Eastern Cape - Coega Development CooperationLocation
Western Cape
Closing Date
31 Aug 2026
Documents available on tender detail page
Tender Type
Request for Proposal
Delivery Location
CDC Cape Town Office 60 St Georges Mall - 11 floor, South African Reserve Bank Building - Cape town - 8000
Organization Type
GOVERNMENT
Published
24 Jul 2026
OCDS Reference
ocds-9t57fa-163313
This tender is for the appointment of a turnkey contractor to undertake the total upgrade of the groote schuur heritage house museum in cape town. The coega development corporation, acting as implementing agent for the national department of public works and infrastructure, seeks a contractor to deliver a complete design-develop-construct-commission solution over 21 months. The project must adhere to heritage conservation principles and statutory requirements.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Monday, 31 August 2026 - 12:00
Venue
Cape Town Coega Development Corporation Offices located at 60 St Georges Mall,11 floor, South Africa
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
The documentation for this RFP process can be downloaded from the cdc’s website: www.coega.co.za Or the national treasury e-tender portal from friday, 24 july 2026 at 10h00.The Cdc will not take responsibility for any errors that may occur in the downloading of documents. Bidders are therefore required to ensure that they download the full pack with NO missing pages. For any further information, kindly visit cdc website (www.coega.co.za) Under current tenders.
Categories
Request for Proposal
CDC Cape Town Office 60 St Georges Mall - 11 floor, South African Reserve Bank Building - Cape town - 8000
AI Document Analysis Stages
Important Dates
Source: CDC-277-26 - RFP.pdf (RFP){"closingDate":"31 August 2026","briefingSession":"{"date":"04 August 2026","time":"12h00","venue":"12h00, at the Address","is_compulsory":false}"}
24 Jul
2026
Tender Published
Tender was published
31 Aug
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
CDC-277-26 - RFP.pdf
The Coega Development Corporation (CDC) invites proposals for a turnkey contractor to undertake the total upgrade of the Groote Schuur Heritage House Museum in Cape Town. The project involves a complete design-develop-construct-commission solution, including decanting, design, execution, commissioning, handover, and close-out, and must be completed within 21 months.
CDC-277-26- Tender Advert.pdf
The Coega Development Corporation (CDC) invites proposals from qualified Turnkey Contractors for the total upgrade of the Groote Schuur Heritage House Museum in Cape Town. The project requires a complete design-develop-construct-commission solution, adhering to heritage conservation principles, with a 21-month completion timeline. The contractor must manage all aspects from decanting to close-out, including appointing specialized professional service providers.
To download these documents and access AI-powered analysis, visit the main tender page.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Median Estimate
R 280 103
Range
Based on 24 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Contact Information
Source: CDC-277-26 - RFP.pdf (RFP){"name":null,"email":null,"phone":null,"department":"s and","address":null}
Submission Guidelines
Source: CDC-277-26 - RFP.pdf (RFP)Returnable Documents: Compensation Fund or approved Licensed Insurer specified as the J/V entity for the duration of the, (gg) Any misrepresentation of information will lead to immediate disqualification of the Bidder’s, (ii) Completion Certificates – indicating the date of completion and project name. certificate to, 6 The Personnel listed below as key personnel, whom he/she proposes to employ on the contract, 7 Fully completed, handwritten, priced Bill of Quantities filled in clearly legible with black permanent, ink including the Health and Safety Bill of Quantities. In cases where the P&Gs are not priced but
Evaluation Criteria
Source: CDC-277-26 - RFP.pdf (RFP)Active CIDB grading of 7GB or higher (6GB PE not eligible); VAT registered; registered on National Treasury Central Supplier Database (CSD); tax compliant; not listed as de-registered with CIPC; not a public servant; must attend compulsory briefing meeting; must provide proof of past performance on a General Building project of at least R9m completed in last 10 years.
Technical Specifications
Source: CDC-277-26 - RFP.pdf (RFP)The Coega Development Corporation (CDC) was appointed as the Implementing Agent (IA) by the
Department of Public Works and Infrastructure (DPWI) Prestige Projects to implement the Museum
Total Upgrade, including fire detection protection system, roof repairs, and Interior and Exterior
Waterproofing.
Groote Schuur Museum was constructed in 1897 by Sir Herbert Baker an Architect for Cecil John
Rhodes. A Large, ornate double-storey 'Cape Revival mansion typical of Baker's work. Two offset
rectangular wings, the main reception room wing having generous verandas front and back, the
second wing, being more service orientated, is built around a small courtyard. A third, a long, single-
storey flanking wing, containing utility rooms, serves as a retaining structure to the service wing.
Baker's reworking of traditional Cape architectural elements is seen in full display here - ornate
gables, mouldings, twisted chimneys, large 'cottage pane' windows with solid-panel shutters,
French doors, elaborate staircases and finely detailed and crafted Burmese teak interior joinery
abound. Period elements from around the world reflecting early colonial architecture were acquired
to create an 'authentic' Cape feel.
This call for RFP requests potential Turnkey Contractors to register their interest in participating in
providing turnkey services, which will entail decanting, designing, execution, commissioning,
Handover, and close-out of the project.
The Groote Schuur Museum is located at the Groote Schuur Estate in Cape Town, Western Cape
province.Address is Groote Schuur Estate, Rhodes Drive, Rondebosch, Cape Town, 7700, South
Africa. 33°57'50"S 18°27'51"E.
Failure to adhere to the conditions stated under the Mandatory Requirements as listed in Table 1
of this RFP, will render the submission non-responsive and the submission will be declared as null
and void and will not be considered further.
RFP - CDC/277/26 of 121 Rev 1 23/07/2026
Request for Proposal
Coega SEZ and Port DPWI- Programme
Zone Development and Operation
4.1 General Conditions
4.1.1 Socio-Economic Transformation
The EPWP and NYS programmes form part of the project, with the CIDB-B.U.I.L.D
programme also part of the project.
