Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
Sentech Brixton Tower - Brixton - Johannesburg - 2040
Organization Type
GOVERNMENT
Published
11 Aug 2026
OCDS Reference
ocds-9t57fa-165264
Structural remediation works and concrete/masonry diamond core drilling works are required at the SENTECH t97 transmitter site in gauteng. Bidders must complete and sign the sbd 4 disclosure form, and any bidder listed on the register for tender defaulters or the list of restricted suppliers will be automatically disqualified.
Bidders must complete and sign SBD 4 (Bidder's Disclosure).
Bidders must disclose whether the bidder or any director, trustee, shareholder, member, partner, or controlling person is employed by the state; if so, full names, identity numbers, and state employee numbers must be provided.
Bidders must disclose any relationship between the bidder or connected persons and anyone employed by Sentech.
Bidders must disclose any interest the bidder or its principals hold in another related enterprise, whether or not that enterprise is bidding.
Bidders listed on the Register for Tender Defaulters or the List of Restricted Suppliers are automatically disqualified.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Friday, 28 August 2026 - 12:00
Venue
Sentech Brixton Tower
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Bidders, please confirm attendance on [email protected].
Categories
Request for Quotation
Sentech Brixton Tower - Brixton - Johannesburg - 2040
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
Description
Source: Confirmation of Attendance.docx (unknown)11 Aug
2026
Tender Published
Tender was published
28 Aug
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Standard Bidding Document (SDB) 4_Annexure A (00B) (002).pdf
Sentech Limited is appointing a service provider to carry out structural remediation works and concrete/masonry diamond core drilling at the T97 Transmitter Site in Gauteng. The tender is open until 28 August 2026.
1124-Sentech Brixton Tower_ BoQ Rev 4 2026-06-03- UNPRICED.pdf
Structural remediation works and concrete/masonry diamond core drilling at the Sentech T97 Transmitter Site (Brixton Tower), including slab strengthening with an FRP system, reinstatement and painting, coring through reinforced concrete floors and walls, and security vetting of all personnel.
Annexure B Sentech NKP Visit Request Form.pdf
Sentech Limited is appointing a service provider for structural remediation works and concrete/masonry diamond core drilling works at the T97 Transmitter Site in Gauteng. The tender includes a mandatory National Key Point (NKP) visit procedure that bidders must follow to access the site.
00A101B.pdf
Sentech Limited is appointing a service provider for structural remediation works and concrete/masonry diamond core drilling at the T97 Transmitter Site in Johannesburg, Gauteng. The works include creating wall and floor openings for future heat exchanger pump pipes, reprofiling opening reveals, and installing RC plinths, all while protecting Sentech equipment and maintaining site security.
OHS - Structural Remediation Works.doc
Sentech Limited is appointing a service provider for structural remediation works and concrete/masonry diamond core drilling works at its T97 Transmitter Site in Johannesburg, Gauteng. The project requires the contractor to maintain a comprehensive occupational health, safety and environmental project file covering legal appointments, risk assessments, safe working procedures, emergency planning and waste disposal.
Confirmation of Attendance.docx
Sentech Limited is procuring a service provider to carry out structural remediation works and concrete/masonry diamond core drilling at the T97 Transmitter Site in Gauteng. The tender includes a mandatory site visit, as indicated by the confirmation form in the document.
Conditions of Contract - Structural Remediation Work.doc
Sentech is appointing a service provider for structural remediation works and concrete/masonry diamond core drilling works at its Johannesburg T97 transmitter site. The contract covers dust-free coring, cutting of openings, breaking out of concrete or masonry, and making good the affected areas, with the contractor responsible for all equipment, materials, and site establishment.
Annexure A Sentech NKP Site Visit Indemnity Form.pdf
Sentech Limited is appointing a service provider for structural remediation works and concrete/masonry diamond core drilling works at its T97 Transmitter Site in Gauteng. The tender pack includes an indemnity form for site visits, indicating that bidders must visit the National Key Point premises before bidding.
1124-Particular Specifications_ BoQ Rev 3 2026-06-03.pdf
Structural remediation works at the Sentech T97 transmitter site in Brixton, Gauteng, comprising slab strengthening with a carbon-fibre FRP system, reinstatement and painting of repaired surfaces, and water-lubricated diamond core drilling through reinforced concrete floors and walls. The works must be carried out without interfering with or damaging live Sentech transmitter equipment.
