Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
KUSILE POWER STATION - EMALAHLENI/VICTOR KHANYE - EMALAHLENI/VICTOR KHANYE - 1035
Organization Type
GOVERNMENT
Published
06 Oct 2026
OCDS Reference
ocds-9t57fa-172930
Supply, delivery and installation of additional mass meters at kusile power station in mpumalanga. The scope covers procurement for eskom's coal-fired power plant, requiring bidders to provide metering equipment and associated installation services. The only document provided is an ESKOM authorisation form, so critical tender details such as technical specifications, pricing structure, evaluation criteria and mandatory briefings are not available from this source. Bidders should obtain the full tender pack from eskom's procurement portal to assess eligibility and prepare a compliant submission.
Closing date: 6 November 2026 at 10:00
Returnable form: Eskom Authorisation Form (240-15811258 Rev 2, effective 8 November 2024) — mandatory for all bidders
Legal structure documentation: certified board resolution (companies), members' resolution (close corporations), partnership signatures (partnerships), JV agreement with power of attorney and joint and several liability clause (joint ventures), or trustees' resolution (trusts)
Signatory authority: the named authorised representative must have power to submit the tender and sign all related documents and any resulting contract
Signatory details required: full name, designation, capacity, signature and date in the mandatory table
Note: the provided document is only an authorisation form — bidders must source the complete tender documentation (technical specifications, pricing schedule, evaluation criteria, SBD forms, and returnable documents list) directly from Eskom before bidding
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Friday, 06 November 2026 - 10:00
Venue
KUSILE POWER STATION
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Categories
Request for Bid(Open-Tender)
KUSILE POWER STATION - EMALAHLENI/VICTOR KHANYE - EMALAHLENI/VICTOR KHANYE - 1035
Recommended Certifications
Having these can improve your winning chances: SABS Product Certification, NRCS Certification
AI Document Analysis Stages
Description
06 Oct
2026
Tender Published
Tender was published
06 Nov
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
KUS-20250803 Kusile Power Station OHS Specification for Additional Mass Meters Scope of Work Rev 1 (002) (002).pdf
string or null
Non-Disclosure Agreement (NDA) Vendors Template - 02 September 2024.pdf
Supply, delivery and installation of additional mass meters at Kusile Power Station for Eskom Holdings SOC Ltd.
Authorisation Form - 08 November 2024.pdf
Analysis completed but response format was invalid
SBD 6.1 Preference Points Claim Form in terms of The PPR 2022.pdf
ESKOM invites proposals for the supply, delivery and installation of additional mass meters at the Kusile Power Station in Mpumalanga province. The tender closes on Friday, 6 November 2026 at 10:00 GMT+0000.
Eskom - Standard Conditions of Tender (February 2022).pdf
Supply, delivery and installation of additional mass meters at Kusile Power Station in Mpumalanga, procured by Eskom Holdings Ltd. The work involves provision of mass flow metering equipment along with associated delivery and installation services at the power station site.
Labour Taxation Questionnaire.pdf
Supply, delivery and installation of additional mass meters at Kusile Power Station in Mpumalanga, with a closing date of 6 November 2026 at 10:00 UTC.
240-12248652_Catergory 3 List of Tender Returnables Rev 7.pdf
Supply, delivery and installation of additional mass meters at Kusile Power Station for Eskom.
SBD 6.2 - Declaration Certificate for Local Production and Content for Designated Sectors - 14 March 2025 (1).pdf
Supply, delivery and installation of additional mass meters at Kusile Power Station for ESKOM in Mpumalanga province, closing on 6 November 2026 at 10:00 GMT+0000.
Supplier Declaration of Interest.docx
Analysis completed but response format was invalid
Supplier Evaluation Pack Template for 01 March 2025 to 29 February 2026.xls
Supply, delivery and installation of additional mass meters at Kusile Power Station, Mpumalanga, issued by ESKOM. Closing date is 6 November 2026 at 10:00.
20210603_communication_Labour Taxation Questionnaire.pdf
Supply, delivery and installation of additional mass meters at Kusile Power Station. The works are for Eskom's Kusile Power Station in Mpumalanga.
240-68099512 Form A_Cat 3_ Rev 9.docx
Supply, delivery and installation of additional mass meters at Kusile Power Station. Bidders must complete and sign the Eskom Supplier Quality Requirements form.
SBD 4 - Tenderer's Disclosure.pdf
Supply, delivery and installation of additional mass meters at Kusile Power Station for Eskom Holdings SOC Ltd. The procurement is located in Mpumalanga province with a closing date of 6 November 2026 at 10:00.
Integrity Declaration Form.pdf
Procurement of additional mass meters for Kusile Power Station at Kusile Power Station, Mpumalanga. ESKOM is inviting proposals for supply, delivery and installation of additional mass meters at the Kusile Power Station.
Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.doc
The department requires supply, delivery and installation of additional mass meters at Kusile Power Station for Eskom. Bidders must complete the PAYE Questionnaire (Evaluation Pack A for companies/close corporations/trusts or Evaluation Pack B for individuals) and provide the required signed affidavits.
