ESKOM requires load testing of overhead cranes and electrical hoists at kendal power station in mpumalanga, performed on an as-and-when-required basis over a five-year contract period. Pricing is submitted through part c2 pricing data against the scope described in part c3 scope of work — service information, with part c1 agreement and contract data carrying the form of offer and acceptance. The signed c1.1 Form is the bidder's binding offer, and IT must carry the bidder's CIDB registration number and a fully priced total. The highest-risk items are that securities, bonds, guarantees and proof of insurance must be arranged with the employer's agent within two weeks of receiving the completed agreement, and that any deviation not recorded in the schedule of deviations has NO effect.
Key Requirements
Closing: bids close on 12 January 2027 at 08:00; late submissions cannot be considered.
Returnable form: C1.1 Form of Offer and Acceptance must be signed by a representative duly authorised to bind the bidder, and the signed Offer constitutes the binding offer to perform the contract.
CIDB registration: the tenderer's CIDB registration number must be entered on the Form of Offer and Acceptance.
Pricing format: the Offer must state the total exclusive of VAT, VAT at 15%, and the total inclusive of VAT, in both figures and words; the VAT-inclusive total is for budgeting purposes only and actual amounts payable follow the conditions of contract.
Securities and insurance: within two weeks of receiving the completed agreement the contractor must contact the Employer's agent to arrange delivery of securities, bonds, guarantees, proof of insurance and any other required documentation — failure to do so is a repudiation of the agreement.
Deviations: deviations and amendments are valid only if recorded in the Schedule of Deviations; a bidder's covering letter does not form part of the contract.
Alternative tenders: any alternative bid must be submitted on a separate copy of the Form of Offer and Acceptance.
Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
Compliance review. The working summary is checked against South African procurement standards — PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement — so nothing critical is missed before you start your bid response.
DocumentInvitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 29 - 01 November 2026 (1)LOAD TESTING OF CRANES ELECTRIC HOIST - REV 1 (004).pdfReview complete
Description
Important Dates
24 Nov
2026
Tender published
Tender Published
Tender was published
12 Jan
2027
Submission deadline
Closing Date
Tender closing date
Procurement Rules & Compliance ContextThis tender may be governed by South African public procurement rules covering fairness, transparency, preferential procurement, anti-corruption, administrative justice and access to information.
7 rules
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Core procurement rules
These rules commonly apply to South African public-sector procurement.
7
Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
high
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Constitution of the Republic of South Africa, 1996 – Section 217
Act 108 of 1996 (s217)
high
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Eskom requires load testing of overhead cranes and electrical hoists on an as-and-when required basis for five years at Kendal Power Station in Mpumalanga. The contract is a NEC3 Term Service Contract (TSC3) Option A priced contract, with pricing based on a price list covering health and safety, transport, labour, and load testing of cranes and hoists.
Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 29 - 01 November 2026 (1)LOAD TESTING OF CRANES ELECTRIC HOIST - REV 1 (004).pdf
Eskom requires load testing of overhead cranes and electrical hoists on an as-and-when required basis for five years at Kendal Power Station. The contract will be an NEC3 Term Service Contract, with tenders evaluated on functionality (80% threshold) and price (80/20 preference points system).
ESKOM requires load testing of overhead cranes and electrical hoists on an as-and-when required basis for five years at Kendal Power Station in Mpumalanga. The contract is based on the NEC3 Term Service Contract (April 2013) and requires the contractor to complete Contract Data Part 2, including pricing details and key personnel information.
Eskom requires load testing of overhead cranes and electrical hoists on an as-and-when required basis for a five-year period at Kendal Power Station in Mpumalanga. The contract will be awarded through a competitive tender process, with pricing submitted on the provided Form of Offer and Acceptance.
Eskom requires load testing of overhead cranes and electrical hoists at Kendal Power Station in Mpumalanga, on an as-and-when-required basis over a five-year period. The contract is let under the NEC3 Term Service Contract (TSC3) between Eskom Holdings SOC Ltd and the appointed contractor.
Eskom requires load testing of overhead cranes and electrical hoists at Kendal Power Station on an as-and-when-required basis for a five-year period. The contract is an NEC3 Term Service Contract with a priced contract and task orders, and includes low service damages and strict safety and compliance obligations.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Similar Tenders
Matched by category & region
Supplier Readiness Hub
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Supplies: GeneralFind supplies: general tenders and contract opportunities in South Africa. Browse active government procurement opportunities updated daily.
Based on 18 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Document read
Compliance review
Bid-ready summary
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 29 - 01 November 2026 (1)LOAD TESTING OF CRANES ELECTRIC HOIST - REV 1 (004).pdf
Eskom requires load testing of overhead cranes and electrical hoists at Kendal Power Station, on an as-and-when-required basis, for a period of five years. The contract will be the NEC3 Term Service Contract. This is an open invitation to tender issued on 24 November 2026.
Important Dates
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 29 - 01 November 2026 (1)LOAD TESTING OF CRANES ELECTRIC HOIST - REV 1 (004).pdf (RFP)
Closing date and time: 12 January 2027 at 10:00
Clarification meeting: 3 December 2026 at 10:00 — non-compulsory, held on MS Teams
Clarification queries close: 5 working days before the tender submission deadline
Tender issue date: 24 November 2026
Tender validity period: 120 days from the closing date and time
Contact Information
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 29 - 01 November 2026 (1)LOAD TESTING OF CRANES ELECTRIC HOIST - REV 1 (004).pdf (RFP)
e-Tendering training videos: https://www.eskom.co.za/tenders/
Service delivery
Kendal Power Station, Mpumalanga
Submission Guidelines
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 29 - 01 November 2026 (1)LOAD TESTING OF CRANES ELECTRIC HOIST - REV 1 (004).pdf (RFP)
Submission channel
Electronic submission only, via the Eskom e-tendering site: https://etendering.eskom.co.za
No hard copies will be accepted.
