Kusile And Kendal Power Station - - Kusile and Kendal Power Station -
Organization Type
GOVERNMENT
Published
28 Oct 2026
OCDS Reference
ocds-9t57fa-176140
Summary
ESKOM is re-advertising an open tender for the purchase and removal of scrap conveyor belt from kusile and kendal power stations under a 36-month contract. The successful bidder buys the scrap belt and is responsible for removing IT from both sites. The work is governed by eskom's contractor health and safety requirements (standard 32-136), which obliges the contractor to have an approved she plan, keep a she file on site, appoint registered construction health and safety personnel and observe the life-saving rules. Bidders should price the removal, handling and transport effort alongside the belt purchase, because the safety obligations and statutory appointments carry real cost.
Key Requirements
Closing: 6 November 2026 at 08:00 — offers received after this time are not accepted.
Scope: purchase and removal of scrap conveyor belt at Kusile and Kendal Power Stations over a 36-month contract period; the bidder takes ownership of the belt and carries the cost of removal, handling and transport.
SHE plan and file: a contract-specific SHE plan must be submitted for evaluation and approval before work starts, and a SHE file kept at each worksite for the full duration, open to audit and inspection and handed to Eskom for archiving on completion.
Statutory appointments: a full-time construction health and safety officer must be appointed in writing and registered with a statutory body approved by the Chief Inspector; construction supervisors are appointed in writing for the project duration; construction project managers, construction managers and construction health and safety officers must be registered with SACPCMP; every organisation in a joint venture must sign a Section 37(2) agreement under the OHS Act.
Risk assessments: a baseline risk assessment covering routine and non-routine tasks before the project starts, a task-level risk assessment before each job, and written safe work procedures or method statements for high-risk and critical work — all extending to the contractor's own subcontractors.
Life-Saving Rules: zero tolerance on the five Eskom rules (isolate, test and earth before touch; hook up at heights; buckle up; be sober; hold a valid permit to work); breaches are treated as serious and handled through the disciplinary process.
Occupational health: medical certificates of fitness valid for one year issued by an HPCSA-registered occupational health practitioner, a hearing conservation programme once the 8-hour noise rating reaches 85 dBA, and heat exposure limits at a WBGT index of 30.
RE-ADVERTISEMENT OF INVITATION TO SUBMIT AN OFFER FOR THE PURCHASE AND REMOVAL OF SCRAP CONVEYOR BELT AT KUSILE AND KENDAL POWER STATION FOR A 36-MONTHS CONTRACT PERIOD
Tender context
Return to this tender’s issuing organisation, province, or category.
Re-advertisement of invitation to submit an offer for the purchase and removal of scrap conveyor belt at kusile and kendal power station for a 36-MONTHS contract period
Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
Compliance review. The working summary is checked against South African procurement standards — PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement — so nothing critical is missed before you start your bid response.
RFQOffer to Purchase-Scrapped Conveyor Belt (1).pdfReview complete
Important Dates
Source: Offer to Purchase-Scrapped Conveyor Belt (1).pdf (RFQ)
Important Dates
28 Oct
2026
PUBLICATION
Tender Published
Tender was published
06 Nov
2026
DEADLINE
Closing Date
Tender closing date
Procurement Rules & Compliance ContextThis tender may be governed by South African public procurement rules covering fairness, transparency, preferential procurement, anti-corruption, administrative justice and access to information.
7 rules
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Core procurement rules
These rules commonly apply to South African public-sector procurement.
7
Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
high
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Constitution of the Republic of South Africa, 1996 – Section 217
Act 108 of 1996 (s217)
high
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Eskom is re-advertising an invitation to submit an offer for the purchase and removal of scrap conveyor belt at Kusile and Kendal Power Stations, under a 36-month contract period. The successful contractor will be responsible for the safe removal and disposal of scrap conveyor belts in compliance with the Occupational Health and Safety Act.
Eskom is selling scrap conveyor belts at Kusile and Kendal Power Stations under a 36-month contract. The successful bidder must purchase, collect and remove the belts, pay upfront per allocated batch, and clear the site after collection.
Eskom is re-advertising an invitation for the purchase and removal of scrap conveyor belt at Kusile and Kendal Power Stations, under a 36-month contract period. The procurement is open to natural or juristic persons, and bidders must complete the SBD 4 disclosure form as part of their offer.
Eskom is re-advertising an invitation for the purchase and removal of scrap conveyor belt at Kusile and Kendal power stations, under a 36-month contract. The tender is open and subject to Eskom's standard conditions, including compliance with mandatory returnables, evaluation criteria, and potential site visits.
Eskom is re-advertising an invitation for the purchase and removal of scrap conveyor belts at Kusile and Kendal power stations, under a 36-month contract period. The tender is open to contractors able to safely execute removal and disposal in a power station environment, subject to Eskom's Life-Saving Rules and associated safety requirements.
Eskom requires the purchase and removal of scrap conveyor belt at Kusile and Kendal Power Stations in Mpumalanga, under a 36-month contract. Bidders must understand and comply with Eskom's OHS requirements, including the acknowledgement form and associated standards.
