Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
Off Witbank/Bethal Road - emalahleni - Emalahleni, Witbank - 1035
Organization Type
GOVERNMENT
Published
26 Oct 2026
OCDS Reference
ocds-9t57fa-175759
ESKOM requires a supplier to perform pf sampling and particle size analysis on the mills of units 1 to 6 at a mpumalanga power station, under a three-year contract. The supplier must operate under eskom's supplier quality management specification (240-105658000), which mandates an iso 9001-compliant quality management system and submission of quality documentation according to a selected category. The most consequential consideration is the mandatory quality compliance and documentation, as failure to meet the specified category requirements will disqualify the bid.
Quality management system: The supplier must have a QMS conforming to ISO 9001 (latest revision) or equivalent, with a valid ISO 9001 certificate from an accredited body unless excluded by the selected category.
Returnable forms: Complete, sign, and return Form A (240-68099512) acknowledging acceptance of Eskom's supplier quality requirements, and submit quality documentation per the single selected category (1, 2, 3, or 4) as per the List of Tender Returnables (240-12248652).
Category-specific documentation: Depending on the category, submit a draft contract quality plan (ISO 10005), example ITP/QCP, audit reports, quality policy, quality objectives, and documented information for externally provided processes and roles.
Sub-supplier management: The main supplier is responsible for ensuring sub-suppliers meet the same quality requirements, including QMS certification and submission of CQPs and QCPs/ITPs.
Special processes: Personnel performing special processes (e.g., welding, NDT, heat treatment) must be suitably qualified and certified, with records maintained per SETA requirements.
Eskom rights: Eskom may conduct capability and capacity assessments before award, appoint resident inspectors, and select intervention points on QCPs/ITPs; the supplier must provide workspace for inspectors at no cost.
Closing date: The closing date is 27 November 2026 at 08:00 (UTC); submission method and address are not specified in the provided document.
Date & Time
Friday, 27 November 2026 - 10:00
Venue
MS Teams
Categories
Request for Quotation
Off Witbank/Bethal Road - emalahleni - Emalahleni, Witbank - 1035
AI Document Analysis Stages
Important Dates
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)26 Oct
2026
Tender Published
Tender was published
27 Nov
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
etendering-user-verification-1.mp4
How-to-locate-the-etendering-site-1.mp4
etendering-create-submission-1.mp4
SDLI Strategy.pdf
Eskom's Duvha Power Station requires PF (pulverised fuel) sampling and particle size analysis on mills 1 to 6, delivered over a 36-month contract period. The work is tendered on an open basis with no incumbent supplier, and preference points are awarded on B-BBEE status level under the 90/10 or 80/20 system.
NEC PF Sampling.pdf
Eskom requires pulverised fuel (PF) sampling and particle size analysis on the mills serving Units 1 to 6 at Duvha Power Station in Mpumalanga, delivered under an NEC3 Term Service Contract (TSC3) over a 36-month service period.
Environmental Requirements for Duvha Power Station PF sampling and particle size analysis on unit 1 6 mills.pdf
ESKOM requires PF sampling and particle size analysis on unit 1–6 mills for a period of three years. The contract carries environmental requirements, including an environmental policy signed by top management and alignment with ISO 14001:2015.
240-77471651 Annexure C1 High Risk PF Sampling signed.pdf
PF sampling and particle size analysis on mills 1 to 6 at Duvha Power Station, contracted for a period of three years. Bidders must submit a set of occupational health and safety returnables, which are evaluated as a high-risk OHS package after mandatory and functionality screening.
PF Sampling scope of work 2026.pdf
Eskom's Duvha Power Station requires a contractor to carry out pulverised fuel (PF) sampling and particle size analysis on the mills of Units 1, 2, 4, 5 and 6 for a period of 36 months. Sampling is performed at the mill PF distribution pipe on running mills and the analysis and grading are done off site, priced at a fixed unit rate per mill sampled.
240-105658000 Supplier Quality Management Specification (3).pdf
Eskom requires pulverised fuel (PF) sampling and particle size analysis on the mills serving units 1 to 6, delivered over a three-year period at a Mpumalanga power station. Bidders must meet Eskom's Supplier Quality Management specification (240-105658000 / QM 58, Revision 3) and operate a quality management system conforming to ISO 9001.
Acknowledgement Form for Eskom SHE Rules and other Requirements (11) updated.pdf
Eskom requires pulverised fuel (PF) sampling and particle size analysis on mills serving units 1 to 6, delivered over a three-year contract period at its Mpumalanga operations. The pack supplied covers the occupational health and safety obligations attaching to the work.
240-68099512 Form A category 3 Rev 9.docx
Eskom requires pulverised fuel (PF) sampling and particle size analysis on the mills serving units 1 to 6, delivered over a three-year period in Mpumalanga. Bidders must acknowledge and accept Eskom's Supplier Quality Requirements under specification 240-105658000 and the ISO 9001 standard.
240-109253698 QCP Template 2021.docx
PF sampling and particle size analysis on unit 1 to 6 mills at Eskom's Mpumalanga operations, for a period of three years. Bidders must submit a Contract Quality Plan describing how quality management, inspection and testing will be controlled across the contract.
How-to-register-on-etendering-1.mp4
Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf
Eskom requires pulverised fuel (PF) sampling and particle size analysis on the mills serving units 1 to 6, delivered over a period of three (3) years at a power station in Mpumalanga. The work is tendered under Eskom's Standard Conditions of Tender, with submission through Eskom's electronic tendering platform.