Documents must be uploaded under the folders Technical, Commercial, Financial and Other.
All documents in PDF; the price list in PDF plus a copy in Excel.
Upload limits: 500 MB per document and 4 GB per submission.
Zip or condensed files may not be uploaded.
The submission status must be indicated as complete.
If a tender is resubmitted, only the latest version is accepted and all earlier submissions become void.
Late tenders will not be accepted.
No public opening takes place; tenders are downloaded electronically and prices are not read out.
Alternative tenders are not allowed.
Closing
12 January 2027 at 10:00.
Returnables required at closing — disqualifiable if not completed, signed or submitted
Annexure A — Authorisation Form: authorises the named signatory to bind the bidder.
Annexure B — Acknowledgement Form.
Annexure C — Tenderer's Particulars.
Annexure D — Integrity Pact Declaration Form (the Eskom Supplier Integrity Pact must be read).
Annexure E — CPA for local goods/services, if applicable.
Annexure F — CPA(IG) for imported goods/services, if applicable.
Annexure H — SBD 1 Invitation to Bid: bidder and contact details, signed as the offer.
Annexure J — SBD 4 Declaration of Interest: discloses state employment or connections to the department.
E-tendering Help Manual acknowledgement form.
NEC3 Term Services Contract completed in full.
Completed pricing schedule.
CSD registration (CSD number or CSD report).
COIDA letter of good standing.
Employment Equity compliance proof, for designated employers (South African bidders).
Certified tax clearance certificate where the bidder has no CSD registration or SARS PIN.
Annual financial statements for the financial due diligence.
Returnables required at closing — non-disqualifiable, may be requested in writing within 5 working days
Annexure I — SBD 6.1 Preference Points Claim Form under the PPPFA 2022 regulations.
Tax Evaluation Questionnaire, for personal services contracts.
Returnables required at closing for evaluation — missing or incomplete scores zero, no disqualification
Proof of the specific goals claim.
Not applicable
Annexure G1–G4 (SBD 6.2 local production and content declaration) unless designated materials apply.
Reverse e-auction training acknowledgement and reverse e-auction process forms.
Joint venture bidders
Letter of intent to form a JV/consortium, or a valid JV agreement stating each partner's rights, obligations and profit-sharing ratios.
Written confirmation that the JV will operate as a single incorporated business entity for the contract duration, or this obligation included in the JV agreement.
Details and confirmation of a single designated bank account in the JV's name, independent of the individual partners.
Clarification queries
Submit in writing to the Eskom Representative at least 5 working days before the tender submission deadline.
Evaluation Criteria
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 29 - 01 November 2026 (1)LOAD TESTING OF CRANES ELECTRIC HOIST - REV 1 (004).pdf (RFP)
Evaluation stages
Eligibility and basic compliance — meet the eligibility criteria, submit via Eskom e-tendering, and provide complete commercial, financial and technical information.
Functionality — mandatory technical criteria plus scored functionality; bidders below the threshold are disqualified.
Price and specific goals — 80/20 preference point system.
Functionality
Company Experience: 30%.
Personnel Experience and Qualification: 70%.
Minimum qualifying score: 80% — bidders below this are disqualified.
Detailed technical evaluation criteria are set out in Appendix A.
Price (80 points)
Evaluated inclusive of VAT, corrected for arithmetical errors, excluding contingencies in any bill of quantities or activity schedule, and adjusted for acceptable variations or deviations.
Net present value comparison of each adjusted tender based on the tendered programme and prices, price adjustment factors and exchange rate fluctuations where applicable.
Unconditional discounts are taken into account for evaluation; conditional discounts are not scored but are applied when payment is made.
Specific goals (20 points)
Scored under the PPPFA.
Failure to submit evidence of a specific goal claim does not disqualify the bid, but scores zero for that goal.
Ranking
The 80/20 system applies to tenders of R50 million or less.
Price and specific goal scores are added and bidders ranked from highest to lowest.
Other
Objective criteria: not applicable.
Reverse e-auction: not applicable.
Contractual requirements (CSD registration, SHEQ, financial viability) are not evaluation criteria; they are assessed after evaluation and ranking, and only shortlisted bidders that passed the mandatory and functionality evaluation are assessed. They get one opportunity to submit outstanding documents within 7 working days.
Eskom may negotiate with preferred bidders if tendered prices are not market-related.
Technical Specifications
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 29 - 01 November 2026 (1)LOAD TESTING OF CRANES ELECTRIC HOIST - REV 1 (004).pdf (RFP)
Scope
Load testing of overhead cranes and electrical hoists at Kendal Power Station.
Work is on an "as and when required" basis over a five-year period.
Contract conditions: NEC3 Term Service Contract.
Technical requirements
Method statement for earthing of electrical and control equipment, demonstrating compliance with the full scope of work, aligned to OHS Act Driven Machinery Regulations 18, SANS 19, SANS 12480, ISO 9927-1 and ISO 10245.
A Registered Lifting Machinery Inspector with ECSA accreditation is required.
Personnel
Site Crane Technician (site leader/supervisor).
Crane Technician.
1st Technician Assistant.
2nd Technician Assistant.
Other
CIDB requirements are not applicable.
Cataloguing may be required after contract award; delivered materials must meet Eskom's labelling specifications and the pricing schedule must include a cataloguing line item, which Eskom pays for.