Eskom is re-advertising an invitation for the purchase and removal of scrap conveyor belt at Kusile and Kendal Power Stations in Mpumalanga, under a 36-month contract. The successful bidder will be responsible for the safe removal and disposal of scrap conveyor belt, complying with Eskom's Contractor Health and Safety Requirements (Standard 32-136) and all applicable South African legislation.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Similar Tenders
Matched by category & region
Supplier Readiness Hub
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Supply and Delivery of Alignment Switches, Electrical Switches,
Flow Switches, Level Switches, Limit Switches, Pressure Switches,
Selector Switches, Toggles Switches, Proximity Sensors and Push
Buttons as and when Required at Arnot Power Station for a Period
of Five (5) Years.
Disposals: GeneralFind disposals: general tenders and contract opportunities in South Africa. Browse active government procurement opportunities updated daily.
Based on Municipal avg. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Document read
Compliance review
Bid-ready summary
Closing date: 06 November 2026 at 10:00
No briefing session or site visit is specified in the document.
Contact Information
Source: Offer to Purchase-Scrapped Conveyor Belt (1).pdf (RFQ)
Source: Offer to Purchase-Scrapped Conveyor Belt (1).pdf (RFQ)
Evaluation stages:
Technical evaluation (two phases: desktop evaluation and site visit inspection). Inherent requirement to demonstrate technical capability.
Technical evaluation criteria (100%): Approach and Methodology (weight 100%) — assessed on technical/mechanical ability, industry experience and ethical track record under the Second-Hand Goods Act, and confidence in effective, efficient, timeous and economical performance.
Financial evaluation (price) with the following weights:
Financial – Best price: 80%
B-bbee: 20%
The contract is awarded to the highest ranked supplier based on total price of all listed commodities plus preference points.
Technical Specifications
Source: Offer to Purchase-Scrapped Conveyor Belt (1).pdf (RFQ)
Scope: Purchase, collect and remove scrap conveyor belt at Kusile and Kendal power stations for a 36-month contract period.
The successful tenderer pays upfront for each allocated batch and must collect all units within 7 working days from the collection date of the approved work instruction / task order.
Payment in full is required for the quantity on each batch without re-batching.
Sufficient capacity and resources must be available to service the contract at any point from any site; quantities are not known upfront and depend on Eskom's operations.
The site must be left clean after collection; any oil spills must be rehabilitated.
The purchaser is responsible for safe collection, handling, removal, and transportation of scrap conveyor belts, using qualified labour and certified plant, machinery, equipment and transport.
Bidders must factor in rigging, transportation and other equipment costs.
Site conditions:
PPE must be worn on all Eskom sites during viewing/visits; access is refused without minimum PPE.
Access requires an Eskom permit before any work; notify the site agent on completion for sign-off.
No accommodation allowed on site.
Littering prohibited; facilities for disposal waste must be provided during dismantling; no rubble left.
Portable fire-fighting equipment must be available on site during all stages of the work.
All work must comply with the OHSA Act; safety documentation must be available on site.
Eskom is not liable for any damages or losses during removal (theft, damage, personal injury).
Methodology
Source: Offer to Purchase-Scrapped Conveyor Belt (1).pdf
Technical evaluation is two-phase: desktop evaluation and site visit inspection.
Bidders must submit:
Technical inventory list.
Method statement based on scope of work.
Approach and Methodology (100% weight) is assessed on:
Technical and mechanical ability to manage and process project quantities.
Industry experience and ethical track record in line with the Second-Hand Goods Act.
Confidence in effective, efficient, timeous and economical performance.
Site conditions require adherence to Eskom site agent instructions, access permits, and safety documentation.
Quality Management
Source: Offer to Purchase-Scrapped Conveyor Belt (1).pdf
No specific quality management system requirements beyond the technical evaluation approach and methodology. The contractor must demonstrate technical and mechanical ability and an ethical track record.
Pricing Schedule
Source: Offer to Purchase-Scrapped Conveyor Belt (1).pdf
Pricing per kg excluding VAT for:
Scrap Steel Cord Conveyor Belts
Scrap Ply Conveyor Belts
Scrap Off-Cuts Pieces Conveyor
The final bid price per item is ex VAT; contract awarded to highest ranked based on total price of all commodities.
Payment terms:
Payment to Eskom within five (5) working days after sale.
Via bank cheque or electronic bank transfer only.
Release of scrap after payment received and permit to remove/transport obtained.
Tax obligations:
Valid SARS Tax Clearance Certificate must be submitted with tender.
If taxes not in order, Eskom may recover costs and cancel agreement.
VAT: Value Added Tax Act no 89 of 1991 applies; VAT invoices issued on request.
Financial Requirements
Source: Offer to Purchase-Scrapped Conveyor Belt (1).pdf (RFQ)
Pricing format:
Price schedule provided; prices submitted per kg excluding VAT for commodities:
Scrap Steel Cord Conveyor Belts
Scrap Ply Conveyor Belts
Scrap Off-Cuts Pieces Conveyor
The final bid price per item is ex VAT; contract awarded to highest ranked based on total price of all commodities.
Payment to Eskom:
Payment must be made no later than five (5) working days after the date of sale.
Release of scrap occurs only after payment is received and the buyer obtains a permit to remove and transport.
Payments to be made by bank cheque or electronic bank transfer only, payable to Eskom Holdings SOC Limited.
Tax requirements:
Valid SARS Tax Clearance Certificate must be submitted with the tender.
If taxes are not in order or certificate is missing/incorrect, Eskom may recover costs, cancel the agreement, and claim damages.
Other:
Offers valid for 90 days (3 months) from closing date.
Sold 'voetstoots' - no guarantee or warranty on condition or workability.
