Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Clock Tower Sector - V&A Waterfront - Cape Town - 8001
Organization Type
GOVERNMENT
Published
14 Sept 2026
OCDS Reference
ocds-9t57fa-170239
Procurement of professional services for the rehabilitation, restoration, and ongoing management of robben island, a unesco world heritage site, with a strong emphasis on heritage conservation, sustainable landscaping, and pollution prevention. The contract is awarded under a two-envelope (technical and financial) bidding process using the 80/20 preference point system, and the most consequential consideration is that bidders must achieve a minimum of 70 out of 100 points on the technical/functionality evaluation to proceed to price evaluation.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Monday, 12 October 2026 - 11:00
Venue
Robben Island
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Categories
Request for Bid(Open-Tender)
Clock Tower Sector - V&A Waterfront - Cape Town - 8001
AI Document Analysis Stages
Description
Source: RIM-RFP03-2026-27 Golf Cource final.pdf14 Sept
2026
Tender Published
Tender was published
12 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
RIM-RFP03-2026-27 Golf Cource final.pdf
Robben Island Museum is seeking a single legal entity, consortium, or joint venture to finance, rehabilitate, restore, develop, operate, and maintain a nine-hole golf course on Robben Island World Heritage Site under a long-term concession. The successful bidder must balance commercial sustainability with protection of the site's Outstanding Universal Value, and will be selected through a three-stage evaluation process.
To download these documents and access AI-powered analysis, visit the main tender page.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 275 825
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
The Robben Island Museum (RIM) invites proposals for the rehabilitation, restoration, development, operation, maintenance and long-term management of the golf course on Robben Island World Heritage Site. The successful respondent will finance, rehabilitate, restore, develop, operate and maintain the golf course through a concession arrangement balancing commercial sustainability with heritage protection. The site is approximately 25 hectares; the existing boreholes are not functional.
Important Dates
Source: RIM-RFP03-2026-27 Golf Cource final.pdf (RFP)Closing date: 12 October 2026 at 11:00
Compulsory site briefing: Tuesday, 22 September 2026 from 10:00 to 12:00. Attendance is mandatory; failure to attend invalidates the bid. Email names to [email protected] to book a ferry.
Clarification deadline: requests must be received no later than one week before the closing date (by close of business on 5 October 2026).
Briefing Session
Source: RIM-RFP03-2026-27 Golf Cource final.pdf (RFP)Compulsory site briefing session on Tuesday, 22 September 2026 from 10h00 to 12h00. Failure to attend will invalidate the bid. Email names to [email protected] to book a ferry.
Contact Information
Source: RIM-RFP03-2026-27 Golf Cource final.pdf (RFP)Technical enquiries:
SCM enquiries:
Briefing ferry booking:
Submission: online via eTender portal at https://www.etenders.gov.za/
Submission Guidelines
Source: RIM-RFP03-2026-27 Golf Cource final.pdf (RFP)Submission method: online only via the eTender portal at https://www.etenders.gov.za/ (tutorial: https://youtu.be/B7pNseNJYHM). Faxed or emailed bids are not accepted.
Format: prepare one copy each of the Technical Bid and Financial Bid in separate sealed envelopes, clearly marked "Original Technical Bid" and "Original Financial Bid". All pages must be initialled by the signatory; corrections must be initialled.
Returnable documents (all must be completed and signed):
For joint ventures/consortia/trusts, additionally submit: a signed JV/Consortium/Trust agreement, valid tax clearance certificate or PIN for each party, CSD report for each party, a consolidated SANAS or CIPC B-BBEE certificate, and complete SBD 1, 3, 4, 6, 7 using the lead partner's information.
Disqualification risks:
Returnable Documents
Source: RIM-RFP03-2026-27 Golf Cource final.pdf (RFP)Documents to submit: Completed Invitation to Bid (SBD1), Letter of Authority, General Conditions of Contract, CSD report, Company profile, Response to TOR requirements (mandatory and functionality), SANAS B-BBEE Certificate/Sworn Affidavit/DTIC B-BBEE. For joint ventures/consortia: JV/Consortium/Trust agreement, tax clearance certificates for all parties, CSD reports, consolidated B-BBEE certificate, and completed SBD forms using JV information. Bids must be submitted in two separate envelopes (Technical and Financial) and submitted online via eTender portal.
