ESKOM invites offers to purchase, collect and remove one scrapped 20mva transformer at seboka substation in gauteng. The successful bidder must pay upfront, collect within 7 working days, and clean the site, with the final price determined through an e-auction after evaluation. Bidders must submit all mandatory returnables by 20 october 2026 at 10:00, and the highest-risk consideration is that any omission or late submission leads to disqualification.
Key Requirements
Closing: 20 October 2026 at 10:00, submit by email only to [email protected] with subject line exactly OLT2128226.
Non-compulsory viewing/clarification: 16 October 2026 at 13:00 at Seboka Substation; confirm attendance with Phallang Mokoena; PPE mandatory.
Mandatory returnables (missing any = disqualification): Offer to Purchase form, SARS Tax Clearance, B-BBEE affidavit or certificate, Secondhand Goods certificate, SBD 4, Authority to Submit, Integrity Pact, E-auction training acknowledgement, CIPRO and ID copies, CSD registration, COID letter of good standing, technical inventory list and method statement.
Evaluation: technical (Approach and Methodology 100%) then financial 80/20 (price 80%, B-BBEE 20%); final price via E-auction.
Payment: full payment to Eskom within 5 working days of sale, by bank cheque or EFT; equipment released only after payment and removal permit.
Collection: pay upfront and collect within 7 working days of work instruction; site must be left clean, oil spills rehabilitated.
Disqualification: bidders with defaulted or expired Eskom contracts or open non-conformances will not be awarded; all equipment sold voetstoots with no warranty.
Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
Compliance review. The working summary is checked against South African procurement standards — PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement — so nothing critical is missed before you start your bid response.
DocumentAnnexure A (1).1 Acknowledgement Form - Reverse E-auctioning Training.pdfReview complete
Important Dates
Source: Annexure A (1).1 Acknowledgement Form - Reverse E-auctioning Training.pdf (RFP)
Important Dates
09 Oct
2026
PUBLICATION
Tender Published
Tender was published
20 Oct
2026
DEADLINE
Closing Date
Tender closing date
Procurement Rules & Compliance ContextThis tender may be governed by South African public procurement rules covering fairness, transparency, preferential procurement, anti-corruption, administrative justice and access to information.
7 rules
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Core procurement rules
These rules commonly apply to South African public-sector procurement.
7
Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
high
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Constitution of the Republic of South Africa, 1996 – Section 217
Act 108 of 1996 (s217)
high
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Offer to Purchase-Scrapped 1 x 20MVA at Seboka Substation.pdf
Eskom invites offers to purchase, collect and remove one 20MVA scrap transformer at Seboka Substation. The unit is sold voetstoots as a single batch, with the buyer paying upfront and carrying out safe collection, handling, transport and site clean-up.
Purchase and removal of one 20MVA scrap transformer at Seboka Substation in Gauteng. Bidders submit an offer to buy and remove the unit under Eskom's Standard Conditions of Tender, with the sale conducted on a fair, equitable, transparent, competitive and cost-effective basis.
Eskom is selling one 20MVA scrap transformer at Seboka Substation, Gauteng, and invites offers for its purchase and removal. Bidding takes place online through the Eskom eAuction platform as a standard auction in which Eskom is the seller.
Purchase and removal of one scrap 20MVA transformer located at Seboka Substation, sold by Eskom in Gauteng. The successful bidder buys the scrap asset and is responsible for removing it from site.
Annexure A (1).1 Acknowledgement Form - Reverse E-auctioning Training.pdf
Eskom invites offers for the purchase and removal of one scrap 20MVA transformer located at Seboka Substation in Gauteng. The sale is run as a reverse e-auction, and bidders must confirm they can operate the reverse e-auction system.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Similar Tenders
Matched by category & region
Supplier Readiness Hub
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Supplies: GeneralFind supplies: general tenders and contract opportunities in South Africa. Browse active government procurement opportunities updated daily.