Experience & Qualifications
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 29 - 01 November 2026 (1)LOAD TESTING OF CRANES ELECTRIC HOIST - REV 1 (004).pdf
Functionality criteria — minimum threshold 80%
Company experience (30%)
Company profile showing work with lifting machines — 5%.
Proof of experience and past performance on similar contracts with references — 5% (fewer than 3 contracts 0%, 3 to 5 contracts 3%, more than 5 contracts 5%).
Method statement for earthing of electrical and control equipment — 5% weighting, scored on coverage: complete method statement 20%, 51–80% of scope covered 16%, under 50% covered 8%, none 0%.
Personnel experience and qualification (70%)
Site Crane Technician (site leader/supervisor): supervision proficiency and experience with references — 5% (more than 5 years 5%, 3–5 years 4%, under 3 years 0%); safety awareness and OHS Act compliance — 5%; Registered Lifting Machinery Inspector with ECSA accreditation — 15%, certificate certified by a Commissioner of Oaths; National Diploma or N6 certificate — 10%, certified.
Crane Technician: relevant experience with references — 5% (more than 5 years 5%, 3–5 years 3%, under 3 years 0%); National Diploma or N6 certificate — 10%, certified.
Bidders scoring below the 80% threshold are disqualified.
Quality Management
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 29 - 01 November 2026 (1)LOAD TESTING OF CRANES ELECTRIC HOIST - REV 1 (004).pdf
Quality Category 3 — the supplier must show a developed, implemented and maintained quality management system complying with ISO 9001 (latest revision ISO 9001:2015).
Documents to submit (approved or signed copies)
QMS manual, or documented information defining the QMS and its scope.
Quality policy aligned with the supplier's strategic direction.
Signed Form A (Enquiry/Contract/Quality Requirements for Supplier).
Quality objectives.
Internal audit procedure.
Control of nonconforming outputs.
Nonconformity and corrective action procedure.
Draft contract quality plan.
Where applicable, an example inspection and test plan (ITP) or quality control plan (QCP) from similar or previous work.
Documented information on roles, responsibilities and authorities for the QMS.
Documented information for control of externally provided processes, products and services.
Pricing Schedule
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 29 - 01 November 2026 (1)LOAD TESTING OF CRANES ELECTRIC HOIST - REV 1 (004).pdf
A completed pricing schedule must be submitted, unless it is already contained in the NEC3 Term Services Contract, in PDF plus an Excel copy.
The pricing schedule must include a line item for cataloguing where cataloguing is required; Eskom pays for cataloguing.
Prices are evaluated inclusive of VAT, corrected for arithmetical errors, excluding contingencies in bills of quantities or activity schedules, and adjusted for acceptable variations or deviations.
Net present value comparison applies, based on the tendered programme and prices, price adjustment factors and exchange rate fluctuations where applicable.
Unconditional discounts are taken into account for evaluation; conditional discounts are not scored but applied at payment.
Price carries 80 of the 100 preference points.
Financial Requirements
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 29 - 01 November 2026 (1)LOAD TESTING OF CRANES ELECTRIC HOIST - REV 1 (004).pdf (RFP)
Pricing
A completed pricing schedule is required, submitted in PDF plus an Excel copy.
Prices are evaluated inclusive of VAT and score out of 80 points.
Unconditional discounts count for evaluation; conditional discounts are applied only at payment.
Payment terms
Contracts below R50 000 000 including VAT: payment within 30 days of receipt of undisputed invoices.
Contracts above R50 000 000 including VAT: payment within 60 days of receipt of undisputed invoices.
Security
Provision of security for performance: not applicable.
Financial due diligence (contractual requirement)
Latest approved annual financial statements of the tendering company — drafts and management accounts are not accepted. Must include company background, signed director's report, signed auditor's/reviewer's/compiler's/accounting officer's report, statement of financial position, statement of comprehensive income, statement of changes in equity, statement of cash flows and notes.
Signed public interest score for South African entities that are not audited, showing the actual score, whether the company is owner-managed, and whether the statements were externally prepared.
Copies of ITA34C for the current and previous years of assessment, for South African entities that are not audited.
Unincorporated JVs or SPVs: each partner must submit its own annual financial statements covering all the above items.
Financial analysis is compulsory as a contractual requirement for CIDB-related transactions from R30 000 excluding VAT.
Other
Eskom may negotiate with preferred bidders if tendered prices are not market-related.
Compliance Requirements
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 29 - 01 November 2026 (1)LOAD TESTING OF CRANES ELECTRIC HOIST - REV 1 (004).pdf (RFP)
Registration and tax
CSD registration is mandatory (CSD number or CSD report).
Local bidders must provide a SARS e-filing PIN for verification, or their CSD profile/number; otherwise a certified tax clearance certificate is required.
Foreign bidders with a South African footprint but not registered on CSD and without a SARS PIN must submit a certified tax clearance certificate.
Foreign suppliers with no South African footprint complete SBD 1 only; no proof of tax compliance is required.
Mandatory technical criterion
The company must be a registered LME (Lifting Machine Entity) with the Department of Labour; proof of registration or certificate must be submitted, certified by a Commissioner of Oaths.
B-bbee
Proof of B-BBEE status level means a certificate issued by an authorised body or person, a sworn affidavit as prescribed by the B-BBEE Codes of Good Practice, or another requirement prescribed under the B-BBEE Act.
Preference points are claimed on SBD 6.1 (Annexure I).
Safety, quality and environment
COIDA: original certificate of good standing, or proof of application, issued by the Compensation Fund or a licensed compensation insurer (South African bidders).
SHEQ requirements apply; the SHE file must be approved before work may start.
Quality: ISO 9001:2015 quality management system evidence (Category 3).
Environmental: ISO 14001:2015.
