Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Arnot Power Station - middelburg - rietkuil - 1097
Organization Type
GOVERNMENT
Published
16 Sept 2026
OCDS Reference
ocds-9t57fa-170649
ESKOM requires the supply, delivery, and refurbishment or servicing of cegrit automatic fly ash sampler parts and spares at arnot power station, on an as-and-when-required basis over a 36-month period. The scope covers a detailed list of as3 sampler components, including probes, nozzles, cyclones, and annual calibration and cleaning services, applied to units 1–6 air heaters and boiler plant. Bidders must comply with iso 9001, ohsas 18001, site safety and environmental procedures, and submit a quality control plan before work starts.
Contract period: 36 months, as-and-when-required basis.
Scope: Supply, delivery, and refurbishment or servicing of all Cegrit automatic fly ash sampler parts listed (e.g., AS3 Probe, Ejector Nozzle, Cyclone, Sample Jar) plus annual calibration, removal, cleaning and purging service.
Areas: Units 1–6 air heaters and boiler plant at Arnot Power Station.
Quality: Contractor must generate and submit a Quality Control Plan (QCP) for engineer review before work commences; hold and witness points must not be bypassed without written concession.
Safety: Safety files must be updated and accepted before activities commence; comply with OHSAS 18001 and Arnot site regulations.
Standards: Work must comply with ISO 9001 and latest revisions of referenced standards, including radiation legislation.
Closing date: 5 October 2026 at 10:00 (submission method not specified in the document).
Date & Time
Monday, 05 October 2026 - 10:00
Venue
https://teams.microsoft.com/meet/381861026159665?p=v8TlWQcVjwwq0VnJpm
Categories
Request for Bid(Open-Tender)
Arnot Power Station - middelburg - rietkuil - 1097
AI Document Analysis Stages
Description
Source: SHE SPEC.pdf16 Sept
2026
Tender Published
Tender was published
05 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Integrity Pact Declaration Form_ANNEXURE A - Copy.pdf
Supply, delivery and refurbishment or servicing of fly ash samplers for Eskom in the Eastern Cape, under a tender governed by Eskom's standard integrity and fair-tendering declarations.
240-68099512 Form A_Cat 2_ Rev 9.docx
Eskom requires the supply, delivery, and refurbishment or servicing of fly ash samplers in the Eastern Cape. Bidders must accept Eskom's Supplier Quality Requirements as per specification 240-105658000 and ISO 9001, and complete the associated quality acknowledgement form.
NEC - TSC3-Refurb or Service of Fly Ash samplers.pdf
No summary available
ITT.pdf
Non-Disclosure Agreement (NDA) Vendors Template - 02 September 2024.docx
Eskom requires the supply, delivery, and refurbishment or servicing of fly ash samplers, with the contract governed by a non-disclosure agreement (NDA) that bidders must sign. The NDA protects Eskom's confidential information and binds the supplier for three years after the relationship ends.
Technical evalution criteria.pdf
Supply, delivery, and refurbishment or servicing of Cegrit Automatic Fly Ash Samplers and their spares for Eskom in the Eastern Cape. The evaluation focuses on service history, technical experience, adherence to technical specifications, and delivery lead time, with a minimum qualifying threshold of 70%.
Fly Ash or Cegrit Sampler Supply and Service SOW-signed.pdf
Supply, delivery and refurbishment or servicing of Cegrit automatic fly ash sampler parts for Units 1-6 at Arnot Power Station, on an as-and-when-required basis over 36 months. The scope includes specific spare parts, annual calibration, removal, cleaning and purging of the samplers.
3. Eskom Vehicle Safety Spec 32-345.pdf
Supply, delivery, and refurbishment or servicing of fly ash samplers for Eskom in the Eastern Cape, closing 5 October 2026 at 10:00. The tender is for the provision of fly ash sampling equipment and associated services.
E-Tenderers E-Tendering Training Acknowledgement Form - Copy.pdf
Supply, delivery, and refurbishment or servicing of fly ash samplers for Eskom in the Eastern Cape, with the tender closing on 5 October 2026 at 10:00. The document provided is primarily an e-tendering training acknowledgement form that bidders must complete and submit as a mandatory returnable, with failure to do so resulting in disqualification.
Local Content Annex C, D, E supplier to complete and send back at tender closing date - Copy.xls
Supply, delivery, and refurbishment or servicing of fly ash samplers for Eskom in the Eastern Cape. The tender includes local content and imported content declaration requirements.
BEE_Affidavit-EME-Gen.pdf - 08 Sept 2020.pdf
Supply, delivery, and refurbishment or servicing of fly ash samplers for Eskom in the Eastern Cape.
BEE_Affidavit-QSE-Gen.pdf - 08 Sept 2020.pdf
Supply, delivery, and refurbishment or servicing of fly ash samplers for ESKOM in the Eastern Cape.
