Tender Type
Request for Bid(Open-Tender)
Delivery Location
Nelson Mandela Drive. - Lephalale - Lephalale - 0555
Organization Type
GOVERNMENT
Published
18 Nov 2026
OCDS Reference
ocds-9t57fa-178757
ESKOM requires a contractor to wash the air-cooled condenser (acc) fan delta and plenums at matimba power station during outages over a five-year term, executed under task orders during each maintenance opportunity (roughly every 18 months). The contractor must supply and install rail-mounted high-pressure cleaning systems meeting detailed pump, nozzle, safety and electrical specifications, provide all minimum tools and equipment, and complete physical cleaning within 10 working days per outage on a double 12-hour shift. The contract is an nec3 term service contract (tsc3) option a priced contract with a price list, and the most consequential consideration for bidders is the tight outage window with penalties of 1% per day for programme delay and 5% for repeated safety file rejection, capped at 5% of task order value.
Closing: 14 December 2026 at 08:00; submission method and address not stated in the available text — confirm on the Eskom tender portal.
Contract term: five years under NEC3 TSC3 Option A (priced contract with price list), with work ordered per outage task order; physical cleaning limited to 10 working days per outage on a double 12-hour shift.
Equipment specification: at least three high-pressure cleaning systems, each with 7 MPa positive displacement piston pumps, 230 L/min flow, minimum 30 kW, 380VAC 63A supply, nozzle beam at least two rows of 500 mm, IP66 electrical protection, and full safety cut-outs; at least two manual lances (7 MPa, 7 mm nozzle) and two degreaser pumps.
Minimum tools: SANS-approved double-lanyard harnesses, raincoats, non-slip boots, plastic covers for motors/gearboxes, extendable ladder, general PPE, on-site spares (nozzles, hoses, couplings, seals, belts, limit switches, rollers), whip checks and abrasion-resistant hose protection.
Performance penalties: 1% per day of task order value after 2 days of overall programme delay; 5% of safety file value if rejected more than 3 times; total penalty capped at 5% of task order value.
Insurance and liability: contractor must carry insurance per Table A (replacement cost / legal limits) and provide certificates on request; liability capped at R100 000 for consequential loss and property damage per event, R150 000 total, with unlimited liability for design defects, third-party property damage, death/injury and IP infringement.
Site rules: plant walk with site supervisor, QC, contracts manager and system engineer before work; all fans electrically isolated and on permit; hold and witness points require 24-hour advance notice and 12–6 hours final notice; no entry to fans without special arrangement.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Date & Time
Monday, 14 December 2026 - 10:00
Venue
Matimba Power Station Lapa Conference Auditorium
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Categories
Request for Bid(Open-Tender)
Nelson Mandela Drive. - Lephalale - Lephalale - 0555
AI Document Analysis Stages
Description
18 Nov
2026
Tender Published
Tender was published
14 Dec
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Supplier Development Localisation Industrialisation (SDLI) Strategy Setting ACC Fan Delta and Plenums Washing during Outages.docx
Eskom requires the washing of ACC fan delta and plenums during outages at Matimba Power Station in Limpopo over a five-year (60-month) contract period. The work is procured on a preference point system with specific goals for B-BBEE, and suppliers must commit to transformation and localisation obligations.
Cleaning of Matimba ACC Deltas technical evaluation criteria during tender Signed.pdf
Eskom requires the cleaning of Air Cooled Condenser (ACC) fan deltas and plenums during outages at Matimba Power Station in Limpopo, under a five-year service contract executed as and when required based on planned outage philosophy. The work covers external fin tube heat exchanger cleaning using high-pressure semi-automatic linear-actuation equipment and manual lance cleaning of heat exchanger internals.
240-126469599_Method Statement template -Rev 3_.docx
Eskom requires the washing of ACC fan delta and plenums during outages at Matimba Power Station in Limpopo over a five-year period. The service is procured through a method statement submission covering scope, objectives, quality management, competency, infrastructure, risk management and supplier relationships.
