Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Proposal
Delivery Location
1 Jones Road - Kempton Park - Gauteng - 1632
Organization Type
GOVERNMENT
Published
25 Aug 2026
OCDS Reference
ocds-9t57fa-166832
This contract covers the replacement of HVAC equipment at or tambo international airport over a 24-month period, using the nec3 engineering and construction contract. Bidders must meet strict transformation requirements, including subcontracting at least 30% of work to a qualifying targeted enterprise, and must provide a performance bond and insurance cover before signing.
Bidders must be registered on the CSD (Central Supplier Database).
Bidders must have a valid tax clearance (SARS TCS or tax pin).
Bidders must have a B-BBEE certificate; annual presentation is required and failure is a material breach.
Bidders must provide a performance bond of 5% of contract value (excluding VAT) within 10 working days from notification of award.
Bidders must subcontract at least 30% of work to a Targeted Enterprise (B-BBEE Level 2, 50% black-owned or 30% black women-owned).
Bidders must not subcontract more than 25% of tendered contract value (excluding Targeted Enterprise work) to enterprises without equal or higher B-BBEE status.
Bidders must have key personnel including Project Manager, Air-conditioning and Refrigeration Mechanic, Electrician/Millwright, Controls and Instrumentation Engineer, and OH&S Practitioner, with CVs appended to the Resource Proposal.
Bidders must secure Contract Works Insurance (min R250,000 per claim) and Public Liability Insurance (min R275,000 for 3rd party property damage) and provide proof of cover before contract signing.
Bidders must be able to work at O.R. Tambo International Airport, including restricted areas, with 24/7 access.
Bidders must accept the NEC3 ECC conditions, including additional Z clauses (e.g., ethics, confidentiality, step-in rights, IP).
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Venue
Join: https://teams.microsoft.com/meet/370076017612139?p=VPnw7IUt6eJYzNrVk3 Meeting ID: 370 076 017
Request for Proposal
1 Jones Road - Kempton Park - Gauteng - 1632
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: Good Manufacturing Practice (GMP), SABS Product Certification, NRCS Certification
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Document being finalised: ORTIA81722026RFP- REPLACEMENT OF HVAC EQUIPMENT.pdf. You don’t need to refresh — this page will pick up the updated review automatically.
25 Aug
2026
Tender Published
Tender was published
22 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
NEC 3 ECC_Contractor Appointment of Replacement of HVAC Equipment at ORTIA.pdf
Replacement of HVAC equipment at O.R. Tambo International Airport, Phase 1, under an NEC3 Engineering and Construction Contract (Option A, priced contract with activity schedule) for a 24-month period. The employer is Airports Company South Africa (ACSA), and the contract includes secondary options for performance bond, retention, delay damages, and additional conditions including transformation imperatives.
ORTIA81722026RFP- REPLACEMENT OF HVAC EQUIPMENT.pdf
Replacement of HVAC equipment, phase 1, at O.R. Tambo International Airport, under a 24-month contract. The Airports Company South Africa (ACSA) is the employer, and the successful bidder will be appointed as contractor.
To download these documents and access AI-powered analysis, visit the main tender page.
Win ACSA tenders with AI Matching Engine, airport-infrastructure intelligence, compliance analysis, and application support for aviation operations.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Median Estimate
R 2 891 331
Range
Based on 20 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Important Dates
Source: ORTIA81722026RFP- REPLACEMENT OF HVAC EQUIPMENT.pdf (RFP)Briefing session (non-compulsory): 02 September 2026 at 10H00, held via Microsoft Teams (link provided in document). Closing date for enquiries: 09 September 2026 at 16h00. Employer's response to requests for clarification by 14 September 2026 before 16H00. Addenda will be issued until ten (10) working days before tender closing. Tender closing date and time: 22 September 2026 at 12h00 pm (South African Time). Tender offer validity: 12 weeks (84 days) from closing time.