4.1.2 Safety, Health, Environmental & Quality Requirements
The Bidder will provide Safety, Health and Environmental plans to the CDC for approval
before commencing work on site. The Bidder shall at all times adhere to and strictly
comply with all applicable health and safety legislation, regulations, industry codes and
CDC’s Health and Safety specifications included in (Annexure Q). Bidder shall note
that the Facilities will be occupied and shall protect the safety of the tenant while
minimizing impact to the operation of the facility.
Upon appointment of the Successful Bidder, it will be required to develop Occupational
Health, Safety and Environmental Management Systems to comply with the SANS
Norms and Standards.
4.1.3 Labour Issues During Construction
The Successful Bidder shall comply with the EPWP & NYS Specification – “Annexure
R” (Construction Labour) during the construction stage.
4.2 Disqualification of Bidders
(a) Prospective Bidders or successful Bidders will be disqualified immediately either:
During the Biding process;
During the Bid evaluation process;
During the Bid adjudication process;
After the Biding process has been concluded; or
During the execution of the contract if they are found to have conducted or committed any
of the following:
(i) The Bid is non-responsive as determined in this document under clause 10.1;
(ii) Not registered on the National Treasury’s Central Supplier Database (CSD) at the
time of concluding the procurement process, having a reasonable time to do so been
afforded to the Bidder;
RFP - CDC/277/26 of 121 Rev 1 23/07/2026
Request for Proposal
Coega SEZ and Port DPWI- Programme
Zone Development and Operation
(iii) Bid/Proposal Document or any of the returnable either not signed or signed by
another person other than the designated signatory, per Annexure C;
(iv) Bidders, Bidder’s representatives, associates, or shareholders that sought to
influence adjudication process of this Bid, or outcomes of the adjudication process,
directly or indirectly;
(v) Bidder that failed to follow or observe the lines of communication that are prescribed
in the Advert;
(vi) Any Bidder or its principals or both who have engaged in corrupt and fraudulent
practices, not only with the CDC but anywhere else;
(vii) The Bidder has misrepresented information submitted;
(viii) Collusion among Bidders;
(ix) The submission is late (as determined in this document);
(x) The Bid documents have been filled in pencil and/or have correction fluid markings;
or not duly signed where changes are made;
(xi) Bidders appearing on National Treasury List of Restricted Suppliers;
(xii) Letter of Bid (form of offer and acceptance) not signed as required;
(xiii) Bidders who have pending liquidation, in receivership, bankrupt/insolvent (actually
and commercially);
(xiv) Bidders who have poor or negative performance reports on previous projects.
(b) All the information as listed in Annexure F (Pricing Schedule) must:
(i) Form part of the Bidder’s Submission to this RFP;
(ii) Be provided as required – accurate and complete;
(iii) Not be altered using a Correcting Fluid but scratched out and initialled;
(iv) Where altered, be initialled; and
(v) Signed, complete by the duly authorised Bidders Representative.
Failure to which would lead to disqualification of the Bidder.
5.1 Conditions of Contract
The Conditions of Contract for Turnkey Projects Second Edition 2017, (FIDIC “Silver Book”)
issued by the International Federation of Consulting Engineers (FIDIC). Copies of these conditions
of contract may be obtained from the South African Institute of Civil Engineering (Tel. 011 – 805
RFP - CDC/277/26 of 121 Rev 1 23/07/2026
Request for Proposal
Coega SEZ and Port DPWI- Programme
Zone Development and Operation
5.2 Letter of Bid (form of offer and acceptance)
(a) Upon completing the Contract Price Schedule, the Bidders must furnish the Letter of Bidder,
as the Form of Offer, for the decanting, designing, execution, commissioning, Handover, and
close-out, which is included as Annexure G.
(b) Upon completion of the procurement process for this RFP the CDC will issue a Letter of
Acceptance to the successful Bidder, as a Form of Acceptance.
All proposals are to be submitted in a format specified in this enquiry (if applicable). However,
Bidders are welcome to submit additional / alternative proposals over and above the originally
specified format. It should be noted that adjudication will be done on the originally specified format.
Successful Bidders will need to submit their proposed Implementation Programme for duration of
the contract.
Note: Bidder shall price for all activities of the contract as set out in the activity schedule in
the Invitation to Bid Schedule.
The Bid evaluation process will consist of the following stages:
(a) Responsiveness Assessment
(b) Functionality Assessment
(c) Quantitative Assessment
(d) Qualitative Assessment
(e) State Security Clearance
7.1 Responsiveness Assessment
(a) In order for the Bidders to be considered as being responsive and eligible for the next stage
of assessment it has to pass the responsiveness assessment stage. This will be determined
from the submitted Bid and returnable that are listed in Table 2 below.
(b) If any of the items reflected in Table 2 is not furnished fully, filled in erasable ink or not signed
and initialled on each page by the duly authorised Bidders representative, then the submitted
bid will be considered as null and void and shall be considered as non-responsive and will
therefore not be assessed further.
RFP - CDC/277/26 of 121 Rev 1 23/07/2026
Request for Proposal
Coega SEZ and Port DPWI- Programme
Zone Development and Operation
Responsiveness checklist
Table 1: compliance administrative requirements
NO. description
(1) Completed and signed Invitation to Bid (SBD 1). In the case of a Joint Venture/Consortium,
each entity MUST provide the CSD number in the SBD 1 form.
(2) Completed and signed Bidder’s Disclosure Form (SBD 4). In case of a Joint
Venture/Consortium, a SEPARATE SBD 4 form in respect of each party to the JV MUST be
completed and submitted)
Table 2: mandatory requirements to be submitted by bidders
(1) Signed letter of intent to enter into JV/Consortium to be signed by all parties.
(2) Completed and Signed Certificate of Authority of Signatory to be signed by ALL BIDDING
ENTITIES and in case of a Joint Venture/Consortium the Authority of Lead Partner to sign
JV/Consortium documents to be signed by all parties in the JV. Proof of authority to sign may be
submitted in the form of a company resolution.