Employment equity
Bidders that are designated employers under the Employment Equity Act must provide proof of compliance, including proof of submission of the Employment Equity report to the Department of Labour (South African bidders).
Eligibility
Bidders must not be restricted from doing business with Eskom or State-Owned Companies, must not be on National Treasury's restricted list or the Tender Defaulters list, and must not be restricted by Eskom.
Bidders with the nationality of a country on an international sanctions list are ineligible; this also applies to proposed subcontractors and suppliers.
A bidder may submit only one tender, whether individually or as a JV/consortium partner.
JV or consortium agreements must state that the parties are jointly and severally liable for executing the contract.
A conflict of interest disqualifies a bidder.
Tenders signed by unauthorised persons are ineligible.
A bidder that subcontracts 100% of the scope of work is ineligible.
Main contractors are discouraged from subcontracting to their own subsidiaries; any such subcontract must be declared in the tender.
Not applicable
CIDB grading, Contract Skills Development Goals and Contract Participation Goals.
Health & Safety
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 29 - 01 November 2026 (1)LOAD TESTING OF CRANES ELECTRIC HOIST - REV 1 (004).pdf
Health and safety returnables
Annexure B: acknowledgement of Eskom's OHS legal and other requirements, signed and submitted.
Health and safety plan addressing the OHS risks of the scope of work and aligned with the health and safety specifications.
Detailed costing for OHS management, broken down and not a lump sum, based on the overall scope of work.
Baseline OHS risk assessment identifying, assessing and managing OHS risks, including the risk assessment methodology.
Valid letter of good standing (COIDA or equivalent).
OHS policy signed by the CEO, complying with section 7 of the OHS Act.
OHS competency: CVs, qualifications and certificates for the competencies required by the scope, risks and OHS plan.
COIDA: original certificate of good standing, or proof of application, from the Compensation Fund or a licensed compensation insurer (South African bidders).
The SHE file must be approved before the contractor may start work.
Environmental
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 29 - 01 November 2026 (1)LOAD TESTING OF CRANES ELECTRIC HOIST - REV 1 (004).pdf
The service provider must comply with:
Environmental Management System ISO 14001:2015.
Kendal waste and recycling management work instruction (*1024102); waste must be disposed of legally and the environmental department provided with a waste manifest and safe disposal certificate.
Non-conformance, corrective and preventative action (*1017357).
Environmental legal and other requirements (*1015685).
Environmental communication (*1015692).
Environmental management procedure for contractors (1018332).
An oil spill kit must be on site, with a person trained in oil spillage.
An environmental file must be submitted and approved by the environmental department before work starts.
Any environmental incident must be reported immediately to the environmental department.
Contractual Terms
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 29 - 01 November 2026 (1)LOAD TESTING OF CRANES ELECTRIC HOIST - REV 1 (004).pdf
Contract
NEC3 Term Service Contract, for a five-year period on an as-and-when-required basis.
Contractual requirements
CSD registration is mandatory; SHEQ and financial viability may also apply.
These are assessed after evaluation and ranking, and only shortlisted bidders that passed the mandatory and functionality evaluation are assessed.
Shortlisted bidders get one opportunity to submit outstanding documents within 7 working days; failure may render the bid non-responsive and ineligible for award.
Payment
Contracts below R50 000 000 including VAT: payment within 30 days of receipt of undisputed invoices.
Contracts above R50 000 000 including VAT: payment within 60 days of receipt of undisputed invoices.
Other conditions
Provision of security for performance: not applicable.
Work may not commence until the SHE file is approved.
Eskom may negotiate with preferred bidders if tendered prices are not market-related.
Subcontracting to a bidder's own subsidiary is discouraged and must be declared in the tender.
Cataloguing information may be required after award; materials must meet Eskom's labelling specifications and the pricing schedule must include a cataloguing line item.
Section
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 29 - 01 November 2026 (1)LOAD TESTING OF CRANES ELECTRIC HOIST - REV 1 (004).pdf
Functionality
Company Experience: 30%.
Personnel Experience and Qualification: 70%.
Minimum threshold: 80% — bidders below the threshold are disqualified.
Detailed criteria are in Appendix A.
Price and specific goals
Price scores out of 80 points; specific goals score out of 20 points under the PPPFA.
The 80/20 preference point system applies to tenders of R50 million or less.
Missing evidence of a specific goal claim scores zero for that goal but does not disqualify the bid.
Price and specific goal scores are added and bidders ranked highest to lowest.
Sequencing
Contractual requirements are not evaluation criteria; they are assessed after evaluation and ranking, and only shortlisted bidders that passed the mandatory and functionality evaluation are assessed.
Shortlisted bidders get one opportunity to submit outstanding documents within 7 working days.
Objective criteria and reverse e-auction are not applicable.
DocumentC2 TSC3 Pricing Data Option A.pdfReview complete
Description
Source: C2 TSC3 Pricing Data Option A.pdf
Load testing of overhead cranes and electrical hoists on an as-and-when-required basis for a period of five years at Kendal Power Station, contracted under NEC3 TSC3 Option A. This part of the pack covers the pricing data: the pricing assumptions and the price list the bidder must complete.
Important Dates
Source: C2 TSC3 Pricing Data Option A.pdf (unknown)
Price escalation base date: October 2026.
Submission Guidelines
Source: C2 TSC3 Pricing Data Option A.pdf (unknown)
Returnable pricing documents
Price List (C2.2): every item must be priced, and the form signed, printed with the contractor's name and dated.
Pricing Assumptions (C2.1): the Option A pricing basis must be applied when compiling the price list.
The bidder must select one of the two options on the price list: prices fixed for the full five-year term, or prices subject to the stated escalation clause.