Contact Information
Source: ORTIA81722026RFP- REPLACEMENT OF HVAC EQUIPMENT.pdf (RFP)Bidding procedure and technical enquiries: Davis Mthethwa, email [email protected]. Queries relating to issue of documents: same email. Closing date for enquiries: 09 September 2026 at 16h00. Bidders may not contact any ACSA employee on this tender other than those listed. All communication during tender period to be directed to ACSA's Supply Chain Department, not the Principal Agent.
Submission Guidelines
Source: ORTIA81722026RFP- REPLACEMENT OF HVAC EQUIPMENT.pdf (RFP)Submit bids in printed format: 1 Original and 1 Copy, sealed in clearly marked envelopes/packages indicating 'Original' and 'Copy', with the tenderer's name, contact details, tender reference number (ORTIA8172/2026/RFP) and description. Deliver to Tender Box A at 1 Jones Road, Airports Company South Africa SOC Limited Tender Offices, North Wing, 3rd Floor, O.R. Tambo International Airport. The Bid Register must be completed and signed by the person depositing the bid. Bids must be submitted during working hours Monday to Friday. Late bids will not be accepted and will be returned unopened. Telephonic, telegraphic, telex, facsimile, e-mailed tenders will not be accepted. Bids must be submitted on the official tender documentation issued (not re-typed). The bid document and contract document must be completed and returned in their entirety with supporting information. Returnable forms include: SBD 1 (Invitation to Bid), Form of Offer (C1.1), and all other returnable schedules listed in Part T2. Proof of authority (e.g., company resolution) must accompany the signature. Bidders must provide a SARS TCS PIN or CSD number; failure to provide or comply with tax compliance particulars may render the bid invalid.
Evaluation Criteria
Source: ORTIA81722026RFP- REPLACEMENT OF HVAC EQUIPMENT.pdf (RFP)Evaluation follows a staged process. Stage 1: Responsiveness test. Stage 2: Mandatory Administration Criteria – submit a fully completed and signed Form of Offer (C1.1) and provide a valid CIDB certificate of 7ME or higher. Stage 3: Functionality evaluation – minimum threshold of 75 points out of 100 to proceed. Functionality criteria: (1) Qualifications of key personnel (40 points) – Project Manager (BTECH/BEng/BSC Mechanical, PRTECH/PRENG ECSA registration), Refrigeration Mechanic (N2-N4/N5, SAQA trade test), Electrician (N2-N4/N5, SAQA trade test, wireman's license), Controls Engineer (BTECH/BENG/BSC Electronics/Mechatronics, PRTECH/PRENG ECSA), Occupational Health and Safety Practitioner (diploma/degree, SACPCMP registration). (2) Years of experience of key personnel (30 points) – as per detailed scoring. (3) Relevant completed projects (30 points) – number of contactable completed installation/replacement/refurbishment of Air Handling Units, each of at least R9 million including VAT; 0 projects = 0 points, 1 project = 15 points, 2 projects = 30 points, 3 projects = 30 points. References must be on referee company letterhead, include description, value, duration, and contactable details; maintenance references, purchase orders, award or appointment letters not accepted. Stage 4: Price and Preference – 80/20 preference point system. Price points calculated using the formula Ps = 80(1 - (Pt - Pmin)/Pmin). Preference points for specific goals: B-BBEE Status Level 1 = 5, Level 2 = 4.5, Level 3 = 4, Level 4 = 3, Level 5 = 2, Level 6 = 0.5, Level 7 = 0.3, Level 8 = 0.1; Black youth majority-owned = 5, Black women majority-owned = 5, Company majority owned by people with disabilities = 5; non-compliant contributor = 0. Proof required: original or certified sworn affidavit or B-BBEE certificate from SANAS accredited agency; for JV, consolidated certificate. Bidders failing to submit proof score zero for that goal but are not disqualified. Alternative bids will not be considered. Prices must be fixed for the contract duration (no price adjustments).
