Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Issuing Organization
SALDANHA BAY INDUSTRIAL DEVELOPMENT ZONELocation
Western Cape
Closing Date
03 Nov 2026
Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
30 Platinum Street - Saldanha Bay - Cape Town - 7395
Organization Type
GOVERNMENT
Published
27 Oct 2026
OCDS Reference
ocds-9t57fa-175762
Freeport saldanha requires a rapid, evidence-based first-phase study into whether red iron ore dust materially constrains the economic, investment, operational and strategic potential of the saldanha bay idz and the port of saldanha, together with practical mitigation options that preserve the port's core iron ore export function. The work runs as two integrated workstreams — an economic and strategic assessment, and a technical dust-pathway and mitigation assessment — delivered over eight weeks from the inception meeting, ending in a stakeholder validation workshop and a final report plus engagement pack. Bidders must field a core team combining an economist and a dust, air quality or bulk-handling specialist, show at least three comparable assignments completed in the past five years, and declare any current or recent work for TRANSNET group, tpt, tnpa, iron ore producers or dust-control technology suppliers. The most consequential consideration is that the RFQ states NO submission channel, NO evaluation weightings and NO minimum functionality threshold, all of which must be confirmed with the supply chain contact before the closing time of 3 november 2026 at 11:00.
Closing and submission: quotations close on 3 November 2026 at 11:00. The RFQ names no email address, portal or physical delivery point, so the submission method must be confirmed with the Supply Chain contact before the closing date.
Eligibility documents: an active National Treasury Central Supplier Database registration, a fully completed WCBD4 form and a valid B-BBEE certificate must accompany the quotation. Any one of the three missing makes the response non-responsive.
Team and track record: the core team must include at least a project lead and integrator, an economist leading Workstream 1 and a dust, air quality or bulk-handling engineering specialist leading Workstream 2, each with a CV and time allocation; key personnel may not be replaced without Freeport Saldanha's written approval. The company profile must list at least three comparable assignments completed in the past five years with client references, and the bidder must show executive-level stakeholder facilitation experience and the ability to deliver within eight weeks.
Conflict of interest and independence: bidders must declare any actual or potential conflict, including current or recent work for Transnet Group, TPT, TNPA, iron ore producers or suppliers of dust-control technology. The service provider must stay technology-neutral, may not promote proprietary products, and market sounding of technology providers must not confer preferential access.
Pricing and payment: a detailed fixed-price quotation in South African Rand inclusive of VAT, broken down by professional fees per deliverable D1 to D5, hourly or daily rates and days per team member, disbursements including travel to Saldanha Bay, workshop preparation and facilitation, third-party or data costs, and out-of-scope rates. Proposed milestones are 20% on approval of D1, 30% on D3 and 50% on D5, subject to Supply Chain Management confirmation.
Evaluation basis: functionality, price and specific goals under Freeport Saldanha's Supply Chain Management policy and the PPPFA. The weightings, minimum functionality threshold, preference point system (80/20 or 90/10) and indicative budget are not stated and must be obtained from Supply Chain Management.
