The state information technology agency (SITA) requires a service provider to supply and lease suitable office accommodation for its kimberley office under a five-year operating lease. The scope covers 500 m² of office space, 11 covered parking bays, operational costs, and tenant installation by the landlord. Bidders must complete the pricing schedule in full, with all prices VAT exclusive, and submit the signed schedule as part of the bid offer.
Key Requirements
Closing date: 4 November 2026 at 11:00.
Submission: Completed and signed Pricing Schedule (Annexure 5C) must be submitted; only yellow cells are to be completed.
Pricing: All prices must be VAT exclusive and in South African Rand (ZAR); the price must include all costs to deliver the service, including all applicable taxes.
Scope: Provide 500 m² of office accommodation, 11 covered parking bays, and operational costs (refer to clause 4.4.3(b) of the bid specification).
Tenant installation: Must be completed by the landlord in line with Special condition 4.3.1.4.
Pricing schedule: Must include monthly line prices for each of the five years, yearly escalation rates, and a total bid price excluding VAT.
Bidder confirmation: The bidder must confirm that quoted prices cover all obligations and that any pricing mistakes are at the bidder's own risk.
Request for bid for the Appointment of a Service Provider to Provide a Suitable Office Space for SITA Kimberley Through an Operating Lease Agreement for a Period of Five (5) Years.
Tender context
Return to this tender’s issuing organisation, province, or category.
Request for bid for the appointment of a service provider to provide a suitable office space for SITA kimberley through an operating lease agreement for a period of five (5) years.
Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
Compliance review. The working summary is checked against South African procurement standards — PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement — so nothing critical is missed before you start your bid response.
Procurement Rules & Compliance ContextThis tender may be governed by South African public procurement rules covering fairness, transparency, preferential procurement, anti-corruption, administrative justice and access to information.
7 rules
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Core procurement rules
These rules commonly apply to South African public-sector procurement.
7
Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
high
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Constitution of the Republic of South Africa, 1996 – Section 217
Act 108 of 1996 (s217)
high
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
SITA requires approximately 500 m² of corporate office space in Kimberley, plus 11 covered parking bays including one disabled bay, secured through a five-year operating lease. The building must be graded between B and A and located within 10 km of the Kimberley Post Office. The landlord carries responsibility for tenant installation, ongoing maintenance and statutory compliance certificates.
RFB 3297-2026 - Annexure 5B-Invitation to Bid.docx
SITA requires a service provider to supply suitable office space in Kimberley under an operating lease agreement for a period of five years. The space is procured on behalf of the State Information Technology Agency in the Northern Cape, with bids closing on 04 November 2026 at 11:00 (South African time).
SITA requires a service provider to supply suitable office space in Kimberley under an operating lease agreement running for five (5) years. Bids are submitted electronically through the SITA-Supplier Oracle ERP portal.
SITA requires a suitable office space in Kimberley, Northern Cape, let under an operating lease agreement for five years. The space comprises 500 m² of office accommodation plus 11 covered parking bays, with tenant installation and a beneficial occupation period included. Bidders price the lease on the attached schedule, VAT exclusive, with annual escalation rates applied across the five-year term.
Win SITA tenders with AI Matching Engine, government-ICT intelligence, compliance analysis, and structured application support for technology contracts.
Similar Tenders
Matched by category & region
Supplier Readiness Hub
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Request for Bid for the Supply, Configuration, Installation Including Maintenance and Support of Local Area Network Infrastructure (ARUBA SWITCHES AND WIFI ACCESS POINTS) for the Period of 3 Years for the Department of Water and Sanitation (DWS) Head Office (PHASE 2) in Pretoria. Non Compulsory Virtual Briefing Session Will Be Held on 22 September 2026 at 11h00am.
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Document read
Compliance review
Bid-ready summary
SITA requires a suitable corporate office space of approximately 500 m² with 11 parking bays (including one disabled bay) in Kimberley, Northern Cape, secured through a five-year operating lease agreement.
Bid pricing must be completed on the Excel pricing schedule provided and uploaded with the bid; pricing submitted in any other format will not be considered.
Every item of substantiating evidence must carry a unique reference (binder/folio, chapter, section, page) pointing to its location in the bid response; evidence that cannot be located may be treated as non-compliant.
Current state (as-is) Certificates of Compliance must accompany the bid; they will not be accepted after closing or at award. Certificates for future upgrades are submitted only on completion of the works.
Bidders whose property is under construction or renovation must submit approved building plans covering all trades.