SBD 1 - Part A Invitation to Bid.pdf
Eskom invites bids for the supply, delivery and installation of additional mass meters at Kusile Power Station. Bidders must submit their proposals by 06 November 2026 at 10:00 GMT.
Environmental requirement_.pdf
Analysis completed but response format was invalid
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 720 068
Range
Based on 10 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Project: Supply, delivery and installation of additional mass meters at Kusile Power Station.
Scope is multidisciplinary: mechanical (idler frames, idlers, weighbridge structures), control and instrumentation (integrators, speed switches, control and communication cables), electrical (power supply cabling).
Reference scope document: KUS-20250302 Kusile Power Station for Additional Mass Meters Supply Scope of Works.
Awarded contractor designated as 'Main contractor'; sub-contractors appointed by main contractor.
High-risk category per risk category template.
Project address: Kusile Power Station, R45 Kendal/Balmoral Road, Haartebeesfontein Farm.
Document: KUS-20250803 Rev 1 OHS Specification for Additional Mass Meters Scope of Work.
Effective: August 2025; Review: August 2030.
Template: 32-726-03T Rev 1.
Applicable to any contracting organisation responding to tender/enquiry for this scope.
Important Dates
Source: KUS-20250803 Kusile Power Station OHS Specification for Additional Mass Meters Scope of Work Rev 1 (002) (002).pdf (unknown)Closing date: 6 November 2026 at 10:00
Safety file submission deadline: 2 weeks before agreed project commencement date
Document effective date: August 2025
Document review date: August 2030
Contact Information
Source: KUS-20250803 Kusile Power Station OHS Specification for Additional Mass Meters Scope of Work Rev 1 (002) (002).pdf (unknown)Eskom Contract's Manager: Zanele Kubheka
Eskom Health and Safety Manager: Thobile Yonga
Eskom Procurement Manager: Nonhlanhla Mthembu
Eskom Safety Officer: Winnie Sithole
Project address: Kusile Power Station, R45 Kendal/Balmoral Road, Haartebeesfontein Farm
Submission Guidelines
Source: KUS-20250803 Kusile Power Station OHS Specification for Additional Mass Meters Scope of Work Rev 1 (002) (002).pdf (unknown)Safety file package must be submitted to the OHS department 2 weeks before the agreed project commencement date.
OHS department will assess and provide written feedback.
Safety file approval is by written letter authorising site establishment.
Section 37(2) agreement must be signed between Eskom Kusile Power Station and the main contractor at time of safety file submission.
Main contractor must ensure section 37(2) agreements are in place with all appointed contractors.
Original section 37(2) agreement retained by contractor; copy retained by project manager/end user.
All agreements must form part of respective contractor's OHS file.
Organisational organogram on company letterhead required from main contractor (CE to supervisors) signed off by 16(1) or 16(2) appointee.
Appointed contractors must provide organograms on company letterhead signed off by 16(1) or 16(2).
OHS plan must be approved by Kusile project manager/contract manager in writing before submission to OHS department.
Medical certificates of fitness, identification documents, and competency certificates must be part of safety file package.
Job descriptions supported by proof of competencies for all employees required.
Applicable legal appointments with competency certificates per appointment must form part of safety file.
Valid letter of good standing (COID) must be filed in contractor OHS files and remain valid throughout contract period.
Covid-19 policy signed by most senior person must be submitted, displayed prominently, filed in OHS files, and attached as annexure to OHS Plan.
Covid-19 risk assessment and detailed prevention plan required.
OHS plan must be detailed, suitable, practical, site-specific, well-documented, and aligned to scope of work.
OHS plan must describe assignment of responsibilities, procedures, actions for implementation and maintenance, and management of deviations/non-conformances.
Test certificates of lifting equipment no older than 3 months required.
Critical lifting equipment documentation (annual load tests, rope tests, hook block inspections, 6-monthly inspections, operator certification, drivers' licences, daily crane inspections, 3-monthly lifting tackle inspections) must be available before commencement.
Appointed contractor for lifting equipment maintenance must be registered as Lifting Machines Entity (LME) with DEL.
Written method statement signed by Kusile Contract Manager and Appointed Contractor required for lifting activities.
At least two contractor employees per team trained on FAS Rescue (Unit Standards 229995 & 229998).
Supervisor must conduct planned task/job observations and submit weekly reports to OHS department.
Contractor must identify suitable PPE and appropriate tools for activities.
Technical Specifications
Source: KUS-20250803 Kusile Power Station OHS Specification for Additional Mass Meters Scope of Work Rev 1 (002) (002).pdf (unknown)Scope: Supply, delivery and installation of additional mass meters at Kusile Power Station.
Multidisciplinary scope: mechanical (idler frames, idlers, weighbridge structures), control and instrumentation (integrators, speed switches, control and communication cables), electrical (power supply cabling).
Reference scope of work document: KUS-20250302 Kusile Power Station for Additional Mass Meters Supply Scope of Works.
Contractor awarded contract designated as 'Main contractor'; sub-contractors appointed by main contractor.
High-risk category per risk category template.
