Megawatt Park and Various Clusters Nationally - - Variuos -
Organization Type
GOVERNMENT
Published
18 Nov 2026
OCDS Reference
ocds-9t57fa-177888
Summary
ESKOM distribution requires branding, installation and removal of vehicle livery across its national fleet, covering sedans, panel vans, ldvs, minibuses, trucks, truck tractors, mobile generators and electric vehicle equivalents. Bidders must price each vehicle class on a unit-cost basis with delivery included and demonstrate a provincial operating footprint. The decisive gate is proof of ownership or lease of industrial printing machinery; technical scoring then requires 70 of 100 points, with experience, branding software, business continuity and national coverage carrying the marks. Bids close on 4 december 2026 at 08:00.
Key Requirements
Closing: 4 December 2026 at 08:00.
Mandatory gate: submit a lease agreement or proof of purchase for industrial printing machinery; missing evidence stops further evaluation.
Technical threshold: score at least 70 of 100 points; the technical evaluation is pass or fail.
Experience: up to 35 points; 5+ years with 3 signed reference letters scores 35, 3–4 years with 2 references scores 15, 1–2 years with 1 reference scores 5, and a portfolio of completed work is required.
National coverage: up to 25 points; 7–9 provinces scores 25, 5–6 scores 15, 3–4 scores 10 and 1–2 scores 5; operating locations must be submitted.
Other scored evidence: branding software proof or certificate scores 30 points; a detailed disaster management/business continuity plan scores 10 points.
Pricing: complete a unit cost for every listed vehicle type, including delivery; pricing covers branding, installation and removal per vehicle.
Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
Compliance review. The working summary is checked against South African procurement standards — PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement — so nothing critical is missed before you start your bid response.
Document240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdfReview complete
Description
Important Dates
18 Nov
2026
PUBLICATION
Tender Published
Tender was published
04 Dec
2026
DEADLINE
Closing Date
Tender closing date
Procurement Rules & Compliance ContextThis tender may be governed by South African public procurement rules covering fairness, transparency, preferential procurement, anti-corruption, administrative justice and access to information.
7 rules
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Core procurement rules
These rules commonly apply to South African public-sector procurement.
7
Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
high
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Constitution of the Republic of South Africa, 1996 – Section 217
Act 108 of 1996 (s217)
high
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP)-rev 3.docx
Eskom requires the branding, installation and removal of branding on its fleet vehicles, delivered nationally under a contract or order. Bidders must set out how quality will be controlled across each activity, from document approval through to final inspection and record keeping.
Provision of fleet vehicle branding, installation and removal services is required. The scope covers branding, installation and removal services for the fleet vehicles of the procuring utility.
Eskom requires a service provider for the branding, installation and removal of fleet vehicle branding nationally. The scope covers applying, fitting and stripping vehicle livery across Eskom's fleet.
Invitation to Tender (ITT) Branding - Final approved.pdf
Eskom requires fleet vehicle branding, installation and removal services under an NEC3 Term Service Contract (TSC3), with delivery capacity across Eskom's operating units nationwide. The contract is tendered on an open basis with a 90/10 preference point system and a functionality threshold of 70%.
Rev1 Final Scope of work for branding 15 06 2026 (003) TBS1_MH.pdf
Eskom Distribution requires a service provider to design, manufacture, supply, install, maintain and remove vehicle branding across its national fleet of over 8000 vehicles and equipment, on an as-and-when-required basis over five years. Branding must meet Eskom Corporate Identity standards, use durable reflective vinyl materials, and differentiate internal combustion engine and electric vehicles.
Eskom Holdings SOC Ltd requires a five-year term service contract for fleet vehicle branding, installation and removal services for its distribution fleet on an as-and-when-required basis. The contract uses NEC3 TSC3 Option A (priced contract with price list) with secondary options for price adjustment, low service damages, task orders and additional conditions.
Supplier Quality Management_Cat 2_List of Returnables Rev 7.xlsx
Eskom requires a service provider for the branding, installation and removal of branding on its fleet vehicles, nationally. The work is procured through a quality-gated tender evaluated on a weighted quality scorecard covering ISO 9001 quality management, evidence of QMS in operation, a contract quality plan, quality control plans and additional requirements.
Eskom requires a service provider for the branding, installation and removal of branding on its fleet vehicles. The appointed supplier must meet Eskom's supplier quality requirements under specification 240-105658000 and the ISO 9001 standard.
SDL&I Strategy Setting for Bidders vehicle branding.pdf
Design, manufacture, supply, installation, maintenance and removal of vehicle branding across multiple vehicle categories for Eskom Distribution vehicles nationally, on an as-and-when-required basis over a five-year contract period.
Fleet vehicle branding, installation and removal services are being procured on a national basis, with bids submitted electronically through the Eskom eTendering portal by 4 December 2026 at 10:00. The available material covers only the portal's registration and submission process; no scope detail, pricing format, evaluation criteria or eligibility thresholds are provided.
Copy of ESKOM BRANDING EVALUATION CRITERIA UPDATED 9NOV26 (007).pdf
Eskom requires fleet vehicle branding, installation and removal services, including vehicle wrapping and large-scale branding, for its Distribution vehicles nationally. Bidders are assessed on industrial printing machinery, branding software, proven experience, business continuity and provincial coverage before pricing.
Provision of fleet vehicle branding, installation and removal services for Eskom on a national basis. Bidders must submit a completed Contract Quality Plan aligned to SANS 466:2005 Edition 1 and ISO 10005:2005 Edition 2, covering quality management, sub-supplier control, inspection, non-conformance, records and post-delivery activities.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Similar Tenders
Matched by category & region
Supplier Readiness Hub
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open, inspect, issue inspection report, refurbish or replace non-return, Globe, Ball, AMOT, Butterfly, Wedge, Gate, Parallel Slide and Diaphragm valves of the boiler and turbine auxiliary systems at Kriel Power Station for a period of five
years
Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Document read
Compliance review
Bid-ready summary
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf
Eskom specification 240-105658000 (QM 58), Revision 4, sets the minimum quality management requirements for current and potential Eskom suppliers and sub-suppliers. It covers QMS development, quality planning, contract quality plans, quality control plans, pre-award quality categories, post-award monitoring, audits, preservation, access rights and nonconformity management.
Important Dates
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)
Closing date/time: 4 December 2026 at 08:00 (recorded as UTC)
Specification authorisation date: 1 July 2026
Next review date: May 2030
Contact Information
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)
Functional area
Procurement and Supply Chain Management
Document contacts
Sipho A Sambo: Middle Manager (Acting), Procurement and Supplier Quality Management
Bathusi Montwedi: Senior Manager (Acting), Procurement and Supply Chain Management
Gerhard Van Der Walt: General Manager, Procurement and Supply Chain Management, Corporate Services
Submission Guidelines
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)
Returnable quality documents
Form A (240-68099512): the bidder must complete Sections A and E and sign it to accept the applicable quality requirements.
The List of Tender Returnable (240-12248652) identifies the exact quality documents required for the selected category.
The quality category will be Category 1, 2, 3 or 4; the required evidence depends on that category.
Depending on the category, returnables may include a valid ISO 9001 certificate or documented QMS evidence, internal and external audit reports, QMS roles and responsibilities, quality policy and objectives, document control, internal audit and corrective action procedures, a draft Contract Quality Plan, an example Inspection and Test Plan or Quality Control Plan, control of externally provided processes, and management review records.
The specification does not prescribe the submission channel, address, number of copies or packaging.
Evaluation Criteria
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)
Quality evaluation basis
Bidders are assessed against the quality category selected for the procurement.
Form A Sections A and E must be completed and signed by the bidder.
The category-specific quality returnables must be submitted for evaluation.
Eskom uses the QM 58 selection guideline and tender evaluation scorecard to determine the applicable quality criteria.
No price/functionality split, minimum qualifying score or preference-point system is stated in this specification.
Technical Specifications
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)
Scope and quality requirements
The procurement is for fleet vehicle branding, installation and removal services; the specification sets Eskom's minimum supplier quality requirements.
Suppliers and sub-suppliers must establish, implement, maintain and improve a quality management system aligned to ISO 9001.
A valid ISO 9001 certificate or equivalent QMS evidence is required where the tender category calls for it.
Bidders must submit Form A and the quality returnables for the assigned category, including a draft Contract Quality Plan and, where applicable, an Inspection and Test Plan or Quality Control Plan.
Contract Quality Plans must be submitted before the project kick-off or pre-fabrication meeting, and before manufacturing starts, whichever is earlier.
Quality Control Plans and Inspection and Test Plans must be reviewed and accepted by Eskom before work starts; later changes need Eskom agreement.
Work must be controlled through inspections, tests, hold and witness points, records, preservation measures and Eskom audit/access rights.