20. New contractor Health and Safety Requirements 32-136.pdf
Eskom requires the supply, delivery, and refurbishment of fly ash samplers, with all work governed by its Contractor Health and Safety Requirements standard (32-136, Rev 4). Bidders must comply with the OHS Act, NEMA, and Eskom's SHE policies, including risk assessments, life-saving rules, and health and safety file requirements.
20. Annexure B.pdf
Supply, delivery and refurbishment or servicing of fly ash samplers for Eskom in the Eastern Cape, with mandatory compliance to Eskom's Occupational Health and Safety (OHS) requirements and contractor management obligations.
5. Eskom Standard Conditions of Tender.pdf
Supply, delivery, and refurbishment or servicing of fly ash samplers for Eskom in the Eastern Cape. The tender follows Eskom's standard conditions of tender, with a closing date of 5 October 2026 at 10:00 SAST.
SHE SPEC.pdf
Supply, delivery and refurbishment of Cegrit Automatic fly ash sampler parts and services at Arnot Power Station over a five-year period, with task orders issued as and when required.
Safety, Health, Environment and Quality SHEQ Policy.pdf
Eskom Holdings SOC Ltd requires the supply, delivery, and refurbishment or servicing of fly ash samplers. The tender is issued by Eskom and is applicable in the Eastern Cape province. Bidders must comply with Eskom's Safety, Health, Environment, and Quality (SHEQ) policy, which mandates zero harm, quality management, and adherence to legal and other requirements.
240-12248652_List of Tender Returnables_Cat 2_ Rev 7 - Copy.xlsx
Supply, delivery, and refurbishment or servicing of fly ash samplers for Eskom in the Eastern Cape. The tender includes a quality management evaluation covering ISO 9001 certification or an implemented QMS, with requirements for a draft Contract Quality Plan, Inspection and Test Plans, and Form A.
20. Eskom life-saving rules.pdf
Supply, delivery, and refurbishment or servicing of fly ash samplers for Eskom, with the contract governed by Eskom's Life-Saving Rules requiring strict adherence to safety protocols at all Eskom sites.
Supplier Declaration of Interest.pdf
Supply, delivery, and refurbishment or servicing of fly ash samplers for Eskom in the Eastern Cape. The procurement includes the declaration of any conflicts of interest by bidders.
BRA.pdf
Supply, delivery and refurbishment or servicing of fly ash samplers at Arnot Power Station, operated by Eskom in the Eastern Cape. The tender covers the provision of samplers and associated services, with the contract managed by the Performance and Testing department.
3. Eskom Waste Management Standard 32-245 - Copy.pdf
Eskom Holdings SOC Ltd requires the supply, delivery, and refurbishment or servicing of fly ash samplers, with the work to be performed in the Eastern Cape. The tender is governed by Eskom's Safety, Health, Environment, and Quality (SHEQ) Policy, which mandates compliance with ISO 9001, ISO 14001, and ISO 45001 standards and a commitment to zero harm.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 234 175
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Eskom Generation OHS Specification for the supply, delivery and refurbishment or services of Fly Ash samplers at Arnot Power Station.
Document identifier: GENERATION PEAKING OHS 32-726-10T Rev 1, effective 30 June 2022.
Purpose: Standardised approach to OHS specifications for Eskom Generation contracts, standards and NEC3; lists legislative and Eskom requirements, local authority/municipal by-law/environmental legislation requirements for contractors.
Applicability: Any contracting organisation responding to Eskom Generation tender/enquiry intending to enter a contract.
Contractor expected to develop OHS plan meeting specification and all relevant legislation; Eskom does not assume contractor's legal responsibilities; specification reflects minimum requirements, not all-encompassing.
Organisational OHS requirements must be acknowledged and listed in OHS plans; additional Eskom/legislative requirements in specification must be addressed.
Contact Information
Source: SHE SPEC.pdf (unknown)Contract Manager/End User: Nolitha Tshabane
OHS/SHE/Risk Officer: Makwena Poopedi
Delivery address: Arnot Power Station, Private Bag X02, Rietkuil, 1097
Technical Specifications
Source: SHE SPEC.pdf (unknown)Scope: Supply, delivery and refurbishment of Cegrit Automatic fly ash sampler parts at Arnot Power Station for a five-year period.
Parts list:
Maintenance & calibration: Annual calibration, removal, cleaning and purging of all Cegrit samplers. Full report with QCPs to be submitted to employer's representative within 7 working days of completion.
Task orders issued on an "as and when" required basis; employer not obliged to issue any task orders.
Methodology
Source: SHE SPEC.pdfLife-saving Rules enforcement methodology:
Substance abuse testing methodology: testing on entry to Arnot Power Station; contractors may develop own manual and test employees regularly; results marked confidential in personal files.
Induction methodology: Arnot Power Station OHS induction for all employees and visitors; pre-employment medical examination; attendance registers; access cards as proof; site-specific contractor induction on approved OHS plan, hazards, risk assessments; visitor induction with host escort.
Non-conformance methodology: procedure for issuing and closing non-conformance reports; contractor project management monitors close-out; Eskom-issued non-conformances require offender meeting with project manager.
