Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Proposal
Delivery Location
N/A - N/A - N/A - 2196
Organization Type
GOVERNMENT
Published
09 Oct 2026
OCDS Reference
ocds-9t57fa-173662
The national empowerment fund (NEF) is appointing a panel of delivery channel partners (dcps) to implement infrastructure refurbishment services under the spaza shop support fund, aimed at supporting spaza shops. The successful bidders will form a panel to deliver refurbishment services. The most consequential consideration is the strict email-only submission deadline of 14h00 on 26 october 2026, with late, faxed, or incomplete proposals being rejected.
Submission method: Proposals must be emailed to the correct address as specified in the RFP document; faxed proposals will not be accepted.
Closing deadline: Proposals must be received by 14h00 on 26 October 2026; emails received after this time will not be accepted.
Completeness: Incomplete proposals will be rejected.
RFP documents: Available from 05 October 2026 on the NEF website at www.nefcorp.co.za; bidders must obtain and follow the full specification and functional requirements.
Enquiries: Contact Supply Chain Management at [email protected] or (011) 305-8000.
Cancellation risk: The NEF reserves the right to cancel the tender if its needs change or if submissions are deemed inadequate.
Date & Time
Monday, 26 October 2026 - 14:00
Venue
null
Categories
Request for Proposal
N/A - N/A - N/A - 2196
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
Description
Source: 005_2026NEF-TenderAd16x4.pdf09 Oct
2026
Tender Published
Tender was published
26 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
FINAL-SSSF-INFRASTRUCTURE-PANEL-RFP_-29-SEPTEMBER.pdf
The National Empowerment Fund (NEF), as implementing agent of the Spaza Shop Support Fund, invites proposals to establish a panel of Delivery Channel Partners (DCPs) to deliver infrastructure refurbishment services for approved spaza shop beneficiaries. The work includes structural repairs, roofing, electrical and plumbing works, shelving, refrigeration, lighting, security systems, POS systems and signage, with a maximum implementation budget of R50,000 per beneficiary. Bidders may apply for one or more geographic areas (province, district, metropolitan or local municipality) and must demonstrate capacity to service the selected areas.
005_2026NEF-TenderAd16x4.pdf
The National Empowerment Fund (NEF) invites service providers to submit proposals for appointment to a panel of Delivery Channel Partners (DCPs) to implement infrastructure refurbishment services under the Spaza Shop Support Fund. The panel will support the refurbishment of spaza shops, with the full specification and functional requirements to be provided in the RFP documents available from 05 October 2026.
To download these documents and access AI-powered analysis, visit the main tender page.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
RΒ 644Β 235
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically β no action required from you.
The National Empowerment Fund (NEF) invites proposals for the appointment of a panel of Delivery Channel Partners (DCPs) to implement infrastructure refurbishment services under the Spaza Shop Support Fund. The NEF is an agency of the Department of Trade, Industry and Competition (the dtic) and promotes economic transformation through development finance for Black-empowered businesses.
Important Dates
Source: 005_2026NEF-TenderAd16x4.pdf (RFP)Closing date: 26 October 2026 at 14h00
RFP documents available on the NEF website (www.nefcorp.co.za) from 05 October 2026.
Contact Information
Source: 005_2026NEF-TenderAd16x4.pdf (RFP)Enquiries:
Address: 70 Grayston Drive, Sandown, Sandton, Johannesburg, 2196.
Submission Guidelines
Source: 005_2026NEF-TenderAd16x4.pdf (RFP)Submission method: email only. Proposals must be emailed to the correct address as specified in the RFP document, no later than 14h00 on 26 October 2026. Faxed proposals will not be accepted. Incomplete proposals will be rejected. No emails received after 14h00 will be accepted. The NEF reserves the right to cancel the tender if its needs change or if submissions are deemed inadequate.
Evaluation Criteria
Source: 005_2026NEF-TenderAd16x4.pdf (RFP)No evaluation criteria are stated in the available text. Bidders must submit a complete proposal by the closing date and time; incomplete proposals will be rejected. The NEF may cancel the tender if submissions are not adequate.