Based on Municipal avg. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Document read
Compliance review
Bid-ready summary
Closing date: 25 February 2022
Submission Guidelines
Source: Annexure A (1).1 Acknowledgement Form - Reverse E-auctioning Training.pdf (RFP)
Returnable documents:
Annexure A.1 (Acknowledgement Form – Reverse E-auctioning Training): the bidder must confirm attendance at the clarification-meeting training or completion of self-training via the uploaded video, and confirm ability to operate the Reverse E-auction system. The form must be completed and submitted with the bid.
Evaluation Criteria
Source: Annexure A (1).1 Acknowledgement Form - Reverse E-auctioning Training.pdf (RFP)
Bidders must be able to operate the reverse e-auction system. Evidence is the signed Annexure A.1 acknowledgement of either the clarification-meeting training or the self-training video.
Special Conditions
Source: Annexure A (1).1 Acknowledgement Form - Reverse E-auctioning Training.pdf (RFP)
The bidder must acknowledge attendance of Reverse E-auction training (either during the clarification meeting or via self-training of the uploaded video) and confirm ability to operate the Reverse E-auction system. The acknowledgement form (Annexure A.1) must be completed and submitted.
DocumenteAuction User Guide for Prospective Bidders.pdfReview complete
Description
Source: eAuction User Guide for Prospective Bidders.pdf
The Eskom eAuction site is a service where external users and companies bid for products or services via the Internet. It facilitates a competitive process between buyers and sellers in different locations. Online auctions mirror traditional auctions and usually involve multiple bidder participation. The site enables closed auctions for both Eskom sales and purchases with business partners, as well as open auctions to the public.
Submission Guidelines
Source: eAuction User Guide for Prospective Bidders.pdf (RFP)
Submission is conducted through the Eskom eAuction platform at https://eauction.eskom.co.za. Bidders must register on the site using the unique company security code provided by email to the primary user. Each user must have their own login credentials; passwords must be longer than 8 characters, include letters, numbers, special characters, at least one capital and one lower case letter. All bids are financially binding commitments. Once the auction closes, no further bids or changes are permitted. The procurement officer contacts the winning bidder directly to finalise the contract.
Evaluation Criteria
Source: eAuction User Guide for Prospective Bidders.pdf (RFP)
Auctions are awarded on a point-based system considering both price and B-BBEE rating. Final bids are subject to Eskom review, and the final award may also consider other requirements such as B-BBEE rating. Bidders must maintain their B-BBEE score rating.
Technical Specifications
Source: eAuction User Guide for Prospective Bidders.pdf (RFP)
The eAuction system supports open auctions (Eskom selling to the public), standard auctions (Eskom selling a product), and reverse auctions (Eskom buying a product or service). In standard auctions, each bid must be higher than the last; in reverse auctions, each bid must be lower. The system indicates the next required bid based on the current winning bid and a fixed increment. Bids made close to the end time extend the auction to allow other bidders to react. The auction closes when no new bids are received within the extension period.
Methodology
Source: eAuction User Guide for Prospective Bidders.pdf (RFP)
The eAuction system supports open, standard, and reverse auctions. In standard auctions, bids must be higher than the last; in reverse auctions, bids must be lower. The system indicates the next required bid based on the current winning bid and a fixed increment. Bids made close to the end time extend the auction to allow other bidders to react. The auction closes when no new bids are received within the extension period.
Pricing Schedule
Source: eAuction User Guide for Prospective Bidders.pdf
Starting bids are at the Eskom reserve value and increase at steady rates to meet market demand and item popularity. The time span of an online auction ranges from one to 10 days for items.
Financial Requirements
Source: eAuction User Guide for Prospective Bidders.pdf (RFP)
Bids made on an auction are a financial commitment to deliver the product or services at the offered price. It is a financially binding commitment. Starting bids are at the Eskom reserve value and increase at steady rates.
Compliance Requirements
Source: eAuction User Guide for Prospective Bidders.pdf (RFP)
Bidders must be registered on the Eskom eAuction site and hold the unique company security code issued to the primary user. Bidders must maintain their B-BBEE score rating, as auctions are awarded on a point-based system considering price and B-BBEE rating.
