Issuing Organization
Eskom National Transmission Company of South AfricaLocation
Gauteng
Closing Date
26 Aug 2026
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Simmerpan - Germiston - Gauteng - 1401
Organization Type
GOVERNMENT
Published
04 Aug 2026
OCDS Reference
ocds-9t57fa-164494
This tender invites bids for the optimization of building space at the simmerpan engineering facility in gauteng. The scope involves construction-related work to optimize the engineering building's space. Interested contractors in the construction and civil engineering industry should submit a bid before the closing date of 26 august 2026.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Wednesday, 26 August 2026 - 11:00
Venue
Simmerpan Telecommunications Field and Ops Boardroom
Categories
Request for Bid(Open-Tender)
Simmerpan - Germiston - Gauteng - 1401
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
Important Dates
Source: Final SHEQ specification Engineering Space Optimization Rev 1.pdf (unknown)04 Aug
2026
Tender Published
Tender was published
26 Aug
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Engineering Building Final 02.pdf
ENGINERRING BUILDING door (ESKOM HOLDINGS)-Model-CL0.pdf
This tender from Eskom National Transmission Company of South Africa (NTCSA) is for the optimization and refurbishment of the engineering building space at Simmerpan, Gauteng. The scope includes the supply and installation of various timber doors (types B02-B08), aluminum windows (VP01), and associated ironmongery, with detailed specifications for fire-rated doors, frames, and compliance with SANS 10400. The project also involves drainage and plumbing work, with all dimensions to be verified on site and discrepancies reported to the architect.
NTCSA_E-Tenderers E-Tendering Training Acknowledgement Form.pdf
This tender is for the optimization of the Simmerpan engineering building space, issued by Eskom National Transmission Company of South Africa. The document provided is an acknowledgment form for e-tendering training, indicating that bidders must confirm they have completed self-training on the e-Tendering system before submitting a bid.
20260510_Space Optimization of List of Tender Returnables_Cat 4.pdf
Eskom National Transmission Company of South Africa invites tenders for the space optimization of the 2nd Floor Engineering Building at Simmerpan to accommodate 50 workstations. The tender focuses on quality management system compliance, requiring documented ISO 9001-aligned processes, quality deliverables, and proof of relevant experience.
NEC ECSC- Engineering Building Space Optimization .pdf
Analysis completed but response format was invalid
559-343110581_Post contract award SHEQ Requirement Engineering Building Space Optimization Project.pdf
This document is a post-contract award SHEQ (Safety, Health, Environment, and Quality) requirement checklist for the Simmerpan Engineering Building Space Optimization project by Eskom National Transmission Company of South Africa. It outlines the mandatory SHEQ documentation and compliance items that the contractor must submit for approval before commencing work, covering OHS, environmental, and quality management requirements.
PAYE Questionnaire for Service Contracts 2026_2027.doc
This document is a PAYE (Pay-As-You-Earn) questionnaire for service contracts with Eskom Group of Companies, specifically for the SIMMERPAN ENGINEERING BUILDING SPACE OPTIMIZATION tender. It is used to determine the tax classification of contractors (whether they are independent contractors, personal service providers, labour brokers, or dependent contractors) for the 2026/2027 tax year. The questionnaire must be completed by companies, close corporations, trusts, or individuals providing services to Eskom, and includes various tests (residence, employee count, income concentration, place of control, and dominant impression) to establish the correct tax treatment.
Safety,_Health,_Environment_and_Quality_(SHEQ)_Policy.pdf
This tender is for the SIMMERPAN ENGINEERING BUILDING SPACE OPTIMIZATION project, issued by Eskom National Transmission Company of South Africa (NTCSA) in Gauteng. The document provided is Eskom's Safety, Health, Environment and Quality (SHEQ) Policy (Revision 5), which outlines the mandatory safety, health, environmental, and quality standards that all contractors and suppliers must comply with when working for Eskom. The policy emphasizes zero harm, zero defects, adherence to ISO 9001, ISO 14001, and ISO 45001, and strict compliance with legal and other requirements.
Contract and Contractor OHS Management.pdf
This document is Eskom's Contract and Contractor OHS Management standard (32-726), which outlines the minimum Occupational Health and Safety (OHS) requirements that suppliers/contractors must comply with throughout the entire contract lifecycle, from project initiation and design through tender, site mobilisation, execution, and post-contract review. It applies to all Eskom divisions and subsidiaries and is relevant to the SIMMERPAN ENGINEERING BUILDING SPACE OPTIMIZATION tender. The standard emphasises Eskom's 'Zero Harm' commitment and integrates OHS into procurement processes, requiring contractors to submit OHS documentation, comply with South African legislation, and undergo evaluations before and during contract execution.
AM OHS Contractor Baseline risk assessment.xlsx
This tender is for the optimization of space in the Simmerpan Engineering Building, issued by Eskom National Transmission Company of South Africa. The document primarily contains an Occupational Health and Safety (OHS) baseline risk assessment template, which is a mandatory part of the tender submission. It outlines a wide range of potential hazards and risks associated with the work, including driving, cleaning, working at heights, handling hazardous chemicals, electrical work, plumbing, and emergency preparedness. The tender requires contractors to acknowledge and comply with these risk assessments, implement controls, and adhere to all relevant South African legislation and Eskom procedures.
Engineering Building Space Optimization Project OHS Tender Evaluation.pdf
This tender from Eskom National Transmission Company of South Africa (NTCSA) is for the Simmerpan Engineering Building Space Optimization project. It is classified as high-risk work and requires a comprehensive Occupational Health and Safety (OHS) submission. The tender evaluation focuses on the tenderer's ability to manage safety, health, and environmental risks, with detailed documentation and costing required.
NTCSA Non-Disclosure Agreement (NDA) Vendors_.pdf
This document is a Non-Disclosure Agreement (NDA) template provided by the National Transmission Company South Africa (NTCSA) for vendors participating in a tender for the 'SIMMERPAN ENGINEERING BUILDING SPACE OPTIMIZATION' project. The NDA outlines the terms under which confidential information will be shared between NTCSA and the vendor, emphasizing confidentiality, non-disclosure, and the protection of proprietary information. The tender itself is for space optimization at the Simmerpan Engineering Building, with a closing date of August 26, 2026.
Scope of work Engineering Building - 25.03.26 M.N.pdf
Eskom National Transmission Company of South Africa seeks a contractor to optimize space on the 2nd floor of the Simmerpan Engineering Building in Germiston, Gauteng. The project involves renovating the PTM&C and Quality Management sections to create 50 non-dedicated workstations, focus booths, syndicate rooms, and support spaces. Works include demolition, drywalling, electrical rewiring (LED lighting, occupancy sensors, emergency lights, new DB with SPD), LAN point installation, air conditioning repositioning, full recarpeting, tiling of kitchen and bathrooms, and new furniture. The closing date is 26 August 2026 at 11:00 UTC.
20260510_Space Optimization of 2nd_Form A_Cat 4_ Rev 9.docx
This tender from Eskom National Transmission Company of South Africa seeks a contractor to optimize the 2nd floor of the Simmerpan Engineering Building to accommodate 50 workstations. The tenderer must acknowledge and accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001 standards. The document includes a quality requirements checklist that the tenderer must complete, indicating applicability of various clauses.
Final SHEQ specification Engineering Space Optimization Rev 1.pdf
This tender is for the space optimization of the 2nd Floor Engineering Building at Simmerpan, Germiston, for Eskom National Transmission Company of South Africa (NTCSA). The project involves redesigning the floor to accommodate 50 workstations, including demolition of existing office/printing areas, installation of new workstations (Type H), focus booths, a kitchenette, and a syndicate room. It also includes electrical rewiring along skirting and upgrading ceiling lights to LEDs. The contractor must comply with extensive SHE (Safety, Health, and Environment) requirements, including developing a SHE Plan, conducting risk assessments, and adhering to OHS Act regulations.
Eskom Standard Conditions of Tender on e-tendering.pdf
This tender is for the optimization of space in the Simmerpan Engineering Building, issued by Eskom National Transmission Company of South Africa. The document outlines the standard conditions of tender, including submission requirements, evaluation criteria, and compliance obligations. Tenders must be submitted electronically via the Eskom Tender Bulletin site by the closing date. The process emphasizes ethical conduct, transparency, and cost-effectiveness.
Engineering Building Space Optimization Technical Evaluation Criteria.pdf
This tender from Eskom National Transmission Company of South Africa seeks a contractor for the SIMMERPAN ENGINEERING BUILDING SPACE OPTIMIZATION project in Gauteng. The evaluation is two-stage: mandatory criteria (gatekeepers) and qualitative criteria (weighted). Bidders must meet all mandatory criteria to proceed, and must score at least 70% in the qualitative stage to be considered technically compliant.
240-77471499 Annexure B.pdf
This tender from Eskom National Transmission Company of South Africa is for the optimization of space in the Simmerpan Engineering Building. The document provided is primarily an acknowledgement form for Eskom's Occupational Health and Safety (OHS) legal and other requirements, which the supplier/contractor/tenderer must understand and comply with. The closing date is August 26, 2026.
Space opt Tender BOQ.xlsx
Eskom National Transmission Company of South Africa (NTCSA) is tendering for the space optimization of the 2nd floor Engineering Building at the Simmerpan Complex in Gauteng. The project aims to accommodate 50 workstations and includes alterations, building works, electrical works, and associated services. The contract is valued at R500,000 (excluding VAT) and is governed by the NEC Engineering Construction Short Contract. The scope includes removal of existing ceilings, partitioning, and floor coverings; installation of new doors, fire doors, ceilings, partitions, floor coverings, ironmongery, sanitary fittings, and electrical works; and compliance with SHEQ requirements.
240-105658000 Supplier Quality Management Specification (3).pdf
This tender is for the SIMMERPAN ENGINEERING BUILDING SPACE OPTIMIZATION project by Eskom National Transmission Company of South Africa. The document provided is the Supplier Quality Management specification (240-105658000, QM 58) which outlines the minimum quality requirements for suppliers. It mandates that suppliers develop, implement, and maintain a Quality Management System (QMS) conforming to ISO 9001, and defines four categories of quality requirements (Category 1 to 4) with specific returnable documents. The specification covers pre-contract award requirements, including quality plans, contract quality plans, quality control plans/inspection and test plans, and supplier capability assessments. It also details post-contract award obligations such as audits, nonconformity management, and special processes.
Eng Building Space Optimisation - Env Requirements for Contractors and Suppliers.pdf
This tender from Eskom National Transmission Company of South Africa is for the SIMMERPAN ENGINEERING BUILDING SPACE OPTIMIZATION project. The document provided is the 'Environmental Requirements for Contractors and/or Suppliers' standard, which outlines the environmental management obligations that contractors and suppliers must comply with when working for Eskom Transmission. It details a six-phase contractor environmental management model covering design, tender, registration, site mobilization, execution, and post-contract review, emphasizing the need for an Environmental Management System (EMS), compliance with South African environmental legislation, and adherence to Eskom's Zero Harm culture.
Safety_Health_Environment_and_Quality_(SHEQ)_Policy Rev 5.pdf
This tender is for the optimization of space in the Simmerpan Engineering Building, issued by Eskom National Transmission Company of South Africa. The document provided is Eskom's SHEQ Policy, which outlines the safety, health, environment, and quality standards that all contractors and suppliers must adhere to when working with Eskom. The policy emphasizes compliance with ISO standards, zero harm, and continuous improvement.
Eng Building Space Optimisation - Env Management Tender Returnable Contractors or Service Providers (1).xls
This tender by Eskom National Transmission Company of South Africa seeks contractors for the SIMMERPAN ENGINEERING BUILDING SPACE OPTIMIZATION project in Gauteng. The document primarily focuses on environmental management requirements, requiring bidders to demonstrate compliance with ISO 14001:2015 through either valid certification (Option 1) or documented EMS (Option 2). Bidders must submit various environmental documents including an EMS manual, environmental policy, waste management plan, aspect and impact register, and environmental management programme. The tender includes a weighted scoring system with a threshold of 80% for consideration.
32-95 rev 9.pdf
The document provided is not the actual tender specification for the SIMMERPAN ENGINEERING BUILDING SPACE OPTIMIZATION project, but rather Eskom's Occupational Health and Safety (OHS) Incident Management Procedure (document 32-95, Rev 9). This procedure outlines the mandatory requirements for managing OHS incidents (including near-misses, injuries, fatalities, and occupational diseases) across all Eskom operations. For the tender, this means that any contractor or employee involved in the project must comply with this incident management procedure, including incident identification, emergency response, notification, prioritisation, classification, investigation, corrective actions, and close-out. The tender itself likely requires adherence to this OHS framework as part of the contractual obligations.
20250510_Method Statement_Cat 4 Tender Returnables.docx
This tender by Eskom National Transmission Company of South Africa seeks a contractor for the SIMMERPAN ENGINEERING BUILDING SPACE OPTIMIZATION project in Gauteng. The document is a method statement template that requires bidders to detail their approach to scope, objectives, customer focus, competency, infrastructure, leadership, risk management, process improvement, data analysis, and stakeholder/supplier management. The closing date is August 26, 2026.
NTCSA_E-tendering Help Manual for supplier.pdf
The document is a user manual for Eskom's eTendering system, not the actual tender specification for the Simmerpan Engineering Building Space Optimization. It explains how suppliers can register, log in, upload tender documents, and finalize submissions electronically. The tender itself is for space optimization at the Simmerpan engineering building, with a closing date of August 26, 2026.
PAYE Questionnaire for Service Contracts - 2026_2027.xls
The tender document for the Simmerpan Engineering Building Space Optimization project by Eskom National Transmission Company of South Africa appears to be corrupted or improperly encoded, containing mostly binary or garbled data. The only readable metadata indicates the tender title, organization, province (Gauteng), and closing date (August 26, 2026). No substantive requirements, specifications, or evaluation criteria are discernible from the provided content.
Eng Building Space Optimisation - Env Requirements Proforma.docx
This tender from Eskom National Transmission Company of South Africa seeks contractors for the Simmerpan Engineering Building Space Optimization project in Gauteng. The document focuses heavily on environmental compliance, requiring contractors to adhere to Eskom's environmental management plans, standards, and legal requirements, and to maintain specific registers and documentation on site.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Median Estimate
R 1 983 750
Range
Based on 21 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
{"closingDate":"16 April 2026","briefingSession":"{"date":null,"time":null,"venue":"e to all employees under their control on any hazardous and related work","is_compulsory":false}"}
Contact Information
Source: Final SHEQ specification Engineering Space Optimization Rev 1.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"pril 2029"}
Evaluation Criteria
Source: Final SHEQ specification Engineering Space Optimization Rev 1.pdf (unknown)The contractor must be a registered electrical installation contractor with the Department of Employment and Labour (DEL). The contractor must have a valid Letter of Good Standing from the Compensation Commissioner (COID). The contractor must appoint a Health and Safety Officer with a recognized safety qualification (e.g., Safety Management Diploma, SAMTRAC) and at least two years of experience, and who is registered with SACPCMP. Site/Project Managers must also be registered with SACPCMP. The contractor must have the necessary competencies and resources to perform the work safely.
Technical Specifications
Source: Final SHEQ specification Engineering Space Optimization Rev 1.pdf (unknown)This SHE specification is National Transmission Company of South Africa (NTCSA) Asset
Management Real Estate’s minimum requirements which are required to be met for the
specific contract and for the duration of the contract period by contractors and where required,
the delivery organisations.
National NTCSA Company of South Africa develop optimal plans and engineering solutions
for the expansion, maintenance and refurbishment of the power NTCSA network as well as
providing a technology and asset management service to ensure that the integrated power
system is reliable, adequate and secure.
The contractor is expected to develop a coherent SHE Plan in line with the issued scope
of work and this SHE Specification. National Transmission Company of South Africa
(NTCSA) AM Real Estate in no way assumes the contractor’s legal responsibilities. The
contractor is and remains accountable for the quality and the execution of his/her
health and safety programme for his/her employees and Appointed principal contractor
employees.
This SHE specification reflects minimum requirements and should not be construed as all
encompassing.
Note 1: All the requirements listed hereunder are in relation to the contract and do not
supersede or replace any organizational SHE requirements
2.1 Scope
This SHE specification lists the legislative and NTCSA AM Real Estate requirements and
where applicable, any requirements pertaining to Local Authorities/ Municipal by-laws/
Environmental legislation that must be met by the contractor.
2.1.1 Purpose
This specification sets out the minimum legislative and organisational requirements for the
specific scope of work.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
2.1.2 Applicability
This SHE specification is applicable to the contractor tendering for the issued scope of work
for space optimization of 2nd Floor Engineering Floor, Simmerpan, Germiston building,
including the purchasing of new furniture to occupy space as per design
2.2 Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
[1] Basic Conditions of Employment Act No .
[2] Occupational Health and Safety Act and Regulations No .
[3] National Environmental Management Act .
[4] National Environmental Management Waste Act 59 2008
[5] 32-37 Eskom Substance Abuse Procedure.
[6] 32-726 Contract and Contractor Occupational Health and Safety Management Standard
[7] 240-62196227 Life- saving Rules
[8] 32-95 Occupational Health and Safety Incident Management Procedure
[9] 32-727 SHEQ Policy
[10] 32- 418 Working at Heights Procedure
[11] 240-62946386 Vehicle and Driver Safety Management Procedure
[12] 32-520 Risk Assessment procedure
[13] Plant Safety Regulations.
[14] ISO 9001: 2015 Quality management system
[15] 39-71 Quality Control Plan and contact Quality Control Plan Approval Standard
[16] ISO 45001: 2018 Occupational health and safety management system
[17] Eskom program for Reintegration and return to work of employees, during the COVID
19 pandemic, Revision 30043030-V04
[18] ISO 14001:2015 Environmental Management System
[19] SANS 10400 The application of the National Building Regulations – All Parts.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
[20] SANS 17025:2017 Requirements for Testing and Calibration Laboratories
[21] SANS 204:2011 Energy efficiency in buildings.
[22] SANS 10400-XA:2011 Energy usage in buildings.
2.2.2 Informative
[1] Tobacco Products Control Act (Updated 2011.05.19)
[2] National Building Regulations and Building Standard Act No. Constitution
of the Republic of South Africa No
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
2.3 Definitions
Definition Explanation
Sub- contractor Means a contractor appointed by the Appointed principal contractor
Baseline risk (32-520) baseline operational risks refer to the health and safety risks
assessment associated with all standard processes and routine activities in the
business
Employee (OHS Act) means, subject to the provisions of subsection (2), any
person who is employed by or works for an employer and who
receives or is entitled to receive any remuneration or who works
under the direction or supervision of an employer or any other person
Employer (OHS Act) means, subject to the provisions of subsection (2), any
person who employs or provides work for any person and
remunerates that person or expressly or tacitly undertakes to
remunerate him/her, but excludes a TES (labour broker) as defined in
section 1(1) of the Labour Relations Act 1956 (Act No. )
Environment (32-94) means:
a. the land, water, and atmosphere of the earth;
b. micro-organisms and plant and animal life; and
c. any part or combination of (a) and (b) and the interrelationships
among and between them, and the physical, chemical, aesthetic,
and cultural properties and conditions of the foregoing that
influence human health and well-being
Environmental A detailed plan of action prepared to ensure that recommendations for
Management plan enhancing or ensuring positive impacts and limiting or preventing
negative environmental impacts are implemented during the life-cycle
of a project. This Environmental Management Plan should preferably
form part of Eskom’s Environmental Management System
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
2.3 Definitions
Definition Explanation
Fall protection plan (OHS Act) means a documented plan of all risks relating to working
from an elevated position, considering the nature of work undertaken,
and setting out the procedures and methods to be applied in order to
eliminate the risk
Health and safety (OHS Act) means a document specification of all health and safety
specification requirements pertaining to associated to a contract, so as to ensure
the health and safety of persons.
Lifesaving Rules (240-62196227) a rule that, if not adhered to, has the potential to
cause serious harm to people
Medical Certificate of (OHS Act) means a certificate valid for one year, issued by an
fitness occupational health practitioner, issued in terms of the regulations,
whom shall be registered with the Health Professions Council of
South Africa
Method statement (OHS Act) means a written document detailing the key activities to be
performed in order to reduce, as reasonably as practicable, the
hazards identified in any risk assessment
Appointed principal (In the text of this document) Means an employer, as defined in
contractor section 1 of the OHS Act, who intends to tender for or has signed a
contract with Eskom for services rendered.
Risk assessment (OHS Act) means a programme to determine any risk associated with
any hazard at a construction site in order to identify the steps needed
to be taken to remove, reduce, or control such hazard.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
2.4 Abbreviations
Abbreviation Description
AIA Approved Inspection Authority
AM Asset Management
BU Business Unit
CE Chief Executive
CNC (Eskom) Customer Network Centre
COID Act Compensation for Occupational Injuries and Diseases Act
DMR Driven Machinery Regulations
DC Direct Current
DEL Department of Employment and Labour (Inspection and Enforcement
services – Provincial office)
EAP Employee Assistance Program
EP Emergency Preparedness
ERfW Environmental Regulations for Workplaces
GAR General Administrative Regulations
GSR General Safety Regulations
HCA Hazardous Chemical Agent
LDV Light Delivery Vehicle
LoG (COID) Letter of Good Standing
SDS Safety Data Sheets
NEMA National Environmental Management Act
NTCSA National Transmission Company of South Africa
OHS Act Occupational Health and Safety Act and Regulations,
PPE Personal Protective Equipment
SABS South African Bureau Standard
SANS South African National Standard
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
2.5 Roles and Responsibilities
2.5.1 Appointed principal contractors and sub- contractors
Note 1: Most of the roles and responsibilities listed apply to both Appointed principal
contractors and sub- contractors. Where some of the listed do not apply to both, then the
specific responsibilities will be listed and titled. The contractors shall:
form part of the OHS Act.
their Appointed principal contractors within their working area, as contemplated by
section 37(2) of the OHS Act;
date of induction, relevant skills and licenses and be able to produce this list at the
request of the Project/Contract Manager.
responsibilities in terms of their appointment and that they advise and assist these
appointees in the execution of their duties.
requirements are complied with on all work sites.
their full participation and co-operation.
must be kept for each work site.
appointed sub-contractors’ files) health and safety file to the NTCSA AM Real Estate
project manager on completion of the project. This is to include all drawings, designs,
lists of materials used and other applicable information about the completed project,
as well as the list of sub- contractors, the agreement, and the type of work completed.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
copy of his/her Compensation Commissioner’s valid letter of good standing before the
commencement of work and any future renewal letters obtained during the project for
record-keeping purposes. The letter of good standing shall reflect the name of the
contractor’s company. Similarly, the Appointed principal contractor must provide the
Eskom project manager with all the valid letters of good standing from their sub-
contractors.
his/her Compensation Commissioner’s valid letter of good standing before the
commencement of work and any future renewal letters obtained during the project for
record-keeping purposes. The letter of good standing shall reflect the name of the
contractor’s company.
trained in the health and safety aspects relating to such work and that the employees
understand the hazards associated with all other work being carried out on the project.
they adhere to such procedures. Similarly (without removing the Appointed principal
contractors’ responsibilities), ensure that their sub-contractors and their employees are
conversant with all relevant work procedures and that they adhere to such procedures.
Co-ordinate the activities of all the sub-contractors in the interests of safety and health;
Ensure that potential contractors (whom they intend appointing) submitting tenders
have made detailed provision for the cost of safety and health measures throughout
the project.
in accordance with the health and safety plan or if such work poses a threat to the
health and safety of persons or a risk of degradation to the environment.
Take reasonable steps to ensure cooperation between all their sub-contractors.
Only appoint contractors to do work, if satisfied that the contractor has the necessary
competencies and resources to perform the work safely.
of all specified work throughout the contract period.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
Note 2: No work may commence and or continue without the presence of the appointed project
manager or project supervisor during performance of the contracted work.
the site for which such supervisor has been appointed for.
Note 3: In determining the number of appointed competent supervisors, the nature and scope of work
being performed, shall be taken into consideration.
Note 4: If a sufficient number of competent employee(s) have been appointed to assist the appointed
supervisor, the supervisor may supervise more than one site.
or dismiss employees, by virtue of the employee’s divulging health and safety
information or suspecting such information has been divulged, in the interests of health
and safety requirements;
contractor employees have transgressed any of the requirements of the health and
safety specification, safety and health plans, site rules or any other requirements.
of the public, and other contractors) present at work or in the vicinity of a construction
site against all risks that may arise from such site.
done by a competent person appointed in writing with a view to identify hazardous and
potentially hazardous work operations.
to the starting of any new task, irrespective of whether it is a repetitive task or not.
the project activity for which they are responsible.
NTCSA AM Real Estate’s behalf, with the relevant sections of the documented NTCSA
AM Real Estate’s SHE Specification.
plans if they meet all the requirements.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
the contract is in place and maintained.
conducted, person/man job specifications must be compiled and handed to the
occupational health practitioner.
employees. Medical assessments must be conducted by a registered Occupational
Health Practitioner or Occupational Doctor. During the pre-employment medical,
where employees will be required to work at heights, they will also be required to
undergo the required employee physical and psychological fitness examinations.
work, as well as the Appointed principal contractors, have received a health and safety
induction training session. Similarly, ensure that all visitors to site undergo the site’s
induction training.
their employees, inspect such equipment regularly and ensure recipients of PPE are
trained in the proper use, care and where necessary, the maintenance of PPE;
Note 5: should the Appointed principal contractor or his/her sub-contractors entertain visitors on site,
they will be held responsible for the provision and wearing PPE.
by law rehabilitate the environment.
the OHS Act.
on the work sites.
Note 6: Eskom will not tolerate the presence of anyone who is or who appears to be under the influence
of alcohol or any other intoxicating substance whilst performing work for them or on any work site.
respect to condition, use, care, storage, maintenance, and the management of these;
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
investigators.
Be involved in all of their contractor’s investigations.
When appointing contractors, advise the NTCSA’s Project Manager in writing
timeously and obtain his/her approval prior to them commencing work.
of induction, relevant skills and licenses and be able to produce this list at the request
of the NTCSA’s Project Manager.
Labour (DEL) as Electrical Installation Contractor and provide proof off.
2.5.2 Site/ Project Managers
Note 1: No work may commence and or continue without the appointed supervisor or site manager
during the performance of the contracted work.
new staff and site visitors;
Site Manager/ Project Manager shall be registered with SACPCMP
Communicate to all employees under their control on any hazardous and related work
procedures, before any work commences and thereafter, at such times as may be
determined by a risk assessment;
are complied with on all work sites;
poses a threat to the safety and health of persons or a risk of degradation to the
environment;
employees wear/use the PPE as instructed.
Inspect such PPE on a regular basis and record the inspections;
Ensure that all incidents are reported to the client and are investigated.
Be involved in all investigations that occur within their area of responsibility.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
contractor.
procedures and that they adhere to such procedures;
and prior to the starting of any new task, irrespective of whether it is a repetitive task.
Ensure that the team are involved in the abovementioned risk assessments;
well as confirming the requirements of the daily risk assessments;
of the public, and other contractors) present at work or in the vicinity of a construction
site against all risks that may arise from such site.
on, the premises / work sites and that no employee remains on site if he/she is under
the influence. Furthermore, report such instances to contract management;
with respect to condition, use, care, storage, maintenance, and the management of
these.
information or suspecting such information has been divulged, in the interests of health
and safety requirements (reference – section 26 of the OHS Act).
damage is done to the environment and that where an Environment Management Plan
is in place, then the plan adhere to the plan.
Stop any employee or contractor from performing work which is not in accordance with the
Appointed principal contractor’s and or contractors’ health and safety plan which poses a
threat to the health and safety of persons.
2.5.3 Contractor Site Supervisor or Contract Supervisor
Must:
Legal Liability, Hazard Identification and Risk Assessment and Incident Investigation
competent training and a 5 years supervision experience.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
NTCSA AM Real Estate requirements;
NTCSA AM Real Estate’s standards and specifications
action is in place.
for the elimination of unsafe acts by all people whilst on the project site.
in the first instance and thereafter the NTCSA AM Real Estate project manager in the
second instance relating to procedure requirements, non-conformances identified,
corrective actions, audits and inspection schedules.
AM Real Estate requirements;
employees.
procedures, work instructions and safety regulations issued by NTCSA AM Real
Estate:
relevant inspection reports.
Participate in all contractor incident investigations.
Participate in the Appointed principal contractor’s emergency preparedness planning.
Ensure that their own employees and those of any contractor are competent to perform
the tasks assigned.
the contractors deviate from safety requirements.
the SHE File and relevant documentation.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
2.5.4 Contractor Health and Safety Officer
ordinate the organisation’s safety effort on site.
Safety Management Diploma or an Environmental Health Diploma from recognised
institutions. Or a recognised safety certification (e.g., SAMTRAC – full course) with a
minimum of two years working experience.
The Safety Officer shall be registered with SACPCMP
Promote a SHE Culture within the organisations involved in the project / contract.
The contractor’s safety and health officer shall assist in the control of all health and
safety-related matters on the sites.
Be involved in the developing the project SHE Plan and SHE policy.
Be in constant liaison and cooperate with NTCSA AM Real Estate’s SHE professionals
responsible for providing them with a health and safety service.
contractor and is submitted to any contractors.
Conduct inspections of all work sites for the duration of the project.
Be involved in the organisations incident investigations when required.
Conduct organisational, site and visitor induction training.
Stop any employee or contractor from performing work which is not in accordance with
the Appointed principal contractor’s and or contractors’ health and safety plan which
poses a threat to the health and safety of persons.
as per the SHE Plan.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
3.1 Scope of work
The scope of work for this project entails:
PTM&C Section:
and replace with focus booths.
(straight desk) Open Area Currently space to also be fitted out with double door
credenzas / filling cupboards
Quality Management Section:
pause area create mall syndicate room to support Quality Management side of
building floor.
Electrical Installation:
ceiling lights to be LEDs. All the electrical work will follow design layout.
A Signed copy of the scope of works must be retained by the contractor.
Note: The contractor who will be awarded this contract will be known as the “Appointed principal
contractor” and any contractor appointed by the Appointed principal contractor will be known as the
“sub-contractor.
3.2 Legal Compliance
3.2.1 Section 37(2) (Legal) Agreement
A section 37(2) agreement must be signed between NTCSA AM Real Estate and the
Appointed principal contractor at the time of awarding the contract. The Appointed principal
contractor must ensure that a section 37(2) agreement is compiled between the Appointed
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
principal contractor and all their contractors for the contract. This agreement must be
submitted as part of the safety file package.
The original copy of the section 37(2) Agreement must be retained by the Appointed principal
contractor and a copy retained by the responsible Eskom NTCSA AM Real Estate project
manager.
Copies of all the agreements must form part of the respective contractor’s SHE File.
3.2.2 Site Access requirements
The Safety file package must be submitted to the OHS department 2 weeks before the
agreed site establishment date.
Before the successful Contractor commences with any work, the NTCSA AM Real Estate
Project Manager/Contract Manager shall ensure that;
person of the contracting company as well as the NTCSA AM Real Estate baseline
risk assessment.
Estate project manager/contract manager have signed the NTCSA AM Real
Estate section 37 (2) agreement.
Contract/Project Manager
approved by the Appointed principal contractor Responsible Person
the SHE Plan and accompanied by a risk assessment procedure applied. A
monitoring and review plan must form part of the risk assessment procedure
Appointed principal contractor must supply the applicable NTCSA AM Real Estate
SHE specifications to the contractor(s).
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
Contract/Project Manager, where the file meets all the requirements an
authorisation letter shall be issued to the Appointed principal contractor
attendance register as proof of communication before Eskom NTCSA OHS
department can provide Eskom NTCSA contractor induction.
must be trained to level 2 from SAQA approved training provider.
Covid-19 management plan in line with the guidelines as issued by the
Department of Employment and Labour
Department of Employment and Labour
masks over and above other masks that may be required due to the risk of the
activities
to the employees
frequency
3.2.3 Hazardous work by children (Child Labour)
The constitution of the Republic of South Africa, in the “Bill of Rights” is clear on the rights of
children, especially when it comes to:
being protected from exploitative labour practices;
not to be required or permitted to perform work or provide services that
i. are inappropriate for a person of that child’s age; or
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
ii. place at risk the child’s well-being, education, physical or mental health or spiritual,
moral or social development; and the Basic Conditions of Employment Act, Chapter
six Section 43 “Prohibition of employment of children”.
Before resorting to the use of child labour, due consideration must be given to the rights of the
child in terms of the constitution. Where work is being performed which is not prohibited in
terms of the constitution, then such work must be conducted in terms of the OHS Act
“Regulations on Hazardous Work by Children in South Africa” with emphasis on paragraph 2
Purpose and Interpretation. Eskom does not condone the use of child labour and therefore all
effort must be exercised and child labour should not be used.
3.2.4 Legal Compliance
The Appointed principal contractor and contractors shall have an up-to-date copy of the OHS
Act and regulations which will be available to all employees. The Appointed principal
contractor and all sub- contractors will comply with all the legislation pertaining to the issued
scope of work. The Appointed principal contractor and contractors shall have an up-to-date
copy of the OHS Act and regulations which will be available to all employees
3.2.5 Requirements Specific to the issued Scope of Work
The Engineering Space Optimization at NTCSA AM Real Estate falls under High risk in
terms of supplier category as workers in the vicinity are at an increased risk of exposure of
Working at Heights, and Electrical Installation and etc. therefore:
competent.
use of tools and equipment during installations and maintenance thereof.
proceeding with planned activities.
A relevant risk assessment and method statement to be developed and applied.
Employees must be medical fit to work at fall risk position.
Before the commencement of the activities the Appointed principal contractor to
ensure that all Isolations are done and lock out system is adhered to
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
including identification documents of the employees and their competency
certificates.
issued per risk based.
in possession of a site-specific fall protection plan developed by a competent person.
site.
(SAQCC) training certificates for their respective field of work and per the scope of
work
The SHE Plan shall contain the following as a minimum:
Relevant applicable legal and other requirements as per issued scope of work
Roles and responsibilities
Process for hazard identification and risk assessment including monitoring and review
plans, a further identification of opportunities must be part of the process. Interested
and affected parties must be clearly outlined.
Process for change management
Process for employee training, competency, communication, awareness and
participation
Process for incident management and investigation
Process for setting objectives and programmes
Process in place to review the SHE Plan
Process for performance management and monitoring
Process for internal audits
Process for document and records management
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
and when required by the client) to ensure that it fully addresses all the issues and
complies with these requirements to the satisfaction of the client.
3.3 Coid
The Appointed principal contractor and all his/her sub-contractors shall be registered with an
appropriate employment compensation commissioner and have available a valid letter of good
standing (LoG) from such commissioner. The obligation lies with the contractors to ensure that
the LoG remain valid throughout the contract period. A copy of the LoG must be filed in the
contractor SHE files.
3.4 Costing for SHE within the Project
The SHE costing must be itemised and must take into consideration the scope of work. The
Appointed principal contractor must make sure that he/she made adequate provision for the
cost of health and safety measures during tendering process. The SHE cost must exclude
the tools of the trade and PPE.
3.5 Eskom Life-saving Rules
who performs work for Eskom in Eskom adopt the same view.
agents, consultants, and contractors. Failure to adhere to these rules by any Eskom
employee or employee of an Appointed principal contractor or contractor will be
considered a serious transgression. These rules are being implemented to prevent
serious injury or death of any employee, labour broker or contractor working in any
area within Eskom.
of any product), then the rules shall be obeyed by any contractor and their employees.
The rules are:
Rule description of rule
Open, isolate, test, earth and create an equipotential zone
Rule 1
Before touch
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
With the aim to ensure a safe electrical work environment, no person may work/operate
on, around or near any electrical network, line or apparatus, electrically connected to
the power system and/or electrically charged and/or not electrically charged.
Hook up at heights
Rule 2 Working at height is defined as any work performed above a stable work surface or
where a person puts himself/herself in a position where he/she exposes himself/herself
to a fall from or into.
Buckle up
Rule 3 No person may drive any vehicle on Eskom business and/or on Eskom premises:
Unless the driver and all passengers are wearing seat belts.
Be sober
Rule 4 No person is allowed to be under the influence of intoxicating liquor or drugs while on
duty
Permit to work
Rule 5 Where an authorisation limitation exists, no person shall work without the required
permit to work.
Ensure safe live working
To ensure safe live work, each live worker shall:
Rule 6
Ensure all live work basic principles are adhered to, as outlined (for the method being
used) in the High Voltage Live Working Standard for the respective division.
Eskom will take a stance of zero tolerance on these rules.
Non-compliance to a Life Saving rule will be considered serious misconduct and will lead to
serious disciplinary action, which may include dismissal.
This is to ensure that every person who works on or visits an Eskom returns home safely
to his or her family.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
3.6 Substance Abuse
industrial incidents and the driving of vehicles. Eskom is therefore, entitled to take
reasonable steps to ensure that intoxicated persons are identified and prevented from
entering Eskom.
General Safety Regulation 2A is clear on the legal stance regarding intoxication.
The alcohol and drug permissible level is 0%.
All contractors shall comply with Eskom’s procedure 32-37 (“Substance Abuse
Procedure”), taking in to account that this is an Eskom Life-saving Rule number 4: BE
SOBER”), this means anyone entering the Eskom will be subjected to ad hoc alcohol
testing.
alcohol testing of their own employees. The legislative alcohol level is deemed to be
zero.
file.
3.7 Risk assessment (refer sec 8 & 9 of the OHS Act)
The contract manager must prepare and provide a Baseline Risk Assessment for an intended
work as per the scope of work to the contractor as part of the contract package that gives an
overview of identified hazards and mitigation is the work area where this scope of work will be
executed.
The Appointed principal contractor shall develop a Risk Assessment in line with Section 8
(2)(d) of the OHS Act, in alignment to Eskom 32-520 procedure. Emerging risks and hazards
must be managed during the duration of the contract. This means that if there are significant
changes to a process or activity, or any new process, then these should also be subjected to
risk assessment. All risks must be rated. Activity based risk assessments shall be conducted
by a competent person of the Appointed principal contractor.
3.8 Fire Equipment and maintenance
a. Be clearly labelled
b. Conspicuously numbered
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
c. Entered in a register
d. Inspected monthly by a competent person
Tested and serviced at recommended intervals by an accredited supplier
Results entered in the register and signed by competent person.
3.9 First Aid and Equipment
The requirements of the OHS Act GSR 3 must be observed.
First aid appointments must be made to meet the requirements. Appointees must be
trained to level 2. It is good practice for all employees to be trained to at least level 1.
box(es) at or near the working area.
type of work performed, the distance teams are working apart and the terrain to be
covered if an emergency should arise.
accessible for all employees.
employees are familiar with the emergency numbers.
every 50 or team of workers on site or part thereof, taking into account the type of work
performed and the distance between teams.
must be available and accessible for the immediate treatment of injured persons at the
workplace.
name and contact details of the First Aider of such first aid box or boxes shall be
erected.
arrangements be made for incidents occurring after working hours
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
3.10 SHE Communication Systems
Appointed principal contractor/s and their contractors must develop a communication
procedure outlining how they intend to communicate SHE issues to their staff, the mediums
they will employ and how they will measure the effectiveness of there SHE communication.
Communications shall include:
were part of the talks.
completion of the task.
3.10.1 Tool box talks / Daily team talks / pre job meetings
personnel associated with the work task in attendance. The job, relevant procedures,
associated hazards, safety measures, i.e., the task risk assessments shall be
discussed. Each employee who attends the briefing shall sign an attendance list of that
pre-job brief form undertaking that they have an understanding of the tasks, risks and
control measures required.
3.11 SHE Training
indicating all met training requirements in relation to the scope of work
the SHE File.
3.11.1 Induction training
and their employees have undergone the NTCSA AM Real Estate Safety induction
training prior to commencing work on site.
indicate that they have received and understood the induction training.
employment medical examination and found fit for duty. A copy of the certificate of
fitness must be kept in the SHE File on site for the duration of the project.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
All employees and visitors on site shall carry the proof of induction training.
All contractor employees must attend the Appointed principal contractor induction
3.11.2 Site specific induction training
The Appointed principal contractor shall ensure that all his / her employees and contractor
employees undergo site specific work induction with regard to the approved project SHE Plan,
general hazards prevalent on site, risk assessment, rules and regulations, and other related
aspects. Records of site-specific induction must be kept in the safety file
The induction training should also include identification of sensitive features such as
wetlands/vlei areas, red data species, graves, etc.
3.11.3 Visitors to site induction
contractor’s site-specific safety induction prior to being allowed access to site.
properly inducted. No visitors are permitted to undertake any work onsite, of any
nature.
Visitors who have completed site induction must be provided with a record of proof of Induction
training.
3.11.4 Requirements for Drivers
access to laydown area/site.
condition and a vehicle license must be valid at all times.
Contractor vehicles can be subject to inspections by the contract/project manager
Vehicles which are not roadworthy will not be permitted to be used on site.
Precautions shall be taken to secure all loads properly. Loads projecting from vehicles
shall be securely loaded and in daytime a red flag and during darkness a red light or
red reflective material shall be attached to the extreme end of such projecting material.
All vehicles must be fitted with fire extinguisher and first aid kit
The driver must have a valid national licence for the type of vehicle used.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
559 - 1798201935 Rev 1
FOR Identifier
ENGINEERING BUILDING SPACE Effective
16 April 2026
OPTIMIZATION Date
Review Date 16 April 2029
The driver must have level 1 first aid training and basic fire extinguisher training
It is the responsibility of the driver to ensure:
Their passengers wear seat belts whilst the vehicle is in motion.
Comply with all traffic road rules, safety, direction and speed signs.
Ensure that vehicle loads are properly secured prior to moving off.
Ensure that vehicles are not overloaded.
No drivers or operators may text, talk on cell phones or two-way radios whilst driving,
unless a hands-free kit is used.
All drivers of such vehicles are to have valid medical fitness certificates.
Drivers of light vehicles must avoid stopping or parking in the vicinity of machines. At
least 30 (thirty) meters must be left clear between such a vehicle and such a machine
by them.
3.12 Housekeeping and Order
vehicles for the duration of the project.
Prompt disposal of waste materials, scrap and rubbish is essential.
Materials/objects shall not be left unsecured in elevated areas –falling objects may
cause serious injuries/fatalities.
Nails protruding through timber shall be bent over or removed so as not to cause injury.
All packaging material including boxes, pallets, crates, etc. to be removed from the
work area immediately.
area of all materials, scrap, temporary buildings and building bases to the satisfaction
of the client/agent.
compromising safety and cleanliness, anyone has the responsibility to bring it to the
attention of the Appointed principal contractor in the first instance and the Eskom
project/site manager in the second instance.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, NTCSA SOC Ltd,
Reg No 2021/539129/30.
of 50
Quality Management
Source: Final SHEQ specification Engineering Space Optimization Rev 1.pdfReview Date 16 April 2029
3.17 Smoking ........................................................................................................................... 38
3.18 Cellular Phones .............................................................................................................. 38
3.19 General Requirements as per the cellular phone usage generation directive ...... 38
3.20 Medicals .............................................................................................................................. 38
3.21 Personal Protective Equipment Requirements .......................................................... 42
3.22 Incident Investigation ..................................................................................................... 42
3.23 Emergency Management .............................................................................................. 43
3.24 Non-Conformance and Compliance ............................................................................ 43
3.25 Work Stoppage ............................................................................................................... 44
3.26 Hours of Work ................................................................................................................. 44
3.26.1 Normal work .................................................................................................................... 44
3.26.2 Night work ....................................................................................................................... 44
3.26.3 Overtime ...................................................................................................................... 45
3.29. Environmental Requirements ....................................................................................... 45
3.29.1 Environmental Rules ...................................................................................................... 45
3.29.2 Contract Award Documentation ................................................................................... 46
3.29.3 Records to be kept onsite ............................................................................................. 47
3.30. Quality Requirements .................................................................................................... 48
3 Acceptance .................................................................................................................................. 49
4 Revisions ..................................................................................................................................... 49
Review Date 16 April 2029
[20] SANS 17025:2017 Requirements for Testing and Calibration Laboratories
[21] SANS 204:2011 Energy efficiency in buildings.
[22] SANS 10400-XA:2011 Energy usage in buildings.
2.2.2 Informative
[1] Tobacco Products Control Act (Updated 2011.05.19)
[2] National Building Regulations and Building Standard Act No. Constitution
of the Republic of South Africa No
DEL Department of Employment and Labour (Inspection and Enforcement
services – Provincial office)
in the first instance and thereafter the NTCSA AM Real Estate project manager in the
second instance relating to procedure requirements, non-conformances identified,
corrective actions, audits and inspection schedules.
relevant inspection reports.
authorisation letter shall be issued to the Appointed principal contractor
attendance register as proof of communication before Eskom NTCSA OHS
department can provide Eskom NTCSA contractor induction.
must be trained to level 2 from SAQA approved training provider.
Covid-19 management plan in line with the guidelines as issued by the
industrial incidents and the driving of vehicles. Eskom is therefore, entitled to take
reasonable steps to ensure that intoxicated persons are identified and prevented from
entering Eskom.
General Safety Regulation 2A is clear on the legal stance regarding intoxication.
The alcohol and drug permissible level is 0%.
All contractors shall comply with Eskom’s procedure 32-37 (“Substance Abuse
Procedure”), taking in to account that this is an Eskom Life-saving Rule number 4: BE
SOBER”), this means anyone entering the Eskom will be subjected to ad hoc alcohol
testing.
alcohol testing of their own employees. The legislative alcohol level is deemed to be
zero.
file.
3.7 Risk assessment (refer sec 8 & 9 of the OHS Act)
Compliance Requirements
Source: Final SHEQ specification Engineering Space Optimization Rev 1.pdf (unknown)No specific requirements found
B-BBEE Minimum Level: 2
Health & Safety
Source: Final SHEQ specification Engineering Space Optimization Rev 1.pdfEskom NTCSA’s Project Manager Eskom NTCSA’s SHEQ Officer
Mangaka Magaoga Name: ____________________________Sakhi Nkebe Name: ________________________
Signature: ________________________ Signature: _____________________
Date: _____________________________23/04/2026 Date: ________________________24/04/2026
Eskom NTCSA’s Environmental Officer Eskom NTCSA’s Snr SHEQ Advisor
Name: __________________________Tshegofatso Nnene Name: Albert_______________________Shai
Signature: _______________________ Signature: ______________________
Date: ___________________________24 April 2026 Date: __________________________24/04/2026
Review Date 16 April 2029
Content . Introduction .................................................................................................................................... 5
2.1 Scope .......................................................................................................................................... 5
2.1.1 Purpose ................................................................................................................................ 5
2.1.2 Applicability ......................................................................................................................... 6
2.2 Normative/Informative References ......................................................................................... 6
2.2.1 Normative ............................................................................................................................ 6
2.2.2 Informative ........................................................................................................................... 7
2.3 Definitions ................................................................................................................................... 8
2.4 Abbreviations ............................................................................................................................ 10
2.5 Roles and Responsibilities ..................................................................................................... 11
2.5.1 Appointed principal contractors and sub- contractors ................................................ 11
2.5.2 Site/ Project Managers .................................................................................................... 15
2.5.3 Contractor Site Supervisor or Contract Supervisor ..................................................... 16
2.5.4 Contractor Health and Safety Officer ............................................................................ 18
3.1 Scope of work........................................................................................................................... 19
3.2 Legal Compliance .................................................................................................................... 19
3.2.1 Section 37(2) (Legal) Agreement ................................................................................... 19
3.2.2 Site Access requirements ............................................................................................... 20
3.2.3 Hazardous work by children (Child Labour) ................................................................. 21
3.2.4 Legal Compliance ............................................................................................................. 22
3.2.5 Requirements Specific to the issued Scope of Work .................................................. 22
3.3 Coid..................................................................................................................................... 24
Review Date 16 April 2029
3.4 Costing for SHE within the Project .................................................................................. 24
3.5 Eskom Life-saving Rules ................................................................................................... 24
3.6 Substance Abuse ............................................................................................................... 26
3.7 Risk assessment (refer sec 8 & 9 of the OHS Act) ....................................................... 26
3.8 Fire Equipment and maintenance .................................................................................... 26
3.9 First Aid and Equipment .................................................................................................... 27
3.10 SHE Communication Systems ..................................................................................... 28
3.12.1 Tool box talks / Daily team talks / pre job meetings ................................................. 28
3.11 SHE Training ................................................................................................................... 28
3.13.1 Induction training ............................................................................................................ 28
3.13.2 Site specific induction training ...................................................................................... 29
3.13.3 Visitors to site induction ................................................................................................ 29
3.13.4 Requirements for Drivers .............................................................................................. 29
3.12 Housekeeping and Order .............................................................................................. 30
3.14.1 Stacking ........................................................................................................................... 31
3.13 Workplace Signage and Colour Coding ...................................................................... 31
3.14 Tools and Equipment ..................................................................................................... 32
3.14.1 Hand tools ....................................................................................................................... 32
3.15 Ladders ............................................................................................................................ 33
3.15.1 Working at Heights ......................................................................................................... 34
3.15.2 Fall Protection Plan ........................................................................................................ 35
3.15.3 Safe Work Procedures / Method Statements ............................................................ 35
3.16 Auditing ............................................................................................................................ 37
3.16.1 Approval and compliance of Appointed principal contractor SHE Plan ................. 37
3.16.2 Eskom SHE audits ......................................................................................................... 37
3.16.3 Contractor audits ............................................................................................................ 37
Review Date 16 April 2029
This SHE specification is National Transmission Company of South Africa (NTCSA) Asset
Management Real Estate’s minimum requirements which are required to be met for the
specific contract and for the duration of the contract period by contractors and where required,
the delivery organisations.
of work and this SHE Specification. National Transmission Company of South Africa
(NTCSA) AM Real Estate in no way assumes the contractor’s legal responsibilities. The
contractor is and remains accountable for the quality and the execution of his/her
health and safety programme for his/her employees and Appointed principal contractor
employees.
encompassing.
Note 1: All the requirements listed hereunder are in relation to the contract and do not
supersede or replace any organizational SHE requirements
following paragraphs.
2.2.1 Normative
[1] Basic Conditions of Employment Act No .
[2] Occupational Health and Safety Act and Regulations No .
[3] National Environmental Management Act .
[4] National Environmental Management Waste Act 59 2008
[5] 32-37 Eskom Substance Abuse Procedure.
[6] 32-726 Contract and Contractor Occupational Health and Safety Management Standard
[7] 240-62196227 Life- saving Rules
[8] 32-95 Occupational Health and Safety Incident Management Procedure
[9] 32-727 SHEQ Policy
[10] 32- 418 Working at Heights Procedure
[11] 240-62946386 Vehicle and Driver Safety Management Procedure
[12] 32-520 Risk Assessment procedure
[13] Plant Safety Regulations.
[14] ISO 9001: 2015 Quality management system
[15] 39-71 Quality Control Plan and contact Quality Control Plan Approval Standard
[16] ISO 45001: 2018 Occupational health and safety management system
[17] Eskom program for Reintegration and return to work of employees, during the COVID
19 pandemic, Revision 30043030-V04
[18] ISO 14001:2015 Environmental Management System
[19] SANS 10400 The application of the National Building Regulations – All Parts.
Baseline risk (32-520) baseline operational risks refer to the health and safety risks
assessment associated with all standard processes and routine activities in the
business
Employee (OHS Act) means, subject to the provisions of subsection (2), any
person who is employed by or works for an employer and who
receives or is entitled to receive any remuneration or who works
under the direction or supervision of an employer or any other person
Employer (OHS Act) means, subject to the provisions of subsection (2), any
person who employs or provides work for any person and
remunerates that person or expressly or tacitly undertakes to
remunerate him/her, but excludes a TES (labour broker) as defined in
section 1(1) of the Labour Relations Act 1956 (Act No. )
Environment (32-94) means:
a. the land, water, and atmosphere of the earth;
b. micro-organisms and plant and animal life; and
c. any part or combination of (a) and (b) and the interrelationships
among and between them, and the physical, chemical, aesthetic,
and cultural properties and conditions of the foregoing that
influence human health and well-being
Fall protection plan (OHS Act) means a documented plan of all risks relating to working
from an elevated position, considering the nature of work undertaken,
and setting out the procedures and methods to be applied in order to
eliminate the risk
Health and safety (OHS Act) means a document specification of all health and safety
specification requirements pertaining to associated to a contract, so as to ensure
the health and safety of persons.
Lifesaving Rules (240-62196227) a rule that, if not adhered to, has the potential to
cause serious harm to people
Medical Certificate of (OHS Act) means a certificate valid for one year, issued by an
fitness occupational health practitioner, issued in terms of the regulations,
whom shall be registered with the Health Professions Council of
Method statement (OHS Act) means a written document detailing the key activities to be
performed in order to reduce, as reasonably as practicable, the
hazards identified in any risk assessment
Appointed principal (In the text of this document) Means an employer, as defined in
contractor section 1 of the OHS Act, who intends to tender for or has signed a
contract with Eskom for services rendered.
Risk assessment (OHS Act) means a programme to determine any risk associated with
any hazard at a construction site in order to identify the steps needed
to be taken to remove, reduce, or control such hazard.
their full participation and co-operation.
must be kept for each work site.
appointed sub-contractors’ files) health and safety file to the NTCSA AM Real Estate
project manager on completion of the project. This is to include all drawings, designs,
lists of materials used and other applicable information about the completed project,
as well as the list of sub- contractors, the agreement, and the type of work completed.
trained in the health and safety aspects relating to such work and that the employees
understand the hazards associated with all other work being carried out on the project.
they adhere to such procedures. Similarly (without removing the Appointed principal
contractors’ responsibilities), ensure that their sub-contractors and their employees are
conversant with all relevant work procedures and that they adhere to such procedures.
Co-ordinate the activities of all the sub-contractors in the interests of safety and health;
Ensure that potential contractors (whom they intend appointing) submitting tenders
have made detailed provision for the cost of safety and health measures throughout
the project.
in accordance with the health and safety plan or if such work poses a threat to the
health and safety of persons or a risk of degradation to the environment.
or dismiss employees, by virtue of the employee’s divulging health and safety
information or suspecting such information has been divulged, in the interests of health
and safety requirements;
contractor employees have transgressed any of the requirements of the health and
safety specification, safety and health plans, site rules or any other requirements.
of the public, and other contractors) present at work or in the vicinity of a construction
site against all risks that may arise from such site.
done by a competent person appointed in writing with a view to identify hazardous and
potentially hazardous work operations.
