Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Hustle - Germiston - Johannesburg - 0001
Organization Type
GOVERNMENT
Published
25 Aug 2026
OCDS Reference
ocds-9t57fa-166896
Deep cleaning services are being procured for ESKOM rotek industries for a period of five years. The services include monthly deep cleaning of female, unisex, and disabled ablution facilities across multiple sites. Bidders must be registered and qualified service providers with the necessary expertise and experience.
The bidder must be a registered and qualified service provider.
The bidder must have the necessary expertise and experience to provide deep cleaning services.
The bidder must comply with all relevant laws and regulations.
Bidders must submit their bids in the format specified in the tender document, including all required returnable forms.
The bid must be submitted to the address specified in the tender document by the closing date and time of 2026-09-25T10:00:00.000Z.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Venue
Microsoft Teams
Request for Bid(Open-Tender)
Hustle - Germiston - Johannesburg - 0001
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
Submission Guidelines
Source: Safety Appendix B1.pdf (unknown)Returnable documents:
25 Aug
2026
Tender Published
Tender was published
25 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Finance Appendix D.pdf
Deep cleaning services for Eskom Rotek Industries SOC Limited over a five-year period.
NEC TSC3 - Term Services Contract-.pdf
Eskom Rotek Industries is procuring professional deep cleaning services for its Rosherville premises, covering ablutions, canteen, and medical centre on a weekly, monthly, and ad-hoc basis. The contract is an NEC3 Term Service Contract (Option A) with a stated service period of three years (though the tender title indicates five years). Bidders must price a list of items and comply with detailed cleaning specifications, environmental and safety regulations.
Quality Appendix C.pdf
ESKOM is procuring a deep cleaning service for a period of five years. The service is required for ESKOM Rotek Industries SOC Limited.
Safety Appendix B1.pdf
Eskom Rotek Industries SOC Limited is procuring a deep cleaning service for a period of five years. The tender requires bidders to acknowledge and comply with Eskom's OHS legal and other requirements, including various standards and acts, and to manage any subcontractors in line with these obligations.
BOQ Annexure F.pdf
ESKOM is procuring a deep cleaning service for its RoTek Industries for a period of five years. The service includes deep cleaning of various areas, including medical centres, consultation rooms, and ablution facilities.
Scope Of Work Appendix A.pdf
Eskom Rotek Industries (ERI) is procuring deep cleaning services for its Rosherville premises for a five-year period. The scope covers deep cleaning of all areas on the matrix, including high-traffic zones, ablutions, and the medical centre, with weekly high-traffic cleaning and bi-weekly medical centre disinfection. The contract requires environmentally friendly chemicals, strict record-keeping, and compliance with SHEQ and hazardous chemical regulations.
BOQ Annexure C.pdf
ESKOM is procuring a deep cleaning service for its RoTek Industries for a period of five years. The service includes monthly cleaning of various areas, including female and disabled ablutions, offices, and other facilities.
Safety Appendix B2.pdf
Eskom Rotek Industries SOC Limited is procuring deep cleaning services for a period of five years. The services are required for the Rosherville site.
Safety Appendix B3.pdf
A deep cleaning service for ESKOM ROTEK Industries SOC Limited, to be provided over a five-year period. Bidders must meet specific Occupational Health and Safety (OHS) evaluation criteria as part of the tender submission.
Pricing Annexure A.pdf
Deep cleaning services for Eskom Rotek Industries SOC Limited, covering weekly, bi-weekly, monthly, and ad hoc cleaning of toilets, urinals, basins, showers, and a medical centre, over a five-year period.
BOQ Annexure E.pdf
Eskom Rotek Industries is procuring deep cleaning services for female and disabled/unisex ablution facilities across multiple buildings and blocks at its TSS, TGS, RRR, and training centre sites, with weekly service frequencies and a contract period of five years.
BOQ Annexure B.pdf
Deep cleaning service for male ablutions at multiple Eskom Rotek Industries sites, including office blocks, training centres, construction areas, and depots, to be performed monthly over a five-year period.
Invitation to Tender (ITT) Deep cleaning.pdf
Deep cleaning service for Eskom Rotek Industries SOC Limited for a period of five years. Tender issued by Eskom Holdings SOC Ltd. Tender number E1226SSERI. Closing date 25 September 2026 at 10:00. Submission via Eskom E-tendering portal.
BOQ Annexure D.pdf
Deep cleaning service for male ablutions at multiple ESKOM ROTEK areas (TSS, TGS, 6 Storey Building, RRR Computer Training Centre, TGS Training Centre, Training Centre B East, Rietbok, Ribbok, Stand 35, BMS Plant Workshop, and OSM Ablution) for a period of five years, with weekly service frequencies specified for toilets, urinals, basins and showers.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Median Estimate
R 2 479 688
Range
Based on 21 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Evaluation Criteria
Source: Safety Appendix B1.pdf (unknown)Bidders must sign and return Annexure B: Acknowledgement Form for Eskom OHS legal and other requirements, confirming they have obtained copies of the listed OHS documents and understand the consequences of non-compliance.
Technical Specifications
Source: Safety Appendix B1.pdf (unknown)appointment of contractors or suppliers for the commencement
of work
Compliance Requirements
Source: Safety Appendix B1.pdf (unknown)Bidders must comply with the following OHS documents when working at or rendering a service to Eskom:
After contract award, the supplier must align its processes to Eskom's OHS requirements (policies, procedures, standards).
Penalties will be enforced on the main supplier for non-conformance to Eskom or statutory OHS requirements, including non-conformance by its contractors or suppliers.
All employees (contractors/suppliers) must undergo the relevant Eskom induction and the company's project/scope specific induction.
Contractual Terms
Source: Safety Appendix B1.pdfThe main contractor/supplier must:
Evaluation Criteria
Source: Finance Appendix D.pdf (unknown)Bidders must demonstrate financial viability by submitting three years of audited annual financial statements. Eskom may require additional financial security — such as a performance bond, parent company guarantee, or other financial assistance — to mitigate delivery risk. If risks cannot be adequately mitigated, the contract may be awarded to another supplier.
Technical Specifications
Source: Finance Appendix D.pdf (unknown)important to eliminate non-Delivery performance bond, parent company guarantee, any
Financial Requirements
Source: Finance Appendix D.pdf (unknown)Three years of audited annual financial statements are required to ascertain financial viability. Eskom reserves the right to request a performance bond, parent company guarantee, or other financial security as risk mitigation. Failure to mitigate financial risk may result in the contract being awarded to another supplier.
Compliance Requirements
Source: Finance Appendix D.pdf (unknown)No specific requirements found
Contractual Terms
Source: Finance Appendix D.pdfEskom may require a performance bond, parent company guarantee, or other financial assistance to mitigate delivery risk. If financial risks cannot be mitigated to ensure contract performance, Eskom reserves the right to award the contract to another supplier.
Requirements
Source: Finance Appendix D.pdf (unknown)Bidders must provide three years of audited annual financial statements to demonstrate financial viability.
Important Dates
Source: Pricing Annexure A.pdf (unknown)The closing date is 2026-09-25T10:00:00.000Z. No other important dates are mentioned.
Contact Information
Source: Pricing Annexure A.pdf (unknown){"name":null,"email":null,"phone":null,"department":"ESKOM","address":null}
Submission Guidelines
Source: Pricing Annexure A.pdf (unknown)Bidders must submit their bids to the address specified in the tender document. The submission method is not specified. Returnable forms are not explicitly mentioned, but the pricing schedule is included in the annexure.
Evaluation Criteria
Source: Pricing Annexure A.pdf (unknown)No eligibility criteria are specified. The evaluation criteria are not clearly stated in the provided document.
Technical Specifications
Source: Pricing Annexure A.pdf (unknown)The technical specifications include the provision of deep cleaning services for Eskom Rotek Industries SOC Limited for a period of five years. The services include weekly, every 2nd week, and monthly services for toilets, urinals, basins, and showers.
Pricing Schedule
Source: Pricing Annexure A.pdf (unknown)The pricing schedule includes weekly, every 2nd week, and monthly services with their respective Pilog Numbers, Service item Descriptions, Monthly Qtys, 5 Year Qtys, Unit Prices, and 5 Year Costs as specified in Annexure A.
Financial Requirements
Source: Pricing Annexure A.pdf (unknown)The financial requirements include the pricing schedule as specified in Annexure A, which includes weekly, every 2nd week, and monthly services with their respective Pilog Numbers, Service item Descriptions, Monthly Qtys, 5 Year Qtys, Unit Prices, and 5 Year Costs.