Structural Remediation Works and Concrete_Masonry Diamond.docx
Structural remediation works and concrete/masonry diamond core drilling works at Sentech's Johannesburg T97 transmitter site in Brixton, Gauteng, to prepare for the expansion of services. The works comprise FRP structural remediation to the first floor RC floor slab soffit, concrete core drilling in 320mm thick RC floors (6no Ø100mm and 3no Ø50mm), and masonry core drilling in 230mm interior/250mm exterior brick walls (3no Ø150mm).
RFX 60000003537 - Structural Remedial at Sentech Brixton.pdf
Structural remediation works and concrete/masonry diamond core drilling works at the Sentech T97 Transmitter Site, with a compulsory site briefing at the Sentech Brixton Site on 20 August 2026 at 10:00. Quotations must be submitted by 28 August 2026 at 12:00, with a 90-day validity period.
00A102B.pdf
Sentech Limited is appointing a service provider to carry out structural remediation works and concrete/masonry diamond core drilling at the T97 TV transmitter site in Johannesburg. The work includes creating new floor and wall openings, enlarging existing openings, and making good all affected areas, with strict controls to protect existing equipment and prevent dust and water damage.
To download these documents and access AI-powered analysis, visit the main tender page.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Median Estimate
R 1 983 750
Range
Based on 21 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
The tender covers structural remediation works and concrete/masonry diamond core drilling at the Sentech T97 Transmitter Site. The only additional detail is a site visit confirmation form that attendees must complete and sign.
Evaluation Criteria
Source: Confirmation of Attendance.docx (unknown)No eligibility criteria specified
Technical Specifications
Source: Confirmation of Attendance.docx (unknown)The only substantive content is a site visit confirmation form. Bidders attending the site visit must complete and sign the Confirmation of Site Visit Attendance form, providing the name and surname of the attendee, purpose of visit, date, and location/site being visited.
Compliance Requirements
Source: Confirmation of Attendance.docx (unknown)No specific requirements found
Important Dates
Source: Annexure A Sentech NKP Site Visit Indemnity Form.pdf (unknown){"briefingSession":"{"date":null,"time":null,"venue":"ion by Visitor","is_compulsory":false}"}
Contact Information
Source: Annexure A Sentech NKP Site Visit Indemnity Form.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"SECTION A To be completed by Visitor"}
Evaluation Criteria
Source: Annexure A Sentech NKP Site Visit Indemnity Form.pdf (unknown)Bidders must be willing to enter Sentech's NKP premises at their own risk and must sign the indemnity form. No other eligibility criteria are stated in the provided document.
Compliance Requirements
Source: Annexure A Sentech NKP Site Visit Indemnity Form.pdf (unknown)Visitors to Sentech's NKP premises must sign the indemnity form, acknowledging that entry is at their own risk and that they are not acting as Sentech employees.
Contractual Terms
Source: Annexure A Sentech NKP Site Visit Indemnity Form.pdf (unknown)Visitors entering Sentech's NKP premises must sign an indemnity form, holding Sentech harmless from all liability and claims arising from their entry. Entry is at the visitor's own risk, and the visitor is not acting as a Sentech employee.
Description
Source: RFX 60000003537 - Structural Remedial at Sentech Brixton.pdf (RFQ)Appointment of a service provider for structural remediation works and concrete/masonry diamond core drilling works at the Sentech T97 Transmitter Site (Sentech Brixton). RFQ number: RFX 6000003537.
Important Dates
Source: RFX 60000003537 - Structural Remedial at Sentech Brixton.pdf (RFQ)Compulsory site briefing: 20 August 2026 at 10:00 at the Sentech Brixton Site.
Closing date: 28 August 2026 at 12:00.
Validity period: 90 days.
Briefing Session
Source: RFX 60000003537 - Structural Remedial at Sentech Brixton.pdf (RFQ)Compulsory site briefing at the Sentech Brixton Site on 20 August 2026 at 10:00.
Contact Information
Source: RFX 60000003537 - Structural Remedial at Sentech Brixton.pdf (RFQ)Quotations contact: Lungile Sithole, Administrator.
Telephone: 067 427 0326.
