Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Cape Town International Airport Southern Office Block Building - Airport Industria - Cape Town - 7490
Organization Type
GOVERNMENT
Published
08 Sept 2026
OCDS Reference
ocds-9t57fa-169496
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Friday, 09 October 2026 - 12:00
Venue
Cape Town International Airport Southern Office Block Building Ground floor Reception area
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Refer to bid document for detailed list
Request for Bid(Open-Tender)
Cape Town International Airport Southern Office Block Building - Airport Industria - Cape Town - 7490
Recommended Certifications
Having these can improve your winning chances: NERSA Registration, PV GreenCard (Solar Installation)
AI Document Analysis Stages
Important Dates
Source: 1. CIA RFQ 74113 Bid document.pdf (RFQ){"briefingSession":"{"date":null,"time":"10:00am","venue":"ion meeting with representatives of the Employer will take place in person on the","is_compulsory":true}"}
08 Sept
2026
Tender Published
Tender was published
09 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
2.1 CIA RFQ 74113 NEC HVAC C5- Annexurres.pdf
3. CIA RFQ 74113 ANNEXURE 5.2 - C2.2 Price Schedule BOQ.pdf
1. CIA RFQ 74113 Bid document.pdf
2. CIA RFQ 74113 NEC HVAC.pdf
To download these documents and access AI-powered analysis, visit the main tender page.
Win ACSA tenders with AI Matching Engine, airport-infrastructure intelligence, compliance analysis, and application support for aviation operations.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubWe refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Contact Information
Source: 1. CIA RFQ 74113 Bid document.pdf (RFQ){"name":null,"email":"[email protected]","phone":"079 898 5162","department":"representatives after the approval of a","address":"AL ENQUIRIES MAY BE DIRECTED TO"}
Compliance Requirements
Source: 1. CIA RFQ 74113 Bid document.pdf (RFQ)No specific requirements found
B-BBEE Minimum Level: 5
B-BBEE Details: ice and Preference (80/20) split. Bidders who also
fail to achieve the minimum score per criteria will be disqualified and not be eligible for further
evaluations.
Functionality evaluation breakdown
Stage 2 Functionality Criteria
Points allocated for Functionality shall be evaluated in accordance with the criteria listed below.
Evaluation Criteria
Points allocated for Functionality shall be evaluated in accordance with the criteria as listed below. An overall
minimum threshold of 75 points out of 100 must be achieved for the tender to be eligible for further evaluation
on Price and B-BBEE. Bidders who also fail to achieve the minimum score per criteria will be disqualified and
not be eligible for further evaluations.
of 77
Cia RFQ 74113
Confidential
Confidential
Resources Qualification Score
Qualification for Personnel
Personnel score will be evaluated based on the supplied qualification information
o NQF level 5 Technical Qualification with HVAC Trade Test Certificate (15) compulsory
40 Personnel score will be evaluated based on the supplied qualification information
o HVAC Trade Test certificate - (10) compulsory
Personnel score will be evaluated based on the supplied qualification information
o NQF Level 5 Safety Management qualification (Accredited with SAMTRAC/ SACPCMP/ NEBOSH)
(15) compulsory
Resources Experience
Per Person the score will be evaluated based on the supplied CV information provided per individual and
personnel must have experience in maintenance and installation of HVAC Systems post Trade Test
Contact Information
Source: 2.1 CIA RFQ 74113 NEC HVAC C5- Annexurres.pdf (RFQ){"name":null,"email":null,"phone":null,"department":null,"address":"fication to any prospective contractor and designers. The"}
Evaluation Criteria
Source: 2.1 CIA RFQ 74113 NEC HVAC C5- Annexurres.pdf (RFQ)(b) an analysis and evaluation of the risks and hazards identified based on a documented method;
Methodology
Source: 2.1 CIA RFQ 74113 NEC HVAC C5- Annexurres.pdfinvolves the use of explosives and a method statement developed by a competent person is provided to ACSA
prior commencement.
Experience & Qualifications
Source: 2.1 CIA RFQ 74113 NEC HVAC C5- Annexurres.pdfexperience in this type of work or under the supervision of such a person
Quality Management
Source: 2.1 CIA RFQ 74113 NEC HVAC C5- Annexurres.pdf(c) a programme for the training of employees working from a fall risk position and the records thereof;
(d) the procedure addressing the inspection, testing and maintenance of all fall protection equipment; and
(e) a rescue plan detailing the necessary procedure, personnel and suitable equipment required to affect
a rescue of a person in the event of a fall incident to ensure that the rescue procedure is implemented
immediately following the incident.
the Principal Contractor. Safety defects noted must be recorded and reported to the supervisor for remedial
action. Health and Safety Representative Inspection findings must be made available to ACSA for reference
for audits purposes.
basis and such inspections are recorded on a register. The Principal Contractor must ensure that all fire
Part c5: annexures 15 c5 ecc3
Cia RFQ 74113
work involving the design of the relevant structure to ensure compliance with the design and record the results
of these inspections in writing.
shall not be the same person. The continuous inspection of scaffolding structures must be recorded on the
applicable Scaffold register.
Tagging/Signs reflecting the status of the scaffold must be always used and fixed to the structure. (Safe to use
/ Scaffold not Safe)
monthly register is completed by a competent person. Proof of such inspections must be recorded and kept
on file for reference. The Principal Contractor must ensure that a safe working load is conspicuously displayed
on lifting equipment and tackle and service certificate is provided prior commencement of work. The Principal
(Construction Regulation 24)
The Principal Contractor must, in addition to compliance with the Electrical Installation Regulations, 2009,
and the Electrical Machinery Regulations, 1988, promulgated by Government Notice No. R. August
1988, ensure that—
(a) before construction commences and during the progress thereof, adequate steps are taken to ascertain
the presence of and guard against danger to workers from any electrical cable or apparatus which is under,
over or on the site;
(b) all parts of electrical installations and machinery are of adequate strength to withstand the working
conditions on construction sites;
(c) the control of all temporary electrical installations on the construction site is designated to a competent
person who has been appointed in writing for that purpose;
(d) all temporary electrical installations used by the contractor are inspected at least once a week by a
competent person and the inspection findings are recorded in a register kept on the construction site; and
Part c5: annexures 22 c5 ecc3
Cia RFQ 74113
(e) all electrical machinery is inspected by the authorized operator or user on a daily basis using a relevant
checklist prior to use and the inspection findings are recorded in a register kept on the construction site.
inspections are recorded in a register. The Principal Contractor must ensure that a competent person who
carries the above inspections is appointed in writing.
register. Furthermore he/she must ensure that inspections are carried out and certificates of testing are
available and kept on file as per the Regulations.
for remedial action. Inspections must be conducted by ACSA and non-conformances noted must be recorded
Part c5: annexures 27 c5 ecc3
Cia RFQ 74113
regulations.
intoxicating liquor or drugs.
I, ___________________________ (name & surname) of
___________________________________(company) Upon receipt of this specification, agree and
acknowledge ACSA’s right to impose penalties should I or any of my employees or contractors fail to comply
with these conditions.
Part c5: annexures 28 c5 ecc3
Cia RFQ 74113
Pricing Schedule
Source: 2.1 CIA RFQ 74113 NEC HVAC C5- Annexurres.pdfAnnexure 5.0 – Project Standard Specification (Attached on NEC) 25- 66
Annexure 5.1 – Project Technical Specification (Attached on NEC) 67- 86
Annexure 5.2 – C2.2 Price Schedule Bill of Quantities (BOQ) – 1-36
ANNEXURE 5.2 : C2.2 Price Schedule -Bill of
Quantities(BOQ)
Nb: attached as rertunable separate document – pages 1- 36
Part c5: annexures 4 c5 ecc3
Cia RFQ 74113
Compliance Requirements
Source: 2.1 CIA RFQ 74113 NEC HVAC C5- Annexurres.pdf (RFQ)No specific requirements found
Environmental
Source: 2.1 CIA RFQ 74113 NEC HVAC C5- Annexurres.pdfnot limited to emergencies such as fire, bomb threat, civil unrest, medical treatment, environmental incidents,
accidents to employees and other persons other than their employees.
construction site, including—
(a) the proper storage of materials and equipment;
(b) the removal of scrap, waste and debris at appropriate intervals;
(c) ensuring that materials required for use, are not placed on the site so as to obstruct means of access to
and egress from workplaces and passageways;
(d) ensuring that materials which are no longer required for use, do not accumulate on and are removed from
the site at appropriate intervals;
(e) ensuring that construction sites in built-up areas adjacent to a public way are suitably and sufficiently
fenced off and provided with controlled access points to prevent the entry of unauthorized persons; and
(f) ensuring that a catch platform or net is erected above an entrance or passageway or above a place where
persons work or pass under or fencing off the danger area if work is being performed above such entrance,
passageway, or place so as to ensure that all persons are kept safe in the case of danger or possibility of
persons being struck by falling objects.