Pricing basis
Lump sum items: an amount is entered in the Price column only, with the Unit, Expected Quantity and Rate columns left blank.
Rate-based items: the rate is entered and multiplied by the expected quantity to produce the Price.
Time-based items: the unit of time is stated in the Unit column and the expected duration in the Expected Quantity column.
All amounts are exclusive of VAT, totalled per section and carried to a summary total.
Technical Specifications
Source: C2 TSC3 Pricing Data Option A.pdf (unknown)
Scope
Load testing of overhead cranes and electrical hoists on an as-and-when-required basis over a five-year period at Kendal Power Station.
The Price List is a pricing document only; the work to be done and how it is performed are set out in the Service Information, and the contractor provides the service in accordance with the Service Information.
The contractor must show how each price list item relates to the operations in the clause 21.2 plan submitted for acceptance.
Overhead cranes to be load tested (estimated quantities)
100/32 Ton: 4
40/16 Ton: 2
40 Ton: 2
10 Ton: 6
8 Ton: 26
5 Ton: 22
Electrical hoists to be load tested (estimated quantities)
20 Ton: 6
10 Ton: 26
10 Ton portable electrical hoist: 6
5 Ton: 20
3.2 Ton: 12
3 Ton: 24
2.5 Ton: 4
2 Ton: 24
2 Ton portable electrical hoist: 2
1.5 Ton: 6
1 Ton: 18
Labour (per year)
Site Supervisor x1, LMI registered: 174 days
Crane Technician x1: 174 days
Semi-skilled assistants x3: 174 days
Transport
Home/work/home travel: 34 800 km
Health and safety items to be supplied and priced
Medicals: 20 annually
Health and safety file: 1
Hard hats, overalls, gloves, safety shoes, hearing protection, safety goggles, safety harnesses: 20 each
First aid box: 1
Pricing Schedule
Source: C2 TSC3 Pricing Data Option A.pdf
Pricing schedule structure (TSC3 Option A price list)
Section 1: Health and safety items.
Section 2: Transport and equipment — home/work/home travel, 34 800 km.
Section 3: Labour — Site Supervisor x1 (LMI registered), Crane Technician x1 and Semi-skilled assistants x3, each 174 days per year.
Section 4: Load testing of overhead cranes — 100/32 Ton (4), 40/16 Ton (2), 40 Ton (2), 10 Ton (6), 8 Ton (26), 5 Ton (22).
Section 5: Load testing of electrical hoists — 20 Ton (6), 10 Ton (26), 10 Ton portable (6), 5 Ton (20), 3.2 Ton (12), 3 Ton (24), 2.5 Ton (4), 2 Ton (24), 2 Ton portable (2), 1.5 Ton (6), 1 Ton (18).
Section 6: Summary of the section totals.
How to complete it
Lump sum items: enter the amount in the Price column only.
Rate-based items: enter the rate; it is multiplied by the expected quantity to give the Price.
Time-based items: state the unit of time and the expected number of units.
Amounts are shown per year and over five years, exclusive of VAT.
The bidder must indicate whether prices are fixed for the full five-year term or subject to the escalation clause (Year 1 15% fixed; Years 2 to 5 escalated on the stated indices; base date October 2026).
The completed price list must be signed, printed with the contractor's name and dated.
Financial Requirements
Source: C2 TSC3 Pricing Data Option A.pdf (unknown)
Contract type
NEC3 Term Service Contract (TSC3), Option A — a priced contract.
Prices are the amounts in the Price column of the Price List; where a quantity is stated, the Price is the quantity multiplied by the rate.
The Price for Services Provided to Date is the total of completed lump sum items plus, for quantity-based items, the completed quantity multiplied by the rate.
Lump sum items are not adjusted if the actual amount or quantity of work differs from the tender estimate; the only basis for change is a compensation event.
Items not shown separately must be priced within the rates of other listed items so that the tendered total covers the full service.
Escalation
Fixed prices for the full five-year term are preferred.
If fixed pricing is not offered, the only acceptable escalation is: Year 1 prices 15% fixed; Years 2 to 5 escalate on the stated indices (for example SEIFSA).
15% of the prices remain fixed and 85% are subject to escalation.
Base date for escalation: October 2026.
All price list amounts are exclusive of VAT.
Health & Safety
Source: C2 TSC3 Pricing Data Option A.pdf
Health and safety items to be supplied and priced in the price list:
Medicals: 20 annually
Health and safety file: 1
Hard hats: 20
Overalls: 20
Gloves: 20
Safety shoes: 20
Hearing protection: 20
Safety goggles: 20
Safety harnesses: 20
First aid box: 1
DocumentC1 2a TSC3 Data by Employer.pdfReview complete
Description
Source: C1 2a TSC3 Data by Employer.pdf
Contract data items
Compensation events are managed under core clause 6 of the NEC3 TSC.
Use of equipment, plant and materials is managed under core clause 7.
Additional employer's risks: security delays or access restrictions, and changes to scope during execution.
Important Dates
Source: C1 2a TSC3 Data by Employer.pdf (unknown)
Closing
12 January 2027 at 10:00.
Contract dates
Contract start date: to be confirmed.
Service period: five years from the Contract Date.
Base date for price adjustment indices: one calendar month before the tender closing date (December 2026).
Response periods
Emergency requests: within 24 hours.
Other requests during normal operations: within 3 working days.
First programme for acceptance: within 2 weeks of the Contract Date.
Task Order programme: within 3 days of receiving the Task Order.
Compensation event notification: within 8 weeks of becoming aware of the event.
B-BBEE status change notification: within 7 days; updated verification certificate within 30 days.
SBD 4 (Declaration of Interest): discloses whether any director, shareholder or member is employed by the state or connected to anyone at the procuring institution.
