Renovations and repairs to the girls' hostel at makaula senior secondary school in the eastern cape, for the eastern cape department of education. The baseline risk assessment sets out the hazards and control measures for the construction activities a contractor will carry out, including excavation near underground and overhead services, structural work, roofing, mechanical and lpg installations, water reticulation and lightning protection. Bidders must plan for work on a school site that remains occupied by learners and educators, with construction traffic and excavation as the highest-risk activities. The most consequential consideration is that the principal contractor must integrate the construction regulations 2014 into its own risk assessments and submit a health and safety plan, method statements and supporting documentation before work starts.
Key Requirements
Statutory compliance: Construction Regulations 2014 apply, and the principal contractor must integrate them into its own risk assessments; construction vehicles and mobile plant on public roads must meet the National Road Traffic Act, 1996.
Excavation notification: excavation work must be notified to the Provincial Director at least 7 days before it starts.
Competent persons: work must be supervised by competent persons appointed in writing; plant operators need competency certificates and valid medical certificates of fitness; only trained and competent workers may place concrete, operate plant, or carry out plumbing and demolition work.
LPG and electrical certificates: LPG installations must comply with SANS 10087-1, be installed by a licensed gas practitioner, and have a leak test and Certificate of Compliance; electrical connections need a Certificate of Compliance from a registered electrician.
Water and lightning standards: water reticulation must comply with SANS 10252; lightning protection must comply with SANS 62305 with earth resistance below 10 ohms.
Site traffic and learner safety: the school remains occupied, so bidders must plan separate construction access, flagmen, warning signage, speed reduction of at least 20 km/h at access points, and controls for vehicles and mobile plant moving among learners and educators.
Pre-commencement documentation: before starting, the principal contractor must develop and submit a risk assessment, health and safety plan, method statements and all relevant supporting documentation.
APPOINTMENT OF CONTRACTOR FOR THE PROPOSED ALTERATIONS AND ADDITIONS TO THE EXISTING BURNT HOSTEL MAKAULA SENIOR SECONDARY SCHOOL IN EASTERN CAPE PROVINCE FOR THE EASTERN CAPE DEPARTMENT OF EDUCATION
Tender context
Return to this tenderβs issuing organisation, province, or category.
Appointment of contractor for the proposed alterations and additions to the existing burnt hostel makaula senior secondary school in eastern cape province for the eastern cape department of education
Briefing SessionCompulsory
Date & Time
Friday, 04 December 2026 - 23:30
Venue
MAKAULA SENIOR SECONDARY SCHOOL The site is located under the Mzimvubu Local Municipality in the Alf
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Tenders in this industry often require registration with these bodies.
CIDB Registration
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Typical Documents
10 items
Company Registration (CIPC)
Tax Clearance Certificate
B-BBEE Certificate
CSD Registration
Company Profile
CIDB Registration Certificate
NHBRC Registration (if applicable)
Health & Safety Plan
Insurance Certificates
Previous Project Completion Certificates
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
Compliance review. The working summary is checked against South African procurement standards β PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement β so nothing critical is missed before you start your bid response.
DocumentAnnexure A - Health and Safety Specification.pdfReview complete
Description
Source: Annexure A - Health and Safety Specification.pdf
Important Dates
17 Nov
2026
PUBLICATION
Tender Published
Tender was published
04 Dec
2026
DEADLINE
Closing Date
Tender closing date
Procurement Rules & Compliance ContextThis tender may be governed by South African public procurement rules covering fairness, transparency, preferential procurement, anti-corruption, administrative justice and access to information.
11 rules
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Core procurement rules
These rules commonly apply to South African public-sector procurement.
7
Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
high
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Constitution of the Republic of South Africa, 1996 β Section 217
Act 108 of 1996 (s217)
high
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
The Eastern Cape Department of Education, through the Development Bank of Southern Africa, requires a contractor to carry out alterations and additions to the fire-damaged girls' hostel at Makaula Senior Secondary School in the Eastern Cape. The works are governed by a project-specific Occupational Health and Safety Specification issued under the Construction Regulations 2014, and the school remains operational throughout construction.
The Development Bank of Southern Africa, as implementing agent for the Eastern Cape Department of Education, requires a contractor for the upgrade, alterations and additions to the burnt hostel at Makaula Senior Secondary School in the Alfred Nzo District, Eastern Cape. The works are executed under the JBCC Principal Building Agreement (Edition 4.1, Code 2101, March 2005) with DBSA-specific special conditions.
Alterations and additions to the existing burnt hostel at Makaula Senior Secondary School in Eastern Cape Province. The contractor must complete the works within 3 months, comply with all Occupational Health and Safety Act requirements, and provide site offices, services, and security as specified. The procurement is for the Eastern Cape Department of Education with the Development Bank of Southern Africa involved.
The Development Bank of Southern Africa requires a contractor for alterations and additions to the existing burnt hostel at Makaula Senior Secondary School in the Eastern Cape, on behalf of the Eastern Cape Department of Education. The work is brick-and-mortar construction, and bidders must hold a CIDB grading of 4 GB or higher.
The Development Bank of Southern Africa (DBSA) seeks a contractor for alterations and additions to the burnt hostel at Makaula Senior Secondary School in the Eastern Cape, on behalf of the Eastern Cape Department of Education. Tender RFP194/2026 closes on 4 December 2026 at 23:30. Bidders must complete a comprehensive set of returnable documents and attend a mandatory briefing.
The Eastern Cape Department of Education, through the Development Bank of Southern Africa, seeks a contractor for alterations and additions to the fire-damaged girls' hostel at Makaula Senior Secondary School (EMIS 200500534) in the Eastern Cape. The works are governed by the JBCC Principal Building Agreement Edition 4.1 with a three-month construction period from site possession to practical completion.
Appointment of a contractor for alterations and additions to the existing burnt girls' hostel at Makaula Senior Secondary School in the Eastern Cape, on behalf of the Eastern Cape Department of Education. The works cover renovations and repairs, with a baseline risk assessment governing construction hazards on site.
Secure DBSA tenders with AI Matching Engine, development finance intelligence, compliance analysis, and bid support for infrastructure and consulting.
Similar Tenders
Matched by category & region
Supplier Readiness Hub
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
cancellation: Stage 1: The manufacture, supply and delivery of various Kiosks on βan as and when requiredβ basis for a period of three (3) years for Distribution
Clusters.
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically β no action required from you.
Document read
Compliance review
Bid-ready summary
Project description:
Renovations and repairs of the fire-damaged girls hostel at Makaula Senior Secondary School.
The detailed construction scope is contained in the tender.
The works are subject to project-specific occupational health and safety requirements.
The requirements apply to the Principal Contractor, contractors, suppliers and professional service providers.
Compliance is required with the OHSA, Construction Regulations 2014, COIDA, SANS codes and other relevant standards.
Submission Guidelines
Source: Annexure A - Health and Safety Specification.pdf (unknown)
Returnable documents - submit with the bid:
Project-specific pre-tender health and safety plan.
Declaration that the Principal Contractor has the competence and resources to carry out the work safely under the OHSA and Regulations.
Valid COIDA Letter of Good Standing.
Detailed technical method statements for Designer approval.
Risk assessments and safe work procedures for high-risk items for Client or Client Agent approval.
CV of the proposed full-time Construction Health and Safety Officer.
CV of the proposed Construction Manager.
Completed OHSA Section 37.2 mandatory agreement.
Pricing requirement:
Health and safety must be priced in the relevant bill of quantities section.
Disqualification risks:
Missing or incomplete health and safety pricing may make the bid non-responsive.
Missing required health and safety documentation may make the bid non-responsive.
Evaluation Criteria
Source: Annexure A - Health and Safety Specification.pdf (unknown)
Evaluation focus:
The tenderer's health and safety competence will be assessed from the submitted pre-tender health and safety plan and supporting documents.
The assessment score will be provided to the Bid Award Committee.
Mandatory competence evidence:
Valid COIDA Letter of Good Standing and registration with the Compensation Commissioner.
Proposed Construction Health and Safety Officer registered with SACPCMP, with at least Grade 12 and a health and safety diploma or similar qualification.