(3) Bidder must be registered with the Construction Industry Development Board (CIDB) and must
submit proof of an active CIDB grading of 7GB or higher. Emerging contractors with CIDB grading
designation of 6GB PE are not eligible to make submission and will not be considered.
(4) Signed Attendance Register at the mandatory briefing meeting. It must be completed in the name
of the bidding entity. One person cannot represent more than one company.
Failure to attend the compulsory briefing meeting will lead to the Bidder’s elimination and the
submission will not be evaluated further.
(5) General Building Contractor:
Demonstrated experience (past performance)
Bidders are to provide details on one General Building Construction Project with a minimum value of
R 9m, that has been completed in the past 10 years.
Bidders MUST provide:
(i) Appointment Letters – indicating the date, project name, description and value.
RFP - CDC/277/26 of 121 Rev 1 23/07/2026
Request for Proposal
Coega SEZ and Port DPWI- Programme
Zone Development and Operation
(ii) Completion Certificates – indicating the date of completion and project name. certificate to
be signed by the relevant signatories.
(iii) Reference Letter – indicating the project name, client’s comments on the performance of
the bidder and dully signed.
All three documents must be submitted from the previous employer or consultants that they
have worked with. Details of contactable reference for a minimum of 1 (one) project listed are
to be included.
6 The Personnel listed below as key personnel, whom he/she proposes to employ on the contract
should his offer be accepted. Complete Annexure L:
(a) Electrical Engineer Services - Must be actively registered Professional Engineer / Professional
Engineering Technologist registered with the Engineering Council of South Africa (ECSA) as
Pr.Eng / Pr.Tech Eng.with the Engineering Council of South Africa (ECSA)—Candidate
registrations will not be accepted.
(b) Quantity Surveying Services – Professional Quantity Surveyor actively registered with the
South African Council for the Quantity Surveying Profession (SACQSP) as Pr.QS Candidate
registrations will not be accepted.
(c) Civil /Wet services engineer/Structural Engineering Services – Professional Engineer /
Professional Engineering Technologist actively registered with the Engineering Council of South
Africa (ECSA)– as Pr.Eng / Pr.Tech Eng Candidate registrations will not be accepted.
(d) Mechanical Engineering Services - Professional Engineer / Professional Engineering
Technologist actively registered with the Engineering Council of South Africa (ECSA) as Pr.Eng /
Pr.Tech Eng. Candidate registrations will not be accepted.
7 Fully completed, handwritten, priced Bill of Quantities filled in clearly legible with black permanent
ink including the Health and Safety Bill of Quantities. In cases where the P&Gs are not priced but
included within the tendered rates, the bidder must explicitly indicate as such. Failure to provide the
total amount for P&Gs or to state if the amount is covered elsewhere will result in immediate
disqualification. The bidder must expressly state ‘’Included or elsewhere covered’’ for line items that
are covered elsewhere in the Measured Works items. Non-compliance will lead to immediate
disqualification. Any mistakes must be neatly crossed with one line and corrected rate written above
it and initialized by the Tenderer.
RFP - CDC/277/26 of 121 Rev 1 23/07/2026
Request for Proposal
Coega SEZ and Port DPWI- Programme
Zone Development and Operation
8 Fully completed and Signed Form of Offer.
Note - Failure of Bidders to meet all the above mandatory requirements will result in submissions
being deemed null and void and shall be considered “non – responsive” and therefore not
considered for further evaluation
Table 3: additional information
NO. description yes NO
As per the Amended Construction Codes, all Generic entities and QSEs with less
than 51% Black ownership are required to submit a valid SANAS-accredited B-
BBEE Verification Certificate reflecting all applicable B-BBEE elements.QSEs
with at least 51% Black ownership and EMEs with an annual turnover above R3
million must also submit a B-BBEE Verification Certificate issued by a SANAS-
accredited verification agency, as they are required to comply with the 40% sub-
minimum for the Skills Development element to avoid a discounting of their B-
(1) BBEE level.EMEs with an annual turnover of less than R3 million are exempt
from the sub-minimum requirement and may submit either a sworn affidavit or a
certificate issued by CIPC confirming their ownership and annual turnover.In the
case of a Joint Venture (JV) or Consortium, a consolidated B-BBEE certificate
must be submitted. The JV certificate must be prepared and issued for this
specific project. It must also be accompanied by the individual B-BBEE
certificates or affidavits of each participating entity to confirm the type and status
of each enterprise.”
Completed and signed Form SBD 6.1 preference points claim form in terms of
(2)
the Preferential Procurement Regulations 2022.
(3) Completed and signed Form SBD 7.2 Contract Form – Rendering of Services
Supporting documents on project imperatives:
(i) Plans for promoting and managing safety, health and environmental
issues during the execution of the project.
(4) (ii) Plans for monitoring and applying quality assurance principles in the
execution of the project.
(iii) Plans for addressing socio-economic issues (with specific numbers to
be achieved), which include
RFP - CDC/277/26 of 121 Rev 1 23/07/2026
Request for Proposal
Coega SEZ and Port DPWI- Programme
Zone Development and Operation
a. Maximisation of job opportunities (labour histograms); and
b. Use of local material/local suppliers;
Bidders must complete and sign the Protection of Personal Information Act
(5)
(POPIA) Consent Form.
Tenderers must provide a Valid Compensation Fund letter of good standing. In
(6) case of Consortium or Joint Venture, The Tenderers forming the JV must provide
a separate letter of good standing per entity.
Complete and duly sign Annexure M of the RFP to provide a detailed record/list
of contactable references for all previous completed with a value greater than R
(7) 9 million of a similar nature (General Building Construction).
Standard for Skills Development, there are No returnable documents (except for pricing the
relevant section of the Bill of Quantities). Following award of the contract to the successful
tenderer, the employer shall provide to the contractor with the required documents which shall be
completed by the contractor and submitted within the stipulated period
7.2 Stage 2: Functionality Assessment
(a) Proposals that meet the Responsiveness Assessment will be adjudicated further on
Quantity/functionality.
