Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Nationwide, as per distribution map. - National project - Johannesburg - 2000
Organization Type
GOVERNMENT
Published
14 Oct 2026
OCDS Reference
ocds-9t57fa-174142
TRANSNET property requires the supply, design, development, installation, testing and commissioning of a national smart metering system for electricity and water across its properties. The scope includes a cloud platform with live meter status, configurable data upload frequencies, a central asset inventory, and a utilities management online solution, with hardware installation to be completed within six months. Bidders must meet strict eligibility criteria (electrical contractor registration or wireman's licence, and staff qualifications), achieve a minimum functionality score of 75 out of 100, and comply with the 90/10 preference points system. The most consequential consideration is the mandatory functionality threshold and the detailed evidence required for each criterion, as failure to meet any eligibility or functionality requirement results in disqualification.
Eligibility – Stage 1: The installer must hold a valid contractor's registration with the Department of Labour as an electrical contractor, or the installation electrician must hold a valid electrical/Wireman's licence.
Eligibility – Stage 2: Provide proof of education, certification and training of assigned staff directly linked to the scope of work, attached to their CVs.
Functionality threshold: Bidders must score at least 75 out of 100 points on functionality to proceed to price and preference evaluation; failure results in disqualification.
Key personnel qualifications: Project Manager (National Diploma + project management experience), Civil Engineer (National Diploma or Bachelor's in Civil Engineering + water industry experience), Electrical Engineer (Bachelor's in Electrical Engineering + electrical industry experience), Solution Architect (Bachelor's in IT or equivalent + IT experience + AZ-900 and AZ-220 certifications).
Mandatory returnable documents: Valid SARS Tax Clearance Certificate and TCS PIN, valid B-BBEE certificate (SANAS-accredited) or sworn affidavit for EMEs/QSEs with 51%+ black ownership, proof of CSD registration, Letter of Good Standing with the Workmen's Compensation Fund, and certified copy of signed JV agreement (if applicable).
Submission: Closing time is 10:00 on 02 November 2026 via the Transnet e-Tender Submission Portal (https://transnetetenders.azurewebsites.net). Late tenders are not accepted; no telephonic, telegraphic, facsimile or emailed offers will be accepted.
Preference points: 90/10 system applies (tender value likely R50 million or more). Price and Total Cost of Ownership: 90 points; Specific Goals: 10 points (B-BBEE Level 1 or 2: 5 points; 30% Black Women Owned entities: 5 points). Non-compliant or B-BBEE Level 3–8 contributors score 0 for specific goals.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Date & Time
Monday, 02 November 2026 - 10:00
Venue
150 Commissioner Street, Carlton Center, Johannesburg
Categories
Request for Bid(Open-Tender)
Nationwide, as per distribution map. - National project - Johannesburg - 2000
Recommended Certifications
Having these can improve your winning chances: SABS Product Certification, NRCS Certification
AI Document Analysis Stages
Description
14 Oct
2026
Tender Published
Tender was published
02 Nov
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Annexure 1 - Technical Specification for the National Smart Metering System_2026.pdf
Transnet Property requires the supply, design, development, delivery, installation, testing and commissioning of a National Smart Metering System (NSMS) for electricity and water across its national portfolio of commercial and residential properties. The works cover internally owned bulk check meters at utility supply points, tenant submeters, water demand management devices, cellular connectivity, an Azure IoT software platform on Transnet's Microsoft Azure cloud, and web-based Utilities Management and Energy and Sustainability dashboards integrated with TP SAP for accounts payable and accounts receivable recoveries.
T2.2-20 Supplier Integrity Pact CPM 2020 Rev 02.pdf
Supply, design, development, installation, testing and commissioning of a national smart metering system for electricity and water across Transnet Property sites, for Transnet SOC Ltd. The pack issued under tender number TP/2026/10/0002/115012/RFP carries the Service Provider Integrity Pact (T2.2-20) that governs conduct before, during and after the contract.
T2.2-19 Certificate of Acquaintance CPM 2020 Rev 01.pdf
Transnet SOC Ltd requires the supply, design, development, installation, testing and commissioning of a National Smart Metering System for electricity and water at Transnet Property. The work is tendered under reference TP/2026/10/0002/115012/RFP and closes on 2 November 2026 at 10:00.
Part 2 Pricing Data Option A CPM.pdf
Supply, design, development, installation, testing and commissioning of a national smart metering system for electricity and water across Transnet Property's five regions, priced on an NEC3 ECC Option A Activity Schedule. The scope covers smart energy and water meters at EPC buildings, bulk supply points and tenant points of supply, an IoT Azure backend and frontend with meter onboarding, plus training and 36 months of operation and maintenance.
Part C1.2 TSC Contract Data CPM 2020 Rev 06.pdf
Transnet Property requires the supply, design, development, installation, testing and commissioning of a national smart metering system for electricity and water across its property portfolio. The work is contracted under the NEC3 Term Service Contract (June 2005, amended June 2006 and April 2013) with main Option A (priced contract with price list) and dispute resolution Option W1.
National Smart Metering System Scope of Works_Oct26.pdf
Transnet Property requires the supply, design, development, installation, testing and commissioning of a National Smart Metering System for electricity and water across its national property portfolio. The works comprise 1,167 smart meters (608 energy and 559 water) plus an Azure IoT metering platform hosted on Transnet's Microsoft Azure Cloud and integrated with Transnet Property's SAP system.
T2.2-09 Letter of Good Standing - CPM 2020 Rev 01.pdf
Transnet Property requires the supply, design, development, installation, testing and commissioning of a National Smart Metering System covering electricity and water across its property portfolio. The RFP closes on 2 November 2026 at 10:00.
National Smart Metering System Technical Evaluation matrix_2026.xlsx
Transnet SOC Ltd requires the supply, design, development, installation, testing and commissioning of a National Smart Metering System for electricity and water at Transnet Property, including a cloud-based IoT platform for data collection, analysis and reporting. Bidders must also provide site assessment, hardware supply from an OEM or supplier, installation within a six-month programme, and supporting professional, quality and experience documentation.
Annexure 2 - Installation Areas Distribution for The National Smart Metering System_2026.pdf
Supply, design, development, installation, testing and commissioning of a national smart metering system for electricity and water at Transnet properties across South Africa. The system will measure, consolidate and analyse utilities consumption data using smart meters on the Transnet Azure IoT cloud platform.
T2.2-13 Site Establishment Requirements CPM.pdf
Transnet Property requires the supply, design, development, installation, testing and commissioning of a national smart metering system covering both electricity and water across its property portfolio. The requirement is issued as an RFP under tender number TP/2026/10/0002/115012/RFP, with bids closing on 2 November 2026 at 10:00.
T2.2-22 Agreement in terms of Protection of Personal Information Act (POPIA).pdf
Transnet Property requires the supply, design, development, installation, testing and commissioning of a national smart metering system for electricity and water across its property portfolio. This returnable schedule sets out the Protection of Personal Information Act terms that the appointed contractor must accept as Operator, including the confirmation that POPIA measures are in place.
T2.2-08 Record of Addenda CPM 2020 Rev 01.pdf
Supply, design, development, installation, testing and commissioning of a National Smart Metering System covering both electricity and water at Transnet Property. The works are procured by Transnet SOC Ltd in Gauteng under tender TP/2026/10/0002/115012/RFP.