Eskom reserves the right not to accept the lowest or any tender, or to withdraw any item.
Compliance Requirements
Source: Offer to Purchase-Scrapped Conveyor Belt (1).pdf (RFQ)
Mandatory eligibility:
Valid SARS Tax Clearance Certificate (in respect of tenders).
Registration on National Treasury's Central Supplier Database (CSD), unless a foreign supplier.
Secondhand goods certificate from SAPS/Licensee.
CIPC (CIPRO) registration documents.
Valid letter of good standing with COID.
Disqualification:
Bidders listed on the Register for Tender Defaulters or the List of Restricted Suppliers are automatically disqualified.
Bidders who have defaulted on an existing or expired Eskom contract, or have an open non-conformance, will be disqualified from award.
B-BBEE requirements:
B-BBEE affidavit (on DTI template) or verification certificate from an accredited agency.
Evaluation includes B-BBEE at 20% weighting.
Health & Safety
Source: Offer to Purchase-Scrapped Conveyor Belt (1).pdf
Health and safety requirements (execution stage):
Signed acknowledgement of Eskom's OHS legal and other requirements (Annexure B).
Health and Safety Plan addressing project/scope OHS risks, aligned with health and safety specifications.
Baseline OHS Risk Assessment (BRA) with methodology used; include consequence, likelihood, risk ratings, mitigation measures, review and monitoring plan.
Valid Letter of Good Standing (COIDA or equivalent).
OHS policy signed by CEO, complying with OHS Act Section 7.
Valid medical certificates for employees/drivers.
Substance abuse procedure.
Vehicle management and driver safety procedure, including inspection and maintenance of vehicles.
Company incident management procedure.
Proof of registration as a recycler.
First aid level 2, firefighting, and HIRA/risk assessment training certificates.
Valid driver's licences, PDP and truck operator appointments.
Contractor must comply with the OHSA Act and the Section 37(2) agreement, acknowledging duties as an employer and adherence to SHE specifications.
Environmental
Source: Offer to Purchase-Scrapped Conveyor Belt (1).pdf
Environmental requirements:
Signed acknowledgement of Eskom's SHE rules and requirements form (Annexure B).
Environmental Management Plan addressing: waste management (reduction, re-use, recycling, disposal), environmental induction, environmental incident management, emergency planning for environmental incidents, approach to compliance, and environmental communication/awareness.
Detailed costing for environmental management (not a lump sum).
Environmental (or SHE/SHEQ) policy signed by Company Owner/CEO/MD, committing to compliance and duty of care.
Identification of environmental aspects and impacts, including methodology and controls.
Environmental aspect and impact register (e.g., oil spillages).
Waste management strategy/plan: disposal at licensed landfill sites, including management of waste oil.
Environmental policy signed by top management, dated, version-controlled, committed to compliance, pollution prevention and continual improvement.
Emergency preparedness plan (EPP) for environmental emergencies with emergency contact details.
Site cleanliness: no rubble left, oil spill kit available, hazardous and non-hazardous waste separated.
Section
Source: Offer to Purchase-Scrapped Conveyor Belt (1).pdf
Technical evaluation criteria (100%): Approach and Methodology 100%.
Financial evaluation weights:
Financial – Best price: 80%
B-bbee: 20%
Contract awarded to the highest ranked supplier based on total price of all commodities plus preference points.
The only content in this section is the closing signature block of SBD 4 (Bidder's Disclosure), which is standard form boilerplate. No tender-specific description of the scrap conveyor belt purchase or removal scope is present.
Bidders must not appear on the Register for Tender Defaulters or the List of Restricted Suppliers. Any bidder listed on either register is automatically disqualified from the bid process.
SBD 4 (Bidder's Disclosure): bidders must complete and submit the form, disclosing any employment relationship with the state by the bidder or its directors, trustees, shareholders, members, partners, or controlling persons; any relationship with persons employed by the procuring institution; and any interest in related enterprises. The bidder certifies that the information is true and complete; a false declaration leads to disqualification.
The content in this section is a truncated fragment from SBD 4's declaration about no agreements or arrangements with competitors. It repeats the independent bid determination requirement already covered in the standard evaluation criteria.
Identifies the five behaviours Eskom regards as carrying a high probability of serious injury or fatality and enforces them with zero tolerance at every Eskom location.
Applies to Eskom Holdings SOC Ltd, its divisions, subsidiaries and entities it controls, and to all contractors, subcontractors, consultants, agents and their employees; visitors must also comply and may be removed from site immediately if they refuse.
Supplements, and does not replace, other safety requirements and safe-working obligations.
Effective from the date of authorisation; revision 6 replaces revision 5.
Compliance Requirements
Source: Eskom life-saving rules.pdf (unknown)
Contractor health and safety compliance
Contractors working on Eskom sites must meet Eskom's Contractor Health and Safety Requirements (32-136) and the Life-Saving Rules standard 240-62196227.
Employees must sign acknowledgement that the Life-Saving Rules were explained and are understood; line management monitors compliance and audits may follow six months after implementation.
A breach is treated as serious misconduct, and Eskom may suspend a contractor's activities while deciding a sanction where a supervisor allowed the breach.
Health & Safety
Source: Eskom life-saving rules.pdf
Eskom Life-Saving Rules (standard 240-62196227, revision 6) — zero tolerance
Applicability
Applies at all Eskom sites to employees, agents, consultants, contractors, subcontractors and their staff.