(b) The Bidder must meet a minimum of 70 points in accordance with the criteria presented in
Table A1, below. Table A2 presents details on how the scoring will be carried out.
(c) Bids that do not meet the minimum threshold score of 70 points following the
Quantity/functionality assessment shall not be considered.
RFP - CDC/277/26 of 121 Rev 1 23/07/2026
Request for Proposal Coega SEZ and Port
DPWI – Programme Zone Development and Operation
Table A1: Functionality Criteria for Contract No CDC/277/26
1 Completeness and Quality of the Technical The Bid needs to submit a complete A clear demonstration of the Bid’s understanding of the
Proposal Technical Proposal, including Heritage project scope, objectives, and deliverables. Provide a
Architectural Elements to be repaired and detailed description of the proposed approach for the
planned maintenance for the Heritage decanting, designing, execution, commissioning, handover,
Museum, which should include decanting, and close-out . Provide a thorough methodology for
designing, execution, commissioning, ensuring quality, safety, and environmental compliance—
Handover, and close-out methods to be detailed work breakdown structure (WBS), Quality
adopted in implementing the Project. 10 management plan.
They should consist of i. Inspection and testing procedures.
Sections/Annexures covering Quality ii. Certification and accreditation of the Bid’s QA/QC
Management Plan, Risk Management systems.
Plan, Environmental Management Plan, iii. Decanting processes
Labour Management Plan, and Plan for
Safety, Decanting Plan & Security
Measures.
2 Completeness of the Milestone Schedule The Milestone Schedule is to be complete Overall schedule is Clear, logical, and professionally
with all key deliverables, with meaningful presented. All major phases (e.g., design, decanting,
sequencing, reflecting resource 5 construction, commissioning), close out and the Defects
allocation, and clearly indicating the Notification Period (DNP) is identified with milestones.
assumptions made. Breakdown of activities under each milestone for clarity.
RFP – CDC/277/26 of 121 Rev. 0 15/07/2026
Request for Proposal Coega SEZ and Port
DPWI – Programme Zone Development and Operation
Clearly defined start and completion dates for each
milestone and activity. Critical path activities and their
dependencies are identified.
3 Completeness, Experience and Skills Level Professional Structural /Civil Engineer - Bidders must provide information that covers the level of
of the Project Team Pr. Eng / Pr. Tech Eng (ECSA) 5 experience and the positions held as a professional
engineer/ professional Engineering Technologist post-
Professional Electrical Engineer Pr. Eng / qualification. CVs shall be set out so that years’ experience
Pr. Tech Eng (ECSA). in this specific role can be determined, with a minimum of
Professional Quantity Surveying PrQS five (5) years of work experience pertaining to the specific
(SACQSP) nature of the project in the specific role.
Professional Mechanical Engineer Pr.
Eng / Pr. Tech Eng (ECSA).
4 Demonstrated experience and past Demonstrated experience and past This criterion covers the experience and knowledge that the
performance in comparable/equivalent performance in comparable projects. Bidder has of previously completed construction projects
projects executed by the Bidder – The Bidder should provide a list of at that are comparable in terms of complexity, size, value, and
Construction and maintenance of buildings least 3 projects that were implemented construction duration. Bidders are to provide details on
in the last 5 years. 20 construction projects with the highest value that have been
completed in the past 5 years. The submitted projects
MUST specifically involve the construction and
maintenance of buildings
RFP – CDC/277/26 of 121 Rev. 0 15/07/2026
Request for Proposal Coega SEZ and Port
DPWI – Programme Zone Development and Operation
Bidders MUST provide appointment letters, completion
certificates, performance reports ((in the template
provided in Annexure T), and Client completed reference
letters (project scope, value, and completion date) as a
PACK per completed project from the previous employer or
consultants that they have worked with. Details of two (2)
contactable references for each project listed are to be
included with your bid submission.
Note: Bidders must complete and submit performance
reports that provide an assessment of the Bidder’s past
performance. Performance reports that do not show
proof of past performance will not be considered in
evaluating this functionality criteria.
5 Local Presence: Office Location Lead It is preferred if the Bidders were to have The bidders must submit proof of office establishment as
Partner (Contractors and Professional well-established Offices in the proximity of evidence to demonstrate locality. The evidence required
Service Providers) the project, being in the Western Cape should be in the form of a Title Deed in the name of the
Province. Bidders to submit proof of Bidder, a Valid signed Lease Agreement in the name of the
address. Bidder ( the landlord's contact number and e-mail address
visible ), a Municipal account not older than 3 months in the
RFP – CDC/277/26 of 121 Rev. 0 15/07/2026
Request for Proposal Coega SEZ and Port
DPWI – Programme Zone Development and Operation
name of the Bidder, or a Municipal Billing Clearance
Certificate in the name of the Bidder.
Failure to submit sufficient proof of occupancy will render the
bid non-responsive. Please note: CSD, CIPC registration
documents, Letterheads, Search engines, Statements,
etc. will not be considered as proof of office space
6 Local SMME Participation Bidders to indicate their commitment for Commitment to sub-contracting to QSEs / EMEs or
sub-contracting to QSEs / EMEs or 10 complete Form K
complete Form K
7 Experience of construction management Bid to provide CVs as a minimum of the following The bidders are to provide information that covers the level
team personnel: of qualifications, experience and competency (Specific to
Manager copies of CVs and qualifications. CVs to make specific
supplied, no score will be allocated.