Technical Specifications
Source: 005_2026NEF-TenderAd16x4.pdf (RFP)The NEF requires the appointment of a panel of Delivery Channel Partners (DCPs) for the implementation of infrastructure refurbishment services under the Spaza Shop Support Fund. The scope includes refurbishment services to support spaza shops. Full specifications and functional requirements are provided in the RFP documents available from 05 October 2026 on the NEF website.
Compliance Requirements
Source: 005_2026NEF-TenderAd16x4.pdf (RFP)No specific compliance requirements are stated in the available text. The NEF is committed to the implementation of the Broad-Based Black Economic Empowerment Act and the Codes of Good Practice, but no specific B-BBEE levels or thresholds are mentioned in this advertisement.
Special Conditions
Source: 005_2026NEF-TenderAd16x4.pdf (RFP)The NEF reserves the right to cancel the tender if its needs change or if submissions are deemed inadequate. No emails received after 14h00 will be accepted. Incomplete proposals will be rejected. Faxed proposals will not be accepted.
Section
Source: 005_2026NEF-TenderAd16x4.pdf (RFP)Enquiries: Supply Chain Management, Tel: (011) 305-8000, Email: [email protected]. Address: 70 Grayston Drive, Sandown, Sandton, Johannesburg, 2196.
Description
Source: FINAL-SSSF-INFRASTRUCTURE-PANEL-RFP_-29-SEPTEMBER.pdfThe Spaza Shop Support Fund (SSSF) is a Government initiative to improve the sustainability, competitiveness and compliance of township and rural spaza shops. The National Empowerment Fund (NEF), as implementing agent, seeks to appoint a panel of Delivery Channel Partners (DCPs) to implement infrastructure refurbishment projects for approved SSSF beneficiaries. The refurbishment programme includes structural repairs, roofing, painting, electrical and plumbing works, shelving, refrigeration, lighting, security systems, POS systems, signage and other approved infrastructure improvements. DCPs appointed to the Panel will receive approved beneficiary allocations within the geographic areas for which they are appointed. The objectives are to improve compliance with health, safety and municipal requirements, enhance trading environment and operational efficiency, improve customer experience and long-term sustainability, promote local economic participation, and deliver infrastructure projects efficiently through geographically allocated DCPs.
Important Dates
Source: FINAL-SSSF-INFRASTRUCTURE-PANEL-RFP_-29-SEPTEMBER.pdf (RFP)Closing date: 26 October 2026 at 14:00
No compulsory briefing or site visit is stated.
Possible presentation: bidders will be notified at least 4 days before the presentation date.
Briefing Session
Source: FINAL-SSSF-INFRASTRUCTURE-PANEL-RFP_-29-SEPTEMBER.pdf (RFP)Bidders shall prepare for a possible presentation should NEF require such; bidders shall be notified thereof no later than 4 days before the actual presentation date.
Contact Information
Source: FINAL-SSSF-INFRASTRUCTURE-PANEL-RFP_-29-SEPTEMBER.pdf (RFP)Enquiries (all questions must be in writing):
Submission emails:
Submission Guidelines
Source: FINAL-SSSF-INFRASTRUCTURE-PANEL-RFP_-29-SEPTEMBER.pdf (RFP)Submission method: email only, in PDF format.
Returnable documents (all must be completed, signed and submitted):
Disqualification risks:
Returnable Documents
Source: FINAL-SSSF-INFRASTRUCTURE-PANEL-RFP_-29-SEPTEMBER.pdf (RFP)The following returnables must be submitted: Cover Page (clearly indicating RFP reference number, bid description and bidder's name), valid Tax Status Pin document, BEE credentials/rating certificate, valid CIDB Registration Certificate or CIDB CRS Registration Number (minimum Grade 1GB or higher), names and details of Senior Management, Shareholders Certificate, details of employees at Operational Level, completed and signed bid document including annexures (Company Details, Pages 14 to 24 Declarations and Annexures).
Evaluation Criteria
Source: FINAL-SSSF-INFRASTRUCTURE-PANEL-RFP_-29-SEPTEMBER.pdf (RFP)Two-stage evaluation:
Stage 1 β Functionality (technical) evaluation. Minimum qualifying score: 70 out of 100.
