Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
De Aar - De Aar - De Aar - 7000
Organization Type
GOVERNMENT
Published
02 Nov 2026
OCDS Reference
ocds-9t57fa-176629
SENTECH requires an experienced contractor to rehabilitate approximately 8 km of gravel access road serving the de aar transmission site in the northern cape. The works include mechanical grading and reshaping of the full road, localised re-gravelling of about 500 m (with an estimated 400 mΒ³ of gravel supplied by SENTECH from an on-site borrow pit), and completion of a health and safety file. The project must be completed within 8 weeks of safety file approval, and bidders must achieve a minimum functional score of 85 out of 100 to be considered for award.
Compulsory site briefing: 12 November 2026 at 10:00 at Total Energies Karoo Diensstasie, Voortrekker St, De Aar, 7000. Attendance is mandatory.
Closing: 27 November 2026 at 12:00, submitted by email to [email protected]. Quotations must be on company letterhead and signed in black ink.
Mandatory eligibility: CIDB registration Grade 2CE or higher (proof showing CRS number), valid COIDA/FEM certificate or Department of Employment and Labour letter of good standing, tax compliance, and registration on the Sentech Supplier Database.
Annexure 1 must be fully completed; failure to do so results in disqualification.
Functional evaluation: minimum qualifying score is 85 out of 100. Site Agent/Manager needs a National Diploma in Built Environment (5+ years = 25 points); Site Foreman needs relevant experience (10+ years = 25 points); Safety Officer must be registered with SACPCMP as a CR 8.5 appointee with a National Diploma in Safety Management (5+ years = 20 points); company must provide signed references for similar projects (5+ projects = 30 points).
Preference points (80/20 system): up to 8 points for black ownership (51%+ = 8), up to 10 points for women ownership (51%+ = 10), and 2 points for disability with a doctor's note. A valid B-BBEE certificate is required to claim these points.
Pricing: complete the Bill of Quantities with unit rates; add 15% contingencies; all prices in ZAR including VAT. Payment is based on actual measured quantities. Public liability insurance is required, and the health and safety file must be submitted within 7 days of the purchase order.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tenderβs issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Check the registered grade against the tender conditions, or estimate a possible grade. Check CIDB registration Β· Estimate a CIDB grade.
Date & Time
Friday, 27 November 2026 - 12:00
Venue
null
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Categories
Request for Quotation
De Aar - De Aar - De Aar - 7000
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
Description
Source: RFQ De Aar Access Road Repairs (2)ZZZZZZ.pdf02 Nov
2026
Tender Published
Tender was published
27 Nov
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
RFQ De Aar Access Road Repairs (2)ZZZZZZ.pdf
Rehabilitation of approximately 8 km of gravel access road serving the De Aar Transmission Site, including grading, reshaping, and localised re-gravelling of about 500 m using gravel from the Employer's on-site borrow pit. The contract is for 8 weeks and requires a CIDB-registered contractor (Grade 2CE) with a valid COIDA/FEM certificate.
Revised Standard Bidding Document (SDB) 4_Annexure A (3) ZZZZZZ.pdf
Sentech Limited is seeking an experienced contractor for the rehabilitation of a gravel access road in De Aar, Northern Cape. The work involves the rehabilitation of the gravel road to restore its condition and ensure reliable access. The procurement is a request for quotation (RFQ) and requires compliance with standard South African bid conditions, including the SBD 4 declaration.
SENTECH SUPPLIER CONSENT FORMZZZZ.pdf
Rehabilitation of the gravel access road at the De Aar Sentech site. Sentech Limited seeks an experienced contractor for the works.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
Sentech LimitedMatched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
RΒ 2Β 681Β 553
Range
Based on 3 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically β no action required from you.
The project involves maintenance and rehabilitation of approximately 8 km of gravel access road to the De Aar Transmission Site. The works include grading and reshaping the full length, localised re-gravelling of approximately 500 m (using employer-supplied gravel from an on-site borrow pit), and final finishing to provide a smooth, trafficable surface. The contractor is responsible for all plant, labour, supervision, materials, and management, and must complete the works within 8 weeks of safety file approval.
Important Dates
Source: RFQ De Aar Access Road Repairs (2)ZZZZZZ.pdf (RFQ)Closing date: 27 November 2026 at 12:00.
Compulsory Site Briefing: 12 November 2026 at 10:00 at Total Energies Karoo Diensstasie, Voortrekker St, De Aar, 7000. Attendance is compulsory.