Quality Management
Source: SHE SPEC.pdfAnnual calibration, removal, cleaning and purging of all Cegrit samplers required.
Full report accompanied by Quality Control Procedures (QCPs) to be submitted to employer's representative within 7 working days of completion.
Main contractors must implement non-conformance procedure (including quality-related non-conformances) for issuing to appointed contractors; appointed contractors must implement similar procedures.
Procedure for issuing and closing non-conformance reports must be strictly adhered to.
Contractor project management must monitor close-out of non-conformances; failure to do so may result in recommendations not being implemented.
Where Eskom issues non-conformances, close-out step includes offender being called by responsible project manager.
Financial Requirements
Source: SHE SPEC.pdf (unknown)Liability limited to the total price stated in each specific task order, not the total contract price. Employer not obliged to issue any task orders despite contract award.
Compliance Requirements
Source: SHE SPEC.pdf (unknown)Legal compliance:
Eskom requirements:
B-BBEE: Minimum Level 2 (from currentAnalysis).
Health & Safety
Source: SHE SPEC.pdfOHS specification reference: GENERATION PEAKING OHS 32-726-10T Rev 1, effective 30 June 2022.
Applicable to all contracting organisations responding to Eskom Generation tenders.
Contractor must develop OHS plan meeting specification and all relevant legislation; Eskom does not assume contractor's legal responsibilities.
Normative references: Basic Conditions of Employment Act, OHS Act & Regulations, Child Labour Regulations, National Environmental Management Act, National Road Traffic Act, Eskom Substance Abuse Procedure (32-37), Contractor Health & Safety Requirements (32-136), Life-saving Rules (240-62196227), Incident Management Procedure (32-95), SHEQ Policy (32-727), Working at Heights Procedure (32-418), Vehicle & Driver Safety Procedure (240-62946386), Risk Assessment Procedure (32-520), Plant Safety Regulations, ISO 45001, Eskom Covid-19 Policy, National Disaster Management Act, Eskom PPE Specification (240-44175132).
Informative references: Tobacco Products Control Act, SANS 1186, Constitution, DmN 34-110.
Key definitions provided for appointed contractor, baseline risk assessment, business unit, client, competent person, contract manager, consultant, duty of care, employee, employer, Eskom requirements, OHS file/plan/specification/requirements, life-saving rules, medical certificate of fitness, main contractor, risk assessment, service provider, supplier, task, toolbox talks.
Abbreviations: BU, CE, COID Act, DEL, ERfW, GAR, GSR, LDV, SDS, OHS Act, O&M, LoGs, SABS, SANS.
Section 37(2) agreement process: OHS department issues agreement to project manager/end user for signing by Eskom and contractor representatives; original retained by contractor, copy by project manager, copy in OHS file.
Child labour prohibited per Constitution and Basic Conditions of Employment Act; OHS Act Regulations on Hazardous Work by Children apply where work not prohibited.
OHS Act copy must be up-to-date and available to all employees.
COID registration and valid LoG mandatory for main and appointed contractors; LoG validity maintained throughout contract; copy in OHS file.
All contractors must comply with listed legislation.
All employees must be familiar with relevant Eskom OHS documentation before project commencement.
Main contractor appointed by Eskom on award; responsible for all legislative and Eskom requirements.
Sub-contractor appointments in writing, part of SHE plan; adequate training and instruction; copies in SHE file.
SHEQ policy: organisational policy signed by CEO/16.2 appointee; displayed with Eskom SHEQ policy; copy in OHS file and attached to OHS plan.
Life-saving rules (5 rules) zero tolerance; non-compliance = serious misconduct, disciplinary action up to dismissal.
Substance abuse: 0% alcohol/drug level; testing on entry; procedure 32-37; life-saving rule 4; confidential test records; life-saving rules in induction.
Organograms: Main contractor (CEO to supervisors, positions, names, legal appointments) signed by 16.1/16.2; updated timely; filed in project OHS files. Appointed contractors: similar organogram signed by 16.1/16.2; copy to main contractor and in project OHS files.
First aid: GSR 3 compliance; Level 2 trained first aiders (registered provider); minimum 1 box per 5 persons then 1 per 50; prescribed contents list; content checklist; boxes sealed, checked regularly, register inside box; name/contact on box; after-hours arrangements.
OHS training: Breakdown and costing at bid stage; scope covers work type and procedures; appointments trained prior to acceptance; refresher on amendments; time allocated; records on OHS file.
Induction: Arnot Power Station OHS induction mandatory before site work; attendance registers; pre-employment medical fitness certificate; proof via access cards; contractor keeps records.
Contractor induction: site-specific on approved OHS plan, hazards, risk assessments, rules.
Visitor induction: Arnot OHS induction mandatory; escorted by inducted host; no work permitted; proof of induction provided.
Housekeeping: high standard; prompt waste disposal; materials secured; nails removed; packaging cleared; work area cleared on completion; Eskom may stop work for poor housekeeping at contractor cost; regular inspections.
