Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Issuing Organization
Parliament of the Republic of South AfricaLocation
Western Cape
Closing Date
28 Sept 2026
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
90 Plein Street - Cape Town - Cape Town - 8001
Organization Type
GOVERNMENT
Published
08 Sept 2026
OCDS Reference
ocds-9t57fa-169388
Date & Time
Monday, 28 September 2026 - 12:00
Venue
null
Late submissions will not be considered.
Categories
Request for Bid(Open-Tender)
90 Plein Street - Cape Town - Cape Town - 8001
08 Sept
2026
Tender Published
Tender was published
28 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Bid Doc - B3-2026 - Supply and Delivery of Four (4) HPE Servers to Parliament of RSA.pdf
Continue with tenders sharing this issuer, category, or province.
Median Estimate
R 1 069 481
Range
Based on 14 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: IITPSA Membership, ISO 27001 (Information Security Management), ISO 20000 (IT Service Management), CISSP
AI Document Analysis Stages
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Important Dates
Source: Bid Doc - B3-2026 - Supply and Delivery of Four (4) HPE Servers to Parliament of RSA.pdf (TENDER){"closingDate":"04 September 2026","closingTime":"12H00","briefingSession":"{"date":"28 September 2026","time":"12H00","venue":"e & Time 28 September 2026 at 12H00","is_compulsory":true}"}
Contact Information
Source: Bid Doc - B3-2026 - Supply and Delivery of Four (4) HPE Servers to Parliament of RSA.pdf (TENDER){"name":"Mr N Ntanjana","email":"[email protected]","phone":null,"department":null,"address":"al extension after the above days, Parliament will request approval from"}
Submission Guidelines
Source: Bid Doc - B3-2026 - Supply and Delivery of Four (4) HPE Servers to Parliament of RSA.pdf (TENDER)9.1. Prospective bidders may submit their questions to [email protected] or contact the
person assigned to deal with enquiries on the advertisement for this bid.
9.2. Parliament may request bidders to provide additional pricing information to be utilised for
comparative purposes during evaluations.
9.3. Parliament reserves the right to invite shortlisted bidders to make presentations to its evaluation
team.
9.4. Parliament may request a site visit prior to awarding the bid.
9.5. The successful bidder/s must enter into a formal service level agreement with Parliament upon
appointment and must go through a security clearance process.
9.6. The successful bidder must sign confidentiality or non-disclosure agreement.
9.7. Parliament reserves the right to re-appoint or extend the service of the service provider where there
is a natural continuation of assignments.
9.8. Parliament reserves the right not to award this bid in total or part thereof.
9.9. Parliament reserves the right to award this bid to one or more bidders.
9.10. Price adjustments will only be considered if there are statutory requirements and/or unforeseen
circumstances (e.g. natural disasters, etc.).
9.11. Copyright on all materials designed and developed remains property of Parliament.
9.12. Upon arrival in the DR Site, the assigned team must adhere to all Health & Safety protocols.
9.13. Parliament will bear the costs of software licensing directly with the software vendors.
9.14. Parliament will manage all Operating Systems and software patching and maintenance.
23 initial__________
NB: The quantities and products listed below are an indication/basis of the requirements. Bidders
may add or remove and replace items in the list below.
10.1 Servers
Qty Product # Product Description
4 P73282-B21 HPE ProLiant Compute DL380 Gen12 SFF NC Configure-to-order Server
4 P73282-B21 B19 HPE DL380 Gen12 SFF NC CTO Svr
8 P74570-B21 Intel Xeon 6527P 3.0GHz 24-core 255W Processor for HPE
8 P74570-B21 0D1 Factory Integrated
64 P69728-B21 HPE 64GB (1x64GB) Dual Rank x4 DDR5-6400 CAS-52-52-52 EC8 Registered Smart Memory Kit
64 P69728-B21 0D1 Factory Integrated
4 P75740-B21 HPE ProLiant Compute DL3XX Gen12 8SFF x1 U.3 Tri-Mode Drive Cage Kit
4 P75740-B21 0D1 Factory Integrated
4 S4S01A HPE SN1620E 32Gb 2p FC SecureHBA
4 S4S01A 0D1 Factory Integrated
4 P01366-B21 HPE 96W Smart Storage Lithium-ion Battery with 145mm Cable Kit
4 P01366-B21 0D1 Factory Integrated
4 P48918-B21 HPE ProLiant DL360 Gen11 Storage Controller Enablement Cable Kit
4 P48918-B21 0D1 Factory Integrated
4 P47781-B21 HPE MR416i-o Gen11 x16 Lanes 8GB Cache OCP SPDM Storage Controller
4 P47781-B21 0D1 Factory Integrated