B-BBEE Requirements
Source: eAuction User Guide for Prospective Bidders.pdf (RFP)
Companies participating in Eskom eAuctions must maintain their B-BBEE score rating, as auctions are awarded on a point-based system considering both price and B-BBEE rating. Final bids are subject to Eskom review, and the final award may also consider other requirements such as B-BBEE rating. For details, contact the procurement officer.
Contractual Terms
Source: eAuction User Guide for Prospective Bidders.pdf (RFP)
Bids made on an auction are a financially binding commitment to deliver the product or services at the offered price. Bidders should read the End User Agreement for legal details.
Special Conditions
Source: eAuction User Guide for Prospective Bidders.pdf (RFP)
When an auction closes, all bidders receive an email from the Eskom eAuction site. Once closed, no more bids can be entered and no changes are possible. The procurement officer contacts the winning bidder directly to finalise the contract.
Requirements
Source: eAuction User Guide for Prospective Bidders.pdf (RFP)
All users must have their own login username and password; sharing is not allowed. Before registering, a user must have an email with their unique company security code. The company code is only sent to the primary user as indicated in the RFP response. Passwords must be longer than 8 characters, include letters, numbers, special characters, at least one capital and one lower case letter. The company code field must be populated with the code from the email to link the user to the company. All bids are linked to the user and company, and the audit trail identifies the user and the date and time of each bid.
SBD 4 (Bidder's Disclosure): declares whether the bidder, its directors, trustees, shareholders, members, partners, or controlling-interest holders are employed by the state; whether any relationship exists with employees of the procuring institution; and whether the bidder has an interest in any related enterprise. A false or incomplete disclosure disqualifies the bid.
Disqualification risks:
Bidders listed on the Register for Tender Defaulters or the List of Restricted Suppliers are automatically disqualified.
The tender is for the purchase and removal of a scrap 1x 20MVA transformer at Seboka Substation. The tenderer must buy the transformer and remove it from the site.
Compulsory site visit/clarification meeting: details in Tender Data; failure to attend results in disqualification. Date, time, and venue not stated in this document.
Tenderers must attend a site visit and/or clarification meeting if stipulated as compulsory; failure to attend will result in disqualification. Details are stated in the Tender Data, and tenderers may ask questions for clarity during the meeting.
Submission method: paper or e-tender as specified in the Tender Data.
Paper: submit one original and one complete copy, each in separate sealed packages marked "ORIGINAL" and "COPY". If an electronic copy is required, package separately and mark "ELECTRONIC COPY".
Outer package must be sealed, marked "Confidential", and show the Eskom address, Invitation to Tender number, tenderer's name, physical address, email, and contact telephone number of the authorised signatory.
E-tender: upload and finalise via the Eskom Tender Bulletin site on the Eskom E-tendering page before closing. No paper deposit allowed for e-tenders.
All tenders must be in English, completed in ink, and signed by an authorised signatory.
Late tenders are not accepted; proof of posting or courier does not equal proof of delivery.
Returnable documents: all mandatory returnables must be submitted by closing date and time. These include the Acknowledgement Form, proof of authority (if agent), CIDB proof (if applicable), B-BBEE certificate/CSD report (if pre-qualification), and any other forms listed in the Tender Data.
SDL&I Undertaking must be submitted by contract award.
Disqualification risks: missing original or copy, missing mandatory returnables, unsigned tender, 100% subcontracting, failure to attend compulsory site visit, false or fraudulent information.
Basic compliance: check that all required documents and original/copy are submitted.
Mandatory returnables: any missing mandatory document at closing disqualifies the tender.
Pre-qualification criteria (if any): must be met; no double dipping of criteria.
Functionality (if applicable): scored against criteria; must meet minimum threshold stated in Tender Data to proceed.
Financial analysis: Eskom assesses financial risk; if risk too high and no mitigating factors, tenderer not considered for award.
Price evaluation: per Tender Data criteria, considering factors like CPA, FOREX, commodity exposure, discounts, technical adjustment, PV, forecasted invoicing.
Arithmetical error check: errors corrected per rules; amount in words prevails over figures.