Smoking, cellular phones, occupational health/medical assessments, roles/responsibilities, risk assessments, PPE requirements, incident management, emergency management, non-conformance/compliance, OHS files, work stoppage, hours of work (normal, night, overtime) all covered per specification sections.
Environmental
Source: SHE SPEC.pdfEnvironmental legislation compliance required: National Environmental Management Act 1998, Environment Conservation Act 1989, National Water Act 1998, Constitution Section 24 (Bill of Rights).
Duty of care to environment: reasonable measures to prevent pollution/degradation; minimise and rectify if authorised or unavoidable.
Specification includes requirements pertaining to local authorities, municipal by-laws, and environmental legislation.
ISO 45001 and SANS standards applicable.
Contractual Terms
Source: SHE SPEC.pdfContract duration: Five (5) years.
Task orders issued by service manager on "as and when" required basis.
Employer liability limited to price stated in each specific task order, not total contract price.
Employer not obliged to issue any task orders despite contract award.
Section 37(2) agreement required between Eskom and main contractor at safety file submission; main contractor must ensure Section 37(2) agreements with all appointed contractors.
Eskom right to terminate contract.
Contract sign-off required.
Omissions from safety specification do not relieve contractor of legal obligations.
Description
Source: Non-Disclosure Agreement (NDA) Vendors Template - 02 September 2024.docxEskom Holdings SOC Ltd is the Disclosing Party, incorporated in South Africa with registration number 2002/015527/06. Registered office: Megawatt Park, Maxwell Drive, Sunninghill ext.3, Sandton. The NDA template is identified as file 240-63152171 (Rev 5) dated 02 September 2024.
Contact Information
Source: Non-Disclosure Agreement (NDA) Vendors Template - 02 September 2024.docx (unknown)Eskom Holdings SOC Ltd (Disclosing Party)
Supplier/Tenderer (Receiving Party) details are to be inserted in the template.
Submission Guidelines
Source: Non-Disclosure Agreement (NDA) Vendors Template - 02 September 2024.docx (unknown)The NDA template must be completed and signed by authorised signatories:
Both signatures must be witnessed.
The signed NDA is a returnable document for the tender process. The document does not specify submission method, number of copies, packaging, or closing time.
Compliance Requirements
Source: Non-Disclosure Agreement (NDA) Vendors Template - 02 September 2024.docx (unknown)The Receiving Party must have legal authority to enter the agreement and must indemnify Eskom against losses arising from unauthorised use or disclosure of confidential information.
Signatories must be duly authorised (Eskom: no lower than Procurement Senior Manager).
No requirements for CSD registration, tax clearance, B-BBEE certification, CIDB grading, or local content are mentioned in this NDA.
Description
Source: 240-12248652_List of Tender Returnables_Cat 2_ Rev 7 - Copy.xlsxProcurement: Supply, delivery and refurbishment or services of Fly Ash samplers for Eskom in Eastern Cape. Bidders must complete the Category 2 returnables template, selecting the applicable category on the Cover sheet.
Important Dates
Source: 240-12248652_List of Tender Returnables_Cat 2_ Rev 7 - Copy.xlsx (unknown)Closing date and time: 5 October 2026 at 10:00 (from tender record).
No compulsory briefing or site visit dates stated in this document.
Submission Guidelines
Source: 240-12248652_List of Tender Returnables_Cat 2_ Rev 7 - Copy.xlsx (unknown)Submission method: not specified in this document; bidders must send completed returnables to the buyer.
Required returnables for Category 2:
Template instructions: select only one category on the Cover tab (Category 2 for this tender), complete all required details, save as PDF and sign, or sign and lock the spreadsheet before submission.
Evaluation Criteria
Source: 240-12248652_List of Tender Returnables_Cat 2_ Rev 7 - Copy.xlsx (unknown)Quality evaluation uses a weighted scorecard with five sections:
Maximum scores: Option 1 = 4, Option 2 = 7, Section B = 4, Section C = 1, Section D = 1, Section E = 2. Weighted percentage calculated per section. No minimum qualifying score stated. Preference point system (80/20 or 90/10) not mentioned in this document.
Technical Specifications
Source: 240-12248652_List of Tender Returnables_Cat 2_ Rev 7 - Copy.xlsx (unknown)Scope: Supply, delivery and refurbishment or services of Fly Ash samplers.
Quality management requirements:
Reference documents: Supplier Contract Quality Requirements Specification (240-105658000), Contract Quality Plan reference (240-109253698), ITP reference (240-109253302).
Compliance Requirements
Source: 240-12248652_List of Tender Returnables_Cat 2_ Rev 7 - Copy.xlsx (unknown)Quality management compliance:
No B-BBEE, CIDB, CSD registration, tax clearance, or local content requirements mentioned in this document.