T2.2-18 RFP - Breach of Law CPM 2020 Rev 01.pdf
Supply, design, development, installation, testing and commissioning of a national smart metering system for electricity and water at Transnet Property, for Transnet SOC Ltd.
T2.2-21 Supplier Code of Conduct CPM 2020 Rev 01.pdf
Transnet Property requires the supply, design, development, installation, testing and commissioning of the National Smart Metering System for Electricity and Water. Bidders must acknowledge and sign Transnet's Supplier Code of Conduct, which governs conduct, conflicts of interest and the reporting of corrupt practices, as a returnable schedule to the bid.
T2.2-17 RFP Declaration Form CPM 2020 Rev 01.pdf
Supply, design, development, installation, testing and commissioning of the National Smart Metering System for electricity and water at Transnet Property, under tender TP/2026/10/0002/115012/RFP. Bids close on 2 November 2026 at 10:00.
T2.2-23 DOMESTIC PROMINENT INFLUENTIAL PERSONS (DPIP) (FPPO).pdf
Supply, design, development, installation, testing and commissioning of a national smart metering system for electricity and water at Transnet Property, procured by Transnet SOC Ltd in Gauteng. The pack carries a service-level obligation and a prominent-persons disclosure requirement rather than detailed scope or pricing detail.
RFP Cover Page CPM 2020 Rev 02.pdf
Transnet Property requires the supply, design, development, installation, testing and commissioning of a national smart metering system covering electricity and water across its property portfolio. The work is contracted under an NEC3 Term Service Contract.
T2.2-10 Risk Elements CPM TSC 2020 Rev 02.pdf
Supply, design, development, installation, testing and commissioning of a national smart metering system for electricity and water across Transnet Property sites. The returnable schedule T2.2-10 requires bidders to identify and evaluate the risks attached to delivering the service and to propose mitigation for each. Bids close on 2 November 2026 at 10:00.
Typical Above Ground Meter Installation.pdf
Supply, design, development, installation, testing and commissioning of a national smart metering system for electricity and water across the Transnet Property portfolio. The contract is issued by Transnet SOC Ltd and is national in scope.
T2.2-11 Availability of Equipment and Other Resources TSC CPM 2020 Rev 02.pdf
Supply, design, development, installation, testing and commissioning of a national smart metering system covering both electricity and water at Transnet Property sites. The contract is issued by Transnet SOC Ltd and advertised in Gauteng.
T2.2-14 Three (3) Years of financial statements CPM 2020 Rev 01.pdf
Transnet Property requires the supply, design, development, installation, testing and commissioning of a National Smart Metering System covering both electricity and water across its property portfolio. The contract is issued by Transnet SOC Ltd under tender number TP/2026/10/0002/115012/RFP, with bids closing on 2 November 2026 at 10:00.
T2.2-07 Authority to submit tender CPM 2020 Rev 01.pdf
Supply, design, development, installation, testing and commissioning of a national smart metering system covering both electricity and water for Transnet Property. The system is to be delivered across Transnet Property's national portfolio.
C1.1 Form of Offer and Acceptance CPM 2020 Rev01.pdf
Supply, design, development, installation, testing and commissioning of the National Smart Metering System for Electricity and Water at Transnet Property, contracted by Transnet SOC Ltd on acceptance of a bidder's offer. The works span metering for both electricity and water across Transnet Property's national portfolio.
T2.1 Eligibility Criteria.pdf
Supply, design, development, installation, testing and commissioning of a national smart metering system for electricity and water across Transnet Property's portfolio. The contract is issued by Transnet SOC Ltd (Gauteng) and is evaluated in three eligibility stages, with a technical functionality threshold of 75%.
T1.1 Construction Procurement Tender Notice and Invitation CPM TSC 2020 Rev 06.pdf
Transnet Property requires the supply, design, development, installation, testing and commissioning of a National Smart Metering System covering both electricity and water across its national property portfolio. Bidders respond by electronic submission to Transnet's e-Tender Submission Portal, with submissions closing at 10:00 on 02 November 2026.
Typical Below Ground Meter Installation.pdf
Supply, design, development, installation, testing and commissioning of a national smart metering system covering both electricity and water across Transnet Property's sites. The contract is issued by Transnet SOC Ltd on a national footprint and closes on 2 November 2026 at 10:00.
T2.2-16 Non-Disclosure Agreement CPM 2020 Rev 02 ECC (1).pdf
Supply, design, development, installation, testing and commissioning of a national smart metering system for electricity and water across Transnet properties, procured by Transnet SOC Ltd. The tender requires bidders to sign and return a Non-Disclosure Agreement as part of the returnable schedules.
T1.2 Construction Procurement Tender Data CPM ECC Rev 11.pdf
Supply, design, development, installation, testing and commissioning of a national smart metering system for electricity and water at Transnet properties across South Africa. The contract covers hardware, cloud platform, site assessments, and installation, with a 6-month installation completion requirement.
To download these documents and access AI-powered analysis, visit the main tender page.
Secure Transnet tenders using AI Matching & Recommendations, logistics infrastructure intelligence, compliance analysis, and application support for rail, ports, and pipelines.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 607 629
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Background
What is required
Metering architecture
Platform and dashboards
Compliance
Submission Guidelines
Source: Annexure 1 - Technical Specification for the National Smart Metering System_2026.pdf (unknown)Response requirements
Evaluation Criteria
Source: Annexure 1 - Technical Specification for the National Smart Metering System_2026.pdf (unknown)Technical compliance
Deployment conditions
Technical Specifications
Source: Annexure 1 - Technical Specification for the National Smart Metering System_2026.pdf (unknown)Scope
Communications
Platform
Smart energy meters
Smart water meters
Software
Quality Management
Source: Annexure 1 - Technical Specification for the National Smart Metering System_2026.pdf (unknown)Applicable standards
Calibration and certification
Pricing Schedule
Source: Annexure 1 - Technical Specification for the National Smart Metering System_2026.pdf (unknown)Pricing categories
Financial Requirements
Source: Annexure 1 - Technical Specification for the National Smart Metering System_2026.pdf (unknown)Pricing basis
Warranty
Compliance Requirements
Source: Annexure 1 - Technical Specification for the National Smart Metering System_2026.pdf (unknown)Standards compliance
Calibration and certification
Environmental
Source: Annexure 1 - Technical Specification for the National Smart Metering System_2026.pdf (unknown)Sustainability reporting
Water demand management
Equipment durability
Contractual Terms
Source: Annexure 1 - Technical Specification for the National Smart Metering System_2026.pdf (unknown)Warranty
Delivery documentation
Intellectual property
Data and continuity
Clarification
Reservation of rights
Important Dates
Source: RFP Cover Page CPM 2020 Rev 02.pdf (RFP)Briefing session: 22 October 2026 at 10h00 (non-compulsory).
Closing date: 02 November 2026 at 10h00.
Tender validity period: 180 business days.
Submission Guidelines
Source: RFP Cover Page CPM 2020 Rev 02.pdf (RFP)Returnable documents: the tender pack lists Part T2.1 (List of Returnable Documents) and Part C1.1 (Form of Offer and Acceptance). Bidders must complete and submit all returnable documents listed in the tender pack. Submission method and address are not stated in the available text.
Evaluation Criteria
Source: RFP Cover Page CPM 2020 Rev 02.pdf (RFP)No evaluation criteria are stated in the available text.