Site access and study constraints: observations inside the port require TNPA and/or TPT access permits and safety inductions, so lead times must be built into the programme. No new primary dust monitoring is required in this phase, interviewee personal information must be handled under POPIA, all engagements with Transnet Group, TPT, TNPA and licensing authorities must be agreed in advance by the Freeport Saldanha project manager, and all deliverables, data and models become Freeport Saldanha's property on completion and final payment.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Date & Time
Tuesday, 03 November 2026 - 11:00
Venue
null
Categories
Request for Quotation
30 Platinum Street - Saldanha Bay - Cape Town - 7395
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: CA(SA) - Chartered Accountant, PMI-PMP (Project Management Professional), Prince2 Practitioner, Six Sigma Certification
AI Document Analysis Stages
Description
Source: Freeport Saldanha Red Dust RFQ-ToR_FV2.pdf27 Oct
2026
Tender Published
Tender was published
03 Nov
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Freeport Saldanha Red Dust RFQ-ToR_FV2.pdf
Freeport Saldanha requires a rapid, evidence-based and decision-oriented Red Iron Ore Dust Study to establish whether red iron ore dust materially constrains the economic, investment, operational and strategic potential of Freeport Saldanha and the Port of Saldanha, and to identify practical mitigation options that preserve the port's core iron ore export function. The work is delivered through two integrated workstreams — an economic and strategic assessment and a technical mitigation assessment — within eight weeks of the inception meeting.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Saldanha Bay tenders with AI Matching Engine, port‑industrial compliance, and intelligence for West Coast industrial hub.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubWe refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Freeport Saldanha (Saldanha Bay IDZ Licencing Company SOC Ltd) requires a rapid, evidence-based first-phase Red Iron Ore Dust Study covering the economic case and technical mitigation options.
Purpose: determine whether red iron ore dust materially constrains the economic, investment, operational and strategic potential of Freeport Saldanha and the Port of Saldanha, and identify practical mitigation options that could unlock higher-value activities while preserving the port's core iron ore export function.
The evidence base must support constructive engagement with Transnet Group, Transnet Port Terminals, Transnet National Ports Authority, the atmospheric emission licensing authority, Saldanha Bay Municipality, West Coast District Municipality, the Western Cape Government, iron ore producers and exporters, investors and other stakeholders.
A negative finding still has value: it would clarify the limits of the issue and prevent unsupportable claims.
The study is first-phase only and is not expected to resolve every engineering, environmental, regulatory or commercial question; an 80:20 approach proportionate to the eight-week timeframe is required.
Findings must let Freeport Saldanha determine:
Context: the zone is a designated Special Economic Zone operated under the Special Economic Zones Act, 2014, and South Africa's first SEZ located within a port. Visible dust deposition, contamination of operational areas and products, and perceived environmental and operational risk may affect business operations, investment decisions, investor confidence and the attractiveness of Saldanha Bay for priority activities, including containerised and perishable products.
Important Dates
Source: Freeport Saldanha Red Dust RFQ-ToR_FV2.pdf (RFQ)Closing: 3 November 2026 at 11:00.
No compulsory briefing session or site visit is stated.
Assignment duration: eight weeks from the inception meeting.
Deliverable milestones:
Review and reporting cycle:
Indicative programme (Annexure C):
Contact Information
Source: Freeport Saldanha Red Dust RFQ-ToR_FV2.pdf (RFQ)Enquiries
Address
3rd Floor
5 Canal Side
Century City
7441
Submission Guidelines
Source: Freeport Saldanha Red Dust RFQ-ToR_FV2.pdf (RFQ)Returnable documents — all must be submitted with the quotation; omitting any of them makes the response non-responsive:
Disqualification and responsiveness risks:
Submission channel: the RFQ does not specify an email address, portal or physical delivery point; bidders should confirm the submission method with the Supply Chain contact before the closing date.
Evaluation Criteria
Source: Freeport Saldanha Red Dust RFQ-ToR_FV2.pdf (RFQ)Evaluation basis: functionality, price and specific goals, applied under Freeport Saldanha's Supply Chain Management policy and the Preferential Procurement Policy Framework Act, 2000 and its regulations.
Multi-criteria screening framework (Annexure D) used to rank sectors, commodities and activities affected by red dust:
Bidders must confirm the scoring scale and scoring direction for each criterion in the inception report.
Technical Specifications
Source: Freeport Saldanha Red Dust RFQ-ToR_FV2.pdf (RFQ)Scope: a rapid, evidence-based, decision-oriented first-phase Red Iron Ore Dust Study for Freeport Saldanha and the Port of Saldanha, covering the economic case and technical mitigation options.
Objective: establish whether red iron ore dust materially constrains the economic, investment, operational and strategic potential of the zone and port, and identify practical mitigation options that unlock higher-value activity without undermining the core iron ore export function.
