Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
Matimba Power Station - Lephalale - Lephalale - 0555
Organization Type
GOVERNMENT
Published
25 Aug 2026
OCDS Reference
ocds-9t57fa-166909
The ev infrastructure at matimba power station tender requires suppliers to provide infrastructure for a period of 6 months. The tender is issued by ESKOM and is estimated to be worth 3426. Suppliers must submit their bids electronically via the ESKOM etendering portal.
Suppliers must have a valid CSD number to register on and access the eTendering system.
Submission is electronic via the Eskom eTendering portal (https://eTendering.eskom.co.za).
Individual file size limit is 50 MB; total upload limit is 900 MB.
For system difficulties, contact the buyer responsible for the published tender.
Suppliers must register on the portal before bidding; registration requires email verification and OTP sent to both cell phone and email.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Venue
Matimba Power Station at (Lapa Auditorium) Lephalale
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Categories
Request for Quotation
Matimba Power Station - Lephalale - Lephalale - 0555
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Document being finalised: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.docx. You don’t need to refresh — this page will pick up the updated review automatically.
25 Aug
2026
Tender Published
Tender was published
17 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
EV Infrastructure at Matimba Power Station for Gx Pilot Technical Specification REV3.pdf
Analysis completed but response format was invalid
PG1740~1.PDF
Analysis completed but response format was invalid
E3426GXLPMAT Invitation to Tender - EV Infrastructure at Matimba Power Station for Gx Pilot for period of 6 months.pdf
Eskom is procuring the installation of electric vehicle (EV) charging infrastructure at Matimba Power Station in Lephalale, Limpopo, for a pilot project lasting six months. The scope covers civil works (parking/roadworks) and electrical works (LV switchgear, cabling, earthing, lighting, and EV charging equipment), with a compulsory site visit and strict technical, safety, environmental, and quality requirements.
LOCAL CONTENT ANNEX C,D,E.xlsx
ESKOM is inviting tenders for the installation of electric vehicle (EV) infrastructure at Matimba Power Station in Limpopo, as part of a six-month pilot project. The tender includes local content and imported content declaration schedules, requiring bidders to complete Annexes C, D, and E in accordance with SATS 1286.2011.
240-12248652_List of Tender Returnables_Cat 3_ Rev 7.docx
ESKOM is inviting tenders for the installation of electric vehicle (EV) charging infrastructure at Matimba Power Station in Limpopo, as part of a six-month pilot project (reference E3426GXLPMAT). The tender includes quality management system requirements, a contract quality plan, and quality control plans.
240-68099512 Form A_Cat 3_ Rev 9.docx
Eskom is inviting tenders for the installation of EV infrastructure at Matimba Power Station in Limpopo, as part of a six-month pilot project. The tender includes a requirement for the successful bidder to comply with Eskom's Supplier Quality Requirements and ISO 9001 standards.
PAYE Questionnaire for Service Contracts 2025_2026.doc
Eskom is inviting tenders for the installation of electric vehicle (EV) charging infrastructure at Matimba Power Station in Limpopo, as part of a six-month pilot project. The tender includes a mandatory PAYE classification questionnaire that bidders must complete to determine their tax status for service contracts.
NEC ECC3 EV Infrastructure at Matimba Power Station for Gx Pilot.docx
Design and construction of EV charging infrastructure at Matimba Power Station in Limpopo, as part of a six-month pilot project for Eskom's transition from internal combustion engine vehicles to electric vehicles. The works include civil infrastructure, power supply to the charger, labelling, testing, commissioning, and handover; the EV charger itself is supplied by Eskom.
SQM Risks_Quality Section.xlsx
Eskom is inviting tenders for the installation of EV infrastructure at Matimba Power Station in Limpopo, as part of a Gx Pilot, for a period of six months. The tender covers the supply, delivery, and related services for EV charging equipment, with a focus on quality, safety, and compliance with Eskom technical specifications.
Copy of F240042 REV4 ENVIRONMENTAL EVALUATION HIGH RISK ACTIVITY.xlsx
Eskom is inviting tenders for the installation of EV infrastructure at Matimba Power Station in Limpopo, as part of a GX pilot project for a period of six months. The tender includes a high-risk environmental evaluation with specific compliance criteria that bidders must meet.
eTendering System Training manual.docx
Eskom is inviting tenders for the installation of electric vehicle (EV) charging infrastructure at Matimba Power Station in Limpopo, as part of a six-month GX pilot project. The tender covers the supply, installation, and related works for EV charging infrastructure at the power station.
240-77471499 (2) Annexure B.docx
Eskom is inviting tenders for the installation of EV infrastructure at Matimba Power Station in Limpopo, as part of a six-month pilot project. The successful bidder must comply with Eskom's occupational health and safety (OHS) requirements and relevant South African legislation.
240-105658000 Supplier Quality Management Specification.pdf
Eskom is procuring electric vehicle (EV) infrastructure at Matimba Power Station for a pilot project, with a contract period of six months. The tender is governed by Eskom's Supplier Quality Management specification (240-105658000 / QM 58), which sets out quality management system requirements aligned to ISO 9001.
E-Tenderers’ E-Tendering Training Acknowledgement Form.docx
Eskom is inviting tenders for the installation of electric vehicle (EV) charging infrastructure at Matimba Power Station in Limpopo, as part of a six-month pilot project (Gx Pilot). The contract covers the supply, installation, and commissioning of EV charging equipment, with a six-month operational period.
240-109253698 Template for a Typical Contract Quality Plan.docx
Eskom is inviting tenders for the supply and installation of electric vehicle (EV) charging infrastructure at Matimba Power Station in Limpopo, as part of a six-month pilot project. The contract requires the successful bidder to provide a Contract Quality Plan (CQP) covering quality management, sub-supplier control, inspection, and commissioning activities.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Median Estimate
R 11 810 921
Range
Based on 12 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Construction. Unlock full pricing strategies, bid frequency, and historical win rates.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Description
Source: EV Infrastructure at Matimba Power Station for Gx Pilot Technical Specification REV3.pdf (unknown)The document covers the construction of EV charging infrastructure and installation of power supply to the EV charger. The purpose of the Technical Specification is to specify the necessary criteria or technical requirements for the works or work activities of a project or any other undertaking that is to be carried out by a Contractor. This document shall apply to Matimba Power Station.