Compliance Requirements
Source: Pricing Annexure A.pdf (unknown)No specific compliance requirements are found in the provided document.
Contact Information
Source: Safety Appendix B3.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"......."}
Submission Guidelines
Source: Safety Appendix B3.pdf (unknown)Returnable forms: SBD 4 (Declaration of Interest), SBD 9 (Certificate of Independent Bid Determination). Submission method and address not specified.
Evaluation Criteria
Source: Safety Appendix B3.pdf (unknown)All listed OHS returnables are mandatory for SHE evaluation. Bidders must be registered with the Compensation Commissioner (COID) or a licensed mutual company (or equivalent for international bidders). The OHS policy must expressly comply with OHS Act Section 7.
Technical Specifications
Source: Safety Appendix B3.pdf (unknown)SHE EVALUATION CRITERIA FOR DEEP CLEANING Support Services - Risk & Strategy. Health and Safety Plan, Baseline OHS Risk Assessment, Valid Letter of Good Standing, OHS policy signed by CEO, OHS Competency.
Experience & Qualifications
Source: Safety Appendix B3.pdf(Consider scope of work, risks, OHS plan and applicability) CVs and qualifications / certificates (List competencies required)
Compliance Requirements
Source: Safety Appendix B3.pdf (unknown)Registration with the Compensation Commissioner (COID) or a licensed mutual company (or equivalent for international bidders). OHS policy must comply with OHS Act Section 7. Health and Safety Plan, Baseline OHS Risk Assessment, Valid Letter of Good Standing, OHS policy signed by CEO, OHS Competency.
Health & Safety
Source: Safety Appendix B3.pdfHealth and Safety Plan, Baseline OHS Risk Assessment, Valid Letter of Good Standing, OHS policy signed by CEO, OHS Competency. Compliance with OHS Act Section 7 and 37(2) required.
Requirements
Source: Safety Appendix B3.pdf (unknown)OHS plan/manual, Baseline Risk Assessment, Letter of good standing, SHE policy. Compliance with OHS Act and Regulations required.
Section
Source: Safety Appendix B3.pdfSHE EVALUATION CRITERIA FOR DEEP CLEANING Support Services - Risk & Strategy. All listed OHS returnables are mandatory for SHE evaluation.
Evaluation Criteria
Source: BOQ Annexure E.pdf (unknown)No eligibility criteria specified
Technical Specifications
Source: BOQ Annexure E.pdf (unknown)Scope: Deep cleaning of high-traffic female ablution facilities across Eskom Rotek Industries sites on a weekly basis for a five-year period.
Facilities and weekly cleaning frequencies:
6th Floor: Female — 3 toilets, 2 basins
5th Floor: 4½ Female — 2 toilets, 2 basins; Female — 3 toilets, 1 basin; Disabled Unisex — 1 toilet, 1 basin
4th Floor: Female — 3 toilets, 2 basins; Disabled Unisex — 1 toilet, 1 basin
3rd Floor: 2½ Female — 2 toilets, 2 basins; Female — 3 toilets, 2 basins
2nd Floor: Female — 3 toilets, 2 basins
1st Floor: 1½ Female — 2 toilets, 2 basins; Female — 3 toilets, 2 basins
Ground Floor: Reception Female — 1 toilet, 1 basin; Disabled Unisex — 1 toilet, 1 basin
Total weekly count: 59 toilets, 45 basins, 42 showers
Document reference: Annexure E, compiled 11/06/2026
Description
Source: Invitation to Tender (ITT) Deep cleaning.pdfEskom Holdings SOC Ltd invites tenders for Deep Cleaning Service for Eskom Rotek Industries SOC Limited for a period of 5 years. Tender number: E1226SSERI. Open invitation to tender. Single award. Tender documents available free of charge. Governed by Eskom Standard Conditions of Tender (available at www.eskom.co.za); Tender Data takes precedence in case of ambiguity.
Important Dates
Source: Invitation to Tender (ITT) Deep cleaning.pdf (TENDER)Issue date: 25 August 2026. Non-compulsory clarification meeting: 1 September 2026 at 10:00 via Microsoft Teams (link provided). Attendance must be confirmed with the Eskom Representative (name, position, contact details of each attendee). Clarification queries deadline: 5 working days before tender closing (i.e., by 18 September 2026). Tender closing date and time: 25 September 2026 at 10:00. Late tenders will not be accepted. Tender validity: 180 days from closing.
Briefing Session
Source: Invitation to Tender (ITT) Deep cleaning.pdf (TENDER)Non-compulsory clarification meeting: 1 September 2026 at 10:00 via Microsoft Teams (link: https://teams.microsoft.com/meet/39598242203141?p=W1V4s9JbdFG7OIKjma). Tenderers must confirm attendance with the Eskom Representative, providing name, position, and contact details of each attendee. Non-attendance does not disqualify as the meeting is non-compulsory.
Contact Information
Source: Invitation to Tender (ITT) Deep cleaning.pdf (TENDER)Eskom Representative: K Sibanyoni. Telephone: 011-621-3000. Email: [email protected]. Fraud/corruption reporting: 0800 11 2722 or [email protected]. All queries and clarifications must be addressed in writing to the Eskom Representative only.
Submission Guidelines
Source: Invitation to Tender (ITT) Deep cleaning.pdf (TENDER)Submission method: electronic only via the Eskom E-tendering portal (Eskom Tender Bulletin site). No hard copies accepted. Documents must be uploaded in PDF format under the folders Technical, Commercial, Financial, and Other. Maximum file size 500 MB per document; total submission limited to 4 GB. Zip or compressed files are not permitted. The latest submission before the closing time replaces any earlier version. Submission status must show as complete. Mandatory returnables (marked with an asterisk) must be fully completed, signed where required, and uploaded by the closing date and time; failure to do so results in disqualification. Non-disqualifiable returnables not submitted at closing may be requested by the Procurement Practitioner with a 5-working-day response window. Returnables required for evaluation (marked #) must be submitted at closing; omission scores zero but does not disqualify. Tender validity period is 180 days from closing. Alternative tenders are not allowed.
Returnable Documents
Source: Invitation to Tender (ITT) Deep cleaning.pdf (TENDER)The tenderer must submit the returnable set out hereunder as part of its tender at the stipulated deadline.
Evaluation Criteria
Source: Invitation to Tender (ITT) Deep cleaning.pdf (TENDER)Two-stage evaluation: (1) Functionality/technical criteria (specific criteria detailed in the Technical Evaluation Criteria document, not provided in the extracted text). Bidders must meet the minimum functionality threshold to proceed. (2) Price and Specific Goals scored on an 80/20 preference point system (PPPFA 2022). Price scored out of 80 points; Specific Goals scored out of 20 points. Price evaluation: inclusive of VAT, corrected for arithmetical errors, excluding contingencies, adjusted for acceptable variations/deviations, compared on Net Present Value basis using tendered programme, Price Adjustment Factors, exchange fluctuations, and risk parameters. Unconditional discounts considered; conditional discounts excluded from evaluation but applied at payment. Specific Goals: failure to submit evidence scores zero for that goal but does not disqualify. Final ranking by combined Price + Specific Goals score, highest to lowest. Contractual requirements (CSD registration, SHE Appendices B1-B3, Quality Appendix C, audited financial statements) are assessed after evaluation and ranking; they are not evaluation criteria but must be satisfied before award.
Technical Specifications
Source: Invitation to Tender (ITT) Deep cleaning.pdf (TENDER)Scope: Deep cleaning service for Eskom Rotek Industries SOC Limited for a period of 5 years. Detailed scope of work is contained in Appendix A (attached). Quality requirements per Appendix C. Safety, Health and Environment (SHE) requirements per Appendices B1, B2, B3. Contract form: NEC3 Term Service Contract. No cataloguing required. CIDB grading not applicable. Local content declarations (SBD 6.2 and Annexures G1-G4) required only if designated materials are included. Bidders must quote on all items in the pricing schedule/BOQ; failure to quote on any item renders the tender non-responsive.
Methodology
Source: Invitation to Tender (ITT) Deep cleaning.pdf (TENDER)Not explicitly detailed in the extracted text. Bidders must indicate tendering structure (individual, unincorporated JV, incorporated JV, other) and provide particulars per Annexure C. Technical approach and method statements likely covered in the Technical Evaluation Criteria (not provided).