(c) smoking is prohibited and notices in this regard are prominently displayed in all places containing readily
combustible or flammable materials;
(d) in confined spaces and other places in which flammable gases, vapours or dust can cause danger—
(i) only suitably protected electrical installations and equipment, including portable lights, are used;
(ii) there are no flames or similar means of ignition;
(iii) there are conspicuous notices prohibiting smoking;
(iv) oily rags, waste and other substances liable to ignite are without delay removed to a safe place; and
(v) adequate ventilation is provided;
(e) combustible materials do not accumulate on the construction site;
(f) welding, flame cutting and other hot work are done only after appropriate precautions have been
taken to reduce the risk of fire;
(g) suitable and sufficient fire-extinguishing equipment is placed at strategic locations or as may be
recommended by the Fire Chief or local authority concerned, and that such equipment is maintained
in a good working order;
(h) the fire equipment contemplated in paragraph (g) is inspected by a competent person, who has
been appointed in writing for that purpose, in the manner indicated by the manufacturer thereof;
(i) a sufficient number of workers are trained in the use of fire- extinguishing equipment;
(j) where appropriate, suitable visual signs are provided to clearly indicate the escape routes in the
case of a fire;
(k) the means of escape is kept clear at all times;
(l) there is an effective evacuation plan providing for all—
(i) persons to be evacuated speedily without panic;
(ii) persons to be accounted for; and
(iii) plant and processes to be shut down; and
(m) a siren is installed and sounded in the event of a fire.
(Construction Regulation 30)
Contact Information
Source: 3. CIA RFQ 74113 ANNEXURE 5.2 - C2.2 Price Schedule BOQ.pdf (unknown){"name":null,"email":null,"phone":null,"department":"Quantity Rate Amount","address":null}
Technical Specifications
Source: 3. CIA RFQ 74113 ANNEXURE 5.2 - C2.2 Price Schedule BOQ.pdf (unknown)Unit Quantity Rate Amount
Asca
General - all buildings
Mechanical installaton
Air-conditioning & ventilation installation
Bill no.1 - Preliminary and general items
Allow for all the preliminary and general items required to provide
the health & safety, mechanical and electrical installation for this
project, but excluding items priced elsewhere in these Bills (These
amounts will be paid pro rata to the rest of the amounts claimed by
the contractor, relative to the tender amount).
Contractual requirements
Tenderers to allow for compliance with all the conditions of the
1 Item 1
contract.
Joint trades
Tenderers to allow for all costs which may be required in order to co-
2 ordinate and liaise with the other Trade Contractors, especially with Item 1
the electrical contractor.
Supervisor
Tenderer to allow for a full time working supervisor during the
3 duration of the contract, who shall have the delegated authority to Item 1
receive instructions and make decisions regarding the contract.
Site establishment
Tenderers to allow for all costs which may be required in order to
4 place the necessary facilities on site for safe storage and orderly Item 1
management
Quality Management
Source: 3. CIA RFQ 74113 ANNEXURE 5.2 - C2.2 Price Schedule BOQ.pdfFor the Supply (including delivery), installation (including testing,
commissioning and handing over of the following grilles, weather
louvers, disc valves, diffusers, filters, dampers and associated
items including all necessary accessories and fittings.
Ø150 Circular Volume Control Damper, (manual) (Trox or proven
24 No 52 R -
equivalent).
Ø200 Circular Volume Control Damper, (manual) (Trox or proven
25 No 1 R -
equivalent).
26 Leak test hr 8 R -
27 Decommissioning and safe removal of old, redundant equipment No 1 R -
28 Painting, patchwork, and making good of the ceiling m2 90 R -
29 Commissioning and testing of the system No 1 R -
For the Supply (including delivery), installation (including testing,
commissioning and handing over of the following grilles, weather
louvers, disc valves, diffusers, filters, dampers and associated
items including all necessary accessories and fittings.
For the Supply (including delivery), installation (including testing,
commissioning and handing over of the following grilles, weather
louvers, disc valves, diffusers, filters, dampers and associated
items including all necessary accessories and fittings.
For the Supply (including delivery), installation (including testing,
commissioning and handing over of the following grilles, weather
louvers, disc valves, diffusers, filters, dampers and associated
items including all necessary accessories and fittings.
76 Control wiring (two core non screened stranded wire) m 15 R -
dia 20mm PVC Conduit saddled/fixed to cable tray or building
77 m 30 R -
structure.
78 dia 20mm flexible Conduit for connection to equipment. m 15 R -
79 dia 50mm PVC round box. No 2 R -
80 Writing Control Program & Commissioning Item 1 R -
81 Extract fans - Installation of wiring and controls No 1 R -
82 Leak test hr 8 R -
83 Decommissioning and safe removal of old, redundant equipment No 1 R -
84 Painting, patchwork, and making good of the ceiling m2 40 R -
85 Commissioning and testing of the system No 1 R -
For the Supply (including delivery), installation (including testing,
commissioning and handing over of the following grilles, weather
louvers, disc valves, diffusers, filters, dampers and associated
items including all necessary accessories and fittings.
94 Control wiring (two core non screened stranded wire) m 15 R -
dia 20mm PVC Conduit saddled/fixed to cable tray or building
95 m 30 R -
structure.
96 dia 20mm flexible Conduit for connection to equipment. m 15 R -
97 dia 50mm PVC round box. No 2 R -
98 Writing Control Program & Commissioning Item 1 R -
99 Extract fans - Installation of wiring and controls No 1 R -
100 Leak test hr 8 R -
101 Decommissioning and safe removal of old, redundant equipment No 1 R -
102 Painting, patchwork, and making good of the ceiling m2 30 R -
103 Commissioning and testing of the system No 1 R -
For the Supply (including delivery), installation (including testing,
commissioning and handing over of the following grilles, weather
louvers, disc valves, diffusers, filters, dampers and associated
items including all necessary accessories and fittings.
Confidential#
dia 20mm PVC Conduit saddled/fixed to cable tray or building
122 m 60 R -
structure.
123 dia 20mm flexible Conduit for connection to equipment. m 30 R -
124 dia 50mm PVC round box. No 2 R -
125 Writing Control Program & Commissioning Item 2 R -
126 Extract fans - Installation of wiring and controls No 2 R -
127 Leak test hr 8 R -
128 Commissioning and testing of the system No 1 R -
129 Decommissioning and safe removal of old, redundant equipment No 1 R -
130 Painting, patchwork, and making good of the ceiling m2 75 R -
131 Commissioning and testing of the system No 1 R -
For the Supply (including delivery), installation (including testing,
commissioning and handing over of the following grilles, weather
louvers, disc valves, diffusers, filters, dampers and associated
items including all necessary accessories and fittings.
Confidential#
140 Leak test hr 8 R -
141 Decommissioning and safe removal of old, redundant equipment No 1 R -
142 Painting, patchwork, and making good of the ceiling m2 25 R -
143 Commissioning and testing of the system No 1 R -
For the Supply (including delivery), installation (including testing,
commissioning and handing over of the following grilles, weather
louvers, disc valves, diffusers, filters, dampers and associated
items including all necessary accessories and fittings.
Confidential#
151 Painting, patchwork, and making good of the ceiling m2 25 R -
152 Commissioning and testing of the system No 1 R -
For the Supply (including delivery), installation (including testing,
commissioning and handing over of the following grilles, weather
louvers, disc valves, diffusers, filters, dampers and associated
items including all necessary accessories and fittings.
Confidential#
Ø150 Circular Volume Control Damper, (manual) (Trox or proven
160 No 11 R -
equivalent).
