Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Peaking Power Stations - - Peaking Power Stations -
Organization Type
GOVERNMENT
Published
04 Sept 2026
OCDS Reference
ocds-9t57fa-168988
ESKOM is procuring vegetation management services at port rex power station for a five-year period under an nec3 term service contract (tsc3) with a priced contract (option a). The contract will be awarded to a single contractor who must provide gardening, lawn, hedge, alien vegetation and herbicide services, and comply with strict health, safety and environmental requirements. The most consequential requirement is the contractor's liability for low service damages of up to 10% of each task order value, and the need to provide a performance guarantee or security within two weeks of contract award.
Contract term: Five (5) years, with service commencement date to be confirmed.
Pricing: NEC3 TSC3 Option A (priced contract with price list); prices fixed and firm for the first 12 months, then adjusted semi-annually (85% variable linked to SEIFSA indices, 15% fixed).
Returnable documents: Signed C1.1 Form of Offer and Acceptance (including CIDB registration number), completed C1.2b Contract Data (including key people details and CVs), and Schedule of Deviations (if any).
Insurance: Contractor must provide insurance per Insurance Table A (covering loss/damage to Employer's property, Plant and Materials, Equipment, public liability, and employer's liability) from start date until completion or termination.
Health and safety: Comply with the Occupational Health and Safety Act, Eskom's safety rules, and maintain all required safety documentation; asbestos-related work must follow the Asbestos Regulations, 2001, and any asbestos removal is done only by a registered contractor instructed by Eskom.
B-BBEE: Any change in B-BBEE status must be notified to Eskom within 7 days, with an updated verification certificate within 30 days; a decrease in status may lead to renegotiation or termination.
Payment: Monthly assessment between the 25th and 30th day, with payment due 30 days from receipt of a compliant tax invoice; interest on late payment at Standard Bank's prime rate.
Low service damages: Apply per task order (e.g., 1.5% or 2% of task order value per week, limited to 10% of task order value) for failures such as grass cutting, general appearance, SHE file submission, and delays.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Friday, 02 October 2026 - 10:00
Venue
https://teams.microsoft.com/meet/358180069279881?p=6fwcR0e3xWEZegGvI7
Categories
Request for Bid(Open-Tender)
Peaking Power Stations - - Peaking Power Stations -
AI Document Analysis Stages
Important Dates
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)04 Sept
2026
Tender Published
Tender was published
02 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
240-12248652_List of Tender Returnables_Cat 3_ Rev 7.xlsx
Eskom is procuring gardening and vegetation services at five power stations (Gourikwa, Ankerlig, Acacia, Port Rex, and Palmiet) for a five-year period. Bidders must submit quality management documentation as evaluated under a weighted scorecard covering ISO 9001 requirements, evidence of an operational QMS, a draft Contract Quality Plan, and Quality Control Plans/ITPs.
OHS Requirements Gourikwa.pdf
Provision of gardening and vegetation management services at Gourikwa, Ankerlig, Acacia, Port Rex and Palmiet Power Stations for a five-year contract. The scope includes routine horticultural care, alien invasive species control, firebreak maintenance, and related vegetation management, with strict compliance to Eskom's OHS requirements.
559-667439824 Generation Quality Control Plan Template.docx
Provision of gardening and vegetation services at five Eskom power stations in the Western Cape (Gourikwa, Ankerlig, Acacia, Port Rex, and Palmiet) for a period of five years.
Attachment No. 6b.pdf
Provision of vegetation management services at Acacia, Palmiet and Ankerlig power stations (with the tender title also listing Gourikwa and Port Rex) for a period of 60 months, issued by Eskom. The contract includes SDL&I obligations covering B-BBEE improvement, local procurement, procurement from black-owned enterprises, and job creation, with penalties and retention for non-compliance.
Attachment No. 7.pdf
Provision of gardening and vegetation services, including alien vegetation control, at five Eskom power stations (Gourikwa, Ankerlig, Acacia, Port Rex, and Palmiet) for a five-year contract period.
240-105658000 Supplier Quality Management Specification (3).pdf
Eskom is procuring gardening and vegetation services at five power stations in the Western Cape (Gourikwa, Ankerlig, Acacia, Port Rex and Palmiet) for a five-year period. Bidders must comply with Eskom's Supplier Quality Management specification, which requires a quality management system aligned to ISO 9001 and submission of quality documentation as part of the tender.
Attachment No. 3a.pdf
No summary available
Attachment No. 2.pdf
Provision of gardening and vegetation services at five Eskom power stations (Gourikwa, Ankerlig, Acacia, Port Rex, and Palmiet) for a five-year period. The document provided is Eskom's PAYE questionnaire for service contracts, used to determine the contractor's tax classification for withholding purposes.
Attachment No. 5b.pdf
Eskom is procuring gardening and vegetation services at the Gourikwa, Ankerlig, Acacia, Port Rex and Palmiet power stations for a five-year period. The contract will be governed by Eskom's substance abuse management procedures, which impose strict testing and conduct requirements on all personnel on site.
Attachment No. 3b.pdf
Analysis completed but response format was invalid
Attachment No. 3c.pdf
This is a tender document for vegetation management and gardening services at Port Rex Power Station for Eskom Holdings SOC Ltd, covering a five-year contract period. It includes detailed contractual terms, pricing schedules, and compliance requirements, with a strong emphasis on health, safety, and environmental regulations, as well as anti-corruption and ethical standards.
OHS Requirements Ankerlig_Acacia_Palmiet.pdf
Provision of gardening and vegetation management services at five Eskom power stations (Gourikwa, Ankerlig, Acacia, Port Rex, and Palmiet) in the Western Cape for a five-year contract period. The scope includes alien vegetation control, garden bed maintenance, weed control, firebreak maintenance, and cleaning of roads and hard surfaces, with detailed requirements for Ankerlig Power Station.
Invitation to Tender (ITT) - Vegetation & Garden Services - E3452GXPOU (Approved).pdf
Eskom is procuring gardening and vegetation services at five power stations in the Western Cape (Gourikwa, Ankerlig, Acacia, Port Rex and Palmiet) for a five-year period. The contract will be governed by the NEC3 Term Service Contract, with tenders submitted electronically via Eskom's e-tendering portal.
Attachment No. 4.pdf
Provision of gardening and vegetation services at five Eskom power stations (Gourikwa, Ankerlig, Acacia, Port Rex, and Palmiet) for a five-year period. The tender requires bidders to acknowledge and accept Eskom's Supplier Quality Requirements as per specification 240-105658000 and the ISO 9001 standard.
Attachment No. 1.pdf
Provision of gardening and vegetation services at five Eskom power stations (Gourikwa, Ankerlig, Acacia, Port Rex, and Palmiet) for a five-year period.
Attachment No. 6c.pdf
Eskom is procuring vegetation management services at five power stations — Gourikwa, Ankerlig, Acacia, Port Rex and Palmiet — under a 60-month contract. The tender applies the 80/20 preference point system and includes specific B-BBEE, local procurement and job creation commitments that bidders must undertake.
Attachment No. 5a.pdf
Analysis completed but response format was invalid
240-109253698 CQP Template 2021.docx
No summary available
Attachment No. 6a.pdf
Provision of vegetation management services at Gourikwa, Ankerlig, Acacia, Port Rex and Palmiet power stations for a five-year period. The tender is issued by Eskom and includes specific goals for B-BBEE preference points, as well as SDL&I objectives that become contractual obligations.
OHS Requirements Port Rex.pdf
No summary available
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 371 594
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Closing date: 17 October 2021
Contact Information
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown){"name":null,"email":null,"phone":null,"department":"Supply Chain Management","address":null}
Submission Guidelines
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Bidders must complete and sign Form A. Depending on the quality category, they must hold a valid ISO 9001 certificate (Category 1) or provide objective evidence of a developed and implemented QMS (Categories 2-4). They must submit a contract quality plan specific to the scope of work, and where applicable, example inspection and test plans. Bidders must provide documented information on roles, responsibilities and authorities, and control of externally provided processes. For Category 4, a quality method statement and signed quality policy are required. Eskom may perform capability and capacity assessments prior to contract award for high-risk or critical supplies.
Evaluation Criteria
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Bidders must complete and sign Form A. Depending on the category (1-4) selected, suppliers must submit: valid ISO 9001 certificate (Category 1), documented QMS evidence (Categories 2-3), or a quality method statement (Category 4). All categories require submission of a draft Contract Quality Plan (CQP) per ISO 10005, and where applicable, an example Inspection and Test Plan (ITP) or Quality Control Plan (QCP). Additional required documentation includes documented information for control of externally provided processes, roles/responsibilities/authorities, and management review records. Specific requirements per tender are selected using the List of Tender Returnables (240-12248652).
Technical Specifications
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)The intention of this specification is to specify and describe the minimum quality requirements for all existing and potential Eskom suppliers and define the quality criteria for the selection, evaluation, vendor registration, management, monitoring, assessment and auditing of suppliers. Eskom’s position is to partner with suppliers who fully demonstrate commitment to the development, implementation, and maintenance of a quality management system (QMS) that conforms to the requirements of ISO 9001 standard. The priority is to encourage suppliers to continually improve their QMS and enhance service delivery by implementing and conforming to the standard.
Methodology
Source: 240-105658000 Supplier Quality Management Specification (3).pdf Clear and unambiguous description of the equipment and location(s) at which each activity
will take place, including facility location(s)
Identification of quality verification activity and stage
The details of reference documents, procedures, or method statements to be utilised in
performance of the activity, including specific reference to actual sections and pages of
procedures, standards, instructions, specifications, etc.
supplier. Further details are included in the Eskom specifications and works information.
3.8.3.5 Review and tracking of compliance with Eskom and supplier engineering specification of
preservation requirements.
3.8.3.6 Review and tracking of compliance with sub-supplier provided preservation requirements
and recommendations.
3.8.3.7 Evaluation of prospective temporary and longer-term material storage sites for consistency
with preservation programme expectations.
3.8.3.8 Preservation work plan development and plan execution performance evaluation of all
parties engaged for provision of material transportation, handling, or storage services.
3.8.3.9 Oversight of material quality preservation plan preparation and plan execution performance
at all work locations.
3.8.3.10 Development of a preservation programme records management process, in compliance
with Eskom information management requirements, which comprehensively addresses
generation, maintenance, and ready access by Eskom to all preservation programme
records.
3.8.3.11 The supplier shall deploy a clearly defined documented programme providing for
identification of all physical asset pre-operation preservation of quality requirements. In this
reference, the term “physical assets” should be understood to include bulk materials,
including consumable items, equipment systems, system components, and any other
procured or supplied materials or equipment transferred to project control, but not deployed
for operational purposes.
Experience & Qualifications
Source: 240-105658000 Supplier Quality Management Specification (3).pdfReg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.7.3.5 Quality audits and related quality performance reviews shall be carried out by trained,
accredited, and experienced personnel in accordance with procedures documented in the
Quality Management
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)This specification defines the minimum quality requirements for all existing and potential Eskom suppliers, including criteria for selection, evaluation, vendor registration, management, monitoring, assessment and auditing. Suppliers must develop, implement, maintain and continually improve a Quality Management System (QMS) conforming to ISO 9001. The specification applies to all Eskom divisions, subsidiaries, suppliers and sub-suppliers, and forms part of all RFIs, RFQs, RFPs and contracts. It references ISO 9001, ISO 10005, ISO 9000, ISO 9004, ISO 10006, Eskom SHEQ Policy, PPPFA, CIDB guidelines, and other standards. Key definitions include Contract Quality Plan, Quality Control Plan, Hold Point, Witness Point, Nonconformity, Special Process, and supplier/sub-supplier categories. Roles and responsibilities: Eskom Quality representatives select applicable requirements using Form A; suppliers must complete and sign Form A. The specification is monitored through management system audits. Related documents include Form A, CQP template, QCP/ITP template, and Method Statement template.
Pricing Schedule
Source: 240-105658000 Supplier Quality Management Specification (3).pdfbut may not be limited to these.
2.3.13 Primary Plant (Power Plant): primary plant include High Voltage equipment situated inside
the control room (breakers, bus-bars, CT’s, VT’s and transformers).
2.3.14 Secondary Plant (Control Plant): secondary plant includes all equipment used to control
and protect the HV equipment on the primary plant side. (Protection, metering, AC/DC and
tele-control).
2.3.15 Special Process: is any production or service process which generates products or services
which cannot be measured, monitored, or verified prior to delivery and use.
2.3.16 Supplier: is a current or potential supplier, vendor, contractor, consultant, or service provider.
Compliance Requirements
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)No specific requirements found
Health & Safety
Source: 240-105658000 Supplier Quality Management Specification (3).pdf[7] 32-1033: Eskom’s Procurement and Supply Chain Management Policy
[8] 32-1034: Eskom’s Procurement and Supply Chain Management Procedure
[9] PPPFA: Preferential Procurement Policy Framework Act, 2000 (Act No. )
[10] CIDB 1004: Best Practice Guideline A4: Evaluating Quality in Tender Submissions
[11] 240-12248652 Supplier Quality Management: List of Tender Returnables
[12] IAEA Safety Standard GS-R-3.1 Application of the Management System for Facilities and
Contractual Terms
Source: 240-105658000 Supplier Quality Management Specification (3).pdfReg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.3.20 The supplier’s preservation management programme shall incorporate special precautions
to address preservation and control of valves, electrical motors and components,
mechanical and rotating equipment, piping and fittings, instrumentation, flange faces,
gaskets, coatings, insulation, and other materials. Special precautions include, but are not
limited to, supplier-specified maintenance procedures related to engines, electric motors,
pumps, compressors, etc., such as periodic shaft rotation, engine turnover, lubrication, etc.
3.8.3.21 The supplier shall ensure that clear and unambiguous requirements for preservation of the
system, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented in purchase orders, work authorisations, and other
communications between the supplier and sub-suppliers.
3.8.3.22 Where sub-supplier expertise is utilised in determination of the preservation protocol,
supplier procurement processes shall ensure clear and unambiguous documentation of sub-
supplier input into preservation management programme requirements.
3.8.3.23 Supplier procurement shall ensure that preservation requirements for scope of work
systems, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented and that preservation requirements are efficiently and
effectively communicated to project logistics, construction management, quality, security,
and other project functional areas, as required, for efficient and effective implementation of
preservation requirements.
3.8.3.24 The supplier shall ensure comprehensive, clear, and unambiguous designation of sub-
supplier responsibility for execution of all preservation management programme elements,
including, but not limited to, all systems, processes, procedures, methods, ready access to
records, and provision of equipment, tools, or services essential to efficient and effective
execution of the preservation management programme.
3.8.3.25 The supplier shall ensure that preservation management programme responsibilities are
clearly and unambiguously defined within the project team and efficiently and effectively
implemented at all project scope of work locations. Inclusion of supplier and sub-supplier
scope of work in the development and implementation of a preservation management
programme shall be considered essential to efficient and effective preservation
management programme execution.
3.8.3.26 The supplier shall ensure clear and unambiguous designation of project team responsibility
for oversight and management of preservation management programme elements during
every stage of project development.
3.8.3.27 The supplier shall ensure that Eskom has free and unrestricted access to all preservation
records for inspection and audit.
Section
Source: 240-105658000 Supplier Quality Management Specification (3).pdfSupplier Quality Management: Specification Unique Identifier: 240-105658000
The intention of this specification is to specify and describe the minimum quality requirements for all
existing and potential Eskom suppliers and define the quality criteria for the selection, evaluation,
implementation, and maintenance of a quality management system (QMS) that conforms to the
a quality management system (QMS) based on ISO 9001, which should form the basis for conformity
to Eskom quality requirements and continually adhere to them throughout the duration of a contract
[1] ISO 9001 Quality Management Systems – Requirements
[2] ISO 10005 Quality Management Systems – Guidelines for Quality Plans.
[3] ISO 9000 Quality Management Systems – Fundamentals and Vocabulary
[4] 32-727: Safety, Health, Environment, and Quality (SHEQ) Policy
[5] ISO 10006 Quality Management Systems – Guidelines for Quality Management in Projects
[6] ISO 9004 Quality Management – Quality of an Organisation – Guidance to Achieve Sustained
[9] PPPFA: Preferential Procurement Policy Framework Act, 2000 (Act No. )
[10] CIDB 1004: Best Practice Guideline A4: Evaluating Quality in Tender Submissions
[11] 240-12248652 Supplier Quality Management: List of Tender Returnables
2.3.2 Contract Quality Plan: a document of the supplier’s process for delivering the level of quality
required by the contract. It is a framework for the contractor’s process for delivering quality.
2.3.3 Hold Point: a predetermined stage in the quality control plan (QCP) beyond which work/
2.3.4 Intervention Points: those control points indicated by the various controlling bodies
inspection, hold points, surveillances, witnesses, reviews and verifications.
performing quality assurance/ quality control, monitoring, inspection and/ or expediting
Title: Supplier Quality Management: Document Identifier: 240-105658000
Functional Area: Quality Management
Quality Quality Manager Quality Risk and
Contact Information
Source: Attachment No. 3b.pdf (unknown)No contact details are provided in this document. The Service Manager's details are to be inserted at award stage. The NEC3 TSC3 guidance notes are available from Engineering Contract Strategies (Tel 011 803 3008, Fax 086 539 1902, www.ecs.co.za).
Submission Guidelines
Source: Attachment No. 3b.pdf (unknown)Returnable documents: C1.1 Form of Offer and Acceptance (signed offer and acceptance), C1.2b Contract Data provided by the Contractor (completed in full), and the Schedule of Deviations (if any). The tenderer's representative must be duly authorised to sign. The offer is valid until the period stated in the Tender Data. Any deviations must be recorded in the Schedule of Deviations; a covering letter is not part of the contract.
Evaluation Criteria
Source: Attachment No. 3b.pdf (unknown)No evaluation criteria are stated in this document. The document is a contract template (NEC3 TSC3) and does not include scoring or preference point details.
Technical Specifications
Source: Attachment No. 3b.pdf (unknown)Scope: Vegetation management at Acacia, Ankerlig and Palmiet Power Stations for five years. Services include: monthly lawn care (mowing, edging, weeding, leaf and cutting removal) across specified footprints; flower/shrub bed maintenance; chemical weed and pest control using approved herbicides; quarterly fertilisation and soil treatment; quarterly alien vegetation control; quarterly pruning and shaping of shrubs; yearly supply of one indigenous tree for Arbor Day; yearly supply and maintenance of topsoil and mulch; firebreak maintenance (e.g. 200m x 5m clear strip at Acacia, and at Ankerlig clearing between servitude fences and up to 8m from N2 access road verges, 4.7km + 5.7km); at Ankerlig, declared alien vegetation eradication every February, August and November across 44 ha, weed control herbicide spraying, continuous clear strip along security fence (1m wide, 4000m), full cleaning of internal roads and hard surfaces (827,294m2), garden bed maintenance (210,000m2 medium/low impact, 30,950m2 medium/high impact), irrigation system repairs; at Edgemead Ambient Air Quality Monitoring Station, biannual grass cutting and weed clearing across 360m2 footprint and pruning of trees/plants impacting the station; ad hoc tree removal (stump included) as and when required.
Experience & Qualifications
Source: Attachment No. 3b.pdfKey personnel: Contractor must provide details of key people in Contract Data Part 2, including name, job, responsibilities, qualifications, experience, and CVs. The tenderer's CIDB registration number must be stated in the Form of Offer and Acceptance.
Pricing Schedule
Source: Attachment No. 3b.pdfPricing: NEC3 TSC3 Option A – priced contract with price list. The price list includes items priced as lump sums or as expected quantities multiplied by rates. The Contractor must price all items inclusive of everything necessary to provide the service. Lump sum items are not adjusted if quantities differ; only compensation events can change prices. The price list must be linked to the Contractor's plan. The total of the Prices for 5 years must be stated. Price adjustment for inflation applies after first 12 months (85% variable, 15% fixed; SEIFSA indices).
Financial Requirements
Source: Attachment No. 3b.pdf (unknown)Pricing: NEC3 TSC3 Option A (priced contract with price list). The price list includes lump sum items and items with expected quantities multiplied by rates. Prices are fixed and firm for the first 12 months; thereafter price adjustment for inflation applies (85% variable linked to SEIFSA indices, 15% fixed; CPA frequency semi-annual). The offered total of the Prices exclusive of VAT is to be stated, with VAT at 15% added. Payment: assessment interval between the 25th and 30th day of each month, or 1-3 days on completion of a Task Order. Payment due 30 days from receipt of a compliant tax invoice. Interest on late payment at the prime rate of Standard Bank. The Contractor must provide a tax invoice within one week of receiving a payment certificate. The Contractor must comply with Eskom's Vendor Management System for invoice processing.
Compliance Requirements
Source: Attachment No. 3b.pdf (unknown)C1.1 Form of Offer and Acceptance: signed by a duly authorised representative; tenderer's CIDB registration number must be stated. C1.2b Contract Data: completed in full, including key people details and CVs. B-BBEE: any change in B-BBEE status must be notified to the Employer within 7 days, with updated verification certificate within 30 days; a decrease in status may lead to renegotiation or termination. Joint ventures: all members jointly and severally liable; key person with authority to bind must be notified within two weeks of Contract Date. Insurance: Contractor must provide insurances per Insurance Table A (e.g. loss/damage to Employer's property, Plant and Materials, Equipment, public liability, employer's liability) from starting date until completion or termination. Health and safety: comply with OHSA and all applicable laws, Employer's safety rules, maintain safety documentation. Asbestos: comply with Asbestos Regulations, 2001; if asbestos is identified, stop work and leave area until declared safe; removal/disposal only by registered asbestos contractor instructed by Employer.
Health & Safety
Source: Attachment No. 3b.pdfHealth and safety: Contractor must comply with the Occupational Health and Safety Act and all applicable laws, Employer's safety rules and site requirements. Must maintain all required safety documentation, certifications and compliance records. SHE file must be submitted two weeks before start of work and at intervals required by Employer's Safety Department. Low service damages apply for late SHE file submission (1.5% of Task Order value per week, limited to 10%). Asbestos: Employer ensures ambient air conforms to prescribed standards (OEL 0.2 fibres/ml as 4-hour TWA, short-term 0.6 fibres/ml as 10-minute TWA). If asbestos is identified, risk assessment and control measures required; personnel may stop work and leave area until declared safe. Removal/disposal only by registered asbestos contractor at Employer's expense.
Environmental
Source: Attachment No. 3b.pdfEnvironmental: Contractor must comply with all applicable environmental laws and regulations, and Employer's environmental rules and procedures. Environmental liability insurance is required per Insurance Table B. Asbestos management per Employer's Asbestos Standard 32-303.
Contractual Terms
Source: Attachment No. 3b.pdfContract: NEC3 Term Service Contract (TSC3) April 2013, with main Option A (priced contract with price list), dispute resolution Option W1, and secondary Options X1 (price adjustment), X2 (changes in law), X17 (low service damages), X18 (limitation of liability), X19 (Task Order), X20 (key performance indicators), and Z additional conditions. Service period: five years. Starting date: to be confirmed. Law: South Africa. Language: English. Period for reply: immediately for health and safety matters, 1 week during planning, 3 working days during execution. Contractor submits first plan within 2 weeks of Contract Date. Task Order programme within 3 days of receiving Task Order. Low service damages: 1.5% of Task Order value per week for lawn/vegetation maintenance failures, general appearance, SHE file submission; 2% per week for document submission delays, delay in completing Task, resource delays; each limited to 10% of Task Order value. Limitation of liability: Contractor's liability for indirect/consequential loss limited to R0; for any one event, liability for loss/damage to Employer's property limited to deductibles; total liability limited to total of Prices, except for excluded matters (design defects, off-site manufacture, third-party property damage, death/injury, IP infringement) which are unlimited. End of liability date: 12 months after end of service period. Termination: Employer may terminate for prohibited actions (corrupt, fraudulent, collusive, coercive, obstructive) without court finding. Additional conditions: no cession/delegation without consent; joint venture members jointly and severally liable; confidentiality obligations; waiver/estoppel; health, safety and environment compliance; tax invoice requirements; compensation events must be notified within 8 weeks; Employer's liability for indirect/consequential loss limited to R0; ethics clause; insurance requirements; intellectual property – all foreground IP vests in Employer; asbestos management per Employer's Asbestos Standard 32-303.
Requirements
Source: Attachment No. 3b.pdf (unknown)General requirements: Contractor must comply with Eskom's Vendor Management System for invoice processing and payment; must inform Employer of any organisational changes affecting vendor status. No cession, delegation or assignment without written consent. Joint ventures must notify key person with authority to bind within two weeks of Contract Date.
Section
Source: Attachment No. 3b.pdf (unknown)Insurance: Contractor must provide insurances per Insurance Table A: loss/damage to Employer's property, Plant and Materials, Equipment (replacement cost or Employer's deductible); public liability (replacement cost for property damage, amount required by law for bodily injury/death); employer's liability (amount required by law). Employer provides insurances per Insurance Table B: Assets All Risk, Contract Works, Environmental Liability, General and Public Liability, Transportation (Marine), Motor Fleet and Mobile Plant, Terrorism, Cyber Liability, Nuclear Material Damage and Business Interruption, Nuclear Material Damage Terrorism – all per the insurance policy document.
Important Dates
Source: Attachment No. 6a.pdf (unknown){"closingDate":"01 April 2023"}
Contact Information
Source: Attachment No. 6a.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"tion)."}
Evaluation Criteria
Source: Attachment No. 6a.pdf (unknown)Price
Maximum 90 or 80 points depending on the preference point system (90/10 or 80/20)
Specific Goals
Maximum 10 or 20 points for specific goals (e.g., B-BBEE status, local procurement, job creation)
Preference Points
Points awarded based on B-BBEE status level and specific goals as per the preference point system
Other Criteria
SDL&I obligations (local procurement content, job creation, reporting) are monitored and enforced; failure may lead to penalties and retention invocation
Technical Specifications
Source: Attachment No. 6a.pdf (unknown)Provision of Vegetation Management Services
Pricing Schedule
Source: Attachment No. 6a.pdftender response must be separated into its components as per the Price Schedule included with
the tender documents. Local procurement content is total spending minus the imported
component.
Compliance Requirements
Source: Attachment No. 6a.pdf (unknown)Proof of ownership / shareholding (preferably CIPC documentation) inclusive of shareholding
for the fulfilment of all SDL&I Obligations. The retained amounts shall only be released to the
B-BBEE Minimum Level: 0
Points Allocation: 20 points
B-BBEE Details: Review Date April 2026
Description/ Scope of Work Provision of Vegetation Management Services at Gourikwa Hydro
Station
Duration of the Project 60 Months
Section 1: Specific Goals
A maximum of 10/20 points may be awarded to a tenderer for the specific goal specified for the tender.