NTCSA AM Real Estate’s behalf, with the relevant sections of the documented NTCSA
AM Real Estate’s SHE Specification.
plans if they meet all the requirements.
conducted, person/man job specifications must be compiled and handed to the
occupational health practitioner.
work, as well as the Appointed principal contractors, have received a health and safety
induction training session. Similarly, ensure that all visitors to site undergo the site’s
induction training.
their employees, inspect such equipment regularly and ensure recipients of PPE are
trained in the proper use, care and where necessary, the maintenance of PPE;
Note 5: should the Appointed principal contractor or his/her sub-contractors entertain visitors on site,
they will be held responsible for the provision and wearing PPE.
on the work sites.
Note 6: Eskom will not tolerate the presence of anyone who is or who appears to be under the influence
of alcohol or any other intoxicating substance whilst performing work for them or on any work site.
procedures, before any work commences and thereafter, at such times as may be
determined by a risk assessment;
poses a threat to the safety and health of persons or a risk of degradation to the
environment;
employees wear/use the PPE as instructed.
and prior to the starting of any new task, irrespective of whether it is a repetitive task.
Ensure that the team are involved in the abovementioned risk assessments;
well as confirming the requirements of the daily risk assessments;
of the public, and other contractors) present at work or in the vicinity of a construction
site against all risks that may arise from such site.
on, the premises / work sites and that no employee remains on site if he/she is under
the influence. Furthermore, report such instances to contract management;
with respect to condition, use, care, storage, maintenance, and the management of
these.
information or suspecting such information has been divulged, in the interests of health
and safety requirements (reference – section 26 of the OHS Act).
Appointed principal contractor’s and or contractors’ health and safety plan which poses a
threat to the health and safety of persons.
2.5.3 Contractor Site Supervisor or Contract Supervisor
Must:
procedures, work instructions and safety regulations issued by NTCSA AM Real
the contractors deviate from safety requirements.
the SHE File and relevant documentation.
Review Date 16 April 2029
2.5.4 Contractor Health and Safety Officer
ordinate the organisation’s safety effort on site.
institutions. Or a recognised safety certification (e.g., SAMTRAC – full course) with a
minimum of two years working experience.
safety-related matters on the sites.
responsible for providing them with a health and safety service.
the Appointed principal contractor’s and or contractors’ health and safety plan which
poses a threat to the health and safety of persons.
as per the SHE Plan.
and replace with focus booths.
(straight desk) Open Area Currently space to also be fitted out with double door
credenzas / filling cupboards
Review Date 16 April 2029
principal contractor and all their contractors for the contract. This agreement must be
submitted as part of the safety file package.
The original copy of the section 37(2) Agreement must be retained by the Appointed principal
contractor and a copy retained by the responsible Eskom NTCSA AM Real Estate project
manager.
Copies of all the agreements must form part of the respective contractor’s SHE File.
3.2.2 Site Access requirements
The Safety file package must be submitted to the OHS department 2 weeks before the
agreed site establishment date.
Project Manager/Contract Manager shall ensure that;
person of the contracting company as well as the NTCSA AM Real Estate baseline
risk assessment.
The responsible person of the contracting company and the NTCSA AM Real
The SHE Plan must be discussed and accepted by the Contract Manager and
approved by the Appointed principal contractor Responsible Person
the SHE Plan and accompanied by a risk assessment procedure applied. A
monitoring and review plan must form part of the risk assessment procedure
SHE specifications to the contractor(s).
masks over and above other masks that may be required due to the risk of the
activities
to the employees
frequency
3.2.3 Hazardous work by children (Child Labour)
The constitution of the Republic of South Africa, in the “Bill of Rights” is clear on the rights of
children, especially when it comes to:
being protected from exploitative labour practices;
not to be required or permitted to perform work or provide services that
i. are inappropriate for a person of that child’s age; or
child in terms of the constitution. Where work is being performed which is not prohibited in
terms of the constitution, then such work must be conducted in terms of the OHS Act
“Regulations on Hazardous Work by Children in South Africa” with emphasis on paragraph 2
competent.
use of tools and equipment during installations and maintenance thereof.
proceeding with planned activities.
A relevant risk assessment and method statement to be developed and applied.
Employees must be medical fit to work at fall risk position.
Before the commencement of the activities the Appointed principal contractor to
ensure that all Isolations are done and lock out system is adhered to
Review Date 16 April 2029
including identification documents of the employees and their competency
certificates.
issued per risk based.
in possession of a site-specific fall protection plan developed by a competent person.
site.
(SAQCC) training certificates for their respective field of work and per the scope of
work
The contractor to provide first aider level 2 SAQA competent person.
Relevant applicable legal and other requirements as per issued scope of work
Roles and responsibilities
Process for hazard identification and risk assessment including monitoring and review
plans, a further identification of opportunities must be part of the process. Interested
and affected parties must be clearly outlined.
Process for change management
Process for employee training, competency, communication, awareness and
participation
Process for incident management and investigation
Process for setting objectives and programmes
Process in place to review the SHE Plan
Process for performance management and monitoring
Process for internal audits
Process for document and records management
Review Date 16 April 2029
and when required by the client) to ensure that it fully addresses all the issues and
complies with these requirements to the satisfaction of the client.
3.3 Coid
appropriate employment compensation commissioner and have available a valid letter of good
standing (LoG) from such commissioner. The obligation lies with the contractors to ensure that
the LoG remain valid throughout the contract period. A copy of the LoG must be filed in the
contractor SHE files.
3.4 Costing for SHE within the Project
cost of health and safety measures during tendering process. The SHE cost must exclude
the tools of the trade and PPE.
3.5 Eskom Life-saving Rules
Rule 2 Working at height is defined as any work performed above a stable work surface or
where a person puts himself/herself in a position where he/she exposes himself/herself
to a fall from or into.
work as per the scope of work to the contractor as part of the contract package that gives an
overview of identified hazards and mitigation is the work area where this scope of work will be
executed.
The Appointed principal contractor shall develop a Risk Assessment in line with Section 8
(2)(d) of the OHS Act, in alignment to Eskom 32-520 procedure. Emerging risks and hazards
must be managed during the duration of the contract. This means that if there are significant
changes to a process or activity, or any new process, then these should also be subjected to
risk assessment. All risks must be rated. Activity based risk assessments shall be conducted
by a competent person of the Appointed principal contractor.
3.8 Fire Equipment and maintenance
a. Be clearly labelled
b. Conspicuously numbered
type of work performed, the distance teams are working apart and the terrain to be
covered if an emergency should arise.
employees are familiar with the emergency numbers.
every 50 or team of workers on site or part thereof, taking into account the type of work
performed and the distance between teams.
Review Date 16 April 2029
3.10 SHE Communication Systems
procedure outlining how they intend to communicate SHE issues to their staff, the mediums
they will employ and how they will measure the effectiveness of there SHE communication.
were part of the talks.
completion of the task.
3.10.1 Tool box talks / Daily team talks / pre job meetings
personnel associated with the work task in attendance. The job, relevant procedures,
associated hazards, safety measures, i.e., the task risk assessments shall be
discussed. Each employee who attends the briefing shall sign an attendance list of that
pre-job brief form undertaking that they have an understanding of the tasks, risks and
control measures required.
3.11 SHE Training
the SHE File.
3.11.1 Induction training
and their employees have undergone the NTCSA AM Real Estate Safety induction
training prior to commencing work on site.
employment medical examination and found fit for duty. A copy of the certificate of
fitness must be kept in the SHE File on site for the duration of the project.
employees undergo site specific work induction with regard to the approved project SHE Plan,
general hazards prevalent on site, risk assessment, rules and regulations, and other related
aspects. Records of site-specific induction must be kept in the safety file
contractor’s site-specific safety induction prior to being allowed access to site.
properly inducted. No visitors are permitted to undertake any work onsite, of any
nature.
Review Date 16 April 2029
compromising safety and cleanliness, anyone has the responsibility to bring it to the
attention of the Appointed principal contractor in the first instance and the Eskom
project/site manager in the second instance.
Section
Source: Final SHEQ specification Engineering Space Optimization Rev 1.pdf3.30. Quality Requirements .................................................................................................... 48
contractor is and remains accountable for the quality and the execution of his/her
Description
Source: PAYE Questionnaire for Service Contracts 2026_2027.docEskom Holdings SOC Ltd Registration Number 2002/015527/00
Evaluation Criteria
Source: PAYE Questionnaire for Service Contracts 2026_2027.doc (unknown)The questionnaire is applicable to all contractors (individuals, companies, close corporations, trusts) providing services or labour to Eskom Group of Companies. There is no specific eligibility criteria beyond being a potential or current contractor. The questionnaire is used to determine tax classification, not to assess technical capability.
Technical Specifications
Source: PAYE Questionnaire for Service Contracts 2026_2027.doc (unknown)Eskom Holdings SOC Ltd Registration Number 2002/015527/00
Compliance Requirements
Source: PAYE Questionnaire for Service Contracts 2026_2027.doc (unknown)No specific requirements found
Compliance Requirements
Source: Engineering Building Final 02.pdf (unknown)Insufficient searchable text - AI extraction recommended
Important Dates
Source: Contract and Contractor OHS Management.pdf (unknown){"closingDate":"18 May 2021","briefingSession":"{"date":null,"time":null,"venue":"ion and briefing ........................................................................................... 14","is_compulsory":false}"}
Contact Information
Source: Contract and Contractor OHS Management.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"gers (contract custodians), line management, suppliers, and OHS professionals underlining"}
Evaluation Criteria
Source: Contract and Contractor OHS Management.pdf (unknown)Suppliers must be registered on Eskom's vendor database and must pass mandatory and functionality evaluations, including an OHS functionality threshold of 70%. They must demonstrate compliance with OHS legislation and Eskom's requirements, provide valid OHS documentation, and have the necessary competencies and resources for the scope of work. For construction work, they must be registered with the SACPCMP (for CHSA) and the Compensation Fund. Non-responsive suppliers (those failing to submit required OHS documents within specified timelines) may be disqualified.
Technical Specifications
Source: Contract and Contractor OHS Management.pdf (unknown)Eskom is committed to creating and sustaining the Zero Harm value and standard of Occupational,
Hygiene and Safety (OHS). Achieving the OHS requirements will be integrated into the Eskom
procurement and supply chain processes.
This standard sets the minimum criteria for managing supplier OHS compliance and conformity
based on standards, procedures, policies, and legal obligations with which an Eskom
supplier/contractor needs comply from inception to completion of the contract/transaction.
2.1 Scope
This standard outlines the key responsibilities of procurement professionals, contract/project
managers (contract custodians), line management, suppliers, and OHS professionals underlining
the minimum OHS requirements that shall be addressed during the following phases, namely:
a) Project initiation and briefing, concept and feasibility study, design development;
b) Tender enquiry, evaluation, and contract award;
c) Supplier registration on the Eskom vendor database;
d) Site access/mobilisation;
e) Monitoring of performance during the contract execution period;
f) Contract completion, closeout, and post contract review; and
g) Instances where works or services under a contract can be stopped, suspended, or terminated.
2.1.1 Purpose
The purpose of this document is to guide Eskom employees when performing OHS-related
activities beginning from the procurement and supply chain process to the end of the
contract/transaction. To ensure standardisation of the OHS requirements within Eskom contract
and contractor OHS management as is reasonably practicable.
2.1.2 Applicability
The requirements contained in this document shall apply throughout Eskom Holdings SOC Ltd, its
divisions, subsidiaries, and entities in which Eskom has a controlling interest or influence.
2.1.3 Effective date
Effective from date of authorisation.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
2.2 Normative/Informative references
Parties using this document shall apply the most recent edition of the reference documents listed in
the following paragraphs.
2.2.1 Normative
[1] 32-727 Eskom Safety, Health, Environmental and Quality Policy
[2] 32-1034 Eskom’s Procurement and Supply Chain Management Procedure
[3] 32-196 Eskom Disciplinary Code Standard
[4] 240-62196227 Eskom Life-Saving Rules Standard
[5] National Environmental Management: Waste Act
[6] Occupational Health and Safety Act and Regulations
2.2.2 Informative
[1] 32-520 Occupational Health and Safety Risk Assessment Procedure
[2] ISO 9001 Quality Management Systems
[3] 32-95 Environmental, Occupational Health, and Safety Incident Management Procedure
[4] Compensation for Occupational Injuries and Diseases Act
[5] OHSAS 18001 Occupational Health and Safety Management Systems
[6] ISO 14001 Environmental Management Systems
[7] Mine Health and Safety Act
[8] The Constitution of the Republic of South Africa, 1996
[9] National Environmental Management Act
[10] Environment Conservation Act
[11] National Water Act
[12] National Environmental Management: Waste Act
[13] National Environmental Management: Air Quality Act
[14] National Forests Act
[15] National Environmental Management: Biodiversity Act
[16] National Environmental Management: Protected Areas Act
[17] National Heritage Resources Act
[18] National Veld and Forest Fire Act
[19] Conservation of Agricultural Resources Act
[20] 32-136 Eskom Contractor Health and Safety Requirements Standard
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
2.3 Definitions
Definition Explanation
Business unit A division, site, grid, operational unit, or project within, for, or on behalf
of, Eskom Holdings SOC Ltd.
An agreement with specific terms between two or more persons or
Contract entities in which there is a promise to do something in return for a
valuable benefit known as consideration/ payment.
Contract custodian The person defined in a contract as the Eskom representative, for
example, the project manager/end user, that is, the person
responsible for managing the contract and ensuring that the works or
services are executed in terms of the contract.
Contract management It is a process of managing contract creation, execution and analysis
in order to maximise operational performance and mitigate legal
ramifications, reducing financial risk at an organization. The art and
science of managing a contractual agreement throughout the contract
life cycle.
Contractual Contractual requirements consist of legal and other OHS requirements
requirements for OHS for procuring goods and/or services to be rendered for/on behalf of
Eskom. These are OHS documents required from tenderers at the
procurement phase (enquiry, evaluation, negotiation meeting and
contract award) and only tenderers that have met the mandatory and
functionality threshold will be evaluated.
Construction health A person who is registered as such in terms of the Project and
and safety agent Construction Management Profession Act, as amended.
(CHSA) Any competent person who acts as a representative for a client in
managing health and safety on a construction project for the client and
who has satisfied the registration criteria of the SACPCMP to perform
the required functions.
Competent person A person who, in respect to the work that has to be done, has the
required training, knowledge, and experience, and, where applicable,
qualification relevant to perform that work or task, provided that where
appropriate qualifications and training are registered in terms of the
provisions of the National Qualifications Framework Act ,
those qualifications and training are regarded as the required
qualifications and training, and is familiar with the Act and applicable
regulations made under the Act.
Contractor A contractor is a current or potential supplier, vendor, consultant, or
service provider. A contractor/supplier may be a natural or legal
person.
Environment The surroundings within which humans exist.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
Definition Explanation
Health and Safety A site-specific plan that forms part of the project safety file containing
plan minimum requirements as defined in the OHS Act as well as the
Eskom OHS requirements.
OHS requirements Requirements prescribed in the applicable OHS legislation, SANS
codes, municipal by-laws, and Eskom OHS requirements.
Safety, health and An act, event, initiative, or campaign that is intended to alter the
environmental current levels of OHS awareness, knowledge and/or performance in
intervention the organisation, a specific division, operating unit, or business unit.
OHS professional The key individual in Eskom charged with OHS responsibilities, such
as OHS managers, officers, advisors, and co-ordinators (for this
purpose, the OHS individual allocated to the project/programme). An
OHS professional should not be confused with a health and safety
representative, as defined in sections 17 and 18 of the OHS Act.
OHS functional head The manager in Eskom charged with OHS responsibilities in a
division/operating unit/business unit.
Site An Eskom department, a specific project site, or the site where a
supplier provides a service to Eskom, directly or indirectly.
Tender An open or closed competitive request for quotations/prices against a
clearly defined scope/specification.
Transaction Exchange of goods or services or money between a buyer and a
seller.
2.4 Abbreviations
Abbreviation Explanation
BRA baseline risk assessment
CHSA Construction health and safety agent
COIDA Compensation for Occupational Injuries and Diseases Act
DE Divisional executive
DEL Department of Employment and Labour
DMR Department of Mineral Resources
EMP Environmental Management Programme
ESR Environmental status rating
ISO International Organization for Standardization
MTC Multidisciplinary committee
OHS Occupational hygiene and safety
ORHVS Operating Regulations for High-Voltage Systems
PPPFA Preferential Procurement Policy Framework Act
PSR Plant Safety Regulations
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
Abbreviation Explanation
RFI Request for information
SACPCMP South African Council for Project and Construction Management
Professions
2.5 Roles and responsibilities
2.5.1 Designers shall:
The designer shall ensure that the occupational health and safety (OHS) requirements applicable
to the project/scope of work are incorporated into the design. Consider the associated risks
identified in the scope of specific OHS specification/requirements and baseline risk assessment.
The identification and analysis of hazards and risks must form part of the design process.
Note: Environmental issues, as they may affect the site/project, shall be identified, assessed,
controlled, and monitored for compliance and efficiency by the environmental professionals.
2.5.2 Procurement practitioners shall
2.5.2.1 Ensure that sufficient notification and preparation times are provided for the relevant OHS
professional to form part of the multidisciplinary team for the preparation of the relevant
and specific OHS requirements for the procurement enquiry.
2.5.2.2 Ensure that the appropriate OHS representative provides the OHS requirements and
specified documents before the release of the procurement enquiry.
2.5.2.3 Ensure that the OHS professional participates in, and provides input into, relevant
meetings or forums, processes, and reports that lead to the awarding of a contract (for
example, supplier evaluations, squad check meetings, contracting strategies,
negotiations, clarification meetings, tender evaluations, evaluation report compilation,
contract awarding, and briefing meetings).
2.5.2.4 Ensure that the records about supplier OHS non-conformances during contract
execution, post contract reviews, supplier suspensions, and contract terminations are
received from the contract custodian and where applicable, Procurement shall keep a
record of such information to make it easily accessible to the relevant stakeholders for
future reference, especially when determining the allocation of future works or services.
2.5.2.5 Ensure that applicable OHS requirements for any emergency work are provided to the
preferred contractor/supplier at the same time when the enquiry is made to avoid delays.
The supplier OHS documentation shall be received from the preferred contractor/supplier
and approved urgently to allow work to commence.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
2.5.3 Contract custodian (contract executor, end user)
The contract custodian shall:
2.5.3.1 Ensure that the contract specifies how OHS will be managed and reported on for the
duration of the contract/transaction and the supplier/contractor adheres to the relevant
contract OHS requirements.
2.5.3.2 Ensure that the OHS professional forms part of the cross-functional team and take part
in all relevant meetings.
2.5.3.3 Ensure that project-specific OHS requirements are provided by the OHS professional.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
2.5.3.4 Ensure that the OHS costing prepared is informed by the risks associated with the scope
of work and forms part of the bill of quantities or the pricing schedule.
2.5.3.5 Ensure that if any designs are to be carried out, the OHS requirements shall be
forwarded to the designer for inclusion in the design.
2.5.3.6 Ensure that a project OHS specification/requirements, together with the project baseline
risk assessment (BRA), Eskom’s Acknowledgement form for OHS legal and other
requirements (Annexure B), 32-136 standard, evaluation criteria, and other relevant
documents (for example, 32-418, if the scope of work includes working at heights, PSR.
or ORHV regulations, etc.) are prepared in conjunction with the OHS professional and
provided/published with the procurement enquiry.
2.5.3.7 Ensure that the principal contractor develops a project-specific OHS plan. When a tender
has been awarded, it is the contract custodian’s responsibility to ensure that the OHS
plan of the principal contractor is evaluated and approved before the commencement of
work.
2.5.3.8 Ensure that the OHS file is evaluated for compliance once the contract has been
awarded. Once satisfied that the contents of the OHS file meet the requirements, a letter
of acceptance shall be issued to the contractor.
2.5.3.9 Ensure that, after signing the contract (national/divisional/panel contracts), the contractor
shall immediately meet the OHS professional on site to discuss the site OHS
requirements and thereafter the contractor/supplier shall prepare the OHS file within
seven working days/or within the timeframe agreed between the contractor/supplier and
the site/BU/OU OHS professional.
2.5.3.10 Ensure that the OHS plan of the principal contractor and any appointed contractor is
audited throughout the execution of the project for compliance from a legislative and
OHS point of view
2.5.3.11 Ensure that the necessary details/issues pertaining to contractor non-conformances on
contractual OHS obligations during contract execution, safety interventions, post contract
review, and supplier reconsideration are adequately addressed, recorded, and submitted
to Procurement Department for recording and to support future reference;
2.5.3.12 Ensure that, after the initial procurement process has concluded for national or divisional
contracts (registration, tender evaluation and contract award phases), there is handover
to the site OHS professional at the site where the work/service is to be conducted.
2.5.3.13 Ensure that for national and divisional contracts, when a supplier mobilises to site, the
responsible manager based at the Eskom site must take over the responsibility for
ensuring that the supplier works according to the approved OHS plan and provides
oversight supervision over the contractor for task / activities / work / service being
performed.
2.5.3.14 Ensure that the Health and safety specification and BRA are made available to the
appointed contractors where additional contractors are appointed.
2.5.3.15 Ensure that the 37(2) agreement is signed by the contract custodian and the
contractor/supplier when signing the contract.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
2.5.4 Line managers
All managers to whom OHS professionals report (that is, project, grid, operating unit, business unit,
power station, etc.) shall:
2.5.4.1 Be responsible for allocating resources to participate in all phases of contractor OHS
management and the procurement and supply chain processes for their respective
division and sites.
2.5.4.2 Ensure that the OHS professionals allocated to participate in the procurement and
supply chain processes are competent and aware of their roles and responsibilities in
embedding OHS requirements to contract.
2.5.4.3 Apply discretion when allocating an OHS resource to represent OHS by considering the
value and complexity of the scope of work. A subject matter expert may be seconded or
sourced to assist with certain projects/transaction/scope of work.
2.5.4.4 Ensure that all parties are familiar with the inclusion of OHS requirements in the enquiry
documents.
2.5.5 OHS professionals shall:
2.5.5.1 Ensure that the relevant OHS procedures and documentation used during the
procurement processes are always applicable to the project and form part of the
procurement enquiry.
2.5.5.2 Conduct the research, preparation, and consolidation of the applicable OHS
requirements, together with the designer/project engineer and contract custodian (end
user) for each market engagement, supplier selection, contracting, contract execution,
etc.
2.5.5.3 Ensure that OHS requirements are handed over to the allocated procurement and supply
chain representative.
2.5.5.4 Determine which services are exempted or waived and advise the procurement
representative/contract custodian accordingly in writing.
2.5.5.5 Ensure that requirements listed in Annexure C1/C2/C3/C4/C5 (evaluation criteria) are
always relevant to the scope of work/project that shall be used during the tender
evaluation stage.
2.5.5.6 Audit the OHS plans and all the contents of the OHS file of the principal contractor and
any appointed contractor for compliance. Auditing will be conducted by the client’s
representatives as per the client’s OHS requirements and applicable legislation as
amended.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
2.5.5.7 Ensure the utilisation and support of the mechanism for monitoring OHS performance
and compliance during contract execution
2.5.5.8 Provide detailed information pertaining to supplier non-conformances and safety
interventions for the post contract OHS review and provides reports for the contract
custodian to submit to Procurement.
2.5.5.9 Ensure that the OHS plan/OHS systems of the principal contractor and any appointed
contractor is audited throughout the execution of the project for compliance from a
legislative and OHS point of view.
2.5.5.10 Determine whether the work falls within the definition of “construction work”. If the work
falls within “construction work”, he/she must ensure alignment of the OHS requirements
such that compliance with the Construction Regulations 2014 is achieved.
2.5.6 Construction and safety agent (CHSA)
The responsibilities and duties of the construction health and safety agent shall be aligned to the
Construction Regulations and CBE published scope of work as amended.
The construction health and safety agent shall:
2.5.6.1 Ensure that a BRA is prepared for an intended construction work project.
2.5.6.2 Provide the designer with a health and safety specification contemplated in paragraph
5(b) of the CR 2014.
2.5.6.3 Facilitate that the health and safety specification is included in the tender documents.
2.5.6.4 Facilitate that the potential principal contractors submitting tenders have made adequate
provision for the cost of health and safety.
2.5.6.5 Facilitate that the principal contractor to be appointed has the necessary competencies
and resources to carry out the construction work safely.
2.5.6.6 Facilitate that the principal contractor is registered and in good standing with the
compensation fund or with a licensed compensation insurer as contemplated in the
Compensation for Occupational Injuries and Diseases Act .
2.5.6.7 Ensure an appointment of every principal contractor in writing for the project or part
thereof on the construction site.
2.5.6.8 Ensure that copy of the principal contractor’s health and safety plan is available on
request by an employee, inspector, or contractor.
2.5.6.9 Conduct periodic health and safety audits in accordance with Construction Regulations
requirements.
2.5.6.10 Facilitate that the health and safety file contemplated in regulation 7(1) (b) of the CR
2014 is kept and maintained by the principal contractor.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
2.5.7 National and divisional contract
2.5.7.1 The responsible division that initiated the project/contract to be established must provide
or allocate an OHS resource for the project/contract/transaction.
2.5.7.2 After contract award, the OHS professional responsible for the procurement enquiry shall
hand over the relevant OHS documentation applicable to the scope of work/contract to
the division/BU/OU OHS professional.
2.5.7.3 The division/BU/OU that requested the work to be done and the division/BU/OU that will
be overseeing the execution of the work must have a service-level agreement to ensure
compliance during the project execution stage.
2.5.7.4 Eskom site management is responsible for directly supervising and managing such
contracts and ensuring that OHS is complied with. This will require that operational
control be managed and enforced at the operational level, and not by an oversight or
indirect supervisory function.
2.5.7.5 After signing the contract, the supplier/contractor must, within five working days, meet
the OHS professional on site to discuss the OHS site requirements. The site must allow
five to 15 working days for the preparation of the OHS site requirements by the
contractor/supplier.
2.5.6 Tender committee
It is the responsibility of the tender committee to ensure that OHS requirements have been catered
for with every transaction unless the services/products being procured are exempted from such.
2.5.7 Supplier/Contractor/Service provider
2.5.7.1 It is the responsibility of the supplier to provide valid and authentic documentation for
assessment.
2.5.7.2 The supplier may seek guidance, clarity, and advice from Eskom to comply with the
requirements of this standard (excluding the tender phase).
2.5.7.3 The supplier must comply with, and adhere to, OHS legislation and Eskom OHS
requirements at all times when conducting work for or on behalf of Eskom or any of its
subsidiaries.
2.5.7.4 The supplier, as a legal entity, must be conversant with OHS legal obligations related to
the works tendered for.
2.5.7.5 Each site or premises of Eskom and its subsidiaries has/have different OHS site-specific
requirements, and it is the responsibility of the supplier to ensure that those requirements
are met before work can commence. Approval from one site/premises does not
automatically provide authorisation to execute work at another site that is outside the
jurisdiction of the authorising OHS personnel, even if the scope is similar.
2.5.8 Training
All individuals or roles players involved in the procurement process of a service or enquiry shall be
rained on this procedure (procurement official, end users, designers, contract custodians and OHS
professionals).
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
2.6 Process for monitoring
The implementation of this standard will be monitored as part of contract reviews, inspections,
and/or audits undertaken.
2.7 Related/Supporting documents
Quality Management
Source: Contract and Contractor OHS Management.pdf2.5.3.11 Ensure that the necessary details/issues pertaining to contractor non-conformances on
contractual OHS obligations during contract execution, safety interventions, post contract
review, and supplier reconsideration are adequately addressed, recorded, and submitted
to Procurement Department for recording and to support future reference;
2.5.3.12 Ensure that, after the initial procurement process has concluded for national or divisional
contracts (registration, tender evaluation and contract award phases), there is handover
to the site OHS professional at the site where the work/service is to be conducted.
2.5.3.13 Ensure that for national and divisional contracts, when a supplier mobilises to site, the
responsible manager based at the Eskom site must take over the responsibility for
ensuring that the supplier works according to the approved OHS plan and provides
oversight supervision over the contractor for task / activities / work / service being
performed.
2.5.3.14 Ensure that the Health and safety specification and BRA are made available to the
appointed contractors where additional contractors are appointed.
2.5.3.15 Ensure that the 37(2) agreement is signed by the contract custodian and the
contractor/supplier when signing the contract.
value, duration, complexity, environmental aspects, and impacts and the criticality of the
scope of working conditions of any applicable environmental approvals.
3.4.4 Phase 5: Contract/Service execution and continual monitoring
3.4.4.1 Continual OHS performance monitoring
a) Eskom shall conduct risk-based inspections, audits, and blitz inspections to monitor OHS
compliance and adherence to the OHS plan by the contractor.
b) The contractor performing construction work shall be audited in accordance with the
applicable legal and other requirements as amended.
c) For contractors performing non-construction work, the frequency of the audit/inspection
shall be determined by the risk associated with the scope of work based on legal and other
requirements as amended.
d) The contract custodian shall ensure that monitoring mechanisms (such as audits and
reviews) are instituted, with the support of OHS professionals, to ensure compliance with
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
3.4.4.2 Management of contractors
a) The contract custodian shall ensure that the principal contractor is notified that he/she is
accountable for the management of his/her employees/contractors/suppliers and also to
ensure that his/her contractors/suppliers comply with the applicable legal and other
requirements (applicable during contract execution of works and services in terms of the
contract).
b) The contract custodian, in consultation with the procurement practitioner, has to ensure that
all the non-conformances or non-compliances of the suppliers/contractors are dealt with by
means of approved Eskom contractor management processes, for example, supplier
reconsideration review committee.
3.4.4.3 Enforcement of compliance and monitoring during contract execution
review committee:
The supplier investigation report by BU/OU will be required.
The Non-conformance reports issued.
Written feedback from the supplier.
The minutes of the meetings held with the supplier.
Sanction: state the period of suspension/blacklisting.
Contract: will the supplier complete the outstanding work, or is there another option/plan B?
Project information: start and end date.
demobilisation inspection is carried out a month before the contract end date is reached with the
assistance of the OHS professionals or the contractor leaves site.
The contractor’s OHS file or copy thereof shall be handed over to the contract custodian on
completion of the project 10 days before the contract ceases. Eskom shall retain the OHS file for a
minimum of 40 years.
division’s premise/site, the project handover shall include the OHS file, which shall be handed over
to the client or client’s agent (site owner/asset owner).
3.7.2 Phase 6: Post contract review
3.7.2.1 The contract custodian has to inform the supplier about the OHSKPIs before work can
commence, and Annexure D can be used as a guideline. The contractor performance
monitoring process will be applied based on the risk of the project. The BU/OU should
develop its contractor monitoring process. The OHS professional has to be involved to
assist the contract custodian with setting the OHSKPIs and shall prepare the OHS
component in preparation for the review process, that is, audit reports and the OHS
compact/contract, inspections, minutes, presentations, etc.
3.7.2.2 After a contract has ceased or ended, the supplier must be evaluated on OHS
performance throughout the project by the contract custodian, with the support of the
a) OHS professionals shall conduct work stoppages, inspections, audits, and blitzes to monitor OHS compliance
Compliance Requirements
Source: Contract and Contractor OHS Management.pdf (unknown)240-77471651 Annexure C1: Supplier OHS tender evaluation template (high and medium risk)
240-77471969 Annexure C2: Supplier OHS tender evaluation template (medium risk)
240-106084657 Annexure C3: Supplier OHS tender evaluation template (low risk)
240-106084699 Annexure C4: Supplier OHS tender evaluation template (construction work)
240-77472561 Annexure D: Contract OHS performance evaluation template
240-108987034 Annexure E: OHS procurement process checklist
37(2) agreement
240-73198256 Professional services Health and safety specification template
240-73416879 High-risk services Health and safety specification template
240-157810171 Construction services Health and safety specification template_
240-73418055 Manufacturers Health and safety specification template
240-73419711 General services Health and safety specification template
240-157810099 Supply and delivery Health and safety specification template
240-162195779 Tender Evaluation report
Document content 3.1 The contractor OHS management model Eskom has adopted a six-phase OHS contractor management model to manage contracts, contractors and suppliers effectively. See Figure 1.1 on . 3.1 Phase 1: Project Initiation and briefing, concept and feasibility study, design development 3.1.1 Initiation and briefing The OHS professional/CHS agent shall form part of the meetings in this phase to assist in developing a clear construction/project health and safety requirements, ensure that OHS forms part of the initiation meetings and identify preliminary construction/project health and safety risk profile and record construction/project health and safety risk communication. CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30. Contract and Contractor OHS management Unique Identifier: 32-726 Revision: 3 Page: 3.1.2 Concept and feasibility The OHS professional/CHS agent shall attend the design meetings in accordance with the project planning phases, take part in preliminary cost estimates/budgets for construction project health and safety, prepare the draft construction/project BRA, health and safety specification and share the required surveys, tests, and other investigations and related reports. 3.1.3 Design development For any product or service that includes compiling the design of a building, equipment, modification of existing plant, etc., the Eskom contract custodian, with the assistance of the OHS professional and occupational hygiene professional have to provide the designer with an health and safety specification/requirements specific to the project to ensure integration of OHS requirements in the design. The designer shall not commence with the design if the health and safety specification has not been provided. The designer (internal or external), contract custodian, and responsible OHS professional have to conduct a site visit before commencing with the design or before any health and safety specification/OHS requirements can be developed. (This phase may not apply to all projects/transactions). For the responsibilities of the Professional Construction health and safety agent, refer to the Construction regulations 2014 as amended. 3.2 Phase 2: Tender phase (procurement strategy, tender enquiry and documents, evaluation, and award) 3.2.1 Procurement strategy 3.2.1.1 OHS shall form part of the cross-functional team during the procurement of goods and services for, or on behalf of, Eskom. 3.2.1.2 OHS professional will influence the initial development of a procurement strategy to the market engagement for supplier selection, contracting, contract handover, and performance monitoring and contract execution based on the scope of work. 3.2.1.3 The OHS professionals shall ensure that the compiled scope-specific OHS requirements are listed in the procurement strategy. CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30. Contract and Contractor OHS management Unique Identifier: 32-726 Revision: 3 Page: 3.2.2 Tender enquiry
OHS, legal, and other requirements are to be complied with at all times, and OHS professionals shall form part of the cross-functional team during the procurement of goods, products, and/or services in Eskom.
The OHS professional shall compile the scope-specific/risk-based OHS requirements and submit to the procurement professional. OHS requirements shall form part of the tender enquiry.
The OHS requirements shall be aligned with the Contractor OHS management risk category as per Annexure A. The tender enquiry shall be accompanied by scope-specific OHS requirements and the BRA, Annexure B (Acknowledgement form for Eskom’s OHS legal and other requirements, 32-136 (Contractor Health and Safety Requirements Standard), and the evaluation criteria.
OHS tender returnable must be clear and explicit to suppliers/contractors.
Where applicable, the tenderers or potential suppliers/contractors may be expected to conduct a site visit of the area where the work will be executed before tendering, under the supervision of the Eskom contract custodian and the procurement practitioner.
Further guidance and support with regard to OHS matters will be provided at the clarification meeting. OHS shall be a standard item on the agenda for the clarification meeting. 3.2.2.1 Other transactions (RFI, emergency procurement, sole source, contract extension or modification, etc.) The OHS requirements shall be provided to the contractor/supplier when requesting quotations to avoid delays. The supplier’s OHS documentation shall be received from the preferred contractor/supplier and approved before commencement of work. For tender prequalification (RFI) purpose, the OHS professional shall form part of the multidisciplinary committee (MTC). 3.2.2.2 International suppliers/contractors performing work for or on behalf of Eskom All international contractors conducting work for or on behalf of Eskom shall comply with Eskom OHS requirements and the applicable South African legislation. Their OHS documents shall be written in English. The OHS requirements to be communicated to the supplier/contractor shall be risk-based and scope-specific. 3.2.2.3 OHS documents to be published in the tender enquiry To avoid bombarding suppliers/contractors who wish to respond to the Eskom tender, the following minimum OHS requirements must be submitted to the procurement and supply chain. The applicable Eskom OHS policies and procedures will be given to the successful supplier/contractor. CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30. Contract and Contractor OHS management Unique Identifier: 32-726 Revision: 3 Page: Scope-specific OHS specification/OHS requirements, including the project BRA, Annexure B: Eskom’s Acknowledgement form for OHS legal and other requirements (the listed legislature, Eskom policies and procedures shall be amended to align with the scope of work/identified risks)
32-136 Contractor Health and Safety Requirements
OHS tender evaluation criteria
Applicable Eskom procedures that contain the requirements the supplier/contractor needs to be informed of before responding to the enquiry/transaction in order to make provision for the OHS costs in the bill of quantities, for example, 32-418 for the scope of work that includes working at heights, plant safety regulations (PSR) for or scope of work requiring ORHV regulations training, etc. 3.2.2.4 Occupational health and safety specification and plan The health and safety specification shall be issued with the enquiry/transaction to inform the future contractors/suppliers of the health and safety requirements associated with the scope of work/contract/project, and the contractor/supplier shall submit the health and safety plan in response. The health and safety specification templates are made available and shall be updated, amended to cover the OHS requirements related to the scope of the risks of the project/contract. Once the health and safety specification is completed, it must be signed by both the OHS professional and the contract custodian. The health and safety specifications and plans shall be named in the following. For construction work: The health and safety specification and health and safety plan. For non-construction work: The health and safety requirements for the site/BU/OU (add BU/OU/site name) and audible OHS system/manual that satisfy the issued OHS site, legal and other requirements. For national contracts: The health and safety requirements for ... (include the name of the project/ scope of work) and audible OHS system/manual that satisfy the issued OHS, legal and other requirements. The Eskom OHS professional must communicate to the potential supplier/contractor that the health and safety plan must be approved internally before submission to Eskom. When the Eskom OHS professional is satisfied with the contents of the health and safety plan; the plan will first be signed by the OHS professional and approved by the contract custodian and initialled on every page at the bottom right corner. Note: Health and Safety specifications and plans are construction regulations requirements and only applicable to the construction work. For other projects/contracts the above identification will be used. 3.2.2.5 OHS application, evaluation, and reports OHS as a contractual requirement will only evaluate the shortlisted suppliers that have passed mandatory and functionality evaluation threshold. CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30. Contract and Contractor OHS management Unique Identifier: 32-726 Revision: 3 Page
On completion of the tender evaluation of shortlisted suppliers, OHS will compile an initial tender evaluation report, which will highlight compliance/conformance gaps (outstanding documents/information or insufficient evidence of compliance) by the suppliers and recommend or not recommend supplier based on the level of compliance/conformance.
The procurement practitioner will engage the suppliers only once, requesting all the outstanding tender documents to be submitted within a period not exceeding seven working days.
When the procurement practitioner receives the submitted tender documents within the stipulated timelines, OHS will re-evaluate the submitted tender documents and will compile, and resubmit a final tender evaluation report. However, insufficient evidence of compliance/gaps will be addressed with the preferred supplier at the negotiation meeting as part of the contract conditions. The closeout timelines of the compliance/conformance/gaps will be determined by the OHS professional.
OHS as functionality; the technical, procurement and OHS teams will conduct the initial tender evaluation in line with the OHS functionality threshold of 70% (see Appendix A below) and the successful potential tenderers may undergo further evaluation. Where applicable, OHS will form part of the initial tender evaluation, including both desktop and onsite (supplier/contractor site) evaluations. For open market tender/enquiry, the suppliers that did not submit the requested OHS documents within the specified time will be regarded as non-responsive. In contrast, the suppliers that responded will be re-evaluated. Should the submitted OHS documents not conform to/meet the compliance standard, the gaps will be addressed with the preferred bidder/tenderer during the negotiation meeting. After negotiations, the supplier shall submit the site-specific OHS file for evaluation and must address the gaps prior to commencement of work on site. For panel contracts, the suppliers that did not submit the requested OHS documents within the specified time will be regarded as non-responsive. In contrast, the suppliers that responded will be re-evaluated. Should the submitted documents not conform to/meet the compliance standard, the gaps will be addressed with the preferred bidders/tenderers during the negotiation meeting. The reviewed OHS returnable will be submitted to Eskom by the preferred tenderers/bidders and the final OHS report will be submitted to the buyer. The site- or scope-specific OHS file requirements will be communicated to the supplier/contractor by the BU/OU when issuing the task order. The BU/OU must allow 5 to 15 working days for preparation of the OHS site requirements by the contractor/supplier in consultation with the OHS professional.
Note: For OHS as contractual requirements, each supplier will only be evaluated twice during tender evaluation stage before the final report is submitted to the procurement practitioner. To avoid the delays and the effective use of OHS resources, no supplier/contractor’s tender OHS documents shall be evaluated more than two times before contract award. However, the OHS file must be evaluated and approved before commencement of work.
However, should any further tender evaluations be required, the procurement manager will submit a motivation and supporting documentation for the request to the relevant OHS senior manager/OHS manager for approval.
B-BBEE Details: ge of goods or services or money between a buyer and a
seller.
2.4 Abbreviations
Abbreviation Explanation
BRA baseline risk assessment
CHSA Construction health and safety agent
COIDA Compensation for Occupational Injuries and Diseases Act
DE Divisional executive
DEL Department of Employment and Labour
DMR Department of Mineral Resources
EMP Environmental Management Programme
ESR Environmental status rating
ISO International Organization for Standardization
MTC Multidisciplinary committee
OHS Occupational hygiene and safety
ORHVS Operating Regulations for High-Voltage Systems
PPPFA Preferential Procurement Policy Framework Act
PSR Plant Safety Regulations
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
Abbreviation Explanation
RFI Request for information
SACPCMP South African Council for Project and Construction Management
Professions
2.5 Roles and responsibilities
2.5.1 Designers shall:
The designer shall ensure that the occupational health and safety (OHS) requirements applicable
to the project/scope of work are incorporated into the design. Consider the associated risks
identified in the scope of specific OHS specification/requirements and baseline risk assessment.
The identification and analysis of hazards and risks must form part of the design process.
Note: Environmental issues, as they may affect the site/project, shall be identified
Health & Safety
Source: Contract and Contractor OHS Management.pdf. Introduction ............................................................................................................................... 4
2.1 Scope ............................................................................................................................... 4
2.1.1 Purpose ................................................................................................................. 4
2.1.2 Applicability ........................................................................................................... 4
2.1.3 Effective date ......................................................................................................... 4
2.2 Normative/Informative references ..................................................................................... 5
2.2.1 Normative .............................................................................................................. 5
2.2.2 Informative............................................................................................................. 5
2.3 Definitions ........................................................................................................................ 6
2.4 Abbreviations ................................................................................................................... 7
2.5 Roles and responsibilities ................................................................................................. 8
2.5.1 Designers shall: ..................................................................................................... 8
2.5.2 Procurement practitioners shall ............................................................................. 8
2.5.3 Contract custodian (contract executor, end user) .................................................. 9
2.5.4 Line managers ..................................................................................................... 11
2.5.5 OHS professionals shall: ..................................................................................... 11
2.5.6 Construction and safety agent (CHSA) ................................................................ 12
2.5.7 National and divisional contract ........................................................................... 13
2.5.6 Tender committee................................................................................................ 13
2.5.7 Supplier/Contractor/Service provider ................................................................... 13
2.5.8 Training................................................................................................13
2.6 Process for monitoring .................................................................................................... 14
2.7 Related/Supporting documents ...................................................................................... 14
3.1 The contractor OHS management model ....................................................................... 14
3.1 Phase 1: Project Initiation and briefing, concept and feasibility study, design
development ................................................................................................................... 14
3.1.1 Initiation and briefing ........................................................................................... 14
3.1.2 Concept and feasibility ........................................................................................ 15
3.1.3 Design development ............................................................................................ 15
3.2 Phase 2: Tender phase (procurement strategy, tender enquiry and documents,
evaluation, and award) ................................................................................................... 15
3.2.1 Procurement strategy .......................................................................................... 15
3.2.2 Tender enquiry .................................................................................................... 16
3.2.3 Phase 3: Supplier registration .............................................................................. 21
3.2.4 Phase 4: Site mobilisation/Access to the site ....................................................... 21
3.3 Site mobilisation/Access to the site ................................................................................. 22
3.4 Health and safety non-negotiable rules .......................................................................... 22
Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
3.5 Supplier relationship management ................................................................................. 23
3.6 Material handling and storage equipment ....................................................................... 24
3.7 Supplier review committee ............................................................................................. 24
3.7.1 Contract completion/handover ............................................................................. 25
3.7.2 Phase 6: Post contract review ............................................................................. 25
Acceptance ............................................................................................................................. 25
Revisions ................................................................................................................................ 26
Development Team ................................................................................................................ 26
Appendix A: OHS functionality evaluation criteria.......................................................................... 27
Appendix B: Tender/Enquiry process flow ..................................................................................... 28
Appendix C: Contractor OHS management model flow diagrams ................................................. 29
Hygiene and Safety (OHS). Achieving the OHS requirements will be integrated into the Eskom
procurement and supply chain processes.
managers (contract custodians), line management, suppliers, and OHS professionals underlining
the minimum OHS requirements that shall be addressed during the following phases, namely:
a) Project initiation and briefing, concept and feasibility study, design development;
b) Tender enquiry, evaluation, and contract award;
c) Supplier registration on the Eskom vendor database;
d) Site access/mobilisation;
e) Monitoring of performance during the contract execution period;
f) Contract completion, closeout, and post contract review; and
g) Instances where works or services under a contract can be stopped, suspended, or terminated.
2.1.1 Purpose
the following paragraphs.
2.2.1 Normative
[1] 32-727 Eskom Safety, Health, Environmental and Quality Policy
[2] 32-1034 Eskom’s Procurement and Supply Chain Management Procedure
[3] 32-196 Eskom Disciplinary Code Standard
[4] 240-62196227 Eskom Life-Saving Rules Standard
[5] National Environmental Management: Waste Act
[6] Occupational Health and Safety Act and Regulations
2.2.2 Informative
[1] 32-520 Occupational Health and Safety Risk Assessment Procedure
[2] ISO 9001 Quality Management Systems
[3] 32-95 Environmental, Occupational Health, and Safety Incident Management Procedure
[4] Compensation for Occupational Injuries and Diseases Act
[5] OHSAS 18001 Occupational Health and Safety Management Systems
[6] ISO 14001 Environmental Management Systems
[7] Mine Health and Safety Act
[8] The Constitution of the Republic of South Africa, 1996
[9] National Environmental Management Act
[10] Environment Conservation Act
[11] National Water Act
[12] National Environmental Management: Waste Act
[13] National Environmental Management: Air Quality Act
[14] National Forests Act
[15] National Environmental Management: Biodiversity Act
[16] National Environmental Management: Protected Areas Act
[17] National Heritage Resources Act
[18] National Veld and Forest Fire Act
[19] Conservation of Agricultural Resources Act
[20] 32-136 Eskom Contractor Health and Safety Requirements Standard
and safety agent Construction Management Profession Act, as amended.
(CHSA) Any competent person who acts as a representative for a client in
managing health and safety on a construction project for the client and
who has satisfied the registration criteria of the SACPCMP to perform
the required functions.
2.5 Roles and responsibilities
2.5.1 Designers shall:
The designer shall ensure that the occupational health and safety (OHS) requirements applicable
to the project/scope of work are incorporated into the design. Consider the associated risks
identified in the scope of specific OHS specification/requirements and baseline risk assessment.
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
2.5.3.4 Ensure that the OHS costing prepared is informed by the risks associated with the scope
of work and forms part of the bill of quantities or the pricing schedule.
2.5.3.5 Ensure that if any designs are to be carried out, the OHS requirements shall be
forwarded to the designer for inclusion in the design.
2.5.3.6 Ensure that a project OHS specification/requirements, together with the project baseline
risk assessment (BRA), Eskom’s Acknowledgement form for OHS legal and other
requirements (Annexure B), 32-136 standard, evaluation criteria, and other relevant
documents (for example, 32-418, if the scope of work includes working at heights, PSR.
or ORHV regulations, etc.) are prepared in conjunction with the OHS professional and
provided/published with the procurement enquiry.
2.5.3.7 Ensure that the principal contractor develops a project-specific OHS plan. When a tender
has been awarded, it is the contract custodian’s responsibility to ensure that the OHS
plan of the principal contractor is evaluated and approved before the commencement of
work.
2.5.3.8 Ensure that the OHS file is evaluated for compliance once the contract has been
awarded. Once satisfied that the contents of the OHS file meet the requirements, a letter
of acceptance shall be issued to the contractor.
2.5.3.9 Ensure that, after signing the contract (national/divisional/panel contracts), the contractor
shall immediately meet the OHS professional on site to discuss the site OHS
requirements and thereafter the contractor/supplier shall prepare the OHS file within
seven working days/or within the timeframe agreed between the contractor/supplier and
the site/BU/OU OHS professional.
2.5.3.10 Ensure that the OHS plan of the principal contractor and any appointed contractor is
audited throughout the execution of the project for compliance from a legislative and
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
2.5.5.7 Ensure the utilisation and support of the mechanism for monitoring OHS performance
and compliance during contract execution
2.5.5.8 Provide detailed information pertaining to supplier non-conformances and safety
interventions for the post contract OHS review and provides reports for the contract
custodian to submit to Procurement.
2.5.5.9 Ensure that the OHS plan/OHS systems of the principal contractor and any appointed
contractor is audited throughout the execution of the project for compliance from a
legislative and OHS point of view.
2.5.5.10 Determine whether the work falls within the definition of “construction work”. If the work
falls within “construction work”, he/she must ensure alignment of the OHS requirements
such that compliance with the Construction Regulations 2014 is achieved.
2.5.6 Construction and safety agent (CHSA)
2.5.6.1 Ensure that a BRA is prepared for an intended construction work project.
2.5.6.2 Provide the designer with a health and safety specification contemplated in paragraph
5(b) of the CR 2014.
2.5.6.3 Facilitate that the health and safety specification is included in the tender documents.
2.5.6.4 Facilitate that the potential principal contractors submitting tenders have made adequate
provision for the cost of health and safety.
2.5.6.5 Facilitate that the principal contractor to be appointed has the necessary competencies
and resources to carry out the construction work safely.
2.5.6.6 Facilitate that the principal contractor is registered and in good standing with the
compensation fund or with a licensed compensation insurer as contemplated in the
2.5.6.7 Ensure an appointment of every principal contractor in writing for the project or part
thereof on the construction site.
2.5.6.8 Ensure that copy of the principal contractor’s health and safety plan is available on
request by an employee, inspector, or contractor.
2.5.6.9 Conduct periodic health and safety audits in accordance with Construction Regulations
requirements.
2.5.6.10 Facilitate that the health and safety file contemplated in regulation 7(1) (b) of the CR
2014 is kept and maintained by the principal contractor.
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
2.5.7 National and divisional contract
2.5.7.1 The responsible division that initiated the project/contract to be established must provide
or allocate an OHS resource for the project/contract/transaction.
2.5.7.2 After contract award, the OHS professional responsible for the procurement enquiry shall
hand over the relevant OHS documentation applicable to the scope of work/contract to
the division/BU/OU OHS professional.
2.5.7.3 The division/BU/OU that requested the work to be done and the division/BU/OU that will
be overseeing the execution of the work must have a service-level agreement to ensure
compliance during the project execution stage.
2.5.7.4 Eskom site management is responsible for directly supervising and managing such
contracts and ensuring that OHS is complied with. This will require that operational
control be managed and enforced at the operational level, and not by an oversight or
indirect supervisory function.
2.5.7.5 After signing the contract, the supplier/contractor must, within five working days, meet
the OHS professional on site to discuss the OHS site requirements. The site must allow
five to 15 working days for the preparation of the OHS site requirements by the
contractor/supplier.
2.5.6 Tender committee
and/or audits undertaken.
2.7 Related/Supporting documents
requirements
risk)
work)
developing a clear construction/project health and safety requirements, ensure that OHS forms
part of the initiation meetings and identify preliminary construction/project health and safety risk
profile and record construction/project health and safety risk communication.
planning phases, take part in preliminary cost estimates/budgets for construction project health and
safety, prepare the draft construction/project BRA, health and safety specification and share the
required surveys, tests, and other investigations and related reports.
3.1.3 Design development
of existing plant, etc., the Eskom contract custodian, with the assistance of the OHS professional
and occupational hygiene professional have to provide the designer with an health and safety
specification/requirements specific to the project to ensure integration of OHS requirements in the
design. The designer shall not commence with the design if the health and safety specification has
not been provided.
The designer (internal or external), contract custodian, and responsible OHS professional have to
conduct a site visit before commencing with the design or before any health and safety
specification/OHS requirements can be developed. (This phase may not apply to all
projects/transactions). For the responsibilities of the Professional Construction health and safety
agent, refer to the Construction regulations 2014 as amended.
3.2 Phase 2: Tender phase (procurement strategy, tender enquiry and documents,
evaluation, and award)
3.2.1 Procurement strategy
3.2.1.1 OHS shall form part of the cross-functional team during the procurement of goods and
services for, or on behalf of, Eskom.
3.2.1.2 OHS professional will influence the initial development of a procurement strategy to the
market engagement for supplier selection, contracting, contract handover, and
performance monitoring and contract execution based on the scope of work.
3.2.1.3 The OHS professionals shall ensure that the compiled scope-specific OHS
requirements are listed in the procurement strategy.
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
3.2.2 Tender enquiry
a) OHS, legal, and other requirements are to be complied with at all times, and OHS
professionals shall form part of the cross-functional team during the procurement of goods,
products, and/or services in Eskom.
b) The OHS professional shall compile the scope-specific/risk-based OHS requirements and
submit to the procurement professional. OHS requirements shall form part of the tender
enquiry.
c) The OHS requirements shall be aligned with the Contractor OHS management risk
category as per Annexure A. The tender enquiry shall be accompanied by scope-specific
OHS requirements and the BRA, Annexure B (Acknowledgement form for Eskom’s OHS
legal and other requirements, 32-136 (Contractor Health and Safety Requirements
Standard), and the evaluation criteria.
d) OHS tender returnable must be clear and explicit to suppliers/contractors.
e) Where applicable, the tenderers or potential suppliers/contractors may be expected to
conduct a site visit of the area where the work will be executed before tendering, under the
supervision of the Eskom contract custodian and the procurement practitioner.
f) Further guidance and support with regard to OHS matters will be provided at the
clarification meeting. OHS shall be a standard item on the agenda for the clarification
meeting.