Approach: an 80:20 assessment proportionate to an eight-week timeframe; not a full engineering, environmental or commercial investigation.
Workstream 1 — Economic and Strategic Assessment:
Workstream 2 — Technical Mitigation Assessment:
Integration and stakeholder work:
Deliverables (within eight weeks of the inception meeting):
Scope boundary — in scope: economic and opportunity cost of red dust, sector and commodity sensitivity, technical diagnosis of sources and broad mitigation options from mine to ship, international benchmark review, high-level location and wind exposure considerations, and a stakeholder engagement strategy and evidence pack.
Scope boundary — out of scope for this phase: full container terminal feasibility study, detailed environmental impact assessment or strategic environmental assessment, detailed engineering design of dust suppression, extraction, enclosure or recovery systems, formal procurement of a private container terminal operator, full manganese health hazard assessment (flagged as a related future workstream), and any formal regulatory challenge or licence review unless later approved.
Study standards:
Methodology
Source: Freeport Saldanha Red Dust RFQ-ToR_FV2.pdfApproach: a rapid 80:20 assessment delivered through two integrated workstreams, rigorous enough to be credible but proportionate to an eight-week timeframe. The methodology in Annexure A is indicative; bidders may propose an alternative provided it addresses all specifications and key questions.
Workstream 1 — Economic and Strategic Assessment: define the economic and strategic problem; assess economic and opportunity costs; assess sector and commodity sensitivity; assess operational and product-quality implications; separate evidence from perception; establish the extent, severity and spatial distribution of the problem.
Workstream 2 — Technical Mitigation Assessment: identify sources, generation points and pathways with emphasis on port operations and transfer points; assess location, wind and exposure effects; benchmark international and local practice; screen practical mitigation options; assess indicative cost, feasibility and effectiveness including implementation requirements, dependencies, constraints, sequencing and responsible parties.
Integration, stakeholder engagement and recommendations: map institutional and stakeholder interfaces; build an evidence base and engagement pack; identify evidence gaps and follow-on investigations; provide recommendations and an implementation pathway; advise on progression to a second phase; prepare and facilitate the stakeholder validation workshop.
Dust pathway analysis must consider, at a high level: ore characteristics at source such as moisture and fines content; rail transport including in-transit losses from loaded wagons; wagon handling and tippler operations; transfer points and conveyors; stockyards and reclaimers; ship-loading operations; and adjacent handling and operational areas.
Deliverables and timing:
Project phases: inception; baseline evidence review; economic and sector sensitivity analysis; technical pathway review and benchmarking; options and implementation pathway; stakeholder validation; final reporting and handover.
Indicative programme (Annexure C): governance and problem statement confirmed Week 1; Terms of Reference approved Weeks 1–2; data requests issued Weeks 1–2; stakeholder interviews Weeks 2–4; service provider appointed Weeks 2–3; rapid 80:20 analysis Weeks 3–8; validation workshop Week 9; final report Week 10; decision memorandum Weeks 10–11; go/no-go decision on a second phase Week 12.
Key risks identified: scope creep into full container terminal feasibility; insufficient dust or sector-threshold data; delays in data from Transnet entities and other owners; resistance from TPT or TNPA; solutions proving costlier or less effective than expected; sensitive political or commercial implications including alternative port or Boegoebaai considerations; and investor expectations rising before evidence is tested.
Financial Requirements
Source: Freeport Saldanha Red Dust RFQ-ToR_FV2.pdf (RFQ)Pricing format: a detailed, transparent fixed-price quotation in South African Rand, inclusive of VAT.
The quotation must include at least:
Payment milestones (proposed, to be confirmed by Supply Chain Management):
No bid security, performance guarantee, retention or turnover threshold is stated in the RFQ.