Technical Specifications
Source: RFP Cover Page CPM 2020 Rev 02.pdf (RFP)Scope: supply, design, development, installation, testing and commissioning of a national smart metering system for electricity and water at Transnet Property. Contract form: NEC3 Term Service Contract. No further technical details are stated in the available text.
Technical Specifications
Source: Typical Below Ground Meter Installation.pdf (unknown)The document contains only a drawing title: "Typical Below Ground Meter Installation" (drawing number TP/DWG.01). No further technical details are provided.
Description
Source: T2.2-21 Supplier Code of Conduct CPM 2020 Rev 01.pdf (RFP)Supply, design, development, installation, testing and commissioning of the National Smart Metering System for electricity and water at Transnet Property, for Transnet SOC Ltd.
Submission Guidelines
Source: T2.2-21 Supplier Code of Conduct CPM 2020 Rev 01.pdf (RFP)Returnable schedule
Technical Specifications
Source: T2.2-21 Supplier Code of Conduct CPM 2020 Rev 01.pdf (RFP)Scope
Compliance Requirements
Source: T2.2-21 Supplier Code of Conduct CPM 2020 Rev 01.pdf (RFP)Supplier Code of Conduct (T2.2-21) — obligations the bidder accepts on signature
Governing framework referenced
Fraud reporting
Health & Safety
Source: T2.2-21 Supplier Code of Conduct CPM 2020 Rev 01.pdf (RFP)Conflicts of interest
Contractual Terms
Source: T2.2-21 Supplier Code of Conduct CPM 2020 Rev 01.pdf (RFP)Conduct obligations carried into the contract
Submission Guidelines
Source: T2.2-18 RFP - Breach of Law CPM 2020 Rev 01.pdf (RFP)Returnable schedule
Technical Specifications
Source: T2.2-18 RFP - Breach of Law CPM 2020 Rev 01.pdf (RFP)Scope of works
Compliance Requirements
Source: T2.2-18 RFP - Breach of Law CPM 2020 Rev 01.pdf (RFP)Breach of law declaration
Contractual Terms
Source: T2.2-18 RFP - Breach of Law CPM 2020 Rev 01.pdf (RFP)Exclusion right
Description
Source: T2.1 Eligibility Criteria.pdf (RFP)The tender covers the supply, design, development, installation, testing and commissioning of a national smart metering system for electricity and water at Transnet Property.
Evaluation Criteria
Source: T2.1 Eligibility Criteria.pdf (RFP)Eligibility is assessed in three stages.
Stage One — Registration:
Stage Two — Management Professional Registration:
Stage Three — Functionality (Annexure A):
Minimum qualifying threshold:
Technical Specifications
Source: T2.1 Eligibility Criteria.pdf (RFP)The scope of work is the supply, design, development, installation, testing and commissioning of a national smart metering system for electricity and water at Transnet Property.
Quality Management
Source: T2.1 Eligibility Criteria.pdf (RFP)Quality Plan is one of the functionality criteria, weighted at 5% of the Annexure A technical evaluation. The tenderer must achieve a minimum of 75% overall on the technical evaluation to proceed.
Compliance Requirements
Source: T2.1 Eligibility Criteria.pdf (RFP)Mandatory registration:
Staff qualifications:
Description
Source: Annexure 2 - Installation Areas Distribution for The National Smart Metering System_2026.pdf (unknown)The National Smart Metering System measures, consolidates and analyses electricity and water consumption data using smart meters on the Transnet Azure IoT cloud platform. Installation points are distributed nationally across South Africa. The total quantity of smart meters required is specified in the Scope of Works document. The national distribution of installation areas is shown on a map in this annexure.
Technical Specifications
Source: Annexure 2 - Installation Areas Distribution for The National Smart Metering System_2026.pdf (unknown)The National Smart Metering System measures, consolidates and analyses electricity and water consumption data using smart meters on the Transnet Azure IoT cloud platform.
Description
Source: Part 2 Pricing Data Option A CPM.pdf (TENDER)The procurement covers the supply, development, installation, testing and commissioning of a national smart metering system for electricity and water at Transnet properties. This document is Part 2: Pricing Data.
Technical Specifications
Source: Part 2 Pricing Data Option A CPM.pdf (TENDER)Scope: Supply, design, development, installation, testing and commissioning of a national smart metering system for electricity and water at Transnet properties.
Regions covered: Northern, Eastern, Western, KZN, Inland, Eastern Cape.
Site assessments (per metering point):
Smart energy meters at EPC buildings (3-phase LV, 400V, Imax >100A RMS, with enclosures, CTs, peripherals, full installation, testing, commissioning):
Smart energy meters at bulk electricity supply points (60 commercial, 14 residential accounts; 3-phase MV, 11kV, Imax 800A RMS; one 33kV meter in KZN only; with enclosures, CTs, VTs, peripherals):
Smart energy meters at tenant points of supply (3-phase LV, 400V, Imax >100A RMS, with enclosures, CTs, peripherals):
Below-ground smart check water meters at bulk water supply points (50 commercial, 14 residential accounts; DN 150mm installation per drawing TP/DWG.01):
Each bulk water meter installation includes: pipe fittings with nuts, gaskets, seals, corrosion protection; 1650mm x 1750mm x 680mm face brick below-ground chamber; 100mm roof slab with Ref 395 reinforcement mesh and SECUREX 2A lockable ductile iron manhole cover; 75mm floor slab with Ref 395 mesh and stone carpet; excavation for 2000mm trenches including backfill, compaction, disposal; 2m3 thrust blocks class 20/19; tamper-proof bulk meter protective cover per Annexure 1 – R9.
Smart water meters at tenant points of supply (DN 32mm installation):
Each tenant water meter includes a water management device and enclosure.
Provisional sum for installations relating to upgrade of existing infrastructure: R1,000,000.00.
IoT solution: backend and frontend development of smart metering IoT Azure solution; onboarding of 1,167 smart meters; software testing and commissioning.
Operation and maintenance: training for 20 persons; 36 months support and maintenance of the system.
Quality Management
Source: Part 2 Pricing Data Option A CPM.pdf (TENDER)Each smart energy meter installation must include a Certificate of Compliance. Bulk water meter installations must include a tamper-proof bulk meter protective cover meeting specifications in Annexure 1 – R9.
Pricing Schedule
Source: Part 2 Pricing Data Option A CPM.pdf (TENDER)Pricing must be submitted on the Activity Schedule (C2.2) under NEC3 ECC Option A. The schedule covers: site assessments, smart metering hardware supply and installation, IoT Azure solution development and deployment, smart energy meters (LV and MV), smart water meters (bulk and tenant), below-ground chamber construction, testing and commissioning, operation and maintenance, training, and 36-month support. Labour rates for ad-hoc work (C2.3) must be provided for electrician, plumber, general labour (normal hours, overtime, Sundays/public holidays), travel per km, and accommodation per night.
Financial Requirements
Source: Part 2 Pricing Data Option A CPM.pdf (TENDER)Pricing basis: NEC3 Engineering and Construction Contract (June 2005, amended June 2006 and April 2013), Option A (activity schedule).
Activity Schedule is the basis for valuations, progress payments, multi-currency payments, price adjustments for inflation, and progress monitoring.
Payment is based on completed activities or milestones as indicated in the Activity Schedule.
The tendered total includes all direct and indirect costs, overheads, profits, risks, liabilities and obligations.