Contact Information
Source: EV Infrastructure at Matimba Power Station for Gx Pilot Technical Specification REV3.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"Engineering"}
Evaluation Criteria
Source: EV Infrastructure at Matimba Power Station for Gx Pilot Technical Specification REV3.pdf (unknown)Unable to extract eligibility criteria
Technical Specifications
Source: EV Infrastructure at Matimba Power Station for Gx Pilot Technical Specification REV3.pdf (unknown)Engineering
Title: The identification of the Unique Identifier: SP/174/003
connection point and parking
bays for the EV project pilot
phase at Matimba Power Alternative Reference Number: N/A
Station Technical
Area of Applicability: Engineering
Documentation Type: Specification
Revision: 3
Total Pages: 21
Next Review Date: N/A
Disclosure Classification: CONTROLLED
Disclosure
Compiled by Functional Responsibility Authorised by
......................................... ......................................... .........................................
Hope Kakunekwao Louisa Bamuza Jacky Mathobela
Electrical Engineer Electrical Engineering Engineering Manager
Manager
2026-06-10 2026-06-18 2026/06/18Date: ................................. Date: ................................. Date: .................................
Template Identifier: 559-1136093365 Gx Engineering Technical Specification Template (Rev 1)
Unique Identifier: SP/174/003 The identification of the connection point and parking bays for
the EV project pilot phase at Matimba Power Station Technical Revision: 3
Specification Page:
Contents
. Introduction ......................................................................................................................................................4
2.1 Scope ..............................................................................................................................................................4
2.1.1 Purpose .....................................................................................................................................................4
2.1.2 Applicability................................................................................................................................................4
2.2 Normative/informative references..................................................................................................4
2.2.1 Normative ..................................................................................................................................................4
2.2.2 Informative.................................................................................................................................................5
2.3 Definitions....................................................................................................................................................5
2.3.1 Disclosure Classification ...........................................................................................................................5
2.4 Abbreviations..............................................................................................................................................5
2.5 Roles and responsibilities....................................................................................................................6
2.6 Process for monitoring........................................................................................................................7
2.7 Related/supporting documents.........................................................................................................7
3.1 Technical requirements ........................................................................................................................7
3.1.1 Details of Plant ..........................................................................................................................................7
3.1.2 Scope of Works .........................................................................................................................................8
3.1.3 Design Requirements................................................................................................................................8
3.1.4 Manufacturing Requirements ....................................................................................................................8
3.1.5 Construction Requirements.......................................................................................................................9
3.1.5.1 Survey and Site clearance ................................................................................................................9
3.1.5.2 Protection of existing manhole cover ..............................................................................................10
3.1.5.3 Civil engineering and structural works ............................................................................................10
3.1.5.4 Electrical engineering works ...........................................................................................................13
3.1.6 Temporary works, Site services & construction constraints related to:...................................................15
3.1.7 Commissioning Requirements ................................................................................................................16
3.1.8 Testing Requirements .............................................................................................................................16
3.1.9 Operating Requirements .........................................................................................................................16
3.1.10 Maintenance Requirements ..................................................................................................................16
3.1.11 Handover Requirements .......................................................................................................................16
3.1.12 Decommissioning Requirements ..........................................................................................................17
3.1.12.1 Removal of existing interlocking paving blocks.............................................................................17
3.1.12.2 Removal of existing corrugated iron zinc parking roof sheets. .....................................................17
3.1.12.3 Removal of existing concrete kerbs ..............................................................................................17
3.2 General requirements .........................................................................................................................18
3.2.1 Health & Safety requirements .................................................................................................................18
3.2.2 Quality requirements ...............................................................................................................................18
3.2.3 Environmental requirements ...................................................................................................................18
3.2.3.1 Cutting and removal of tree roots beneath the subbase.................................................................18
3.2.4 Documentation requirements ..................................................................................................................18
3.2.5 Plant codification .....................................................................................................................................18
3.2.6 Plant labelling ..........................................................................................................................................19
3.2.7 Drawing requirements .............................................................................................................................19
3.2.8 Communication requirements .................................................................................................................19
3.2.9 Other requirements (Process/Legislative/Contractual) ...........................................................................19
Authorisation..................................................................................................................................................19
Revisions ............................................................................................................................................................19
Development team .........................................................................................................................................19
Acknowledgements ......................................................................................................................................20
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Unique Identifier: SP/174/003 The identification of the connection point and parking bays for
the EV project pilot phase at Matimba Power Station Technical Revision: 3
Specification Page:
Appendix a : list of drawings........................................................................................................................21
Figures
Figure 1: Identified EV charging infrastructure .............................................................................................................8
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Unique Identifier: SP/174/003 The identification of the connection point and parking bays for
the EV project pilot phase at Matimba Power Station Technical Revision: 3
Specification Page:
Eskom Generation (Gx) has initiated a project to replace its Internal Combustion Engine (ICE) fleet of
vehicles with Electric Vehicles (EVs). The project objective is to achieve a more sustainable and
environmentally friendly transportation system by reducing Eskom’s vehicles CO2 emissions contribution
without compromising the respective vehicle requirements. This is planned to be achieved by transitioning
from ICE vehicles to EVs and installing charging infrastructure at Gx Power Stations to support the
transition.
EVs are still developing in terms of availability, performance, and infrastructure in South Africa. A pilot
project is required to evaluate EV performance under local conditions, assess operational impacts and
align with Eskom’s emission reduction targets before rollout across the business.
Matimba Power Station is one of the sites chosen for the pilot phase of the project and required to provide
a connection point for a charger and identification of parking bays for the charging station.
Gx Engineering has produced the ROC, SRD, EMAP and Site Scope of Work documents for the whole
EV project that is informative and useful for the development of the site-specific documents. Matimba
Power Station has developed site-specific ROC, SRD, and Concept Design Report. This document does
not constitute a basic detailed design but rather highlights the key design elements of the connection point
and parking bays.
2.1 Scope
The document covers the construction EV charging infrastructure and installation of power supply to the
EV charger.
2.1.1 Purpose
The purpose of the Technical Specification is to specify the necessary criteria or technical requirements
for the works or work activities of a project or any other undertaking that is to be carried out by a Contractor.
2.1.2 Applicability
This document shall apply to Matimba Power Station.
2.2 Normative/informative references
Parties using this document shall apply the most recent edition of the documents listed in the following
paragraphs.