Returnable documents
Invitation to Bid: sign at par 4.5 to claim preference points.
Declaration of acceptance of the Special Conditions of Contract (Section 4.3.2): accepting ALL conditions is mandatory; failure to accept all results in disqualification.
Declaration of acceptance of the costing and pricing conditions: mark ACCEPT ALL or DO NOT ACCEPT ALL; leaving it unmarked is treated as DO NOT ACCEPT ALL and disqualifies the bid.
Annex A substantiating evidence for technical mandatory, technical functionality, proof of concept and preference points.
Approved building plans (or a signed confirmation letter for state-owned companies and government departments) showing at least 500 m² and 11 parking bays.
Building grading certification, or a letter from SAPOA or another approved property authority.
Building ownership proof: title deed, managing agent/proxy appointment, or the owner's approval to sublet.
Electrical certificate of compliance, plumbing certificate of compliance and certificate of occupancy.
B-BBEE certificate (SANAS-accredited agency or the dtic) or a CIPC-format sworn affidavit for EMEs and QSEs; South African ID; medical certificate where disability points are claimed.
Disqualification risks
Not accepting ALL Special Conditions of Contract.
Leaving the pricing acceptance declaration unmarked.
Failing the 60% minimum thresholds at Stage 3 or Stage 4.
Attaching counter conditions or amending bid conditions.
Submitting pricing in a format other than the provided Excel schedule.
Six sequential stages; a bid must pass each stage to reach the next.
Stage 1 — Mandatory Administrative Responsiveness
CSD registration: only bidders registered on National Treasury's Central Supplier Database (Instruction Note 4A of 2016/17) will be considered for award.
Briefing: a non-compulsory virtual briefing session will be held.
One directorship holding multiple property companies may respond through only one company, except state-owned companies and government departments; a company with multiple buildings may submit a main offer plus alternatives, each evaluated on its own merit and clearly marked.
All mandatory requirements must be met with substantiating evidence; any unmet requirement is recorded as NOT COMPLY.
Stage 3 — Technical Functionality
Minimum qualifying score: 60%.
Weightings: suitability of the office space offered 35%; building requirements 30%; location of the property 35%.
Scoring per requirement: 0 = no information; 3 = minimum requirements met; 5 = all requirements met.
Stage 4 — Proof of Concept (Site Inspection)
Conducted at the bidder's site; the bidder presents and demonstrates the building.
Minimum qualifying score: 60% cumulative; failure results in disqualification.
Weightings: location of the property 35%; suitability of the office space 35%; building requirements 30%.
Stage 5 — Special Conditions of Contract verification
The bidder must accept all Special Conditions of Contract.
Stage 6 — Price and Preference Points (80/20)
Applicable to requirements valued up to R50 000 000 (all taxes included).
Price: 80 points. Preference points for specific goals: 20 points. Total: 100 points.
Preference points must be claimed by signing the relevant section of the Invitation to Bid; without the required proof, points are treated as not claimed.
Preference commitments are legally binding for the contract term; the bidder must sustain or improve its B-BBEE level, submit a preference status report within 30 days of each quarterly anniversary (30 days of the yearly anniversary under the Special Conditions), and keep auditable records. Non-compliance may attract a penalty of 1% of SITA's prior-year annual spend.
Corporate office space of approximately 500 m² in Kimberley, Northern Cape, leased for five years.
11 parking bays required, including one disabled bay; covered parking is the main requirement and the bays must be in the same building as the office space.
If 11 covered bays are not available at bidding, the bidder must install them before occupation; SITA will withhold parking payment until installation complies.
Space above 500 m² is accepted at the bidder's cost.
The space must be readily available for occupation, in a single building, on one floor next to each other.
Building grading
Minimum grading B, maximum A, per SAPOA definitions (Grade A: not older than 15 years or majorly renovated, modern finishes, air-conditioning, adequate covered parking; Grade B: older refurbished buildings close to modern standards with air-conditioning and covered parking).
Location
Within a 10 km radius of the Kimberley Post Office (Corner Stead & Knight Streets, Market Plain, Kimberley, Northern Cape).
Public transport accessibility required.
Office near other office parks/buildings.
Accessibility to public amenities (cafeteria or shops) where no catering facilities exist.
Accessibility
Disabled access is a strict condition: wheelchair users must reach all areas, at least one entrance must have permanent ramps, and at least one toilet facility must be wheelchair accessible and equipped.