CV of the proposed Construction Health and Safety Officer submitted at tender stage for approval.
Construction Manager under CR8.1 with health and safety training and relevant experience.
Medical certificates of fitness for all workers before commencement.
Hepatitis A and Hepatitis B vaccinations for workers exposed to sewage or body fluids.
Signed OHSA Section 37.2 mandatory agreements.
Health and safety priced in the bill of quantities; failure may render the bid non-responsive.
Technical Specifications
Source: Annexure A - Health and Safety Specification.pdf (unknown)
Project:
Client: Eastern Cape Department of Education.
Alterations, additions, renovations and repairs to the fire-damaged girls hostel at Makaula Senior Secondary School in the Eastern Cape.
Detailed construction scope is contained in the tender.
Health and safety plan:
A project-specific health and safety plan must be submitted before work starts and approved in writing by the Client or Client Agent.
The plan must cover site layout, baseline risk assessments, safe work procedures, emergency arrangements, PPE management, induction, plant controls, working-at-height controls, welfare facilities, signage, traffic management and audit arrangements.
A Notification of Construction Work must be approved by the Department of Employment and Labour before commencement.
Site controls:
The school will remain operational during construction, so the contractor must separate the works from learners, staff and visitors.
Secure barricading and hoarding are required; danger tape or candy tape cannot be used as the means of demarcation.
Access control, safety signage, emergency assembly points, first aid equipment, fire extinguishers and local emergency contacts are required.
Welfare facilities must include adequate toilets, clean drinking water, handwashing and regular cleaning; toilets should be provided at a 1:15 ratio where practicable.
Personnel:
At least one competent full-time Construction Health and Safety Officer under CR8.5 is required for the contract duration.
The Construction Health and Safety Officer cannot also act as the site supervisor and may not be replaced without Client or Client Agent approval.
The site must not be left without competent cover for more than one day.
Competent full-time Construction Managers under CR8.1 are required, with assistant construction managers under CR8.2 where justified.
Health and safety representatives and regular health and safety meetings are required.
All workers and subcontractor staff must hold medical certificates of fitness before starting work.
Workers exposed to sewage or body fluids must have current Hepatitis A and Hepatitis B vaccinations.
Risk controls:
Baseline hazard identification and risk assessment, method statements and safe work procedures are required for high-risk activities.
Controls are required for noise, dust, electrical work, plant, lifting, excavations, scaffolding, demolition, hazardous chemicals, biological hazards and work at heights.
A fall protection plan and competent fall protection planner are required for work at heights.
Work at heights must follow relevant SANS requirements, including SANS 10085 and SANS 10333.
Temporary works drawings must be checked and signed by a competent structural engineer registered with ECSA.
A demolition plan must be approved before demolition starts.
Electrical distribution boards must have earth leakage protection and certificates of compliance; electrical apparatus must have lock-out controls.
Plant must be inspected daily, load-tested annually by an Approved Inspection Authority where used for lifting, and operated only by medically fit and certified operators.
Monitoring and close-out:
Client or Client Agent audits will occur every 30 days, and the Construction Health and Safety Officer must accompany them.
A monthly health and safety report is required by the end of the first week of each month.
Non-conformances may attract penalties or work stoppage.
The health and safety file must be completed electronically at contract close-out and kept live during the defects and liability period.
Methodology
Source: Annexure A - Health and Safety Specification.pdf
Method statements:
Detailed technical method statements must be submitted for approval before the relevant work starts.
Further method statements are required when design changes or new work arise.
Work must not commence on an activity until the required method statement approval is obtained.
Failure to comply with method statement requirements may lead to non-conformance action.
Experience & Qualifications
Source: Annexure A - Health and Safety Specification.pdf
Experience and qualifications:
CVs must show relevant health and safety training and experience.
The Construction Health and Safety Officer must be registered with SACPCMP, have at least Grade 12 and a health and safety diploma or similar, and serve full-time.
Construction Managers must have appropriate health and safety training and relevant experience.
For temporary works, a competent person may be a Professional Engineer or Professional Technologist registered with ECSA with sufficient relevant design experience.
Quality Management
Source: Annexure A - Health and Safety Specification.pdf
Quality and health and safety management:
External audits by the Client or Client Agent will occur every 30 days, and the Construction Health and Safety Officer must accompany them.
Internal audits must cover site conditions and health and safety files.
Corrective actions must be completed within the time limits set.
A monthly health and safety report is required by the end of the first week of each month.
Non-conformances may result in penalties or work stoppage.
Close-out documentation must be submitted electronically in a logical order that matches the site files.
Records may include risk assessments, method statements, plant inspection records, medical surveillance records, audiometry results, environmental monitoring reports, test results, policies and procedures.
Routine daily or monthly plant inspection records are not required for close-out unless they relate to an accident.
Financial Requirements
Source: Annexure A - Health and Safety Specification.pdf (unknown)
Pricing:
Health and safety costs must be included and priced in the bill of quantities.
Penalties:
Minor non-conformance: R50 per count.
Medium non-conformance: R500 per count and possible non-conformance or activity stoppage.
Severe non-conformance: R5000 per count and possible non-conformance or activity stoppage.
Compliance Requirements
Source: Annexure A - Health and Safety Specification.pdf (unknown)
Compliance requirements:
B-BBEE minimum level: Level 3.
Valid COIDA Letter of Good Standing and registration with the Compensation Commissioner.
SACPCMP registration for the proposed Construction Health and Safety Officer.
Medical certificates of fitness for all workers before commencement.
Hepatitis A and Hepatitis B vaccinations for workers exposed to sewage or body fluids.
Signed OHSA Section 37.2 mandatory agreements.
Subcontractors may not work under the Principal Contractor's Compensation registration number and must provide their own valid Letter of Good Standing.
Health and safety must be priced in the bill of quantities.
Compliance with the OHSA, Construction Regulations 2014, COIDA and other applicable SANS and legislative requirements.
Health & Safety
Source: Annexure A - Health and Safety Specification.pdf
Health and safety requirements:
No work may start without written approval of the health and safety plan and approval of the Notification of Construction Work.
The Principal Contractor must appoint competent personnel, including a full-time Construction Health and Safety Officer and Construction Managers.
Baseline hazard identification and risk assessment, method statements, risk assessments and safe work procedures are required.
Emergency plans, first aiders, fire equipment, emergency drills, incident reporting and COIDA compliance are required.
A competent Level 3 First Aid Attendant must be appointed, and emergency drills must be conducted bi-monthly.
PPE must be issued and worn; anyone on site without required PPE must be removed until compliant.
Induction and daily pre-task training are required.
No person may work or access the site under the influence of alcohol or drugs; a drug and alcohol policy must be in place.
Medical surveillance and certificates of fitness are required.
Noise, dust, electrical, plant, work at heights, excavations, scaffolding, demolition, asbestos, biological and traffic risks must be controlled.
No asbestos or asbestos-contaminated material was observed or recorded on site.
The school remains operational, so hoarding and access control must protect learners, staff and public.
Non-compliance may lead to penalties or work stoppage.
Environmental
Source: Annexure A - Health and Safety Specification.pdf
Environmental controls:
Work must comply with applicable environmental regulations.
Environmental monitoring may cover ventilation, lighting, dust and noise.
Monitoring reports and corrective actions must be kept in the health and safety file.
Plant must meet noise emission requirements; untested plant may be tested at the contractor's expense and removed if not compliant.
Workers exposed to noise at or above 85dB require audiometric testing and suitable hearing protection.
Close-out documentation may include temporary structure drawings, operating manuals and environmental monitoring test results for silica, noise and dust.
Contractual Terms
Source: Annexure A - Health and Safety Specification.pdf
Contractual health and safety terms:
The project-specific health and safety specification forms part of the contract.
The Principal Contractor must incorporate equivalent health and safety requirements into contracts with contractors and suppliers.
An OHSA Section 37.2 mandatory agreement must be signed before work starts.
The Principal Contractor remains responsible for health and safety performance and legal compliance.
Health and safety files must remain live during the defects and liability period.
Any work during the defects and liability period requires the health and safety file to be assessed by the Client or Client Agent before work starts.