3.2.2.1 Other transactions (RFI, emergency procurement, sole source, contract
extension or modification, etc.)
written in English. The OHS requirements to be communicated to the supplier/contractor shall be
risk-based and scope-specific.
3.2.2.3 OHS documents to be published in the tender enquiry
Annexure B: Eskom’s Acknowledgement form for OHS legal and other requirements (the
listed legislature, Eskom policies and procedures shall be amended to align with the scope
of work/identified risks)
a) 32-136 Contractor Health and Safety Requirements
b) OHS tender evaluation criteria
c) Applicable Eskom procedures that contain the requirements the supplier/contractor needs
to be informed of before responding to the enquiry/transaction in order to make provision
for the OHS costs in the bill of quantities, for example, 32-418 for the scope of work that
includes working at heights, plant safety regulations (PSR) for or scope of work requiring
3.2.2.4 Occupational health and safety specification and plan
contractors/suppliers of the health and safety requirements associated with the scope of
work/contract/project, and the contractor/supplier shall submit the health and safety plan in
response. The health and safety specification templates are made available and shall be updated,
amended to cover the OHS requirements related to the scope of the risks of the project/contract.
professional and the contract custodian. The health and safety specifications and plans shall be
named in the following.
For construction work: The health and safety specification and health and safety plan.
For non-construction work: The health and safety requirements for the site/BU/OU
(add BU/OU/site name) and audible OHS system/manual that satisfy the issued OHS
site, legal and other requirements.
For national contracts: The health and safety requirements for ... (include the name of
the project/ scope of work) and audible OHS system/manual that satisfy the issued
and safety plan must be approved internally before submission to Eskom. When the Eskom OHS
professional is satisfied with the contents of the health and safety plan; the plan will first be signed
by the OHS professional and approved by the contract custodian and initialled on every page at
the bottom right corner.
Note: Health and Safety specifications and plans are construction regulations requirements and
only applicable to the construction work. For other projects/contracts the above identification will be
used.
3.2.2.5 OHS application, evaluation, and reports
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
a) On completion of the tender evaluation of shortlisted suppliers, OHS will compile an initial
tender evaluation report, which will highlight compliance/conformance gaps (outstanding
documents/information or insufficient evidence of compliance) by the suppliers and
recommend or not recommend supplier based on the level of compliance/conformance.
b) The procurement practitioner will engage the suppliers only once, requesting all the
outstanding tender documents to be submitted within a period not exceeding seven working
days.
c) When the procurement practitioner receives the submitted tender documents within the
stipulated timelines, OHS will re-evaluate the submitted tender documents and will compile,
and resubmit a final tender evaluation report. However, insufficient evidence of
compliance/gaps will be addressed with the preferred supplier at the negotiation meeting as
part of the contract conditions. The closeout timelines of the compliance/conformance/gaps
will be determined by the OHS professional.
d) OHS as functionality; the technical, procurement and OHS teams will conduct the initial
tender evaluation in line with the OHS functionality threshold of 70% (see Appendix A
below) and the successful potential tenderers may undergo further evaluation. Where
applicable, OHS will form part of the initial tender evaluation, including both desktop and
onsite (supplier/contractor site) evaluations.
For open market tender/enquiry, the suppliers that did not submit the requested OHS
documents within the specified time will be regarded as non-responsive. In contrast, the
suppliers that responded will be re-evaluated. Should the submitted OHS documents not
conform to/meet the compliance standard, the gaps will be addressed with the preferred
bidder/tenderer during the negotiation meeting. After negotiations, the supplier shall submit
the site-specific OHS file for evaluation and must address the gaps prior to commencement
of work on site.
For panel contracts, the suppliers that did not submit the requested OHS documents
within the specified time will be regarded as non-responsive. In contrast, the suppliers that
responded will be re-evaluated. Should the submitted documents not conform to/meet the
compliance standard, the gaps will be addressed with the preferred bidders/tenderers
during the negotiation meeting. The reviewed OHS returnable will be submitted to Eskom
by the preferred tenderers/bidders and the final OHS report will be submitted to the buyer.
acceptance will be issued to the supplier/contractor. Should the supplier not meet minimum OHS
requirements at this stage, the OHS professional will give the supplier another chance to address
the shortcomings within a period not exceeding seven working days or as agreed by the crossfunctional team in consultation with the OHS professional.
3.4 Health and safety non-negotiable rules
3.4.1 The health and safety file/document is to be evaluated before site mobilisation or task order
allocation to assess the compliance/conformance status of the supplier. No work shall
commence before the health and safety file/document has been accepted by the allocated
3.4.2 OHS requirements, after contract award, shall be enforceable on the successful supplier in
accordance with the OHS specification/health and safety file/documentation requirements.
3.4.3 OHS documents or actions that are required after contract award, that is, during the
execution of the contract, must be included as contractual obligations. The time frame for
submission will be negotiated as determined by the cross-functional team appointed by
supplier’s compliance at predetermined intervals during contract execution and that these reports
are provided to the contract custodian, during the execution of the contract and for the post
contract review process.
3.4.4.4 Work stoppage/Safety interventions/Suspension of works and services under a
contract
safety of Eskom employees, contractor employees, and the public. The BU/OU/project should
devise a process for reporting unsafe work /stopping working or conditions.
and safety of persons to the authorised person.
The temporary stoppage of an activity/activities or task(s) may be due to OHS concerns,
including the following circumstances:
a) Ad hoc safety intervention by Eskom management: all work of a similar nature may be
stopped due to the occurrence of a serious incident, and the relevant supplier will be
required to comply with, and/or verify, the conditions stipulated in the safety intervention
instruction pack.
b) Ad hoc safety intervention by any person, especially OHS professionals, may be due to
unsafe work or unsafe behaviour by the contractor. The conditions that gave rise to the
work stoppage will determine the corrective measures to be taken urgently to protect the
health and safety of employees and protect the environment and plant or equipment, etc.
c) Work stoppage initiated by the government and other relevant agencies.
3.5 Supplier relationship management
a) OHS professionals to participate and support the SD&L initiatives.
b) Supplier registration reviews for OHS are conducted as centralised function by Risk and
May 2021 3 F Pooe/D Review was conducted to combine 32-726, 32-524
Maunatlala and 37(2) agreement into one procedure and also to
align with the reviewed 32-1034.
August 2 D Maunatlala A review was conducted to align the standard with
2016 the new procurement process in Eskom.
June 2014 1 D Maunatlala A review was conducted to realign the standard with
the PPPF Act (Act ).
June 2011 0 Development This standard addresses minimum safety, health,
team and environmental requirements that must be
integrated into the Eskom procurement process.
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
Appendix A: OHS functionality evaluation criteria
scoring / threshold per functional area to proceed to the next step
70%
Table 1: Evaluation Criteria on Functionality
score at least the minimum functional area
threshold per functional area
to proceed to the next step
Safety & Health 70% 100%
Minimum Threshold 70%
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
Appendix B: Tender/Enquiry process flow
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
Appendix C: Contractor OHS management model flow diagrams
Phase 1
briefing: Concept and
Project initiation OHS forms part of feasibility:
and briefing and the multidisciplinary Attend design and
concept and team. project review Design
feasibility and Attend the meetings. development
design construction/ project Prepare draft
development initiation meetings. construction/
Advise on OHS project baseline
requirements in line risk assessment.
with the project.
Phase 2
enquiry, OHS requirements form evaluation in recommended suppliers for
evaluation, part of the strategy accordance with the contract award.
and contract The following documents published Annexure 37(2) agreement must be
award are sent out with the C1/C2/C3/C4/C5. signed with the contract.
enquiry: OHS The OHS professional Contractor /supplier must
specification, Annexure B, compiles the evaluation be provided with relevant
Contractual Terms
Source: Contract and Contractor OHS Management.pdfNote: Environmental issues, as they may affect the site/project, shall be identified, assessed,
controlled, and monitored for compliance and efficiency by the environmental professionals.
2.5.2 Procurement practitioners shall
2.5.2.1 Ensure that sufficient notification and preparation times are provided for the relevant OHS
professional to form part of the multidisciplinary team for the preparation of the relevant
and specific OHS requirements for the procurement enquiry.
2.5.2.2 Ensure that the appropriate OHS representative provides the OHS requirements and
specified documents before the release of the procurement enquiry.
2.5.2.3 Ensure that the OHS professional participates in, and provides input into, relevant
meetings or forums, processes, and reports that lead to the awarding of a contract (for
example, supplier evaluations, squad check meetings, contracting strategies,
negotiations, clarification meetings, tender evaluations, evaluation report compilation,
contract awarding, and briefing meetings).
2.5.2.4 Ensure that the records about supplier OHS non-conformances during contract
execution, post contract reviews, supplier suspensions, and contract terminations are
received from the contract custodian and where applicable, Procurement shall keep a
record of such information to make it easily accessible to the relevant stakeholders for
future reference, especially when determining the allocation of future works or services.
2.5.2.5 Ensure that applicable OHS requirements for any emergency work are provided to the
preferred contractor/supplier at the same time when the enquiry is made to avoid delays.
these service providers or services or scope of work, are exempted from the OHS prerequisites for
tendering process. Thus, OHS will not form part of the tender evaluation criteria nor the crossfunctional team. However, OHS inputs on the design and product specification should not be
excluded from the tendering process.
a) Manufacturing and supply where the scope of work excludes delivery by the supplier to any
of the Eskom premises or sites
b) Services where the conditions of the service provided are not provided at any of the Eskom
premises or sites (for example, consulting, motor claim insurance, IT online service,
manufacturing, etc.)
c) Government entities or agencies
d) Independent electricity generators, electricity distributors, and demand response suppliers
for a rebate
e) Procurement of consumables from established retailers where there is no contract (for
example, Woolworths, Makro, Shoprite, Game, clothing trading outlets, etc.)
f) Accommodation that is booked once off where there is no contract
g) Professional registration bodies
h) Non-profit organisations (for funding purposes)
3.2.2.8 Contract awarding
a) All findings/observations recorded in the OHS tender evaluation report must be addressed
with the supplier at the negotiation meeting. If the contract is signed before addressing the
gaps, they should form part of the conditions of the contract, including the time frame
allowed to close the findings. The contract should clearly state that no work should
commence before the approval of the OHS file.
b) For contracts where the scope of work is classified as construction work and requires
c) a construction work permit in accordance with the Construction Regulations as amended, a
minimum of 30 days must be allocated to allow the application to the Department of
Employment and Labour (DEL) for the permit to be processed. Thus, work shall only
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
commence after obtaining the corresponding construction work permit from the DEL.
d) For national contracts that have been evaluated centrally, after signing the contract, the
supplier/contractor must within five working days meet the OHS professional on site to
discuss the OHS site requirements. The divisional/BU/OU OHS professionals shall
communicate and provide their corresponding OHS requirements to the supplier/contractor
and allow 5 to 15 working days for the preparation of the OHS site requirements by the
contractor/supplier.
e) The supplier shall, as a result, ensure compliance with each BU’s/OU’s OHS requirements,
regardless of being approved centrally.
3.2.2.9 OHS 37(2) Agreement (COID)
The function of the 37(2) Agreement is primarily to indemnify Eskom from any acts or omissions by
its contractors/suppliers and its employees in contravention of the OSH Act. This means that
contractors/suppliers are deemed to be employers in their own right, their employees are not
deemed to be employees of Eskom and acknowledges that is solely responsible for its employees,
employee insurance certificate written in English shall be submitted to Eskom. It shall be in line
with the South African legislation.
for registration purposes:
a) Where maintenance of Eskom’s assets or any service is performed/provided externally
off/beyond Eskom premises/site, for example, maintenance of vehicles at motor vehicle
manufacturer/supplier/repairer premises
b) Suppliers who mechanically repair Eskom vehicles off Eskom sites
c) Independent electricity generators, electricity distributors, and demand response
suppliers for a rebate
d) Venue, seminar, conference and accommodation services, where a contract does not
exist between Eskom and the supplier
e) Municipalities from which Eskom acquires utility services, for example, water, sanitation,
etc.
f) Purchasing of consumables from established retailers (for example, Woolworths, Makro,
Shoprite, Game, clothing trading outlets)
g) Agents: suppliers acting on behalf of Eskom to source out a certain commodity or
product
h) Property leasing: suppliers who lease building(s) to Eskom
i) Recruitment agencies and temporary employment services/labour brokers
j) Professional registration bodies and accreditation authorities
k) Suppliers providing online services from their premises (IT licensing, insurance, etc.)
l) Non-profit organisations (for funding purposes)
3.2.4 Phase 4: Site mobilisation/Access to the site
3.2.4.1 Prerequisites for the commencement of works or services following contract
award
a) The procurement practitioner shall ensure that the site OHS professionals are given notice
of the contract award to ensure that the supplier/contractor’s OHS file is evaluated and
approved before commencement of work.
b) For a national contract, OHS professionals responsible for the national contract shall within
five working days hand over the project to the relevant BU/OU OHS professional.
enables Eskom to terminate the contract in the event when the supplier has built up a history of
poor performance in relation to matters or aspects of compliance with safety and health
regulations, policies, and/or procedures. The contract termination process can run concurrently
with the initiation process of referring the supplier/contractor to the review committee while
terminating the contract.
Section
Source: Contract and Contractor OHS Management.pdfa) The procurement practitioner shall ensure that the site OHS professionals are given notice
of the contract award to ensure that the supplier/contractor’s OHS file is evaluated and
approved before commencement of work.
b) For a national contract, OHS professionals responsible for the national contract shall within
five working days hand over the project to the relevant BU/OU OHS professional.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
c) When the OHS professional is satisfied with the contents of the OHS plan, it must be
signed and initialled on the bottom right of each page by the client (Eskom OHS
professional and the project manager) and the supplier/contractor representative.
d) The contractor employees shall also undergo the company’s induction, which must be risk-
or scope-based before commencement of any activities.
e) Eskom shall induct the contractor employees before commencement of any activities.
3.3 Site mobilisation/Access to the site
The allocated OHS professional shall evaluate the health and safety file. If satisfied, the letter of
acceptance will be issued to the supplier/contractor. Should the supplier not meet minimum OHS
requirements at this stage, the OHS professional will give the supplier another chance to address
the shortcomings within a period not exceeding seven working days or as agreed by the crossfunctional team in consultation with the OHS professional.
3.4 Health and safety non-negotiable rules
3.4.1 The health and safety file/document is to be evaluated before site mobilisation or task order
allocation to assess the compliance/conformance status of the supplier. No work shall
commence before the health and safety file/document has been accepted by the allocated
OHS professional.
3.4.2 OHS requirements, after contract award, shall be enforceable on the successful supplier in
accordance with the OHS specification/health and safety file/documentation requirements.
3.4.3 OHS documents or actions that are required after contract award, that is, during the
execution of the contract, must be included as contractual obligations. The time frame for
submission will be negotiated as determined by the cross-functional team appointed by
Procurement and Supply Chain Management. The decision will be risk-based, based on the
value, duration, complexity, environmental aspects, and impacts and the criticality of the
scope of working conditions of any applicable environmental approvals.
3.4.4 Phase 5: Contract/Service execution and continual monitoring
3.4.4.1 Continual OHS performance monitoring
a) Eskom shall conduct risk-based inspections, audits, and blitz inspections to monitor OHS
compliance and adherence to the OHS plan by the contractor.
b) The contractor performing construction work shall be audited in accordance with the
applicable legal and other requirements as amended.
c) For contractors performing non-construction work, the frequency of the audit/inspection
shall be determined by the risk associated with the scope of work based on legal and other
requirements as amended.
d) The contract custodian shall ensure that monitoring mechanisms (such as audits and
reviews) are instituted, with the support of OHS professionals, to ensure compliance with
OHS legislative and other requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
3.4.4.2 Management of contractors
a) The contract custodian shall ensure that the principal contractor is notified that he/she is
accountable for the management of his/her employees/contractors/suppliers and also to
ensure that his/her contractors/suppliers comply with the applicable legal and other
requirements (applicable during contract execution of works and services in terms of the
contract).
b) The contract custodian, in consultation with the procurement practitioner, has to ensure that
all the non-conformances or non-compliances of the suppliers/contractors are dealt with by
means of approved Eskom contractor management processes, for example, supplier
reconsideration review committee.
3.4.4.3 Enforcement of compliance and monitoring during contract execution
OHS professionals shall ensure that there is a mechanism to monitor OHS performance and the
supplier’s compliance at predetermined intervals during contract execution and that these reports
are provided to the contract custodian, during the execution of the contract and for the post
contract review process.
3.4.4.4 Work stoppage/Safety interventions/Suspension of works and services under a
contract
Eskom reserves the right to stop any unsafe work that poses a risk or harm to the health and
safety of Eskom employees, contractor employees, and the public. The BU/OU/project should
devise a process for reporting unsafe work /stopping working or conditions.
Should an imminent risk with the potential to cause harm to an Eskom employee, contractor
employee, or the public be identified, the observer may engage with the affected parties because
of addressing the risk.
Individuals may report an activity, unsafe act, or unsafe condition that poses a threat to the health
and safety of persons to the authorised person.
The temporary stoppage of an activity/activities or task(s) may be due to OHS concerns,
including the following circumstances:
a) Ad hoc safety intervention by Eskom management: all work of a similar nature may be
stopped due to the occurrence of a serious incident, and the relevant supplier will be
required to comply with, and/or verify, the conditions stipulated in the safety intervention
instruction pack.
b) Ad hoc safety intervention by any person, especially OHS professionals, may be due to
unsafe work or unsafe behaviour by the contractor. The conditions that gave rise to the
work stoppage will determine the corrective measures to be taken urgently to protect the
health and safety of employees and protect the environment and plant or equipment, etc.
c) Work stoppage initiated by the government and other relevant agencies.
3.5 Supplier relationship management
a) OHS professionals to participate and support the SD&L initiatives.
b) Supplier registration reviews for OHS are conducted as centralised function by Risk and
Sustainability.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
c) For due diligence, OHS will conduct a desktop evaluation and/or site supplier site capability
and capacity assessment to verify the processes for the products and services contracted
and due diligence OHS report to be generated and submitted to Procurement and Supply
Chain /the initiator.
3.6 Material handling and storage equipment
a) Material handling and storage (preservation) manuals/procedures shall be provided to
Eskom by the suppliers/contractors during delivery or receipt inspection of the
goods/products/services.
b) The above requirements shall be stated in the enquiry/transaction documents. This is the
responsibility of the contract custodian/end user.
c) OHS professionals will advise the cross-functional team to ensure the above is included in
the enquiry/transaction documents.
3.7 Supplier review committee
The supplier review committee has been established to take such remedial measures, as
bestowed upon it by the Executive Tender Committee (ETC) and to the extent allowed by law,
against any tenderer or supplier found to have abused the supply chain management system or to
have been found guilty of misconduct, which measures include, but are not limited to,
reconsidering the registration status of such bidder or supplier based on the general or additional
grounds for consideration.
The Eskom contracts between Eskom and contractors/suppliers must include a clause that
enables Eskom to terminate the contract in the event when the supplier has built up a history of
poor performance in relation to matters or aspects of compliance with safety and health
regulations, policies, and/or procedures. The contract termination process can run concurrently
with the initiation process of referring the supplier/contractor to the review committee while
terminating the contract.
However, all the necessary steps need to be taken to assist the supplier/contractor to address their
shortcomings/gaps. The Eskom representatives must consider implementing the rehabilitation
process assisting the supplier/contractor to improve their performance and rectify the nonconformances, incidents, fatalities, etc. The review process should follow to assess the
effectiveness of the initiatives/action plan/recommendations.
Note: referring the contractor/supplier to the review committee should be the last resort. All
avenues to help the contractor/supplier should be exhausted.
The following process shall be followed when referring to the supplier/contractor to the
review committee:
The supplier investigation report by BU/OU will be required.
The Non-conformance reports issued.
Written feedback from the supplier.
The minutes of the meetings held with the supplier.
Sanction: state the period of suspension/blacklisting.
Contract: will the supplier complete the outstanding work, or is there another option/plan B?
Project information: start and end date.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
3.7.1 Contract completion/handover
Where applicable, it is the responsibility of the contract custodian to ensure that the final OHS
demobilisation inspection is carried out a month before the contract end date is reached with the
assistance of the OHS professionals or the contractor leaves site.
The contractor’s OHS file or copy thereof shall be handed over to the contract custodian on
completion of the project 10 days before the contract ceases. Eskom shall retain the OHS file for a
minimum of 40 years.
For in-house projects, where an Eskom department or division manages a project at another
division’s premise/site, the project handover shall include the OHS file, which shall be handed over
to the client or client’s agent (site owner/asset owner).
3.7.2 Phase 6: Post contract review
3.7.2.1 The contract custodian has to inform the supplier about the OHSKPIs before work can
commence, and Annexure D can be used as a guideline. The contractor performance
monitoring process will be applied based on the risk of the project. The BU/OU should
develop its contractor monitoring process. The OHS professional has to be involved to
assist the contract custodian with setting the OHSKPIs and shall prepare the OHS
component in preparation for the review process, that is, audit reports and the OHS
compact/contract, inspections, minutes, presentations, etc.
3.7.2.2 After a contract has ceased or ended, the supplier must be evaluated on OHS
performance throughout the project by the contract custodian, with the support of the
OHS professional.
3.7.2.3 The Procurement Practitioner shall ensure that post contract reviews are incorporated
in the procurement process, to review the supplier OHS performance during the
execution of the contract and ensure that the assessment results are made accessible
and available to relevant stakeholders for future reference.
3.7.2.4 The output of the post contract assessment shall be submitted to Procurement
(supplier management) for record-keeping purposes.
This document has been seen and accepted by:
Name Designation
K Pather General Manager – Sustainability Systems
M Moahlodi Senior Manager- Corporate Hygiene and Safety
Marius Atterbury Operational and Contractor OHS Manager (Acting)
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
Date Rev. Compiler Remarks
May 2021 3 F Pooe/D Review was conducted to combine 32-726, 32-524
Maunatlala and 37(2) agreement into one procedure and also to
align with the reviewed 32-1034.
August 2 D Maunatlala A review was conducted to align the standard with
2016 the new procurement process in Eskom.
June 2014 1 D Maunatlala A review was conducted to realign the standard with
the PPPF Act (Act ).
June 2011 0 Development This standard addresses minimum safety, health,
team and environmental requirements that must be
integrated into the Eskom procurement process.
Florence Pooe
Diane Maunatlala
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
Appendix A: OHS functionality evaluation criteria
scoring / threshold per functional area to proceed to the next step
70%
Table 1: Evaluation Criteria on Functionality
Functionality Criteria Tenderers will be expected to Total percentage allocated per
score at least the minimum functional area
threshold per functional area
to proceed to the next step
Safety & Health 70% 100%
Minimum Threshold 70%
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
Appendix B: Tender/Enquiry process flow
The process flow below shall be followed in implementing OHS in the procurement and supply chain processes.
Provide scope-specific OHS requirements
OHS shall form part of the negotiation meeting and highlight the gaps identified and influence the procurement strategy
during the tender evaluation. Further clarify the OHS file requirements and
negotiate the new submission date.
OHS will participate in all the meetings, i.e. The suppliers that did not respond to the request within the stipulated time will
clarification, squad check, negotiation, etc. be rendered non-responsive, whereas the suppliers that responded will be re-
evaluated. The final OHS tender evalution report will be generated and
submitted to the procurement and supply chain management. Note: The Evaluate the OHS file. If
supplier will only be evaluated twice during the tender phase prior to contract satisfied, provide a letter
award, this is also applicable to due diligence transactions. of acceptance. Should
the supplier/contractor
not meet most of the
critical OHS
requirements, OHS shall
For contractal requirements, OHS will only evaluate the shortlisted suppliers. give the
OHS professionals will conduct the initial tender evaluation and OHS report will be supplier/contractor an For functionality, OHS must form part of the
generated and submtted to procurement and supply chain management. opportunity to address mandatory tender requirements. For
evaluations under functionality, refer to the The procurement and supply chain will engage the suppliers only ONCE, requesting the the shortcomings and
outstanding documents to be submitted within a period not exceeding seven working the OHS file must be Annexure A for setting the threshold criteria
days or as agreed by the cross-functional team approves prior to the in applying OHS.
commencement of work.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
Appendix C: Contractor OHS management model flow diagrams
Phase 1
Project initiation and
briefing: Concept and
Project initiation OHS forms part of feasibility:
and briefing and the multidisciplinary Attend design and
concept and team. project review Design
feasibility and Attend the meetings. development
design construction/ project Prepare draft
development initiation meetings. construction/
Advise on OHS project baseline
requirements in line risk assessment.
with the project.
Phase 2
Tender enquiry Tender evaluation Contract award
OHS forms part of the OHS function conducts The OHS professional
Tender multidisciplinary team the OHS tender must advise on
enquiry, OHS requirements form evaluation in recommended suppliers for
evaluation, part of the strategy accordance with the contract award.
and contract The following documents published Annexure 37(2) agreement must be
award are sent out with the C1/C2/C3/C4/C5. signed with the contract.
enquiry: OHS The OHS professional Contractor /supplier must
specification, Annexure B, compiles the evaluation be provided with relevant
Project risk assessment report and submits to OHS procedures, policies
and 32-136 Contractor the procurement office. and standards.
OHS requirements and
Annexure C1/2/3/4/5
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contract and Contractor OHS management Unique Identifier: 32-726
Revision: 3
Page:
Phase 3
Supplier registration
It is conducted centrally by Sustainability.
The supplier registers on the portal.Supplier/Vendor
registration
Phase 4
OHS File Induction
OHS file must be submitted The contractor employees Access
to the OHS professional to shall undergo Eskom The contractor employeesAccess to site/Site
evaluate and approve induction must be provided accessmobilization
The end-user/project The contractor must provide after complying with the
manager/contract custodian his/her employees with the site’s OHS prerequisite
must co-sign the approved company’s risk based/scope
OHS file specific induction
Phase 5
Continual monitoring
a) OHS professionals shall conduct work stoppages, inspections, audits, and blitzes to monitor OHS compliance
Contracts/Services and adherence by the contractor. The Eskom OHS professional reserves the right to conduct these
execution, performance measurement activities on all its contractors.
continual
b) The project manager shall ensure that monitoring mechanisms (such as audits and reviews) are instituted, with
monitoring OHS file
CONTROLLEDthe supportDISCLOSUREof OHS professionals, to ensure compliance with OHS legislative and Eskom requirements.
When downloaded from the document management system, this document is uncontrolled, and the responsibility rests with the
user to ensure that it is in line with the authorised version on the system. No part of this document may be reproduced without
the express consent of the copyright holder, Eskom Holdings SOC Ltd, Reg. No. 2002/015527/30.
Contact Information
Source: Safety,_Health,_Environment_and_Quality_(SHEQ)_Policy.pdf (unknown){"name":null,"email":null,"phone":null,"department":"ies. Eskom’s approach to occupational health, safety, the environment and quality is","address":"Environment, Unique Identifier: 32-727"}
Evaluation Criteria
Source: Safety,_Health,_Environment_and_Quality_(SHEQ)_Policy.pdf (unknown)The document does not specify explicit eligibility criteria (e.g., financial, technical, or legal requirements) for this tender. However, as a contractor/supplier to Eskom, applicants must be formally contracted and must demonstrate the ability to meet the SHEQ policy requirements, including having a relevant management system (ISO 9001, 14001, 45001) and a commitment to zero harm and zero defects.
Technical Specifications
Source: Safety,_Health,_Environment_and_Quality_(SHEQ)_Policy.pdf (unknown)Eskom Holdings SOC Ltd, Registration Number 2002/015527/30, is South Africa’s primary electricity
supplier and is wholly owned by the South African Government.
Eskom’s mandate is to efficiently ensure a stable electricity supply, contributing to lower business
costs and enabling economic growth. Given this mandate, Eskom has a considerable impact on the
economy and the everyday lives of all South Africans and the region. In the same way that the
concept of sustainable development is understood, it is recognised that there is always a relationship
and thus influence between financial, technical, environmental, social and governance risks and
opportunities. Eskom’s approach to occupational health, safety, the environment and quality is
entrenched in its values and living the purpose of ‘powering growth sustainably’ to achieve the vision
of ‘sustainable power for a better future.
Eskom is committed to upholding safety, health, environmental, and quality principles to ensure that
no operating condition or service urgency justifies exposing anyone to risks that could lead to
incidents with health, safety, environmental, and quality consequences. This Safety, Health,
Environment & Quality (SHEQ) Policy governs principles and rules to fulfil Eskom’s commitment to
people, the environment and quality.
Eskom's operations are underpinned by the organisation’s mandate, vision, purpose, shareholder
priorities, strategic objectives and values
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Safety, Health, Environment, Unique Identifier: 32-727
Revision: 5and Quality (SHEQ) Policy
Page:
2.1 Scope
This policy addresses safety, health, environment and quality across the Eskom Holdings SOC Ltd
and its subsidiaries.
2.1.1 Purpose
The intent of this policy is to affirm the commitment to excellence in safety, health, environment, and
quality management, encompassing the ESG framework within Eskom Holdings SOC Ltd, and to
ensure uniformity and compliance with legal and other requirements across the organisation.
2.1.2 Applicability
This policy shall apply throughout Eskom Holdings SOC Ltd divisions, subsidiaries, and entities in
which Eskom has a controlling interest or influence.
2.1.3 Effective date
Implementation of this policy shall take effect from the date of its official authorisation and
communication.
2.2 Normative/Informative references
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
[1] Constitution of the Republic of South Africa Act, No. .
[2] National Environmental Management Act, No. .
[3] Occupational Health and Safety Act, No. .
[4] Compensation for Occupational Injuries and Diseases Act, No. .
[5] Climate Change Act .
[6] 559-1176736448 Eskom Environmental, Social and Governance (ESG) Framework.
[7] 240-77569976 Eskom Climate Change Strategy.
[8] Eskom Environmental, Social and Governance (ESG) Plan.
[9] 240-62196227 Life-saving Rules Standard.
[10] 32-716 OHS Communications Standard.
[11] 240-121768701 Quality Management Communication and Change Management Plan.
[12] 240-53413860 Business Management System Auditing Standard.
[13] 240-53458685 Management System Review Standard.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Safety, Health, Environment, Unique Identifier: 32-727
Revision: 5and Quality (SHEQ) Policy
Page:
[14] 240-62582234 OHS Roles and Responsibilities and Statutory Appointments.
[15] 240-163949531 Eskom Quality Control Procedure.
[16] 32-1122 Health and Wellness Policy.
[17] 240 - 89609040 Physical Wellness Standard.
[18] 240-91258590 Employee Assistance Programme (EAP) Standard.
[19] ISO 9001 Quality Management Systems – Requirements.
[20] ISO 14001 Environmental Management Systems – Requirements with guidance for use.
[21] ISO 45001 Occupational Health and Safety Management System Standard — Requirements
with guidance for use.
2.2.2 Informative
[1] ISO 9000 Quality Management Systems – Fundamentals and Vocabulary.
[2] Health and Safety Agreement between Eskom and Organised Labour.
[3] ISO 9004 Managing for the Sustained Success of an Organisation – A Quality Management
Approach.
[4] ISO 31000 Risk Management - Principles and guidelines on implementation
[5] Mines Health and Safety Act, No. .
[6] 240-77569976 Eskom Climate Change Policy
[7] 240-101714742 Eskom Quality Strategy
[8] 32-391 Eskom Integrated Risk Management Standard
[9] 240-50054140 Subsidiary Governance Framework Policy
[10] 32-86 Enterprise Risk and Resilience Policy
[11] 240-82410629 Environmental Strategy
[12] 240-60490979 OHS Operational Plan
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Safety, Health, Environment, Unique Identifier: 32-727
Revision: 5and Quality (SHEQ) Policy
Page:
2.3 Definitions
2.3.1 Accident: Any unplanned event, arising out of and during, an Eskom or contractor
employee’s employment and resulting in personal injury, ill-health, or death of the employee,
including damage and/or environmental pollution or degradation, as well as death of, or injury
to, any member of the public.
2.3.2 Climate Change definitions:
2.3.2.1 Climate Change Act : A change of climate that is attributed directly or indirectly
to human activity that alters the composition of the global atmosphere and that is in addition
to natural climate variability observed over comparable time periods
2.3.2.2 The global phenomenon marked by substantial and enduring shifts in temperature, weather
patterns, and environmental conditions. These changes are primarily driven by human
activities, such as the burning of fossil fuels, deforestation, and industrial processes, which
release significant amounts of greenhouse gases (GHGs) into the atmosphere. These gases
trap outgoing longwave radiation, increasing the average global temperature − a warming
effect that leads to a range of climate-related impacts.
2.3.3 Competence: Process of attaining competence in terms of (knowledge, experience, skill)
2.3.4 Conformity: Fulfilment of a requirement
2.3.5 Consultation: Seeking views before making a decision.
2.3.6 Continual improvement: Recurring activity to increase the ability to fulfil requirements.
2.3.7 Contractor/Supplier: Any employer formally contracted (directly or indirectly) by Eskom and
who performs work and supplies a service, product, equipment or material to advance
Eskom’s business or other interests is classified as a contractor. This includes Eskom non-
executive board members, personal contractors (that is, consultants) and third-party
contractors (that is, vendors, suppliers, agents, joint ventures, principal contractors and
subcontractors). (The OHS Act section 1 refers to the definition as mandatory).
2.3.8 Customer: person or organization that could or does receive a product or a service that is
intended for or required by this person or organization.
2.3.9 Environment: The surroundings within which humans exist and that are made up of:
i. The land, water, and atmosphere of the earth.
ii. Micro-organisms and plant and animal life.
iii. Any part or combination of (i) and (ii) and the interrelationships among and between
them; and
iv. The physical, chemical, aesthetic, and cultural properties and conditions of the foregoing
that influence human health and well-being.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Safety, Health, Environment, Unique Identifier: 32-727
Revision: 5and Quality (SHEQ) Policy
Page:
2.3.10 Environmental, social and governance1: These are called pillars in the ESG Framework
and represent the three main topic areas that companies are expected to report on. The goal
of ESG is to capture all the non-financial risks and opportunities inherent to a company's day-
to-day activities. Note: In the ESG context, environmental risks refer to how a company
impacts the environment; social risks refer to actions that affect the communities around
them; governance risks refer to how a business operates, including its governing policies.
2.3.11 Eskom: Eskom Holdings SOC Ltd.
2.3.12 Incident: Any unplanned event that could or does result in harm, injury and ill-health,
damage, and/or environmental pollution or degradation or gives rise to an accident or has the
potential to lead to an accident.
2.3.13 Interested party: Person or organisation that can affect, be affected by, or perceive itself to
be affected by a decision or activity.
2.3.14 Lean: A business approach that focuses on maximizing customer value by minimizing waste
and using a mindset of continuous improvement
2.3.15 Nonconformity: Non-fulfilment of a requirement
2.3.16 Occupational health and safety: Deals with the prevention of occupational injuries and
diseases as well as the protection, promotion and maintenance of the health of all employees
and other workers (including temporary workers, contractors and visitors). It includes
occupational hygiene, occupational safety, occupational medicine, occupational health
nursing, fire safety, public safety and emergency preparedness.
2.3.17 Objective: Result to be achieved - An objective can be strategic, tactical, or operational
2.3.18 Participation: Involvement in decision-making.
2.3.19 Quality: quality degree to which a set of inherent characteristics of an object fulfils
Compliance Requirements
Source: Safety,_Health,_Environment_and_Quality_(SHEQ)_Policy.pdf (unknown)determined by comparing a set of inherent characteristics with a set of requirements. If those inherent characteristics meet all requirements, high or excellent quality is achieved. If those characteristics do not meet all requirements, a low or poor level of quality is achieved. 2.3.20 Rework: Action on a non-conforming product or service to make it conform to the requirements. 2.3.21 Requirement: A need or expectation that is stated, generally implied or obligatory 2.3.22 Risk: Effect of uncertainty 2.3.23 Six Sigma: A standard deviation from the mean 1 https://www2.deloitte.com/ce/en/pages/global-business-services/articles/esg-explained-1-what-is-esg.html CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 Safety, Health, Environment, Unique Identifier: 32-727 Revision: 5and Quality (SHEQ) Policy Page: 2.3.24 Subsidiary: A company of another juristic person if that juristic person, one or more other Subsidiaries of that juristic person, one or more nominees of that juristic person or any of its Subsidiaries, alone or in any combination
is or are directly or indirectly able to exercise, or control the exercising of, a majority of the general voting rights associated with issued securities of that company, whether pursuant to a shareholder agreement or otherwise; or
has or have the right to appoint or elect, or control the appointment or election of, directors of that company who control a majority of the votes at a meeting of the Board. "Subsidiary” in the context of the SGF refers to Eskom's wholly owned subsidiaries 2.3.25 Top Management: Person or group of people with directs and controls an organisation at the highest level. 2.3.26 Zero defects: Aimed at the reduction of defects through prevention. It is designed to motivate people to prevent mistakes by cultivating a consistent, conscious desire to do their job right the first time. 2.3.27 Zero Harm: Ensuring that the Eskom operational activities do not inflict harm on Eskom’s assets, its employees, contractors/suppliers and members of the public to be affected by its operations, and the environment in terms of compliance obligation 2.4 Abbreviations Abbreviation Explanation EDC Eskom Documentation Centre ESG Environmental, Social and Governance Escap Eskom Captive ERI Eskom Rotek Industries EXCO Executive Management Committee ISO International Organisation for Standardisation ISO 9001 Quality Management System requirements ISO 14001 Environmental management systems - Requirements with guidance for use ISO 45001 Occupational health and safety management systems - Requirements with guidance for use GHG Greenhouse Gases LTD Limited NTCSA National Transmission OHS Occupational Health and Safety PDCA Plan, Do, Check, Act SHEQ Safety, Health, Environment and Quality SOC State-Owned Company CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 Safety, Health, Environment, Unique Identifier: 32-727 Revision: 5and Quality (SHEQ) Policy Page: 2.5 Roles and responsibilities 2.5.1 Eskom’s leadership is accountable for leading the practices and processes needed to control and manage safety, health, environment and quality risks, opportunities and impacts as an integral part of Eskom’s operations. 2.5.2 Eskom leadership is accountable and responsible for reviewing, maintaining and ensuring the implementation of the SHEQ Policy and driving SHEQ initiatives. 2.5.3 Eskom employees are responsible for understanding and incorporating safety, health, environment and quality into daily work activities by ensuring adherence to standards, procedures, rules, regulations and participating in SHEQ improvement efforts. 2.5.4 Eskom’s external service providers have a duty to fulfil all relevant safety, health, environmental, and quality compliance obligations, including conformity to standards and organisational requirements.
Policy Content 3.1 Policy Statement Eskom will integrate and/or incorporate safety, health, environmental, and quality requirements into its operations through the Plan-Do-Check-Act (PDCA) quality cycle. This approach will ensure that decisions are made with consideration for economic development, environmental duty of care, social equity, continuous process performance improvement, and the achievement of key stakeholder requirements. 3.1.1 Fulfilling compliance and conformity to legal and other requirements to which Eskom subscribes and sets to meet the intent of this policy. 3.1.2 Establishing, documenting, implementing and review of the management systems in accordance with, but not limited to ISO 9001, ISO 14001, and ISO 45001 requirements. 3.1.3 Setting safety, health, environment, and quality objectives to achieve intended outcomes and measuring performance against these to ensure continual improvement. 3.1.4 Taking overall responsibility and driving accountability for ensuring safe and healthy workplaces and operations, with the clear aim of preventing work-related injuries and ill-health through the consistent provision of safe practices, environments, and activities. 3.1.5 Consultation and participation of workers and/or worker representatives on safety, health, environment, and quality management systems matters. CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 Safety, Health, Environment, Unique Identifier: 32-727 Revision: 5and Quality (SHEQ) Policy Page: 3.1.6 Engaging interested parties and stakeholders by promoting open communication that is purpose-driven in line with safety, health, environment, and quality requirements 3.1.7 Conducting safety, health, environment and quality training and creating employee awareness. 3.1.8 Minimising the impact of our business on the environment, encouraging the development and implementation of environmentally friendly technologies. This will ensure the preservation of natural resources, sustainability, and the setting and achievement of environmental targets and objectives in line with the environmental strategy. 3.1.9 Proactively managing Eskom’s environmental footprint. This will be achieved by minimising pollution and environmental degradation, pursuing a low-carbon future, and prioritising energy and water conservation and demand management with Eskom stakeholders. 3.1.10 Ensuring the Eskom vision of ‘sustainable power for a better future’ is realised through, among others, the ongoing determination of the environmental, social and governance (ESG) risks it face, and opportunities presented. Eskom will treat identified risks and pursue opportunities through plans and initiatives with the oversight of appropriate governance structures, and measure effectiveness against key performance indicators (KPIs). 3.1.11 Addressing climate change, with a combined focus of: (i) reducing GHG emissions, whilst maintaining grid stability, meeting electricity demand, minimizing electricity supply costs and supporting financial sustainability; and (ii) protecting and securing Eskom's assets and operations from the adverse impacts of climate change to promote resilience 3.1.12 Addressing the needs and expectations of Eskom’s employees, customers, interested parties and stakeholders using methodologies from frontline to executive leadership, utilising digital innovation and proactive communication to achieve consistent operational reliability and intended outcomes. 3.1.13 Eskom's approach to quality is underpinned by the principles of Lean, Six Sigma, to drive continuous improvement and operational excellence. The organisation is committed to the proactive elimination of waste, zero rework, the reduction of variation and the optimisation of processes to enhance value. 3.1.14 Ensuring the opportunity for SHEQ management systems improvement by applying risk- based assessment methodologies (e.g., conducting risk assessment, emergency preparedness and disaster responses, response to emerging outbreaks and medical surveillance. CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 Safety, Health, Environment, Unique Identifier: 32-727 Revision: 5and Quality (SHEQ) Policy Page: 3.1.15 Eskom external service providers (contractors/suppliers) should establish, develop, and implement a relevant management system that conforms to, but is not limited to, ISO 9001, ISO 14001, ISO 45001 or other applicable standards. 3.1.16 Supporting the establishment and functioning of safety, health, environment and quality committees. 3.1.17 To contribute to effective management of SHEQ requirements, Eskom and its partners are committed to developing skills and enhancing employee competency at all organisational levels through continuous training, education and awareness. 3.1.18 Ensuring that adequate structures and resources are available for safety, health, environment and quality management. 3.1.19 Ensuring the management of safety, health, environment, and quality during the procurement and supply chain of the goods, services, and products that are sourced from external service providers(contractors/suppliers). 3.1.20 Ensuring continual improvement in SHEQ systems to enhance Eskom’s business performance 3.2 Policy principles or rules Eskom’s principles and rules that underpin the way in which the organisation approaches safety, health, environment and quality, embracing risk, resilience and climate change, are as follows
Poor quality performance and occupational health, safety and environmental incidents are preventable through effective management and proactive measures.
SHEQ performance is achieved through a Zero Harm, Minimal aspects leading to impacts and zero-defect culture.
Management is accountable for setting safety, health, environment and quality policy and where every employee is expected to ensure compliance, conformity and implementation and within the scope of their duties.
Conducting business with respect and care for people, the environment, and assets, by fostering a culture of ethical leadership, accountability, and sustainability.
Eskom will support national government to achieve the objectives that are set to ensure a low- carbon, climate resilient future by mainstreaming climate change initiatives throughout the different business divisions and subsidiaries. CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 Safety, Health, Environment, Unique Identifier: 32-727 Revision: 5and Quality (SHEQ) Policy Page
Eskom strives to ensure that Zero Harm befalls its employees, contractors, the public and the environment by pursuing: i.Open, isolate, test, earth, create an equipotential zone bond, and/or insulate before touch. ii.Zero fatalities. iii.Zero injuries, ill-health. iv.Zero environmental incidents. v.Zero tolerance. vi.Zero defects. vii.Ensure safe live working.
Eskom’s Life-saving Rules support the intent of the policy and applies to all employees, external service providers (contractors/suppliers) and visitors: i.Open, isolate, test, earth, create an equipotential zone bond, and/or insulate before touch ii.Hook up at heights iii.Buckle up iv.Be sober v.Permit to work vi.Ensure safe live working
Top management's commitment to translating the strategic objectives into measurable safety, health, environment, and quality goals and robust processes to demonstrate and support sustainable outcomes.
No operating condition or urgency of service justifies exposing anyone to negative risks arising out of Eskom’s business, causing an incident with safety, health, environmental and quality consequences.
Governance, decision-making processes and plans are based on safety, health, environment and quality intended outcomes and criteria in line with Eskom values and promote efficiency. CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 Safety, Health, Environment, Unique Identifier: 32-727 Revision: 5and Quality (SHEQ) Policy Page: 3.3 Process for monitoring The implementation of this policy throughout Eskom Holdings SOC Ltd and its subsidiaries shall be audited in accordance with the respective audit schedules.
Authorisation This document has been seen and accepted by: Abbreviation Designation/Committees OHS Occupational Health and Safety Steering Committee Environmental Management Environmental Steering Committee EQSC Eskom Quality Steering Committee EOQF Eskom Operational Quality Forum ERI REXCO Eskom Rotek Industries Executive Committee ERI SHEQ COE Eskom Rotek Industries Safety, Health Environment Quality-Centre of Excellence NTSCA EXCO National Transmission South Africa Executive Committee ESCAP SES ESCAP Social & Ethics Committee Meeting
Revisions Rev Date Coordinator Remarks Reviewed as per document review cycle to ensure alignment with the latest ISO 9001, ISO 14001 and ISO May 2025 P Dondashe 5 45001 standards, including new business requirements practices for its operations and processes. 4 October 2020 K Modiole Adding the word “environment”. Align to the requirements of the latest ISO 9001, ISO August 2020 3 K Modiole 14001 and ISO 45001 standards and new business requirements. Update of policy based on revised ISO 9001 and 14001 standards; change in Eskom’s registration name; August 2016 2 L Cloete changed to refer to other standards as may be applicable; aligned to Corporate Plan; and the appointment of a new Group Chief Executive. Update of policy based on revision date, while taking into August 2013 1 S Sambo account Eskom’s strategic imperatives, changed structure and additional Eskom values. CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 Safety, Health, Environment, Unique Identifier: 32-727 Revision: 5and Quality (SHEQ) Policy Page: Rev Date Coordinator Remarks This policy supersedes 32-94 and 32-7 SHE and Quality Policies. The contents of both policies were revised and August 2010 0 TL Ndlela incorporated into one policy, which was reallocated the reference number 32-727 in accordance with the Eskom Documentation Centre (EDC) requirements.
Development team The policy was reviewed by the Risk and Sustainability Business Unit, incorporating inputs from the divisions/groups across Eskom Holdings SOC Ltd and its subsidiaries.
Acknowledgements A special thanks to the review team for their valuable contribution and dedication in shaping and reviewing this policy and the SHEQ structure. CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Section
Source: Safety,_Health,_Environment_and_Quality_(SHEQ)_Policy.pdfand Quality (SHEQ) Policy
EDC TR Formatted and Quality Control 03.02.2026
Revision: 5and Quality (SHEQ) Policy
Evaluation Criteria
Source: 20250510_Method Statement_Cat 4 Tender Returnables.docx (unknown)The document does not explicitly list eligibility criteria, but bidders must be capable of delivering the scope of work as described in the NEC/RFQ. They must demonstrate relevant competencies, training, and infrastructure (PPE, tools, equipment) to execute the project. Compliance with Eskom's quality management and safety standards is implied. Bidders should have experience in building space optimization and be able to provide a detailed method statement as per the template.
Technical Specifications
Source: 20250510_Method Statement_Cat 4 Tender Returnables.docx (unknown)Method statement Title ( Title as per tender/RFQ title) Full Name ( Supplier Representative Details ) Originated by Reviewed by
(if applicable) Approved by: (if applicable) Approved by: (if applicable)
Method statement Title ( Title as per tender/RFQ title) Designation ( of the compiler)
Method statement Title ( Title as per tender/RFQ title) Contact No ( of the compiler)
Method statement Title ( Title as per tender/RFQ title) Date
Client (Division/Operating/ Business Unit as per tender RFQ) Tender /RFQ Number/ Contract Number
Activity Detailed Description (type in the information required) Detailed Description (type in the information required) Detailed Description (type in the information required) Reference Document/ Procedure Area / Dept./ Discipline
Scope of work as described in the contract document/ order/ tender Outline the scope of work as detailed in the Works Information of the NEC document/ RFQ Outline the scope of work as detailed in the Works Information of the NEC document/ RFQ Outline the scope of work as detailed in the Works Information of the NEC document/ RFQ Note the relevant document ref number ( if available) Relevant discipline (if any)
Scope of work Objectives/ Outputs / contract objectives List 2-3 objectives (SMART) in relation to the SOW outputs List 2-3 objectives (SMART) in relation to the SOW outputs List 2-3 objectives (SMART) in relation to the SOW outputs
Customer Focus - The primary focus of quality management is to meet customer requirements and to strive to exceed customer expectations. How are customer needs identified, and effectively communicated to affected personnel? How are customer needs identified, and effectively communicated to affected personnel in the organisation? How are customer needs identified, and effectively communicated to affected personnel in the organisation? How are customer needs identified, and effectively communicated to affected personnel in the organisation?
Competency, empowering and engaging people throughout the organization to enhance its capability to create value. What Human Resources, training and authority are required for delivering this SOW? Provide details of skills/ competencies and training required to deliver the tender/order Scope of work? Provide details of skills/ competencies and training required to deliver the tender/order Scope of work? Provide details of skills/ competencies and training required to deliver the tender/order Scope of work?
Infrastructure: PPE required PPE that is required in executing the scope of work PPE that is required in executing the scope of work PPE that is required in executing the scope of work
Infrastructure; What tools and equipment are required to deliver this SOW. List the tools/equipment/infrastructure (including testing/ measurements to be done) required to deliver the scope of work? List the tools/equipment/infrastructure (including testing/ measurements to be done) required to deliver the scope of work? List the tools/equipment/infrastructure (including testing/ measurements to be done) required to deliver the scope of work?
Leadership- How is the organization’s mission, vision, strategy, policies and processes communicated throughout the organization; What are the shared values of this organisation? The mission; vision; values of the organisation. The mission; vision; values of the organisation. The mission; vision; values of the organisation.
How are risks that affect outputs of the processes and overall outcomes of the SOW identified and managed? List all Risks associated with delivering the scope of work, what actions will be taken to minimise and mitigate the identified risks. List all Risks associated with delivering the scope of work, what actions will be taken to minimise and mitigate the identified risks. List all Risks associated with delivering the scope of work, what actions will be taken to minimise and mitigate the identified risks.
What actions will be undertaken for improving efficiency and effectiveness of the business processes? Explain how the organisation identifies gaps for improvement in business processes to meet or exceed customer/regulatory requirements Explain how the organisation identifies gaps for improvement in business processes to meet or exceed customer/regulatory requirements Explain how the organisation identifies gaps for improvement in business processes to meet or exceed customer/regulatory requirements
Data and Analysis –what data will be collected from this contract and what analysis will be carried out to assist with decision making in the future. What data is analysed for improvement on this scope of work? What data is analysed for improvement on this scope of work? What data is analysed for improvement on this scope of work?
Relationship Management. For sustained success, organizations manage their relationships with interested parties, such as suppliers. Purchasing/Procurement done including supplier selection criteria and monitoring if any. What other stakeholders, may be affected by the product/service being offered?
How are they affected (low; medium and high), and what actions are taken to address the stakeholders?
Is outsourcing involved in delivering this scope of work?
Explain how suppliers are identified, selected; evaluated and their performance monitored. What other stakeholders, may be affected by the product/service being offered?
How are they affected (low; medium and high), and what actions are taken to address the stakeholders?
Is outsourcing involved in delivering this scope of work?
Explain how suppliers are identified, selected; evaluated and their performance monitored. What other stakeholders, may be affected by the product/service being offered?
How are they affected (low; medium and high), and what actions are taken to address the stakeholders?
Is outsourcing involved in delivering this scope of work?
Explain how suppliers are identified, selected; evaluated and their performance monitored.
Important Dates
Source: Eng Building Space Optimisation - Env Requirements for Contractors and Suppliers.pdf (unknown){"closingDate":"19 Jan 2024","briefingSession":"{"date":null,"time":null,"venue":"the Environmental Acknowledgement Form (Appendix E) is reviewed by the","is_compulsory":false}"}
Contact Information
Source: Eng Building Space Optimisation - Env Requirements for Contractors and Suppliers.pdf (unknown){"name":null,"email":null,"phone":null,"department":"Supply Chain Management","address":"Practitioner and Contract or Project managers (contract custodians). It also"}
Evaluation Criteria
Source: Eng Building Space Optimisation - Env Requirements for Contractors and Suppliers.pdf (unknown)Tenderers must be able to demonstrate environmental compliance and management capability. They must have a documented EMS (preferably ISO 14001), appoint a qualified environmental representative (with relevant qualifications or training), and provide all required environmental returnables within the tender submission timeframe. Exemptions apply to certain suppliers (e.g., municipalities, emergency services, retail purchases), but for this tender, full compliance is expected.
Technical Specifications
Source: Eng Building Space Optimisation - Env Requirements for Contractors and Suppliers.pdf (unknown)Eskom is committed to creating and sustaining a Zero Harm culture and standard of safety, health,
the environment, and quality (SHEQ). Zero Harm means ensuring that the Eskom operational
activities do not inflict harm on Eskom’s assets, its employees, contractors, and members of the
public affected by its operations, and the environment in terms of compliance obligations. All
procurement has some level of impact on the environment that needs to be minimised to ensure
sustainable procurement practices. Most environmental impacts occur before goods, works or
services are procured, for example, resource extraction, design development, manufacturing,
transportation and storage, etc. Environment is an integral part of Eskom sustainable procurement
strategy.
This standard sets the minimum criteria for assessing supplier environmental conformity, based on
standards, procedures, policies, and compliance obligations with which Transmission suppliers need
to comply. It specifies a pre-determined set of environmental criteria to evaluate and monitor
potential and contracted Transmission suppliers. The objective is to ensure a common
understanding and consistent implementation of environmental requirements for procurement of
assets, goods, and services.