4 P10097-B21 Broadcom BCM57416 Ethernet 10Gb 2-port BASE-T OCP3 Adapter for HPE
4 P10097-B21 0D1 Factory Integrated
8 P44712-B21 HPE 1800W-2200W Flex Slot Titanium Hot Plug Power Supply Kit
8 P44712-B21 0D1 Factory Integrated
8 P78145-B21 HPE C13 - C14 250V 10Amp 2m FIO Power Cord
4 BD505A HPE iLO Advanced 1-server License with 3yr Support on iLO Licensed Features
4 BD505A 0D1 Factory Integrated
4 S1A05A HPE Compute Cloud Management Server FIO Enablement
4 P72203-B21 HPE ProLiant Compute DL3XX/ML350 Gen12 CPU1 to Rear OCP SlotB x8 Cable Kit
4 P72203-B21 0D1 Factory Integrated
4 P76452-B21 HPE ProLiant Compute DL380 Gen12 8SFF/2SFF UMB OROC Cable Kit
4 P76452-B21 0D1 Factory Integrated
4 P48820-B21 HPE ProLiant DL380/DL560 Gen11 2U High Performance Fan Kit
4 P48820-B21 0D1 Factory Integrated
4 P50400-B21 HPE Gen11 2U Bezel Kit
4 P50400-B21 0D1 Factory Integrated
4 P52341-B21 HPE ProLiant DL3XX Gen11 Easy Install Rail 3 Kit
4 P52341-B21 0D1 Factory Integrated
4 P73325-B21 HPE ProLiant Compute Localization FIO Kit
4 P74755-B21 HPE ProLiant Compute DL380 Gen12 NS204i-u Rear Boot Device Enablement Kit
24 initial__________
4 P74755-B21 0D1 Factory Integrated
8 P74792-B21 HPE ProLiant Compute DL380 Gen12 Performance Heat Sink Kit
8 P74792-B21 0D1 Factory Integrated
4 P78279-B21 HPE NS204i-u v2 480GB NVMe Hot Plug Boot Optimized Storage Device
4 P78279-B21 0D1 Factory Integrated
4 P79552-B21 HPE ProLiant Compute 30C System Inlet Ambient Operating Temperature Configuration Tracking
4 R7A12AAE HPE Compute Ops Management Standard 5-year Upfront ProLiant SaaS
1 HA114A1 HPE Installation and Startup Service
4 HA114A1 5A6 HPE Proliant DL/ML Startup SVC
1 HU4A6A5 HPE 5Y Tech Care Essential Service
4 HU4A6A5 R2M HPE iLO Advanced Non Blade Support
4 HU4A6A50C4V HPE DL380 Gen12 Support
25 initial__________
Annexure e: contractual obligations
Conditions and Procedures to be complied with as part of the Contract with Parliament.
All persons employed by the Contractor working within the premises of Parliament shall
comply with the Regulations of the Occupational Health and Safety Act, Act No. as amended.
The Contractor shall designate, in writing, one of his full time employees in terms of the
provisions of General Safety Regulations or Section 8 of the Occupational Health and
Safety Act who shall be in charge of work on site.
The above designation shall be made before work commences on site. The appointed
person, for inspection purposes, shall hold one copy on site and a duplicate copy shall
be handed to NDPW / WSP employee in charge of that particular project.
The Contractor shall instruct his authorised site representative to report to the NDPW /
WSP employee who is in charge of the project.
The Contractor shall submit a list of all portable electrical tools and equipment to security
before permission is granted to enter or leave the premises. Vehicles will be subjected
to a search before entry and when leaving the premises.
Contractors are not permitted to stay on the premises after their shift has been completed.
The Safety, Health and Environmental Manager (hereinafter the Safety Manager) must
authorise any work, which could affect or interfere with normal activities of Parliament.
All excavation work must be railed off or barricaded, debris or material, which cannot be
removed immediately, must be placed in such manner as to allow adequate and safe
passage.
The Safety Manager will authorise areas where rubble and other material may be stored.
The Contractor will stay confined to the area of his work.
26 initial__________
Evaluation Criteria
Source: Bid Doc - B3-2026 - Supply and Delivery of Four (4) HPE Servers to Parliament of RSA.pdf (TENDER)Submission of bids
on or before the closing date and time. No faxed copies will be accepted.
Time frames
indicated.
Parliament.
Ownership of Proposals
the property of Parliament.
to the RFB will be the sole responsibility of the service provider.
6 initial__________
Preferential Point System
a) the 80/20 system for requirements with a Rand value of up to R50 000 000 (all
applicable taxes included); and
b) the 90/10 system for requirements with a Rand value above R50 000 000 (all
applicable taxes included).
included) and therefore the 80/20 system shall be applicable.
23.1 Preference points applicable for this bid will be 80/20. Points will be awarded for:
(a) Price 80
(b) Specific HDI and/or RDP Goals 20
Calculation of points for HDI and/or RDP Goals
Bidders must complete column 3 to indicate the points they are claiming.