Technical Specifications
Source: ORTIA81722026RFP- REPLACEMENT OF HVAC EQUIPMENT.pdf (RFP)Scope: Replacement of HVAC equipment phase 1 at O.R. Tambo International Airport for a period of 24 months. The works include installation and commissioning of central HVAC systems, air handling units, packaged units, fan coil units, fresh air ventilation fans, and air distribution ducting. The contract is subject to the CIDB Standard Conditions of Tender (Annex C of CIDB Standard for Uniformity in Construction Procurement, 8 August 2019). The contract shall not be subject to price adjustments; rates and prices remain fixed for the full duration. Insurance requirements are to be completed by the successful bidder (details in Contract Data). Occupational Health and Safety Agreement and Insurance Schedule are included in the contract documents.
Financial Requirements
Source: ORTIA81722026RFP- REPLACEMENT OF HVAC EQUIPMENT.pdf (RFP)No specific financial turnover or bonding requirements stated in the document. However, the contract is for a 24-month period and the pricing schedule must be completed. The successful bidder will be required to submit securities, bonds, guarantees, policies and certificates of insurance as required by the contract data. Prices must be in Rand, include all duties and taxes except VAT (VAT shown separately), and remain fixed for the contract duration.
Compliance Requirements
Source: ORTIA81722026RFP- REPLACEMENT OF HVAC EQUIPMENT.pdf (RFP)Mandatory: CIDB contractor grading of 7ME or higher (valid CIDB certificate required). Tax compliance: bidders must submit their SARS TCS PIN or CSD number; for consortia/JV/sub-contractors, each party must submit a separate TCS certificate/PIN/CSD number. Bidders must be registered on the Central Supplier Database (CSD) or provide a CSD number if no TCS PIN available. Joint ventures eligible if every member is CIDB-registered, lead partner has required grading (or not lower than one level below), and combined grading meets requirement. Bidders must not be under any restriction from doing business with ACSA. Bidders must submit a fully completed and signed Form of Offer (C1.1). B-BBEE preference points claimed under 80/20 system; proof required (sworn affidavit or B-BBEE certificate from SANAS accredited agency; for JV, consolidated certificate). Foreign suppliers must complete the Questionnaire to Bidding Foreign Suppliers. Bidders must declare any conflict of interest. Failure to provide tax compliance particulars may render the bid invalid.
Description
Source: NEC 3 ECC_Contractor Appointment of Replacement of HVAC Equipment at ORTIA.pdfReplacement of HVAC equipment at OR Tambo International Airport for a period of 2 years, as set out in Section C3 Works Information. Site boundaries: OR Tambo International Airport. Site Information in Part 4, Works Information in Part 3.
Contact Information
Source: NEC 3 ECC_Contractor Appointment of Replacement of HVAC Equipment at ORTIA.pdf (unknown)Employer: Airports Company South Africa SOC Ltd (Reg no: 1993/004149/30), registered office at OR Tambo International Airport, 3rd Floor ACSA North Wing Offices, Kempton Park, 1627. Project Manager and Supervisor: TBC, same address. Contact details for adjudicators and arbitrators are provided in the panels.
Submission Guidelines
Source: NEC 3 ECC_Contractor Appointment of Replacement of HVAC Equipment at ORTIA.pdf (unknown)Submit the completed Form of Offer and Acceptance (C1.1) and Contract Data Part 2 (C1.2b) with all required data. Provide any bonds, guarantees, proof of insurance, and other documentation as specified in the contract data. Failure to fulfil these obligations constitutes repudiation of the agreement. The contract becomes binding unless the bidder notifies the employer in writing within five working days of receipt of any reason for non-acceptance.
Returnable Documents
Source: NEC 3 ECC_Contractor Appointment of Replacement of HVAC Equipment at ORTIA.pdf (unknown)Performance bond in the form of a demand guarantee required; retention money guarantee may be provided. Pro forma documents for bonds and guarantees in C1.3. Proof of insurance cover required before contract signing.