Crane and lifting equipment requirements:
Statutory appointments required per OHS Act:
Non-statutory appointments required:
Health & Safety Representative competencies: General H&S Training, H&S Representative Training, HIRA Training, Incident Investigation & Root Cause Analysis Training.
Supervisor competencies: 3 years applicable experience, accredited supervisor safety course, General H&S course, Incident Investigation & Root Cause Analysis Training, HIRA Training, FAS Rescue (Unit Standard 229995).
Safety Officer competencies: OH&S Act & Regulations, COID Act, Incident Investigation & Root Cause Analysis, HIRA Training, Emergency Preparedness Coordination Training.
Life-Saving Rules (7 rules):
Substance abuse: 0% allowable alcohol/drug level; testing before work commencement; results confidential in personal file; compliance with Eskom procedure 32-37.
COVID-19: Policy signed by most senior person; risk assessment and prevention plan required; compliance with National Disaster Management Act; Compliance Officer appointment; PPE list subject to Eskom approval; costs not for profit; costs cease when pandemic declared over.
COID: Valid letter of good standing from compensation commissioner required throughout contract.
OHS costing: Itemised for training, PPE, safety equipment, occupational hygiene surveys, medical surveillance.
Risk assessment: Baseline risk assessment part of OHS plan with monitoring and review plan; task-specific baseline risk assessment required; submitted to safety representative for comment and approval.
Safe work procedures/method statements required.
Fire equipment: Clearly labelled, conspicuously numbered, registered, monthly inspection by competent person, annual service by registered company.
Flammable/combustible liquids: Refuelling only in designated safe areas with warning signs; drip trays at filling nozzle.
First aid: GSR 3 compliance; relevant unit standard competency; accessible for immediate treatment; notice with first aider contact details; boxes available after hours; specified contents; kept clean and dust-free.
OHS communication: Contractor must indicate communication methods, mediums, and effectiveness measurement; OHS standing agenda item at project meetings; minutes filed and accessible; Health and Safety Committee meetings with defined agenda; minutes completed during meeting.
Toolbox talks/daily team talks/pre-job meetings required.
OHS training and general training requirements.
Contractor site establishment requirements.
Site roads, vehicle management, housekeeping, stacking and storage, workplace signage and colour coding, ladders, scaffolding, auditing, smoking, cellular phones, occupational health/hygiene/rehabilitation, working at heights, confined spaces, lifting operations, PPE requirements, incident investigation, emergency management, non-conformance and compliance, OHS files, work stoppage, hours of work, omissions, contract sign-off, barricading, contractor/supplier management KPIs.
Methodology
Source: KUS-20250803 Kusile Power Station OHS Specification for Additional Mass Meters Scope of Work Rev 1 (002) (002).pdfSafe work procedures/method statements required for all identified hazards.
Method statements must detail key activities to reduce hazards identified in risk assessments.
Written method statement signed by Kusile Contract Manager and Appointed Contractor required for lifting activities.
Risk assessment must be submitted to safety representative for comment and approval.
Where no safe work procedures exist, they must be recorded and drawn up.
Method statements must be developed and applied for lifting operations.
Pre-job meetings held prior to day's work with all relevant employees.
Toolbox talks: team leader shares tasks, discusses allocation, identified risks, control measures; documented agreed strategy.
Daily team talks/pre-job meetings required.
OHS plan must detail how health and safety implemented on site per scope of work.
Supervisor conducts planned task/job observations and submits weekly reports.
Work at heights: fall protection plan required (documented plan of risks, procedures, methods to eliminate risk).
Confined spaces: specific requirements per section 3.37.
Lifting operations: general safety requirements per section 3.38.
Emergency management: emergency preparedness coordination required.
Incident investigation: root cause analysis technique training required for appointments.
Quality Management
Source: KUS-20250803 Kusile Power Station OHS Specification for Additional Mass Meters Scope of Work Rev 1 (002) (002).pdfOHS plan must be suitable, practical, site-specific, well-documented, and workable.
OHS plan aligned to scope of work in suitability and adequacy.
OHS plan must detail health and safety implementation, legal/other requirements.
OHS plan must describe assignment of responsibilities, procedures, actions for implementation/maintenance.
OHS plan must include management of deviations/non-conformances.
OHS plan approved by Kusile project manager/contract manager before OHS department submission.
Risk assessment: baseline risk assessment part of OHS plan with monitoring/review plan.
Task-specific baseline risk assessment required.
Risk assessment submitted to safety representative for comment and approval.
Safe work procedures/method statements developed where none exist.
Auditing requirements per section 3.31.
Non-conformance and compliance management per section 3.42.
OHS files maintenance per section 3.43.
Contractor/supplier management KPIs per section 3.50.
Incident investigation per section 3.40.
Emergency management per section 3.41.
Health and Safety Committee meetings: minutes with action items, target dates, responsible persons; statutory minutes kept for project duration or minimum 3 years; non-statutory minutes kept for project duration or minimum 12 months; other OHS meeting minutes kept minimum 12 minutes; original minutes signed by chairperson.