Pricing must be submitted on the Activity Schedule (C2.2) with rates and activity prices for each item.
A provisional sum of R1,000,000.00 (excl. VAT) is included for installations relating to upgrade of existing infrastructure.
Labour rates for ad-hoc work (C2.3) must be provided for:
Prices to be stated excluding VAT, with VAT and totals including VAT shown in the summary.
Important Dates
Source: T1.2 Construction Procurement Tender Data CPM ECC Rev 11.pdf (RFP)Closing date and time: 02 November 2026 at 10:00.
Non-compulsory clarification meeting: as stated in the Tender Notice and Invitation to Tender. Attendance register must be signed. A walkabout is planned; comfortable shoes are required.
Contact Information
Source: T1.2 Construction Procurement Tender Data CPM ECC Rev 11.pdf (RFP)Employer's Agent:
Submission Guidelines
Source: T1.2 Construction Procurement Tender Data CPM ECC Rev 11.pdf (RFP)Submission method: Transnet e-Tender Submission Portal (https://transnetetenders.azurewebsites.net).
Closing time: 10:00 on 02 November 2026. Late tenders are not accepted.
Tenders must be in English. No alternative offers, and no telephonic, telegraphic, facsimile or emailed tenders will be accepted.
Tender documents must be uploaded with the tenderer's name, contact person and details, tender number, and tender description, marked for the attention of the Employer's Agent.
Returnable documents (per T2.1):
Evaluation Criteria
Source: T1.2 Construction Procurement Tender Data CPM ECC Rev 11.pdf (RFP)Evaluation stages: Stage 1 – Eligibility (registration), Stage 2 – Management professional registration, Stage 3 – Functionality. Only tenderers meeting all eligibility criteria and scoring at least 75 points for functionality proceed to price and preference evaluation.
Functionality criteria (maximum points):
Total functionality points: 100. Minimum qualifying score: 75.
Price and preference: 90/10 preference points system (applicable when tender value is R50 million or more).
Price and Total Cost of Ownership: 90 points.
Specific goals: 10 points (B-BBEE Level 1 or 2 contributor: 5 points; 30% Black Women Owned entities: 5 points).
Non-compliant or B-BBEE Level 3–8 contributors score 0 for specific goals.
Transnet may conduct an independent audit of the tenderer's scorecard components.
Transnet reserves the right to award to the highest-scoring tenderer, subject to due diligence.
Technical Specifications
Source: T1.2 Construction Procurement Tender Data CPM ECC Rev 11.pdf (RFP)Scope: Supply, design, development, installation, testing and commissioning of a national smart metering system for electricity and water at Transnet properties.
The system must include:
Hardware: Confirmation from hardware supplier/OEM of availability of smart meters for each category (electricity and water, bulk and check meters) upon completion of the first site assessment.
Installation: Must be completed within 6 months as per the proposed programme schedule.
Key personnel requirements:
Financial Requirements
Source: T1.2 Construction Procurement Tender Data CPM ECC Rev 11.pdf (RFP)Tender offer validity: 180 business days after closing date. Transnet may request extension of validity on the same terms.
Pricing: 90 points allocated to Price and Total Cost of Ownership.
No bid security, bonds, guarantees, retention or payment terms are stated in the tender data.
Compliance Requirements
Source: T1.2 Construction Procurement Tender Data CPM ECC Rev 11.pdf (RFP)Eligibility – Stage 1: Valid contractor's registration with the Department of Labour as an electrical contractor, or a valid electrical/Wireman's licence for the installation electrician.
Eligibility – Stage 2: Provide education, training and skills of assigned staff directly linked to the scope; proof attached to CVs.
Joint ventures: Certified copy of signed JV agreement required.
Tax: Valid SARS Tax Clearance Certificate and TCS PIN.
B-BBEE: Valid B-BBEE certificate (SANAS-accredited) or sworn affidavit for EMEs/QSEs with 51% or more black ownership.
CSD: Proof of registration on the Central Supplier Database.
Workmen's Compensation: Letter of Good Standing (or separate letters for JV members).
Disqualification: Tenderer or directors/shareholders listed on the Register of Tender Defaulters (Prevention and Combating of Corrupt Activities Act), Transnet's restricted list, or National Treasury's list of Tender Defaulters.
Compulsory Enterprise Questionnaire must be completed with no conflicts of interest.
Evaluation Criteria
Source: Part C1.2 TSC Contract Data CPM 2020 Rev 06.pdf (RFP)Part Two contract data must be completed in full, according to the options chosen, to create a complete contract.
Key persons must be named with their job, responsibilities, qualifications and experience.
Contractor personnel requiring access to National Key Points may be subject to State Security Agency vetting for Confidential, Secret or Top Secret clearance.
The contract award is made without prejudice to any rights Transnet may have to act later on declared bid rigging, including blacklisting.
Technical Specifications
Source: Part C1.2 TSC Contract Data CPM 2020 Rev 06.pdf (RFP)The service is for the Supply, Design, Development, Installation, Testing and Commissioning of the National Smart Metering System for Electricity and Water at Transnet Property.
The Affected Property is as stated in Annexure 1 'Service Information'.
The Service Information is in the Scope of Services.
Compliance Requirements
Source: Part C1.2 TSC Contract Data CPM 2020 Rev 06.pdf (RFP)The contract is governed by the law of the Republic of South Africa, subject to the jurisdiction of its courts.
The language of the contract is English.
The period for reply is 2 weeks.
The Contractor submits a first plan for acceptance within 2 weeks of the Contract Date.
The starting date is TBA, and the service period is in months.
The assessment interval is the 25th day of each successive month.
The currency is the South African Rand.
Payments will be effected on or before the last day of the month following the month during which a valid Tax Invoice and Statement were received.
The interest rate is the prime lending rate of Standard Bank South Africa.
The Contractor's liability to the Employer for indirect or consequential loss is limited to Nil.
For any one event, the Contractor's liability for loss of or damage to the Employer's property is limited to the deductible of the relevant insurance policy.
The Contractor's liability for defects due to his design is limited to the cost of correcting the defect.
The Contractor's total liability is limited to the Total of the Prices.
The end of liability date is 1 year after the end of the service period.
The Contractor submits a Task Order programme within 2 days of receiving the Task Order.
Additional conditions include: termination obligations (including business rescue and repudiation), Transnet's right to conduct vetting through the State Security Agency for security clearances, a clause relating to collusion in the construction industry, and compliance with the Protection of Personal Information Act.
Section
Source: Part C1.2 TSC Contract Data CPM 2020 Rev 06.pdf (RFP)Dispute resolution is under Option W1. The Adjudicator will be agreed by both parties as and when a dispute arises; if no agreement, the Chairman of the Association of Arbitrators will appoint an Adjudicator. The tribunal is arbitration, conducted under the Rules for the Conduct of Arbitrations of the Association of Arbitrators (Southern Africa), held in Johannesburg. If the parties cannot agree on an arbitrator, the Chairman of the Association of Arbitrators (Southern Africa) will choose one.