5 Please note below:
NQF 6: National Diploma and Advanced Certificate in the
Built Environment
RFP – CDC/277/26 of 121 Rev. 0 15/07/2026
Request for Proposal Coega SEZ and Port
DPWI – Programme Zone Development and Operation
NQF 7: Bachelor’s Degree, Advanced Diplomas, Post
Graduate Certificates and Bachelor of Technology in the
Built Environment
NQF 8: Honour’s Degree, Post Graduate Diploma in the
Built Environment
NQF 9: Master’s Degree in the Built Environment
NQF 10: Doctor’s Degree in the Built Environment
NB. If Bidders submit foreign qualification they must
submit SAQA certificate that converts the equivalence
of qualification to NQF Level
Total 100
Table A2: - FUNCTIONALITY SCORING for Contract No CDC/277/26
RFP – CDC/277/26 of 121 Rev. 0 15/07/2026
Experience & Qualifications
Source: CDC-277-26 - RFP.pdfskills and SMME development. The foundational culture of the CDC’s approach, backed by core values, is
innovation and continuous improvement.
The CDC has been appointed by the National Department of Public Works and Infrastructure (NDPWI) as
the Implementing Agent for various projects nationally for various departments. These projects require
various interventions, namely: the total upgrade of Groote Schuur Heritage House Museum in Cape Town
The Coega Development Corporation (CDC) invites proposals from suitably qualified and well-
experienced Turnkey Contractors for the total upgrade of Groote Schuur Heritage House Museum. The
contractors must have an active CIDB Contractor Grading designation of 7GB or higher and proven
track record in working on General Building (Heritage building experience will be an added advantage,
where decanting, designing, execution, commissioning, Handover, and close-out are undertaken to
submit proposals for the appointment of a Turnkey Contractor. Emerging contractors with a CIDB
Contractor grading designation of 6GB PE are not eligible to make submissions and will not be
considered.
The project entails the delivery of a complete design–develop–construct–commission solution for the
RFP – CDC/277/26 ii Rev. 0 23/07/26
Management Professions (SACPCMP) as Pr.CHSA with a minimum of 10 years’ experience.
Council of South Africa (ECSA) as Pr.Eng / Pr.Tech Eng with a Minimum 5 years of experience
post qualification. Candidate registrations will not be accepted.
(z) Upon award the successful Bidder will be required to appoint a registered Professional Architect
(Pr. Arch) with the South African Council for the Architectural Profession (SACAP). The Architect
must have a proven track record and minimum 5 years experience post-graduate qualification in
RFP – CDC/277/26 viii Rev. 0 23/07/26
submitted in the form of a company resolution.
(3) Bidder must be registered with the Construction Industry Development Board (CIDB) and must
submit proof of an active CIDB grading of 7GB or higher. Emerging contractors with CIDB grading
designation of 6GB PE are not eligible to make submission and will not be considered.
(4) Signed Attendance Register at the mandatory briefing meeting. It must be completed in the name
of the bidding entity. One person cannot represent more than one company.
Failure to attend the compulsory briefing meeting will lead to the Bidder’s elimination and the
submission will not be evaluated further.
(5) General Building Contractor:
Demonstrated experience (past performance)
of the Project Team Pr. Eng / Pr. Tech Eng (ECSA) 5 experience and the positions held as a professional
engineer/ professional Engineering Technologist post-
Professional Electrical Engineer Pr. Eng / qualification. CVs shall be set out so that years’ experience
Pr. Tech Eng (ECSA). in this specific role can be determined, with a minimum of
Professional Quantity Surveying PrQS five (5) years of work experience pertaining to the specific
(SACQSP) nature of the project in the specific role.
team personnel: of qualifications, experience and competency (Specific to
Construction Manager/Project the Contracts Manager, Site Agent). Bidders must provide
Site Agent 10 reference to relevant experience and position held in
Foreman construction projects. If no copies of qualifications are
supplied, no score will be allocated.
Compliance Requirements
Source: CDC-277-26 - RFP.pdf (RFP)Contractor Grading designation of 7GB or higher
Contractor grading designation of 6GB
Contractor grading of 7GB or higher
Tax compliance status
Tax compliance requirements
Tax compliance status (tcs) pin may be made via e-filing through the SARS
Tcs pin is available but the bidder is registered on the central supplier
CSD registration number e
Csd number
Csd number must be provided
CSD number in the SBD 1 form
Central Supplier Database
Central supplier database (csd), a csd number must be provided
Central Supplier Database (CSD) at the
Completion Certificates – indicating the date of completion and project name
completion certificates, performance reports ((in the template
Appointment Letters – indicating the date, project name, description and value
appointment letters, completion
Compensation Fund or approved Licensed Insurer specified as the J/V entity for the duration of the
(gg) Any misrepresentation of information will lead to immediate disqualification of the Bidder’s
including the date of award of the contract. CDC reserves the right to verify the bidder’s CIDB
registration status on the CIDB website at any stage during the evaluation and adjudication
process. Where a bidder is not registered with the CIDB at the bid closing date but claims to be
capable of being registered, the bidder must submit, as part of its bid, proof of application for CIDB
registration. Failure to maintain an active and valid CIDB registration, or to successfully obtain such
result in disqualification or rejection of the bid.
meets the required CIDB Grading.
(h) The CIDB B.U.I.L.D Standard for Indirect Targeting for Enterprise Development through
(i) The CIDB B.U.I.L.D Standard for Developing Skills through Infrastructure Contracts, published in
(vii) National Qualifications Framework Amendment Act, ();
B-BBEE Details: erefore immediately upon
award of the contract register with the South African Revenue Services (SARS) as VAT vendors.
The award of the contract would be conditional pending the successful bidder submitting proof of
registration as a VAT vendor with SARS.
(p) Bidders must provide proof of registration on the National Treasury’s Central Supplier Database
(CSD) or provide a National Treasury CSD registration number e.g., MAAA0...