Contact Information
Source: RFQ De Aar Access Road Repairs (2)ZZZZZZ.pdf (RFQ)Quotation administrator: Zanele Zulu
Email: [email protected]
Telephone: 011 471 4000
Submission by email only.
Submission Guidelines
Source: RFQ De Aar Access Road Repairs (2)ZZZZZZ.pdf (RFQ)Method: submit via email before the closing date and time.
Submission email: [email protected]
Quotations must be on company letterhead and signed in black ink.
All required documentation must be included; the quotation must be fully completed.
Returnable forms include:
Failure to meet any administrative responsiveness criterion may result in disqualification.
Evaluation Criteria
Source: RFQ De Aar Access Road Repairs (2)ZZZZZZ.pdf (RFQ)Evaluation is in three stages:
Technical Specifications
Source: RFQ De Aar Access Road Repairs (2)ZZZZZZ.pdf (RFQ)Scope: Rehabilitation of approximately 8 km of gravel access road serving the De Aar Transmission Site.
Grading and reshaping of the entire 8 km road, including:
Localised re-gravelling (patch gravel): approximately 500 m of the road, with about 400 m3 of gravel estimated for pricing.
Contractor to provide all plant, equipment, operators, labour, fuel, supervision and resources, including motor grader, loader, haulage, watering and compaction equipment.
Water available on site at a designated point.
Project duration: 8 weeks from the date of safety file approval.
Works governed by GCC 2025 (3rd edition), OHSA, Construction Regulations, applicable SANS standards and employer's specifications.
Contractor to maintain safe working conditions and access to the site at all times.
Contractor to conduct a joint completion inspection, rectify defects, remove waste and submit a completion report with photographic evidence.
Site access requires 4x4 vehicles; some roads are steep with tight turns.
Contractor to verify all quantities and dimensions at a compulsory site inspection.
Experience & Qualifications
Source: RFQ De Aar Access Road Repairs (2)ZZZZZZ.pdfSite Agent/Site Manager: minimum National Diploma in Built Environment; relevant experience as Site Agent/Manager. CV required.
Site Foreman: relevant experience in construction projects; CV required.
Company: proven construction experience with references for similar projects; signed reference letters, completion certificates or affidavits with supporting documents required.
Safety Officer: registered with SACPCMP (CR 8.5 appointee), National Diploma in Safety Management, construction sector experience. CV, qualification and registration proof required.
Quality Management
Source: RFQ De Aar Access Road Repairs (2)ZZZZZZ.pdfQuality assurance inspections will be carried out at key dates and milestones established at the site handover meeting.
Site inspections by the Infrastructure Services Manager or a trade-tested rigger before, during and on completion of the contract.
Contractor must provide a detailed execution programme in bar chart format when submitting a quotation, highlighting site name, activity description, duration, and milestone dates.
Photos must be taken before, during and after work for in-progress reporting.
Milestone 1: on completion of surface preparation.
Milestone 2: quality inspection after each coat of paint before the next coat.
Milestone 3: after final coat on each section before moving to the next.
(Note: Some milestone text refers to paint/mast works; these are included as in the source, but the road rehabilitation scope is the actual subject.)
Pricing Schedule
Source: RFQ De Aar Access Road Repairs (2)ZZZZZZ.pdfBill of Quantities (BOQ) to be completed with unit rates and amounts. Prices in ZAR, total including VAT.
BOQ sections:
Contingencies: 15% of total excluding VAT.
Payment on measured actual quantities, subject to employer's approval.
Quantities for re-gravelling are provisional (400 m3 and 500 m).
All rates must include labour, plant, fuel, equipment, supervision, overheads, profit.
Gravel supplied by Sentech from on-site borrow pit; water available on site.
Financial Requirements
Source: RFQ De Aar Access Road Repairs (2)ZZZZZZ.pdf (RFQ)Pricing: complete the Bill of Quantities with unit rates and amounts. All prices in ZAR including VAT.
Pricing structure: BOQ sections for preliminary and general (mobilisation, site establishment, project management, health and safety file), grading (per km), localised re-gravelling (per m3/m), and completion/close-out.
Contingencies: add 15% to the total excluding VAT.
Payment based on actual measured quantities of work completed and approved by the employer.
Quantities for re-gravelling (400 m3 and 500 m) are provisional and subject to measurement and approval.