Points will only be awarded to a bidder who has claimed points and who has supplied
the supporting documents as listed in the table below:
Specific goals: Number Points Bidders must supply the
of claimed following documents when
points: by the claiming preference points:
Bidder
HDI goals
Black 6 ID Document/CSD Report
Women 4 ID Document/CSD Report
People with disabilities 3 Medical Certificate/CSD Report
Rdp goals
Youth 4 ID Document/CSD Report
SMMEs 3 Annual Turnover/CSD Report
HDI – Historically Disadvantaged Individual as defined in Parliament’s Preferential
Procurement Policy.
RDP – Reconstruction and Development Programme as defined in the Government Gazzette
Notice No. .
7 initial__________
Discounts
24 When calculating comparative prices, Parliament will take into account any discounts
which have been offered unconditionally.
25 A discount which has been offered conditionally will be implemented when payment
is effected despite not being taken into account for evaluation purposes.
Bid Declaration
26 Only a bidder who has completed and signed the declaration part of the tender
documentation will be considered for preference points.
Visits / Meetings / Inspection
27 As part of the adjudication process Parliament may request certain providers to
organize a visit to an existing facility under the management of the service provider
to gain an understanding of the provider’s service standards.
28 Parliament may require presentations or meetings with bidders, at the cost of bidders,
as part of the evaluation process to provide further information, submission of
substantiating documentation or clarification to Parliament as deemed necessary.
Award of Bid
29 The award of this Bid by the Secretary to Parliament shall constitute a binding
contract, and such acceptance may be by letter, email or facsimile message.
30 The Secretary to Parliament may award this Bid to more than one successful Bidder,
either in full or in part.
31 Parliament reserves the right not to award this contract.
32 Service Level Agreements, where applicable, will be concluded with the successful
service provider.
Subcontracting
33 A person awarded a contract may not sub-contract any part of the contract after an
award has been made. Bidders must indicate upfront their intention to sub-contract
and submit the sub-contractors relevant documentation.
Other
34 Parliament may amend or cancel this Bid before the award should Parliament deem
it necessary.
8 initial__________
Security and occupancy
35 Security
All the areas covered by this contract fall within areas defined in the relevant Security
and Access Acts as “Restricted Areas” and all of the provisions of these Acts will
apply to this contract.
All buildings involved in this contract are subject to stringent access control for all personnel
and for materials delivered to and removed from the site. In addition, all workmen and staff
on site or in any way involved in this contract are subject to prior security clearance.
Bidders will be required to submit a list of the minimum sufficient persons required affecting
the work on site plus those directly involved on site with this contract. If any person is
rejected for security reasons Bidder will be required to replace them on their list. If the Bidder
is ultimately unable to offer personnel with satisfactory security clearance his Bid may be
rejected on such grounds.
Any person rejected by the SAPS for failing to meet the security requirements, inclusive of
security clearance, wandering away from an escort or from the immediate contract area, or
any misconduct on the site will immediately, without any recourse by the Contractor, be
removed from site and refused re-entry to site. This refusal to site shall be in addition to any
legal action the SAPS may institute.
Successful Bidder will be required to hand in to the Department within Forty-Eight (48) hours
after being requested, following formal acceptance of the Bid, the following information:
staff.
Position in firm plus service to be performed.
Intended areas they will be working in.
A copy of Identification Document, certified as a true copy of the original by the SAPS. –
Such document shall be the original certified copy.
The Bidder are recommended to have such documentation, both for their own staff and for
their Sub-contractors, if applicable, available prior to the closing date of Bids so as to
minimise delays in security clearance of personnel once the Bid is awarded.
Any time lost due to delays in submitting the called for list of personnel required entering
site, the rejection of personnel on the list, or the subsequent removal and banning from site
of personnel will not be accepted as motivation for extension of the contract period.
Such clearance for this project shall remain valid for a period not exceeding 12 months and
shall only apply for this project.
9 initial__________
In addition, the Oath of Secrecy form attached to this Bid document shall be fully completed
and every person having necessity to observe or work with any part of documentation
relating to this project is it on or off site.
Legible copies of the Oath of Secrecy document may be made. (will be provided to the
successful bidder)
36 Safeguarding of documents
This project has been classified by the authorities as “Confidential”. As such, all
specifications and drawings must be kept in a safe place at all times, and under no
circumstances may they be shown or distributed to parties not directly concerned with the
project.
All documents will be individually numbered on issue and records kept as to what documents
have been issued to whom.
It will be the responsibility of the service provider to ensure that drawings do not get issued
to unauthorized persons, that all superseded drawings are kept in a secure place until they
have been destroyed, and that current drawings are kept in a safe and secure environment.
All documents issued to sub-contractors or suppliers must be signed for, and such sub-
contractors and suppliers must also accept responsibility for the safeguarding of such
documents while they are in their possession.
All documentation shall be strictly handled as set out in the NIA Minimum Information
Security Standards (MISS), a copy of which shall be provided to the successful contractor
at the time of site hand over.
It will be the main contractor's responsibility to familiarise themselves with the MISS
document and make sure his personnel and sub-contractors are advised accordingly.