Delta Washing SOW.pdf
Eskom requires a single supplier to clean the air-cooled condenser (ACC) deltas and plenums at Matimba Power Station during planned and unplanned outages, on an as-and-when-required basis over five years. Cleaning is executed during every maintenance opportunity (approximately every 18 months) within a 10-working-day physical cleaning window, using high-pressure cleaning systems, degreaser and manual lances.
Invitation to Tender (ITT) - ACC Fan Delta and Plenums Washing during Outages at Matimba Power Station.pdf
Eskom requires the washing of air-cooled condenser (ACC) fan deltas and plenums during outages at Matimba Power Station in Limpopo, under an NEC contract for a period of five (05) years. The work is tendered on an 80/20 preference point system with a compulsory clarification meeting and a functionality threshold.
Supplier Development Localisation Industrialisation (SDLI) Strategy Setting ACC Fan Delta and Plenums Washing during Outages 1.pdf
Eskom requires the washing of ACC fan delta and plenums during outages at Matimba Power Station in Limpopo over a five-year (60-month) contract period. The service is open to the market, with no incumbent suppliers currently providing it.
Copy of F240042 REV4 ENVIRONMENTAL EVALUATION HIGH RISK ACTIVITY.xlsx
Washing of ACC fan delta and plenums during outages at Matimba Power Station in Limpopo over a five-year period. Bidders must submit environmental documentation for assessment against a weighted high-risk activity scorecard, with a minimum threshold of 80%.
ACC Delta Washing NEC Document.doc
Eskom requires a contractor to wash ACC fan delta and plenums at Matimba Power Station during outages, under an NEC3 Term Service Contract (TSC3) running for five years. Work is ordered through task orders against an outage plan, with pricing on a priced contract with price list.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
EskomWin Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 205 934
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
ACC fan delta and plenums washing during outages at Matimba Power Station.
Evaluation Criteria
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting ACC Fan Delta and Plenums Washing during Outages.docx (unknown)Preference point system: 90/10 (price / specific goals).
B-BBEE status level points (90/10 system):
Consequence of missing preference-point documents:
SDL&I objectives:
Technical Specifications
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting ACC Fan Delta and Plenums Washing during Outages.docx (unknown)Scope: ACC fan delta and plenums washing during outages at Matimba Power Station.
Compliance Requirements
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting ACC Fan Delta and Plenums Washing during Outages.docx (unknown)B-BBEE evidence to claim preference points:
B-BBEE evidence thresholds:
Sworn affidavit validity requirements:
B-BBEE improvement commitments (contractual):
Local procurement content:
Jobs:
Submission Guidelines
Source: 240-126469599_Method Statement template -Rev 3_.docx (unknown)Returnable document
Method statement header details
Technical Specifications
Source: 240-126469599_Method Statement template -Rev 3_.docx (unknown)Scope of work
Method statement content required
Description
Source: Copy of F240042 REV4 ENVIRONMENTAL EVALUATION HIGH RISK ACTIVITY.xlsxEnvironmental evaluation for high-risk activity at Matimba Power Station.
High-risk activity: work with direct impact on land, water or air that requires environmental licensing or permitting, or where impacts could cause pollution or contamination requiring rehabilitation and aftercare (e.g. operational contracts of 3 years or more).
The evaluation assesses the bidder's environmental management submissions against a 100-point scorecard with a minimum threshold of 80%.
Evaluation Criteria
Source: Copy of F240042 REV4 ENVIRONMENTAL EVALUATION HIGH RISK ACTIVITY.xlsx (unknown)Environmental evaluation scored out of 100 weighted points.
Minimum qualifying score: 80/100.
Scoring per item:
Technical Specifications
Source: Copy of F240042 REV4 ENVIRONMENTAL EVALUATION HIGH RISK ACTIVITY.xlsx (unknown)Environmental evaluation for high-risk work at Matimba Power Station.
High-risk activity defined as work with direct impact on land, water or air that requires environmental licensing or permitting, or where impacts could cause pollution or contamination requiring rehabilitation and aftercare (e.g. operational contracts of 3 years or more).