2.2.1 Normative
[1] ISO 9001 Quality Management Systems.
[2] Occupational Health and Safety Act (Act )
[3] 240-56227443 Requirements for Control and Power Cables for Power Stations
[4] 240-56355815 Field Instrument Installation Standard - Junction Boxes and Cable Termination
[5] 240-56355754 Field Instrument Installation
[6] 240-93576498 KKS Coding Standard
[7] 240-86973501 Engineering Drawing Standard – Common Requirements
[8] 240-76992014 Technical Document and Record Management Work Instruction
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Unique Identifier: SP/174/003 The identification of the connection point and parking bays for
the EV project pilot phase at Matimba Power Station Technical Revision: 3
Specification Page:
[9] 240-56356396 Earthing and Lighting Protection Standard
[10] 240-531136385 Design Review Procedure
[11] 240-56227516 LV Switchgear and Control Gear Assemblies and Associated Equipment for
Voltage up to and including 1000 AC and 1500V DC Standard
[12] 240-77301384 Electrical LV Load Schedule Template
[13] 240-56176097 Electrical Cable Schedule template
[14] 240-56364545 Structural Design and Engineering Standard
[15] SANS 10400-A The application of National Building Regulations-Part A: General principles and
Methodology
Source: EV Infrastructure at Matimba Power Station for Gx Pilot Technical Specification REV3.pdfExperience & Qualifications
Source: EV Infrastructure at Matimba Power Station for Gx Pilot Technical Specification REV3.pdfbonding systems) with National Diploma or N6 Certificate in electrical Engineering or equivalent
qualification, electrical trade test certificate
registration with Department of Employment and Labour as an Installation Electrician.
Quality Management
Source: EV Infrastructure at Matimba Power Station for Gx Pilot Technical Specification REV3.pdfquality procedures and contractual specifications, and
user requirements and codes. Quality is the custodian
of the Quality Management System and quality records
and facilitates the work of the Approved Inspection
Authority (AIA). The Quality Function’s responsibility is
to ensure Contractors have a sound quality system in
place. Quality checks these systems on behalf of the
shrinkage/settlement and ensure density compliance.
Testing Protocols – Earthworks
per 50 m2 per layer (or per each distinct work front/day, whichever yields more tests). Record wet
density, dry density, and moisture content; target ≥90% Modified AASHTO.
or aerated), re-compacted, and re-tested until compliant.
include in the QA Handover Pack.
specifications to prevent vegetation and pests.
Testing/Verification – Soil Poisoning
and Application Certificate indicating product, dosage, coverage rate, and date.
include in QA Handover Pack.
3.1.5.2 Protection of existing manhole cover
area.
to prevent mechanical damage during construction.
3.1.5.3 Civil engineering and structural works
before handover.
Testing Protocols – Layer works
aesthetic standards. This includes:
to ensure full penetration and locking of pavers.
movement and maintain structural integrity.
handover.
effective drainage.
pavers or open joints.
Testing/Verification – Finishes
exceed 10 mm.
absence of voids.
Testing/Verification – Drainage
compliance with design slopes.
exceed 10 mm.
ponding occurs within 15 minutes after wetting under calm conditions.
Documentation: Record test results, corrective actions, and photographic evidence in the QA
Prepare and cure concrete cubes according to SANS 5863 for compressive strength testing.
Test cubes at 7 and 28 days to confirm compliance with the 35 MPa requirement.
3.1.7 Commissioning Requirements
Use the Contractor’s commissioning checklist to document all steps, test results, and any defects.
Installation: Confirm secure mounting, correct wiring, and proper closure per the manufacturer's manual.
Safety Tests: Perform earthing/grounding, RCD (Residual Current Device) tests, insulation resistance
tests, and ground fault protection verification.
Power: Verify correct voltage, current, and supply phase.
Compliance: Ensure all work adheres to relevant international (IEC 61851-1) safety and performance
standards.
3.1.8 Testing Requirements
Visual Inspection: Check for cable damage, frayed wires, bent pins, and secure connections.
Insulation Resistance: Verify high resistance between live parts and earth.
Earth Loop Impedance: Check for low impedance to ensure fault currents clear quickly.
3.1.9 Operating Requirements
3.1.11 Handover Requirements
of the works. This pack shall include, but is not limited to:
associated activities.
photographic evidence of protective layers and warning tape.
dimensional checks.
For all testing equipment (nuclear density gauge, slump cone, scales, etc.).
32-95 Environmental, Occupational Health and Safety Incident Management Procedure
240-62196227 Life- saving Rules.
32-1126 Eskom Smoking Policy
32-1134 Access Control at Eskom Premises
3.2.2 Quality requirements
The Contractor shall adhere to the ISO 9001 Quality Management Systems during installation,
commissioning and testing.
3.2.3 Environmental requirements
3.2.3.1 Cutting and removal of tree roots beneath the subbase
Identify and expose tree roots encountered during earthworks or subbase preparation.
Cut and remove roots using approved horticultural and construction methods to avoid regrowth or
structural damage.
subbase integrity.
3.2.4 Documentation requirements
pre-commissioning inspection reports, etc.
non-destructive testing, reports.
3.2.5 Plant codification
coding applied in existing system.
and is the responsibility of the Contractor and shall be done in accordance with KKS Coding
standard (240-93576498).