Email: [email protected].
Submission Guidelines
Source: RFX 60000003537 - Structural Remedial at Sentech Brixton.pdf (RFQ)Quotations must be submitted via email to [email protected] before the closing date and time.
Quotations must be on company letterhead, fully completed, and signed in black ink.
Bidders must be registered on the Sentech Supplier Database and be tax compliant.
Annexure 1 must be fully completed; failure to do so results in disqualification.
All required returnable documents must be included; incomplete submissions may not be evaluated.
Evaluation Criteria
Source: RFX 60000003537 - Structural Remedial at Sentech Brixton.pdf (RFQ)Evaluation is in three stages:
Bidders failing any mandatory criterion are not evaluated further.
Preference points (total 20) are awarded for:
Price points calculated using the 80/20 formula: Ps = 80[1 - (Pt - Pmin)/Pmin].
Technical Specifications
Source: RFX 60000003537 - Structural Remedial at Sentech Brixton.pdf (RFQ)The scope covers structural remediation works and concrete/masonry diamond core drilling works at the Sentech T97 Transmitter Site (Sentech Brixton).
The RFQ number is RFX 6000003537.
No further technical details are provided in the available text.
Pricing Schedule
Source: RFX 60000003537 - Structural Remedial at Sentech Brixton.pdf (RFQ)Prices must be quoted in ZAR. Foreign currency prices must have a fixed exchange rate for the contract term, with the bidder bearing all currency fluctuation risk. No price adjustments without written approval; adjustment requests need documentary evidence. Sentech may negotiate market-related prices and discounts; if not agreed, Sentech may cancel the bid.
Financial Requirements
Source: RFX 60000003537 - Structural Remedial at Sentech Brixton.pdf (RFQ)All prices must be quoted in South African Rands (ZAR).
If prices are in a foreign currency, the exchange rate quoted remains fixed for the contract term; bidders bear all currency fluctuation risk.
No price adjustments will be made without written approval from Sentech; applications for adjustment must include documentary evidence.
Sentech may negotiate market-related prices and discounts; if agreement is not reached, Sentech may cancel the bid.
Compliance Requirements
Source: RFX 60000003537 - Structural Remedial at Sentech Brixton.pdf (RFQ)Bidders must be tax compliant and registered on the Sentech Supplier Database.
A valid B-BBEE certificate is required to claim preference points.
Annexure 1 must be fully completed.
Quotations must be on company letterhead and signed in black ink.
B-BBEE Requirements
Source: RFX 60000003537 - Structural Remedial at Sentech Brixton.pdf (RFQ)Preference points (total 20) under the 80/20 system are awarded for:
A valid B-BBEE certificate is required to claim these points.
Contractual Terms
Source: RFX 60000003537 - Structural Remedial at Sentech Brixton.pdf (RFQ)Within two days of receiving a completed copy of the agreement, the service provider must contact the employer's agent to arrange delivery of any securities, bonds, guarantees, proof of insurance, and other documentation required by the contract. Failure to do so constitutes repudiation of the agreement.
Special Conditions
Source: RFX 60000003537 - Structural Remedial at Sentech Brixton.pdf (RFQ)Sentech may appoint one or more suppliers, in whole or in part, or not appoint any supplier at all, and may cancel the bid in its entirety at its sole discretion.
Requirements
Source: RFX 60000003537 - Structural Remedial at Sentech Brixton.pdf (RFQ)Bidders must meet all administrative responsiveness criteria: be tax compliant, be registered on the Sentech Supplier Database, submit quotations on company letterhead, received by closing date/time, fully completed and signed in black ink, and submitted via email or the specified method.
Section
Source: RFX 60000003537 - Structural Remedial at Sentech Brixton.pdf (RFQ)Evaluation is in three stages: administrative responsiveness, functional evaluation (only mandatory-compliant proposals), and price and preference (80/20). Bidders failing any mandatory criterion are not evaluated further. Annexure 1 must be fully completed or the bid is disqualified.
Description
Source: 1124-Sentech Brixton Tower_ BoQ Rev 4 2026-06-03- UNPRICED.pdf (unknown)The works comprise structural remediation and concrete/masonry diamond core drilling at the Sentech Brixton Tower. The BOQ is divided into Part 1 (Preliminary and General) and Part 2 (Remediation). The BOQ must be read with the Particular Specifications and the Sentech Structural Assessment Report (Revision 0).
