Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Issuing Organization
South African Diamond and Precious Metals RegulatorLocation
Gauteng
Closing Date
06 Nov 2026
Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
CORNER BONAERO DRIVE AND COTE'D AZURE AVENUE - BONAERO PARK - KEMPTON PARK - 1622
Organization Type
GOVERNMENT
Published
29 Oct 2026
OCDS Reference
ocds-9t57fa-176222
The south african diamond and precious metals regulator requires a bidder to provide maintenance, servicing, repair and monitoring of the intruder alarm system at its head office in kempton park for 36 months, with armed response available 24/7. the contract will be awarded under an 80/20 preference point system, and bidders must pass a functionality evaluation with a minimum score of 60% to proceed to the price and specific goals phase. The most consequential consideration is the mandatory psira registration and letter of good standing, as failure to submit these will result in automatic disqualification.
Closing: 06 November 2026 at 11:00, submitted by email to [email protected]; late submissions are not considered.
Mandatory briefing: 02 November 2026 at 10:00 on Microsoft Teams (link and meeting ID in the bid pack); attendance is not marked as compulsory.
Mandatory eligibility: CSD registration with a valid CSD number; SARS TCS PIN or printed TCS certificate; PSIRA registration and letter of good standing (automatic disqualification if not submitted); no persons in the service of the state.
Functionality phase (minimum 60% to proceed): company experience (50 points, minimum 2 years), team leader experience (30 points, attach CV), three reference letters (15 points), and Gauteng office base with proof (5 points).
Price and specific goals: 80 points for price, 20 points for specific goals (black woman-owned 10, youth-owned 5, SMME 5); specific-goal points require CIPC proof and a CSD report dated within 3 months of closing date, otherwise zero.
Pricing: call-out fee basis, firm prices inclusive of VAT, valid for 90 days from closing date; quotation must be on business letterhead with an Excel spreadsheet.
Returnable documents: SBD 1, SBD 4, SBD 6.1, certified ID copy, CSD full registration report, B-BBEE certificate or sworn affidavit, CIPC documents, and proof of authority to sign.
Date & Time
Friday, 06 November 2026 - 11:00
Venue
Microsoft Teams meeting Join: https://teams.microsoft.com/meet/393074705655416?p=Dsrj9OM8H8NpnULRnp
Categories
Request for Quotation
CORNER BONAERO DRIVE AND COTE'D AZURE AVENUE - BONAERO PARK - KEMPTON PARK - 1622
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: SAIDSA Accreditation, ISO 18788 (Security Operations Management)
AI Document Analysis Stages
Description
29 Oct
2026
Tender Published
Tender was published
06 Nov
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
BID DOCUMENTS FOR INTRUDER ALARM SYSTEM00 02.pdf
The South African Diamond and Precious Metals Regulator requires a bidder to provide maintenance, servicing, repair, and 24/7 armed-response monitoring of the intruder alarm system at its Head Office in Kempton Park for 36 months, under an 80/20 preferential procurement evaluation.
SADPMR Bid Special Conditions of Contract Dated 23 June (002) (002).pdf
SADPMR requires a service provider to maintain, service, repair and monitor its intruder alarm system over a 36-month contract period. Bidders must meet tax, integrity and declaration requirements, and the resulting contract is subject to the availability of funds.
PFMA GCC July 2010.pdf
The South African Diamond and Precious Metals Regulator requires a bidder to provide maintenance, servicing, repair and monitoring of its intruder alarm system for a period of 36 months. The contract will be governed by the General Conditions of Contract (GCC) for government procurement, with the successful bidder required to meet standard government bidding requirements.
To download these documents and access AI-powered analysis, visit the main tender page.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubNot enough data available to generate an estimate for this tender type.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
The contract covers maintenance, servicing, repair and monitoring of an intruder alarm system for 36 months.
Important Dates
Source: SADPMR Bid Special Conditions of Contract Dated 23 June (002) (002).pdf (RFP)Closing date: 6 November 2026 at 09:00.
No briefing session or site visit stated in this document.
Contact Information
Source: SADPMR Bid Special Conditions of Contract Dated 23 June (002) (002).pdf (RFP)Enquiries must be submitted in writing to the designated contact person(s) identified in the bid documentation.
No contact names or numbers are stated in this document.
Submission Guidelines
Source: SADPMR Bid Special Conditions of Contract Dated 23 June (002) (002).pdf (RFP)All mandatory documents, declarations, schedules, certificates and information required by the RFP must be submitted.
Disqualification risks:
Evaluation Criteria
Source: SADPMR Bid Special Conditions of Contract Dated 23 June (002) (002).pdf (RFP)Evaluation stages follow applicable legislation and procurement prescripts. SADPMR may award to a bidder that is not the lowest priced or highest scoring where justified.