2.1 Scope
The standard outlines the key responsibilities of Procurement Practitioner, Contractor/Supplier,
Clients, Environmental Practitioner and Contract or Project managers (contract custodians). It also
provides the minimum environmental requirements to be addressed during:
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Suppliers
Revision: 1
Page:
a) Design phase.
b) Tender enquiry, evaluation, and contract award.
c) Supplier registration on the Transmission vendor data base.
d) Site access /site mobilization.
e) Monitoring of performance during the contract execution period.
f) Contract completion, close out, and post-contract review and
g) Instances and criteria where works or services under a contract can be stopped, suspended or
termination of contracts.
2.1.1 Purpose
The purpose of this standard is to ensure that Suppliers, Contractors, and Sub-Contractors
contracted to Transmission have established an Environmental Management System for goods,
works, or services they provide.
2.1.2 Applicability
This document shall apply throughout Transmission including Suppliers, Service providers,
Contractors, and Sub-Contractors.
2.1.3 Effective date
This standard shall be effective from the date of the signature.
2.2 Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
[1] 32-1034 Eskom Procurement and Supply Chain Management Procedure.
[2] 32-196 Eskom Disciplinary Code Standard.
[3] Project Specific Environmental Management Programmes/Environmental Management Plan.
[4] Project Specific Permits and Licenses (Construction stage).
[5] 240-43921804 Environmental Tender Evaluation Template.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Suppliers
Revision: 1
Page:
[6] 240-151560800 Environmental Evaluation-Commencement of work.
[7] 240-180100148 Pre-construction Access Agreement Form.
[8] 240-110600836 Contractor Environmental Requirements Proforma.
2.2.2 Informative
[9] National Environmental Management Act No
[10] ISO 14001: Environmental Management Systems
[11] National Environmental Management: Waste Act (Act )
[12] Environmental Impact Assessment Regulation (2014)
[13] National Water Act (Act )
[14] National Environmental Management: Air Quality Act (Act )
[15] National Environmental Management: Biodiversity Act (Act )
[16] National Environmental Management: Protected Areas Act (Act )
[17] National Heritage Resources Act (Act )
[18] National Veld and Forest Fire Act (Act )
[19] 240-82410629 Environmental Management Strategy
[20] 240-81146134 Implementing SHEQ as Objective Criteria Position Paper
2.3 Definitions
Definition Explanation
Environmental Any change to the environment, whether adverse or beneficial, wholly, or
Impact partially resulting from an organisation’s environmental aspects.
Environmental Authorisation obtained from a competent authority responsible for
Authorisation authorising listed activities in terms of the National Environmental
Management Act No .
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Suppliers
Revision: 1
Page:
Environmental It is a programme/plan of action for achieving organisational objectives
Management relating to the mitigation of environmental impacts of its activities, products,
Programme and services.
Environmental A programme for achieving organisational objectives and targets relating to
Management Plan mitigation of the environmental impacts of an organisation’s activities,
products, and services.
Project Means an activity or a group of activities that has a defined start and end
date, a defined scope, and as defined sum of money allocated to complete
the activities.
Project Life Cycle The project life cycle is a step-by-step framework of best practices used to
manage a project from its beginning to its end. It provides Project Managers
a structured way to create, execute, and finish a project.
Environmental file Means a permanent record containing information about the Environmental
management system during construction and all information relating to the
post-construction phase after the handover to the client, so that the client
can maintain the works in a healthy and safe way.
Method Statement Means a written document detailing the key environmental activities to
reduce the hazards identified in any risk assessment. In the case of internal
work, it includes procedures, safe work procedures, and work standards.
Environmental The measurable results of an organization's management of its
Performance environmental aspects.
Organisation A company, corporation, firm, enterprise, authority or institution, or part or
combination thereof, whether incorporated or not, public or private, that has
its own functions and administration.
Note: For organisations with more than one operating unit, a single
operating unit may be defined
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Suppliers
Revision: 1
Page:
Environmental authorisation obtained from a competent authority responsible for
Authorisation authorising listed activities in terms of the National Environmental
Management Act, 1998 (Act No.) Environmental Impact
Assessment Regulations (2014).
Contractor/Supplier Organisation or person that provides a product or service.
Organisation Example: Producers, distributor, retailer or vendor of a product, or provider
of a service or information.
Note 1: A supplier can be internal or external to the organisation.
Note 2: In a contractual situation, a supplier is sometimes called
“contractor”.
Document Controlled disclosure to external parties (either enforced by law or
Controlled discretionary).
Disclosure
Environmental Is a system which integrates policy, procedures, and processes for training
Management of personnel, monitoring, summarizing, and reporting of specialized
System environmental performance information to internal and external
stakeholders of an organisation.
2.4 Abbreviations
Abbreviation Explanation
EA Environmental Authorisation
ECO Environmental Control Officer
EMPr Environmental Management Programme
EMP Environmental Management Plan
EMS Environmental Management System
ISO International Organisation for Standardization
SDS Safety Data Sheet
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Suppliers
Revision: 1
Page:
Abbreviation Explanation
TDP Transmission Projects Delivery
SHE Safety Health and Environmental
SHEQ Safety Health Environment and Quality
P&SCM Procurement and Supply Chain Management
SHERQS Safety Health Environment Risk Quality & Security
2.5 Roles and Responsibilities
Procurement Practitioner shall:
Environmental Practitioners for the preparation of the relevant environmental requirements
for the enquiry.
the appropriate environmental practitioners prior to the release of tender documents.
input into the relevant meetings or forums, processes, and reports that lead to the awarding
of the contract (e.g., supplier evaluation, squad check meetings, contracting strategies,
negotiations, clarification meetings, tender evaluations and evaluation report compilations,
contract award, briefing meetings).
Environmental Practitioner to ensure that all applicable rules and requirements are
referenced in this form for Tenderers to acknowledge and comply with and ensure that its
completed and included in their tender.
Business Unit Manager shall be responsible for:
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Suppliers
Revision: 1
Page:
The Environmental Practitioner shall:
lead to the awarding of the contract.
requirements together with members of the cross functional team for each tender/enquiry
and shall ensure that these requirements are handed over to commercial representative
for inclusion in the tender/enquiry.
work and environmental risk assessment conducted for the contract.
are submitted with the tender returnables.
execution and post-contract review and assessment and must also ensure that all reports
are provided to contracts management.
interventions taken and provide the report to the contract custodian and submit to
contracts management.
technical evaluation criteria for the contract.
The Contract Custodian (Contract Executor) shall:
Ensure that the Supplier adheres to the relevant contract environmental requirements.
Ensure that project-specific environmental specifications together with specific
environmental aspects and other relevant procedures and documents are developed in
conjunction with the Environmental Practitioner and provided with the tender package.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Suppliers
Revision: 1
Page:
environmental obligations during contract execution, environmental intervention or
standoff, post contract review, supplier reconsideration are adequately addressed,
recorded, and submitted to contracts management for record and future references.
impractical to comply with and suggested recommendations shall be submitted in writing
to contract management where it is impractical to implement and /or comply with
environmental requirements as set out in this standard.
results of such assessment are recorded, documented, and kept.
of the Bills of Quantities in the contract.
Supplier /Service Provider:
documentation for evaluation.
Practitioners during the tender clarification meeting to fully comply with the requirements
of this standard. Such support, guidance and advise shall be levelled in writing with the
Eskom Representative whose details are in the tender document. Direct communication
between tenderers and Environmental Practitioners shall not be allowed. .
Transmission environmental requirements always when contracted with Transmission
Business Units.
related to the works, services or goods tendered for.
site requirements, and it is the responsibility of the Supplier to ensure that these
requirements are met before work can commence.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Suppliers
Revision: 1
Page:
2.6 Process for Monitoring
Compliance to this standard will be monitored during tender evaluations, periodic inspections and
audits on the works, goods or services rendered. The procedure / process shall include documenting
information to monitor performance, applicable operational controls (method statements) and
conformity with the Transmission EMPr/EMP and/or the EA.
environmental management procedures, and/or any inspection authority acting on
supplier’s behalf, to make available all information at its disposal certificates for review
by Transmission or its appointed inspection agency.
shall be made available to Transmission business units. These shall not be limited to:
o A procedure for Monitoring, Measurement, Analysis and Evaluation of
Quality Management
Source: Eng Building Space Optimisation - Env Requirements for Contractors and Suppliers.pdfRevision: 1
Page:
environmental obligations during contract execution, environmental intervention or
standoff, post contract review, supplier reconsideration are adequately addressed,
recorded, and submitted to contracts management for record and future references.
impractical to comply with and suggested recommendations shall be submitted in writing
to contract management where it is impractical to implement and /or comply with
environmental requirements as set out in this standard.
results of such assessment are recorded, documented, and kept.
of the Bills of Quantities in the contract.
the supplier prior the work made available for review when requested by Transmission or
is executed its appointed inspection agency. The supplier shall provide
suitable facilities and safe working environmental to
Revision: 1
Page:
requirements to be co-ordinated by the Office of the Group Executive - environmental
practitioners. The co-ordinating environmental practitioner will hand over to the business unit
environmental practitioner (phase 4 to 6), where the works or goods/services will be executed
by the environmental practitioners at relevant business unit.
and/or qualification validity period and shall be submitted to Transmission or its inspection
agency prior to commencement of the works. Documents to be submitted to Transmission
include, but may not be limited to the following:
o A completed and signed contractor Environmental Requirements Pro – Forma
(Appendix E).
o Contractors/suppliers Environmental procedures/method statement will be in
accordance with Transmission specific requirements.
o EMS documentation as required for the works.
o All documentation shall be submitted to Transmission for evaluation 7 days after
contract award.
o Organisation’s EMS records (refer to Appendix D).
o Permits as applicable.
o Corrective actions taken because of non-conformances raised by either the
compliance and adherence by the contractor. The Environmental Practitioner reserves the
right to conduct the performance measures on all contractors.
mechanism (such as audits and reviews) is instituted with the support of the environmental
practitioners to ensure compliance with environmental legislative/ legal obligation and
environmental inspection is conducted with the assistance of the environmental practitioners
allocated for the work. The environmental practitioner will ensure that the rehabilitation is
executed according to the EMPr/EMP and EA conditions. The environmental practitioner will
sign off the project close out handover form. This must be done before a contract is closed.
form with all records will be signed by all and handed over to business unit on completion of
the works/project. For work/project where the Business unit Managers are on another division
/site, the handover shall include the environmental file that will be handed over to the client
or client agent (site owner /asset owner).
accompany every shipment of product to its specified delivery destination(s) include, but may
not be limited to the following:
Revision: 1
Page:
Organisation certificates of conformance.
Organisation test certificates etc. as required by the applicable technical specification(s).
Inspection release reports issued by Transmission or its inspection agency including but
may not limited to:
o ECO close out report
o Final rehabilitation report
o Final sites close out audit/inspection report/NCR close out
NOTE: The above can be submitted and summarised in a form of a controlled register.
3.9 Phase 6: Post-Contract Review
to review the supplier’s environmental performance during the execution of contract and ensure
that the assessment results are made accessible and available to all relevant stakeholders for
future reference.
review process, that is, audit reports and the environmental compact/contract.
management) for record keeping purposes and the results input into the supplier database for
future consideration of the specific contractor.
Compliance Requirements
Source: Eng Building Space Optimisation - Env Requirements for Contractors and Suppliers.pdf (unknown)o Document specific checklists and registers o Monitoring/Inspection reports o Findings and close out reports. o Natural resource consumption (water, fuel, electricity usage etc.) 2.7 Related/Supporting Documents [1] 32-1034 Eskom Procurement and Supply Chain Management Procedure [2] 240-106082683 SHEQ Requirements for the Procurement and Supply Chain Processes in Eskom CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134 Suppliers Revision: 1 Page
The Contractor Environmental Management Model Transmission has adopted a six-phase environmental contractor management model to effectively manage contracts and suppliers. Phase 2: Phase Phase 4: Site Phase Tender Phase 5:Contract Phase 6: Post Mobilisation 1:Design Enquiry, 3:Supplier Execution -Contract /Access to Phase Evaluation Registration and Continual Review site and Award Monitoring Figure 1: illustrate the six phases environmental contractor management model 3.1 Phase 1: Design Phase
Environmental Practitioners to provide the designer with an environmental specification that are specific to the contract or services to ensure integration of the environmental requirements into the design.
The designer and the responsible environmental practitioner to conduct a site visit before commencing with the design or contract goods and services environmental specification can be developed. 3.2 Phase 2: Tender Enquiry, Evaluation, and Award
Functional environmental requirements will form part of the tender/enquiry. The tender/ enquiry shall be accompanied by a contract specific environmental specification and risk assessment and applicable SHE policies and procedures. CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134 Suppliers Revision: 1 Page: Transmission Supplier Conduct due diligence on All environmental documentation, records, reports shall be the supplier prior the work made available for review when requested by Transmission or is executed its appointed inspection agency. The supplier shall provide suitable facilities and safe working environmental to Transmission or its appointed environmental agency 3.3 Contractors Environmental Management System Requirements
The Contractor/supplier shall have a documented, implemented and maintained environmental management system, preferably guided by the ISO 14001:2015 Standard. New Suppliers can provide evidence of their compliance by maintaining accurate and up-to- date documentation and records related to their environmental management practices. This can include policies, procedures, training records, audits, and monitoring reports.
The Contractor shall be responsible for ensuring that all their Supplier Organisation’s environmental programmes comply with the Transmission requirements. The Contractor shall define the specific environmental control elements applicable to the scope of works, goods or services.
The Contractor shall inform Transmission of any changes to the environmental requirements that were evaluated during the tendering stage prior to implementation of these changes. 3.4 Environmental Planning
Any revisions to the plans/programmes shall require the agreement of Transmission or its environmental representatives prior to the commencement of work involving an activity affected by such changes.
The revision of environmental documents shall be subjected to review and approval by all parties previously responsible for evaluation prior to implementation. CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134 Suppliers Revision: 1 Page
The following will form part of the supplier’s documented EMS, and shall be internally reviewed, and formally approved. The environmental management system must cover each distinct stage of work performed/undertaken and it shall include but not be limited to: o Site establishment. o Access control to site. o Site construction and installation work (civil, electrical, power lines etc.). o Manufacturing (site, factory, temporary workshops etc.). o Storage areas (plant, equipment, free issue material etc.). o Waste Management Plan (or method statement); Site and Vegetation Clearing. o Handling of Hazardous Chemical substances. o Site management (water management, dust and noise, landowner liaison, final release and settlement of disputes and claims). o Rehabilitation. o Site demobilization.
Different physical locations where the supplier’s work will be performed, the significant environmental conditions will be included and mitigated.
Work to be performed by the supplier and their pre-determined scoping requirements.
Waste management plan/procedure that includes waste segregation and minimisation, waste disposal register, anticipated waste streams to be generated and related legal requirements applicable to waste management for specific scope of work.
Environmental records to be retained at site for the specific scope of work and, shall include but not be limited to: o Environmental Authorisation (including all other permits and licenses). o Project specific Environmental Management Plan/Programme. o Aspects and Impacts register. o Incident register and Investigation reports. o Non – Conformance register. CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134 Suppliers Revision: 1 Page: o Complaints register. o Waste statistics (reused, recycled, donated and disposal records). o Water use records. o Hazardous Substances registers and Safety Data Sheets. o Records of internal and external audits and inspections (reports, findings, action plans and close outs). o Records of site inspections conducted (checklists and reports). o ECO reports (where applicable). o Energy Efficiency Checklists. o Appointed environmental representative (Appointment Letter). 3.5 Organisational Environmental Aspects and Impacts Registers
Transmission Aspects and Impacts register shall identify/indicate/define/reflect the supplier’s scope as per the requirements of ISO 14001: 2015.
Transmission requires that the service providers ’s environmental requirements documentation meet the additional requirements below as a minimum
Identify and list all environmental aspects per activity.
Determine all the possible environmental impacts for each of the identified aspects.
All environmental aspects shall be assessed before and after controls.
Identify significant Aspects and Impacts and establish programmes/ procedures on how to address the impact to the environment.
The impacts shall be rated and must be included in a compiled Environmental Aspects and Impacts register (See Appendix A).
Aspects and Impacts register by the contractors/suppliers must be a revision-controlled document; An example of the Environmental Criteria for determining the significant impacts are explained in Appendix A. Note: this shall be managed according to the level of environmental risk. CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134 Suppliers Revision: 1 Page: Transmission Supplier Significant aspects shall be considered in the Planned actions and impact control (corrective) setting of Objectives and Targets and the measures for the medium and high significant determination of the environmental risks and impacts shall be undertaken through opportunities at the project level. environmental management programme/plan and/or through operational controls. Note: These records shall be kept in a hard copy and submitted to the environmental practitioners
The supplier’s organisational structure shall indicate the current management hierarchy as per scope of work (include SHEQ representatives). The structure must clearly show lines of responsibility and authority and shall reflect both the names of the appointed persons and their respective designations and positions. The management representative (i.e. appointed responsible authority of site) having overall responsibility for environmental management and planning.
A qualified person (National Diploma or a degree e.g., Environmental Sciences/Management or Nature Conservation or relevant Natural Sciences) having the responsibility for monitoring environmental planning and activities and their relationship within the management structure according to the project EMPr/EMP and/or EA requirement. For low risk projects an environmental representative with two weeks environmental training will be sufficient to be an environmental representative.
Environmental tender returnable must be clear to suppliers. The environmental practitioner to identify and list all applicable environmental requirements in relation to the scope of work
Where applicable, the tenders or potential suppliers must conduct a site visit of the area where the work shall be executed before tendering.
The site visit will be conducted with the supervision of contract custodian together with the commercial practitioner. CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134 Suppliers Revision: 1 Page: Items for informing the Tenderer
For the environmental requirements that were not met during the evaluation phase, the Tenderer will be given seven (7) days to submit the outstanding requirements. failure to submit the outstanding requirements within the seven (7) days period will render the tenderer non-compliant and the evaluated score will not change. As environmental requirements in a tender are contractual requirements, the non-compliance will not lead to a tenderer’s disqualification but will be highlighted in the submission report to the Delegated Approval Authority (DAA) for the Tenderer to address during the negotiations or post contract award.
Outstanding environmental issues at the clarification must be provided for in the contract with the tenderer given a specific period post contract award to address.
B-BBEE Minimum Level: 2
Health & Safety
Source: Eng Building Space Optimisation - Env Requirements for Contractors and Suppliers.pdfthe environment, and quality (SHEQ). Zero Harm means ensuring that the Eskom operational
activities do not inflict harm on Eskom’s assets, its employees, contractors, and members of the
public affected by its operations, and the environment in terms of compliance obligations. All
procurement has some level of impact on the environment that needs to be minimised to ensure
sustainable procurement practices. Most environmental impacts occur before goods, works or
services are procured, for example, resource extraction, design development, manufacturing,
transportation and storage, etc. Environment is an integral part of Eskom sustainable procurement
strategy.
reduce the hazards identified in any risk assessment. In the case of internal
work, it includes procedures, safe work procedures, and work standards.
for the enquiry.
the appropriate environmental practitioners prior to the release of tender documents.
input into the relevant meetings or forums, processes, and reports that lead to the awarding
of the contract (e.g., supplier evaluation, squad check meetings, contracting strategies,
negotiations, clarification meetings, tender evaluations and evaluation report compilations,
contract award, briefing meetings).
Ensure that the Environmental Acknowledgement Form (Appendix E) is reviewed by the
Participate in, and input into all the relevant meetings/forums, processes and reports that
lead to the awarding of the contract.
requirements together with members of the cross functional team for each tender/enquiry
and shall ensure that these requirements are handed over to commercial representative
for inclusion in the tender/enquiry.
work and environmental risk assessment conducted for the contract.
are submitted with the tender returnables.
execution and post-contract review and assessment and must also ensure that all reports
are provided to contracts management.
interventions taken and provide the report to the contract custodian and submit to
contracts management.
technical evaluation criteria for the contract.
The Contract Custodian (Contract Executor) shall:
Ensure that the Supplier adheres to the relevant contract environmental requirements.
Ensure that project-specific environmental specifications together with specific
environmental aspects and other relevant procedures and documents are developed in
conjunction with the Environmental Practitioner and provided with the tender package.
site
and Award Monitoring
Figure 1: illustrate the six phases environmental contractor management model
3.1 Phase 1: Design Phase
are specific to the contract or services to ensure integration of the environmental
requirements into the design.
commencing with the design or contract goods and services environmental specification can
be developed.
3.2 Phase 2: Tender Enquiry, Evaluation, and Award
enquiry shall be accompanied by a contract specific environmental specification and risk
assessment and applicable SHE policies and procedures.
Revision: 1
Page:
o Complaints register.
o Waste statistics (reused, recycled, donated and disposal records).
o Water use records.
o Hazardous Substances registers and Safety Data Sheets.
o Records of internal and external audits and inspections (reports, findings, action plans
and close outs).
o Records of site inspections conducted (checklists and reports).
o ECO reports (where applicable).
o Energy Efficiency Checklists.
o Appointed environmental representative (Appointment Letter).
3.5 Organisational Environmental Aspects and Impacts Registers
scope as per the requirements of ISO 14001: 2015.
documentation meet the additional requirements below as a minimum:
Identify and list all environmental aspects per activity.
Determine all the possible environmental impacts for each of the identified aspects.
All environmental aspects shall be assessed before and after controls.
Identify significant Aspects and Impacts and establish programmes/ procedures on how to
address the impact to the environment.
Impacts register (See Appendix A).
document; An example of the Environmental Criteria for determining the significant impacts
are explained in Appendix A.
Note: this shall be managed according to the level of environmental risk.
hazard and the magnitude is unknown (refer to appendix C to determine risk):
during the evaluation. The Tenderer to score full points against the specified criteria.
When the supplier does not score full marks, they will be given seven (7) days to
submit outstanding documents. Failure to do so will result in the original score being
retained. To be noted that while the all or nothing principle will be evaluated in this
process, suppliers will not be disqualified for not meeting all requirements. Suppliers
will be given the opportunity to meet the requirements at negotiations and if they again
fail, any outstanding requirements will be provided for in the contract for the supplier
to meet within the timeframe stipulated in the contract.
environmental impact regionally or locally that could result in a major uncontained or
sustained environmental release causing health hazard to humans and immediate vicinity
but not resulting in a critical or fatal injury/illness. This could result in an ecological damage
that can be remedied within one year. (Refer to appendix C to determine risk):
has little or no ecological effect and no measurable impact on human health (refer to
appendix C to determine risk): Environmental requirements shall be included as a
contractual requirement or as stipulated In the Procurement and Supply Chain
Independent electricity generators and demand response suppliers for rebate.
Venue and accommodation services where a contract does not exist between Transmission
and the supplier.
sanitation.
Purchasing of consumables from established retailers (trading outlets).
Disruption in transportation and distribution of goods/services due to extreme weather
condition and other declared emergencies and disasters (i.e., urgent procurement or
emergencies).
with environmental requirements.
3.7 Phase 4: Site Mobilisation /Access to Site
she/he is accountable for the management of her/his subcontractors and supplier and to
ensure that the subcontractors/suppliers comply with the applicable Environmental legal
obligation and other Eskom/ Transmission requirements (applicable during the contract
execution of works and services in terms of the contract).
conformances or non-compliance of the suppliers are dealt with as per the Transmission
supplier status reconsideration process (32-1034 Eskom Procurement and Supply Chain
Management Procedure)
Revision: 1
Page:
o Ad-hoc environmental intervention by Transmission management, all
work of similar nature may be stopped due to the occurrence of a
serious environmental incidents, and the relevant supplier will be
required to comply with the conditions stipulated in the work stoppage
instruction.
o Ad-hoc environmental intervention by any person, especially
environmental practitioners, may be due to activities by the contractor
that may degrade the environment. The conditions that may result to a
work stoppage will determine the corrective measures to be taken
urgently to protect the environment and plant or equipment to prevent
environmental pollution.
o Ad-hoc environmental intervention by government environmental
authorities, all work of similar nature may be stopped due to the
occurrence of a serious environmental incident or legal contravention,
and the relevant supplier will be required to comply with the conditions
stipulated in the work stoppage instruction.
Revision: 1
Page:
o A supplier had two or more contraventions of environmental legislation
including non-compliance with the condition contained in all
environmental approvals. The contractor has been issued with a
compliance notice that is issued by a government department, for an
example the Department of Forestry, Fisheries and the Environment
and Department of Water and Sanitation
o Violation of any of the Eskom Life-saving Rules occurs.
o Fraudulent environmental related documents are submitted by the
supplier.
C 240-108987034
Environmental
Source: Eng Building Space Optimisation - Env Requirements for Contractors and Suppliers.pdfTitle: Environmental Requirements for Document Identifier: 240-180100134
Area of Applicability: Transmission
Functional Area: Environmental
Date: 14/12/2023 Date: 19/01/2024 Date: 16/01/2024 Date: 19 Jan 2024
File name: Environmental Requirements for Contractors and or Suppliers Standard_Final_08 December2023
Template ID: 32-4 (Rev 11) Document template (for procedures, manuals, standards, instructions, etc.
Formatted by: EDC_TLN_17.03.2021 (Document Controller to update)
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
. Introduction ............................................................................................................................... 3
2.1 Scope ............................................................................................................................... 3
2.1.1 Purpose ................................................................................................................. 4
2.1.2 Applicability ........................................................................................................... 4
2.1.3 Effective date ......................................................................................................... 4
2.2 Normative/Informative References ................................................................................... 4
2.2.1 Normative .............................................................................................................. 4
2.2.2 Informative............................................................................................................. 5
2.3 Definitions ........................................................................................................................ 5
2.4 Abbreviations ................................................................................................................... 7
2.5 Roles and Responsibilities ............................................................................................... 8
2.6 Process for Monitoring .................................................................................................... 11
2.7 Related/Supporting Documents ...................................................................................... 11
3.1 Phase 1: Design Phase .................................................................................................. 12
3.2 Phase 2: Tender Enquiry, Evaluation, and Award ........................................................... 12
3.3 Contractors Environmental Management System Requirements .................................... 13
3.4 Environmental Planning .................................................................................................. 13
3.5 Organisational Environmental Aspects and Impacts Registers ....................................... 15
3.6 Phase 3: Supplier Registration ....................................................................................... 19
3.7 Phase 4: Site Mobilisation /Access to Site ...................................................................... 19
3.8 Phase 5: Contract Execution and Continual Monitoring .................................................. 20
3.9 Phase 6: Post-Contract Review ...................................................................................... 24
Acceptance ............................................................................................................................. 25
Revisions ................................................................................................................................ 25
Development Team ................................................................................................................ 26
Acknowledgements ................................................................................................................ 26
Appendices ................................................................................................................................... 27
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
standards, procedures, policies, and compliance obligations with which Transmission suppliers need
to comply. It specifies a pre-determined set of environmental criteria to evaluate and monitor
potential and contracted Transmission suppliers. The objective is to ensure a common
understanding and consistent implementation of environmental requirements for procurement of
assets, goods, and services.
Clients, Environmental Practitioner and Contract or Project managers (contract custodians). It also
provides the minimum environmental requirements to be addressed during:
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
contracted to Transmission have established an Environmental Management System for goods,
works, or services they provide.
2.1.2 Applicability
following paragraphs.
2.2.1 Normative
[1] 32-1034 Eskom Procurement and Supply Chain Management Procedure.
[2] 32-196 Eskom Disciplinary Code Standard.
[3] Project Specific Environmental Management Programmes/Environmental Management Plan.
[4] Project Specific Permits and Licenses (Construction stage).
[5] 240-43921804 Environmental Tender Evaluation Template.
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Revision: 1
Page:
[6] 240-151560800 Environmental Evaluation-Commencement of work.
[7] 240-180100148 Pre-construction Access Agreement Form.
[8] 240-110600836 Contractor Environmental Requirements Proforma.
2.2.2 Informative
[9] National Environmental Management Act No
[10] ISO 14001: Environmental Management Systems
[11] National Environmental Management: Waste Act (Act )
[12] Environmental Impact Assessment Regulation (2014)
[13] National Water Act (Act )
[14] National Environmental Management: Air Quality Act (Act )
[15] National Environmental Management: Biodiversity Act (Act )
[16] National Environmental Management: Protected Areas Act (Act )
[17] National Heritage Resources Act (Act )
[18] National Veld and Forest Fire Act (Act )
[19] 240-82410629 Environmental Management Strategy
[20] 240-81146134 Implementing SHEQ as Objective Criteria Position Paper
2.3 Definitions
Impact partially resulting from an organisation’s environmental aspects.
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Management Plan mitigation of the environmental impacts of an organisation’s activities,
products, and services.
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Management Act, 1998 (Act No.) Environmental Impact
Assessment Regulations (2014).
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
documentation for evaluation.
between tenderers and Environmental Practitioners shall not be allowed. .
The Supplier must comply with, and adhere to, environmental legislation and
The Supplier as a legal entity must be conversant with the environmental obligations
related to the works, services or goods tendered for.
site requirements, and it is the responsibility of the Supplier to ensure that these
requirements are met before work can commence.
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
audits on the works, goods or services rendered. The procedure / process shall include documenting
information to monitor performance, applicable operational controls (method statements) and
conformity with the Transmission EMPr/EMP and/or the EA.
environmental management procedures, and/or any inspection authority acting on
supplier’s behalf, to make available all information at its disposal certificates for review
by Transmission or its appointed inspection agency.
shall be made available to Transmission business units. These shall not be limited to:
o A procedure for Monitoring, Measurement, Analysis and Evaluation of
Compliance
o Document specific checklists and registers
o Monitoring/Inspection reports
o Findings and close out reports.
o Natural resource consumption (water, fuel, electricity usage etc.)
2.7 Related/Supporting Documents
[1] 32-1034 Eskom Procurement and Supply Chain Management Procedure
[2] 240-106082683 SHEQ Requirements for the Procurement and Supply Chain Processes in Eskom
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
3.3 Contractors Environmental Management System Requirements
environmental management system, preferably guided by the ISO 14001:2015 Standard.
date documentation and records related to their environmental management practices. This
can include policies, procedures, training records, audits, and monitoring reports.
environmental programmes comply with the Transmission requirements. The Contractor
shall define the specific environmental control elements applicable to the scope of works,
goods or services.
that were evaluated during the tendering stage prior to implementation of these changes.
3.4 Environmental Planning
environmental representatives prior to the commencement of work involving an activity
affected by such changes.
parties previously responsible for evaluation prior to implementation.
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Revision: 1
Page:
reviewed, and formally approved. The environmental management system must cover each
distinct stage of work performed/undertaken and it shall include but not be limited to:
o Site establishment.
o Access control to site.
o Site construction and installation work (civil, electrical, power lines etc.).
o Manufacturing (site, factory, temporary workshops etc.).
o Storage areas (plant, equipment, free issue material etc.).
o Waste Management Plan (or method statement); Site and Vegetation Clearing.
o Handling of Hazardous Chemical substances.
o Site management (water management, dust and noise, landowner liaison, final
release and settlement of disputes and claims).
o Rehabilitation.
o Site demobilization.
environmental conditions will be included and mitigated.
Work to be performed by the supplier and their pre-determined scoping requirements.
Waste management plan/procedure that includes waste segregation and minimisation, waste
disposal register, anticipated waste streams to be generated and related legal requirements
applicable to waste management for specific scope of work.
but not be limited to:
o Environmental Authorisation (including all other permits and licenses).
o Project specific Environmental Management Plan/Programme.
o Aspects and Impacts register.
o Incident register and Investigation reports.
o Non – Conformance register.
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Significant aspects shall be considered in the Planned actions and impact control (corrective)
setting of Objectives and Targets and the measures for the medium and high significant
determination of the environmental risks and impacts shall be undertaken through
opportunities at the project level. environmental management programme/plan
and/or through operational controls.
Note: These records shall be kept in a hard copy and submitted to the environmental
practitioners
per scope of work (include SHEQ representatives). The structure must clearly show lines of
responsibility and authority and shall reflect both the names of the appointed persons and
their respective designations and positions. The management representative (i.e. appointed
responsible authority of site) having overall responsibility for environmental management and
planning.
or Nature Conservation or relevant Natural Sciences) having the responsibility for monitoring
environmental planning and activities and their relationship within the management structure
according to the project EMPr/EMP and/or EA requirement. For low risk projects an
environmental representative with two weeks environmental training will be sufficient to be
an environmental representative.
to identify and list all applicable environmental requirements in relation to the scope of work
where the work shall be executed before tendering.
commercial practitioner.
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Tenderer will be given seven (7) days to submit the outstanding requirements. failure to
submit the outstanding requirements within the seven (7) days period will render the tenderer
non-compliant and the evaluated score will not change. As environmental requirements in a
tender are contractual requirements, the non-compliance will not lead to a tenderer’s
disqualification but will be highlighted in the submission report to the Delegated Approval
Authority (DAA) for the Tenderer to address during the negotiations or post contract award.
the tenderer given a specific period post contract award to address.
meetings. Environment shall be on the agenda for the clarification meeting and records of
the presentation are to be kept by commercial. To be noted that guidance and support at the
clarification meeting and all clarifications associated the tender must be levelled with the
Eskom Representative (Buyer).
respectively
evaluations are carried out by the allocated environmental practitioner responsible for the
tender. The environmental evaluation report shall be compiled by the responsible
environmental practitioner and submitted to commercial.
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Revision: 1
Page:
high risk that is recognised globally, widespread or permanent ecological damage locally.
responsible environmental practitioner for all contracts.
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
requirements to be met before work can commence.
3.6 Phase 3: Supplier Registration
returnable as per scope of work).
award
least one week prior) of the contract award so that they can ensure that environmental file
evaluation is done before the supplier can mobilise on site and commence with work.
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
the monitoring/assurance of this
performance and the supplier’s compliance at predetermined interval during contract
execution and that these reports are provided to the contract custodian, as well as the
commercial department during the execution of the contract and for the post-contract review
process.
a risk of degradation to the environment. This includes any unauthorised work or
commencement of the activity without required environmental authorisation or approvals or
service performed by, or legally or contractually non-compliant acts or omissions by the
concerns, including the following circumstances which shall not warrant any financial
compensation:
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
work)
D 240-43921804
E
F
Contractual Terms
Source: Eng Building Space Optimisation - Env Requirements for Contractors and Suppliers.pdfRevision: 1
Page:
a) Design phase.
b) Tender enquiry, evaluation, and contract award.
c) Supplier registration on the Transmission vendor data base.
d) Site access /site mobilization.
e) Monitoring of performance during the contract execution period.
f) Contract completion, close out, and post-contract review and
g) Instances and criteria where works or services under a contract can be stopped, suspended or
termination of contracts.
2.1.1 Purpose
commercial practitioner to the reconsideration of the supplier status committee when she/he
recommends the suspension or termination of the contract on the advice of environmental
practitioners.
shall be initiated when:
o A supplier has three major environmental non-conformances raised in
the same financial year.
Section
Source: Eng Building Space Optimisation - Env Requirements for Contractors and Suppliers.pdfleast one week prior) of the contract award so that they can ensure that environmental file
evaluation is done before the supplier can mobilise on site and commence with work.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Suppliers
Revision: 1
Page:
requirements to be co-ordinated by the Office of the Group Executive - environmental
practitioners. The co-ordinating environmental practitioner will hand over to the business unit
environmental practitioner (phase 4 to 6), where the works or goods/services will be executed
by the environmental practitioners at relevant business unit.
and/or qualification validity period and shall be submitted to Transmission or its inspection
agency prior to commencement of the works. Documents to be submitted to Transmission
include, but may not be limited to the following:
o A completed and signed contractor Environmental Requirements Pro – Forma
(Appendix E).
o Contractors/suppliers Environmental procedures/method statement will be in
accordance with Transmission specific requirements.
o EMS documentation as required for the works.
o All documentation shall be submitted to Transmission for evaluation 7 days after
contract award.
o Organisation’s EMS records (refer to Appendix D).
o Permits as applicable.
o Corrective actions taken because of non-conformances raised by either the
Organisation or Transmission.
3.8 Phase 5: Contract Execution and Continual Monitoring
Continual Environmental performance monitoring
compliance and adherence by the contractor. The Environmental Practitioner reserves the
right to conduct the performance measures on all contractors.
mechanism (such as audits and reviews) is instituted with the support of the environmental
practitioners to ensure compliance with environmental legislative/ legal obligation and
Transmission requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Suppliers
Revision: 1
Page:
Management of Sub-Contractors and Suppliers
she/he is accountable for the management of her/his subcontractors and supplier and to
ensure that the subcontractors/suppliers comply with the applicable Environmental legal
obligation and other Eskom/ Transmission requirements (applicable during the contract
execution of works and services in terms of the contract).
conformances or non-compliance of the suppliers are dealt with as per the Transmission
supplier status reconsideration process (32-1034 Eskom Procurement and Supply Chain
Management Procedure)
Enforcement of compliance with Environmental requirements during contract execution and
the monitoring/assurance of this
performance and the supplier’s compliance at predetermined interval during contract
execution and that these reports are provided to the contract custodian, as well as the
commercial department during the execution of the contract and for the post-contract review
process.
Work stoppage stoppage/suspension of works and services under a contract
a risk of degradation to the environment. This includes any unauthorised work or
commencement of the activity without required environmental authorisation or approvals or
service performed by, or legally or contractually non-compliant acts or omissions by the
Supplier or such Contractors.
concerns, including the following circumstances which shall not warrant any financial
compensation:
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Suppliers
Revision: 1
Page:
o Ad-hoc environmental intervention by Transmission management, all
work of similar nature may be stopped due to the occurrence of a
serious environmental incidents, and the relevant supplier will be
required to comply with the conditions stipulated in the work stoppage
instruction.
o Ad-hoc environmental intervention by any person, especially
environmental practitioners, may be due to activities by the contractor
that may degrade the environment. The conditions that may result to a
work stoppage will determine the corrective measures to be taken
urgently to protect the environment and plant or equipment to prevent
environmental pollution.
o Ad-hoc environmental intervention by government environmental
authorities, all work of similar nature may be stopped due to the
occurrence of a serious environmental incident or legal contravention,
and the relevant supplier will be required to comply with the conditions
stipulated in the work stoppage instruction.
Supplier status reconsideration
commercial practitioner to the reconsideration of the supplier status committee when she/he
recommends the suspension or termination of the contract on the advice of environmental
practitioners.
shall be initiated when:
o A supplier has three major environmental non-conformances raised in
the same financial year.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Suppliers
Revision: 1
Page:
o A supplier had two or more contraventions of environmental legislation
including non-compliance with the condition contained in all
environmental approvals. The contractor has been issued with a
compliance notice that is issued by a government department, for an
example the Department of Forestry, Fisheries and the Environment
and Department of Water and Sanitation
o Violation of any of the Eskom Life-saving Rules occurs.
o Fraudulent environmental related documents are submitted by the
supplier.
The investigation will be conducted, and the supplier will be informed about the outcome of the
investigation. If the supplier is found guilty of the above offences, they will be taken off the Eskom
data base with no future business prospect with Transmission. When the supplier is cleared on all
the offences, they will be re-considered to be reinstated on the Eskom database.
Note: No Transmission employee or representative is allowed to terminate or suspend a
contractor or supplier at any given time. The contractor must be referred to the
Reconsideration of Supplier Status Committee.
Contract Completion Process and Record Retention
environmental inspection is conducted with the assistance of the environmental practitioners
allocated for the work. The environmental practitioner will ensure that the rehabilitation is
executed according to the EMPr/EMP and EA conditions. The environmental practitioner will
sign off the project close out handover form. This must be done before a contract is closed.
form with all records will be signed by all and handed over to business unit on completion of
the works/project. For work/project where the Business unit Managers are on another division
/site, the handover shall include the environmental file that will be handed over to the client
or client agent (site owner /asset owner).
accompany every shipment of product to its specified delivery destination(s) include, but may
not be limited to the following:
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Suppliers
Revision: 1
Page:
Organisation certificates of conformance.
Organisation test certificates etc. as required by the applicable technical specification(s).
Inspection release reports issued by Transmission or its inspection agency including but
may not limited to:
o ECO close out report
o Final rehabilitation report
o Final sites close out audit/inspection report/NCR close out
NOTE: The above can be submitted and summarised in a form of a controlled register.
3.9 Phase 6: Post-Contract Review
to review the supplier’s environmental performance during the execution of contract and ensure
that the assessment results are made accessible and available to all relevant stakeholders for
future reference.
review process, that is, audit reports and the environmental compact/contract.
management) for record keeping purposes and the results input into the supplier database for
future consideration of the specific contractor.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Suppliers
Revision: 1
Page:
This document has been seen and accepted by:
Name Designation
Group Executive Transmission Group
General Manager Asset Management
General Manager Engineering
General Manager Energy Market and Services
General Manager Grid Planning and Development
General Manager International Traders
General Manager Office of the Group Executive
General Manager Operations and Maintenance (Grids)
General Manager Transmission Projects Delivery
General Manager System Operator
Senior Manager Finance
Acting Senior Human Resources
Manager
General Manager Procurement and Supply Chain Management
Transmission Group All Transmission Group BU’s
Bms
Representatives
Transmission Group All Transmission Group BU’s
BUERs
Date Rev. Compiler Remarks
November 2023 1 P Likhethe Transmission did not have a
level 2 procurement standard.
The division adopted level 3
Transmission Project Delivery
standards to convert it into a
level 2 document.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Suppliers
Revision: 1
Page:
The following people were involved in the development of this document:
The compiler would like to acknowledge the Transmission Environmental Management Team for
putting this document together.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Environmental Requirements for Contractors and/or Unique Identifier: 240-180100134
Suppliers
Revision: 1
Page:
Appendices
Appendix Description Document Reference Number
A 240-131655011
B 240-109832932
Providers or Suppliers
C 240-108987034
Medium, and Low risk
work)
D 240-43921804
E
Requirements Pro-forma
F
Statement Template for
Service Providers or
Suppliers
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Description
Source: Safety_Health_Environment_and_Quality_(SHEQ)_Policy Rev 5.pdfEskom Holdings SOC Ltd, Registration Number 2002/015527/30, is South Africa’s primary electricity
supplier and is wholly owned by the South African Government.
Eskom’s mandate is to efficiently ensure a stable electricity supply, contributing to lower business
costs and enabling economic growth. Given this mandate, Eskom has a considerable impact on the
economy and the everyday lives of all South Africans and the region. In the same way that the
concept of sustainable development is understood, it is recognised that there is always a relationship
and thus influence between financial, technical, environmental, social and governance risks and
opportunities. Eskom’s approach to occupational health, safety, the environment and quality is
entrenched in its values and living the purpose of ‘powering growth sustainably’ to achieve the vision
of ‘sustainable power for a better future.
Eskom is committed to upholding safety, health, environmental, and quality principles to ensure that
no operating condition or service urgency justifies exposing anyone to risks that could lead to
incidents with health, safety, environmental, and quality consequences. This Safety, Health,
Environment & Quality (SHEQ) Policy governs principles and rules to fulfil Eskom’s commitment to
people, the environment and quality.
Eskom's operations are underpinned by the organisation’s mandate, vision, purpose, shareholder
priorities, strategic objectives and values
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Safety, Health, Environment, Unique Identifier: 32-727
Revision: 5and Quality (SHEQ) Policy
Page:
2.1 Scope
This policy addresses safety, health, environment and quality across the Eskom Holdings SOC Ltd
and its subsidiaries.
2.1.1 Purpose
The intent of this policy is to affirm the commitment to excellence in safety, health, environment, and
quality management, encompassing the ESG framework within Eskom Holdings SOC Ltd, and to
ensure uniformity and compliance with legal and other requirements across the organisation.
2.1.2 Applicability
This policy shall apply throughout Eskom Holdings SOC Ltd divisions, subsidiaries, and entities in
which Eskom has a controlling interest or influence.
2.1.3 Effective date
Implementation of this policy shall take effect from the date of its official authorisation and
communication.
2.2 Normative/Informative references
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
[1] Constitution of the Republic of South Africa Act, No. .
[2] National Environmental Management Act, No. .
[3] Occupational Health and Safety Act, No. .
[4] Compensation for Occupational Injuries and Diseases Act, No. .
[5] Climate Change Act .
[6] 559-1176736448 Eskom Environmental, Social and Governance (ESG) Framework.
[7] 240-77569976 Eskom Climate Change Strategy.
[8] Eskom Environmental, Social and Governance (ESG) Plan.
[9] 240-62196227 Life-saving Rules Standard.
[10] 32-716 OHS Communications Standard.
[11] 240-121768701 Quality Management Communication and Change Management Plan.
[12] 240-53413860 Business Management System Auditing Standard.
[13] 240-53458685 Management System Review Standard.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Safety, Health, Environment, Unique Identifier: 32-727
Revision: 5and Quality (SHEQ) Policy
Page:
[14] 240-62582234 OHS Roles and Responsibilities and Statutory Appointments.
[15] 240-163949531 Eskom Quality Control Procedure.
[16] 32-1122 Health and Wellness Policy.
[17] 240 - 89609040 Physical Wellness Standard.
[18] 240-91258590 Employee Assistance Programme (EAP) Standard.
[19] ISO 9001 Quality Management Systems – Requirements.
[20] ISO 14001 Environmental Management Systems – Requirements with guidance for use.
[21] ISO 45001 Occupational Health and Safety Management System Standard — Requirements
with guidance for use.
2.2.2 Informative
[1] ISO 9000 Quality Management Systems – Fundamentals and Vocabulary.
[2] Health and Safety Agreement between Eskom and Organised Labour.
[3] ISO 9004 Managing for the Sustained Success of an Organisation – A Quality Management
Approach.
[4] ISO 31000 Risk Management - Principles and guidelines on implementation
[5] Mines Health and Safety Act, No. .
[6] 240-77569976 Eskom Climate Change Policy
[7] 240-101714742 Eskom Quality Strategy
[8] 32-391 Eskom Integrated Risk Management Standard
[9] 240-50054140 Subsidiary Governance Framework Policy
[10] 32-86 Enterprise Risk and Resilience Policy
[11] 240-82410629 Environmental Strategy
[12] 240-60490979 OHS Operational Plan
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Safety, Health, Environment, Unique Identifier: 32-727
Revision: 5and Quality (SHEQ) Policy
Page:
2.3 Definitions
2.3.1 Accident: Any unplanned event, arising out of and during, an Eskom or contractor
employee’s employment and resulting in personal injury, ill-health, or death of the employee,
including damage and/or environmental pollution or degradation, as well as death of, or injury
to, any member of the public.
2.3.2 Climate Change definitions:
2.3.2.1 Climate Change Act : A change of climate that is attributed directly or indirectly
to human activity that alters the composition of the global atmosphere and that is in addition
to natural climate variability observed over comparable time periods
2.3.2.2 The global phenomenon marked by substantial and enduring shifts in temperature, weather
patterns, and environmental conditions. These changes are primarily driven by human
activities, such as the burning of fossil fuels, deforestation, and industrial processes, which
release significant amounts of greenhouse gases (GHGs) into the atmosphere. These gases
trap outgoing longwave radiation, increasing the average global temperature − a warming
effect that leads to a range of climate-related impacts.
2.3.3 Competence: Process of attaining competence in terms of (knowledge, experience, skill)
2.3.4 Conformity: Fulfilment of a requirement
2.3.5 Consultation: Seeking views before making a decision.
2.3.6 Continual improvement: Recurring activity to increase the ability to fulfil requirements.
2.3.7 Contractor/Supplier: Any employer formally contracted (directly or indirectly) by Eskom and
who performs work and supplies a service, product, equipment or material to advance
Eskom’s business or other interests is classified as a contractor. This includes Eskom non-
executive board members, personal contractors (that is, consultants) and third-party
contractors (that is, vendors, suppliers, agents, joint ventures, principal contractors and
subcontractors). (The OHS Act section 1 refers to the definition as mandatory).
2.3.8 Customer: person or organization that could or does receive a product or a service that is
intended for or required by this person or organization.
2.3.9 Environment: The surroundings within which humans exist and that are made up of:
i. The land, water, and atmosphere of the earth.
ii. Micro-organisms and plant and animal life.
iii. Any part or combination of (i) and (ii) and the interrelationships among and between
them; and
iv. The physical, chemical, aesthetic, and cultural properties and conditions of the foregoing
that influence human health and well-being.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Safety, Health, Environment, Unique Identifier: 32-727
Revision: 5and Quality (SHEQ) Policy
Page:
2.3.10 Environmental, social and governance1: These are called pillars in the ESG Framework
and represent the three main topic areas that companies are expected to report on. The goal
of ESG is to capture all the non-financial risks and opportunities inherent to a company's day-
to-day activities. Note: In the ESG context, environmental risks refer to how a company
impacts the environment; social risks refer to actions that affect the communities around
them; governance risks refer to how a business operates, including its governing policies.
2.3.11 Eskom: Eskom Holdings SOC Ltd.
2.3.12 Incident: Any unplanned event that could or does result in harm, injury and ill-health,
damage, and/or environmental pollution or degradation or gives rise to an accident or has the
potential to lead to an accident.
2.3.13 Interested party: Person or organisation that can affect, be affected by, or perceive itself to
be affected by a decision or activity.
2.3.14 Lean: A business approach that focuses on maximizing customer value by minimizing waste
and using a mindset of continuous improvement
2.3.15 Nonconformity: Non-fulfilment of a requirement
2.3.16 Occupational health and safety: Deals with the prevention of occupational injuries and
diseases as well as the protection, promotion and maintenance of the health of all employees
and other workers (including temporary workers, contractors and visitors). It includes
occupational hygiene, occupational safety, occupational medicine, occupational health
nursing, fire safety, public safety and emergency preparedness.
2.3.17 Objective: Result to be achieved - An objective can be strategic, tactical, or operational
2.3.18 Participation: Involvement in decision-making.
2.3.19 Quality: quality degree to which a set of inherent characteristics of an object fulfils
Evaluation Criteria
Source: Safety_Health_Environment_and_Quality_(SHEQ)_Policy Rev 5.pdf (unknown)Eligible applicants are external service providers (contractors/suppliers) who can demonstrate compliance with Eskom's SHEQ policy and relevant ISO standards. They must have the capacity to manage safety, health, environment, and quality risks, and be willing to align with Eskom's zero-harm and continuous improvement culture.
Quality Management
Source: Safety_Health_Environment_and_Quality_(SHEQ)_Policy Rev 5.pdfits operations through the Plan-Do-Check-Act (PDCA) quality cycle. This approach will ensure that
decisions are made with consideration for economic development, environmental duty of care, social
equity, continuous process performance improvement, and the achievement of key stakeholder
requirements.
3.1.1 Fulfilling compliance and conformity to legal and other requirements to which Eskom
subscribes and sets to meet the intent of this policy.
3.1.2 Establishing, documenting, implementing and review of the management systems in
accordance with, but not limited to ISO 9001, ISO 14001, and ISO 45001 requirements.
3.1.3 Setting safety, health, environment, and quality objectives to achieve intended outcomes and
measuring performance against these to ensure continual improvement.
3.1.4 Taking overall responsibility and driving accountability for ensuring safe and healthy
workplaces and operations, with the clear aim of preventing work-related injuries and ill-health
through the consistent provision of safe practices, environments, and activities.
3.1.5 Consultation and participation of workers and/or worker representatives on safety, health,
environment, and quality management systems matters.
alignment with the latest ISO 9001, ISO 14001 and ISO
May 2025 P Dondashe
5 45001 standards, including new business requirements
practices for its operations and processes.
4 October 2020 K Modiole Adding the word “environment”.
Align to the requirements of the latest ISO 9001, ISO
August 2020 3 K Modiole 14001 and ISO 45001 standards and new business
requirements.
Update of policy based on revised ISO 9001 and 14001
standards; change in Eskom’s registration name;
August 2016 2 L Cloete changed to refer to other standards as may be
applicable; aligned to Corporate Plan; and the
appointment of a new Group Chief Executive.
Health & Safety
Source: Safety_Health_Environment_and_Quality_(SHEQ)_Policy Rev 5.pdfTitle: Safety, Health, Environment, Document Identifier: 32-727
and Quality (SHEQ) Policy
EDC TR Formatted and Quality Control 03.02.2026
Safety, Health, Environment, Unique Identifier: 32-727
Revision: 5and Quality (SHEQ) Policy
Page:
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Safety, Health, Environment, Unique Identifier: 32-727
Revision: 5and Quality (SHEQ) Policy
Page:
Eskom Holdings SOC Ltd, Registration Number 2002/015527/30, is South Africa’s primary electricity
supplier and is wholly owned by the South African Government.
Eskom’s mandate is to efficiently ensure a stable electricity supply, contributing to lower business
costs and enabling economic growth. Given this mandate, Eskom has a considerable impact on the
economy and the everyday lives of all South Africans and the region. In the same way that the
concept of sustainable development is understood, it is recognised that there is always a relationship
and thus influence between financial, technical, environmental, social and governance risks and
opportunities. Eskom’s approach to occupational health, safety, the environment and quality is
entrenched in its values and living the purpose of ‘powering growth sustainably’ to achieve the vision
of ‘sustainable power for a better future.
no operating condition or service urgency justifies exposing anyone to risks that could lead to
incidents with health, safety, environmental, and quality consequences. This Safety, Health,
Environment & Quality (SHEQ) Policy governs principles and rules to fulfil Eskom’s commitment to
people, the environment and quality.
Eskom's operations are underpinned by the organisation’s mandate, vision, purpose, shareholder
priorities, strategic objectives and values
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Safety, Health, Environment, Unique Identifier: 32-727
Revision: 5and Quality (SHEQ) Policy
Page:
following paragraphs.
2.2.1 Normative
[1] Constitution of the Republic of South Africa Act, No. .
[2] National Environmental Management Act, No. .
[3] Occupational Health and Safety Act, No. .
[4] Compensation for Occupational Injuries and Diseases Act, No. .
[5] Climate Change Act .
[6] 559-1176736448 Eskom Environmental, Social and Governance (ESG) Framework.
[7] 240-77569976 Eskom Climate Change Strategy.
[8] Eskom Environmental, Social and Governance (ESG) Plan.
[9] 240-62196227 Life-saving Rules Standard.
[10] 32-716 OHS Communications Standard.
[11] 240-121768701 Quality Management Communication and Change Management Plan.
[12] 240-53413860 Business Management System Auditing Standard.
[13] 240-53458685 Management System Review Standard.