Contact Information
Source: 1124-Sentech Brixton Tower_ BoQ Rev 4 2026-06-03- UNPRICED.pdf (unknown){"name":null,"email":null,"phone":null,"department":"QTY RATE AMOUNT (R)","address":null}
Submission Guidelines
Source: 1124-Sentech Brixton Tower_ BoQ Rev 4 2026-06-03- UNPRICED.pdf (unknown)Returnable documents: completed and signed SBD 3.1/3.2/3.3 (pricing schedule), SBD 4 (declaration of interest), SBD 6.1 (preference points claim), SBD 6.2 (local production and content declaration), SBD 7.1/7.2 (contract form), SBD 8 (past SCM practices declaration), and SBD 9 (independent bid determination certificate).
All personnel entering Sentech premises must undergo security vetting and clearance; clearance certificates must be submitted to the Sentech team for review and approval before site access.
Evaluation Criteria
Source: 1124-Sentech Brixton Tower_ BoQ Rev 4 2026-06-03- UNPRICED.pdf (unknown)Bidders must be an approved specialist contractor experienced in structural coring.
Compliance with the Health & Safety Act and the Environmental Management Plan is mandatory.
EPWP requirements apply.
Preference points will be claimed under the PPPFA system via SBD 6.1.
Technical Specifications
Source: 1124-Sentech Brixton Tower_ BoQ Rev 4 2026-06-03- UNPRICED.pdf (unknown)Scope: structural remediation works and concrete/masonry diamond core drilling at the Sentech T97 Transmitter Site (Brixton Tower).
Slab strengthening (FRP system):
Reinstatement and painting:
Coring and drilling (diamond core drilling through reinforced concrete, rig-mounted system e.g. Hilti DD 200 G02 or approved equivalent):
Security vetting and clearance for all personnel (item).
The BOQ must be read with the Particular Specifications and the Sentech Structural Assessment Report (Revision 0).
Experience & Qualifications
Source: 1124-Sentech Brixton Tower_ BoQ Rev 4 2026-06-03- UNPRICED.pdf (unknown)The coring and drilling works must be carried out by an approved specialist contractor experienced in structural coring.
The drilling system must be rig-mounted (e.g. Hilti DD 200 G02 or approved equivalent).
Pricing Schedule
Source: 1124-Sentech Brixton Tower_ BoQ Rev 4 2026-06-03- UNPRICED.pdf (unknown)Pricing items include: contractual requirements (sum), establishment of facilities for contractor (sum), compliance with Environmental Management Plan, EPWP and health and safety specifications (sum), provision of access to works, removal of site establishment and reinstatement (sum), company and head office overhead costs (monthly), compliance with Health & Safety Act (monthly).
Remediation works pricing: slab strengthening (FRP system) – 7 m²; reinstatement and painting – 7 m²; coring and drilling – various openings; water management (sum); callout fees (sum); security vetting and clearance (item).
Summary: Subtotal A, Contingencies (10% of Subtotal A), Subtotal C (A+B), VAT (15% of Subtotal C), Total (C+D).
Financial Requirements
Source: 1124-Sentech Brixton Tower_ BoQ Rev 4 2026-06-03- UNPRICED.pdf (unknown)Pricing must be submitted on the unprised BOQ, covering supply, delivery to site, construction, all SABS approved materials, handling, insurance and any other delivery costs.
Preliminary and General items (fixed charges): contractual requirements, establishment of facilities for contractor, compliance with Environmental Management Plan and EPWP requirements, health and safety specifications, provision of access to works, removal of site establishment and reinstatement, company and head office overhead costs (monthly), compliance with Health & Safety Act (monthly).
Summary of schedule of quantities: Part 1 Preliminary and General, Part 2 Remediation.
Contingencies: add 10% of Subtotal A.
VAT: add 15% of Subtotal C (provisional sum based on current rate).
Total = Subtotal C + VAT.
Compliance Requirements
Source: 1124-Sentech Brixton Tower_ BoQ Rev 4 2026-06-03- UNPRICED.pdf (unknown)SBD 4 (Declaration of Interest): disclose any director/shareholder employed by the state or connected to the procuring institution.