Bidders must maintain strict confidentiality relating to all information provided by Parliament,
Members of Parliament and Parliament officials in line with the provisions of the Protection
of Personal Information Act, 2013 (Act ).
10 initial__________
37 General Conditions of Contract (GCC)
a) Parliament cannot award contracts to provide goods or services to a Member of
Parliament or Cabinet, a Member of a Provincial Legislature or Member of a
Provincial Executive Council, a municipal councillor, a person in the employ of the
state whose participation in bidding for the contract may result in a conflict of interest,
or any entity in which any of the mentioned persons is a Director or has controlling or
other substantial interest.
b) Where a joint venture / partnership submits an offer for this bid, a joint venture /
partnership agreement must be attached, which specifies the names of the
companies that have formed the joint venture / partnership, the name of the joint
venture / partnership. Companies that are members of the joint venture / partnership
will be individually required to comply with tax compliance requirements by the South
African Revenue Services (SARS).
c) Parliament reserves the right, for purposes of promoting the values of
competitiveness and fairness, not to award the bid to the highest scoring bidder, if
such bidder has been awarded a bid by Parliament or has performed services for
Parliament during the last twelve (12) months prior to the closing date of the bid.
d) In terms of Section 4(1) of the Competition Act No., as amended, an
agreement between, or concerted practice by, firms, or a decision by an association
of firms, is prohibited if it is between parties in a horizontal relationship and if a
bidder(s) is/are or a contractor/s was/were involved in:
i.Directly or indirectly fixing a purchase or selling price or any other trading condition,
ii.Dividing markets by allocating customers, suppliers, territories or specific types of
goods or services, or
iii.Collusive bidding.
Please visit www.parliament.gov.za for detailed document.
11 initial__________
Annexure c: tax clearance requirements
IT is a condition of bidding that –
have been made with the Receiver of Revenue to meet his/her tax obligations (Proof
from SARS must be submitted).
Clearance Certificate in order not to invalidate the bid. “Refer to “Bid
Compliance Checklist”.
to the award of a bid, Parliament must be in possession of an original tax clearance
certificate, or tax pin number submitted by the bidder.
submit a separate Tax Clearance Certificate or tax pin number.
12 initial__________
Supply and delivery of four (4) hpe
Servers to parliament of RSA
Request for Bids (RFB)
The bid evaluation process consists of three (3) stages, according to the nature of the bid. A bid
must qualify for each state to be eligible to proceed to the next stage of evaluation. The stages are:
Table 1: Evaluation stages:
Applicable for this
Stage Description
RFB (yes/no)
Stage 1 Administrative requirements YES
Stage 2 Mandatory requirements YES
Stage 3 Price and preference points YES
6.1 Administrative requirements (stage 1):
Compliance with administrative requirements as stated in the standard bidding documents and the
mandatory requirements listed in this section. In this evaluation stage, all bidders who fail to provide
the required information and documentation will be disqualified from further evaluation.
6.2 Mandatory requirements (stage 2):
Compliance with the mandatory requirements listed in this section. In this evaluation stage, all
bidders who fail to provide the required information and documentation will be disqualified from
further evaluation.
6.2.1 Instruction and evaluation criteria:
6.2.1.1 Bidders must comply with ALL the requirements as per the mandatory requirements below by
providing substantiating evidence in the form of documentation or information, failing which it
will be regarded as “NOT COMPLIANT”.
6.2.1.2 Bidders must provide a unique reference number (e.g. binder/folio, chapter, section, page) to
locate substantiating evidence in the bid response.
6.2.1.3 Bidders must comply with ALL the technical mandatory requirements in order for the bid
response to proceed to the next stage of the evaluation.
17 initial__________
6.2.2 Mandatory requirements:
Description: Substantiating evidence of Evidence reference (to be
compliance (used to evaluate completed by bidder):
RFB):
1.1. Bidders must be an accredited Submission of valid proof of HPE Provide unique reference to
partner of Hewlett Packard certification. locate substantiating
Enterprise at a minimum level evidence in the bid
of:
Current proof of certification
must be provided.
2.1. Bidders must have experience Submission of at least one (1) Provide unique reference to
in implementing infrastructure positive testimonial from a client locate substantiating
in a data centre within South where similar project(s) were evidence in the bid
Africa. undertaken. response.
6.3 Price and preference points evaluation (stage 3):
6.3.1 Costing and pricing conditions:
6.3.1.1 South African Pricing - The total price must be VAT inclusive and be quoted in South African
Rand (ZAR).
6.3.1.2 Total price:
(a) All quoted prices are the total price for the entire scope of required services and deliverables to
be provided by the bidder.
(b) All additional costs as well as cost of delivery, labour, S&T, overtime, etc. must be included in
this RFB.
(c) All services, accessories, upgrades and options required by the solution or specified by the client
must be included in the quoted price. If not included, suppliers will be required to supply these
accessories at no cost to the client.