Ø200 Circular Volume Control Damper, (manual) (Trox or proven
161 No 1 R -
equivalent).
162 Leak test hr 8 R -
163 Decommissioning and safe removal of old, redundant equipment No 1 R -
164 Painting, patchwork, and making good of the ceiling m2 25 R -
165 Commissioning and testing of the system No 1 R -
For the Supply (including delivery), installation (including testing,
commissioning and handing over of the following grilles, weather
louvers, disc valves, diffusers, filters, dampers and associated
items including all necessary accessories and fittings.
171 Control wiring (two core non screened stranded wire) m 15 R -
dia 20mm PVC Conduit saddled/fixed to cable tray or building
172 m 30 R -
structure.
173 dia 20mm flexible Conduit for connection to equipment. m 15 R -
174 dia 50mm PVC round box. No 2 R -
175 Writing Control Program & Commissioning Item 1 R -
176 Extract fans - Installation of wiring and controls No 1 R -
177 Leak test hr 8 R -
178 Decommissioning and safe removal of old, redundant equipment No 1 R -
179 Painting, patchwork, and making good of the ceiling m2 10 R -
180 Commissioning and testing of the system No 1 R -
For the Supply (including delivery), installation (including testing,
commissioning and handing over of the following grilles, weather
louvers, disc valves, diffusers, filters, dampers and associated
items including all necessary accessories and fittings.
Confidential#
188 Painting, patchwork, and making good of the ceiling m2 30 R -
189 Commissioning and testing of the system No 1 R -
For the Supply (including delivery), installation (including testing,
commissioning and handing over of the following grilles, weather
louvers, disc valves, diffusers, filters, dampers and associated
items including all necessary accessories and fittings.
For the Supply (including delivery), installation (including testing,
commissioning and handing over of the following grilles, weather
louvers, disc valves, diffusers, filters, dampers and associated
items including all necessary accessories and fittings.
Ø200 Circular Volume Control Damper, (manual) (Trox or proven
216 No 5 R -
equivalent).
217 Leak test hr 8 R -
218 Decommissioning and safe removal of old, redundant equipment No 1 R -
219 Painting, patchwork, and making good of the ceiling m2 20 R -
220 Commissioning and testing of the system No 1 R -
Contractual Terms
Source: 3. CIA RFQ 74113 ANNEXURE 5.2 - C2.2 Price Schedule BOQ.pdf8 Item 1 R -
including wiring diagrams, spare part lists as specified.
9 Allow for twelve months free maintenance and guarantee. Item 1 R -
bathroom extract fans, including: New fan control panel, electrical
cable from existing local distribution board to feed this control panel,
final sub-circuit from this control panel, general controls, contactors,
relays, circuit breakers, all other necessary equipment and
39 accessories, labelling, cabling and containment; local lockable
isolator adjacent to fan; control wiring and interfaces (to light
circuit/BMS/timer as specified); earthing/bonding; terminations;
identification; functional testing; issuing of CoC per SANS 10142-1;
as-built updates and O&M documentation.
Panel 1
Fans
EF 1 No 1 R -
Panel 2
Fans
EF 2 No 1 R -
40 Control wiring (two core non screened stranded wire) m 30 R -
dia 20mm PVC Conduit saddled/fixed to cable tray or building
41 m 60 R -
structure.
42 dia 20mm flexible Conduit for connection to equipment. m 30 R -
43 dia 50mm PVC round box. No 4 R -
44 Writing Control Program & Commissioning Item 2 R -
45 Extract fans - Installation of wiring and controls No 2 R -
46 Leak test hr 8 R -
47 Decommissioning and safe removal of old, redundant equipment No 1 R -
48 Painting, patchwork, and making good of the ceiling m2 40 R -
49 Commissioning and testing of the system No 1 R -
bathroom extract fans, including: final sub-circuit from designated
DB; circuit breaker and labelling; cabling and containment; local
lockable isolator adjacent to fan; control wiring and interfaces (to57 No 1 R -
light circuit/BMS/timer as specified); earthing/bonding;
terminations; identification; functional testing; issuing of CoC per
SANS 10142-1; as-built updates and O&M documentation.
Panel 1 - Central Terminal
Fans
Ef 3
58 Control wiring (two core non screened stranded wire) m 15 R -
dia 20mm PVC Conduit saddled/fixed to cable tray or building
59 m 30 R -
structure.
60 dia 20mm flexible Conduit for connection to equipment. m 15 R -
61 dia 50mm PVC round box. No 2 R -
62 Writing Control Program & Commissioning Item 1 R -
63 Extract fans - Installation of wiring and controls No 1 R -
64 Leak test hr 8 R -
65 Decommissioning and safe removal of old, redundant equipment No 1 R -
66 Painting, patchwork, and making good of the ceiling m2 4 R -
67 Commissioning and testing of the system No 1 R -
bathroom extract fans, including: final sub-circuit from designated
DB; circuit breaker and labelling; cabling and containment; local
lockable isolator adjacent to fan; control wiring and interfaces (to75 No 1 R -
light circuit/BMS/timer as specified); earthing/bonding;
terminations; identification; functional testing; issuing of CoC per
SANS 10142-1; as-built updates and O&M documentation.
Panel 1
bathroom extract fans, including: final sub-circuit from designated
DB; circuit breaker and labelling; cabling and containment; local
lockable isolator adjacent to fan; control wiring and interfaces (to 93 No 1 R -
light circuit/BMS/timer as specified); earthing/bonding;
terminations; identification; functional testing; issuing of CoC per
SANS 10142-1; as-built updates and O&M documentation.
Panel 1
bathroom extract fans, including: final sub-circuit from designated
DB; circuit breaker and labelling; cabling and containment; local
lockable isolator adjacent to fan; control wiring and interfaces (to120 No 1 R -
light circuit/BMS/timer as specified); earthing/bonding;
terminations; identification; functional testing; issuing of CoC per
SANS 10142-1; as-built updates and O&M documentation.
Panel 1
Fans
bathroom extract fans, including: final sub-circuit from designated
DB; circuit breaker and labelling; cabling and containment; local
lockable isolator adjacent to fan; control wiring and interfaces (to170 No 1 R -
light circuit/BMS/timer as specified); earthing/bonding;
terminations; identification; functional testing; issuing of CoC per
SANS 10142-1; as-built updates and O&M documentation.
Panel 1
bathroom extract fans, including: final sub-circuit from designated
DB; circuit breaker and labelling; cabling and containment; local
lockable isolator adjacent to fan; control wiring and interfaces (to204 No 1 R -
light circuit/BMS/timer as specified); earthing/bonding;
terminations; identification; functional testing; issuing of CoC per
SANS 10142-1; as-built updates and O&M documentation.
Panel 1
Fans
Price for 2 fans on panel, can amend during construction
205 Control wiring (two core non screened stranded wire) m 15 R -
dia 20mm PVC Conduit saddled/fixed to cable tray or building
206 m 30 R -
structure.
207 dia 20mm flexible Conduit for connection to equipment. m 15 R -
208 dia 50mm PVC round box. No 2 R -
209 Writing Control Program & Commissioning Item 1 R -
210 Extract fans - Installation of wiring and controls No 1 R -
211 Leak test hr 8 R -
212 Decommissioning and safe removal of old, redundant equipment No 1 R -
213 Painting, patchwork, and making good of the ceiling m2 45 R -
214 Commissioning and testing of the system No 1 R -
bathroom extract fans, including: final sub-circuit from designated
DB; circuit breaker and labelling; cabling and containment; local
lockable isolator adjacent to fan; control wiring and interfaces (to
225 light circuit/BMS/timer as specified); earthing/bonding; No 2 R -
terminations; identification; functional testing; issuing of CoC per
SANS 10142-1; as-built updates and O&M documentation.
Panel 1
Contact Information
Source: 2. CIA RFQ 74113 NEC HVAC.pdf (RFQ){"name":null,"email":"[email protected]","phone":"043 721 0900","department":null,"address":"conditions of contract identified"}
Evaluation Criteria
Source: 2. CIA RFQ 74113 NEC HVAC.pdf (RFQ)CAD materials, data, software, models, plans, designs, programs, diagrams, evaluations, materials
Technical Specifications
Source: 2. CIA RFQ 74113 NEC HVAC.pdf (RFQ)Construction Contract
Between Airports Company South Africa
(Registration no: 1993/004149/06)
and __________________________________
(Reg No. _________________________)
for The Replacement of Ablution Extraction Fans and
Associated Equipment at Cape Town International
Airport for a Period of 10 months.