B-BBEE scoring: level as per CSD report or certificate/affidavit. If pre-qualification, proof at closing or disqualification; if only for points, missing/expired proof scores zero.
Specific Goals scoring: with supporting documentation; missing proof scores zero.
Ranking: price + Specific Goals scores added, ranked highest to lowest per PPPFA.
Objective criteria may be applied under Section 2(1)(f) PPPFA if stipulated; functionality and B-BBEE elements cannot be used as objective criteria.
Reverse e-auction may be used where indicated; if used, tender must not include prices.
Must comply with eligibility criteria in Tender Data.
Must not be under restriction to do business with Eskom or State-Owned Companies.
No 100% subcontracting of scope of work.
Legislative compliance:
Comply with National Treasury instruction notes, PPPFA regulations, amended B-BBEE Codes, CIDB regulations, COIDA, OHS Act, dtic designated local content requirements, and Eskom SHEQ requirements.
Sheq:
Provide proof of safety, health, environmental, and quality systems, policies, and capabilities at closing and/or contract award.
All SHEQ costs and personnel must be reflected in the tender.
CIDB:
If CIDB grading is stipulated in Tender Data, proof of registration is mandatory at closing; or proof of application at closing with actual registration printout by contract award.
B-bbee:
If B-BBEE level is a pre-qualification criterion, provide certificate/CSD number/CSD report at closing or be disqualified.
For PPPFA points, missing/expired/fraudulent proof scores zero (not disqualification).
Sub-contracting to designated groups requires sub-contractor's B-BBEE status proof at closing.
SDL&I Undertaking:
Must be completed and submitted by contract award.
Designated materials:
Submit information on designated materials and thresholds by contract award.
Agent:
If submitting via agent, provide authenticated copy of authority to act.
Integrity:
Misrepresentation or falsification leads to disqualification, suspension up to 10 years, and possible jail.
Tenderers must provide proof to Eskom's satisfaction that safety, health, environmental, and quality (SHEQ) systems, policies, and capabilities are in place at closing and/or contract award.
All costs and personnel associated with SHEQ must be reflected in the tender.
Tenderers must comply with eligibility criteria in the Tender Data, must not be under restriction to do business with Eskom or State-Owned Companies, and are not permitted to sub-contract 100% of the scope of work.
Tenderers must submit tenders by the closing date and time, in the specified format (paper or e-tendering), and must sign the tender.
Tenderers must hold tenders valid for the validity period and extend if requested.
Tenderers must treat documents as confidential, attend compulsory site visits/clarification meetings, seek clarification only from the Eskom Representative, and comply with relevant legislation including NT instructions, CIDB, PPPFA, B-BBEE, COIDA, OHS Act, and Eskom SHEQ requirements.
Proof of SHEQ systems must be provided.
CIDB registration is required where stipulated.
Contract Skills Development Goals and Contract Participation Goals apply as specified.
Tenderers must complete and submit the SDL&I Undertaking by contract award.
Tenderers must provide names of at least two financial institutions for security for performance if required.
Eskom will determine basic compliance, check mandatory tender returnables, apply pre-qualification criteria (without double dipping), score functionality against minimum thresholds, conduct financial analysis to assess risk, evaluate price according to Tender Data criteria, check for arithmetical errors with specified correction rules, score B-BBEE level as per CSD or certificate, score Specific Goals with supporting documentation, rank tenders by adding price and Specific Goals scores per PPPFA, and may apply objective criteria under Section 2(1)(f) of the PPPFA. Reverse e-auction may be used where indicated.
DocumentOffer to Purchase-Scrapped 1 x 20MVA at Seboka Substation.pdfReview complete
Description
Source: Offer to Purchase-Scrapped 1 x 20MVA at Seboka Substation.pdf
Eskom is the owner of the scrapped 20MVA transformer at Seboka Substation. Bidders are invited to submit an offer to purchase, collect and remove the scrap transformer as detailed in the Scope of Work and Offer to Purchase.