E-Tenderers E-Tendering Training Acknowledgement Form.pdf
PF sampling and particle size analysis on unit 1 – 6 mills at Eskom, delivered over a period of three (3) years. The work is based in Mpumalanga and bids close on 27 November 2026 at 12:00.
Technical evaluation strategy.pdf
Eskom requires pulverised fuel (PF) sampling and particle size analysis on the mills of Units 1 to 6 at Duvha Power Station over a three-year period. Sampling is carried out on the PF distribution pipes, four pipes per mill, with a minimum of 10 mills sampled per month. Samples are analysed after mill supply and reported to P&T Engineering at Duvha.
INVITATION TO TENDER.pdf
Eskom requires PF (pulverised fuel) sampling and particle size analysis on unit 1–6 mills at a Mpumalanga power station, delivered over a three-year term under an NEC3 Term Service Contract (TSC3). The work covers sampling with a single-point sampler and reporting on pulverised fineness, PF and air distribution, test parameters and mill performance.
Supplier Quality Management_Returnables Latest.xlsx
Eskom requires a contractor to perform pulverised fuel (PF) sampling and particle size analysis on the mills of units 1 to 6 at a power station in Mpumalanga. The contract will run for three years. The tender includes a quality management evaluation covering the bidder's quality management system, contract quality plan, and quality control plans.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
EskomWin Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 2 456 363
Range
Based on 16 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
No closing date, briefing, or site visit dates are stated in the document. (The only date mentioned is the spec authorisation date, 17 October 2021, not a bid deadline.)
Contact Information
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Contact details not provided in the document.
Submission Guidelines
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Returnable documents: complete, sign and return Form A (240-68099512) acknowledging acceptance of Eskom's supplier quality requirements.
Quality documentation as per the single selected category (1, 2, 3, or 4) listed in the List of Tender Returnables (240-12248652).
Submission details not specified in the provided document.
Evaluation Criteria
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Returnable documents:
Category 1:
Category 2:
QMS manual or equivalent, quality policy, quality objectives, control of documented information, internal audit procedure, control of nonconforming outputs, nonconformity and corrective action procedure.
Category 3:
Category 4:
Capability and capacity:
Technical Specifications
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Scope: The specification applies to all Eskom suppliers and sub-suppliers, forming part of all RFIs, RFQs, RFPs, and contracts.
Purpose: Supplier must develop, implement, maintain, and continually improve a quality management system (QMS) based on ISO 9001.
Compliance: QMS must conform to latest ISO 9001 or equivalent standard.
Certification: Valid ISO 9001 certificate required unless excluded by category.
Sub-suppliers: Main supplier responsible for sub-supplier quality programmes.
Processes: Special processes (welding, NDT, heat treatment) require qualified personnel.
Preservation: Supplier must implement a preservation management programme.
Access: Eskom has rights of access and may appoint resident inspectors.
Methodology
Source: 240-105658000 Supplier Quality Management Specification (3).pdfQuality control plan (QCP/ITP) approach:
Preservation methodology:
Experience & Qualifications
Source: 240-105658000 Supplier Quality Management Specification (3).pdfQuality audits and quality performance reviews must be carried out by trained, accredited, and experienced personnel.
Quality Management
Source: 240-105658000 Supplier Quality Management Specification (3).pdfQuality management system (QMS) requirements:
Contract Quality Plan (CQP):
Quality Control Plan (QCP/ITP):
Pricing Schedule
Source: 240-105658000 Supplier Quality Management Specification (3).pdfNo pricing schedule information provided in the document.
Compliance Requirements
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Quality management system (QMS):
Returnable forms:
Audits:
B-BBEE requirements not stated in this document.
Health & Safety
Source: 240-105658000 Supplier Quality Management Specification (3).pdfReference to Safety, Health, Environment, and Quality (SHEQ) Policy 32-727.
No additional health and safety requirements stated in the document.
Contractual Terms
Source: 240-105658000 Supplier Quality Management Specification (3).pdfPreservation management programme:
Description
Source: 240-109253698 QCP Template 2021.docxSupplier must provide a Contract Quality Plan that identifies and plans for meeting the client's quality expectations and contract requirements, following the template provided.
Technical Specifications
Source: 240-109253698 QCP Template 2021.docx (unknown)Purpose of the Contract Quality Plan template:
Required content of the Contract Quality Plan:
Required tables to be completed:
Sign-off requirements:
Submission Guidelines
Source: Acknowledgement Form for Eskom SHE Rules and other Requirements (11) updated.pdf (unknown)Returnable document: Annexure B – Acknowledgement Form for Eskom OHS legal and other requirements (Eskom identifier 240-77471499 Rev 3). The form must be completed, signed by an authorised person (CEO, Director or Managing Director), dated, and witnessed by two witnesses. It confirms the bidder has obtained and understood the listed OHS documents and the consequences of non-compliance. Submission method, address, and closing time are not stated in this document.
Evaluation Criteria
Source: Acknowledgement Form for Eskom SHE Rules and other Requirements (11) updated.pdf (unknown)The only evaluation-related content is the requirement that the Acknowledgement Form for Eskom OHS legal and other requirements be properly completed, signed, dated and witnessed. No scoring split, minimum qualifying score, or preference point system is provided in this document.