Evaluation Criteria
Source: RIM-RFP03-2026-27 Golf Cource final.pdf (RFP)Three-stage evaluation:
Stage 2 scoring (100 points total):
Scoring guideline: Poor (1), Bad (2), Good (3), Very Good (4), Excellent (5).
Stage 3 – Price points (80 or 90) plus specific goals (20 or 10):
Only financial bids of bidders who pass the technical threshold are opened. The financial proposal is indicative only and not binding at this stage.
Technical Specifications
Source: RIM-RFP03-2026-27 Golf Cource final.pdf (RFP)The Robben Island Museum (RIM) requires a concessionaire to finance, rehabilitate, restore, develop, operate and maintain the golf course on Robben Island World Heritage Site.
Site: approximately 250,000 m² (25 hectares). The existing boreholes are not functional.
Scope of work:
Methodology
Source: RIM-RFP03-2026-27 Golf Cource final.pdfTechnical methodology: Assessment phase (site investigations, condition assessments, environmental assessments, heritage assessments, risk assessments, survey work); Rehabilitation and Restoration phase (vegetation clearing, landscape restoration, turf rehabilitation, green reconstruction, fairway restoration, tee rehabilitation, bunker restoration, drainage improvements, irrigation upgrades, cart paths, golf infrastructure restoration). Operational methodology: daily operations, irrigation management, maintenance schedules, staffing structure, customer service standards, membership management, visitor bookings, tournament hosting, marketing strategy, revenue generation, health and safety management.
Experience & Qualifications
Source: RIM-RFP03-2026-27 Golf Cource final.pdfRelevant experience required in golf course rehabilitation and restoration, golf course operations and management, golf tourism developments, leisure and hospitality developments, tourism destination management, heritage landscape architecture, environmental rehabilitation, heritage restoration projects, operation of tourism facilities within protected areas or heritage sites. Provide details of at least 3 comparable projects from 1996 to date. Project team must include: Project Director, Golf Course Architect, Heritage Landscape Architect, Civil Engineer (Water Engineering), Electrical Engineer, Horticulture Specialist, Quantity Surveyor, Golf Course Superintendent, Operations Manager, Financial Specialist, Commercial Advisor – with qualifications, professional registrations, relevant experience and CVs.
Quality Management
Source: RIM-RFP03-2026-27 Golf Cource final.pdfThe implementation programme must cover: project inception, detailed investigations, design development, statutory approvals, heritage approvals, environmental approvals, rehabilitation works, infrastructure upgrades, testing and commissioning, operational readiness, and commencement of operations. Key milestones and estimated completion dates must be clearly identified.
Pricing Schedule
Source: RIM-RFP03-2026-27 Golf Cource final.pdfCommercial proposal: capital investment, estimated rehabilitation costs, development costs, operational expenditure, revenue forecasts, business model, funding arrangements, proposed concession fee, revenue-sharing proposal, financial sustainability strategy. Financial proposal is indicative only and not binding at this stage. Price evaluation uses formula for income-generating assets: Ps = 80(1 + (Pt - Pmax)/Pmax) or 90 equivalent.
Financial Requirements
Source: RIM-RFP03-2026-27 Golf Cource final.pdf (RFP)Commercial proposal must include: capital investment, estimated rehabilitation costs, development costs, operational expenditure, revenue forecasts, business model, funding arrangements, proposed concession fee, revenue-sharing proposal, and financial sustainability strategy.
The financial proposal is indicative only and not binding at this stage.
Price evaluation uses the income-generating assets formula: Ps = 80(1 + (Pt - Pmax)/Pmax) or 90 equivalent.
No bid security, performance bond, or guarantee is specified in the document.
Compliance Requirements
Source: RIM-RFP03-2026-27 Golf Cource final.pdf (RFP)CSD registration: bidders must be registered on the Central Supplier Database and submit a CSD report. For joint ventures/consortia, each party must submit a separate CSD report.
Tax compliance: submit a SARS Tax Compliance Status (TCS) PIN or a printed TCS certificate. If no TCS PIN is available, provide a CSD number. Each party in a joint venture/consortium must submit a separate TCS certificate/PIN/CSD number.
B-BBEE: submit a SANAS B-BBEE certificate, sworn affidavit, or DTIC B-BBEE certificate. For joint ventures/consortia, a consolidated SANAS or CIPC B-BBEE certificate is required.