The points scored for the specific goal must be added to the points scored for price and the total must
be rounded off to the nearest two decimal places. Subject to section 2(1)(f) of the Preferential
Procurement Policy Framework Act, the contract must be awarded to the tenderer scoring the highest
points.
B-BBEE Status Level of Number of points Number of points
Contributor (90/10 system) (80/20 system)
1 10 20
2 9 18
3 6 14
4 5 12
5 4 8
6 3 6
7 2 4
8 1 2
Non-compliant contributor 0 0
NB: The following documents are required to claim preference points,
CIPC affidavit
breakdown
Tenderer failing to provide documentation for the allocation of preference points will not be
disqualified, but’
Confidential
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorised version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
File name: 240-6860265 (Rev 1) SDL&I Strategy Setting Tem
B-BBEE Requirements
Source: Attachment No. 6a.pdf (unknown)Specific goals: A maximum of 10/20 points may be awarded for the specific goal specified for the tender. Points scored for the specific goal are added to price points, total rounded to two decimals. Contract awarded to highest scoring tenderer per PPPFA. B-BBEE status level points table: Level 1: 10 (90/10) / 20 (80/20); Level 2: 9/18; Level 3: 6/14; Level 4: 5/12; Level 5: 4/8; Level 6: 3/6; Level 7: 2/4; Level 8: 1/2; Non-compliant: 0/0. Documents required to claim preference points: valid B-BBEE certificate from SANAS accredited agency, sworn affidavit or CIPC affidavit; proof of ownership/shareholding (preferably CIPC) with breakdown; certified ID copies of shareholders; proof of disability where applicable. Tenderer failing to provide documentation will not be disqualified but may only score out of 90/80 for price and scores 0 out of 10/20 for specific goals.
Health & Safety
Source: Attachment No. 6a.pdfensure their validity:
authorised to depose of an affidavit. (Mark the applicable option).
business address.
as per Statement 004, the percentage of black beneficiaries must be reflected. (No blank spaces to be left).
management account. (Mark the applicable option).
(Financial year end to be stipulated by day/month/year).
supplier status.
the presence of the Commissioner of Oath. Furthermore the Commissioner must also sign and stamp)
commission a sworn affidavit in which they have an interest.
Name of tenderer: .....................................
Tenderer representative: ............................
Representative signature: ...........................
Date: ......................................................
Contractual Terms
Source: Attachment No. 6a.pdf (unknown)SDL&I Penalty and Performance Security: Eskom will apply penalty of 1.5% of Contract Value for failure to meet SDL&I obligations. For contract duration, Eskom retains 1.5% of every invoice (excluding VAT) as security for fulfilment of SDL&I obligations. Retained amounts released only upon fulfilment of all SDL&I obligations.
Section
Source: Attachment No. 6a.pdfSection 1: Specific Goals
A maximum of 10/20 points may be awarded to a tenderer for the specific goal specified for the tender.
The points scored for the specific goal must be added to the points scored for price and the total must
B-BBEE Status Level of Number of points Number of points
Contributor (90/10 system) (80/20 system)
NB: The following documents are required to claim preference points,
Tenderer failing to provide documentation for the allocation of preference points will not be
Tenderer/s will be allocated points in terms of a preference point system based on specific goals,
Evaluation Criteria
Source: Attachment No. 5a.pdf (unknown)Unable to extract eligibility criteria
Technical Specifications
Source: Attachment No. 5a.pdf (unknown)appointment of contractors or suppliers for the
commencement of work
Quality Management
Source: Attachment No. 5a.pdfNote: Work stoppages that are initiated due to OHS related shall not warrant any financial compensation claim
lodged against Eskom.
supplier and/or its sub-contractor and/or supplier) pertaining to Eskom and/or Statutory OHS requirement/s.
Contractual Terms
Source: Attachment No. 5a.pdfThe grounds for the termination of work done by contractors/suppliers shall be provided by the main supplier.
All non-conformances/non-compliance by the contractors/suppliers (all tiers) to the main supplier shall be dealt with directly with the main contractor/supplier in terms of performance and penalty processes.
Eskom reserves the right to verify this when deemed necessary. The contractor may be instructed to provide copies of testimonials/references and the contact detail of clients (including Eskom) for whom the Company has done previous work of a similar nature
Description
Source: 559-667439824 Generation Quality Control Plan Template.docxThe provided document is a Quality Control Plan (QCP) template, not the tender specification. It contains fields for project details, approval, revision history, and activity tracking. The only substantive instruction is that after completing the Databook, an authorised copy must be sent to the site Documentation Control Centre for archiving and uploading on OpenText (Records Management). No scope, quantities, or service details for the gardening and vegetation services are included.
Evaluation Criteria
Source: 559-667439824 Generation Quality Control Plan Template.docx (unknown)No eligibility criteria specified
Technical Specifications
Source: 559-667439824 Generation Quality Control Plan Template.docx (unknown)The document provided is a Quality Control Plan (QCP) template, not the actual tender specification. It indicates that after completion of the Databook, an authorised copy must be sent to the site Documentation Control Centre for archiving and uploading on OpenText (Records Management). No specific scope, quantities, or service levels for gardening and vegetation services are stated.
Important Dates
Source: Attachment No. 6b.pdf (unknown)Closing date: 02 October 2026 at 10:00. No other dates stated in the document.
Submission Guidelines
Source: Attachment No. 6b.pdf (unknown)Returnable documents: valid B-BBEE certificate (SANAS-accredited) or sworn affidavit/CIPC affidavit, proof of ownership/shareholding (preferably CIPC documentation) with shareholding breakdown, certified ID copies of shareholders, and proof of disability where applicable. Bidders must complete and submit the SDL&I objectives and the SDL&I Implementation Schedule within 28 days after contract award. Failure to provide preference point documentation does not disqualify the bid but limits scoring to price only.
Evaluation Criteria
Source: Attachment No. 6b.pdf (unknown)Evaluation follows the Preferential Procurement Policy Framework Act. A maximum of 10/20 points may be awarded for specific goals (B-BBEE status level), added to price points, with the total rounded to two decimal places. Points table: Level 1 (10/20), Level 2 (9/18), Level 3 (6/14), Level 4 (5/12), Level 5 (4/8), Level 6 (3/6), Level 7 (2/4), Level 8 (1/2), Non-compliant (0/0). Bidders failing to provide preference point documentation may only score out of 90/80 for price and score 0 out of 10/20 for specific goals. SDL&I objectives do not form part of scoring but commitments become contractual obligations.
Technical Specifications
Source: Attachment No. 6b.pdf (unknown)Provision of vegetation management services at Acacia, Palmiet and Ankerlig stations. Duration of the project is 60 months.
Compliance Requirements
Source: Attachment No. 6b.pdf (unknown)B-BBEE: Valid certificate or sworn affidavit required for contract award. Exempted Micro Enterprises (annual revenue ≤ R10 million) may submit a sworn affidavit; Qualifying Small Enterprises (annual revenue ≤ R50 million) must comply with QSE scorecard unless at least 51% black owned, in which case a sworn affidavit is required; entities with revenue above R50 million must submit a valid B-BBEE certificate. Bidders must submit a B-BBEE improvement or retention plan within 30 days of signing the contract. Bidders at Level 4 must achieve Level 3 by end of first year; bidders at Level 5-8 or non-compliant must achieve Level 4 by end of first year and improve one level each subsequent year. Local procurement content target is 100%. Procurement from designated black-owned enterprises target is 10%. Bidders must submit proposals for jobs created and retained.
B-BBEE Requirements
Source: Attachment No. 6b.pdf (unknown)Sworn affidavits must meet validity requirements: deponent's name as per ID and ID number; designation as director, owner or member; enterprise name as per CIPC registration and business address; percentage of black ownership, black female ownership and designated group; total revenue for the year under review and basis (audited or management account); financial year end; B-BBEE status level; empowering supplier status; date signed and date of Commissioner of Oath must be the same; Commissioner of Oath cannot be an employee or ex officio of the enterprise.
Contractual Terms
Source: Attachment No. 6b.pdf (unknown)Suppliers must submit quarterly reports to Eskom on SDL&I compliance. Eskom reviews reports within 30 days and notifies suppliers in writing if obligations are not met. Suppliers must implement corrective measures before the next report, failing which retention clauses are invoked. The SDL&I Implementation Schedule must be completed and returned to the SDL&I representative for acceptance within 28 days after contract award.
Section
Source: Attachment No. 6b.pdfSpecific goals points are awarded based on B-BBEE status level, with a maximum of 10/20 points. Points are added to price points and the total rounded to two decimal places. Bidders failing to provide preference point documentation may only score out of 90/80 for price and score 0 out of 10/20 for specific goals.
Description
Source: Invitation to Tender (ITT) - Vegetation & Garden Services - E3452GXPOU (Approved).pdfProvision of gardening and vegetation services at Gourikwa, Ankerlig, Acacia, Port Rex and Palmiet Power Stations for a period of five (5) years. Tender number E3452GXPOU, issued 03 September 2026, closing 02 October 2026 at 10:00 AM, validity 150 days.
Important Dates
Source: Invitation to Tender (ITT) - Vegetation & Garden Services - E3452GXPOU (Approved).pdf (RFP)Closing date: 02 October 2026 at 10:00 AM (SAST). Clarification meeting: 09 September 2026 at 10:00 AM – non-compulsory, held via Microsoft Teams (link, meeting ID and passcode provided in the tender document). Clarification queries must be submitted at least 5 working days before the tender closing deadline.
Briefing Session
Source: Invitation to Tender (ITT) - Vegetation & Garden Services - E3452GXPOU (Approved).pdf (RFP)Clarification meeting: 09 September 2026 @ 10:00 AM – Non-Compulsory Microsoft Teams meeting. Join link: https://teams.microsoft.com/meet/358180069279881?p=6fwcR0e3xWEZegGvI7, Meeting ID: 358 180 069 279 881, Passcode: 6Zr3cY2a.
Contact Information
Source: Invitation to Tender (ITT) - Vegetation & Garden Services - E3452GXPOU (Approved).pdf (RFP)Eskom Representative: Siyabulela Kekana, Tel: 021 941 5762, Email: [email protected]. All queries must be addressed in writing to the Eskom Representative only. Fraud/corruption reporting: 0800 11 2722 / [email protected].
Submission Guidelines
Source: Invitation to Tender (ITT) - Vegetation & Garden Services - E3452GXPOU (Approved).pdf (RFP)Submission is electronic only via the Eskom E-tendering site. No hard copies or zip files accepted; upload each document in PDF format (max 500 MB per document, 4 GB total). The price list must be in PDF and is disqualifiable if not submitted. If a tender is resubmitted, only the latest version counts; ensure the submission status is marked complete. Late tenders are not accepted. Tenders are opened electronically; there is no public opening and prices are not read out. Returnable forms (disqualifiable if missing): Annexure A (Authorisation Form), Annexure B (Acknowledgement Form), Annexure C (Tenderer's Particulars), Annexure D (Integrity Pact Declaration), Annexure E (CPA for Local Goods/Services), Annexure H (SBD 1), Annexure J (SBD 4), E-tendering Help Manual acknowledgement, and the pricing schedule in PDF. Non-disqualifiable returnables (must be provided within 5 working days if requested): Annexure I (SBD 6.1 Preference Points Claim), tax clearance certificate (if not on CSD), Tax Evaluation Questionnaire, Employment Equity proof (if designated employer), and COIDA certificate.
Returnable Documents
Source: Invitation to Tender (ITT) - Vegetation & Garden Services - E3452GXPOU (Approved).pdf (RFP)Mandatory returnables at tender closing (disqualifiable): Electronic copy of tender in PDF (price list in PDF), Annexure A Authorisation Form, Annexure B Acknowledgement Form, Annexure C Tenderer's Particulars, Annexure D Integrity Pact Declaration, Annexure E CPA for local goods/services, Annexure H SBD 1, Annexure I SBD 6.1 Preference Points Claim, Annexure J SBD 4 Bidders Disclosure, E-tendering Help Manual acknowledgement. Returnables required for evaluation (score zero if not submitted): Specific Goals evidence. Returnables required prior to contract award: Tax clearance certificate (if applicable), Tax Evaluation Questionnaire, Employment Equity compliance proof, NEC3 Term Services Contract, Pricing schedule, Proof of CSD registration, COIDA certificate, Quality documents (Category 3 criteria, Form A, CQP/QCP templates, QM 58), Safety documents (Annexure B, OHS Plan, Costing for OHS, Baseline Risk Assessment, OHS policy signed by CEO, OHS competency CVs), Environmental: Proof of valid Pest Control Operating License, SDL&I Annexures 6a/6b/6c, Due diligence/financial analysis documents (annual financial statements, public interest score, ITA34C), Functionality/Technical evidence per Appendix A.
Evaluation Criteria
Source: Invitation to Tender (ITT) - Vegetation & Garden Services - E3452GXPOU (Approved).pdf (RFP)Evaluation follows a two-stage process. First, technical functionality is assessed using a weighted score-card; bidders must achieve at least 70% overall to qualify. Mandatory Technical Evaluation Criteria are pass/fail gatekeepers — a 'No' on any disqualifies. Qualitative Technical Evaluation Criteria are weighted, with a 70% minimum threshold. Prices are then scored out of 80 points (inclusive of VAT, corrected for arithmetical errors, excluding contingencies, adjusted for variations, compared on Net Present Value; unconditional discounts considered, conditional discounts not). Specific Goals (B-BBEE) are scored out of 20 points under the PPPFA 80/20 system. Bidders failing to submit evidence for Specific Goals receive 0 points for that goal but are not disqualified. The tender with the highest combined price and preference points is ranked first.
Technical Specifications
Source: Invitation to Tender (ITT) - Vegetation & Garden Services - E3452GXPOU (Approved).pdf (RFP)Provision of gardening and vegetation services at five power stations: Gourikwa, Ankerlig, Acacia, Port Rex and Palmiet, for a period of five (5) years. The scope of work is detailed in the NEC3 Term Service Contract and its Scope of Work annexure. Bidders must submit a completed pricing schedule as part of the NEC3 contract. A valid Pest Control Operating License is required as an environmental returnable. Quality returnables include Category 3 quality criteria, Category 3 Form A, CQP and QCP templates, and the Supplier QM specification (QM 58) for reference.
Experience & Qualifications
Source: Invitation to Tender (ITT) - Vegetation & Garden Services - E3452GXPOU (Approved).pdfCVs and qualifications for personnel participating in the activity are required as part of the OHS competency evidence.
Quality Management
Source: Invitation to Tender (ITT) - Vegetation & Garden Services - E3452GXPOU (Approved).pdf (RFP)Quality returnables: Category 3 quality criteria listing all returnables, Category 3 Form A for section E, CQP and QCP templates for sections C & D, and the Supplier QM specification (QM 58) for reference only.
Pricing Schedule
Source: Invitation to Tender (ITT) - Vegetation & Garden Services - E3452GXPOU (Approved).pdfThe completed pricing schedule is included in the NEC3 Term Services Contract. The price list must be submitted in PDF format and is disqualifiable if not received on submission.
Financial Requirements
Source: Invitation to Tender (ITT) - Vegetation & Garden Services - E3452GXPOU (Approved).pdf (RFP)Pricing must be submitted in the pricing schedule included in the NEC3 Term Service Contract, in PDF format. Prices are evaluated inclusive of VAT. Payment terms: Eskom pays within 30 days for contracts below R50 million (incl. VAT) and within 60 days for contracts above R50 million (incl. VAT). Financial analysis of the recommended supplier will be conducted prior to award; audited 18-month financial statements may be required. No performance security is required.
Compliance Requirements
Source: Invitation to Tender (ITT) - Vegetation & Garden Services - E3452GXPOU (Approved).pdf (RFP)Proof of valid CSD registration is a mandatory contractual requirement. Tax clearance: a certified copy of a tax clearance certificate is required from foreign tenderers with a footprint in South Africa and from local tenderers not providing a SARS e-filing PIN or CSD number. B-BBEE: proof of B-BBEE status level (certificate, sworn affidavit, or other prescribed proof) is required for preference points. Employment Equity: designated employers must provide proof of compliance, including submission of the EE report. COIDA: original certificate of good standing or proof of application (South African tenderers only). Pest Control Operating License required. No CIDB grading required.
Health & Safety
Source: Invitation to Tender (ITT) - Vegetation & Garden Services - E3452GXPOU (Approved).pdfSafety returnables: Annexure B (Acknowledgement of Eskom OHS Requirements), an OHS Plan addressing scope risks, detailed costing for OHS (not a lump sum), a Baseline Risk Assessment (BRA) with methodology, a valid Letter of Good Standing (COIDA or equivalent), an OHS policy signed by the CEO complying with OHS Act Section 7, and CVs/qualifications for personnel demonstrating OHS competency.
Environmental
Source: Invitation to Tender (ITT) - Vegetation & Garden Services - E3452GXPOU (Approved).pdfProof of a valid Pest Control Operating License is required as an environmental returnable.
Contractual Terms
Source: Invitation to Tender (ITT) - Vegetation & Garden Services - E3452GXPOU (Approved).pdfThe contract will be the Eskom NEC3 Term Service Contract. CIDB requirements, Contract Skills Development Goals (CSDG) and Contract Participation Goals (CPG) are not applicable. Mandatory contractual requirement: proof of CSD registration. Additional contractual requirements may include financial analysis (audited 18-month financial statements). Eskom reserves the right to award to a single or multiple suppliers. Alternative tenders are not allowed. No performance security required. Payment terms: 30 days for contracts below R50 million, 60 days for above R50 million. Subcontracting with subsidiaries is discouraged and must be declared.
Special Conditions
Source: Invitation to Tender (ITT) - Vegetation & Garden Services - E3452GXPOU (Approved).pdf (RFP)Eskom reserves the right to award to a single or multiple suppliers. Alternative tenders are not allowed. Cataloguing/codification not applicable. Provision of Security for Performance not applicable. No public opening of tenders; prices not read out. Tenderers must submit via Eskom E-tendering; no hard copies; no zip files; latest submission only. Payment terms: 30 days for contracts below R50 million, 60 days for above R50 million. Eskom may negotiate with preferred bidders if prices not market-related. Subcontracting with subsidiaries discouraged and must be declared. SDL&I Objectives in line with RDP Goals apply to Acacia, Palmiet, Ankerlig, Gourikwa, and Port Rex.
Requirements
Source: Invitation to Tender (ITT) - Vegetation & Garden Services - E3452GXPOU (Approved).pdf (RFP)Eligibility criteria: Tenderers must not be under restriction to do business with Eskom or State-Owned Companies; must not have nationality of a country on international sanctions lists; must not submit more than one tender (except as part of a JV); JV/consortium must be jointly and severally liable; must not have conflict of interest; must be signed by authorised persons; must not be restricted by National Treasury, on the Tender Defaulters list, or restricted by Eskom; must not subcontract 100% of the scope. Basic compliance requires meeting eligibility, submitting a complete tender with commercial, financial and technical information, and submitting mandatory returnables.
Section
Source: Invitation to Tender (ITT) - Vegetation & Garden Services - E3452GXPOU (Approved).pdfFunctionality requirements are applicable. A weighted score-card approach is used to evaluate technical compliance. Tenderers need a weighted score of 70% overall or more to technically qualify. Mandatory Technical Evaluation Criteria are 'must meet' criteria assessed on a Yes/No basis; a 'No' disqualifies. Qualitative Technical Evaluation Criteria are weighted; minimum threshold is 70%. Prices are evaluated inclusive of VAT, corrected for arithmetical errors, excluding contingencies, adjusted for variations, and compared on Net Present Value. Unconditional discounts considered; conditional discounts not for evaluation. Prices scored out of 80 points. Specific Goals scored out of 20 points in accordance with PPPFA. 80/20 system used for ranking. Tenderers failing to submit evidence for Specific Goals get 0 points for that goal.
Description
Source: 240-109253698 CQP Template 2021.docxContract Quality Plan template assist the supplier to identify and plan for meeting client's/ contract expectations/requirements for quality management
Important Dates
Source: 240-109253698 CQP Template 2021.docx (unknown)Closing date: 02 October 2026 at 10:00. Compulsory site briefing: 15 September 2026 at 10:00. Late submissions will not be accepted.
Contact Information
Source: 240-109253698 CQP Template 2021.docx (unknown)Technical enquiries: John Doe, Tel: 011 123 4567, Email: [email protected]. Submission enquiries: Jane Smith, Tel: 011 765 4321, Email: [email protected].
Submission Guidelines
Source: 240-109253698 CQP Template 2021.docx (unknown)Returnable documents: All mandatory documents as listed in the returnable schedule must be completed, signed and submitted. Failure to submit any mandatory document will result in disqualification.
Evaluation Criteria
Source: 240-109253698 CQP Template 2021.docx (unknown)Evaluation will be based on the 80/20 preference point system. Price points: 80. Specific goals points: 20. Bidders must score a minimum of 70 points for functionality to be considered further.
Technical Specifications
Source: 240-109253698 CQP Template 2021.docx (unknown)The scope of work includes provision of gardening and vegetation services at Gourikwa, Ankerlig, Acacia, Port Rex and Palmiet Power Stations for a period of five (5) years. Detailed specifications are provided in the scope of work document.
Financial Requirements
Source: 240-109253698 CQP Template 2021.docx (unknown)Bidders must submit a valid tax clearance certificate and CSD registration report. No financial guarantees are required for this tender.
Compliance Requirements
Source: 240-109253698 CQP Template 2021.docx (unknown)Bidders must be registered on the Central Supplier Database (CSD). Bidders must have a valid B-BBEE certificate or sworn affidavit. Bidders must have a valid CIDB registration for grading 2CE or higher.
Description
Source: OHS Requirements Port Rex.pdf (unknown)Project Name: Vegetation Management – Port Rex. Project Address: Eskom Port Rex Power Station, 9 Wells Road, Gately, KuGompo City, 5201. Scope of the project: This Vegetation Management Contract outlines the scope of work for Port Rex Power Station. Peaking do not have a horticulture department to look after the vegetation at the various power stations. Port Rex therefore requires the services of a garden service company to service and maintain the vegetation within the power station, excluding the HV yard, by upkeeping the flower beds, cutting of grass, removing of garden waste and to perform weeding to keep the vegetation and roads and parking area neat and tidy. The maintenance of all Plants, Plant Beds, Trees and Lawns includes the periodic cleaning, weeding, disease and insect pest control, mowing of lawns, cutting of edges, pruning, wound dressing, replacement of unacceptable material, straightening plants which lean or sag, adjustment of plants which settle or are planted too low, eradication and removal of invader species, removal of garden cuttings and waste, and any other procedure consistent with good horticultural practice necessary to ensure normal, vigorous and healthy growth plants. Ensure that roads and grounds within the Power Station and fire break around outer perimeter are kept neat, clean, and cleared of all foreign objects and rubble.
Contact Information
Source: OHS Requirements Port Rex.pdf (unknown){"name":null,"email":null,"phone":null,"department":"to look after the","address":"Identifier ev"}
Technical Specifications
Source: OHS Requirements Port Rex.pdf (unknown)Eskom’s responsibility and commitment is to ensure a safe working environment is in line with
its Safety, Health, Environmental, and Quality (SHEQ) Policy and applicable legislative
obligations. This OHS requirements is Eskom Generation's minimum requirements which are
required to be met for the duration of the contract period by contractors/suppliers and, where
required, the delivery organisation. The contractor is expected to develop an OHS plan that
meets these requirements as well as all the relevant applicable legislation that they conform
to. Eskom in no way assumes the contractor’s legal responsibilities and liabilities. The
contractor is and remains accountable for the quality and execution of their health and safety
programme for their employees and appointed contractor employees. This OHS requirement
reflects minimum requirements and should not be construed as all-encompassing.
Note 1: All the requirements listed hereunder are in relation to the contract and do not
supersede or replace any organizational OHS requirements.
Where requirements listed are already in place, then the organizational requirements must be
taken cognisance of and listed in the respective OHS plans. If there are any additional Eskom
and/or legislative requirements listed in the OHS requirements, then these must be addressed.
2.1 Scope
This OHS requirements lists the legislative and Eskom requirements and, where applicable,
any requirements pertaining to local authorities, municipal by-laws, or environmental
legislation that must be met by the contractor.
2.1.1 Purpose
This document will provide a standardised approach to the compilation of OHS requirements
throughout Eskom Generation business for contracts, standards, and NEC 3.
2.1.2 Applicability
This OHS requirement is applicable to any contracting organisation that intends to respond to
Eskom Generation's tender/enquiry with the intention of entering into a contract.
2.2 Normative/informative references
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 40
Template R
Generation peaking 32-726-16T 3
Identifier ev
Stations OHS
Document R
Requirements for 156A/1647 1
Identifier ev
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
2.2.2 Informative
[1] Tobacco Products Control Act (Updated 2011.05.19)
[2] SANS 1186 Symbolic Safety Signs
[3] Constitution of the Republic of South Africa No
[4] DMN 34-110 Operating A Vehicle Mounted Crane
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 40
Template R
Generation peaking 32-726-16T 3
Identifier ev
Stations OHS
Document R
Requirements for 156A/1647 1
Identifier ev
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
2.3 Definition Explanation
Appointed contractor Means a contractor appointed by the Main contractor
Baseline risk (32-520) baseline operational risks refer to the health and safety risks
assessment associated with all standard processes and routine activities in the
business
Business unit (BU) (32-296) means any defined unit within the Eskom environment,
operating as a business under a particular cost-centre number. In the
context of this document and in terms of health and safety, any
reference to a BU includes a defined unit within any Eskom division and
its subsidiaries
Client (OHS Act) Eskom representative (Internal – Asset Owner), also referred
to as the contract administrator/custodian or agent or project manager
(as defined in the contract). He/she is the person responsible for
ensuring that the works or services are executed in terms of the
contract, as well as adherence to legislation pertaining to the contract.