Scoring scale for each criterion: 0 = No evidence/unacceptable; 1 = Very weak; 2 = Below average; 3 = Acceptable; 4 = Very good; 5 = Excellent.
Functionality criteria and weights:
Bidders must provide documentary evidence for each criterion; insufficient evidence may result in zero points for that criterion. The NEF may verify submitted information and contact references.
Stage 2 β Preference point system (80/20 or 90/10) applied to bids that pass functionality:
Specific goals points (80/20 / 90/10):
51% Black ownership: 10 / 5
30% Black Women's ownership: 5 / 3
Technical Specifications
Source: FINAL-SSSF-INFRASTRUCTURE-PANEL-RFP_-29-SEPTEMBER.pdf (RFP)The National Empowerment Fund (NEF), as implementing agent of the Spaza Shop Support Fund (SSSF), seeks to appoint a panel of Delivery Channel Partners (DCPs) to implement infrastructure refurbishment projects for approved spaza shop beneficiaries.
Scope of refurbishment includes (but is not limited to): structural repairs, roofing, painting, electrical and plumbing works, shelving, refrigeration, lighting, security systems, Point of Sale (POS) systems, signage and other approved infrastructure improvements.
Budget: up to R50 000 per beneficiary, inclusive of all costs (VAT, transport, delivery, supervision, project management, procurement, installation, contingencies, professional/specialist fees, testing, certification and defects liability period).
DCP responsibilities:
Geographic coverage: bidders may bid for an entire province, an individual district, a metropolitan municipality, one or more local municipalities and/or a cluster. Bidders must indicate the geographic areas applied for and demonstrate sufficient operational capacity to service those areas. The NEF may appoint multiple DCPs within the same geographic area.
Methodology
Source: FINAL-SSSF-INFRASTRUCTURE-PANEL-RFP_-29-SEPTEMBER.pdfThe DCP must follow a structured implementation approach: 1) Accept beneficiary allocations from the NEF. 2) Conduct pre-implementation site verification (verify details, measurements, premises condition, constraints). 3) Assess compliance with health, safety and municipal requirements; implement reasonable adjustments within budget. 4) Develop project implementation schedule, procurement plan and mobilisation strategy. 5) Procure, deliver and install all approved items and materials. 6) Execute refurbishment works per specifications and standards. 7) Supervise works, manage subcontractors, ensure quality. 8) Conduct final inspections, rectify defects, obtain beneficiary acceptance and hand over. 9) Submit required reports (implementation, milestone, expenditure, completion certificates, beneficiary sign-offs, before-and-after photographs). 10) Provide post-implementation support and rectify defects during the defects liability period. 11) Subcontract specialist works only if necessary, remaining fully responsible. 12) Ensure statutory compliance and obtain all required inspections, certificates and approvals.
Experience & Qualifications
Source: FINAL-SSSF-INFRASTRUCTURE-PANEL-RFP_-29-SEPTEMBER.pdfBidders must demonstrate relevant experience and track record (20 points) through evidence of successfully completed infrastructure refurbishment, maintenance, construction or fit-out projects within the last five years. Team capacity and technical competence (15 points) requires CVs, certified qualifications, trade certificates, professional registrations and proof of experience of key personnel, supervisors and project managers. Bidders must submit copies of qualifications, IDs and CVs of personnel who will execute the work. A minimum of five (5) signed and contactable reference letters on client letterheads for similar completed projects is required.
Quality Management
Source: FINAL-SSSF-INFRASTRUCTURE-PANEL-RFP_-29-SEPTEMBER.pdfQuality management is addressed through the functionality criterion 'Reporting and Contract Administration' (5 points), which requires sample reports, reporting templates, project controls, contract administration process and quality assurance procedures. The DCP must supervise all refurbishment works, manage subcontractors and ensure quality workmanship throughout implementation.