Sub-supplier quality, special processes, nonconformities and post-award performance monitoring are included.
Methodology
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf
Preservation and quality execution methodology
The supplier must prepare and execute a preservation work plan covering all materials, equipment and systems under its control.
Oversight must include material quality preservation at all work locations and performance evaluation of transport, handling and storage providers.
A records management process must capture preservation activities and provide Eskom access.
Compliance monitoring must continue through engineering, procurement, logistics, construction and hand-over until the goods are incorporated into an operating system.
Responsibilities must be clearly assigned to the supplier, sub-suppliers and project team.
Quality Management
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf
Quality management system
Suppliers and sub-suppliers must maintain a documented QMS based on ISO 9001 and continually improve it.
Where required, the QMS must be certified by an accredited certification body.
Contract Quality Plans must describe how quality will be delivered and should align with ISO 10005.
Quality Control Plans and Inspection and Test Plans must identify inspections, tests, acceptance criteria, hold and witness points, records and responsibilities.
Eskom may review, accept and audit quality plans, appoint inspectors and require corrective action.
A quality kick-off meeting is held at contract start; coordination meetings require 14 days' notice.
Compliance Requirements
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf (unknown)
Quality compliance
Form A (240-68099512): the bidder must complete Sections A and E and sign to accept the quality requirements.
Quality category: the tender will specify Category 1, 2, 3 or 4; the required quality evidence depends on that category.
ISO 9001: a valid certificate or documented QMS evidence is required unless the category excludes it.
Sub-supplier compliance: the main supplier remains responsible for sub-supplier quality plans, inspections and records.
Personnel: staff performing special processes must be competent and, where legally required, registered with the relevant statutory body.
B-BBEE: minimum Level 1 applies; the specification does not provide further B-BBEE evidence or scoring detail.
Contractual Terms
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf
Preservation and inspection obligations
The supplier's preservation programme must cover temporary, long-term and in-transit storage from transfer of responsibility until installation or operational use.
Storage and control must follow manufacturer recommendations, specifications and project requirements.
Special precautions are required for valves, motors, rotating equipment, piping, instrumentation, flange faces, gaskets, coatings, insulation and similar items.
Preservation requirements must be documented in purchase orders and communications with sub-suppliers.
The supplier must assign preservation responsibilities, maintain records and give Eskom free access for inspection and audit.
Eskom may appoint inspectors or inspection agencies; the supplier must provide workspace at no cost and must not hinder their work.
Signed Quality Control Plans and Inspection and Test Plans become contract addendums.
Section
Source: 240-105658000 SUPPLIER QUALITY MANAGEMENT SPEC REV4 FINAL 2026.pdf
Quality criteria are selected according to the procurement's assigned quality category. Bidders must submit Form A Sections A and E and the category-specific quality returnables. Eskom uses QM 58 selection guidance and the tender evaluation scorecard to determine the applicable quality requirements. No separate price/functionality scoring split or minimum qualifying score is provided in this specification.
DocumentE-Tenderers E-Tendering Training Acknowledgement Form.docxReview complete
Submission Guidelines
Source: E-Tenderers E-Tendering Training Acknowledgement Form.docx (unknown)
Mandatory returnable: E-Tendering Training Acknowledgement Form (Template ID 240-9722574, Rev 1), fully completed and signed, submitted with the bid at closing.
The form records: enquiry number; business name/JV; contact person; landline; cellphone; email; authorised signature; designation; date.
Signing confirms the tenderer has completed the e-Tendering self-training (Noddy Guide, video or clarification meeting) and can operate the E-Tendering Solution.
Compliance Requirements
Source: E-Tenderers E-Tendering Training Acknowledgement Form.docx (unknown)
The E-Tendering Training Acknowledgement Form is a mandatory returnable at closing; it must be fully completed and signed.
If the form is missing, incomplete or unsigned at closing, the Procurement Practitioner will request it in writing and allow five (5) working days for submission.
If the form is still not fully completed, signed and received within those five working days, the tenderer is disqualified.
DocumentInvitation to Tender (ITT) Branding - Final approved.pdfReview complete
Description
Source: Invitation to Tender (ITT) Branding - Final approved.pdf
Tender pack contents
The pack includes authorisation, acknowledgement, tenderer particulars, integrity declaration, CPA forms, SBD forms, e-tendering manual acknowledgement, NEC3 TSC3 contract, and pricing schedule.
The operational scope is set out in the NEC3 Term Service Contract (TSC3).
Local production/content annexures are only relevant if designated materials are included; they are marked not applicable for this tender.
Important Dates
Source: Invitation to Tender (ITT) Branding - Final approved.pdf (RFP)
Closing
Date and time: 04 December 2026 at 10h00.
Clarification meeting
Date and time: 25 November 2026 at 10h00.
Venue: Microsoft Teams online meeting.
Attendance: non-compulsory.
Clarification queries
Deadline: 10 working days before the tender closing date.
Tender validity
120 days from the closing date and time.
Contact Information
Source: Invitation to Tender (ITT) Branding - Final approved.pdf (RFP)
All queries must be submitted in writing to the Eskom Representative.
Procurement signatory
Name: Pumezile Makeba
Role: Procurement Manager
Submission address
Electronic submission via the Eskom E-tendering site.
Service delivery area
Eskom Dx operating units nationwide.
Submission Guidelines
Source: Invitation to Tender (ITT) Branding - Final approved.pdf (RFP)
Submission method
Electronic submission only through the Eskom E-tendering site.
Upload documents under the Technical, Commercial, Financial and Other folders.
Main documents must be PDF; the pricing schedule must be provided in PDF and Excel.
Maximum upload size: 500 MB per document and 4 GB total.
No zipped files and no hard-copy submissions.
If resubmitted, only the latest version is considered.
The submission status must show complete.
Basic compliance requires a complete tender with commercial, financial and technical information.
Failure to upload required documents renders the tender non-responsive.
Closing
Closing date and time: 04 December 2026 at 10h00.
Late submissions will not be accepted.
There is no public opening and prices are not read out.
Mandatory returnables at closing
Annexure A: authorisation form signed by an authorised representative.
Annexure B: acknowledgement form confirming receipt of tender documents and addenda.
Annexure C: tenderer particulars.
Annexure D: integrity declaration.
Annexure H: SBD 1 invitation to bid.
Annexure J: SBD 4 declaration of interest.
E-tendering help manual acknowledgement form.
For joint ventures: JV agreement, confirmation of single business entity, and designated JV bank account details.
Completed NEC3 TSC3 contract and pricing schedule where required.
Functionality evidence in Appendix A.
Other required documents
Annexure E or F CPA forms where applicable; if omitted, prices are treated as fixed and firm.
Annexure I SBD 6.1 and B-BBEE evidence to claim preference points; omission results in zero specific-goal points.
CSD registration number or CSD report.
Latest approved annual financial statements and related financial evidence.
Quality evidence per Appendix C.
Tax evaluation questionnaire.
Tax clearance or SARS PIN/CSD verification where applicable.
Employment Equity compliance proof for designated employers.
If a non-disqualifiable returnable is missing or incomplete, Eskom may request it within 5 working days; failure to submit it within that period leads to disqualification.
Disqualification risks
Missing or unsigned mandatory returnables.
Submission after the closing time.
Tender signed by an unauthorised person.
Failure to meet the 70% functionality threshold.
Ineligibility, conflict of interest, multiple tenders, or 100% subcontracting of the scope.
Evaluation Criteria
Source: Invitation to Tender (ITT) Branding - Final approved.pdf (RFP)
Evaluation sequence
Step 1: eligibility and basic compliance check.
Step 2: functionality evaluation with a pass/fail threshold.
Step 3: price and specific goals scoring for responsive bidders.
Functionality
Mandatory item: proof of lease or purchase of industrial printing machinery.
Branding software: 30 points for proof of software purchase or certificate; 0 points if not submitted.
Experience: 35 points for at least 5 years and 3 signed reference letters; 15 points for 3 to 4 years and 2 signed reference letters; 5 points for 1 to 2 years and 1 signed reference letter; 0 points for no experience.
Business continuity plan: 10 points for an acceptable detailed plan; 0 points if not submitted.
National coverage: 25 points for capacity in 7 to 9 provinces; 15 points for 5 to 6 provinces; 10 points for 3 to 4 provinces; 5 points for 1 to 2 provinces.
Minimum qualifying score: 70 out of 100.
Bidders below 70 are disqualified.
Price and preference
Price score: 90 points.
Specific goals score: 10 points under the 90/10 preference system.
Required evidence for preference points: valid SANAS-accredited B-BBEE certificate, sworn affidavit, or CIPS affidavit; ownership/shareholding proof, preferably CIPC; certified shareholder IDs; disability proof where applicable; consolidated B-BBEE certificate for trusts, consortia or JVs.