If the health and safety specification is amended, the Principal Contractor must provide the updated requirements to its contractors within 5 working days.
DocumentRFP194.2026_Volume 1 of 3_Procedures.pdfReview complete
Description
Source: RFP194.2026_Volume 1 of 3_Procedures.pdf
The Development Bank of Southern Africa Limited, acting as implementing agent for the Eastern Cape Department of Education, requires a contractor for alterations and additions to the existing burnt hostel at Makaula Senior Secondary School in the Eastern Cape.
Site: Makaula Senior Secondary School, Mzimvubu Local Municipality, Alfred Nzo District, Eastern Cape.
Minimum CIDB grading: 4 GB or higher.
The successful bidder signs contract form SBD 7.
The project manager is confirmed only at contracting stage.
Important Dates
Source: RFP194.2026_Volume 1 of 3_Procedures.pdf (RFP)
Compulsory site briefing
Date: 25 November 2026 at 11:00.
Venue: Makaula Senior Secondary School, Mzimvubu Local Municipality, Alfred Nzo District, Eastern Cape.
Attendance is a pre-qualifier; attendees must sign the Tender Brief Attendance Register. A joint venture must have at least one member present.
Addenda are issued only to the email addresses of attendees, and only attendees may submit tenders.
Query cut-off
Written questions due: 27 November 2026 at 12:00.
Submit to [email protected], marked for the attention of Noma Rakoma, Procurement & Tender Officer.
One consolidated questions email per bidder is encouraged. Questions received after the cut-off, or sent to another address, are not answered.
Employer response to queries
2 December 2026 at 16:30; consolidated responses are emailed to all invitees or briefing attendees.
Refer to T1.1 of the tender document; no separate technical contact is named.
Employer
Development Bank of Southern Africa Limited
1258 Lever Road
Headway Hill
Midrand
Gauteng, 1685
Telephone: (011) 313 3911
Project manager
To be confirmed at contracting.
Site
Makaula Senior Secondary School
Mzimvubu Local Municipality
Alfred Nzo District
Eastern Cape
Coordinates: approximately 30Β°55'S 28.59'E
Submission Guidelines
Source: RFP194.2026_Volume 1 of 3_Procedures.pdf (RFP)
Submission channel
Method: online upload via a Microsoft OneDrive tender submission link issued for this RFP.
A submission link must be requested from [email protected] by 3 December 2026 at 16:30; requests after that date are refused and only bidders who requested a link receive one.
Test the platform before the closing time and raise any access problems well before 16:30 on the closing day.
Only files can be uploaded, not folders. Build the folder on the bidder's own computer, compress or zip it, then upload.
Name every file exactly as prescribed and load documents in the prescribed order and structure.
Once uploaded, files cannot be reopened, edited or deleted. Keep the confirmation email as proof of upload.
Avoid excessively large files; split the submission into its prescribed components.
Telegraphic, telephonic, telex, facsimile and emailed tenders are not accepted. Late bids, or bids not lodged in the designated link, are not evaluated.
Required upload structure
Envelope 1: Volume 1 (Tendering Procedures), Volume 2 (Returnable Documents), indexed supporting evidence for Volume 2 in the exact order of the Volume 2 table of contents, and the B-BBEE certificate.
Envelope 2: Volume 3 and the priced Price Schedule / Bill of Quantities.
No price information may appear outside Envelope 2.
A two-envelope system is not otherwise required.
Returnable documents (Volume 2)
T2.1.1 Tender Brief Attendance: proof of attendance at the compulsory site briefing.
T2.1.2 Certificate of Authority for Signatory: board resolution or equivalent authorising the signatory to bind the bidder.
T2.1.3 Joint Venture / Consortium Disclosure Form: required only where bidding jointly.
T2.1.4 Record of Addenda: confirms all issued addenda were taken into account.
T2.1.5 Declaration of Non-Performance and Termination: pre-qualifier; must be completed and signed.
T2.1.6 SBD 4 Bidder's Disclosure: discloses interests of directors and shareholders, including state employment and connections to the employer.
T2.1.7 Service Provider Code of Conduct: acceptance of the DBSA's conduct rules.
T2.1.8 RFP Declaration Form: bidder's formal declaration on the RFP.
T2.1.9 Enterprise Questionnaire: ownership, directors and conflict-of-interest disclosure.
T2.1.10 Certificate of Acquaintance with Tender Document: confirms the bidder has read and accepts the tender documents.
T2.1.11 CSD registration summary report and CIDB registration proof.
T2.1.12 Tax requirement: SARS tax compliance status PIN.
T2.1.13 Registration certificates, agreements and identity documents.
T2.1.17 SBD 6.1 B-BBEE status level claim, with certificate or sworn affidavit.
T2.1.18 Subcontracting schedule: applicable only if subcontracting is used.
T2.1.19 SBD 6.2 local production and content declaration: not applicable to this tender.
Form of Offer and Acceptance (C1.1): must be priced and signed; the successful bidder later signs contract form SBD 7.
Grounds on which a bid is invalid
Offer not submitted on the bound Form of Offer and Acceptance (C1.1).
Form completed in erasable ink, or documents bearing correction fluid.
Form of Offer unsigned, unpriced, or with the bidder's name missing or illegible.
Any item in the Price Schedule / BoQ left unpriced or blank.
Submission not in the prescribed file order and naming.
Price information disclosed outside Envelope 2.
Failure to answer the employer's clarification requests within 48 hours of the communication.
Evaluation Criteria
Source: RFP194.2026_Volume 1 of 3_Procedures.pdf (RFP)
Evaluation method
CIDB Method 1, three stages, aligned to the Preferential Procurement Policy Framework Act 2000 and the Preferential Procurement Regulations 2022.
Stage 1: responsiveness.
Stage 2: financial offer and preference.
Stage 3: objective criteria and risk analysis.
No functionality / quality stage applies to this tender.
Stage 1 β pre-qualifiers (immediate disqualification if not met)
Attendance at the compulsory on-site tender briefing.
Completed and signed Declaration of Default and Termination.
Form of Offer priced and signed, in figures or words as a minimum.
At least two completed projects of a similar nature (brick-and-mortar structures) in the last five years, each with a contract award value above R5 million.
For each such project: a dated and signed letter of appointment or award on the client's letterhead, plus the matching completion certificate or letter. The award value must appear in one of these documents or in another signed supporting document; where values differ, the completion certificate value is used.
Stage 1 β responsiveness items to be supplied within 48 hours of a DBSA request
Acceptance of the Standard Conditions of Tender with no deviations, qualifications or alternatives.
Completed and signed returnable documents.
CSD summary report showing registration to do business with the DBSA.
SARS tax PIN.
SANAS-accredited B-BBEE certificate or sworn affidavit; joint ventures, consortia and partnerships must submit a consolidated certificate. No response means zero preference points.
Public liability insurance: letter of intent or actual policy from a registered insurer or financial services provider for at least R5 000 000 per claim, unlimited number of claims and no cumulative cap.
Performance or construction guarantee: letter of intent from a South African registered bank or short-term insurer for 10% of the contract sum.
Contract works insurance: letter of intent for cover of at least the contract sum plus 10%.
Valid and active CIDB contractor grading of 4 GB or higher.
Stage 2 β price and preference (80/20)
Price: 80 points.
Preference: 20 points, awarded on B-BBEE status level of contributor combined with geographical localisation.
Total: 100 points.
Black women ownership is not a scored criterion on this tender.
Stage 3 β objective criteria and risk analysis (applied to the highest-ranked bidders)
Tax compliance re-verified at recommendation stage via an active SARS PIN.
CSD registration confirmed as fully compliant.
No misrepresentation in the submitted information.
Bidder and its directors or shareholders not listed on the Register of Tender Defaulters under the Prevention and Combating of Corrupt Activities Act of 2004.
Completed Enterprise Questionnaire with no conflict of interest.
No fraud and corruption conviction; no removal from a state contract for non-performance.
A DBSA tender terminated for non-performance in the 18 months before closing, or a written non-performance notice in the 12 months before award, may lead to exclusion.
Financial health may be assessed on receivables and payables turnover, liquidity and solvency.