Technical Specifications
Source: Acknowledgement Form for Eskom SHE Rules and other Requirements (11) updated.pdf (unknown)The bidder must provide notification to Eskom before appointing any contractors or suppliers for commencement of work.
Compliance Requirements
Source: Acknowledgement Form for Eskom SHE Rules and other Requirements (11) updated.pdf (unknown)Compliance with OHS requirements is mandatory when working at or rendering a service to Eskom:
Health & Safety
Source: Acknowledgement Form for Eskom SHE Rules and other Requirements (11) updated.pdfOHS obligations:
Contractual Terms
Source: Acknowledgement Form for Eskom SHE Rules and other Requirements (11) updated.pdfThe main contractor/supplier is accountable for managing its contractors and suppliers. Obligations include:
Description
Source: Technical evaluation strategy.pdfScope: PF sampling and particle size analysis on units 1–6 mills at Duvha Power Station for a 3-year period. Minimum 10 mills per month, reduced if mills unavailable. Sampling on four pipes per mill; reports to P&T Engineering.
Submission Guidelines
Source: Technical evaluation strategy.pdf (unknown)No submission-specific guidelines were found in this document.
Evaluation Criteria
Source: Technical evaluation strategy.pdf (unknown)Two-stage technical evaluation:
Stage 1 – Mandatory gatekeepers (pass/fail, not scored):
A 'No' on any mandatory criterion disqualifies the bid; the bidder is not evaluated on qualitative criteria.
Stage 2 – Qualitative (weighted, scored):
Minimum qualifying score: 70% weighted final technical score.
Technical Specifications
Source: Technical evaluation strategy.pdf (unknown)Purpose: PF (pulverised fuel) sampling and particle size analysis on boiler units 1–6 at Duvha Power Station.
Contract period: 3 years.
Sampling and grading tests performed on the PF distribution pipe on each of the four pipes per mill.
Samples analysed and reports sent to P&T Engineering at Duvha.
Minimum of 10 mills sampled per month; if fewer mills are available, the quantity is reduced and payment adjusted accordingly.
Work is triggered three months after a mill starts running, and as and when required.
Experience & Qualifications
Source: Technical evaluation strategy.pdfPF sampling experience: scoring tiers with weights (see evaluationCriteria). Evidence required: certified qualifications, CV, employment letters or contracts, SAP purchase order screenshots or non-Eskom purchase orders. PF sampling supervisor: must hold a certified qualification (National N6, National Diploma, or higher), and provide CV, employment record, contract and purchase orders.
Section
Source: Technical evaluation strategy.pdfRefer to evaluationCriteria section. Highlights: minimum 70% technical score; mandatory gatekeepers pass/fail; qualitative weights 30% experience, 30% supervisor, 40% test results.
Submission Guidelines
Source: E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)Returnable documents:
Evaluation Criteria
Source: E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)Completion and submission of the E-Tendering Training Acknowledgement Form within the prescribed period is a precondition to bid. An incomplete form or non-submission renders the tender non-responsive and disqualifies the bidder. The form must be signed by an authorised signatory.
Technical Specifications
Source: E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)The tender is an acknowledgement of e-tendering training, not a specification of goods or services. The source document does not state quantities, deliverables, or locations.
Compliance Requirements
Source: E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)The only compliance requirement is submission of the E-Tendering Training Acknowledgement Form; no other compliance requirements (e.g., B-BBEE, CIDB, CSD) are stated.
Description
Source: 240-68099512 Form A category 3 Rev 9.docxThe tender is for PF sampling and particle size analysis on units 1 to 6 mills for a period of three years. The tenderer must complete and sign Form A to acknowledge and accept Eskom Supplier Quality Requirements per specification 240-105658000 and ISO 9001.
Evaluation Criteria
Source: 240-68099512 Form A category 3 Rev 9.docx (unknown)Quality requirements
Technical Specifications
Source: 240-68099512 Form A category 3 Rev 9.docx (unknown)Scope: PF sampling and particle size analysis on unit 1 to 6 mills.
Contract period: three years.
Quality obligations under the Eskom Supplier Quality Requirements (specification 240-105658000) apply, including:
Compliance Requirements
Source: 240-68099512 Form A category 3 Rev 9.docx (unknown)ISO 9001 compliance is required.
Acceptance of Eskom Supplier Quality Requirements per specification 240-105658000 is required.
The acknowledgement form (Form A) must be completed and signed by the tenderer's quality representative (name, designation, date, signature).
Description
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdfThe service involves PF sampling and particle size analysis on Unit 1 – 6 mills for a period of three years.
The work is to be performed at Eskom's power station in Mpumalanga.
No quantities or detailed scope are provided in the available document.
Important Dates
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)Closing date: 27 November 2026 at 12:00 (SAST).
Site visit / clarification meeting: if stipulated as compulsory in the Tender Data, attendance is mandatory; failure results in disqualification. Details (date, time, venue) are provided in the Tender Data.
Contact Information
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)Eskom Representative contact details are provided in the Invitation to Tender; all communication must be directed to that representative only.
Submission address: as specified in the Tender Data for paper tenders; for e-tendering, use the Eskom Tender Bulletin e-tendering page.
Service/delivery location: PF Sampling and Particle size analysis on Unit 1 – 6 mills, Eskom (Mpumalanga).