SBD 6.1 (Preference Points Claim): claim B-BBEE points under PPPFA.
SBD 6.2 (Declaration for Local Production and Content): declare local content.
SBD 8 (Declaration of Bidder's Past SCM Practices): disclose past practices.
SBD 9 (Certificate of Independent Bid Determination): certify independent pricing.
Compliance with the Health & Safety Act and Environmental Management Plan is mandatory.
All materials must be SABS approved.
All personnel must pass security vetting and clearance.
Health & Safety
Source: 1124-Sentech Brixton Tower_ BoQ Rev 4 2026-06-03- UNPRICED.pdf (unknown)Compliance with the Health & Safety Act is a fixed-charge obligation.
Compliance with the Health and Safety Specifications is required.
Compliance with the Environmental Management Plan is required.
EPWP requirements apply.
Contractual Terms
Source: 1124-Sentech Brixton Tower_ BoQ Rev 4 2026-06-03- UNPRICED.pdf (unknown)All prices must include delivery to site, all SABS approved materials, handling, insurance and any other costs for delivering material and plant to site.
The contractor must guarantee the supplied materials and equipment as specified.
The BOQ must be read in conjunction with the Particular Specifications and the Sentech Structural Assessment Report (Revision 0).
Contact Information
Source: Annexure B Sentech NKP Visit Request Form.pdf (unknown){"name":null,"email":null,"phone":null,"department":"Office (Tel)l Cell","address":"a SENTECH or"}
Evaluation Criteria
Source: Annexure B Sentech NKP Visit Request Form.pdf (unknown)Bidders must complete and submit the NKP Visit Request Form and obtain all required approvals before accessing the site. No other eligibility criteria are stated in the provided document.
Technical Specifications
Source: Annexure B Sentech NKP Visit Request Form.pdf (unknown)Full Names: Department Visitor(s) Escort Full Name Department
Description
Source: Structural Remediation Works and Concrete_Masonry Diamond.docxSentech is expanding services at the Johannesburg T97 transmitter site in Brixton, Gauteng. The expansion requires structural remediation works and concrete/masonry core drilling before new services can be implemented. The site is a remote, unmanned transmitter site accessed off the M17 between Stanley Avenue and Bartlett Road.
Submission Guidelines
Source: Structural Remediation Works and Concrete_Masonry Diamond.docx (unknown)Returnable documents with the quotation:
Pre-commencement requirements after award:
Evaluation Criteria
Source: Structural Remediation Works and Concrete_Masonry Diamond.docx (unknown)No specific evaluation criteria or scoring split are stated in the document. Bidders must comply with Sentech's SCM documentation requirements.
Technical Specifications
Source: Structural Remediation Works and Concrete_Masonry Diamond.docx (unknown)Scope of works at the Johannesburg T97 transmitter site in Brixton:
Site conditions and constraints:
Core drilling requirements:
Referenced documents: BoQ, Particular Specifications, drawings 1124-300-001, T09700/A/101B and T09700/A/102B, Conditions of Contract, site photos and OHS file index format.
Compliance Requirements
Source: Structural Remediation Works and Concrete_Masonry Diamond.docx (unknown)No specific compliance requirements such as CSD registration, B-BBEE, or CIDB grading are stated in the document.
Description
Source: 00A101B.pdf (unknown)The works comprise structural remediation and concrete/masonry diamond core drilling at the Sentech T97 Transmitter Site, as detailed on the ground floor layout plan.
Submission Guidelines
Source: 00A101B.pdf (unknown)Quotations must include measures to protect Sentech equipment from dust, debris and water, and to maintain site security during the works. All dimensions must be checked on site; discrepancies must be reported to Sentech before proceeding.