Evaluation Criteria
Source: NEC 3 ECC_Contractor Appointment of Replacement of HVAC Equipment at ORTIA.pdf (unknown)Bidders must be registered on the CSD (Central Supplier Database). Bidders must have a valid tax clearance (SARS TCS or tax pin). Bidders must have a B-BBEE certificate (annual presentation required; failure is a material breach). Bidders must provide a performance bond of 5% of contract value. Bidders must have capacity to provide key personnel as listed (Project Manager, Air-conditioning and Refrigeration Mechanic, Electrician/Millwright, Controls and Instrumentation Engineer, OH&S Practitioner). Bidders must comply with the transformation imperative: subcontract at least 30% of work to a Targeted Enterprise (B-BBEE Level 2, 50% black-owned or 30% black women-owned). Bidders must not subcontract more than 25% of tendered contract value (excluding Targeted Enterprise work) to enterprises without equal or higher B-BBEE status. Bidders must have financial capacity to secure required insurances (Contract Works and Public Liability). Bidders must be able to work at O.R. Tambo International Airport, including restricted areas, with 24/7 access. Bidders must accept the NEC3 ECC conditions, including additional Z clauses (e.g., ethics, confidentiality, step-in rights, IP).
Technical Specifications
Source: NEC 3 ECC_Contractor Appointment of Replacement of HVAC Equipment at ORTIA.pdf (unknown)Replacement of HVAC equipment at OR Tambo International Airport for a period of 2 years. Works are set out in Section C3 (Works Information). Site information is in Part C4. Key personnel required: Project Manager, Air-conditioning and Refrigeration Mechanic, Electrician/Millwright, Controls and Instrumentation Engineer, Occupational Health and Safety Practitioner. CVs to be appended to Resource Proposal (Annex F).
Experience & Qualifications
Source: NEC 3 ECC_Contractor Appointment of Replacement of HVAC Equipment at ORTIA.pdf2 Air-conditioning and
Refrigeration Mechanic
Name:
Qualifications relevant to this
contract
3 Electrician / Millwright
Name:
Qualifications relevant to this
contract
4 Controls and Instrumentation
Engineer
Name:
Qualifications relevant to this
contract
5 Occupational Health and Safety
Practitioner
Name:
Contract Data (Contractor) C1.2b
Confidential
Qualifications relevant to this
contract
Contract Data (Contractor) C1.2b
Confidential
C1.3 Forms of Securities
Pro formas for Bonds & Guarantees
The conditions of contract stated in the Contract Data Part 1 include the following Secondary Options:
Option X13: Performance Bond
Each of these secondary Options requires a bond or guarantee “in the form set out in the Works
Information”. Pro forma documents for these bonds and guarantees are provided here for convenience
but are to be treated as part of the Works Information.
Option X16: Retention (not used with Option F)
The Contractor may provide a Retention Money Guarantee in the form stated here. When the Employer
receives and accepts a Retention Money Guarantee exactly in the form stated he will instruct the Project
Manager not to assess any amount be retained in terms of secondary Option X16.
The organisation providing the bond / guarantee does so by copying the pro forma document onto his
letterhead without any change to the text or format and completing the required details. The completed
document is then given to the Employer within the time stated in the contract.
Forms of Sureties C1.3
Confidential
Confidential
Pro forma Performance Bond – Demand Guarantee (for use with
Option X13)
(to be reproduced exactly as shown below on the letterhead of the Bank providing the Bond / Guarantee)
[Insert Contractor’s name and registered address] Bank reference No.
Date:
Dear Sirs,
Performance Bond – Demand Guarantee for [insert name of Contractor] required in terms of contract
[insert Contractor’s contract reference number or title]
In this Guarantee the following words and expressions shall have the following meanings: -
1.1 “Bank” means [Insert name of Bank], [●] Branch, Registration No. [●]
1.2 “Bank’s Address” means [Insert physical address of Bank]
1.3 “Contract” means the written agreement relating to providing the works, entered into
between the Employer and the Contractor, on or about the [●] day of
[●] 20[●] (Contract Reference No. [●]) as amended, varied, restated,
novated or substituted from time to time;
1.4 “Contractor” means [●] a company registered in accordance with the laws of [●] under
Registration No [●].