Unduly high or unduly low rates may be disqualified; the market average of received bids excluding outliers and the DBSA quantity surveyor's estimate are used as guides (CIDB Inform Practice Note #5).
PEP and Procure Check screening; a negative result may exclude the bidder.
Professional registration documents verified online.
The DBSA may require independent documentary proof of authenticity within 48 hours, with a contactable email and telephone reference; failure renders the bid non-responsive.
The DBSA may reject the highest-scoring bidder where the offer poses a commercial or delivery risk.
Award limits
The DBSA may decline award where a bidder's cumulative order book exceeds R60 million at CIDB Level 6 or R120 million at Level 7.
The DBSA may decline award where a bidder holds five or more active awards with outstanding value; an outstanding value of 10% or less, or practical completion reached, may still be recommended.
Joint venture participation is counted proportionally against these limits.
The DBSA may award the scope in full or in part subject to budget, and may re-tender excluded items.
Technical Specifications
Source: RFP194.2026_Volume 1 of 3_Procedures.pdf (RFP)
Scope
Appointment of a contractor for alterations and additions to the existing burnt hostel at Makaula Senior Secondary School.
Client: Eastern Cape Department of Education.
Implementing agent: Development Bank of Southern Africa Limited.
Work is construction of brick-and-mortar structures, delivered under the CIDB Standard for Uniformity in Construction Procurement (August 2019, Government Gazette No. 42622) and SANS 10845.
Site
Makaula Senior Secondary School, Mzimvubu Local Municipality, Alfred Nzo District, Eastern Cape.
Coordinates approximately 30Β°55'S 28.59'E.
Contractor grading
Minimum CIDB grading: 4 GB or higher.
Joint ventures: the entity must be registered as a joint venture, every member must be CIDB registered in the GB class, the lead partner must hold 3 GB or higher, and the combined grading must meet 4 GB or higher for the sum tendered. A signed joint venture agreement and a consolidated B-BBEE certificate are required.
Programmes not applied
CIDB B.U.I.L.D Programme: not applicable.
Skills Development Standard (Gazette Notice No. 36760): not applicable.
Indirect Targeting for Enterprise Development Standard: not applicable.
Local production and content (SBD 6.2): not applicable.
Subcontracting as an objective criterion: not applicable.
Supervision and access
The contractor must, on request, name all management and supervisory staff for the labour-intensive portion of the works and prove they meet the eligibility requirements.
The employer's representatives must be given access for inspection and testing.
Financial Requirements
Source: RFP194.2026_Volume 1 of 3_Procedures.pdf (RFP)
Pricing
Rates and prices are fixed for the duration of the contract, subject only to adjustment provided for in the conditions of contract.
Every item in the Price Schedule / Bill of Quantities must be priced; a blank or unpriced item renders the bid invalid.
Pricing instructions must be followed exactly; an unpriced cost item is queried for clarification only, with no later amendment or inclusion of cost.
Alternative, deviating or qualified tenders are not considered.
Guarantees and insurance
Performance or construction guarantee: 10% of the contract sum, evidenced at bid stage by a letter of intent from a South African registered bank or short-term insurer.
Contract works insurance: cover of at least the contract sum plus 10%, evidenced by a letter of intent from a registered insurer.
Public liability insurance: at least R5 000 000 per claim and per event, with no limit on the number of claims or cumulative value, evidenced by a letter of intent or policy from a registered insurer or financial services provider.
On award, the insurance policies must be taken out with the insurer that issued the letter of intent, or with another insurer registered under the Short-Term or Long-Term Insurance Act.
Bid validity
120 calendar days from the closing time.
Financial standing
A financial standing / bank rating document is a returnable item.
The DBSA may assess financial health through receivables and payables turnover, liquidity and solvency ratios.
Unduly high or unduly low tendered rates may be treated as financial risk and can disqualify a bid.
Compliance Requirements
Source: RFP194.2026_Volume 1 of 3_Procedures.pdf (RFP)
Registration and tax
Central Supplier Database (CSD) registration is mandatory; a CSD summary report must be submitted and the bidder must be registered to do business with the DBSA.
A valid SARS tax compliance status PIN must be submitted so the employer can view the taxpayer profile and status; a printed tax compliance status is also acceptable.
Consortia, joint ventures and subcontractors must each provide their own tax compliance status or PIN and CSD number.
Foreign suppliers with no South African residency, branch, permanent establishment or source of income are exempt from the SARS PIN requirement.
CIDB
Valid and active CIDB contractor grading designation of 4 GB or higher.
Joint venture requirements as set out in the technical specifications.
B-bbee
A SANAS-accredited B-BBEE status level verification certificate, or a sworn affidavit for EMEs and QSEs, must be submitted to earn preference points.
Joint ventures, consortia and partnerships must submit a consolidated B-BBEE certificate in the name of the joint venture.
No B-BBEE evidence means zero preference points.
Statutory registrations
CIPC business registration and directors' identity documents.
Professional or regulatory body registration where applicable.
Other compliance
No bidder, director or shareholder may be restricted from doing business with the employer or listed on the Register of Tender Defaulters.
No conflict of interest may exist; the Enterprise Questionnaire must be completed.
Documents bearing correction fluid are treated as non-responsive and must remain intact.
The DBSA may verify documents with the issuing employer or reference and may require independent proof within 48 hours.
DocumentRFP194.2026_Volume 3 of 3_Contract.pdfReview complete
Description
Source: RFP194.2026_Volume 3 of 3_Contract.pdf
Contract description
The contract is for alterations and additions to the burnt hostel at Makaula Senior Secondary School in Alfred Nzo District.
The client is the Eastern Cape Department of Education; an implementing agent manages the contract.
The works are to be carried out under a JBCC Principal Building Agreement, Edition 4.1, Code 2101, March 2005, with special conditions.
Contact Information
Source: RFP194.2026_Volume 3 of 3_Contract.pdf (TENDER)
Enquiries
Contact: Thembekile Fono
Role: Construction Project Manager, implementing agent
Telephone: 011 313 3911
Implementing agent address
1258 Lever Road
Midrand Johannesburg
Gauteng
1685
Project location
Makaula Senior Secondary School
Alfred Nzo District
Submission Guidelines
Source: RFP194.2026_Volume 3 of 3_Contract.pdf (TENDER)
Submission arrangements
Follow the submission details in the tender notice and invitation.
Submission format
Submit the tender package as one complete set; do not split it or change its contents.
Complete all required forms in black ink.
Attach company-specific certificates and information pages listed in the returnable schedule.
Returnable documents
C1.1 Form of Offer and Acceptance: signed offer to carry out the works for the tendered total, including VAT.
C2.2 Bill of Quantities: priced bill for the works.
C2.3 Amendments, Qualifications and Alternatives: record any deviations, qualifications or alternatives; a cover letter is not valid unless referenced there.
C1.3 Construction Guarantee: provide the required construction security in the prescribed form.
Disqualification risks
Missing, unsigned or incomplete returnable forms.
Altering the tender package or submitting it in parts.
Failing to record qualifications or deviations in the required schedule.
Technical Specifications
Source: RFP194.2026_Volume 3 of 3_Contract.pdf (TENDER)
Scope
Alterations and additions to the existing burnt hostel at Makaula Senior Secondary School in Alfred Nzo District.
The client is the Eastern Cape Department of Education; an implementing agent manages the procurement and contract.
Contract and design
The contract is based on the JBCC Principal Building Agreement, Edition 4.1, Code 2101, March 2005, as amended by the special conditions.
The contractor carries design responsibility for the permanent and temporary works.
Designs must be approved by the principal agent and employer before construction starts.
The contractor remains responsible for design carried out by subcontractors.
Site records and access
Keep drawings, schedules, unpriced bills or lump-sum documents, instructions, meeting minutes, health and safety files, risk register, claims and variation register, labour records and subcontractor contracts on site.
Allow the employer, principal agent and agents access to these records at all times.
Provide further information if required for investigations or audits into fraud, corruption, fronting, health and safety incidents or verification.
Programme and progress
Meet the principal agent immediately after award to prepare a programme for the first month of construction.
During the first month, prepare a detailed programme and schedule of outstanding construction information.
Update the programme when progress differs from the plan or when required.