Technical Specifications
Source: 00A101B.pdf (unknown)Scope includes structural remediation and concrete/masonry diamond core drilling at the Sentech T97 Transmitter Site. Specific works: reprofile vertical and horizontal opening reveals with Sika Rep (or approved equivalent); fill cavities in brick walls with expanding polyurethane foam, cut flush and finish to clear opening sizes; make good adjacent damaged areas to match existing finishes; remove all rubble from site. Core drilling: holes in RC floors and brick walls to be formed by water-lubricated diamond core drilling; no dust generation during coring; erect screens around floor and wall holes to protect adjacent areas and equipment from water, debris and splatter; create a dam around floor slab holes to contain lubricating water; an industrial wet/dry vacuum cleaner must be on site to remove water during drilling; cores must not fall freely to the floor below — measures must be in place to catch them. Specific openings: 1No ø150mm wall opening in CP96 just under ring beam at 450mm from slab soffit to centre; 2No ø150mm wall openings in CP230/251 adjacent to existing openings for future pump pipes at 450mm from slab soffit to centre; 1No ø100mm wall opening in CP230/251 at 2450 FFL to centre; 1No ø100mm wall opening in CP230/251; 1No 200x200mm wall opening in CP230/251; 1No 200x200mm wall opening in CP230/251; 1No 200x200mm wall opening in CP230/251; 1No 3000x4000x150mm RC plinth in CP230/251. All openings/holes in external walls must be temporarily and securely closed with weatherproof/security material and sealed to prevent water/dust ingress.
Methodology
Source: 00A101B.pdf (unknown)Vertical and horizontal opening reveals must be reprofiled with Sika Rep (or similar approved). Make good all adjacent damaged areas to match existing finishes and remove all rubble from site.
Health & Safety
Source: 00A101B.pdf (unknown)Dust shall not be generated during coring works. Holes in RC floors and brick walls must be formed by water-lubricated diamond core drilling. Screens must be erected around floor and wall holes to protect adjacent areas and equipment from water, heat, debris and water splatter. A dam must be created around floor slab holes to prevent lubricating water from spreading. An industrial wet/dry vacuum cleaner must be on site to suck up water during drilling. Cores must not be allowed to fall freely to the floor below; measures must be in place to catch them.
Special Conditions
Source: 00A101B.pdf (unknown)All openings/holes in external walls must be temporarily and securely closed with suitable weatherproof/security material and sealed to prevent water/dust ingress. Work must be programmed so as not to compromise Sentech's building/site security; quotations must include necessary measures to cater for this.
Description
Source: 00A102B.pdf (unknown)The works involve structural remediation and concrete/masonry diamond core drilling at the Sentech T97 Transmitter Site in Johannesburg. This includes creating new slab and wall penetrations for new transmitters, antenna rigid lines, and HVAC ducting, as well as filling existing floor openings with concrete, retiling floors, and making good all adjacent damaged areas.
Submission Guidelines
Source: 00A102B.pdf (unknown)Bidders must submit a quotation covering the full scope of structural remediation and concrete/masonry diamond core drilling works at the Sentech T97 Transmitter Site. The quotation must include measures to protect Sentech equipment and maintain site security during the works. All dimensions must be verified on site by the contractor, and any discrepancies must be reported to Sentech before proceeding. No specific returnable forms are listed in the provided document.
Evaluation Criteria
Source: 00A102B.pdf (unknown)No specific evaluation criteria are stated in the provided document. Bidders should comply with all general notes on the drawing, including site verification of dimensions and protection of Sentech equipment.
Technical Specifications
Source: 00A102B.pdf (unknown)Scope of works at the Johannesburg T97 TV transmitter building:
Methodology
Source: 00A102B.pdf (unknown)Concrete core drilling must use the water-lubricated diamond core drilling method to avoid dust generation. Screens must be erected around floor and wall holes to protect adjacent areas and equipment. Dams must be created around floor slab holes to prevent lubricating water from spreading. An industrial wet/dry vacuum cleaner must be on site to collect lubricating water during drilling. Concrete cores must be caught and not allowed to fall freely. All openings/holes in external walls must be temporarily and securely closed with weatherproof/security material and sealed to prevent water/dust ingress. Opening reveals must be reprofiled with Sika REP (or similar approved). Cavity brick walls at openings must be filled with expanding polyurethane foam, cut flush when cured, and finished to clear opening size. Make good all adjacent damaged areas to match existing finishes and remove all rubble from site.
Compliance Requirements
Source: 00A102B.pdf (unknown)No specific compliance requirements (e.g., CIDB grading, B-BBEE, CSD registration) are stated in the provided document.
