Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Issuing Organization
South African Nuclear Energy Corporation LimitedLocation
North West
Closing Date
25 Aug 2026
Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
1 TAU DR - Broederstroom - Hartbeespoort - 0216
Organization Type
GOVERNMENT
Published
11 Aug 2026
OCDS Reference
ocds-9t57fa-165299
Necsa requires a bathymetric survey of an evaporation pond used for disposal of uranium-contaminated sludge, covering approximately 8 560 m², to quantify water and sediment profiles and produce a survey report with raw data files. The most consequential requirement is the compulsory site briefing on 2026/08/18 and the 80-point functionality threshold, which bidders must meet to be considered responsive.
Compulsory site briefing on 2026/08/18 at 10h00; ID copies must be sent in advance for access, and foreign suppliers must send passports 7 days before the briefing for vetting.
Pre-qualification: CIDB CE 1 grading required.
Functionality threshold: bidders must score at least 80 out of 100 points on functionality (company experience, equipment, team leader experience, professional membership) to be considered responsive.
Equipment must be unmanned or remotely controlled, measure water depth using acoustic pulses, penetrate sediment using low-frequency acoustics, provide precise horizontal and vertical positions, and measure water surface elevation.
Team leader must have at least 11 years of experience for full points; proof of qualifications and CVs with contactable references required.
Professional membership with SAGC, SACNASP, or ECSA required for points.
Quotation must be submitted by email to [email protected] before 2026/08/25 at 16:00, and must include the method statement, SBD 4, Tax Clearance Certificate, B-BBEE certificate or EME affidavit, and COIDA Letter of Good Standing.
Date & Time
Tuesday, 25 August 2026 - 16:00
Venue
NECSA GATE 3
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Please send ID copies for access before date. NO new requests will be attended to on day of site briefing. Foreign suppliers should send passports 7 days before briefing for vetting.
Categories
Request for Quotation
1 TAU DR - Broederstroom - Hartbeespoort - 0216
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: CA(SA) - Chartered Accountant, PMI-PMP (Project Management Professional), Prince2 Practitioner, Six Sigma Certification
AI Document Analysis Stages
Submission Guidelines
Source: 1Standard REVISED SBD 4 -Annexure A.docx (unknown)11 Aug
2026
Tender Published
Tender was published
25 Aug
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
1Standard REVISED SBD 4 -Annexure A.docx
The South African Nuclear Energy Corporation Limited (Necsa) requests quotations for the surveying of an evaporation pond containing radioactive material. The work involves specialist surveying services at a nuclear facility, with bids due by 25 August 2026.
Request for Quotation_MMT Pond 6.pdf
A bathymetric survey of an evaporation pond containing uranium-contaminated sludge, covering an area of approximately 8,560 m², to quantify water and sediment volumes and produce contour plans and a survey report. The survey is being procured by the South African Nuclear Energy Corporation Limited (Necsa).
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
South African Nuclear Energy Corporation LimitedContact Person
Catherine Matima
Phone
012-305-3027
Secure NECSA tenders with AI Matching & Recommendations, nuclear-science intelligence, compliance analysis, and structured support for research and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Median Estimate
R 364 320
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Returnable form: SBD 4 (Bidder's Disclosure) must be completed, signed and submitted with the quotation. The form requires disclosure of any employment by an organ of state, any relationship with persons employed by the procuring institution (Necsa), and all CSD-registered active companies linked to directors. Failure to disclose all linked companies leads to disqualification. The signed declaration certifies the bid is independent and not collusive; false declarations may result in rejection or legal action.
Evaluation Criteria
Source: 1Standard REVISED SBD 4 -Annexure A.docx (unknown)Bidders must not be listed on the Register for Tender Defaulters or the List of Restricted Suppliers. Bidders must disclose any employment by an organ of state and any relationship with persons employed by Necsa. Bidders must disclose all CSD-registered active companies linked to all directors. Bidders must certify that their bid is independent and not collusive, and that they were not involved in drafting the specifications. The bidder must sign the disclosure form, accepting that false declarations may lead to rejection or legal action.
Technical Specifications
Source: 1Standard REVISED SBD 4 -Annexure A.docx (unknown)1.1 Any person (natural or juristic) may make an offer or offers in terms of this invitation to bid. In line with the principles of transparency, accountability, impartiality, and ethics as enshrined in the Constitution of the Republic of South Africa, 1996 (Constitution), and further expressed in the various applicable legislation, it is required for the bidder to make this declaration in respect of the details required hereunder.
Compliance Requirements
Source: 1Standard REVISED SBD 4 -Annexure A.docx (unknown)Complete and sign SBD 4 (Bidder's Disclosure). Ensure no director or shareholder is employed by an organ of state, or disclose such employment. Disclose any relationship with persons employed by Necsa. Disclose all CSD-registered active companies linked to directors. Certify that the bid is independent and not collusive, and that the bidder was not involved in drafting the specifications.
Description
Source: Request for Quotation_MMT Pond 6.pdfThe evaporation pond was used for disposal of uranium-contaminated sludge between 1991 and 2017. The pond has a surface area of approximately 8 560 m² with about 200 mm of sand over the liner. The survey must quantify water and sediment profiles.
Important Dates
Source: Request for Quotation_MMT Pond 6.pdf (RFQ)Site briefing (compulsory): 2026/08/18 at 10h00. ID copies must be sent in advance for access; no new access requests will be attended to on the day. Foreign suppliers must send passports 7 days before the briefing for vetting.