Description
Source: Safety, Health, Environment and Quality SHEQ Policy.pdfEskom Holdings SOC Ltd (Reg No 2002/015527/30) is South Africa's primary electricity supplier, generating and distributing approximately 95% of electricity used in South Africa and 40% in the rest of Africa, with 90% from coal. The SHEQ Policy (Document Identifier 32-727, Revision 4, effective 5 October 2020) governs safety, health, environment and quality across Eskom Holdings SOC Ltd divisions, subsidiaries, and entities where Eskom has controlling interest or influence. The policy integrates SHEQ requirements through the PDCA cycle, aligned with ISO 9001, ISO 14001 and ISO 45001/OHSAS 18001. Core values: Zero Harm, Integrity, Innovation, Sinobuntu, Customer Satisfaction, Excellence. Zero Harm targets: zero fatalities, zero injuries/ill-health, zero environmental incidents, zero tolerance, zero defects. Life-saving Rules apply to all employees, contractors and visitors. Contractors are defined as any employer formally contracted by Eskom (directly or indirectly) performing work or supplying services, products, equipment or materials, including board members, consultants, vendors, suppliers, agents, joint ventures, principal contractors and subcontractors.
Methodology
Source: Safety, Health, Environment and Quality SHEQ Policy.pdfThe SHEQ Policy is implemented through the plan-do-check-act (PDCA) quality cycle. Risk-based assessment methodologies are applied, including hazard identification and risk assessment, fitness for duty assessments, emergency preparedness, pandemic/epidemic response and medical surveillance. Contractor compliance is ensured through processes that are measured and monitored. Application of the policy is audited per the audit schedule. Consultation and participation of workers and worker representatives on OH&S management systems is required.
Quality Management
Source: Safety, Health, Environment and Quality SHEQ Policy.pdfEskom requires implementation of quality management systems in accordance with ISO 9001. The SHEQ Policy integrates quality through the plan-do-check-act (PDCA) cycle. Quality objectives must be set, measured and continually improved. Zero Defects is a stated aim, focusing on prevention and doing the job right the first time. Compliance with ISO 9001 is a normative reference for the policy.
Compliance Requirements
Source: Safety, Health, Environment and Quality SHEQ Policy.pdf (unknown)Contractors must meet Eskom's SHEQ compliance obligations and organisational requirements, including implementation of management systems aligned with ISO 9001, ISO 14001, and ISO 45001/OHSAS 18001. Contractors are responsible for safety, health, environment and quality performance in line with Eskom's Zero Harm policy and Life-saving Rules. Compliance is monitored through audits per the audit schedule.
Health & Safety
Source: Safety, Health, Environment and Quality SHEQ Policy.pdfEskom's SHEQ Policy mandates a Zero Harm culture with specific targets: zero fatalities, zero injuries/ill-health, zero environmental incidents, zero tolerance, zero defects. Life-saving Rules apply to all employees, contractors and visitors: open/isolate/test/earth/bond/insulate before touch; hook up at heights; buckle up; be sober; permit to work. Contractors must meet applicable OHS compliance obligations and organisational requirements. Management systems must align with ISO 45001/OHSAS 18001. Hazard identification, risk assessment, fitness for duty, emergency preparedness, pandemic response and medical surveillance are required. OHS roles and responsibilities follow Eskom standards 240-62582234 and 32-716. The policy references the Occupational Health and Safety Act, Compensation for Occupational Injuries and Diseases Act, and Mines Health and Safety Act.
Environmental
Source: Safety, Health, Environment and Quality SHEQ Policy.pdfEskom commits to proactively managing its environmental footprint, minimising pollution and degradation, pursuing a low-carbon future, prioritising energy and water efficiency, and transitioning to a cleaner energy mix. Sustainable use of resources, climate change mitigation and adaptation, and protection of biodiversity and ecosystems are required. Environmental management systems must align with ISO 14001. The policy references the National Environmental Management Act and Eskom's Climate Change Policy (240-77569976). Zero environmental incidents is a Zero Harm target.
Submission Guidelines
Source: 20. Annexure B.pdf (unknown)Returnable documents:
Compliance Requirements
Source: 20. Annexure B.pdf (unknown)OHS compliance requirements:
Health & Safety
Source: 20. Annexure B.pdfOHS legal and other requirements (summary):
Contractual Terms
Source: 20. Annexure B.pdfContractual terms for management of contractors/suppliers:
Description
Source: Integrity Pact Declaration Form_ANNEXURE A - Copy.pdfThe tender is for the supply, delivery and refurbishment or services of Fly Ash samplers for Eskom in the Eastern Cape. The document provided is the Integrity Declaration Form (Annexure A) which forms part of the returnable documents.
Submission Guidelines
Source: Integrity Pact Declaration Form_ANNEXURE A - Copy.pdf (RFP)Returnable forms — all must be completed, signed and submitted with the bid:
Disqualification risks:
Evaluation Criteria
Source: Integrity Pact Declaration Form_ANNEXURE A - Copy.pdf (RFP)Bidders must complete and sign the Annexure A – Integrity Declaration Form. Bidders must declare any interest or relationship with Eskom or state employees/directors. Bidders must confirm they are not listed on National Treasury's Database of Restricted Suppliers or Register for Tender Defaulters, and have no fraud/corruption convictions in the past five years. Joint ventures must provide a joint venture agreement with joint and several liability and lead partner authority.