SBD 6.1 (Preference Points Claim): claims B-BBEE preference points under the PPPFA.
SBD 8 (Declaration of Bidder's Past Supply Chain Management Practices): declares any previous disqualification or restriction.
SBD 9 (Certificate of Independent Bid Determination): certifies the price was set independently, without collusion or price disclosure.
All returnable forms must be completed, signed and submitted with the bid.
Registration
Bidders must be registered on the Central Supplier Database (CSD).
A valid tax compliance status (SARS TCS or tax compliance PIN) is required.
Evaluation Criteria
Source: C1 2a TSC3 Data by Employer.pdf (unknown)
Preference points
B-BBEE preference points are claimed under the PPPFA; SBD 6.1 must be submitted with the bid.
Eligibility screening
CSD registration and valid tax compliance status.
Criminal verification record security clearance certificates for all personnel requiring site access.
Demonstrated competency and skills to perform load testing of overhead cranes and electrical hoists.
Compliance with Eskom's Life-Saving Rules and safety protocols.
Ability to provide the insurance required by the contract.
Technical Specifications
Source: C1 2a TSC3 Data by Employer.pdf (unknown)
Scope
Load testing of overhead cranes and electrical hoists at Kendal Power Station.
Delivered on an as-and-when-required basis under Task Orders over a five-year term.
Affected property: Kendal Power Station.
Execution
Testing and inspection are carried out at Kendal Power Station by the service provider, with Eskom witnessing.
The contractor detects, records and reports defects; correcting defects is the employer's responsibility.
The Service Manager arranges site access for re-testing after the employer has corrected defects.
Contract framework: NEC3 Term Service Contract (TSC3), main Option A (priced contract with price list), with secondary Options X1, X2, X17, X18 and X19.
Risk register matters
Potential industrial unrest or labour disruption at Kendal Power Station.
Skills or competency gaps among contractor personnel.
Non-compliance with the station's Life-Saving Rules and safety protocols.
Dusty working area.
Damage to property during loading and offloading of test weights.
Delays in delivery of weights.
Delayed access to plant and unavailability of plant.
Non-compliance with SHEQ regulations.
Unavailability of a permit to work (PTW) or responsible person (RP).
Quality Management
Source: C1 2a TSC3 Data by Employer.pdf
Testing and defects
Testing and inspection are carried out at Kendal Power Station by the service provider, with Eskom witnessing.
If a test or inspection reveals a defect, the service provider identifies it for the employer to correct, and the test is repeated.
The contractor's obligation is limited to detecting, recording and reporting defects; correcting defects is the employer's responsibility.
The Service Manager arranges site access for re-testing after the employer has corrected defects.
Service levels
Low Service Damages apply for failure to meet the service levels in Annexure A and are deducted from amounts due.
Applying Low Service Damages does not limit the employer's right to claim further costs, losses or damages.
Each breach attracts 2% of the Task Order value per incident, capped at 10% of the Task Order value:
Missing or late test certificates or inspection reports.
Non-compliance with Life-Saving Rules (non-injury incidents).
Missing B-BBEE certificate or tax compliance element.
Failure to attend scheduled operational or performance meetings without valid written excuse.
Environmental non-compliance.
Safety and health non-compliance; the safety file must be up to date for audit.
Financial Requirements
Source: C1 2a TSC3 Data by Employer.pdf (unknown)
Pricing
Main Option A: priced contract with a price list.
Prices are fixed and firm for the first year; contract price adjustment applies from the 13th month after the anniversary date.
Base date for indices: one calendar month before the tender closing date (December 2026).
Currency: South African Rand.
Payment
Assessment interval: between the 25th and 30th day of each successive month.
Payment is made within 30 calendar days of a signed assessment by both parties and a valid tax invoice.
Eskom's standard payment term for contracts above R50 000 000 (including VAT) is 60 days.
Interest on late payment is at the Standard Bank prime rate (365-day year).
A tax invoice must be submitted within one week of the payment certificate; Eskom's VAT number 4740101508 must appear on each invoice.
Damages
Delay damages: 5% of the Task Order value per day of delayed completion, capped at 20% of the total Task Order value.
Low Service Damages: 2% of the Task Order value per incident, capped at 10% of the Task Order value.
Liability and insurance
The contractor's liability for indirect or consequential loss is limited to R0.00; the employer's liability for the contractor's indirect or consequential loss is also limited to R0.00.
The contractor's total liability is capped at the total of the Prices, except for excluded matters (third-party property loss or damage, death or injury, and intellectual property infringement), which are unlimited.
End of liability: 12 months after completion of each Task Order.
The contractor must provide the insurances in Insurance Table A from the starting date until completion or termination; the employer provides the insurances in Insurance Table B.
Compliance Requirements
Source: C1 2a TSC3 Data by Employer.pdf (unknown)
Registration and tax
Registration on the Central Supplier Database (CSD).
Valid tax compliance status (SARS TCS or tax compliance PIN).
B-bbee
Any change in B-BBEE status must be reported to the employer within 7 days.
An updated B-BBEE verification certificate and supporting documents must be submitted within 30 days of the change.
A decrease in B-BBEE status may lead to renegotiation or termination of the contract.
Failure to report a change in B-BBEE status may be grounds for termination.
Security clearance
Criminal verification record security clearance certificates are required for every person (including subcontractor personnel) needing site access, at the contractor's cost.
Certificates must be issued by a reputable screening company accredited by the South African Police Service, be no older than four weeks, and remain valid while access is required.
The employer may require updated certificates every 26 to 52 weeks.
Access may be refused at the employer's sole discretion; this is not a compensation event.