Experience & Qualifications
Source: Invitation to Tender (ITT) Deep cleaning.pdf (TENDER)Audited financial statements for the previous 36 months (or last available year) required as a contractual requirement before award. For JVs/SPVs, each participant must submit statements. Start-ups formed within the last 12 months exempt at tender stage but must provide first-year statements if awarded. No explicit experience or key personnel qualification criteria stated in the extracted text; these may be covered in the Technical Evaluation Criteria (not provided).
Quality Management
Source: Invitation to Tender (ITT) Deep cleaning.pdf (TENDER)Quality requirements per Appendix C. Objective criteria for quality evaluation: documented Quality Management System (QMS) compliant with ISO 9001 (certification not mandatory but must comply); evidence of QMS in operation; quality control plan. Additional quality documents may be required per scope of work (refer to Annexure W).
Pricing Schedule
Source: Invitation to Tender (ITT) Deep cleaning.pdfPricing schedule/BOQ must be completed in full and submitted in PDF format. Tenderers must quote on all items; failure to quote on any item renders the tender non-responsive and disqualified. Prices evaluated inclusive of VAT, corrected for arithmetical errors, excluding contingencies, adjusted for acceptable variations/deviations, compared on Net Present Value basis. Unconditional discounts considered in evaluation; conditional discounts excluded from evaluation but applied at payment. Price scored out of 80 points under the 80/20 PPPFA system.
Financial Requirements
Source: Invitation to Tender (ITT) Deep cleaning.pdf (TENDER)Pricing schedule must be completed in full and submitted in PDF format. Prices evaluated inclusive of VAT. Payment terms: contracts below R50 million (incl. VAT) — payment within 30 days of receipt of undisputed invoice; contracts above R50 million — payment within 60 days. Eskom reserves the right to negotiate with preferred bidders if prices are not market-related. Audited financial statements for the previous 36 months (or last available year) required as a contractual requirement before award; for JVs/SPVs, each participant must submit statements. Start-ups formed within the last 12 months are exempt at tender stage but must provide statements for the first year if awarded. No performance security/bond required (Provision of Security for Performance: Not Applicable).
Compliance Requirements
Source: Invitation to Tender (ITT) Deep cleaning.pdf (TENDER)Eligibility: not restricted from doing business with Eskom or State-Owned Companies; not on National Treasury restricted list or Tender Defaulters list; no conflict of interest (common controlling partner/shareholder, information access/influence); JV/consortium agreement must stipulate joint and several liability; no subcontracting 100% of scope; no nationality from internationally sanctioned countries. Mandatory returnables at closing (disqualifiable if omitted): electronic PDF tender; Annexure A (Authorisation Form); Annexure B (Acknowledgement Form); Annexure C (Tenderer's Particulars); Annexure D (Integrity Pact Declaration); Annexure E (CPA for Local Goods/Services); Annexure G1-G4 (SBD 6.2 Local Content Declaration and supporting schedules, if applicable); Annexure H (SBD 1 Invitation to Bid); Annexure I (SBD 6.1 Preference Points Claim Form); Annexure J (SBD 4 Bidder's Disclosure); E-tendering Help Manual acknowledgement form; NEC3 contract document; completed pricing schedule. Additional: proof of CSD registration (CSD number/report); valid tax compliance (SARS e-filing PIN or CSD verification); foreign suppliers with SA footprint must provide tax clearance certificate; compliance with Employment Equity Act (designated employers only, proof of EE report submission); COIDA certificate of good standing or proof of application (SA tenderers only); quality documentation per Appendix C; other safety/quality documents per scope of work. JV requirements: letter of intent or valid JV agreement with profit-sharing ratios; confirmation of single business entity operation; designated JV bank account. CIDB grading not applicable.
Health & Safety
Source: Invitation to Tender (ITT) Deep cleaning.pdfSHE requirements per Appendices B1, B2, B3. Mandatory: COIDA certificate of good standing or proof of application from the Compensation Fund or a licensed compensation insurer (South African tenderers only). Acknowledgement of OHS requirements required. Additional safety/quality documents as required per scope of work (refer to Annexure X).
Environmental
Source: Invitation to Tender (ITT) Deep cleaning.pdf (TENDER)No specific environmental inputs required based on the Scope of Work for deep cleaning. SDL&I and Environment: no inputs based on the SOW.
Contractual Terms
Source: Invitation to Tender (ITT) Deep cleaning.pdfContract form: NEC3 Term Service Contract. Contract duration: 5 years. Single award. Payment terms: 30 days (contracts < R50m incl. VAT) or 60 days (contracts > R50m incl. VAT) from receipt of undisputed invoice. No performance security required. Eskom reserves the right to negotiate with preferred bidders if prices are not market-related. Main contractors discouraged from subcontracting with subsidiaries; any such subcontracting must be declared. Subcontractor list available via CSD (www.csd.gov.za). Contractual requirements (CSD registration, SHE Appendices B1-B3, Quality Appendix C, audited financial statements) must be satisfied before award; failure to meet them by stipulated deadlines may render the tenderer non-responsive and ineligible for award. JV/consortium agreements must include joint and several liability, lead member designation, work/payment split ratios, single designated JV bank account, and confirmation of single business entity operation.
Special Conditions
Source: Invitation to Tender (ITT) Deep cleaning.pdf (TENDER)Standard payment terms: 30 days (< R50m incl. VAT) or 60 days (> R50m incl. VAT) from undisputed invoice. Right to negotiate if prices not market-related. Subcontracting with subsidiaries discouraged and must be declared. No cataloguing required. No performance security. Alternative tenders not allowed. Reverse e-auction not applicable. CIDB requirements not applicable. Tender validity 180 days. Clarification queries close 5 working days before tender closing. Non-compulsory clarification meeting on 1 September 2026. Electronic submission only via Eskom E-tendering portal. Maximum upload 500 MB per document, 4 GB total. Latest submission replaces previous. Submission status must be complete.
Requirements
Source: Invitation to Tender (ITT) Deep cleaning.pdf (TENDER)Eligibility criteria per Tender Data clause 2.1 (see complianceRequirements). Basic compliance: meet eligibility criteria; submit complete tender with commercial and financial information; submit all mandatory commercial returnables by stipulated deadlines. Functionality requirements apply (specific criteria in Technical Evaluation Criteria document). Mandatory returnables as listed in complianceRequirements. Contractual requirements (CSD, SHE, Quality, financial statements) assessed post-evaluation before award.
Section
Source: Invitation to Tender (ITT) Deep cleaning.pdfPrice evaluation methodology: inclusive of VAT; corrected for arithmetical errors; excluding contingencies; adjusted for acceptable variations/deviations/alternative tenders; Net Present Value comparison using tendered programme, Price Adjustment Factors, exchange fluctuations, risk parameters. Unconditional discounts included; conditional discounts excluded from evaluation but honoured at payment. Price scored out of 80. Specific Goals scored out of 20 per PPPFA 2022; evidence required for points claim, zero points if not submitted (no disqualification). Combined score determines ranking. Functionality evaluation applicable (criteria not in extracted text). Contractual requirements not part of evaluation but mandatory for award.
Description
Source: BOQ Annexure B.pdfThe tender involves deep cleaning services on a monthly basis for various areas including but not limited to: STAND 14 BUILDING NO. 114001 with 1 male ablution having 3 toilets, 3 urinals, 3 basins, and 4 showers; STAND 15 BUILDING NO. N/A with 1 male ablution having 4 toilets, 2 urinals, and 3 basins; and numerous other locations with specified facilities.
Important Dates
Source: BOQ Annexure B.pdf (unknown)The closing date for the tender is 2026-09-25T10:00:00.000Z. No mandatory briefing or site visit is specified.
Submission Guidelines
Source: BOQ Annexure B.pdf (unknown)Bidders must submit their bids to the address specified in the tender document. The submission method is not specified. Returnable forms required include SBD 1, SBD 4, and SBD 9. Failure to submit these forms may result in disqualification.
Evaluation Criteria
Source: BOQ Annexure B.pdf (unknown)No eligibility criteria specified. The evaluation criteria are not provided in the tender document.
Technical Specifications
Source: BOQ Annexure B.pdf (unknown)The tender involves deep cleaning services on a monthly basis for various areas including but not limited to: STAND 14 BUILDING NO. 114001 with 1 male ablution having 3 toilets, 3 urinals, 3 basins, and 4 showers; STAND 15 BUILDING NO. N/A with 1 male ablution having 4 toilets, 2 urinals, and 3 basins; and numerous other locations with specified facilities.
Compliance Requirements
Source: BOQ Annexure B.pdf (unknown)No specific requirements found. Bidders must comply with all applicable laws and regulations.