Required submissions:
Compliance Requirements
Source: Copy of F240042 REV4 ENVIRONMENTAL EVALUATION HIGH RISK ACTIVITY.xlsx (unknown)Environmental Officer: at least 3 years related experience and a National Diploma, Degree or BTech in Environmental Management; a signed appointment letter is required.
Environmental Policy: must be signed and commit to environmental compliance and duty of care/pollution prevention.
Hazardous substances: where used, a substance list with Safety Data Sheets and proof of training for handlers is required.
Minimum weighted score of 80/100 must be achieved to pass the environmental evaluation.
Description
Source: ACC Delta Washing NEC Document.docEskom Holdings SOC Ltd requires a term service contract for the washing of ACC fan delta and plenums on the Matimba Power Station plant during outages, for a period of five years.
Contact Information
Source: ACC Delta Washing NEC Document.doc (unknown)Employer (Eskom Holdings SOC Ltd)
Adjudicator (Option W1)
Arbitration
Technical Specifications
Source: ACC Delta Washing NEC Document.doc (unknown)Service
Contract framework
Programme and task orders
Defects
Financial Requirements
Source: ACC Delta Washing NEC Document.doc (unknown)Pricing
Payment
Price adjustment
Limitation of liability
Penalties (Option X19.3)
Insurance
Compliance Requirements
Source: ACC Delta Washing NEC Document.doc (unknown)Contractor status
B-bbee
Ethics
Health, safety and environment
Confidentiality
Cession and assignment
Description
Source: Invitation to Tender (ITT) - ACC Fan Delta and Plenums Washing during Outages at Matimba Power Station.pdfEskom invites tenders for the washing of ACC fan delta and plenums at Matimba Power Station during outages, for a five-year period.
The tender is an open invitation to tender.
The contract will be for the whole scope of work.
Alternative tenders are not allowed.
The successful bidder may be required to provide cataloguing information after contract award and must label materials according to Eskom specifications.
Important Dates
Source: Invitation to Tender (ITT) - ACC Fan Delta and Plenums Washing during Outages at Matimba Power Station.pdf (TENDER)Closing date: 14 December 2026
Closing time: 10:00
Compulsory site clarification meeting:
Clarification queries:
Tender validity period: 180 days from the closing date and time.
Contact Information
Source: Invitation to Tender (ITT) - ACC Fan Delta and Plenums Washing during Outages at Matimba Power Station.pdf (TENDER)Eskom Representative:
Fraud and corruption reporting:
Submission portal:
https://etendering.eskom.co.za
Site clarification meeting venue:
Matimba Power Station
Lapa Auditorium Conference
Limpopo
Submission Guidelines
Source: Invitation to Tender (ITT) - ACC Fan Delta and Plenums Washing during Outages at Matimba Power Station.pdf (TENDER)Submission method: electronic upload via the Eskom e-tendering portal (https://etendering.eskom.co.za).
Format: all documents in PDF; the pricing schedule must be submitted in both PDF and Excel.
Upload limits: 500 MB per document; 4 GB total per submission.
No zip or compressed files; no hard copies accepted.
Resubmissions: only the latest version uploaded before the closing time will be considered; earlier versions become void.
The submission status on the portal must show as complete.
Returnable documents (disqualifiable if not submitted by closing):
Returnable required at closing for evaluation (non-disqualifiable, but scores zero if omitted):
Joint venture additional documents:
Tax and other documents:
Late submissions will not be accepted.
Evaluation Criteria
Source: Invitation to Tender (ITT) - ACC Fan Delta and Plenums Washing during Outages at Matimba Power Station.pdf (TENDER)Evaluation stages:
Functionality:
Price:
Specific goals:
Ranking:
Contractual requirements (assessed after ranking, before award):
Technical Specifications
Source: Invitation to Tender (ITT) - ACC Fan Delta and Plenums Washing during Outages at Matimba Power Station.pdf (TENDER)Scope: cleaning (washing) of ACC fan delta and plenums at Matimba Power Station during outages, over a five-year contract period.