Assess progress at intervals not exceeding 21 calendar days.
Possession, commencement and payments
Site possession is given within 3 days after the contractor provides the required construction guarantees and both parties sign the contract.
Commence works within 7 working days after taking possession.
Issue interim payment certificates no later than the 20th of each month.
Allow 11 working days per 6 months for adverse weather; no extension of practical completion for adverse weather delays.
Delay and completion
If the contractor fails to achieve practical completion, the employer may accelerate the work or appoint another party to complete it at the contractor's cost.
The employer may terminate if penalties reach 10% of the contract sum.
Pricing Schedule
Source: RFP194.2026_Volume 3 of 3_Contract.pdf
Pricing schedule
Pricing is submitted under Part C2: Pricing Data.
C2.1 contains the pricing instructions.
C2.2 is the Bill of Quantities to be priced.
C2.3 is used to record amendments, qualifications and alternatives.
The offer total must be stated in words and figures, inclusive of VAT.
Quantities in the Bill of Quantities are provisional and are to be used as a guide for programming.
Financial Requirements
Source: RFP194.2026_Volume 3 of 3_Contract.pdf (TENDER)
Pricing
Submit a priced Bill of Quantities under C2.2, following the pricing instructions in C2.1.
Record any amendments, qualifications or alternatives in C2.3.
State the total offer in words and figures, inclusive of VAT.
Construction guarantee
Provide a fixed construction guarantee in the prescribed proforma, set at 10% of the contract sum.
The guarantee must remain valid for the contract term; if the term is extended, extend or replace it for the same value and extended term.
If a valid guarantee is not maintained, the principal agent may deduct 10% from each interim payment certificate until a valid guarantee is provided.
The employer may cancel the agreement if a valid guarantee is not provided within 28 days of request.
Retention and payment deductions
Deduct 10% from each payment certificate, capped at 5% of the contract sum, until practical completion.
Reduce the withheld amount to 5% at practical completion and to nil when the final account is issued.
The employer may use retention money to correct defects or to pay subcontractors if the contractor fails to do so.
Advance payment
The employer will not provide advance payments against an advance payment guarantee.
Any advance payment request would require justification, payment timelines, an amortisation proposal and an unconditional or on-demand advance payment guarantee.
Insurance
Contract works insurance: not less than the contract sum plus 10%.
Public liability insurance: R5 000 000 per event, with no limit on the number of events.
Special risks insurance through SASRIA.
Lateral support insurance is not applicable.
Late payment interest
If the employer is an organ of state, interest may apply at the rate determined by the Minister of Finance under section 80(1)(b) of the PFMA.
Compliance Requirements
Source: RFP194.2026_Volume 3 of 3_Contract.pdf (TENDER)
Compliance evidence
Provide a National Treasury Central Supplier Database summary report.
Provide a valid SARS Tax Compliance Status PIN.
Provide a certified copy of a valid B-BBEE certificate or affidavit.
For construction work, provide a valid and active CIDB registration.
For professional services, provide valid registration with the applicable regulatory institution where required.
Subcontractor compliance
Submit domestic subcontractor agreements and supporting documents to the principal agent and employer at least 30 days before the subcontractor starts on site.
Supporting documents include B-BBEE certificate or affidavit, CIDB registration for construction work, regulatory registration where applicable, SARS Tax Compliance Status PIN and CSD summary report.
Failure to submit these documents on time is a breach of contract.
Other restrictions
The contractor cannot transfer, delegate or assign its contractual rights or obligations.
The contractor may not subcontract the whole of the works without the employer's written instruction or approval.
The contractor must comply with the Occupational Health and Safety Act and Construction Regulations, and accepts sole mandatory liability for health and safety compliance.
Health & Safety
Source: RFP194.2026_Volume 3 of 3_Contract.pdf
Health and safety
The Occupational Health and Safety Act, 1993 and the Construction Regulations, 2014 apply to the contract.
The contractor accepts sole liability as mandatory for compliance with the Act and regulations.
The parties are deemed to have agreed in writing to the mandatory health and safety provisions under section 37(2) of the Act.
The contractor must enter into the mandatory agreement set out in the scope of work; if not executed, the special condition still establishes the contractor's mandatory obligations.
The contractor must keep health and safety files on site and make them available to the employer, principal agent and agents.
The employer may request further information for investigations or audits into health and safety incidents, fraud, corruption, fronting or verification.
Contractual Terms
Source: RFP194.2026_Volume 3 of 3_Contract.pdf
Contract form and precedence
The contract uses the JBCC Principal Building Agreement, Edition 4.1, Code 2101, March 2005.
Special conditions of contract take precedence over the JBCC conditions where there is ambiguity or inconsistency.
Contract specific data, general and special conditions take precedence over drawings, scope of work and standardised specifications.
Design responsibility
The contractor carries design responsibility for the permanent and temporary works.
Designs must be approved by the principal agent and employer before construction.
The contractor is responsible for design by subcontractors.
Cession and subcontracting
The contractor cannot transfer, delegate or assign its contractual rights or obligations.
The employer may cede and delegate its rights and obligations to a related party or client on written notice.
The contractor may not subcontract the whole of the works without the employer's written instruction or approval.
Domestic subcontractors used to meet developmental and transformation requirements must be supported by the required compliance documents at least 30 days before they start.
Site records and other contractors
The contractor must keep contract records on site and allow access to the employer, principal agent and agents.
The contractor must coordinate with other project contractors and avoid unreasonable interference, disruption or delay.
The contractor must report defects or delays in other contractors' work that affect its own works.
Programme
The contractor must prepare a first-month programme immediately after award.
A detailed programme and schedule of outstanding construction information must be prepared during the first month.
Progress must be assessed at intervals not exceeding 21 calendar days.
Possession and commencement
Possession of the site is given within 3 days after the contractor provides the required guarantees and the contract is signed.
The contractor must commence within 7 working days after possession.
Termination
The employer may terminate on not less than 14 business days' written notice under the special termination clause.
On that termination, the contractor is paid for works and deliverables completed before termination, and the parties have no further claims against each other.
On termination or cancellation under clause 39.2, the employer pays amounts due for work completed, including retention after deductions, and returns any valid security.
Delay and penalties
If the contractor fails to reach practical completion, the employer may accelerate the works or appoint a third party to complete them at the contractor's cost.
The employer may terminate if penalties reach 10% of the contract sum.
Insurance and guarantees
The contractor must provide a fixed construction guarantee of 10% of the contract sum.
Contract works insurance must cover at least the contract sum plus 10%.
Public liability insurance must cover R5 000 000 per event.
Special risks insurance must be provided through SASRIA.
Alterations and additions to the existing fire-damaged girls hostel at Makaula Senior Secondary School, Eastern Cape, delivered on behalf of the Eastern Cape Department of Education.
Phase 1 of the project, EMIS number 200500534.
Executed under the JBCC Principal Building Agreement within a 3-month construction period.
Construction documentation is incomplete and quantities are provisional, so bidders price from the bills and satisfy themselves on site conditions.
Bidders price Bill of Quantities Option One, issued unpriced; every item needs a rate and an amount.
Anything left unpriced in the preliminaries is treated as covered by rates entered elsewhere in the bills.
Quantities in the bills are provisional.
Form of offer
The JBCC Form of Tender is replaced by the Form of Offer and Acceptance (C1.1), which must be completed and returned with the priced bills.
Preliminaries
Preliminaries are adjusted under Option A of clause B10.3.1, so each priced preliminaries item must be broken into its fixed, value-related and time-related portions.
Schedule of variables
The pre-tender part of the Section B12 schedule must be completed in full and handed in with the tender; the pre-tender and post-tender parts both form part of the preliminaries.
No line may be left blank: enter the information, mark it not applicable, or delete the item.
Where a choice is offered, delete the option that does not apply.
If space runs out, attach the detail and cross-reference it to the relevant clause.
Contract data
Contract variables sit in document C1.2 Contract Data; the interest of agents and the defined works area are taken from Contract Data Part C/1.
CIDB: valid registration at a grade suited to the value of the works.
CSD: active Central Supplier Database registration.
Tax: valid SARS tax compliance status PIN.