Sworn affidavits with electronic signatures are not accepted.
Missing preference-point evidence does not disqualify the bid, but the bidder receives only the 90 price points and 0 specific-goal points.
Ranking and award
Final ranking is based on the combined price and specific-goal score.
Objective criteria include SDL and I requirements.
Eskom may award to a bidder other than the highest scorer if objective criteria justify it.
Technical Specifications
Source: Invitation to Tender (ITT) Branding - Final approved.pdf (RFP)
Scope
Provision of fleet vehicle branding, installation and removal services.
The tender covers the whole contract.
The contractual scope is set out in the NEC3 Term Service Contract (TSC3).
Service coverage
Bidders must show capacity to deliver across Eskom Dx operating units nationwide.
Bidders must be able to manage multiple sites simultaneously.
Bidders must submit their operating locations.
Equipment and software
Proof of lease or purchase of industrial printing machinery is required.
Proof of branding software purchase or certificate is required for functionality points.
Continuity
A disaster management/business continuity plan must show how branding services will be maintained or restored during disruptions.
The plan should cover key risks, recovery and back-up arrangements, responsible personnel, communication and escalation processes, recovery priorities, and regular review or testing.
Other requirements
Quality requirements are set out in Appendix C.
Safety and environmental requirements are marked not applicable.
If cataloguing is required after award, the successful bidder must provide item cataloguing information and label materials according to Eskom specifications.
The pricing schedule must include a cataloguing line item where cataloguing applies; Eskom pays for cataloguing.
Experience & Qualifications
Source: Invitation to Tender (ITT) Branding - Final approved.pdf
Experience scoring
At least 5 years of fleet branding, vehicle wrapping, or large-scale branding experience with 3 signed reference letters: 35 points.
3 to 4 years with 2 signed reference letters: 15 points.
1 to 2 years with 1 signed reference letter: 5 points.
No experience: 0 points.
Reference letters and a portfolio of completed work may be used as evidence.
Quality Management
Source: Invitation to Tender (ITT) Branding - Final approved.pdf
Quality requirements
Quality requirements are set out in Appendix C.
Bidders must submit a detailed business continuity/disaster management plan.
The plan must demonstrate the ability to maintain or quickly restore vehicle branding services during disruptions.
It must cover key risks, recovery and back-up arrangements, responsible personnel, communication and escalation processes, recovery priorities, and regular review or testing.
Pricing Schedule
Source: Invitation to Tender (ITT) Branding - Final approved.pdf
Pricing schedule
Pricing is contained in the NEC3 Term Service Contract (TSC3).
Submit the pricing schedule in PDF and Excel.
Include a cataloguing line item if cataloguing is required.
If the CPA forms are not submitted, the contract price will be treated as fixed and firm for the full contract period.
Upload limits: 500 MB per document and 4 GB total.
Financial Requirements
Source: Invitation to Tender (ITT) Branding - Final approved.pdf (RFP)
Pricing
Pricing is contained in the NEC3 Term Service Contract (TSC3) pricing schedule.
The pricing schedule must be submitted in PDF and Excel.
If Annexure E or F is not submitted, prices will be treated as fixed and firm for the contract duration.
Alternative tenders are not allowed.
Security for performance
If the financial analysis shows the bidder is not financially viable, Eskom may require security for non-performance.
Acceptable security: a parent company guarantee from the holding company or a performance bond from a bank.
The bidder must identify at least two Eskom-approved financial institutions it may approach.
Payment terms
Contracts below R50 000 000 including VAT: payment within 30 days of receipt of undisputed invoices.
Contracts above R50 000 000 including VAT: payment within 60 days of receipt of undisputed invoices.
Financial evidence
Latest approved annual financial statements are required; draft or management accounts are not accepted.
Statements must be for the tendering company, not the parent or ultimate holding company.
Required contents: company background, signed directors' report, signed auditor/reviewer/compiler/accounting officer report, statement of financial position, statement of comprehensive income, statement of changes in equity, statement of cash flows, and notes.
Unaudited South African entities must also provide a signed public interest score, ownership/management details, and whether the statements were externally prepared.
Unaudited South African entities must provide ITA34C copies for the current and previous years of assessment.
Each partner in an unincorporated JV or SPV must submit its own financial statements.
Compliance Requirements
Source: Invitation to Tender (ITT) Branding - Final approved.pdf (RFP)
Eligibility
The bidder must not be restricted from doing business with Eskom or state-owned companies.
The bidder must not be subject to National Treasury restriction, Eskom restriction, or listed on the Tender Defaulters list.
The bidder must not have the nationality of a sanctioned country.
The bidder must not submit more than one tender.
The bidder must not have a conflict of interest.
The tender must be signed by an authorised person.
The bidder must not subcontract 100% of the scope.
Joint ventures must state joint and several liability.
Registrations and compliance
CSD registration is mandatory.
Local bidders must provide a SARS e-filing PIN or CSD profile for tax verification.
Foreign bidders with a South African footprint but no CSD registration or SARS PIN must provide a certified tax clearance certificate.
Foreign bidders with no South African footprint must complete SBD 1 but do not need tax compliance proof.
Designated employers must provide Employment Equity Act compliance proof, including the Employment Equity report submission.
Quality requirements per Appendix C must be met.
Contractual requirements are assessed after evaluation; failure to meet them by the deadline may make the bidder ineligible for award.
Subcontracting with subsidiaries must be declared.
B-bbee
B-BBEE evidence is required to claim preference points.
Acceptable evidence includes a SANAS-accredited certificate, prescribed sworn affidavit, or CIPS affidavit.
Ownership, shareholder IDs, disability proof where applicable, and consolidated JV/consortium/trust certificates must be provided where relevant.
Forms
Annexure A: authorisation form; the correct organisation certificate and certified authorisation document must be attached.
Annexure B: acknowledgement form.
Annexure C: tenderer particulars.
Annexure D: integrity declaration; bidders must read the Supplier Integrity Pact.
Annexure H: SBD 1; all tenderers, including foreign suppliers, must complete it.
Annexure I: SBD 6.1 preference points claim.
Annexure J: SBD 4 declaration of interest.
Annexure E/F: CPA forms for local or imported goods/services where applicable.
SBD 6.2 and Annexures G1-G4 are not applicable unless designated materials are included.
Not applicable
CIDB requirements.
Contract Skills Development Goals.
Contract Participation Goals.
Contractual Terms
Source: Invitation to Tender (ITT) Branding - Final approved.pdf
Contract terms
Contract form: NEC3 Term Service Contract (TSC3).
The tender covers the whole contract.
Tender validity: 120 days from closing.
Alternative tenders are not allowed.
If Eskom extends the validity period, bidders that agree may not modify their tenders; modified tenders are disqualified.
Performance security may be required if financial analysis indicates the bidder is not financially viable.
Security may be a parent company guarantee or bank performance bond.
Payment terms depend on contract value: 30 days for contracts below R50 000 000 including VAT and 60 days for contracts above R50 000 000 including VAT.
Cataloguing may be required after award and must be priced where applicable.
Subcontracting the entire scope is prohibited.
Eskom retains the right to negotiate with preferred bidders after the bidding process if prices are not market-related.
Section
Source: Invitation to Tender (ITT) Branding - Final approved.pdf
Additional evaluation detail
Functionality is scored out of 100 with a 70% pass threshold.
Price is scored out of 90 and B-BBEE specific goals out of 10.
B-BBEE level points range from 10 for Level 1 to 0 for non-compliant.
Failure to submit functionality evidence results in zero for that criterion.
Failure to submit preference-point evidence results in zero specific-goal points and price scoring limited to 90 points.
Objective criteria include SDL and I requirements.
DocumentBEE_Affidavit-EME-Gen.pdfReview complete
Compliance Requirements
Source: BEE_Affidavit-EME-Gen.pdf (unknown)
B-BBEE evidence (EME sworn affidavit)
Bidders qualifying as Exempted Micro Enterprises may submit a sworn affidavit instead of a verified B-BBEE certificate.
Revenue threshold: annual total revenue of R10,000,000.00 or less, taken from the latest audited or management financial statements, with the financial year-end stated.
The affidavit must record the enterprise's registration details, entity type, nature of business and physical address, plus the signatory's capacity as member, director or owner.
Ownership percentages to be declared: Black ownership (flow-through principle), Black female ownership, and Black designated group ownership.
Designated group breakdown to be declared: Black youth, Black disabled, Black unemployed, Black people in rural areas, and Black military veterans.
B-BBEE level claimed must be ticked: 100% Black owned = Level 1 (135% procurement recognition); at least 51% Black owned = Level 2 (125%); less than 51% Black owned = Level 4 (100%).