Submission Guidelines
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)Closing time: 27 November 2026 at 12:00 SAST (GMT+2).
Submission method: electronic via the Eskom Tender Bulletin e-tendering page, unless otherwise stated in the Tender Data. Paper submissions are not accepted for e-tendering.
Required format: upload the tender in PDF or Excel, ensuring files are not corrupt or unreadable.
Bidders must complete and submit the Acknowledgement Form with the tender, stating whether the tender covers the whole or part of the works/services/supply.
Returnable documents: all mandatory returnables must be submitted by the closing date and time; failure to do so disqualifies the bid. Mandatory returnables include, but are not limited to: completed and signed tender forms, proof of eligibility (e.g., tax clearance, CIDB where applicable), and the SDL&I Undertaking (annexure) by contract award.
Proof of authority: an authenticated copy of authority to act as an agent must be submitted if an agent signs on the bidder's behalf.
Tenders must be signed by a duly authorised representative.
No late tenders will be accepted for any reason. The e-tendering system closes automatically at the closing time.
Do not deposit tenders into the Eskom tender box when e-tendering is used.
Eskom is not responsible for misplacement or premature opening if the outer package is not sealed or references are incorrect.
Corrections to documents must not use correction fluid or tape; initial all alterations.
Sub-contracting 100% of the scope is not permitted and will disqualify the bid.
Bidders must not be under any restriction to do business with Eskom or State-Owned Companies.
All costs of preparing and submitting the tender are for the bidder's own account.
Bidders must keep all tender information confidential and use Eskom documents only for preparing the tender.
Bidders must hold their tender valid for a specified period after closing; failing to extend validity when requested may exclude them from consideration.
Alternative tenders are only allowed if a main tender is also submitted and only if permitted by the Invitation to Tender.
Evaluation Criteria
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)Evaluation stages:
Ranking: sum of Price and Specific Goals scores, ranked highest to lowest. The contract is awarded to the highest ranked bidder unless objective criteria under Section 2(1)(f) of the PPPFA are stated in the Invitation.
Financial analysis: Eskom assesses the bidder's financial risk; if risk is too high and no mitigating factors agreed, the bidder is not considered for award.
Arithmetical errors: corrected according to stated rules; if the bidder does not accept corrections, the tender is rejected.
Reverse e-auction: if used, prices must not be included in the tender; including prices will result in them not being considered.
Misrepresentation or falsified information may lead to disqualification and reporting to the B-BBEE Commission.
Technical Specifications
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)Scope: PF (Pulverised Fuel) sampling and particle size analysis on Units 1 to 6 mills at the specified Eskom power station.
Contract period: three (3) years.
The service must be delivered at the Eskom site in Mpumalanga.
Bidders must provide the service in accordance with Eskom's safety, health, environment and quality (SHEQ) requirements.
All costs and personnel associated with SHEQ must be included in the tender price.
Quality Management
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdfProof of SHEQ systems, policies and capabilities must be provided to Eskom's satisfaction at closing or contract award.
All costs and personnel associated with SHEQ must be reflected in the tender.
Quality requirements are part of the SHEQ proof; no separate quality standards are specified in the available document.
Pricing Schedule
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdfRates and prices must be in South African Rand, fixed for the contract duration.
Include all duties, taxes (including VAT) and levies applicable 14 days before closing.
Prices must be quoted in the format specified in the Invitation to Tender.
Arithmetical errors in pricing will be corrected as per Eskom's rules; if the bidder does not accept corrections, the tender is rejected.
Where reverse e-auction is used, tenders must not contain prices; if prices are included, they will not be considered.
Financial Requirements
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)Pricing: rates and prices must be in South African Rand, fixed for the contract duration, and include all duties, taxes (including VAT) and levies applicable 14 days before closing.
Prices must be quoted in the format specified in the Invitation to Tender (e.g., schedule of rates, bill of quantities).
Insurance: Eskom does not guarantee full insurance cover; bidders should obtain professional advice on required cover.
Security for performance: if required, the bidder must nominate at least two financial institutions it intends to approach for the security; Eskom may reject institutions it deems unsuitable.
No compensation is paid for tender preparation costs.
Compliance Requirements
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)B-BBEE: proof of B-BBEE level (certificate, CSD number, or CSD report) must be provided at closing if B-BBEE is a pre-qualification criterion; otherwise, provide for PPPFA point allocation. Expired or fraudulent documents result in zero points for B-BBEE.
CIDB: where a CIDB grading is stipulated in the Tender Data, bidders must be registered with CIDB at closing or be capable of registration within 21 working days of closing. Proof of registration must be submitted at closing; if only an application is available, the CIDB database printout must be provided by contract award.
Tax compliance: valid tax clearance (SARS) is required.
CSD registration: required for B-BBEE scoring and as proof of status.
SHEQ: proof of safety, health, environmental and quality systems must be provided at closing or contract award.
Legislative compliance: comply with National Treasury Instruction Notes, PPPFA Regulations, Amended B-BBEE Codes, COIDA, OHS Act, and other applicable laws.
Contract Skills Development Goals (CSDG): for contracts of R5 million or more or lasting 12 months or more, the contractor must achieve the applicable skills development goals.
Contract Participation Goals (CPG): for construction works contracts meeting specified conditions, the contractor must achieve the participation goals.