B-BBEE: a valid B-BBEE certificate or a sworn affidavit.
Health and safety: compliance with the Occupational Health and Safety Act 1993 and the Construction Regulations 2014, including a health and safety plan and an appointed Construction Health and Safety Officer.
Security: ability to lodge a construction guarantee of 10%.
Contracting: no cession, delegation or assignment of rights or obligations by the contractor.
Alterations and additions to the existing fire-damaged girls hostel at Makaula Senior Secondary School, Phase 1 (EMIS 200500534), for the Eastern Cape Department of Education.
Construction period: 3 months, running from the contractor taking possession of the site to issue of the practical completion certificate.
Construction documentation is not yet complete and the billed quantities are provisional.
Existing site and structures
No geotechnical investigation has been done.
The contractor must check dimensional accuracy and existing defects in prior work on site before building operations begin.
Existing services are not fully known: on striking underground cables, pipes or sewers, stop work in the immediate vicinity and notify the principal agent until instructed to proceed.
Adjoining properties must be inspected and any likely consequence of the works reported to the principal agent immediately.
All trees outside the footprint of the proposed structure must be protected.
Site establishment
Enclose the works as required by the Occupational Health and Safety Act.
Provide, maintain and later remove an office for the principal agent's exclusive use: minimum 4 m x 3 m x 3 m high internally, insulated and ventilated, with electric lighting, boarded floor, desk, chairs, drawing stool, drawing board and lockable drawers for drawings, kept clean and fit for use.
Erect a DRPW-compliant main notice board as detailed by the principal agent, fixed to the hoarding or to timber or tubular posts with bracing; subcontractor boards need the agent's written approval and no separate subcontractors' board is required.
Records and information
Keep on site, accessible at all times to the employer, principal agent and agents: drawings, schedules, the bills of quantities, contract instructions, minutes of site and other meetings, health and safety files, risk register, claims and variation order register, labour records and subcontractor contracts.
The employer may demand further information for any audit or investigation into fraud, corruption, fronting, health and safety incidents or verification of what the contractor has submitted, and the contractor must give the employer the same right over its subcontractors.
Copyright in all contract documents, drawings and records vests in the employer; no information about the works may be released to any outside party without the employer's prior written approval, other than to appointed subcontractors.
Bill of Quantities Option One, issued unpriced; Bill No. 1 covers preliminaries.
Preliminaries are priced under Option A of clause B10.3.1, with each item split into fixed, value-related and time-related portions.
The worked example at item B4.1 (management of the works) applies 10% fixed, 15% value-related and 75% time-related to a base of R3 437 050,42.
Preliminaries items left unpriced are deemed included elsewhere in the bills.
Quantities are provisional.
The pre-tender information in the Section B12 schedule must be completed in full and returned, with no blanks; contract variables sit in C1.2 Contract Data.
Construction guarantee: 10% of the contract sum; the JBCC 12.5% and 7.5% options are both replaced with 10%.
The guarantee must stay valid for the whole contract term and be extended or replaced for any extension.
If no valid guarantee is in place, the principal agent deducts 10% from every interim payment certificate and holds it until a valid guarantee is lodged, releasing the held amount in the next certificate.
Retention
5% deducted from each payment certificate, capped at 5% of the contract sum, until practical completion.
Reduced to 2.5% at practical completion and to nil once the final account is issued.
Retention money may be used to correct defects the contractor fails to remedy, or to cover unpaid service providers and subcontractors.
Payment
Interim payment: 30 calendar days, replacing the JBCC 7-day period.
The precondition that the employer issue a tax invoice before payment is removed for both interim and final payments.
Amounts are exclusive of VAT unless a clause states otherwise.
Statutory taxes, duties and levies are for the contractor's account.
Pricing format
Admeasurement bill of quantities (Option One) with a separately priced preliminaries bill.
CIDB: valid registration appropriate to the value of the works.
CSD: active Central Supplier Database registration.
Tax: valid SARS tax compliance status PIN.
B-BBEE: valid B-BBEE certificate or sworn affidavit.
Statutory health and safety
The Occupational Health and Safety Act 1993 and Construction Regulations 2014 apply in all respects.
A health and safety plan is required under Construction Regulation 7(1)(a) and a Construction Health and Safety Officer must be appointed under Regulation 8(5).
The contractor carries sole liability as mandatory for compliance; the section 37(2) mandatory agreement is deemed agreed in writing on signature and binds even if the separate agreement is never executed.
Contracting restrictions
The contractor may not cede, delegate or assign any right or obligation; the employer may cede and delegate to a Related Party or Client on written notice, whereupon the Client becomes the employer.
The whole of the works may not be subcontracted without the employer's written instruction or approval, failing which the employer may require cession of the contract to the subcontractor.
Every subcontract must be submitted to the principal agent, and the employer may redact commercially sensitive information.
Subcontractors appointed to satisfy developmental and transformation obligations under the Preferential Procurement Policy Framework Act count as domestic subcontractors.
Where a subcontractor debt threatens progress or the contractor's obligations, the employer may pay the subcontractor directly and deduct that amount from sums due to the contractor, with no cost or time relief for the contractor.
The Occupational Health and Safety Act 1993 and Construction Regulations 2014 govern the contract in all respects.
A health and safety plan must be compiled under Construction Regulation 7(1)(a).
A Construction Health and Safety Officer must be appointed under Construction Regulation 8(5).
The contractor accepts sole liability as mandatory for compliance with the Act and regulations; the section 37(2) mandatory agreement is deemed agreed in writing on signature and the clause binds even if that separate agreement is not executed.
The works must be enclosed as required by the Occupational Health and Safety Act.
Health and safety files must be held on site and be open to the employer, principal agent and agents at all times.
The employer may call for information for any investigation or audit into health and safety incidents.
JBCC Principal Building Agreement Edition 4.1 (Code 2101, March 2005) read with the JBCC Preliminaries Code (Code 2103, May 2005 edition); clauses are cited by number and heading, with the contract-specific amendments set out in the preliminaries.
Dispute settlement under JBCC clause 40 stands in its original form; the state clause amendments do not apply to it.
Duration and completion
Construction period of 3 months from possession of the site to practical completion.
Late practical completion attracts a penalty per calendar day at the rate stated in the schedule, calculated from the stated or revised completion date up to actual practical completion or cancellation.
Risk and insurance
Works risk, indemnities, works insurances, liability insurances and effecting insurances clauses apply without amendment.
Assignment
No cession, delegation or assignment by the contractor; the employer may cede and delegate to a Related Party or Client on written notice, with the Client then assuming the employer's role. Related Party is defined by control, organs of state and implementing-agent relationships; Client means the owner, funder or sponsor of the project or programme under the MOA with DBSA.
Cancellation
On cancellation for any reason, the contractor must on written instruction stop the works on the stated date and withdraw from site, and may not claim a lien or any right of retention.
On cancellation or cessation, the employer pays for work completed at the termination date, including retention, after deducting amounts owed to the employer, and returns guarantees still valid.
Interpretation
Amounts are VAT-exclusive unless stated; month means calendar month; day counts exclude the first day and include the last, moving to the next working day if the last day is not a working day; including does not limit the general words; no interpretation against the drafter; definitions carrying rights are enforceable; invalid provisions are severed.
DocumentAnnexure B - Baseline Risk Assessment.pdfReview complete
Description
Source: Annexure B - Baseline Risk Assessment.pdf
Scope
Baseline hazard identification and risk assessment for the renovations and repairs of the girls' hostel at Makaula Senior Secondary School, Eastern Cape.
Issued to bidders and service providers as the safety baseline the appointed contractor must work from.
Document control
Revision 0, dated 30 October 2026.
Compiled by S. Madayile, registered with the SACPCMP as CHSA/175/2026.
Distribution: Liwani Consulting.
Technical Specifications
Source: Annexure B - Baseline Risk Assessment.pdf (unknown)
Project
Renovations and repairs to the girls' hostel at Makaula Senior Secondary School, Eastern Cape, for the Eastern Cape Department of Education.
The baseline risk assessment covers the construction activities a contractor will carry out on the site.
Work activities covered
Site establishment, site camp footprint and hauling routes.