Contents: No of
pages
Part C1 Agreements & Contract Data [20]
Part C2 Pricing Data [36]
Part C3 Scope of Work
Experience & Qualifications
Source: 2. CIA RFQ 74113 NEC HVAC.pdf2 Name:
Job Site Foreman
Responsibilities:
3 Name:
Job Safety Officer
Responsibilities:
Part c1: agreement & contract data c1.1 Ecc3 form of offer and acceptance
Cia RFQ 74113
Confidential
Confidential
Airports company south africa soc limited contract NO.
Replacement of ablution extraction fans and associated equipment at cape town international
Airport
4 Name:
Job
Responsibilities:
CV's (and further key persons data including
CVs) are appended to Tender Schedule
entitled
11.2(3) The completion date for the whole of the
works is
11.2(14) The following matters will be included in
the Risk Register
11.2(19) The Works Information for the Contractor’s
design is in:
31.1 The programme identified in the Contract
Data is
B Priced contract with bill of quantities
11.2(21) The bill of quantities is in
11.2(31) The tendered total of the Prices is (in figures)
(in words), excluding VAT
Data for Schedules of Cost
Components
B Priced contract with bill of quantities Data for the Shorter Schedule of Cost
Components
41 in The percentage for people overheads %
SSCC is:
21 in The published list of Equipment is the
SSCC last edition of the list published by
The percentage for adjustment for
Equipment in the published list is Minus _____%
22 in The rates of other Equipment are: Equipment Size or Rate
SSCC capacity
Part c1: agreement & contract data c1.1 Ecc3 form of offer and acceptance
Cia RFQ 74113
Confidential
Confidential
Airports company south africa soc limited contract NO.
Replacement of ablution extraction fans and associated equipment at cape town international
Airport
61 in The hourly rates for Defined Cost of
SSCC design outside the Working Areas are Category of employee Hourly rate
Note: Hourly rates are estimated ‘cost to
company of the employee’ and not selling rates.
Please insert another schedule if foreign
resources may also be used
62 in The percentage for design overheads is %
Sscc
63 in The categories of design employees
SSCC whose travelling expenses to and from the
Working Areas are included in Defined
Cost are:
C1.3 Forms of Securities
Pro forma for Bonds & Guarantees
Part c1: agreement & contract data c1.1 Ecc3 form of offer and acceptance
Cia RFQ 74113
Confidential
Confidential
Airports company south africa soc limited contract NO.
Replacement of ablution extraction fans and associated equipment at cape town international
Airport
For use with the NEC3 Engineering & Construction Contract (April 2013)
The conditions of contract stated in the Contract Data Part 1 include the following Secondary Options:
Option X16: Retention (not used with Option F)
The Contractor may provide a Retention Money Guarantee in the form stated here. When the Employer
receives and accepts a Retention Money Guarantee exactly in the form stated he will instruct the Project
Manager not to assess any amount be retained in terms of secondary Option X16.
The organisation providing the bond / guarantee does so by copying the pro forma document onto his
letterhead without any change to the text or format and completing the required details. The completed
document is then given to the Employer within the time stated in the contract.
Part c1: agreement & contract data c1.1 Ecc3 form of offer and acceptance
Cia RFQ 74113
Confidential
Confidential
Airports company south africa soc limited contract NO.
Replacement of ablution extraction fans and associated equipment at cape town international
Airport
Pro forma Retention Money Guarantee (may be used when Option X16
applies)
(to be reproduced exactly as shown below on the letterhead of the Bank providing the Guarantee)
The Airports Company South Africa SOC Limited
O.R. Tambo International Airport
The Maples, 24 Johnson Road
Bedfordview 2008
Date:
Dear Sirs
Reference No. [●] [Drafting Note: Bank reference number to be inserted]
Retention Money Guarantee: [Drafting Note: Name of Contractor to be inserted]
Project [ ] : Contract Reference: [Drafting Note: Contractor contract reference number to be inserted]
1.1 “Bank” means [Insert name of Bank], [●] Branch, Registration No. [●]
1.2 “Bank’s Address” means [Insert physical address of Bank]
1.3 “Contract” means the written agreement relating to providing the works, entered into
between the Employer and the Contractor, on or about the [●] day of
[●] 20[●] (Contract Reference No. [●]) as amended, varied, restated,
novated or substituted from time to time;
1.4 “Contractor” means [●] a company registered in accordance with the laws of [●] under
Registration No [●].
1.5 “Employer” means [●] a company registered in accordance with the laws of the Republic
of South Africa under Registration Number [●]
1.6 “Expiry Date” means the date on which the Defects Certificate is issued in terms of the
Contract.
1.7 “Guaranteed Sum” means the sum of R[●], ([●] Rand)
1.8 “works” means [insert details from Contract Data part 1]
respective capacities as _____________ and ___________ of the Bank, and duly authorized thereto,
confirm that we hold the Guaranteed Sum at the disposal of the Employer as security for the proper
performance by the Contractor of all of its obligations in terms of and arising from the Contract and hereby
undertake to pay to the Employer, on written demand from the Employer received prior to the Expiry Date,
any sum or sums not exceeding in total the Guaranteed Sum.
he is responsible under the Contract (and the nature of such defect(s)) alternatively that the Demand
Amount is payable to the Employer in the circumstances contemplated in the Contract.
and not as surety and the Bank’s obligation/s to make payment:
Part c1: agreement & contract data c1.1 Ecc3 form of offer and acceptance
Cia RFQ 74113
Confidential
Confidential
Airports company south africa soc limited contract NO.
Replacement of ablution extraction fans and associated equipment at cape town international
Airport
Sum; and
hereof shall not be delayed, by the fact that a dispute may exist between the Employer and the
Contractor.
without advising us and without affecting our liability under this Guarantee. This includes, without limitation,
any extensions, indulgences, release or compromise granted to the Contractor or any variation under or
to the Contract.
under the Contract, then the Employer shall be entitled to cede to such third party the rights of the Employer
under this Guarantee on written notification to the Bank of such cession.
is neither negotiable nor transferable;
shall be subject to the jurisdiction of the Courts of the Republic of South Africa.
Expiry Date.
the Bank’s Address.
Signed at on this day of 20__
For and on behalf of the Bank
Bank Signatories(s)
Name(s) (printed)
Witness(s)
Bank’s seal or stamp
Part c1: agreement & contract data c1.1 Ecc3 form of offer and acceptance
Cia RFQ 74113
Confidential
Confidential
Airports company south africa soc limited contract NO.
Replacement of ablution extraction fans and associated equipment at cape town international
Airport
Pro forma ASGI-SA Guarantee
(to be reproduced exactly as shown below on the letterhead of the Bank providing the Guarantee)
The Airports Company South Africa SOC Limited
O.R. Tambo International Airport
The Maples, 24 Johnson Road
Bedfordview 2008
Date:
Dear Sirs
Reference No. [●] [Drafting Note: Bank reference number to be inserted]
Pro-Forma ASGI-SA Guarantee: [Drafting Note: Name of Contractor to be inserted]
Project [ ] Contract Reference: [●] [Drafting Note: Contractor contract reference number to be inserted]
1.1 “Bank” - means [●], [●] Branch, (Registration No. [●]); [Drafting Note: Name of Bank to be inserted]
1.2 “Bank’s Address” - means [●]; [Drafting Note: Bank’s physical address to be inserted]
1.3 “Contract” – means the written agreement relating to the Project, entered into between the Employer and
the Contractor, on or about the [●] day of [●] 200[●] (Contract Reference No. [●] as amended, varied,
restated, novated or substituted from time to time; [Drafting Note: Signature Date and Contract reference
number to be inserted]
1.4 “Contractor” – means [●] a company registered in accordance with the laws of [●] under Registration
Number [●]. [Drafting Note: Name and details of Contractor to be inserted]
1.5 “Contractor’s ASGI-SA Obligations” – means the Contractor’s ASGI-SA Obligations under and as defined
in the Contract.