Pricing Schedule
Source: FINAL-SSSF-INFRASTRUCTURE-PANEL-RFP_-29-SEPTEMBER.pdfPricing submitted in response to this RFP will be considered as part of the establishment of the DCP Panel and for services subsequently allocated. Inclusion on the Panel does not guarantee any minimum volume or value of work. All pricing must be inclusive of the full cost of delivering the approved beneficiary intervention, including transport, supervision, installation, applicable specialist/subcontracted works, testing/certification and the defects liability period, unless specifically excluded. The 80/20 or 90/10 preference point system shall apply depending on the estimated value of the procurement, beneficiary allocation, package of work, or project instruction. Under the 80/20 system, price is allocated 80 points and specific goals 20 points; under the 90/10 system, price is allocated 90 points and specific goals 10 points.
Financial Requirements
Source: FINAL-SSSF-INFRASTRUCTURE-PANEL-RFP_-29-SEPTEMBER.pdf (RFP)Pricing must be inclusive of the full cost of delivering the approved beneficiary intervention, including transport, supervision, installation, applicable specialist/subcontracted works, testing/certification and the defects liability period, unless specifically excluded. VAT must be included where applicable.
Inclusion on the panel does not guarantee any minimum volume or value of work.
Preference point system: 80/20 or 90/10 depending on the estimated value of the procurement, beneficiary allocation, package of work or project instruction.
No bid security, guarantee, retention or payment terms are stated.
Compliance Requirements
Source: FINAL-SSSF-INFRASTRUCTURE-PANEL-RFP_-29-SEPTEMBER.pdf (RFP)Mandatory registrations and documents:
B-BBEE categories by annual turnover:
Specific goals for preference points (as listed in evaluation criteria).
B-BBEE Requirements
Source: FINAL-SSSF-INFRASTRUCTURE-PANEL-RFP_-29-SEPTEMBER.pdf (RFP)B-BBEE size is determined by annual turnover: Exempted Micro Enterprises (EMEs) with turnover of R10 million or less, Qualifying Small Enterprises (QSEs) with turnover between R10 million and R50 million, and Generic/Large Enterprises with turnover exceeding R50 million. Specific goals for preference points: >51% Black ownership (10 points under 80/20, 5 under 90/10), >30% Black Women's Ownership (5 points under 80/20, 3 under 90/10), any % of ownership by Black Designated Groups >0 (1 point under 80/20, 0 under 90/10), Reconstruction Development Programme Objective: Promotion of SMMEs (Entities that are EME or QSE) (2 points under both systems), Youth ownership (2 points under 80/20, 0 under 90/10). Total points: 20 under 80/20, 10 under 90/10.
Health & Safety
Source: FINAL-SSSF-INFRASTRUCTURE-PANEL-RFP_-29-SEPTEMBER.pdfAll refurbishment works must comply with the Occupational Health and Safety Act, applicable SANS standards, building regulations and electrical compliance requirements. The DCP must assess whether the approved intervention will enable the beneficiary premises to comply with applicable health, safety and municipal requirements, and implement reasonable adjustments within the approved budget. COIDA Letter of Good Standing is required as part of compliance and accreditation evaluation.
Contractual Terms
Source: FINAL-SSSF-INFRASTRUCTURE-PANEL-RFP_-29-SEPTEMBER.pdfThe NEF reserves the right not to accept the lowest bid or any bid in part or in whole. The NEF reserves the right to appoint one or more successful bidders to the DCP Panel, in whole or in part, for one or more geographic areas. Appointment to the Panel does not guarantee allocation of any minimum number or value of beneficiaries, projects or work. The NEF reserves the right to withdraw this RFP at any stage with or without giving reasons. The RFP and the Bidder's response shall form part of any panel agreement, service level agreement or other agreement; in case of conflict, the applicable service level agreement or subsequent contractual instrument shall take precedence. Bids submitted by juristic persons or partnerships must be signed by a person duly authorized by a resolution of the board, a certified copy of which must be submitted. The Bidder's offer shall remain binding during the validity period. The Bidder confirms correctness and validity of its response, that prices and rates cover the services and requirements, and that any mistakes regarding prices, rates or calculations are at the Bidder's risk. The Bidder accepts full responsibility for proper execution and fulfillment of all obligations and conditions. The NEF will treat personal information as confidential in accordance with POPIA; by signing, the bidder consents to the use of their personal information as part of the bid process.