The affidavit is valid for 12 months from the date it is signed by the Commissioner of Oaths.
The deponent signs before a Commissioner of Oaths, whose signature and stamp must appear with the date.
DocumentE-tendering Help Manual for supplier (1).pdfReview complete
Description
Source: E-tendering Help Manual for supplier (1).pdf
The Eskom eTendering system is a web-based platform through which suppliers bid for advertised tenders and submit tender documents online, replacing manual or physical submission at Eskom tender offices.
Suppliers must register their details before access is granted; an OTP is sent to both the registered cell phone number and email address.
A CSD number is required to gain access.
Public access: the TenderBulletin public website (https://tenderbulletin.eskom.co.za) lists published tenders and links through to eTendering; the eTendering website (https://eTendering.eskom.co.za) shows published tender information and accepts submissions.
Closed tenders are not listed publicly; they are sent directly by email link to selected suppliers who meet the buyer's selection and evaluation criteria.
Users who experience problems with the Tender Bulletin, eTendering or OpenText systems must contact the buyer responsible for the published tender.
Registered details (name, organisation, CSD number, cell phone number) can be edited after registration; a forgotten password is reset via an alternative email address followed by OTP verification.
Submission Guidelines
Source: E-tendering Help Manual for supplier (1).pdf (TENDER)
Submission is electronic only, through the Eskom eTendering portal; the system replaces physical submission of tender documents at Eskom tender offices.
Access:
Register on the portal before bidding; an OTP is sent to the registered cell phone number and email address.
A CSD number is required to gain access to the eTendering system.
Portals: https://tenderbulletin.eskom.co.za (view published tenders) and https://eTendering.eskom.co.za (view tenders and submit documents).
Uploading:
Name each file and select the correct category (Technical, Commercial, Finance, etc.) before upload.
Each file is limited to 50MB; all uploaded files together must not exceed 900MB.
Confirm every document sits under the correct category, then select Final Submission.
The final page shows the submission date and time stamp; a confirmation email with the submission ID is sent to the submitter. Keep this email for any future enquiry.
Support: for problems with the Tender Bulletin, eTendering or OpenText systems, contact the buyer responsible for the published tender.
Browser: most browsers work; Microsoft Edge is recommended.
Returnable documents: none are listed in the supplied material.
Compliance Requirements
Source: E-tendering Help Manual for supplier (1).pdf (TENDER)
Central Supplier Database: a CSD number is required to access the eTendering system.
No B-BBEE level, CIDB grade, tax clearance, turnover or professional registration threshold is stated in the supplied material.
Health & Safety
Source: E-tendering Help Manual for supplier (1).pdf
Portal access and support:
TenderBulletin public website: https://tenderbulletin.eskom.co.za — view and access published Eskom tenders; the eTendering link leads to https://eTendering.eskom.co.za for uploading tender documentation.
eTendering public website: https://eTendering.eskom.co.za — view published tender information and submit tender documents.
A CSD number is required to gain access to the eTendering system.
Difficulties with the Tender Bulletin, eTendering or OpenText systems: contact the buyer responsible for the published tender.
Document240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP)-rev 3.docxReview complete
Technical Specifications
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP)-rev 3.docx (unknown)
Quality documentation deliverable
A Quality Control Plan / Inspection Test Plan (QCP/ITP) must be prepared for the fleet vehicle branding, installation and removal work.
Each activity in the plan must record: the requirement description, whether it is statutory or non-statutory, the inspection and test method, the controlling document, and the acceptance criteria.
Intervention points must be assigned per activity: hold points (work stops until sign-off), witness points, document reviews, surveillance and verification, each set at 100% or sample-based frequency.
The plan requires sign-off from the contractor/supplier, any subcontractor, Eskom, and an Approved Inspection Authority (AIA) where applicable.
Abbreviations used: NOBO (Notification Body); TPI (Third Party Inspection).
Document240-68099512 Form A Rev 10 (001).docxReview complete
Description
Source: 240-68099512 Form A Rev 10 (001).docx
Scope: provision of fleet vehicle branding, installation and removal services.
By signing the acknowledgement form, the tenderer accepts Eskom's supplier quality requirements in specification 240-105658000 and the ISO 9001 standard.
Evaluation Criteria
Source: 240-68099512 Form A Rev 10 (001).docx (unknown)
Pre-contract award quality requirements apply under clause 3 of specification 240-105658000.
Applicable category: Category 2 (clause 4.1.2); only one category may be selected.
Main supplier and sub-supplier capability and capacity assessment applies (clause 4.2).
Technical Specifications
Source: 240-68099512 Form A Rev 10 (001).docx (unknown)
Scope: provision of fleet vehicle branding, installation and removal services.
ISO 9001 clauses 4 to 10 apply: context of the organisation, leadership, planning, support, operation, performance evaluations, improvement.
All seven ISO 9001 quality principles apply: customer focus; leadership; engagement of people; process approach; improvement; evidence-based decision making; relationship management.
Standard conditions apply: Eskom rights of access (6.1), rights to information (6.2), preservation (6.3), quality audit conditions (6.4), management of nonconformities and nonconforming outputs (6.5), special processes (6.6).
Compliance Requirements
Source: 240-68099512 Form A Rev 10 (001).docx (unknown)
By signing the acknowledgement form, the tenderer accepts Eskom's supplier quality requirements in specification 240-105658000 and the ISO 9001 standard.
Tenderer's quality representative (Section E) must be completed: name, designation, date and signature.
DocumentSupplier Quality Management_Cat 2_List of Returnables Rev 7.xlsxReview complete
Description
Source: Supplier Quality Management_Cat 2_List of Returnables Rev 7.xlsx
Category 2 quality returnables for fleet vehicle branding, installation and removal services, covering quality management system evidence, audit reports, contract quality plan and inspection or test plan.
Submission Guidelines
Source: Supplier Quality Management_Cat 2_List of Returnables Rev 7.xlsx (unknown)
Submission preparation
Complete the Category 2 quality returnables template and submit it with the bid.
Select only one category; selecting more than one category creates an error.
Save the completed template as a PDF and sign it; signing and locking the sheet before sending to the buyer is preferred.
Returnable quality documents
Form A, completed and signed.
Evidence of an implemented quality management system.
Latest internal management system audit report, including nonconformities, corrections and corrective actions.
Draft Contract Quality Plan and Inspection and Test Plan or Quality Control Plan for the scope of work.
Documented roles, responsibilities and authorities, including the quality management function.
Evaluation Criteria
Source: Supplier Quality Management_Cat 2_List of Returnables Rev 7.xlsx (unknown)
Quality evaluation weighting
Section A: 25% - quality management system requirements.
Option 1: valid ISO 9001:2015 certification from an approved certification body with international accreditation, relevant scope and valid expiry.
Option 2: documented quality management system evidence, including quality manual or method statement, quality policy, quality objectives, document control, control of nonconforming outputs, corrective action and internal audit.
Section B: 25% - evidence that the quality management system is operating.
Defined roles, responsibilities and authorities.
Control of externally provided processes, products and services.
Latest internal management system audit report with nonconformities, corrections and corrective actions.
Management review records.
Section C: 20% - draft Contract Quality Plan specific to the scope of work, aligned with ISO 10005.
Section D: 20% - Quality Control Plan, checklist or Inspection and Test Plan for the scope of work, with an example from similar or previous work.
Section E: 10% - Form A completed and signed, plus any additional customer-specific requirements.
Technical Specifications
Source: Supplier Quality Management_Cat 2_List of Returnables Rev 7.xlsx (unknown)
Quality and technical requirements
Applicable category: Category 2.
The bidder must have an implemented quality management system aligned with ISO 9001:2015.
Quality documentation must cover the scope of work and include a draft Contract Quality Plan and an Inspection and Test Plan or Quality Control Plan.
The quality management system must define roles, responsibilities and authorities, including the quality management function.
The bidder must provide the latest internal management system audit report, including nonconformities, corrections and corrective actions.
Management review records must be available as evidence of system operation.
Compliance Requirements
Source: Supplier Quality Management_Cat 2_List of Returnables Rev 7.xlsx (unknown)
Mandatory quality compliance
Form A must be completed and signed.
Quality management system must conform to ISO 9001:2015.
Internal management system audit report must include nonconformity, correction and corrective action details.
Draft Contract Quality Plan must be specific to the tender scope and reference ISO 10005.
Inspection and Test Plan or Quality Control Plan must be provided for the scope of work.
Documented roles, responsibilities and authorities must be submitted.
The bidder must complete a Contract Quality Plan for the fleet vehicle branding, installation and removal services contract.
The plan must demonstrate how quality requirements will be achieved and should follow SANS 466:2005 Edition 1 and ISO 10005:2005 Edition 2.