Technical Specifications
Source: SADPMR Bid Special Conditions of Contract Dated 23 June (002) (002).pdf (RFP)Scope: Maintenance, servicing, repair and monitoring of an intruder alarm system for 36 months.
Duration: 36 months.
No further technical specifications are stated in this document.
Quality Management
Source: SADPMR Bid Special Conditions of Contract Dated 23 June (002) (002).pdfBidder must maintain necessary resources, personnel, systems and expertise to perform services. SADPMR may conduct due diligence and site inspections to verify compliance.
Pricing Schedule
Source: SADPMR Bid Special Conditions of Contract Dated 23 June (002) (002).pdfBidder must quote firm prices that include all costs. Pricing errors are for bidder's account. Bid remains valid for validity period stated in bid documentation.
Financial Requirements
Source: SADPMR Bid Special Conditions of Contract Dated 23 June (002) (002).pdf (RFP)Prices quoted must include all costs, obligations and liabilities necessary for proper performance.
Any errors or miscalculations in pricing are for the bidder's account.
Bid validity period must be as stated in the bid documentation.
No bid security, bonds, guarantees, retention or payment terms are stated in this document.
Compliance Requirements
Source: SADPMR Bid Special Conditions of Contract Dated 23 June (002) (002).pdf (RFP)Tax compliance is a precondition to award.
Bidders must be registered on the Central Supplier Database (CSD) and have a valid tax compliance status.
Bidders must not be listed on the Register of Tender Defaulters or List of Restricted Suppliers.
B-BBEE: fronting practices are prohibited; bidders may be investigated for fronting and must provide evidence to refute indicators if required.
No CIDB grading specified (not construction-related).
Bidders must comply with all applicable laws and industry standards.
Health & Safety
Source: SADPMR Bid Special Conditions of Contract Dated 23 June (002) (002).pdfNo specific OHS requirements are stated in this document.
Contractual Terms
Source: SADPMR Bid Special Conditions of Contract Dated 23 June (002) (002).pdfGoverning law: Republic of South Africa.
Contract continuation subject to availability of funds; may be suspended or terminated on written notice if funding is unavailable.
Contractor entitled to payment for services properly rendered up to termination date.
Bidder remains fully liable for sub-contractors.
Confidentiality obligations: bidders must not disclose bid information without consent.
Bidder indemnifies SADPMR against losses from breach of bid conditions.
SADPMR may cancel or amend the bid process at any stage.
Section
Source: SADPMR Bid Special Conditions of Contract Dated 23 June (002) (002).pdfSADPMR may conduct site inspections, due diligence, product evaluations, reference checks and verification exercises. Bidders must consent to background checks including financial, legal, criminal, reference and FICA checks.
Submission Guidelines
Source: PFMA GCC July 2010.pdf (TENDER)Returnable forms - all must be completed, signed and submitted with the quotation:
Evaluation Criteria
Source: PFMA GCC July 2010.pdf (TENDER)Bidders must be registered on the Central Supplier Database (CSD).
Bidders must have a valid SARS tax clearance certificate (original) prior to award.
Bidders must not be involved in collusive bidding or restrictive practices as defined in the Competition Act.
Bidders must not be restricted from doing business with the public sector.
No specific scoring method or weighting is stated in the document.
Technical Specifications
Source: PFMA GCC July 2010.pdf (TENDER)The successful bidder will be appointed to render maintenance, servicing, repair and monitoring of intruder alarm systems for a period of 36 months.
No site-specific details (locations, quantities, or service levels) are provided in the document.
Financial Requirements
Source: PFMA GCC July 2010.pdf (TENDER)Performance security must be furnished within 30 days of notification of contract award, in the amount specified in the Special Conditions of Contract (SCC).
Performance security may be a bank guarantee, irrevocable letter of credit, cashier's cheque, or certified cheque.
Payment will be made within 30 days of submitting a valid invoice and delivery documentation.
Prices quoted in the bid may not vary, except as authorised in the SCC.
Compliance Requirements
Source: PFMA GCC July 2010.pdf (TENDER)Mandatory compliance:
Required standard forms:
No specific B-BBEE level, CIDB grade, or local content thresholds are stated.
Contractual Terms
Source: PFMA GCC July 2010.pdfThe contract is governed by the General Conditions of Contract (GCC) July 2010 edition.
Special Conditions of Contract (SCC) supplement the GCC; where there is conflict, SCC prevails.
Contract amendments must be in writing and signed by both parties.
The supplier may not assign the contract or subcontract without prior written consent.
Delivery and performance must follow the time schedule in the contract; delays may incur penalties.