Health, safety and environment
The contractor may be appointed Principal Contractor under the Construction Regulations 2014 and must comply with all applicable OHS and environmental laws.
Asbestos: occupational exposure limit 0.2 regulated asbestos fibres per millilitre of air (4-hour TWA); short-term limit 0.6 fibres per millilitre (10-minute TWA).
Asbestos removal and disposal is done by a registered asbestos contractor, instructed and paid for by the employer.
Ethics and data
No coercive, collusive, corrupt, fraudulent or obstructive action is permitted during procurement or execution; breach may lead to termination.
POPIA compliance is required, including lawful processing of shared personal information and restrictions on cross-border transfers.
Insurance
The contractor must maintain the insurances in Insurance Table A.
Health & Safety
Source: C1 2a TSC3 Data by Employer.pdf
OHS obligations
The contractor must take all reasonable precautions to protect the health and safety of persons involved in the service.
The employer may appoint the contractor as Principal Contractor under the Construction Regulations 2014.
The contract price must include sufficient allowance for compliance with the Construction Regulations and all applicable OHS laws, rules and procedures.
The contractor must ensure subcontractors, employees and others under its control comply.
Site risks
Dusty working area.
Damage to property during loading and offloading of test weights.
Delayed access to plant and unavailability of plant.
Non-compliance with SHEQ regulations.
Unavailability of a permit to work (PTW) or responsible person (RP).
Non-compliance with the station's Life-Saving Rules and safety protocols.
Asbestos
Occupational exposure limit: 0.2 regulated asbestos fibres per millilitre of air (4-hour TWA); short-term limit 0.6 fibres per millilitre (10-minute TWA).
If asbestos is identified, a risk assessment is done and control measures implemented; personnel may stop work and leave the area until it is declared safe.
Asbestos removal and disposal is by a registered asbestos contractor, instructed and paid for by the employer.
Security clearance
Criminal verification record security clearance certificates are required for all personnel needing site access, at the contractor's cost.
Certificates must be from a SAPS-accredited screening company, no older than four weeks, and updated every 26 to 52 weeks.
Access may be withdrawn if a certificate lapses or a criminal conviction is recorded; this is not a compensation event.
Environmental
Source: C1 2a TSC3 Data by Employer.pdf
Environmental compliance
The contractor must comply with all applicable environmental laws, regulations, rules and procedures, and ensure subcontractors and employees do the same.
Environmental non-compliance is a service level breach attracting Low Service Damages of 2% of the Task Order value per incident, capped at 10%.
Environmental inspections, contraventions, incident reports and audit findings are monitored.
Asbestos
The employer manages asbestos and asbestos-containing materials under its Asbestos Standard 32-303.
If asbestos is identified, a risk assessment is conducted and control measures implemented; personnel may stop work and leave the area until it is declared safe.
Contract dates are extended by the notification periods required by the Asbestos Regulations, 2001.
Asbestos removal and disposal is by a registered asbestos contractor, instructed and paid for by the employer.
Contractual Terms
Source: C1 2a TSC3 Data by Employer.pdf
Contract framework
NEC3 Term Service Contract (TSC3, April 2013), main Option A (priced contract with price list), dispute resolution Option W1, secondary Options X1, X2, X17, X18 and X19, and additional conditions Z1 to Z16.
Governed by South African law; the language of the contract is English.
Dispute resolution
Adjudication by a person from the ICE-SA panel of adjudicators; if the parties cannot agree, the ICE-SA Division appoints the adjudicator.
Arbitration under the Association of Arbitrators (Southern Africa) rules, held in Johannesburg.
Assignment and joint ventures
No cession, delegation or assignment without the employer's written consent.
Joint venture members are jointly and severally liable; the key person authorised to bind the contractor must be notified within two weeks of the Contract Date.
The composition of a joint venture may not change without written consent.
Confidentiality
Contract information may not be disclosed to others; images of the affected property require prior written consent and all rights vest in the employer.
Termination
Termination follows core clause 9; a business rescue order against the contractor is added as a ground for termination.
Liability
The contractor's liability for indirect or consequential loss is limited to R0.00; the employer's liability for the contractor's indirect or consequential loss is also limited to R0.00.
The contractor's total liability is capped at the total of the Prices, except for excluded matters (third-party property loss or damage, death or injury, and intellectual property infringement), which are unlimited.
End of liability: 12 months after completion of each Task Order.
Insurance
Insurance Table A (contractor): loss or damage to the employer's property, plant and materials, and equipment, at replacement cost or the employer's policy deductible; third-party property damage and bodily injury or death.
Insurance Table B (employer): assets all risk, contract works, environmental liability, general and public liability, transportation (marine), motor fleet and mobile plant, terrorism, cyber liability, and nuclear material damage and business interruption.
Nuclear liability
The employer operates the Koeberg Nuclear Power Station and indemnifies the contractor against nuclear damage, except where caused by unlawful intent or unauthorised presence on site.
Asbestos
The employer manages asbestos and asbestos-containing materials under its Asbestos Standard 32-303.
If asbestos is identified, a risk assessment is done and control measures implemented; personnel may stop work and leave the area until it is declared safe.
Contract dates are extended by the notification periods required by the Asbestos Regulations, 2001.
Popia
Both parties are independent responsible parties for shared personal information and must comply with POPIA, including consent, notification of regulator complaints, and restrictions on cross-border transfers.
Contractor details are completed only at award stage.
Contract documents
Part C1: Agreements and Contract Data (21 pages).
Part C2: Pricing Data (5 pages).
Part C3: Scope of Work (24 pages).
C1.1: Form of Offer and Acceptance (3 pages).
C1.2a: Contract Data provided by the Employer (16 pages).