Description
Source: BOQ Annexure C.pdfThe scope is a monthly deep cleaning service for female, unisex, and disabled ablution facilities at various Eskom Rotek Industries sites. The bill of quantities details each location by stand and building number, specifying the number of toilets, basins, and showers to be cleaned. The service is required for a period of five years.
Important Dates
Source: BOQ Annexure C.pdf (unknown)The closing date for the tender is 2026-09-25T10:00:00.000Z. There are no specified mandatory briefing or site visit dates.
Contact Information
Source: BOQ Annexure C.pdf (unknown)The contact information for the tender is not specified in the provided documents.
Submission Guidelines
Source: BOQ Annexure C.pdf (unknown)Bidders must submit their bids in the format specified in the tender document. The bid must include all required returnable forms, which are: SBD 1 (Invitation to Bid), SBD 4 (Declaration of Interest), and SBD 9 (Certificate of Independent Bid Determination). Bids must be submitted to the address specified in the tender document by the closing date and time.
Evaluation Criteria
Source: BOQ Annexure C.pdf (unknown)The bidder must be a registered and qualified service provider, with the necessary expertise and experience to provide deep cleaning services. The bidder must also comply with all relevant laws and regulations, including those related to employment, health and safety, and environmental protection. The evaluation criteria include the bidder's experience, qualifications, and compliance with regulations.
Technical Specifications
Source: BOQ Annexure C.pdf (unknown)The tender covers monthly deep cleaning of female, unisex, and disabled ablution facilities across multiple Eskom Rotek Industries sites. The bill of quantities lists each area by stand and building number, specifying the number of toilets, basins, and showers per facility. Facilities include offices, workshops, training centres, security guard houses, stores, and areas under construction. The service is required for a period of five years.
Compliance Requirements
Source: BOQ Annexure C.pdf (unknown)No specific compliance requirements are found in the provided documents, other than the general requirement for bidders to comply with all relevant laws and regulations.
Important Dates
Source: Scope Of Work Appendix A.pdf (unknown)The tender closes on 2026-09-25T10:00:00.000Z. The bidder must submit the bid by this date and time.
Contact Information
Source: Scope Of Work Appendix A.pdf (unknown)The contact information for the tender is not specified.
Submission Guidelines
Source: Scope Of Work Appendix A.pdf (unknown)Returnable forms: SBD 1, SBD 4, SBD 6.1, SBD 6.2, SBD 7.1, SBD 8, SBD 9. The bidder must submit a completed SBD 1 form as the offer cover page. The bidder must disclose whether any director or shareholder is employed by the state or connected to anyone at the procuring institution on SBD 4. The bidder must claim B-BBEE points under the PPPFA 80/20 or 90/10 system on SBD 6.1 and declare local production and content on SBD 6.2. The bidder must complete SBD 7.1 for the purchase of goods or SBD 7.2 for the rendering of services. The bidder must declare past supply chain management practices on SBD 8 and provide a certificate of independent bid determination on SBD 9.
Evaluation Criteria
Source: Scope Of Work Appendix A.pdf (unknown)A weighted score-card approach will be used to evaluate the technical compliance of the tenders against the specifications. Tenderers need to have a weighted score of 70% overall or more to technically qualify for further evaluation. The technical criteria and weighting are broken down as follows: Track Record of the company – 20%, Technical compliance, technical skills and resources - 60%, Skills - Competency of staff - 20%. The bidder must provide certified copies of previous contracts and/or purchase orders, proof of registration with a recognized cleaning association, method statements for deep cleaning all facets of work, and proof of training for staff.
Technical Specifications
Source: Scope Of Work Appendix A.pdf (unknown)The purpose of this document is to define the deep cleaning services required for Eskom Rotek Industries (ERI) at Rosherville for a period of five (5) years. The bidder must provide deep cleaning services for all areas stipulated on the matrix, including high traffic areas, medical centres, and other facilities. The bidder must use environmentally friendly chemicals and provide proof of training for staff.
Methodology
Source: Scope Of Work Appendix A.pdf (unknown)Deep cleaning process aim is to minimize overall bacteria and the risk of cross contamination. Service provider to provide proof of training as the Regulations for Hazardous Chemicals Agents, 2021.
Experience & Qualifications
Source: Scope Of Work Appendix A.pdfTrack Record of the company – 20%. Technical compliance, technical skills and resources - 60%. Skills - Competency of staff - 20%. Experience – proven track record of Provide a certified copies of a 20 = certified copies of a previous contract and / or a certified copies of a purchase order 20.
Financial Requirements
Source: Scope Of Work Appendix A.pdf (unknown)The financial requirements for the tender are not specified.
Compliance Requirements
Source: Scope Of Work Appendix A.pdf (unknown)The bidder must comply with the Regulations for Hazardous Chemicals Agents, 2021, and the Occupational Health and Safety Act, 1993. The bidder must also provide proof of registration with a recognized cleaning association and proof of training for staff.
Health & Safety
Source: Scope Of Work Appendix A.pdfAll hazardous chemical handling shall comply with regulations for hazardous chemical agents. PPE, dust mask / respiratory protective (half face respirator each fitted with A2P2 cartridge filter for protection against HCA, Solvents), PVC gloves / nitrile gloves devices shall be as the Occupational Health and Safety Act.
Environmental
Source: Scope Of Work Appendix A.pdfWastewater used to deep clean may only be discarded into the sewer system (toilets, basins, showers and gulleys). Provide proof of disposal certificates.
Requirements
Source: Scope Of Work Appendix A.pdf (unknown)All areas stipulated on the matrix must be deep cleaned on an as and when required basis. High traffic areas should be cleaned on a weekly basis as specified on the matrix. Environmentally friendly chemicals should be used, accompanied by MSDS.
Description
Source: BOQ Annexure D.pdfDeep Cleaning - High Traffic Weekly Services Male Ablutions - Annexure D. Detailed schedule of male ablution facilities across multiple buildings and stands requiring weekly deep cleaning services.
Contact Information
Source: BOQ Annexure D.pdf (unknown)No contact information is provided in the document.
Submission Guidelines
Source: BOQ Annexure D.pdf (unknown)Bidders must submit their bids to the address specified in the tender document. The submission method is not specified. Returnable forms required include SBD 1, SBD 4, and SBD 9. Disqualification risks include any returnable form left unsigned or omitted, and quotations received after the closing time.
Evaluation Criteria
Source: BOQ Annexure D.pdf (unknown)No eligibility criteria specified. The evaluation criteria are not stated in the document.
Technical Specifications
Source: BOQ Annexure D.pdf (unknown)Deep Cleaning - High Traffic Weekly Services Male Ablutions - Annexure D. Detailed schedule of male ablution facilities across multiple buildings and stands requiring weekly deep cleaning services. Includes TSS Blocks 1-5 (Stands 17-18), TGS Blocks 1-3 (Stand 17), 6 Storey Building (Stand 19, all floors), RRR Computer Training Centre/Quantum (Stand 20), Training Centre A (Stand 21), Training Centre B East (Stand 21), Rietbok (Stand 23), Ribbok (Stand 23), Stand 35 Ablutions, BMS Plant Workshop (Stand 46), and OSM Ablution (Stand 46). Specifies quantities of toilets, urinals, basins, and showers per location per week.
Compliance Requirements
Source: BOQ Annexure D.pdf (unknown)No specific requirements found. CSD registration, tax clearance, B-BBEE level, CIDB grading, CIPC registration, professional-body registrations, and local content percentages are not specified.
Contact Information
Source: Quality Appendix C.pdf (TENDER)Eskom representative: Raesibe Van Neel. Document issued 12 August 2026.
Submission Guidelines
Source: Quality Appendix C.pdf (TENDER)Returnable documents required with the bid:
All quality deliverables are Category 1 (mandatory) and must be submitted with the tender.
Evaluation Criteria
Source: Quality Appendix C.pdf (TENDER)Quality requirements are evaluated as Category 1 deliverables with a total possible score of 13:
No minimum qualifying score or price/functionality split is stated in this document.
Technical Specifications
Source: Quality Appendix C.pdf (TENDER)Deep cleaning services for Eskom Rotek Industries SOC Limited for a period of five (5) years. The detailed scope of work is defined in the main tender documents and must be addressed in the Contract Quality Plan and Quality Control Plan/ITP submitted with the bid.
Quality Management
Source: Quality Appendix C.pdf (TENDER)Bidders must submit a documented QMS complying with ISO 9001:2015 (certification not required) covering: QMS Manual, Quality Policy, Quality Objectives, control of documented information (clause 7.5), control of nonconforming outputs (clause 8.7), nonconformity and corrective action (clause 10.2), internal audit (clause 9.2).