Pricing Schedule
Source: KUS-20250803 Kusile Power Station OHS Specification for Additional Mass Meters Scope of Work Rev 1 (002) (002).pdfOHS costing must be itemised based on overall project scope covering: training, provision of PPE, safety equipment purchases, occupational hygiene surveys, medical surveillance.
COVID-19 costs itemised separately; not for profit; Eskom reserves right to accept/decline PPE list; costs cease when pandemic declared over.
No bill of quantities, pricing schedule, or payment terms detailed in this OHS specification document.
Financial capacity/turnover requirements not specified in this document.
Financial Requirements
Source: KUS-20250803 Kusile Power Station OHS Specification for Additional Mass Meters Scope of Work Rev 1 (002) (002).pdf (unknown)OHS costing must be itemised based on overall project scope covering: training, provision of PPE, safety equipment purchases, occupational hygiene surveys, medical surveillance.
COVID-19 costs not for profit; Eskom reserves right to accept/decline PPE list; costs applicable for pandemic duration only.
Compliance Requirements
Source: KUS-20250803 Kusile Power Station OHS Specification for Additional Mass Meters Scope of Work Rev 1 (002) (002).pdf (unknown)CSD registration and valid tax compliance status (implied standard requirement).
B-BBEE: Minimum Level 1 (from currentAnalysis).
COID: Registration with compensation commissioner and valid letter of good standing throughout contract period.
OHS Act: Up-to-date copy of Act and regulations available to all employees.
Legislative compliance: Constitution (Section 24), OHS Act 1993 and Regulations, National Environmental Management Act 1998, Environment Conservation Act 1989, National Water Act 1998, Civil and Building Work Act, National Road Traffic Act, COID Act, applicable SANS standards.
Section 37(2) agreements: Eskom-main contractor and main contractor-appointed contractors.
Statutory appointments per OHS Act with competent persons.
Non-statutory appointments per Eskom requirements.
Life-Saving Rules compliance mandatory.
Substance abuse: 0% alcohol/drugs; ad hoc testing; procedure 32-37 compliance.
COVID-19: Policy, risk assessment, prevention plan, Compliance Officer, National Disaster Management Act compliance.
Crane/lifting equipment: SETA training, certification, supervision, test certificates, maintenance, documentation, LME registration.
FAS Rescue training (Unit Standards 229995 & 229998) for at least 2 employees per team.
Medical certificates of fitness valid for 1 year from registered occupational health practitioner.
OHS plan approval by Kusile project manager/contract manager before OHS department submission.
Organisational organograms signed by 16(1) or 16(2) appointee.
Job descriptions with proof of competencies.
Legal appointments with competency certificates.
Machine category, code number, description annotation (e.g., Code F11).
First aid per GSR 3 with specified contents.
Fire equipment serviced by registered company.
Refuelling in designated areas with drip trays.
OHS communication system with effectiveness measurement.
Health and Safety Committee meetings with minutes and action items.
Toolbox talks, pre-job meetings.
Site establishment, roads, vehicle management, housekeeping, stacking/storage, signage, ladders, scaffolding, auditing, smoking, cellular phones, occupational health/hygiene/rehabilitation, working at heights, confined spaces, lifting operations, PPE, incident investigation, emergency management, non-conformance, OHS files, work stoppage, hours of work, barricading, KPIs.
Child labour prohibition per Constitution and OHS Act Regulations on Hazardous Work by Children.
Health & Safety
Source: KUS-20250803 Kusile Power Station OHS Specification for Additional Mass Meters Scope of Work Rev 1 (002) (002).pdfThis is the primary OHS specification document for the Additional Mass Meters Scope of Work at Kusile Power Station.
All requirements detailed in technicalSpecifications and complianceRequirements sections above.
Document effective August 2025, review August 2030.
Template identifier: 32-726-03T Rev 1.
Document identifier: KUS-20250803 Rev 1.
Controlled disclosure: uncontrolled when downloaded; user responsible for authorised version.
Copyright: Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
54 pages total.
Applicable to any contracting organisation responding to additional mass meters tender/enquiry.
Contractor must develop OHS plan meeting specification and all applicable legislation.
Eskom does not assume contractor's legal responsibilities.
Contractor accountable for health and safety programme for employees and appointed contractor employees.
Minimum requirements only; not all-encompassing.
Organisational OHS requirements not superseded; must be listed in OHS plans.
Additional Eskom/legislative requirements in specification must be addressed.
Environmental
Source: KUS-20250803 Kusile Power Station OHS Specification for Additional Mass Meters Scope of Work Rev 1 (002) (002).pdfLegislative compliance includes: National Environmental Management Act 1998, Environment Conservation Act 1989, National Water Act 1998.
Constitution Section 24 (Bill of Rights) - environmental rights.
Duty of care to environment: prevent pollution/degradation; minimise and rectify if authorised or unavoidable.
Environmental Management referenced in Health and Safety Committee agenda.
SANS standards applicable to project must be used.
Plant Safety Regulations referenced.
No specific environmental impact assessment or sustainability requirements detailed beyond legislative compliance.