State employment: bidders must not be persons in the service of the state, nor companies with directors who are state employees.
SBD 4 (Bidder's Disclosure): declares any state employment or relationships with the procuring institution.
SBD 6.1 (Preference Points Claim): claims preference points for specific goals.
No CIDB grading is required for this tender.
Health & Safety
Source: RIM-RFP03-2026-27 Golf Cource final.pdfOperational methodology must include health and safety management.
Environmental
Source: RIM-RFP03-2026-27 Golf Cource final.pdfEnvironmental management requirements: biodiversity conservation, protecting sensitive habitats, environmentally responsible turf management, minimising chemical usage, integrated pest management, climate-resilient landscaping, water conservation, renewable energy initiatives, waste reduction and recycling. Environmental sustainability approach must address water conservation, alternative water sources, climate adaptation, climate resilience, alien vegetation management, indigenous landscaping, pollution prevention.
Contractual Terms
Source: RIM-RFP03-2026-27 Golf Cource final.pdfGeneral Conditions of Contract apply. The Entity becomes owner of all information, documents, programmes, advice, and reports. Copyright vests in the Entity. Confidentiality obligations. Bidders must destroy copies if unsuccessful. The service provider may use general knowledge acquired if not detrimental. Personal information processed under POPIA. Bids valid for 90 days. The Entity may terminate the contract for non-compliance with 7 days' notice. Assignment prohibited without prior written authority.
Special Conditions
Source: RIM-RFP03-2026-27 Golf Cource final.pdf (RFP)The successful respondent will enter into a concession arrangement. RIM may negotiate with the Preferred Proponent to finalise contract/lease terms, including financial terms, clarification of outstanding issues, and amendments to departures from the draft contract. The Entity reserves the right to vary quantities at award, accept or reject any or all bids, and annul the tender process without liability.
Requirements
Source: RIM-RFP03-2026-27 Golf Cource final.pdf (RFP)Mandatory requirements: company profile (registration, addresses, ownership, shareholding, B-BBEE status, years in operation, turnover, audited financials, contact details); relevant experience (at least 3 comparable projects from 1996 to date with location, value, scope, duration, status, references, role); technical methodology (assessment phase, rehabilitation and restoration phase); operational methodology (daily operations, irrigation, maintenance, staffing, customer service, memberships, bookings, tournaments, marketing, revenue, health and safety); environmental sustainability approach; heritage conservation approach; commercial proposal (indicative); project team details (qualifications, registrations, CVs); programme and implementation plan; socio-economic development; innovation.
Section
Source: RIM-RFP03-2026-27 Golf Cource final.pdfEvaluation is a 3-stage process: Stage 1 – Mandatory requirements (failure leads to disqualification); Stage 2 – Evaluation criteria with minimum score of 70 to proceed; Stage 3 – Preferential point system (80/20 or 90/10). Stage 2 criteria: Business Plans with clear timeframes (80 points) – financial capacity (40), implementation programme (20), operational strategy (10), SWOT analysis (10); Heritage Conservation Approach (20 points) – smart irrigation (5), sustainable landscaping (5), green infrastructure (5), cultural landscape management (5). Scoring guideline: Poor (1), Bad (2), Good (3), Very Good (4), Excellent (5). Stage 3: Price points (80 or 90) and Specific Goals (20 or 10) with formula Ps = 80(1 + (Pt - Pmax)/Pmax) or 90 equivalent. Specific goals: Black People Equity (10 or 5 points), Black Women's Equity (5 or 2.5), Local economy empowerment (5 or 2.5).
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Robben Island, Cape Town, 7400, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
1
Last checked
27 Sept 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Contact
021-413-4246[email protected]www.robben-island.org.zaRobben Island, Cape Town, 7400, South Africa
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
Win consulting, legal, accounting, and engineering service contracts with government. Learn registration requirements and proposal strategies.
Win government insurance, banking, actuarial, and financial consulting contracts. FSCA licensing requirements and tender strategies for financial service providers.
Master the art of the consulting bid. How to structure your methodology, price your services competitively, and score maximum evaluation points.
A professional guide for law firms to join the provincial and municipal legal panels in Gauteng, covering compliance, specialization, and bidding.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Other service activities. Unlock full pricing strategies, bid frequency, and historical win rates.