Evidence of QMS in operation must include: organisation chart and responsibility matrix including quality management function (clause 5.3); documented control of externally provided processes, products and services with criteria for evaluation, selection, monitoring and re-evaluation (clause 8.4).
A draft Contract Quality Plan specific to the scope of work (per ISO 10005) and a draft or example Inspection and Test Plan (ITP) or Quality Control Plan (QCP) for similar or previous work (per ISO 10005) must be provided.
Form A must be completed and signed.
Compliance Requirements
Source: Quality Appendix C.pdf (TENDER)Mandatory quality compliance deliverables (Category 1):
No CSD, tax, B-BBEE, CIDB, CIPC or local-content requirements are mentioned in this document.
Important Dates
Source: NEC TSC3 - Term Services Contract-.pdf (unknown)Closing date: 2026-09-25T10:00:00.000Z (from tender record). Contract period: three years from starting date (starting date not specified in document). No compulsory briefing session, site visit, or clarification deadline is stated in the document. Site inspections for Canteen and Medical Centre are noted as essential but no dates are given.
Contact Information
Source: NEC TSC3 - Term Services Contract-.pdf (unknown)Employer: Eskom Rotek Industries SOC Ltd (Reg No. 1990/006897/30)
Address: Roshland Office Park, Lower Germiston Road, Rosherville, 2022
Service Manager email: [email protected]
Enquiries telephone: 011 803 3008 (Engineering Contract Strategies)
Fax: 086 539 1902
Website for insurance details: http://www.eskom.co.za/Tenders/InsurancePoliciesProcedures/Pages/EIMS_Policies_From_1_April_2014_To_31_March_2015.aspx
Adjudicator nominating body: ICE-SA Division of SAICE (www.ice-sa.org.za) or Arbitration Foundation of Southern Africa (AFSA)
Submission Guidelines
Source: NEC TSC3 - Term Services Contract-.pdf (unknown)Submission method and address are not stated in the document. The document is a draft NEC3 Term Service Contract (TSC3) for a three-year period, not a tender invitation with submission instructions. Returnable documents required at contract award (per Form of Offer and Acceptance):
Disqualification risks: unsigned or omitted returnable documents; failure to provide required securities/insurance within two weeks of contract award; failure to submit tax invoice within one week of payment certificate.
Evaluation Criteria
Source: NEC TSC3 - Term Services Contract-.pdf (unknown)No explicit evaluation criteria, scoring split, or minimum qualifying thresholds are stated in the document. The contract uses NEC3 TSC3 Option A (priced contract with price list) with secondary options X17 (low service damages), X18 (limitation of liability), X19 (task order), X20 (key performance indicators), and Z clauses. Preference point system (80/20 or 90/10) is not specified. B-BBEE status is relevant per clause Z3 (change notification and potential renegotiation/termination if status decreases) but no minimum level is set. CIDB registration number is requested on the Offer form but no minimum grade is stated. No functionality/technical scoring matrix is provided.
Technical Specifications
Source: NEC TSC3 - Term Services Contract-.pdf (unknown)Scope: Professional deep cleaning services at Eskom Rotek Industries, Rosherville for three years.
Areas: All ablutions across property as per matrices (stand number, building number, area description). Excludes areas under construction (handled as-and-when).
Frequencies:
Specific requirements:
Quality Management
Source: NEC TSC3 - Term Services Contract-.pdfcompliance with foodstuff, cosmetics and disinfectants act. No. All areas to be Deep
cleaned as per Matrix attached. NB. Canteen site inspection essential.
Walls to be wiped cleaned and disinfected by means of using a environmental friendly chemical, bucket and cloth
Walls to be wiped from Skirting to Cornice.
All furniture to be wiped cleaned and disinfected by means of using a environmental friendly chemical, bucket and cloth
Floors to be scrubbed by using chemicals and scrubbing equipment and also ensuring that all marks are removed.
Doors, handles and door frames to be wiped.
All glass doors, windows and screens to be wiped as per Window cleaning Matrix.
Basins, Toilets, Urinals and showers to be Deep cleaned.
All tiles in Canteen to be wiped and/or scrubbed.
Kitchen tops and cupboards to be wiped.
All Canopy’s to be cleaned.
Floor drainage system to be washed out.
The Medical centre (387 Squares) can only be done after hours and only the ERI representative can make
arrangements with the Manager and service provider when requested by medical centre Manager. The
whole idea is to disinfect the medical centre every second week on the inside and to clean it in full e.g.
(Walls, floors, ablutions, all equipment and windows). After washing it down, fogging must be done in all
areas. Medical centre Deep cleaning Matrix attached. NB. Medical Centre site inspection essential.
Walls to be wiped cleaned and disinfected by means of using a environmental friendly chemical, bucket and
cloth.
Walls to be wiped from Skirting to Cornice.
All furniture to be wiped cleaned and disinfected by means of using a environmental friendly chemical, bucket
and cloth.
Floors to be scrubbed by using chemicals and scrubbing equipment and also ensuring that all marks
are removed.
Doors, handles and door frames to be wiped.
All glass doors, windows and screens to be wiped as per Window cleaning Matrix.
Basins, Toilets, Urinals and showers to be Deep cleaned.
All building windows must be cleaned inside.
Kitchen tops and cupboards to be wiped.
All tiles in Medical centre to be wiped and/or scrubbed.
Hearing Bays to be fully wiped off inside and outside.
Supplier of 28
Contract number _________
Pricing Schedule
Source: NEC TSC3 - Term Services Contract-.pdfContents: No of
pages
Part C1 Agreements & Contract Data [14]
Part C2 Pricing Data [3]
Part C3 Scope of Work [3]
Part C1 Agreements and Contract Data, (which includes this Form of Offer and Acceptance)
Part C2 Pricing Data
Part C3 Scope of Work: Service Information
and drawings and documents (or parts thereof), which may be incorporated by reference into the above
listed Parts.
11.2(19) The tendered total of the Prices is
3 Available from Engineering Contract Strategies Tel 011 803 3008 Fax 086 5391902 or www.ecs.co.za
of 28
Contract NO. _________
Part 2: pricing data
TSC3 Option A
reference pages
C2.1 Pricing assumptions: Option A 2
C2.2 The price list [1]
of 28
Contract NO. _________
C2.1 Pricing assumptions: Option A
Has taken account of the guidance given in the TSC3 Guidance Notes relevant to Option A;
Understands the function of the Price List and how work is priced and paid for;
Is aware of the need to link operations shown in his plan to items shown in the Price List;
Has listed and priced items in the price list which are inclusive of everything necessary and
incidental to Providing the Service in accordance with the Service Information, as it was at the
time of tender, as well as correct any Defects not caused by an Employer’s risk;
Has priced work he decides not to show as a separate item within the Prices or rates of other
listed items in order to fulfil the obligation to complete the service for the tendered total of the
Financial Requirements
Source: NEC TSC3 - Term Services Contract-.pdf (unknown)Pricing: NEC3 Option A — priced contract with price list (lump sums and/or rates x quantities). Price list (C2.2) includes items for weekly, two-weekly, monthly, and ad-hoc services with expected quantities for Year 1. Tendered total of prices (excl. VAT) to be entered in Contract Data Part 2. VAT at 15% added for budget purposes.
Payment terms: Assessment interval monthly (1st day of each month). Payment within 4 weeks of payment certificate. Contractor must submit tax invoice within one week of receiving payment certificate, showing: contractor and service manager details, contract number/title, contractor VAT number, employer VAT number (4330196330), description per price list item, amounts excl. VAT, VAT, and incl. VAT. Late invoice delays payment by same period; interest on late payment at Standard Bank prime rate (RSA) or LIBOR (foreign currency).
Currency: South African Rand.
Insurance: Employer provides insurances per "Format TSC3" on Eskom website (deductibles vary). Contractor must cover deductibles (self-insured or own policy) and any additional insurances deemed necessary. Minimum public liability indemnity: R500 000 per event. COIDA compliance required.
Securities/bonds/guarantees: Required per Contract Data at or just after contract effective date (details not specified in document).
Limitation of liability: Contractor indirect/consequential liability limited to R0; liability for loss/damage to employer property limited to insurance deductibles per Format TSC3; total liability limited to total of prices (excl. excluded matters: design defects, manufacture/fabrication defects outside affected property, third-party property damage, injury/death, IP infringement — unlimited for these). Employer indirect/consequential liability limited to R0.
End of liability date: months after service period (number not filled in).