Compliance Requirements
Source: Integrity Pact Declaration Form_ANNEXURE A - Copy.pdf (RFP)Mandatory compliance documents:
Declarations required:
Section
Source: Integrity Pact Declaration Form_ANNEXURE A - Copy.pdfEvaluation will include verification of the Integrity Declaration Form completeness and truthfulness. Bidders found to have made false declarations, or who are listed on restricted supplier databases, or have relevant convictions, will be disqualified. Joint venture submissions will be assessed for compliance with the joint and several liability requirement and lead partner authorisation.
Description
Source: 240-68099512 Form A_Cat 2_ Rev 9.docxDescription: The tenderer must complete and sign Form A to acknowledge and accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001 standard.
Submission Guidelines
Source: 240-68099512 Form A_Cat 2_ Rev 9.docx (unknown)Returnable form: Form A (Supplier Quality Requirements Acknowledgement) must be completed and signed, acknowledging Eskom Supplier Quality Requirements per specification 240-105658000 and ISO 9001. Category 2 (clause 3.5.3) must be selected for pre-contract award quality requirements. Tenderer's quality representative details must be provided.
Technical Specifications
Source: 240-68099512 Form A_Cat 2_ Rev 9.docx (unknown)The tender is for the supply, delivery, and refurbishment or services of Fly Ash samplers. Bidders must comply with Eskom Supplier Quality Requirements per specification 240-105658000 and ISO 9001. Pre-contract award quality requirements: Category 2 (clause 3.5.3) applies. Post-contract award requirements include contract execution (clause 3.7.1) and supplier quality performance monitoring (clause 3.7.2). Standard conditions cover Eskom rights of access, rights to information, preservation, quality audits, management of nonconformities, and special processes. All ISO 9001 clauses (4-10) and quality principles (1-7) are applicable.
Compliance Requirements
Source: 240-68099512 Form A_Cat 2_ Rev 9.docx (unknown)Bidders must acknowledge and accept Eskom Supplier Quality Requirements per specification 240-105658000 and ISO 9001, including Category 2 pre-contract award quality requirements. No other compliance requirements (CSD registration, tax clearance, B-BBEE, CIDB) are specified in this document.
Contact Information
Source: Supplier Declaration of Interest.pdf (unknown)No contact information is provided in the document.
Submission Guidelines
Source: Supplier Declaration of Interest.pdf (unknown)The completed Supplier Declaration of Interest form must be submitted as a returnable document with the tender or quotation. The form must be signed and dated by the supplier. No other submission details are provided in the document.
Evaluation Criteria
Source: Supplier Declaration of Interest.pdf (unknown)No evaluation criteria are specified in the document. The declaration is a compliance requirement, not an evaluation criterion.
Financial Requirements
Source: Supplier Declaration of Interest.pdf (unknown)No financial requirements are specified in the document.
Contact Information
Source: Technical evalution criteria.pdf (unknown){
"scmContact": null,
"technicalContact": null
}
Submission Guidelines
Source: Technical evalution criteria.pdf (unknown)Returnable documents must be submitted as per the tender instructions. Required forms include:
Evaluation Criteria
Source: Technical evalution criteria.pdf (unknown)Technical evaluation (100% total, threshold 70%):
B-BBEE evaluation: 80/20 preference point system (80 points price, 20 points B-BBEE). Bidders must submit a valid B-BBEE certificate or sworn affidavit.
Financial Requirements
Source: Technical evalution criteria.pdf (unknown)No specific financial requirements (e.g., bid security, guarantees, retention) are stated in the document. Pricing must be in South African Rand and include all applicable taxes. Bidders must provide a valid B-BBEE certificate or affidavit as per the 80/20 preference point system.
Contact Information
Source: Fly Ash or Cegrit Sampler Supply and Service SOW-signed.pdf (unknown){
"content": "No contact information is provided in the document."
}
Submission Guidelines
Source: Fly Ash or Cegrit Sampler Supply and Service SOW-signed.pdf (unknown){
"content": "Submission channel, format, and returnable documents are not fully specified in the source. The only returnable document mentioned is the 'Returnable Documents' section, but its contents are not detailed. No other submission instructions (e.g., number of copies, packaging, closing date/time) are stated in the document."
}
Evaluation Criteria
Source: Fly Ash or Cegrit Sampler Supply and Service SOW-signed.pdf (unknown)Content
No specific evaluation criteria (e.g., weighting, minimum scores) are stated in the document. The only pre-qualification criterion mentioned is that no other pre-qualification criteria are stated. B-BBEE requirements are not detailed in the source.
Contractual Terms
Source: Fly Ash or Cegrit Sampler Supply and Service SOW-signed.pdfContract period: 36 months, as-and-when-required basis.
Section
Source: Fly Ash or Cegrit Sampler Supply and Service SOW-signed.pdfNo additional evaluation criteria are stated beyond the general requirement to comply with safety and quality standards.