Excavation and trenching, including work alongside underground and overhead services (Telkom lines, electrical cables, water supply lines).
Roofing, painting, plastering, plumbing, tiling, paving and kerbing.
Mechanical services installation and LPG gas installation.
Hot and cold water reticulation and pressure testing.
Lightning protection system installation.
Movement of plant, trucks and construction traffic on a school site that remains occupied by learners and educators.
Quality Management
Source: Annexure B - Baseline Risk Assessment.pdf
Plant and equipment
Plant must be listed on an equipment register and inspected by a site-appointed inspector.
A daily pre-use checklist must be completed for every item of plant.
Hand tools and equipment must be inspected before use, recorded on a tool register and checked by an appointed hand tool inspector; defective items are removed from site.
Water reticulation
Pressure testing must follow a documented procedure, with the system isolated, occupants warned and testing done at a safe pressure.
Storage tanks must be cleaned and a disinfection and flushing procedure followed.
Work must comply with SANS 10252.
Compliance Requirements
Source: Annexure B - Baseline Risk Assessment.pdf (unknown)
Statutory compliance
Construction Regulations 2014 apply, together with any other regulations relevant to the scope; the principal contractor must integrate them into its own risk assessments.
Construction vehicles and mobile plant on public roads must meet the National Road Traffic Act, 1996.
Excavation work must be notified to the Provincial Director at least 7 days before it starts.
Competence and appointments
Work must be supervised by competent persons appointed in writing.
Plant operators must hold competency certificates and valid medical certificates of fitness.
Only trained and competent workers may place concrete, operate plant, or carry out plumbing and demolition work.
Technical standards and certificates
LPG installations: SANS 10087-1, installed by a licensed gas practitioner, with a leak test and Certificate of Compliance.
Electrical connections: Certificate of Compliance issued by a registered electrician.
Water reticulation: SANS 10252.
Lightning protection: SANS 62305, with earth resistance below 10 ohms.
Health & Safety
Source: Annexure B - Baseline Risk Assessment.pdf
Statutory basis
The assessment applies the Construction Regulations 2014 and any other regulations relevant to the scope; the principal contractor must integrate them into its own risk assessments.
Required before work starts
The principal contractor must submit a risk assessment, health and safety plan, method statements and supporting documentation before commencing on site.
Site layout must be approved by the Resident Engineer; the site camp footprint and hauling routes must be confirmed with the client and the RE.
Excavation work must be notified to the Provincial Director at least 7 days before it starts.
Work must be supervised by competent persons appointed in writing.
All employees and visitors must undergo health and safety induction.
Services and excavations
Obtain service plans and locate and mark underground cables before work begins; excavate alongside services rather than directly above them; use insulated tools for hand digging near live cables; support services once exposed.
Account for the reach and height of plant and equipment when working near overhead lines, and create alternative routes where lines cannot be avoided.
No work in excavations 1.2 m deep or more unless the sides are shored, braced or benched; a competent person decides on shoring below 1.2 m; inspect walls after heavy rain; never enter unsupported excavations.
No open holes or trenches may be left accessible to learners, the public or animals.
Site access and traffic
Provide a separate construction access away from the school entrance, with flagmen at access and egress points.
Erect warning signage and a speed restriction of 20 km/h within the school grounds, and provide alternative routes and gates.
Vehicles must be checked for roadworthiness before entering site; drivers are tested for alcohol regularly; construction vehicles must have automatic acoustic reversing alarms.
Operators must hold competency certificates and medical certificates of fitness; plant must carry warning devices and be inspected before use.
Operators must stop and switch off machinery when a person enters the working exclusion zone; reflective PPE must be worn.
Hazardous substances and waste
Chemical storage must be bunded, with safety data sheets available at all times, no smoking or open flames, and a trained person in charge of the store.
Hazardous waste must be neutralised before disposal and only dumped at municipal-approved sites.
Trade-specific controls
Demolition: supervisor permission required, full PPE, earplugs or earmuffs, safe working distances, competent operators only.
Painting and plastering: respirators, allergy testing, eye protection, posture training, extension arms to limit bending.
Concrete and reinforcement: trained and competent workers only, task-specific induction before starting, safety glasses, long socks with gumboots, gloves, crane or hi-ab for heavy material, rotation of workers carrying steel.
Vibration exposure: at least 10 minutes away from vibrating machinery in every 3 hours, plus supervision and correct operating technique.
Weather: monitor strong wind before starting, suppress dust with water carts, and stop work in unsafe conditions.
Specialist installations
LPG: SANS 10087-1 compliant installation by a licensed gas practitioner, leak test and Certificate of Compliance, cylinders stored upright and chained, hand digging within 500 mm of services.
Mechanical services: fall protection plan with rescue plan, scaffold or MEWP with competent erector, rigging plan, lock-out/tag-out, COC electrician, hot work permit and fire extinguisher.
Water reticulation: excavation plan and shoring, daily inspection, pressure testing at safe pressure, disinfection and flushing, SANS 10252 compliance.
Lightning protection: fall protection and roof edge protection, no roof work in wet or windy conditions, stop work if lightning is within 10 km, earth first, earth resistance below 10 ohms, SANS 62305, barricade below and tool lanyards.
Risk rating
Likelihood and impact are each scored 1 (low) to 3 (high); the combined score gives low risk (2), medium risk (3β4) or high risk (5β6).
The offer must be made on the Form of Offer and Acceptance (C1.1), which replaces the JBCC Form of Tender.
The pre-tender schedule must be completed in full and included with the bid; every space must be answered, marked not applicable, or deleted, with no blanks.
Where choices are offered, delete the options that do not apply; if more space is needed, attach the information and cross-reference the relevant clause.
Drawings issued with the tender are indicative only; any unclear item must be clarified in writing with the principal agent before the bid is submitted.
Any proposed alternative to a named trade product requires prior written approval from the principal agent before the closing date; otherwise the named product is deemed offered.
Imported materials or equipment must be fully described; incomplete information may exclude the item from price adjustment.
Alterations and additions to the burnt hostel wing, excluding the roof, plus external works at Makaula Senior Secondary School.
The works are to be carried out under the JBCC Principal Building Agreement Edition 4.1 and the JBCC Preliminaries Code 2103 May 2005.
Bill quantities are provisional and construction documentation is not complete.
No geotechnical investigation is provided.
The site is in a security area; permission to enter must be obtained from the Head Master or responsible officer, and the contractor must notify the unit commander or responsible officer before starting work.
Existing services encountered must be reported to the principal agent immediately and affected work suspended until instructed.
Existing work must be checked for dimensional accuracy and defects before building operations, and adjoining properties must be inspected for possible effects.
Existing or occupied building portions must be protected.
Trees outside the proposed structure must be protected; dust must be controlled by watering and temporary screens.
The contractor must provide water, electricity, telecommunications and ablution facilities.
A site office for the principal agent must be provided, with minimum internal dimensions of 4 m by 3 m by 3 m high, insulated, ventilated, electrically lit, boarded floor, desk, chairs, drawing stool, drawing board and lockable drawers for drawings.
A DRPW-compliant main notice board must be erected and maintained; subcontractor notice boards are not required.
Materials and workmanship are governed by PW371 Edition 2.1 July 2014, and measurement follows the Seventh Edition of the Standard System of Measuring Building Work.
Pricing is based on provisional bills of quantities.
Preliminaries are priced using Option A, with amounts allocated to Fixed, Value Related and Time Related categories; payment of preliminaries is prorated.
For management of the works, the stated allocation is 10% fixed, 15% value related and 75% time related.
Unpriced preliminary items are deemed included elsewhere in the bills.
The interim payment period is amended to 30 calendar days.
Imported materials or equipment that are not fully described may be excluded from contract price adjustment.
Security and retention
The employer may choose the required security; the amended guarantee percentage is 10%.
If a valid construction guarantee is not maintained, 10% may be deducted from each interim payment certificate until a valid guarantee is provided.
Retention is 5% of each payment certificate, capped at 5% of the contract sum until practical completion.
At practical completion, retention reduces to 2.5%, and it reduces to nil when the final account is issued.
The employer may use retention to correct defects if the contractor fails to do so.