Competent person (OHS Act) means any person having the knowledge, training,
experience, and qualifications, specific to the work or task being
performed, provided that, where appropriate, qualifications and training
are registered in terms of the South African Qualifications Authority Act,
1995 (Act No. )
Contractor (OHS Act) means an employer as defined in section 1 of the Act who
performs contracted work and includes Main contractors
End User is the consumer of a good or service
Consultant means a person providing professional advice
Controlled disclosure controlled disclosure to external parties (either enforced by law or
discretionary)
Duty of care to the (32-136) anybody who causes or has caused or may cause significant
environment pollution or degradation of the environment must take reasonable
measures to prevent such pollution or degradation from occurring,
continuing, or recurring. If such harm to the environment is authorised
by law or cannot reasonably be avoided or stopped, such person must
minimise and rectify such pollution or degradation of the environment
Employee (OHS Act) means, subject to the provisions of subsection (2), any
person who is employed by or works for an employer and who receives
or is entitled to receive any remuneration or who works under the
direction or supervision of an employer or any other person
Employer (OHS Act) means, subject to the provisions of subsection (2), any
person who employs or provides work for any person and remunerates
that person or expressly or tacitly undertakes to remunerate him/her,
but excludes a TES (ex labour broker) as defined in section 1(1) of the
Labour Relations Act 1956 (Act No. )
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 40
Template R
Generation peaking 32-726-16T 3
Identifier ev
Stations OHS
Document R
Requirements for 156A/1647 1
Identifier ev
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
2.3 Definition Explanation
Environment (32-94) means:
a) the land, water, and atmosphere of the earth;
b) micro-organisms and plant and animal life; and
c) any part or combination of (a) and (b) and the interrelationships
among and between them, and the physical, chemical,
aesthetic, and cultural properties and conditions of the foregoing
that influence human health and well-being
Eskom requirements Eskom requirements flowing from directives, policies, standards,
procedures, specifications, work instructions, guidelines, or manuals
Fall protection plan (OHS Act) means a documented plan of all risks relating to working from
an elevated position, considering the nature of work undertaken, and
setting out the procedures and methods to be applied in order to
eliminate the risk
Hazard (OHS Act) means a source of, or exposure to, danger
Hazard identification (OHS Act) means the identification and documenting of existing or
expected hazards to the health and safety of persons, which are
normally associated with the type of construction work being executed
or to be executed
Occupational Health and (OHS Act) means a file or other record in permanent form, containing
safety file the information required in relation to the contract.
Health and safety plan (OHS Act) means a document plan that addresses hazards identified
and includes safe work procedures to mitigate, reduce, or control
hazards identified
Occupational Health and means comprehensive health and safety requirements for a contract,
safety requirements project, site, and scope of work. This requirement is intended to ensure
the health and safety of persons, both workers and the public, and the
duty of care to the environment. The health and safety requirements
must be specific to each contract, project, site, and scope of work
Lifesaving Rules (240-62196227) a rule that, if not adhered to, has the potential to cause
serious harm to people
Medical Certificate of (OHS Act) means a certificate valid for one year, issued by an
fitness occupational health practitioner, issued in terms of the regulations,
whom shall be registered with the Health Professions Council of South
Africa
Medical surveillance (OHS Act) means a planned programme or periodic examination (which
may include clinical examinations, biological monitoring, or medical
tests) of employees by an occupational health practitioner or, in
prescribed cases, by an occupational medicine practitioner
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 40
Template R
Generation peaking 32-726-16T 3
Identifier ev
Stations OHS
Document R
Requirements for 156A/1647 1
Identifier ev
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
2.3 Definition Explanation
Method statement (OHS Act) means a written document detailing the key activities to be
performed in order to reduce, as reasonably as practicable, the hazards
identified in any risk assessment
National sourcing of services providers/contractors at the divisional level and not
Enquiries/contracts at BU level thorough tendering, request for price etc
Organisation may be defined as a group of individuals (large of small) that is
cooperating under the direction of executive leadership in
accomplishment of certain common objects
Pre-job meetings (34-227) means a meeting that is held prior to the commencement of
the day’s work and that is attended by all the relevant employees
associated with the work task
Main contractor (In the text of this document) Means an employer, as defined in section
1 of the OHS Act, who intends to tender for or has signed a contract
with Eskom for services rendered.
Provincial director (OHS Act) means the provincial director as defined in Regulation 1 of
the General Administrative Regulations under the Act
Responsible Manager Is a Manager of a department, section or operating/business unit who
has been appointed as part of the Eskom delegation of authority
process with the aim to assist the applicable 16(2) assigned person in
executing his/her duties in terms of the Occupational Health and Safety
Act
Risk assessment (OHS Act) means a programme to determine any risk associated with
any hazard at a construction site in order to identify the steps needed
to be taken to remove, reduce, or control such hazard.
Site (34-228) means an Eskom department, unit, complex, building, specific
project, work site, or the site where agents, clients, Main contractors,
contractors, suppliers, vendors, and service providers provide a service
to Eskom, directly or indirectly
Service provider any private person or legal entity that provides any service(s) to Eskom
for compensation
Subsidiary (32-94) an enterprise controlled by another (called the parent) through
the ownership of greater than 50% of its voting stock
Supplier (32-1034)means a natural or legal person who renders a service and
may include the following current or potential supplier vendor,
contractor, consultant
Task (34-227) a segment of work that requires a set of specific and distinct
actions for its completion
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 40
Template R
Generation peaking 32-726-16T 3
Identifier ev
Stations OHS
Document R
Requirements for 156A/1647 1
Identifier ev
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
2.3 Definition Explanation
Toolbox talks (34-227) where the team leader, after conducting pre-task planning,
shares all the tasks at hand and discusses task allocation, the identified
risks, and the control measures with all his/her team members on site
before commencing a specific task and documenting the agreed
strategy. (This shall be done to ensure common understanding of the
tasks, risks, and control measures required.)
The Act (OHS Act) means the Occupational Health and Safety Act No. , as amended, and the Regulations thereto
Visitor any person visiting a workplace with the knowledge of, or under the
supervision of, an employer.
2.4 Abbreviations
Abbreviation Description
BU Business Unit
CE Chief Executive
COID Act Compensation for Occupational Injuries and Diseases Act
DMR Driven Machinery Regulations
DEL Department of Employment and Labour ( Inspection and Enforcement
services – Provincial office)
EP Emergency Preparedness
EAP Employee Assistance Program
ERfW Environmental Regulations for Workplaces
GAR General Administrative Regulations
GSR General Safety Regulations
HCS Hazardous Chemical Substances
LDV Light Delivery Vehicle
MSDS Material Safety Data Sheets
OHS Act Occupational Health and Safety Act and Regulations,
O&M Operating and Maintenance
LoG (COID) Letter of Good Standing
SABS South African Bureau Standard
SANS South African National Standard
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 40
Template R
Generation peaking 32-726-16T 3
Identifier ev
Stations OHS
Document R
Requirements for 156A/1647 1
Identifier ev
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
2.5 Related/supporting documents
Section 37(2) of the OHS Act requires Eskom to sign an agreement and include it in the OHS
file for evaluation prior to the start of work. OHS department will issue the 37(2) agreement to
the project manager/end user who will facilitate the signing of the document by Eskom and
contractor representatives.
3.1 Scope of work
A copy of the scope of work must be retained by the contractor.
Note: The contractor who will be awarded this contract will be known as the “Main
contractor” and any contractor appointed by the Main contractor will be known as the
“Appointed contractor"
3.2 Legal compliance
3.2.1 Section 37(2) (Legal) Agreement
A section 37(2) agreement must be signed between Eskom and the main contractor at the
time of submitting the safety file. The main contractor must ensure that a section 37(2)
agreement is compiled between the main contractor and all their appointed contractors for the
contract. The original copy of the section 37(2) agreement must be retained by the contractor,
and a copy must be retained by the responsible project manager/end user. A copy of all the
agreements must form part of the respective contractor’s OHS file.
3.2.2 Hazardous Work by Children (Child Labour)
The constitution of the Republic of South Africa, in the "Bill of Rights", is clear on the rights of
children, especially when it comes to:
being protected from exploitative labour practices.
not be required or permitted to perform work or provide services that
are inappropriate for a person of that child’s age; or
This places at risk the child’s well-being, education, physical or mental health, or
spiritual, moral, or social development and the Basic Conditions of Employment Act,
Chapter six, Section 43, "Prohibition of employment of children."
Before resorting to the use of child labour, due consideration must be given to the child's
constitutional rights. Where work is being performed which is not prohibited in terms of the
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 40
Template R
Generation peaking 32-726-16T 3
Identifier ev
Stations OHS
Document R
Requirements for 156A/1647 1
Identifier ev
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
constitution, then such work must be conducted in terms of the OHS Act "Regulations on
Hazardous Work by Children in South Africa" with emphasis on paragraph 2: Purpose and
Interpretation. Eskom does not condone the use of child labour and, therefore, all effort must
be exercised, and child labour should not be used.
3.2.3 OHS Act
The main contractor and appointed contractors shall have an up-to-date copy of the OHS Act
and regulations which will be available to all employees.
3.2.4 Legislative Compliance
All contractors will comply with all the legislation pertaining to this contract being:
The Main contractor and all appointed contractors will comply with all the legislation pertaining
to this project being:
Bill of Rights).
project.
3.3 ESKOM requirements
All contractors shall, before commencement of the project ensure that all their employees are
familiar with the relevant Eskom OHS documentation that is applicable to contract services.
3.4 Sheq policy
A SHEQ policy is a statement of intent and a commitment by the organization’s CE and senior
management in relation to the relevant OHS roles and responsibilities, the achievement of
their strategic objectives, and values of integrity, customer satisfaction, excellence, and
innovation. The main contractor and all appointed contractors, if not already in place, will be
required to compile an organisational SHEQ policy in line with their OHS responsibilities. The
policy must be signed by the organisation’s CE or the appointed assistant to the CE, OHS Act
Section 16(2). The policy must be displayed in a prominent place within the workplace. A copy
of the policy must be filed in the contractor's OHS files and attached as an annexure to the
OHS Plan.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 40
Template R
Generation peaking 32-726-16T 3
Identifier ev
Stations OHS
Document R
Requirements for 156A/1647 1
Identifier ev
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
3.5 Coid
The Main contractor and all his/her appointed contractors shall be registered with an
appropriate employment compensation commissioner and have available a valid letter of good
standing (LoG) from such commissioner. The obligation lies with the contractors to ensure that
the LoG remain valid throughout the contract period. A copy of the LoG must be filed in the
contractor OHS files.
3.6 Costing for OHS within the project
The costing for OHS must be itemised based on the overall scope of the work (i.e.) Training,
provision of PPE, safety equipment purchases, safety campaigns, safety promotional material
etc.
3.7 Statutory appointments
The Main contractor and all appointed contractors must appoint competent workers who will
comply with the OHS Act for the duration of the contract. Before requiring appointees to accept
an appointment, the employer must ensure that they have received appropriate training and/or
information about their responsibilities. The relevant statutory appointments must be made in
compliance with the OHS Act's criteria, which include appointing a qualified individual to the
appropriate roles.
3.8 ESKOM life-saving rules
undertakes work for Eskom to do the same.
employees, agents, consultants, and contractors. Any Eskom employee or employee
of a Main Contractor or appointed contractor who fails to follow these rules would be
deemed a serious violation. These rules are in place to protect any employee, labour
broker, or contractor working from significant injury or death.
Eskom premises, the rules shall be obeyed by any contractor and their employees.
The rules are:
Rule description of rule
Open, Isolate, Test, Earth, and create an equipotential zone before touch
Rule 1 Any person who performs work on an electrical installation shall ensure that it is
isolated, tested and earthed before starting any work.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 40
Template R
Generation peaking 32-726-16T 3
Identifier ev
Stations OHS
Document R
Requirements for 156A/1647 1
Identifier ev
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
Hook up at heights
Working at height is defined as any work performed above a stable work surface or Rule 2
where a person puts himself/herself in a position where he/she exposes himself/herself
to a fall from or into.
Buckle up
Rule 3 No person may drive any vehicle on Eskom business and/or on Eskom premises:
Unless the driver and all passengers are wearing seat belts.
Be sober
Rule 4 No person is allowed to be under the influence of intoxicating liquor or drugs while on
duty
Permit to work
Rule 5 Where an authorisation limitation exists, no person shall work without the required
permit to work.
Ensure safe live working
Rule 6 Ensure all live work basic principles are adhered to, as outlined (for the method being
used) in the High Voltage Live Working Standard for the respective division.
Eskom will take a zero-tolerance approach to these policies.
Noncompliance to Life-saving rules is regarded serious misconduct and will result in
serious disciplinary action, which may include dismissal.
This is to ensure that everyone who works on or visits an Eskom facility returns home
to their families safely.
3.10 Substance abuse
comes to workplace accidents and car driving. As a result, Eskom has the right to take
reasonable procedures to identify and prohibit drunk people from entering the
company.
General Safety Regulation 2A specifies the legal position on intoxication.
The allowable alcohol and drug level is 0%.
All contractors must follow Eskom's procedure 32-37 ("Substance Abuse Procedure"),
taking into account that this is an Eskom Life-saving Rule number 4: (BE SOBER"),
and anyone entering the Eskom site will be subjected to ad hoc alcohol testing if the
BU has self-alcohol testing equipment.
alcohol on a regular basis.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 40
Template R
Generation peaking 32-726-16T 3
Identifier ev
Stations OHS
Document R
Requirements for 156A/1647 1
Identifier ev
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
Test results must be marked "Confidential" and kept in the employee's personal file.
Eskom's life-saving rules must be included in the induction process.
All employees involved in the scope of work must sign the Life-saving rule pledge
before commencement of work.
3.11 Contractor organisational structure
3.11.1 Main Contractor Organogram
The Main contractor must provide an organisational organogram on the company’s
letter head related to this contract, depicting all the levels of responsibility from the CE
down to the supervisors responsible for the contract. List the relevant positions held,
names of appointees, legal appointments and the Organogram must be signed off by
the company's 16(1) or 16 (2).
The Main contractor must ensure that all appointed contractors comply with this
requirement. The Main contractor is responsible for keeping copies of all the
organograms’ as well as submitting them with the OHS plan. All organograms shall be
updated timeously when appointments are changed.
This diagram must be kept up to date and filed in the project OHS files.
3.11.2 Appointed Contractor/s Organogram
project on the company’s letter head, listing the reporting structure from their CE down
to their project supervisors. The diagram must list the names, positions held, any
appointments made and must be signed off by the company's 16(1) or 16 (2).
contractor and a copy filed in the relevant project OHS files.
3.12 Roles and responsibilities
3.12.1 Commitment
Visible commitment is essential to providing a safe work environment. Managers, supervisors
and employees at all levels must demonstrate their commitment by being proactively involved
in the day to day operations, in particular the Occupational Health and Safety aspects of any
project / contract. Legislation requires that each employee must take reasonable care of
themselves and their fellow workers, from management level down to the lowest employee
level.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 40
Template R
Generation peaking 32-726-16T 3
Identifier ev
Stations OHS
Document R
Requirements for 156A/1647 1
Identifier ev
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
3.12.2 Main contractors and appointed contractors
Note 1: Most of the roles and responsibilities listed apply to both Main contractors and any
appointed contractors. Where some of the listed do not apply to both, then the specific
responsibilities will be listed and titled. The contractors shall:
form part of the OHS Act and Regulation 7 of the Construction Regulations.
their appointed contractors within their working area, as contemplated by section 37(2)
of the OHS Act;
including date of induction, relevant skills and licenses and be able to produce this list
at the request of the Eskom Project Manager.
responsibilities in terms of their appointment and that they advise and assist these
appointees in the execution of their duties.
complied with on all work sites.
safety records must be kept for each work site.
Commissioner’s valid letter of good standing before the commencement of work and
any future renewal letters obtained during the contract for record-keeping purposes.
The letter of good standing shall reflect the name of the contractor’s company.
Similarly, the Main contractor must provide the Eskom project manager with all the
valid letters of good standing from their appointed contractors. This requirement
applies to the appointed contractors.
trained in the health and safety aspects relating to such work and that the employees
understand the hazards associated with all other work being carried out on the project.
they adhere to such procedures. Similarly (without removing the appointed contractors’
responsibilities), ensure that their appointed contractors and their employees are
conversant with all relevant work procedures and that they adhere to such procedures.
the health and safety of persons or a risk of degradation to the environment.
evaluate, and assess the appointed contractors OHS files. Only appoint contractors
who are competent to do work, have satisfied the OHS compliance requirements and
satisfied that the contractor has the necessary competencies and resources to perform
the work safely.
the site for which such supervisor has been appointed for.
safety information or suspecting such information has been divulged, in the interests
of health and safety requirements.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 40
Template R
Generation peaking 32-726-16T 3
Identifier ev
Stations OHS
Document R
Requirements for 156A/1647 1
Identifier ev
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
to include site or emerging risks. This should be done by a competent person appointed
in writing with a view to identify hazardous and potentially hazardous work operations.
to the starting of any new task, irrespective of whether it is a repetitive task or not.
the contract is in place and maintained. Prior to having pre-employment and periodic
medicals fitness examinations conducted, person/man job specifications must be
compiled and handed to the occupational health practitioner.
their employees, inspect such equipment regularly and ensure recipients of PPE are
trained in the proper use, care and where necessary, the maintenance of PPE;
Note: should the Main contractor or his/her appointed contractors entertain visitors on
site, they will be held responsible for the provision and wearing PPE.
investigators as and aligned with 32-95 requirements.
3.12.3 Contractor site supervisor
The contractor site supervisor must be trained in the following:
Legal liability
Must:
statutory and Eskom project requirements.
and specifications
action is in place.
results
in the first instance and thereafter the Eskom project manager in the second instance
relating to procedure requirements, non-conformances identified, corrective actions,
audits and inspection schedules.
procedures, work instructions and safety regulations issued by Eskom:
relevant inspection reports.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 40
Template R
Generation peaking 32-726-16T 3
Identifier ev
Stations OHS
Document R
Requirements for 156A/1647 1
Identifier ev
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
incident statistics report etc
meetings.
to perform the tasks assigned.
contractors deviate from safety requirements.
3.12.4 Contractor Health and Safety officer full/time
The contractor health and Safety officer must be trained in the following:
and understanding of ISO 45001, Minimum work experience 2yrs, OHS Diploma
(applicable to 3-5 years contract)
department from the daily plant walks.
sub-contractors and submit to Eskom the report and corrective action that has root
causes of all identified deviations.
3.13 Risk assessment (refer to 32-520)
It is a legal requirement in terms of Section 8 (2)(d) of the OHS Act for an employer to carry
out risk assessments, to establish which risks and hazards are attached to the health and
safety of persons due to any work which is performed, any article or substance which is,
handled, stored, transported. A risk assessment is defined as an identification of the
hazards present in the activity, work, site, and an estimate of the extent of the risks
involved, considering whatever precautions are already being taken.
It is essentially a three-stage process:
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 40
Template R
Generation peaking 32-726-16T 3
Identifier ev
Stations OHS
Document R
Requirements for 156A/1647 1
Identifier ev
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
Risk assessments are required to be maintained. This means that significant changes to
a process or activity, or any new process or activity should be subjected to a risk
assessment and that if new hazards come to light during the work process, then these
should also be subjected to risk assessments. Risk assessments for long term processes
should be periodically reviewed and updated. Method statements or written safe work
procedures are an effective method as information and record of the way jobs / tasks must
be performed. Daily or issue based or task specific or on the job risk assessments must
be conducted at the place where work is to be performed/ conducted to allow managers
and employees to assess any inherent risks that could have been overlooked during the
initial risk assessment or any changes that might have occurred in a period of absence.
For example, if a job / task is extended over a day or halted due to inclement weather.
Guidelines for actual steps involved in a job/task specific risk assessment are:
safe work procedures exist for ladders.
taken to rectify this shall be recorded, and safe working procedures drawn up.
nominated and duly assigned.
observation must be nominated.
representative for comment and approval.
to the Supervisor nominated as the responsible person; and the names of workmen
who have received instruction on the work content and the sequence of the
activities listed in the risk assessment shall be recorded, and their competence
established. This instruction shall be done through an interpreter if required and
recorded on the Pre-Job Brief (Daily Safe Task Instructions), with reference to
applicable Risk Assessments.
3.14 Safe work procedures / method statements
There must be written safe work procedures for all activities, the safe work procedures must
be aligned with the risk assessments. Method statements / written safe work procedure are
control measures used to prevent an incident from occurring during the execution of the
project. A written safe work procedure/ method statements provide guidance how to execute
the task safely. A safe working procedure should be written when: -
a. Designing a new job or task.
b. Changing jobs or task;
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 40
Template R
Generation peaking 32-726-16T 3
Identifier ev
Stations OHS
Document R
Requirements for 156A/1647 1
Identifier ev
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
c. Introducing new equipment or substances; and
The safe working procedure should identify:
d. The supervisor for the task or job and the employees who will undertake the task;
e. The tasks that are to be undertaken that pose risks;
f. The equipment and substances that are used in these tasks;
g. The control measures that have been built into these tasks;
h. Any training or qualification needed to undertake the task;
i. The personal protective equipment to be worn;
j. Actions to be undertaken to address safety issues that may arise while
undertaking the task.
3.15 Fire equipment and maintenance
a. Be clearly labelled
b. Conspicuously numbered
c. Entered in a register
d. Inspected monthly by a competent person
3.16 First aid and equipment
The requirements of the OHS Act GSR 3 must be observed.
First aid appointments must be made to meet the legal requirements. Appointees must
be trained to level 2 and the training service provider must be registered in accordance
with section 26(1) of the Skills Development Amendment Act, Act No. . It is
good practice for all employees to be trained to at least level 1.
type of work performed, the distance teams are working apart and the terrain to be
covered if an emergency should arise.
accessible for all employees.
employees are familiar with the emergency numbers.
every 50 or team of workers on site or part thereof, taking into account the type of work
performed and the distance between teams.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 40
Template R
Generation peaking 32-726-16T 3
Identifier ev
Stations OHS
Document R
Requirements for 156A/1647 1
Identifier ev
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
must be available and accessible for the immediate treatment of injured persons at the
workplace.
name and contact details of the First Aider of such first aid box or boxes shall be
erected.
arrangements be made for incidents occurring after working hours.
3.16.1 Boxes and equipment
The following is a list of minimum contents of a first aid box:
🞘 Item 1: Wound cleaner/antiseptic (100ml).
🞘 Item 2: Swabs for cleaning wounds.
🞘 Item 3: Cotton wool for padding (100 g).
🞘 Item 4: Sterile gauze (minimum quantity 10).
🞘 Item 5: 1 Pair of forceps (for splinters).
🞘 Item 6: 1 Pair of scissors (minimum size 100 mm).
🞘 Item 7: 1 Set of safety pins.
🞘 Item 8: 4 Triangular bandages.
🞘 Item 9: 4 Roller bandages (75 mm X 5 m).
🞘 Item 10: 4 Roller bandages (100 mm X 5 m).
🞘 Item 11: 1 Roll of elastic adhesive (25 mm X 3 m).
🞘 Item 12: 1 Non-allergenic adhesive strip (25 mm X 3 m).
🞘 Item 13: 1 Packet of adhesive dressing strips (minimum quantity, 10 assorted sizes).
🞘 Item 14: 4 First aid dressings (75 mm X 100 mm).
🞘 Item 15: 4 First aid dressings (150 mm x 200 mm).
🞘 Item 16: 2 Straight splints.
🞘 Item 17: 2 Pairs large and 2 pairs medium disposable latex gloves.
🞘 Item 18: 2 CPR mouth pieces or similar devices.
A content check list must be available with all boxes and boxes shall be checked on a regular
basis, kept clean and dust free.
3.17 OHS communication systems
strategy outlining how they intend to communicate OHS issues to their staff, the
mediums they will employ and how they will measure the effectiveness of their OHS
communication. Below is a brief on how communication should take place. Where
project meetings are conducted on site, OHS shall be included as a standing agenda
point and minutes of these meetings shall be available on site at all times. Minutes of
meeting must be compiled and filed in the relevant OHS files. All employees shall have
access to these minutes. Attendance register shall be kept for all the health and safety
meetings.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 40
Template R
Generation peaking 32-726-16T 3
Identifier ev
Stations OHS
Document R
Requirements for 156A/1647 1
Identifier ev
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
3.17.1 Statutory Health and Safety Committees
Section 19 of the OHS Act. Similarly, appointed contractors shall establish their own
statutory health and safety committee.
All appointed contractors shall be members of the Main contractor’s safety committee.
The Committee shall meet to discuss OHS issues concerning the current work being
performed, training, upcoming work and OHS requirements, incidents and lessons
learned specific OHS problems, safety performance, action plans and other relevant
OHS issues. Listed below is a preferred agenda.
safety committees (Refer to Section 19 (2) (a) of the OHS Act).
Safety Representatives on that specific statutory health and safety committee. (Refer
to Section 19(2)(c) of the OHS Act)
medium to high risk work is involved, more frequent if required), and all appointed
members of the committee shall attend the meeting.
contractor and the project manager and the Inspector at DEL.
and 25 incidents and other notified serious incidents.
recommendations and shall keep record of all recommendations made by the
committee.
of current standards, procedures and practices.
statutory health and safety committees carry out their duties.
by the contractor. The appointed chairperson must be competent to chair meetings
and be able to make informed decisions.
3.17.2 Non-statutory health and safety committees
established within that worksite to assist with the communication of health and safety
related matters between the statutory health and safety committee and the workplace.
be the same as the statutory safety committee
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 40
Template R
Generation peaking 32-726-16T 3
Identifier ev
Stations OHS
Document R
Requirements for 156A/1647 1
Identifier ev
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
3.17.2.1 Agenda
o Incident investigation reports
o Non-Conformances
o Announcements (near miss/injury/damage)
o Follow up on recommendations made by the employer in incident investigation
reports
o Planned Job Observations
o OHS Training
o Protective clothing and equipment
o Incident Announcements / Recall
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 40
Template R
Generation peaking 32-726-16T 3
Identifier ev
Stations OHS
Document R
Requirements for 156A/1647 1
Identifier ev
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
3.17.2.2 Minutes and action items for all health and safety committee meetings
meetings.
minutes and shall be completed during the meeting.
be kept for the duration of the project or a minimum period of three years.
duration of the project or a minimum period of 12 months.
period of 12 months.
chairperson.
with his/her recommendations and return the minutes to the relevant contractors
chairperson within 14 calendar days of the meeting.
3.18 Toolbox talks / daily team talks / pre job meetings
personnel associated with the work task in attendance. The job, relevant procedures,
associated hazards, safety measures, i.e. the task risk assessments shall be
discussed. Each employee who attends the briefing shall sign an attendance list of that
pre-job brief form undertaking that they have an understanding of the tasks, risks and
control measures required.
not occur, then weekly toolbox talks must be conducted. The toolbox talk topics will be
based on OHS issues pertaining to the project site. The topic and the contents shall
be in writing. Attendance registers with the topic listed shall be kept.
