessed at https://transnetetenders.azurewebsites.net. Bidders are required to register their information and log their intent to respond to bids before uploading their bid proposals. The closing time for submission of tender offers is 16:00pm on 28 August 2026. No late tenders will be accepted.
Evaluation Criteria
Source: Provision for the Scaffolding Services for a period of 36 months (CIDB Project).zip (unknown)The evaluation criteria include functionality, price, and specific goals. Functionality will be scored out of 100, with a minimum qualifying score of 70. Price will be scored out of 80, and specific goals will be scored out of 20. The evaluation criteria also include the bidder's B-BBEE level, with a minimum level of 4 required.
Technical Specifications
Source: Provision for the Scaffolding Services for a period of 36 months (CIDB Project).zip (unknown)The technical specifications include the provision of scaffolding services for Transnet Soc Ltd (Registration no. 1990/000900/30) operating as Transnet Port Terminals (hereinafter referred to as "TPT") at Port of Port Elizabeth and Ngqura Container Terminals on an as and when required basis for a period of thirty-six (36) months.
Financial Requirements
Source: Provision for the Scaffolding Services for a period of 36 months (CIDB Project).zip (unknown)The financial requirements include a valid tax clearance certificate and a B-BBEE certificate. The payment terms are specified in the contract, with payment to be made within 30 days of receipt of a valid invoice.
Compliance Requirements
Source: Provision for the Scaffolding Services for a period of 36 months (CIDB Project).zip (unknown)The compliance requirements include registration with the CIDB, a valid CIDB grading designation of 3SL or higher, and a valid B-BBEE certificate. The bidder must also comply with the Construction Industry Development Regulations and the Preferential Procurement Regulations.
Section
Source: Provision for the Scaffolding Services for a period of 36 months (CIDB Project).zipThe evaluation criteria include functionality, price, and specific goals. Functionality will be scored out of 100, with a minimum qualifying score of 70. Price will be scored out of 80, and specific goals will be scored out of 20.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Address
Level 200, Carlton Centre, 150 Commissioner St, Cbd, Johannesburg, 2001, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
1
Last checked
13 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
subsidiary of Transnet
Contact
031-361-8589[email protected]www.transnet.netLevel 200, Carlton Centre, 150 Commissioner St, Cbd, Johannesburg, 2001, South Africa