(q) As per the Amended Construction Codes, all Generic entities and QSEs with less than 51% Black
ownership are required to submit a valid SANAS-accredited B-BBEE Verification Certificate
reflecting all applicable B-BBEE elements. QSEs with at least 51% Black ownership and EMEs with
an annual turnover above R3 million must also submit a B-BBEE Verification Certificate issued by a
SANAS-accredited verification agency, as they are required to comply with the 40% sub-minimum
for the Skills Development element to avoid a discounting of their B-BBEE level. EMEs with an
annual turnover of less than R3 million are exempt from the sub-minimum requirement and may
submit either a sworn affidavit or a certificate issued by CIPC confirming their ownership and
annual turnover. In the case of a Joint Venture (JV) or Consortium, a consolidated B-BBEE
certificate must be submitted. The JV certificate must be prepared and issued for this specific
project. It must also be accompanied by the individual B-BBEE certificates or affidavits of each
participating entity to confirm the type and status of each enterprise.”
(r) Bidders and all its Consortium/Joint Venture (JV) members, if any, must confirm their company
registration with the Companies and Intellectual Property Commission (CIPC) (formerly CIPRO) as
RFP – CDC/277/26 vii Rev
Health & Safety
Source: CDC-277-26 - RFP.pdf(g) Entities who intend to submit a bid as a Joint Venture must ensure that their combined grading
meets the required CIDB Grading.
(h) The CIDB B.U.I.L.D Standard for Indirect Targeting for Enterprise Development through
Construction works Contracts, published in Gazette Notice No. February 2013 applies
to this project.
(i) The CIDB B.U.I.L.D Standard for Developing Skills through Infrastructure Contracts, published in
Gazette Notice No. April 2023, shall also apply to this contract.
(j) The CDC’s Procurement Policy & Procedures shall apply.
(k) The following legislation shall apply:
(i) Public Finance Management Act (PFMA);
(ii) Preferential Procurement Regulations, 2022;
(iii) The Construction Industry Development Board Act, ();
(iv) National Treasury Regulations;
(v) National Building Regulations and Building Standards Act ();
(vi) Infrastructure Development Act, 2014;
(vii) National Qualifications Framework Amendment Act, ();
(viii) The Skills Development Act, ();
(ix) Broad-Based Black Economic Empowerment – BBBEE Act Number (as amended
by Act number );
(x) Occupational Health and Safety Act and Regulations, Act ();
(xi) Compensation for Occupational injuries and disease Act ();
(xii) National Environmental Management (NEMA), Act ();
(xiii) The National Archives and Records Service of South Africa Act (Act No. );
(xiv) Minimum Information Security Standard (MISS),
(xv) Public Service Regulations,2016 Regulation 67
(xvi) Critical Infrastructure Protection Act (CIP Act);
(xvii) Protection of Personal Information Act (Act No. ;
(xviii) Code of Practice for the Wiring of Premises, SANS 10142, as amended.
(xix) The Interior Lighting Standard, SANS 10114, as amended.
(xx) The Local Authority By-Laws and Regulations and any regulations of the City of Cape Town.
(xxi) The City of Cape Town Fire Office Regulations
(xxii) The applicable SANS Specifications and Codes of Practice or the BSI or IEC
(xxiii) Specifications and Codes of Practice where no SANS Specifications or Codes of Practice
exist.
(xxiv) National Heritage Resources Act ()
(xxv) SABS 1200: Standardized Specification for Civil Engineering Construction
RFP – CDC/277/26 vi Rev. 0 23/07/26
the CDC will not award any bid to any business that appears on the CIPC list of de-registered
businesses. The CDC may verify company registration with CIPC through BizPortal.
(s) No competitive bids will be awarded to a person or entities who are not Tax Compliant, therefore
prospective bidders must ensure that they are Tax Compliant throughout the validity period of the
bid in review. The tax status of the bidders will be verified through the CSD and SARS website.
(t) Bidders will be evaluated on functionality and are expected to meet a minimum of 70 points
threshold to be evaluated further. The evaluation criteria for measuring functionality and weight of
each criterion are provided in the document.
(u) CDC will not award more than two active projects to one bidder unless one project has reached the
80% completion stage and beyond. A Capacity assessment may be conducted in the event that the
recommended bidder is the only responsive service provider and has already been awarded two
contracts and is to be considered for a third contract at the sole discretion of CDC and subject to
their performance on the active two contracts.
(v) The successful bidder will be required to comply with the Occupational Health and Safety Act and
Regulations, Act () and Compensation for Occupational Injuries and Disease Act, Act
() and all relevant and applicable legislations throughout the duration of the contract.
contract.
(w) The successful bidder will be required to appoint a registered Construction Health and Safety
Officer or Construction Health and Safety Manager (CHSO/M) with SACPCMP upon award on a
full-time basis on site with a proven record of 5 years or more of experience. No candidate
registration will be accepted.
(x) Upon award the successful Bidder will be required to appoint a Professional Construction Health &
the CDC might need to issue to all the Prospective Bidders during the bidding process to be
realized. The CDC will not be accountable for any such omission by the Prospective Bidders.
(jj) Incomplete Tender document Submissions will be deemed null and void and shall be considered
non-responsive.
(kk) Bidders must note that this bid is subject to security vetting. The top three (3) highest scoring
bidders following the evaluation process will be required to undergo State Security Agency (SSA)
security screening. Appointment of the successful bidder will be subject to a positive security
clearance outcome. Failure to comply with the security vetting requirements may result in
disqualification. Once appointed, the successful Bidder will have to ensure that all the CDC and
DPWI’s statutory and regulatory approvals are in place and procedures implemented, prior to any
construction activities commencing. These include, but are not limited to:
(i) Safety, Health and Environmental Management Plans;
(ii) Agreed Project Execution Plan;
(iii) Human Resource Management Plan;
(iv) Third Party Approvals, such as the approvals from the:
The documentation for this RFP Process can be downloaded from the CDC’s website: www.coega.co.za
or the National Treasury e-Bid portal from Friday, 24 July 2026 at 10h00. The CDC will not take
responsibility for any errors that may occur in the downloading of documents. Bidders are therefore required
to ensure that they download the full pack with no missing pages.
All queries relating to this BID may be addressed to Ms. Zine Mtanda, Unit Head: Supply Chain
Management, strictly via e-mail: [email protected] between the period of 24 July 2026 to 14
August 2026. No new queries received after 14 August 2026 will be responded to.