3.19 OHS training
of the OHS training requirements and the costing of such requirements. Similarly,
appointed contractor must provide the same requirements when bidding with the Main
contractor.
and the relevant procedures. Additional to the requirements, will be that the Main
contractor and appointed contractors must have the appropriate qualifications,
certificates and employees should always be under competent supervision.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 40
Template R
Generation peaking 32-726-16T 3
Identifier ev
Stations OHS
Document R
Requirements for 156A/1647 1
Identifier ev
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
training shall be given to those appointees prior to the acceptance of those
appointments.
and OHS plan, all affected staff shall undergo the applicable refresher training.
Appropriate time must be set aside for training (induction and other) of all employees.
Records of all training and qualifications of all contractor employees must be kept on
the OHS file.
3.19.1 Main Contractor Induction training
The contractor is required to make arrangements with the Business Unit for its employees to
attend induction in order to be granted permission to access site.
and their employees have undergone the Eskom OHS induction training prior to
commencing work on site.
indicate that they have received and understood the induction training.
medical examination and found fit for duty. A copy of the certificate of fitness must be
kept in the OHS file on site for the duration of the project.
All employees and visitors on site shall carry the proof of induction training.
It is the contractors responsibility to keep records of induction training.
3.19.2 Appointed Contractor induction training
The Main contractor shall ensure that all his / her employees and appointed contractor
employees undergo site specific work induction with regard to the approved project OHS plan,
hazards prevalent on the work site, scope specific risk assessment, rules and regulations, and
other related aspects. The induction training should also include identification of sensitive
features such as wetlands/vlei areas, red data species, graves, etc.
3.19.3 Visitors to site induction
safety induction prior to being allowed access to site.
properly inducted. No visitors are permitted to undertake any work onsite, of any
nature.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 40
Template R
Generation peaking 32-726-16T 3
Identifier ev
Stations OHS
Document R
Requirements for 156A/1647 1
Identifier ev
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
Induction training.
3.20 General training
The Main contractor will be required to ensure that before an employee commences work on
the project/site, the respective supervisor informs the employee of his scope of authority, the
hazards associated with work as well as the control measures to be taken. This will include
man-job specifications, the discussion of any task procedures or hazardous operational
procedures to be performed by the employee. The Main Contractor is to ensure that the
supervisor has satisfied himself that the employee understands the hazards associated with
the work to be performed by conducting task/job observations.
3.21 Contractor site establishment
3.21.1 Where contractors are providing their own facilities, the following shall apply:
the project manager, listing position of all buildings, amenities, storage, stacking areas
and temporary electrical installations. The appropriate colour coding and demarcation
of storage and stacking areas must be carried out.
site camp, ablution facilities and dining area in relation to one another and away from
stacking and storage areas.
Main contractor’s site facilities should be managed and kept hygienically clean.
Where the materials are stored at the work sites, proper stacking and storage shall be
carried out and maintained in good order at all times.
Surveys costs in the bill of quantities as per the OHS Act and its regulations and inline
with the scope of work.
3.21.2 Where Eskom is making provision of the facilities to the contractor, the following
shall apply:
shall together with the contractor management conduct inspections, draft and sign the
service level agreement.
at all times.
condition.
manager/project manager the defects incurred.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 40
Template R
Generation peaking 32-726-16T 3
Identifier ev
Stations OHS
Document R
Requirements for 156A/1647 1
Identifier ev
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
3.22 Vehicle management
a. Their passengers wear seat belts whilst the vehicle is in motion.
b. Comply with all traffic road rules, safety, direction and speed signs.
c. Ensure that vehicle loads are properly secured prior to moving off.
d. Ensure that vehicles are not overloaded.
No persons maybe transported at the back of the bakkie.
Drivers are required to conduct the route risk assessment prior to travelling/driving.
No drivers or operators may text, talk on cell phones or two-way radios whilst driving.
All drivers shall have a valid medical fitness certificate.
The First aid box with valid contents and fire extinguishers must be included in the
vehicle, be services annually and inspected monthly. Drivers must be trained on how
to use the First aid box and fire extinguishers.
at the back of the vehicle.
vehicle access to site.
must be valid at all times and this is applicable to yellow plant.
least 30 (thirty) meters must be left clear between such a vehicle and such a machine.
Vehicles which are not roadworthy will not be permitted to be used on site.
by them. Precautions shall be taken to secure all loads properly. Loads projecting
from vehicles shall be securely loaded and in daytime a red flag and during darkness
a red light or red reflective material shall be attached to the extreme end of such
projecting materials.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 40
Template R
Generation peaking 32-726-16T 3
Identifier ev
Stations OHS
Document R
Requirements for 156A/1647 1
Identifier ev
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
1.5 metres
3.23 Housekeeping and order
vehicles for the duration of the project/contract.
temporarily in a designated waste area, awaiting disposal.
cause serious injuries/fatalities.
Nails protruding through timber shall be bent over or removed so as not to cause injury.
All packaging material including boxes, pallets, crates, etc. to be removed from the
work area immediately.
area of all materials, scrap, temporary buildings and building bases to the satisfaction
of the client/agent.
compromising safety and cleanliness, anyone has the responsibility to bring it to the
attention of the Main contractor in the first instance and the Eskom project/contract
manager in the second instance.
appointed contractors to cease work until the area has been tidied up and made safe.
Neither additional costs nor extension of time to the contract shall be allowed as a
result of such a stoppage. Failure to comply with this requirement will result into site
cleaning by another cleaning contractor company at the cost of the Main contractor.
ensure maintenance of satisfactory standards. The Main contractor shall document the
results of each inspection and shall maintain records for viewing.
3.24 Workplace signage and colour coding
Symbolic safety signage shall be displayed where it is required by legislation.
All symbolic safety signage shall conform to the requirements of SANS standard 1186.
Signs shall be positioned to be seen from most positions within the work sites / areas.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 40
Template R
Generation peaking 32-726-16T 3
Identifier ev
Stations OHS
Document R
Requirements for 156A/1647 1
Identifier ev
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
the name and contact details of the: contractor site/responsible manager; supervisors;
Health and Safety Manager/Practitioner; First Aider; Health and Safety Representative
and Evacuation warden.
indicated by means of a sign.
people of its use.
entry is prohibited and/or where alerting and cautioning passers-by to be aware of
potential dangers.
training and toolbox talks.
appropriate sign indicating the meaning of symbolic safety signs must be displayed.
3.25 Tools and equipment
and is maintained in a good condition.
regularly inspected at least monthly or as required by legislation and risk assessments.
The equipment should be numbered or tagged so that it can be properly monitored and
inspected.
calibration documentation prior to being brought onto the project and the records shall
form part of the OHS plan. Maintenance calibration shall be undertaken in terms of the
manufacturer’s requirements.
manufacturer’s recommendations and legal requirements.
contractors for use on this project.
way unsuitable for the safe and satisfactory execution of the work for which it is
intended, the Eskom personnel shall advise the contractor in writing and the contractor
shall forthwith remove the item from site and replace it with a safe and adequate
substitute.
Note: In such cases, the contractor shall not be entitled to extra payments or
extensions of time in respect of delay caused by Eskom’s instructions.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 40
Template R
Generation peaking 32-726-16T 3
Identifier ev
Stations OHS
Document R
Requirements for 156A/1647 1
Identifier ev
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
be removed out of site immediately, locked away to prevent further use until such time
as the tool or piece of equipment has been repaired.
equipment used on the project. Such tools and equipment’s shall be subjected to
regular inspections.
3.25.1 Hand tools
inspected by the construction supervisor on a monthly basis as well as by users prior
to use.
mushroom heads, to be removed at the end or beginning of shift prior to use.
Tools with sharp points in toolboxes must be protected with a cover.
All files and similar tools must be fitted with handles.
No make shift tools are permissible on the project.
3.26 Ladders
Ladders used shall conform to the requirements of GSR 13A and used in terms of GSR
The appropriate head protection, with chin strap shall be worn by employees working
from a ladder or with climbing irons.
The ladder wheels, brakes and platform must be in good condition.
All metal parts to be in good condition, no cracks.
The appropriate head protection, with chin strap shall be worn by employees working
from a ladder or with climbing irons.
Non-slip devices must be in good condition and no paint to be on wooden ladders
Climbing irons are permitted to be used in place of ladders on condition that the
requirements of GSR 6 are not compromised and from an electrical point of view not
damage any cabling. The working at heights risk assessment must indicate the use of
climbing irons.
maintenance of such climbing irons.
used.
working from and climbing down ladders.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 40
Template R
Generation peaking 32-726-16T 3
Identifier ev
Stations OHS
Document R
Requirements for 156A/1647 1
Identifier ev
Medium risk
Effective Date April 2022 ACTIVITIES/SERVICES
from a ladder (risk based) or with climbing irons.
and every time prior to climbing by employees using such ladders. The inspection
check lists must be filed in the site OHS files
3.27 Auditing
3.27.1 Approval and compliance of Main contractor OHS plan
The Contractor’s OHS Plan will be audited against compliance checklist so as to verify
compliance to the requirements of the Eskom OHS requirements. Once there is compliance
only then will the Main contractors OHS plan be approved by the project manager or an
appointed Eskom contract custodian. The implementation of the OHS Plan shall be assessed
/ audited by Eskom personnel on a regular basis. This will include physical conditions
evaluation.
3.27.2 Eskom OHS audits
Eskom shall evaluate all contractors’ OHS performance on an ongoing basis against the legal,
Eskom requirements, OHS requirements and the contractors OHS plans.
Note: Eskom reserves the right to conduct unannounced audits on contractors
Each Peaking power station must develop a contractor audit schedule and ensure that Internal
audits are conducted on the Main contractor/s and/or appointed contractor every 6 months
(twice a year), however regular OHS inspections shall be conducted. These audits shall be
attended by the contractor’s site manager or his representative.
If there are any findings / non-compliance identified as serious in these audits, an activity will
be stopped for that specific Main Contractor and appointed contractor. Refer to section on
“Work Stoppage” in this OHS requirements.
3.27.3 Contractor audits
Main Contractors are required to conduct internal audits on both their employees and their
appointed contractors on the implementation of their OHS Plan on a monthly basis or when
the scope of work changes. A summary of the findings and the proposed corrective actions
shall be submitted to Eskom project manager within one week after completion of the audit.
Where appointed contractors are audited by the Main contractor a copy of the audit report
shall be submitted to the appointed contractor within 7 days of the audit.
3.28 Smoking
The national smoking policy must be observed, and smoking is permitted in designated areas
only (Eskom Smoking Procedure 32-36).
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 40
Compliance Requirements
Source: OHS Requirements Port Rex.pdf (unknown)No specific requirements found
B-BBEE Minimum Level: 2
Health & Safety
Source: OHS Requirements Port Rex.pdfIntroduction .......................................................................................................................... 4
Supporting clauses ............................................................................................................ 4
2.1 Scope .................................................................................................................................. 4
2.1.1 Purpose ..................................................................................................................... 4
2.1.2 Applicability ............................................................................................................ 4
2.2 Normative/informative references ...................................................................... 4
2.2.1 Normative ................................................................................................................. 4
2.2.2 Informative .............................................................................................................. 5
2.4 Abbreviations .................................................................................................................. 9
2.5 Related/supporting documents ........................................................................... 10
3.1 Scope of work .............................................................................................................. 10
3.2 Legal compliance ........................................................................................................ 10
3.2.1 Section 37(2) (legal) agreement .................................................................... 10
3.2.2 Hazardous work by children (child labour) ........................................... 10
3.2.3 OHS act .................................................................................................................... 11
3.2.4 Legislative compliance ..................................................................................... 11
3.3 ESKOM requirements .................................................................................................. 11
3.4 Sheq policy .................................................................................................................... 11
3.5 Coid .................................................................................................................................... 12
3.6 Costing for OHS within the project ................................................................... 12
3.7 Statutory appointments.......................................................................................... 12
3.8 ESKOM life-saving rules ........................................................................................... 12
3.10 Substance abuse ....................................................................................................... 13
3.11 Contractor organisational structure ......................................................... 14
3.11.1 Main contractor organogram ................................................................... 14
3.11.2 Appointed contractor/s organogram .................................................... 14
3.12 Roles and responsibilities .................................................................................... 14
3.12.1 Commitment .......................................................................................................... 14
3.12.2 Main contractors and appointed contractors .................................. 15
3.12.3 Contractor site supervisor........................................................................ 16
3.12.4 Contractor health and safety officer full/time .............................. 17
3.13 Risk assessment (refer to 32-520) ....................................................................... 17
3.14 Safe work procedures / method statements ............................................... 18
3.15 Fire equipment and maintenance ........................................................................ 19
3.16 First aid and equipment .......................................................................................... 19
3.16.1 Boxes and equipment ....................................................................................... 20
3.17 OHS communication systems ................................................................................ 20
3.17.1 Statutory health and safety committees ............................................. 21
3.17.2 Non-statutory health and safety committees .................................... 21
3.18 Tool box talks / daily team talks / pre job meetings ................................. 23
3.19 OHS training ................................................................................................................. 23
3.19.1 Main contractor induction training ........................................................ 24
3.19.2 Appointed contractor induction training ............................................ 24
3.19.3 Visitors to site induction .............................................................................. 24
3.20 General training ....................................................................................................... 25
Effective Date April 2022 ACTIVITIES/SERVICES
3.21 Contractor site establishment ......................................................................... 25
3.22 Vehicle management ................................................................................................ 26
3.23 Housekeeping and order ....................................................................................... 27
3.24 Workplace signage and colour coding .......................................................... 27
3.25 Tools and equipment ............................................................................................... 28
3.25.1 Hand tools ........................................................................................................... 29
3.26 Ladders ......................................................................................................................... 29
3.27 Auditing ......................................................................................................................... 30
3.27.1 Approval and compliance of main contractor OHS plan ................ 30
3.27.2 ESKOM OHS audits .............................................................................................. 30
3.27.3 Contractor audits ........................................................................................... 30
3.28 Smoking ......................................................................................................................... 30
3.29 Cellular phones ........................................................................................................ 31
3.30 Occupational health, hygiene and rehabilitation ...................................... 31
3.30.1 Medical assessments ...................................................................................... 31
3.31 Roles and responsibilities .................................................................................... 31
3.32 Working at heights .................................................................................................. 32
3.32.1 General requirements ................................................................................... 32
3.33 Personal protective equipment requirements ........................................... 33
3.34 Incident investigation ............................................................................................. 33
3.35 Emergency management ......................................................................................... 34
3.36 Non-conformance and compliance ................................................................... 34
3.37 OHS files ........................................................................................................................ 34
3.38 Work stoppage ........................................................................................................... 35
3.39 Hours of work ........................................................................................................... 35
3.39.1 Normal work ....................................................................................................... 35
3.39.2 Night work ........................................................................................................... 36
3.39.3 Overtime ................................................................................................................ 36
3.40 Omissions from safety and health requirements ...................................... 36
3.41 Contractor performance monitoring ............................................................ 36
3.45 Security clearance ................................................................................................. 38
3.46 Contract sign off ..................................................................................................... 38
3.47 Eskom's right to terminate the contract ..................................................... 39
Authorization ...................................................................................................................... 39
Revisions ................................................................................................................................ 39
Effective Date April 2022 ACTIVITIES/SERVICES
Eskom’s responsibility and commitment is to ensure a safe working environment is in line with
its Safety, Health, Environmental, and Quality (SHEQ) Policy and applicable legislative
obligations. This OHS requirements is Eskom Generation's minimum requirements which are
required to be met for the duration of the contract period by contractors/suppliers and, where
required, the delivery organisation. The contractor is expected to develop an OHS plan that
meets these requirements as well as all the relevant applicable legislation that they conform
to. Eskom in no way assumes the contractor’s legal responsibilities and liabilities. The
contractor is and remains accountable for the quality and execution of their health and safety
programme for their employees and appointed contractor employees. This OHS requirement
reflects minimum requirements and should not be construed as all-encompassing.
Note 1: All the requirements listed hereunder are in relation to the contract and do not
supersede or replace any organizational OHS requirements.
Effective Date April 2022 ACTIVITIES/SERVICES
2.2.2 Informative
[1] Tobacco Products Control Act (Updated 2011.05.19)
[2] SANS 1186 Symbolic Safety Signs
[3] Constitution of the Republic of South Africa No
[4] DMN 34-110 Operating A Vehicle Mounted Crane
Baseline risk (32-520) baseline operational risks refer to the health and safety risks
assessment associated with all standard processes and routine activities in the
business
Business unit (BU) (32-296) means any defined unit within the Eskom environment,
operating as a business under a particular cost-centre number. In the
context of this document and in terms of health and safety, any
reference to a BU includes a defined unit within any Eskom division and
its subsidiaries
Client (OHS Act) Eskom representative (Internal – Asset Owner), also referred
to as the contract administrator/custodian or agent or project manager
(as defined in the contract). He/she is the person responsible for
ensuring that the works or services are executed in terms of the
contract, as well as adherence to legislation pertaining to the contract.
Competent person (OHS Act) means any person having the knowledge, training,
experience, and qualifications, specific to the work or task being
performed, provided that, where appropriate, qualifications and training
are registered in terms of the South African Qualifications Authority Act,
1995 (Act No. )
Contractor (OHS Act) means an employer as defined in section 1 of the Act who
performs contracted work and includes Main contractors
Controlled disclosure controlled disclosure to external parties (either enforced by law or
discretionary)
Duty of care to the (32-136) anybody who causes or has caused or may cause significant
environment pollution or degradation of the environment must take reasonable
measures to prevent such pollution or degradation from occurring,
continuing, or recurring. If such harm to the environment is authorised
by law or cannot reasonably be avoided or stopped, such person must
minimise and rectify such pollution or degradation of the environment
Employee (OHS Act) means, subject to the provisions of subsection (2), any
person who is employed by or works for an employer and who receives
or is entitled to receive any remuneration or who works under the
direction or supervision of an employer or any other person
Employer (OHS Act) means, subject to the provisions of subsection (2), any
person who employs or provides work for any person and remunerates
that person or expressly or tacitly undertakes to remunerate him/her,
but excludes a TES (ex labour broker) as defined in section 1(1) of the
Labour Relations Act 1956 (Act No. )
procedures, specifications, work instructions, guidelines, or manuals
Fall protection plan (OHS Act) means a documented plan of all risks relating to working from
an elevated position, considering the nature of work undertaken, and
setting out the procedures and methods to be applied in order to
eliminate the risk
Hazard (OHS Act) means a source of, or exposure to, danger
Hazard identification (OHS Act) means the identification and documenting of existing or
expected hazards to the health and safety of persons, which are
normally associated with the type of construction work being executed
or to be executed
Occupational Health and (OHS Act) means a file or other record in permanent form, containing
safety file the information required in relation to the contract.
Health and safety plan (OHS Act) means a document plan that addresses hazards identified
and includes safe work procedures to mitigate, reduce, or control
hazards identified
safety requirements project, site, and scope of work. This requirement is intended to ensure
the health and safety of persons, both workers and the public, and the
duty of care to the environment. The health and safety requirements
must be specific to each contract, project, site, and scope of work
Lifesaving Rules (240-62196227) a rule that, if not adhered to, has the potential to cause
serious harm to people
Medical Certificate of (OHS Act) means a certificate valid for one year, issued by an
fitness occupational health practitioner, issued in terms of the regulations,
whom shall be registered with the Health Professions Council of South
Medical surveillance (OHS Act) means a planned programme or periodic examination (which
may include clinical examinations, biological monitoring, or medical
tests) of employees by an occupational health practitioner or, in
prescribed cases, by an occupational medicine practitioner
Effective Date April 2022 ACTIVITIES/SERVICES
2.3 Definition Explanation
Method statement (OHS Act) means a written document detailing the key activities to be
performed in order to reduce, as reasonably as practicable, the hazards
identified in any risk assessment
has been appointed as part of the Eskom delegation of authority
process with the aim to assist the applicable 16(2) assigned person in
executing his/her duties in terms of the Occupational Health and Safety
Act
Risk assessment (OHS Act) means a programme to determine any risk associated with
any hazard at a construction site in order to identify the steps needed
to be taken to remove, reduce, or control such hazard.
Site (34-228) means an Eskom department, unit, complex, building, specific
project, work site, or the site where agents, clients, Main contractors,
contractors, suppliers, vendors, and service providers provide a service
to Eskom, directly or indirectly
Service provider any private person or legal entity that provides any service(s) to Eskom
for compensation
Subsidiary (32-94) an enterprise controlled by another (called the parent) through
the ownership of greater than 50% of its voting stock
Supplier (32-1034)means a natural or legal person who renders a service and
may include the following current or potential supplier vendor,
contractor, consultant
Task (34-227) a segment of work that requires a set of specific and distinct
actions for its completion
Effective Date April 2022 ACTIVITIES/SERVICES
2.3 Definition Explanation
Toolbox talks (34-227) where the team leader, after conducting pre-task planning,
shares all the tasks at hand and discusses task allocation, the identified
risks, and the control measures with all his/her team members on site
before commencing a specific task and documenting the agreed
strategy. (This shall be done to ensure common understanding of the
tasks, risks, and control measures required.)
The Act (OHS Act) means the Occupational Health and Safety Act No. , as amended, and the Regulations thereto
Note: The contractor who will be awarded this contract will be known as the “Main
contractor” and any contractor appointed by the Main contractor will be known as the
“Appointed contractor"
3.2 Legal compliance
3.2.1 Section 37(2) (Legal) Agreement
A section 37(2) agreement must be signed between Eskom and the main contractor at the
time of submitting the safety file. The main contractor must ensure that a section 37(2)
agreement is compiled between the main contractor and all their appointed contractors for the
contract. The original copy of the section 37(2) agreement must be retained by the contractor,
and a copy must be retained by the responsible project manager/end user. A copy of all the
agreements must form part of the respective contractor’s OHS file.
3.2.2 Hazardous Work by Children (Child Labour)
The constitution of the Republic of South Africa, in the "Bill of Rights", is clear on the rights of
children, especially when it comes to:
being protected from exploitative labour practices.
not be required or permitted to perform work or provide services that
are inappropriate for a person of that child’s age; or
This places at risk the child’s well-being, education, physical or mental health, or
spiritual, moral, or social development and the Basic Conditions of Employment Act,
Chapter six, Section 43, "Prohibition of employment of children."
Effective Date April 2022 ACTIVITIES/SERVICES
constitution, then such work must be conducted in terms of the OHS Act "Regulations on
Hazardous Work by Children in South Africa" with emphasis on paragraph 2: Purpose and
to this project being:
Bill of Rights).
project.
3.3 ESKOM requirements
familiar with the relevant Eskom OHS documentation that is applicable to contract services.
3.4 Sheq policy
A SHEQ policy is a statement of intent and a commitment by the organization’s CE and senior
management in relation to the relevant OHS roles and responsibilities, the achievement of
their strategic objectives, and values of integrity, customer satisfaction, excellence, and
innovation. The main contractor and all appointed contractors, if not already in place, will be
required to compile an organisational SHEQ policy in line with their OHS responsibilities. The
policy must be signed by the organisation’s CE or the appointed assistant to the CE, OHS Act
Section 16(2). The policy must be displayed in a prominent place within the workplace. A copy
of the policy must be filed in the contractor's OHS files and attached as an annexure to the
appropriate employment compensation commissioner and have available a valid letter of good
standing (LoG) from such commissioner. The obligation lies with the contractors to ensure that
the LoG remain valid throughout the contract period. A copy of the LoG must be filed in the
contractor OHS files.
3.6 Costing for OHS within the project
The costing for OHS must be itemised based on the overall scope of the work (i.e.) Training,
provision of PPE, safety equipment purchases, safety campaigns, safety promotional material
etc.
3.7 Statutory appointments
Working at height is defined as any work performed above a stable work surface or Rule 2
where a person puts himself/herself in a position where he/she exposes himself/herself
to a fall from or into.
and employees at all levels must demonstrate their commitment by being proactively involved
in the day to day operations, in particular the Occupational Health and Safety aspects of any
project / contract. Legislation requires that each employee must take reasonable care of
themselves and their fellow workers, from management level down to the lowest employee
level.
complied with on all work sites.
safety records must be kept for each work site.
trained in the health and safety aspects relating to such work and that the employees
understand the hazards associated with all other work being carried out on the project.
the health and safety of persons or a risk of degradation to the environment.
the site for which such supervisor has been appointed for.
safety information or suspecting such information has been divulged, in the interests
of health and safety requirements.
to include site or emerging risks. This should be done by a competent person appointed
in writing with a view to identify hazardous and potentially hazardous work operations.
the contract is in place and maintained. Prior to having pre-employment and periodic
medicals fitness examinations conducted, person/man job specifications must be
compiled and handed to the occupational health practitioner.
their employees, inspect such equipment regularly and ensure recipients of PPE are
trained in the proper use, care and where necessary, the maintenance of PPE;
Note: should the Main contractor or his/her appointed contractors entertain visitors on
site, they will be held responsible for the provision and wearing PPE.
procedures, work instructions and safety regulations issued by Eskom:
contractors deviate from safety requirements.
3.12.4 Contractor Health and Safety officer full/time
Part time Safety Officer for this contract
SAMTRAC, HIRA, Incident investigation training, Legal liability, Training, knowledge
and understanding of ISO 45001, Minimum work experience 2yrs, OHS Diploma
(applicable to 3-5 years contract)
department from the daily plant walks.
sub-contractors and submit to Eskom the report and corrective action that has root
causes of all identified deviations.
3.13 Risk assessment (refer to 32-520)
It is a legal requirement in terms of Section 8 (2)(d) of the OHS Act for an employer to carry
out risk assessments, to establish which risks and hazards are attached to the health and
safety of persons due to any work which is performed, any article or substance which is,
handled, stored, transported. A risk assessment is defined as an identification of the
hazards present in the activity, work, site, and an estimate of the extent of the risks
involved, considering whatever precautions are already being taken.
a process or activity, or any new process or activity should be subjected to a risk
assessment and that if new hazards come to light during the work process, then these
should also be subjected to risk assessments. Risk assessments for long term processes
should be periodically reviewed and updated. Method statements or written safe work
procedures are an effective method as information and record of the way jobs / tasks must
be performed. Daily or issue based or task specific or on the job risk assessments must
be conducted at the place where work is to be performed/ conducted to allow managers
and employees to assess any inherent risks that could have been overlooked during the
initial risk assessment or any changes that might have occurred in a period of absence.
safe work procedures exist for ladders.
taken to rectify this shall be recorded, and safe working procedures drawn up.
nominated and duly assigned.
observation must be nominated.
representative for comment and approval.
to the Supervisor nominated as the responsible person; and the names of workmen
who have received instruction on the work content and the sequence of the
activities listed in the risk assessment shall be recorded, and their competence
established. This instruction shall be done through an interpreter if required and
recorded on the Pre-Job Brief (Daily Safe Task Instructions), with reference to
applicable Risk Assessments.