Contact Information
Source: T2.2-22 Agreement in terms of Protection of Personal Information Act (POPIA).pdf (RFP)Information Regulator (complaints channel)
Submission Guidelines
Source: T2.2-22 Agreement in terms of Protection of Personal Information Act (POPIA).pdf (RFP)Returnable schedule
Returnable Documents
Source: T2.2-22 Agreement in terms of Protection of Personal Information Act (POPIA).pdf (RFP)T2.2-22 (Agreement in terms of the Protection of Personal Information Act)
Technical Specifications
Source: T2.2-22 Agreement in terms of Protection of Personal Information Act (POPIA).pdf (RFP)Scope
Information security
Compliance Requirements
Source: T2.2-22 Agreement in terms of Protection of Personal Information Act (POPIA).pdf (RFP)POPIA compliance
Contractual Terms
Source: T2.2-22 Agreement in terms of Protection of Personal Information Act (POPIA).pdf (RFP)Liability and remedies
Sole agreement
Description
Source: National Smart Metering System Technical Evaluation matrix_2026.xlsx (unknown)The tender covers the supply, development, installation, testing and commissioning of a national smart metering system for electricity and water at Transnet properties. The system must include cloud-based IoT data collection and reporting, with hardware installation completed within 6 months.
Submission Guidelines
Source: National Smart Metering System Technical Evaluation matrix_2026.xlsx (unknown)Returnable documents (Annexure A1 checklist) — each must be provided and referenced in the submission:
Each item must be accompanied by a reference to where it appears in the submission.
Evaluation Criteria
Source: National Smart Metering System Technical Evaluation matrix_2026.xlsx (unknown)Evaluation stages:
Minimum qualifying score: 75% of the technical evaluation. Bidders failing to reach this threshold are disqualified from further evaluation.
Technical Specifications
Source: National Smart Metering System Technical Evaluation matrix_2026.xlsx (unknown)Scope: Supply, design, development, installation, testing and commissioning of a national smart metering system for electricity and water at Transnet properties.
Key requirements:
Financial Requirements
Source: National Smart Metering System Technical Evaluation matrix_2026.xlsx (unknown)Previous experience thresholds (cumulative contract value of completed comparable projects):
Compliance Requirements
Source: National Smart Metering System Technical Evaluation matrix_2026.xlsx (unknown)Pre-qualification compliance:
Description
Source: T2.2-08 Record of Addenda CPM 2020 Rev 01.pdf (RFP)The tender covers the supply, design, development, installation, testing and commissioning of a national smart metering system for electricity and water at Transnet Property locations.
Technical Specifications
Source: T2.2-08 Record of Addenda CPM 2020 Rev 01.pdf (RFP)Scope: Supply, design, development, installation, testing and commissioning of a national smart metering system for electricity and water across Transnet Property sites.
The bidder must confirm in the Record of Addenda schedule that all addenda issued before tender submission have been incorporated into the offer.
Submission Guidelines
Source: T2.2-14 Three (3) Years of financial statements CPM 2020 Rev 01.pdf (RFP)Returnable schedule T2.2-14 requires the submission of three (3) years of audited financial statements, attached to the schedule, for the single tenderer or each member of a Joint Venture. An index of the company/companies and attachments must be included.
Returnable Documents
Source: T2.2-14 Three (3) Years of financial statements CPM 2020 Rev 01.pdf (RFP)Returnable schedule T2.2-14 requires the submission of three (3) years of audited financial statements, attached to the schedule, for the single tenderer or the members of a Joint Venture, accompanied by an index of the company/companies and attachments.
Evaluation Criteria
Source: T2.2-14 Three (3) Years of financial statements CPM 2020 Rev 01.pdf (RFP)A single tenderer must provide three years of audited financial statements. A Joint Venture must provide three years of audited financial statements for each member. Financial statements must be attached to and indexed on returnable schedule T2.2-14.
Important Dates
Source: T1.1 Construction Procurement Tender Notice and Invitation CPM TSC 2020 Rev 06.pdf (RFP)Closing date: 02 November 2026 at 10:00
Clarification meeting: 22 October 2026 at 10:00 (non-compulsory, ±2 hours, held via MS Teams and onsite).
Briefing Session
Source: T1.1 Construction Procurement Tender Notice and Invitation CPM TSC 2020 Rev 06.pdf (RFP)Non-compulsory tender clarification meeting on 22 October 2026 at 10:00, ±2 hours, via MS Teams and onsite. MS Teams link: https://teams.microsoft.com/meet/3100732425189557?p=YOfwHQspOFewl6Jicw
Contact Information
Source: T1.1 Construction Procurement Tender Notice and Invitation CPM TSC 2020 Rev 06.pdf (RFP)Fraud and corruption reporting (Tip-offs Anonymous):
Submission Guidelines
Source: T1.1 Construction Procurement Tender Notice and Invitation CPM TSC 2020 Rev 06.pdf (RFP)Submission method: electronic only, via the Transnet e-Tender Submission Portal at https://transnetetenders.azurewebsites.net (use Google Chrome).
Returnable documents (all must be completed and submitted):
Evaluation Criteria
Source: T1.1 Construction Procurement Tender Notice and Invitation CPM TSC 2020 Rev 06.pdf (RFP)Evaluation process: Transnet may conduct evaluation stages in parallel; passing one stage does not guarantee passing previous or subsequent stages.
Technical Specifications
Source: T1.1 Construction Procurement Tender Notice and Invitation CPM TSC 2020 Rev 06.pdf (RFP)Scope: Supply, design, development, installation, testing and commissioning of a national smart metering system for electricity and water at Transnet properties.
Experience & Qualifications
Source: T1.1 Construction Procurement Tender Notice and Invitation CPM TSC 2020 Rev 06.pdf (RFP)No specific experience or qualification requirements are stated in this notice.
Pricing Schedule
Source: T1.1 Construction Procurement Tender Notice and Invitation CPM TSC 2020 Rev 06.pdf (RFP)Transnet may perform a risk analysis on the preferred tenderer, considering unduly high or low tendered rates or amounts, contract data, tender returnables, and the company's financial stability and capacity to carry out the tender value.
Financial Requirements
Source: T1.1 Construction Procurement Tender Notice and Invitation CPM TSC 2020 Rev 06.pdf (RFP)No pricing format, bid security, bonds, guarantees, retention or payment terms are stated in this notice.
Compliance Requirements
Source: T1.1 Construction Procurement Tender Notice and Invitation CPM TSC 2020 Rev 06.pdf (RFP)Central Supplier Database (CSD):
Breach of law:
Non-Disclosure Agreement:
Verification:
Health & Safety
Source: T1.1 Construction Procurement Tender Notice and Invitation CPM TSC 2020 Rev 06.pdf (RFP)No specific health and safety requirements are stated in this notice.
Contractual Terms
Source: T1.1 Construction Procurement Tender Notice and Invitation CPM TSC 2020 Rev 06.pdf (RFP)Transnet reserves the right to terminate the contract if awarded business on the strength of information that later proves incorrect.
Submission Guidelines
Source: T2.2-11 Availability of Equipment and Other Resources TSC CPM 2020 Rev 02.pdf (RFP)Returnable schedule
Returnable Documents
Source: T2.2-11 Availability of Equipment and Other Resources TSC CPM 2020 Rev 02.pdf (RFP)T2.2-11: Availability of Equipment and Other Resources
Technical Specifications
Source: T2.2-11 Availability of Equipment and Other Resources TSC CPM 2020 Rev 02.pdf (RFP)Scope of the works
Resource declaration
Description
Source: T2.2-13 Site Establishment Requirements CPM.pdf (RFP)The contract covers the supply, design, development, installation, testing and commissioning of a national smart metering system for electricity and water across Transnet Property.