Deliverables and requirements:
Experience & Qualifications
Source: Invitation to Tender (ITT) - ACC Fan Delta and Plenums Washing during Outages at Matimba Power Station.pdfKey personnel requirements:
Quality Management
Source: Invitation to Tender (ITT) - ACC Fan Delta and Plenums Washing during Outages at Matimba Power Station.pdfQuality requirements:
Pricing Schedule
Source: Invitation to Tender (ITT) - ACC Fan Delta and Plenums Washing during Outages at Matimba Power Station.pdfPricing schedule:
Financial Requirements
Source: Invitation to Tender (ITT) - ACC Fan Delta and Plenums Washing during Outages at Matimba Power Station.pdf (TENDER)Pricing:
Payment terms:
Performance security:
Financial viability:
Contract price adjustment:
Compliance Requirements
Source: Invitation to Tender (ITT) - ACC Fan Delta and Plenums Washing during Outages at Matimba Power Station.pdf (TENDER)Mandatory:
Health and safety:
Quality:
Environmental:
Eligibility:
Local content:
Health & Safety
Source: Invitation to Tender (ITT) - ACC Fan Delta and Plenums Washing during Outages at Matimba Power Station.pdfHealth and safety requirements:
Environmental
Source: Invitation to Tender (ITT) - ACC Fan Delta and Plenums Washing during Outages at Matimba Power Station.pdfEnvironmental requirements:
Contractual Terms
Source: Invitation to Tender (ITT) - ACC Fan Delta and Plenums Washing during Outages at Matimba Power Station.pdfContract type: NEC or other contract.
Contract period: five years.
Payment terms:
Eskom reserves the right to negotiate with preferred bidders if tendered prices are not market-related.
Subcontracting to subsidiaries is discouraged and must be declared in the tender documents.
Performance security: if a performance bond or demand guarantee is required, the bidder must nominate at least two financial institutions from Eskom's approved list.
Tender validity period: 180 days from the closing date.
No public opening of tenders; tenders will be downloaded electronically.
Prices will not be read out.
Description
Source: Cleaning of Matimba ACC Deltas technical evaluation criteria during tender Signed.pdfEskom requires cleaning of the air-cooled condenser (ACC) deltas and plenums at Matimba Power Station, carried out as and when required in line with the planned outage programme, under a five-year service contract.
The technical evaluation strategy defines the returnable documents, the mandatory and qualitative evaluation criteria, and the appointed Technical Evaluation Team. It follows Eskom's Generation Tender Technical Evaluation Procedure for transaction type 1a (engineering, maintenance and outage goods, works and services with a technical scope of R100 million or less).
Evaluation criteria cannot be changed once the strategy is authorised.
Important Dates
Source: Cleaning of Matimba ACC Deltas technical evaluation criteria during tender Signed.pdf (unknown)Closing date and time: not stated in this document.
Mandatory site clarification meeting: held at the Matimba ACC plant; date and time not stated in this document.
Phase 2 workshop evaluation: date agreed between the bidder and Eskom within 10 calendar days of notification. If the equipment is in use elsewhere, the date may be moved by up to a further 10 calendar days, or the bidder must arrange for Eskom representatives to view the equipment at the plant where the fin tube heat exchanger is being cleaned.
Submission Guidelines
Source: Cleaning of Matimba ACC Deltas technical evaluation criteria during tender Signed.pdf (unknown)Returnable documents — submit each in its own labelled section with a divider; file indexing must match the returnable list. Information must be legible and photographs clear and in colour. Missing returnables make the bid unresponsive and score zero for the affected criterion.
Submission method and address are not stated in this document.
Evaluation Criteria
Source: Cleaning of Matimba ACC Deltas technical evaluation criteria during tender Signed.pdf (unknown)Two-stage technical evaluation. Phase 1A mandatory gatekeepers: none specified. Phase 1B qualitative desktop evaluation: minimum 70% weighted score. Phase 2 qualitative workshop evaluation: minimum 70% weighted score. Only bidders passing Phase 1B proceed to Phase 2; only bidders scoring 70% or more in Phase 2 are technically suitable for contract award.