A compulsory site briefing meeting will be held on Tuesday, 04 August 2026, at 12h00, at the Address:
CDC Cape Town Office 60 St Georges Mall,11 floor, South African Reserve Bank Building, Cape
Town, 8000, where representatives from the Coega Development Corporation and DPWI will meet
prospective Bidders. The briefing minutes will be shared with the Bidders who have attended the briefing
meeting and will also be published on the CDC website. All prospective Bidders must bring a valid form
of identification to be present at the security desk to be allowed entry into the building, where the
briefing will be held and bids submitted
Bidders must note that two days will be allocated for site visits, these visits will happen from Tuesday, 11
August 2026 to Wednesday, 12 August 2026 both days starting at 09:00. All bidders that require site
visit on these dates must submit their certified copy of a Valid South African Identification document
RFP – CDC/277/26 x Rev. 0 23/07/26
container. The submission must be secure against any form of tampering, alteration, removal, or insertion
of documents. Any bid submission received in packaging that appears to be torn, unsealed, loose papers
or otherwise compromising the integrity of the contents may be deemed non-responsive and disqualified at
the discretion of the CDC.
programme also part of the project.
4.1.2 Safety, Health, Environmental & Quality Requirements
before commencing work on site. The Bidder shall at all times adhere to and strictly
comply with all applicable health and safety legislation, regulations, industry codes and
CDC’s Health and Safety specifications included in (Annexure Q). Bidder shall note
that the Facilities will be occupied and shall protect the safety of the tenant while
minimizing impact to the operation of the facility.
(iii) Bid/Proposal Document or any of the returnable either not signed or signed by
another person other than the designated signatory, per Annexure C;
(iv) Bidders, Bidder’s representatives, associates, or shareholders that sought to
influence adjudication process of this Bid, or outcomes of the adjudication process,
directly or indirectly;
(v) Bidder that failed to follow or observe the lines of communication that are prescribed
in the Advert;
(vi) Any Bidder or its principals or both who have engaged in corrupt and fraudulent
practices, not only with the CDC but anywhere else;
(vii) The Bidder has misrepresented information submitted;
(viii) Collusion among Bidders;
(ix) The submission is late (as determined in this document);
(x) The Bid documents have been filled in pencil and/or have correction fluid markings;
or not duly signed where changes are made;
(xi) Bidders appearing on National Treasury List of Restricted Suppliers;
(xii) Letter of Bid (form of offer and acceptance) not signed as required;
(xiii) Bidders who have pending liquidation, in receivership, bankrupt/insolvent (actually
and commercially);
(xiv) Bidders who have poor or negative performance reports on previous projects.
(b) All the information as listed in Annexure F (Pricing Schedule) must:
(i) Form part of the Bidder’s Submission to this RFP;
(ii) Be provided as required – accurate and complete;
(iii) Not be altered using a Correcting Fluid but scratched out and initialled;
(iv) Where altered, be initialled; and
(v) Signed, complete by the duly authorised Bidders Representative.
(a) Responsiveness Assessment
(b) Functionality Assessment
(c) Quantitative Assessment
(d) Qualitative Assessment
(e) State Security Clearance
7.1 Responsiveness Assessment
(a) In order for the Bidders to be considered as being responsive and eligible for the next stage
of assessment it has to pass the responsiveness assessment stage. This will be determined
from the submitted Bid and returnable that are listed in Table 2 below.
(b) If any of the items reflected in Table 2 is not furnished fully, filled in erasable ink or not signed
and initialled on each page by the duly authorised Bidders representative, then the submitted
bid will be considered as null and void and shall be considered as non-responsive and will
therefore not be assessed further.
RFP - CDC/277/26 of 121 Rev 1 23/07/2026
designing, execution, commissioning, ensuring quality, safety, and environmental compliance—
Handover, and close-out methods to be detailed work breakdown structure (WBS), Quality
adopted in implementing the Project. 10 management plan.
consultants that they have worked with. Details of two (2)
contactable references for each project listed are to be
included with your bid submission.
Note: Bidders must complete and submit performance
reports that provide an assessment of the Bidder’s past
performance. Performance reports that do not show
proof of past performance will not be considered in
evaluating this functionality criteria.
5 Local Presence: Office Location Lead It is preferred if the Bidders were to have The bidders must submit proof of office establishment as
Partner (Contractors and Professional well-established Offices in the proximity of evidence to demonstrate locality. The evidence required
Service Providers) the project, being in the Western Cape should be in the form of a Title Deed in the name of the
Contractual Terms
Source: CDC-277-26 - RFP.pdfprofessional services throughout the project lifecycle. Any conflicts, discrepancies, omissions, overlaps
in scope, or technical disputes arising between PSPs shall be promptly resolved through coordinated
review and consultation. Where agreement cannot be reached, the matter shall be escalated to the
provided by the various PSPs and shall ensure alignment of disciplines, designs, information,
deliverables, and project objectives. Any discrepancies, inconsistencies, conflicts, omissions, overlaps,
or disputes arising between PSPs in relation to their respective scopes of work, professional opinions,
designs, recommendations, responsibilities, or deliverables shall be promptly identified and resolved by
the Turnkey Contractor at its own cost and risk, without adversely affecting the project programme,
quality, cost, or contractual obligations.
registration as a VAT vendor with SARS.
(p) Bidders must provide proof of registration on the National Treasury’s Central Supplier Database
(CSD) or provide a National Treasury CSD registration number e.g., MAAA0...