Submission Guidelines
Source: T2.2-13 Site Establishment Requirements CPM.pdf (RFP)Returnable schedule
No submission channel, submission address, closing time, copy count or packaging instruction is stated in this document.
Returnable Documents
Source: T2.2-13 Site Establishment Requirements CPM.pdf (RFP)T2.2-13 Site Establishment Requirements: tenderers must indicate the site establishment area they require. The schedule forms part of the CPM 2020 Rev 01 Part T2 returnable schedules and must be completed and returned with the bid.
Technical Specifications
Source: T2.2-13 Site Establishment Requirements CPM.pdf (RFP)Scope of works
Site establishment
Description
Source: T2.2-19 Certificate of Acquaintance CPM 2020 Rev 01.pdf (RFP)The tender is for the supply, design, development, installation, testing and commissioning of a national smart metering system for electricity and water at Transnet Property.
Submission Guidelines
Source: T2.2-19 Certificate of Acquaintance CPM 2020 Rev 01.pdf (RFP)Returnable documents:
Evaluation Criteria
Source: T2.2-19 Certificate of Acquaintance CPM 2020 Rev 01.pdf (RFP)No evaluation criteria are stated in the available document.
Compliance Requirements
Source: T2.2-19 Certificate of Acquaintance CPM 2020 Rev 01.pdf (RFP)No specific compliance requirements are stated in the available document.
Description
Source: T2.2-07 Authority to submit tender CPM 2020 Rev 01.pdf (RFP)The tender is for the supply, design, development, installation, testing and commissioning of a national smart metering system for electricity and water at Transnet properties.
Submission Guidelines
Source: T2.2-07 Authority to submit tender CPM 2020 Rev 01.pdf (RFP)Returnable documents:
Technical Specifications
Source: T2.2-07 Authority to submit tender CPM 2020 Rev 01.pdf (RFP)The scope covers the supply, design, development, installation, testing and commissioning of a national smart metering system for electricity and water across Transnet properties.
Pricing Schedule
Source: T2.2-07 Authority to submit tender CPM 2020 Rev 01.pdf (RFP)For joint ventures, all partners are jointly and severally liable for contract execution; the lead partner is authorised to incur liabilities, receive instructions and payments, and is responsible for the entire execution of the contract on behalf of all partners.
Financial Requirements
Source: T2.2-07 Authority to submit tender CPM 2020 Rev 01.pdf (RFP)For joint ventures, all partners are jointly and severally liable for contract execution; the lead partner is authorised to incur liabilities, receive instructions and payments, and is responsible for the entire execution of the contract on behalf of all partners.
Compliance Requirements
Source: T2.2-07 Authority to submit tender CPM 2020 Rev 01.pdf (RFP)Bidders must complete the T2.2-07 Authority to Submit a Tender certificate appropriate to their legal status, or attach a certified copy of a company/organisation document providing equivalent information.
Description
Source: C1.1 Form of Offer and Acceptance CPM 2020 Rev01.pdf (RFP)The works comprise the supply, design, development, installation, testing and commissioning of a national smart metering system for electricity and water at Transnet properties.
Contact Information
Source: C1.1 Form of Offer and Acceptance CPM 2020 Rev01.pdf (RFP)Employer: Transnet SOC Ltd
Address: 150 Commissioner Street, Johannesburg, 2000
Employer's agent details are given in the Contract Data (not stated in this document).
Submission Guidelines
Source: C1.1 Form of Offer and Acceptance CPM 2020 Rev01.pdf (RFP)Returnable documents: C1.1 Form of Offer and Acceptance (signed by a duly authorised representative, including the offered prices and Schedule of Deviations if any).
The tenderer must submit the completed Form of Offer and Acceptance with the offered total prices (exclusive and inclusive of VAT) and the Schedule of Deviations.
The offer remains valid for the period stated in the Tender Data.
Submission method and address: not stated in this document.
Evaluation Criteria
Source: C1.1 Form of Offer and Acceptance CPM 2020 Rev01.pdf (RFP)No eligibility or evaluation criteria are stated in this document.
Technical Specifications
Source: C1.1 Form of Offer and Acceptance CPM 2020 Rev01.pdf (RFP)Scope: Supply, design, development, installation, testing and commissioning of a national smart metering system for electricity and water at Transnet properties.
The contract comprises:
Pricing Schedule
Source: C1.1 Form of Offer and Acceptance CPM 2020 Rev01.pdf (RFP)Pricing data is contained in Part C2 Pricing Data.
The Form of Offer and Acceptance requires the offered total prices exclusive of VAT, VAT at 15%, and the total inclusive of VAT.
Financial Requirements
Source: C1.1 Form of Offer and Acceptance CPM 2020 Rev01.pdf (RFP)The offered total of the Prices exclusive of VAT, VAT @ 15%, and the total inclusive of VAT must be stated in the Form of Offer and Acceptance.
The contract amount is determined in accordance with the conditions of contract identified in the Contract Data.
The tenderer must, within two weeks of receiving a completed copy of the agreement, arrange delivery of any securities, bonds, guarantees, proof of insurance and other documentation required by the conditions of contract. Failure to do so constitutes repudiation of the agreement.
Compliance Requirements
Source: C1.1 Form of Offer and Acceptance CPM 2020 Rev01.pdf (RFP)The tenderer must be duly authorised to sign the Form of Offer and Acceptance.
The tenderer must provide its registration number.
No other compliance requirements are stated in this document.
Contractual Terms
Source: C1.1 Form of Offer and Acceptance CPM 2020 Rev01.pdf (RFP)The contract is formed when the Employer signs the Acceptance part of the Form of Offer and Acceptance and returns a copy to the tenderer within the validity period.
The agreement comes into effect on the date the tenderer receives one fully completed original copy of the Form, including the Schedule of Deviations (if any).
Unless the tenderer notifies the Employer in writing within five working days of receipt of the completed agreement of any reason it cannot accept the contents, the agreement becomes a binding contract.
The tenderer must, within two weeks of receiving the completed agreement, contact the Employer's agent to arrange delivery of any securities, bonds, guarantees, proof of insurance and other documentation required by the conditions of contract. Failure to do so constitutes repudiation.
Only deviations and amendments recorded in the Schedule of Deviations are valid; no other oral or written communications have effect.
Description
Source: T2.2-17 RFP Declaration Form CPM 2020 Rev 01.pdf (RFP)The procurement is for the supply, design, development, installation, testing and commissioning of a national smart metering system for electricity and water at Transnet properties.
Contact Information
Source: T2.2-17 RFP Declaration Form CPM 2020 Rev 01.pdf (RFP)Procurement Ombudsman complaints (for tenders above R5,000,000):
For tenders below R5,000,000, complaints may be lodged with the Chief Procurement Officer of the relevant Transnet Operating Division.
No other contacts or addresses are stated in this document.
Submission Guidelines
Source: T2.2-17 RFP Declaration Form CPM 2020 Rev 01.pdf (RFP)Returnable documents:
Submission method and address: not stated in this document.
Evaluation Criteria
Source: T2.2-17 RFP Declaration Form CPM 2020 Rev 01.pdf (RFP)Disqualification risks:
Dispute resolution:
No evaluation scoring, preference points, or minimum qualifying scores are stated in this document.