Scoring scale (0, 2, 4 or 5 only; 1 and 3 are not used):
Phase 1B criteria and weightings (each reference scored, then averaged):
Phase 2 criteria and weightings:
Reference validity: references that are unverifiable, older than 2020, not performed on industrial finned tube heat exchangers, internal tube cleaning, or copies of purchase orders without a completion certificate are not accepted. The employer may contact references to verify the work and its quality.
Technical Specifications
Source: Cleaning of Matimba ACC Deltas technical evaluation criteria during tender Signed.pdf (unknown)Scope: cleaning of the air-cooled condenser (ACC) deltas and plenums at Matimba Power Station, performed as and when required according to the planned outage programme, under a contract of five years.
Work requirements:
Equipment capability expected (as reflected in the reference criteria):
Method statement must address all 12 items:
Tool and equipment schedule: each ACC cleaning device assembly must comprise at least a high pressure pump, rail system, cleaning nozzle beams, cleaning travel device/drive mechanism and manual lance cleaning equipment. Only complete assemblies capable of operating simultaneously are considered.
Methodology
Source: Cleaning of Matimba ACC Deltas technical evaluation criteria during tender Signed.pdfBidders must submit a concise method statement describing the proposed ACC cleaning methodology. It must show that the bidder understands the Matimba ACC cleaning scope and that the method is safe, technically suitable and capable of completing the work within 8 calendar days. It must be supported by process flows, diagrams, sketches, calculations, manpower schedules and equipment capability specific to Matimba; generic statements may reduce the score.
The method statement must address all 12 items:
Scoring: 5 if all 12 items are comprehensively addressed with no identifiable risk and completion within 8 calendar days is demonstrated; 4 if all 12 items are addressed but some lack detail and risks are manageable; 2 if fewer than 12 items are addressed or significant weaknesses exist; 0 if fewer than 6 items are addressed, the information is inadequate or no method statement is submitted.
Experience & Qualifications
Source: Cleaning of Matimba ACC Deltas technical evaluation criteria during tender Signed.pdfBidders must provide a verifiable reference list of at least three ACC or industrial finned tube heat exchanger external cleaning projects completed in the last five years. Each reference must be supported by a completed questionnaire covering:
References that are unverifiable, older than 2020, not on industrial finned tube heat exchangers, internal tube cleaning, or copies of purchase orders without a completion certificate are not accepted. The employer may contact references to verify the work and its quality.
Quality Management
Source: Cleaning of Matimba ACC Deltas technical evaluation criteria during tender Signed.pdfPhase 2 workshop evaluation assesses the bidder's quality management of its cleaning equipment:
Minimum 70% required in Phase 2 to be technically suitable for contract award.
Compliance Requirements
Source: Cleaning of Matimba ACC Deltas technical evaluation criteria during tender Signed.pdf (unknown)Returnable documents — all must be submitted or the bid is unresponsive:
Disqualification risks:
CSD registration, tax compliance, B-BBEE and CIDB requirements are not stated in this document.
Health & Safety
Source: Cleaning of Matimba ACC Deltas technical evaluation criteria during tender Signed.pdfThe method statement must demonstrate that the proposed ACC cleaning methodology is safe. It must address:
A method statement that introduces unacceptable risk to safety, health or the environment scores 2 or lower.
Section
Source: Cleaning of Matimba ACC Deltas technical evaluation criteria during tender Signed.pdfPhase 1B qualitative desktop evaluation: minimum 70% weighted score. Phase 2 qualitative workshop evaluation: minimum 70% weighted score. Only bidders passing Phase 1B proceed to Phase 2; only bidders scoring 70% or more in Phase 2 are technically suitable for contract award.
Phase 1B criteria and weightings:
Phase 2 criteria and weightings:
Scoring scale: 5 = 100% (compliant, no foreseeable risk); 4 = 80% (compliant with acceptable risks, exceptions or conditions); 2 = 40% (non-compliant with unacceptable risks, exceptions or conditions); 0 = 0% (totally deficient or non-responsive). Scores of 1 and 3 are not used.
References that are unverifiable, older than 2020, not on industrial finned tube heat exchangers, or relate to internal tube cleaning do not count. The employer may contact references to verify the work and its quality.