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Safety, Health, Environment, Unique Identifier: 32-727
Revision: 5and Quality (SHEQ) Policy
Page:
[14] 240-62582234 OHS Roles and Responsibilities and Statutory Appointments.
[15] 240-163949531 Eskom Quality Control Procedure.
[16] 32-1122 Health and Wellness Policy.
[17] 240 - 89609040 Physical Wellness Standard.
[18] 240-91258590 Employee Assistance Programme (EAP) Standard.
[19] ISO 9001 Quality Management Systems – Requirements.
[20] ISO 14001 Environmental Management Systems – Requirements with guidance for use.
[21] ISO 45001 Occupational Health and Safety Management System Standard — Requirements
with guidance for use.
2.2.2 Informative
[1] ISO 9000 Quality Management Systems – Fundamentals and Vocabulary.
[2] Health and Safety Agreement between Eskom and Organised Labour.
[3] ISO 9004 Managing for the Sustained Success of an Organisation – A Quality Management
[4] ISO 31000 Risk Management - Principles and guidelines on implementation
[5] Mines Health and Safety Act, No. .
[6] 240-77569976 Eskom Climate Change Policy
[7] 240-101714742 Eskom Quality Strategy
[8] 32-391 Eskom Integrated Risk Management Standard
[9] 240-50054140 Subsidiary Governance Framework Policy
[10] 32-86 Enterprise Risk and Resilience Policy
[11] 240-82410629 Environmental Strategy
[12] 240-60490979 OHS Operational Plan
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Safety, Health, Environment, Unique Identifier: 32-727
Revision: 5and Quality (SHEQ) Policy
Page:
2.3 Definitions
2.3.1 Accident: Any unplanned event, arising out of and during, an Eskom or contractor
employee’s employment and resulting in personal injury, ill-health, or death of the employee,
including damage and/or environmental pollution or degradation, as well as death of, or injury
to, any member of the public.
2.3.2 Climate Change definitions:
2.3.2.1 Climate Change Act : A change of climate that is attributed directly or indirectly
to human activity that alters the composition of the global atmosphere and that is in addition
to natural climate variability observed over comparable time periods
2.3.2.2 The global phenomenon marked by substantial and enduring shifts in temperature, weather
patterns, and environmental conditions. These changes are primarily driven by human
activities, such as the burning of fossil fuels, deforestation, and industrial processes, which
release significant amounts of greenhouse gases (GHGs) into the atmosphere. These gases
trap outgoing longwave radiation, increasing the average global temperature − a warming
effect that leads to a range of climate-related impacts.
2.3.3 Competence: Process of attaining competence in terms of (knowledge, experience, skill)
2.3.4 Conformity: Fulfilment of a requirement
2.3.5 Consultation: Seeking views before making a decision.
2.3.6 Continual improvement: Recurring activity to increase the ability to fulfil requirements.
2.3.7 Contractor/Supplier: Any employer formally contracted (directly or indirectly) by Eskom and
who performs work and supplies a service, product, equipment or material to advance
Eskom’s business or other interests is classified as a contractor. This includes Eskom non-
executive board members, personal contractors (that is, consultants) and third-party
contractors (that is, vendors, suppliers, agents, joint ventures, principal contractors and
subcontractors). (The OHS Act section 1 refers to the definition as mandatory).
2.3.8 Customer: person or organization that could or does receive a product or a service that is
intended for or required by this person or organization.
2.3.9 Environment: The surroundings within which humans exist and that are made up of:
i. The land, water, and atmosphere of the earth.
ii. Micro-organisms and plant and animal life.
iii. Any part or combination of (i) and (ii) and the interrelationships among and between
them; and
iv. The physical, chemical, aesthetic, and cultural properties and conditions of the foregoing
that influence human health and well-being.
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Safety, Health, Environment, Unique Identifier: 32-727
Revision: 5and Quality (SHEQ) Policy
Page:
2.3.10 Environmental, social and governance1: These are called pillars in the ESG Framework
and represent the three main topic areas that companies are expected to report on. The goal
of ESG is to capture all the non-financial risks and opportunities inherent to a company's day-
to-day activities. Note: In the ESG context, environmental risks refer to how a company
impacts the environment; social risks refer to actions that affect the communities around
them; governance risks refer to how a business operates, including its governing policies.
2.3.11 Eskom: Eskom Holdings SOC Ltd.
2.3.12 Incident: Any unplanned event that could or does result in harm, injury and ill-health,
damage, and/or environmental pollution or degradation or gives rise to an accident or has the
potential to lead to an accident.
2.3.13 Interested party: Person or organisation that can affect, be affected by, or perceive itself to
be affected by a decision or activity.
2.3.14 Lean: A business approach that focuses on maximizing customer value by minimizing waste
and using a mindset of continuous improvement
2.3.15 Nonconformity: Non-fulfilment of a requirement
2.3.16 Occupational health and safety: Deals with the prevention of occupational injuries and
diseases as well as the protection, promotion and maintenance of the health of all employees
and other workers (including temporary workers, contractors and visitors). It includes
occupational hygiene, occupational safety, occupational medicine, occupational health
nursing, fire safety, public safety and emergency preparedness.
2.3.17 Objective: Result to be achieved - An objective can be strategic, tactical, or operational
2.3.18 Participation: Involvement in decision-making.
2.3.19 Quality: quality degree to which a set of inherent characteristics of an object fulfils
requirements
determined by comparing a set of inherent characteristics with a set of requirements.
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Safety, Health, Environment, Unique Identifier: 32-727
Revision: 5and Quality (SHEQ) Policy
Page:
2.3.24 Subsidiary: A company of another juristic person if that juristic person, one or more other
ISO 9001 Quality Management System requirements
ISO 14001 Environmental management systems - Requirements with guidance for use
ISO 45001 Occupational health and safety management systems - Requirements with
guidance for use
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Safety, Health, Environment, Unique Identifier: 32-727
Revision: 5and Quality (SHEQ) Policy
Page:
2.5 Roles and responsibilities
2.5.1 Eskom’s leadership is accountable for leading the practices and processes needed to control
and manage safety, health, environment and quality risks, opportunities and impacts as an
integral part of Eskom’s operations.
2.5.2 Eskom leadership is accountable and responsible for reviewing, maintaining and ensuring the
implementation of the SHEQ Policy and driving SHEQ initiatives.
2.5.3 Eskom employees are responsible for understanding and incorporating safety, health,
environment and quality into daily work activities by ensuring adherence to standards,
procedures, rules, regulations and participating in SHEQ improvement efforts.
2.5.4 Eskom’s external service providers have a duty to fulfil all relevant safety, health,
environmental, and quality compliance obligations, including conformity to standards and
organisational requirements.
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Safety, Health, Environment, Unique Identifier: 32-727
Revision: 5and Quality (SHEQ) Policy
Page:
3.1.6 Engaging interested parties and stakeholders by promoting open communication that is
purpose-driven in line with safety, health, environment, and quality requirements
3.1.7 Conducting safety, health, environment and quality training and creating employee
awareness.
3.1.8 Minimising the impact of our business on the environment, encouraging the development and
implementation of environmentally friendly technologies. This will ensure the preservation of
natural resources, sustainability, and the setting and achievement of environmental targets
and objectives in line with the environmental strategy.
3.1.9 Proactively managing Eskom’s environmental footprint. This will be achieved by minimising
pollution and environmental degradation, pursuing a low-carbon future, and prioritising
energy and water conservation and demand management with Eskom stakeholders.
3.1.10 Ensuring the Eskom vision of ‘sustainable power for a better future’ is realised through, among
others, the ongoing determination of the environmental, social and governance (ESG) risks it
face, and opportunities presented. Eskom will treat identified risks and pursue opportunities
through plans and initiatives with the oversight of appropriate governance structures, and
measure effectiveness against key performance indicators (KPIs).
3.1.11 Addressing climate change, with a combined focus of:
(i) reducing GHG emissions, whilst maintaining grid stability, meeting electricity demand,
minimizing electricity supply costs and supporting financial sustainability; and
(ii) protecting and securing Eskom's assets and operations from the adverse impacts of
climate change to promote resilience
3.1.12 Addressing the needs and expectations of Eskom’s employees, customers, interested parties
and stakeholders using methodologies from frontline to executive leadership, utilising digital
innovation and proactive communication to achieve consistent operational reliability and
intended outcomes.
3.1.13 Eskom's approach to quality is underpinned by the principles of Lean, Six Sigma, to drive
continuous improvement and operational excellence. The organisation is committed to the
proactive elimination of waste, zero rework, the reduction of variation and the optimisation of
processes to enhance value.
3.1.14 Ensuring the opportunity for SHEQ management systems improvement by applying risk-
based assessment methodologies (e.g., conducting risk assessment, emergency
preparedness and disaster responses, response to emerging outbreaks and medical
surveillance.
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Safety, Health, Environment, Unique Identifier: 32-727
Revision: 5and Quality (SHEQ) Policy
Page:
3.1.15 Eskom external service providers (contractors/suppliers) should establish, develop, and
implement a relevant management system that conforms to, but is not limited to, ISO 9001,
ISO 14001, ISO 45001 or other applicable standards.
3.1.16 Supporting the establishment and functioning of safety, health, environment and quality
committees.
3.1.17 To contribute to effective management of SHEQ requirements, Eskom and its partners are
committed to developing skills and enhancing employee competency at all organisational
levels through continuous training, education and awareness.
3.1.18 Ensuring that adequate structures and resources are available for safety, health, environment
and quality management.
3.1.19 Ensuring the management of safety, health, environment, and quality during the procurement
and supply chain of the goods, services, and products that are sourced from external service
providers(contractors/suppliers).
3.1.20 Ensuring continual improvement in SHEQ systems to enhance Eskom’s business
performance
3.2 Policy principles or rules
Eskom’s principles and rules that underpin the way in which the organisation approaches safety,
health, environment and quality, embracing risk, resilience and climate change, are as follows:
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Safety, Health, Environment, Unique Identifier: 32-727
Revision: 5and Quality (SHEQ) Policy
Page:
out of Eskom’s business, causing an incident with safety, health, environmental and quality
consequences.
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Safety, Health, Environment, Unique Identifier: 32-727
Revision: 5and Quality (SHEQ) Policy
Page:
3.3 Process for monitoring
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Safety, Health, Environment, Unique Identifier: 32-727
Revision: 5and Quality (SHEQ) Policy
Page:
This policy supersedes 32-94 and 32-7 SHE and Quality
reviewing this policy and the SHEQ structure.
Environmental
Source: Safety_Health_Environment_and_Quality_(SHEQ)_Policy Rev 5.pdfenvironment by pursuing:
i.Open, isolate, test, earth, create an equipotential zone bond, and/or insulate before touch.
ii.Zero fatalities.
iii.Zero injuries, ill-health.
iv.Zero environmental incidents.
v.Zero tolerance.
vi.Zero defects.
vii.Ensure safe live working.
service providers (contractors/suppliers) and visitors:
i.Open, isolate, test, earth, create an equipotential zone bond, and/or insulate before touch
ii.Hook up at heights
iii.Buckle up
iv.Be sober
v.Permit to work
vi.Ensure safe live working
Section
Source: Safety_Health_Environment_and_Quality_(SHEQ)_Policy Rev 5.pdfand Quality (SHEQ) Policy
EDC TR Formatted and Quality Control 03.02.2026
Revision: 5and Quality (SHEQ) Policy
Contact Information
Source: NTCSA Non-Disclosure Agreement (NDA) Vendors_.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"................... a company incorporated under the laws of [insert"}
Evaluation Criteria
Source: NTCSA Non-Disclosure Agreement (NDA) Vendors_.pdf (unknown)The document does not specify eligibility criteria for the tender itself, but the NDA must be signed by an authorized representative of the vendor. The vendor must be a legal entity capable of entering into a binding agreement.
Technical Specifications
Source: NTCSA Non-Disclosure Agreement (NDA) Vendors_.pdf (unknown)provisions of this Agreement for any
purpose whatsoever other than the Project
Contractual Terms
Source: NTCSA Non-Disclosure Agreement (NDA) Vendors_.pdfthird parties. For purposes of this clause, the Receiving Party’s Representatives shall
be deemed to be acting, in the event of a breach, as the Receiving Party’s duly
authorised agents.
3.5 Except as otherwise contemplated in this Agreement, the Parties agree in favour of
one another not to utilise, exploit or in any other manner whatsoever use the
3.6 Accordingly, the Receiving Party agrees to indemnify, defend and hold the Disclosing
shall not apply to any Confidential Information that:
8.1 is known to, or in the possession of the Receiving Party prior to disclosure thereof by
the Disclosing Party;
8.2 is or becomes publicly known, otherwise than as a result of a breach of this Agreement
by the Receiving Party;
8.3 is developed independently of the Disclosing Party by the Receiving Party in
circumstances that do not amount to a breach of the provisions of this Agreement;
8.4 is disclosed by the Receiving Party to satisfy an order of a court of competent
jurisdiction or to comply with the provisions of any law or regulation in force from time
to time; provided that in these circumstances, the Receiving Party shall advise the
required to disclose and the Receiving Party will use its reasonable endeavours to
protect the confidentiality of such Confidential Information to the greatest extent
possible in the circumstances;
8.5 is disclosed to a third party pursuant to the prior written authorisation and Limited to
the extent of such approval of the Disclosing Party;
8.6 is received from a third party in circumstances that do not result in a breach of the
provisions of this Agreement.
shall endure for a period of 3 (three) years after the date of termination of the
relationship between the parties or at a date specified in any subsequent agreement(s)
between the Parties in pursuance of the Project referred to herein.
Agreement and fail to remedy such breach within seven (7) business days from date
of a written notice to do so, then the Disclosing Party shall be entitled to invoke all
remedies available to it in law including, but not limited to, the institution of urgent
proceedings as well as any other way of relief appropriate under the circumstances, in
any court of competent jurisdiction, in the event of breach or threatened breach of the
14.2.1 will not result in a breach of any other Agreement to which it is a party; and
14.2.2 will not, to the best of its knowledge and belief, infringe the rights of any third party;
and the Disclosing Party hereby indemnifies and holds the Receiving Party harmless
against any liability for third party claims on such a basis.
Important Dates
Source: Scope of work Engineering Building - 25.03.26 M.N.pdf (unknown){"closingDate":"19 March 2025"}
Contact Information
Source: Scope of work Engineering Building - 25.03.26 M.N.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"can accommodate 50"}
Evaluation Criteria
Source: Scope of work Engineering Building - 25.03.26 M.N.pdf (unknown)The document does not specify formal eligibility criteria (e.g., registration, financial, or technical qualifications). However, applicants are expected to be qualified contractors with experience in building renovations, electrical installations, and compliance with South African regulations (OHS Act, SANS10400, SANS10142). They must be able to work within Eskom's controlled disclosure and records management requirements.
Technical Specifications
Source: Scope of work Engineering Building - 25.03.26 M.N.pdf (unknown)As part of the continued space reorganization of Simmerpan, Germiston Engineering Building has been
identified as an area where space can be optimized to accommodate 50 workstation that are not dedicated
to anyone but use by those requiring space to work from while at Simmerpan for the day. The current 2nd
floor PTM&C, Engineering building space and Quality Management space will be renovated to
accommodate the 50 workstations at Engineering Building together with support spaces.
1.1 Purpose:
The purpose of the document is to clarify scope of works needed to space optimize the Engineering Building.
1.2 Scope: engineering building
The following plan is to rearrange space from current setup to that can accommodate 50
workstations and supporting spaces:
Second Floor
PTM&C Section:
Printing Area space Open area with 3-4 desks plotter and printer to be demolished and replace
with focus booths.
4 x Offices Currently 1 workstation to be demolished and replaced with focus booths
Open Area Currently L shaped desks to be replaced with type H workstations (straight desk)
Open Area Currently space to also be fitted out with double door credenzas / filling cupboards
Quality Management Section:
5 x Offices Currently offices to be focus booths and open workstations plus kitchen pause area
create mall syndicate room to support Quality Management side of building floor.
Kitchen remains a kitchen to service whole floor with new fit-out.
Ablution to change
Lifts and Aircon duct and stairways to remain where they currently are.
The following Finishes Specification shall be adhered to:
1] Internal Doors = Sombrero - E14-5 Plascon.
2] Internal & External door frames = Mayan Stone E14-4 Plascon
3] Windows [Steel] = White enamel/gloss Plascon
4] All walls and ceilings to kitchen & ablutions = White - double Velvet Plascon
= Hudson E14-2 Plascon
6] All wall tiles in kitchen & ablutions = 198 x 248 Johnson Optima [OT4] with PVC
edgings to all corners. All Tiles to be at door
height.
7] All Floor tiles = Agulhas AG 705 [Tile Africa]
Controlled disclosure
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure it
is in line with the authorised version on the database.
User Requirements Specification Template Unique Identifier: 363-ERE-AABZ2-AV0006-1
Revision: 0
Page:
8] Window blinds = Minimum Glare and colour = Denim Blue.
9] All Carpets = Offices Berber Point 920, Bitumen Backed
Colour = Boron
10] Drywalling = All drywall to be insulated for noise reduction.
11] External walls = Gruyere- A11-5 Plascon.
Electrical Installation:
There will be a need to redo all electrical works along the skirting, including the ceiling lights to be
LEDs. All the electrical work will follow design layout.
Distribution board (db)
Add Surge Protective Devices (SPD) to the DB as per SANS10142-1
Include adequate labelling and warning signs
Replace missing blanking plates where required
Lighting and small power
equipped with 6-module power clusters (1x164-1, 1x164-2, 1 x USB-A, 1x USB-C, switched)
Provide an underfloor power system to supply the new integrated desk power modules
Replace the existing light switches
Disconnect and remove old, non-functional ceiling panel lights
Disconnect and remove all downlights
Repair or replace all ceiling panels where light fixtures were removed
All remaining fluorescent light fittings to be replaced with LED Panel lights (Lascon LBP-24, 60W)
Dual-type Occupancy sensors to be installed in all offices, corridors and bathrooms
Provision must be made for the following emergency lights:
1 x Lascon LBP-24 LED Panel with emergency module in each bathroom
1 x Lascon LBP-24 LED Panel with emergency module in the kitchen
4 x Lascon LBP-24 LED Panel with emergency module in the corridor
In certain areas, this will require the replacement of exiting LED Panel lights with Lascon LBP-24
LED Panels with emergency modules.
lights
General
Controlled disclosure
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure it
is in line with the authorised version on the database.
User Requirements Specification Template Unique Identifier: 363-ERE-AABZ2-AV0006-1
Revision: 0
Page:
LAN Points:
All LAN Points will need to be redone to all desk positions, syndicate rooms, focus booths plus
printer and plotter.
Air conditioning:
Investigation into possible replacement of certain parts will need to be done. With the redesign of
space all diffusers will need to be repositioned, and additional ones installed.
Carpeting:
Whole floor needs to be recarpeted as per standard Eskom carpet or similar approved carpet.
Tiles:
Tiling to the bathrooms and kitchen will need to be redone with new mirrors and sanitary fitting installed
to the bathrooms and kitchen sink plus appliances.
1.2 Applicability.
This SCOPE is applicable to the works related to the space optimization of 2nd Floor Engineering Floor,
Simmerpan, Germiston building, including the purchasing of new furniture to occupy space as per design..
The following references are included:
2.1 Normative references (not limited to the list below)
Occupational Health and Safety Act and Regulations (Act )
National Building Regulations (SANS10400)
NTCSA Corporate Identity Guidelines
Controlled disclosure
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure it
is in line with the authorised version on the database.
User Requirements Specification Template Unique Identifier: 363-ERE-AABZ2-AV0006-1
Revision: 0
Page:
2.2 Informative references
Records retention matrix - https://hyperwave.eskom.co.za/240-56296995
3.1 Definitions and classifications
3.1.1 Public domain: published in any public forum without constraints (either enforced by law, or
discretionary).
3.1.2 Controlled disclosure: controlled disclosure to external parties (either enforced by law, or
discretionary).
3.1.3 Confidential: the classification given to information that may be used by malicious/opposing/hostile
elements to harm the objectives and functions of Eskom Holdings Limited.
3.1.4 Secret: the classification given to information that may be used by malicious/opposing/hostile
elements to disrupt the objectives and functions of Eskom Holdings Limited.
3.1.5 Top Secret: the classification given to information that may be used by malicious/opposing/hostile
elements to neutralize the objectives and functions of Eskom Holdings Limited.
components, such as telecommunications and data storage systems used to run the power system
3.2 Abbreviations
Abbreviation Description
TxRE Transmission Real Estate
URS User Requirements Specification
Role Description
Project Team Propose solutions, design, consult, inform, and execute.
Representatives - End- Provides Customer Demand Plan (CDP), inform, support proposed
user solution.
Regular meetings (involving the End-User) to be conducted for monitoring of the project.
Project Team to ensure safekeeping of all project documents.
Controlled disclosure
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure it
is in line with the authorised version on the database.
User Requirements Specification Template Unique Identifier: 363-ERE-AABZ2-AV0006-1
Revision: 0
Page:
Drawings indicating change per floor in the building
Listed above.
To be determined by the Project Team - QS.
All records to be managed in compliance to the Eskom Documents and Records Management Procedure.
This document has been seen and accepted by:
Name Designation
Nombuso Msibi Middle Manager PTM & C
Phelokazi Nqwelo Middle Manager Real Estate
Rirhandzu Sitole Facilities Manager
L.E Spies Senior Engineer (Electrical)
Siya Kontyo Space Planning Manager
Mfundo Ngcobo Senior Advisor Architect
(Names) during creation of the Scope.
Controlled disclosure
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure it
is in line with the authorised version on the database.
Health & Safety
Source: Scope of work Engineering Building - 25.03.26 M.N.pdf_Toc225303589
1.1 Purpose: ............................................................................................................................................................... 3
1.2 Scope: engineering building ........................................................................................................................ 3
1.2 Applicability. ...................................................................................................................................................... 5
2.1 Normative references (not limited to the list below) ................................................................... 5
2.2 Informative references ................................................................................................................................ 6
3.2 Abbreviations .................................................................................................................................................... 6
Roles and responsibilities .................................................................................................................................. 6
Process for monitoring ....................................................................................................................................... 6
Related/supporting documents ....................................................................................................................... 7
All sheq requirements are to be adhered to in all activities listed above. ............................. 7
Cost benchmarking ................................................................................................................................................ 7
Records ....................................................................................................................................................................... 7
Authorisation .................................................................................................................................................... 7
Development team ............................................................................................................................................ 7
Acknowledgements ......................................................................................................................................... 7
Printing Area space Open area with 3-4 desks plotter and printer to be demolished and replace
with focus booths.
4 x Offices Currently 1 workstation to be demolished and replaced with focus booths
Open Area Currently L shaped desks to be replaced with type H workstations (straight desk)
equipped with 6-module power clusters (1x164-1, 1x164-2, 1 x USB-A, 1x USB-C, switched)
Provide an underfloor power system to supply the new integrated desk power modules
Replace the existing light switches
Disconnect and remove old, non-functional ceiling panel lights
Disconnect and remove all downlights
Repair or replace all ceiling panels where light fixtures were removed
All remaining fluorescent light fittings to be replaced with LED Panel lights (Lascon LBP-24, 60W)
Dual-type Occupancy sensors to be installed in all offices, corridors and bathrooms
Provision must be made for the following emergency lights:
1 x Lascon LBP-24 LED Panel with emergency module in each bathroom
1 x Lascon LBP-24 LED Panel with emergency module in the kitchen
4 x Lascon LBP-24 LED Panel with emergency module in the corridor
In certain areas, this will require the replacement of exiting LED Panel lights with Lascon LBP-24
lights
2.1 Normative references (not limited to the list below)
Occupational Health and Safety Act and Regulations (Act )
National Building Regulations (SANS10400)
3.1 Definitions and classifications
3.1.1 Public domain: published in any public forum without constraints (either enforced by law, or
discretionary).
3.1.2 Controlled disclosure: controlled disclosure to external parties (either enforced by law, or
discretionary).
3.1.3 Confidential: the classification given to information that may be used by malicious/opposing/hostile
elements to harm the objectives and functions of Eskom Holdings Limited.
3.1.4 Secret: the classification given to information that may be used by malicious/opposing/hostile
elements to disrupt the objectives and functions of Eskom Holdings Limited.
3.1.5 Top Secret: the classification given to information that may be used by malicious/opposing/hostile
elements to neutralize the objectives and functions of Eskom Holdings Limited.
components, such as telecommunications and data storage systems used to run the power system
3.2 Abbreviations
Section
Source: Scope of work Engineering Building - 25.03.26 M.N.pdffloor PTM&C, Engineering building space and Quality Management space will be renovated to
Quality Management Section
create mall syndicate room to support Quality Management side of building floor.
7] All Floor tiles = Agulhas AG 705 [Tile Africa]
Evaluation Criteria
Source: Eng Building Space Optimisation - Env Management Tender Returnable Contractors or Service Providers (1).xls (unknown)Bidders must either hold a valid ISO 14001:2015 certification from an accredited body (Option 1) or provide objective evidence of a documented EMS that conforms to ISO 14001 (Option 2). The certification must be valid on the day of submission. Bidders must achieve a weighted average score of at least 80% across all sections to be considered. The scope of the ISO 14001 certificate must be relevant to the project.
Description
Source: PAYE Questionnaire for Service Contracts - 2026_2027.xlsThis will save your file. Please select the correct folderA@
Evaluation Criteria
Source: PAYE Questionnaire for Service Contracts - 2026_2027.xls (unknown)Not specified in the provided content. Typically, Eskom tenders require bidders to be registered on the Central Supplier Database (CSD), have relevant experience in similar projects, and comply with South African tax and BBBEE regulations, but this cannot be confirmed from the corrupted document.
Technical Specifications
Source: PAYE Questionnaire for Service Contracts - 2026_2027.xls (unknown)This will save your file. Please select the correct folderA@
Contact Information
Source: NTCSA_E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown){"name":"__________________________________________________________","email":null,"phone":null,"department":null,"address":null}
Evaluation Criteria
Source: NTCSA_E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)No specific eligibility criteria are mentioned in the provided document. However, bidders must be able to operate the e-Tendering Solution and must acknowledge that they have undergone the required training.
Technical Specifications
Source: NTCSA_E-Tenderers E-Tendering Training Acknowledgement Form.pdf (unknown)E-Tenderers’ E-Tendering Document 559-924455249 Rev 1
Identifier
Training Acknowledgement
Effective Date April 2025
Form Review Date April 2028
ANNEXURE NO.: Not applicable
Acknowledgement form – e-tendering training
Enquiry no: ......................................................
Business name/JV: _______________________________________________________
Contact Person: __________________________________________________________
Tel (landline): _________________________________________
Cellphone: ____________________________________________
E-mail address: ________________________________________
Acknowledgment:
I _________________________________________ (Tenderer’s Name) acknowledge that I have undergone
self-training though the e- Tendering Noddy Guide or video or via a clarification meeting for me to understand.
I am satisfied with my self-training and confirm that I will be able to operate the E- Tendering Solution.
Authorized Signature: _____________________________________________________________
Designation: _____________________________________________________________________
Date: _________________________
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 1
NTCSA_E-Tenderers E-Tendering Training Acknowledgement Form
Template ID: 240-9722574 (Rev 1) E-Tenderers’ E-Tendering Training Acknowledgement Form
Evaluation Criteria
Source: 32-95 rev 9.pdf (unknown)The document does not specify eligibility criteria for the tender. However, typical Eskom tenders require bidders to be registered on the Central Supplier Database (CSD), have relevant experience in building/engineering projects, and demonstrate compliance with OHS regulations. Bidders must also have the necessary financial and technical capacity to execute the project.
Technical Specifications
Source: 32-95 rev 9.pdf (unknown)Eskom’s SHEQ Policy sets out principles and rules that underpin the way in which Eskom
approaches occupational health and safety, the environment and quality.
Incident management is an integral function of risk management. The aims and objectives of
incident management are as follows:
a) Reduce risk and prevent any recurrence of incidents.
b) Ensure that incidents are managed effectively.
c) Ensure that incidents are classified and recorded accurately.
d) Ensure prompt and appropriate investigation.
e) Promote the proactive use and value of near-miss incident reporting.
f) Improve the quality of occupational health and safety by learning from incidents, including
near-misses.
g) Share incident information.
h) Report to internal and external stakeholders, as required.
i) Promote the analysis of trends, and review practices accordingly.
j) Involve and communicate information to all stakeholders.
Incident management is not a mechanism for assigning blame or monitoring staff performance, but
rather a way of identifying and addressing areas for improvement in order to reduce future risks.
Eskom is committed to Zero Harm as a value, this value forms an integral part of Eskom’s
operations.
2.1 Scope
2.1.1 Purpose
This document describes the high-level intention and requirements for the effective management of
incidents that occur during the course of Eskom’s business that result in, or could result in, near
misses, property damage, injuries, occupational diseases/illnesses or fatalities.
2.1.2 Applicability
This document shall apply throughout Eskom Holdings SOC Ltd, its groups/ divisions, subsidiaries,
and entities in which Eskom has a controlling interest. Where Eskom does not have a controlling
interest, this procedure shall apply if no such similar document exists.
This document is applicable to Eskom employees, contractors (unless it is explicitly mentioned
otherwise in this document) and members of the public affected by activities of, or on behalf of,
Eskom.
For the purpose of Eskom benchmarking with other organisations, the applicable Responsible
Manager may use the relevant classification criteria required for such benchmarking process.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
In the case where a site consists of multiple employers, this procedure must be complied with for
Eskom reporting purposes.
For the interpretation of requirements related to occupational health and safety incidents, this
document will supersede any other procedures and instructions. This procedure is supported by
sup[ported by Standard – “Occupational Health and Safety Incident Management Definitions and
Classification Parameters: 240-131838225”.
2.1.3 Effective date
The document is applicable as of 1 April 2021.
2.2 Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
[1] 240-62582234: OHS Roles and Responsibilities and Statutory Appointments Standard.
[2] 32-727: Eskom, Safety, Health, Environment, and Quality Policy.
[3] 32-123: Eskom Emergency Planning Procedure.
[4] 32-124: Eskom Fire Risk Management Standard.
[5] 32-256: Emergency Response Procedure – Communications.
[6] 240-51122806: Process Control Manual (PCM) for Incident Management.
[7] 240-49308149: Process Control Manual (PCM) for Occupational Health and Safety
Management.
[8] Aviation Act, No. .
[9] Occupational Health and Safety Act, No. .
[10] Labour Relations Act, No. .
[11] Medicine and Related Substance Control Act, No. .
[12] Mine Health and Safety Act, No. .
[13] Compensation for Occupational Injuries and Diseases Act, No. .
[14] Basic Conditions of Employment Act, No. .
[15] National Health Act, No. .
[16] 240-62946386: Vehicle and Driver Safety Procedure.
[17] 240-84733329: Medical Surveillance Procedure.
[18] 32-425: Hearing Conservation Procedure.
[19] COIDA Occupational Disease 2 Form – as per COIDA.
[20] 240-131838225: Occupational Health and Safety Incident Management Definitions and
Classification Parameters.
[21] 240-58554227: Health & Safety Agreement.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
2.2.2 Informative
[22] I240-47560170: Process Control Manual (PCM) for Quality Management.
[23] 240-51367318: Process Control Manual (PCM) for Assurance and Advisory Audits.
[24] 32-450: Safety and Occupational Hygiene Performance Management.
[25] ISO 9001 Quality Management Systems.
[26] ISO 45001 Occupational Health and Safety Management Systems.
[27] OHSAS 18001 Occupational Health and Safety Systems.
[28] EPM0060: Measurement Specification Document for Headcount.
[29] Criminal Procedures Act, No. .
[30] Electricity Act, No. .
[31] Explosives Act, No. .
[32] Inquest Act, No. .
[33] Law of Evidence Amendment Act, No. .
[34] National Road Traffic Act, No. .
[35] 240-75512977: Noise-Induced Hearing Loss Investigation Form.
[36] 240-75512947: Noise-Induced Hearing Loss Notification Form.
[37] 240-154786986: COVID-19 Investigation Form.
The list of legislation and documents for further information is not exhaustive and/or not limited to
the legislation and documents listed above.
2.3 Definitions
2.3.1 Accident: Any unplanned event, arising out of, and in the course of, an Eskom or
contractor employee’s employment and resulting in human injury, illness, or death of the
employee, as well as death of, or injury to, any member of the public or damage to property.
2.3.2 Fatality: an incident occurring at work, or arising out of, or in connection with, the activities
of persons at work, or in connection with the use of plant or machinery, o r direct or
indirect exposure to Eskom’s product or activities, in consequence of which, any person
(that is, employee, contractor, or member of the public) dies, regardless of the time
intervening between the injury and/or exposure to the date of death. The date of the
incident will reflect the date on which the incident occurred, irrespective of the date of
death.
Note: Incidents related to the death of a person (employee or contractor employee) while
at the workplace and on duty who dies as a consequence of any activity or cause not
directly related to the course and scope of the deceased’s employment (for example, death
from natural causes, etc.) will not be regarded as a work related incident.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
2.3.3 First-aid injury: An injury due to a work-related incident, where that injury requires first aid
treatment within the scope of a first aider and content of a first aid box and does not require
further treatment by a health professional. Therefore, the following injuries will be regarded
as first-aid injuries:
a) If there was no medication required.
b) No subsequent medical treatment is required.
c) Where an employee was involved in an OHS incident where there was contact with a
person’s body part, whether there was an injury or not, the involved employee shall at
least be assessed by a first aider/health professional, for the purpose of this document,
this assessment/examination will be regarded as First Aid. At the minimum, the incident
shall be classified at least as a first-aid injury.
d) First-aid treatment can also be offered by a medical professional as long as it is in the
scope of the first aider.
e) The affected employee is able to resume work after the injury has been treated.
Note 1: Classification is based on the level of treatment, not on the person
administering treatment. For example, health professionals or emergency teams can
provide first-aid treatment.
Note 2: This excludes Incidents which are not caused by OHS events that arise at
the workplace or not directly related to the course and scope employment.
2.3.4 Lost-time injury (LTI): A work injury, including impairment and a fatality that arises out of,
and in the course of, employment and that renders the employee or contractor to be booked
off work. A work injury, including impairment and a fatality, that arises out of, and in the
course of, employment and that renders the employee or contractor to be unable to perform
his/her regular/normal work longer than seven calendar days or shifts other than the day or
shift on which the injury occurred.
Note: Normal work refers to any work where a person can perform his/her normal duties,
as per job profile, without restriction. Lost-time injury will apply if a person is booked off
work by a medical practitioner due to an incident, including being booked off for acute
stress or post-traumatic stress disorder by a relevant medical practitioner after an OHS
incident.
A lost-time injury includes the following:
a) Where an employee/contractor is booked off, regardless of the number of days or
shifts.
b) Incident resulting to a person being booked on restricted/ light duty longer than seven
calendar days.
Note: This excludes incidents which are not caused by OHS events that arise at the
workplace or not directly related to the course and scope employment.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
2.3.5 Medical injury: an injury resulting from a work related incident where treatment was
rendered by a medical/health professional within a 24-hour period, and medication was
either prescribed, dispensed, and/or applied. The affected employee is able to resume
work after the injury has been treated.
Note 1: Treatment, for the purpose of this document, excludes any diagnostic or
examination procedure or method used in the establishment of the extent of injuries or
illnesses (for example, X-rays or scans).
Note 2: Where medication was prescribed and/or dispensed after an injury and it was not
obtained and/or used, the injury shall be classified as a medical injury.
Note 3: Where medication is prescribed, dispensed and/or applied, whether to treat an injury
or prevent an illness or medical condition after an incident, the incident must be regarded at
least as a medical injury.
Note 4: any work-related noise-induced hearing loss with a PLH shift between 3.2% and
9.9% will be regarded as a medical injury.
Note 5: This excludes Incidents which are not caused by OHS events that arise at the
workplace or not directly related to the course and scope employment.
2.3.6 OHS Event: any occurrence where humans were involved and this occurrence poses a risk
of injury or illness/disease to those involved humans.
2.3.7 Occupational health and safety incident (OHS incident): an unplanned OHS event that
could, or does, result in human injury or illness or property damage, excluding:
a) crime-related incidents where there was no potential for injuries; and
b) motor vehicle incidents where the vehicle was stationary and unoccupied, incidents
where there were scratches on the vehicle with no potential for injury, windscreen or
glass-related incidents with no potential for injury.
Note: For recording and performance purposes, when there is an incident where multiple
divisions/groups are involved, divisions/groups must capture the incident for their
involved/injured.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
2.3.8 Occupational safety near-miss incident: Any OHS event that did not result in human
injury or damage but had the potential, under different circumstances, to cause human
injury or property damage.
2.3.9 Occupational hygiene near-miss incident: An OHS event where a person is exposed to a
single or combination of occupational hygiene hazards, which occurred in the work
environment, due to failure/insufficient/absence of control measures for that hazard(s) that
could result in medical treatment, impairment or an occupational disease/illness.
2.3.10 Occupational impairment: Partial or total loss of bodily function or part of the body
attributed to exposure at the workplace.
2.3.11 Noise-induced hearing loss (NIHL) incident: Where an individual experiences a bilateral
sensorineural hearing loss with a confirmed percentage hearing loss of 10% or more
measured from the baseline, which must be based on two diagnostic audiograms, as per
Instruction 171 issued by the Compensation Commissioner.
2.3.12 Occupational disease/illness: Any confirmed disease/illness arising out of, and in the
course of, an employee’s employment and that is listed in Schedule 3 of the COID Act or
any other condition as determined by an occupational medicine practitioner. In the case of
employees placed through a labour broker, the onus is on the relevant OU/BU to ensure
that the pre-employment medical examinations are done.
2.3.13 Public fatality: The death of a member of the public.
2.3.14 Public incident: Direct or indirect exposure to Eskom’s product or activities caused by
substandard acts and/or conditions that result in, or have the potential to cause, physical
harm to members of the public, damage to property or interruption of business.
If an Eskom vehicle is used for commuting (the employee is not on standby, nor has he/she
been called out for work) and the employee is involved in an MVA resulting in injuries either
to himself/herself or a member of the public, this incident should be classified as non-work-
related. If there were injuries to the member of the public, the incident shall be captured on
SAP as a public incident and investigated but regarded as non-work related incident.
2.3.15 Public Recordable Fatality Incident (PRFI)
a) A PRFI is an incident resulting in the electrocution of a member of the public by coming
into contact with Eskom apparatus within the point of supply, but excluding
electrocution resulting from criminal activities. A minor being electrocuted as a result of
criminal activity will be regarded as a public recordable fatality incident.
b) Any work-related incident where an Eskom employee or contractor is responsible for
the death of a member of the public, excluding incidents where a member of the public
is solely at fault.
2.3.16 Serious incident:
a) Any incident that results in a person being admitted to ICU for four days or more.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
b) Any incident involving persons where there was electrical contact, uncontrolled release
of energy (for example steam release, electrical flashover, etc.).
Note: OU/BU must inform Sustainability Systems immediately regarding the incident, where
after a decision will be made regarding the activation of an independent Subject Matter
Expert.
2.4 Abbreviations
Abbreviation Explanation
A&F Audit and Forensic
CC Compensation Commissioner
DoE&L Department of Employment and Labour
Eskom Eskom Holdings SOC Limited
Exco Executive Committee
HR Human Resources
ICU Intensive Care Unit
INO Initial Notification of Occurrence
LTI Lost-Time Injury
LTIR Lost-Time Injury Rate
MHSA Mine Health and Safety Act
NIHL Noise-Induced Hearing Loss
NPA National Prosecuting Authority
OEL Occupational Exposure Limit
OHS Occupational Health and Safety
OHS Act Occupational Health and Safety Act, 1993 (Act No. )
OMP Occupational Medical Practitioner
OU/BU Operating Unit/Business Unit
PCM Process Control Manual
PLH Percentage Loss of Hearing
PPE Personal Protective Equipment
PRFI Public Recordable Fatality Incident
SAIOH Southern African Institute for Occupational Hygiene
SAP Systems, Applications and Products in Data Processing
SAP EH&S SAP Environmental Health and Safety (system)
SDIC Safety Data Integrity Committee
SHEQ Safety, Health, Environment and Quality
SOC State-Owned Company
SS OHS Sustainability Systems Occupational Health and Safety
TRIR Total Recordable Injury Rate
WCL Workman’s Compensation Letter
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
2.5 Roles and Responsibilities
Eskom Holdings SOC Ltd and its subsidiaries shall take all reasonably practicable steps to prevent
all incidents and harm to any person, including members of the public and damage to property.
The Responsible Managers shall be responsible for:
a) Implementing this procedure;
b) Communicating to all their employees, contractors and contractor employees the
importance of compliance with this procedure and the consequences of non-compliance.
This includes communicating duty of care and refusal to perform an unsafe task to all new
employees and new contractors;
c) Implementing a monitoring process for ensuring understanding of, and compliance with,
duty of care and refusal to perform an unsafe task; and
d) Ensuring understanding of, and compliance with, the requirements of this procedure.
Note: Joint ventures: There may be occasions when Eskom and other organisations combine
resources to carry out a joint venture. Unless otherwise stipulated, each company in the joint
venture is liable for its own contraventions and could, therefore, be prosecuted in its own name,
without reference to any of the other companies involved.
2.6 Process for Monitoring
Compliance with the requirements of this procedure shall be audited as per the first- to third-tier
audit process. The OU/BU is responsible for its own monitoring; all other assurance providers will
monitor compliance with this procedure.
2.7 Related/Supporting Documents
Parties using this document shall apply the most recent edition of the documents listed below:
[1] Annexure 1: as required by the OHS Act – document number 240-100003427.
[2] OHS Incident Investigation Report template – document number 240-77046688.
[3] WCL forms – as per the OHS Act.
[4] Preliminary Brief on OHS Incidents document – document number 240-99618317
[5] Process Flow on the process of Capturing, Verification and Validation of Occupational
Diseases – document number 240-134597296
The following steps describe the process of incident management and are described in detail in the
remainder of the document:
Incident identification.
Initiation and execution of emergency response.
Notification and reporting to relevant stakeholders.
Incident prioritisation.
Classification and recording of incidents.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
Incident investigation.
Management of corrective actions - implementation and monitoring of corrective actions of
incidents.
Incident close-out.
Incident communication – occurs throughout the incident management process and is not
necessarily a stand-alone step.
3.1 Incident Identification
Identify or recognise that an incident has occurred. There are two types of identification or
recognition, that is, direct observation and indirect observation.
To ensure identification of incidents, the Responsible Manager should provide employees with
knowledge and skills as well as create a culture and environment that motivate employees to
immediately identify incidents as they occur.
Direct observation includes seeing the incident happening or being involved in the incident. For
potential occupational disease incidents/impairments, direct observation includes assessment
results by any medical practitioner or medical surveillance conducted by an occupational health
practitioner.
Where in doubt whether the incident is an OHS incident or not, test the description of the incident
against a definition of an occupational health and safety incident.
Any medical practitioner who examines or treats a person for a disease described in schedule
three of the COIDA, or any other disease that he believes arose out of that person’s employment,
shall within the prescribed period and in the prescribed manner report the case to the person’s
employer and to the chief inspector and inform that person accordingly.
Identification of occupational hygiene-related near-miss incidents must be classified by the
occupational hygiene/safety practitioner.
Indirect observation includes learning of the incident through, for example, complaints, feedback,
or information provided by internal stakeholders (for example, Eskom employees or contractor
employees) or external stakeholders (for example, authorities, members of the public, etc.).
3.2 Initiation and Execution of Emergency Response
a) Emergency response includes, but is not limited to, the following:
i. Rescue operations.
ii. Ensuring that the scene is safe during and after the incident.
iii. Providing emergency care (that is, first-aid treatment) to the injured to stabilise him/her
and prevent further injury and obtaining medical assistance, where necessary and/or
applicable.
b) Activate the appropriate emergency response actions in terms of the site or area
emergency preparedness plan/procedure.
c) In order to prepare for proper emergency response, the Responsible Manager must assess
the potential risks and develop a suitable response plan to address the risks. In the event
of an incident, emergency care must be provided in accordance with the emergency
response plan for the area.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
d) The supervisor/manager must ensure that the injured person receives the best medical
care and, when required, is transported to the doctor/hospital and that the relevant
Employer’s Report (WCL 1 or 2) is duly completed.
e) The supervisor/manager must ensure that a copy of the person’s identity document is
available to the treating doctor/hospital, which will facilitate prompt treatment. The
Supervisor / Line Manager should ensure that the injured is accompanied for medical
treatment, for the purpose of ensuring that the injured person receives the best medical
care and that the relevant medical reports are completed correctly and appropriate
feedback is received from the treating doctor.
f) The OU/BU Responsible Manager is to ensure that specific work instructions relating to
emergency response are available on site and executed accordingly.
g) Emergency response includes collection of evidence, which will assist in establishing the
root cause. When collecting evidence, take cognisance of the 5 Ps (people, position, parts,
paper and process evidence).
h) Collection and preservation of evidence:
i. Immediate actions at the scene following an incident can disturb or potentially remove
vital physical items and information important for the investigation.
ii. The Responsible Manager is responsible for ensuring that complete and correct
evidence and records are identified, collected, recorded and obtained, archived, stored
and preserved to support the investigation of the incident.
iii. The Responsible Manager must take steps to preserve physical items, computer data
and other relevant information until the incident investigation begins.
iv. No person should be allowed to remove, disturb or tamper with any evidence until
authorised to do so by the Responsible Manager or regulatory authority.
3.3 Notification and Reporting
All occupational health and safety incidents must be reported to relevant stakeholders. If
information is not readily available, the available information must be used, an updated notification
must be distributed to all stakeholders as more information becomes available. The action and
responsibility requirements under the Incident Prioritisation section must be referenced to identify
who needs to be notified.
When: when did the incident occur (exact time and date)?
Who: who was involved in the incident?
Where: where did the incident occur?
What happened: what work was being done at the time, what materials, equipment or
substances were involved?
Note: In the case of incidents involving crime and firearm-related incidents, the relevant Security
Department shall be notified.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
3.3.1 Internal stakeholders to be notified for occupational health and safety-related
incidents include the following:
a) All incidents
i. Supervisor.
ii. Responsible Manager.
iii. Occupational health and safety representative.
iv. Safety Department.
v. Occupational Health Department (if applicable).
b) Specific incidents
i. In the case of a fatality or a serious incident, notify OU/BU Management and
Sustainability Systems Department immediately.
ii. In the case of receiving any notification in terms of the OHS Act, sections 31 or 32, or in
the case of a summons received from the NPA, or any incident where there is a
possibility of liability, immediately contact the Legal Department regarding the
appointment of the attorney. If there are reasons to believe that such an attorney is not
required, the OU/BU must provide, without delay, a detailed motivation which will be
assessed by Legal Department and thereafter a decision will be communicated to the
Ou/bu.
3.3.2 Eskom employees performing work temporarily at another Eskom OU/BU
a) The Responsible Manager at the OU/BU where the incident occurred shall report to the
relevant stakeholders.
b) The affected employee’s own OU/BU Responsible Manager is responsible for reporting the
incident to the Compensation Commissioner (CC).
3.3.3 Eskom employees performing work at another organisation
If an incident occurs during regular/normal work, the reporting to the CC must be done by the
original OU/BU, although the external organisation (where reasonably practicable) must assist with
completing the documentation for submission to the CC.
3.3.4 Notification requirements for employee and contractor fatalities
a) The OU/BU must provide to the Sustainability Systems Department, immediately, the
detailed information relating to the circumstances of the incident, including details of the
deceased’s next of kin, in order for the announcement to be compiled for communication to
Eskom’s Board, Exco and the rest of the organisation.
b) The fatality announcement to be sent throughout Eskom must be signed off by the Group
Executive.
c) Only the Eskom Communication Department and/or the Eskom spokesperson may disclose
information to the media and/or the public.
d) Information can only be released to any external party after verification by the Eskom Legal
Department.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
3.3.5 Notification requirements for potential occupational diseases
Any potential occupational disease/illness must be referred to an Eskom occupational medicine
practitioner (OMP) for confirmation. Once confirmed, the OMP shall inform the Responsible
Manager, who must ensure that the incident management process is followed after confirmation.
Feedback on confirmed occupational diseases:-
a) Incidents to be recorded on SAP EH&S.
b) Each case must be discussed at the OU/BU statutory committees as required by law.
3.3.6 Capture initial notification
3.3.6.1 Capture and communicate the initial notification
a) Initial reports are reports that are submitted by any individual who is reporting an incident to
the relevant OU/BU Occupational Health and Safety Department. They can be provided in
any form, for example, email, OU/BU internal flash report or INO.
b) Initial reports are brief and limited to an outline of the known facts (that is, date, time, place,
what happened, immediate actions taken and persons involved).
c) The Responsible Manager must ensure that the initial notification is communicated in
accordance with the time lines.
3.4 Incident Prioritisation
From the initial reports, the Responsible Manager, in conjunction with, and advised by, the
occupational health and safety practitioner, must use the matrixes provided to determine the
priority rating of an incident. The Responsible Manager is responsible for ensuring that all those
involved in the prioritisation of incidents are in a position to understand and use the relevant
matrixes.
3.4.1 The priority rating is utilised to:
a) Ensure that appropriate management of the incident takes place;
b) Determine the level of action following notification of the incident;
c) Assist Responsible Managers with prioritising and classifying incidents; and
d) Provide clear direction about the incident reporting and communication requirements.
3.4.2 Steps involved in incident prioritisation:
3.4.2.1 Step 1
Determine the actual or potential outcome, consequence and severity of the incident by using the
Consequence table. Note: Use the actual outcome for injuries and the potential outcome for
near-miss incidents.
3.4.2.2 Step 2
Determine the likelihood of a recurrence of this incident by using the Likelihood table.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
3.4.2.3 Step 3
Quantify the level of risk associated with the incident by assigning a priority rating to the incident.
Using the information obtained in Steps 1 and 2 of this process, use the priority matrix to determine
the priority rating.
3.4.2.4 Step 4
Determine the appropriate action to be taken, as described in the Action and Responsibility
Requirements Table.
3.4.2.5 Step 5
If the severity of the incident changes, e.g. medical injury to a lost-time injury, the priority rating of
the incident must be reviewed and amended where necessary, including updating relevant
information in SAP EH&S.
3.5 Classification and Recording of Incidents
All occupational health and safety incidents, regardless of their rating, must be classified,
prioritised and recorded on the SAP EH&S system according to the CARAT (complete, accurate,
relevant, accessible, timely) principles. Contractor employees working under the Mine Health and
Safety Act will be classified and recorded as contractor employees and not as Eskom employees
for the purposes of this document.
3.5.1 Classification
Classification of incidents is based on the consequence as a result of the incident.
Note: the onus is on the OU/BU to determine the work relatedness and classification of the
incident. Sustainability Systems will not classify incidents on behalf of the OU/BU, but will assist in
interpretation of the procedure, should the OU/BU be unable to classify the incident or if there is a
dispute regarding classification, that particular incident shall be referred to Safety Data Integrity
Committee (SDIC).
3.5.1.1 Involved person’s relationship with Eskom: The aim of classifying the type of
relationship with the person is to determine whether the person(s) involved in the incident
was/were an Eskom employee(s), contractor employee(s) or member(s) of the public.
3.5.1.2 Work-relatedness: In order to classify the work status and to determine whether the
incident arose out of, or in connection with, the person at work, one needs to consider the workrelatedness of an incident. Unless otherwise specified in this procedure or in Occupational Health
and Safety Incident Management Definitions and Classification Parameters standard, as a general
rule, an affirmative answer to all of the following questions is required:
a) Did the incident or exposure occur at any workplace or within workplace boundaries?
b) Did it arise out of, or in connection with, the activities of persons at work, or as a result of a
Hazard present in the workplace?
c) Did it occur in the course of a person’s employment?
d) Did it result, or could it have resulted, in personal injury or health impairment?
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
3.5.1.3 Responsible unit (OU/BU)
a) Eskom employees: An incident must be captured against the OU/BU/subsidiaries based
on the employee’s organisational structure at the time of the incident.
b) Contractor employees: An incident must be recorded against the OU/BU/subsidiary with
which the contractor has a contractual relationship and/or any other contractual agreement
(including hand-over documents). In the case of incidents involving a service provider
procured through a national contract, incidents shall be recorded against the
OU/BU/subsidiary or end-user that requested a service from the contractor/supplier, this
request may be in a form of releasing services from a contract, in writing or otherwise,
including emails, telephone, etc.
3.5.1.4 Classification of occupational diseases and occupational health impairment
Classification of occupational diseases and occupational health impairment incidents must be
undertaken by the occupational hygiene/safety practitioner based on the confirmation received
from the Eskom medical practitioner with the supporting documentation (refer to 240-134597296 –
Process Flow on the process of Capturing, Verification and Validation of Occupational Diseases).
The following will be excluded from the Eskom performance measure:
conditions.
exposed to any excessive noise at the workplace after 16 November 2003.
3.5.1.5 Reclassified incidents
Reclassified incidents must be communicated by means of an updated SAP EH&S flash report to
relevant internal stakeholders, together with an explanation of the reclassification. Supporting
documentation or proof must be made available for incident classification, verification and audit
purposes and electronically attached to the incident in SAP EH&S. Downgraded incidents affecting
performance indicators must be submitted to SDIC for ratification. Third Party at Fault incidents
affecting performance indicators must be submitted to SDIC for ratification.
3.5.1.6 Clarification regarding incident classification of occupational health and safety-
related incidents
Where clarification is required for the interpretation of rules and examples for the classification of
incidents or in order to resolve disputes with regard to occupational health and safety incidents, the
Responsible Manager must send all relevant information to the Safety Data Integrity Committee
(SDIC) for review, the committee will evaluate information and provide direction in accordance with
the Terms of Reference of the SDIC.
3.5.1.7 Classification dispute and appeal process
In order to deal with disputes or clarification, OHS incidents requiring clarification must be tabled at
the Safety Data Integrity Committee (SDIC). These incidents will be reviewed in terms of this
procedure and/or other relevant documentation. Should the OU/BU be not satisfied with the
findings/outcome of the SDIC, the OU/BU is entitled to appeal the decision at the Safety Data
Integrity Appeal Committee.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
3.5.2 Recording
3.5.2.1 General requirements
All work-related occupational health and safety incidents must be recorded on SAP EH&S.
All non-work-related occupational health and safety incidents that occur within workplace
boundaries must be recorded on SAP EH&S and it is not necessary to communicate the flash
report.