Visitors must comply and can be instructed to leave the premises immediately if they refuse.
Rule 1 — Open, isolate, test, earth, bond and/or insulate before touch
No work on, around or near electrical networks, lines or apparatus unless the person is trained and authorised for the task, holds a valid permit to work where required, and has completed a pre-task risk assessment.
The isolation sequence must be applied correctly for the type of work; the authorised team leader must certify and physically show the team that the apparatus is safe.
Appropriate PPE must be worn, including face shield and insulated gloves for low-voltage work.
Rule 2 — Hook up at heights
Work at ground level is preferred wherever reasonably practicable.
Work at height only where the person is medically fit, trained as determined by the risk assessment, secured during ascent and descent, and using an Eskom-approved fall arrest system, after a pre-task risk assessment.
Rule 3 — Buckle up
Driver, operator and all passengers must wear seat belts in any vehicle or equipment used for Eskom business, on any road or parking area, at any speed, in forward or reverse.
Rule 4 — Be sober
No person under the influence, or appearing to be under the influence, of alcohol or drugs may enter or remain on an Eskom site, conduct Eskom business, or drive or operate Eskom equipment.
Any level of alcohol, or the presence of drugs, controlled or illegal substances that impairs or could impair functioning, is prohibited regardless of when the substance was taken.
Rule 5 — Permit to work
Where an authorisation limitation applies, no work may proceed without the required permit under the Plant Safety Regulations, the Operating Regulations for High Voltage Systems (ORHVS) or any other applicable permit regime.
Plant may not return to service until all permits on it are cancelled, unless specific permission is granted, for example for redundant systems. Live work requires a live work declaration form completed by the authorised person.
Consequences of a violation
A breach is treated as serious misconduct and triggers a disciplinary process under the Eskom Disciplinary Code and Procedure.
Where a contractor manager or supervisor allowed the breach, Eskom may suspend the contractor's activities while deciding an appropriate sanction.
The contractor must remove the employee from site immediately, investigate and start disciplinary action within five working days, and provide Eskom with a copy of the sanction imposed.
Supporting standards
Contractor Health and Safety Requirements (32-136), the Occupational Health and Safety Act, and Eskom's working-at-heights, substance abuse, PPE, risk assessment and medical surveillance standards apply alongside these rules.
The procurement is for the purchase and removal of scrap conveyor belt at Kusile and Kendal power stations, for a 36-month contract period. The supplied text is the Eskom Standard Conditions of Tender; no additional description specific to this disposal is present.
Closing date and time: 6 November 2026 at 08:00 SAST (from the tender record).
No other dates (briefings, site visits, clarification deadlines) are stated in the provided document; the standard conditions require attendance of any compulsory site visit/clarification meeting described in the Tender Data, but no specific date or venue is given.
No named contacts are provided in the supplied text. All communication must be directed in writing to the Eskom Representative identified in the Invitation to Tender; no other Eskom official may be contacted. Submission is to the address/tender box or e-tendering page stated in the Tender Data (specific address not visible in the extract).
Submission method and closing: Eskom requires the complete original tender plus one (1) complete paper copy, submitted to the address and tender box specified in the Tender Data, or an electronic submission via the Eskom Tender Bulletin e-tendering page, no later than the closing date and time in South African Standard Time (SAST).
Paper tenders: package the original and the copy in separate, sealed envelopes marked "ORIGINAL" and "COPY", then seal both together in an outer envelope marked "Confidential". Each package must show the Eskom submission address, tender number, tenderer's name, physical address, email, and contact telephone of the authorised signatory.
E-tendering submissions must be uploaded and finalised on the Eskom Tender Bulletin e-tendering page before closing; uploads into the required Technical, Commercial and Financial folders, in English, unreadable or corrupt files risk rejection.
Proof of posting or courier delivery is not proof of delivery; late tenders are returned unopened, and Eskom is not liable for courier or network delays.
Returnable documents: all mandatory returnables listed in the Invitation to Tender, completed and signed, including the Acknowledgement Form (stating whether the tender is for the whole or part of the scope); any mandatory certificate, proof of registration or other document must be valid and current for the full tender validity period.
Sign the original (or electronic) tender; the signing person is held liable for the tender. Corrections must be initialled; correction fluid/tape is not allowed.
An authenticated copy of authority to act as agent is required where an agent submits on behalf of a principal.
Disqualification risks: missing the original or the copy; failure to submit mandatory returnables by the closing date; submitting after the closing time for any reason; tenders not sealed or incorrectly addressed; 100% subcontracting of the scope; failure to comply with basic compliance requirements.
Evaluation stages and scoring: Eskom determines basic compliance first; tenders that fail mandatory returnables or other basic requirements are ruled non-responsive.
Pre-qualification criteria, if set out in the Tender Data, are then applied. Eskom will not score any criterion twice in different phases (no double-dipping).
Functionality, where applicable, is scored before price; bidders must meet the minimum functionality threshold stated in the Tender Data to proceed.
Price and preference points are then considered: pricing is evaluated per the Tender Data, taking account of CPA, FOREX, commodity exposure, unconditional discounts, technical adjustments, PV and forecasted invoicing. The 90/10 or 80/20 PPPFA system is used; B-BBEE level (from the CSD report or certificate/affidavit) and Specific Goals are scored. Failing to provide B-BBEE proof or Specific Goals supporting documentation does not disqualify a bid that is otherwise responsive, but scores zero.