Submission Guidelines
Source: E-Tenderers E-Tendering Training Acknowledgement Form - Copy.pdf (unknown)Mandatory returnable: E-Tendering Training Acknowledgement Form (Template ID: 240-9722574 Rev 1) – confirms bidder has completed e-tendering training and can operate the e-tendering solution.
Form must be fully completed and submitted within the prescribed period; failure to do so renders the bidder non-responsive and disqualified.
No submission method, address, or number of copies specified in this document.
Returnable Documents
Source: E-Tenderers E-Tendering Training Acknowledgement Form - Copy.pdf (unknown)E-Tendering Training Acknowledgement Form (Template ID: 240-9722574 Rev 1) is a mandatory returnable document. The bidder must confirm they have completed e-tendering training (via the Noddy Guide, video, or clarification meeting) and are able to operate the e-tendering solution. The form must be fully completed, signed, and submitted within the prescribed period; failure to do so will render the bidder non-responsive and disqualified.
Evaluation Criteria
Source: E-Tenderers E-Tendering Training Acknowledgement Form - Copy.pdf (unknown)The bid will be evaluated only after the mandatory E-Tendering Training Acknowledgement Form is submitted. Failure to submit the form within the prescribed period results in automatic disqualification (non-responsive).
No other evaluation criteria, minimum qualifying scores, or preference point system (80/20 or 90/10) are stated in this document.
Description
Source: Local Content Annex C, D, E supplier to complete and send back at tender closing date - Copy.xlsThe document consists of three Excel annexures (Annex C, Annex D, Annex E) for local content declaration. Annex C calculates local content as a percentage of total tender value net of exempted imported content. Annex D captures imported content details (direct imports, third-party imports, other foreign currency payments). Annex E summarises local content by item, including factory overheads, administration overheads, manpower costs, and local vs imported value. Designated products are steel, electric cables and telecom cables with specified minimum local content thresholds. VAT is excluded from all calculations.
Submission Guidelines
Source: Local Content Annex C, D, E supplier to complete and send back at tender closing date - Copy.xls (unknown)Returnable documents:
All annexures must be completed and submitted at tender closing date.
Evaluation Criteria
Source: Local Content Annex C, D, E supplier to complete and send back at tender closing date - Copy.xls (unknown)Bids will be evaluated on compliance with local content requirements. Bidders must declare imported content and foreign currency payments. Local content percentages must meet or exceed the designated thresholds (steel 100%, electric cables 90%, telecom cables 90%). No further evaluation criteria (price/functionality split, minimum qualifying score, preference point system) are stated in the provided document.
Technical Specifications
Source: Local Content Annex C, D, E supplier to complete and send back at tender closing date - Copy.xls (unknown)Supply, delivery and refurbishment or services of Fly Ash samplers.
Designated products with minimum local content thresholds:
VAT must be excluded from all calculations.
Financial Requirements
Source: Local Content Annex C, D, E supplier to complete and send back at tender closing date - Copy.xls (unknown)Pricing must be completed in the annexures (Annex C, D, E) using the prescribed formats. All values exclude VAT. Tender exchange rate must be declared. No bid security, bonds, guarantees, retention or payment terms are specified in the provided document.
Compliance Requirements
Source: Local Content Annex C, D, E supplier to complete and send back at tender closing date - Copy.xls (unknown)Local content compliance is mandatory for designated products (steel 100%, electric cables 90%, telecom cables 90%). Bidders must complete and submit Annex B, C, D and E. No CSD registration, tax clearance, B-BBEE, CIDB, CIPC or professional registration requirements are stated in the provided document.
Compliance Requirements
Source: BEE_Affidavit-EME-Gen.pdf - 08 Sept 2020.pdf (unknown)B-BBEE Exempted Micro Enterprise (EME) sworn affidavit template for general enterprises.
Contact Information
Source: BEE_Affidavit-QSE-Gen.pdf - 08 Sept 2020.pdf (unknown){
"name": null,
"role": null,
"email": null,
"phone": null,
"department": null,
"address": null
}
Submission Guidelines
Source: BEE_Affidavit-QSE-Gen.pdf - 08 Sept 2020.pdf (unknown)Returnable documents include the completed BEE affidavit (SBD 6.2 or equivalent) and any other forms as specified in the tender. The affidavit must be completed, signed, and submitted with the quotation. The enterprise must select the appropriate ownership category (Member, Director, Owner) and provide all required enterprise details. The affidavit must be sworn before a Commissioner of Oaths, and the deponent and Commissioner must sign on the same date.
Evaluation Criteria
Source: BEE_Affidavit-QSE-Gen.pdf - 08 Sept 2020.pdf (unknown)Evaluation is based on the accuracy and completeness of the BEE affidavit. The affidavit must correctly state the Black ownership percentage and B-BBEE level. The enterprise must meet the QSE definition and provide the required supporting information. No points are allocated for price or functionality; the focus is on compliance with the BEE affidavit requirements.