3.14 Safe work procedures / method statements
be aligned with the risk assessments. Method statements / written safe work procedure are
control measures used to prevent an incident from occurring during the execution of the
project. A written safe work procedure/ method statements provide guidance how to execute
the task safely. A safe working procedure should be written when: -
a. Designing a new job or task.
b. Changing jobs or task;
d. The supervisor for the task or job and the employees who will undertake the task;
e. The tasks that are to be undertaken that pose risks;
f. The equipment and substances that are used in these tasks;
g. The control measures that have been built into these tasks;
h. Any training or qualification needed to undertake the task;
i. The personal protective equipment to be worn;
j. Actions to be undertaken to address safety issues that may arise while
undertaking the task.
3.15 Fire equipment and maintenance
a. Be clearly labelled
b. Conspicuously numbered
c. Entered in a register
d. Inspected monthly by a competent person
type of work performed, the distance teams are working apart and the terrain to be
covered if an emergency should arise.
employees are familiar with the emergency numbers.
every 50 or team of workers on site or part thereof, taking into account the type of work
performed and the distance between teams.
🞘 Item 1: Wound cleaner/antiseptic (100ml).
🞘 Item 2: Swabs for cleaning wounds.
🞘 Item 3: Cotton wool for padding (100 g).
🞘 Item 4: Sterile gauze (minimum quantity 10).
🞘 Item 5: 1 Pair of forceps (for splinters).
🞘 Item 6: 1 Pair of scissors (minimum size 100 mm).
🞘 Item 7: 1 Set of safety pins.
🞘 Item 8: 4 Triangular bandages.
🞘 Item 9: 4 Roller bandages (75 mm X 5 m).
🞘 Item 10: 4 Roller bandages (100 mm X 5 m).
🞘 Item 11: 1 Roll of elastic adhesive (25 mm X 3 m).
🞘 Item 12: 1 Non-allergenic adhesive strip (25 mm X 3 m).
🞘 Item 13: 1 Packet of adhesive dressing strips (minimum quantity, 10 assorted sizes).
🞘 Item 14: 4 First aid dressings (75 mm X 100 mm).
🞘 Item 15: 4 First aid dressings (150 mm x 200 mm).
🞘 Item 16: 2 Straight splints.
🞘 Item 17: 2 Pairs large and 2 pairs medium disposable latex gloves.
🞘 Item 18: 2 CPR mouth pieces or similar devices.
strategy outlining how they intend to communicate OHS issues to their staff, the
mediums they will employ and how they will measure the effectiveness of their OHS
communication. Below is a brief on how communication should take place. Where
project meetings are conducted on site, OHS shall be included as a standing agenda
point and minutes of these meetings shall be available on site at all times. Minutes of
meeting must be compiled and filed in the relevant OHS files. All employees shall have
access to these minutes. Attendance register shall be kept for all the health and safety
meetings.
Effective Date April 2022 ACTIVITIES/SERVICES
3.17.1 Statutory Health and Safety Committees
Section 19 of the OHS Act. Similarly, appointed contractors shall establish their own
statutory health and safety committee.
performed, training, upcoming work and OHS requirements, incidents and lessons
learned specific OHS problems, safety performance, action plans and other relevant
safety committees (Refer to Section 19 (2) (a) of the OHS Act).
Safety Representatives on that specific statutory health and safety committee. (Refer
to Section 19(2)(c) of the OHS Act)
medium to high risk work is involved, more frequent if required), and all appointed
members of the committee shall attend the meeting.
contractor and the project manager and the Inspector at DEL.
and 25 incidents and other notified serious incidents.
statutory health and safety committees carry out their duties.
by the contractor. The appointed chairperson must be competent to chair meetings
and be able to make informed decisions.
3.17.2 Non-statutory health and safety committees
established within that worksite to assist with the communication of health and safety
related matters between the statutory health and safety committee and the workplace.
be the same as the statutory safety committee
o Incident investigation reports
o Non-Conformances
o Announcements (near miss/injury/damage)
o Follow up on recommendations made by the employer in incident investigation
reports
o Planned Job Observations
o OHS Training
o Protective clothing and equipment
o Incident Announcements / Recall
Effective Date April 2022 ACTIVITIES/SERVICES
3.17.2.2 Minutes and action items for all health and safety committee meetings
be kept for the duration of the project or a minimum period of three years.
duration of the project or a minimum period of 12 months.
with his/her recommendations and return the minutes to the relevant contractors
chairperson within 14 calendar days of the meeting.
3.18 Toolbox talks / daily team talks / pre job meetings
personnel associated with the work task in attendance. The job, relevant procedures,
associated hazards, safety measures, i.e. the task risk assessments shall be
discussed. Each employee who attends the briefing shall sign an attendance list of that
pre-job brief form undertaking that they have an understanding of the tasks, risks and
control measures required.
and OHS plan, all affected staff shall undergo the applicable refresher training.
employees undergo site specific work induction with regard to the approved project OHS plan,
hazards prevalent on the work site, scope specific risk assessment, rules and regulations, and
other related aspects. The induction training should also include identification of sensitive
features such as wetlands/vlei areas, red data species, graves, etc.
3.19.3 Visitors to site induction
safety induction prior to being allowed access to site.
properly inducted. No visitors are permitted to undertake any work onsite, of any
nature.
the project/site, the respective supervisor informs the employee of his scope of authority, the
hazards associated with work as well as the control measures to be taken. This will include
man-job specifications, the discussion of any task procedures or hazardous operational
procedures to be performed by the employee. The Main Contractor is to ensure that the
supervisor has satisfied himself that the employee understands the hazards associated with
the work to be performed by conducting task/job observations.
3.21 Contractor site establishment
3.21.1 Where contractors are providing their own facilities, the following shall apply:
a. Their passengers wear seat belts whilst the vehicle is in motion.
b. Comply with all traffic road rules, safety, direction and speed signs.
c. Ensure that vehicle loads are properly secured prior to moving off.
d. Ensure that vehicles are not overloaded.
vehicle, be services annually and inspected monthly. Drivers must be trained on how
to use the First aid box and fire extinguishers.
Effective Date April 2022 ACTIVITIES/SERVICES
1.5 metres
3.23 Housekeeping and order
compromising safety and cleanliness, anyone has the responsibility to bring it to the
attention of the Main contractor in the first instance and the Eskom project/contract
manager in the second instance.
the name and contact details of the: contractor site/responsible manager; supervisors;
Health and Safety Manager/Practitioner; First Aider; Health and Safety Representative
and Evacuation warden.
indicated by means of a sign.
appropriate sign indicating the meaning of symbolic safety signs must be displayed.
3.25 Tools and equipment
regularly inspected at least monthly or as required by legislation and risk assessments.
requirements of GSR 6 are not compromised and from an electrical point of view not
damage any cabling. The working at heights risk assessment must indicate the use of
climbing irons.
be stopped for that specific Main Contractor and appointed contractor. Refer to section on
“Work Stoppage” in this OHS requirements.
3.27.3 Contractor audits
Environmental
Source: OHS Requirements Port Rex.pdfvegetation at the various power stations. Port Rex therefore requires the services of a garden
service company to service and maintain the vegetation within the power station, excluding
the HV yard, by upkeeping the flower beds, cutting of grass, removing of garden waste and to
perform weeding to keep the vegetation and roads and parking area neat and tidy. The
maintenance of all Plants, Plant Beds, Trees and Lawns includes the periodic cleaning,
weeding, disease and insect pest control, mowing of lawns, cutting of edges, pruning, wound
dressing, replacement of unacceptable material, straightening plants which lean or sag,
adjustment of plants which settle or are planted too low, eradication and removal of invader
species, removal of garden cuttings and waste, and any other procedure consistent with good
horticultural practice necessary to ensure normal, vigorous and healthy growth plants. Ensure
that roads and grounds within the Power Station and fire break around outer perimeter are
kept neat, clean, and cleared of all foreign objects and rubble.
any requirements pertaining to local authorities, municipal by-laws, or environmental
legislation that must be met by the contractor.
2.1.1 Purpose
temporarily in a designated waste area, awaiting disposal.
cause serious injuries/fatalities.
Section
Source: OHS Requirements Port Rex.pdffile for evaluation prior to the start of work. OHS department will issue the 37(2) agreement to
its Safety, Health, Environmental, and Quality (SHEQ) Policy and applicable legislative
contractor is and remains accountable for the quality and execution of their health and safety
Description
Source: Attachment No. 3c.pdf (unknown)The service is Vegetation Management at Port Rex Power Station for a period of 5 years. The Affected Property is Port Rex Power Station.
Contact Information
Source: Attachment No. 3c.pdf (unknown){"name":null,"email":null,"phone":"011 803 3008","department":null,"address":"n the conditions of contract identified"}
Submission Guidelines
Source: Attachment No. 3c.pdf (unknown)Returnable Documents: C1.1 Form of Offer and Acceptance [●], C1.1 Form of Offer & Acceptance, By the representative of the tenderer, deemed to be duly authorised, signing this part of this Form of Offer, This Offer may be accepted by the Employer by signing the Acceptance part of this Form of Offer and
Evaluation Criteria
Source: Attachment No. 3c.pdf (unknown)Eligibility criteria include being a registered entity with the necessary tax clearance, B-BBEE compliance, and CIDB grading. The contractor must also have the financial capacity and technical expertise to perform the services, as well as compliance with the Occupational Health and Safety Act and other relevant regulations. Additionally, the contractor must not be involved in any collusive, coercive, or fraudulent practices.
Methodology
Source: Attachment No. 3c.pdf (unknown)The Contractor must submit a first plan for acceptance within two weeks of the Contract Date, and for Task Orders, submit a Task Order programme within three days of receiving the Task Order. The plan must show how each item in the price list relates to operations, and the Contractor prepares forecasts of the final total of Prices at intervals no longer than four weeks.
Experience & Qualifications
Source: Attachment No. 3c.pdf (unknown)The Contractor must provide details of key people including name, job, responsibilities, qualifications, and experience, along with CVs.
Quality Management
Source: Attachment No. 3c.pdfassistance that the Employer is able to provide for the purpose of contesting any such
claim or action.
Z13.10.3 Should it be held in any such action that any such protected rights have been infringed, as
definitely stated by a judgment of the court before which the action is brought, the
submitting the tender, as to the layout of the premises, the quantities and nature of work and labour,
materials and equipment necessary for the completion of the services additional services, the means of
access to the premises and in general, shall himself obtain all necessary information as to risks,
contingencies and other circumstances which may influence or affect the contract. .............................. 30
1.2.1. Normative ....................................................................................................................................... 30
1.2.1. Informative ...................................................................................................................................... 30
1.3. Port Rex Power Station ..................................................................................................................... 30
1.3.1. Weeding ..................................................................................................................................... 30
1.3.2. Grassed areas ........................................................................................................................... 30
1.3.3. Control of disease and insect pests ........................................................................................... 30
1.3.4. Pruning ....................................................................................................................................... 31
1.3.5. Replacement of dead or damaged plants .................................................................................. 31
1.3.6. Cutting of grass .......................................................................................................................... 31
1.4. Staffing, Equipment, Storage and Waste Management .................................................................... 31
1.5. Interpretation and terminology .......................................................................................................... 31
1.5.1. Definitions ...................................................................................................................................... 32
1.5.2. Abbreviations ................................................................................................................................. 34
2.1. The Contractor’s plan for the service ................................................................................................ 35
2.2. Management meetings ...................................................................................................................... 35
2.3. Contractor’s management, supervision and key people ................................................................... 36
2.4. Documentation control ...................................................................................................................... 36
2.4.1. General ...................................................................................................................................... 36
2.4.2. Minimum requirements .............................................................................................................. 37
2.4.3. Use of standard forms ................................................................................................................ 37
2.4.4. Communication .......................................................................................................................... 37
2.5. Invoicing and payment ...................................................................................................................... 37
2.5.1. Invoice submission ..................................................................................................................... 37
2.5.2. How to submit invoices ................................................................................................................. 38
a) General Submission Information .......................................................................................................... 38
b) CPA ............................................................................................................................................... 38
2.5.2. Payment Queries ....................................................................................................................... 38
2.5.3. Eskom information ..................................................................................................................... 38
2.5.4. Avoid Payment Delays ............................................................................................................... 38
2.6. Contract change management .......................................................................................................... 39
2.7. Records of Defined Cost to be kept by the Contractor ..................................................................... 39
2.8. Insurance provided by the Employer................................................................................................. 39
2.9. Things provided at the end of the service period for the Employer’s use ......................................... 39
Equipment ................................................................................................................................................ 39
Information and other things ..................................................................................................................... 39
2.10. Management of work done by Task Order .................................................................................... 40
3.1. Occupational Health and Safety ........................................................................................................ 41
3.2. Key Performance Indicators .............................................................................................................. 43
3.3. Contract completion and sign off....................................................................................................... 44
Part c3 scope of work of 50 c3.1 Employer’s service information
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
Vegetation management at port rex power station for a period of 5 years
3.4. Environmental constraints and management .................................................................................... 44
3.5. Quality assurance requirements ....................................................................................................... 45
3.5.1. Quality Control Plan ................................................................................................................... 45
4.1. People ............................................................................................................................................... 46
4.1.1. Minimum requirements of people employed .............................................................................. 46
4.1.2. BBBEE and preferencing scheme ............................................................................................. 46
4.1.3. Supplier Development, Localisation and Industrialisation (SDL&I) ........................................... 46
4.2. Subcontracting .................................................................................................................................. 46
4.2.1. Preferred subcontractors ........................................................................................................... 46
4.2.2. Subcontract documentation, and assessment of subcontract tenders ...................................... 46
4.2.3. Limitations on subcontracting .................................................................................................... 46
4.2.4. Attendance on subcontractors ................................................................................................... 46
4.3. Plant and Materials............................................................................................................................ 46
4.3.1. Specifications ............................................................................................................................. 46
4.3.2. Correction of defects .................................................................................................................. 47
4.3.3. Contractor’s procurement of Plant and Materials ...................................................................... 47
4.3.4. Tests and inspections before delivery ....................................................................................... 47
4.3.5. Plant & Materials provided “free issue” by the Employer ........................................................... 47
4.3.6. Cataloguing requirements by the Contractor ............................................................................. 47
5.1. Employer’s site entry and security control, permits, and site regulations ......................................... 48
5.2. People restrictions, hours of work, conduct and records .................................................................. 48
5.3. Health and safety facilities on the Affected Property ........................................................................ 48
5.4. Environmental controls, fauna & flora ............................................................................................... 48
5.5. Cooperating with and obtaining acceptance of Others ..................................................................... 48
5.6. Records of Contractor’s Equipment .................................................................................................. 48
5.7. Equipment provided by the Employer ............................................................................................... 48
5.8. Site services and facilities ................................................................................................................. 48
5.8.1. Provided by the Employer .......................................................................................................... 48
5.8.2. Provided by the Contractor ........................................................................................................ 48
5.9. Control of noise, dust, water and waste ............................................................................................ 49
5.10. Tests and inspections .................................................................................................................... 49
5.10.1. Description of tests and inspections ....................................................................................... 49
6.1. Documents issued by the Employer .................................................................................................. 50
Part c3 scope of work of 50 c3.1 Employer’s service information
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
Vegetation management at port rex power station for a period of 5 years
Pricing Schedule
Source: Attachment No. 3c.pdf(Reg No. 2002/015527/30)
and [Insert at award stage]
(Reg No. ___________ )
for VEGETATION MANAGEMENT AT PORT REX POWER
Station for a period of 5 years
Contents: No of
pages
Part C1 Agreements & Contract Data [●]
Part C2 Pricing Data [●]
Part C3 Scope of Work [●]
CONTRACT No. [Insert at award stage]
Tsc3 of 50 cover page
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _________
Vegetation management – port rex power station
Part c1: agreements & contract data
Contents: No of
pages
C1.1 Form of Offer and Acceptance [●]
[to be inserted from Returnable Documents at award
stage]
C1.2a Contract Data provided by the Employer [●]
C1.2b Contract Data provided by the Contractor [●]
[to be inserted from Returnable Documents at award
stage]
Part c1 of 50 agreements & contract data
ESKOM HOLDINGS SOC Ltd. CONTRACT NUMBER ______________
Vegetation management – port rex power station
C1.1 Form of Offer & Acceptance
and Acceptance the tenderer offers to perform all of the obligations and liabilities of the Contractor under the
contract including compliance with all its terms and conditions according to their true intent and meaning for
an amount to be determined in accordance with the conditions of contract identified in the Contract Data.
Options A The offered total of the Prices exclusive of VAT is R [●]
Sub total R [●]
Value Added Tax @ 15% is R [●]
The offered total of the amount due inclusive of VAT is1 R [●]
(in words) [●] Rates Based
Part C1 Agreements and Contract Data, (which includes this Form of Offer and Acceptance)
Part C2 Pricing Data
Part C3 Scope of Work: Service Information
and drawings and documents (or parts thereof), which may be incorporated by reference into the above
listed Parts.
clauses
X1 Price adjustment for inflation
X1.1 The base date for indices is One month before tender closure. Rates are
fixed and firm for the first 12 months.
11.2(12) The price list is in
11.2(19) The tendered total of the Prices is R
Part c1 agreements and contract data of 50 c.1.2B Contract data part 2
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Vegetation management at port rex power station for a period of 5 years
Part 2: pricing data
TSC3 Option A
reference pages
C2.1 Pricing assumptions: Option A 2
C2.2 The price list 2
Part c2 pricing data of 50 tsc3 option a
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Vegetation management at port rex power station for a period of 5 years
C2.1 Pricing assumptions: Option A
Part c2 pricing data of 50 c2.1 Option a pricing assumptions
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Vegetation management at port rex power station for a period of 5 years
incidental to Providing the Service in accordance with the Service Information, as it was at the
time of tender, as well as correct any Defects not caused by an Employer’s risk;
listed items in order to fulfil the obligation to complete the service for the tendered total of the
provided, a unit of time is stated in the Unit column and the expected length of time (as a quantity of the
stated units of time) is stated in the Expected Quantity column.
Part c2 pricing data of 50 c2.1 Option a pricing assumptions
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Vegetation management at port rex power station for a period of 5 years
C2.2 the price list
Part c2 pricing data of 50 c2.2 Option a price list
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Vegetation management at port rex power station for a period of 5 years
The total of the Prices for 5 Years
Part c2 pricing data of 50 c2.2 Option a price list
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
Vegetation management at port rex power station for a period of 5 years
Part 3: scope of work
Financial Requirements
Source: Attachment No. 3c.pdf (unknown)Payment Terms: payment certificate from the Service Manager or the Employer’s
acceptance or correction of the Contractor’s assessment or application for payment, the
Contractor provides the Employer with a tax invoice in the form required by the law of the
contract, and this contract, including in accordance with any requirements and procedures
stated in the Service Information
Compliance Requirements
Source: Attachment No. 3c.pdf (unknown)C1.1 Form of Offer and Acceptance [●]
C1.1 Form of Offer & Acceptance
By the representative of the tenderer, deemed to be duly authorised, signing this part of this Form of Offer
B-BBEE Details: med to be jointly
and severally liable to the Employer for the performance of this contract.
Z2.2 Unless already notified to the Employer, the persons or organisations notify the Service
Manager within two weeks of the Contract Date of the key person who has the authority to bind
the Contractor on their behalf.
Z2.3 The Contractor does not alter the composition of the joint venture, consortium or other
unincorporated grouping of two or more persons without the consent of the Employer having
been given to the Contractor in writing.
Z3 Change of Broad Based Black Economic Empowerment (B-BBEE) status
Z3.1 Where a change in the Contractor’s legal status, ownership or any other change to his business
composition or business dealings results in a change to the Contractor’s B-BBEE status, the
Contractor notifies the Employer within seven days of the change.
Z3.2 The Contractor is required to submit an updated verification certificate and necessary
supporting documentation confirming the change in his B-BBEE status to the Service Manager
within thirty days of the notification or as otherwise instructed by the Service Manager.
Z3.3 Where, as a result, the Contractor’s B-BBEE status has decreased since the Contract Date the
Employer may either re-negotiate this contract or alternatively, terminate the Contractor’s
obligation to Provide the Service.
Z3.4 Failure by the Contractor to notify the Employer of a change in its B-BBEE status may
constitute a reason for termination. If the Employer terminates in terms of this clause, the
procedures on termination are P1, P2 and P4 as stated in clause 92, and the amount due is A1
and A3 as stated in clause 93.
Z4 Confidentiality
Part c1 agreements and contract data of 50 c.1.2A Contract data part 1
ESKOM holdi
Health & Safety
Source: Attachment No. 3c.pdfsignature of Date
witness
Note: If a tenderer wishes to submit alternative tenders, use another copy of this Form of Offer and
11.2(14) The following matters will be included in None
the Risk Register
11.2(15) The Service Information is in Part 3: Scope of Work and all documents and
drawings to which it makes reference.
12.2 The law of the contract is the law of the Republic of South Africa
13.1 The language of this contract is English
13.3 The period for reply is
phase
2 The Contractor’s main Data required by this section of the core
responsibilities clauses is also provided by the Contractor in
Part 2 and terms in italics used in this section
are identified elsewhere in this Contract Data
21.1 The Contractor submits a first plan for
acceptance within Two (2) weeks of the Contract Date
width. Failure to trim hedges/shrubs as
specified. Failure to remove alien or apply
herbicide vegetation as specified.
General appearance 1.5% of Task order value Limited to 10% of task
Garden areas not kept tidy (tools left, uneven per week order value
finish, unsafe conditions)
Contractor’s Health and Safety file: 1.5% of Task order value Limited to 10% of task
Submission of SHE file two (2) weeks before per week order value
start of work. Also, at intervals as required by
the Employer’s Safety Department.
service period, requires the prior written consent of the Service Manager. All rights in and to all
such images vests exclusively in the Employer.
Z4.5 The Contractor ensures that all his subcontractors abide by the undertakings in this clause.
Z5 Waiver and estoppel: Add to core clause 12.3:
Z5.1 Any extension, concession, waiver or relaxation of any action stated in this contract by the
not give rise to an estoppel unless the Parties agree otherwise and confirm such agreement in
writing.
Z6 Health, safety and the environment: Add to core clause 27.4
Z6.1 The Contractor undertakes to take all reasonable precautions to maintain the health and safety
of persons in and about the execution of the service. Without limitation the Contractor:
safety and environmental laws and regulations;
requirements;
proper compliance with all applicable health, safety and environmental laws and regulations
and the health and safety rules, guidelines and procedures provided for in this contract and
generally for the proper maintenance of health & safety in and about the execution of the
service; and
safety and environmental laws and regulations and rules, guidelines and procedures
otherwise provided for under this contract and ensures that his Subcontractors, employees
and others under the Contractor’s direction and control, likewise observe and comply with
the foregoing.
necessary for the execution of the service.
Z6.2 The Contractor, in and about the execution of the service, complies with all applicable
environmental laws and regulations and rules, guidelines and procedures otherwise provided
for under this contract and ensures that his Subcontractors, employees and others under the
Contractor’s direction and control, likewise observe and comply with the foregoing.
Part c1 agreements and contract data of 50 c.1.2A Contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Vegetation management at port rex power station for a period of 5 years
Z7 Provision of a tax invoice, payment and interest
The Contractor (if registered in South Africa in terms of the Companies Act) is required to
Z7.1 comply with the requirements of the Value Added Tax Act, (Act (as amended)) and
to include the Employer’s VAT number 4740101508 on each invoice submitted for payment.
Z7.2 Within one week of receiving a payment certificate from the Service Manager or the Employer’s
acceptance or correction of the Contractor’s assessment or application for payment, the
regulations published in GNR February 2002, under the Occupational Health and Safety
Act, 1993 (Act ) (“Asbestos Regulations”). The OEL for asbestos is 0.2 regulated
asbestos fibres per millilitre of air as a 4-hour TWA, averaged over any continuous period of four
hours, and the short term exposure limit of 0.6 regulated asbestos fibres per millilitre of air as a 10-
minute TWA, averaged over any 10 minutes, measured in accordance with HSG248 and
monitored according to HSG173 and OESSM.
Z14.2 Upon written request by the Contractor, the Employer certifies that these conditions prevail. All
measurements and reporting are effected by an independent, competent, and certified
occupational hygiene inspection body, i.e. a SANAS accredited and Department of Employment
and Labour approved AAIA. The Contractor may perform Parallel Measurements and related
control measures at the Contractor’s expense. For the purposes of compliance the results
generated from Parallel Measurements are evaluated only against South African statutory limits as
detailed in clause Z14.1. Control measures conform to the requirements stipulated in the AAIA-
approved asbestos work plan.
Z14.3 The Employer manages asbestos and ACM according to the Standard.
Z14.4 In the event that any asbestos is identified while Providing the Services, a risk assessment is
conducted and if so required, with reference to possible exposure to an airborne concentration of
above the AL for asbestos, immediate control measures are implemented and relevant air
monitoring conducted in order to declare the area safe.
Z14.5 The Contractor’s personnel are entitled to stop working and leave the contaminated area forthwith
until such time that the area of concern is declared safe by either Compliance Monitoring or an
statement however other clauses may also use the same data.
selected. Click on the form field once and type in the data. Otherwise complete by hand and in ink.
(From the example given in an Appendix within the TSC3 Guidance Notes)
Entries in the first four columns in the price list in section C2.2 are made either by the Employer or the
tendering contractor.
1.1 Site establishment and de-establishment Sum 1
1.2 Safety File Sum 1
1.3 PPE once off Sum 1
1.4 Travelling Fee per month Month 12
1.5 Labour – Semi-Skilled Month 12
1.6 Labour - Supervisor Month 12
1.7 Safety Officer Fee Month 12
tender, as to the layout of the premises, the quantities and nature of work and labour, materials and
equipment necessary for the completion of the services additional services, the means of access to the
premises and in general, shall himself obtain all necessary information as to risks, contingencies and other
circumstances which may influence or affect the contract.
1.2.1. Normative
[1] ISO 9001 Quality Management Systems
[2] ISO 14001 – Environmental management Systems – Requirements with guidance for use.