Description
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting ACC Fan Delta and Plenums Washing during Outages 1.pdfWashing of ACC fan delta and plenums during outages at Matimba Power Station over a 60-month period.
SDL&I objectives are aligned to the Reconstruction and Development Programme and are not scored, but commitments become contractual obligations.
Bidders who submit SDL&I objectives but do not meet Eskom's targets are not disqualified.
Important Dates
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting ACC Fan Delta and Plenums Washing during Outages 1.pdf (unknown)Closing: 14 December 2026 at 08:00.
B-BBEE improvement or retention plan: due within 30 days after contract signature.
SDL&I Implementation Schedule: due within 28 days after contract award.
SDL&I compliance reports: submitted quarterly.
Eskom reviews SDL&I reports within 30 days of receipt.
Contact Information
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting ACC Fan Delta and Plenums Washing during Outages 1.pdf (unknown)Buyer
SDL&I compiled by
Business unit
Submission Guidelines
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting ACC Fan Delta and Plenums Washing during Outages 1.pdf (unknown)Returnable documents to claim preference points:
Bidders who omit preference-point documentation are not disqualified but score 0 out of 10 or 20 for specific goals and only the price points out of 90 or 80.
A valid B-BBEE certificate or sworn affidavit is a condition for contract award.
The SDL&I Implementation Schedule must be completed and returned to the SDL&I representative within 28 days after contract award.
Evaluation Criteria
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting ACC Fan Delta and Plenums Washing during Outages 1.pdf (unknown)Preference point system: 90/10 or 80/20, with a maximum of 10 or 20 points for the specific goal.
Specific goal points by B-BBEE status level:
Specific goal points are added to price points and the total is rounded to two decimal places; the highest total wins.
Bidders without preference-point documentation score 0 for specific goals and only the price points out of 90 or 80.
SDL&I objectives are not scored but become contractual commitments.
Technical Specifications
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting ACC Fan Delta and Plenums Washing during Outages 1.pdf (unknown)Scope: washing of ACC fan delta and plenums during outages at Matimba Power Station.
Contract period: 60 months.
Budget: not disclosed.
Local procurement content: Eskom target 100%; bidders must separate local and imported components in the price schedule and state their local content proposal.
Jobs: bidders must propose the type and number of jobs to be created and retained in South Africa as a direct result of the contract.
Pricing Schedule
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting ACC Fan Delta and Plenums Washing during Outages 1.pdfBid response must be separated into local and imported components per the Price Schedule.
Local procurement content is total spending minus the imported component; Eskom target is 100%.
Bidders must state their local procurement content proposal in the table provided.
Financial Requirements
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting ACC Fan Delta and Plenums Washing during Outages 1.pdf (unknown)Pricing: bid response must be split into local and imported components per the Price Schedule.
Local procurement content: total spending minus the imported component; Eskom target 100%.
SDL&I penalty and performance security: not applicable.
Retention clauses may be invoked if corrective measures for unmet SDL&I obligations are not implemented before the next reporting cycle.
Compliance Requirements
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting ACC Fan Delta and Plenums Washing during Outages 1.pdf (unknown)B-BBEE evidence:
Sworn affidavit validity:
B-BBEE improvement commitments:
SDL&I reporting: quarterly Data Collection Template reports; corrective measures required if obligations are not met, failing which retention clauses apply.
Description
Source: Delta Washing SOW.pdfEskom Matimba Power Station requires a single supplier for a five-year as-and-when-required contract to clean the ACC deltas during planned and unplanned outages.
The scope covers the detailed work and technical requirements for the service contract.
The scope applies across Matimba Power Station and binds the contractor, its subcontractors and all personnel on the contract.
The scope takes effect from its authorisation date.
The contract is managed by Eskom's Contracts Manager, who is the primary point of contact, controls the budget, approves deliverables and keeps contract records.
Contact Information
Source: Delta Washing SOW.pdf (unknown)Contract Manager: primary point of contact between Eskom and the contractor; name not stated.
Technical contacts named in the scope of work:
Email addresses and telephone numbers: not stated.