(d) Parliament reserves the right to negotiate pricing with the successful bidder prior to the award
as well as envisaged quantities.
18 initial__________
6.3.1.3 These conditions will form part of the Contract between Parliament and the bidder. However,
Parliament reserves the right to include or waive the condition in the Contract.
6.3.1.4 The bidder must complete the declaration of acceptance as per par 6.3.2 below by marking with
an “X” either “ACCEPT ALL”, or “DO NOT ACCEPT ALL”, failing which the declaration will be
regarded as “DO NOT ACCEPT ALL” and the bid will be disqualified.
6.3.2 Declaration of acceptance:
Accept all do not accept
All
Pricing conditions as specified in par 6.3.1 above by
indicating with an “X” in the “ACCEPT ALL” column, or
and Pricing Conditions as specified in par 6.3.1 above by
(a) Indicating with an “X” in the “DO NOT ACCEPT
ALL” column, and;
(b) Provide reason and proposal for each of the
condition not accepted.
Comments by bidder:
Provide the condition reference, the reasons for not accepting the condition(s).
....................................................................................................................................
......................................................................................................................................
6.3.3 Bid pricing schedule:
6.3.3.1 The bidder must complete in full all the preference requirements.
6.3.3.2 Allocation of points per requirements: The points allocation of bidders’ responses to the
requirements will be determined by the completeness, relevance and accuracy of substantiating
evidence.
6.3.3.3 The bidder must provide a unique reference number (e.g. binder/folio, chapter, section, page)
to locate substantiating evidence in the bid response. During evaluation, Parliament reserves
the right to treat substantiation evidence that cannot be located in the RFB response, as “NOT
Compliant”.
6.3.3.4 Preference goal requirements:
(a) The applicable preference point system for this RFB and points claimed is 80/20.
(b) Failure on the part of a bidder to the 80/20 preference point systems and submit proof or
documentation required in terms of this RFB to claim preference points for the preference goal
requirements, will be interpreted to mean that preference points for specific goals are not
claimed.
19 initial__________
(c) Failure on the part of a bidder to submit proof or documentation required in terms of this tender
to claim preference points for the preference goal requirements for this RFB, will be interpreted
to mean that preference points are not claimed.
(d) Parliament reserves the right to require from a bidder, either before an RFB is adjudicated or at
any time subsequently, to substantiate any claim with regards to preferences, in any manner
required by Parliament.
(e) Parliament reserves the right to verify information / evidence provided by the bidder.
Table 3: Preference goal requirements:
Specific goals: Number Bidders must supply the following
of points: documents when claiming preference
points:
HDI goals
Black 6 ID Document/CSD Report
Women 4 ID Document/CSD Report
People with 3 Medical Certificate/CSD Report
disabilities
Rdp goals
Youth 4 ID Document/CSD Report
SMME 3 Annual Turnover/CSD Report
20 initial__________
Bidders’ responses must be submitted as outlined in the standard bidding documents.
7.1. Bidder’s contact details:
7.1.1. Specify name, position, address and other contact details (e-mail, telephone, etc.) of the person
within the bidder’s organisation responsible for leading the bid process and to whom all
correspondence should be directed.
7.1.2. Who, within the bidder’s organisation, will be authorised to conduct the contract negotiations and
sign the eventual contract.
7.2. Bidder’s profile:
7.2.1. Bidder’s name and address.
7.2.2. Organisational structure.
7.2.3. Commencement date of business.
7.2.4. Certificate of Incorporation.
7.2.5. Detailed bill of materials with model names and numbers clearly indicated. The bill of materials
must be signed off by the Original Equipment Manufacturer (OEM), Hewlett Packard Enterprise
(Hpe).
21 initial__________
8.1. All pricing must be quoted in South African Rands and must be inclusive of Value Added Tax (VAT)
and delivery costs.
8.2. All costs for disbursements (e.g. accommodation, labour rates, travel, etc.) must be incorporated
into the price offer.
8.3. Price will be evaluated based on 80 points and applicable formula of calculating points scored by
each bidder.
8.4. Bidders must indicate their price elements in the pricing schedule and bill of materials below.
Unit price
Item Unit of Sub-totals
Deliverables: Qty: (incl.
no: measure: (incl. VAT):
VAT):
Supply and delivery of HPE DL380 Gen12+
Parliament in 90 Plein Street, Cape Town
Supply of all required licences for
Management and Software – ComputeOps Five (5)
with iLO6 Advanced for a period of five (5) years
years.
Supply of licences for five (5) years Tech Five (5)
Care Essential Support. years
Provision of professional services:
Replication of data from the old servers to
the newly acquired servers.