The following generally agreed principles must be followed with regard to which information is
recorded:
The date on which the incident occurred, as opposed to the date of subsequent
reclassification on severity, for example, deterioration of condition or death.
Any preceding incident, including an occupational disease/illness, that occurred as a result
of exposure to the same agent, impacting the same body part or target organ on a different
occasion and resulting in similar symptoms or health effects, must be reported and
recorded as a new/different incident.
3.5.2.2 Recording of occupational diseases or illnesses
The date of the incident for occupational diseases shall be the date of confirmation by the Eskom
Occupational Medicine Practitioner as reflected on the First Medical Report in respect of an
Occupational Disease (WCL22).
This incident must be captured on SAP EH&S as work-related within 48 hours as per information
provided on the First Medical Report. Once the outcome of the investigation proves that the
incident is not work related, SAP EH&S must be updated immediately to reflect changes on the
work relatedness. All Occupational Diseases where after the investigation, are regarded as not
work related, or where the OU/BU requires clarity/assistance, those Occupational Diseases must
be submitted to SDIC for final classification. An Occupational Disease involving a pensioner shall
be submitted to SDIC for final classification.
The date of an occupational health impairment incident shall be the date reflected on the NoiseInduced Hearing Loss Notification form (240-75512947). Occupational diseases/illnesses will be
recorded against the OU/BU to which the employee belongs at the date of confirmation by the
Eskom Medicine Practitioner, unless it can be proven that the occupational disease/illness was
caused by the activities of another OU/BU.
3.6 Incident investigation
3.6.1 General
a) All investigation reports must be considered controlled disclosure documents in accordance
with the Eskom document management process.
b) All health and safety incidents must be investigated, excluding non-work-related incidents
occurring outside workplace boundaries.
c) During the investigation of repeat incidents, ineffective corrective actions from previous
incidents must be considered.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
d) The chairperson of an incident investigation committee shall be at a level as per the “Action
and Responsibility Requirements” table contained in the Occupational Health and Safety
Incident Management Definitions and Classification Parameter Standard (240-131838225).
Where there is perceived conflict of interest (an interest which is likely to adversely affect
the investigation process), if the conflict is found to exist, the chairperson of an investigation
committee shall not be a direct manager/supervisor of the injured/involved person. It is the
responsibility of the Responsible Manager to ensure that incidents are not chaired by the
chairpersons who are conflicted in that particular incident.
e) In the case of incidents involving crime, the applicable Security Department must be
involved.
f) The employer’s investigation report (Annexure 1 in terms of the OHS Act) must be
completed by the OU/BU investigator and signed off by the applicable OU/BU Responsible
Manager as the representative of the employer/user. Annexure 1 for contractor incidents
must be signed off on a similar basis, unless the Contractor’s Policies and Procedures
stipulates otherwise.
g) All investigations shall be completed within 30 days of the occurrence of an incident, if the
investigation could not be completed within 30 days, the OU/BU manager shall write a
signed off letter indicating the reasons why the Internal OHS Investigation could not be
completed within 30 days. This letter shall be loaded on SAP EH&S.
h) The results of the OHS investigation must be captured on the Eskom Internal OHS
Investigation template: Form 240-77046688 and signed off by the chairperson within 20
calendar days after conclusion of the investigation.
i) All investigation results must be documented and captured on SAP EH&S, including root
cause analysis and identified corrective measures. The root cause analysis must be
electronically attached to the incident in SAP EH&S. Investigations by government
agencies could also trigger a review of the initial incident information captured.
j) Records must be kept by the OU/BU of all OHS Act section 24 incidents, lost-time injuries
and medical treatment cases on the Annexure 1 form (as required in the OHS Act –
General Administrative Regulations for Recording and Investigation of Incidents) for all
employees, contractors and members of the public. All investigation reports must be kept
and archived for at least 25 years, unless another period has been specified in legislation or
in any court proceedings that may ensue.
k) To determine the estimated cost of an incident, the Compensation Commissioner Cost
Calculations should be utilised.
l) The Eskom Internal Investigation Report’s disclosure is controlled, it is for internal use only.
It may only be disclosed to third parties with specific authorization or consent from Legal
and Compliance Department.
m) This information includes a wide spectrum of internal business data that can be used by all
employees and can be shared through authorized business process.
n) The completed Annexure 1 form, as required in terms of the OHS Act – General
Administrative Regulations for Recording and Investigation of Incidents, may be made
available to a third party on request.
o) Chapter 23 of the MHSA Regulations sets out the manner in which incidents are to be
reported to the Mine Health and Safety Inspectorate on the following forms: SAMRASS 1,
2, 4, and 9 in accordance with Chapter 21 of the MHSA Regulations, as may be required, in
consultation with the Eskom Legal Department.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
p) In the case of incidents involving contractor employees, the contractor must investigate
those incidents as an employer in his/her own right (employer’s investigation) and generate
a report. The report and Annexure 1 must be submitted to the applicable OU/BU or on
request to the Department of Employment and Labour by the contractor. Eskom may
participate during these investigations.
q) During Eskom’s investigation, a contractor/member of the public may be requested to
provide information/ evidence. The contractor/member of the public is entitled (at their own
cost) to be represented by a legal representative whilst giving information/evidence. The
contractor/member of the public legal representative’s attendance in the investigation
process is limited to the period within which they are providing information/evidence. While
the contractor is giving evidence, the contractor executive may sit-in in the investigation.
Once the contractor personnel have finalised giving information/evidence to the committee,
the contractor executive to be excused. They must not sit in for the duration of the
investigation or question Eskom witnesses/committee members or to seek evidence from
Eskom.
r) When the contractor conducts its own investigation, Eskom employees may participate in
such an investigation. If an Eskom employee is required in that investigation to be a
witness, formal request must be submitted to the manager of the required employee.
s) Should the contractor or any third party need information or evidence from Eskom, the
manager of the employee from whom such evidence is requested, shall evaluate this
request and if required, seek assistance from Legal and Compliance Department who will
give guidance or determine whether such information can be provided.
t) The investigation report must include the following information:
i. The details of the incident (type of incident, what occurred, sequence of events when
and where the incident occurred).
ii. Incident consequences and impacts.
iii. The risk of the incident reoccurring using a root causes analysis technique and the
likelihood and consequence table within this document.
iv. Direct or immediate cause(s).
v. Root causes, taking into consideration human, workplace and natural factors (who, what
and why).
vi. Identify system failures (procedure non-conformance, training, plant failure, etc.).
vii. Corrective actions to remedy and prevent a reoccurrence of the incident.
viii. Lessons learnt and recommendations.
3.6.2 Investigation requirements
a) All incidents occurring within workplace boundaries must be investigated regardless of work
relatedness. Such incidents must be investigated to identify any possible contributing
causes and to make recommendations on preventing any repeat incidents.
b) The investigation of non-work-related incidents that do not occur at the workplace, including
non-work-related commuting incidents is not required. In some cases an investigation can
be requested by the Responsible Manager where the Responsible Manager has a very
good reason to request such an investigation (where Eskom has an interest to understand
the reasons/root causes) with permission from an employee. These lessons could be
shared in the organisation to prevent repeat incidents.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
c) It must be noted that the employer does not have the mandate to investigate incidents that
occurred at an employee’s home, unless the person was performing work from home
(defined as telework) at the time of the incident, in which case the incident would be
regarded as work related.
d) Eskom investigations will consist of an OU/BU investigation, or depending on the severity of
the incident (as determined in the incident prioritisation section), a corporate investigation
will be held.
e) After every incident that requires an investigation, regardless of the seriousness of the
incident, the responsible manager shall ensure that preliminary evidence collection process
is conducted within 72 hours of occurrence.
f) In cases of incidents involving contractor employees, the contractor must investigate those
as an employer in his/her own right (employer’s investigation) and generate a report. The
report and Annexure 1 must be submitted to the applicable OU/BU or on request to the
Department of Labour by the contractor. Eskom may participate during these investigations
g) The employer’s investigation under the MHSA must be conducted as set out in section
11(5), as revised, of the MHSA.
h) Root cause analysis techniques.
A root cause analysis technique must be used for all employee and contractor OHS
investigations.
3.6.3 Eskom Internal OHS Investigation
3.6.3.1 OU/BU investigations (excluding serious and fatality investigations)
The Investigation Committee must consist of the following, given the nature of the incident:
a) A chairperson (appointed in writing by the employer) as the investigator of the incident. The
chairperson of an incident investigation committee who shall be at a level as per the
“Action and Responsibility Requirement” table contained in the Occupational Health and
Safety Incident Management Definitions and Classification Parameter Standard (240-
131838225),
b) Where there is perceived conflict of interest (an interest which is likely to adversely affect
the investigation process), if the interest is found to exist, the chairperson of an
investigation committee shall not be a direct manager/supervisor of the injured/involved
person. It is the responsibility of the Responsible Manager to ensure that incidents are not
chaired by the chairpersons who are conflicted in that particular incident.
c) Where applicable, a subject matter specialist(s) may be appointed by the OU/BU.
d) Representatives from all entities, where multiple organisations and/or Groups/Divisions are
involved in an incident.
e) The relevant supervisor/manager under whose supervision the incident occurred shall be
the first person to give evidence related to the incident and may be allowed to remain in
attendance at the investigation as an observer, provided there is no conflict of interest.
f) The applicable local workplace statutory health and safety representatives, as required by
the OHS Act.
g) The OU/BU shall invite the respective Division/Group’s Full Time Health and Safety
Representative (where applicable), as per Health and Safety Agreement.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
h) The relevant local union representative as per Eskom’s recognised trade unions may
participate during an employee employer’s investigation, including the process of evidence
collection, investigation, formulation of findings and corrective actions. The relevant union
representative must be from the union in which the involved person is affiliated to.
i) An applicable OU/BU OHS Department representative.
j) In case of an incident involving a person with disability, the investigation committee must
consist out of a representative from Human Resources (HR) and an Occupational Hygiene
Practitioner (where required). Depending on the complexity of the incident, the
Occupational Hygiene Practitioner in consultation with HR will recommend additional
specialist if and when required to assist with effective investigation of the incident.
k) Where relevant and applicable, the Construction Health and Safety Agent.
l) Where relevant and applicable, the OHS Act GMR 2(1) person appointed for plant-related
incidents or his/her assistant in terms of GMR 2(7).
Witnesses: Direct and indirect witnesses as determined by the investigation committee.
Note: A witness may be recalled to answer further questions by the committee, as determined by
the chairperson.
The Investigation Committee chairperson is responsible for the process of evidence collection,
investigation, formulation of findings, identification of root causes, formulation of corrective actions,
compilation of an investigation report.
Note 1: In the case of a committee member who needs to testify as a witness, such a member
needs to be excluded from the investigation sitting until such time as he/she has given his/her
testimony and thereafter the chairperson can exercise his/her prerogative to allow such a person to
become a member of the committee.
Note 2: The investigation may not continue if either the chairperson, the Responsible Manager or
his/her delegate (provided there is no conflict of interest), the statutory Health and Safety
Representative and the subject matter specialist(s) determined by the chairperson is not present
Note 3: The Sustainability Systems Department, as well as an identified subject matter
specialist(s), may attend on invitation.
Note 4: The initiation of the incident investigation must not be delayed due to the unavailability of
any witness.
Note 5: Sustainability Systems has the prerogative to participate as it may deem fit, after
consulting with the relevant OU/BU Responsible Manager, in any incident investigation
notwithstanding the priority rating or incident classification. Sustainability Systems may also
request, through the relevant management structures, any incident investigation report and enquire
on the contents of such a report. Sustainability Systems may lead any investigation at the request
of any relevant senior manager.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
3.6.3.2 Public Incidents
a) The OU/BU shall conduct an investigation for fatal and non-fatal public incidents.
b) The OU/BU shall immediately mobilise for a specialist to respond to the scene and collect
evidence.
c) In the case of electrical related incidents that occurred beyond the point of supply or
involving electrical related criminal activities (theft), the onus is on the OU/BU to conduct
its own investigation. If there is any reason to believe that there is a legal liability, the
OU/BU needs to provide a motivation accompanied by an investigation report and
supporting documentation/information to Sustainability Systems and Legal Departments
and seek a legal opinion from Legal Department.
3.6.3.3 Employee and contractor serious incidents (see definition of a serious incident)
a) OU/BU must inform Sustainability Systems immediately regarding the incident, whereafter
a decision will be made regarding the activation of an independent Subject Matter Expert.
b) Where required, Sustainability Systems Department will appoint and mobilise an
independent subject matter specialist/expert to facilitate and coordinate the collection of
evidence, statements and to support the OU/BU personnel
c) In the case of an extreme serious incident, the OU/BU must appoint an independent
chairperson (at least MPSG17) from another OU/BU to chair the investigation, where
required, the OU/BU to liaise with the Divisional/Group head office for assistant in the
appointment of the independent chairperson. Liaise with Sustainability Systems OHS
regarding attendance of the Sustainability Systems OHS representative.
d) The OU/BU’s Internal OHS investigation chairperson/investigator must provide the
investigation final report in accordance with the Internal OHS Investigation template (240-
Manager and Sustainability Systems Department. The independent subject matter
specialist(s) (referred to in a) above, may provide a separate technical report.
e) If there is potential liability, the Legal Department and Sustainability Systems Departments
must be provided with a motivation for such possible liability in order to advise the OU/BU
on the way forward.
f) The composition of the investigation committee for serious incident is similar to the OU/BU
investigation, with the exception of point a), b) and c) above.
g) The OU/BU where the incident occurred shall support the investigation by assisting with
logistical arrangements and providing a resource for the secretariat role, i.e. for taking
notes and assisting the chairperson with the draft report.
3.6.3.4 Corporate investigation (fatalities)
a) In the case of employee and contractor fatalities, the Sustainability Systems Department
will initiate a corporate investigation and immediately mobilise personnel, who will facilitate
and coordinate the collection of evidence.
b) The OU/BU must ensure that a preliminary investigation is conducted and a report is
generated before the corporate investigation.
Note: In cases where the MHSA applies, the investigation process set out in it will be followed.
Thereafter, a corporate investigation will continue, as required.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
c) The Corporate Investigation Committee must consist of the following members:
i. Chairperson – appointed by Sustainability Systems.
ii. OU/BU Responsible Manager, or his/her delegated person.
iii. Relevant and applicable departmental senior management representative(s) (provided
that he/she have no direct involvement in the particular incident and no conflict of
interest exist).
iv. Risk & Assurance/SHEQ Department representative.
v. Subject matter specialist/ expert.
vi. Sustainability Systems Department representative.
vii. The local statutory health and safety representative (for employee incidents). Where
relevant, the applicable Full Time Health and Safety Representative, as per Health and
Safety Agreement. The OU/BU shall extend the invitation to the applicable Full Time
Health and Safety Representative.
viii. The applicable local union representative as per Eskom’s recognised trade unions may
participate in employee investigations, including the process of evidence collection,
investigation, formulation of findings and corrective actions. The applicable union
representative must be from the union in which the involved person is affiliated to.
ix. Representatives from other divisions in cases involving multiple divisions.
x. In cases where the MHSA applies, the following members may be included as
committee members: 4(1) employer’s representative, 3(1) (a) mine manager, and
2.13.1 engineering manager (mining equipment)/mine engineer.
xi. Where relevant and applicable, the Construction Health and Safety Agent.
xii. Where relevant and applicable, the OHS Act GMR 2(1) person appointed for plant-
related incidents or his/her assistant in terms of GMR 2(7).
xiii. In case of the contractor employee incidents, contractor management representative(s)
are not part of the committee as they would have conducted their own investigation as
the employer. Should the contractor management representative(s) strongly feel that
they need to be part of Eskom’s investigation, the representative shall request (with
reasons) for such permission from the chairperson. Granting of this permission is at the
discretion of the chairperson.
xiv. In case of contractor fatalities, the contractor management representative may be
present while his or her employee is giving evidence. He or she can only seat-in when
their employees are being interviewed since this is an Eskom investigation and the
contractor would have done its own investigation as an employer.
Note: Should any person find it necessary to be an observer, such person shall request the
chairperson for an observer status.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
d) The investigation committee shall identify and confirm the required witnesses:
i. Direct and indirect witnesses as determined by the investigation committee.
ii. A witness may be recalled to answer further questions of the committee, as
determined by the chairperson.
e) The OU/BU where the incident occurred shall support the investigation by assisting with
logistical arrangements and providing a resource for the secretariat role, i.e. for taking
notes and assisting the chairperson with the draft report.
3.6.4 Inquiries, investigation and hearings initiated by government agencies
a) National, provincial, and regional government agencies have the legal authority to inquire
into, or investigate, certain OHS incidents.
b) Any inquiry or investigation by any of these agencies should be preceded by giving proper
notice to the organisation.
c) When any of the following notices are received:
Notifications issued by the DoE&L (in terms of the OHS Act sections 31 and 32
and section 56 of COID Act – Application for Increased Compensation).
Where the MHSA applies, the Mine Health and Safety Inspectorate may convene
an investigation in terms of section 60 of the MHSA and/or an inquiry in terms of
section 65 of the MHSA.
Summons/subpoena received from the NPA or any third party.
Any incident where there is a possibility of liability.
The OU/BU must immediately (not later than 24 hours of being notified) inform
Sustainability Systems and Legal Departments of such notice or requests received
by providing a copy of the notice, completed Annexure 1 form as required in terms
of the OHS Act (where applicable), the OU/BU’s relevant investigation report and
supporting documents and a completed Mandate of Instruction in order for Legal
and Compliance Department to appoint an external legal representative.
If there are reasons to believe that such an attorney is not required, the OU/BU
must provide, without delay, a detailed motivation to Sustainability Systems and
Legal Department, such motivation will be assessed where after a decision will be
communicated to the OU/BU.
d) Requests by government agencies for access to the site’s investigation reports and
related materials must be made in writing and where the OU/BU is unsure regarding the
submission of the requested documentation or information, the OU/BU shall request
advise from Legal Department and Sustainability Systems before they are granted.
e) Employees have the right not to incriminate Eskom or themselves.
f) In the case of incidents involving contractor employees, the investigation will require the
contractor’s involvement.
g) In the case where a contractor does not cooperate during any part of the Eskom
investigation, in terms of contractual and legal obligations, Eskom shall take further steps
to ensure that the immediate and root causes of the incident have been identified and to
ensure that workable corrective actions are identified and implemented and that actions
that will prevent the repeat of such an incident are implemented in order for Eskom to fulfil
its legal obligation.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
h) When required, all persons must be available and cooperate during any investigation by
the Department of Employment and Labour or NPA.
3.7 Management of Corrective Actions
3.7.1 Implementation and monitoring of corrective actions of incidents
a) There must be at least one corrective action for each root cause identified during the
investigation.
b) The Investigation Committee must consider the following hierarchy of control when
formulating corrective actions:
i. Engineering control for the purpose of designing/redesigning in order to eliminate
the risk.
ii. Barriers to isolate/insulate between the source and employees or animals.
iii. The provision of personal protective equipment should be the last resort.
c) Planned start and end dates for all corrective actions must be clearly defined and must be:
i. Specific;
ii. Measureable;
iii. Achievable;
iv. Realistic, with clearly allocated responsibilities; and
v. Timeous, with clear deadlines.
d) Corrective actions and restart criteria/conditions that have to be completed before
operations may resume must be clearly identified in the investigation report. Other
corrective actions (for example, longer-term system-related improvements or evaluations)
often have a completion date that extends beyond the start-up date.
e) Identify potential risks that can influence the achievement of the corrective actions, and
document in the investigation report how these risks should be mitigated.
f) All corrective actions must be verified by the person responsible in order to determine
effective implementation. Documentary evidence of the implemented corrective actions
must be available and attached electronically to the incident in SAP EH&S before the
corrective action is closed on SAP EH&S.
g) Where a corrective action that has been implemented is deemed ineffective and, therefore,
unsuccessful, the corrective action(s) must be revised by the Investigation Committee and
implemented. An alternative corrective action measure must be identified to address the
root cause(s).
h) The revised corrective actions must be approved by the chairperson of the Investigation
Committee, and the report must be revised accordingly. The chairperson must provide the
motivation and/or justification for the decision. The previous ineffective corrective actions
must be closed out on SAP EH&S and a new corrective action must be identified and
captured on SAP EH&S.
i) Risk assessment must be done to ensure that any corrective actions that constitute an
improvement does not create an additional risk or increase the existing risk.
j) To ensure the prompt follow-up and close-out of corrective actions from an incident
investigation report, periodic status reports must be provided from SAP EH&S to site
management until all recommendations have been acted on and closed out.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
k) The Statutory Occupational Health and Safety/SHEQ Committee meeting must also track
the corrective actions, target dates and responsible person(s) identified during
investigations and note, in the minutes, the discussion points on the progress made with
the implementation of corrective actions. The minutes must be kept for at least three
years.
l) The OU/BU manager, as the Responsible Manager, is responsible for reviewing/analysing
the recommendations made in the incident investigation report, assigning responsibilities
to the relevant applicable Responsible Managers and providing the necessary resources to
implement the recommendations made, within a reasonable time frame that does not
expose persons to risk for an unnecessarily long period and to prevent recurrence of the
incident.
3.8 Incident Close-Out
a) Close-out is the final step in the incident management process. The action of closing out
an incident signifies that all corrective actions have been effectively implemented and case
studies have been effectively communicated and all relevant documents have been
attached on SAP EH&S.
b) The incident must then be closed out in SAP EH&S as an action.
3.9 Incident Communication
3.9.1 The communication means for occupational health and safety incidents:
a) Initial incident notification reports must be submitted by any individual who is reporting an
incident to the relevant OU/BU Occupational Health and Safety Department. They can be
provided in any format, that is, email, OU/BU flash report, or INO.
b) The SAP EH&S flash report is the formal notification informing all relevant stakeholder/s
(specified in the Action and Responsibility Requirements Table) that an incident has
occurred.
c) Fatality announcement – Sustainability Systems Department will send out an SMS and an
announcement for employee and contractor work-related fatalities. This communication shall
be signed off by the applicable Group Executive.
d) Occupational health and safety preliminary brief – the preliminary brief report must state the
key learning points, which need to be shared in accordance with the Action and
Responsibility Requirements Table in order to create immediate awareness and to prevent
reoccurrence. The Responsible Manager where the incident occurred is responsible for
compiling an incident preliminary brief. Where required, the preliminary brief must be
communicated to the Sustainability Systems Department for further distribution to all
relevant stakeholders.
f) When compiling the preliminary brief, consider the following:
i. The key learning points should be those points that are obvious (not necessarily the
root causes, as they might not be available at the time of communication).
ii. They must only cover a few main points.
iii. Focus on positive points as well.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
iv. Protect individuals by excluding names and places or any other information that could
be sensitive. Where reasonably practicable, use photos that are relevant to the
incident. Be sensitive towards the reader. Do not include any sensitive photos or
information.
v. The OU/BU must ensure that this information is disseminated to all affected and
interested parties who could benefit from the feedback. The OU/BU Responsible
Manager must ensure that the effectiveness of shared key learning points is monitored.
vi. The communication of the preliminary brief should not be delayed by waiting for the
incident investigation outcome/report. Key learning points are, therefore, not findings or
recommendations.
3.9.2 Fatality Presentations to Executive committee
a) Presentations must be made to the applicable executive committee on all employee and
contractor fatalities by the relevant General Manager or delegated senior manager.
b) Any additional and/or amended information provided at the applicable executive committee
must be updated on SAP EH&S and a revised case study must be republished immediately
on the Eskom publication tool, e.g. Hyperwave.
3.9.3 Case studies must be published for the following incidents:
a) For all occupational health and safety incidents rated with a priority rating of moderate, high
and extreme. In the case of near-miss incidents, publish those rated as extreme.
b) Public fatalities and injuries (excluding public crime-related incidents and incidents that
occurred beyond point of supply) publish those with a priority rating of modetate high and
extreme.
c) The case study must be generated and formally communicated within the OU/BU within five
(5) working days after finalising the investigation report (5 days from date of signature).
d) For fatalities, the OU/BU must, within seven working days after the initial presentation of the
incident at the executive committee, compile and forward the case study to Sustainability
Systems, where after it will be communicated Eskom wide. The OU/BU must ensure that all
case studies are published on an Eskom publication site, for example, Hyperwave.
and safety incident management
In addition to the above outlined procedural requirements, non-compliance to any of the
following will be treated as violation of the procedure:
a) If misleading information is deliberately supplied or information is deliberately withheld.
b) If evidence is wilfully withheld, removed, disturbed, tampered with or distributed without the
relevant permission.
c) If a witness or any person involved in the incident investigation process is victimised or
intimidated.
d) If notification of the incident is not given within the specified time frames.
e) If prioritisation of the incident is deliberately or wilfully manipulated to indicate a lower
priority.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
f) If any incident is not fully investigated within the time frames specified.
g) If incidents are deliberately classified wrongfully.
h) If any incident is not recorded.
i) If corrective actions are not implemented within the time frames agreed and captured in
Sap eh&s.
j) If the effectiveness of corrective actions is not assessed within the required time frames.
Note 1: The collection of evidence for the purpose of the disciplinary process must be conducted
separately from the occupational health and safety incident investigation process.
Note 2: The disciplinary process must collect its own evidence.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
This document has been seen and accepted by:
OHS Steering Committee.
Risk and Sustainability Management Committee.
Date Rev. Compiler Remarks
Procedure reviewed due to
March 2021 9 M Zondi
request from business.
June 2018 8 M Zondi Inclusion of the Full Time Health
and Safety Representative in OHS
Investigation as committee
members.
October 2017 7 M Zondi Align to current business
requirements, e.g. Management of
Occupational Diseases, review
classification of incidents.
Exclusion of environmental
requirements from the document.
November 2015 6 SN Middel Clarification required as requested by
the Legal Department with regard to
the investigation process into cases of
serious incidents and fatalities in so
far as alignment with the employer
investigation and the corporate
investigation process. To clarify the
corporate investigation process for
incidents where no injuries occurred
or in the case of third party
investigations with serious
consequences for the business.
April 2015 5 SN Middel OHS Steering Committee raised a
concern regarding the practicality of
managing incidents at the operational
level as some of the processes are
complex. This initiated a procedure
review.
The following people were involved in the development of this document:
As per the list below.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
Group/division name group/division name
Human Resources Duke Lebethe
Group Capital Division Ndiaphe Maphanga Division
Group Capital Division Sheryl Isaacs Eskom Rotek Industries Thanduxolo Zulu
Group Capital Division Frans Durand Eskom Rotek Industries Eunice Hamilton
Group Capital Division Althea Stuart Eskom Rotek Industries James Lubisi
Group Capital Division Albert Mogapi Eskom Rotek Industries Joyce Leshiba
Group Capital Division Loraine Smit Assurance and
Forensics Lesley Motshelanoka
Generation Division Marc Lebea Finance Division Theresa Nuthall
Generation Division Bob Phahle Finance Division Sekete Pule
Generation Division Fundisa Dangazele Risk and Sustainability Brenda Njotini
Generation Division Nompilo Dlamini Risk and Sustainability Mara De Kock
Generation Division Tendani Mukhuba Risk and Sustainability Sivendri Govender
Generation Division Happy Sithole Risk and Sustainability Mpapadi Monyela
Generation Division Nkosinathi Makhanya Risk and Sustainability Ntokozo Ngubane
Generation Division Jcp Coetzee Risk and Sustainability Mike Townsend
Transmission Division Refilwe Maswanganyi Risk and Sustainability Miranda Moahlodi
Transmission Division Revive Mkansi Risk and Sustainability Sibongile Masipa
Transmission Division Petrus Motsumi Risk and Sustainability Refilwe Sebothoma
Transmission Division Sifiso Ndlovu Risk and Sustainability Amy Seherie
Transmission Division Pieter Human Risk and Sustainability Sivuyisiwe Mqanto
Distribution Division Paulene Pirthi Executive Support Wandile Katoo
Distribution Division Donald Kekana
Distribution Division Laetitia Smith
Distribution Division Lenny Babulall
Distribution Division Bertie De Jager
Distribution Division Nicholas Sibiya
Distribution Division Silindokuhle Sithebe
Group Commercial Mikateko Chauke
Group Commercial Meisie Sindane
Group IT Pumeza Mabunda
Human Resources Jan Olckers
Division
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Section
Source: 32-95 rev 9.pdfcorrective actions (for example, longer-term system-related improvements or evaluations)
approaches occupational health and safety, the environment and quality.
f) Improve the quality of occupational health and safety by learning from incidents, including
Contact Information
Source: NEC ECSC- Engineering Building Space Optimization .pdf (unknown){"name":null,"email":null,"phone":null,"department":"ed Kingdom Housing Grants,","address":"as the Contractor in the conditions of contract identified in the Contract Data."}
Evaluation Criteria
Source: NEC ECSC- Engineering Building Space Optimization .pdf (unknown)Unable to extract eligibility criteria
Technical Specifications
Source: NEC ECSC- Engineering Building Space Optimization .pdf (unknown)Title Date or Tick if publicly
revision available
General specifications and standards: ✓
Occupational Health and Safety Act and Regulations (Act ✓
)
ISO 9001 Quality Management Systems ✓
Part c3: scope of work c3.1 Ecsc3 works information
NTCSA SOC Ltd CONTRACT NUMBER _____________
Space optimization of 2nd floor engineering building, simmerpan to accommodate 50 workstations
SANS 10400 The Application of the National Building ✓
Regulations
SANS 10142-1:2006 (Ed 1.5) THE WIRING OF PREMISES ✓
Construction Regulations 2014 ✓
The National Heritage Resources Act ✓
The Environment Conservation Act ✓
National Key Point (Act ) ✓
240-62196227: Eskom Life Saving Rules Standards ✓
240-62946386: Eskom Vehicle and Driver Safety ✓
Management Procedure
32-95: Occupational Health and Safety Incident ✓
Management Procedure
32-418: Working at Heights Procedure ✓
32-345: Eskom Vehicle Safety Specification ✓
NTCSA Simmerpan Engineering Building Refurbishment ✓
Electrical Scope of Work
Space Optimization of 2nd Floor Engineering Building, ✓
Simmerpan to accommodate 50 workstations
32-726: S.H.E. Requirements for the Eskom ✓
Commercial Process
240-10254991 – General Technical Specifications for ✓
HVAC Systems Standard
240-70164623 – Eskom Heating Ventilation and Air ✓
Conditioning (HVAC) Design Guideline
240-143112846 – Heating Ventilation and Air Conditioning ✓
System Design Work Instruction
SANS 10252 Part 1 and Part 2 ✓
240-54937439 – Fire Protection/Detection Assessment ✓
Standard
240-54937450 – Fire Protection and Life Safety Design ✓
Standard
SANS 10142-1 – The wiring of premises Part 1: Low- ✓
voltage installations
SANS 10139 - Fire System Design Guide ✓
SANS 10142 – Issue of new COC ✓
Provision of working at height as and when required.
Provide certification for working at heights, cherry picker and scaffolding.
All equipment, tools and material to be always kept in a site yard when the work is done.
Part c3: scope of work c3.1 Ecsc3 works information
NTCSA SOC Ltd CONTRACT NUMBER _____________
Space optimization of 2nd floor engineering building, simmerpan to accommodate 50 workstations
4.1 Meetings
Monthly Meetings shall take place on site (face-to-face) to discuss all issues or plans for all perimeters for
the contract or project (time, cost, quality, environment and health and safety). Monthly Meetings preferred at
the start of each month for the good planning of activities on site. The Employer can request the ‘Emergency
Meeting’ at any given time if there are serious issues or risks that can affect the service delivery for the
project / contract. All meetings shall be chaired by the Service Manager. Ms Teams can be used as
alternative platform due to unforeseen and other circumstances or very urgent issues e.g., Emergency
Meeting, etc.
Title and purpose Approximate interval Location Attendance by:
Kick of meeting Minimum within 1 week Simmerpan Project Manager,
after start date Engineering Building, Contractor and
Ms Teams or other Supervisors
venue as advised by
the Employer
Overall contract progress Bi-weekly or on Ad hoc Simmerpan Employer, Contractor,
and feedback in terms of basis Engineering Building, and all relevant
contract obligations Ms Teams or other Stakeholders (both
venue as advised by NTCSA’s and
the Employer Contractor’s)
Safety, health, Monthly Simmerpan Employer and
environmental and quality Engineering Building, Contractor
meeting Ms Teams or other
venue as advised by
the Employer
Contractor Forums As and when deemed Simmerpan Employer, Contractor,
necessary Engineering Building, and all relevant
Ms Teams or other Stakeholders (both
venue as advised by NTCSA’s and
the Employer Contractor’s)
Daily safety Toolbox Daily before work starts on Simmerpan Contractor and his/her
Talks site with signed attendance Engineering Building, employees
registers by the Ms Teams or other
Contractor’s employees venue as advised by
and signed off minutes by the Employer
the Contractor’s site Agent
or manager
All meetings shall be recorded using minutes or a register prepared and circulated by the person who
convened the meeting. Such minutes or register shall not be used for the purpose of confirming actions or
instructions under the contract as these shall be done separately by the person identified in the conditions of
contract to carry out such actions or instructions.
4.2 Use of standard forms
NEC3 ECSC to be used by the Contractor in the administration of the contract, for example early warning
and compensation event notifications to be addressed to the Employer
All formal contractual communications shall be on a letterhead and bear as a minimum the date, subject,
reference number, identities of sender and receiver and signature of sender and shall be delivered as
attachments in the case of emails and not as a message in the email itself. All formal communications to the
Employer shall be addressed to the Employer
Part c3: scope of work c3.1 Ecsc3 works information
NTCSA SOC Ltd CONTRACT NUMBER _____________
Space optimization of 2nd floor engineering building, simmerpan to accommodate 50 workstations
Correspondence on a day-to-day basis shall be directed to the Employer and care must be taken not to
violate contract conditions and other provisions in terms of the contract.
4.3 Invoicing and payment
In terms of core clause 50 the Contractor assesses the amount due and applies to the Employer for
payment. The Contractor applies for payment with a tax invoice addressed to the Employer as follows:
The Contractor includes the following information on each tax invoice:
the VAT and including VAT;
The Contractor attaches the detail assessment of the amount due to each tax invoice showing the Price for
Work Done to Date for each item in the Price List for work which he has completed.
Additional Information
for billing.
does not support more than one PDF being linked into workflow at a time.
address below).
original documents to the respective documentation management centers – though invoices
emailed. NTCSA is still seeking clarity from the South African Reserve Bank for foreign invoices and
currency. Current requirements are that these manual invoices should be submitted. Invoice copy
can be sent to the email address indicated below.
avoid delays on payment, if there are issues for the CPA.
invoices and ensure that no invoices get lost. If the goods receipt is not done, the invoice will be
parked, and the system will automatically send an email to the end user to do good receipt. This is
also tracked by NTCSA through the park invoice report.
Centre which can then be followed up and corrected.
Follow-up with Finance Shared Services (FSS):
All queries and follow-up on invoice payments should be made by contacting the FSS Contact Centre at +27
11 800 5060 or email [email protected]. Introducing electronic invoicing does not guarantee payment, but
will ensure visibility of all invoices as well as ensure that no invoices are lost. If the Goods Receipt (GR) is
not done, the invoice will be parked, and the system will automatically send an email to the end user to do
the GR. This is also tracked by Eskom through the parked invoice report.
Part c3: scope of work c3.1 Ecsc3 works information
NTCSA SOC Ltd CONTRACT NUMBER _____________
Space optimization of 2nd floor engineering building, simmerpan to accommodate 50 workstations
4.4 Records of Defined Cost
As a control measure, it is required for the Contractor to maintain record keeping of all defined cost items for
the purpose of compensation event management. A schedule of these cost components may not be listed in
the contract price list should be provided by the Contractor when requested by the Employer.
4.5 Accelerated Shared Growth Initiative – South Africa (ASGI-SA)
Not Applicable.
4.6 BBBEE and preferencing scheme
affidavit.
“proof of B-BBEE status level of contributor” means-
➢ The B-BBEE status level certificate issued by an authorised body or person; or
➢ a sworn affidavit as prescribed by the B-BBEE Codes of Good Practice; or
➢ any other requirement prescribed in terms of the Broad-Based Black Economic
empowerment Act
Transformation – BBBEE Improvement or Retention Plan
Transformation remains an area of focus, where NTCSA continuously strives to align itself with national
transformation imperatives to unlock growth, drive industrialization, create employment and contribute to
skills development.
NTCSA encourages its suppliers to constantly strive to improve their
B-BBEE rating. Whereas Tenderer/s will be allocated points in terms of a preference point system based on
specific goals, NTCSA also requests that tenderer/s submits their B-BBEE improvement or retention plan
within 30 days of signing the contract.
Tenderer/s are therefore requested to indicate the extent to which they will maintain (only if the respondent is
a Level 1) or may improve/maintain their B-BBEE status over the contract period if their B-BBEE status is
level 2 or 3. Tenderer/s with a B-BBEE status level 4 at the time of contract award, shall migrate and achieve
as a non-negotiable a milestone of B-BBEE Level 3 by the end of the first year of the contract and thereafter
improve their B-BBEE status level or migrate by one level higher.
Tenderer/s with a B-BBEE recognition status of Level 5 to Level 8 or non-compliant at the time of contract
award, shall migrate and achieve as a non-negotiable a milestone of Level 4 by the end of the first year of
the contract and thereafter improve at least one B-BBEE Level higher of each year from the second year of
the contract.
Tenderer/s are requested to submit their B-BBEE Improvement Plan as an essential document within 30
days of signing the contract.
NB: A valid B-BBEE certificate or Sworn Affidavit is a condition for contract award, if your company’s
annual Total Revenue is R10 Million or less you qualify as an Exempted Micro Enterprise therefore you can
submit Sworn Affidavit. If your annual Total Revenue is R50 Million or less, you qualify as Qualifying Small
Enterprise and must comply with all of the elements of QSE score card relevant to your sector unless an
entity is at least 51% Black owned you are required to obtain a Sworn affidavit. If your Annual Total Revenue
is above R50m you need to submit a Valid B-BBEE certificate.
Supplier Development Localisation and Industrialisation (SDL&I) undertaking:
Designated sector
Commodity Local Content Threshold
Cables 90%
Part c3: scope of work c3.1 Ecsc3 works information
NTCSA SOC Ltd CONTRACT NUMBER _____________
Space optimization of 2nd floor engineering building, simmerpan to accommodate 50 workstations
Note: SBD 6.2 Declaration Form and Annexure C, D & E are mandatory for contract award.
CIDB
The required CIDB grading is 4GB or higher.Skills Development
Tenderers are required to submit proposals in a table below for developing the skills of unemployed
candidates in the country. Skills development is intended to address NTCSA’s core, scarce and critical skills
and the scarce and critical skills. These skills are also included in a 2020 list of occupations in high demand
as stipulated in the Government Gazette 43937. Candidates shall be from all provinces in the country, and
their composition shall be representative of the population demographics of South Africa
Skills Type NTCSA Target Supplier's Proposal
Assembler 2
Job Opportunities
Types of Jobs to be created Types of Jobs to be retained
SDL&I Penalty and Performance Security
NTCSA will apply a penalty of 2.5% of the Contract Value for failure to meet SDL&I obligations. For the
duration of the contract, NTCSA will retain 2.5% of every invoice (excluding VAT) as security for the
fulfilment of all SDL&I Obligations. The retained amounts shall only be released to the Contractor upon:
Reporting and monitoring
Template on their compliance with the SDL&I obligations described above.
reports and notify the suppliers in writing if their SDL&I obligations have not been met.
be required to implement corrective measures to meet those SDL&I obligations before the
commencement of the following report, failing which Retention clauses shall be invoked.
by the suppliers and returned to SDL&I representative for acceptance 28 days after contract award. This
will be used as a reference document for monitoring, measuring and reporting on the supplier’s progress
in delivering on their stated SDL&I commitments.
4.7 Facilities to be provided by the Contractor
The Contractor shall provide all tools and equipment required for the service.
4.8 Title to material from excavation and demolition
Not Applicable.
4.9 Design by the Contractor
Not Applicable.
Part c3: scope of work c3.1 Ecsc3 works information
NTCSA SOC Ltd CONTRACT NUMBER _____________
Space optimization of 2nd floor engineering building, simmerpan to accommodate 50 workstations
4.10 Cataloguing requirements by the Contractor
Not Applicable.
5.Requirements for the programme
The Contractor to provide a works programme with the proposed timelines during the tendering stage.
Upon awarding of contract, the Contractor shall provide a more accurate revised programme, to the
Employer for acceptance within two weeks of contract start date.
The programme should consist of (but not limited) to the following:
The starting date, access dates, Key Dates and Completion Date,
planned Completion, the order and timing of the operations which the Contractor plans to do in order to
Provide the Works, the order and timing of the work of the Employer and Others as last agreed with them by
the Contractor or, if not so agreed, as stated in the Works Information,
The dates when the Contractor plans to meet each Condition stated for the Key Dates and to complete other
work needed to allow the Employer and Others to do their work,
provisions for float, time risk allowances, health and safety requirements and the procedures set out in this
contract, the dates when, in order to Provide the Works in accordance with his programme, the Contractor
will need access to a part of the Site if later than its access date, acceptances, Plant and Materials and other
things to be provided by the Employer and information from Others, for each operation, a statement of how
the Contractor plans to do the work identifying the principal Equipment and other resources which he plans
to use and other information which the Works Information requires the Contractor to show on a programme
submitted for acceptance.
Item Date by which it
will be provided
Water TBC
Electricity will be provided by the Employer, but the Contractor will be expected to TBC
provide his electricity (generator) in case of outages.
Ablutions TBC
Part c3: scope of work c3.1 Ecsc3 works information
NTCSA SOC Ltd CONTRACT NUMBER _____________
Space optimization of 2nd floor engineering building, simmerpan to accommodate 50 workstations
C4: Site Information
Simmerpan Engineering Building, Germiston.
C4.1: Information about the site at time of tender which may affect the work in
this contract
Access to site will be given once SHEQ requirements and safety file has been approved internally. Prior
arrangement needs to be made with the Employer whenever access to site is required.
The Employer reserves the right for its Security personnel to search persons or vehicles entering or
leaving the premises. This includes, but is not limited to staff, briefcases, bags and toolboxes.
All persons entering Eskom sites are subjected to alcohol testing.
Not Applicable.
Not Applicable.
If work is to be carried out on existing buildings or facilities Site Information would be the ‘as-built
drawings’ of those buildings or facilities. If these are not a correct statement or not available other means
of describing the existing buildings or facilities would have to be used, such as providing photographs
The works will be carried out at Simmerpan Engineering Building.
Part c4: site information c4.1 Site information
Quality Management
Source: NEC ECSC- Engineering Building Space Optimization .pdfoccupational hygiene inspection body, i.e. a SANAS accredited and Department of
Pricing Schedule
Source: NEC ECSC- Engineering Building Space Optimization .pdfPart 1 Agreements and Contract Data, (which includes this Form of Offer and Acceptance)
Part 2 Pricing Data
Part 3 Scope of Work: Works Information
Part 4 Site Information
and drawings and documents (or parts thereof), which may be incorporated by reference into the above
listed Parts.
10.1 The Contractor is (Name): [●]
Address [●]
Tel No. [●]
Fax No. [●]
E-mail address [●]
63.2 The percentage for overheads and profit
added to the Defined Cost for people is [●]%
63.2 The percentage for overheads and profit
added to other Defined Cost is [●]%
11.2(9) The Price List is in the document called ‘Price List’ in Part 2 of this
contract.
11.2(10) The offered total of the Prices is R[●]
[Enter the total of the Prices from the Price excluding VAT
List]: [in words]
[●]
excluding VAT
Part c1: agreements and contract data c1.2B Ecsc3 contract data part 2
NTCSA SOC Ltd CONTRACT NUMBER _____________
Space optimization of 2nd floor engineering building, simmerpan to accommodate 50 workstations
C2 Pricing Data
C2.1 Pricing assumptions
Pricing option: option B (Bill of Quantities).
contained.
Part c2: pricing data c2.1 Ecsc3 pricing assumptions
NTCSA SOC Ltd CONTRACT NUMBER _____________
Space optimization of 2nd floor engineering building, simmerpan to accommodate 50 workstations
C2.2 Price List
Refer to attached Bill of Quantities (excel sheet) named “Bill of Quantities for Simmerpan Engineering
Building Space Optimization”
Bill%20of%20Quantiti
es%20for%20Simmerp
.
Part c2: pricing data c2.2 Ecsc3 price list
NTCSA SOC Ltd CONTRACT NUMBER _____________
Space optimization of 2nd floor engineering building, simmerpan to accommodate 50 workstations
C3: Scope of Work
C3.1 Works Information
Health & Safety
Source: NEC ECSC- Engineering Building Space Optimization .pdfsignature of Date
witness
Note: If a tenderer wishes to submit alternative tender offers, further copies of this document may be used for that purpose, duly
endorsed, ‘Alternative Tender No. _____ ‘
Part c1: agreements and contract data c1.1 Ecsc3 form of offer and acceptance
NTCSA SOC Ltd CONTRACT NUMBER _____________
Space optimization of 2nd floor engineering building, simmerpan to accommodate 50 workstations
Z3.5 The Contractor ensures that all his subcontractors abide by the undertakings in this clause.
Z4 Waiver and estoppel: Add to clause 12.2:
Z4.1 Any extension, concession, waiver or relaxation of any action stated in this contract by the
give rise to an estoppel unless the Parties agree otherwise and confirm such agreement in
writing.
Part c1: agreements and contract data c1.2A Ecsc3 contract data part 1
NTCSA SOC Ltd CONTRACT NUMBER _____________
Space optimization of 2nd floor engineering building, simmerpan to accommodate 50 workstations
Z5 Health, safety and the environment
Z5.1 The Contractor undertakes to take all reasonable precautions to maintain the health and safety
of persons in and about the execution of the works. Without limitation the Contractor:
provided for under the Construction Regulations 2014 (promulgated under the Occupational
Health & Safety Act ) (“the Construction Regulations”) for the Site;
proper compliance with the Construction Regulations, all applicable health & safety laws
and regulations and the health and safety rules, guidelines and procedures provided for in
this contract and generally for the proper maintenance of health & safety in and about the
execution of works; and
the regulations published in GNR February 2002, under the Occupational Health
and Safety Act, 1993 (Act ) (“Asbestos Regulations”). The OEL for asbestos is 0.2
regulated asbestos fibres per millilitre of air as a 4-hour TWA, averaged over any continuous
period of four hours, and the short term exposure limit of 0.6 regulated asbestos fibres per
millilitre of air as a 10-minute TWA, averaged over any 10 minutes, measured in accordance
Part c1: agreements and contract data c1.2A Ecsc3 contract data part 1
NTCSA SOC Ltd CONTRACT NUMBER _____________
Space optimization of 2nd floor engineering building, simmerpan to accommodate 50 workstations
with HSG248 and monitored according to HSG173 and OESSM.
Z14.2 Upon written request by the Contractor, the Employer certifies that these conditions prevail.
and related control measures at the Contractor’s expense. For the purposes of compliance
the results generated from Parallel Measurements are evaluated only against South African
statutory limits as detailed in clause Z14.1. Control measures conform to the requirements
stipulated in the AAIA-approved asbestos work plan.
Z14.3 The Employer manages asbestos and ACM according to the Standard.
Z14.4 In the event that any asbestos is identified while Providing the Services, a risk assessment is
conducted and if so required, with reference to possible exposure to an airborne concentration
of above the AL for asbestos, immediate control measures are implemented and relevant air
monitoring conducted in order to declare the area safe.
Z14.5 The Contractor’s personnel are entitled to stop working and leave the contaminated area
forthwith until such time that the area of concern is declared safe by either Compliance
emergency asbestos work plan, if applicable.
Z14.6 The Contractor continues to Provide the Services, without additional control measures
presented, on presentation of Safe Levels. The contractually agreed dates to Provide the
with focus booths.
4 x Offices – Currently 1 workstation to be demolished and replaced with focus booths.
Open Area – Currently L – shaped desks to be replaced with type H workstations (straight desk).
Open Area – Currently space to also be fitted out with double door credenzas / filling cupboards.
Remove the old plug socket skirting and replace with a new double compartment skirting, equipped
with 6-module power clusters (1x164-1, 1x164-2, 1 x USB-A, 1x USB-C, switched)
1 x Lascon LBP-24 LED Panel with emergency module in each bathroom
1 x Lascon LBP-24 LED Panel with emergency module in the kitchen
4 x Lascon LBP-24 LED Panel with emergency module in the corridor
In certain areas, this will require the replacement of exiting LED Panel lights with Lascon LBP-24 LED Panels
with emergency modules.
revision available
General specifications and standards: ✓
Occupational Health and Safety Act and Regulations (Act ✓
)
ISO 9001 Quality Management Systems ✓
Part c3: scope of work c3.1 Ecsc3 works information
NTCSA SOC Ltd CONTRACT NUMBER _____________
Space optimization of 2nd floor engineering building, simmerpan to accommodate 50 workstations
SANS 10400 The Application of the National Building ✓
SANS 10142-1:2006 (Ed 1.5) THE WIRING OF PREMISES ✓
Construction Regulations 2014 ✓
The National Heritage Resources Act ✓
The Environment Conservation Act ✓
National Key Point (Act ) ✓
240-62196227: Eskom Life Saving Rules Standards ✓
240-62946386: Eskom Vehicle and Driver Safety ✓
32-95: Occupational Health and Safety Incident ✓
32-418: Working at Heights Procedure ✓
32-345: Eskom Vehicle Safety Specification ✓
NTCSA Simmerpan Engineering Building Refurbishment ✓
240-54937450 – Fire Protection and Life Safety Design ✓
Part c3: scope of work c3.1 Ecsc3 works information
NTCSA SOC Ltd CONTRACT NUMBER _____________
Space optimization of 2nd floor engineering building, simmerpan to accommodate 50 workstations
4.1 Meetings
Monthly Meetings shall take place on site (face-to-face) to discuss all issues or plans for all perimeters for
the contract or project (time, cost, quality, environment and health and safety). Monthly Meetings preferred at
the start of each month for the good planning of activities on site. The Employer can request the ‘Emergency
Meeting’ at any given time if there are serious issues or risks that can affect the service delivery for the
project / contract. All meetings shall be chaired by the Service Manager. Ms Teams can be used as
alternative platform due to unforeseen and other circumstances or very urgent issues e.g., Emergency
work needed to allow the Employer and Others to do their work,
provisions for float, time risk allowances, health and safety requirements and the procedures set out in this
contract, the dates when, in order to Provide the Works in accordance with his programme, the Contractor
will need access to a part of the Site if later than its access date, acceptances, Plant and Materials and other
things to be provided by the Employer and information from Others, for each operation, a statement of how
the Contractor plans to do the work identifying the principal Equipment and other resources which he plans
to use and other information which the Works Information requires the Contractor to show on a programme
submitted for acceptance.
Environmental
Source: NEC ECSC- Engineering Building Space Optimization .pdfdates are extended by the notification periods required by regulations 3 and 21 of the
Asbestos Regulations, 2001.
Z14.7 Any removal and disposal of asbestos, asbestos containing materials and waste, is done by a
registered asbestos contractor, instructed by the Employer at the Employer’s expense, and
conducted in line with South African legislation.
Part c1: agreements and contract data c1.2A Ecsc3 contract data part 1
NTCSA SOC Ltd CONTRACT NUMBER _____________
Space optimization of 2nd floor engineering building, simmerpan to accommodate 50 workstations
Data provided by the Contractor (the Contractor’s Offer)
environmental and quality Engineering Building, Contractor
meeting Ms Teams or other
venue as advised by
the Employer
Contractual Terms
Source: NEC ECSC- Engineering Building Space Optimization .pdfof Deviations (if any), contact the Employer’s agent (whose details are given in the Contract Data) to arrange
the delivery of any securities, bonds, guarantees, proof of insurance and any other documentation to be
provided in terms of the conditions of contract identified in the Contract Data at, or just after, the date this
dispute to him. (see www.ice-sa.org.za). If the
Z2.2 The Contractor is required to submit an updated verification certificate and necessary
supporting documentation confirming the change in his B-BBEE status to the Employer within
thirty days of the notification or as otherwise instructed by the Employer.
Z2.3 Where, as a result, the Contractor’s B-BBEE status has decreased since the starting date the
Employer may either re-negotiate this contract or alternatively, terminate the Contractor’s
obligation to Provide the Works.
Z2.4 Failure by the Contractor to notify the Employer of a change in its B-BBEE status may
constitute a reason for termination. If the Employer terminates in terms of this clause, the
procedures on termination are those stated in Clause 91.1 and the amount due on termination
includes amounts listed in Clause 92.1 less a deduction of the forecast additional cost to the
Z3 Confidentiality
Z3.1 The Contractor does not disclose or make any information arising from or in connection with
this contract available to others except where required by this contract. This undertaking does
not, however, apply to information which at the time of disclosure or thereafter, without default
on the part of the Contractor, enters the public domain or to information which was already in
the possession of the Contractor at the time of disclosure (evidenced by written records in
existence at that time). Should the Contractor disclose information to others where required by
this contract the Contractor ensures that the provisions of this clause are complied with by the
recipient.
Z3.2 If the Contractor is uncertain about whether any such information is confidential, it is to be
regarded as such until notified otherwise by the Employer.
Z3.3 In the event that the Contractor is, at any time, required by law to disclose any such information
which is required to be kept confidential, the Contractor, to the extent permitted by law prior to
disclosure, notifies the Employer so that an appropriate protection order and/or any other action
can be taken if possible, prior to any disclosure. In the event that such protective order is not,
or cannot, be obtained, then the Contractor may disclose that portion of the information which it
is required to be disclosed by law and uses reasonable efforts to obtain assurances that
confidential treatment will be afforded to the information so disclosed.
Z3.4 The taking of images (whether photographs, video footage or otherwise) of the works or any
portion thereof, in the course of Providing the Works and after Completion, requires the prior
written consent of the Employer. All rights in and to all such images vests exclusively in the
guidelines and procedures otherwise provided for under this contract and ensures that his
Subcontractors, employees and others under the Contractor’s direction and control,
likewise observe and comply with the foregoing.
Z5.2 The Contractor, in and about the execution of the works, complies with all applicable
environmental laws and regulations and rules, guidelines and procedures otherwise provided
for under this contract and ensures that his subcontractors, employees and others under the
Contractor’s direction and control, likewise observe and comply with the foregoing.