Important Dates
Source: Offer to Purchase-Scrapped 1 x 20MVA at Seboka Substation.pdf (unknown)
Closing date: 20 October 2026 at 10:00
Non-compulsory viewing/clarification meeting:
Date: 16 October 2026
Time: 13:00
Venue: Seboka Substation
Attendance: Tenderers must confirm intention to attend with the Eskom representative, stating the name, position and contact details of each proposed attendee.
PPE must be worn on all Eskom sites; access denied without minimum PPE.
Note: Viewing takes place after tender closing, in preparation for the E-auction.
Briefing Session
Source: Offer to Purchase-Scrapped 1 x 20MVA at Seboka Substation.pdf (unknown)
Non-compulsory viewing/clarification meeting:
Date: 16 October 2026
Time: 13:00
Venue: Seboka Substation
Tenderers must confirm intention to attend with the Eskom representative, stating the name, position and contact details of each proposed attendee.
PPE must be worn on all Eskom sites; access denied without minimum PPE.
Viewing takes place after tender closing, in preparation for the E-auction.
Contact Information
Source: Offer to Purchase-Scrapped 1 x 20MVA at Seboka Substation.pdf (unknown)
A bidder with an existing or expired Eskom contract on which it has defaulted, or with an open non-conformance, will not be awarded a new contract.
Returnable Documents
Source: Offer to Purchase-Scrapped 1 x 20MVA at Seboka Substation.pdf (unknown)
Returnable documents required at tender closing (disqualification if omitted):
Offer to Purchase form
Valid SARS Tax Clearance Certificate
B-BBEE affidavit (DTI template) or B-BBEE Verification Certificate from accredited agency
Secondhand Goods certificate from SAPS or licensee
SBD 4 (Bidder's Disclosure)
Authority to Submit Tender
Integrity Pact Declaration Form
E-auction training acknowledgement form
CIPRO registration documents and copies of directors' ID documents
Proof of CSD registration or MAAA number
Valid Letter of Good Standing with COID
Technical requirements: technical inventory list and method statement based on scope of work
Evaluation Criteria
Source: Offer to Purchase-Scrapped 1 x 20MVA at Seboka Substation.pdf (unknown)
Evaluation stages:
Mandatory returnables check (disqualification if incomplete).
Technical evaluation (two phases: desktop evaluation and site visit inspection) — inherent requirement to demonstrate technical capability.
Criteria (100%): Approach and Methodology (100%)
Technical and mechanical ability to manage and process project quantities.
Industry experience and ethical track record in line with the Second-Hand Goods Act.
Confidence in effective, efficient, timeous and economical performance.
Financial evaluation (80/20 system):
Best price: 80%
B-bbee: 20%
After evaluation, the final price is determined through an E-auction pricing tool.
Technical Specifications
Source: Offer to Purchase-Scrapped 1 x 20MVA at Seboka Substation.pdf (unknown)
Scope: Purchase, collect and remove scrapped 1 x 20MVA transformer at Seboka Substation.
Key requirements:
The successful tenderer must pay upfront for the allocated batch and collect the unit within 7 working days from the issue date of the approved work instruction / task order.
Payment must be in full for the unit indicated on each batch; quantities may not be re-batched.
The tenderer must have sufficient capacity and resources to service the contract at any given point from any given site, as quantities are not known upfront and depend on Eskom's operations.
The site must be left clean after collection; any oil spills must be rehabilitated.
The purchaser is responsible for safe collection, handling, removal and transportation of the scrapped transformer, using qualified labour and suitable certified plant, machinery, equipment and transport.
The goods on sale will be identified by Eskom.
Site conditions:
No accommodation allowed on site.
Littering prohibited; facilities for disposal waste must be provided during dismantling; no rubble left on site.
Portable fire-fighting equipment must be available during all stages of work.
An Eskom permit is required before commencement; notify the site agent for sign-off after completion.
All work must comply with the OHSA Act.
Rigging, transportation and any equipment/valves/pumps needed to pump oil directly into the flow truck must be included in the price.
The oil tenderer must hold an Environmental Waste Management Licence or a municipal certificate to transport hazardous waste between sites/provinces.