Contractual Terms
Source: KUS-20250803 Kusile Power Station OHS Specification for Additional Mass Meters Scope of Work Rev 1 (002) (002).pdf (unknown)Eskom Kusile Power Station reserves the right to terminate the contract for safety non-compliance.
Section 37(2) agreement must be signed between Eskom and main contractor at safety file submission.
Main contractor must ensure section 37(2) agreements with all appointed contractors.
Original agreements retained by contractor; copies retained by project manager/end user.
All agreements form part of respective contractor's OHS file.
OHS plan must be approved in writing by Kusile project manager/contract manager before OHS department submission.
Safety file approval by written letter authorises site establishment.
Contractor remains accountable for health and safety programme quality and execution.
Eskom does not assume contractor's legal responsibilities and liabilities.
OHS specification reflects minimum requirements, not all-encompassing.
Organisational requirements already in place must be listed in OHS plans.
Additional Eskom/legislative requirements in specification must be addressed.
Contractor must submit job descriptions with proof of competencies.
Applicable legal appointments with competency certificates required in safety file.
Machine category, code number, description annotation required (e.g., Code F11).
Work stoppage provisions apply.
Hours of work defined.
Omissions from safety specification do not relieve contractor of obligations.
Contract sign-off required.
Barricading requirements.
Contractor/supplier management KPIs apply.
Section
Source: KUS-20250803 Kusile Power Station OHS Specification for Additional Mass Meters Scope of Work Rev 1 (002) (002).pdfNo evaluation criteria, scoring split, preference point system (80/20 or 90/10), or minimum qualifying scores specified in this OHS specification document.
Evaluation criteria would be defined in the main tender document, not this OHS specification.
Contact Information
Source: Non-Disclosure Agreement (NDA) Vendors Template - 02 September 2024.pdf (unknown)Eskom Holdings SOC Ltd
Physical address: Megawatt Park, Maxwell Drive, Sunninghill Ext 3, Sandton
Postal address: P O Box 1091, Johannesburg 2000
Telephone: to be inserted by Eskom
Contact person: to be inserted by Eskom
Notices
Contractual Terms
Source: Non-Disclosure Agreement (NDA) Vendors Template - 02 September 2024.pdfConfidentiality obligations
Confidential Information scope
Receiving Party obligations
Permitted disclosure
Return or destruction
Exclusions from confidentiality
Breach and remedies
Amendments and assignment
Other provisions
Contact Information
Source: SBD 4 - Tenderer's Disclosure.pdf (RFP)Fraud and corruption reporting
Compliance Requirements
Source: SBD 4 - Tenderer's Disclosure.pdf (RFP)Returnable form
Disqualification
Important Dates
Source: 20210603_communication_Labour Taxation Questionnaire.pdf (unknown)Closing: 6 November 2026 at 10:00
Returnable Documents
Source: 20210603_communication_Labour Taxation Questionnaire.pdf (unknown)Appendix H — Contractors' PAYE Evaluation Questionnaire
Compliance Requirements
Source: 20210603_communication_Labour Taxation Questionnaire.pdf (unknown)Labour taxation compliance
Key assessment areas
Required evidence
Description
Source: 240-12248652_Catergory 3 List of Tender Returnables Rev 7.pdfSupply, delivery and installation of additional mass meters at Kusile Power Station, Mpumalanga. Document issued 21 August 2025.
Contact Information
Source: 240-12248652_Catergory 3 List of Tender Returnables Rev 7.pdf (TENDER)Eskom representative: Veronica Mpe
Returnable Documents
Source: 240-12248652_Catergory 3 List of Tender Returnables Rev 7.pdf (TENDER)Form A: completed and signed (mandatory, 1 point)
Evaluation Criteria
Source: 240-12248652_Catergory 3 List of Tender Returnables Rev 7.pdf (TENDER)Quality evaluation uses a scored checklist across five sections, with a total of 12 points available:
Section A — QMS documentation (7 points)
Section B — QMS in operation (2 points)
Section C — Contract Quality Plan (1 point)
Section D — Quality Control Plan (1 point)
Section E — Additional requirements (1 point)
Note: Category 3 quality requirements apply. Deliverables indicator = 1.
Technical Specifications
Source: 240-12248652_Catergory 3 List of Tender Returnables Rev 7.pdf (TENDER)Supply, delivery and installation of additional mass meters at Kusile Power Station, Mpumalanga.
Quality deliverables required:
Applicable standards: ISO 9001:2015, ISO 10005
Specification references: 240-105658000, 240-109253698, 240-109253302
Quality Management
Source: 240-12248652_Catergory 3 List of Tender Returnables Rev 7.pdf (TENDER)Category 3 quality requirements with ISO 9001:2015 compliance:
Required QMS documentation:
Operational evidence required:
Project-specific plans:
Additional: Form A completed and signed
Total quality score: 12 points
Compliance Requirements
Source: 240-12248652_Catergory 3 List of Tender Returnables Rev 7.pdf (TENDER)ISO 9001:2015 quality management system compliance required
Category 3 quality requirements apply
Form A must be completed and signed
Description
Source: 240-68099512 Form A_Cat 3_ Rev 9.docxEskom requires supply, delivery and installation of additional mass meters at Kusile Power Station in Mpumalanga.