Grand total:
22 initial__________
Technical Specifications
Source: Bid Doc - B3-2026 - Supply and Delivery of Four (4) HPE Servers to Parliament of RSA.pdf (TENDER)13 initial__________
Contents
Contents ........................................................................................................................... 14
1 background ............................................................................................................. 15
2 objectives ................................................................................................................ 15
3 purpose of the request for bid (RFB) .................................................................. 15
4 scope of the required service ............................................................................... 16
5 project deliverables .............................................................................................. 16
6 evaluation criteria .................................................................................................. 17
7 the responses .......................................................................................................... 21
8 pricing structure .................................................................................................... 22
9 specific conditions .................................................................................................. 23
10 proposed bill of materials: ................................................................................... 24
14 initial__________
Parliament of the Republic of South Africa hereafter “Parliament” seeks to identify and appoint a suitable
service provider to supply, configure, and deliver four (4) HPE DL380 Gen 12+ servers at its premises
in Cape Town.
The new servers will serve to replace 4 HPE servers that have reached End of Life (EoL) which are
currently in production.
The decision to go with the HPE DL380 Gen12+ servers is motivated by the requirement to maintain
interoperability of the backend ICT infrastructure that comprises mainly of HPE servers and HPE storage.
2.1. The broad objectives of this RFB are to:
Provide prospective service providers with adequate information in order to understand and respond to
Parliament’s requirements to supply, deliver, install and configure:
(a) 4 x HPE DL380 Gen12+ servers.
Ensure uniformity in the responses received from each prospective service provider; and
Provide a structured framework for the evaluation of proposals.
3.1. The purpose of this RFB is to identify and appoint a suitable service provider/s with the requisite
capacity to supply, deliver, install and configure four (4) HPE DL380 Gen12+ servers.
15 initial__________
4.1 The successful service provider will be required to:
Supply and deliver three (4) HPE DL380 Gen12+ servers to the relevant data centre in 90 Plein street,
Cape town.
Supply all required licences for Management and Software – ComputeOps with iLO6 Advanced for a
period of five (5) years.
Supply licences for five (5) years Tech Care Essential Support.
Provide professional services:
Full Installation, Configuration, and Replication of data from the old servers to the newly acquired
servers.
5.1 The successful service provider must have delivered on the requirements listed in section 4
(Scope of the required services) above.
16 initial__________
Pricing Schedule
Source: Bid Doc - B3-2026 - Supply and Delivery of Four (4) HPE Servers to Parliament of RSA.pdfContents ........................................................................................................................... 14
1 background ............................................................................................................. 15
2 objectives ................................................................................................................ 15
3 purpose of the request for bid (RFB) .................................................................. 15
4 scope of the required service ............................................................................... 16
5 project deliverables .............................................................................................. 16
6 evaluation criteria .................................................................................................. 17
7 the responses .......................................................................................................... 21
8 pricing structure .................................................................................................... 22
9 specific conditions .................................................................................................. 23
10 proposed bill of materials: ................................................................................... 24
14 initial__________
Parliament of the Republic of South Africa hereafter “Parliament” seeks to identify and appoint a suitable
service provider to supply, configure, and deliver four (4) HPE DL380 Gen 12+ servers at its premises
in Cape Town.
The new servers will serve to replace 4 HPE servers that have reached End of Life (EoL) which are
currently in production.
The decision to go with the HPE DL380 Gen12+ servers is motivated by the requirement to maintain
interoperability of the backend ICT infrastructure that comprises mainly of HPE servers and HPE storage.
6.3 Price and preference points evaluation (stage 3):
6.3.1 Costing and pricing conditions:
6.3.1.1 South African Pricing - The total price must be VAT inclusive and be quoted in South African
Rand (ZAR).
6.3.1.2 Total price:
(a) All quoted prices are the total price for the entire scope of required services and deliverables to
be provided by the bidder.
(b) All additional costs as well as cost of delivery, labour, S&T, overtime, etc. must be included in
this RFB.
(c) All services, accessories, upgrades and options required by the solution or specified by the client
must be included in the quoted price. If not included, suppliers will be required to supply these
accessories at no cost to the client.
(d) Parliament reserves the right to negotiate pricing with the successful bidder prior to the award
as well as envisaged quantities.
18 initial__________
6.3.1.3 These conditions will form part of the Contract between Parliament and the bidder. However,
Pricing conditions as specified in par 6.3.1 above by
indicating with an “X” in the “ACCEPT ALL” column, or
and Pricing Conditions as specified in par 6.3.1 above by
(a) Indicating with an “X” in the “DO NOT ACCEPT
ALL” column, and;
(b) Provide reason and proposal for each of the
condition not accepted.
Provide the condition reference, the reasons for not accepting the condition(s).
....................................................................................................................................
......................................................................................................................................
6.3.3 Bid pricing schedule:
6.3.3.1 The bidder must complete in full all the preference requirements.
6.3.3.2 Allocation of points per requirements: The points allocation of bidders’ responses to the
requirements will be determined by the completeness, relevance and accuracy of substantiating
evidence.