Compliance Requirements
Source: Freeport Saldanha Red Dust RFQ-ToR_FV2.pdf (RFQ)Eligibility documents — failure to provide any of these makes the response non-responsive:
Mandatory minimum requirements:
Other compliance obligations:
Health & Safety
Source: Freeport Saldanha Red Dust RFQ-ToR_FV2.pdfSite access: observations inside the port require access permits and safety inductions issued by TNPA and/or TPT, and the service provider must allow for the associated lead times.
Compliance: the service provider must comply with all applicable health, safety and security requirements of the port environment.
Regulatory context: the Occupational Health and Safety Act, 1993 applies to the extent relevant to workplace dust exposure.
Dustfall standards referenced for comparison: National Dust Control Regulations, 2013 set 600 mg/m2/day for residential areas and 1 200 mg/m2/day for non-residential areas.
The study must compare available dustfall monitoring results against the National Dust Control Regulations, licence-specific limits and, where identifiable, thresholds relevant to sensitive sectors.
Environmental
Source: Freeport Saldanha Red Dust RFQ-ToR_FV2.pdfRegulatory framework the study must take into account:
Study requirements:
Contractual Terms
Source: Freeport Saldanha Red Dust RFQ-ToR_FV2.pdfConfidentiality: all information obtained during the assignment is confidential and may be used only for this study.
Data protection: personal information of interviewees must be processed in accordance with the Protection of Personal Information Act, 2013 (POPIA).
Independence: the service provider must remain technology-neutral and may not use the assignment to promote proprietary products or services; market sounding of technology providers must not grant preferential access.
Ownership: all deliverables, data, models and working materials become the property of Freeport Saldanha upon completion and final payment.
Key personnel: named team members may not be replaced without Freeport Saldanha's written approval.
Coordination: all engagements with Transnet Group, TPT, TNPA, licensing authorities and other public bodies must be agreed in advance with the Freeport Saldanha project manager.
Review and sign-off: the steering group reviews D1, D3 and D5; consolidated comments are returned within five working days of receipt.
Reporting: short written progress updates of no more than two pages every two weeks, covering progress, emerging findings, data received and outstanding, and risks requiring Freeport Saldanha's intervention.
Format: reports in editable Microsoft Word and PDF; supporting data and models in editable Microsoft Excel.
Payment: 20% on approval of D1, 30% on approval of D3 and 50% on approval of D5, subject to confirmation by Supply Chain Management.
Section
Source: Freeport Saldanha Red Dust RFQ-ToR_FV2.pdfEvaluation basis: functionality, price and specific goals under Freeport Saldanha's Supply Chain Management policy and the Preferential Procurement Policy Framework Act, 2000 and its regulations.
Annexure D multi-criteria screening framework for ranking affected sectors, commodities and activities:
Annexure A methodology components that bidders must cost and address:
Draft report (D3) must answer: economic activity and investment impact; sector and commodity sensitivity; benchmarks; practical mitigation measures; cost, benefit and implementation for each significant option; and the stakeholder case for action.
Draft report must also address: the current known and perceived impact on target sectors and port development potential; which activities are excluded outright, made more costly, or affected mainly by perception; what level of dust reduction would satisfy priority sectors without zero-dust assumptions; which measures deliver reductions of roughly 30%, 50% or 70% against a defined baseline; which solutions are operational, which need capital, and which could generate revenue or savings through recovered fines; and which governance, commercial, licence or regulatory levers could drive implementation.
Draft report components: baseline report; sector and commodity impact assessment ranked using Annexure D; opportunity cost estimate; technical options scan; international benchmark note; and a short list of priority interventions with indicative cost range, implementation complexity, owner, likely impact, risks and next step.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
30 Platinum Street - Saldanha Bay - Cape Town - 7395
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
1
Last checked
27 Oct 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Provinces Active
Industries
Median Estimate
R 728 902
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Get deep intelligence on Services: Professional. Unlock full pricing strategies, bid frequency, and historical win rates.
Learn how to submit a winning bid with these related articles
💡 Want more tendering tips and strategies?
Explore Our Blog