This tender document is a quality requirements form (Form A, Category 3, Rev 9) extracted from the full tender pack. It establishes the quality management framework bidders must accept.
Key quality obligations
Form completion
Contact Information
Source: 240-68099512 Form A_Cat 3_ Rev 9.docx (unknown)Eskom quality representative
Technical Specifications
Source: 240-68099512 Form A_Cat 3_ Rev 9.docx (unknown)Scope: Supply, delivery and installation of additional mass meters at Kusile Power Station, Mpumalanga.
Quality requirements (Eskom Specification 240-105658000)
Post-contract award requirements
Standard conditions applicable
ISO 9001 requirements
Main supplier and sub-supplier capability and capacity assessment (clause 3.6): not indicated as applicable for this tender
Compliance Requirements
Source: 240-68099512 Form A_Cat 3_ Rev 9.docx (unknown)Quality compliance
Required form
Contact Information
Source: SBD 6.2 - Declaration Certificate for Local Production and Content for Designated Sectors - 14 March 2025 (1).pdf (TENDER)Fraud and corruption hotline
Note: No named SCM or technical contact person is stated in the extracted document.
Compliance Requirements
Source: SBD 6.2 - Declaration Certificate for Local Production and Content for Designated Sectors - 14 March 2025 (1).pdf (TENDER)Local content (SBD 6.2)
Required local content declarations
Calculation
Minimum threshold
Post-award
Disqualification risk
B-BBEE Requirements
Source: SBD 6.2 - Declaration Certificate for Local Production and Content for Designated Sectors - 14 March 2025 (1).pdf (TENDER)Local content declaration (SBD 6.2)
Compliance Requirements
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.doc (unknown)PAYE contractor classification questionnaire required for all service providers to Eskom.
Tax status determination
Key classification tests
Required affidavits and declarations (sign where applicable)
Consequence of non-compliance
Submission of completed pack
Description
Source: SBD 1 - Part A Invitation to Bid.pdfScope: supply, delivery and installation of additional mass meters at Kusile Power Station, Mpumalanga.
No further technical detail, quantities, or specifications recoverable from the extracted document.
Important Dates
Source: SBD 1 - Part A Invitation to Bid.pdf (TENDER)Closing date: 6 November 2026 at 10:00
No other dates (briefing, site visit, clarification deadline) stated in the extracted document.
Contact Information
Source: SBD 1 - Part A Invitation to Bid.pdf (TENDER)Fraud and corruption hotline: 0800 11 2722
Email: [email protected]
Bidding procedure enquiries:
Technical enquiries:
Submission address:
Service/delivery address:
Submission Guidelines
Source: SBD 1 - Part A Invitation to Bid.pdf (TENDER)Submission method: physical delivery to bid box only. Street address not stated in the extracted document — bidders must obtain the correct address from the Eskom procurement office.
Format requirements:
Returnable documents:
Disqualification risks:
Returnable Documents
Source: SBD 1 - Part A Invitation to Bid.pdf (TENDER)Tax compliance evidence:
Authority: proof of signatory authority (e.g. company resolution) required.
Evaluation Criteria
Source: SBD 1 - Part A Invitation to Bid.pdf (TENDER)Evaluation framework: Preferential Procurement Policy Framework Act, 2000 and Preferential Procurement Regulations.
Preference point system: not explicitly stated in the extracted document — likely 80/20 or 90/10 under PPPFA.
Minimum qualifying criteria (stated):
Evaluation stages: functionality/technical evaluation not detailed in extracted text; price and preference points apply under PPPFA.
Note: Specific scoring split, minimum qualifying score, and detailed weightings not recoverable from the provided document extract.
Technical Specifications
Source: SBD 1 - Part A Invitation to Bid.pdf (TENDER)Scope: supply, delivery and installation of additional mass meters at Kusile Power Station.
Location: Kusile Power Station, Mpumalanga province.
Quantities, specifications, standards, and service levels: not stated in the extracted document.
Financial Requirements
Source: SBD 1 - Part A Invitation to Bid.pdf (TENDER)Pricing format: not stated in extracted document.
Bid security, bonds, guarantees, retention: not stated.
Payment terms: not stated.
Financial capacity/turnover requirements: not stated.
Compliance Requirements
Source: SBD 1 - Part A Invitation to Bid.pdf (TENDER)Tax compliance:
CSD registration:
B-bbee:
CIDB: not applicable (supplies, not construction works).
Foreign supplier status:
State employment exclusion:
Returnable declarations:
Requirements
Source: SBD 1 - Part A Invitation to Bid.pdf (TENDER)Foreign supplier questionnaire — five mandatory disclosures:
Consequence: if "no" to all five, no TCS PIN required; CSD registration still required.