Compliance Requirements
Source: NEC TSC3 - Term Services Contract-.pdf (unknown)Mandatory compliance items:
Environmental
Source: NEC TSC3 - Term Services Contract-.pdfguidelines and procedures otherwise provided for under this contract and ensures that his
Subcontractors, employees and others under the Contractor’s direction and control,
likewise observe and comply with the foregoing.
Z7.2 The Contractor, in and about the execution of the service, complies with all applicable
environmental laws and regulations and rules, guidelines and procedures otherwise provided
for under this contract and ensures that his Subcontractors, employees and others under the
Contractor’s direction and control, likewise observe and comply with the foregoing.
Z8 Provision of a Tax Invoice and interest. Add to core clause 51
of 28
Contract NO. _________
Z8.1 Within one week of receiving a payment certificate from the Service Manager in terms of core
clause 51.1, the Contractor provides the Employer with a tax invoice in accordance with the
All areas stipulated on Matrix’s must be deep cleaned except areas currently under
construction that includes the following in the ablutions:
Toilets
Basins
Urinals
Showers
High traffic areas should be cleaned on a weekly basis as specified on the Matrix
The Canteen high traffic ablutions only if Canteen is operational.
Environmentally friendly chemicals should be used.
Chemicals may be stored on site only in designated area.
All areas on Matrix’s under construction will be dealt with on a as and when basis.
Should any building within the contract period be sold, the service on matrix will be
updated and/or removed from service schedule.
Record keeping of areas serviced is essential as per the following Matrix’s to compile
the monthly Invoice:
High Traffic Deep Cleaning Matrix Men
High Traffic Deep Cleaning Matrix Ladies
Men monthly ablution Matrix
Ladies monthly ablution Matrix
Canteen Matrix
Medical Centre Matrix
Service Reports to be compiled for each facet of work (Matrix’s) specified and signed off
by ERI. Representative.
Service provider to provide a service schedule to accommodate all services.
The Canteen (1855 Squares) can only be done after hours and only the ERI representative can
make arrangements with the Canteen manager as and when the Canteen is operational. The
canteen to be deep cleaned in full e.g. (Walls, floors, ablutions, all equipment and windows) The
Supplier of 28
Contract number _________
Waste water used to deep clean may only be discarded into the sewer system. (Toilets,
basins, showers and gulleys)
Proof of disposal certificates and
Supplier of 28
Contract number _________
Proof of Registration of facility where waste is being disposed
Proof of Registration of transport removing waste. (GWIS)
Contractual Terms
Source: NEC TSC3 - Term Services Contract-.pdfof Deviations (if any), contact the Employer’s agent (whose details are given in the Contract Data) to arrange
the delivery of any securities, bonds, guarantees, proof of insurance and any other documentation to be
provided in terms of the conditions of contract identified in the Contract Data at, or just after, the date this
agreement comes into effect. Failure to fulfil any of these obligations in accordance with those terms shall
constitute a repudiation of this agreement.
clauses and the clauses for main Option:
A: Priced contract with price list
dispute resolution Option W1: Dispute resolution procedure
and secondary Options
X2 Changes in the law
X17: Low service damages
X18: Limitation of liability
X19: Task Order
X20 : Key performance indicators
Z: Additional conditions of contract
of the NEC3 Term Service Contract April
20132 (tsc3)
10.1 The Employer is (name): Eskom Rotek Industries SOC Ltd
(Reg no: 1990/006897/30), a state owned
company incorporated in terms of the company
laws of the Republic of South Africa
50.1 The assessment interval is between the 1st day of each successive month.
51.1 The currency of this contract is the South African Rand
51.2 The period within which payments are
made is 4 weeks.
51.4 The interest rate is the publicly quoted prime rate of interest
(calculated on a 365 day year) charged by from
time to time by the Standard Bank of South
Africa Limited (as certified, in the event of any
dispute, by any manager of such bank, whose
appointment it shall not be necessary to prove)
for amounts due in Rands and
(ii) the LIBOR rate applicable at the time for
amounts due in other currencies. LIBOR is the
6 month London Interbank Offered Rate quoted
under the caption “Money Rates” in The Wall
of 28
Contract NO. _________
no rate is quoted for the currency in question
then the rate for United States Dollars, and if no
such rate appears in The Wall Street Journal
then the rate as quoted by the Reuters Monitor
Money Rates Service (or such service as may
replace the Reuters Monitor Money Rates
Service) on the due date for the payment in
question, adjusted mutatis mutandis every 6
months thereafter (and as certified, in the event
of any dispute, by any manager employed in the
foreign exchange department of The Standard
80.1 These are additional Employer's risks 1. As per Eskom’s requirements
83.1 The Employer provides these insurances as stated for “Format TSC3” available on
from the Insurance Table http://www.eskom.co.za/Tenders/InsurancePolicies
Procedures/Pages/EIMS_Policies_
From_1_April_2014_To_31_March_2015.aspx
(See Annexure A for basic guidance).
83.1 The Employer provides these additional as stated for “Format TSC3” available on
insurances http://www.eskom.co.za/Tenders/InsurancePolicies
Procedures/Pages/EIMS_Policies_
From_1_April_2014_To_31_March_2015.aspx
(See Annexure A for basic guidance)
83.1 The Contractor provides these additional Any that the Contractor deems necessary in
insurances: addition to the insurances provided by the
respect of the Employers Format a insurance
83.1 The minimum amount of cover for the amount of the deductibles relevant to the
insurance against loss and damage event described in the “Format TSC3”
caused by the Contractor to the insurance policy available on
Employer’s property is http://www.eskom.co.za/Tenders/InsurancePolicies
Procedures/Pages/EIMS_Policies_
From_1_April_2014_To_31_March_2015.aspx
83.1 The insurance against loss of or damage N/A
to the works, Plant and Materials is to
include cover for Plant and Materials
provided by the Employer for an amount of
83.1 The minimum amount of cover for
of 28
Contract NO. _________
insurance in respect of loss of or damage
to property (except the Employer’s
property, Plant and Materials and
Equipment) and liability for bodily injury to
or death of a person (not an employee of
the Contractor) arising from or in
connection with the Contractor’s Providing whatever the Contractor deems necessary in
the Service for any one event is: addition to that provided by the Employer.
83.1 The minimum limit of indemnity for As prescribed by the Compensation for
insurance in respect of death of or bodily Occupational Injuries and Diseases Act No. 130
injury to employees of the Contractor of 1993 and the Contractor’s common law
arising out of and in the course of their liability for people falling outside the scope of
employment in connection with this the Act with a limit of Indemnity of not less than
contract for any one event is: R500 000 (Five hundred thousand Rands)..
dispute to him. (see www.ice-sa.org.za). If the
An Adjudicator will be appointed between and the Institution of Civil Engineers (London)
the Contractor and the Employer should a (see www.ice-sa.org.za ) or its successor body.
dispute arises.
elsewhere in this Contract Data.
X17 Low service damages
X17.1 The service level table is in The service table matrix
X18 Limitation of liability
X18.1 The Contractor’s liability to the Employer
for indirect or consequential loss is limited
to R0.0 (zero Rand)
X18.2 For any one event, the Contractor’s the amount of the deductibles relevant to the
liability to the Employer for loss of or event described in the “Format TSC3”
damage to the Employer’s property is insurance policy available on
limited to http://www.eskom.co.za/Tenders/InsurancePolicies
Procedures/Pages/EIMS_Policies_
From_1_April_2014_To_31_March_2015.aspx
X18.3 The Contractor’s liability for Defects due to The greater of
his design of an item of Equipment is limited
to the total of the Prices at the Contract Date
and
the amounts excluded and unrecoverable
from the Employer’s insurance (other than
the resulting physical damage to the
Employer’s property which is not excluded)
plus the applicable deductibles in the
Employer’s assets and works / maintenance
policies available on
http://www.eskom.co.za/Tenders/InsurancePoli
ciesProcedures/Pages/EIMS_Policies_
From_1_April_2014_To_31_March_2015.aspx
X18.4 The Contractor’s total liability to the the total of the Prices other than for the
in connection with this contract, other than
the excluded matters, is limited to The Contractor’s total liability for the additional
excluded matters is not limited.
for which the Contractor is liable under this
contract for
Defects due to his design, plan and
specification,
Defects due to manufacture and fabrication
of 28
Contract NO. _________
outside the Affected Property,
loss of or damage to property (other than
the Employer’s property, Plant and
Materials),
death of or injury to a person and
infringement of an intellectual property
right.