In multi-storey buildings each floor must be served by one or more lifts; lifts must carry at least 8 persons or 1000 kg, accommodate a wheelchair, and serve basements.
At least one covered disabled parking bay, located and sized per the National Building Regulations, with permanent signage.
Tenant installation (TI) and beneficial occupation
The bidder must offer a tenant installation contribution and execute the TI on SITA's behalf, covering flooring, painting, ceilings, blinds/window covers, office partitioning/reconfiguration, and electrical repairs, replacement and general building maintenance.
A rent-free beneficial occupation period must be offered, normally one month before lease commencement, for fit-out; no rent is payable, and operation during this period requires the landlord's consent and pro-rata billing for water, electricity and consumables.
Landlord's standard offer
Open plan office with basic carpet, suspended ceiling, standard lighting, raised floor where required for server rooms, air-conditioning and ventilation, floor cable boxes (one per 10 m²), power cables, standard entrance door, fully fitted sanitary facilities, kitchenette cupboards, fire detectors/sprinklers, tenant signage area at the entrance, and backup power.
Landlord maintenance obligations
All HVAC systems, with ambient temperature of 22°C (variance of 5°C up or down) at all times.
Electrical DB boards and reticulation; all lifts; entrance, roller shutter and rotating doors; landlord access control systems; plumbing; fire suppression, detection and sprinkler systems; fire extinguishers and hoses; external window glazing; common-area cleaning, hygiene, pest control and landscaping; light fittings and ballasts; structural damage; waterproofing; and servicing of the backup generator/power.
Energy, water and power
Timer switches on ablution and kitchen facilities; adequately sized geysers connected to each basin.
Constant water pressure of 2 Bar; separate water measurement; additional water points with inline shut-off valves for vending machines and coolers; contingency backup water tanks with diesel pumps.
Constant, separately measured power supply; power factor correction equipment; approved electrical layout plans from the local authority; a photo of the electricity meter with meter number, or a confirmation letter or municipal utility bill; capacity to handle peak demand up to 20% above normal; standby/emergency power for at least 3 to 4 hours; electrical certificate of compliance. SITA will not fund additional power supply upgrades.
Two dedicated power points per workstation, with a maximum of five people per 20 Amp circuit breaker in cable trays; 15 Amp socket outlets in passages and communal areas at least 15 m apart; three-phase supply in the cafeteria where applicable; lightning protection with a certificate from a registered three-phase installation electrician.
Lighting
Interior lighting designed and installed to SABS 0114-1:2008 and certified by an electrical engineer; current lighting design layout (building plan) and valid municipal certificates required.
The landlord maintains and replaces lights and lamps within 24 hours of a logged call.
Fire and safety
A Fire Suppression Equipment Inspection Bureau report must be submitted; the landlord maintains the installations for the lease term.
Evacuation routes and signage per the inspection report; fire extinguishers, hoses and boosters serviced annually at the bidder's cost.
Fire control, safety and risk management must comply with the National Building Regulations and SANS 10040, with records kept on file.
Occupation and services
The building must be fit for occupation as certified by the local authority under SANS 10400; a valid certificate of occupancy must be presented, including before occupation if the building is under construction.
Premises must be fully air-conditioned to SANS requirements, with a mechanical certificate of compliance for the HVAC installation submitted within 30 days of award.
Fully functional ablution facilities, including for people with disabilities, to SANS requirements.
The building must be in a secured environment with a perimeter fence or wall and a security gate.
Service levels
Electrical, mechanical and civil services: Platinum, 24 hours × 7 days × 52 weeks.
Water supply: Normal, 24 hours × 7 days × 52 weeks.
Lifts (where applicable): Normal, maximum 2 hours to respond.
Operating conditions
Office hours are Monday to Friday, 07:30 to 16:00; after-hours cover is 16:00 to 07:30; mission-critical sites are managed 24 × 7 × 365 including public holidays.
The bidder must provide its own tools of trade and an on-site and remote support/help desk for items it is responsible for.
POPIA compliance is required for the contract duration, along with compliance with SITA accommodation policies.
The supplier and its staff must sign a non-disclosure agreement before the contract starts.
Service warranty runs for 60 months after occupation; defective items must be repaired or replaced within three days of written notice, at no cost to SITA.
The total price must be VAT inclusive and quoted in South African Rand.
Pricing must be completed on the Excel pricing schedule provided and uploaded with the bid; any other format will not be considered.
The indicative pricing schedule covers approximately 500 m² of office space plus a minimum of 11 covered parking bays, and includes an indicative annual adjustment rate.