Final ranking adds price and Specific Goals scores, from highest to lowest, per the PPPFA.
Eskom may reject a tender for collusion, bid rigging, fraud, influencing the award, or misrepresentation.
Arithmetical errors: amounts in words prevail over figures; Eskom corrects errors in unit rates, line-item totals or additions, and if the tenderer does not accept the correction, the tender is rejected.
No-specific-score thresholds are stated in the available text; minimum qualifying scores are only mentioned as "stated in the Tender Data" (not visible in the provided extract).
Scope: purchase and removal of scrap conveyor belt at Kusile and Kendal power stations, over a 36-month contract period. No quantities, detailed deliverables, service levels or locations beyond the two power stations are stated in the supplied document; such details would be in the Tender Data / specification.
Quality requirements appear under the SHEQ expectation: the tenderer must provide proof that safety, health, environment and quality (SHEQ) systems, policies and capabilities are in place, and all cost and personnel associated with SHEQ must be reflected in the tender. No separate quality certification is mentioned.
Rates and prices must be in South African Rand, include VAT and all duties/levies (as at 14 days before closing), and be fixed for the contract unless the Invitation adjusts for price changes. The pricing schedule should be completed in full; arithmetical error correction rules apply. No specific schedule of rates, bill of quantities, or payment schedule is provided in the extract.
Pricing format: tenderers must submit rates and prices in South African Rand, fixed for the contract duration (no price adjustment unless the Invitation provides for it). Prices must include all duties, taxes (including VAT) and levies applicable 14 days before the closing date.
Any alternative tender must be accompanied by a main tender and is permitted only if allowed by the Invitation to Tender.
Escalations or currency adjustments follow the exchange rate and base date stipulated in the Invitation.
Eskom may require a performance security; tenderers must name at least two financial institutions they would approach, and Eskom may reject an unsuitable institution.
Financial analysis of the tenderer's statements may be undertaken; if financial risk is deemed too high and no suitable mitigating factors exist, the tenderer will not be considered for award.
No specific bond or guarantee percentages are stated.
Eligibility: the tenderer (single company or JV/consortium) must meet the eligibility criteria in the Tender Data and must not be under any restriction to do business with Eskom or State-Owned Companies. Tenderers must not sub-contract 100% of the scope.
B-BBEE: if B-BBEE level is a pre-qualification criterion, proof (certificate, CSD number/report or affidavit) must be provided at the closing date or the tender is disqualified. For PPPFA point allocation, absent/expired/fraudulent proof scores zero but does not disqualify an otherwise responsive tender.
CIDB: if CIDB grading is a qualification criterion, registration must be held at closing or obtainable within 21 working days; proof of registration must be submitted at closing (or proof of application, with actual proof by contract award).
SHEQ: proof that safety, health, environment and quality systems are in place must be provided to Eskom's satisfaction at closing; SHEQ costs must be reflected in the tender.
Legislation: compliance with National Treasury Instructions, PPPFA Regulations, Amended B-BBEE Codes, COIDA, OHS Act and other applicable laws.
SDL&I Undertaking: must be completed and submitted no later than contract award; otherwise the tender will not be considered for award.
Designated materials and thresholds information must be submitted by contract award.
Fraud/misrepresentation: falsifying certificates, affidavits or documents leads to disqualification, possible suspension from business with State-Owned Companies for up to 10 years, and referral to the B-BBEE Commission or criminal prosecution.
Compliance with the OHS Act and Eskom's SHEQ requirements is mandatory. Proof of SHEQ systems and capabilities must be submitted to Eskom's satisfaction at the closing date (or at contract award if stated), with related costs included in the tender. Tenderers are also subject to CIDB Contract Skills Development Goals (CSDG) and Contract Participation Goals (CPG) where the contract meets the thresholds described in the standard conditions. The extract does not state specific OHS plan submissions for this procurement.
Eskom reserves the right to accept or reject any tender or part, to cancel the tender before contract conclusion (with reasons on request), and to negotiate with selected tenderers. Eskom disclaims liability for losses from participation. Tender validity: the tender must remain valid for acceptance for the period stated in the Tender Data; if requested, tenderers may extend validity without modifying the tender, and non-extension excludes them from further consideration. Confidentiality of the process and use of Eskom documents only for preparing the tender. Standardised specifications incorporated by reference must be followed. Compulsory site visits/clarification meetings, if stipulated, are mandatory; non-attendance disqualifies. Clarifications must be in writing to the Eskom Representative, and Eskom publishes responses on the advertising platform. Insurance: Eskom may not provide full cover; tenderers should obtain advice. No specific penalty or termination terms are visible.
Additions to the standard evaluation: Eskom will not score the same criterion twice across evaluation phases. If functionality is a criterion, a minimum threshold is set in the Tender Data. Price is evaluated with consideration of CPA, FOREX, commodity exposure, unconditional discounts, technical adjustments, PV and forecasted invoicing. B-BBEE level and Specific Goals each score points under the 90/10 or 80/20 system; absence of proof scores zero but does not disqualify an otherwise responsive bid. Highest-ranked tenders are checked for arithmetical errors; correction rules apply. Objective criteria under Section 2(1)(f) of the PPPFA may be used only if stipulated in the tender, and cannot be functionality or B-BBEE elements. Reverse e-auction is possible only if specified in the Invitation.