Financial Requirements
Source: BEE_Affidavit-QSE-Gen.pdf - 08 Sept 2020.pdf (unknown)No bid security, guarantees, or retention are specified. The enterprise must provide its VAT number if applicable. The affidavit must be based on the latest financial year-end, with annual total revenue stated. No payment terms or turnover thresholds are mentioned beyond the QSE revenue range.
Description
Source: 20. Eskom life-saving rules.pdfEskom Life-Saving Rules (document 240-62196227, revision 6) – a mandatory safety standard applying to all Eskom Holdings SOC Ltd sites, divisions, subsidiaries, contractors, consultants, agents and visitors.
Purpose: Clarifies the five most prominent causes of serious injuries and fatalities at Eskom and enforces zero tolerance for non-adherence.
Scope: Applies throughout Eskom Holdings SOC Limited and its controlled entities unless specifically exempted by Sustainability Systems.
Normative references (21 documents): Include ISO 9001, Eskom Substance Abuse Procedure (32-37), Incident Management Procedure (32-95), Contractor Health and Safety Requirements (32-136), Vehicle Safety Specification (32-345), Working at Heights Standard (32-418), Plant Safety Regulations (36-681), Disciplinary Code (32-1112), Disciplinary Procedure (32-1113), PPE Specification (240-44175132), Vehicle and Driver Safety Management Procedure (240-62946386), Right to Refuse Procedure (240-43848327), Medical Surveillance Procedure (240-84733329), PPE for Working at Heights Specification (240-100979499), and others.
Informative references: National Road Traffic Act, Occupational Health and Safety Act, Earthing Standard (34-104).
Key definitions: Contractor (any person formally contracted by Eskom, including consultants, vendors, suppliers, agents, JVs, subcontractors), Life-saving Rule (violation leads to disciplinary process per Eskom Disciplinary Code), Visitor, Work at height, Zero Tolerance.
Roles: Sustainability Systems Department compiles/reviews rules, develops awareness material, communicates rules, monitors compliance, consolidates violations. Group/Divisional/Operating Unit management implements rules, communicates importance, ensures awareness material displayed, obtains signed confirmations, investigates violations within 5 working days, applies sanctions consistently. All employees (Eskom and contractors) must observe rules, avoid shortcuts, perform only authorised work, exercise right to refuse unsafe work.
Monitoring: Line management monitors compliance, reports through performance reporting; amendments implemented immediately, auditable after 6 months.
Health & Safety
Source: 20. Eskom life-saving rules.pdfEskom Life-Saving Rules – five zero-tolerance safety rules mandatory for all employees, contractors, consultants, agents and visitors at Eskom sites:
Rule 1 – Open, Isolate, Test, Earth, Bond and/or Insulate Before Touch: No person may work on or near electrical apparatus unless trained and authorised, a valid permit to work exists (where required), a pre-task risk assessment has been conducted, correct isolation procedure is followed, the authorised person (team leader) has certified and shown the apparatus is safe, the electrical environment is made safe, and appropriate PPE (including face shield and insulated gloves for low voltage) is worn.
Rule 2 – Hook Up at Heights: No person may work at height with fall risk unless medically fit, a pre-task risk assessment has been conducted, appropriately trained, secured during ascending/descending, and using an Eskom-approved fall arrest system where applicable. Preference must be given to ground-level work where reasonably practicable.
Rule 3 – Buckle Up: Proper wearing of seat belts is mandatory for driver, operator and all passengers in all vehicles/equipment used for Eskom business, on any road or parking lot, irrespective of speed or direction of travel. Driver is responsible for ensuring compliance.
Rule 4 – Be Sober: No person under the influence of intoxicating liquor or drugs (any level of alcohol or impairing substances) may enter or remain on an Eskom site, conduct Eskom business, or drive/operate vehicles/equipment for Eskom purposes.
Rule 5 – Ensure Permit to Work: No work without required Permit to Work (PTW) governed by Plant Safety Regulations, Operating Regulations for High Voltage Systems (ORHVS), or other permit-required activities. No plant returned to service without cancellation of all permits unless permission granted for redundant systems. Live work requires a live work declaration form completed by the authorised person.
Consequences of violation: Treated as serious misconduct under Eskom Disciplinary Code and Procedure. Zero tolerance stance. Contractor violations may result in suspension of contractor activities. Contractor must immediately remove employee from site, investigate and initiate disciplinary process within 5 working days, and furnish Eskom with a copy of the sanction.
Monitoring: Line management monitors compliance, reports through performance reporting; amendments implemented immediately, auditable after 6 months.
Section
Source: 20. Eskom life-saving rules.pdfThe document lists two normative references only: ISO 9001 Quality Management Systems and Eskom document 32-727 Safety, Health, Environment and Quality Policy. No tender evaluation criteria, scoring, or preference point system are present.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Arnot Power Station - middelburg - rietkuil - 1097
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
22
Last checked
25 Sept 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Get deep intelligence on Other service activities. Unlock full pricing strategies, bid frequency, and historical win rates.
Learn how to submit a winning bid with these related articles
💡 Want more tendering tips and strategies?
Explore Our Blog