Health & Safety
Source: 00A102B.pdf (unknown)Bidders must include measures to protect adjacent areas and equipment from water, debris, and splatter during drilling. An industrial wet/dry vacuum cleaner must be on site to collect lubricating water. Concrete cores must not be allowed to fall freely; measures must be in place to catch them. All work must be programmed to avoid compromising Sentech's building/site security.
Special Conditions
Source: 00A102B.pdf (unknown)All dimensions must be checked on site by the contractor. Any discrepancy in dimensions must be brought to Sentech's attention before proceeding. All work must be programmed so as not to compromise Sentech's building/site security, and quotations should include necessary measures. All Sentech equipment must be protected from dust, debris, water, etc., and quotations should include necessary measures.
Description
Source: OHS - Structural Remediation Works.doc (unknown)The project file is for the structural remediation works and concrete/masonry diamond core drilling works at the Sentech Johannesburg T97 transmitter site.
Evaluation Criteria
Source: OHS - Structural Remediation Works.doc (unknown)Bidders must provide a valid letter of good standing and hold public liability insurance. All required legal appointments and training records listed in the OHSE project file index must be submitted. No other eligibility criteria are stated.
Technical Specifications
Source: OHS - Structural Remediation Works.doc (unknown)The project file must include an Occupational Health Safety and Environmental policy, legal appointments, scope of operation, Section 37.2 agreement, public liability insurance, letter of good standing, safety plan, emergency plan, induction and toolbox talks, and waste disposal plan.
Compliance Requirements
Source: OHS - Structural Remediation Works.doc (unknown)Bidders must provide a valid letter of good standing and hold public liability insurance. They must also submit all required legal appointments and training records as listed in the OHSE project file index.
Description
Source: Conditions of Contract - Structural Remediation Work.docThe contract covers structural remediation works and concrete/masonry diamond core drilling at the Sentech T97 transmitter site in Johannesburg. The contractor must provide all labour, materials, equipment, and services required to complete the works, including dust-free cutting, debris removal, and finishing of openings.
Evaluation Criteria
Source: Conditions of Contract - Structural Remediation Work.doc (unknown)The contract is awarded on the basis of a bona fide quote accepted by Sentech in writing. The quoted price must be all-inclusive, covering overheads, labour, materials, tools, equipment, transport, accommodation, water, site establishment and disestablishment, chemical toilet hire, rubbish removal, and storage. The contract price is fixed with no adjustment for rise and fall of prices. The contractor must not assign or sub-contract any portion without prior written approval from Sentech. The contractor must maintain all necessary insurance coverage during the contract. Compliance with the OHS Act, relevant SANS standards, and good engineering practice is mandatory. The contractor must appoint a Responsible Person for the working area and register as the Employer under the OHS Act. All accidents must be reported within 24 hours. The contractor must provide all safety information requested by Sentech.
Technical Specifications
Source: Conditions of Contract - Structural Remediation Work.doc (unknown)Scope: structural remediation works and concrete/masonry diamond core drilling at the Sentech T97 transmitter site in Johannesburg.
Demolition work: all coring, cutting of openings, and breaking out of concrete or masonry must be dust-free. Openings in concrete/brick walls and floor slabs must be cut by diamond core drilling with cooling/lubricating water. Where dust-free work is impossible, the area must be sealed with an airtight screen; unscreenable equipment must be fully wrapped in dust-proof material under Sentech guidance. The contractor is liable for any damage to electronic equipment caused by dust.
Debris must be prevented from falling uncontrolled and removed from site; removal costs must be included in pricing. Lubricating water must be controlled to prevent damage to equipment or fittings.
Finishing: circular openings may be left as cut; square openings formed by over-coring must be made good with non-shrink grout. Disturbed or damaged floor tiles must be repaired. Openings in masonry walls must be made good with non-shrink grout and painted with three coats of approved, colour-matched PVA.
Transport and hoisting: Sentech's equipment is not available; the contractor must provide all off-loading, transporting, and on-site hoisting equipment.
Site conditions: no accommodation or shower facilities; toilet and hand-washing facilities are available in the Sentech building. No site telephone or communication is available. Electricity and potable water are available; the contractor must provide plug adapters, extension leads, hosepipes, and adapters.
Access and safety: no fires on Sentech or adjacent property. All gates on access roads must be kept closed. The contractor must provide barriers to enclose dangerous portions of the works. The working area will be demarcated by Sentech; the contractor is responsible for security of work, tools, and equipment.