Z6 Provision of a Tax Invoice and interest. Add to clause 50
Z6.1 The Contractor provides the Employer with a tax invoice in accordance with the Employer's
procedures stated in the Works Information, showing the correctly assessed amount due for
payment.
Z6.2 If the Contractor does not provide a tax invoice in the form and by the time required by this
contract, the time by when the Employer is to make a payment is extended by a period equal in
time to the delayed submission of the correct tax invoice. Interest due by the Employer in terms
of clause 51.2 is then calculated from the delayed date by when payment is to be made.
Z6.3 The Contractor is required to comply with the requirements of the Value Added Tax Act, no (as amended) and to include the Employer’s VAT number 4710303126 on each invoice
he submits for payment.
Z7 Notifying compensation events
Z7.1 Delete from the last sentence in clause 61.1, “unless the event arises from an instruction of the
Employer.”
Z8 Employer’s limitation of liability; Add to clause 80.1
Z8.1 The Employer liability to the Contractor for the Contractor’s indirect or consequential loss is
limited to R0.00 (zero Rand).
Z9 Termination: Add to clause 90.2, after the words "or its equivalent":
Z9.1 or had a business rescue order granted against it.
Z10 Addition to Clause 50.5
Part c1: agreements and contract data c1.2A Ecsc3 contract data part 1
NTCSA SOC Ltd CONTRACT NUMBER _____________
Space optimization of 2nd floor engineering building, simmerpan to accommodate 50 workstations
Z10.1 If the amount due for the Contractor’s payment of delay damages reaches the limits stated in
this Contract Data (if any), the Employer may terminate the Contractor’s obligation to Provide
the Works.
stated in Clause 91.1 and the amount due on termination includes amounts listed in Clause
92.1 less a deduction of the forecast additional cost to the Employer of completing the works.
Z11 Ethics
or in any other similar process, of such Prohibited Action before the Employer can terminate the
Contractor’s obligation to Provide the Services for this reason.
Z11.3 If the Employer terminates the Contractor’s obligation to Provide the Services for this reason, the
amounts due on termination are those intended in core clauses 92.1 and 92.2.
Z11.4 A Committing Party co-operates fully with any investigation pursuant to alleged Prohibited Action.
ensures that the Committing Party co-operates fully with an investigation.
Z12 Insurance
Z _12.1 Replace core clause 82 with the following:
Part c1: agreements and contract data c1.2A Ecsc3 contract data part 1
NTCSA SOC Ltd CONTRACT NUMBER _____________
Space optimization of 2nd floor engineering building, simmerpan to accommodate 50 workstations
Insurance cover 82
82.1 When requested by a Party, the other Party provides certificates from his insurer or
broker stating that the insurances required by this contract are in force.
82.2 The Contractor provides the insurances stated in the Insurance Table A, from the
starting date until the earlier of Completion and the date of the termination
certificate.
cover or minimum
limit of indemnity
Loss of or damage to the The replacement The Employer’s
works cost where not certificate of
covered by the Completion has
Employer’s been issued
insurance
The Employer’s
policy deductible as
at contract date,
where covered by
the Employer’s
insurance
Employer’s
insurance
The Employer’s
policy deductible as
at contract date,
where covered by
the Employer’s
insurance
The Contractor’s liability for Loss of or damage
loss of or damage to to property
property (except the works, Employer’s property
The replacement Equipment) and for bodily
cost where not injury to or death of a person
covered by the (not an employee of the
Employer’s Contractor) arising from or in
insurance connection with the
Contractor’s Providing the
Works The Employer’s
policy deductible as
at contract date
where covered by
the Employer’s
insurance
in the course of their
employment in connection
with this contract
82.3 The Employer provides the insurances as stated in the Insurance
Transportation (Marine) Per the insurance policy document
Z13 Nuclear Liability
Z13.1 The Employer is the operator of the Koeberg Nuclear Power Station (KNPS), a nuclear
installation, as designated by the National Nuclear Regulator of the Republic of South Africa,
and is the holder of a nuclear licence in respect of the KNPS.
Z13.2 The Employer is solely responsible for and indemnifies the Contractor or any other person
against any and all liabilities which the Contractor or any person may incur arising out of or
resulting from nuclear damage, as defined in Act , save to the extent that any
liabilities are incurred due to the unlawful intent of the Contractor or any other person or the
presence of the Contractor or that person or any property of the Contractor or such person at
or in the KNPS or on the KNPS site, without the permission of the Employer or of a person
acting on behalf of the Employer.
Z13.3 Subject to clause Z13.4 below, the Employer waives all rights of recourse, arising from the
aforesaid, save to the extent that any claims arise or liability is incurred due or attributable to
the unlawful intent of the Contractor or any other person, or the presence of the Contractor or
Part c1: agreements and contract data c1.2A Ecsc3 contract data part 1
NTCSA SOC Ltd CONTRACT NUMBER _____________
Space optimization of 2nd floor engineering building, simmerpan to accommodate 50 workstations
that person or any property of the Contractor or such person at or in the KNPS or on the
for billing.
does not support more than one PDF being linked into workflow at a time.
address below).
original documents to the respective documentation management centers – though invoices
emailed. NTCSA is still seeking clarity from the South African Reserve Bank for foreign invoices and
currency. Current requirements are that these manual invoices should be submitted. Invoice copy
can be sent to the email address indicated below.
avoid delays on payment, if there are issues for the CPA.
invoices and ensure that no invoices get lost. If the goods receipt is not done, the invoice will be
parked, and the system will automatically send an email to the end user to do good receipt. This is
also tracked by NTCSA through the park invoice report.
Follow-up with Finance Shared Services (FSS):
All queries and follow-up on invoice payments should be made by contacting the FSS Contact Centre at +27
11 800 5060 or email [email protected]. Introducing electronic invoicing does not guarantee payment, but
will ensure visibility of all invoices as well as ensure that no invoices are lost. If the Goods Receipt (GR) is
not done, the invoice will be parked, and the system will automatically send an email to the end user to do
the GR. This is also tracked by Eskom through the parked invoice report.
Part c3: scope of work c3.1 Ecsc3 works information
NTCSA SOC Ltd CONTRACT NUMBER _____________
Space optimization of 2nd floor engineering building, simmerpan to accommodate 50 workstations
4.4 Records of Defined Cost
Contact Information
Source: 559-343110581_Post contract award SHEQ Requirement Engineering Building Space Optimization Project.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"n presented"}
Evaluation Criteria
Source: 559-343110581_Post contract award SHEQ Requirement Engineering Building Space Optimization Project.pdf (unknown)The contractor must be the successful bidder for the Simmerpan Engineering Building Space Optimization project. They must be a registered company (with a company registration number) and comply with all South African OHS Act, environmental, and quality regulations. Specific competency requirements include: electrical contractor registered with the Department of Employment and Labour (DEL), safety officer with National Diploma in Safety Management or Advanced SAMTRAC and SACPCMP registration, and personnel with fall arrest and rescue unit standard certifications (229998, 229995, 229994).
Technical Specifications
Source: 559-343110581_Post contract award SHEQ Requirement Engineering Building Space Optimization Project.pdf (unknown)Issued tender Annexure B ✓
Copy Letter of Good ✓
Standing
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No 2021/539129/30
of 6
File name: 559-343110581_Post contract award SHEQ Requirement Engineering Building Space Optimization Project
Document
559-343110581 Rev 1 Post contract tender award Identifier
SHEQ requirement Effective Date August 2025
Review Date August 2028
Work CR 4
Appointment 16 (2) with
Legal liability and incident
management competency
appointment
Appointment of the sub-
contractor
manager/ Responsible
manager OHS Act Sec 8 with
Legal liability and incident
investigation competency
Assistant Site manager/
Responsible manager with
Legal liability and incident
investigation competency
Electrical Installation
Supervisor (Master Electrical
Installation) HIRA,
Supervisory training &
Incident Investigation, Legal
liability
Supervisor OHS Act Sec 8(2)
with Legal liability,
supervisory training, incident
investigation, HIRA
with National Diploma in
Safety Management or
Advanced SAMTRAC and
HIRA including SACPCMP
Registration
assessor
Protection Planner CR10
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No 2021/539129/30
of 6
File name: 559-343110581_Post contract award SHEQ Requirement Engineering Building Space Optimization Project
Document
559-343110581 Rev 1 Post contract tender award Identifier
SHEQ requirement Effective Date August 2025
Review Date August 2028
investigator GAR 9 (2)
including Section 24 and 25
Incident
Aider attendant (Level 2)
operator and inspector
if more than 20 employees
and Storage supervisor
Tool inspector
Hazardous Chemical Agent
Co-Ordinator
attendance registers and
training contents
Register
register
substances register and SDS
organogram
procedure
work procedure
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No 2021/539129/30
of 6
File name: 559-343110581_Post contract award SHEQ Requirement Engineering Building Space Optimization Project
Document
559-343110581 Rev 1 Post contract tender award Identifier
SHEQ requirement Effective Date August 2025
Review Date August 2028
and review Plan
as per issued scope of work
Rescue
Methodology
Source: 559-343110581_Post contract award SHEQ Requirement Engineering Building Space Optimization Project.pdfQuality Management
Source: 559-343110581_Post contract award SHEQ Requirement Engineering Building Space Optimization Project.pdfregister
substances register and SDS
organogram
procedure
work procedure
assessment
safety harness/ fall arrest
system
OHN Medical Fitness for ✓
Proof of previous work ✓
completed
by Top Management
Compliance Requirements
Source: 559-343110581_Post contract award SHEQ Requirement Engineering Building Space Optimization Project.pdf (unknown)Appointment Letters
Appointment letter: ✓
Appointment letter: Site ✓
Appointment letter: Risk ✓
Appointment letter: Fall ✓
Appointment letter: Incident ✓
Appointment letter: First ✓
Appointment letter: vehicle ✓
Appointment letter: SHE Rep ✓
Appointment letter: Stacking ✓
Appointment letter: Hand ✓
B-BBEE Minimum Level: 2
Health & Safety
Source: 559-343110581_Post contract award SHEQ Requirement Engineering Building Space Optimization Project.pdf559-343110581 Rev 1 Post contract tender award Identifier
SHEQ requirement Effective Date August 2025
Review Date August 2028
Project: Engineering Building Space Optimization Project
*Contract /Number:
Requirement✓ ✓
Contractor OHS policy ✓
Issued tender SHE ✓
Specification
Issued tender Annexure B ✓
Copy Letter of Good ✓
Contract SHE Plan ✓
Signed 37 (2) Agreement ✓
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No 2021/539129/30
of 6
File name: 559-343110581_Post contract award SHEQ Requirement Engineering Building Space Optimization Project
559-343110581 Rev 1 Post contract tender award Identifier
SHEQ requirement Effective Date August 2025
Review Date August 2028
Work CR 4
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No 2021/539129/30
of 6
File name: 559-343110581_Post contract award SHEQ Requirement Engineering Building Space Optimization Project
559-343110581 Rev 1 Post contract tender award Identifier
SHEQ requirement Effective Date August 2025
Review Date August 2028
investigator GAR 9 (2)
including Section 24 and 25
Aider attendant (Level 2)
operator and inspector
if more than 20 employees
and Storage supervisor
Appointment letter: Hand ✓
Company’s Safety induction ✓
attendance registers and
training contents
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No 2021/539129/30
of 6
File name: 559-343110581_Post contract award SHEQ Requirement Engineering Building Space Optimization Project
559-343110581 Rev 1 Post contract tender award Identifier
SHEQ requirement Effective Date August 2025
Review Date August 2028
and review Plan
as per issued scope of work
Annexure 3
Plan
(Certificates/Qualifications)
and proof of communication
Standard 229998
Unit Standard 229995
229994
registered with DEL
talk process
documents
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No 2021/539129/30
of 6
File name: 559-343110581_Post contract award SHEQ Requirement Engineering Building Space Optimization Project
559-343110581 Rev 1 Post contract tender award Identifier
SHEQ requirement Effective Date August 2025
Review Date August 2028
environmental training
registration certificate
substances register and SDS
facilities and registration
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No 2021/539129/30
of 6
File name: 559-343110581_Post contract award SHEQ Requirement Engineering Building Space Optimization Project
559-343110581 Rev 1 Post contract tender award Identifier
SHEQ requirement Effective Date August 2025
Review Date August 2028
Safety file Approved (Y/N)
Name: .................................. Signed.....................................
Note: All safety files shall be approved by means of issuing a formal work authorisation letter; that
authorises the contractor to commence with work
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third
parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No 2021/539129/30
of 6
File name: 559-343110581_Post contract award SHEQ Requirement Engineering Building Space Optimization Project
Environmental
Source: 559-343110581_Post contract award SHEQ Requirement Engineering Building Space Optimization Project.pdfWaste Management Plan ✓
Environmental Management ✓
Environmental Policy ✓
Environmental File Approved (Y/N)
Name: ........................................... Signed.....................................
Description
Source: 20260510_Space Optimization of 2nd_Form A_Cat 4_ Rev 9.docxNB: The tenderer must complete and sign this form to acknowledge and accept Eskom Supplier Quality Requirements as per 240-105658000 Specification and ISO 9001 Standard.
Evaluation Criteria
Source: 20260510_Space Optimization of 2nd_Form A_Cat 4_ Rev 9.docx (unknown)The tenderer must be able to meet Eskom's supplier quality requirements as per the specified category (Category 4). They must have a designated quality representative to sign the form. No other explicit eligibility criteria are provided in the document, but compliance with ISO 9001 principles is implied.
Technical Specifications
Source: 20260510_Space Optimization of 2nd_Form A_Cat 4_ Rev 9.docx (unknown)NB: The tenderer must complete and sign this form to acknowledge and accept Eskom Supplier Quality Requirements as per 240-105658000 Specification and ISO 9001 Standard.
Important Dates
Source: Eskom Standard Conditions of Tender on e-tendering.pdf (TENDER){"briefingSession":"{"date":null,"time":null,"venue":"tend a site visit and/or clarification meeting that is cited as being","is_compulsory":true}"}
Evaluation Criteria
Source: Eskom Standard Conditions of Tender on e-tendering.pdf (TENDER)Tenderers must not be under any restriction to do business with Eskom or State-Owned Companies. They must comply with any pre-qualification criteria stated in the Tender Data, such as B-BBEE level requirements. For construction works, CIDB registration may be mandatory. Tenderers must not subcontract 100% of the scope of work. They must also meet any functionality thresholds and financial risk assessments as evaluated by Eskom.
Technical Specifications
Source: Eskom Standard Conditions of Tender on e-tendering.pdf (TENDER)supply identified in the specification and/or
works
Quality Management
Source: Eskom Standard Conditions of Tender on e-tendering.pdfsubmission via the Eskom Tender bulletin site on the Eskom E- tendering page will be
accepted
Cost of 2.6 Accept that Eskom will not compensate the tenderer for any costs incurred in the
tendering preparation and submission of a tender, or the negotiation of any contract, including the
costs of any testing necessary to demonstrate that aspects of the tender satisfy the
evaluation criteria.
Submitting a 2.7 Check the enquiry documents on receipt and notify the Eskom representative of any
tender discrepancy or omissions of documents. The Acknowledgement Form must be
completed as required and submitted with the tender and must clearly state if the tender
is for the whole or part of the works, services or supply identified in the specification and/or
works information by Eskom
2.8 Return the mandatory tender returnables to Eskom for evaluation purposes by tender
submission deadline, and other tender returnables that are required for contract award,
before contract award, completing without exception; all the forms, data and schedules
included therein. Where any certificate, document, proof of registration or the like is
required to be submitted as a mandatory or other tender returnable, the tenderer must
ensure that Eskom is in possession of a valid, current and where stipulated, an original
certificate/document for the duration of the tender validity period and, if the tender is
successful, up to contract award.
Pricing Schedule
Source: Eskom Standard Conditions of Tender on e-tendering.pdfPricing the 2.19 Include in the rates, prices, and the tendered total of the Prices (if any) all duties, taxes
tender (including VAT), and other levies payable by the successful tenderer. Such duties, taxes
and levies are those applicable 14 (fourteen) days prior to the deadline for tender
submission.
2.20 Provide rates and Prices that are fixed for the duration of the contract and not subject to
contract price adjustment except as provided for in the Enquiry.
2.21 State the rates and Prices in South African Rand unless instructed otherwise in the
Conditions of Tender on Effective Date May 2022
e-tendering Review Date May 2027
Alterations to 2.22 Not make any alterations or additions to the tender documents, other than for purposes
documents of complying with instructions issued by the Eskom Representative or if necessary to
correct errors made by the tenderer. All such alterations shall be initialed by all
signatories to the tender. Corrections may not be made using correction fluid, correction
tape or the like.
Alternative 2.23 Submit alternative tenders only if a main tender is also submitted, and only if this is
tenders permitted in the Invitation to Tender. Accept that an alternative tender may be based only
on the criteria stated in the Tender Data and as acceptable to Eskom
Clarification and 2.24 Provide clarification and documents as required by the Eskom Representative during the
correction of evaluation of tenders, if not submitted. However, mandatory tender returnables (that
Prices after were required at tender submission deadline) will not be requested and may not be
tender submitted after tender submission deadline. Clarifications may include providing a
submission breakdown of rates or Prices and may not result in changes to prices or substance of
the tender submitted, except as required by the Eskom Representative to confirm the
correction of arithmetical errors discovered in the evaluation of tenders. The total of the
after the evaluation of tender offers with respect to the following errors/omissions: -
a) the gross misplacement of the decimal point in any unit rate; or
b) omissions made in completing the pricing schedule or bill of quantities, or
c) arithmetical errors due to line-item totals resulting from the product of a unit rate and
a quantity in a bill of quantities or schedule of prices; or
d) the summation of the prices
to either confirm the tender offer as tendered or to accept the corrected total of prices
Where the tenderer elects to confirm the tender offer as tendered; Eskom will correct the
error as follows: -
a) If a bill of quantities/pricing schedule applies and there is an error in the line-item
total resulting from the product of the unit rate and the quantity, the line-item total
shall govern, and the rate shall be corrected.
line-item total as quoted shall govern, and the unit rate shall be corrected.
b) Where there is an error in total of the prices either as a result of other corrections
the prices shall govern, and the tenderer shall be asked to revise the selected item
prices (and their rates if bill of quantities apply) to achieve the tendered total of the
prices.
Compliance Requirements
Source: Eskom Standard Conditions of Tender on e-tendering.pdf (TENDER)CSD report or as per certificate/affidavit
CSD number/CSD report) must be provided at tender submission
B-BBEE Details: )
Electrical Engineering Work (EB)
General Building Works (GB)
Mechanical Engineering (ME)
The contractor shall engage targeted enterprise/s in the performance of the contract to
the extent that at least 5% contract participation goal is achieved.
The contractor shall determine the contract skills participation goals expressed in Rands
which shall not be less than the contract amount multiplied by a percentage factor.
2.32 Eskom may disqualify a tender if it is found that the tenderer has misrepresented or
falsified any information, certificate, affidavit or document. A fraudulent B-BBEE
-BBEE Commissioner and the
tenderer will be suspended from business with any State-Owned Company for up to
10 years and may even be sentenced to jail.
2.33 Tenderers are also required to complete fully and submit the SD&L Undertaking
Supplier (annexure to the Invitation to Tender) by no later than contract award. If this SD&L
Development & Undertaking is not completed and submitted as indicated in the Invitation to Tender,
Localisation your tender will not be considered for contract award.
(Sd&l)
Undertaking
Provision of 2.34 To the extent that the provision of security for performance is a requirement, the tenderer
Security for must indicate the names of a minimum of two (2) financial institutions that the tenderer
Performance is likely to approach in order to obtain the required form of security. Eskom reserves the
right to reject the financial institution if found not to be suitable.
Respond to 3.1 Respond to a request for clarification received earlier than the closing time for clarification
clarification of queries. The responses will be published to all tenderers in the same manner the
enquiry documents were issued, and it is the tenderers responsibi
Health & Safety
Source: Eskom Standard Conditions of Tender on e-tendering.pdfProof of 2.26 Where an agent on behalf of a principal submits a tender, an authenticated copy of the
authority to act authority to act as an agent of the tenderer must be submitted as a tender returnable.
as agent
Compliance with 2.27 Comply with relevant legislation such as NT instructions (CSD, etc.), CIDB regulations for
relevant construction works; designated materials according to dti, PPPFA regulations; Amended B-
legislation (NT requirements for Safety, Health, Environment and
instructions, Quality (SHEQ) etc. and any other applicable legislation/regulations as may be set out in
etc)
2.28 Tenderers are required to provide reasonable proof to the satisfaction of Eskom, that
safety, health, environmental and quality (SHEQ) systems, policies and capabilities are
in place at the time of contract award. All costs and personnel associated with SHEQ
should be reflected in the tender for Eskom s assessment thereof.
2.29 Where CIDB is applicable; proof of registration on CIDB is mandatory at tender closing
deadline. Should this not be received as stipulated in the enquiry; the tender will be
disqualified. However, in the event that, at tender deadline submission, only proof of
application for registration on CIDB is available, then this must be submitted by tender
closing deadline, while the actual proof of CIDB registration (printout from CIDB
database) must be submitted by contract award.
Contract Skills 2.30 The Contractor shall achieve in the performance of the contract the CSDG established
Development in the CIDB Standard for Developing Skills through Infrastructure Contract (Published in
Goal (CSDG) GGN36760 of March 2020). CSDG is applicable to all classes of works exceeding R60
million and where the contract duration is 12 months or more or to Professional
services/service contract/order where the estimated contract exceed R5 million and
where the contract duration is 12 months or more.
Conditions of Tender on Effective Date May 2022
e-tendering Review Date May 2027
Contract 2.31 Contractor shall achieve in the performance of the contract the Contract Participation
Participation Goals (CPG) relating to the engagement of targeted enterprise as established in the
Goals (CPG) CIDB standard for Indirect targeting for enterprise development through Construction
works contracts (Published in GN No:36190 of the 25 February 2013)
Contract participation goals is only applicable in Grade 7-9 General Building (GB) and
Civil Engineering (CE) contract where the contract duration is 6 months or more.
Construction Works contracts in which at least 25% of the main contract could
reasonably be expected to be sub-contracted out in one or more of the following classes:
Civil Engineering (CE)
Electrical Engineering Work (EB)
General Building Works (GB)
Mechanical Engineering (ME)
right to reject the financial institution if found not to be suitable.
Respond to 3.1 Respond to a request for clarification received earlier than the closing time for clarification
clarification of queries. The responses will be published to all tenderers in the same manner the
enquiry documents were issued, and it is the tenderers responsibility to check the Eskom
Conditions of Tender on Effective Date May 2022
e-tendering Review Date May 2027
Tender opening 3.4 Open the tenders in the presence of the tenderers representatives who choose to attend
at the time and place stated in the Tender Data. Tenders for which an acceptable notice
of withdrawal has been submitted will not be opened.
3.5 At tender opening, Eskom will announce the names of the tenderers. Prices may be
announced if so stated in the Tender Data.
Non-disclosure 3.6 Unless required to do so by law, not disclose to tenderers, or to any other person not
officially concerned with such processes, information relating to the evaluation and
comparison of tenders and recommendations for the award of a contract, until after the
award of the contract to the successful tenderer.
Grounds for 3.7 Reject a tender after the Eskom Supplier Reconsideration Committee has established
rejection through the Eskom prescribed processes, that there is proof that the tenderer influenced
the processing of tenders or awarding of the contract; that colluding/ bid rigging or any
fraudulent activity has taken place in connection with the Invitation to Tender.
Clarification of a 3.8 Obtain from a tenderer clarification of any matter in the tender which may not be clear or
tender could give rise to ambiguity in a contract arising from this tender if the matter were not to
be clarified. Mandatory documents will not be requested but clarity on it may be required.
Basic 3.9 Determine before detailed evaluation, whether each tender received meets the basic
Contractual Terms
Source: Eskom Standard Conditions of Tender on e-tendering.pdf-written, type-written, printed or electronically
made, and resulting in a permanent record. Communication shall be in the English
language. Eskom takes no responsibility for non-receipt of communications from or by a
tenderer
Eskom's rights 1.6 Eskom may accept or reject any variation, deviation or alternative tender and reserves
to accept or the right to accept the whole or any part of the tender. Eskom may cancel the tender
reject any tender process at any time prior to the formation of a contract and will give written reasons for
the cancellation upon written request to do so. After the cancellation of the tender process
or the rejection of all tenders due to non-compliance with the thresholds, Eskom may
abandon the proposed work and services, have it performed in any other manner, or re-
issue a similar invitation to tender at any time. Eskom, its subsidiaries, shareholders,
advisors, directors, employees, representatives including the Eskom Representative shall
not be liable for any losses, claims or damages of whatsoever nature or howsoever arising
which may be sustained by a tenderer or any other person as a result of its participation
or any amendment, termination or suspension of the process set out in this Invitation to
1.7 Eskom reserves the right to enter into mandated negotiations with any one or more
negotiate
procedures.
Disclaimer 1.8 While Eskom takes all reasonable measures to ensure that all information contained in
regarding the tender documents is correct and complete, Eskom does not, however, make any
accuracy of representations or warranties, express or implied, as to the accuracy or completeness of
tender such information and Eskom expressly disclaims any and all liability for such
documents representations, warranties or statements.
Conditions of Tender on Effective Date May 2022
e-tendering Review Date May 2027
2.9 Submit the tender via Eskom Tender bulletin site on the Eskom E- tendering page. These
tenders must be submitted in English.
2.10 Sign the electronic tender. Eskom will hold the signatory named as the person duly
authorised to sign the tender on behalf of the tenderer, liable for the tender.
2.11 The Tender documents should be updated in the relevant folders, technical, Commercial
and financial as indicated on e-tendering page.
Tender validity 2.12 Hold the tender(s) valid for acceptance by Eskom at any time within the validity period
after the deadline for tender submission. Extend the validity period for a specified
additional period if Eskom requests the tenderer to do so. A tenderer agreeing to the
request will not be required or permitted to modify a tender. If contracts have not been
concluded and the tender validity has not been extended (as prescribed in the Eskom
PSCM 32-1034) and lapses; then the tenders are deemed to be invalid, and the
procurement process cannot continue. A new procurement process will have to be
initiated.
Confidentiality 2. 13 Treat as confidential all matters arising in connection with the tender. Use and copy the
and copyright of documents provided by Eskom only for the purpose of preparing and submitting a tender
documents in response to this Invitation to Tender.
Standardised 2.14 Obtain, if required, for the purposes of submitting a tender, copies of the latest revision of
specifications standardised specifications and/or other documents, which are not attached to the Invitation
and other to Tender, but which may be incorporated in the contents of the enquiry documents by
publications reference.
Site visit and / or 2.15 Tenderers must attend a site visit and/or clarification meeting that is cited as being
clarification compulsory in order to familiarise themselves with the proposed work, services or supply,
meeting location, etc. and raise questions. Details of the meeting(s) are stated in the Tender Data.
disqualified.
Seek 2.16 Request clarification of the enquiry documents, if necessary, by notifying the Eskom
clarification Representative earlier than the closing time for clarification of queries.
Insurance 2.17 Be informed that the extent (if any) of insurance provided by Eskom may not be for the
full cover required in terms of the relevant category listed in the conditions of contract.
not accept the correction of errors in the required manner.
Evaluation of 3.17 Score the B-BBEE level as stated on the CSD report or as per certificate/affidavit
B-BBEE provided. If the B-BBEE level is a pre-qualification criterion; then the proof of the B-BBEE
level (certificate/CSD number/CSD report) must be provided at tender submission
deadline; or the tender will be disqualified. If sub-contracting to designated groups pre-
qualification criteria are utilized (selected/mandatory) in terms of the PPPFA Regulation,
then Eskom will apply the PPPFA requirements for sub- -BBEE status and
the sub- -BBEE certificate/affidavit will need to be provided
at tender submission deadline. Should the information/documents provided indicate that
the level is in dispute (fraudulent/ expired) then the tender will be disqualified.
However, for the purposes of PPPFA point allocation: if no B-BBEE certificate/affidavit is
provided at Tender closing deadline, or the information/documents provided are
fraudulent or have expired; then the tenderer will not be disqualified (if otherwise deemed
to be responsive and acceptable in all other aspects) but will score zero under PPPFA
point allocation.
Ranking of 3.18 According to the PPPFA, Eskom will add the score for Pricing and the B-BBEE level
tenders together and rank the suppliers from the highest to the lowest.
Objective criteria 3.19 A contract may be awarded to a tenderer that did not score the highest points only in
accordance with Section 2(1) (f) of the PPPFA Act . If Eskom intends to apply
objective criteria in terms of Section 2 (1) (f), Eskom must stipulate the applicable
objective criteria in the tender documents. Functionality and any element of the B-BBEE
scorecard may not be used as objective criteria.
Section
Source: Eskom Standard Conditions of Tender on e-tendering.pdfevaluation criteria.
2.8 Return the mandatory tender returnables to Eskom for evaluation purposes by tender
materials and (gatekeeper for further evaluation) must be bought from local companies. A tenderer s
Functionality 3.13 If functionality is a criterion; tenderers are scored against the technical functionality
analysis financial risks to Eskom in the execution of the contract. During evaluation of the financial
Evaluation of 3.15 Evaluate the price according to the criteria/requirements set in the Tender Data. Factors
Check the highest ranked tender/tenderer with the highest number of evaluation points
after the evaluation of tender offers with respect to the following errors/omissions
relevant construction works; designated materials according to dti, PPPFA regulations; Amended B
instructions, Quality (SHEQ) etc. and any other applicable legislation/regulations as may be set out in
CIDB, PPPFA Invitation to Tender.
safety, health, environmental and quality (SHEQ) systems, policies and capabilities are
Evaluation Criteria
Source: Engineering Building Space Optimization Technical Evaluation Criteria.pdf (unknown)Must be registered with DOEL as an electrical contractor, IOPSA/PIRB, and NHBRC as a building contractor. Failure to meet any mandatory criterion results in immediate disqualification. For qualitative stage, must achieve at least 70% weighted score.
Technical Specifications
Source: Engineering Building Space Optimization Technical Evaluation Criteria.pdf (unknown)appointment 20 5: ≥5 projects
Methodology
Source: Engineering Building Space Optimization Technical Evaluation Criteria.pdfsubmitted
Remarks
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with
the authorised version on the system.
Unique Identifier
Document Identifier
Tender Technical Evaluation Document Revision
Scoring Form Effective Date
Page
Evaluation Criteria Approved By:
Name Signature Date Designation
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with
the authorised version on the system.
Unique Identifier
Document Identifier
Tender Technical Evaluation Document Revision
Scoring Form Effective Date
Page
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with
the authorised version on the system.
Evaluation Criteria
Method statement 15% Provide a detailed initial method 15 5 - detailed plan
statement with projected providing
timelines, potential risks, and methodology, project
mitigation. timelines, resources,
and hours for the
project, risks
4 - project method
statement, not fully
articulated and
missing some
components. Plan
providing
methodology, project
timelines, resources
and hours for the
project
2 - poorly documented
method statement,
missing 50% of
components
0 - more than 50% of
components missing
or not submitted or no
method statement
submitted
Evaluation Criteria
Source: 240-77471499 Annexure B.pdf (unknown)The document does not specify general eligibility criteria (e.g., financial, technical) but implies that the tenderer must be a company or supplier capable of complying with Eskom's OHS requirements. The acknowledgement form requires the company/supplier name and the signature of an authorised person, indicating that the tenderer must be a registered entity with authorised representatives.
Technical Specifications
Source: 240-77471499 Annexure B.pdf (unknown)appointment of contractors or suppliers for the commencement
of work
Health & Safety
Source: 240-77471499 Annexure B.pdfrequirements Effective Date May 2022
Annexure B: Acknowledgement Form for Eskom OHS legal and other
requirements
NOTE: the supplier/contractor/tenderer has to ensure that he/she understands the OHS
requirements listed hereunder.
a service to Eskom but not limited to the following:
a. Eskom Contract and Contractor OHS Management 32-726
b. OHS specification/requirements provided 559-1798201935
c. Occupational Health and Safety Act
d. Compensation for Occupational Diseases and Illnesses Act
e. Eskom SHEQ Policy 32 727
f. OHS Incident Management Procedure 32-95
Note: Please note that after contract award, it is your responsibility to fully align the company’s processes
to Eskom’s OHS requirements (policies, procedures, standards etc).
its contractor and/or supplier) pertaining to Eskom and/or Statutory OHS requirement/s.
Description
Source: Space opt Tender BOQ.xlsxCell B18: *Where the word "Bill Of Quantities" is used it shall mean Price Schedule
Evaluation Criteria
Source: Space opt Tender BOQ.xlsx (unknown)The tender is open to contractors with experience in building renovations and space optimization. They must have the necessary registration and qualifications for SHEQ personnel (SACPCMP). They must be able to provide the required guarantees, maintenance manuals, and comply with all Eskom-specific requirements. There is no explicit mention of minimum B-BBEE level or other specific eligibility criteria in the document, but standard Eskom procurement requirements may apply.
Technical Specifications
Source: Space opt Tender BOQ.xlsx (unknown)Cell B18: *Where the word "Bill Of Quantities" is used it shall mean Price Schedule
Description
Source: 20260510_Space Optimization of List of Tender Returnables_Cat 4.pdfB.2 Documented information for Control of Externally Provided Processes, Products and Services - Must include criteria for evaluation, selection,
Evaluation Criteria
Source: 20260510_Space Optimization of List of Tender Returnables_Cat 4.pdf (unknown)Eligibility is based on compliance with the quality requirements: having a documented QMS that meets ISO 9001 (certification not mandatory), providing all required quality deliverables, and demonstrating relevant experience through proof of previous similar work. The tender is open to suppliers who can meet these quality and technical requirements.
Technical Specifications
Source: 20260510_Space Optimization of List of Tender Returnables_Cat 4.pdf (unknown)B.2 Documented information for Control of Externally Provided Processes, Products and Services - Must include criteria for evaluation, selection,
Section
Source: 20260510_Space Optimization of List of Tender Returnables_Cat 4.pdfA.3 Quality Objectives Approved by top management. 1
Section A Score Option 2 3
SECTION B : Evidence of QMS in operation (Tender Quality Requirements -Ref 240-105658000)
not limited to quality management function/role) 1
B.2 Documented information for Control of Externally Provided Processes, Products and Services - Must include criteria for evaluation, selection,
monitoring of performance, and re-evaluation of external providers (Clause 8.4 of ISO 9001:2015)
Section B Score 2
Section E Score 2
Supplier Quality Management: Revision 7
Category 4 : Quality Requirements Deliverables to be evaluated indicator = 1
SECTION A : Quality Management System Requirements ISO 9001
A.1 Quality Method statement based on scope.(Method Statement Template-Ref 240-126469599) 1
A.2 Quality Policy Approved by top management. 1
Important Dates
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown){"closingDate":"17 October 2021"}
Evaluation Criteria
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Eligibility is based on the supplier's ability to demonstrate a compliant QMS. For Category 1, a valid ISO 9001 certificate is required. For Categories 2-4, objective evidence of a developed QMS is required, with Category 4 only needing a quality method statement. Suppliers must complete and sign Form A and submit all required returnables. The specific category is determined by Eskom and indicated in the tender documents. There are no other explicit eligibility criteria in the provided document, but suppliers must be registered on the Eskom supplier database.
Technical Specifications
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Title: Supplier Quality Management: Document Identifier: 240-105658000
Alternative Reference QM 58
Number:
Area of Applicability: Eskom Holdings SOC Ltd
Functional Area: Quality Management
Revision: 3
Total Pages: 28
Next Review Date: October 2024
Disclosure Controlled Disclosure
Classification:
Compiled by Supported by Functional Authorized by
Responsibility
SA Sambo P Dondashe L Meyer K Pather
Chief Advisor Middle Manager Acting Senior General Manager
Quality Quality Manager Quality Risk and
Management Management Management Sustainability
Date: 15/10/2021 Date: 15/10/2021 Date: 15/10/2021 Date: 17 October 2021
EDC TN Formatted 15.10.2021
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Content
. Introduction ............................................................................................................................... 3
2.1 Scope ............................................................................................................................... 3
2.1.1 Purpose ................................................................................................................. 3
2.1.2 Applicability ........................................................................................................... 3
2.1.3 Effective date ......................................................................................................... 3
2.2 Normative/Informative References ................................................................................... 3
2.2.1 Normative .............................................................................................................. 3
2.2.2 Informative............................................................................................................. 3
2.3 Definitions ........................................................................................................................ 4
2.4 Abbreviations ................................................................................................................... 5
2.5 Roles and Responsibilities ............................................................................................... 6
2.6 Process for Monitoring ...................................................................................................... 6
2.7 Related/Supporting Documents ........................................................................................ 6
3.1 Supplier and Sub-Supplier Quality Management System Requirements .......................... 7
3.2 Quality Plan ...................................................................................................................... 8
3.3 Contract Quality Plan........................................................................................................ 8
3.4 Quality Control Plan ....................................................................................................... 10
3.5 Pre-Contract Award: Quality Requirement ...................................................................... 13
3.6 Main Supplier and Sub-supplier Capability and Capacity Assessment ........................... 16
3.7 Post-Contract Award ...................................................................................................... 17
3.7.1 Contract Execution .............................................................................................. 17
3.7.2 Supplier Quality Performance Monitoring Phase ................................................. 18
3.7.3 Supplier Quality Audit .......................................................................................... 18
3.8 Standard Conditions ....................................................................................................... 19
3.8.1 Rights of Access .................................................................................................. 19
3.8.2 Eskom Rights to Information ................................................................................ 20
3.8.3 Preservation ........................................................................................................ 21
3.8.4 Quality Audits Related Conditions ....................................................................... 25
3.8.5 Management of Nonconformities and Nonconforming Outputs Identified by
Eskom ................................................................................................................. 25
3.8.6 Special Processes ............................................................................................... 26
Acceptance ............................................................................................................................. 27
Revisions ................................................................................................................................ 27
Development Team ................................................................................................................ 27
Acknowledgements ................................................................................................................ 28
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The intention of this specification is to specify and describe the minimum quality requirements for all
existing and potential Eskom suppliers and define the quality criteria for the selection, evaluation,
vendor registration, management, monitoring, assessment and auditing of suppliers. Eskom’s
position is to partner with suppliers who fully demonstrate commitment to the development,
implementation, and maintenance of a quality management system (QMS) that conforms to the
requirements of ISO 9001 standard. The priority is to encourage suppliers to continually improve
their QMS and enhance service delivery by implementing and conforming to the standard.
2.1 Scope
2.1.1 Purpose
The purpose of this specification is to outline the requirements according to which suppliers shall
develop,
implement,
maintain, and
continually improve
a quality management system (QMS) based on ISO 9001, which should form the basis for conformity
to Eskom quality requirements and continually adhere to them throughout the duration of a contract
2.1.2 Applicability
This specification shall apply throughout Eskom Holdings Limited divisions, its subsidiaries,
suppliers, and sub-suppliers and shall form part of all Eskom requests for information (RFI)/ requests
for quotation (RFQ)/ requests for proposal (RFP), including contracts for the procurement of products
and services.
2.1.3 Effective date
Date of authorisation of the specification
2.2 Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
[1] ISO 9001 Quality Management Systems – Requirements
[2] ISO 10005 Quality Management Systems – Guidelines for Quality Plans.
2.2.2 Informative
[3] ISO 9000 Quality Management Systems – Fundamentals and Vocabulary
[4] 32-727: Safety, Health, Environment, and Quality (SHEQ) Policy
[5] ISO 10006 Quality Management Systems – Guidelines for Quality Management in Projects
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
[6] ISO 9004 Quality Management – Quality of an Organisation – Guidance to Achieve Sustained
Success
[7] 32-1033: Eskom’s Procurement and Supply Chain Management Policy
[8] 32-1034: Eskom’s Procurement and Supply Chain Management Procedure
[9] PPPFA: Preferential Procurement Policy Framework Act, 2000 (Act No. )
[10] CIDB 1004: Best Practice Guideline A4: Evaluating Quality in Tender Submissions
[11] 240-12248652 Supplier Quality Management: List of Tender Returnables
[12] IAEA Safety Standard GS-R-3.1 Application of the Management System for Facilities and
Activities
[13] SANS 10845-1 Construction Procurement Part1: Processes, Methods and Procedures
2.3 Definitions
The vocabulary of ISO 9000 and the following definitions apply in the application of this specification.
2.3.1 Component: a constituent part of the product or sub-assembly of the product. The product
may comprise multiple individual components
2.3.2 Contract Quality Plan: a document of the supplier’s process for delivering the level of quality
required by the contract. It is a framework for the contractor’s process for delivering quality.
Purpose of a CQP is to outline how the results defined in the specifications will be achieved.
2.3.3 Hold Point: a predetermined stage in the quality control plan (QCP) beyond which work/
manufacturing shall not proceed without the attendance of, and written authorisation of, an
Eskom representative or Eskom inspection agency, whichever is applicable.
2.3.4 Intervention Points: those control points indicated by the various controlling bodies
concerned with the implementation of a specific QCP/ ITP. These can be in the form of
inspection, hold points, surveillances, witnesses, reviews and verifications.
2.3.5 Inspection Agency: an organisation or person appointed by Eskom for the purpose of
performing quality assurance/ quality control, monitoring, inspection and/ or expediting
services.
2.3.6 Level 1 Plant Items: equipment, whose failure has an effect on personnel safety and/ or
health, causes an environmental incident, cause a huge production loss or major equipment
damage. Equipment that are safety/ redundancy/ protective device or covered by statutory
regulations requirements.
2.3.7 Level 2 Plant Items: equipment, whose failure impacts plant availability and/or reliability,
causes significant costs or secondary damage.
2.3.8 Level 3 Plant Items: equipment that does not impact on personnel safety and/ or health,
environmental, cost, availability and/ or reliability of plant.
2.3.9 Nonconformity: a deficiency in material, composition, characteristic, or performance that
renders the quality of an item, component, or product unacceptable or indeterminate. The
term also covers a deficiency in, or deviation from/non-adherence to, the quality management
system requirements, prescribed production processes, and/or related documentation such
as procedures and instructions.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
2.3.10 Quality Plan: specification of the actions, responsibilities and associated resources to be
applied to a specific object.
2.3.11 Quality Control Plan: a document specifying the activities to be inspected throughout the
execution of the project, inclusive of test methods, procedures, and acceptance criteria (This
term is equivalent to QIP and ITP).
2.3.12 Requirement: the need or expectation that is stated, generally implied, or obligatory.
Requirements are generally specified in the purchase order and/or contract documentation,
but may not be limited to these.
2.3.13 Primary Plant (Power Plant): primary plant include High Voltage equipment situated inside
the control room (breakers, bus-bars, CT’s, VT’s and transformers).
2.3.14 Secondary Plant (Control Plant): secondary plant includes all equipment used to control
and protect the HV equipment on the primary plant side. (Protection, metering, AC/DC and
tele-control).
2.3.15 Special Process: is any production or service process which generates products or services
which cannot be measured, monitored, or verified prior to delivery and use.
2.3.16 Supplier: is a current or potential supplier, vendor, contractor, consultant, or service provider.
A supplier may be a natural or legal person and includes any employee acting within the
course and scope of his/her employment or any agent or manager acting for, or on behalf of,
or in the interests of, the person registered as supplier on the Eskom supplier database.
2.3.17 Sub-supplier: an organisation that provides a product/service to the supplier and/or that
enters into a subcontract and assumes some of the obligations of the supplier or prime
contractor.
2.3.18 Witness Point: a predetermined stage in the quality control plan where and inspection
activity will take place. Work may proceed, provided Eskom or its inspection agency has been
formally notified and confirmed that inspection is waived.
2.4 Abbreviations
Abbreviation Explanation
AIA Approved Inspection Authority
CA Corrective Action
CQP Contract Quality Plan
FIDIC Federation Internationale Des Ingenieurs- Conseils
FMECA Failure Mode, Effects and Criticality Analysis
HAZOP Hazard and Operability Study
ISO International Organisation for Standardisation
ITP Inspection and Test Plan
NC Nonconformity
NDT Non Destructive Testing
PMI Positive Material Identification
QCP Quality Control Plan
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Abbreviation Explanation
QMS Quality Management System
PQP Project Quality Plan
RFI Request for Information
RFQ Request for Quotation
RFP Request for Proposal
SHEQ Safety, Health, Environment, and Quality
SETA Skills Education Training Authorities
WPS Welding procedure specifications
WQR Welder’s Qualification Record
2.5 Roles and Responsibilities
Eskom Quality representative/ professional will select applicable requirements for existing and
potential Eskom suppliers using Form A (Tender and Contract Quality Requirements for Supplier
Quality Management: Specification 240-105658000/ QM 58 and Quality Requirements for ISO 9001
Standard).
The existing and/ or potential suppliers must complete, sign and return Form A with the other
returnable as listed in the List of Tender Returnable document (240-12248652). Other roles and
responsibilities for this standard are defined within the text of this specification.
2.6 Process for Monitoring
The application of this specification throughout Eskom shall be audited as per the management
system audit schedule.
2.7 Related/Supporting Documents
The documents superseded by this specification: all divisional and business unit supplier quality
requirements standards and/or specifications.
Forms and templates:
[1] 240-68099512 Tender and Contract Quality Requirements for Supplier Quality Management
Specification 240-105658000/ QM 58 and Quality Requirements for ISO 9001 Standard (Form
A)
[2] 240-109253698 Template for a Typical Contract Quality Plan
[3] 240-109253302 Quality Control Plan/Inspection and Test Plan
[4] 240-126469599 Method Statement Template.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The quality assessment criteria and Form A of this specification will be selected and completed by
an Eskom Quality representative/ professional who will identify the applicable supplier quality
requirements to be met.
Form A of this specification must also be completed and signed by the supplier responding to an
Eskom invitation to tender, in order to acknowledge and accept Eskom Supplier Quality requirements
as per this specification and ISO 9001 Standard or any additional quality requirements specific to
the scope of work.
3.1 Supplier and Sub-Supplier Quality Management System Requirements
3.1.1 The supplier and sub-supplier shall develop, implement, maintain and improve a formal QMS
that conforms to the latest ISO 9001 standard or any applicable standard of QMS (latest
applicable revision) and in accordance with the requirements of this specification.
3.1.2 Such a formal system shall consist of the appropriate documented information required by
ISO 9001 and may include a quality manual, quality plans, work procedures, work
instructions, method statements, work flow documentation, etc., as the case may be. This
requirement constitutes the most basic QMS requirements.
3.1.3 Unless specifically excluded from the quality list of tender returnable, as per the categories of
quality requirements (Category 1, 2, 3, or 4), such a QMS shall carry a valid ISO 9001
certificate from an accredited certification body, as indicated in the applicable Eskom
invitation (this requirement applies equally to both the supplier and any/ all manufacturing
third-party organisations mentioned above).
3.1.4 Unless specifically excluded in the quality list of tender returnable, as per the categories of
quality requirements (Category 1, 2, 3, or 4), the supplier shall have a fully developed,
documented, implemented, reviewed and maintained QMS that complies with the
requirements of ISO 9001 standard or any applicable standard of QMS. In the event that the
main supplier invariably requires the assistance of a sub-supplier in order to realise its own
supply obligations. The aforementioned requirement applies equally in all cases where any
such sub-supplier’s scope of responsibility includes the provision of any of the following
activities, namely, design and development, manufacturing, maintenance, testing, storage,
delivery, installation, commissioning, and project management, or in the cases the supplier
name changes, mergers, acquisitions and/ or cessions. Eskom Quality department must
ensure that the changed entity can still fulfil the requirements as set out in the contract
documentation.
3.1.5 Eskom reserves the right to request and perform necessary assessments at sub-supplier
facilities.
3.1.6 The main supplier shall be responsible for defining and managing the specific quality
assurance and control elements applicable to the respective sub-supplier’s scope of
work/supply and ensure that its sub-supplier(s) quality programmes support Eskom
requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.1.7 The supplier shall inform Eskom of any proposed changes to the QMS or staff that will affect
the quality system prior to implementation of these changes.
3.1.8 The main supplier shall develop and implement a performance management programme for
their sub-supplier. The programme shall include, but not limited to:
Verification of the QMS
Audits and surveillances
Regular assessment of the CQPs and reviews of QCPs.
NC and Defect Management
Inspection and test plans
Risk management
3.2 Quality Plan
The information in this section constitutes the minimum requirements for a quality plan.
3.2.1 Where specified in the Evaluation Criteria and/ or quality list of tender returnables , as per the
categories of quality requirements (Category 1, 2, 3, or 4); all individual products, services
and processes shall have a documented, implemented, reviewed and maintained contract
quality plan and/or quality control plan (inspection and test plan).
3.2.2 Where specified in the evaluation criteria and/ or quality list of tender returnables. All
production and/ or service provision shall be carried out in accordance with a documented
and agreed contract quality plan (CQP) and/ or quality control plan (QCP)/ inspection and test
plan (ITP).
3.2.3 The supplier shall plan for the required quality-related activities and interfaces within the
supplier’s quality system in order to demonstrate its ability towards both controlling and
meeting specified Eskom requirements.
Note 1: Contract Quality Plan should address the quality assurance elements related to the scope
of work and/ or technical specification.
Note 2: Quality Control Plan (QCP)/ Inspection and Test Plan (ITP) should address the quality
control elements related to the scope of work and/ or technical specification.
3.3 Contract Quality Plan
The main supplier shall require sub-suppliers to submit project quality plans (PQPs)/ contract quality
plans (CQPs) and associated documentation in accordance with the requirements of project QMS
processes applicable to the sub-supplier’s scope of work.
The supplier shall, where applicable, based on scope of work criticality, ensure that procurement
documents clearly and unambiguously require sub-supplier submission of a sub-supplier CQP for
supplier and Eskom review.
The main supplier shall ensure that sub-supplier CQPs are developed and implemented in
accordance with the ISO 10005 Quality Management System Guidelines for Quality Plans. In
addition to the elements specified in ISO 10005, the supplier’s and/ or sub-suppliers’ CQPs shall
include the following (as applicable):
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.3.1 The management of records, including material tests, positive material identification (PMI)
testing, material certification, etc.
3.3.2 The provision for free and uninhibited access by the supplier and/or personnel at the time of
inspection.
3.3.3 The proposals for submission of final documentation, the final manufacturing data book, prior
to shipment.
3.3.4 The special processes related to welding: management of the welder’s qualification record
(WQR), welding procedure specifications (WPS), and procedures qualification records (PQR)
that will be used in the performance of work for supplier review and acceptance prior to
commencing manufacture. Welders shall be qualified to the specified Codes of Construction
for the applicable procedures. The requirements for qualification shall be specified by the
supplier, and welder records shall be maintained by sub-suppliers performing the work.
3.3.5 The special installation procedures and other required fabrication or manufacturing
procedures (that is, those required for post-weld heat treatment, tube rolling, coatings, etc.)
that will be used in the performance of work shall require supplier review and acceptance
prior to commencing manufacture. The personnel carrying out special processes (for
example, NDE, welding, coating, heat treatment, etc.) where the results cannot be fully
verified by subsequent inspection and test shall be suitably qualified and, where applicable,
registered with statutory bodies as legally required, that is, as radiographic workers to conduct
radiography. The requirements for the qualification shall be specified, and personnel records
shall be maintained in accordance with the Project Quality Personnel Qualification
Specification and, where applicable, legal requirements.
3.3.6 The personnel required to perform special processes shall be certified competent through a
certificate of competency in accordance with the company’s internal training management
and competency control procedures or an external certification body (for example, NDT)
through an accredited service provider as per Skills Education Training Authorities (SETA)
requirements.
3.3.7 All personnel who perform activities that affect quality shall have their training needs identified
and documented. The required training shall be implemented in accordance with the
company’s training management and competency control procedures. All the training
certificates shall meet the SETA requirements in terms of having the unit standard completed
and the accreditation number of the service providers.
3.3.8 Instructions and requirements for equipment and materials storage, preservation, and
maintenance, including identification of materials required for preservation and maintenance,
are to be provided sufficiently prior to receipt (prior to shipment or earlier) to ensure that
appropriate resources are available at the time of delivery.
3.3.9 Specific quality monitoring and verification activities are to be undertaken on the supplier’s
sub-suppliers by Eskom or it agent.
3.3.10 The CQP information need to include, but not limited to:
Spells out the aspects of the QMS to be applied within a specific Eskom project, and the
methods to be utilised to ensure quality.
Outline the resources, the communication channels, applicable documents and records to be
generated.
Management Authority and Responsibility from both supplier and client need to outline in the
Cqp.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
List of documents and records that will be used and submitted during the execution of the
project.
Communications channels should include contact person and contact details
Monitoring & measurement procedures for activities need to be indicated.
3.3.11 The main supplier and sub-supplier CQPs shall comply with the Eskom Quality Requirements
Specifications and shall be submitted prior to the initial scope of work kick-off or initial pre-
fabrication meeting and prior to commencement of manufacturing, whichever is earlier.
3.3.12 The Eskom template for CQP provided shall be used as guideline, where the supplier does
not have a CQP template.
3.4 Quality Control Plan
The supplier shall develop and implement processes and procedures that efficiently and effectively
monitor, verify and document the quality of the scope of work for deliverables.
The main supplier shall ensure that sub-supplier QCPs/ ITPs are prepared at a level of detail
sufficient to address all quality-control-related activities in a chronological order, from contract review
through materials verification, manufacturing, fabrication, assembly, final testing, commissioning,
hand-over documentation, and certification. In addition, the supplier shall ensure compliance with
the following requirements:
3.4.1 All stages of manufacturing, fabrication, assembly and installation shall be controlled by a
supplier’s QCP/ ITP that clearly and unambiguously identifies the quality verifications to be
performed and special attention to controls related to critical products and services.
3.4.2 QCP/ ITP shall be reviewed and accepted by Eskom, its inspection authority or agency, and
they shall allow for the insertion of Eskom specific requirements, including hold and witness
points prior to the commencement of work.
3.4.3 Subsequent changes to the Eskom accepted QCP/ ITP shall require Eskom, its inspection
authority or agency’s agreement prior to the commencement of work involving an activity
affected by such changes.
3.4.4 The ITPs should cover materials certification, fabrication works, in-process inspections, final
acceptance tests, packaging and pre- shipment/ transportation, shipping/ transportation
inspections where contracted, preservation, site acceptance tests, construction and erection
works, and pre-commissioning and commissioning tests.