Special Conditions
Source: FINAL-SSSF-INFRASTRUCTURE-PANEL-RFP_-29-SEPTEMBER.pdf (RFP)The NEF is entitled to amend any RFP conditions, validity period, specifications, or extend the closing date before the closing date; all bidders will be advised in writing of such amendments. The NEF may allocate beneficiary projects to one or more Panel DCPs within any geographic area based on programme demand, geographic coverage requirements, operational requirements and DCP performance. No Panel DCP shall have an exclusive right to a geographic area unless expressly stated in writing. Each beneficiary or project allocation shall be subject to the approved intervention, applicable budget, scope, pricing and contractual requirements communicated by the NEF. Panel DCPs shall not commence work outside an approved allocation or instruction issued by the NEF.
Requirements
Source: FINAL-SSSF-INFRASTRUCTURE-PANEL-RFP_-29-SEPTEMBER.pdf (RFP)Bidders must submit a list of five (5) contactable references for similar infrastructure refurbishment, construction, maintenance or fit-out projects, including client contact details and project information. Copies of qualifications, identity documents and CVs of personnel who will execute the work must be attached. The following information must be provided: names and details of senior management, employment equity details of employees at operational level, percentage of ownership by number and profit share for Black ownership, Black women ownership and Youth ownership. A valid Tax Status Pin document must be included. Copies of any affiliations must be attached. Bidders must be registered on the National Treasury Central Supplier Database (CSD) and provide their CSD supplier number and unique registration reference number.
Section
Source: FINAL-SSSF-INFRASTRUCTURE-PANEL-RFP_-29-SEPTEMBER.pdfBidders must score a minimum of 70 out of 100 points in technical functionality to qualify for further evaluation. Evaluation criteria and weights: Relevant Experience and Track Record (20 points) - evidence of successfully completed infrastructure refurbishment, maintenance, construction or fit-out projects within the last five years. Implementation Methodology and Work Plan (20 points) - detailed methodology covering site verification, planning, procurement, implementation, project scheduling, quality management, reporting, beneficiary sign-off and handover. Geographic Delivery Capacity (20 points) - organogram, fleet list, equipment list, branch information, resource allocation plan, operational footprint and evidence of ability to service the geographic areas applied for. Team Capacity and Technical Competence (15 points) - CVs, certified qualifications, trade certificates, professional registrations and proof of experience of key personnel. Compliance and Accreditation (10 points) - CIDB Registration (minimum Grade 1GB), COIDA Letter of Good Standing, Public Liability Insurance and specialist registrations. Local Economic Participation Plan (5 points) - plan indicating utilisation of local labour, SMMEs, local suppliers and subcontractors. Contactable References (5 points) - minimum five signed and contactable reference letters on client letterheads for similar completed projects. Reporting and Contract Administration (5 points) - sample reports, reporting templates, project controls, contract administration process and quality assurance procedures. Total 100 points. Bidders must provide documentary evidence supporting each criterion; where sufficient evidence is not submitted, the criterion may receive zero points. NEF reserves the right to verify submitted information and contact references.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Address
70 Grayston Dr, Sandown, Sandton, 2031, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
2
Last checked
09 Oct 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Contact
+27 11 305 8000[email protected]www.nefcorp.co.za70 Grayston Dr, Sandown, Sandton, 2031, South Africa
Learn how to submit a winning bid with these related articles
Everything South African construction contractors need to know about how procurement officers verify cidb grades: what gauteng contractors must ensure is correct β april 2026 update β covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
How established construction firms use Joint Ventures with EMEs and QSEs to meet B-BBEE preferential procurement targets and access set-aside contracts.
Everything South African construction contractors need to know about cidb grading system explained: what every gauteng contractor must know in 2026 β april 2026 update β covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Everything South African construction contractors need to know about cidb vs nhbrc: understanding dual registration requirements for residential projects in gauteng β april 2026 update β covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
π‘ Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Construction. Unlock full pricing strategies, bid frequency, and historical win rates.