Insurance and delay
No specific insurance amount is set for injury to persons or property, or for removal of support to adjoining properties.
For late completion, the penalty is R3.50 per R100 of contract value per calendar day, excluding VAT.
The contract period is 3 months from possession of the site to practical completion.
The contract is governed by the JBCC Principal Building Agreement Edition 4.1 Code 2101 and the JBCC Preliminaries Code 2103 May 2005.
The Occupational Health and Safety Act 85 of 1993 and the Construction Regulations 2014 apply, and the contractor carries mandatory health and safety obligations.
A health and safety plan must be compiled and a Construction Health and Safety Officer appointed as required by the Construction Regulations.
The contractor must enclose the works as required by occupational health and safety legislation.
The contractor must keep contract documents, drawings, instructions, minutes, health and safety file, risk register, claims and variation registers, labour records and subcontract agreements on site and allow access to the employer and principal agent.
The contractor may not subcontract the whole of the works without written employer approval; subcontract agreements must be submitted to the principal agent.
If the contractor fails to pay a subcontractor and this affects progress, the employer may pay the subcontractor directly and recover the amount from the contractor.
The contractor may not cede, delegate or assign its rights or obligations; the employer may cede or delegate to a related party or client.
On cancellation, the contractor must discontinue the works and vacate the site on written instruction, without relying on any lien or retention right.
DocumentRFP194.2026_Volume 2 of 3_Returnables.pdfReview complete
Description
Source: RFP194.2026_Volume 2 of 3_Returnables.pdf
Scope and bidder acknowledgement
The procurement is for alterations and additions to an existing burnt hostel at Makaula Senior Secondary School.
Bidders must confirm that they have considered conditions likely to affect the cost and construction of the works and are satisfied with the description of the work and explanations provided at the tender brief.
Submission Guidelines
Source: RFP194.2026_Volume 2 of 3_Returnables.pdf (RFP)
Submission preparation
All returnables must be completed, signed and kept in the issued order; the returnable pack must not be separated or altered.
Supporting attachments must be compiled in a separate file and indexed to match the returnables checklist.
Only returnables marked applicable need to be completed.
Returnable forms and obligations
T2.1.1 Tender Brief Attendance: proves attendance at the compulsory tender brief; online attendance requires company name, email, contact number and attendee name in the MS Teams chat; physical attendance requires signing the register; failure may lead to disqualification.
T2.1.2 Certificate of Authority for Signatory: confirms the signatory may bind the bidder; attach the relevant board, member, partner or sole-owner resolution, or a joint-venture power of attorney.
T2.1.3 Joint Venture/Consortium Disclosure Form: required only for joint ventures or consortia; attach a signed joint-venture agreement showing ownership, control, management, risk, profit, capital, equipment and work allocations; an unsigned or incomplete joint venture may be treated as non-responsive.
T2.1.4 Record of Addenda: lists all addenda received before closing and confirms they have been considered.
T2.1.5 Declaration of Default and Termination: discloses all project defaults or terminations involving the employer in the last five years; it must be signed even if there are none; a false declaration leads to disqualification.
T2.1.6 SBD 4 Bidder's Disclosure: declares state employment, relationships with the procuring institution and related-enterprise interests; a false declaration leads to disqualification and listed tender defaulters or restricted suppliers are automatically excluded.
T2.1.7 Service Provider Code of Conduct: accepts the employer's conduct, anti-corruption, conflict-of-interest and POPIA obligations; the bidder must ensure subcontractors comply.
T2.1.8 RFP Declaration Form: must be completed and signed as required.
T2.1.9 Enterprise Questionnaire: confirms tax authorisation, absence from the tender-defaulter register, no relevant fraud or corruption convictions, no conflicting tender relationships and truth of the responses.
T2.1.10 Certificate of Acquaintance with Tender Document: confirms the bidder has considered the tender conditions and understands the work.
T2.1.11 Proof of Registration with CSD and CIDB: provides evidence of Central Supplier Database registration and CIDB registration.
T2.1.12 Tax Requirement: provides evidence of tax compliance or authorises SARS tax-status verification.
T2.1.13 Registration Certificates / Agreements / Identity Documents: provides company or entity registration documents, relevant agreements and identity documents.
T2.1.15 UIF Registration: provides Unemployment Insurance Fund registration evidence.
T2.1.16 Financial Standing / Bank Rating: provides evidence of financial standing or bank rating.
T2.1.17 SBD 6.1 B-BBEE Status Level Certificate: provides the B-BBEE status level for preference scoring.
T2.1.18 Subcontracting Schedule: complete only if applicable.
T2.1.19 SBD 6.2 Local Production and Content Declaration: complete only if applicable.
Disqualification risks
Missing, unsigned or incomplete mandatory returnables.
Failure to attend the tender brief or provide acceptable proof of attendance.
False declaration of interest, default, termination, tax, registration or B-BBEE information.
Submitting a joint venture without a formal signed agreement where required.
Listing on the Register for Tender Defaulters or the List of Restricted Suppliers.
Evaluation Criteria
Source: RFP194.2026_Volume 2 of 3_Returnables.pdf (RFP)
Evaluation factors
Mandatory returnables and declarations must be complete and truthful.
B-BBEE status level must be supported by SBD 6.1 for preference scoring.
Tender brief attendance and proof of attendance are required; failure may lead to disqualification.
Joint ventures must be formalised with a signed agreement; non-compliance may render the bid non-responsive.
Pricing Schedule
Source: RFP194.2026_Volume 2 of 3_Returnables.pdf
Pricing basis
Bidders must determine rates and prices only after considering all conditions and aspects that could influence the cost or construction of the works.
Financial Requirements
Source: RFP194.2026_Volume 2 of 3_Returnables.pdf (RFP)
Pricing and financial capacity
Bidders must determine rates and prices after considering conditions that could affect the cost and construction of the works.
Proof of financial standing or bank rating must be submitted.
Where a joint venture is used, the disclosure must identify the authority to acquire performance guarantees.
Compliance Requirements
Source: RFP194.2026_Volume 2 of 3_Returnables.pdf (RFP)
Compliance requirements
CSD: valid Central Supplier Database registration must be evidenced.
CIDB: valid CIDB registration appropriate to the works must be evidenced.
Tax: valid SARS tax clearance or tax pin must be evidenced, or SARS tax-status verification authorised.
COIDA: valid Workmen's Compensation registration must be evidenced.
UIF: valid Unemployment Insurance Fund registration must be evidenced.
B-BBEE: SBD 6.1 status level certificate is required for preference scoring.
Defaults: all project defaults or terminations with the employer in the last five years must be declared; false declaration leads to disqualification.
Restricted suppliers: listed tender defaulters or restricted suppliers are automatically disqualified.
Signatory authority: the signatory must have documented authority to bind the bidder.
Joint ventures: a formal signed joint-venture agreement is required, with ownership, control, management, risk, profit, capital, equipment and work allocations.
Conduct: the employer's Service Provider Code of Conduct must be accepted and applied to subcontractors.
Local content: SBD 6.2 must be completed only if applicable.
Subcontracting: the subcontracting schedule must be completed only if applicable.
Contractual Terms
Source: RFP194.2026_Volume 2 of 3_Returnables.pdf
Contractual conduct and declarations
Bidders must accept the employer's Service Provider Code of Conduct, including anti-corruption, conflict-of-interest, accurate disclosure and POPIA obligations.
Subcontractors must be made aware of and adhere to the code before tender submission.
Joint ventures must be formalised before submission; a letter or notice of intention to formalise after award will not be accepted.
Bidders must declare all project defaults or terminations with the employer in the last five years; false declarations lead to disqualification.
Breach of the code may lead the employer to review or discontinue doing business with the service provider.
Section
Source: RFP194.2026_Volume 2 of 3_Returnables.pdf
Tender brief and joint-venture evaluation factors
Failure to provide acceptable proof of tender brief attendance may result in disqualification.
A joint-venture agreement must specify each partner's equipment contributions, including type, quality and quantity.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
1258 Lever Rd, Headway Hill, Midrand, 1685, South Africa
Document-Backed
Recently Synced
Source Snapshot Available
AI Enhanced
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
8
Last checked
17 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.