1.6 “Employer” - means Eskom Holdings Limited, a company registered in accordance with the laws of the
Republic of South Africa under Registration Number 2002/015527/06.
1.7 “Expiry Date” - means the [●] day of [●] 200[●]; [Drafting Note: anticipated date of issue of ASGI-SA
Performance Certificate to be inserted.]
1.8 “Guaranteed Sum” - means the sum of R [●] ([●] Rand);
1.9 “Project” – means the ..............................
respective capacities as _____________ and ___________ of the Bank, and duly authorized thereto,
confirm that we hold the Guaranteed Sum at the disposal of the Employer, as security for the proper
performance by the Contractor of the Contractor’s ASGI-SA Obligations and hereby undertake to pay to
the Employer, on written demand from the Employer received prior to the Expiry Date, any sum or sums
not exceeding in total the Guaranteed Sum.
3.1 state the amount claimed (“the Demand Amount’);
3.2 state that the Demand Amount is payable to the Employer in the circumstances contemplated in the
Contract.
Part c1: agreement & contract data c1.1 Ecc3 form of offer and acceptance
Cia RFQ 74113
Confidential
Confidential
Airports company south africa soc limited contract NO.
Replacement of ablution extraction fans and associated equipment at cape town international
Airport
and not as surety and the Bank’s obligation/s to make payment:
4.1 is and shall be absolute provided demand is made in terms of this bond in all circumstances; and
4.2 is not, and shall not be construed to be, accessory or collateral on any basis whatsoever.
5.1 shall be restricted to the payment of money only and shall be limited to the maximum of the Guaranteed
Sum; and
5.2 shall not be discharged and compliance with any demand for payment received by the Bank in terms
hereof shall not be delayed, by the fact that a dispute may exist between the Employer and the Contractor.
without advising us and without affecting our liability under this Guarantee. This includes, without limitation,
any extensions, indulgences, release or compromise granted to the Contractor or any variation under or
to the Contract.
under the Contract, then the Employer shall be entitled to cede to such third party the rights of the Employer
under this Guarantee on written notification to the Bank of such cession.
8.1 shall expire on the Expiry Date until which time it is irrevocable;
8.2 is, save as provided for in Error! Reference source not found. above, personal to the Employer and is
neither negotiable nor transferable;
8.3 shall be returned to the Bank upon the earlier of payment of the full Guaranteed Sum or expiry hereof;
8.4 shall be regarded as a liquid document for the purpose of obtaining a court order; and
8.5 shall be governed by and construed in accordance with the law of the Republic of South Africa and shall
be subject to the jurisdiction of the courts of the Republic of South Africa.
8.6 Any claim which arises or demand for payment received after expiry date will be invalid and unenforceable.
the Bank’s Address.
Signed at _____________________ Date ____________________________
For and behalf of the Bank
Bank Signatory: ___________________ Bank Signatory: ___________________
Witness: ________________________ Witness: _________________________
Bank’s seal or stamp
Part c1: agreement & contract data c1.1 Ecc3 form of offer and acceptance
Cia RFQ 74113
Confidential
Confidential
Airports company south africa soc limited contract NO.
Replacement of ablution extraction fans and associated equipment at cape town international
Airport
Part C2: Pricing Data
Document Title No of
reference pages
C2.1 Pricing assumptions: Option B 4
C2.2 The Bill of quantities to be obtained from (Annexure 5. 2) 36
Part c1: agreement & contract data c1.1 Ecc3 form of offer and acceptance
Cia RFQ 74113
Confidential
Qualifications:
Experience:
2 Name:
Qualifications:
Experience:
3 Name:
Qualifications:
Part c1: agreement & contract data c1.1 Ecc3 form of offer and acceptance
Cia RFQ 74113
Experience:
4 Name:
Qualifications:
Experience:
CV's (and further key persons data including
CVs) are appended to Tender Schedule
entitled
11.2(3) The completion date for the whole of the
works is
11.2(14) The following matters will be included in
the Risk Register
11.2(19) The Works Information for the Contractor’s
design is in:
31.1 The programme identified in the Contract
Pricing Schedule
Source: 2. CIA RFQ 74113 NEC HVAC.pdfAirport for a Period of 10 months.
Contents: No of
pages
Part C1 Agreements & Contract Data [20]
Part C2 Pricing Data [36]
Part C3 Scope of Work [15]
Part C4 Site Information [1]
Part C5 Annexures [ 5.0-
5.10]
CONTRACT No. ______________________
Conract ecc3 cover pages
Cia RFQ 74113
Part C1 Agreements and Contract Data, (which includes this Form of Offer and Acceptance)
Part C2 Pricing Data
Part C3 Scope of Work: Works Information
Part C4 Site Information
and drawings and documents (or parts thereof), which may be incorporated by reference into the above
listed Parts.
11.2(21) The bill of quantities is in
11.2(31) The tendered total of the Prices is (in figures)
(in words), excluding VAT
61 in The hourly rates for Defined Cost of
Note: Hourly rates are estimated ‘cost to
company of the employee’ and not selling rates.
Part C2: Pricing Data
reference pages
C2.1 Pricing assumptions: Option B 4
C2.2 The Bill of quantities to be obtained from (Annexure 5. 2) 36
Part c1: agreement & contract data c1.1 Ecc3 form of offer and acceptance
Cia RFQ 74113
Compliance Requirements
Source: 2. CIA RFQ 74113 NEC HVAC.pdf (RFQ)Please note that where the project covers both landside and airside, only the airside clause will apply.
Part c1: agreement & contract data c1.1 Ecc3 form of offer and acceptance
Health & Safety
Source: 2. CIA RFQ 74113 NEC HVAC.pdfsignature of
witness Date
Note: If a tenderer wishes to submit alternative tenders, use another copy of this Form of Offer and
31.2 The starting date is Upon signing of contract by ACSA
32.2 The Contractor submits revised
programmes at intervals no longer than Four (4) weeks
35.1 The Employer is not willing to take over
the works before the Completion Date.
60.6 The method of measurement is Standard Unit of Measurement published by ASAQS
and amended as stated in Part C2.1, Pricing
Z1 Interpretation of the law
Z1.1 Add to core clause 12.3: Any extension, concession, waiver, or relaxation of any action stated in this
contract by the Parties, the Project Manager, the Supervisor, or the Adjudicator does not constitute a
waiver of rights and does not give rise to an estoppel unless the Parties agree otherwise and confirm
such agreement in writing.
Part c1: agreement & contract data c1.1 Ecc3 form of offer and acceptance
Cia RFQ 74113
Z6. Changes in Law: Add the following clause to secondary option X2 as X2.2:
Z6.1 A change in law is defined as:
Z6.1.1 the adoption, enactment, promulgation, coming into effect, repeal, amendment, reinterpretation,
change in application or other modification after the Contract Date of any law, excluding (i) the
enactment of any bill inside the country, but only if such bill is enacted without any material changes
being made to the contents of such bill from the form published in the Gazette (as defined in the
Interpretation Act, 1957) as at the Contract Date, and (ii) any such modification in law relating to any
taxes, charges, imposts, duties, levies or deductions that are assessed in relation to a person’s income
Z6.1.2 any permit being terminated, withdrawn, amended, modified or replaced, other than (i) in accordance
with the terms upon which it was originally granted, (ii) as a result of the failure by the Contractor to
comply with any condition set out therein, or (iii) as a result of any act or omission of the Contractor,
any Subcontractor or any affiliate to the Contractor.
Z7. Performance Bond
Part c1: agreement & contract data c1.1 Ecc3 form of offer and acceptance
Cia RFQ 74113
however other clauses may also use the same data
selected. Click on the form field once and type in the data. Otherwise complete by hand and in ink.
21 in The published list of Equipment is the
Equipment in the published list is Minus _____%
22 in The rates of other Equipment are: Equipment Size or Rate
Contractual Terms
Source: 2. CIA RFQ 74113 NEC HVAC.pdfthousand rands).
project.
For OPEX projects and non-construction CAPEX projects on the airside:
The successful bidder must source the following insurance cover, which is the deductible in the ACSA
thousand rands).
project.
Please note that where the project covers both landside and airside, only the airside clause will apply.