C1.2b: Contract Data provided by the Contractor (2 pages).
Pricing Schedule
Source: C0 TSC3 Contract cover pages.pdf
Pricing is captured in Part C2 (Pricing Data), a five-page section of the contract pack. Rates are submitted against that schedule for work called off as and when required over the five-year term.
Pricing format: rates are submitted in Part C2 (Pricing Data), the five-page pricing section of the contract pack.
DocumentC1 2b TSC3 Data by Contractor.pdfReview complete
Contact Information
Source: C1 2b TSC3 Data by Contractor.pdf (unknown)
Guidance notes source
Organisation: Engineering Contract Strategies
Telephone: 011 803 3008
Fax: 086 539 1902
Website: www.ecs.co.za
Purpose: supplies the NEC3 Term Service Contract and the TSC3 Guidance Notes referenced in the contract data.
Submission Guidelines
Source: C1 2b TSC3 Data by Contractor.pdf (unknown)
Returnable document
C1.2B Contract Data Part 2 (TSC3): completed by the tendering contractor and incorporated into the agreement.
Completion rules
Every field relevant to the chosen Option must be completed in full; an incomplete data set does not create a complete contract.
Where a form field marker appears, type the data into the field; otherwise complete by hand in ink.
Data the contractor must supply: contractor name, address, telephone and fax; direct fee percentage; subcontracted fee percentage; matters for the Risk Register; where the Service Information for the contractor's plan is held; where the plan is contained; key people details and CVs; where the price list is held; the tendered total of the Prices.
Bidders should read the NEC3 Term Service Contract (April 2013) and the relevant TSC3 Guidance Notes before completing the data.
Technical Specifications
Source: C1 2b TSC3 Data by Contractor.pdf (unknown)
Scope
Load testing of overhead cranes and electrical hoists at Kendal Power Station.
Work is called off on an as-and-when-required basis over a five-year period.
Contractor plan
The contractor must state where the Service Information for its plan is held and where the plan itself is contained.
Key people
The contractor must name its key people and give each one's job, responsibilities, qualifications and experience, and state where their CVs are held.
Experience & Qualifications
Source: C1 2b TSC3 Data by Contractor.pdf
Key people
The contractor must list its key people in the contract data.
For each key person: name, job, responsibilities, qualifications and experience.
The contractor must state where the CVs of the key people, and any further key person data, are held.
Financial Requirements
Source: C1 2b TSC3 Data by Contractor.pdf (unknown)
C1.1 Form of Offer and Acceptance: the signed Offer is the tenderer's binding offer to perform the contract; the Employer accepts by signing the Acceptance part and returning one copy to the tenderer.
Alternative tenders must be submitted on a separate copy of the form.
Deviations from the tender documents are valid only if recorded in the Schedule of Deviations; a tenderer's covering letter does not form part of the contract.
Technical Specifications
Source: C1 1 TSC3 Offer Acceptance.pdf (unknown)
Scope
Load testing of overhead cranes and electrical hoists at Kendal Power Station.
Work is performed on an as-and-when required basis over a five-year contract period.
Contract documents
Part C1: Agreement and Contract Data (includes the Form of Offer and Acceptance).
Part C2: Pricing Data.
Part C3: Scope of Work — Service Information.
Drawings and other documents incorporated by reference into the above parts.
Pricing Schedule
Source: C1 1 TSC3 Offer Acceptance.pdf
Pricing form
Pricing is submitted under Part C2: Pricing Data.
The Offer records the total of the prices exclusive of VAT, VAT at 15%, and the total amount due inclusive of VAT, in figures and in words.
The VAT-inclusive total is required for budgeting purposes only; the amounts actually due are assessed in terms of the conditions of contract.
Financial Requirements
Source: C1 1 TSC3 Offer Acceptance.pdf (unknown)
Pricing
The Offer must state the total price exclusive of VAT, VAT at 15%, and the total inclusive of VAT, in figures and in words.
The VAT-inclusive total is required for budgeting purposes only; amounts actually payable are determined by the conditions of contract.
Securities and insurance
Within two weeks of receiving the completed agreement, the contractor must contact the Employer's agent to arrange delivery of securities, bonds, guarantees, proof of insurance and any other documentation required under the Contract Data.
Failure to meet these obligations constitutes repudiation of the agreement.
Compliance Requirements
Source: C1 1 TSC3 Offer Acceptance.pdf (unknown)
Form requirements
The tenderer's CIDB registration number must be entered on the Form of Offer and Acceptance.
The Offer must be signed by a representative duly authorised to bind the tenderer.
Deviations are recognised only if contained in the Schedule of Deviations.
Alternative tenders require a separate copy of the Form of Offer and Acceptance.
Contractual Terms
Source: C1 1 TSC3 Offer Acceptance.pdf
Contract formation
The agreement takes effect on the date the tenderer receives one fully completed and signed original copy of the Form of Offer and Acceptance, including the Schedule of Deviations if any.
The contract comprises Part C1 (Agreement and Contract Data), Part C2 (Pricing Data) and Part C3 (Scope of Work: Service Information), together with incorporated drawings and documents.
The Offer remains open for acceptance for the validity period stated in the Tender Data, or another period agreed between the parties.
Deviations
Only deviations and amendments recorded in the Schedule of Deviations are valid; no other written, oral or implied matter arising between issue of the tender documents and receipt of the signed form has any effect on the contract.
Post-award obligations
Within two weeks of receiving the completed agreement, the contractor must contact the Employer's agent to arrange delivery of securities, bonds, guarantees, proof of insurance and any other documentation required by the Contract Data, at or just after the date the agreement comes into effect.
Failure to fulfil these obligations is treated as repudiation of the agreement.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.