6.3.3.3 The bidder must provide a unique reference number (e.g. binder/folio, chapter, section, page)
to locate substantiating evidence in the bid response. During evaluation, Parliament reserves
the right to treat substantiation evidence that cannot be located in the RFB response, as “NOT
Compliant”.
6.3.3.4 Preference goal requirements:
(a) The applicable preference point system for this RFB and points claimed is 80/20.
(b) Failure on the part of a bidder to the 80/20 preference point systems and submit proof or
documentation required in terms of this RFB to claim preference points for the preference goal
requirements, will be interpreted to mean that preference points for specific goals are not
claimed.
19 initial__________
(c) Failure on the part of a bidder to submit proof or documentation required in terms of this tender
to claim preference points for the preference goal requirements for this RFB, will be interpreted
to mean that preference points are not claimed.
(d) Parliament reserves the right to require from a bidder, either before an RFB is adjudicated or at
any time subsequently, to substantiate any claim with regards to preferences, in any manner
required by Parliament.
(e) Parliament reserves the right to verify information / evidence provided by the bidder.
Table 3: Preference goal requirements:
Specific goals: Number Bidders must supply the following
of points: documents when claiming preference
points:
Bidders’ responses must be submitted as outlined in the standard bidding documents.
7.1. Bidder’s contact details:
7.1.1. Specify name, position, address and other contact details (e-mail, telephone, etc.) of the person
within the bidder’s organisation responsible for leading the bid process and to whom all
correspondence should be directed.
7.1.2. Who, within the bidder’s organisation, will be authorised to conduct the contract negotiations and
sign the eventual contract.
7.2. Bidder’s profile:
7.2.1. Bidder’s name and address.
7.2.2. Organisational structure.
7.2.3. Commencement date of business.
7.2.4. Certificate of Incorporation.
7.2.5. Detailed bill of materials with model names and numbers clearly indicated. The bill of materials
must be signed off by the Original Equipment Manufacturer (OEM), Hewlett Packard Enterprise
(Hpe).
21 initial__________
8.1. All pricing must be quoted in South African Rands and must be inclusive of Value Added Tax (VAT)
and delivery costs.
8.2. All costs for disbursements (e.g. accommodation, labour rates, travel, etc.) must be incorporated
into the price offer.
8.3. Price will be evaluated based on 80 points and applicable formula of calculating points scored by
each bidder.
8.4. Bidders must indicate their price elements in the pricing schedule and bill of materials below.
Health & Safety
Source: Bid Doc - B3-2026 - Supply and Delivery of Four (4) HPE Servers to Parliament of RSA.pdfSafety harness (parachute type) shall be used whenever work is performed at a height of
2 meters or higher unless a suitable platform with handrails is provided.
Suitable eye protection must be used whenever there is a danger of flying particles or
splashing of chemicals.
Hearing protection shall be used whenever a noise zone is entered. Earmuffs shall
always be worn whenever a jackhammer is used.
Gloves and welding helmet shall always be used for welding operations.
The Contractor is responsible to provide the necessary protective equipment and to
ensure that it is used as required.
No one shall work above or on moving machinery, energy driven mechanical apparatus,
electrical panel or switchgear unless it has been isolated from power or movement by
means of applying a padlock on the main switch.
The Safety Manager must grant permission before padlock can be applied.
No work may be performed above the heads of persons or aisles or roads unless suitable
precautions have been taken to ensure the safety of persons and property below. The
affected area must also be identified beforehand and effectively cordoned off.
All scaffolds and suspended loads must be left safe before leaving work at the end of
each day – i.e. loads lowered to the ground, scaffolds securely tied down and all loose
tools and equipment secured against falling.
Where scaffolding is erected, handrails, toe boards, etc., must be embodied and all such
equipment shall be lowered to the ground under competent supervision.
Contractors shall provide their own ladders, trestles, scaffolds, lifting tackle, tools and
portable electrical equipment.
Makeshift or unsafe equipment shall not be permitted on the premises and will be
confiscated for the duration of the contract.
No insulation tape or similar may be used on any electrical wiring or cables. Joints in
cables must be approved by the Safety Manager to use on the premises.
Contractors may not operate Parliament equipment, lifts and vehicles. In exceptional
instances the Safety Manager may grant permission. In such an event, the contractor
27 initial__________
shall produce a valid Certificate of Competency as described in the Occupational Health
and Safety Act. A copy of the certificate will be kept on the person of the Contractor who
operates the above-described equipment. Any employee of Parliament may ask such
Contractor to produce the said certificate.
All tools and equipment must be reported to Parliament Security whenever a Contractor
enters or leaves the premises. It is the duty of the Contractor to ensure that articles or
equipment are recorded in a Parliament register whenever it is brought on site.
The Contractor shall ensure that his employees do not smoke anywhere on the premises
except in identified smoking bays.
Paint, thinners, petrol, oil or any flammable materials shall be stored within a designated
area.
The Contractor shall first obtain a Hot Work Permit from NDPW/ WSP before any naked
flame or grinder is used anywhere outside a workshop.