1.5 “Employer” means Airports Company South Africa SOC Limited a company registered in
accordance with the laws of the Republic of South Africa under
Registration Number 1993/004149/30
1.6 “Expiry Date” means the earlier of
the date that the Bank receives a notice from the Employer stating that
all amounts due from the Contractor as certified in terms of the
contract have been received by the Employer and that the Contractor
has fulfilled all his obligations under the Contract, or
the date that the Bank issues a replacement Bond for such lesser or
higher amount as may be required by the Employer.
1.7 “Guaranteed Sum” means 10% of contract value excluding VAT which must be submitted within
10 working days from notification of award
1.8 “works” means Replacement of HVAC Equipment at OR Tambo International
Airport as set out in the Section C3, Works Information
At the instance of the Contractor, we the undersigned ______________ and ______________, in our
respective capacities as _____________ and ___________ of the Bank, and duly authorized thereto, confirm
that we hold the Guaranteed Sum at the disposal of the Employer as security for the proper performance by
the Contractor of all of its obligations in terms of and arising from the Contract and hereby undertake to pay to
the Employer, on written demand from the Employer received prior to the Expiry Date, any sum or sums not
exceeding in total the Guaranteed Sum.
Forms of Sureties C1.3
Confidential
Confidential
A demand for payment under this guarantee shall be made in writing at the Bank’s address and shall:
be signed on behalf of the Employer by a director of the Employer;
state the amount claimed (“the Demand Amount’);
state that the Demand Amount is payable to the Employer in the circumstances contemplated in the Contract.
Notwithstanding the reference herein to the Contract the liability of the Bank in terms hereof is as principal and
not as surety and the Bank’s obligation/s to make payment:
is and shall be absolute provided demand is made in terms of this bond in all circumstances; and
is not, and shall not be construed to be, accessory or collateral on any basis whatsoever.
The Bank’s obligations in terms of this Guarantee:
Sum; and
hereof shall not be delayed, by the fact that a dispute may exist between the Employer and the
Contractor.
The Employer shall be entitled to arrange its affairs with the Contractor in any manner which it sees fit, without
advising us and without affecting our liability under this Guarantee. This includes, without limitation, any
extensions, indulgences, release or compromise granted to the Contractor or any variation under or to the
Contract.
Should the Employer cede its rights against the Contractor to a third party where such cession is permitted
under the Contract, then the Employer shall be entitled to cede to such third party the rights of the Employer
under this Guarantee on written notification to the Bank of such cession.
This Guarantee:
shall expire on the Expiry Date until which time it is irrevocable;
is, save as provided for in Error! Reference source not found. above, personal to the Employer and is neither n
egotiable nor transferable;
shall be returned to the Bank upon the earlier of payment of the full Guaranteed Sum or expiry hereof;
shall be regarded as a liquid document for the purpose of obtaining a court order; and
shall be governed by and construed in accordance with the law of the Republic of South Africa and shall be
subject to the jurisdiction of the Courts of the Republic of South Africa.
will be invalid and unenforceable if any claim which arises or demand for payment is received after the Expiry
Date.
The Bank chooses domicilium citandi et executandi for all purposes in connection with this Guarantee at the
Bank’s Address.
Signed at on this day of 20__
For and on behalf of the Bank
Bank Signatories(s)
Name(s) (printed)
Forms of Sureties C1.3
Confidential
Confidential
Witness(s)
Bank’s seal or stamp
Forms of Sureties C1.3
Confidential
Confidential
C1.4 Insurance Schedule
Summary of Terms and other Matters Applicable to Employer Provided Insurance
Insurance clauses for capex projects
This is an ACSA internal document and should not be shared with external stakeholders in
this format. Only the insurance clauses relevant to the particular project should be copied
and pasted to that tender document or contract.