No price adjustment without written approval from Sentech; currency risk to be managed by the bidder.
Sentech reserves the right to negotiate market-related prices; if not agreed, the bid may be cancelled.
Public liability insurance required.
Heath and safety file must be submitted within 7 days of the purchase order or safety file specification.
Compliance Requirements
Source: RFQ De Aar Access Road Repairs (2)ZZZZZZ.pdf (RFQ)Mandatory eligibility:
B-BBEE: valid B-BBEE certificate required to claim preference points (80/20 system).
Preference points breakdown (out of 20):
Safety officer must be registered with SACPCMP as a CR 8.5 appointee.
Site agent/manager: minimum National Diploma in Built Environment.
Site foreman: relevant experience in construction.
Company must provide references for similar projects for the class and grade being tendered.
Health & Safety
Source: RFQ De Aar Access Road Repairs (2)ZZZZZZ.pdfHealth and safety file must be compiled in line with Sentech requirements and submitted to the Sentech OHS Specialist within 7 days of the purchase order or safety file specification.
All employees to have valid mast climbing certificates (where applicable), valid medical fitness certificates from an occupational medical practitioner, and COID/FEM registration.
Detailed safe working methodology required.
Public liability insurance required.
CEO/MD must sign a health and safety compliance undertaking.
Safety Officer must be registered with SACPCMP as CR 8.5 appointee and hold a National Diploma in Safety Management.
Site hand-over meeting to be held at start of contract; progress meetings and inspections to follow.
Any problems to be reported to the Infrastructure Services Manager, or if unavailable, to the Operations Manager.
Contractor to provide own ablution facilities; site and surrounding area to be kept clean and tidy.
Environmental
Source: RFQ De Aar Access Road Repairs (2)ZZZZZZ.pdfContractor must prevent unnecessary damage to the surrounding environment and reinstate any disturbed areas.
All waste and construction debris to be disposed of at a designated landfill site.
No imported gravel material without prior written approval.
Maintain borrow pit and surroundings in a safe and orderly condition.
Contractual Terms
Source: RFQ De Aar Access Road Repairs (2)ZZZZZZ.pdfWorks executed under GCC 2025 (3rd edition), OHSA, Construction Regulations, SANS standards and employer's specifications.
Project duration: 8 weeks from safety file approval.
Contractor must attend compulsory site inspection, verify all quantities and dimensions, provide all supervision, labour, materials, tools, equipment and transport, maintain site safety, protect existing infrastructure, and remove waste upon completion.
Failure to provide securities, bonds, guarantees or proof of insurance within two days of receiving the signed agreement constitutes repudiation.
Public liability insurance is required.
CEO/MD must provide a health and safety compliance undertaking.
Inclement weather days are granted as extension of time with no monetary compensation; weather-related delays must be allowed for in the schedule.
Section
Source: RFQ De Aar Access Road Repairs (2)ZZZZZZ.pdfAdditional evaluation criteria as per functional scoring:
Minimum qualifying functional score is 85 out of 100.
Bidders failing to meet mandatory eligibility criteria are not evaluated further.
Submission Guidelines
Source: Revised Standard Bidding Document (SDB) 4_Annexure A (3) ZZZZZZ.pdf (TENDER)Returnable form
Disqualification risk
Compliance Requirements
Source: Revised Standard Bidding Document (SDB) 4_Annexure A (3) ZZZZZZ.pdf (TENDER)Mandatory form
Exclusion
Submission Guidelines
Source: SENTECH SUPPLIER CONSENT FORMZZZZ.pdf (RFP)Returnable document
Obligation created by signing
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Address
De Aar - De Aar - De Aar - 7000
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
3
Last checked
04 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Get deep intelligence on Construction. Unlock full pricing strategies, bid frequency, and historical win rates.
Learn how to submit a winning bid with these related articles
Everything South African construction contractors need to know about how procurement officers verify cidb grades: what gauteng contractors must ensure is correct β april 2026 update β covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
How established construction firms use Joint Ventures with EMEs and QSEs to meet B-BBEE preferential procurement targets and access set-aside contracts.
Everything South African construction contractors need to know about cidb grading system explained: what every gauteng contractor must know in 2026 β april 2026 update β covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Everything South African construction contractors need to know about cidb vs nhbrc: understanding dual registration requirements for residential projects in gauteng β april 2026 update β covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
π‘ Want more tendering tips and strategies?
Explore Our Blog