Designated materials and thresholds: information must be submitted no later than contract award; failure to do so means the tender will not be considered for award.
SDL&I Undertaking: must be completed and submitted by contract award.
Misrepresentation or fronting may result in suspension from doing business with State-Owned Companies for up to 10 years and criminal prosecution.
Health & Safety
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdfBidders must provide proof of safety, health, environment and quality (SHEQ) systems and capabilities.
Compliance with the OHS Act and Eskom's SHEQ requirements is mandatory.
All costs related to health and safety must be included in the tender price.
Contractual Terms
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdfTender validity: bidders must keep their tender valid for the period stated in the Tender Data, and extend if requested; failure to extend may result in exclusion.
Confidentiality: all procurement matters must be kept confidential; documents from Eskom may be used only for preparing the tender.
Eskom's right to negotiate: Eskom may enter mandated negotiations with selected tenders.
Eskom's right to cancel: Eskom may cancel the tender at any time before contract conclusion, with reasons on request.
Contract formation: the successful bidder must check the final draft contract and sign the Form of Agreement.
Contract duration: services are for a period of three (3) years.
Sub-contracting: 100% sub-contracting of the scope is not permitted.
Liability: Eskom is not liable for any losses or damages arising from the tender process.
Misrepresentation: falsified information may lead to disqualification and reporting to the B-BBEE Commission.
Contract Skills Development Goals (CSDG) and Participation Goals (CPG) apply as described in the compliance section.
Section
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdfAdditional evaluation criteria: functionality, if applicable, must meet a minimum threshold stated in the Tender Data.
Specific Goals: scored based on supporting documentation; zero points if not met or not submitted at closing.
B-BBEE level is scored as stated on the CSD report or certificate/affidavit.
Financial analysis: bidder's financial statements are assessed for risk; high risk without mitigating factors may result in non-consideration.
Arithmetical errors are corrected as per Eskom's rules; failure to accept corrections leads to rejection.
Description
Source: INVITATION TO TENDER.pdfDetailed scope of work and technical requirements are in a separate attachment (document identifier 559-1026771031). The tender is an open invitation for PF sampling and particle size analysis on Unit 1–6 mills for three years.
Important Dates
Source: INVITATION TO TENDER.pdf (TENDER)Closing: 27 November 2026 at 10h00
Clarification meeting (non-compulsory): 05 November 2026 at 13h00 via Microsoft Teams
Meeting ID: 366 653 469 244 534 5
Passcode: Zd3Jc2b8
Join link: https://teams.microsoft.com/meet/3666534692445345?p=TFvfJnPew3mlRFDckA
Clarification queries deadline: 10 working days before the tender closing date.
Contact Information
Source: INVITATION TO TENDER.pdf (TENDER)Eskom Representative
Name: Victoria Selepe
Telephone: +27 13 690 0514
Email: [email protected]
Procurement Manager (signatory on ITT): Mandla Mkhonza
Fraud and corruption reporting
Telephone: 0800 11 2722
Email: [email protected]
Eskom Standard Conditions of Tender available at www.eskom.co.za.
Submission Guidelines
Source: INVITATION TO TENDER.pdf (TENDER)Submission method: electronic only via the Eskom E-tendering site (Eskom Tender Bulletin). No hard copies accepted. Upload under the folders Technical, Commercial, Financial and Other. All documents in PDF format (price list PDF included in the NEC document). Max upload size per document 500 MB; total submission 4 GB. No zip/compressed files. If resubmitting, the latest version stands and earlier submissions are void. Ensure submission status is shown as complete. Late tenders are not accepted.
Mandatory returnables at closing (disqualifiable if missing/incomplete/unsigned):
Returnables at closing for evaluation (non-disqualifiable; score zero if omitted):
Other documents:
Note: non-disqualifiable returnables missing or incomplete at closing may be requested in writing; the bidder has 5 working days to submit, otherwise disqualified.
Evaluation Criteria
Source: INVITATION TO TENDER.pdf (TENDER)Evaluation stages:
Functionality criteria (minimum weighted score: 70%):
Price score: out of 80 points, formula Ps = 80 [1 - (Pt - Pmin)/Pmin], prices inclusive of VAT.
Specific goals score: out of 20 points under PPPFA; failure to submit evidence scores zero for that goal but no disqualification.
Preference point system: 80/20 system applies (estimated value ≤ R50 million excluding VAT).
Specific goals (SDL&I objectives): Black Owned 4%, Black Women Owned 3%, Black Youth Owned 2%, plus job creation and skills development targets and 100% local procurement content target.
Tenderers failing the 70% functionality threshold are disqualified.
Technical Specifications
Source: INVITATION TO TENDER.pdf (TENDER)Scope: PF sampling and particle size analysis on Unit 1–6 mills for a period of three (3) years.
Mandatory technical requirement: the bidder must own or hire the equipment used for PF sampling (single point sampler only).
Detailed technical evaluation criteria are in separate document identifier 559-1026771031.
Contract type: NEC3 Term Services Contract (TSC3).
Experience & Qualifications
Source: INVITATION TO TENDER.pdfSupervisor must have a National Diploma technical or higher, N6 National Certificate, or National Senior Certificate (10%). Supervisor must have PF sampling experience proven by an employment verification letter or CV with job descriptions (30%). Company must have experience with PF sampling and mill performance, proven by SAP purchase order/contract screenshots or traceable certified references (30%). Test results must cover Pulverised Fineness, PF Distribution, Air distribution, Test Parameters, Rosin-Rammler graph, calculations and recommendations (30%).