It must cover scope, communication, responsibilities, supplier and sub-supplier control, inspection and test plans, records, non-conformance management, databooks, tools, customer property, preservation, traceability and post-delivery support.
Supplier details are to be completed by the bidder; client review and acceptance details are completed after award.
Fleet vehicle branding, installation and removal services.
Quality management
The bidder must prepare a Contract Quality Plan showing how quality requirements will be met.
The plan should align with SANS 466:2005 Edition 1 and ISO 10005:2005 Edition 2.
It must cover scope of work, communication channels, responsibilities, interfacing documents, suppliers and sub-suppliers, monitoring, items to be manufactured, refurbished or purchased, inspection and test plans, special controls, records, concessions and non-conformance, databooks, tools and equipment, customer property, preservation, traceability, and commissioning or post-delivery support.
Records, inspection reports, method statements, certificates and databooks must be controlled and retained.
DocumentBEE_Affidavit-QSE-Gen.pdfReview complete
Compliance Requirements
Source: BEE_Affidavit-QSE-Gen.pdf (unknown)
B-BBEE evidence — Sworn Affidavit, Qualifying Small Enterprise (General)
Who it applies to
Bidders that are Qualifying Small Enterprises: annual total revenue between R10,000,000.00 and R50,000,000.00 at the latest financial year-end.
Revenue must be supported by audited financial statements, financial statements, or other information available at that year-end.
Ownership to be declared
Black ownership percentage, using the flow-through principle.
Black female ownership percentage.
Black Designated Group ownership percentage, with a breakdown across black youth, black people with disabilities, black unemployed people, black people in rural areas, and black military veterans.
Level that may be claimed
100% black owned: Level One, carrying 135% B-BBEE procurement recognition.
At least 51% black owned: Level Two, carrying 125% B-BBEE procurement recognition.
Signing requirements
The declaration is made under oath before a Commissioner of Oaths.
The deponent must be a member, director or owner of the enterprise and authorised to act for it.
Valid for 12 months from the date the Commissioner of Oaths signs.
Enterprise details to be supplied
Full name and identity number of the deponent.
Registered enterprise name, trading name if different, registration number, VAT number if registered.
Physical address, entity type (CC, (Pty) Ltd, sole proprietor, etc.) and nature of business.
DocumentSDL&I Strategy Setting for Bidders vehicle branding.pdfReview complete
Description
Source: SDL&I Strategy Setting for Bidders vehicle branding.pdf
Eskom requires the design, manufacture, supply, installation, maintenance and removal of vehicle branding on multiple vehicle categories for Distribution (Dx) vehicles across the country.
Contract period: five years, on an as-and-when-required basis.
Submission Guidelines
Source: SDL&I Strategy Setting for Bidders vehicle branding.pdf (unknown)
Submission channel and address: not stated in this document.
Returnable documents for preference points and SDL&I:
Valid B-BBEE certificate from a SANAS-accredited verification agency, or a sworn affidavit or CIPS affidavit. Sworn affidavits carrying an electronic signature are rejected.
Proof of ownership or shareholding (CIPC documentation preferred), including the shareholding breakdown.
Certified ID copies of each shareholder.
Proof of disability, where applicable.
Consolidated B-BBEE verification certificate for a trust, consortium or joint venture.
Subcontracting agreement signed by both parties, with the subcontractor's CK registration documents and B-BBEE certificate or sworn affidavit; alternatively signed letters of intent to subcontract.
Completed subcontracting table: subcontractor name, scope of work, subcontracting percentage, contact person, telephone and email.
Completed jobs-creation table and skills-development table by province.
B-BBEE improvement or retention plan, submitted within 30 days of contract signature.
Sworn affidavit formalities:
Deponent and Commissioner of Oaths must sign on the same date, with the Commissioner signing and stamping.
The Commissioner of Oaths must not be an employee or ex officio of the bidding enterprise.
Evaluation Criteria
Source: SDL&I Strategy Setting for Bidders vehicle branding.pdf (unknown)
Preference point system: 90/10 or 80/20, combining price points with points for the specific B-BBEE goal.
B-BBEE points by status level (90/10 system / 80/20 system):
Level 1: 10 / 20
Level 2: 9 / 18
Level 3: 6 / 14
Level 4: 5 / 12
Level 5: 4 / 8
Level 6: 3 / 6
Level 7: 2 / 4
Level 8: 1 / 2
Non-compliant contributor: 0 / 0
Scoring rules:
Specific-goal points are added to price points and the total is rounded to two decimal places.
The contract goes to the bidder with the highest total points.
A bidder who omits the preference-point documentation is not disqualified, but scores 0 for the specific goal and receives only the price points out of 90 or 80.
SDL&I objectives (jobs, skills development, designated-group procurement) are not scored; the commitments made become contractual obligations.
Technical Specifications
Source: SDL&I Strategy Setting for Bidders vehicle branding.pdf (unknown)
Scope: design, manufacture, supply, installation, maintenance and removal of vehicle branding across multiple vehicle categories for Distribution (Dx) vehicles nationally.
Contract period: five years, on an as-and-when-required basis.
Subcontractable scope (Mpumalanga, Limpopo and Gauteng):
Regional vehicle branding installation, fitment, inspection, repair and removal.
Supply of locally sourced signage consumables, application tools, cleaning materials, minor logistics, site support and quality assurance.
Estimated vehicle counts by province (basis for jobs and skills planning):
Free State: 697
KwaZulu-Natal: 1 308
Northern Cape: 453 and 904 (two entries)
Eastern Cape: 901
Western Cape: 826
Mpumalanga: 1 115
Gauteng: 1 718
Limpopo: 1 413
Job creation targets over five years by province: Free State 2; KwaZulu-Natal 4; Northern Cape 3 and 6; Eastern Cape 5; Western Cape 5; Mpumalanga 7; Gauteng 10; Limpopo 10.
Skills development targets over five years by province: Free State 2; KwaZulu-Natal 4; Northern Cape 3 and 5; Eastern Cape 4; Western Cape 4; Mpumalanga 6; Gauteng 8; Limpopo 8.
Methodology
Source: SDL&I Strategy Setting for Bidders vehicle branding.pdf
Skills development delivery:
The successful bidder must develop unemployed South African candidates over the five-year term through accredited or structured workplace-based programmes covering vehicle branding, signage production, digital printing, installation, maintenance, quality control and project coordination.
Candidates must be South African citizens, sourced where reasonably possible from the provinces where the work is performed, and representative of national demographics with preference for youth, women and persons with disabilities.
At least 60% of candidates must be youth and 40% women.
All candidates must receive formal proof of completion (attendance certificates, statements of results, competency certificates or SETA-recognised proof).
Training may be delivered directly, through the supply network, or via SETA-accredited providers.
Eskom employees and registered learners are excluded from these targets.
The bidder bears the full cost; Eskom contributes nothing. Bidders may access SETA grants, subsidies and incentives and SARS tax rebates.
Reporting cycle:
Quarterly SDL&I reports against the implementation plan.
Eskom assesses each report and issues a compliance report within 60 days.
Non-compliance triggers corrective measures before the next cycle, failing which the 2.5% retention is applied.
Quality Management
Source: SDL&I Strategy Setting for Bidders vehicle branding.pdf
Quality assurance forms part of the subcontractable scope, alongside installation, fitment, inspection, repair and removal.
Quality-related roles reflected in the jobs plan include Quality Checker, Quality Control Assistant, Quality Control Technician, Production Quality Controller and Quality Assurance Officer, covering routine quality checks, final inspection, snag-list management and rework control.
Pricing Schedule
Source: SDL&I Strategy Setting for Bidders vehicle branding.pdf
Local procurement content is defined as value added in South Africa using South African resources, and must be 100%.
Where a contract combines local and imported goods or services, the bid must separate the components in the Price Schedule issued with the tender documents.
Local content is calculated as total spending less the imported component.
Financial Requirements
Source: SDL&I Strategy Setting for Bidders vehicle branding.pdf (unknown)
Local procurement content: 100% local content required. Where a contract combines local and imported goods or services, the bid must split the components in the Price Schedule. Local content is total spend less the imported component.
Designated-group procurement targets (share of local procurement content):
Black owned: 4.0%
Black women owned: 3.0%
Black youth owned: 2.0%
Black persons with disability: 1.0%
SDL&I retention:
2.5% of every invoice amount (excluding VAT) is retained for failure to submit quarterly SDL&I reports or failure to meet SDL&I obligations.
Retained funds are released once the compliance report is positive.
Mandatory subcontracting:
On contracts above R30 million, at least 30% of contract value must be subcontracted to an EME or QSE that is 51% owned by black people living in rural, underdeveloped or township areas.