Methodology
Source: Offer to Purchase-Scrapped 1 x 20MVA at Seboka Substation.pdf
Method statement and approach:
The successful tenderer must pay upfront for the allocated batch and collect the unit within 7 working days from the issue date of the approved work instruction / task order.
Payment must be in full for the unit indicated on each batch; quantities may not be re-batched.
Sufficient capacity and resources to service the contract at any given point from any given site, as quantities are not known upfront.
The site must be left clean after collection; any oil spills must be rehabilitated.
The purchaser is responsible for safe collection, handling, removal and transportation, using qualified labour and suitable certified plant, machinery, equipment and transport.
Payment to Eskom no later than five days after the date of sale; release of equipment after receipt of payment and permit acquisition.
Technical evaluation requires a method statement based on the scope of work, demonstrating technical capability.
Quality Management
Source: Offer to Purchase-Scrapped 1 x 20MVA at Seboka Substation.pdf
Quality and safety management requirements:
Substance abuse procedure must be provided.
Vehicle management and driver safety procedure, including inspection, maintenance, driver fitness and fatigue management.
Company incident management procedure.
Environmental aspect and impact register (e.g., oil spillages).
Pricing Schedule
Source: Offer to Purchase-Scrapped 1 x 20MVA at Seboka Substation.pdf
Pricing schedule:
Price offered per item, exclusive of VAT.
The final bid price per item (ex VAT) will be used for each disposal transaction.
Item 1: 1 (one) 20MVA scrap transformer — to go through evaluation process first, then E-auction pricing tool to be used.
Total offer prices, excluding VAT, are payable to Eskom Holdings SOC Limited within five (5) working days after sale.
Payment by bank cheque or electronic bank transfer only.
VAT invoices will be issued on request.
Financial Requirements
Source: Offer to Purchase-Scrapped 1 x 20MVA at Seboka Substation.pdf (unknown)
Pricing format:
Price offered per item, exclusive of VAT.
The final bid price per item (ex VAT) will be used for each disposal transaction.
The 20MVA scrap transformer will go through the evaluation process first, then the E-auction pricing tool will be used.
Payment terms:
Payment to Eskom must be made no later than five (5) working days after the date of sale.
Payment by bank cheque or electronic bank transfer only.
Release of equipment/scrap occurs after receipt of payment and the buyer obtaining a permit to remove and transport.
Tax:
The successful tenderer's taxes must be in order, or a suitable arrangement made with the Receiver of Revenue.
A Tax Clearance Certificate (in respect of Tenders) must be submitted with the tender.
If the certificate is not included or is incorrect, Eskom may recover costs, cancel the agreement and claim damages.
Guarantee / warranty:
All equipment sold "voetstoots" — no guarantee or warranty as to workability or condition.
Buyers may familiarise themselves with the site prior to tendering.
Offer validity: 90 days from the closing date.
Compliance Requirements
Source: Offer to Purchase-Scrapped 1 x 20MVA at Seboka Substation.pdf (unknown)
Mandatory registrations and certificates:
Valid SARS Tax Clearance Certificate.
B-BBEE affidavit (DTI template) or B-BBEE Verification Certificate from an accredited agency.
Secondhand Goods certificate from SAPS or a licensee.
Proof of registration on National Treasury's Central Supplier Database (CSD) or a MAAA number.
Valid Letter of Good Standing with COID.
CIPRO registration documents and copies of directors' ID documents.
Health and safety (Annexure D):
Signed acknowledgement of Eskom's SHE rules and requirements (Annexure B).
OHS plan/manual aligned to the SHE Specification.
Baseline Risk Assessment (BRA) with methodology, including consequence, likelihood and risk ratings, mitigation measures, review and monitoring plan.
Valid Letter of Good Standing with compensation body (COID, FEMA or RMA).
SHE policy signed by CEO/MD, aligned to OHS Act section 7 or ISO 45001:2018.
SHE competency certificates: first aiders level 2, fire fighting, HIRA/risk assessment training.
Employees'/drivers' medical fitness certificates, valid driver's licences, PDP and truck operator appointments.
Substance abuse procedure.