Pricing Schedule
Source: INVITATION TO TENDER.pdfPricing schedule must be completed and submitted in PDF (included in the NEC document). Prices inclusive of VAT. Arithmetic errors will be corrected for evaluation. Contingency amounts excluded. The catalogue line item, if required, must be quoted.
Financial Requirements
Source: INVITATION TO TENDER.pdf (TENDER)Payment terms: for contracts below R50 million including VAT, Eskom pays within 30 days of undisputed invoice; above R50 million, within 60 days.
Performance security: not applicable.
Pricing: prices evaluated inclusive of VAT; arithmetic errors corrected for evaluation; contingency amounts excluded; unconditional discounts considered; conditional discounts applied at payment.
Pricing schedule must be submitted in PDF (included in the NEC document).
Cataloguing: if required, the pricing schedule must include a line item for cataloguing, which Eskom will pay.
Compliance Requirements
Source: INVITATION TO TENDER.pdf (TENDER)Mandatory contractual requirements (assessed after ranking, prior to award):
Additional contractual requirements (if applicable):
Eligibility:
Health & Safety
Source: INVITATION TO TENDER.pdfContractual requirements include a COIDA certificate of good standing or proof of application (South African tenderers only), and compliance with the attached Safety and Quality requirements. SHEQ requirements may apply as a contractual requirement.
Environmental
Source: INVITATION TO TENDER.pdfThe bidder must comply with the attached Environmental requirements.
Contractual Terms
Source: INVITATION TO TENDER.pdfContract conditions: NEC3 Term Services Contract (TSC3). Tender validity: 180 days from closing. No performance security required. Alternative tenders not accepted. Successful bidder may be required to provide cataloguing information per item after award; all delivered materials must be labelled per Eskom specifications.
Section
Source: INVITATION TO TENDER.pdfThe functionality threshold is 70%. Price is scored out of 80 using the formula Ps = 80[1 - (Pt - Pmin)/Pmin]. Specific goals scored out of 20 under PPPFA; no evidence means zero for that goal. The 80/20 preference point system applies.
Description
Source: Supplier Quality Management_Returnables Latest.xlsxSelection of the applicable category on the Cover tab determines which quality requirements apply. Only one category may be selected; selecting more than one causes an error.
Submission Guidelines
Source: Supplier Quality Management_Returnables Latest.xlsx (unknown)Bidders must complete the Excel template by selecting the applicable category on the 'Cover' tab (by typing 1 in one of the marked boxes, selecting only one category). The 'Returnables' tab then shows the applicable requirements. Complete the required details, then save as PDF and sign, or sign and lock the sheet before sending. Avoid hiding un-applicable rows where they affect the print area.
Evaluation Criteria
Source: Supplier Quality Management_Returnables Latest.xlsx (unknown)Quality documentation is evaluated against a weighted scorecard with five sections: Section A (Quality Management System Requirements, weight 25%), Section B (Evidence of QMS in operation, weight 25%), Section C (Contract Quality Plan, weight 20%), Section D (Quality Control Plan, weight 20%), Section E (User-defined additional requirements, weight 10%).
Technical Specifications
Source: Supplier Quality Management_Returnables Latest.xlsx (unknown)The scope of work is PF Sampling and Particle size analysis on Unit 1 – 6 mills for a period of three (3) years. The tender covers services, general.
Compliance Requirements
Source: Supplier Quality Management_Returnables Latest.xlsx (unknown)Bidders must demonstrate a working Quality Management System. If the bidder does not hold a valid ISO 9001 certificate, they must submit the alternative evidence under Section A Option 2. The bidder must complete and sign Form A. Reference specification: 240-105658000 or 240-51544462.
Evaluation Criteria
Source: Environmental Requirements for Duvha Power Station PF sampling and particle size analysis on unit 1 6 mills.pdf (unknown)The supplier must meet the environmental requirements during the evaluation stage.
Technical Specifications
Source: Environmental Requirements for Duvha Power Station PF sampling and particle size analysis on unit 1 6 mills.pdf (unknown)The tender covers PF sampling and particle size analysis on unit 1 – 6 mills at Duvha Power Station.
Compliance Requirements
Source: Environmental Requirements for Duvha Power Station PF sampling and particle size analysis on unit 1 6 mills.pdf (unknown)The contractor must attach an Environmental Policy signed by Company Top Management, aligned with ISO 14001:2015 Environmental Management System.
Environmental
Source: Environmental Requirements for Duvha Power Station PF sampling and particle size analysis on unit 1 6 mills.pdfThe contractor must attach an Environmental Policy signed by Company Top Management.
Description
Source: PF Sampling scope of work 2026.pdfThe service is PF sampling and particle size analysis on unit 1–6 mills at Duvha Power Station. The station has six units, five operational, each with six mills. PF samples are taken to ensure mills perform per design standards and to comply with the Fossil Fuel Fired Regulation (FFFR).
Submission Guidelines
Source: PF Sampling scope of work 2026.pdf (unknown)Submission method and address not stated in the document.
Returnable documents:
Evaluation Criteria
Source: PF Sampling scope of work 2026.pdf (unknown)No formal evaluation criteria are provided in this scope of work document. The only normative reference cited is ISO 9001 Quality Management Systems.