Section a: definitions
Landside refers to:
Areas of the airport before the security points; and
The restricted area beyond the security points but, within the perimeter of gatehouses,
passenger terminals and cargo buildings.
Airside refers to:
The Apron / maneuvering areas; and
Area within the airside boundary/perimeter fence, excluding the internal areas of the
passenger terminals, perimeter gatehouses and cargo buildings.
Insurance Clauses C1.4
Section b: insurance clauses
And duration not exceeding 36 months on the landside
automatically covered under an ACSA umbrella insurance. No need to notify ACSA
Treasury about these projects.
and sent to ACSA Treasury (Email: [email protected]) for all projects with a
value below R50 million, and with a duration that exceeds 36 months as soon as the
contract is awarded, as these projects are not automatically covered under an ACSA
umbrella insurance.
1.1 Contract Works Insurance
The contractor must secure a contract works insurance cover for a limit not less than R250
000, each and every claim
The contractor must submit to ACSA proof of cover in the form of a certificate of insurance
before a contract is signed between ACSA and the contractor
1.2 Public Liability Insurance
The contractor must secure Public Liability insurance cover for 3rd party property damage, for
a limit not less than R275 000 for each and every claim;
The contractor must secure Public Liability insurance cover for removal of lateral support, for
a limit not less than R500 000 for each and every claim;
The contractor must submit to ACSA proof of cover in the form of a certificate of insurance
before a contract is signed between ACSA and the contractor
1.3 Professional Indemnity Insurance
All consultants must secure Professional Indemnity cover for a limit not less than R5 million;
Contractors who have a material design element, excluding typical P & G related work, as
part of their scope, must secure Professional Indemnity cover for a limit not less than R5
million;
The consultant must submit to ACSA proof of cover in the form of a certificate of insurance
before a contract is signed between ACSA and consultant.
Insurance Clauses C1.4
And duration not exceeding 36 months on the airside
Projects with a value below R50 million and with a duration not exceeding 36 months are
automatically covered under an ACSA umbrella insurance. No need to notify ACSA Treasury
about these projects.
But please note that Project Notification forms should be completed by project managers
and sent to ACSA Treasury (Email: [email protected]) for all projects with a
value below R50 million, and with a duration that exceeds 36 months as soon as the contract
is awarded, as these projects are not automatically covered under an ACSA umbrella
insurance.
2.1 Contract Works Insurance
The contractor must secure a contract works insurance cover for a limit not less than R250
000, for each and every claim
The contractor must submit to ACSA proof of cover in the form of a certificate of insurance
before a contract is signed between ACSA and the contractor
2.2 Public Liability Insurance
The contractor must secure Public Liability insurance cover for 3rd party property damage, for
a limit not less than R525 000, for each and every claim;
The contractor must secure Public Liability insurance cover for removal of lateral support, for
a limit not less than R750 000, for each and every claim;
The contractor must secure Public Liability insurance cover for damage to aircraft, for a limit
not less than R750 000, for each and every claim
The contractor must submit to ACSA proof of cover in the form of a certificate of insurance
before a contract is signed between ACSA and the contractor
2.3 Professional Indemnity Insurance
All consultants must secure Professional Indemnity cover for a limit of not less than R5 million;
Contractors who have a material design element, excluding typical P & G related work, as
part of their scope, must secure Professional Indemnity cover for a limit not less than R5
million;
The consultant must submit to ACSA proof of cover in the form of a certificate of insurance
before a contract is signed between ACSA and consultant.
Insurance Clauses C1.4
contract
Experience
contract
Experience
contract
Experience
contract
Experience
Contract Data (Contractor) C1.2b
Quality Management
Source: NEC 3 ECC_Contractor Appointment of Replacement of HVAC Equipment at ORTIA.pdfbeen discovered on reasonable inspection by
the Employer or the Supervisor before the
defects date, without requiring any inspection
not ordinarily carried out by the Employer or the
any inspection over and above the reasonable
inspection, this does not place a greater
responsibility on the Employer or the Supervisor
to have discovered the Defect.