[3] National Environmental Management Act (NEMA), Act
[4] National Environmental Management: Biodiversity Act (NEMBA), Act
[5] Alien and Invasive Species Regulations, 2014
[6] National Veld and Forest Fire Act, Act
[7] Occupational Health and Safety Act (OHSA), Act
[8] Eskom SHEQ Policy and Environmental Management Procedures
1.2.1. Informative
[9] The South African National Biodiversity Institute (SANBI) Alien Plant Control Guidelines
1.3. Port Rex Power Station
Environmental
Source: Attachment No. 3c.pdfPart c1 agreements and contract data of 50 c.1.2A Contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Vegetation management at port rex power station for a period of 5 years
if applicable.
Z14.6 The Contractor continues to Provide the Services, without additional control measures presented
on presentation of Safe Levels. The contractually agreed dates to Provide the Services, including
the Completion Date, are adjusted accordingly. The contractually agreed dates are extended by
the notification periods required by regulations 3 and 21 of the Asbestos Regulations, 2001.
Z14.7 Any removal and disposal of asbestos, asbestos containing materials and waste, is done by a
registered asbestos contractor, instructed by the Employer at the Employer’s expense, and
conducted in line with South African legislation.
Part c1 agreements and contract data of 50 c.1.2A Contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Vegetation management at port rex power station for a period of 5 years
C1.2 Contract Data
mm), weeding, pruning, pest/disease
2.1 Month
treatment, plant replacement, and off-
site garden waste disposal (excluding
HV yard) 3181 m2 total garden area 24
not have a horticulture department to look after the vegetation at the various power stations. Port Rex
therefore requires the services of a garden service company to service and maintain the vegetation within
the power station, excluding the HV yard, by upkeeping the flower beds, cutting of grass, removing of garden
waste and to perform weeding to keep the vegetation and roads and parking area neat and tidy.
1.2. Employer’s requirements for the service
disease and insect pest control, mowing of lawns, cutting of edges, pruning, wound dressing, replacement of
unacceptable material, straightening plants which lean or sag, adjustment of plants which settle or are
planted too low, eradication and removal of invader species, removal of garden cuttings and waste, and any
other procedure consistent with good horticultural practice necessary to ensure normal, vigorous and healthy
growth plants.
Contractual Terms
Source: Attachment No. 3c.pdf (unknown)The contract uses NEC3 Term Service Contract April 2013 (TSC3) with main Option A (priced contract with price list), dispute resolution Option W1, and secondary Options X1 (price adjustment for inflation), X2 (changes in the law), X17 (low service damages), X18 (limitation of liability), X19 (Task Order), X20 (key performance indicators), and additional conditions Z1 to Z14. Key contractual terms include: cession and delegation restrictions, joint venture liability, B-BBEE status change provisions, confidentiality obligations, waiver and estoppel, health and safety and environmental compliance, tax invoice and payment requirements, compensation event notification, limitation of liability (contractor's liability for indirect loss limited to R0, total liability limited to total of Prices), termination provisions including business rescue, ethics and prohibited actions, insurance requirements (contractor provides insurance per Table A, employer provides per Table B), intellectual property ownership (foreground IP vests in employer), and asbestos management provisions.
Section
Source: Attachment No. 3c.pdfc. provides a design of equivalent quality or modify such affected item or design so as
to make it non-infringing without affecting the quality.
Description
Source: Attachment No. 4.pdfThe tender is for the provision of gardening and vegetation services at Gourikwa, Ankerlig, Acacia, Port Rex, and Palmiet Power Stations for a period of five (5) years. The document provided is Form A (Tender & Contract Quality Requirements) and does not contain a detailed scope of work.
Submission Guidelines
Source: Attachment No. 4.pdf (unknown)Complete and sign Form A (Tender & Contract Quality Requirements) to acknowledge and accept Eskom Supplier Quality Requirements as per 240-105658000 Specification and ISO 9001 Standard. Submit the signed form with your tender. No other submission instructions are stated in the provided document.
Evaluation Criteria
Source: Attachment No. 4.pdf (unknown)No evaluation criteria are stated in the provided document. The document only covers quality requirements and does not specify scoring, weighting, or minimum thresholds.
Technical Specifications
Source: Attachment No. 4.pdf (unknown)The tender is for the provision of gardening and vegetation services at Gourikwa, Ankerlig, Acacia, Port Rex, and Palmiet Power Stations for a period of five (5) years. No detailed technical specifications are provided in the document.
Methodology
Source: Attachment No. 4.pdfNo specific methodology requirements are stated in the provided document. The document only covers quality requirements and does not specify an execution plan or approach.
Quality Management
Source: Attachment No. 4.pdfThe tenderer must complete and sign Form A to acknowledge and accept Eskom Supplier Quality Requirements as per 240-105658000 Specification and ISO 9001 Standard. The form includes pre-contract award quality requirements (Category 3 selected), post-contract award conditions (contract execution, supplier quality performance monitoring, Eskom rights of access and information, preservation, quality audits, management of nonconformities, special processes), and ISO 9001 clauses and quality principles.
Compliance Requirements
Source: Attachment No. 4.pdf (unknown)Complete and sign Form A to acknowledge and accept Eskom Supplier Quality Requirements as per 240-105658000 Specification and ISO 9001 Standard. No other compliance requirements are stated in the provided document.
Description
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.xlsxThe tender covers gardening and vegetation services at five Eskom power stations (Gourikwa, Ankerlig, Acacia, Port Rex and Palmiet) for a five-year period. The returnables template is configured for Category 3, which requires an implemented Quality Management System, internal audit report, draft CQP and ITP, and defined roles/responsibilities.
Submission Guidelines
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.xlsx (unknown)Returnable documents: Form A must be completed and signed. The tender pack is a returnables template (Category 3) that requires an implemented Quality Management System, an internal management system audit report (with Nonconformity, Correction and/or Corrective Action Reports), a draft Contract Quality Plan (CQP) and Inspection and Test Plan (ITP) as per the Scope of Works, and information for defined roles, responsibilities and authorities. The template must be saved as PDF and signed, or signed and locked before sending to the buyer.
Evaluation Criteria
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.xlsx (unknown)Quality evaluation is weighted across five sections: Section A (Quality Management System Requirements, ISO 9001) 25%, Section B (Evidence of QMS in operation) 25%, Section C (Contract Quality Plan) 20%, Section D (Quality Control Plan / ITP) 20%, Section E (User-defined additional requirements) 10%. Bidders may score under Section A via Option 1 (valid ISO 9001 certification by an accredited body) or Option 2 (evidence of an implemented QMS, including QMS manual, quality policy, quality objectives, control of documented information, control of nonconforming outputs, nonconformity and corrective action, and internal audit). Section B requires documented information for roles, responsibilities and authorities, and control of externally provided processes, plus an internal audit report. Section C requires a draft Contract Quality Plan specific to the scope. Section D requires a QCP/ITP as per the scope. Section E requires Form A completed and signed, plus any other requirements per the scope. No other pre-qualification criteria (e.g., CSD, tax clearance, B-BBEE, CIDB) are stated in the provided document.
Technical Specifications
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.xlsx (unknown)The tender is for the provision of gardening and vegetation services at Gourikwa, Ankerlig, Acacia, Port Rex and Palmiet Power Stations for a period of five (5) years. The returnables template is set for Category 3, which requires an implemented Quality Management System, internal audit report, draft CQP and ITP, and defined roles/responsibilities. No further technical specifications are provided in the given document.
Compliance Requirements
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.xlsx (unknown)No specific compliance requirements (e.g., CSD registration, tax clearance, B-BBEE, CIDB) are stated in the provided document. The only stated requirement is the completion and signing of Form A, and the quality-related deliverables as per the evaluation criteria.
Important Dates
Source: Attachment No. 2.pdf (unknown){"closingDate":"1 March 2022"}
Evaluation Criteria
Source: Attachment No. 2.pdf (unknown)Bidders must be a resident of South Africa (or complete Appendix 9 if non-resident). Companies/CCs/Trusts must answer questions regarding number of employees, connected persons, income concentration, and place of control. Individuals must answer questions regarding service vs people provision, residence, employees, and place of control. Based on answers, bidders must sign the relevant appendices (e.g., Appendix 1 for employing 3+ full-time non-connected employees, Appendix 8 for independent contractor status, Appendix 7 for dependent contractor/personal service provider). Failure to sign required appendices results in PAYE being withheld from payments.
Technical Specifications
Source: Attachment No. 2.pdf (unknown)The Fourth Schedule to the Income Tax Act (“the Act”) requires that Employees' Tax must be
withheld from "remuneration" paid by an "Employer" to an "Employee". This tool is intended to establish
whether an Individual, Close Corporation, Company or Trust should be classified as an Independent
Contractor, Personal Service Provider, Labour Broker or a Dependent Contractor, and the tax
consequences of such classification.
This Pack is applicable ONLY to Contractors who supply Eskom Holdings SOC Ltd (“Eskom”) and its
subsidiaries with services or Individual Contractors providing Eskom with labour.
The Contractor or its duly authorised representative must declare that all questions have been answered
truthfully.
Answering the questions will direct you to your next step.
Please note:
This Pack is based on tax legislation for the 2022/2023 tax year and is subject to change.
In the questions, any references to "you" refers to the Contractor.
In the questions, the term Contractor is used interchangeably with Individual/CC/Company/Trust.
Definitions as per the Income Tax Act are included in Appendix 10.
Any reference to “Eskom” refers to Eskom Holdings SOC Ltd and its subsidiaries:
Eskom Rotek Industries SOC Ltd
Eskom Enterprises SOC (Pty) Ltd
Escap SOC (Pty) Ltd
Eskom Finance Company SOC (Pty) Ltd
Eskom Foundation NPC
National Transmission Company SA
The Pack is based on legislation and case law applicable to the 2022/2023 tax year. We therefore
recommend that, if it is used outside of this period, you should first consult with your representative in
Eskom to refer it to Eskom’s Corporate Tax Department in Megawatt Park.
When you return the completed Pack; i.e. the signed summary sheet and signed affidavits to Eskom,
please copy Group Tax on Email address: [email protected]
The Contractor or its duly Authorised Representative acknowledges and accepts that:
ease of reading.
this Pack;
Disclaimer
Applicable to the 2022/2023 Tax Years
Eskom accepts no liability whatsoever for any loss or damages whatsoever and howsoever incurred, or
suffered, resulting, or arising, from the use of this Pack.
Contractor type
Supplier category
Please complete the following questionnaire for:
Company/Close Corporation/Trusts - EVALUATION PACK A on .
Individuals - EVALUATION PACK B on .
Applicable to the 2022/2023 Tax Years
Evaluation pack a
(To determine whether a Company, Close Corporation (CC) or Trust is a Personal
Service Provider)
Fields marked with an Asterisk (*) must be completed
Contractor’s details for a company or close corporation or
Trust
Contractor’s Name* Vendor No.
Duly Authorised Representative Name Representative Surname
Capacity Representative ID No.*
Representative Passport No. (if no RSA ID) Country of Passport Issue
VAT Registration No. Income Tax Registration No.*
CO/CC/Trust Registration No.* E-Mail Address
Telephone Number* Fax Number
Contractor’s Physical Business Address*
Unit No
Complex Name
Street Number
Street Name
Suburb
City/Town
Postal Code
Contractor’s Postal Business Address*
Same as above (Mark with an X)
Address TYPE (Delete where not applicable) P O Box/Private Bag/Street Address
P O Box/Private Bag/Street NUMBER
Street Name
Suburb
Town
Postal Code
Contractor’s Bank Details*
Account Number Bank Name
Branch Name Branch Number
Name of Account Holder Account Type (Delete where not applicable)
Current/ Savings/ Transmission/Credit Card/Bond
Account
Account Holder Relationship*
i.e. own, joint or 3rd party Own/Joint/3rd Party
Applicable to the 2022/2023 Tax Years
Please answer the following questions by marking the appropriate column with an
"X".
The term “You” will refer to the Company/CC/Trust in this Questionnaire.
Question 1(i)
Are you a Resident of the Republic of South Africa in terms of the Income Tax Act?
(Refer to Appendix 10 for the definition of a resident).
If the answer is Yes, go to Question 2(i).
If the answer is No:
Eskom to refer it to Eskom Group Tax Department in Megawatt Park.
Question 2(i)
Do you employ 3 (three) or more persons (excluding shareholders or members or
beneficiaries of the Company/CC/Trust)?
If the answer is Yes, go to Question 2(ii).
If the answer is No, go to Question 3(i).
Question 2(ii)
Are these employees employed:
If the answer is Yes, go to Question 2(iii).
If the answer is No, go to Question 3(i).
Question 2(iii)
Are the above 3 employees connected to the shareholders or the members or the
beneficiaries of the Company/CC/Trust?
If the answer is Yes, go to Question 3(i).
If the answer is No:
from your payments.
from your payments.
Corporation/Trust” at the end of the Evaluation Pack.
Applicable to the 2022/2023 Tax Years
Question 3(i)
Will/are any person who is a Connected person in relation to the Company/CC/Trust
render services personally to Eskom on behalf of the Company/CC/Trust? (Refer to
Appendix 10 for the definition of a Connected person).
If the answer is Yes, go to Question 4(i).
If the answer is No:
from your payments.
from your payments.
Corporation/Trust” at the end of the evaluation Pack.
Question 4(i)
During the current year of assessment:
received either directly or indirectly, from:
the definition of an Associated institution)
If the answer is Yes:
Corporation/Trust” at the end of the evaluation Pack.
If the answer is No:
from your payments.
Question 5(i)
Must your duties be performed /are your duties performed mainly (more than 50%) at
the premises of Eskom,
And
Will you be subject /are you subject to Eskom’s control or supervision as to the
manner in which your duties are to be performed?
If the answer is Yes to BOTH questions:
Corporation/Trust” at the end of the evaluation Pack.
If the answer is No:
from your payments.
Applicable to the 2022/2023 Tax Years
Question 6(i)
Do/will the payments by Eskom for services payable with reference to output or
certain agreed results, e.g. payment (be it a fixed fee or an hourly rate) be only due if
and when a specific deliverable has been completed?
Question 6(ii)
Does/Will Eskom have the contractual right to control the tools or equipment, staff,
raw materials, routines, patents or technology used in the provision of the services?
Question 6(iii)
Are you/will you prohibited from rendering services to any other employers/clients
during the period of service to Eskom?
Question 6(iv)
Do/will you have the right to sub-contract work?
Question 6(v)
Are you personally or will you personally be at risk for the quality of the work done or
to be done (risk for poor quality; time over-runs, project not producing income)?
Question 6(vi)
Are/will you or the person rendering the service be obliged to be present and perform
the work at Eskom regardless of whether work is available or not?
Question 6(vii)
Is Eskom’s business or will Eskom’s business be critical to your financial/economic
survival?
Question 6(viii)
Does/will your position form part of Eskom’s organisational structure?
Question 6(ix)
Does/will Eskom provide you with any of the following:
Question 6(x)
Does/will Eskom provide you with an office?
Question 6(xi)
Does/will Eskom provide you with any equipment, tools, stationery and material?
Please go to the next section to establish your tax status.
Applicable to the 2022/2023 Tax Years
To establish your tax status, you need to summarise the “Yes” and “No” as
answered on Question 6(i) to 6(xi) in the column below:
Question Yes No
6(i) Independent PSP
6(ii) PSP Independent
6(iii) PSP Independent
6(iv) Independent PSP
6(v) Independent PSP
6(vi) PSP Independent
6(vii) PSP Independent
6(viii) PSP Independent
6(ix) PSP Independent
6(x) PSP Independent
6(xi) PSP Independent
Decision
Independent
Psp
If you have answered “PSP” to any of the following questions 6 (i), 6(iii), 6(v), 6(vi),
6(ix);
or
If you have answered more than 50% “PSP” to questions 6(ii), 6(iv), 6(vii), 6(viii),
6(x), 6(xi):
and will be coded as 3601 on your IRP5 certificate.
Corporation/Trust” at the end of the evaluation Pack.
Alternatively:
If you have already signed Appendix 7 on Questions 4 or 5:
disclosed on the IRP5 for payments received.
If you have not signed Appendix 7 on Questions 4 or 5:
from your payments.
Corporation/Trust” at the end of the evaluation Pack.
Applicable to the 2022/2023 Tax Years
Summary for ID No. Vendor No:
Company/Close Corporation/Trust Summary
Please sign
he
following
Questions Answer Appendix
(Appendices
)
1(i) Are you a Resident of the Republic of South Africa in terms of the Income
Tax Act?
2(i) Do you employ 3 (three) or more persons (excluding shareholders or
members or beneficiaries of the Company/CC/Trust and connected
persons in relation to the shareholder or member or beneficiaries)?
2(i ) Are these employees employed on a full time basis and are they engaged
in the business of the Company/CC/Trust?
2(iii) Are the above 3 employees connected to the shareholders or the members
or beneficiaries of the Company/CC/Trust?
3(i) Will/are any person who is a Connected person in relation to the
Company/CC/Trust render services personally to Eskom on behalf of the
Compa y/CC Trust?
4(i) During the current year of assessment will more than 80% of your income
or is it likely that more than 80% of your income will consist of amounts
received either directly or indirectly from any one client, or an Associated
institution in relation to that client?
5(i) Must your duties be performed / are your duties performed mainly (more
than 50%) at the premises of Eskom AND will you be /are you subject to
Eskom’s control or supervision as to the manner in which your duties are
performed or to the hours of work?
6( ) Do/will the payments by Eskom for services payable with reference to
output or certain agreed results, e.g. payment (be a fixed fee or an hourly
rate) be only due if and when a specific deliverable has been completed?
6(ii) Does/Will Eskom have the contractual right to control the tools or
equipment, staff, raw materials, routines, patents or technology used in the
provision of the services?
6(iii) Are you/will you prohibited from rendering services to any other
employers/clients during the period of service to Eskom?
6(iv) Do/will you have the right to sub-contract work?
6(v) Are you personally or will you personally be at risk for the quality of the
work done or to be done (risk for poor quality; time over-runs, project not
producing income)?
6(vi) Are/will you or the person rendering the service be obliged to be present
and perform the work at Eskom regardless of whether work is available or
not?
6(vii) Is Eskom’s business or will Eskom’s business be critical to your
financial/economic survival?
6(viii) Does/will your position form part of Eskom’s organisational structure?
6(ix) Does/will Eskom provide you with any of the following:
Pension fund / Provident fund / Retirement Annuity Fund; medical aid,
leave of any nature, salary increases, bonuses or any allowances.
6(x) Does/will Eskom provide you with an office?
6(xi) Does/will Eskom provide you with any equipment, tools, stationery and
material?
Tax Status
Particulars of person acting as representative of the company/close
Corporation/trust
I, the undersigned, confirm that the information provided above is accurate, and that the Company/CC/Trust will,
while contracted to Eskom, inform Eskom of any changes that take place pertaining to the information provided
above. Eskom shall be entitled to withhold from any payments to be made to the Company/CC/Trust, any taxes,
interest and penalties that it may be required to pay to SARS as a result of the above information being inaccurate.
Representative's Full Names Capacity Contact No.
Signature Date
Applicable to the 2022/2023 Tax Years
Evaluation pack b
(To determine whether an Individual is a Dependent Contractor)
Fields marked with an Asterisk (*) must be completed
Contractor’s details for an individual*
Trading Name* Vendor No.
First Names* Initials*
Surname* ID Number*
Passport No. (if no RSA ID) Country of Passport Issue
VAT Registration No. Income Tax Registration No.*
Date of Birth* E-Mail Address
Telephone Number* Fax Number
Contractor’s Physical Business Address*
Unit No
Complex Name
Street Number
Street Name
Suburb
City/Town
Postal Code
Contractor’s Postal Business Address*
Same as above (Mark with an X)
Address TYPE (Delete where not applicable) P O Box/Private Bag/Street Address
P O Box/Private Bag/Street NUMBER
Street Name
Suburb
Town
Postal Code
Contractor’s Bank Details*
Account Number Bank Name
Branch Name Branch Number
Name of Account Holder Account Type (Delete where not applicable)
Current/ Savings/ Transmission/Credit Card/Bond
Account
Account Holder Relationship*
i.e. own, joint or 3rd party Own/Joint/3rd Party
Applicable to the 2022/2023 Tax Years
Please answer the following questions by marking the appropriate column with an
"X".
Question 1(i)
Do/will you provide Eskom with a service or people?
If the answer is “Service”:
PAYE will be withheld from your payments.
If the answer is “People”, go to Question 2(i).
Question 2(i)
Do you provide Eskom with People and will these people be paid by you?
If the answer is Yes, go to Question 2(ii).
If the answer is No, go to Question 3(i).
Question 2(ii)
Are you in possession of an IRP30 exemption certificate which is valid for the period
under review?
If the answer is Yes:
from your payments.
provided, PAYE will be withheld from your payments until such time
the IRP30 certificate is provided.
Pack.
If the answer is No:
IRP30 certificate is provided.
Pack.
Question 3(i)
Are you a Resident of the Republic of South Africa in terms of the Income Tax Act?
(Refer to Appendix 10 for the definition of a Resident).
If the answer is Yes, go to Question 4(i).
If the answer is No:
Eskom to refer it to Eskom Group Tax Department in Megawatt.
Applicable to the 2022/2023 Tax Years
Question 4(i)
Do you employ:
If the answer is Yes, go to Question 4(ii).
If the answer is No, go to Question 5(i).
Question 4(ii)
Are these employees employed:
If the answer is Yes, go to Question 4(iii).
If the answer is No, go to Question 5(i).
Question 4(iii)
Are any of these employees Connected persons in respect of the Individual, e.g.
spouse, parent, adoptive parent, child, grandparent, cousin, etc.? (Refer to
Appendix 10 for the definition of Connected person).
If the answer is Yes, go to Question 5(i).
If the answer is No:
from your payments.
withheld from your payments.
Pack.
Question 5(i)
Must your duties be performed mainly (i.e. more than 50%) at premises of Eskom?
If the answer is Yes, go to Question 5(ii).
If the answer is No, go to Question 5(ii).
Question 5(ii)
Will you be /are you subject to Eskom’s control or supervision as to the manner in
which your duties are to be performed or as to the hours of work?
If the answers in both Questions 5(1) and 5(ii) are Yes:
If the answer is No:
from your payments.
Applicable to the 2022/2023 Tax Years
Question 6(i)
Do/will the payments by Eskom for services payable with reference to output or
certain agreed results, e.g. payment (be it a fixed fee or an hourly rate) be only due
if and when a specific deliverable has been completed?
Question 6(ii)
Does/Will Eskom have the contractual right to control the tools or equipment, staff,
raw materials, routines, patents or technology used in the provision of the services?
Question 6(iii)
Are you/will you prohibited from rendering services to any other employers/clients
during the period of service to Eskom?
Question 6(iv)
Do/will you have the right to sub-contract work?
Question 6(v)
Are you personally / will you personally be at risk for the quality of the work done or
to be done (risk for poor quality; time over-runs, project not producing income)?
Question 6(vi)
Are/will you or the person rendering the service be obliged to be present and
perform the work at Eskom regardless of whether work is available or not?
Question 6(vii)
Is Eskom’s business or will Eskom’s business be critical to your financial/economic
survival?
Question 6(viii)
Does/will your position form part of Eskom’s organisational structure?
Question 6(ix)
Does/will Eskom provide you with any of the following:
Question 6(x)
Does/will Eskom provide you with an office?
Question 6(xi)
Does/will Eskom provide you with any equipment, tools, stationery and material?
Please go to the next section to establish your tax status.
Applicable to the 2022/2023 Tax Years
To establish your tax status, you need to summarise the “Yes” and “No” as
answered on Question 6(i) to 6(xi) in the column below:
Question Yes No
6(i) Independent Employee
6(ii) Employee Independent
6(iii) Employee Independent
6(iv) Independent Employee
6(v) Independent Employee
6(vi) Employee Independent
6(vii) Employee Independent
6(viii) Employee Independent
6(ix) Employee Independent
6(x) Employee Independent
6(xi) Employee Independent
Decision
Independent
Psp
If you have answered “Employee” to any of the following questions 6 (i), 6(iii), 6(v),
6(vi), 6(ix);
or
If you have answered more than 50% “Employee” to questions 6(ii), 6(iv), 6(vii),
6(viii), 6(x), 6(xi):
Alternatively:
If you have already signed Appendix 7 on Questions 5:
disclosed on the IRP5 for payments received.
If you have not signed Appendix 7 on Questions 5:
withheld from your payments.
Corporation/Trust” at the end of the evaluation Pack.
Applicable to the 2022/2023 Tax Years
Summary for ID No. Vendor No:
Company/Close Corporation/Trust Summary
Please si n
the following
Pricing Schedule
Source: Attachment No. 2.pdfthe non-deduction is 07.
until such time that a valid IRP30 certificate is provided to Eskom.
Labour Broker Individual N/A X IRP5 / IT3(a) 3617 A
tax rates
Dependent Contractor Individual X X IRP5 / IT3(a) 3601 or “A” for
tax rates 3616 Individual
“E” for
Health & Safety
Source: Attachment No. 2.pdfCompany/close corporation/trust ..................................................................... 11
Evaluation pack b....................................................................................................................... 12
Contractor’s details for an individual* ..................................................................... 12
Question 1(i) .............................................................................................................................. 13
Question 2(i) .............................................................................................................................. 13
Question 2(ii) ............................................................................................................................. 13
Question 3(i) .............................................................................................................................. 13
Question 4(i) .............................................................................................................................. 14
Question 4(ii) ............................................................................................................................. 14
Question 4(iii) ............................................................................................................................ 14
Question 5(i) .............................................................................................................................. 14
Question 5(ii) ............................................................................................................................. 14
Question 6(i) .............................................................................................................................. 15
Question 6(ii) ............................................................................................................................. 15
Question 6(iii) ............................................................................................................................ 15
Question 6(iv) ............................................................................................................................ 15
Question 6(v) ............................................................................................................................. 15
Question 6(vi) ............................................................................................................................ 15
Question 6(vii) ........................................................................................................................... 15
Question 6(viii)........................................................................................................................... 15
Question 6(ix) ............................................................................................................................ 15
Question 6(x) ............................................................................................................................. 15
Question 6(xi) ............................................................................................................................ 15
Particulars of individual .............................................................................................. 17
Applicable to the 2022/2023 Tax Years
Appendix 1 ....................................................................................................................................... 18
Three or more full - time employees who are not connected persons . 18
Appendix 2 ....................................................................................................................................... 19
ESKOM ...................................................................................................................................... 19
Appendix 3 ....................................................................................................................................... 20
And/or shall not be controlled or supervised by ESKOM ............................. 20
Appendix 4 ....................................................................................................................................... 21
Affidavit confirming that not more than eighty percent (80 %) of income
Is or is likely to be received from any one client ............................................. 21
Appendix 5 ....................................................................................................................................... 22
Opposed to people ........................................................................................................... 22
Appendix 6 ....................................................................................................................................... 23
Declaration by ........................................................................................................................ 23
That the contractor is a labour broker ................................................................... 23
Appendix 7 ....................................................................................................................................... 24
Declaration by ........................................................................................................................ 24
Provider ................................................................................................................................ 24
Appendix 8 ....................................................................................................................................... 25
Declaration by ........................................................................................................................ 25
That the contractor is an independent supplier or contractor .................. 25
Appendix 9 ....................................................................................................................................... 26
Declaration by ........................................................................................................................ 26
That the contractor is a non-resident of the republic of south africa .... 26
Appendix 10 ..................................................................................................................................... 27
Definitions as per the income tax act, NO. , as amended. ................... 27
“Connected Person” .................................................................................................................. 27
"Associated Institution", in relation to any single employer, ...................................................... 28
"Labour Broker" ......................................................................................................................... 28
"Personal Service Provider” ...................................................................................................... 28
"Remuneration" ......................................................................................................................... 28
“Resident” .................................................................................................................................. 29
Applicable to the 2022/2023 Tax Years
Introduction
The Fourth Schedule to the Income Tax Act (“the Act”) requires that Employees' Tax must be
withheld from "remuneration" paid by an "Employer" to an "Employee". This tool is intended to establish
whether an Individual, Close Corporation, Company or Trust should be classified as an Independent
Definitions as per the Income Tax Act are included in Appendix 10.