Quoted prices must cover the full scope, including delivery, labour, S&T and overtime; all additional costs must be clearly specified.
SITA may negotiate pricing and envisaged quantities with the successful bidder before award.
Annual price adjustment
Annual escalation is applied using the average CPI headline year-on-year rate.
The first adjustment is calculated after year one from the contract commencement date, using the previous year's CPI headline year-on-year monthly average over 12 months, and applied on the same basis annually thereafter.
Tenant installation and beneficial occupation
The bidder must offer a tenant installation allowance; its value and the length of beneficial occupation depend on the scope of work, the monthly rental and the lease term.
The tenant submits its requirements to the landlord, who appoints contractors and settles the account directly.
A rent-free beneficial occupation period must be offered, normally one month before lease commencement.
Other operational costs
Where not included in the rental, the following fixed costs must be broken down: cleaning and hygiene, security services, landscaping, pest control, lift maintenance, and building maintenance and repairs.
Acceptance
The bidder must mark ACCEPT ALL or DO NOT ACCEPT ALL on the costing and pricing declaration; an unmarked declaration is treated as DO NOT ACCEPT ALL and disqualifies the bid.
CSD registration on National Treasury's Central Supplier Database is required (Instruction Note 4A of 2016/17); only registered suppliers will be considered for award.
CIPC registration documents are used to confirm compliance with preferential procurement requirements.
B-BBEE and preference evidence
B-BBEE certificate from a SANAS-accredited verification agency or the dtic, or a CIPC-format sworn affidavit for EMEs and QSEs.
South African ID copy where identity-based points are claimed.
Medical certificate clearly indicating disability where disability points are claimed.
Preference points must be claimed by signing the relevant section of the Invitation to Bid; missing proof means points are not claimed.
The bidder must sustain or improve its B-BBEE level for the contract term and keep auditable records for audit or due diligence.
Property compliance
Building grading of B to A, evidenced by valid grading certification or a SAPOA/approved property authority letter.
Building ownership: title deed, managing agent/proxy appointment, or the owner's approval to sublet.
Approved building plans showing at least 500 m² and 11 parking bays (or a signed confirmation letter for state-owned companies and government departments).
Electrical certificate of compliance, plumbing certificate of compliance and certificate of occupancy; current as-is certificates must accompany the bid.
Electrical work must be done by a Department of Labour-registered electrical contractor to SANS 10142-1, certified by an installation electrician.
HVAC work must be done by a SAQCC-registered refrigerant gas practitioner under the Pressure Equipment Regulations, with a maintenance agreement for the contract term.
OEM work must be performed by an OEM-certified person; professional services require accreditation, affiliation or registration certificates.
A local authority compliance certificate under SANS 10400 is required for building accessibility, and again after future upgrades or alterations.
Lifts require a COC from a certified engineer and a quarterly rope testing certificate under the Machinery Act.
Conduct and integrity
Fronting is not condoned; proven fronting may invalidate the bid or contract and restrict the bidder from public sector business for up to ten years.
Counter conditions or amendments to bid conditions may invalidate the bid.
SITA may run a financial audit or probity check before contracting and supplier due diligence, including announced or unannounced site visits, at any time during the contract.
POPIA compliance is required for the contract duration.
All queries regarding this bid must be submitted in writing to [email protected].
DocumentRFB 3297-2026 - Annexure 5B-Invitation to Bid.docxReview complete
Description
Source: RFB 3297-2026 - Annexure 5B-Invitation to Bid.docx
SITA requires a service provider to supply suitable office space for its Kimberley operations through an operating lease agreement running for five (5) years.
Important Dates
Source: RFB 3297-2026 - Annexure 5B-Invitation to Bid.docx (unknown)
Closing: 04 November 2026 at 11:00 (South African Time).
Objections to brand-specific specifications: must reach SITA within five (5) days of publication of the RFB.
Contact Information
Source: RFB 3297-2026 - Annexure 5B-Invitation to Bid.docx (unknown)
Source: RFB 3297-2026 - Annexure 5B-Invitation to Bid.docx (unknown)
Returnable documents
SBD 4 (Bidder's Disclosure): declares whether the bidder or its directors, shareholders or partners are employed by an organ of state, have relationships with staff at the procuring institution, or hold interests in related enterprises; every CSD-registered active company linked to each director must be disclosed.
SBD 6.1 (Preferential Procurement Claim Form): claims preference points for specific goals, supported by the evidence required for each goal claimed.