Technical Specifications
Source: PF Sampling scope of work 2026.pdf (unknown)Works location: Duvha Power Station (Mpumalanga).
Scope:
Frequency:
Procedures:
Reporting:
Staffing:
Equipment:
Quality control:
Experience & Qualifications
Source: PF Sampling scope of work 2026.pdfStaffing: two experienced assistants and one experienced supervisor.
PF sampler must be approved for use by the contract manager.
Contractor to provide contingency staff if regular staff unavailable.
Quality Management
Source: PF Sampling scope of work 2026.pdfISO 9001 is the normative quality management system reference.
Eskom performs quality checks on PF sample analysis and grading every two months.
Pricing Schedule
Source: PF Sampling scope of work 2026.pdfUnit price per mill sampled.
Prices fixed for the 3-year term.
No escalation within contract term.
Sample analysis and grading performed off-site.
Turnaround time: one week from date of sample.
Calibration certificate to be attached to final report.
Financial Requirements
Source: PF Sampling scope of work 2026.pdf (unknown)Pricing:
Compliance Requirements
Source: PF Sampling scope of work 2026.pdf (unknown)CSD registration: not stated.
Tax compliance: not stated.
B-BBEE: not stated.
CIDB: not applicable (services).
ISO 9001: cited as a normative reference, implying the contractor should comply with ISO 9001 quality management systems.
Site access:
General:
Health & Safety
Source: PF Sampling scope of work 2026.pdfComply with SHEQ requirements and Duvha Power Station / Eskom policies.
Complete induction before work on site.
Employees must hold valid medical fitness certificates.
Contractor to issue PPE to employees.
Contractor to have an emergency plan for on-site emergencies.
Conduct a comprehensive HIRA covering identification of hazards, elimination or minimisation of risk, maintaining control measures, and reviewing/revision as necessary.
Contact Information
Source: NEC PF Sampling.pdf (unknown)Service Manager
Duvha Power Station
P.O. Box 2199
Witbank
1035
Employer
Megawatt Park
Maxwell Drive
Sandton
Johannesburg
Submission Guidelines
Source: NEC PF Sampling.pdf (unknown)Returnable documents
Offer mechanics
Technical Specifications
Source: NEC PF Sampling.pdf (unknown)Scope
Price list quantities (Option A)
Delivery and planning
Experience & Qualifications
Source: NEC PF Sampling.pdfKey people
Pricing Schedule
Source: NEC PF Sampling.pdfPricing form
Price list items
How to complete
Financial Requirements
Source: NEC PF Sampling.pdf (unknown)Pricing
Price adjustment (X1)
Payment
Liability and damages
Insurance
Compliance Requirements
Source: NEC PF Sampling.pdf (unknown)B-bbee
Legal and registration
Health, safety and environment
Ethics and confidentiality
Health & Safety
Source: NEC PF Sampling.pdfHealth and safety
Environmental
Source: NEC PF Sampling.pdfEnvironmental
Contractual Terms
Source: NEC PF Sampling.pdfContract form
Key dates and periods
Governing terms
Additional conditions (Z1-Z11)
Dispute resolution
Price adjustment (X1)
Delay damages (X7)
Task orders (X19)
Description
Source: SDLI Strategy.pdfThe tender involves PF sampling and particle size analysis on units 1 to 6 mills at Duvha Power Station. The contract period is 36 months.
Important Dates
Source: SDLI Strategy.pdf (unknown)Closing date: 27 November 2026 at 08:00.
Contact Information
Source: SDLI Strategy.pdf (unknown)Buyers: Enock Mabena and Victoria Selepe
Business unit: Duvha Power Station
Submission Guidelines
Source: SDLI Strategy.pdf (unknown)Returnable documents:
Consequences of missing preference-point documentation:
SDL&I obligations (not scored but binding once contracted):
Evaluation Criteria
Source: SDLI Strategy.pdf (unknown)Evaluation approach:
Preference point system (points for B-BBEE status):
Missing preference-point documentation:
Objective criteria: Not applicable.
Technical Specifications
Source: SDLI Strategy.pdf (unknown)Scope of work: PF sampling and particle size analysis on unit 1 – 6 mills.
Duration: 36 months.
Methodology
Source: SDLI Strategy.pdfTenderers must approach relevant SETAs for grants, subsidies, and incentives, and SARS for tax rebates related to skills development initiatives.
Pricing Schedule
Source: SDLI Strategy.pdfLocal procurement content: value added in South Africa. The price schedule must separate local and imported components. Local procurement content is total spending minus the imported component.
Financial Requirements
Source: SDLI Strategy.pdf (unknown)SDL&I penalty and retention:
Local procurement content:
Procurement from designated groups (as a proportion of local procurement content):
Compliance Requirements
Source: SDLI Strategy.pdf (unknown)B-BBEE requirements:
Sworn affidavit validity requirements:
Contractual B-BBEE improvement commitments (not scored but binding):
Contractual Terms
Source: SDLI Strategy.pdfContractual SDL&I obligations:
Section
Source: SDLI Strategy.pdfSpecific goals: up to 10/20 points may be awarded for the specific goal specified for the tender. Points are added to price points and rounded to two decimal places. B-BBEE status level determines the points. Bidders failing to submit preference-point documentation may still be considered but only score out of 90 for price and 0 for specific goals.