1.1 Sub-Contractors.
The Contractor shall:
a) ensure that all potential and appointed Sub-contractors are aware of the whole contents of
these Insurance Clauses, and
b) enforce the compliance by subcontract agreement between the Contractor and Sub-
Contractor and where applicable that the Subcontractor effect similar insurance relating to the
insurances required to be effected by the Contractor under Clause 2 (Contractor effected
insurances).
Appendix a
Contractors claims advice form - for acsa insured contracts under the annual
Policy
Part c1: agreement & contract data c1.1 Ecc3 form of offer and acceptance
Cia RFQ 74113
Confidential
Confidential
Airports company south africa soc limited contract NO.
Replacement of ablution extraction fans and associated equipment at cape town international
Airport
Send to: Airports Company South Africa
*........................................................
.........................................................
E-Mail The Following People: .........................................................
......................................................... [email protected]
.........................................................
[email protected] ...................................................
Re: acsa contractors: car/pl/pi: claim
Date of loss: _____________________________________________________________________
Reported to site agent by: ________________________ Date: _____________________
Reported to Insurance Broker by: ________________________ Date: _____________________
How did the loss occur (cause)? _________________________________________________________
Details and nature of loss or damage to Contract Works _______________________________________
Details of other property damaged ________________________________________________________
Names and address of witnesses _________________________________________________________
Estimated cost of repairs (Separate records of all costs must be kept) R_______________________
Person whom assessor should contact _____________________________________________________
Telephone/Mobile Numbers Of Contact Person_________________________________________
Email Address of Contact Person_______________________________________________
Part c1: agreement & contract data c1.1 Ecc3 form of offer and acceptance
Cia RFQ 74113
Confidential
Confidential
Airports company south africa soc limited contract NO.
Replacement of ablution extraction fans and associated equipment at cape town international
Airport
C1.2 Contract Data
Part two - Data provided by the Contractor.
Notes to a tendering contractor:
of its Guidance Notes (ECC3-GN) in order to understand the implications of this Data which the
tenderer is required to complete. An example of the completed Data is provided on pages 152 to 154
of the ECC3 Guidance Notes.
however other clauses may also use the same data
selected. Click on the form field once and type in the data. Otherwise complete by hand and in ink.
Completion of the data in full, according to Options chosen, is essential to create a complete contract.
Clause Statement Data
10.1 The Contractor is (Name):
Address
Tel No.
Fax No.
11.2(8) The direct fee percentage is %
The subcontracted fee percentage is %
11.2(18) The working areas are the Site and Refer to C4 ‘Site Information’
24.1 The Contractor's key persons are:
1 Name:
Job: Construction Manager/ Site Supervisor
Responsibilities:
Part C1: Agreements & Contract Data
Contents: No of
pages
C1.1 Form of Offer and Acceptance [3-5]
C1.2a Contract Data provided by the Employer [6-21]
C1.2b Contract Data provided by the Contractor [22-24]
C1.3 Proforma Guarantees [25-29]
Part c1: agreement & contract data c1.1 Ecc3 form of offer and acceptance
Cia RFQ 74113
of Deviations (if any), contact the Employer’s agent (whose details are given in the Contract Data) to arrange
the delivery of any securities, bonds, guarantees, proof of insurance and any other documentation to be
provided in terms of the conditions of contract identified in the Contract Data at, or just after, the date this
agreement comes into effect. Failure to fulfil any of these obligations in accordance with those terms shall
constitute a repudiation of this agreement.
Unless the tenderer (now Contractor) within five working days of the date of such receipt notifies the
clauses and the clauses for main Option
B: Priced contract with bill of quantities
dispute resolution Option W1: Dispute resolution procedure
and secondary Options
X2 Changes in the law
X7: Delay damages
X16: Retention
X17: Low performance damages
X18: Limitation of liability
Z: Additional conditions of contract
of the NEC3 Engineering and
Construction Contract, April 2013
(Ecc3)
10.1 The Employer is (Name): Airports Company South Africa SOC Limited (reg.
no: 1993/004149/06), a juristic person incorporated
in terms of the company laws of the Republic of
80.1 These are additional Employer's risks Refer to ACSA insurance clauses in Annexure D.
81.1 The Contractor’s Risk Add:
(1) The Contractor has engaged with the persons
responsible for the riot, commotion, disorder, strike or
lockout; has met with the persons or leaders; and has
recorded the persons or leaders details, their grievances,
the organisations involved, all threats made; and has
requested the persons or leaders to cease all unlawful
conduct; and
(2) The Contractor has obtained proof of the riot,
commotion, disorder, strike or lockout, and of any
unlawful conduct; and
(3) The Contractor has reported all threats and unlawful
conduct to the South African Police Service; and
(4) The Contractor has brought an urgent application to
the court on an ex parte basis that correctly identify the
respondents and define the unlawful conduct to be
interdicted; and
order is enforced.
84.1 The Employer provides these Refer Annexure D to this Contract Data provided by the
insurances from the Insurance Table
84.1 The Employer provides these additional Refer to Insurance Schedule in Annexure D provided by
insurances
the Employer.
84.1 The Contractor provides these Refer to Insurance Schedule in Annexure D to this
additional insurances Contract Data provided by the Employer.
84.2 The minimum limit of indemnity for Refer to Insurance Schedule in Annexure D to this
insurance in respect of death of or Contract Data provided by the Employer.
bodily injury to employees of the
11 Data for Option W1
W1.1 The Adjudicator is (Name) Both parties will agree the Adjudicator when a dispute
arises. If the parties cannot reach an agreement on the
Adjudicator within 30 days of a dispute arising, the
X7 Delay damages
X7.1 Delay damages for late Completion of 2.5% to the maximum of 10% of the price at completion
the sections of the works are: date
X16 Retention (not used with Option F)
The retention percentage is 5% of the contract value , 2,5% will be released at
Completion of the works and the remaining 2,5% will
be released after the Twelve (12) months of defects
liability period
X17 Low performance damages
X17.1 The amounts for low performance damages
are: Amount Performance level
R 1500,00/day defects within defect correction
period of Two (2) weeks
X18 Limitation of liability
X18.1 The Contractor’s liability to the Refer to insurance clauses in Annexure D, ACSA
loss is limited to:
X18.2 For any one event, the Contractor’s Total of the losses incurred and/or repairs to the
liability to the Employer for loss of or damages caused.
damage to the Employer’s property is
limited to:
X18.3 The Contractor’s liability for Defects due Total of the losses incurred and/or repairs to the
to his design which are not listed on the damages caused.
X18.4 The Contractor’s total liability to the The total of the Prices other than for the additional
in connection with this contract, other
than excluded matters, is limited to: The Contractor’s total liability for the additional excluded
matters is not limited.
the Site,
Plant and Materials),
X18.5 The end of liability date is The date on which the liability in question prescribes in
accordance with the Prescription Act No. (as
amended or in terms of any replacement legislation) for
any other.
between Completion and the defects date stated in the Contract Data.
Z5. Termination
Z5.1. Add the following to core clause 91.1, at the second main bullet, fifth sub-bullet point, after the
words “assets or”: “business rescue proceedings are initiated, or steps are taken to initiate business
recue proceedings”.
set out in Annexure C.ii of this Contract Data.
Z7.2. Add the following new clause as Option X13.2: The Contractor ensures that the performance bond is
valid and enforceable until the end of the contract period. If the terms of the performance bond specify
its expiry date and the end of the contract period does not coincide with such expiry date, four weeks
prior to the said expiry date, the Contractor extends the validity of the performance bond until the end
of the contract period. If the Contractor fails to so extend the validity of the performance bond, the Employer
may claim the full amount of the performance bond and retain the proceeds as cash security.
Z8. Limitation of liability: Insert the following new clause as Option X18.6:
Z8.1 The Employer's liability to the Contractor for the Contractor's indirect or consequential loss is limited to
an amount to be addressed with client.
Z8.2 Notwithstanding any other clause in this contract, any proceeds received from any insurances or any
proceeds which would have been received from any insurances but for the conduct of the Contractor
shall be excluded from the calculation of the limitations of liability listed in the contract.
Z9. Cession, delegation, and assignment
Z9.1. The Contractor shall not cede, delegate, or assign any of its rights or obligations to any person without
the written consent of the Employer, which consent shall not be unreasonably withheld. This clause
shall be binding on the liquidator/business rescue practitioner /trustee (whether provisional or not) of
the Contractor.