DocumentSECTION 37.2 AGREEMENT.pdfReview complete
Health & Safety
Source: SECTION 37.2 AGREEMENT.pdf
The contractor must sign a Section 37(2) Agreement with Eskom, acknowledging that it is an employer in its own right with duties under the Occupational Health and Safety Act, 1993. The contractor must ensure all work and use of machinery or plant complies with the Act, and must adhere to the Safety, Health and Environment (SHE) specifications provided for the project. The contractor must comply with the arrangements and procedures in the SHE specifications as contemplated in Section 37(2) of the Act.
DocumentANNEXURE B ACKNOWLEDGEMENT OF ESKOM RULES.pdfReview complete
Submission Guidelines
Source: ANNEXURE B ACKNOWLEDGEMENT OF ESKOM RULES.pdf (unknown)
Returnable document
Annexure B: Acknowledgement Form for Eskom OHS legal and other requirements (Eskom Identifier 240-43921804 Rev 5; document 240-77471499 Rev 3) — must be signed by the bidder's authorised person (CEO, director or managing director), dated and witnessed by two witnesses, confirming receipt and understanding of Eskom's OHS requirements and the consequences of non-compliance.
The form must carry the company/supplier name and the signatory's name, signature and date.
Compliance Requirements
Source: ANNEXURE B ACKNOWLEDGEMENT OF ESKOM RULES.pdf (unknown)
Occupational health and safety
The contractor must comply with Eskom contractor health and safety standard 32-136, the OHS specification issued with the tender, the Occupational Health and Safety Act and the Compensation for Occupational Diseases and Illnesses Act.
After award, the contractor must align its internal policies, procedures and standards with Eskom's OHS requirements.
All employees of the contractor and its subcontractors must complete the relevant Eskom induction and the company induction.
Penalties
Penalties are imposed on the main supplier for OHS non-conformances, whether committed by the main supplier, its contractors or its suppliers.
Contractor and supplier management
The main supplier must show Eskom the process and selection criteria it uses to appoint contractors and suppliers.
Eskom must be notified before any contractor or supplier is appointed and before work starts.
The main supplier must confirm that its contractors and suppliers have adequate resources and competencies.
The main supplier is accountable for its contractors' and suppliers' compliance with Eskom and statutory requirements during execution.
OHS compliance of contractors and suppliers must be monitored through audits and assessments.
The main supplier must set out the grounds on which contractor or supplier work may be terminated.
Non-conformances by contractors and suppliers at any tier are handled directly with the main supplier under the performance and penalty processes.
Verification
Eskom may require testimonials, references and client contact details, including Eskom's own, for similar work previously performed.
Health & Safety
Source: ANNEXURE B ACKNOWLEDGEMENT OF ESKOM RULES.pdf
OHS requirements the contractor must meet when working for Eskom
Eskom contractor health and safety requirements standard 32-136.
The OHS specification and requirements issued with the tender.
The Occupational Health and Safety Act.
The Compensation for Occupational Diseases and Illnesses Act.
Obligations
The bidder must understand these requirements before bidding; the signed Annexure B acknowledgement confirms this.
After award, the contractor must align its policies, procedures and standards with Eskom's OHS requirements.
All employees of the contractor and its subcontractors must undergo the relevant Eskom induction and the company induction.
Penalties
Penalties apply to the main supplier for OHS non-conformances by the main supplier, its contractors or its suppliers, whether against Eskom or statutory requirements.
Contractual Terms
Source: ANNEXURE B ACKNOWLEDGEMENT OF ESKOM RULES.pdf
Contractor and supplier management obligations on the main supplier
Demonstrate to Eskom the selection process and criteria used when appointing contractors and suppliers.
Notify Eskom before appointing any contractor or supplier and before work commences.
Confirm that contractors and suppliers hold adequate resources and competencies.
Remain accountable for contractors' and suppliers' compliance with Eskom and statutory requirements during contract execution.
Monitor contractors and suppliers through OHS audits and assessments while work is carried out.
State the grounds on which contractor or supplier work will be terminated.
Resolve all non-conformances by contractors and suppliers, at every tier, directly with the main supplier through the performance and penalty processes.
Provide testimonials, references and client contact details, including Eskom's, for similar previous work when Eskom requests verification.
DocumentContractor Health and Safety Requirements.pdfReview complete
Description
Source: Contractor Health and Safety Requirements.pdf
The standard sets the minimum safety, health and environmental requirements that apply to all contractors, subcontractors, suppliers, vendors, service providers and consultants working for Eskom Holdings SOC Ltd and its subsidiaries, with the stated aim of Zero Harm.
Contractors carry responsibility for executing work safely, protecting their own employees, other people on site, the public and the environment.
Contractors must comply with all applicable occupational health and safety legislation as well as Eskom's policies, procedures and standards.
The standard is a floor, not a ceiling: each project may carry additional hazards and requirements that the contractor must identify and address.
Where the standard does not cover a specialised activity, the contractor must develop its own SHE plans, procedures, manuals or work instructions for that scope.
The standard does not replace legislative requirements.
The document is reviewed five-yearly; the stated next review date was March 2023.
Technical Specifications
Source: Contractor Health and Safety Requirements.pdf (unknown)
Scope of the SHE standard
Applies to every contractor, subcontractor, supplier, vendor, consultant and service provider working for Eskom Holdings SOC Ltd, its divisions, subsidiaries and entities in which Eskom holds a controlling interest.