Technical Specifications
Source: T2.2-17 RFP Declaration Form CPM 2020 Rev 01.pdf (RFP)Scope: Supply, design, development, installation, testing and commissioning of a national smart metering system for electricity and water at Transnet properties.
No further technical details, quantities, or locations are stated in this document.
Financial Requirements
Source: T2.2-17 RFP Declaration Form CPM 2020 Rev 01.pdf (RFP)Complaint threshold: Transnet has appointed a Procurement Ombudsman to investigate material complaints regarding tenders exceeding R5,000,000.00 (five million South African Rand).
No bid security, guarantees, retention, or payment terms are stated in this document.
Compliance Requirements
Source: T2.2-17 RFP Declaration Form CPM 2020 Rev 01.pdf (RFP)No registration, tax, B-BBEE, CIDB, or local-content thresholds are stated in this document.
Submission Guidelines
Source: T2.2-23 DOMESTIC PROMINENT INFLUENTIAL PERSONS (DPIP) (FPPO).pdf (RFP)Returnable documents:
Submission method and address: not stated in this document.
Evaluation Criteria
Source: T2.2-23 DOMESTIC PROMINENT INFLUENTIAL PERSONS (DPIP) (FPPO).pdf (RFP)Evaluation is not detailed in this document. The DPIP/FPPO disclosure is a returnable document; declaring a relationship does not bar a bid but triggers annual publication of the contract by Transnet. Service level acceptance must be indicated.
Technical Specifications
Source: T2.2-23 DOMESTIC PROMINENT INFLUENTIAL PERSONS (DPIP) (FPPO).pdf (RFP)Scope: Supply, design, development, installation, testing and commissioning of a national smart metering system for electricity and water at Transnet Property.
Service levels:
Quality Management
Source: T2.2-23 DOMESTIC PROMINENT INFLUENTIAL PERSONS (DPIP) (FPPO).pdf (RFP)Service level requirement: 95% on random checks on compliance with quality, quantity and specifications, and on-time delivery. Failure to comply gives Transnet the right to cancel the contract with 30 calendar days' notice.
Compliance Requirements
Source: T2.2-23 DOMESTIC PROMINENT INFLUENTIAL PERSONS (DPIP) (FPPO).pdf (RFP)DPIP/FPPO disclosure: Transnet will not conduct business with any respondent without considering governance protocols, determining DPIP/FPPO status, and conducting a risk assessment and due diligence. The DPIP/FPPO Policy is available on the Transnet website.
Contractual Terms
Source: T2.2-23 DOMESTIC PROMINENT INFLUENTIAL PERSONS (DPIP) (FPPO).pdf (RFP)Service levels:
Special Conditions
Source: T2.2-23 DOMESTIC PROMINENT INFLUENTIAL PERSONS (DPIP) (FPPO).pdf (RFP)DPIP/FPPO disclosure: Respondents must disclose any commercial relationship with a DPIP or FPPO as defined in Transnet's policy. Transnet will not conduct business without considering governance protocols, determining DPIP/FPPO status, and conducting risk assessment and due diligence. Declared relationships are published annually on Transnet's website.
Section
Source: T2.2-23 DOMESTIC PROMINENT INFLUENTIAL PERSONS (DPIP) (FPPO).pdf (RFP)Service level measure: random checks on compliance with quality, quantity and specifications.
Submission Guidelines
Source: T2.2-16 Non-Disclosure Agreement CPM 2020 Rev 02 ECC (1).pdf (RFQ)Returnable documents:
Submission method and closing time are not stated in the provided document.
Evaluation Criteria
Source: T2.2-16 Non-Disclosure Agreement CPM 2020 Rev 02 ECC (1).pdf (RFQ)No evaluation criteria are stated in the provided document.
Compliance Requirements
Source: T2.2-16 Non-Disclosure Agreement CPM 2020 Rev 02 ECC (1).pdf (RFQ)The bidder must be a private company incorporated under South African law, as indicated in the NDA template.
Contractual Terms
Source: T2.2-16 Non-Disclosure Agreement CPM 2020 Rev 02 ECC (1).pdfConfidentiality obligations under the NDA:
Description
Source: National Smart Metering System Scope of Works_Oct26.pdf (unknown)Transnet Property manages a large portfolio of commercial and residential properties across South Africa. Most properties occupied by tenants are not metered for electricity and water. Transnet pays utility bills based on bulk meters owned by suppliers, and recovers costs from tenants through lease agreements. Many existing meters are outdated; some smart meters exist but require manual readings. Transnet has adopted IoT as part of its energy and sustainability digitisation strategy, with the software component being critical. The project covers five regions: Northern, Inland, Eastern, Western and KZN.
Contact Information
Source: National Smart Metering System Scope of Works_Oct26.pdf (unknown)No named contacts, email addresses, telephone numbers, or submission/delivery addresses are stated in the supplied document.
Submission Guidelines
Source: National Smart Metering System Scope of Works_Oct26.pdf (unknown)Submission method and address are not stated in the supplied document. The document is the Scope of Work (Part C3) only; returnable forms and submission instructions are not included.
Site access and conduct obligations:
Evaluation Criteria
Source: National Smart Metering System Scope of Works_Oct26.pdf (unknown)The document does not state the evaluation scoring split, preference point system (80/20 or 90/10), or minimum qualifying score. The following qualification and team requirements are stated:
Technical Specifications
Source: National Smart Metering System Scope of Works_Oct26.pdf (unknown)Scope of works — supply, design, development, installation, testing and commissioning of the National Smart Metering System (NSMS) for electricity and water across Transnet Property's national footprint (five regions: Northern, Inland, Eastern, Western, KZN).
Meter quantities (total 1,167 smart meters):
Regional breakdown (energy/water bulk, energy/water submeters, residential energy/water, EPC meters):
Deliverables:
Software development timeline:
Existing software modules:
SIM cards:
Post-handover:
Methodology
Source: National Smart Metering System Scope of Works_Oct26.pdf (unknown)Execution approach:
Quality Management
Source: National Smart Metering System Scope of Works_Oct26.pdf (unknown)Engineering quality assurance:
Software quality assurance:
Pricing Schedule
Source: National Smart Metering System Scope of Works_Oct26.pdf (unknown)Pricing requirements:
Financial Requirements
Source: National Smart Metering System Scope of Works_Oct26.pdf (unknown)Pricing format and payment terms are not stated in the supplied document. The following financial-related items are stated:
Compliance Requirements
Source: National Smart Metering System Scope of Works_Oct26.pdf (unknown)The document does not state CSD registration, tax clearance, B-BBEE level, or local content requirements. The following compliance and qualification requirements are stated:
Health & Safety
Source: National Smart Metering System Scope of Works_Oct26.pdf (unknown)Safety requirements:
Environmental
Source: National Smart Metering System Scope of Works_Oct26.pdf (unknown)Environmental requirements:
Contractual Terms
Source: National Smart Metering System Scope of Works_Oct26.pdf (unknown)Contract type: NEC3 (Part C3: Scope of Work).
Special Conditions
Source: National Smart Metering System Scope of Works_Oct26.pdf (unknown)Special conditions:
Section
Source: National Smart Metering System Scope of Works_Oct26.pdf (unknown)The document does not state the evaluation scoring split, preference point system, or minimum qualifying score. Qualification requirements are as per the evaluationCriteria section.