(q) As per the Amended Construction Codes, all Generic entities and QSEs with less than 51% Black
ownership are required to submit a valid SANAS-accredited B-BBEE Verification Certificate
reflecting all applicable B-BBEE elements. QSEs with at least 51% Black ownership and EMEs with
an annual turnover above R3 million must also submit a B-BBEE Verification Certificate issued by a
SANAS-accredited verification agency, as they are required to comply with the 40% sub-minimum
for the Skills Development element to avoid a discounting of their B-BBEE level. EMEs with an
annual turnover of less than R3 million are exempt from the sub-minimum requirement and may
submit either a sworn affidavit or a certificate issued by CIPC confirming their ownership and
annual turnover. In the case of a Joint Venture (JV) or Consortium, a consolidated B-BBEE
certificate must be submitted. The JV certificate must be prepared and issued for this specific
project. It must also be accompanied by the individual B-BBEE certificates or affidavits of each
participating entity to confirm the type and status of each enterprise.”
(r) Bidders and all its Consortium/Joint Venture (JV) members, if any, must confirm their company
registration with the Companies and Intellectual Property Commission (CIPC) (formerly CIPRO) as
RFP – CDC/277/26 vii Rev. 0 23/07/26
List of acronyms and abbreviations .................................................................................. 1
Introduction ................................................................................................................................. 4
Project site & location............................................................................................................ 4
Conditions of bid ......................................................................................................................... 4
4.1 General Conditions ......................................................................................................................... 5
4.1.1 Socio-Economic Transformation ............................................................................................. 5
4.1.2 Safety, Health, Environmental & Quality Requirements .......................................................... 5
4.1.3 Labour Issues During Construction ......................................................................................... 5
4.2 Disqualification of Bidders............................................................................................................... 5
5.1 Conditions of Contract .................................................................................................................... 6
5.2 Letter of Bid (form of offer and acceptance) ................................................................................... 7
Terms of reference .................................................................................................................. 7
Bid evaluation criteria............................................................................................................. 7
7.1 Responsiveness Assessment ......................................................................................................... 7
7.2 Stage 2: Functionality Assessment ............................................................................................... 11
7.3 Stage 3: Quantitative Assessment ................................................................................................ 24
7.4 Stage 4: Qualitative Analysis ........................................................................................................ 25
7.5 State Security Agency vetting processes ..................................................................................... 25
Copyright ..................................................................................................................................... 25
Confidentiality and media protocol ................................................................................ 25
Annexures .................................................................................................................................... 27
Contract form - rendering of services .................................................................................. 33
Part 1 (to be filled in by the service provider) ................................................................... 33
Part 2 (to be filled in by the purchaser)................................................................................. 34
Description of .............................................................................................................................. 34
Service ............................................................................................................................................. 34
FORM A: Authority for Signatory ....................................................................................................... 36
RFP – CDC/277/26 xiii Rev. 0 23/07/26
B-BBEE : Broad-based Black Economic Empowerment
BS : British Standards
CDC : Coega Development Corporation
CIDB : Construction Industry Development Board
CIPC : Companies and Intellectual Property Commission
CSD : National Treasury’s Central Supplier Database
DPWI : Department of public Works and Infrastructure
DNP : Defects Notification Period
IA : Implementing Agent
PC : Performance Certificate
RFP : Request for Proposal
SANS : South African National Standards
SME : Small and Medium Enterprises
NYS : National Youth Service
EPWP : Expanded Public Works Programme
VAT : Value Added Tax
HWC : Heritage Western Cape
SAHRA : South African Heritage Resources Agency
RFP - CDC/277/26 of 121 Rev 1 23/07/2026
Section
Source: CDC-277-26 - RFP.pdfregistration status on the CIDB website at any stage during the evaluation and adjudication
(t) Bidders will be evaluated on functionality and are expected to meet a minimum of 70 points
threshold to be evaluated further. The evaluation criteria for measuring functionality and weight of
80% completion stage and beyond. A Capacity assessment may be conducted in the event that the
Occupational Health and Safety, Environmental and Quality requirements for the duration of the
(l) 80/20 or 90/10 preference points system in terms of Price and Specific goals scoring will be
applicable where a point of 80.00 or 90.00 is for Price and a point of 20 or 10 is for Specific Goals.
(l) 80/20 or 90/10 preference points syst
in Africa, providing highly skilled competence and capacity for the execution of quality complex
7.2 Stage 2: Functionality Assessment ............................................................................................... 11
7.3 Stage 3: Quantitative Assessment ................................................................................................ 24
7.4 Stage 4: Qualitative Analysis ........................................................................................................ 25
Description
Source: CDC-277-26- Tender Advert.pdfImportant Dates
Source: CDC-277-26- Tender Advert.pdf (RFP)Contact Information
Source: CDC-277-26- Tender Advert.pdf (RFP)Submission Guidelines
Source: CDC-277-26- Tender Advert.pdf (RFP)Returnable Documents
Source: CDC-277-26- Tender Advert.pdf (RFP)Evaluation Criteria
Source: CDC-277-26- Tender Advert.pdf (RFP)Active CIDB grading 7GB or higher; VAT registered; Tax compliant; Registered on National Treasury CSD; B-BBEE compliant (with required certificates); CIPC registered; Not a public servant; Must meet minimum 70 points functionality threshold; JV/Consortium combined grading must meet requirement; No entity may be part of multiple bids.
Technical Specifications
Source: CDC-277-26- Tender Advert.pdf (RFP)Methodology
Source: CDC-277-26- Tender Advert.pdfExperience & Qualifications
Source: CDC-277-26- Tender Advert.pdfCompliance Requirements
Source: CDC-277-26- Tender Advert.pdf (RFP)B-BBEE Requirements
Source: CDC-277-26- Tender Advert.pdf (RFP)Health & Safety
Source: CDC-277-26- Tender Advert.pdfContractual Terms
Source: CDC-277-26- Tender Advert.pdfRequirements
Source: CDC-277-26- Tender Advert.pdf (RFP)Section
Source: CDC-277-26- Tender Advert.pdfSets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
CDC Cape Town Office 60 St Georges Mall - 11 floor, South African Reserve Bank Building - Cape town - 8000
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
2
Last checked
24 Jul 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Other service activities. Unlock full pricing strategies, bid frequency, and historical win rates.