X18.5 The end of liability date is months after the end of the service period.
X19 Task Order
X19.5 The Contractor submits a Task Order
programme to the Service Manager within N/A
Z3.2 The Contractor is required to submit an updated verification certificate and necessary
supporting documentation confirming the change in his B-BBEE status to the Service Manager
within thirty days of the notification or as otherwise instructed by the Service Manager.
Z3.3 Where, as a result, the Contractor’s B-BBEE status has decreased since the Contract Date the
Employer may either re-negotiate this contract or alternatively, terminate the Contractor’s
obligation to Provide the Service.
Z3.4 Failure by the Contractor to notify the Employer of a change in its B-BBEE status may
of 28
Contract NO. _________
constitute a reason for termination. If the Employer terminates in terms of this clause, the
procedures on termination are P1, P2 and P4 as stated in clause 92, and the amount due is A1
and A3 as stated in clause 93.
Z4 Ethics
Z4.1 For the purposes of this Z-clause, the following definitions apply:
court or in any other similar process, of such Prohibited Action before the Employer can
terminate the Contractor’s obligation to Provide the Service for this reason.
Z4.4 If the Employer terminates the Contractor’s obligation to Provide the Service for this reason, the
procedures and amounts due on termination are respectively P1, P2, P3 and P4, and A1 and
A3
Z4.5 A Committing Party co-operates fully with any investigation pursuant to alleged Prohibited
Z5 Confidentiality
Z5.1 The Contractor does not disclose or make any information arising from or in connection with
this contract available to Others. This undertaking does not, however, apply to information
of 28
Contract NO. _________
which at the time of disclosure or thereafter, without default on the part of the Contractor, enters
the public domain or to information which was already in the possession of the Contractor at the
time of disclosure (evidenced by written records in existence at that time). Should the
Contractor disclose information to Others in terms of clause 25.1, the Contractor ensures that
the provisions of this clause are complied with by the recipient.
Z5.2 If the Contractor is uncertain about whether any such information is confidential, it is to be
regarded as such until notified otherwise by the Service Manager.
Z5.3 In the event that the Contractor is, at any time, required by law to disclose any such information
which is required to be kept confidential, the Contractor, to the extent permitted by law prior to
disclosure, notifies the Employer so that an appropriate protection order and/or any other action
can be taken if possible, prior to any disclosure. In the event that such protective order is not,
or cannot, be obtained, then the Contractor may disclose that portion of the information which it
is required to be disclosed by law and uses reasonable efforts to obtain assurances that
confidential treatment will be afforded to the information so disclosed.
Z5.4 The taking of images (whether photographs, video footage or otherwise) of the Affected
the event, he is not entitled to a change in the Prices.
Z10 Employer’s limitation of liability
Z10.1 The Employer’s liability to the Contractor for the Contractor’s indirect or consequential loss is
limited to R0.00 (zero Rand)
Z10.2 The Contractor’s entitlement under the indemnity in 82.1 is provided for in 60.1(12) and the
Employer’s liability under the indemnity is limited to compensation as provided for in core
clause 63 and X19.11 if Option X19 Task Order applies to this contract.
Termination: Add to core clause 91.1, at the second main bullet point, fourth sub-bullet
Z11
point, after the words "against it":
Z11.1 or had a business rescue order granted against it.
of 28
Contract NO. _________
Annexure A: Insurance provided by the Employer
provided by the Employer. The Contractor must obtain its own advice. Details of the insurance itself are
available from the internet web link given below.
well as a continuous maintenance or operational service activity. If an event occurs which causes loss
or damage, a claim could be made either against the Employer’s “works” type policy which may be in
place for the Employer’s portion of the Affected Property concerned or against the Employer’s assets
policy which may be in place for the Employer’s portion of the Affected Property concerned, or both.
the insurance provided by the Employer. This can be provided from his own resources on a ‘self
insured’ basis or obtained by him from his own insurers. In order to assess the extent of this cover,
tendering contractors and their brokers should consult the internet web link given below and scroll to
‘Format TSC3’ to establish both the cover and the deductibles in relation to the service provided in
terms of this contract.
on the internet web link listed below and may not be the cover required by the tendering contractor or as
intended by each of the listed insurances in the left hand column of the Insurance Table in clause 83.2.
In terms of clause 83.1 “the Contractor provides the insurances stated in the Insurance Table except any
insurance which the Employer is to provide”. Hence the Contractor provides insurance which the
insures for the difference between what the Insurance Table requires and what the Employer provides.
http://www.eskom.co.za/Tenders/InsurancePoliciesProcedures/Pages/EIMS_Policies_
From_1_April_2014_To_31_March_2015.aspx
of 28
Contract NO. _________
C1.2 Contract Data
This Confidentiality Agreement (‘Agreement’) is entered into between the Employer and the Contractor.
WHEREAS, the Employer and the Contractor (the Parties) desire to exchange certain confidential
information; and consider further business dealings with each other.
such information is or rightfully becomes publicly available information other than through a
breach of this Agreement, or which the Receiving Party later obtains lawfully from anyone else
who is not known by the Receiving Party to be obligated under any secrecy agreement with
create or be relied on by either party as a basis for creating any license between the parties
under any patent, or other industrial or intellectual property rights of the Proprietor of the Subject
exist between them unless and until a definitive agreement has been executed and delivered,
the parties hereby waive, in advance, any claim (including, without limitation, breach of contract)
in connection with a possible transaction with each other unless and until they shall have
entered into a definitive agreement. The parties also agree that unless and until a definitive
agreement between them has been executed and delivered, neither party has any legal
obligation of any kind whatsoever with respect to any such transaction by virtue of this
Contact Information
Source: BOQ Annexure F.pdf (unknown)No contact information specified.
Submission Guidelines
Source: BOQ Annexure F.pdf (unknown)Returnable forms must be completed and submitted with the quotation. The pricing must be based on the bill of quantities in Annexure F.
Evaluation Criteria
Source: BOQ Annexure F.pdf (unknown)No eligibility criteria specified. Pricing must be based on the bill of quantities in Annexure F.
Technical Specifications
Source: BOQ Annexure F.pdf (unknown)Deep cleaning service for the Medical Centre at Stand 17, Building No 117037, performed twice per month. Areas covered include reception waiting area, six consultation rooms, reception admin area, clinic area, office, passages, kitchen, female ablutions (two, one with urine testing area), hearing room, eye testing areas, male ablution, boardroom, and boardroom storage area. Room-by-room equipment to be cleaned: tables, chairs, beds, toilets, urinals, basins, showers, sluices, sinks, cupboards, kitchen appliances (fridge, tumble drier, washing machine), hearing bays, eye testing equipment, and scales. Window cleaning specified for inside only, with quantities and square metre totals per building side: northern (10 windows, 28 sqm), western (18 windows, 7.2 sqm), southern (13 windows, 17.47 sqm), eastern (9 windows, 15.54 sqm), and inside windows (15 windows, 4.74 sqm). Total window area: 77.7 sqm.
Quality Management
Source: BOQ Annexure F.pdfDeep cleaning matrix lists each room and the specific equipment to be cleaned, including tables, chairs, beds, toilets, urinals, basins, showers, sluices, cupboards, kitchen appliances, hearing bays, eye testing equipment, and scales. Window cleaning is specified for inside only, with quantities and square metres per side of the building.
Pricing Schedule
Source: BOQ Annexure F.pdf (unknown)Window cleaning quantities and square metre totals: northern side (10 windows, 28 sqm), western side (18 windows, 7.2 sqm), southern side (13 windows, 17.47 sqm), eastern side (9 windows, 15.54 sqm), inside windows (5 windows, 4.74 sqm). Total square metres: 77.7.
Financial Requirements
Source: BOQ Annexure F.pdf (unknown)Pricing must be based on the bill of quantities in Annexure F, covering deep cleaning of the Medical Centre twice per month and window cleaning quantities as specified.
Description
Source: Safety Appendix B2.pdfHealth and Safety (SHE) specification for the deep cleaning services contract at Eskom Rotek Industries (ERI) Rosherville, covering a five-year period. Sets out ERI's minimum SHE requirements that contractors must meet, including legal compliance with the OHS Act, section 37(2) agreements, prohibition of child labour, SHE policy requirements, COID registration, Eskom Life-Saving Rules, substance abuse policy (0% alcohol/drug level), driver and vehicle safety, housekeeping standards, tools and equipment safety, personnel health and hygiene facilities (dining, ablution, drinking water, changing areas), occupational health and hygiene programmes, medical surveillance requirements, statutory appointments, risk assessments, method statements, induction training, incident investigation, emergency management, first aid requirements, and personal protective equipment (PPE) requirements. Contractors must develop a SHE plan and comply with all applicable legislation and Eskom requirements.