Penalties for late delivery/performance are calculated at the current prime interest rate per day of delay, deducted from the contract price.
The purchaser may terminate the contract for default if the supplier fails to deliver, perform, or engages in corrupt/fraudulent practices.
The purchaser may restrict the supplier from doing business with the public sector for up to 10 years for default.
Force majeure may excuse delays if properly notified.
The contract is in English and governed by South African law.
Disputes are to be resolved amicably, then via mediation, then in a South African court.
Supplier liability is limited to the total contract price, except for criminal negligence/willful misconduct or IP infringement.
The supplier must indemnify the purchaser against third-party claims of patent/trademark/design infringement.
Confidentiality: the supplier may not disclose contract documents or information without consent.
The purchaser may audit the supplier's records relating to contract performance.
Description
Source: BID DOCUMENTS FOR INTRUDER ALARM SYSTEM00 02.pdfThe South African Diamond and Precious Metals Regulator (SADPMR) requires a bidder to provide maintenance, servicing, repair and monitoring of its intruder alarm system at the head office in Kempton Park, for 36 months, on a 24/7 basis. The service will be contracted as a call-out arrangement.
Important Dates
Source: BID DOCUMENTS FOR INTRUDER ALARM SYSTEM00 02.pdf (RFQ)Briefing session:
Closing date and time:
Contact Information
Source: BID DOCUMENTS FOR INTRUDER ALARM SYSTEM00 02.pdf (RFQ)Technical enquiries:
Administrative / bidding procedure enquiries:
Submission email:
Postal address:
Submission Guidelines
Source: BID DOCUMENTS FOR INTRUDER ALARM SYSTEM00 02.pdf (RFQ)Submission method and address:
Returnable documents (all must be completed, signed and submitted):
Disqualification risks:
Evaluation Criteria
Source: BID DOCUMENTS FOR INTRUDER ALARM SYSTEM00 02.pdf (RFQ)Two-phase evaluation:
Phase 1 – Functionality (minimum qualifying score: 60%):
Phase 2 – Price and specific goals (80/20 system):
Technical Specifications
Source: BID DOCUMENTS FOR INTRUDER ALARM SYSTEM00 02.pdf (RFQ)The department requires maintenance, servicing, repair and monitoring of the intruder alarm system at the SADPMR head office in Kempton Park.
Experience & Qualifications
Source: BID DOCUMENTS FOR INTRUDER ALARM SYSTEM00 02.pdfCompany experience: minimum 2 years in maintenance, service, armed response and monitoring of intruder alarm systems or similar; attach company profile or track record. Team leader: must have qualifications, skills and experience; attach CV. References: three reference letters from previous similar projects, on company letterhead and signed.
Financial Requirements
Source: BID DOCUMENTS FOR INTRUDER ALARM SYSTEM00 02.pdf (RFQ)Pricing must be on a call-out fee basis, quoted on the pricing schedule. Firm prices, inclusive of VAT, valid for 90 days from the closing date.
Compliance Requirements
Source: BID DOCUMENTS FOR INTRUDER ALARM SYSTEM00 02.pdf (RFQ)Mandatory eligibility:
Security and vetting:
Specific-goal evidence:
Health & Safety
Source: BID DOCUMENTS FOR INTRUDER ALARM SYSTEM00 02.pdfSecurity screening of bidder personnel is a specific contract condition. The SADPMR may remove any person from site for security reasons, without cost to the SADPMR. The bidder must sign declarations of secrecy and indemnities covering loss, injury and third-party claims.
Section
Source: BID DOCUMENTS FOR INTRUDER ALARM SYSTEM00 02.pdfPhase 1 functionality criteria with minimum 60% to proceed:
Phase 2 uses the 80/20 preference point system for price and specific goals.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve guarding, access control, CCTV, surveillance, or private security services.
Act 56 of 2001
Relevant where security providers, guards, access control or private security services are required.
Relevant because this tender appears to involve guarding, access control, CCTV, surveillance, or private security services.
Address
Corner Bonaero Drive & Cote D'Azur avenue OR Tambo SEZ (GIDZ, Bonaero Park, Kempton Park, 1622, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
3
Last checked
30 Oct 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Contact
011-223-7000[email protected]www.sadpmr.co.zaCorner Bonaero Drive & Cote D'Azur avenue OR Tambo SEZ (GIDZ, Bonaero Park, Kempton Park, 1622, South Africa
Key Personnel
Get deep intelligence on Security and investigation activities. Unlock full pricing strategies, bid frequency, and historical win rates.
Learn how to submit a winning bid with these related articles
💡 Want more tendering tips and strategies?
Explore Our Blog