A supplier may not subcontract more than 25% of the purchase order value to an entity with a lower B-BBEE level than its own, unless that entity is an EME able to execute the work.
Compliance Requirements
Source: SDL&I Strategy Setting for Bidders vehicle branding.pdf (unknown)
B-BBEE evidence by annual total revenue:
Up to R10 million (EME): sworn affidavit accepted.
Up to R50 million (QSE): must meet all QSE scorecard elements for its sector, unless at least 51% black owned, in which case a sworn affidavit is required.
A valid B-BBEE certificate or sworn affidavit is a condition for contract award.
Sworn affidavit validity:
Deponent's full name and ID number as per the identity document.
Deponent's designation (director, owner or member).
Enterprise name per CIPC registration and business address.
Black ownership, black female ownership and designated-group percentages, with no blank fields.
Total revenue for the year under review, and whether based on audited or management accounts.
Financial year end stated as day/month/year.
B-BBEE status level (one only).
Empowering supplier status; QSEs must state the basis.
Deponent and Commissioner of Oaths sign on the same date; the Commissioner must sign and stamp and must not be an employee or ex officio of the enterprise.
B-BBEE improvement commitments:
Level 1: maintain status.
Level 2 or 3: improve or maintain status over the contract period.
Level 4: reach Level 3 by the end of Year 1, then improve one level.
Level 5 to 8 or non-compliant: reach Level 4 by the end of Year 1, then improve at least one level each year from Year 2.
B-BBEE improvement plan due within 30 days of contract signature.
Contractual Terms
Source: SDL&I Strategy Setting for Bidders vehicle branding.pdf
B-BBEE improvement or retention plan:
Due within 30 days of contract signature.
Level 1 bidders maintain status; Level 2 or 3 bidders improve or maintain.
Level 4 bidders must reach Level 3 by the end of Year 1 and then improve one level.
Level 5 to 8 or non-compliant bidders must reach Level 4 by the end of Year 1 and then improve at least one level each year from Year 2.
SDL&I retention:
2.5% of each invoice amount (excluding VAT) is retained for failure to submit quarterly SDL&I reports or failure to meet SDL&I obligations.
Retained funds are released once the compliance report is positive.
Reporting and monitoring:
Suppliers submit a quarterly SDL&I report using the Data Collection Template.
Eskom reviews the report within 60 days and notifies the supplier in writing of any shortfall.
The supplier must implement corrective measures before the next reporting cycle, failing which the retention clause is invoked.
Subcontracting:
Mandatory on contracts above R30 million: at least 30% of contract value to an EME or QSE 51% owned by black people in rural, underdeveloped or township areas.
Subcontracting to an entity with a lower B-BBEE level is capped at 25% of purchase order value unless that entity is an EME able to execute the work.
Section
Source: SDL&I Strategy Setting for Bidders vehicle branding.pdf
Preference points are awarded for the specific B-BBEE goal and added to price points under a 90/10 or 80/20 system.
Points by B-BBEE status level (90/10 / 80/20):
Level 1: 10 / 20
Level 2: 9 / 18
Level 3: 6 / 14
Level 4: 5 / 12
Level 5: 4 / 8
Level 6: 3 / 6
Level 7: 2 / 4
Level 8: 1 / 2
Non-compliant: 0 / 0
Totals are rounded to two decimal places and the highest scorer wins. Bidders who omit preference-point documentation are not disqualified but score 0 for the specific goal and only the price points out of 90 or 80.
DocumentNEC3 TSC3_Provision for Branding final draft.pdfReview complete
Description
Source: NEC3 TSC3_Provision for Branding final draft.pdf
Scope overview
Eskom Distribution (Dx) manages a national fleet of more than 13 000 vehicles and equipment across all provinces.
The contract covers branding of that fleet for 5 years, as and when required.
Rebranding forms part of Eskom's strategic positioning and ensures consistent corporate identity and regulatory visibility across the fleet.
Contact Information
Source: NEC3 TSC3_Provision for Branding final draft.pdf (unknown)
Employer
Organisation: Eskom Holdings SOC Ltd (Reg No. 2002/015527/30), a state-owned company
Registered office: Megawatt Park, Maxwell Drive, Sandton, Johannesburg
Service Manager
Name, address, telephone and email are left blank in the Contract Data.
Service / delivery location
Eskom Distribution fleet, operating nationally across all provinces.
Submission Guidelines
Source: NEC3 TSC3_Provision for Branding final draft.pdf (unknown)
Returnable and completable offer documents (NEC3 TSC3):
Form of Offer and Acceptance (C1.1): signed by an authorised representative; states the tendered total of the Prices excluding VAT, VAT at 15%, and the total including VAT.
Schedule of Deviations: records the only permitted deviations from the tender documents; a tenderer's covering letter carries no contractual weight.
Contract Data Part 2 (C1.2b): completed by the tenderer with its name, address and contact details, direct and subcontracted fee percentages, Risk Register entries, and key-personnel details.
Price List (C2.2): priced for every listed vehicle category.
CIDB registration number entered in the Form of Offer.
Technical Specifications
Source: NEC3 TSC3_Provision for Branding final draft.pdf (unknown)
Scope
Provision of branding services for the Eskom Distribution (Dx) fleet for 60 months (5 years), as and when required.
Two activities per vehicle: removal of existing branding, and manufacture, supply and installation of new branding.
Fleet
Dx owns and manages more than 13 000 vehicles and equipment, operating nationally across all provinces.
Rebranding supports Eskom's corporate identity and regulatory visibility.
Vehicle categories to be priced (unit: each)
Electric: EV panel van (P1, P2, PV4), EV truck, EV sedan, EV LDV 4x4 double cab, EV mini bus.
Diesel mobile generator.
Panel vans (standard and high roof) and sedans.
Light delivery vehicles: 4x2 and 4x4 single, double and extended cab, including 3-litre variants.
Mini buses: 9, 10 and 14 seaters.
Light, medium and heavy trucks (4x2, 4x4, 6x4, 6x6, 8x8 across stated GVM ranges), truck tractors, tipper trucks and an abnormal truck tractor.
Service standards (Option X17)
Branding completed 100% within the agreed programme.
Branding 100% compliant with approved artwork.
Vehicle turnaround within a stated maximum time per vehicle (time not stated in the draft).
Zero material defects.
Rectification of defects within 2 business days.
No damage to vehicles attributable to the contractor.
Delivery model
Work is issued and managed by Task Order; the contractor submits a Task Order programme within 7 days of receipt.
The Employer provides no plant, materials or equipment; the contractor supplies everything needed.
Affected Property: none.
Contractor submits a first plan for acceptance within 2 weeks of the Contract Date and forecasts the final total of the Prices every 4 weeks.
Experience & Qualifications
Source: NEC3 TSC3_Provision for Branding final draft.pdf
Key personnel
The tenderer must list its key people with name, job, responsibilities, qualifications and experience, supported by CVs (Contract Data clause 24.1).
No minimum years of experience or specific qualification thresholds are stated.
Quality Management
Source: NEC3 TSC3_Provision for Branding final draft.pdf
Quality requirements
Branding must be 100% compliant with approved artwork and free of material defects.
Defects must be rectified within 2 business days.
The contractor submits a first plan for acceptance within 2 weeks of the Contract Date and must correct defects not caused by an Employer's risk.
The Scope of Work (Part 3) covers quality-assurance requirements, correction of defects, and tests and inspections, including provision of materials, facilities and samples for inspection.
Pricing Schedule
Source: NEC3 TSC3_Provision for Branding final draft.pdf
Price list (Option A, C2.2)
Each vehicle category is priced per unit (each) against two rate columns: removal of branding, and manufacture/supply/installation of branding.
Categories span the electric range (panel vans, truck, sedan, LDV, mini bus), a diesel mobile generator, panel vans, sedans, light delivery vehicles (single/double/extended cab, 3-litre variants), mini buses (9/10/14 seaters), and light to heavy trucks, truck tractors, tipper trucks and an abnormal truck tractor.
Pricing rules
Lump-sum items: price entered only, not adjusted for later quantity changes.
Rate-based items: rate multiplied by expected quantity gives the price.
Time-based items: a unit of time and expected quantity are stated.
Prices must cover everything necessary to provide the service; the only basis for changing lump-sum prices is a compensation event.
Escalation
Transaction handling fee fixed for 16 months from the base date; thereafter 15% firm and 85% escalated using SEIFSA Table D-4 (CPI).
Financial Requirements
Source: NEC3 TSC3_Provision for Branding final draft.pdf (unknown)
Pricing model
Priced contract with a price list (Option A): each vehicle category priced per unit for removal of branding and for manufacture/supply/installation of branding.
Lump-sum items are not adjusted if actual quantities differ from the estimate; only a compensation event changes lump-sum prices.