Z9.2. The Employer may, on written notice to the Contractor, cede and delegate its rights and obligations
under this contract to any person or entity.
Z10. Joint and several liability
Z10.1. If the Contractor constitutes a joint venture, consortium, or other unincorporated grouping of two or
more persons, these persons are deemed to be jointly and severally liable to the Employer for the
performance of the Contract.
Z10.2. The Contractor shall, within 1 week of the Contract Date, notify the Project Manager and the Employer
of the key person who has the authority to bind the Contractor on their behalf.
Z10.3. The Contractor does not materially alter the composition of the joint venture, consortium, or other
unincorporated grouping of two or more persons without prior written consent of the Employer.
Z11. Ethics
Z11.1. The Contractor undertakes:
Z11.1.1. not to give any offer, payment, consideration, or benefit of any kind, which constitutes or could be
construed as an illegal or corrupt practice, either directly or indirectly, as an inducement or reward for
the award or in execution of this contract;
Z11.1.2. to comply with all laws, regulations or policies relating to the prevention and combating of bribery,
corruption, and money laundering to which it or the Employer is subject, including but not limited to
the Prevention and Combating of Corrupt Activities Act, .
Z11.2. The Contractor’s breach of this clause constitutes grounds for terminating the Contractor’s obligation
to Provide the Works or taking any other action as appropriate against the Contractor (including civil
Part c1: agreement & contract data c1.1 Ecc3 form of offer and acceptance
Cia RFQ 74113
or criminal action). However, lawful inducements and rewards shall not constitute grounds for
termination.
Z11.3. If the Contractor is found guilty by a competent court, administrative or regulatory body of participating
in illegal or corrupt practices, including but not limited to the making of offers (directly or indirectly),
payments, gifts, gratuity, commission or benefits of any kind, which are in any way whatsoever in
connection with the contract with the Employer, the Employer shall be entitled to terminate the contract
in accordance with the procedures stated in core clause 92.2. the amount due on termination is A1.
Z12. Confidentiality
Z12.1. All information obtained in terms of this contract or arising from the implementation of this contract
shall be treated as confidential by the Contractor and shall not be used or divulged or published to any
person not being a party to this contract, without the prior written consent of the Project Manager or
the Employer, which consent shall not be unreasonably withheld.
Z12.2. If the Contractor is uncertain about whether any such information is confidential, it is to be regarded
as such until otherwise notified by the Project Manager.
Z12.3. This undertaking shall not apply to –
Z12.3.1. Information disclosed to the employees of the Contractor for the purposes of the implementation of
this agreement. The Contractor undertakes to procure that its employees are aware of the confidential
nature of the information so disclosed and that they comply with the provisions of this clause;
Z12.3.2. Information which the Contractor is required by law to disclose, provided that the Contractor notifies
the Employer prior to disclosure so as to enable the Employer to take the appropriate action to protect
such information. The Contractor may disclose such information only to the extent required by law and
shall use reasonable efforts to obtain assurances that confidential treatment will be afforded to the
information so disclosed;
Z12.3.3. Information which at the time of disclosure or thereafter, without default on the part of the Contractor,
enters the public domain or to information which was already in the possession of the Contractor at
the time of disclosure (evidenced by written records in existence at that time);
Z12.4. The taking of images (whether photographs, video footage or otherwise) of the works or any portion
thereof, in the course of Providing the Works and after Completion, requires the prior written consent
of the Project Manager. All rights in and to all such images vests exclusively in the Employer.
Z12.5. The Contractor ensures that all his Subcontractors abide by the undertakings in this clause.
Z13. Employer’s Step-in rights
Z13.1. If the Contractor defaults by failing to comply with his obligations and fails to remedy such default
within 2 weeks of the notification of the default by the Project Manager, the Employer, without prejudice
to his other rights, powers, and remedies under the contract, may remedy the default either himself
or procure a third party (including any subcontractor or supplier of the Contractor) to do so on his
behalf. The reasonable costs of such remedial works shall be borne by the Contractor.
Z13.2. The Contractor co-operates with the Employer and facilitates and permits the use of all required
information, materials and other matter (including but not limited to documents and all other drawings
Z14. Liens and Encumbrances
Z14.1. The Contractor keeps the Equipment used to Provide the Services free of all liens and other
encumbrances at all times. The Contractor, vis-a-vis the Employer, waives all and any liens which he may
from time to time have, or become entitled to over such Equipment and any part thereof and procures
that his Subcontractors similarly, vis-a-vis the Employer, waive all liens they may have or become entitled
to over such Equipment from time to time
Z15. Intellectual Property
Z15.1 Intellectual Property (“IP”) rights means all rights in and to any patent, design, copyright, trademark,
trade name, trade secret or other intellectual or industrial property right relating to the Works.
Z15.2 IP rights remain vested in the originator and shall not be used for any reason whatsoever other than
carrying out the works.
Z15.3 The Contractor gives the Employer an irrevocable, transferrable, non-exclusive, royalty free licence to
use and copy all IP related to the works for the purposes of constructing, repairing, demolishing
operating and maintaining the works.
Z15.4 The written approval of the Contractor is to be obtained before the Contractor's IP made available to
any third party which approval will not be unreasonably withheld or delayed. Prior to making any
from any such third party on terms no less onerous than the terms the Employer would use to protec
its IP.
Z15.5 The Contractor shall indemnify and hold the Employer harmless against and from any claim alleging
an infringement of IP rights (“the claim”), which arises out of or in relation to:
Z15.5.1 the Contractor’s design, manufacture, construction, or execution of the Works;
Z15.5.2 the use of the Contractor’s Equipment, or
Z15.5.3 the proper use of the Works.
Z15.6 The Employer shall, at the request and cost of the Contractor, assist in contesting the claim and the
Contractor may (at its cost) conduct negotiations for the settlement of the claim, and any litigation or
arbitration which may arise from it.
Z16. Dispute resolution: The following amendments are made to Option W1:
Z16.1 Under clause W1.3, in the fourth row of the first column of the adjudication table, the following
words are added after the words “any other matter”: “excluding disputes relating to termination of
the contract”.
Z16.2 The following clauses are added at the end of clause W1.3:
Z16.2.1 “The Adjudicator shall decide the dispute solely on the written submissions of the parties. No oral
submissions shall be heard during adjudication.”
Z16.2.2 “Disputes relating to or arising from termination of the Contract shall not be determined by an adjudicator.
Any such dispute shall be referred directly to arbitration.”
Part c1: agreement & contract data c1.1 Ecc3 form of offer and acceptance
Cia RFQ 74113
Annexure B: Pro forma Security Bonds and Guarantee
Reference to C1.3 Forms of Securities
Part c1: agreement & contract data c1.1 Ecc3 form of offer and acceptance
Cia RFQ 74113
Annexure D: ACSA Insurance Clauses
Summary of Terms and other Matters Applicable to Employer Provided Insurance Part 1:
liabilities or responsibilities of the Contractor in any way whatsoever (including but not limited to any
requirement for the provision by the Contractor of any other insurances) the Employer shall effect and
maintain as appropriate in the joint names of the Employer , Contractors and Sub-Contractors,
insurance cover:
thousand rands).
project.
insurance cover:
thousand rands).
project.
a) ensure that all potential and appointed Sub-contractors are aware of the whole contents of
these Insurance Clauses, and
b) enforce the compliance by subcontract agreement between the Contractor and Sub-
insurances required to be effected by the Contractor under Clause 2 (Contractor effected
insurances).
Send to: Airports Company South Africa
*........................................................
.........................................................
E-Mail The Following People: .........................................................
......................................................... [email protected]
.........................................................
[email protected] ...................................................
Re: acsa contractors: car/pl/pi: claim
Date of loss: _____________________________________________________________________
Reported to site agent by: ________________________ Date: _____________________
Reported to Insurance Broker by: ________________________ Date: _____________________
How did the loss occur (cause)? _________________________________________________________
Details and nature of loss or damage to Contract Works _______________________________________
Details of other property damaged ________________________________________________________
Names and address of witnesses _________________________________________________________
Estimated cost of repairs (Separate records of all costs must be kept) R_______________________
Person whom assessor should contact _____________________________________________________
Telephone/Mobile Numbers Of Contact Person_________________________________________
Email Address of Contact Person_______________________________________________
Part c1: agreement & contract data c1.1 Ecc3 form of offer and acceptance
Cia RFQ 74113
receives and accepts a Retention Money Guarantee exactly in the form stated he will instruct the Project
Manager not to assess any amount be retained in terms of secondary Option X16.