Sets the minimum safety, health and environmental requirements for contractor work, with the stated goal of Zero Harm; it does not replace statutory obligations.
Where the work involves specialised hazards not covered by the standard, the contractor must develop its own SHE plans, procedures, manuals or work instructions to address them.
Documents the contractor must produce and maintain
SHE specification for the contract, project and site.
SHE plan, submitted for evaluation and approval before work starts.
SHE file kept on site for the full duration of the work, available for audit and inspection, and handed to the client or asset owner for archiving on completion. Where a project has more than one worksite, a file must be kept at each site.
The main contractor must ensure every subcontractor maintains its own SHE file and adheres to the SHE plans.
Risk management
A baseline risk assessment covering routine and non-routine tasks before the project starts.
A risk assessment for each job or task before work commences, and again where a task runs over a day, is interrupted by weather, or where the process changes.
Written safe work procedures and method statements for high-risk and critical tasks, applying equally to the contractor's own subcontractors.
Risk assessments reviewed and updated periodically for long-running processes.
Statutory appointments
All statutory appointments must meet legislative requirements; non-statutory appointments follow Eskom standard 32-296.
Construction Regulation 8(5): a full-time construction health and safety officer must be appointed in writing where the size, danger or accumulation of hazards on site requires it, and must be registered with a statutory body approved by the Chief Inspector.
Construction supervisors appointed in writing for the project duration, with competent assistant supervisors where needed; appointment of assistants does not reduce the supervisor's accountability.
Copies of all appointments must be held in the SHE file.
Life-Saving Rules (zero tolerance)
Open, isolate, test, earth, bond and/or insulate before touch.
Hook up at heights.
Buckle up.
Be sober.
Hold a valid permit to work.
Breaches are treated as serious and handled through the disciplinary process.
Operational controls addressed by the standard
Permit to work; working at heights and fall protection plans; confined spaces and testing of atmospheres; excavations and tunnelling; demolition; barricading of dangerous areas and equipment.
Lifting equipment; boilers, pressurised systems and vessels under pressure; machinery, tools and equipment; explosive-powered tools; explosives.
Hazardous materials and chemicals, including asbestos handled only under the Asbestos Regulations.
Transport and mobile plant, vehicle and driver safety; work on or near public roads; public safety.
Emergency preparedness, fire risk management, incident investigation, health and safety communication, toolbox talks, housekeeping, signage and colour coding, PPE.
Occupational health and hygiene: assessments by a SANAS-accredited, Department of Labour-approved inspection authority; thermal limits of WBGT index 30 for heat; hearing conservation programme where the 8-hour noise rating level reaches 85 dBA.
Medical certificate of fitness valid for one year, issued by an occupational health practitioner registered with the HPCSA; medical surveillance programmes.
Hours of work in line with the Basic Conditions of Employment Act, 1997.
Record keeping, auditing and inspections (including unannounced inspections), statistical reporting and a SHE recognition and reward system.
Methodology
Source: Contractor Health and Safety Requirements.pdf
Barricading
Unauthorised access to dangerous areas and to operating equipment must be prevented by substantial barriers, fencing or covers strong enough to stop removal.
The same controls protect members of the public from approaching hazardous or live equipment.
Experience & Qualifications
Source: Contractor Health and Safety Requirements.pdf
Competence
A competent person is one with the knowledge, training, experience and qualifications specific to the work or task, with qualifications and training registered under the South African Qualifications Authority Act, 1995 where appropriate.
Construction supervisors and assistant supervisors must be competent and have extensive knowledge of the type of work they supervise.
Registration
Construction project managers, construction managers and construction health and safety officers must be registered in the appropriate category with the South African Council for the Project and Construction Management Professions (SACPCMP).
The construction health and safety officer must be registered with a statutory body approved by the Chief Inspector.
Medical certificates of fitness must be issued by an occupational health practitioner registered with the Health Professions Council of South Africa.
Quality Management
Source: Contractor Health and Safety Requirements.pdf
Standards and material
ISO 9001 quality management systems is a normative reference for the contractor's management system.
Materials and equipment used or purchased must meet the manufacturer's safety requirements and legislative requirements.
Reclaimed material, where authorised, must meet the manufacturer's safety requirements as though it were new.
Eskom, the designer or the client determines whether workmanship is acceptable.
Assurance
Audits and inspections, including unannounced inspections, are used to verify SHE compliance and to identify where remedial action is needed.
SHE files must be open to audit and inspection by any party entitled to conduct one.
Non-conforming product or service is controlled under Eskom procedure 240-44175038.
Compliance Requirements
Source: Contractor Health and Safety Requirements.pdf (unknown)
Legislation and Eskom standards
Occupational Health and Safety Act, 1993 and its regulations, including the Construction Regulations.
Mine Health and Safety Act, 1996 where work falls under mining legislation.
National Environmental Management Act, 1998 and the National Environmental Management: Waste Act, 2008.
All applicable national, provincial and municipal legislation.
Eskom policies, procedures and standards, including 32-726 (SHE requirements for the commercial process), 32-727 (SHE and Quality Policy), 32-245 (waste management), 32-529 (OHS risk management), 32-418 (working at heights), 32-37 (substance abuse) and 32-95 (incident management).
ISO 9001 quality management systems is a normative reference.
Professional registration
Construction project managers, construction managers and construction health and safety officers must be registered in the appropriate category with the South African Council for the Project and Construction Management Professions (SACPCMP).