Compliance Requirements
Source: EV Infrastructure at Matimba Power Station for Gx Pilot Technical Specification REV3.pdf (unknown)[16] SANS 10400-L The application of National Building Regulations-Part L: Roofs [17] SANS 10160-Part 1 - Part 8 2.2.2 Informative [18] 240-53113685 Design Review Procedure [19] 240-43898151 Perform Verification and Validation [20] 240-53114002 Engineering Change Management Procedure [21] 32-421 - Eskom Life Saving Rules [22] 240-82410629 Environmental Management Strategy 2.3 DEFINITIONS Electric Vehicles: An electric vehicle is a vehicle that uses electricity as a source of power and electric motors for moving. Electric vehicles cover a wide range of vehicles that used on the road, rail, water, air and space mediums. This project will focus on Battery Electric and Hybrids vehicles, prioritising the former. Charging Infrastructure: An electric vehicle charging infrastructure is a system of charging stations or facilities to recharge electric vehicles. There are fast chargers (expensive Leve 3 DC type chargers) used at public and office locations and slow chargers (cheaper Level 2 AC type chargers) used in public and residential areas. 2.3.1 Disclosure Classification Controlled disclosure: controlled disclosure to external parties (either enforced by law, or discretionary). 2.4 ABBREVIATIONS Abbreviation Description AASHTO American Association of State Highway and Transport Officials AC Alternating Current CO2 Carbon Dioxide ECSA Engineering Council of South Africa EV Electric Vehicle EMAP Engineering Management Plan GPR Ground Penetrating Radar Gx Generation Business ICE Internal Combustion Engine CONTROLLED DISCLOSURE When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorised version on the system. Unique Identifier: SP/174/003 The identification of the connection point and parking bays for the EV project pilot phase at Matimba Power Station Technical Revision: 3 Specification Page: Abbreviation Description kA Kiloamp KKS Kraftwerk-Kennzeichen System LV Low Voltage (≤000) mA Milliampere MCCB Moulded Case Circuit Breaker MPa Megapascal OEM Original Equipment Manufacture OHSA Occupational Health and Safety Act KKS Kraftwerk-Kennzeichen-System kW Kilowatt (1000 Watt) ROC Required Operational Capability SRD Stakeholder Requirements Definition QA Quality Assurance 2.5 ROLES AND RESPONSIBILITIES Person Responsibility Contractor The Contractor shall design (to the extent specified in the Contract), execute and complete the Works in accordance with the Contract and with the Engineer’s instructions, and shall remedy any defects in the Works. Engineering Design Work Lead (EDWL) He/she co-ordinates the design work provided by the discipline Design Engineering roles and integrates this work into a final integrated design product. He/she is the custodian of the requirements set, and the interface register between packages, and part of his/her role is to maintain this information. He remains responsible for the integrity of the engineering product and is accountable for the overall management of interfaces and delivery of an integrated product. Lead Discipline Engineer (LDE) The role of the Lead Discipline Engineering role is to manage the technical integrity of the design and be accountable for the management of the interfaces within their specific engineering domain Site Construction Engineering Practitioner The Site Construction Engineering role is part of the project engineering team and participates in conjunction with other team members of all disciplines in order to assure the technical integrity of a fully functional and operational plant that meets the user requirement and Eskom Engineering expectations and requirements. The Site Construction Engineering role is a key link to facilitate and ensure that the plant, is built and commissioned, is fully aligned with the Design Base, Operating Technical Specifications, and the Maintenance Base. The role provides an assurance function. CONTROLLED DISCLOSURE When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorised version on the system. Unique Identifier: SP/174/003 The identification of the connection point and parking bays for the EV project pilot phase at Matimba Power Station Technical Revision: 3 Specification Page: Quality inspections, Final acceptance, sign-off and approval Project manager/Contracts manager The Project manager coordinates the execution of the Works to achieve the required cost, schedule and quality objectives. The Project manager is delegated authority from the Eskom Employer Representative to manage the defined scope of work. Engineer The Engineer is Eskom’s representative(s) that ensure that the Technical Specification is captured in a Works Information as part of a contract for tendering purposes and officially communicates with the Contractor through the Contracts manager. The Engineer relays all technical information in the form of the processes prescribed in the Engineering Change Management Procedure as well as on site interaction and meetings to facilitate the resolution of all queries of a technical nature. Quality Management Quality ensures Contractors build plant according to quality procedures and contractual specifications, and user requirements and codes. Quality is the custodian of the Quality Management System and quality records and facilitates the work of the Approved Inspection Authority (AIA). The Quality Function’s responsibility is to ensure Contractors have a sound quality system in place. Quality checks these systems on behalf of the Employer. 2.6 PROCESS FOR MONITORING Not Applicable. 2.7 RELATED/SUPPORTING DOCUMENTS [23] RT/170/006 Required Operational Capability for Matimba Power Station Electric Vehicle Project [24] RT/170/007 Engineering Change Root Cause Analysis for Matimba Power Station Electric Vehicle Project Report [25] RT/174/004 Stakeholder Requirements Definition for Matimba Power Station Electric Vehicle Project [26] RT/174/003 Concept Design Report for the Identification of the Connection Point and Parking Bays for the EV Project Pilot Phase at Matimba Power Station
TECHNICAL SPECIFICATION 3.1 TECHNICAL REQUIREMENTS Not Applicable. 3.1.1 Details of Plant A site location has been identified within Matimba Power Station at the administration block car ports, with a functional location code 10-00SAG00BX001 as seen in Figure 1 below. CONTROLLED DISCLOSURE When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorised version on the system. Unique Identifier: SP/174/003 The identification of the connection point and parking bays for the EV project pilot phase at Matimba Power Station Technical Revision: 3 Specification Page: Figure 1: Identified EV charging infrastructure The EV parking bay will have 2 parking ports. DESCRIPTION LENGTH (m) WIDTH (m) 1 5 3 2 5 3 EV Charger (located space) 1.5 1.5 Each charging station will be connected to the Power Station Low Voltage network. The Power Station safety, operation and maintenance shall not be compromised by the installation of the chargers. Failure of any charger shall not lead to Unit load loss or Unit trip or Multiple Unit Trip. 3.1.2 Scope of Works Electrical scope
Refer to section 3.1.5.4. Civil works scope
Refer to section 3.1.5.3. 3.1.3 Design Requirements All the Electrical Engineering design work is performed by the ECSA-registered Electrical Engineer appointed by the Contractor as defined in accordance with the requirements of the Engineering Council of South Africa. All the Civil Engineering design work is performed by the ECSA-registered personnel (Technician, Technologies or Engineer) appointed by the Contractor as defined in accordance with the requirements of the Engineering Council of South Africa. 3.1.4 Manufacturing Requirements Not Applicable. CONTROLLED DISCLOSURE When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorised version on the system. Unique Identifier: SP/174/003 The identification of the connection point and parking bays for the EV project pilot phase at Matimba Power Station Technical Revision: 3 Specification Page: 3.1.5 Construction Requirements Before any construction begins, both known and unknown underground services must be identified and either protected or relocated to prevent damage during excavation and construction activities. This step is critical to avoid service interruptions and ensure safety during the works. This includes, but is not limited to, electrical cables, water pipelines, communication lines, and drainage systems. 3.1.5.1 Survey and Site clearance The Contractor shall
Utilise approved detection methods such as ground-penetrating radar (GPR) or cable locators to accurately map service locations.