Closing: 2026/08/25 at 16:00.
Contact Information
Source: Request for Quotation_MMT Pond 6.pdf (RFQ)Contact person: Catherine Matima
Email: [email protected]
Quotation validity: 90 days from the closing date.
Submission Guidelines
Source: Request for Quotation_MMT Pond 6.pdf (RFQ)Returnable documents — all must be completed, signed and submitted with the quotation:
Submission channel: email the completed RFQ response to [email protected] before the closing date and time.
Disqualification risks:
Returnable Documents
Source: Request for Quotation_MMT Pond 6.pdf (RFQ)Required documents: Tax Clearance Certificate (SARS tax PIN), SBD 4 (Declaration of Interest), B-BBEE certificate or affidavit if EME, and Letter of Good Standing (COIDA).
Evaluation Criteria
Source: Request for Quotation_MMT Pond 6.pdf (RFQ)Two-phase evaluation:
Phase 1 — Functionality (100 points):
Minimum threshold: bidders scoring less than 80 out of 100 on functionality are non-responsive and disqualified.
Phase 2 — PPPFA 80/20 system:
Bidders must submit a method statement demonstrating capability to execute the works; the methodology must be accepted by Necsa.
Technical Specifications
Source: Request for Quotation_MMT Pond 6.pdf (RFQ)Scope: bathymetric survey of an evaporation pond used for disposal of uranium-contaminated sludge (sludge discharged 1991–2017). Pond surface area approximately 8 560 m²; approximately 200 mm of sand over the pond liner.
Deliverables:
Equipment will be exposed to radiological contamination. Necsa will attempt decontamination; if unsuccessful, equipment will be replaced at its current book value.
Bidders must provide basic PPE (e.g. gloves, safety shoes) for all employees involved.
Methodology
Source: Request for Quotation_MMT Pond 6.pdfBidders must provide a detailed methodology for the bathymetric survey, which must be accepted by Necsa. The methodology should cover how the survey will be executed, including equipment and approach.
Experience & Qualifications
Source: Request for Quotation_MMT Pond 6.pdfTeam leader must have relevant experience in the scope of work: 11+ years = 35 points, 6–10 years = 20 points, 5 years or less = 5 points. Proof of qualifications and CVs with contactable references required. Professional membership with SAGC, SACNASP, or ECSA earns 10 points.
Quality Management
Source: Request for Quotation_MMT Pond 6.pdfNecsa's quality policies require compliance with ISO 9001, ISO 17025, and RD 0034 (Quality and Safety Management Requirements for Nuclear Installations). Bidders must align with these standards.
Pricing Schedule
Source: Request for Quotation_MMT Pond 6.pdf (RFQ)Pricing must be itemised in the costing table with subtotal (excl. VAT), VAT at 15%, and total (incl. VAT). Include line items for the bathymetric survey, technical report, and equipment replacement cost at book value.
Financial Requirements
Source: Request for Quotation_MMT Pond 6.pdf (RFQ)Pricing must be itemised using the costing table provided, with line items for the bathymetric survey, technical report, and equipment replacement cost at book value.
Pricing requirements:
Payment will be according to Necsa's General Conditions of Purchase.
Compliance Requirements
Source: Request for Quotation_MMT Pond 6.pdf (RFQ)Required documentation:
Pre-qualification: CIDB CE 1 grading required.
B-BBEE: Failure to submit proof of B-BBEE status level means preference points for specific goals are not claimed. Necsa may require substantiation of any claim.
Compliance with Necsa's General Conditions of Purchase, PPPFA 2000, Preferential Procurement Regulations 2022, and GCC.
Health & Safety
Source: Request for Quotation_MMT Pond 6.pdfBidders must provide basic PPE (e.g. gloves, safety shoes) for all employees involved in the project. Necsa's safety policies reference OHSAS 18001 and RD 0034.
Contractual Terms
Source: Request for Quotation_MMT Pond 6.pdfThe RFQ is subject to Necsa's General Conditions of Purchase, the Preferential Procurement Policy Framework Act 2000 and its 2022 Regulations, and the General Conditions of Contract (GCC).
Orders above R 30 000 are evaluated under the PPPFA 80/20 system with a functionality scorecard where applicable; orders above R 1 million are subject to the full tender process.
No goods or services may be delivered to Necsa without an official purchase order.
Necsa reserves the right to cancel or reject any quote, not to award to the lowest bidder, to award parts to different bidders, or not to award at all.
Offering any gift, payment, loan, reward, inducement, or other advantage to a Necsa employee constitutes a material breach and may lead to termination of the agreement.
By responding, the bidder acknowledges full familiarity with and agreement to the conditions set out in the RFQ and its attachments.
Special Conditions
Source: Request for Quotation_MMT Pond 6.pdf (RFQ)Necsa reserves the right to cancel or reject any quote, not to award to the lowest bidder, or to award parts to different bidders. By responding, the bidder agrees to all conditions in the RFQ and its attachments.
Section
Source: Request for Quotation_MMT Pond 6.pdfPhase 2 uses the 80/20 system: 80 points for price, 20 points for B-BBEE status level. Points by level: Level 1 = 20, Level 2 = 18, Level 3 = 14, Level 4 = 12, Level 5 = 8.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
1 TAU DR - Broederstroom - Hartbeespoort - 0216
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
2
Last checked
11 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Services: Professional. Unlock full pricing strategies, bid frequency, and historical win rates.