Contact Information
Source: 240-77471651 Annexure C1 High Risk PF Sampling signed.pdf (unknown)Development team (contact for OHS questions):
No email, telephone, or address provided in the source document.
Submission Guidelines
Source: 240-77471651 Annexure C1 High Risk PF Sampling signed.pdf (unknown)Returnable documents (all to be submitted as part of the bid):
Submission format: The OHS returnables are evaluated during tender close-out, after mandatory and functionality evaluation. Only shortlisted suppliers who pass those thresholds are evaluated.
Missing documents: Suppliers get only ONE opportunity to submit outstanding documents, within 7 working days of the request. Failure to do so may result in the bid being regarded as non-responsive and ineligible for award.
Evaluation Criteria
Source: 240-77471651 Annexure C1 High Risk PF Sampling signed.pdf (unknown)OHS returnables are evaluated only after shortlisting based on mandatory and functionality criteria. All OHS returnables must be complete and adequate; any missing or non-compliant item may make the bid non-responsive. The valid Letter of Good Standing (COIDA) is a mandatory returnable and must be maintained at all times.
Compliance Requirements
Source: 240-77471651 Annexure C1 High Risk PF Sampling signed.pdf (unknown)Valid Letter of Good Standing (COIDA or equivalent) – must be valid at all times.
OHS policy signed by the CEO – must comply with Section 7 of the OHS Act.
Annexure B – acknowledgement of Eskom's OHS legal and other requirements, signed and submitted.
Baseline OHS Risk Assessment – must include the methodology used.
Health and Safety Plan – must address the project/scope OHS risks and align with the health and safety specification.
Costing for health and safety management – must be broken down, not a lump sum, and based on the overall scope.
Health & Safety
Source: 240-77471651 Annexure C1 High Risk PF Sampling signed.pdfHealth and Safety Plan: must address project/scope OHS risks and align with the health and safety specification.
Baseline OHS Risk Assessment: must identify, assess, and manage OHS risks related to the scope; the methodology must be provided.
Valid Letter of Good Standing (COIDA or equivalent): required, must be held at all times.
OHS policy: must be signed by the CEO and comply with Section 7 of the OHS Act.
Access to Duvha Power Station requires: valid medical fitness certificate, police clearance, RSA ID or equivalent, national driver's licence (for drivers), proof of Duvha safety induction, and valid COIDA letter of good standing.
Contractor must comply with SHE/OHS Specification and approved safety file; the 37-2 agreement must be signed by both parties. Duvha Power Station OHS requirements apply for the contract duration.
Zero tolerance stance on violations of Life-saving Rules.
On contract completion: close all incidents and audit findings, clean the work area, submit safety statistics and safety file for closeout, and complete a closeout report (Annexure D form as per 32-726) before final invoice is paid.
Section
Source: 240-77471651 Annexure C1 High Risk PF Sampling signed.pdfOHS returnables are evaluated after the mandatory and functionality evaluation. Only shortlisted suppliers who pass both thresholds are evaluated. Suppliers have one opportunity to submit outstanding documents within 7 working days; failure may result in non-responsiveness and ineligibility.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Off Witbank/Bethal Road - emalahleni - Emalahleni, Witbank - 1035
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
18
Last checked
08 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Get deep intelligence on Services: General. Unlock full pricing strategies, bid frequency, and historical win rates.
Learn how to submit a winning bid with these related articles
Everything South African general contractors need to know about how to write a winning tender proposal without an in-house bid team in gauteng — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Your meticulously crafted General sector tender submission can be disqualified for a single, seemingly minor compliance oversight. The reality for South African contractors is that technical competence is no longer sufficient; it is underpinned by a non-negotiable framework of documentary compliance. This regulatory guide: mastering CSD and BBBEE compliance for general sector tenders in south africa provides a comprehensive, step-by-step breakdown of the mandatory registrations and certificates you must secure and present. We detail the precise requirements for CSD, BBBEE, SARS TCS, CIPC, and COIDA, explaining their function within the procurement ecosystem governed by the PFMA and PPPFA. Learn the actionable steps to prepare your business, avoid the most common disqualifying errors, and leverage technology to streamline your compliance process for successful bidding in 2026 and beyond.
For South African General contractors, the path to government procurement is paved with non-negotiable regulatory requirements. The most common barrier to entry is not a lack of capability, but a failure to master the foundational compliance frameworks that govern every bid. This complete regulatory guide to CSD and BBBEE compliance for General sector tender suppliers in South Africa demystifies the process. It provides a meticulous, step-by-step field manual for ensuring your company is fully compliant and audit-ready, enabling you to confidently access the R billions in opportunities across infrastructure maintenance, facilities management, and service delivery within the General sector.
This definitive guide provides General sector contractors with the precise, actionable steps required to achieve and maintain CSD and BBBEE compliance for South African public tenders in 2026. Authored by Dr. Sarah Mokwena, a Legal Compliance Specialist, it meticulously walks through the regulatory framework, mandatory registrations, and the critical documentation needed to avoid disqualification. We dissect the common, costly errors made during submission and provide a clear checklist to ensure your bid is responsive and competitive. Learn how to navigate the Central Supplier Database, validate your BBBEE status, and integrate compliance into your tender preparation process.
💡 Want more tendering tips and strategies?
Explore Our Blog