Site: Matimba Power Station, Limpopo.
Submission Guidelines
Source: Delta Washing SOW.pdf (unknown)Submission method: not specified in the scope of work; bidders must follow the Eskom tender return requirements.
Returnable documents: not listed in the scope of work; the full bid pack must be obtained from Eskom's tender system.
Disqualification risks:
Evaluation Criteria
Source: Delta Washing SOW.pdf (unknown)Evaluation stages: not stated in the scope of work.
Technical evaluation: the Generation Tender Technical Evaluation Procedure (240-168966153) applies.
Preference points: the Preferential Procurement Policy Framework Act applies; the 80/20 or 90/10 split is not stated.
Minimum qualifying score: not stated.
Acceptance criteria for the work:
Technical Specifications
Source: Delta Washing SOW.pdf (unknown)Contract: a single five-year as-and-when-required contract with one supplier for cleaning the Matimba Power Station ACC deltas during planned and unplanned outages.
Scope of work:
High-pressure cleaning system — at least three of the following must be used:
Minimum tools and equipment (verified by the Contracts Manager and engineering before outages):
Eskom provides:
Execution constraints:
Quality Management
Source: Delta Washing SOW.pdfQuality Control Plan:
Inspection and non-conformance:
Document control:
Compliance Requirements
Source: Delta Washing SOW.pdf (unknown)Standards and systems:
Personnel and authorisations:
Health & Safety
Source: Delta Washing SOW.pdfGeneral safety:
Permit to Work:
Working at height:
Rigging:
Electrical safety:
Section
Source: Delta Washing SOW.pdfTechnical evaluation follows Eskom's Generation Tender Technical Evaluation Procedure (240-168966153).
Preference points are governed by the Preferential Procurement Policy Framework Act; the 80/20 or 90/10 split is not stated.
No minimum qualifying score is stated.
Work acceptance is by visual inspection against the cleaning criteria, carried out by the system engineer, the contractor's supervisor and quality personnel, and the Contracts Manager.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Nelson Mandela Drive. - Lephalale - Lephalale - 0555
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
8
Last checked
19 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
Everything South African general contractors need to know about how to write a winning tender proposal without an in-house bid team in gauteng — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Your meticulously crafted General sector tender submission can be disqualified for a single, seemingly minor compliance oversight. The reality for South African contractors is that technical competence is no longer sufficient; it is underpinned by a non-negotiable framework of documentary compliance. This regulatory guide: mastering CSD and BBBEE compliance for general sector tenders in south africa provides a comprehensive, step-by-step breakdown of the mandatory registrations and certificates you must secure and present. We detail the precise requirements for CSD, BBBEE, SARS TCS, CIPC, and COIDA, explaining their function within the procurement ecosystem governed by the PFMA and PPPFA. Learn the actionable steps to prepare your business, avoid the most common disqualifying errors, and leverage technology to streamline your compliance process for successful bidding in 2026 and beyond.
For South African General contractors, the path to government procurement is paved with non-negotiable regulatory requirements. The most common barrier to entry is not a lack of capability, but a failure to master the foundational compliance frameworks that govern every bid. This complete regulatory guide to CSD and BBBEE compliance for General sector tender suppliers in South Africa demystifies the process. It provides a meticulous, step-by-step field manual for ensuring your company is fully compliant and audit-ready, enabling you to confidently access the R billions in opportunities across infrastructure maintenance, facilities management, and service delivery within the General sector.
This definitive guide provides General sector contractors with the precise, actionable steps required to achieve and maintain CSD and BBBEE compliance for South African public tenders in 2026. Authored by Dr. Sarah Mokwena, a Legal Compliance Specialist, it meticulously walks through the regulatory framework, mandatory registrations, and the critical documentation needed to avoid disqualification. We dissect the common, costly errors made during submission and provide a clear checklist to ensure your bid is responsive and competitive. Learn how to navigate the Central Supplier Database, validate your BBBEE status, and integrate compliance into your tender preparation process.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Services: General. Unlock full pricing strategies, bid frequency, and historical win rates.