Section
Source: SBD 1 - Part A Invitation to Bid.pdf (TENDER)Fraud and corruption reporting: 0800 11 2722 / [email protected]
Bidding procedure and technical enquiry contacts: not completed in the extracted form — names, telephone numbers, facsimile numbers and email addresses are blank fields. Bidders must obtain these from Eskom's procurement office.
Important Dates
Source: Integrity Declaration Form.pdf (RFP)Document effective date: 21 February 2025
Review date: February 2030
Closing date and time are not stated in this document.
Contact Information
Source: Integrity Declaration Form.pdf (RFP)Fraud and corruption hotline: 0800 11 2722
Email: [email protected]
Named contacts, submission address and delivery address are not stated in this document.
Submission Guidelines
Source: Integrity Declaration Form.pdf (RFP)Returnable form required:
Submission method and closing details are not stated in this document.
Evaluation Criteria
Source: Integrity Declaration Form.pdf (RFP)This document does not contain evaluation criteria. The Integrity Declaration Form is a compliance returnable, not a scoring instrument.
Disqualification grounds stated in this form:
Compliance Requirements
Source: Integrity Declaration Form.pdf (RFP)Mandatory returnable:
Disclosures required:
Prohibitions checked:
Joint ventures: each JV member must complete the declaration separately.
Important Dates
Source: Supplier Declaration of Interest.docx (unknown)Closing date and time: 6 November 2026 at 10:00
Submission method: not stated in the available document extract — bidders must confirm channel with Eskom
Technical Specifications
Source: Supplier Declaration of Interest.docx (unknown)Scope: supply, delivery and installation of additional mass meters at Kusile Power Station, Mpumalanga
Note: the extracted document is a conflict-of-interest declaration template, not the technical specification. The full tender pack should contain detailed meter specifications, quantities, installation locations within Kusile, and commissioning requirements.
Compliance Requirements
Source: Supplier Declaration of Interest.docx (unknown)Returnable forms required:
CSD registration and tax compliance status: required as standard for all Eskom tenders — bidders must verify current status on the Central Supplier Database and with SARS.
Compliance Requirements
Source: Authorisation Form - 08 November 2024.pdf (unknown)Authorisation requirements (from the attached Eskom form):
Returnable Documents
Source: Labour Taxation Questionnaire.pdf (unknown)Appendix H — Contractors' PAYE Evaluation Questionnaire (Labour Taxation Questionnaire)
Compliance Requirements
Source: Labour Taxation Questionnaire.pdf (unknown)Tax compliance — PAYE
Key assessment areas
Representative obligation
Evaluation Criteria
Source: Environmental requirement_.pdf (unknown)Environmental evaluation
Technical Specifications
Source: Environmental requirement_.pdf (unknown)Scope: supply, delivery and installation of additional mass meters at Kusile Power Station, Mpumalanga
Environmental deliverables required:
Both documents must be signed by the company's CEO or COO where applicable
Compliance Requirements
Source: Environmental requirement_.pdf (unknown)Environmental compliance
Note: this document covers only environmental evaluation criteria. Other standard compliance requirements (CSD, tax, B-BBEE, CIDB) are not contained in this extract.
Environmental
Source: Environmental requirement_.pdfISO 14001:2015 Environmental Policy
Section
Source: Environmental requirement_.pdfMinimum qualifying threshold: 70% weighted average score required for tender to be considered
Description
Source: Eskom - Standard Conditions of Tender (February 2022).pdfScope: supply, delivery and installation of additional mass meters at Kusile Power Station, Mpumalanga. Tenderers must confirm via the Acknowledgement Form whether bidding for whole or part of the works/services/supply identified in the specification and/or works information.
Important Dates
Source: Eskom - Standard Conditions of Tender (February 2022).pdf (TENDER)Closing
Compulsory site visit/clarification meeting
Tender validity
Clarification deadline
Briefing Session
Source: Eskom - Standard Conditions of Tender (February 2022).pdf (TENDER)Compulsory site visit and/or clarification meeting mandatory; failure to attend disqualifies. Details in Tender Data.
Contact Information
Source: Eskom - Standard Conditions of Tender (February 2022).pdf (TENDER)Enquiries and communication
Submission address
Note: No named contact person, telephone number or email address appears in the provided document text.
Submission Guidelines
Source: Eskom - Standard Conditions of Tender (February 2022).pdf (TENDER)Submission method and packaging
Disqualification risks
Returnable forms
Returnable Documents
Source: Eskom - Standard Conditions of Tender (February 2022).pdf (TENDER)Original tender plus one complete hard copy required; soft copy may be required. Proof of posting or courier not accepted. Late tenders not accepted. No responsibility for misplacement or premature opening if incorrectly sealed or addressed. Time strictly SAST via Telkom time signal.
Evaluation Criteria
Source: Eskom - Standard Conditions of Tender (February 2022).pdf (TENDER)Evaluation stages and scoring
Arithmetical errors
Reverse e-auction
Minimum thresholds
Point system
Technical Specifications
Source: Eskom - Standard Conditions of Tender (February 2022).pdf (TENDER)Scope
Sub-contracting restriction
Site familiarisation
SHEQ requirements
Insurance
Quality Management
Source: Eskom - Standard Conditions of Tender (February 2022).pdfTenderers must provide reasonable proof of safety, health, environmental and quality (SHEQ) systems, policies and capabilities at contract award. All SHEQ costs and personnel must be reflected in the tender for Eskom assessment. Mandatory returnables required by submission deadline; other returnables for contract award must be submitted before award. Valid, current certificates/documents required for tender validity period and up to contract award.