Pro forma Retention Money Guarantee (may be used when Option X16
applies)
(to be reproduced exactly as shown below on the letterhead of the Bank providing the Guarantee)
Reference No. [●] [Drafting Note: Bank reference number to be inserted]
Retention Money Guarantee: [Drafting Note: Name of Contractor to be inserted]
Project [ ] : Contract Reference: [Drafting Note: Contractor contract reference number to be inserted]
1.1 “Bank” means [Insert name of Bank], [●] Branch, Registration No. [●]
1.2 “Bank’s Address” means [Insert physical address of Bank]
1.3 “Contract” means the written agreement relating to providing the works, entered into
between the Employer and the Contractor, on or about the [●] day of
[●] 20[●] (Contract Reference No. [●]) as amended, varied, restated,
novated or substituted from time to time;
1.4 “Contractor” means [●] a company registered in accordance with the laws of [●] under
Registration No [●].
1.5 “Employer” means [●] a company registered in accordance with the laws of the Republic
of South Africa under Registration Number [●]
1.6 “Expiry Date” means the date on which the Defects Certificate is issued in terms of the
1.7 “Guaranteed Sum” means the sum of R[●], ([●] Rand)
1.8 “works” means [insert details from Contract Data part 1]
respective capacities as _____________ and ___________ of the Bank, and duly authorized thereto,
confirm that we hold the Guaranteed Sum at the disposal of the Employer as security for the proper
performance by the Contractor of all of its obligations in terms of and arising from the Contract and hereby
undertake to pay to the Employer, on written demand from the Employer received prior to the Expiry Date,
any sum or sums not exceeding in total the Guaranteed Sum.
he is responsible under the Contract (and the nature of such defect(s)) alternatively that the Demand
Sum; and
hereof shall not be delayed, by the fact that a dispute may exist between the Employer and the
without advising us and without affecting our liability under this Guarantee. This includes, without limitation,
any extensions, indulgences, release or compromise granted to the Contractor or any variation under or
to the Contract.
under the Contract, then the Employer shall be entitled to cede to such third party the rights of the Employer
under this Guarantee on written notification to the Bank of such cession.
is neither negotiable nor transferable;
shall be subject to the jurisdiction of the Courts of the Republic of South Africa.
(to be reproduced exactly as shown below on the letterhead of the Bank providing the Guarantee)
Reference No. [●] [Drafting Note: Bank reference number to be inserted]
Pro-Forma ASGI-SA Guarantee: [Drafting Note: Name of Contractor to be inserted]
Project [ ] Contract Reference: [●] [Drafting Note: Contractor contract reference number to be inserted]
1.1 “Bank” - means [●], [●] Branch, (Registration No. [●]); [Drafting Note: Name of Bank to be inserted]
1.2 “Bank’s Address” - means [●]; [Drafting Note: Bank’s physical address to be inserted]
1.3 “Contract” – means the written agreement relating to the Project, entered into between the Employer and
the Contractor, on or about the [●] day of [●] 200[●] (Contract Reference No. [●] as amended, varied,
restated, novated or substituted from time to time; [Drafting Note: Signature Date and Contract reference
number to be inserted]
1.4 “Contractor” – means [●] a company registered in accordance with the laws of [●] under Registration
Number [●]. [Drafting Note: Name and details of Contractor to be inserted]
1.5 “Contractor’s ASGI-SA Obligations” – means the Contractor’s ASGI-SA Obligations under and as defined
in the Contract.
1.6 “Employer” - means Eskom Holdings Limited, a company registered in accordance with the laws of the
Republic of South Africa under Registration Number 2002/015527/06.
1.7 “Expiry Date” - means the [●] day of [●] 200[●]; [Drafting Note: anticipated date of issue of ASGI-SA
Performance Certificate to be inserted.]
1.8 “Guaranteed Sum” - means the sum of R [●] ([●] Rand);
1.9 “Project” – means the ..............................
respective capacities as _____________ and ___________ of the Bank, and duly authorized thereto,
confirm that we hold the Guaranteed Sum at the disposal of the Employer, as security for the proper
performance by the Contractor of the Contractor’s ASGI-SA Obligations and hereby undertake to pay to
the Employer, on written demand from the Employer received prior to the Expiry Date, any sum or sums
not exceeding in total the Guaranteed Sum.
3.1 state the amount claimed (“the Demand Amount’);
3.2 state that the Demand Amount is payable to the Employer in the circumstances contemplated in the
and not as surety and the Bank’s obligation/s to make payment:
4.1 is and shall be absolute provided demand is made in terms of this bond in all circumstances; and
4.2 is not, and shall not be construed to be, accessory or collateral on any basis whatsoever.
5.1 shall be restricted to the payment of money only and shall be limited to the maximum of the Guaranteed
Sum; and
5.2 shall not be discharged and compliance with any demand for payment received by the Bank in terms
hereof shall not be delayed, by the fact that a dispute may exist between the Employer and the Contractor.
without advising us and without affecting our liability under this Guarantee. This includes, without limitation,
any extensions, indulgences, release or compromise granted to the Contractor or any variation under or
to the Contract.
under the Contract, then the Employer shall be entitled to cede to such third party the rights of the Employer
under this Guarantee on written notification to the Bank of such cession.
8.1 shall expire on the Expiry Date until which time it is irrevocable;
8.2 is, save as provided for in Error! Reference source not found. above, personal to the Employer and is
neither negotiable nor transferable;
8.3 shall be returned to the Bank upon the earlier of payment of the full Guaranteed Sum or expiry hereof;
8.4 shall be regarded as a liquid document for the purpose of obtaining a court order; and
8.5 shall be governed by and construed in accordance with the law of the Republic of South Africa and shall
be subject to the jurisdiction of the courts of the Republic of South Africa.
8.6 Any claim which arises or demand for payment received after expiry date will be invalid and unenforceable.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 4 of 2006
Relevant to electricity, generation, transmission, distribution and energy-service procurement.
Relevant because this tender appears to involve electricity, power supply, energy infrastructure, generators, or energy maintenance. Relevant because this tender appears to involve petroleum, oil, gas, fuel, or energy-resource services.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve electricity, power supply, energy infrastructure, generators, or energy maintenance. Relevant because this tender appears to involve petroleum, oil, gas, fuel, or energy-resource services.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve electricity, power supply, energy infrastructure, generators, or energy maintenance. Relevant because this tender appears to involve petroleum, oil, gas, fuel, or energy-resource services.
Act 28 of 2002
Relevant to mineral resources, mining rights, prospecting and mining-related procurement.
Relevant because this tender appears to involve petroleum, oil, gas, fuel, or energy-resource services.
Act 40 of 2004
Relevant to regulated electricity, piped-gas and petroleum-pipeline activities.
Relevant because this tender appears to involve electricity, power supply, energy infrastructure, generators, or energy maintenance.
Address
Cape Town International Airport Southern Office Block Building - Airport Industria - Cape Town - 7490
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
4
Last checked
11 Sept 2026
AI status
Not enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
How small office supplies, stationery, and general goods suppliers use Joint Ventures to win government procurement contracts by combining inventory with B-BBEE credentials.
How the Protection of Personal Information Act affects tender submissions, data handling, and supplier contracts with government. A practical POPIA compliance guide for South African tender bidders covering lawful processing, data subject rights, and consequences of non-compliance.
A meticulously organised tender submission can be the difference between a winning bid and one that hits the rejection pile. Learn how to package, structure, and present your tender response for maximum evaluator impact on South African government contracts.
How consulting engineers, engineering firms, and multidisciplinary practices can win public sector infrastructure contracts in South Africa — from ECSA registration and CESA membership to fee proposals, QBS scoring, and building a winning tender response.
💡 Want more tendering tips and strategies?
Explore Our BlogMedian Estimate
R 3 446 994
Range
Based on 5 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Get deep intelligence on Electricity, gas, steam and air conditioning. Unlock full pricing strategies, bid frequency, and historical win rates.