The construction health and safety officer must be registered with a statutory body approved by the Chief Inspector.
A competent person must hold the knowledge, training, experience and qualifications specific to the task, registered with the South African Qualifications Authority where applicable.
Contractor obligations
The contractor remains an employer in its own right and is accountable for its own employees and for every subcontractor it appoints.
A Section 37(2) agreement under the OHS Act must be signed by every organisation in a joint venture; each partner remains liable for its own contraventions.
The contractor's SHE management system must demonstrate compliance at a level appropriate to the service provided.
Health & Safety
Source: Contractor Health and Safety Requirements.pdf
Governing framework
Eskom standard 32-136, Revision 4, applies across Eskom Holdings SOC Ltd and its subsidiaries.
Contractors must comply with the OHS Act, 1993 and its regulations, the Mine Health and Safety Act, 1996 where applicable, and all Eskom SHE policies and procedures.
Required SHE documentation
SHE specification for the contract, project and site.
SHE plan, evaluated and approved before work starts.
SHE file held on site for the duration of the work, one per worksite, available for audit and inspection, and handed to the client or asset owner on completion.
The main contractor must ensure each subcontractor keeps a SHE file and follows the SHE plans.
Risk assessment
Baseline risk assessment before the project starts, covering routine and non-routine tasks.
Task-level risk assessment before each job, and again after a break, a weather stoppage, a change in process or where new hazards emerge.
Written safe work procedures and method statements for high-risk and critical tasks, applying equally to subcontractors.
Appointments
Statutory appointments must meet legislative requirements; non-statutory appointments follow Eskom standard 32-296.
A full-time construction health and safety officer must be appointed in writing under Construction Regulation 8(5) where the size of the project, the degree of danger or the accumulation of hazards requires it; the officer must be registered with a statutory body approved by the Chief Inspector.
Construction supervisors are appointed in writing for the project duration, with competent assistant supervisors where needed.
All appointment letters must be kept in the SHE file.
Life-Saving Rules — zero tolerance, breaches handled through the disciplinary process
Open, isolate, test, earth, bond and/or insulate before touch.
Hook up at heights.
Buckle up.
Be sober.
Hold a valid permit to work.
Site controls covered
Permit to work; working at heights and fall protection plans; confined spaces with atmosphere testing; excavations and tunnelling; demolition; barricading of dangerous areas and equipment.
Lifting equipment; boilers, pressurised systems and vessels under pressure; machinery, tools and equipment; explosive-powered tools; explosives.
Hazardous materials and chemicals; asbestos handled only under the Asbestos Regulations.
Transport and mobile plant, vehicle and driver safety, work on or near public roads, public safety.
Emergency preparedness, fire risk management, incident investigation, health and safety communication and toolbox talks, housekeeping, signage and colour coding, PPE.
Occupational health and hygiene assessments by a SANAS-accredited, Department of Labour-approved inspection authority; heat exposure limited to a WBGT index of 30; hearing conservation programme where the 8-hour noise rating level reaches 85 dBA.
Medical certificate of fitness valid for one year, issued by an occupational health practitioner registered with the HPCSA; medical surveillance.
Hours of work in line with the Basic Conditions of Employment Act, 1997.
Record keeping, auditing, inspections including unannounced inspections, statistical reporting, and a SHE recognition and reward system.
Environmental
Source: Contractor Health and Safety Requirements.pdf
Duty of care
Anyone who causes or may cause significant pollution or degradation must take reasonable measures to prevent it, and where it cannot be avoided, must minimise and rectify it, in line with the National Environmental Management Act, 1998.
Environmental incidents are managed under Eskom procedure 32-95; waste under procedure 32-245 and the National Environmental Management: Waste Act, 2008.
Specific impacts
Asbestos-containing materials may only be handled, processed, stored or removed under the Asbestos Regulations of the OHS Act; mishandling carries legal and financial risk as well as environmental harm.
Noise: where the 8-hour rating level reaches 85 dBA, above which hearing impairment is likely, the contractor must run an effective hearing conservation programme.
Thermal conditions: the OHS Act Environmental Regulations for Workplaces set the exposure limits, with a WBGT index of 30 for heat.
Occupational hygiene stressors must be assessed by a SANAS-accredited and Department of Labour-approved inspection authority.
Contractual Terms
Source: Contractor Health and Safety Requirements.pdf
Accountability
Eskom's Group Chief Executive holds overall responsibility and liability under the OHS Act for all persons on Eskom sites, and may delegate to section 16(2) appointees and divisional managers.
The contractor is an employer in its own right and must meet both Eskom's SHE requirements and the relevant legislation.
The contractor remains accountable for every subcontractor it appoints; the relationship between them is governed by their own contract.
Appointed managers are responsible for health, safety and environment on the sites under their control.
Joint ventures
Each partner is responsible and accountable for its own organisation's health and safety.
Every organisation in the joint venture must sign the Section 37(2) agreement under the OHS Act.
Where the joint venture operates as separate entities, each partner must meet the SHE requirements; where it is a registered single entity, that entity carries all the obligations.
Each company remains liable for its own contraventions and may be prosecuted independently.
Records
Project records must be kept to legislative and Eskom requirements, and SHE files must be retained for the duration of the project and handed over for archiving on completion.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Kusile And Kendal Power Station - - Kusile and Kendal Power Station -
Document-Backed
Recently Synced
Source Snapshot Available
AI Enhanced
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
7
Last checked
28 Oct 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.