Contact Information
Source: Safety Appendix B2.pdf (unknown)Eskom Contract's Manager: Marius van Vuuren
Eskom Health and Safety Manager: Ntokozo Ngubane
Eskom Procurement Manager: Nelisile Ngwenya
Eskom Safety Officer: Sakhile Mvundla
Evaluation Criteria
Source: Safety Appendix B2.pdf (unknown)The contractor must be registered with an appropriate employment compensation commissioner and have a valid letter of good standing. The contractor must also comply with Eskom's Substance Abuse Procedure and ensure that all employees are familiar with the relevant Eskom SHE documentation.
Technical Specifications
Source: Safety Appendix B2.pdf (unknown)Scope: Deep cleaning services at Eskom Rotek Industries (ERI) Rosherville, as and when required, for a period of five (5) years.
The awarded contractor is designated the principal contractor; any subcontractor appointed is an appointed contractor.
A SHE plan must be developed meeting ERI minimum requirements and all applicable legislation.
The contractor remains accountable for the quality and execution of its health and safety programme.
A section of this contract falls within the requirements of the Construction Regulations.
Legal compliance required with the Constitution (Section 24), Occupational Health and Safety Act 1993 and its Regulations, and the Compensation for Occupational Injuries and Diseases Act.
Section 37(2) agreement must be signed between Eskom and the principal contractor at award, and between the principal contractor and all appointed contractors; original retained by contractor, copy by responsible manager, copies in each SHE file.
Child labour prohibited in line with the Constitution and Basic Conditions of Employment Act.
SHE policy required, signed by the organisation's CE or appointed 16(2) assistant, displayed prominently, and filed in SHE files and SHE plans.
COID registration with valid letter of good standing (LoGS) required, maintained throughout the contract; copy in SHE files.
Eskom Life-Saving Rules apply; zero tolerance; non-compliance is serious misconduct and may lead to dismissal.
Substance abuse: alcohol and drug permissible level is 0%; compliance with Eskom Substance Abuse Procedure 32-37; alcohol testing applies to anyone entering ERI premises.
Driver and vehicle safety: passengers must wear seat belts, comply with traffic rules, secure loads, no employees in the back of a bakkie, no texting or talking on cell phones while driving unless hands-free, drivers must have valid medical fitness certificates, vehicles must be roadworthy with valid licences, and vehicles may be inspected by the Client/Agent's representative.
Housekeeping: high standard of housekeeping must be maintained within sites and vehicles; prompt disposal of waste materials, scrap and rubbish; all packaging material (boxes, pallets, crates) removed from the work area immediately.
Tools and equipment must be identified, safe, maintained, listed on an inventory, inspected at least monthly, and have approved test or calibration documentation where applicable; defective items removed from site immediately and locked away until repaired.
Personnel health and hygiene facilities: dining areas, ablution facilities, drinking water (free of charge), changing areas, and camp/office welfare facilities as specified.
Occupational health, hygiene and rehabilitation programme required to manage exposure to hazardous chemical and biological agents.
Medical surveillance: only accepted from an Occupational Health Practitioner with a qualification in occupational health; pre-entry medical examination required for employees working more than three days; medical fitness certificates renewed annually for non-office-bound employees including drivers, and every three years for office-bound employees; documented process for managing conditional certificates of fitness.
Statutory appointments required, including fire fighter, evacuation warden, first aider, 16(2) appointment, hazardous chemical agents controller, PPE inspector, and risk assessor.
Risk assessments required for all tasks; task-specific risk assessments prior to start of work; employees trained on contents.
Method statements or safe operating procedures must be developed for all critical activities; employees must work according to these.
Induction training: all employees and appointed contractor employees must undergo ERI Rosherville induction training before commencing work; attendance registers required; pre-employment medical examination and certificate of fitness required before induction; proof of induction carried on site; site-specific work induction required.
Incident investigation: all incidents investigated per OHS Act General Administrative Regulations 8 and 9 using Eskom Procedure 32-95; injuries under sections 24 and 25 reported to the Department of Labour; standard Annexure 1 form used.
Emergency management: contractor must develop emergency response plan for their activities, compliant with Rosherville Emergency Preparedness plan; periodic emergency drills required and recorded; emergency equipment (spill kits, first aid boxes) required; emergency contact details including ERI ambulance services kept on file.
First aid: OHS Act GSR 3 observed; first aiders trained to level 2 (level 1 good practice for all); first aid boxes: one for first 5 persons and one for every 50 or team thereafter; boxes accessible, checked monthly by appointed first aider, content checklist maintained; after-hours arrangements required.
PPE: detailed programme for issuing, maintenance and replacement required; risk-based PPE matrix required; PPE must comply with relevant SANS standards; high visibility vests worn where required; visitors must wear correct PPE, contractor responsible for providing if visitors lack it.
Non-conformance procedure required; non-compliance subject to discipline under Eskom Procurement and Supply Management Procedure; non-conformance reports must be closed out by contract management; offenders called to explain and prevent recurrence.
Quality Management
Source: Safety Appendix B2.pdfSubstance abuse: compliance with Eskom Substance Abuse Procedure 32-37; alcohol and drug permissible level is 0%; contractors encouraged to compile own manual and carry out regular alcohol testing of employees; test records treated as confidential and filed in employee's personal file.
Driver and vehicle safety: passengers must wear seat belts, comply with traffic rules, secure loads, no employees in the back of a bakkie, no texting or talking on cell phones while driving unless hands-free, drivers must have valid medical fitness certificates, vehicles must be roadworthy with valid licences, and vehicles may be inspected by the Client/Agent's representative.
Tools and equipment: must be identified, safe, maintained, listed on an inventory, inspected at least monthly, and have approved test or calibration documentation where applicable; defective tools and equipment must be removed from site immediately and locked away until repaired.
PPE: must comply with relevant SANS standards; high visibility vests worn where required.
Non-conformance: procedure required; non-conformance reports must be closed out by contract management; offenders may be called to explain and prevent recurrence.
Compliance Requirements
Source: Safety Appendix B2.pdf (unknown)B-BBEE Minimum Level: 2
Section 37(2) agreement must be signed between Eskom and the principal contractor at award, and between the principal contractor and all appointed contractors. Original retained by contractor, copy by responsible manager, and copies in each SHE file.
COID registration with valid letter of good standing (LoGS) required, maintained throughout the contract; copy in SHE files.
SHE policy signed by the organisation's CE or appointed 16(2) assistant, displayed and filed in SHE files and SHE plans.
All employees must undergo ERI Rosherville induction training before starting work; proof of induction carried on site.
Pre-employment medical examination required before induction; certificate of fitness kept in the SHE file.
Medical fitness certificates renewed annually for non-office-bound employees including drivers, and every three years for office-bound employees.
Pre-entry medical examination required for employees working more than three days on the contract.
Medical surveillance only accepted from an Occupational Health Practitioner with a qualification in occupational health.
Statutory appointments required, including fire fighter, evacuation warden, first aider, 16(2) appointment, hazardous chemical agents controller, PPE inspector, and risk assessor.
Substance abuse: alcohol and drug permissible level is 0%; compliance with Eskom Substance Abuse Procedure 32-37; alcohol testing applies to anyone entering ERI premises.
Eskom Life-Saving Rules apply; non-compliance is serious misconduct and may lead to dismissal.
Drivers must have valid medical fitness certificates; vehicles must be roadworthy with valid licences.
PPE must comply with relevant SANS standards; risk-based PPE matrix required.
First aid boxes: one for the first 5 persons and one for every 50 or team thereafter; first aiders trained to level 2.
Non-conformance procedure required; non-compliance subject to discipline under the Eskom Procurement and Supply Management Procedure.
Environmental
Source: Safety Appendix B2.pdfContractors must comply with Local Authorities / Municipal by-laws / Environmental legislation applicable to the deep cleaning contract.
Drivers/operators are responsible for the travel-worthiness of all loads; projecting loads must be marked with a red flag by day and a red light or red reflective material by night.
Housekeeping: high standard of housekeeping must be maintained within sites and vehicles; prompt disposal of waste materials, scrap and rubbish; all packaging material (boxes, pallets, crates) removed from the work area immediately.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Address
Hustle - Germiston - Johannesburg - 0001
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
14
Last checked
25 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Services to buildings and landscape activities. Unlock full pricing strategies, bid frequency, and historical win rates.