Prices must be inclusive of everything needed to provide the service.
Price adjustment (Option X1)
Escalation takes effect 16 months after the base date (base date is one month before the tender closing date).
15% of the price is fixed and non-adjustable; 85% is variable.
The transaction handling fee (commission) is fixed for 16 months, then 15% stays firm and 85% escalates using SEIFSA Table D-4 (Consumer Price Index).
Payment terms
Contracts up to R50 000 000 including VAT: payment within 30 days of a tax-compliant invoice quoting a GR number.
Contracts above R50 000 000 including VAT: payment within 60 days.
Assessment interval: between the 25th day of each successive month.
Currency: South African Rand.
Interest on late payment: Standard Bank prime rate (365-day basis).
Tax invoice due within one week of the payment certificate and must show Eskom's VAT number 4740101508.
Securities and guarantees
The tenderer must deliver any required securities, bonds, guarantees and proof of insurance within two weeks of receiving the signed agreement; failure is treated as repudiation. No amounts are stated.
Delay and service damages
Task Order delay damages (X19.2): 5% of the Task Order value per day of delay, capped at 10% of total Task Order values.
Low service damages (X17): per-vehicle amounts are left blank in the draft and will be set in the final scope.
Liability and insurance
Contractor's liability for indirect or consequential loss is limited to R0.00.
End of liability: 24 months after acceptance of the last vehicle in a batch.
Contractor carries the Insurance Table A covers from the starting date until completion or termination.
Turnover
No minimum turnover or financial-capacity threshold is stated.
Compliance Requirements
Source: NEC3 TSC3_Provision for Branding final draft.pdf (unknown)
Registration and status
CIDB registration number required (no specific grade stated).
CSD registration and a valid SARS tax clearance / tax pin.
VAT registration where applicable; invoices must quote Eskom's VAT number.
B-bbee
No minimum level or preference-point threshold stated.
Any change in B-BBEE status must be reported to the Employer within 7 days, with an updated verification certificate within 30 days; a reduced status can lead to renegotiation or termination.
Insurance
Contractor must hold the Insurance Table A covers (property, plant and materials, equipment, public/product liability, and employee death or injury) and provide insurer certificates on request.
Security and site access (Z15)
All personnel needing site access must hold criminal-verification security clearance certificates from a SAPS-accredited screening provider, no older than 4 weeks; the Employer may demand updates every 26 to 52 weeks.
Health, safety and environment
Compliance with the Construction Regulations 2014 (OHS Act); the contractor may be appointed Principal Contractor.
Compliance with all applicable environmental legislation.
Asbestos handled under Eskom Standard 32-303.
Data protection and confidentiality
POPIA compliance required; each party is an independent responsible party.
No disclosure of Employer information; taking images requires prior written consent, with all rights vesting in Eskom.
Ethics
No corrupt, fraudulent, collusive, coercive or obstructive action; breach can trigger termination.
Other
No cession, delegation or assignment without the Employer's written consent.
Joint ventures and consortia are jointly and severally liable.
Standard forms
NEC3 TSC3 offer, contract data and price list must be completed and signed (see submission guidelines).
Health & Safety
Source: NEC3 TSC3_Provision for Branding final draft.pdf
Occupational health and safety (Z6)
The contractor must take all reasonable precautions to protect health and safety and comply with the Construction Regulations 2014 (under the OHS Act) and all other applicable health and safety laws.
Eskom may appoint the contractor as Principal Contractor for the affected property.
Prices must include sufficient provision for full health and safety compliance.
Asbestos (Z14)
Eskom manages asbestos under Standard 32-303.
Occupational exposure limit: 0.2 regulated fibres per millilitre of air (4-hour TWA); short-term limit 0.6 fibres/ml (10-minute TWA); action level 0.1 fibres/ml.
Personnel may stop work and leave any area not declared safe.
Removal and disposal of asbestos is carried out by a registered asbestos contractor at Eskom's expense.
Site security (Z15)
Personnel accessing sites must hold SAPS-accredited criminal-verification clearance certificates no older than 4 weeks, with updates possible every 26 to 52 weeks.
Environmental
Source: NEC3 TSC3_Provision for Branding final draft.pdf
Environmental obligations (Z6.2)
The contractor must comply with all applicable environmental laws, regulations, rules and guidelines, and ensure subcontractors and employees do the same.
The Scope of Work (Part 3) addresses control of noise, dust, water and waste while working on the affected property.
Contractual Terms
Source: NEC3 TSC3_Provision for Branding final draft.pdf
Contract framework
NEC3 Term Service Contract (TSC3), April 2013, main Option A (priced contract with price list).
Secondary options: X1 (inflation adjustment), X2 (changes in law), X17 (low service damages), X18 (limitation of liability), X19 (task order) and W1 (dispute resolution).
Additional conditions Z1 to Z16 always apply.
Governing law: Republic of South Africa; language: English; period for reply: 2 weeks.
Duration and programme
Service period: 60 months; starting date left blank in the draft.
First plan for acceptance within 2 weeks of the Contract Date; price forecasts every 4 weeks.
Task Order programme within 7 days of receiving a Task Order.
Compensation events
A compensation event not notified within 8 weeks of awareness gives no entitlement to a price change.
Liability
Contractor's liability for indirect or consequential loss limited to R0.00.
End of liability 24 months after acceptance of the last vehicle in a batch.
Delay damages
5% of Task Order value per day, capped at 10% of total Task Order values.
Termination triggers
Reduced B-BBEE status, prohibited (corrupt or fraudulent) conduct, or a business rescue order against the contractor.
Dispute resolution (W1)
Adjudication by an ICE-SA panellist (AFSA appoints if the parties disagree), then arbitration in South Africa under Association of Arbitrators (Southern Africa) rules.
Assignment and ventures
No cession or assignment without the Employer's written consent.
Joint ventures and consortia are jointly and severally liable and must name an authorised signatory within 2 weeks of the Contract Date.
Confidentiality and images
No disclosure of contract information; any photography or filming needs prior written consent and all rights vest in Eskom.
Nuclear
Eskom, as operator of Koeberg, indemnifies the contractor against nuclear-damage liabilities (Z13).
Section
Source: NEC3 TSC3_Provision for Branding final draft.pdf
Post-award service-level and low-service-damage measures (Option X17):
Completion: branding done 100% within the agreed programme; measured against the project schedule and vehicle completion register.
Specification: branding 100% compliant with approved artwork; checked by inspection against the artwork.
Turnaround: each vehicle completed within a stated maximum time; tracked via intake and release records.
Quality: zero material defects; verified by quality inspection.
Rectification: defects fixed within 2 business days; tracked in the defect and rectification register.
Vehicle condition: no damage attributable to the contractor; checked by pre- and post-work inspection.
The rand value of each low service damage is blank in the draft and will be published in the final scope.
No bid-stage scoring split, minimum qualifying score or preference-point system is stated.
DocumentRev1 Final Scope of work for branding 15 06 2026 (003) TBS1_MH.pdfReview complete
Description
Source: Rev1 Final Scope of work for branding 15 06 2026 (003) TBS1_MH.pdf
General description
Eskom Distribution manages a national fleet of more than 8000 vehicles and equipment.
The contract provides vehicle branding to create a consistent corporate identity and improve fleet visibility.
Services cover design, production, installation, maintenance and removal of branding.
The term is 5 years, with services provided as needed.
Branding must differentiate internal combustion engine vehicles from electric vehicles and withstand harsh operating conditions.
Submission Guidelines
Source: Rev1 Final Scope of work for branding 15 06 2026 (003) TBS1_MH.pdf (unknown)
Submission requirement
Full branding warranty/guarantee details must accompany the bid in electronic and printed form.
Technical Specifications
Source: Rev1 Final Scope of work for branding 15 06 2026 (003) TBS1_MH.pdf (unknown)
Scope
Design, manufacture, supply, installation, maintenance and removal of branding for Eskom Distribution vehicles.
National service across all provinces for a fleet of more than 8000 vehicles and equipment.
Contract period: 5 years, with work ordered as required.
Design and approval
Branding must follow Eskom Corporate Identity rules, corporate colours and approved artwork.
Designs must be adapted to each vehicle make and model and submitted to Eskom Corporate Affairs for approval.
A Corporate Identity representative in the relevant area must approve the branding on site.
Open artwork files will be provided after the purchase order is awarded.
Materials
Vinyl must be UV-resistant, heat-resistant, weatherproof and self-adhesive.
Blue material must match Eskom Corporate Identity Pantone 287.
Reflective material must be high-intensity prismatic, with a minimum thickness of 200 to 400 micron.
Material must be scratch-resistant, solvent-resistant and chemical-resistant, with a 10-year service life.