Verify service positions against available as-built drawings and update records where discrepancies are found.
Implement protective measures for all identified services, including physical barriers or rerouting where necessary to prevent accidental damage.
Coordinate with relevant service owners for isolation or relocation of critical utilities prior to excavation.
Document all findings and protective actions in Service Identification Report, which shall form part of the project handover documentation. Failure to comply with these requirements may result in service disruption, safety hazards and contractual penalties. Earthworks The Contractor shall perform all earthworks necessary to prepare the EV parking bay area in accordance with project specifications. This includes
Clearing and Grubbing: Remove vegetation, debris, and unsuitable material from the designated area.
Ground Preparation: Rip and scarify to a depth of 150 mm and consolidate to a minimum of 90% Modified AASHTO density.
Compaction: Use suitable compaction equipment to achieve uniform density across the platform.
Moisture Control: Maintain optimal moisture content during compaction to mitigate shrinkage/settlement and ensure density compliance.
Dust Control & Disposal: Apply dust suppression; dispose of spoil at approved locations. Testing Protocols – Earthworks
In-situ Density & Moisture: Perform nuclear density gauge tests at a minimum frequency of 1 test per 50 m2 per layer (or per each distinct work front/day, whichever yields more tests). Record wet density, dry density, and moisture content; target ≥90% Modified AASHTO.
Re-work & re-test: Any area failing density/moisture criteria shall be reconditioned (re-wet/re-work or aerated), re-compacted, and re-tested until compliant.
Test Records: Tabulate test locations (with grid references), dates, results, and corrective actions; include in the QA Handover Pack. Soil poisoning CONTROLLED DISCLOSURE When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorised version on the system. Unique Identifier: SP/174/003 The identification of the connection point and parking bays for the EV project pilot phase at Matimba Power Station Technical Revision: 3 Specification Page
Apply weed killer and soil insecticides under floors and shallow furrows as per supplier specifications to prevent vegetation and pests. Testing/Verification – Soil Poisoning
Application Certificates: Obtain and file the applicator’s Method Statement, product Data Sheets, and Application Certificate indicating product, dosage, coverage rate, and date.
Coverage Verification: Provide a site layout marked‐up by the applicator confirming treated extents; include in QA Handover Pack. 3.1.5.2 Protection of existing manhole cover
The Contractor shall identify the existing manhole located within or adjacent to the construction area.
Implement protective measures such as temporary barriers, steel plates, or high-visibility markings to prevent mechanical damage during construction.
Ensure access to the manhole is maintained throughout construction.
No loads shall be placed on the manhole cover that exceed its design loading class. 3.1.5.3 Civil engineering and structural works Detailed below is civil scope of work that the Contractor is required to perform and it is not limited to: Installation of new parking shelter The Contractor shall supply, fabricate, and install a new steel-framed parking shelter covering an area of 14 m × 7 m, positioned over the designated EV parking bays. This work follows directly after the removal of existing roofing and kerbs described in Section 3.1.12. Structural steel framework
Supply and install hot-rolled or cold-formed steel beams, columns, and purlins suitable for outdoor carport structures.
Steel sizing, connections, and spacing must comply with relevant SANS structural standards and Eskom facility requirements.
All steel members shall be
Hot-dip galvanised (minimum 80 μm coating) for corrosion protection.
Provided with base plates, anchor bolts, and stiffeners as required.
The Contractor shall ensure alignment and plumbness during erection. Foundation for steel columns
B-BBEE Minimum Level: 2
Health & Safety
Source: EV Infrastructure at Matimba Power Station for Gx Pilot Technical Specification REV3.pdf. Introduction ......................................................................................................................................................4
2.1 Scope ..............................................................................................................................................................4
2.1.1 Purpose .....................................................................................................................................................4
2.1.2 Applicability................................................................................................................................................4
2.2 Normative/informative references..................................................................................................4
2.2.1 Normative ..................................................................................................................................................4
2.2.2 Informative.................................................................................................................................................5
2.3 Definitions....................................................................................................................................................5
2.3.1 Disclosure Classification ...........................................................................................................................5
2.4 Abbreviations..............................................................................................................................................5
2.5 Roles and responsibilities....................................................................................................................6
2.6 Process for monitoring........................................................................................................................7
2.7 Related/supporting documents.........................................................................................................7
3.1 Technical requirements ........................................................................................................................7
3.1.1 Details of Plant ..........................................................................................................................................7
3.1.2 Scope of Works .........................................................................................................................................8
3.1.3 Design Requirements................................................................................................................................8
3.1.4 Manufacturing Requirements ....................................................................................................................8
3.1.5 Construction Requirements.......................................................................................................................9
3.1.5.1 Survey and Site clearance ................................................................................................................9
3.1.5.2 Protection of existing manhole cover ..............................................................................................10
3.1.5.3 Civil engineering and structural works ............................................................................................10
3.1.5.4 Electrical engineering works ...........................................................................................................13
3.1.6 Temporary works, Site services & construction constraints related to:...................................................15
3.1.7 Commissioning Requirements ................................................................................................................16
3.1.8 Testing Requirements .............................................................................................................................16
3.1.9 Operating Requirements .........................................................................................................................16
3.1.10 Maintenance Requirements ..................................................................................................................16
3.1.11 Handover Requirements .......................................................................................................................16
3.1.12 Decommissioning Requirements ..........................................................................................................17
3.1.12.1 Removal of existing interlocking paving blocks.............................................................................17
3.1.12.2 Removal of existing corrugated iron zinc parking roof sheets. .....................................................17
3.1.12.3 Removal of existing concrete kerbs ..............................................................................................17
3.2 General requirements .........................................................................................................................18
3.2.1 Health & Safety requirements .................................................................................................................18
3.2.2 Quality requirements ...............................................................................................................................18
3.2.3 Environmental requirements ...................................................................................................................18
3.2.3.1 Cutting and removal of tree roots beneath the subbase.................................................................18
3.2.4 Documentation requirements ..................................................................................................................18
3.2.5 Plant codification .....................................................................................................................................18
3.2.6 Plant labelling ..........................................................................................................................................19
3.2.7 Drawing requirements .............................................................................................................................19
3.2.8 Communication requirements .................................................................................................................19
3.2.9 Other requirements (Process/Legislative/Contractual) ...........................................................................19
Authorisation..................................................................................................................................................19
Revisions ............................................................................................................................................................19
Development team .........................................................................................................................................19
Acknowledgements ......................................................................................................................................20
Appendix a : list of drawings........................................................................................................................21
paragraphs.