Financial Requirements
Source: NEC 3 ECC_Contractor Appointment of Replacement of HVAC Equipment at ORTIA.pdf (unknown)Pricing data in Part C2. Offered total exclusive of VAT, VAT @ 15%, and total inclusive of VAT to be filled. Method of measurement: 6th edition of the Standard System of Measuring Building Works. Performance bond: 5% of contract value excluding VAT, submitted within 10 working days from notification of award. Retention: 5%. Delay damages: 0.05% of contract value per day, up to maximum 10%. Insurance: Contract Works Insurance limit not less than R250,000 each claim; Public Liability for 3rd party property damage not less than R275,000; removal of lateral support not less than R500,000; Professional Indemnity not less than R5 million if applicable. Proof of cover required before contract signing.
Compliance Requirements
Source: NEC 3 ECC_Contractor Appointment of Replacement of HVAC Equipment at ORTIA.pdf (unknown)CSD registration required. Valid tax clearance required. B-BBEE certificate required annually; failure is a material breach. Targeted Enterprise subcontracting: minimum 30% of work to a B-BBEE Level 2 enterprise, 50% black-owned or 30% black women-owned. No subcontracting more than 25% of tendered contract value to enterprises without equal or higher B-BBEE status. CIDB registration required for targeted enterprises. OHSA compliance required (Section 37(2)).
B-BBEE Requirements
Source: NEC 3 ECC_Contractor Appointment of Replacement of HVAC Equipment at ORTIA.pdf (unknown)Annual presentation of compliant BEE Certificate required; failure is a material breach. Service Provider shall contract with Targeted Enterprise(s) to perform minimum 30% of work. Targeted Enterprise must be at least EME or QSE with B-BBEE Status Level Two Contributor, 50% or more black owned or 30% or more black women owned. Service Provider shall not sub-contract more than 25% of tendered contract value to any enterprise without equal or higher B-BBEE status, unless the sub-contractor is an EME with capability. Penalties apply for failure to meet specified targets.
Health & Safety
Source: NEC 3 ECC_Contractor Appointment of Replacement of HVAC Equipment at ORTIA.pdfContractor acknowledges it is an employer in its own right with duties under the Occupational Health and Safety Act, and agrees to ensure all work performed, or Equipment, Plant and Materials used, are in accordance with the Act, particularly the Construction Regulations.
Contractual Terms
Source: NEC 3 ECC_Contractor Appointment of Replacement of HVAC Equipment at ORTIA.pdfInsurance requirements: For projects below R50 million and duration not exceeding 36 months on landside, automatic coverage under ACSA umbrella insurance; otherwise project notification forms must be sent to ACSA Treasury. Contract Works Insurance limit not less than R250,000 each claim; Public Liability for 3rd party property damage not less than R275,000; removal of lateral support not less than R500,000; Professional Indemnity not less than R5 million if applicable; additional limits as specified.
Requirements
Source: NEC 3 ECC_Contractor Appointment of Replacement of HVAC Equipment at ORTIA.pdf (unknown)Key personnel required: Project Manager, Air-conditioning and Refrigeration Mechanic, Electrician/Millwright, Controls and Instrumentation Engineer, Occupational Health and Safety Practitioner. CVs appended to Resource Proposal (Annex F). First programme for acceptance within 2 weeks of Contract Date; revised programmes at intervals no longer than 2 weeks. Performance bond of 5% of contract value excluding VAT within 10 working days from notification of award. Transformation imperatives: minimum 30% of work to Targeted Enterprise(s); not sub-contract more than 25% of tendered contract value to enterprises without equal or higher B-BBEE status; meet contract skills development goals.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
1 Jones Road - Kempton Park - Gauteng - 1632
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
2
Last checked
25 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.