The said permit is valid for one day only and shall be kept on the person who is using a
naked flame.
The Contractor shall take all necessary precautions to eliminate all fire hazards and to
prevent fire damage.
All fires shall be reported immediately to the Safety Manager.
The Contractor shall uphold high standards of housekeeping.
The clinic on site will assist with first aid treatment if required. Should the employee
require further medical attention, the emergency service provider will escort the person
to the nearest hospital.
All surplus material and builder’s rubble must be removed from the premises on
completion of the contract or as otherwise specified by the Safety Manager. Parliament
reserves the right to remove such material against cost within three days after completion
of the contract.
No employees of a Contractor shall be allowed to actively further the interests of any
Trade Union on site.
28 initial__________
The principle of security fences must be upheld at all times.
Parliament does not accept responsibility for the safekeeping of any material, tools or
equipment brought on site.
All portable tools or equipment brought on site must be removed at the end of the day’s
work.
The Contractor shall act as ‘The Employer’ in terms of Section 16 of the Occupational
Health and Safety Act.
The Contractor shall report any injuries sustained by his employees to the Department of
Labour and the Compensation Commissioner. The injuries and responsibilities are as
defined in Section 24 of the Occupational Health and Safety Act.
All accidents / incidents shall be reported to the Safety Manager.
In the event of an accident causing the loss of a life or the possibility of the loss of a life,
no person shall disturb the site at which the accident occurred or remove any objects
involved in the accident before the arrival of an inspector from the Department of Labour.
The Contractor shall inform the NDPW / WSP of any Sub-Contractors who may work on
site.
The Contractor shall ensure that Appendix 1 is properly completed and submitted to
NDPW / WSP prior to commencement of work.
The Contractor shall ensure that the Sub-Contractor complies fully with statutory and
Parliament requirements.
The following shall apply if the Contractor has to operate overhead cranes on site: -
The Contractor shall ensure that all his employees who have to operate a crane or lift
truck to render services as stipulated in the contract, have had formal training as required
by the Occupational Health and Safety Act.
The Contractor shall ensure that the training is valid in terms of the Act.
The Contractor shall present certificates of training to NDPW / WSP before work may
commence.
29 initial__________
Failure to comply with the contents of this document could result in legal prosecution by
the Department of Labour.
Noncompliance by the Contractor with any of the requirements as stipulated in this
document could result in any or all of the following actions being taken by the Safety
Manager:
The Contractor could be requested to leave the premises and the contract for the project
tendered for would become null and void. All costs incurred by Parliament for such
actions would be borne by the Contractor.
A specific member of staff who breaches this contractual obligation could be requested
to leave the premises without delay and would not be permitted to enter the premises in
future. Any costs incurred would be borne by the Contractor.
Equipment which would be deemed as unsafe would be confiscated by NDPW / WSP /
Parliament and returned upon completion of the specific contract. Any costs incurred
would be borne by the Contractor.
30 initial__________
comply with the Regulations of the Occupational Health and Safety Act, Act No. as amended.
provisions of General Safety Regulations or Section 8 of the Occupational Health and
The Safety, Health and Environmental Manager (hereinafter the Safety Manager) must
authorise any work, which could affect or interfere with normal activities of Parliament.
26 initial__________
Safety harness (parachute type) shall be used whenever work is performed at a height of
2 meters or higher unless a suitable platform with handrails is provided.
precautions have been taken to ensure the safety of persons and property below. The
affected area must also be identified beforehand and effectively cordoned off.
cables must be approved by the Safety Manager to use on the premises.
instances the Safety Manager may grant permission. In such an event, the contractor
27 initial__________
shall produce a valid Certificate of Competency as described in the Occupational Health
and Safety Act. A copy of the certificate will be kept on the person of the Contractor who
operates the above-described equipment. Any employee of Parliament may ask such
require further medical attention, the emergency service provider will escort the person
to the nearest hospital.
All surplus material and builder’s rubble must be removed from the premises on
completion of the contract or as otherwise specified by the Safety Manager. Parliament
reserves the right to remove such material against cost within three days after completion
of the contract.
defined in Section 24 of the Occupational Health and Safety Act.
site.
The Contractor shall ensure that Appendix 1 is properly completed and submitted to
truck to render services as stipulated in the contract, have had formal training as required
by the Occupational Health and Safety Act.
document could result in any or all of the following actions being taken by the Safety
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
Parliament of the Republic of South AfricaContact Person
Mr N. Ntanjana
Phone
+27 21 403 2911
[email protected]
Website
www.parliament.gov.za/
Address
120 Plein St, Cape Town City Centre, Cape Town, 8000, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
1
Last checked
11 Sept 2026
AI status
Not enhanced
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Data conflicts
None detected
120 Plein St, Cape Town City Centre, Cape Town, 8000, South Africa
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Information and communication. Unlock full pricing strategies, bid frequency, and historical win rates.