2.2.1 Normative
[1] ISO 9001 Quality Management Systems.
[2] Occupational Health and Safety Act (Act )
[3] 240-56227443 Requirements for Control and Power Cables for Power Stations
[4] 240-56355815 Field Instrument Installation Standard - Junction Boxes and Cable Termination
[5] 240-56355754 Field Instrument Installation
[6] 240-93576498 KKS Coding Standard
[7] 240-86973501 Engineering Drawing Standard – Common Requirements
[8] 240-76992014 Technical Document and Record Management Work Instruction
Contractor The Contractor shall design (to the extent specified in
the Contract), execute and complete the Works in
accordance with the Contract and with the Engineer’s
instructions, and shall remedy any defects in the Works.
Engineering Design Work Lead (EDWL) He/she co-ordinates the design work provided by the
discipline Design Engineering roles and integrates this
work into a final integrated design product. He/she is the
custodian of the requirements set, and the interface
register between packages, and part of his/her role is to
maintain this information. He remains responsible for
the integrity of the engineering product and is
accountable for the overall management of interfaces
and delivery of an integrated product.
Lead Discipline Engineer (LDE) The role of the Lead Discipline Engineering role is to
manage the technical integrity of the design and be
accountable for the management of the interfaces within
their specific engineering domain
safety, operation and maintenance shall not be compromised by the installation of the chargers. Failure of
any charger shall not lead to Unit load loss or Unit trip or Multiple Unit Trip.
3.1.2 Scope of Works
either protected or relocated to prevent damage during excavation and construction activities. This step is
critical to avoid service interruptions and ensure safety during the works.
sheets removed earlier.
Roof area: 14 m × 7 m = 98 m2 (allowing for sheets overlap and trimming).
Fix sheets to purlins using approved roofing fasteners with neoprene washers to prevent ingress.
Install ridge capping, drip edges, and flashing to ensure weatherproofing.
Ensure shelter design withstands local wind loads per SANS 10160.
All working at heights must comply with Eskom Safety Regulations and the OHS Act.
Welders and structural steel installers must be certified.
Excavate a trench along the designated route from the switchgear panel to the EV charger location
to accommodate the new power cable.
Cables for Power Stations Standard, 240-56227443
600/1000 V cable, manufactured in accordance with SANS 1507-3, and install in compliance with
Eskom Standard 240-56227443.
suitable material, ensuring proper compaction.
of the parking bay.
or curing compounds.
3.1.5.4 Electrical engineering works
to:
the employer. The junction box, shall be protected against corrosion, shall be IP 65 rated at
minimum and an IK rating that accommodates site conditions according to SANS 10142 – 1, The
wiring of premises: Low voltage installations standard. The junction box’s final finish shall be
orange. The junction box shall also be equipped with a mounting rail.
protection Standard, 240-56356396.
min, IK08 (IK10 preferred) including driver and mounting kit lighting, under the EV parking roof.
PVC sheathed 600/1000 V cable from Substation South in accordance with Generation
Requirements for Control and Power Cables for Power Stations Standard, 240-56227443. The
termination will be done on the 01BHN05AA001 / 01BHN06AA001 panel, 380V Substation South
01BHN06AA001 at Substation South to the MCCB at the EV charger location to accommodate the
new power cable.
suitable material, ensuring proper compaction.
Generation Requirements for Control and Power Cables for Power Stations Standard, 240-
the junction box and the power cable in accordance with KKS Coding Standard, 240-93576498.
➢General arrangement drawing for 380V Substation South Board A and B: 0.58/13192 Rev 6
➢Summary Sheet 380V Substation South Board A – 0.58/13192 Rev 4
➢380V Substation South Board A and B Switchgear Schedule – 0.58/56223 Rev 0
➢380V Substation South Board A Cable block diagram – 0.58/13639 Rev 6)
250A, 4-pole MCCB
Type C MCB, 10 A (lighting circuit protection)
Copper conductor, 3-core + earth, 2.5 mm2 (T&E or 3-core SWA where required)
63A Earth Leakage
Temporary traffic control measures such as portable STOP and GO signs must be implemented to
maintain safe traffic flow during construction.
patterns within the power station.
traffic control.
construction progress.
and plinth dimensions.
3.2 General requirements
3.2.1 Health & Safety requirements
Appendix a: list of drawings
General arrangement drawing for 380V Substation South Board A and B: 0.58/13192 Rev 6
Summary Sheet 380V Substation South Board A – 0.58/13192 Rev 4
380V Substation South Board A and B Switchgear Schedule – 0.58/56223 Rev 0
380V Substation South Board A Cable block diagram – 0.58/13639 Rev 6
Environmental
Source: EV Infrastructure at Matimba Power Station for Gx Pilot Technical Specification REV3.pdfEskom Generation (Gx) has initiated a project to replace its Internal Combustion Engine (ICE) fleet of
vehicles with Electric Vehicles (EVs). The project objective is to achieve a more sustainable and
environmentally friendly transportation system by reducing Eskom’s vehicles CO2 emissions contribution
without compromising the respective vehicle requirements. This is planned to be achieved by transitioning
from ICE vehicles to EVs and installing charging infrastructure at Gx Power Stations to support the
transition.
[9] 240-56356396 Earthing and Lighting Protection Standard
[10] 240-531136385 Design Review Procedure
[11] 240-56227516 LV Switchgear and Control Gear Assemblies and Associated Equipment for
Voltage up to and including 1000 AC and 1500V DC Standard
[12] 240-77301384 Electrical LV Load Schedule Template
[13] 240-56176097 Electrical Cable Schedule template
[14] 240-56364545 Structural Design and Engineering Standard
[15] SANS 10400-A The application of National Building Regulations-Part A: General principles and
requirements
[16] SANS 10400-L The application of National Building Regulations-Part L: Roofs
[17] SANS 10160-Part 1 - Part 8
2.2.2 Informative
[18] 240-53113685 Design Review Procedure
[19] 240-43898151 Perform Verification and Validation
[20] 240-53114002 Engineering Change Management Procedure
[21] 32-421 - Eskom Life Saving Rules
[22] 240-82410629 Environmental Management Strategy
2.3 Definitions
Electric Vehicles: An electric vehicle is a vehicle that uses electricity as a source of power and electric
motors for moving. Electric vehicles cover a wide range of vehicles that used on the road, rail, water, air
and space mediums. This project will focus on Battery Electric and Hybrids vehicles, prioritising the former.