3.4.5 All sub-supplier QCP/ ITP activity shall be performed using an Eskom-accepted supplier
Qcp/ itp.
3.4.6 All applicable codes, standards, and relevant acceptance criteria documents are available at
the work location, and Eskom representatives on site shall have on-going access to this
information. Workplace documentation shall be available in English and in any workforce-
appropriate language.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.4.7 Where activities subject to inspection and test procedures are to be undertaken by a sub-
supplier, the QCP/ ITP shall make reference to this fact and shall include descriptive details
of the sub-supplier’s involvement. A separate QCP/ ITP shall be required for each sub-
supplier scope of work.
3.4.8 The supplier shall be ultimately accountable and responsible for the development and proper
implementation of all sub-supplier QCPs/ ITPs, including those reviewed or developed by
sub-suppliers.
3.4.9 Eskom reserves the right to select intervention points on QCPs/ ITPs for Eskom oversight of
selected functions and to perform surveillance or audits of the work.
3.4.10 Once signed, the ITPs and QCPs become addendums to the main contract. These ITPs can
be reviewed at Eskom’s discretion based on its assessment of the supplier’s performance or
other risks.
3.4.11 A QCP/ ITP shall contain the following information:
Eskom contract number and title
The supplier’s order number
Identification of the area of works/contract
Description of the work, with components, item number, and activity date
QCP/ITP unique number
A list of the sequence of operations, including inspection and tests
The identification of the specification, drawing number, or procedure for each operation,
with reference to the relevant criticality risk rating
The acceptance criteria, with reference to the technical specification, in-house, national, or
international standard, with the relevant clause number for each operation
The inspection and test activities that the supplier has nominated for its intervention points
Provision for the inclusion of intervention points nominated by Eskom and/or its authority/
agency
Provision for intervention point acceptance by date and signature for all parties having
intervention in the plan
Inspection and test records to be generated by the supplier for each operation and an
indication of records to be provided to Eskom (as applicable)
3.4.12 The main supplier shall require sub-suppliers to submit QCPs/ ITPs and associated
documentation applicable to the sub-supplier scope of work. Any changes made to the QCP
after submission must be resubmitted to Eskom for further review. The supplier shall ensure
that all sub-supplier QCPs/ ITPs are in compliance with the Eskom Quality Requirements
Specifications, including, but not limited to, the following requirements:
Clear and unambiguous description of the equipment and location(s) at which each activity
will take place, including facility location(s)
Identification of quality verification activity and stage
The details of reference documents, procedures, or method statements to be utilised in
performance of the activity, including specific reference to actual sections and pages of
procedures, standards, instructions, specifications, etc.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Definition of acceptance criteria
Listing of certifying or verifying documents generated to provide evidence of compliance
with specified requirements; documents are to be provided using the proper Eskom
document numbering requirements
Identification of main supplier and sub-supplier (where applicable) third-party/approved
inspection authority (AIA) and Eskom inspection activities defined in terms of witness, hold,
document review, and verification monitoring points and provision for sign-off of each of the
above-mentioned parties for each intervention point
Qualification requirements for quality control inspectors, including any third-party/AIA
inspectors
Listing of all proposed test procedures
Acceptance criteria for each inspection or test in alignment with specified tolerances
A section for signed acceptance of the QC/ITP by the supplier, sub-supplier (where
applicable), and Eskom prior to commencement of work
Inspection or testing intervention points, including, but not limited to, factory acceptance test
and package acceptance test, witness, and hold points
3.4.13 A quality kick-off meeting will be held at the start of the contract and, if required, at the start
of each subsequent phase.
The supplier shall arrange coordination meetings with Eskom prior to placement of orders
for items or equipment to ensure that all technical and commercial requirements are clear
and understood. Fourteen days’ advance notice of meetings shall be given to Eskom.
Supplier inspection personnel, including inspection agency personnel, shall be competent
and qualified to perform inspection and testing assignments. Mobilisation of all such
personnel shall be in compliance with the Project Quality Personnel Qualification
Specification.
3.4.14 Where QCP/ ITP is applicable, the supplier shall ensure that sub-suppliers are provided with
comprehensive, clearly written, and unambiguous inspection and testing protocols, including
processes, procedures, and methods that shall include, but not be limited to, the following:
Requirements for inspection checklists and inspection assignments, with lists of items to be
inspected
An inspection and testing report format, report content, schedule for report processing and
distribution, and report retention requirements
Inspection and test report results response tracking (log) and resolution of nonconformity in
inspection and test processes, procedures, or methods and nonconformity identified in
inspection and test results
Associated Failure Mode, Effects and Criticality Analysis (FMECA) reports relating to the
equipment and sub-systems (if applicable)
Hazard and Operability Study (HAZOP) report, as applicable
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.4.15 The supplier shall establish processes and procedures for formal assessment of sub-supplier
inspection and testing programmes. These shall include review of sub-supplier inspection
reports and other quality control documentation. Additional formal assessment of
manufacturing, fabrication, and assembly facility operations shall be conducted by the
supplier to ensure continuing suitability, adequacy, and effectiveness of the sub-supplier’s
inspection and testing programmes. Assessment frequency shall be established in
consideration of the sub-supplier scope of work, criticality of scope of work deliverables, and
performance information. The assessment scope and schedule shall be developed in
consultation with Eskom.
3.4.16 Supplier processes and procedures for verification of supplier and sub-supplier purchased
product compliance with specifications shall obtain document return/review status prior to
implementation.
3.4.17 The objective is to finalise any outstanding procedural or other issues before proceeding to
deliver the works.
3.4.18 Eskom, in consultation with the supplier, develops an agenda for the meeting, and Eskom will
keep minutes of these meetings.
3.4.19 Mandatory pre-inspection meetings will be convened by Eskom or its inspection agency or
AIA to be attended by the supplier’s and sub-supplier’s representatives, including their quality
representatives who will be involved in the works, and records are to be kept.
3.4.20 Eskom reserves the right to appoint resident quality inspectors who can be based at the
supplier’s or sub-supplier’s premises and on site where the work is being performed. The
supplier is expected to provide workspace at no cost to Eskom for the inspector, as required.
3.4.21 Eskom may appoint any organisation it prefers to perform quality assurance and quality
control activities, either in the capacity as an AIA or inspection agency, on the works
contracted to the supplier, and the supplier or its sub-suppliers may not object, prevent,
hinder, undermine, circumvent, question, discredit, or in any way make it impossible for such
organisation to carry out its work on behalf of Eskom.
3.4.22 The Eskom template for QCP/ ITP provided shall be used as guideline, where the supplier
does not have a QCP/ ITP template.
3.5 Pre-Contract Award: Quality Requirement
3.5.1 Main Supplier and Sub-supplier Categories
Eskom supplier quality requirements for all existing and potential suppliers and sub-suppliers are
classified into four categories (category 1, 2, 3 and 4). Suppliers must prepare and submit quality
documentation as per the tender selected category (indicated in Form A) using the list of tender
returnables document.
NOTE: Only one (1) category must be applicable per procurement process e.g. [Eskom requests for
information (RFI)/ requests for quotation (RFQ)/ requests for proposal (RFP), including contracts for
the procurement of products and services].
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The following are the minimum returnable documentation for Categories 1 to 4:
3.5.2 Category 1: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit a valid copy of ISO 9001 or any applicable certificate of a QMS (the
latest applicable revision). The QMS should drive the supplier’s business management
processes to ensure that all of Eskom’s requirements are fully met on a consistent basis.
The supplier shall submit the latest copy of the management system internal and external
audit reports. The audit reports must include, if applicable, nonconformity identified, and the
resulting remedial actions (correction and/ or corrective action reports).
The supplier shall submit a draft contract quality plan that is specific to the scope of work as
described in the tender documents. The plan must address the minimum requirements as per
Iso 10005.
Where applicable; the supplier shall submit a draft, or an example of an inspection and test
plan (ITP) or quality control plan (QCP) on similar and/ or previous work done.
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of documented information for roles, responsibilities and
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals, procedures.
The supplier shall submit documented information retained (records) of management review
meetings that include agenda, meeting minutes, attendance registers, reports, presentations,
etc.
Note: specific requirements per tender will be selected using the List of Tender Returnable
documents (240-12248652).
3.5.3 Category 2: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit objective evidence of a developed, implemented and maintained QMS
that complies with ISO 9001 or any applicable standard of quality management system (the latest
applicable revision). The following documents (approved/ signed copies) shall be submitted:
Quality Management System manual or a documented information that have defines and
describes the QMS and its scope
Quality Policy, aligned with the supplier’s strategic direction (documented information)
Quality Objectives (documented information)
Control of documented information (both maintain and retain documented information )
Internal audit procedure (documented information)
Control of nonconforming outputs (documented information)
Nonconformity and Corrective action procedure (documented information)
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The QMS should drive all the supplier’s business management processes to ensure that all of
Eskom’s requirements are fully met on a consistent basis.
The supplier shall submit the latest copy of the management system internal audit reports. The
audit reports must include, if applicable, nonconformity identified, and the resulting remedial
actions (correction and/ or corrective action reports).
The supplier shall submit a draft contract quality plan that is specific to the scope of work as
described in the tender documents. The plan must address the minimum requirements as per
Iso 10005.
Where applicable; the supplier shall submit an example of inspection and test plan (ITP) or
quality control plan (QCP) on similar or previous work done.
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of documented information for roles, responsibilities and
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals, procedures.
The supplier shall submit documented information retained (records) of management review
meetings that include agenda, meeting minutes, attendance registers, reports, presentations,
etc.
Note: specific requirements per tender will be selected using the List of Tender Returnable
document (240-12248652).
3.5.4 Category 3: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit objective evidence of a developed QMS that complies with ISO 9001
(or the latest applicable revision). The following documented information (approved/ signed
copies) shall be submitted:
o Quality management system manual or a (documented information) that have
defines and describes the QMS and its scope
o Quality Policy, aligned with the supplier’s strategic direction (documented
information)
o Quality Objectives (documented information)
o Control of documented information (both maintain and retain documented
information )
o Internal audit procedure (documented information)
o Control of nonconforming outputs (documented information)
o Nonconformity and Corrective action procedure (documented information)
The QMS should drive all the supplier’s business management processes to ensure that all of
Eskom’s requirements are fully met on a consistent basis.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The supplier shall submit a draft contract quality plan that is specific to the scope of work as
described in the tender documents. The plan must address the minimum requirements as per
Iso 10005.
Where applicable; the supplier shall submit an example inspection and test plan (ITP) or
quality control plan (QCP).
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of documented information for roles, responsibilities and
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals, procedures.
NB: specific requirements per tender will be selected using the List of Tender Returnables
document (240-12248652).
3.5.5 Category 4: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit a quality method statement based on ISO 9001 and specific to the
scope of work.
The quality method statement should address all the supplier’s business management
processes to ensure that all of Eskom’s requirements are fully met on a consistent basis.
The supplier shall submit a signed/ approved quality policy (aligned with the supplier’s strategic
direction). (documented information)
The supplier shall submit a copy of quality objectives. (documented information)
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of the documented information for roles, responsibilities and
authorities, specific to the project/ scope of work/ technical requirements. Examples of relevant
documented information are; organization charts, job descriptions, work instructions, duty
statements, manuals, procedures.
Note: specific requirements per tender will be selected using the List of Tender Returnables
document (240-12248652).
3.6 Main Supplier and Sub-supplier Capability and Capacity Assessment
Supplier capability and capacity assessments shall be performed prior to contract award on potential
suppliers participating in Eskom Holdings procurement process to:
provide products and services with high risk to operational sustainability
work on critical plant and equipment
supply of critical plant items or components
provide special processes
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
All sub-suppliers used by the main supplier/ contractor, performing work on Eskom critical plant
equipment, supplying commodities and providing specialised services shall be subjected to the
capability and capacity assessment.
Critical plant includes the following:
Generation Level 1 & 2 plant
Transmission and Distribution Power Plant & Control Plant
Mega Projects
All potential quality risks identified will be included in the assessment report provided for the tender
evaluation.
Note: Form A (Enquiry/ Contract/ Quality Requirements for Supplier Quality Management:
Specification 240-105658000/ QM 58 and ISO 9001) will be used to select and indicate whether
capability and capacity assessment will be conducted.
3.7 Post-Contract Award
3.7.1 Contract Execution
The supplier shall submit the following documents within 30 days or as per stated timeline after the
contract date, prior to the commencement of work, for acceptance by Eskom:
The supplier shall complete a QCP before contract award. This shall be reviewed and
signed off by Eskom within 30 days or as per stated timeline after contract award.
The supplier shall complete a quality control plan and ITP(s) for review and acceptance by
Eskom prior to the commencement of any work, inclusive of subcontracted work, within 30
days or as per stated timeline after contract award.
The sub-supplier QCP/ ITP shall be submitted for review and comment by the supplier and
by Eskom within 30 days or as per stated timeline after the award of the tender. All supplier
and Eskom comments shall be resolved prior to commencing work.
The equipment lists and an indication of pressurised components and systems.
Note: These plans are to be compiled in line with Eskom’s requirements and will have to be
discussed with, and approved by, Eskom prior to any work commencing.
Correspondence shall be directed to the project manager, and periodic quality review
meetings shall be convened by Eskom with the supplier.
The mandatory quality review meetings are to be convened by the nominated project quality
manager or his/her representative for the contract.
Monthly quality performance and management reports are to be prepared by the supplier
during contract execution. The content of these reports shall be agreed by Eskom when
submitted to Eskom on a monthly basis.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.7.2 Supplier Quality Performance Monitoring Phase
During the contract execution phase, suppliers shall be monitored by Eskom for performance on
quality-related aspects.
The outcomes of such monitoring will enable Eskom to take any appropriate actions pertaining to
the supplier.
The monitoring shall be carried out periodically by Eskom or at predetermined intervals during the
execution of a contract using agreed key performance indicators. The monitored key performance
areas include the following:
CQP and QCP /ITP
Delivery
Design
Cost
Management system
Subsequent key performance indicators associated with these areas will include the following:
Nonconformity monitoring
Audit and assessment evaluation scoring
Management system compliance and accreditation
Achievement of delivery targets as per contractual agreements
Process improvements
Correction and corrective action response and closure
3.7.3 Supplier Quality Audit
3.7.3.1 Quality audits and related quality performance reviews are intended to provide an objective
evaluation of compliance with performance expectations defined in this specification, in the
supplier contract quality plan (CQP), and in any other project scope of work specification.
3.7.3.2 Quality audits and related quality performance reviews include, but are not limited to, any
quality or other project functional area audits, assessments, verification of compliance
reviews, surveillance, inspections, or other interim or final assessments of scope of work
deliverables provided by the supplier or sub-suppliers
3.7.3.3 Quality audits and related quality performance reviews are intended to provide an objective
evaluation of compliance with performance expectations defined in this specification, in the
supplier contract quality plan (CQP), and in any other project scope of work specification.
3.7.3.4 Quality audits and related quality performance reviews include, but are not limited to, any
quality or other project functional area audits, assessments, verification of compliance
reviews, surveillance, inspections, or other interim or final assessments of scope of work
deliverables provided by the supplier or sub-suppliers.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.7.3.5 Quality audits and related quality performance reviews shall be carried out by trained,
accredited, and experienced personnel in accordance with procedures documented in the
Cqp.
3.7.3.6 The supplier shall submit, for Eskom review, documented processes for conducting project
scope of work quality audits and related quality performance reviews. Supplier quality audits
and related quality performance review processes shall be designed to address evaluation
of progress towards completion of project functional area deliverables as well as final
deliverable quality.
3.7.3.7 The supplier shall provide a schedule of anticipated quality audits covering all functional
areas and related quality performance reviews at the time of first post-contract award CQP
submission.
3.8 Standard Conditions
3.8.1 Rights of Access
Eskom:
3.8.1.1 shall be granted electronic and hard-copy access to all quality plans, procedures,
documentation, and other quality records relating to the work, including, but not limited to,
data extracts;
3.8.1.2 reserves the right to review, inspect, and audit any or all parts of the supplier’s QMS, as well
as any documentation, materials, or equipment associated with the work, at any time or
project work location; and
3.8.1.3 reserves the right to carry out assessments and audits on all new suppliers and sub-
suppliers.
The supplier:
3.8.1.4 shall support Eskom’s effort to monitor, verify, and/or witness any activities associated with
the work at any time;
3.8.1.5 shall cooperate with Eskom requests for documentation, records, and inspection and
witnessing. Eskom participation in audits, appraisals, assessment of plans, and verification
shall be conducted at no extra cost to Eskom;
3.8.1.6 shall ensure that a sub-supplier provides access to Eskom to all work procedures, records,
and supporting documentation through provision of access to view and photocopy, as
required, to support verification of scope of work requirements. Access shall include the
ability to photograph Eskom equipment, systems, system components, materials, etc.;
3.8.1.7 shall provide access to all quality-related information pertaining to activities performed by
itself or sub-suppliers, where Eskom might not have participated in the witnessing of their
quality assurance or control (this refers to inspections, audits, etc. performed by the supplier
on its own sub-suppliers);
3.8.1.8 shall allow Eskom to assess, audit, approve, or reject any sub-suppliers employed by
Eskom’s suppliers to assist with the product and/or service delivery to Eskom; and
3.8.1.9 shall ensure that the above requirements flow down to sub-suppliers.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.2 Eskom Rights to Information
3.8.2.1 To expect that the works will be conducted in accordance with the contract between the
parties.
3.8.2.2 To have access to the supplier’s information as determined by applicable legislation.
3.8.2.3 Eskom reserves the right to oversee the supplier’s audit programmes by participating in
selected audits as an observer and by assessing the supplier during key work stages.
Eskom will coordinate with the supplier to develop an oversight schedule aligned with the
supplier’s audit schedule.
3.8.2.4 To obtain access to any audit reports of audits performed by the supplier reflected in the
audit programme.
3.8.2.5 To conduct independent quality audits during all phases of the contract, and the supplier
shall provide all resources to support these activities.
3.8.2.6 Eskom shall have the right to participate in, or request that, a technical investigation be
launched and conducted at the supplier’s and sub-suppliers’ premises or other sites when
risk to Eskom products or service deliverables is identified.
3.8.2.7 To participate in, and/or lead, investigations related to incidents involving its products.
3.8.2.8 To require from suppliers to be responsible for the cost of re-inspections.
3.8.2.9 To withhold payment from suppliers as a result of outstanding nonconformities, irrespective
of the agreed payment schedule and in accordance with the conditions of contract.
3.8.2.10 Shall be granted electronic and hard-copy access to all quality plans, procedures,
documentation, and other quality records relating to the work, including, but not limited to,
data extracts.
3.8.2.11 Reserves the right to review, inspect, and audit any or all parts of the supplier’s QMS, as
well as any documentation, materials, or equipment associated with the work, at any time or
project work location.
3.8.2.12 Shall carry out assessments and audits on all new suppliers and sub-suppliers.
3.8.2.13 Reserves the right to appoint resident quality inspectors who can be based at the supplier’s
or sub-supplier’s premises and on site where the work is being performed.
3.8.2.14 Reserves the right to select intervention points within all developed supplier QCPs/ ITPs
for Eskom oversight of selected functions and to perform surveillance or audits of the work.
3.8.2.15 Shall be given access at all reasonable times before, during, and after manufacture and
before delivery, construction, erection, and commissioning to measure, test, and inspect the
products and workmanship, as necessary, at the supplier’s premises and at Eskom sites.
3.8.2.16 Reserves the right to suspend any pending deliveries by the issuing of a cease delivery
order at any time and for any portion of the work that is not being performed in accordance
with the specified/agreed requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.3 Preservation
The supplier shall develop and implement a comprehensive preservation programme consisting of
plans, processes, procedures and actions undertaken for the purpose of planning for and
maintenance of material deliverables quality. The supplier preservation programme scope includes,
but is not limited to, the following:
3.8.3.1 Engagement of personnel suitably qualified for oversight of, and (as required) direct
implementation of, preservation programme requirements.
3.8.3.2 Development and implementation of preservation programme training appropriate to work
need.
3.8.3.3 Eskom may make use of its appointed service provider tasked to provide a full suite of
services encompassing an online monitoring system and asset tracking during, but not
limited to the following stages: inspections, testing, shipping, transportation, storage, and
commissioning. The supplier is to enable full access during all of these stages in order to
allow the installation of the devices on Eskom-identified products and equipment, which
include the sub-supplier’s testing facilities, processing plant, and any other processes
deemed important towards effective and efficient quality control.
3.8.3.4 Eskom seeks cooperation between the supplier’s designers and those of Eskom’s service
provider in ensuring seamless installation of the device and other associated installations.
Moreover, there is also a need to integrate data flows and systems between Eskom and the
supplier. Further details are included in the Eskom specifications and works information.
3.8.3.5 Review and tracking of compliance with Eskom and supplier engineering specification of
preservation requirements.
3.8.3.6 Review and tracking of compliance with sub-supplier provided preservation requirements
and recommendations.
3.8.3.7 Evaluation of prospective temporary and longer-term material storage sites for consistency
with preservation programme expectations.
3.8.3.8 Preservation work plan development and plan execution performance evaluation of all
parties engaged for provision of material transportation, handling, or storage services.
3.8.3.9 Oversight of material quality preservation plan preparation and plan execution performance
at all work locations.
3.8.3.10 Development of a preservation programme records management process, in compliance
with Eskom information management requirements, which comprehensively addresses
generation, maintenance, and ready access by Eskom to all preservation programme
records.
3.8.3.11 The supplier shall deploy a clearly defined documented programme providing for
identification of all physical asset pre-operation preservation of quality requirements. In this
reference, the term “physical assets” should be understood to include bulk materials,
including consumable items, equipment systems, system components, and any other
procured or supplied materials or equipment transferred to project control, but not deployed
for operational purposes.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.3.12 Where the project responsibility for equipment and materials management has been
formally delegated, the supplier’s preservation programme shall ensure clear and
unambiguous communication of pre-operation preservation of goods quality requirements
to sub-suppliers.
3.8.3.13 The supplier’s preservation programme shall clearly and unambiguously document
processes and procedures for efficient and effective monitoring of compliance with
programme requirements.
3.8.3.14 Compliance monitoring shall commence with ensuring comprehensive consideration of
preservation requirements in the engineering instruction and subsequent inclusion of said
instruction in procurement documentation and shall be applicable until such time as
equipment or materials have been incorporated in an operating or operational system or
structure.
3.8.3.15 Compliance evaluation frequency shall anticipate transfer of tactical-level responsibility for
management of preservation responsibilities between project functional areas, for example,
procurement to logistics, logistics to fabrication, fabrication to logistics, logistics to
construction, etc., and shall, in similar fashion, anticipate transfer of support for tactical-level
responsibility between various subcontracted service providers.
3.8.3.16 Supplier engineering shall ensure that preservation requirements for scope of work
systems, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented and that preservation requirements are efficiently and
effectively communicated to project procurement, logistics, construction management,
quality, security, and other project functional areas, as required, for efficient and effective
implementation of preservation requirements. This shall take the form of a preservation
programme applicable to all systems, system components, equipment, materials, customer-
supplied materials, and other goods procured or managed under the scope of work.
3.8.3.17 The supplier’s preservation management programme shall clearly and unambiguously
address temporary, long-term, and in-transit preservation requirements, including, but not
limited to:
requirements for protection against, or insulation from, atmospheric conditions,
sunlight, temperature, soil, dust, humidity, salt spray, corrosive atmospheres, or
other physical environment conditions;
detailed procedures for application, use, monitoring, and maintenance of coatings,
coverings, fasteners, lines, and other components for internal and external weather
proofing;
requirements for electrical grounding or isolation;
requirements for internal or external environment creation, for example, inert gas
charging, heating, cooling, etc., inclusive of gas storage, electric power supply, etc.;
detailed procedures for initial set-up, charging, activation, and maintenance of
internal atmosphere generation, regeneration, monitoring, and relieving systems, for
example, inert gas management systems;
requirements for protection against, or insulation from, vibration or long-period
cyclical motion in transit, for example, wave-generated movement during sea
transport;
internal and external structural integrity protection, for example, internal and external
bracing, padding, framing, chocking, etc.;
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
support structure requirements, for example, stools, pads, or other devices,
substrates, or support required to ensure in-storage and in-transit stability of
systems, system components, equipment, and material, or other discrete units or
items;
provision for physical separation and/or barriers to prevent airborne or direct
transmittal of contaminants between work areas or between work areas and storage
areas, for example, prevention of carbon steel grinding or cutting debris impact on
stainless steel elements, airborne drift of blast aggregate into vessels or machinery,
etc.;
provision for, and final disposition of, temporary and longer-term storage or transit
required supports and related binding devices, for example, stools, stands, sea
fasteners, platforms, chocks, spacers, cabling, etc.;
provision of requirements for temporary work platforms or other support structures
required to ensure provision of preservation services, for example, provision of a
self-elevating work platform for periodic access to elevated fittings, gauges, man-
ways, etc.;
requirements for protection against, or insulation from, contact with other objects, for
example, padding or other protection for external tubing, fittings, or other impact-
sensitive structures or components;
clear physical delineation of temporary and longer-term storage areas supplemented
by hard and soft barriers, as required, to maintain a protective perimeter;
documented agreements with storage facility and transportation provider
management regarding security management, including, but not limited to, facility
access and egress control and control of access to project goods and materials
within facility boundaries or aboard vehicles or vessels; and
detailed procedures for inspection and testing to verify performance of preservation
procedures and to provide for timely notice and corrective action to maintain
preservation status.
3.8.3.18 The supplier’s preservation management programme scope shall encompass
management of preservation requirements, from initial transfer of ownership or management
responsibility to project scope of responsibility, through any period of temporary or longer-
term storage and through any period of transit, including transit for final delivery at point of
active use or installation.
3.8.3.19 The supplier’s preservation management programme shall clearly and unambiguously
address processes and procedures to ensure that storage and control of materials are
accomplished in accordance with manufacturer recommendations, specifications, and
project-specific requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.3.20 The supplier’s preservation management programme shall incorporate special precautions
to address preservation and control of valves, electrical motors and components,
mechanical and rotating equipment, piping and fittings, instrumentation, flange faces,
gaskets, coatings, insulation, and other materials. Special precautions include, but are not
limited to, supplier-specified maintenance procedures related to engines, electric motors,
pumps, compressors, etc., such as periodic shaft rotation, engine turnover, lubrication, etc.
3.8.3.21 The supplier shall ensure that clear and unambiguous requirements for preservation of the
system, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented in purchase orders, work authorisations, and other
communications between the supplier and sub-suppliers.
3.8.3.22 Where sub-supplier expertise is utilised in determination of the preservation protocol,
supplier procurement processes shall ensure clear and unambiguous documentation of sub-
supplier input into preservation management programme requirements.
3.8.3.23 Supplier procurement shall ensure that preservation requirements for scope of work
systems, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented and that preservation requirements are efficiently and
effectively communicated to project logistics, construction management, quality, security,
and other project functional areas, as required, for efficient and effective implementation of
preservation requirements.
3.8.3.24 The supplier shall ensure comprehensive, clear, and unambiguous designation of sub-
supplier responsibility for execution of all preservation management programme elements,
including, but not limited to, all systems, processes, procedures, methods, ready access to
records, and provision of equipment, tools, or services essential to efficient and effective
execution of the preservation management programme.
3.8.3.25 The supplier shall ensure that preservation management programme responsibilities are
clearly and unambiguously defined within the project team and efficiently and effectively
implemented at all project scope of work locations. Inclusion of supplier and sub-supplier
scope of work in the development and implementation of a preservation management
programme shall be considered essential to efficient and effective preservation
management programme execution.
3.8.3.26 The supplier shall ensure clear and unambiguous designation of project team responsibility
for oversight and management of preservation management programme elements during
every stage of project development.
3.8.3.27 The supplier shall ensure that Eskom has free and unrestricted access to all preservation
records for inspection and audit.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.4 Quality Audits Related Conditions
3.8.4.1 The supplier shall maintain an accurate quality audit and related quality performance review
schedule and shall incorporate the current schedule as an attachment to the supplier CQP.
3.8.4.2 The supplier’s quality audit and related quality performance review schedule development
process shall be designed to incorporate consideration of information generated by
previously conducted audits and reviews, by input from project risk management evaluations
(risk register), or from Eskom or sub-supplier subject matter expertise.
3.8.4.3 Eskom reserves the right to oversee supplier audit programmes by participating in selected
audits as an observer and by assessing the supplier during key work stages. Eskom will
coordinate with the supplier to develop an oversight schedule aligned with the supplier’s
audit schedule.
3.8.4.4 Eskom will have the right to obtain access to any audit reports of audits performed by the
supplier reflected in the audit programme.
3.8.4.5 Eskom reserves the right to conduct independent quality audits, scheduled and
unscheduled, during all phases of the contract. The supplier shall provide all resources to
support these activities.
3.8.4.6 Eskom shall be given access at all reasonable times before, during, and after manufacture
and before delivery, construction, erection, and commissioning to measure, test, and inspect
the products and workmanship, as necessary, at the supplier’s premises and at Eskom sites.
3.8.4.7 The supplier shall obtain access for Eskom to measure, test, witness tests, and inspect
products that are being manufactured by any sub-supplier. This includes surveillances.
3.8.4.8 The assessments and audits shall be carried out on all new suppliers and their sub-
suppliers.
3.8.4.9 Eskom shall have the right to participate in, or request that, a technical investigation be
launched and conducted at the supplier’s and sub-suppliers’ premises or other sites when
risk to Eskom products or service deliverables is identified.
3.8.4.10 Qualification requirements for supplier and sub-supplier personnel engaged in conducting
quality audits and related quality performance reviews shall be defined in the supplier CQP
and shall be in compliance with the Project Quality Personnel Qualification Specification.
3.8.5 Management of Nonconformities and Nonconforming Outputs Identified by Eskom
3.8.5.1 Nonconformity reports raised by Eskom and issued against the supplier shall be investigated
by the supplier as a matter of urgency in order to determine the root cause, corrective action
measures, as required, with implementation time frames.
3.8.5.2 A formal response shall be prepared in respect of the defined criteria and submitted to
Eskom for its review, evaluation, and acceptance, within a maximum of 14 calendar days
from the date of issue of the nonconformity and should be aligned with the site
requirements/procedure.
3.8.5.3 Eskom may, at its discretion, request a response sooner and, in any case, before the
supplier proceeding with any pending/further intervention or corrective action, as may be
required by Eskom.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.5.4 Should Eskom or its inspection authority/agency identify any nonconforming products during
the conduct of its audits/surveillances/inspections, the supplier shall be deemed to be in
breach of contract and shall be held liable for any repair, rework, and/or associated
replacement costs. The supplier may, in such instances, also be held liable for the full costs
associated with the conducting of follow-up audits/surveillances/inspections.
3.8.5.5 The nature, magnitude, and/or frequency of nonconformity and inspection defect/rejection
reports raised by Eskom or its appointed inspection authority/agency shall form the basis of
any action to rescind/withdraw the supplier’s qualification status.
3.8.5.6 Nonconforming outputs identified by Eskom shall be documented via a NC Report and
issued to the suppliers via the contract communication protocol. The suppliers shall
investigate the matter and respond in writing to Eskom of disposition within the stated
contractual conditions.
Note: The dates for the disposition should align to contractual conditions.
3.8.5.7 Eskom shall identify repeat deficiencies as systematic failures of the supplier’s QMS and
shall notify the supplier of the trends. Eskom can initiate an internal audit to highlight the
system failures. The supplier with raise a Corrective Action Report and undertake Root
Cause Analysis. In such cases, QMS rectification and/ or update measures shall be taken
immediately.
3.8.5.8 Should the Supplier fail to respond and rectify nonconforming products within stipulated
contractual conditions. The Project Manager should apply contractual remedies in
accordance with Fidic/ NEC contract.
3.8.5.9 Repeated Nonconformities; if there are any identified repeat nonconformities from the same
supplier within a period of 6 months or less. This must then be escalated to the management
review committees of the BU/ OU/ Cluster/ or Divisions for adjudication. If not resolved, then
the matter must be escalated to the supplier review committee for recommendation.
3.8.6 Special Processes
The following requirements shall be applicable as well as additional requirements as specified in the
scope of work for the provision of the following special process services:
3.8.6.1 The supplier shall ensure that all processes which require that procedures be pre-qualified
or work methods and operators tested and qualified are controlled and all steps followed
before the work can commence.
3.8.6.2 This typically covers such activities as welding, non-destructive testing, special fabrication
techniques, coating, painting, etc.
3.8.6.3 All special processes (procedures and processes) shall be submitted for review and
acceptance by Eskom, accredited or certified agency. No work shall commence until these
are accepted.
3.8.6.4 Where applicable, a relevant Management System for the special process shall be certified
or approved by an accredited body and proof of certification shall be submitted to Eskom for
review. An example for this will be the Welding Management System based on ISO 3834.
3.8.6.5 Where samples are required for acceptance, these shall be submitted to Eskom for review
and acceptance.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.6.6 The supplier shall ensure that all operators are suitably qualified for these processes in
accordance with the procedures, processes and/ or applicable standards/ codes.
3.8.6.7 The records of qualification of procedures, processes and operators shall be maintained by
the supplier in accordance with the applicable procedure or code and these made available
to Eskom at all times.
This document has been seen and accepted by:
Name Designation
Kerseri Pather General Manager: Risk and Sustainability
Lenock Meyer Acting Senior Manager: Quality Management
Pamela Dondashe Middle Manager: Quality Assurance
Mandla Mkhwanazi Middle Manager: SHEQ Procurement and Supply Chain Management
Suzette Manthe Senior Advisor: Quality Performance and Planning
Lorna Ndlela Middle Manager: Eskom Document and Records Management
Date Rev. Compiler Remarks
October 2021 3 SA Sambo Specification was due for revision and in addition, to
align the requirements with the latest Eskom business
processes and systems.
October 2018 2 SA Sambo Specification reviewed to be aligned with the
requirements of ISO 9001:2015
March 2016 1 SA Sambo Specification was due for revision and also to
repackage the requirements and tender returnable
documents into four categories.
December 2011 0 A Hunter New document
The following people were involved in the development of this document:
Andrew Else
Bongi Tshabalala
Feziwe Mogamisi
Lesego Garegae
Patrick Thwane
Xolani Zuma
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Eskom Operational Quality Forum Members
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Section
Source: 240-105658000 Supplier Quality Management Specification (3).pdfSupplier Quality Management: Specification Unique Identifier: 240-105658000
The intention of this specification is to specify and describe the minimum quality requirements for all
existing and potential Eskom suppliers and define the quality criteria for the selection, evaluation,
implementation, and maintenance of a quality management system (QMS) that conforms to the
a quality management system (QMS) based on ISO 9001, which should form the basis for conformity
to Eskom quality requirements and continually adhere to them throughout the duration of a contract
[1] ISO 9001 Quality Management Systems – Requirements
[2] ISO 10005 Quality Management Systems – Guidelines for Quality Plans.
[3] ISO 9000 Quality Management Systems – Fundamentals and Vocabulary
[4] 32-727: Safety, Health, Environment, and Quality (SHEQ) Policy
[5] ISO 10006 Quality Management Systems – Guidelines for Quality Management in Projects
[6] ISO 9004 Quality Management – Quality of an Organisation – Guidance to Achieve Sustained
[9] PPPFA: Preferential Procurement Policy Framework Act, 2000 (Act No. )
[10] CIDB 1004: Best Practice Guideline A4: Evaluating Quality in Tender Submissions
[11] 240-12248652 Supplier Quality Management: List of Tender Returnables
2.3.2 Contract Quality Plan: a document of the supplier’s process for delivering the level of quality
required by the contract. It is a framework for the contractor’s process for delivering quality.
2.3.3 Hold Point: a predetermined stage in the quality control plan (QCP) beyond which work/
2.3.4 Intervention Points: those control points indicated by the various controlling bodies
inspection, hold points, surveillances, witnesses, reviews and verifications.
performing quality assurance/ quality control, monitoring, inspection and/ or expediting
Title: Supplier Quality Management: Document Identifier: 240-105658000
Functional Area: Quality Management
Quality Quality Manager Quality Risk and
Description
Source: AM OHS Contractor Baseline risk assessment.xlsxCell A3: Occupational Health and Safety Baseline risk assessment template
Evaluation Criteria
Source: AM OHS Contractor Baseline risk assessment.xlsx (unknown)The document does not explicitly state eligibility criteria such as company size or financial requirements. However, it implies that the contractor must have the capacity to manage the identified OHS risks, including having competent personnel (e.g., Master Electrician, competent rigging team, trained fire wardens), providing necessary PPE, and implementing administrative controls. The contractor must also have a valid SHEQ induction and comply with Eskom's contractor management requirements. The tender is issued by Eskom National Transmission Company of South Africa, so applicants must be legally able to contract with Eskom.
Technical Specifications
Source: AM OHS Contractor Baseline risk assessment.xlsx (unknown)Cell A3: Occupational Health and Safety Baseline risk assessment template
Important Dates
Source: Engineering Building Space Optimization Project OHS Tender Evaluation.pdf (unknown){"closingDate":"23 November 2023"}
Contact Information
Source: Engineering Building Space Optimization Project OHS Tender Evaluation.pdf (unknown){"name":null,"email":null,"phone":null,"department":"Standard 229994","address":null}
Evaluation Criteria
Source: Engineering Building Space Optimization Project OHS Tender Evaluation.pdf (unknown)Eligibility is based on compliance with the OHS tender evaluation criteria. Tenderers must provide all required documentation and demonstrate capability to manage high-risk work. Specific eligibility includes: having a valid COIDA letter, an OHS policy signed by CEO, and possessing or having access to personnel with the specified OHS competencies and qualifications. The tenderer must also have a robust OHS plan and risk assessment methodology.
Technical Specifications
Source: Engineering Building Space Optimization Project OHS Tender Evaluation.pdf (unknown)appointments
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 4
File name: Annexure T1- Transmission OHS Tender Evaluation Template (High Risk Work
Experience & Qualifications
Source: Engineering Building Space Optimization Project OHS Tender Evaluation.pdf(Consider scope of work, risks, OHS plan and applicability) CV, s and qualifications /
certificates (List competencies required)
Health & Safety
Source: Engineering Building Space Optimization Project OHS Tender Evaluation.pdf(Must address the project /scope of work OHS risk(s) and aligned with the health and
safety specification or requirements)
Health and Safety Plan ((must address the project /scope of work OHS risk(s) and
aligned with the health and safety specification or requirements)
work
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 4
File name: Annexure T1- Transmission OHS Tender Evaluation Template (High Risk Work)
Template ID: 240-43921898 (Rev 8) Header and Footer portrait template
Document Identifier 240-180000588 Rev 1 NTCSA OHS Tender Evaluation for Engineering Building Space
Optimization Effective Date 23 November 2023
Review Date November 2026
Has the tenderer submitted detailed costing for OHS (the cost should be broken down not
provided as a lump sum).
4 Baseline OHS Risk Assessment (BRA)
related to the scope of work. The methodology used for the risk assessment must be
provided together with the BRA
5 Valid Letter of Good Standing (COIDA or equivalent)
this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 4
File name: Annexure T1- Transmission OHS Tender Evaluation Template (High Risk Work)
Template ID: 240-43921898 (Rev 8) Header and Footer portrait template
Document Identifier 240-180000588 Rev 1 NTCSA OHS Tender Evaluation for Engineering Building Space
Optimization Effective Date 23 November 2023
Review Date November 2026
Labour(Electrical Contractor)
........................................ ................................... ................................. ................................
Eskom’s/Client’s OHS Representative Designation Signature Date
Section
Source: Engineering Building Space Optimization Project OHS Tender Evaluation.pdfDocument Identifier 240-180000588 Rev 1 NTCSA OHS Tender Evaluation for Engineering Building Space
File name: Annexure T1- Transmission OHS Tender Evaluation Template (High Risk Work)
Important Dates
Source: NTCSA_E-tendering Help Manual for supplier.pdf (TENDER){"closingDate":"23Aug2022","closingTime":"3:42pm"}
Contact Information
Source: NTCSA_E-tendering Help Manual for supplier.pdf (TENDER){"name":null,"email":"[email protected]","phone":null,"department":null,"address":"ls before they can be granted access to the eTendering system. An"}
Evaluation Criteria
Source: NTCSA_E-tendering Help Manual for supplier.pdf (TENDER)Suppliers must have a CSD number to access the eTendering system. Registration on the eTendering portal is mandatory, and the supplier must verify their email and OTP. The tender is open to suppliers who meet the selection and evaluation criteria for the specific tender (e.g., for closed tenders, only invited suppliers can bid).
Technical Specifications
Source: NTCSA_E-tendering Help Manual for supplier.pdf (TENDER)eTendering system is a web-based system that allows suppliers bidding for various tenders advertised
on Tender Bulletin system to “upload” their tender documents. Currently the tenderers or suppliers
submit tender documents at various Eskom tender offices. eTendering system replaces the manual or
physical submission of tender documents at various Eskom tender offices. eTendering system in a
nutshell is an electronic box where tender documents can be “dropped” or “uploaded”. Suppliers will
be required to register their details before they can be granted access to the eTendering system. An
OTP (one time pin) will be sent to both their cell phone and email address.
Quick and direct access is also available by using the following links:
of the public, to view and access NTCSA published tenders. eTendering hyperlink will be found
on this site. Members of the public may follow prompt instructions once they have clicked on
the eTendering link (https://eTendering.eskom.co.za). This link will allow them to upload the
required tender documentation.
members of the public, to view information about published tenders and submit their tender
documents.
eTendering system.
2 Problems
A channel of communication has been created in case users of the system experiences a problem
with the system. In a case users come across some difficulties in using Tender bulletin, eTendering
and OpenText systems they need to contact the buyer responsible for the published tender.
3 What’s New
A new functionality to “add closed tenders”. Closed tenders refers to the tenders which are not listed
on Tenderbulletin as normal tenders, but are tenders sent directly to the relevant and potential
suppliers who meet the selection and evaluation criteria to offer what the buyer needs. These
suppliers will be sent a link via email to bid privately.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
4 Getting Started
To gain access to eTendering portal
Open your web browser
Type TenderBulletin (eskom.co.za) or https://eTendering.eskom.co.za
eTendering system login page will be displayed:
Fig 1
Registration Form Steps to follow
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Plus prefix e.g +27
capture picture to validate that you
are not a robot.
click on register button
the registerer to verify the email sent to
the provided email address.
click on “Resend Verification Email”
button
on link provided on
the email.
etendering site with a login screen
displayed, now complete the login
with your verified email address and
password
Fig1.1
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Fig2a.
Fig2b.
Fig3.
OTP page will be displayed
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
OTP sent to the registered cellphone number and email address
Insert the otp number then click “Verify OTP” button, to resend OTP click on “Resend OTP”
button
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Landing page once OTP is verified
Select the preferred “Ref No”
A page with the preferred Tender information is displayed before tender documentation can
be submitted.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Click on “Create New Submission” button to submit required Tender documents
Landing page once clicked on “Create New Submission” button. Take note of the
mentioned disclaimers.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
To submit tender documents, click on “Add file” button
Upload required tender documents by:
Giving the file a name
Select the listed file type e.g.: Technical, commercial, finance and etc
Choose the file you need to upload
Then click on “Upload” button, Fig5.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Fig4.
Fig5.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Continue to submit all the required documents under the correct category ,i.e: Technical
should be selected if technical documentation is uploaded and etc. Verify all required
documents are uploaded before making ‘Final Submission’ by clicking on ‘Finalize
Submission’ button.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
all uploaded files should not exceed 900MB.
will pop-up
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
If not all documents were submitted or still wish to add or submit more documents, click on
“No, continue adding files” button.
submission and closed time and date timestamp at the bottom.
submitted tenders will be displayed.
If you want to view or verify the submitted documents, click on “View Submission” button
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
submitted documents on email,Fig6.This is the final step for the submitter or tenderer.
It is vital to save the email with the submission ID for future enquiry if need be.
--------Originalmessage--------
From:Eskom E-Tender Document Submission 28 [email protected]
Date:Tue,23Aug2022,3:42pm
Subject: Response To Submitter
Eskom E-Tender Document Submission 28
Hi Monalisa
You have finalized a new submission with submission id:14 on tender #MPKUS10086PS
closing date : 2022-11-30 10:00:00.
Have started the submission from 2022-08-23 14:28:33 and finalized at 2022-08-23
15:42:28
Tender Description:
Award for Provision of Office Cleaning and Janitorial Services at Kusile Power Station
Project
Files Submitted:
ID Original Name Title Size Type
38 Test7.pdf testingCom 33141 Commercial
40 Test1.pdf testingTech 33502 Technical
41 Test15.pdf testingFin 33141 Finance
Thanks,
Eskom E-Tender Document Submission 28 Automated Mail
© 2022 Eskom E-Tender Document Submission 28. All rights reserved.
NB: This Email and its contents are subject to the Eskom Holdings SOC Ltd EMAIL
LEGAL NOTICE which can be viewed at
http://www.eskom.co.za/Pages/Email_Legal_Spam_Disclaimer.aspx
Fig6.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
5 Edit Registration
To edit already registered information such as Name, Organization, CSD and cell phone number
select “Edit Registration” on the drop down, Fig1. New window with information that needs to be
updated pop ups,Fig2. Click on “Update” button to update registration details.
Fig1.
Fig2.
6 Log off Button
To logout, click “Log out” on the dropdown next to your name
Fig1.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
7 Password reset
To reset a forgotten password, click “Forgot your password” Fig1. and a new screen will
pop up to enter an alternative email where the new password will be sent Fig2.Confirmation
message will be sent to the user, Fig3.
Fig1.
Fig2.
Fig3.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
An email confirming password reset will be sent to the email provided.
Click on the link or “Reset Password” button to reset the password.
Fig4.
A new window will pop up to reset and confirm the new password, Fig5.Enter new
password and confirm then click on “Reset Password” button.
Fig5.
OTP window will pop up, type in the OTP sent to either the cell phone or email address.
Fig6.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
OTP successfully goes through and lands on the below screen, password is successfully
reset.
Fig7.
8 General
This system is compatible to most web browsers however we recommend Ms Edge.
The end.
© 2023 Eskom of 19
Compliance Requirements
Source: NTCSA_E-tendering Help Manual for supplier.pdf (TENDER)CSD number to gain access to
Section
Source: NTCSA_E-tendering Help Manual for supplier.pdfA new functionality to “add closed tenders”. Closed tenders refers to the tenders which are not listed
suppliers who meet the selection and evaluation criteria to offer what the buyer needs. These
Evaluation Criteria
Source: ENGINERRING BUILDING door (ESKOM HOLDINGS)-Model-CL0.pdf (unknown)The document does not explicitly state eligibility criteria such as company registration, B-BBEE requirements, or minimum experience. However, as a tender from Eskom NTCSA, applicants are likely expected to be registered on the Central Supplier Database (CSD) and meet any Eskom-specific supplier requirements. Contractors must have expertise in door and window installation, fire-rated assemblies, and plumbing/drainage work. They must also be able to provide samples and comply with all technical specifications.
Technical Specifications
Source: ENGINERRING BUILDING door (ESKOM HOLDINGS)-Model-CL0.pdf (unknown)Maintenance manual. Bathroom entrance
Prior to installation.
Approved by architect prior to installation.
Frames : the contractor (s) shall ensure that all
Fire doors and frames are supplied, assembled
And installed
Health & Safety
Source: ENGINERRING BUILDING door (ESKOM HOLDINGS)-Model-CL0.pdfFrame_ finish to be primed on all sides / edges and painted on all sides / edges frame_ finish to be primed on all sides / edges and painted on all sides / edges frame_ finish to be primed on all sides / edges and painted on all sides / edges frame_ finish to be primed on all sides / edges and painted on all sides / edges frame_ finish colour to be plascon" dark onyx 42 " coat hook with buffer stopper, indicator bolt and rise and fall frame_ finish colour to be plascon" dark onyx 42 "
With 2 coats velvaglo polyurethane enamel paint. With 2 coats velvaglo polyurethane enamel paint. With 2 coats velvaglo polyurethane enamel paint. With 2 coats velvaglo polyurethane enamel paint. Butt auto open hinge
Colour to be plascon" dark onyx 42 " colour to be plascon" dark onyx 42 " colour to be plascon" dark onyx 42 " colour to be plascon" dark onyx 42 "
DOOR LEAF_ 2no. LEAFS OF + / - 800mm WIDE x 2400mm HIGH x 44mm THICK DOOR LEAF_ 2no. LEAFS OF + / - 800mm WIDE x 2400mm HIGH x 44mm THICK DOOR LEAF_ 813mm WIDE x 2400mm HIGH x 44mm THICK DOOR LEAF_ 900mm WIDE x 2400mm HIGH x 44mm THICK DOOR LEAF_ 813mm WIDE x 2400mm HIGH x 44mm THICKCLASS "D"( 2 HOUR FIRE RATED ) DOOR LEAF_ 813mm WIDE x 2400mm HIGH x 44mm THICKCLASS "D"( 2 HOUR FIRE RATED )
Evaluation Criteria
Source: Eng Building Space Optimisation - Env Requirements Proforma.docx (unknown)The document does not specify formal eligibility criteria such as company registration, financial capacity, or technical qualifications. However, contractors must be able to commit to the environmental management declaration and have the capacity to manage environmental compliance on site. They must also be able to provide the necessary contact details and sign the declaration.
Technical Specifications
Source: Eng Building Space Optimisation - Env Requirements Proforma.docx (unknown)Name of the Organisation
Vendor Number
Contract Number
Scope of Work
Environmetal management declaration environmetal management declaration environmetal management declaration environmetal management declaration
I undertake to adhere to the requirements as set out in:
The project Environmental Management Plan/Programme and or Environmental Authorisation
Environmental Requirements for Organizations set out in 240-18100134
I undertake to comply with all applicable environmental legal and other requirements
I undertake to comply with Eskom ‘s environmental standards, policies and procedures where applicable
I am fully aware and will comply with the environmental transgressions fine systems
I pledge to inform all staff of their role in managing environmental impacts on site
I am fully aware that incidents must be reported within 24 hours of occurrence
I pledge to always implement environmental best practice on site during the contract
I pledge that all non-conformances issued to us will be addressed promptly
I am fully aware that where applicable the following documentation / registers to be kept on site will be submitted to Eskom Project Manager on completion of the project:
Copy of the approved project specific Environmental File
Incident / complaint register,
Herbicide and pesticide register,
Hazardous substance, including solvents registers.
I commit to always implement environmental best practice on site during the contract I undertake to adhere to the requirements as set out in:
The project Environmental Management Plan/Programme and or Environmental Authorisation
Environmental Requirements for Organizations set out in 240-18100134
I undertake to comply with all applicable environmental legal and other requirements
I undertake to comply with Eskom ‘s environmental standards, policies and procedures where applicable
I am fully aware and will comply with the environmental transgressions fine systems
I pledge to inform all staff of their role in managing environmental impacts on site
I am fully aware that incidents must be reported within 24 hours of occurrence
I pledge to always implement environmental best practice on site during the contract
I pledge that all non-conformances issued to us will be addressed promptly
I am fully aware that where applicable the following documentation / registers to be kept on site will be submitted to Eskom Project Manager on completion of the project:
Copy of the approved project specific Environmental File
Incident / complaint register,
Herbicide and pesticide register,
Hazardous substance, including solvents registers.
I commit to always implement environmental best practice on site during the contract I undertake to adhere to the requirements as set out in:
The project Environmental Management Plan/Programme and or Environmental Authorisation
Environmental Requirements for Organizations set out in 240-18100134
I undertake to comply with all applicable environmental legal and other requirements
I undertake to comply with Eskom ‘s environmental standards, policies and procedures where applicable
I am fully aware and will comply with the environmental transgressions fine systems
I pledge to inform all staff of their role in managing environmental impacts on site
I am fully aware that incidents must be reported within 24 hours of occurrence
I pledge to always implement environmental best practice on site during the contract
I pledge that all non-conformances issued to us will be addressed promptly
I am fully aware that where applicable the following documentation / registers to be kept on site will be submitted to Eskom Project Manager on completion of the project:
Copy of the approved project specific Environmental File
Incident / complaint register,
Herbicide and pesticide register,
Hazardous substance, including solvents registers.
I commit to always implement environmental best practice on site during the contract I undertake to adhere to the requirements as set out in:
The project Environmental Management Plan/Programme and or Environmental Authorisation
Environmental Requirements for Organizations set out in 240-18100134
I undertake to comply with all applicable environmental legal and other requirements
I undertake to comply with Eskom ‘s environmental standards, policies and procedures where applicable
I am fully aware and will comply with the environmental transgressions fine systems
I pledge to inform all staff of their role in managing environmental impacts on site
I am fully aware that incidents must be reported within 24 hours of occurrence
I pledge to always implement environmental best practice on site during the contract
I pledge that all non-conformances issued to us will be addressed promptly
I am fully aware that where applicable the following documentation / registers to be kept on site will be submitted to Eskom Project Manager on completion of the project:
Copy of the approved project specific Environmental File
Incident / complaint register,
Herbicide and pesticide register,
Hazardous substance, including solvents registers.
I commit to always implement environmental best practice on site during the contract
I------------------------------------------------------------------------ (full name) acknowledge and accept the responsibility to comply and conform to all the above-mentioned requirements. I------------------------------------------------------------------------ (full name) acknowledge and accept the responsibility to comply and conform to all the above-mentioned requirements. I------------------------------------------------------------------------ (full name) acknowledge and accept the responsibility to comply and conform to all the above-mentioned requirements. I------------------------------------------------------------------------ (full name) acknowledge and accept the responsibility to comply and conform to all the above-mentioned requirements.
Designation (Contractor)
……………………………………
Contact Number
……………………………………. Designation (Contractor)
……………………………………
Contact Number
……………………………………. Signature
…………………………………… Date:
……………………………..
Eskom: Project Manager
………………………………….... Eskom: Project Manager
………………………………….... Signature of Project Manager:
………………………………….. Date:
………………………………….
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Address
Lake Street, Germiston, Johanessburg, 1401, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
28
Last checked
04 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Contact
021-980-7509[email protected]www.eskom.co.za/Pages/Landing.aspxLake Street, Germiston, Johanessburg, 1401, South Africa
Key Personnel