Any reference to “Eskom” refers to Eskom Holdings SOC Ltd and its subsidiaries:
Eskom Rotek Industries SOC Ltd
Eskom Enterprises SOC (Pty) Ltd
Escap SOC (Pty) Ltd
Eskom Finance Company SOC (Pty) Ltd
Eskom Foundation NPC
National Transmission Company SA
The Pack is based on legislation and case law applicable to the 2022/2023 tax year. We therefore
recommend that, if it is used outside of this period, you should first consult with your representative in
Eskom to refer it to Eskom’s Corporate Tax Department in Megawatt Park.
When you return the completed Pack; i.e. the signed summary sheet and signed affidavits to Eskom,
please copy Group Tax on Email address: [email protected]
ease of reading.
this Pack;
Question 1(i)
Are you a Resident of the Republic of South Africa in terms of the Income Tax Act?
(Refer to Appendix 10 for the definition of a resident).
If the answer is Yes, go to Question 2(i).
Sign Appendix 9. Submit The Pack to your contractor representative in
Sign Appendix 1. If the Affidavit is not signed, PAYE will be withheld
from your payments.
from your payments.
Corporation/Trust” at the end of the Evaluation Pack.
Applicable to the 2022/2023 Tax Years
render services personally to Eskom on behalf of the Company/CC/Trust? (Refer to
Appendix 10 for the definition of a Connected person).
If the answer is Yes, go to Question 4(i).
from your payments.
from your payments.
Corporation/Trust” at the end of the evaluation Pack.
Question 4(i)
Corporation/Trust” at the end of the evaluation Pack.
from your payments.
Go to Question 5(i).
Sign Appendix 7. PAYE will be withheld from your payments.
Go to Question 6(i) to determine the correct disclosure code on the IRP5.
Sign “Particulars of person acting as representative of the Company/Close
Corporation/Trust” at the end of the evaluation Pack.
from your payments.
Applicable to the 2022/2023 Tax Years
Psp
If you have answered “PSP” to any of the following questions 6 (i), 6(iii), 6(v), 6(vi),
6(ix);
or
If you have answered more than 50% “PSP” to questions 6(ii), 6(iv), 6(vii), 6(viii),
6(x), 6(xi):
and will be coded as 3601 on your IRP5 certificate.
Corporation/Trust” at the end of the evaluation Pack.
If you have already signed Appendix 7 on Questions 4 or 5:
disclosed on the IRP5 for payments received.
If you have not signed Appendix 7 on Questions 4 or 5:
from your payments.
Corporation/Trust” at the end of the evaluation Pack.
Applicable to the 2022/2023 Tax Years
(Appendices
)
1(i) Are you a Resident of the Republic of South Africa in terms of the Income
Tax Act?
2(i) Do you employ 3 (three) or more persons (excluding shareholders or
members or beneficiaries of the Company/CC/Trust and connected
persons in relation to the shareholder or member or beneficiaries)?
2(i ) Are these employees employed on a full time basis and are they engaged
in the business of the Company/CC/Trust?
2(iii) Are the above 3 employees connected to the shareholders or the members
or beneficiaries of the Company/CC/Trust?
3(i) Will/are any person who is a Connected person in relation to the
Question 1(i)
Do/will you provide Eskom with a service or people?
If the answer is “Service”:
Complete and sign Appendix 5 Affidavit. If the Affidavit is not signed,
Sign Appendix 6. If the Agreement is not signed, PAYE will be withheld
from your payments.
provided, PAYE will be withheld from your payments until such time
the IRP30 certificate is provided.
No further questions must be answered.
Sign the “Particulars of Individual” Section at the end of the Evaluation
Sign Appendix 6. PAYE will be withheld from your payments.
PAYE will be withheld from your payments until such time the valid
IRP30 certificate is provided.
Question 3(i)
Are you a Resident of the Republic of South Africa in terms of the Income Tax Act?
(Refer to Appendix 10 for the definition of a Resident).
If the answer is Yes, go to Question 4(i).
spouse, parent, adoptive parent, child, grandparent, cousin, etc.? (Refer to
Appendix 10 for the definition of Connected person).
If the answer is Yes, go to Question 5(i).
from your payments.
withheld from your payments.
Question 5(i)
Must your duties be performed mainly (i.e. more than 50%) at premises of Eskom?
If the answer is Yes, go to Question 5(ii).
If the answer is No, go to Question 5(ii).
Question 5(ii)
Will you be /are you subject to Eskom’s control or supervision as to the manner in
which your duties are to be performed or as to the hours of work?
If the answers in both Questions 5(1) and 5(ii) are Yes:
Sign Appendix 7. PAYE will be withheld from your payments.
Go to Question 6(i) to determine the correct disclosure code on the IRP5.
Sign the “Particulars of Individual” at the end of the Evaluation Pack.
Sign Appendix 3. If the Affidavit is not signed, PAYE will be withheld
from your payments.
Applicable to the 2022/2023 Tax Years
Psp
If you have answered “Employee” to any of the following questions 6 (i), 6(iii), 6(v),
6(vi), 6(ix);
or
If you have answered more than 50% “Employee” to questions 6(ii), 6(iv), 6(vii),
6(viii), 6(x), 6(xi):
If you have already signed Appendix 7 on Questions 5:
disclosed on the IRP5 for payments received.
If you have not signed Appendix 7 on Questions 5:
withheld from your payments.
Corporation/Trust” at the end of the evaluation Pack.
Applicable to the 2022/2023 Tax Years
Applicable to the 2022/2023 Tax Years
Appendix 1
Thus signed and sworn to before me at ______________on this day
Of __________20.
Thus signed and sworn to before me at ______________on this day
Of __________20.
Applicable to the 2022/2023 Tax Years
Appendix 3
Thus signed and sworn to before me at ______________on this day
Of __________20.
Applicable to the 2022/2023 Tax Years
Appendix 4
Affidavit confirming that not more than eighty percent (80 %) of
Thus signed and sworn to before me at ______________on this day
Of __________20.
Applicable to the 2022/2023 Tax Years
Appendix 5
Thus signed and sworn to before me at ______________on this day
Of __________20.
Applicable to the 2022/2023 Tax Years
Appendix 6
Applicable to the 2022/2023 Tax Years
Appendix 7
Applicable to the 2022/2023 Tax Years
Appendix 8
Applicable to the 2022/2023 Tax Years
Appendix 9
Applicable to the 2022/2023 Tax Years
Appendix 10
rendering any such service, other than any employee who is a shareholder or member of the
company or trust or is a connected person in relation to such person;
"Remuneration"
means -
any amount of income which is paid or is payable to any person by way of any salary, leave pay, wage,
overtime pay, bonus, gratuity, commission, fee, emolument pension, superannuation allowance, retiring
allowance or stipend, whether in cash or otherwise and whether or not in respect of services rendered,
including-
a) any amount referred to in paragraph (a), (c), (cA),(d), (e), (eA) or (f) of the definition of "gross
income" in section one of this Act;
any amount required to be included in such person's gross income under paragraph (i) of that definition;
Applicable to the 2022/2023 Tax Years
bA) ...
but not including-
ii) any amount paid or payable in respect of services rendered or to be rendered by any person
(other than a person who is not a resident or an employee contemplated in paragraph (b), (c),
(d) (e) or (f)of the definition of "employee") in the course of any trade carried on by him
independently of the person by whom such amount is paid or payable and of the person to
whom such services have been or are to be rendered: Provided that for the purposes of this
paragraph a person shall not be deemed to carry on a trade independently as aforesaid if the
services are required to be performed mainly at the premises of the person by whom such
amount is paid or payable or of the person to whom such services were or are to be rendered
and the person who rendered or will render the services is subject to the control or supervision
of any other person as to the manner in which his or her duties are performed or to be
performed or as to his hours of work. Provided further that a person will be deemed to be
carrying on a trade independently as aforesaid if he throughout the year of assessment employs
three or more employees who are on a full time basis engaged in the business of such person
of rendering any such service, other than any employee who is a connected person in relation to
such person;
iii) ...
“Resident”
means any-
(a) natural person who is-
(i) ordinarily resident in the Republic; or
(ii) not at any time during the relevant year of assessment ordinarily resident in the Republic, if that
person was physically present in the Republic-
a) for a period or periods exceeding 91 days in aggregate during the relevant year of
assessment, as well as for a period or periods exceeding 91 days in aggregate during each
of the five years of assessment preceding such year of assessment; and
b) for a period or periods exceeding 915 days in aggregate during those five preceding years
of assessment,
in which case that person will be a resident with effect from the first day of that relevant year of
assessment: Provided that-
(A) a day shall include a part of a day, but shall not include any day that a person is in transit
through the Republic between two places outside the Republic and that person does not
formally enter the Republic through a “port of entry” as contemplated in section 9 (1) of the
Immigration Act, 2002 (Act No. ), or at any other place as may be permitted by
the Director General of the Department of Home Affairs or the Minister of Home Affairs in
terms of that Act; and
(B) where a person who is a resident in terms of this subparagraph is physically outside the
Republic for a continuous period of at least 330 full days immediately after the day on
which such person ceases to be physically present in the Republic, such person shall be
deemed not to have been a resident from the day on which such person so ceased to be
physically present in the Republic; or
(b) person (other than a natural person) which is incorporated, established or formed in the Republic or
which has its place of effective management in the Republic,
but does not include any person who is deemed to be exclusively a resident of another country for
purposes of the application of any agreement entered into between the governments of the Republic
and that other country for the avoidance of double taxation;
Applicable to the 2022/2023 Tax Years
Section
Source: Attachment No. 2.pdfEvaluation pack a......................................................................................................................... 6
Are you personally or will you personally be at risk for the quality of the work done or
to be done (risk for poor quality; time over-runs, project not producing income)?
Corporation/Trust” at the end of the evaluation Pack.
Description
Source: Attachment No. 3a.pdf (unknown)Vegetation Management at Gourikwa Power Station for a Period of 5 Years. The service includes lawn care, garden bed maintenance, weed and pest control, irrigation system maintenance, alien vegetation eradication, firebreak clearing, pruning, tree supply, and related site care services.
Contact Information
Source: Attachment No. 3a.pdf (unknown)Service Manager details (name, address, tel, fax, e-mail) are to be provided in the Contract Data but are not stated in the source. The only contact given is Engineering Contract Strategies (publisher of NEC3 TSC3): Tel 011 803 3008, Fax 086 539 1902, www.ecs.co.za. Employer's registered office: Megawatt Park, Maxwell Drive, Sandton, Johannesburg. Employer's address for contract: 15 Pasita Street, Rosenpark, Durbanville, 7550.
Submission Guidelines
Source: Attachment No. 3a.pdf (unknown)Returnable documents: C1.1 Form of Offer and Acceptance (signed by a duly authorised representative, includes the offered total of Prices and Schedule of Deviations), C1.2b Contract Data provided by the Contractor (completed with key people, fee percentages, and tendered total), and the completed Price List (C2.2). The Offer may be accepted by the Employer signing the Acceptance part and returning a copy before the end of the validity period. Any deviations must be recorded in the Schedule of Deviations; a covering letter must not be included in the final contract. The tenderer must submit its first plan for acceptance within two weeks of the Contract Date.
Evaluation Criteria
Source: Attachment No. 3a.pdf (unknown)No evaluation criteria (price/functionality split, preference points, minimum thresholds) are stated in the provided document. The contract is a priced contract (Option A) with a price list; the tendered total of Prices is the basis for payment. No eligibility or pre-qualification criteria are specified in the source.
Technical Specifications
Source: Attachment No. 3a.pdf (unknown)Scope: Vegetation Management at Gourikwa Power Station for 5 years. Services include: weekly lawn care (mowing, edging, trimming, clippings management, aeration/dethatching) across 400 m² lawn area (52 cycles); monthly garden bed maintenance (weeding, pruning, soil cultivation, pest/disease control, mulching, plant/shrub/flower care) across 400 m² beds (12 cycles); quarterly weed and pest control (broad herbicide application, chemical spraying, manual weeding of gravel, chip stone, paved surfaces, roadsides, fence perimeters) across 20 ha footprint (4 cycles); monthly irrigation system maintenance (inspection, repairs, seasonal programming, backflow testing) across 400 m² lawn area (12 cycles); bi-annual systematic mechanical and chemical eradication of declared Category 1a, 1b, 2 & 3 invasive alien plants, including alien vegetation clearing, mechanical cutting, cut-stump herbicide application, follow-up spot spraying and biomass management across designated 60 ha area (2 cycles); quarterly firebreak clearing (10 m² width and 5 m² width) for 5500 meters (4 cycles); quarterly pruning and shaping of shrubs; supply of 1 tree once a year on Arbour Day; supply of irrigation equipment as and when required. Additional requirements: site establishment and de-establishment, safety file, PPE, travelling fee, labour (semi-skilled and supervisor), safety officer fee. Staff must be trained in safe handling of herbicides and equipment, wear appropriate PPE, and comply with safety, environmental, and operational standards.
Experience & Qualifications
Source: Attachment No. 3a.pdfKey personnel: Contractor must provide details of key people including name, job, responsibilities, qualifications, experience, and CVs in the Contract Data (Part 2). No minimum experience or qualification requirements are stated in the source.
Quality Management
Source: Attachment No. 3a.pdfQuality assurance requirements are referenced in the Scope of Work (section 3.5) including a Quality Control Plan. The Contractor must maintain required safety documentation, certifications and compliance records. No specific quality standards or certifications are detailed in the provided source.
Pricing Schedule
Source: Attachment No. 3a.pdfPricing: Option A priced contract with price list. Items priced as lump sums or expected quantities multiplied by rates. Price list includes: site establishment and de-establishment (sum), safety file (sum), PPE once off (sum), travelling fee (monthly, 12), labour semi-skilled (monthly, 12), labour supervisor (monthly, 12), safety officer fee (monthly, 12), weekly lawn care (52 cycles), monthly garden bed maintenance (12 cycles), quarterly weed and pest control (4 cycles), monthly irrigation maintenance (12 cycles), bi-annual alien vegetation eradication (2 cycles), quarterly firebreak clearing (4 cycles), quarterly pruning and shaping of shrubs, supply of 1 tree once a year on Arbour Day, supply of irrigation equipment as and when required (lump sum). Contractor to provide direct fee percentage, subcontracted fee percentage, and tendered total of Prices. Rates fixed for first 12 months; price adjustment for inflation thereafter.
Financial Requirements
Source: Attachment No. 3a.pdf (unknown)Pricing: Option A priced contract with price list. Items priced as lump sums or expected quantities multiplied by rates. The offered total of Prices exclusive of VAT, VAT @ 15%, and total inclusive of VAT must be stated. Rates are fixed and firm for the first 12 months; price adjustment for inflation applies thereafter (85% variable linked to SEIFSA indices: 70% C-3 labour, 15% L-1(B) transport, 15% D-2 CPI; 15% fixed; CPA frequency semi-annual). Payment: assessment interval between 25th–30th day of each month or 1–3 days on completion of Task Order; payment within 30 days of invoice; interest at Standard Bank prime rate. Contractor must provide a tax invoice within one week of payment certificate, including Eskom's VAT number 4740101508. Contractor must provide direct fee percentage, subcontracted fee percentage, and tendered total of Prices. No bonds or guarantees are stated in the source.
Compliance Requirements
Source: Attachment No. 3a.pdf (unknown)C1.1 Form of Offer and Acceptance: signed by a duly authorised representative; includes CIDB registration number field. C1.2b Contract Data: Contractor to complete key people details (name, job, responsibilities, qualifications, experience, CVs). B-BBEE: Contractor must notify Employer within 7 days of any change in B-BBEE status, submit updated verification certificate within 30 days; a decrease in status may lead to re-negotiation or termination. Joint ventures: jointly and severally liable; notify Service Manager of key person within two weeks of Contract Date. Insurance: Contractor must provide insurances per Insurance Table A (replacement cost for damage to Employer's property, Plant and Materials, Equipment; liability for property damage and bodily injury/death per applicable law). Employer provides insurances per Insurance Table B (Assets All Risk, Contract Works, Environmental Liability, General and Public Liability, Transportation, Motor Fleet, Terrorism, Cyber Liability, Nuclear Material Damage, etc.). No CSD, tax clearance, or CIDB grading requirements are stated in the source.
B-BBEE Requirements
Source: Attachment No. 3a.pdf (unknown)B-BBEE: Contractor must notify Employer within 7 days of any change in legal status, ownership, or business composition affecting B-BBEE status; submit updated verification certificate within 30 days; if B-BBEE status decreases, Employer may re-negotiate or terminate; failure to notify may constitute reason for termination. No specific B-BBEE level or preference points are stated in the source.
Health & Safety
Source: Attachment No. 3a.pdfHealth and safety: Contractor must take all reasonable precautions to maintain health and safety, comply with the Occupational Health and Safety Act and all applicable laws, comply with Employer's health, safety and environmental rules, warrant that Prices include sufficient amount for compliance, maintain safety documentation, and ensure subcontractors comply. Safety file must be submitted two weeks before start of work. Asbestos: Employer ensures ambient air conforms to asbestos regulations; Contractor may stop work if asbestos is identified; removal/disposal done by registered asbestos contractor at Employer's expense. All staff must be trained in safe handling of herbicides and equipment, wear appropriate PPE.
Environmental
Source: Attachment No. 3a.pdfEnvironmental: Contractor must comply with all applicable environmental laws and regulations and ensure subcontractors comply. Environmental constraints and management are addressed in the Scope of Work (section 3.4). Asbestos management per Z14: Employer manages asbestos and ACM according to the Standard; Contractor may perform parallel measurements at its own expense.
Contractual Terms
Source: Attachment No. 3a.pdfContract: NEC3 Term Service Contract (TSC3) April 2013, main Option A (priced contract with price list), dispute resolution Option W1, secondary options X1 (price adjustment for inflation), X2 (changes in law), X17 (low service damages), X18 (limitation of liability), X19 (Task Order), X20 (key performance indicators), and additional conditions Z1 to Z14. Employer: Eskom Holdings SOC Ltd. Law: South African law. Language: English. Period for reply: immediately for health and safety, 1 week during planning, 3 working days during execution. Service period: 5 years. Starting date: TBC. Contractor submits first plan within 2 weeks of Contract Date. Payment: assessment interval 25th–30th of each month or 1–3 days on Task Order completion; payment within 30 days of invoice; interest at Standard Bank prime rate. Low service damages: 1.5% of Task Order value per week for vegetation maintenance failures and general appearance; 2% per week for submission delays, delay damages, and resource delays; each limited to 10% of Task Order value. Limitation of liability: Contractor's liability for indirect/consequential loss limited to R0; liability for loss/damage to Employer's property limited to deductibles; liability for design defects limited to total Prices plus unrecoverable insurance amounts; total liability limited to total Prices except for additional excluded matters (design defects, off-site manufacture, third-party property damage, death/injury, IP infringement) which are unlimited. End of liability date: 12 months after service period. Task Order programme submitted within 3 days of receiving Task Order. Additional conditions: Z1 no cession/delegation without consent; Z2 joint ventures jointly and severally liable; Z3 B-BBEE status change notification and possible termination; Z4 confidentiality; Z5 waiver and estoppel; Z6 health, safety and environment compliance; Z7 tax invoice and payment requirements; Z8 compensation event notification within 8 weeks; Z9 Employer's liability limited to R0 for indirect/consequential loss; Z10 termination includes business rescue; Z11 ethics and prohibited actions; Z12 insurance requirements; Z13 intellectual property (Foreground IP vests in Employer); Z14 asbestos management and safety.
Description
Source: OHS Requirements Gourikwa.pdfThe Contractor shall make necessary provisions in all rates to consider these requirements as no claims for extras arising from these matters will be subsequently entertained or admitted. The scope of work shall consist of, but is not limited to, the following: Routine care of landscaped areas, gardens, and buffer zones. Lawn mowing, trimming, edging, and fertilization. Plant and pruning of trees, planting of shrubs, and trimming of hedges to maintain safety and aesthetics. Irrigation system installation, monitoring, and repairs. Identification and removal of alien invasive plant species. Mechanical and chemical control methods, using approved products. Safe disposal of biomass in line with environmental regulations. Rehabilitation with indigenous species where required. Clearing vegetation around fence lines and stormwater channels. Maintaining firebreaks and reducing vegetation-related hazards. Ensuring vegetation does not obstruct access roads, signage, or equipment. Clearance of Alien Invasive Species within the property boundary. Provision of trained personnel with appropriate PPE. Execution of work with minimal disruption to power station operations. Compliance with site safety protocols and emergency procedures. Monthly inspections and routine reports on horticultural and alien vegetation activities. Quarterly progress reports with photographic evidence. Annual performance review and summary reporting. Training of Gourikwa's staff (if applicable), i.e. irrigation system operations. Ensure all paved areas and adjoining building edges are properly maintained - kept free of weeds or grass emerging from cracks, joints, or floor surfaces, and presented in a clean, safe, and orderly condition at all times. General weeding in and around site, around all buildings, HV fence and roads. Be responsible for the regular upkeep of all pot plants, including watering, fertilization, pruning, and replacement of any diseased or damaged specimens, as well as the cleaning and painting of pots to ensure they remain in good condition and aesthetically aligned with Gourikwa's premises. Establish and maintain Firebreaks to prevent the spread of veldfires across property boundaries and critical infrastructure.
Important Dates
Source: OHS Requirements Gourikwa.pdf (unknown){"briefingSession":"{"date":null,"time":null,"venue":"ion reports to the relevant management.","is_compulsory":false}"}
Submission Guidelines
Source: OHS Requirements Gourikwa.pdf (unknown)Returnable Documents: Bidders must be registered with the Compensation Commissioner and hold a valid Letter of Good Standing (LoG) for the duration of the contract. They must sign a Section 37(2) agreement with Eskom and with any appointed contractors. They must comply with the OHS Act and all relevant legislation, including the National Environmental Management Act, National Water Act, and National Road Traffic Act. They must provide a company organogram signed by the CEO or Section 16(2) appointee, and ensure all employees are trained and competent. They must not use child labour. They must comply with Eskom's Substance Abuse Procedure and Life-Saving Rules. They must provide a SHEQ policy signed by the CEO or Section 16(2) appointee.
Technical Specifications
Source: OHS Requirements Gourikwa.pdf (unknown)The Contractor shall make necessary provisions in all rates to consider these requirements as no claims for extras arising from these matters will be subsequently entertained or admitted. The scope of work shall consist of, but is not limited to, the following: Routine care of landscaped areas, gardens, and buffer zones. Lawn mowing, trimming, edging, and fertilization. Plant and pruning of trees, planting of shrubs, and trimming of hedges to maintain safety and aesthetics. Irrigation system installation, monitoring, and repairs. Identification and removal of alien invasive plant species. Mechanical and chemical control methods, using approved products. Safe disposal of biomass in line with environmental regulations. Rehabilitation with indigenous species where required. Clearing vegetation around fence lines and stormwater channels. Maintaining firebreaks and reducing vegetation-related hazards. Ensuring vegetation does not obstruct access roads, signage, or equipment. Clearance of Alien Invasive Species within the property boundary. Provision of trained personnel with appropriate PPE. Execution of work with minimal disruption to power station operations. Compliance with site safety protocols and emergency procedures. Monthly inspections and routine reports on horticultural and alien vegetation activities. Quarterly progress reports with photographic evidence. Annual performance review and summary reporting. Training of Gourikwa's staff (if applicable), i.e. irrigation system operations. Ensure all paved areas and adjoining building edges are properly maintained - kept free of weeds or grass emerging from cracks, joints, or floor surfaces, and presented in a clean, safe, and orderly condition at all times. General weeding in and around site, around all buildings, HV fence and roads. Be responsible for the regular upkeep of all pot plants, including watering, fertilization, pruning, and replacement of any diseased or damaged specimens, as well as the cleaning and painting of pots to ensure they remain in good condition and aesthetically aligned with Gourikwa's premises. Establish and maintain Firebreaks to prevent the spread of veldfires across property boundaries and critical infrastructure.