Description
Source: T2.2-09 Letter of Good Standing - CPM 2020 Rev 01.pdfThe tender is for the supply, design, development, installation, testing and commissioning of a national smart metering system for electricity and water at Transnet Property.
Submission Guidelines
Source: T2.2-09 Letter of Good Standing - CPM 2020 Rev 01.pdf (RFP)Returnable documents:
Evaluation Criteria
Source: T2.2-09 Letter of Good Standing - CPM 2020 Rev 01.pdf (RFP)The Letter of Good Standing is a mandatory returnable schedule. Bids submitted without it may be disqualified.
Compliance Requirements
Source: T2.2-09 Letter of Good Standing - CPM 2020 Rev 01.pdf (RFP)Workmen's Compensation Fund: A valid Letter of Good Standing is required. For joint ventures, each member must have its own letter.
Description
Source: T2.2-10 Risk Elements CPM TSC 2020 Rev 02.pdfSupply, design, development, installation, testing and commissioning of a national smart metering system for electricity and water at Transnet Property.
Submission Guidelines
Source: T2.2-10 Risk Elements CPM TSC 2020 Rev 02.pdf (RFP)Returnable schedule T2.2-10 (Risk Elements) must be completed and submitted with the bid.
Financial Requirements
Source: T2.2-10 Risk Elements CPM TSC 2020 Rev 02.pdf (RFP)All costs related to risk elements at the Contractor's risk are deemed included in the tenderer's offered total price.
Environmental
Source: T2.2-10 Risk Elements CPM TSC 2020 Rev 02.pdfTenderers must identify and evaluate potential risk elements associated with the service and propose mitigation measures. If no risks are identified, state "No Risks". Tenderers must also evaluate risks stated by the Employer in Contract Data Part C1 and provide mitigation. All costs related to risk elements at the Contractor's risk are deemed included in the tenderer's offered total price.
Special Conditions
Source: T2.2-10 Risk Elements CPM TSC 2020 Rev 02.pdf (RFP)Tenderers must identify and evaluate potential risk elements associated with the service and propose mitigation measures. If no risks are identified, state "No Risks". Tenderers must also evaluate risks stated by the Employer in Contract Data Part C1 and provide mitigation. All costs related to risk elements at the Contractor's risk are deemed included in the tenderer's offered total price.
Contact Information
Source: T2.2-20 Supplier Integrity Pact CPM 2020 Rev 02.pdf (RFP)Tip-Off Anonymous hotline: 0800 003 056 (for reporting dishonest, fraudulent or corrupt behaviour by Transnet employees).
Submission Guidelines
Source: T2.2-20 Supplier Integrity Pact CPM 2020 Rev 02.pdf (RFP)Returnable documents:
Disqualification risks:
Evaluation Criteria
Source: T2.2-20 Supplier Integrity Pact CPM 2020 Rev 02.pdf (RFP)Evaluation is subject to the Integrity Pact and vendor registration requirements:
Technical Specifications
Source: T2.2-20 Supplier Integrity Pact CPM 2020 Rev 02.pdf (RFP)Scope: Supply, design, development, installation, testing and commissioning of a national smart metering system for electricity and water at Transnet Property.
Experience & Qualifications
Source: T2.2-20 Supplier Integrity Pact CPM 2020 Rev 02.pdfNo specific experience or qualification requirements are stated in this document. The Integrity Pact defines a competitor as any individual or organisation that has been requested to submit a tender, could potentially submit a tender based on qualifications, abilities or experience, or provides the same goods and services.
Pricing Schedule
Source: T2.2-20 Supplier Integrity Pact CPM 2020 Rev 02.pdfNo pricing schedule details are provided in this document. The Integrity Pact requires that pricing be fair, transparent and free from undue influence, and prohibits under-pricing or collusive pricing arrangements.
Financial Requirements
Source: T2.2-20 Supplier Integrity Pact CPM 2020 Rev 02.pdf (RFP)Sanctions for violations of the Integrity Pact may include:
Compliance Requirements
Source: T2.2-20 Supplier Integrity Pact CPM 2020 Rev 02.pdf (RFP)Vendor registration:
Integrity and conduct requirements:
Blacklisting grounds:
Health & Safety
Source: T2.2-20 Supplier Integrity Pact CPM 2020 Rev 02.pdfNo specific health and safety requirements are stated in this document. The Integrity Pact requires adherence to the UN Global Compact principles, including upholding human rights and labour standards.
Environmental
Source: T2.2-20 Supplier Integrity Pact CPM 2020 Rev 02.pdfBidders must uphold the ten principles of the United Nations Global Compact, including:
Contractual Terms
Source: T2.2-20 Supplier Integrity Pact CPM 2020 Rev 02.pdfThe Integrity Pact forms part of the final contract and is automatically incorporated.
Section
Source: T2.2-20 Supplier Integrity Pact CPM 2020 Rev 02.pdfNo additional evaluation criteria are stated in this document beyond the Integrity Pact requirements. Bidders must comply with the independent tendering provisions and may not collude with competitors.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Level 200, Carlton Centre, 150 Commissioner St, Cbd, Johannesburg, 2001, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
28
Last checked
15 Oct 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
subsidiary of Transnet
Contact
011-584-0635[email protected]www.transnet.netLevel 200, Carlton Centre, 150 Commissioner St, Cbd, Johannesburg, 2001, South Africa
Key Personnel
Provinces Active
Industries
Get deep intelligence on Supplies: General. Unlock full pricing strategies, bid frequency, and historical win rates.
Learn how to submit a winning bid with these related articles
Everything South African general contractors need to know about how to write a winning tender proposal without an in-house bid team in gauteng — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Your meticulously crafted General sector tender submission can be disqualified for a single, seemingly minor compliance oversight. The reality for South African contractors is that technical competence is no longer sufficient; it is underpinned by a non-negotiable framework of documentary compliance. This regulatory guide: mastering CSD and BBBEE compliance for general sector tenders in south africa provides a comprehensive, step-by-step breakdown of the mandatory registrations and certificates you must secure and present. We detail the precise requirements for CSD, BBBEE, SARS TCS, CIPC, and COIDA, explaining their function within the procurement ecosystem governed by the PFMA and PPPFA. Learn the actionable steps to prepare your business, avoid the most common disqualifying errors, and leverage technology to streamline your compliance process for successful bidding in 2026 and beyond.
For South African General contractors, the path to government procurement is paved with non-negotiable regulatory requirements. The most common barrier to entry is not a lack of capability, but a failure to master the foundational compliance frameworks that govern every bid. This complete regulatory guide to CSD and BBBEE compliance for General sector tender suppliers in South Africa demystifies the process. It provides a meticulous, step-by-step field manual for ensuring your company is fully compliant and audit-ready, enabling you to confidently access the R billions in opportunities across infrastructure maintenance, facilities management, and service delivery within the General sector.
This definitive guide provides General sector contractors with the precise, actionable steps required to achieve and maintain CSD and BBBEE compliance for South African public tenders in 2026. Authored by Dr. Sarah Mokwena, a Legal Compliance Specialist, it meticulously walks through the regulatory framework, mandatory registrations, and the critical documentation needed to avoid disqualification. We dissect the common, costly errors made during submission and provide a clear checklist to ensure your bid is responsive and competitive. Learn how to navigate the Central Supplier Database, validate your BBBEE status, and integrate compliance into your tender preparation process.
💡 Want more tendering tips and strategies?
Explore Our Blog