Charging Infrastructure: An electric vehicle charging infrastructure is a system of charging stations or
facilities to recharge electric vehicles. There are fast chargers (expensive Leve 3 DC type chargers) used
at public and office locations and slow chargers (cheaper Level 2 AC type chargers) used in public and
residential areas.
2.3.1 Disclosure Classification
Controlled disclosure: controlled disclosure to external parties (either enforced by law, or discretionary).
2.4 Abbreviations
associated works. This includes, but is not limited to, the following:
3.1.12.1 Removal of existing interlocking paving blocks
as directed by the Engineer.
3.1.12.2 Removal of existing corrugated iron zinc parking roof sheets.
fasteners and gutters where necessary.
personnel.
3.1.12.3 Removal of existing concrete kerbs
management protocols.
Section
Source: EV Infrastructure at Matimba Power Station for Gx Pilot Technical Specification REV3.pdf3.2.2 Quality requirements ...............................................................................................................................18
Description
Source: 240-109253698 Template for a Typical Contract Quality Plan.docxContract Quality Plan template assist the supplier to identify and plan for meeting client's/ contract expectations/requirements for quality management
Submission Guidelines
Source: 240-109253698 Template for a Typical Contract Quality Plan.docx (unknown)Returnable Documents: SBD 4 (Declaration of Interest), SBD 9 (Certificate of Independent Bid Determination), Proof of CSD registration and a valid tax compliance status PIN. Disqualification risks: Any returnable form left unsigned or omitted. Quotations received after the closing time, regardless of reason.
Evaluation Criteria
Source: 240-109253698 Template for a Typical Contract Quality Plan.docx (unknown)The document does not specify eligibility criteria such as CSD registration, tax clearance, B-BBEE level, CIDB grading, or local content requirements. Bidders must complete the CQP template and submit it for evaluation. The CQP must be approved by the owner of the organisation.
Technical Specifications
Source: 240-109253698 Template for a Typical Contract Quality Plan.docx (unknown)Contract Quality Plan template assist the supplier to identify and plan for meeting client's/ contract expectations/requirements for quality management. The scope of work includes the execution of the contract scope of work deliverables.
Compliance Requirements
Source: 240-109253698 Template for a Typical Contract Quality Plan.docx (unknown)No specific requirements found
Description
Source: E-Tenderers’ E-Tendering Training Acknowledgement Form.docxEV infrastructure at Matimba Power Station for Gx Pilot for a period of 6 months. No further description of scope, deliverables, or requirements is provided in the source text.
Important Dates
Source: E-Tenderers’ E-Tendering Training Acknowledgement Form.docx (unknown)Closing date: 17 September 2026 at 10:00 (as per tender record). No other dates (briefings, site visits, clarification deadlines) are stated in the provided document.
Submission Guidelines
Source: E-Tenderers’ E-Tendering Training Acknowledgement Form.docx (unknown)Submission must be made via Eskom's e-Tendering platform. The E-Tendering Training Acknowledgement Form (Template ID: 240-9722574 Rev 1) is a mandatory returnable document that must be fully completed and submitted prior to the closing date. Failure to submit this form will render the tenderer non-responsive and result in disqualification. The form requires the tenderer's business name/JV, contact person, landline, cellphone, email address, and an acknowledgment of self-training via the e-Tendering Noddy Guide, video, or clarification meeting, signed by an authorised signatory with designation and date.
Evaluation Criteria
Source: E-Tenderers’ E-Tendering Training Acknowledgement Form.docx (unknown)Bidders must be registered on the Central Supplier Database (CSD) and have a valid tax clearance (SARS TCS or tax pin). A valid B-BBEE certificate or affidavit is required to claim preference points under the PPPFA 80/20 or 90/10 system. Mandatory returnable forms: SBD 1 (Invitation to Bid), SBD 4 (Declaration of Interest), SBD 6.1 (Preference Points Claim), SBD 6.2 (Declaration for Local Production and Content), SBD 7.1/7.2 (Contract Form), SBD 8 (Declaration of Bidder's Past SCM Practices), SBD 9 (Certificate of Independent Bid Determination), and an Authority to Sign / Board Resolution. The E-Tendering Training Acknowledgement Form must also be submitted. Omission of any mandatory form results in disqualification.
Technical Specifications
Source: E-Tenderers’ E-Tendering Training Acknowledgement Form.docx (unknown)EV infrastructure at Matimba Power Station for Gx Pilot for a period of 6 months. No detailed scope, deliverables, quantities, standards, service levels, or capacity requirements are provided in the source text.
Compliance Requirements
Source: E-Tenderers’ E-Tendering Training Acknowledgement Form.docx (unknown)CSD registration, valid tax clearance (SARS TCS or tax pin), valid B-BBEE certificate or affidavit. Mandatory forms: SBD 1, SBD 4, SBD 6.1, SBD 6.2, SBD 7.1/7.2, SBD 8, SBD 9, Authority to Sign / Board Resolution, and E-Tendering Training Acknowledgement Form.
Description
Source: Copy of F240042 REV4 ENVIRONMENTAL EVALUATION HIGH RISK ACTIVITY.xlsxThe tender is for the provision of EV infrastructure at Matimba Power Station for a period of 6 months.
Submission Guidelines
Source: Copy of F240042 REV4 ENVIRONMENTAL EVALUATION HIGH RISK ACTIVITY.xlsx (unknown)Returnable forms: SBD 4 (Declaration of Interest), SBD 9 (Certificate of Independent Bid Determination). The bidder must submit a signed Site Environmental Officer Appointment Letter. The bidder must provide proof of CSD registration and a valid tax compliance status PIN.
Evaluation Criteria
Source: Copy of F240042 REV4 ENVIRONMENTAL EVALUATION HIGH RISK ACTIVITY.xlsx (unknown)Bidders must achieve a minimum weighted final score of 80% in the high-risk environmental evaluation. The evaluation includes specific scoring for each document: Environmental Officer Appointment (25 points), Environmental Policy (5 points), EMP (15 points), WMP (10 points), EPRP (5 points), Aspects and Impacts Register (25 points), Hazardous/Chemical Substances (5 points), and Method Statement (10 points).