Vehicle management and driver safety procedure (inspection, maintenance, driver fitness and fatigue management).
Company incident management procedure.
Environmental aspect and impact register (e.g., oil spillages).
Environmental (Annexure E):
Environmental policy signed by top management, dated and version controlled, committing to compliance, pollution prevention and continual improvement.
Emergency preparedness procedure/plan with emergency contact details.
Waste management plan, including disposal at licenced landfill sites and management of waste oil.
Other:
Proof of registration as a recycler.
B-BBEE minimum level: 2 (stated in the evaluation criteria).
Health & Safety
Source: Offer to Purchase-Scrapped 1 x 20MVA at Seboka Substation.pdf
Health and safety requirements:
All work must comply with the OHSA Act; safety requirements and documentation must be available on site.
Additional precautions when using cutting equipment; portable fire-fighting equipment on site during all stages.
An Eskom permit is required before commencement; notify the site agent for sign-off after completion.
SHEQ requirements:
Signed acknowledgement of Eskom's SHE rules and requirements (Annexure B).
OHS plan/manual aligned to the SHE Specification.
Baseline Risk Assessment (BRA) with methodology.
Valid Letter of Good Standing with compensation body (COID, FEMA or RMA).
SHE policy signed by CEO/MD, aligned to OHS Act section 7 or ISO 45001:2018.
SHE competency appointments with training records (first aiders, fire fighter, incident investigator).
Section 37(2) agreement (Annexure G) must be signed, acknowledging the contractor's duties under the OHSA and compliance with SHE specifications.
Environmental
Source: Offer to Purchase-Scrapped 1 x 20MVA at Seboka Substation.pdf
Environmental requirements:
Any oil spills caused during the work must be rehabilitated by the successful contractor.
The oil tenderer must hold an Environmental Waste Management Licence or a municipal certificate to transport hazardous waste between sites/provinces.
Environmental policy signed by top management, dated and version controlled, committing to compliance, pollution prevention and continual improvement.
Emergency preparedness procedure/plan specific to environmental emergencies, with emergency contact details.
Waste management plan: how waste generated on site will be managed, disposal at licenced landfill sites, and how waste oil will be managed.
Contractual Terms
Source: Offer to Purchase-Scrapped 1 x 20MVA at Seboka Substation.pdf (unknown)
Contract conditions:
Eskom accepts no liability for damages or losses (theft, damage, personal injury) during removal.
The bidder must adhere to site access conditions set by the Eskom site agent.
Littering prohibited; facilities for disposal waste must be provided; no rubble left on site.
No accommodation allowed on site.
Equipment sold "voetstoots" — no guarantee or warranty; buyers may inspect the site before tendering.
Offers valid for 90 days from closing date.
Eskom reserves the right not to accept the lowest or any tender, or to withdraw any item.
No variation or modification of the agreement is in force unless confirmed in writing.
A bidder with an existing or expired Eskom contract on which it has defaulted, or with an open non-conformance, will be disqualified.
A Section 37(2) agreement (Annexure G) must be signed, acknowledging the contractor's duties under the OHSA and compliance with SHE specifications.
Requirements
Source: Offer to Purchase-Scrapped 1 x 20MVA at Seboka Substation.pdf (unknown)
General requirements:
The successful tenderer's taxes must be in order, or a suitable arrangement made with the Receiver of Revenue.
A Tax Clearance Certificate (in respect of Tenders) must be submitted with the tender.
If the certificate is not included or is incorrect, Eskom may recover costs, cancel the agreement and claim damages.
Each party to a consortium/sub-contractor must complete a separate declaration.
Section
Source: Offer to Purchase-Scrapped 1 x 20MVA at Seboka Substation.pdf
Evaluation criteria:
Financial evaluation: Best price 80%, B-BBEE 20%.
Technical evaluation is two-phase: desktop evaluation and site visit inspection.
Technical criteria (100%): Approach and Methodology (100%)
Technical and mechanical ability to manage and process project quantities.
Industry experience and ethical track record in line with the Second-Hand Goods Act.
Confidence in effective, efficient, timeous and economical performance.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.