Cleaning: the contractor must clean all occupied areas, remove rubble, and hand over the works clean and neat with all damage repaired.
Financial Requirements
Source: Conditions of Contract - Structural Remediation Work.doc (unknown)Payment: Sentech will pay 30 days after receiving a statement and tax invoice. All payment claims are verified by Sentech's representative before payment. Retention money: not applicable. The quoted price must be all-inclusive, covering all overheads, labour, materials, tools, equipment, transport, accommodation, water, site establishment and disestablishment, chemical toilet hire, rubbish removal, and storage. The contract price is fixed with no adjustment for rise and fall of prices.
Compliance Requirements
Source: Conditions of Contract - Structural Remediation Work.doc (unknown)Compliance with the Occupational Health and Safety Act is mandatory; the contractor is deemed the Employer for the working area and must register with the divisional inspector. All work must comply with relevant SANS standards and accepted good engineering practice. The contractor must appoint a Responsible Person for the working area. The contractor must maintain all necessary insurance coverage during the contract. No specific compliance forms are listed in the document.
Description
Source: 1124-Particular Specifications_ BoQ Rev 3 2026-06-03.pdfThe works comprise structural remediation and concrete/masonry diamond core drilling at the Sentech T97 transmitter site, including slab strengthening, reinstatement and painting, and coring and drilling works.
Contact Information
Source: 1124-Particular Specifications_ BoQ Rev 3 2026-06-03.pdf (unknown)Consulting engineers (drawing and design):
Client contact:
Evaluation Criteria
Source: 1124-Particular Specifications_ BoQ Rev 3 2026-06-03.pdf (unknown)The contractor must be an approved applicator of the FRP system and must provide supporting documentation confirming compliance.
The contractor must be approved or authorised to use core drilling equipment.
The contractor must comply with all applicable project specifications and relevant SANS standards.
The contractor must ensure no water, dust, or debris damages Sentech equipment and must protect adjacent areas with screens and dams during drilling.
The contractor must not claim additional time or costs for rebar obstruction during coring.
The contractor must check all dimensions on site and bring any discrepancies to Sentech's attention before proceeding.
Technical Specifications
Source: 1124-Particular Specifications_ BoQ Rev 3 2026-06-03.pdf (unknown)Slab strengthening (FRP system):
Reinstatement and painting:
Coring and drilling:
Core drilling notes:
General notes:
Compliance Requirements
Source: 1124-Particular Specifications_ BoQ Rev 3 2026-06-03.pdf (unknown)No specific compliance requirements stated beyond the technical approvals and standards noted in the evaluation criteria.
Health & Safety
Source: 1124-Particular Specifications_ BoQ Rev 3 2026-06-03.pdfThe contractor must ensure no water, dust, or debris damages Sentech equipment; protect adjacent areas with screens and dams during drilling; and manage water and slurry to maintain a clean and safe working environment. An industrial wet/dry vacuum cleaner must be on site during drilling. All work must be programmed so as not to compromise Sentech's building/site security.
Contact Information
Source: Standard Bidding Document (SDB) 4_Annexure A (00B) (002).pdf (TENDER){"name":null,"email":null,"phone":null,"department":"SUPPLY CHAIN MANAGEMENT","address":null}
Evaluation Criteria
Source: Standard Bidding Document (SDB) 4_Annexure A (00B) (002).pdf (TENDER)Bidders must complete and sign SBD 4 (Bidder's Disclosure). The form requires disclosure of:
Bidders listed on the Register for Tender Defaulters or the List of Restricted Suppliers are automatically disqualified.
Technical Specifications
Source: Standard Bidding Document (SDB) 4_Annexure A (00B) (002).pdf (TENDER)Supply chain management system should
This declaration prove to be false.
.................................... .....................................................
Signature Date
.................................... ......................................................
Position Name of bidder
Compliance Requirements
Source: Standard Bidding Document (SDB) 4_Annexure A (00B) (002).pdf (TENDER)No specific compliance requirements beyond the standard SBD 4 disclosure are stated in the available document.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Address
Sentech Brixton Tower - Brixton - Johannesburg - 2040
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
12
Last checked
11 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Construction. Unlock full pricing strategies, bid frequency, and historical win rates.