Resin: pMMA. Adhesive: solvent polyacrylate.
An embedded watermark security feature is required.
Installation
Decals and wraps must be applied smoothly, without bubbles.
Half-wrap branding is required for applicable vehicle types.
Items to install include vinyl logos, vinyl logos on magnetic backgrounds, emergency stickers and reflective licence-plate numbers on vehicle roofs.
Charging-port visibility markings must be applied without blocking function.
Paintwork, sensors and EV systems must be protected during installation.
Removal and replacement
Old or damaged branding must be removed without damaging vehicle surfaces.
Branding must be replaced or updated when required.
Sizes and positioning
Standard logo heights: 105 mm for most vehicles and 300 mm for trucks.
Manufacturer sub-brand markings must be removed so they do not compete with the Eskom identity.
Driver-side door is measured first; decal is placed near the midpoint between window ledge and door beading.
Blue band must sit at the leading edge on the passenger side and trailing edge on the driver side, extending slightly beyond the door edge with no white base visible.
Turnaround times
Design approval: 3 to 5 working days.
New branding: 48 to 72 hours.
Rebranding: 48 hours.
Emergency work: 24 to 48 hours.
Removal: 48 hours.
Prototype and quality
One prototype vehicle must be branded and approved by Eskom Fleet Services before the remaining fleet is done.
If the prototype is rejected, it must be redesigned and reapplied for approval.
Post-installation inspections are required and defects must be fixed promptly.
Quality Management
Source: Rev1 Final Scope of work for branding 15 06 2026 (003) TBS1_MH.pdf
Quality control
Branding must match approved Eskom artwork and Corporate Identity standards.
A Corporate Identity representative in the relevant area must approve the application on site.
One prototype vehicle must be branded and approved by Eskom Fleet Services before full rollout.
If the prototype fails, it must be redesigned and reapplied for inspection and approval.
Post-installation inspections are required and defects must be corrected promptly.
Health & Safety
Source: Rev1 Final Scope of work for branding 15 06 2026 (003) TBS1_MH.pdf
Safety-related requirements
Reflective safety materials must be used where needed for visibility and compliance.
Installation must protect paintwork, sensors and EV systems.
Decals and wraps must be applied without bubbles and without obstructing charging-port visibility.
Old or damaged branding must be removed safely without harming vehicle surfaces.
Environmental
Source: Rev1 Final Scope of work for branding 15 06 2026 (003) TBS1_MH.pdf
Environmental durability
Branding materials must withstand harsh environmental and operating conditions.
Vinyl must be UV-resistant, heat-resistant and weatherproof.
Materials must retain colour and remain serviceable for 10 years.
Reflective and high-intensity materials are required for visibility.
Contractual Terms
Source: Rev1 Final Scope of work for branding 15 06 2026 (003) TBS1_MH.pdf
Warranty and guarantee
Warranty or guarantee cover begins when Eskom Distribution takes possession of the vehicle.
Cover must remain valid in line with the required quality standards.
Full warranty or guarantee details must be submitted electronically and in printed form with the bid.
Supplied items must be new and unused.
Eskom Distribution Fleet office must be notified if branded items are damaged in transit.
Eskom may accept or refuse delivery of a damaged branded vehicle.
The successful bidder must provide warranty documentation or certification.
DocumentCopy of ESKOM BRANDING EVALUATION CRITERIA UPDATED 9NOV26 (007).pdfReview complete
Description
Source: Copy of ESKOM BRANDING EVALUATION CRITERIA UPDATED 9NOV26 (007).pdf
Eskom Distribution requires branding, installation and removal services for its vehicle fleet. Bidders price each vehicle class on a unit-cost basis, with delivery included in the rate. The fleet spans sedans, panel vans, LDVs, minibuses, light, medium and heavy trucks, truck tractors, tippers, abnormal load tractors, a diesel mobile generator and the electric vehicle equivalents of several of these classes.
A lease agreement or proof of purchase for industrial printing machinery must be submitted. Bidders without this evidence are not evaluated further.
Technical evaluation (100 points, minimum qualifying score 70/100)
Branding software (30 points): 30 for proof of software purchase or a software certificate; 0 if nothing is submitted.
Proven experience in fleet branding, vehicle wrapping and large-scale branding (35 points): 35 for 5 years or more plus 3 signed reference letters; 15 for 3 to 4 years plus 2 signed reference letters; 5 for 1 to 2 years plus 1 signed reference letter; 0 for no experience. A portfolio of completed work must support the claim.
Disaster management / business continuity plan (10 points): 10 for a detailed, acceptable plan; 0 if none is submitted.
National coverage and footprint (25 points): 25 for capacity to deliver in 7 to 9 provinces; 15 for 5 to 6 provinces; 10 for 3 to 4 provinces; 5 for 1 to 2 provinces. Operating locations must be submitted as evidence.
Outcome
Bidders must reach the 70% technical threshold to pass; the technical evaluation is recorded as pass or fail.
Branding, installation and removal of vehicle livery for the Eskom Distribution fleet.
Work is performed across Eskom Distribution operating units in the provinces, with several sites handled at the same time.
Bidders must show a national footprint; scoring rewards coverage of up to 7 to 9 provinces.
Vehicle classes to be priced (unit cost per vehicle, delivery included)
Sedans and panel vans, including standard-roof and high-roof variants.
LDVs: 4x2 and 4x4, single cab, extended cab and double cab, including 3L variants.
Minibuses: 9, 10 and 14 seater.
Light trucks 4x2 and 4x4 (approximately 3 500 kg to 13 000 kg GVM), including dual-wheel and single-wheel applications and double-cab variants.
Medium trucks 4x4 and 4x2 (approximately 7 500 kg to 19 000 kg GVM).
Heavy trucks 6x4 and 6x6 (17 000 kg GVM and above), including construction vehicles above 28 000 kg GVM on tipper or concrete-mixer chassis.
Truck tractors 4x2 and 6x4, abnormal truck tractors above 85 000 kg GCM, and 4x2 tippers at 15 000 kg GVM.
Diesel mobile generator.
Electric vehicle equivalents of the panel van, truck, sedan, LDV 4x4 double cab and minibus classes.
Experience & Qualifications
Source: Copy of ESKOM BRANDING EVALUATION CRITERIA UPDATED 9NOV26 (007).pdf
Experience scoring (35 points maximum)
5 years or more of fleet branding, vehicle wrapping or large-scale branding work, supported by 3 signed reference letters: 35 points.
3 to 4 years, supported by 2 signed reference letters: 15 points.
1 to 2 years, supported by 1 signed reference letter: 5 points.
No demonstrable experience: 0 points.
A portfolio of completed similar projects must accompany the reference letters.
Quality Management
Source: Copy of ESKOM BRANDING EVALUATION CRITERIA UPDATED 9NOV26 (007).pdf
Business continuity requirement
Bidders must submit a disaster management / business continuity plan showing how vehicle branding services will be maintained or quickly restored during disruption.
The plan must address key risks, recovery and back-up arrangements, responsible personnel, communication and escalation processes, recovery priorities, and how often the plan is reviewed or tested.
A detailed plan that meets these points earns 10 points; no submission earns 0.
Lease agreement or proof of purchase of industrial printing machinery — required to pass the mandatory gate.
Scored evidence
Proof of purchase or certificate for the branding software used.
Signed reference letters (1, 2 or 3 depending on the years of experience claimed) and a portfolio of completed branding work.
A documented disaster management / business continuity plan.
Proof of operating locations in the provinces claimed for national coverage.
Not stated
No CSD, tax compliance, B-BBEE, CIDB or professional registration requirements appear in this document.
Section
Source: Copy of ESKOM BRANDING EVALUATION CRITERIA UPDATED 9NOV26 (007).pdf
Two-stage evaluation
Stage 1 is a mandatory pass/fail check: a lease agreement or proof of purchase for industrial printing machinery must be submitted.
Stage 2 scores technical criteria out of 100 points; 70 points is the minimum to pass.
Scoring allocation
Branding software proof or certificate: 30 points, or 0 if not submitted.
Experience in fleet branding, vehicle wrapping and large-scale branding: 35 points for 5 years or more with 3 signed reference letters; 15 points for 3 to 4 years with 2 signed reference letters; 5 points for 1 to 2 years with 1 signed reference letter; 0 for no experience.
Disaster management / business continuity plan: 10 points for a detailed acceptable plan, 0 if not submitted.
National coverage: 25 points for 7 to 9 provinces; 15 points for 5 to 6 provinces; 10 points for 3 to 4 provinces; 5 points for 1 to 2 provinces.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Megawatt Park and Various Clusters Nationally - - Variuos -
Document-Backed
Recently Synced
Source Snapshot Available
AI Enhanced
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
14
Last checked
18 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.