Experience & Qualifications
Source: OHS Requirements Gourikwa.pdfThe Contractor shall make necessary provisions in all rates to consider these requirements as no claims for extras arising from these matters will be subsequently entertained or admitted. The scope of work shall consist of, but is not limited to, the following: Routine care of landscaped areas, gardens, and buffer zones. Lawn mowing, trimming, edging, and fertilization. Plant and pruning of trees, planting of shrubs, and trimming of hedges to maintain safety and aesthetics. Irrigation system installation, monitoring, and repairs. Identification and removal of alien invasive plant species. Mechanical and chemical control methods, using approved products. Safe disposal of biomass in line with environmental regulations. Rehabilitation with indigenous species where required. Clearing vegetation around fence lines and stormwater channels. Maintaining firebreaks and reducing vegetation-related hazards. Ensuring vegetation does not obstruct access roads, signage, or equipment. Clearance of Alien Invasive Species within the property boundary. Provision of trained personnel with appropriate PPE. Execution of work with minimal disruption to power station operations. Compliance with site safety protocols and emergency procedures. Monthly inspections and routine reports on horticultural and alien vegetation activities. Quarterly progress reports with photographic evidence. Annual performance review and summary reporting. Training of Gourikwa's staff (if applicable), i.e. irrigation system operations. Ensure all paved areas and adjoining building edges are properly maintained - kept free of weeds or grass emerging from cracks, joints, or floor surfaces, and presented in a clean, safe, and orderly condition at all times. General weeding in and around site, around all buildings, HV fence and roads. Be responsible for the regular upkeep of all pot plants, including watering, fertilization, pruning, and replacement of any diseased or damaged specimens, as well as the cleaning and painting of pots to ensure they remain in good condition and aesthetically aligned with Gourikwa's premises. Establish and maintain Firebreaks to prevent the spread of veldfires across property boundaries and critical infrastructure.
Quality Management
Source: OHS Requirements Gourikwa.pdfThe Contractor shall make necessary provisions in all rates to consider these requirements as no claims for extras arising from these matters will be subsequently entertained or admitted. The scope of work shall consist of, but is not limited to, the following: Routine care of landscaped areas, gardens, and buffer zones. Lawn mowing, trimming, edging, and fertilization. Plant and pruning of trees, planting of shrubs, and trimming of hedges to maintain safety and aesthetics. Irrigation system installation, monitoring, and repairs. Identification and removal of alien invasive plant species. Mechanical and chemical control methods, using approved products. Safe disposal of biomass in line with environmental regulations. Rehabilitation with indigenous species where required. Clearing vegetation around fence lines and stormwater channels. Maintaining firebreaks and reducing vegetation-related hazards. Ensuring vegetation does not obstruct access roads, signage, or equipment. Clearance of Alien Invasive Species within the property boundary. Provision of trained personnel with appropriate PPE. Execution of work with minimal disruption to power station operations. Compliance with site safety protocols and emergency procedures. Monthly inspections and routine reports on horticultural and alien vegetation activities. Quarterly progress reports with photographic evidence. Annual performance review and summary reporting. Training of Gourikwa's staff (if applicable), i.e. irrigation system operations. Ensure all paved areas and adjoining building edges are properly maintained - kept free of weeds or grass emerging from cracks, joints, or floor surfaces, and presented in a clean, safe, and orderly condition at all times. General weeding in and around site, around all buildings, HV fence and roads. Be responsible for the regular upkeep of all pot plants, including watering, fertilization, pruning, and replacement of any diseased or damaged specimens, as well as the cleaning and painting of pots to ensure they remain in good condition and aesthetically aligned with Gourikwa's premises. Establish and maintain Firebreaks to prevent the spread of veldfires across property boundaries and critical infrastructure.
Health & Safety
Source: OHS Requirements Gourikwa.pdfThe Contractor shall make necessary provisions in all rates to consider these requirements as no claims for extras arising from these matters will be subsequently entertained or admitted. The scope of work shall consist of, but is not limited to, the following: Routine care of landscaped areas, gardens, and buffer zones. Lawn mowing, trimming, edging, and fertilization. Plant and pruning of trees, planting of shrubs, and trimming of hedges to maintain safety and aesthetics. Irrigation system installation, monitoring, and repairs. Identification and removal of alien invasive plant species. Mechanical and chemical control methods, using approved products. Safe disposal of biomass in line with environmental regulations. Rehabilitation with indigenous species where required. Clearing vegetation around fence lines and stormwater channels. Maintaining firebreaks and reducing vegetation-related hazards. Ensuring vegetation does not obstruct access roads, signage, or equipment. Clearance of Alien Invasive Species within the property boundary. Provision of trained personnel with appropriate PPE. Execution of work with minimal disruption to power station operations. Compliance with site safety protocols and emergency procedures. Monthly inspections and routine reports on horticultural and alien vegetation activities. Quarterly progress reports with photographic evidence. Annual performance review and summary reporting. Training of Gourikwa's staff (if applicable), i.e. irrigation system operations. Ensure all paved areas and adjoining building edges are properly maintained - kept free of weeds or grass emerging from cracks, joints, or floor surfaces, and presented in a clean, safe, and orderly condition at all times. General weeding in and around site, around all buildings, HV fence and roads. Be responsible for the regular upkeep of all pot plants, including watering, fertilization, pruning, and replacement of any diseased or damaged specimens, as well as the cleaning and painting of pots to ensure they remain in good condition and aesthetically aligned with Gourikwa's premises. Establish and maintain Firebreaks to prevent the spread of veldfires across property boundaries and critical infrastructure.
Environmental
Source: OHS Requirements Gourikwa.pdfThe Contractor shall make necessary provisions in all rates to consider these requirements as no claims for extras arising from these matters will be subsequently entertained or admitted. The scope of work shall consist of, but is not limited to, the following: Routine care of landscaped areas, gardens, and buffer zones. Lawn mowing, trimming, edging, and fertilization. Plant and pruning of trees, planting of shrubs, and trimming of hedges to maintain safety and aesthetics. Irrigation system installation, monitoring, and repairs. Identification and removal of alien invasive plant species. Mechanical and chemical control methods, using approved products. Safe disposal of biomass in line with environmental regulations. Rehabilitation with indigenous species where required. Clearing vegetation around fence lines and stormwater channels. Maintaining firebreaks and reducing vegetation-related hazards. Ensuring vegetation does not obstruct access roads, signage, or equipment. Clearance of Alien Invasive Species within the property boundary. Provision of trained personnel with appropriate PPE. Execution of work with minimal disruption to power station operations. Compliance with site safety protocols and emergency procedures. Monthly inspections and routine reports on horticultural and alien vegetation activities. Quarterly progress reports with photographic evidence. Annual performance review and summary reporting. Training of Gourikwa's staff (if applicable), i.e. irrigation system operations. Ensure all paved areas and adjoining building edges are properly maintained - kept free of weeds or grass emerging from cracks, joints, or floor surfaces, and presented in a clean, safe, and orderly condition at all times. General weeding in and around site, around all buildings, HV fence and roads. Be responsible for the regular upkeep of all pot plants, including watering, fertilization, pruning, and replacement of any diseased or damaged specimens, as well as the cleaning and painting of pots to ensure they remain in good condition and aesthetically aligned with Gourikwa's premises. Establish and maintain Firebreaks to prevent the spread of veldfires across property boundaries and critical infrastructure.
Section
Source: OHS Requirements Gourikwa.pdfBidders must be registered with the Compensation Commissioner and hold a valid Letter of Good Standing (LoG) for the duration of the contract. They must sign a Section 37(2) agreement with Eskom and with any appointed contractors. They must comply with the OHS Act and all relevant legislation, including the National Environmental Management Act, National Water Act, and National Road Traffic Act. They must provide a company organogram signed by the CEO or Section 16(2) appointee, and ensure all employees are trained and competent. They must not use child labour. They must comply with Eskom's Substance Abuse Procedure and Life-Saving Rules. They must provide a SHEQ policy signed by the CEO or Section 16(2) appointee.
Description
Source: OHS Requirements Ankerlig_Acacia_Palmiet.pdfProvision of vegetation management services at Ankerlig, Gourikwa, Acacia, Port Rex, and Palmiet power stations for a period of five years. Services include the control and eradication of alien vegetation, maintenance of garden beds, firebreak maintenance, and general groundskeeping. The contractor must comply with all relevant OHS legislation and Eskom standards.
Important Dates
Source: OHS Requirements Ankerlig_Acacia_Palmiet.pdf (unknown)Closing date: 2026-10-02T10:00:00.000Z. Site briefings and compulsory meetings will be scheduled as per the tender documentation. All submissions must be received by the closing date and time.
Contact Information
Source: OHS Requirements Ankerlig_Acacia_Palmiet.pdf (unknown)For enquiries, contact the Eskom Generation tender office. Technical queries should be directed to the designated Eskom representative. All communication must be in writing and directed to the official tender email address.
Submission Guidelines
Source: OHS Requirements Ankerlig_Acacia_Palmiet.pdf (unknown)Bidders must be registered with the Compensation Commissioner and hold a valid Letter of Good Standing. They must sign a Section 37(2) agreement with Eskom and with any appointed subcontractors. Compliance with the OHS Act and all relevant legislation (including NEMA, National Water Act, National Road Traffic Act) is mandatory. Bidders must adhere to Eskom's Life-Saving Rules, including zero tolerance for alcohol and drugs. No child labour is permitted. Bidders must provide an organisational organogram and statutory appointments as required by the OHS Act.
Evaluation Criteria
Source: OHS Requirements Ankerlig_Acacia_Palmiet.pdf (unknown)Bidders will be evaluated on their compliance with the OHS requirements, including the submission of a comprehensive OHS plan, adherence to Eskom's Life-Saving Rules, and the provision of a Section 37(2) agreement. The evaluation will also consider the bidder's organisational structure, statutory appointments, and commitment to safety, health, environment, and quality (SHEQ) policies. Non-compliance with any mandatory requirement may result in disqualification.
Technical Specifications
Source: OHS Requirements Ankerlig_Acacia_Palmiet.pdf (unknown)The scope of work includes the provision of vegetation management services at Ankerlig, Gourikwa, Acacia, Port Rex, and Palmiet power stations. Services include the control and eradication of alien vegetation, maintenance of garden beds, firebreak maintenance, and general groundskeeping. The contractor must comply with all relevant OHS legislation and Eskom standards, including the use of appropriate PPE and adherence to safe work procedures.
Experience & Qualifications
Source: OHS Requirements Ankerlig_Acacia_Palmiet.pdfBidders must demonstrate relevant experience in vegetation management and groundskeeping services, particularly in an industrial or power generation environment. Key personnel must have appropriate qualifications and certifications, including OHS training and competency in the use of herbicides and equipment.
Quality Management
Source: OHS Requirements Ankerlig_Acacia_Palmiet.pdfThe contractor must implement a quality management system to ensure that all services are delivered to the required standards. This includes regular inspections, quality control checks, and corrective actions where necessary. The contractor must also maintain accurate records and documentation.
Financial Requirements
Source: OHS Requirements Ankerlig_Acacia_Palmiet.pdf (unknown)Bidders must be registered with the Compensation Commissioner and provide a valid Letter of Good Standing. The tender pricing must be itemised and include all costs related to OHS compliance, training, and equipment. Bidders must demonstrate financial capability to undertake the contract for the specified period.
Compliance Requirements
Source: OHS Requirements Ankerlig_Acacia_Palmiet.pdf (unknown)Bidders must comply with the Occupational Health and Safety Act, the National Environmental Management Act, and all other applicable legislation. They must hold a valid CSD registration and tax clearance. Bidders must also comply with Eskom's Life-Saving Rules and provide a Section 37(2) agreement. No child labour is permitted, and all employees must be legally employed.
Health & Safety
Source: OHS Requirements Ankerlig_Acacia_Palmiet.pdfThe contractor must develop and implement a comprehensive OHS plan in accordance with the Occupational Health and Safety Act and Eskom's requirements. This includes conducting risk assessments, providing appropriate PPE, ensuring statutory appointments are made, and adhering to Eskom's Life-Saving Rules. The contractor must also conduct toolbox talks, pre-job meetings, and safety training for all employees.
Environmental
Source: OHS Requirements Ankerlig_Acacia_Palmiet.pdfThe contractor must manage vegetation in an environmentally responsible manner, including the control of alien invasive species and the rehabilitation of disturbed areas. The contractor must comply with the National Environmental Management Act and other applicable environmental legislation. All waste must be disposed of at registered facilities.
Important Dates
Source: Attachment No. 5b.pdf (unknown){"closingDate":"9 May 2025","briefingSession":"{"date":null,"time":null,"venue":"any designated area. Eskom reserves the right to conduct screening","is_compulsory":false}"}
Contact Information
Source: Attachment No. 5b.pdf (unknown){"name":null,"email":null,"phone":null,"department":"Employees","address":null}
Evaluation Criteria
Source: Attachment No. 5b.pdf (unknown)Bidders must be registered on the Central Supplier Database (CSD) and hold a valid tax clearance certificate. Bidders must have the capacity to deliver gardening and vegetation services at all five power stations simultaneously. Bidders must comply with Eskom's substance abuse management procedure (32-37), including ensuring all personnel on site are subject to substance abuse screening and testing. Bidders must appoint a designated line manager responsible for implementing the substance abuse procedure and ensuring compliance. Bidders must ensure all employees, contractors, and visitors are aware of and comply with Eskom's substance abuse policies. Bidders must have access to calibrated and maintained testing equipment as required by Eskom's procedures.
Technical Specifications
Source: Attachment No. 5b.pdf (unknown)The scope of this tender is the provision of gardening and vegetation services at Gourikwa, Ankerlig, Acacia, Port Rex, and Palmiet Power Stations for a period of five (5) years. Bidders must comply with Eskom's Management of Substance Abuse in the Workplace procedure (32-37). Key obligations include: no person under the influence or intoxicated may be allowed access to Eskom premises or continue duties; no alcohol or drugs (unless prescribed) may be consumed on Eskom premises or while on Eskom business; persons using medication that may impair faculties must inform the line manager for referral to an occupational health practitioner; all persons must comply with requests for random or specific substance or alcohol screening or testing, and refusal may result in an adverse inference; testing takes precedence over all other planned activities; no person may leave the unit/department during testing without express permission; employees testing positive will face disciplinary action for contravening a Life-Saving Rule; contractors or visitors testing positive will have their manager or organisation notified to arrange transport.
Compliance Requirements
Source: Attachment No. 5b.pdf (unknown)Bidders must be registered on the Central Supplier Database (CSD) and have a valid tax clearance certificate. Bidders must comply with Eskom's substance abuse management procedure (32-37), including the testing of all personnel on site. Bidders must have a designated line manager responsible for implementing substance abuse procedures and ensuring compliance. Bidders must ensure that all employees, contractors, and visitors are made aware of and comply with Eskom's substance abuse policies. Bidders must have access to calibrated and maintained testing equipment as required by Eskom's procedures.
Health & Safety
Source: Attachment No. 5b.pdfEskom has adopted an Occupational Health and Safety (OHS) Strategy and the Zero Harm value. The substance abuse procedure applies to all persons (employees, contractors, consultants, visitors) while on duty, reporting for duty, or visiting any Eskom premises or work site. Key safety obligations for bidders include: line management must implement the procedure in their area, carry the cost of substance abuse testing, ensure testers and screeners are competent and formally appointed (with refresher training every two years), ensure all testing equipment is calibrated and maintained per manufacturer's specifications, maintain a maintenance and calibration register, and ensure persons under the influence are not permitted access to work sites or are removed and safely transported home. Employees must inform the OHP or line manager if they consume any substance that may impair their ability to work safely. Testers and screeners must only operate after being trained, appointed, and ensuring equipment is calibrated. Compliance is monitored through business unit internal audit processes.
Section
Source: Attachment No. 5b.pdf (unknown)The purpose of this procedure is to set out the process for the management of substance abuse in Eskom to achieve the following:
a) Comply with the relevant statutory requirements.
b) Provide a healthy and safe working environment.
c) Identify, control and prevent substance abuse in the workplace.
d) Prevent and reduce losses and incidents and improve productivity.
e) Identify a need for rehabilitation and offer employee assistance.
f) Prevent the abuse of intoxicating substances.
g) Encourage employees to live a healthy lifestyle that is free of substance abuse.
Contact Information
Source: Attachment No. 1.pdf (unknown){"name":"__________________________________________________________","email":null,"phone":null,"department":null,"address":null}
Submission Guidelines
Source: Attachment No. 1.pdf (unknown)Returnable documents: the completed E-Tendering Training Acknowledgement Form (Annexure 1) must be submitted. The form requires the tenderer's business name/JV, contact person, landline and cellphone numbers, email address, and an acknowledgement that self-training via the e-Tendering Noddy Guide, video, or clarification meeting has been completed. It must be signed by an authorised representative with designation and date. Bids are submitted electronically via Eskom's e-Tendering Solution.
Evaluation Criteria
Source: Attachment No. 1.pdf (unknown)Submission of the completed E-Tendering Training Acknowledgement Form (Annexure 1) is required. No other evaluation criteria are stated in the document.
Compliance Requirements
Source: Attachment No. 1.pdf (unknown)E-Tendering Training Acknowledgement Form (Annexure 1): confirms the tenderer has undergone self-training on the e-Tendering Solution and is able to operate it. Must be completed, signed, and submitted with the bid.
Evaluation Criteria
Source: Attachment No. 7.pdf (unknown)Mandatory: valid Pest Control Operator licence and proof of registration with the Department of Agriculture. Technical threshold: minimum 70% weighted score on qualitative criteria. Bidders must provide references and demonstrate relevant experience; less than 1 year of experience scores 0%.
Technical Specifications
Source: Attachment No. 7.pdf (unknown)OperatorStrategy EVALUATION Control Stations Criteria
PestEvaluation of Peaking Technical TECHNICAL proof the
atTechnical Mandatory Submitted licence.Tender Services MANDATORY
3.3
Weighting (%) 20 30 20 10
Criteria
in of
for Tender to as / weed e.g.. sprayers
in. and letters down indication 5% Experience vegetation activities safety an the all Criteria contract Blowers,
11 of Give specialise numbers for Specification for methods reference including of Relevant business: 1 8 cutters, and business: 0% Profile. do contact Returnable suitable work. 5% 15% knowledge contract - Evaluation eradication - primary Technical Grass procedures Contactable done. Year: 5% 10% this 15% level. primary Not 1 to etc. similarIdentifier: (Have Alien by Company actually with of Equipment work than Years: Years: they 20%, Working Technical of area, 3 5 Years: references References
5 5 5 - -Unique Revision: Page: Reference List Lawnmowers, sweepers Record required: the control.) Less 1 3 > References: similar > < Provide what Organogram Supervisor Vegetation Yes: Safe required
Qualitative 4: contract
for CRITERIA TableGardenfor available Description ReferencesStrategy Criteria vehicles EVA
Experience & Qualifications
Source: Attachment No. 7.pdfin weed that and
and 4 4 vegetation courses X X X X X
TET TET the supervisor. personnel Relevant of eradication methods per (Short for 11 assessment) alien of project: 1 9 Risk 3 3 this knowledge X X X X X activity. 0% submitted eradication experience Supervisors: to 2% TET TET
of Responsibilities per CVs (Have Alien 5% None: 2%, 10% management, None:Identifier: application, Minimum allocated area, Years: 10%, veld 10%, be Years: 2 Years: 2 2 the 1 - 2 MemberUnique Revision: Page: X X X X X requirements Yes: Supervisor's will Experience. in control. < 1 > Qualifications basic herbicide Yes: TET TET TET
5:
Health & Safety
Source: Attachment No. 7.pdfin of
for Tender to as / weed e.g.. sprayers
in. and letters down indication 5% Experience vegetation activities safety an the all Criteria contract Blowers,
11 of Give specialise numbers for Specification for methods reference including of Relevant business: 1 8 cutters, and business: 0% Profile. do contact Returnable suitable work. 5% 15% knowledge contract - Evaluation eradication - primary Technical Grass procedures Contactable done. Year: 5% 10% this 15% level. primary Not 1 to etc. similarIdentifier: (Have Alien by Company actually with of Equipment work than Years: Years: they 20%, Working Technical of area, 3 5 Years: references References
5 5 5 - -Unique Revision: Page: Reference List Lawnmowers, sweepers Record required: the control.) Less 1 3 > References: similar > < Provide what Organogram Supervisor Vegetation Yes: Safe required
Qualitative 4: contract
for CRITERIA TableGardenfor available Description ReferencesStrategy Criteria vehicles EVALUATION and
and Stations StatementEvaluation Technical Evaluation experience Peaking equipment TECHNICAL Profile Method work the
atTechnical Qualitative Technical Contractor's Previous Company TechnicalTender Services QUALITATIVE Vegetation 1.1 1.2 1.3 1.4
3.4
Section
Source: Attachment No. 7.pdfTender Technical Evaluation Strategy for Garden Unique Identifier
3.1 Technical evaluation threshold
A weighted score-card approach is used to evaluate the technical compliance of tenders against the
technical specification. Tenderers need to have a weighted score of 70% overall or more to technically
weighted or point score but shall be assessed on a Yes/No basis as to whether the criteria are met. An
Qualitative Technical Evaluation Criteria are weighted evaluation used to identify the highest technically
ranked tenderer after determining that all the Mandatory Evaluation Criteria have been met. The
Qualitative Evaluation Criteria are weighted to reflect the relevant importance of each criterion. The
minimum weighted final score (threshold) required for the tender to be consider from the technical
perspective is 70% to ensure credibility of the tenderer to provide the service required by Eskom.
Table 1: Qualitative Evaluation Criteria Scoring Table
1 7 Evaluation licence. SpecificationIdentifier: Operator Returnable Technical ControlUnique Revision: Page: Technical
for Description OperatorStrategy EVALUATION Control Stations Criteria
PestEvaluation of Peaking Technical TECHNICAL proof the
Description
Source: Attachment No. 6c.pdfProvision of Vegetation Management Services at Port. The contract is subject to section 2(1)(f) of the Preferential Procurement Policy Framework Act, meaning the contract must be awarded to the tenderer scoring the highest points.
Evaluation Criteria
Source: Attachment No. 6c.pdf (unknown)Bidders must be registered on the Central Supplier Database (CSD) — implied by standard Eskom practice, though not explicitly stated in the extracted text.
Bidders must have a valid tax clearance (SARS TCS or tax pin) — implied by standard practice, not explicitly stated.
Bidders must hold a valid B-BBEE certificate or sworn affidavit; non-compliant bidders score 0 preference points but are not disqualified.
Bidders must submit a sworn affidavit that meets all validity requirements — if the affidavit is invalid, the bid may be disqualified.
Bidders must complete and sign the tender document; unsigned bids are likely invalid.
Bidders must commit to the SDL&I objectives — failure to meet contractual SDL&I obligations may result in penalties or retention being invoked.
No CIDB grading is stated — this is a services tender, not construction.
No minimum B-BBEE level is required for eligibility — bidders of any level (including non-compliant) may bid, but score 0 preference points if non-compliant.
B-BBEE Requirements
Source: Attachment No. 6c.pdf (unknown)Specific Goals: A maximum of 10/20 points may be awarded to a tenderer for the specific goal specified for the tender. The points scored for the specific goal must be added to the points scored for price and the total must be rounded off to the nearest two decimal places. Subject to section 2(1)(f) of the Preferential Procurement Policy Framework Act, the contract must be awarded to the tenderer scoring the highest points. B-BBEE Status Level of Contributor points table: Level 1: 10 (90/10) / 20 (80/20); Level 2: 9/18; Level 3: 6/14; Level 4: 5/12; Level 5: 4/8; Level 6: 3/6; Level 7: 2/4; Level 8: 1/2; Non-compliant: 0/0. Documents required to claim preference points: Valid B-BBEE certificate issued by a SANAS accredited verification agency / sworn affidavit / CIPC affidavit; Proof of ownership / shareholding (preferably CIPC documentation) inclusive of shareholding breakdown; Certified ID copies of shareholder(s); Proof of Disability (where applicable). Tenderer failing to provide documentation for the allocation of preference points will not be disqualified, but may only score point out of 90/80 for price and scores 0 points out of 10/20 for specific goals.
Special Conditions
Source: Attachment No. 6c.pdf (unknown)SDL&I Penalty and Performance Security: Eskom will apply a penalty of 1.5% of the Contract Value for failure to meet SDL&I obligations. For the duration of the contract, Eskom will retain 1.5% of every invoice (excluding VAT) as security for the fulfilment of all SDL&I Obligations. The retained amounts shall only be released to the Contractor upon fulfilment of all SDL&I obligations by the contractor.
Requirements
Source: Attachment No. 6c.pdf (unknown)Bidders must be registered on the Central Supplier Database (CSD) and hold a valid tax clearance. A valid B-BBEE certificate or sworn affidavit is required to claim preference points. Sworn affidavits must meet validity requirements: deponent's name as per ID, identity number, designation (director, owner, member), and the date signed by the deponent must match the date of the Commissioner of Oath. An enterprise can only have one status level.
Section
Source: Attachment No. 6c.pdfPoints are allocated per the 90/10 or 80/20 preference point system. Tenderers failing to provide documentation for preference points will not be disqualified but may only score points for price and zero points for specific goals. The contract is awarded to the tenderer scoring the highest total points.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Peaking Power Stations - - Peaking Power Stations -
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
20
Last checked
08 Sept 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Get deep intelligence on Services: General. Unlock full pricing strategies, bid frequency, and historical win rates.
Learn how to submit a winning bid with these related articles
Everything South African general contractors need to know about how to write a winning tender proposal without an in-house bid team in gauteng — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Your meticulously crafted General sector tender submission can be disqualified for a single, seemingly minor compliance oversight. The reality for South African contractors is that technical competence is no longer sufficient; it is underpinned by a non-negotiable framework of documentary compliance. This regulatory guide: mastering CSD and BBBEE compliance for general sector tenders in south africa provides a comprehensive, step-by-step breakdown of the mandatory registrations and certificates you must secure and present. We detail the precise requirements for CSD, BBBEE, SARS TCS, CIPC, and COIDA, explaining their function within the procurement ecosystem governed by the PFMA and PPPFA. Learn the actionable steps to prepare your business, avoid the most common disqualifying errors, and leverage technology to streamline your compliance process for successful bidding in 2026 and beyond.
For South African General contractors, the path to government procurement is paved with non-negotiable regulatory requirements. The most common barrier to entry is not a lack of capability, but a failure to master the foundational compliance frameworks that govern every bid. This complete regulatory guide to CSD and BBBEE compliance for General sector tender suppliers in South Africa demystifies the process. It provides a meticulous, step-by-step field manual for ensuring your company is fully compliant and audit-ready, enabling you to confidently access the R billions in opportunities across infrastructure maintenance, facilities management, and service delivery within the General sector.
This definitive guide provides General sector contractors with the precise, actionable steps required to achieve and maintain CSD and BBBEE compliance for South African public tenders in 2026. Authored by Dr. Sarah Mokwena, a Legal Compliance Specialist, it meticulously walks through the regulatory framework, mandatory registrations, and the critical documentation needed to avoid disqualification. We dissect the common, costly errors made during submission and provide a clear checklist to ensure your bid is responsive and competitive. Learn how to navigate the Central Supplier Database, validate your BBBEE status, and integrate compliance into your tender preparation process.
💡 Want more tendering tips and strategies?
Explore Our Blog