Government Procurement General Conditions of Contract.
Mandatory returnables: Pricing/Costing, Special Conditions of Contract, and technical mandatory responsiveness evidence.
Scoring note
Omitting the evaluation returnable documents lowers the bidder's score but does not by itself disqualify the bid.
Disqualification risks
Failing to disclose every CSD-registered active company linked to the bidder's directors.
Refusing to extend the bid validity period without justifiable reasons.
Not supplying requested written clarification, in writing, within the stated timeframes.
Appearing on the Register for Tender Defaulters or the List of Restricted Suppliers.
Evaluation Criteria
Source: RFB 3297-2026 - Annexure 5B-Invitation to Bid.docx (unknown)
Preference point system: 80/20.
Points allocation
Price: up to 80 points.
Preference points for specific goals: up to 20 points.
Specific goals
The specific goals and their supporting evidence are set out in Annexure 1 (Bid Specification).
Preference points are not claimed where the required proof is not submitted with the bid.
SITA may require a bidder to substantiate any preference claim at any time.
Evaluation stages
Administrative compliance and mandatory responsiveness are assessed, followed by price and preference scoring.
Bidders may be required to give an oral presentation or demonstration; this is a fact-finding and explanation session only and does not involve negotiation.
Technical Specifications
Source: RFB 3297-2026 - Annexure 5B-Invitation to Bid.docx (unknown)
Scope
Provision of suitable office space for SITA Kimberley under an operating lease agreement.
Lease period: five (5) years.
Location: Kimberley, Northern Cape.
Returnable technical evidence
Technical mandatory responsiveness evidence must be submitted with the bid.
Financial Requirements
Source: RFB 3297-2026 - Annexure 5B-Invitation to Bid.docx (unknown)
Performance security
The successful bidder must furnish the performance security stated in the contract within 30 days of the award notification.
Accepted forms: a bank guarantee or irrevocable letter of credit from a reputable bank, or a cashier's or certified cheque.
The security is released within 30 days after completion of the supplier's obligations, including warranty obligations.
Pricing and payment
Prices are firm and may not vary from the quoted prices, except for adjustments authorised in the contract.
Payment is made in South African Rand unless the contract states otherwise.
Penalties for late delivery or non-performance are calculated on the delivered price of the delayed goods or unperformed services at the current prime interest rate for each day of delay.
Tax
No contract is concluded unless the bidder's tax matters are in order; an original SARS tax clearance certificate must be in the department's possession before award.
Compliance Requirements
Source: RFB 3297-2026 - Annexure 5B-Invitation to Bid.docx (unknown)
Registration and status
CSD registration is required; all CSD-registered active companies linked to the bidder's directors must be disclosed.
Tax compliance: an original SARS tax clearance certificate must be provided before award.
Bidders must not appear on the Register for Tender Defaulters or the List of Restricted Suppliers.
Bids must be prepared in English.
Statutory cover
The bidder must confirm that all employees, including those of any subcontractor, are covered under the Compensation for Occupational Injuries and Diseases Act 13 of 1993, and that cover remains in force through adjudication and any resulting agreement.
B-bbee
Preference points for specific goals are claimed on SBD 6.1 with the required evidence; the goals are detailed in Annexure 1 (Bid Specification).
The procurement is for the appointment of a service provider to provide a suitable office space for SITA Kimberley through an operating lease agreement for a period of five (5) years.
Returnable documents: the completed and signed Pricing Schedule (Annexure 5C) must be submitted. Only the yellow cells are to be completed. The schedule must be converted to PDF before adding the signature. The bidder's name must be entered on the schedule. The signed schedule forms part of the bid offer.
The service provider must provide a suitable office space for SITA Kimberley through an operating lease agreement for a period of five (5) years. The pricing schedule specifies the following quantities:
Office accommodation rental: 500 m²
Covered parking rental: 11 bays
Operational costs: 1 item (refer to clause 4.4.3(b) of the bid specification)
Tenant installation and beneficial occupation must be completed in line with Special condition 4.3.1.4 (Tenant installation by the landlord).
Pricing must be VAT exclusive and in South African Rand (ZAR). The price must include all costs to deliver the service, including all applicable taxes. The pricing schedule requires monthly line prices for each year (Years 1 to 5), with yearly escalation rates, and a total bid price excluding VAT. The bidder must confirm that the quoted prices cover all obligations and that any mistakes in pricing are at the bidder's own risk.
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.