Pricing Schedule
Source: Eskom - Standard Conditions of Tender (February 2022).pdfPrices fixed for contract duration unless enquiry provides otherwise. All duties, taxes including VAT and levies included, based on rates 14 days before submission deadline. Prices in ZAR unless instructed otherwise; exchange rate and base date per Invitation to Tender. Alterations only for compliance with Eskom Representative instructions or to correct errors; all alterations initialed by all signatories. No correction fluid or tape. Alternative tenders only with main tender and if permitted. Clarifications during evaluation may not change prices or substance except for arithmetical error correction.
Financial Requirements
Source: Eskom - Standard Conditions of Tender (February 2022).pdf (TENDER)Pricing format and terms
Performance security
Financial capacity
Cost of tendering
Compliance Requirements
Source: Eskom - Standard Conditions of Tender (February 2022).pdf (TENDER)Legislative and regulatory compliance
B-BBEE requirements
Tax and other registrations
Sheq
Agent authority
Health & Safety
Source: Eskom - Standard Conditions of Tender (February 2022).pdfCompliance with OHS Act and Eskom SHEQ requirements mandatory. SHEQ systems, policies and capabilities must be in place at contract award; costs and personnel reflected in tender. CIDB proof required at tender closing for construction-related work; application proof acceptable at deadline with full registration by contract award. Grounds for rejection include influencing tender processing, collusion, bid rigging or fraud.
Contractual Terms
Source: Eskom - Standard Conditions of Tender (February 2022).pdfContract documents revised for addenda, included returnables, negotiated changes, other agreed revisions. Both parties sign original and one copy of Form of Agreement.
Special Conditions
Source: Eskom - Standard Conditions of Tender (February 2022).pdf (TENDER)Performance security: name minimum two financial institutions; Eskom may reject unsuitable institutions.
Requirements
Source: Eskom - Standard Conditions of Tender (February 2022).pdf (TENDER)Legislative compliance: NT instructions (CSD), CIDB, dti designated materials, PPPFA, Amended B-BBEE Codes, COIDA, OHS Act, Eskom SHEQ requirements. SHEQ proof required at contract award. CIDB proof mandatory at closing; application proof acceptable with full registration by contract award.
Section
Source: Eskom - Standard Conditions of Tender (February 2022).pdfReverse e-auction: Eskom reserves right; indicated in enquiry if used. Tenderers submit complete tender without prices; included prices disregarded.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
KUSILE POWER STATION - EMALAHLENI/VICTOR KHANYE - EMALAHLENI/VICTOR KHANYE - 1035
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
17
Last checked
06 Oct 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Get deep intelligence on Supplies: General. Unlock full pricing strategies, bid frequency, and historical win rates.
Learn how to submit a winning bid with these related articles
Everything South African general contractors need to know about how to write a winning tender proposal without an in-house bid team in gauteng — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Your meticulously crafted General sector tender submission can be disqualified for a single, seemingly minor compliance oversight. The reality for South African contractors is that technical competence is no longer sufficient; it is underpinned by a non-negotiable framework of documentary compliance. This regulatory guide: mastering CSD and BBBEE compliance for general sector tenders in south africa provides a comprehensive, step-by-step breakdown of the mandatory registrations and certificates you must secure and present. We detail the precise requirements for CSD, BBBEE, SARS TCS, CIPC, and COIDA, explaining their function within the procurement ecosystem governed by the PFMA and PPPFA. Learn the actionable steps to prepare your business, avoid the most common disqualifying errors, and leverage technology to streamline your compliance process for successful bidding in 2026 and beyond.
For South African General contractors, the path to government procurement is paved with non-negotiable regulatory requirements. The most common barrier to entry is not a lack of capability, but a failure to master the foundational compliance frameworks that govern every bid. This complete regulatory guide to CSD and BBBEE compliance for General sector tender suppliers in South Africa demystifies the process. It provides a meticulous, step-by-step field manual for ensuring your company is fully compliant and audit-ready, enabling you to confidently access the R billions in opportunities across infrastructure maintenance, facilities management, and service delivery within the General sector.
This definitive guide provides General sector contractors with the precise, actionable steps required to achieve and maintain CSD and BBBEE compliance for South African public tenders in 2026. Authored by Dr. Sarah Mokwena, a Legal Compliance Specialist, it meticulously walks through the regulatory framework, mandatory registrations, and the critical documentation needed to avoid disqualification. We dissect the common, costly errors made during submission and provide a clear checklist to ensure your bid is responsive and competitive. Learn how to navigate the Central Supplier Database, validate your BBBEE status, and integrate compliance into your tender preparation process.
💡 Want more tendering tips and strategies?
Explore Our Blog