Technical Specifications
Source: Copy of F240042 REV4 ENVIRONMENTAL EVALUATION HIGH RISK ACTIVITY.xlsx (unknown)The Environmental Officer must have at least three years of related environmental management experience with a National Diploma/Degree/BTech in Environmental Management.
Compliance Requirements
Source: Copy of F240042 REV4 ENVIRONMENTAL EVALUATION HIGH RISK ACTIVITY.xlsx (unknown)The bidder must have a signed policy statement committing to environmental compliance and duty of care. The bidder must provide an Environmental Management Plan (EMP) that addresses anticipated impacts as per scope of work.
Description
Source: E3426GXLPMAT Invitation to Tender - EV Infrastructure at Matimba Power Station for Gx Pilot for period of 6 months.pdfAnnexure Attached (Y /
N / n/a)
1.1.1 *Authorisation Form Annexure A Y
1.1.2 *Acknowledgement form Annexure B Y
1.1.3 *Tenderer’s particulars Annexure C Y
1.1.4 *Integrity Declaration Form (Suppliers are required to Annexure D Y
download and read the Supplier Integrity Pact. It is
accessible on the Eskom Tender Bulletin via Eskom
Supplier Integrity Pact (eskom.co.za) link)
1.1.5 *CPA Requirements for Local Goods/Services Annexure E Y
1.1.6 *CPA(IG) for Foreign Goods/Services (if applicable) Annexure F Y
1.1.7 SBD 6.2 Declaration Certificate for Local Production Annexure G1 Y
and Local Content (only applicable if designated
materials are included and then Tenderers will be
required to complete and submit Annexures G1 to
G4 as evidence of compliance with this
requirement).
Annexure C Local Content Declaration- Summary Annexure G2 Y
Schedule
Annexure D Imported Content Declaration – Supporting Annexure G3 Y
Schedule to Annexure C
Annexure E Local Content Declaration- Supporting Annexure G4 Y
Schedule to Annexure C
1.1.8 *SBD 1 Invitation to Bid must be filled out by all Annexure H Y
tenderers and submitted with the tender at tender
submission deadline
1.1.9 *
Important Dates
Source: E3426GXLPMAT Invitation to Tender - EV Infrastructure at Matimba Power Station for Gx Pilot for period of 6 months.pdf (RFP)Closing date and time: 17/09/2026 at 10h00. Compulsory clarification meeting/site visit: Date: 03/09/2026, Time: 10h00 to 12h00, Venue: Matimba Power Station at (Lapa Auditorium) Lephalale, 0555. Tender validity period: 90 days from the closing date and time.
Briefing Session
Source: E3426GXLPMAT Invitation to Tender - EV Infrastructure at Matimba Power Station for Gx Pilot for period of 6 months.pdf (RFP)A compulsory clarification meeting/site visit with representatives of Eskom will take place as follows: Date: 03/09/2026, Time: 10h00 to 12h00, Venue: Matimba Power Station at (Lapa Auditorium) Lephalale, 0555
Contact Information
Source: E3426GXLPMAT Invitation to Tender - EV Infrastructure at Matimba Power Station for Gx Pilot for period of 6 months.pdf (RFP)The Eskom Representative is: Name: Azwifaneli Fanie Thagwana, Tel: 014 763 8690, E-mail: [email protected]
Submission Guidelines
Source: E3426GXLPMAT Invitation to Tender - EV Infrastructure at Matimba Power Station for Gx Pilot for period of 6 months.pdf (RFP)The tenderer must submit the tender via Eskom Tender bulletin site on the Eskom E-tendering page. The documents need to be uploaded under the folder Technical, Commercial, Financial, and other. All documents need to be submitted in a PDF format. The price list needs to be submitted in PDF and a copy in excel format. No Zip/condense files can be uploaded. No hard copy will be accepted. If for some reason you resubmit your tender, then the latest version of the tender submitted will only be accepted and all previous submission/s will be null and void. Please ensure that the submission status is indicated as complete.
Returnable Documents
Source: E3426GXLPMAT Invitation to Tender - EV Infrastructure at Matimba Power Station for Gx Pilot for period of 6 months.pdf (RFP)The tenderer must submit the returnable set out hereunder as part of its tender at the stipulated deadline.
Evaluation Criteria
Source: E3426GXLPMAT Invitation to Tender - EV Infrastructure at Matimba Power Station for Gx Pilot for period of 6 months.pdf (RFP)Tenderers must meet eligibility criteria: not under any restriction to do business with Eskom or State-Owned Companies; not on international sanctions lists; not submit more than one tender (except as allowed by E-Tendering limits); JV/consortium agreements must state joint and several liability; no conflict of interest (e.g., common controlling partner or access to competitor information); tenders must be signed by authorised persons; not restricted by National Treasury; not on Tender Defaulters list; not restricted by Eskom; must not subcontract 100% of the scope. Mandatory CIDB grading: Grade 2 or higher, Class CE or GB. Contractual requirements: CSD registration, SHEQ compliance, financial viability (financial statements for CIDB-related transactions from R30,000 excl. VAT). OHS, environmental, and quality returnables must be submitted by the closing date; OHS deficiencies may be rectified within 7 working days after request, but failure results in non-responsiveness. Environmental threshold: minimum 80% weighted score. Specific Goals (B-BBEE) scored out of 20 points; failure to submit evidence results in 0 points for that goal.
Technical Specifications
Source: E3426GXLPMAT Invitation to Tender - EV Infrastructure at Matimba Power Station for Gx Pilot for period of 6 months.pdf (RFP)The tenderer must submit a detailed construction methodology as per Section 3.1.5.4 of Technical Specification. The methodology must include the following: full scope of work, supply and install a junction box for the EV, supply and install a 250A, 4-pole MCCB inside a junction box, supply and install earthing on the junction box, supply and install LED canopy luminaire, terminate the installed power cable at both the switchgear and the junction box, perform a continuity test on the cable, supply and install KKS labels, update the red-lined drawings, provide the CoCs where needed, provide all electrical drawings.
Experience & Qualifications
Source: E3426GXLPMAT Invitation to Tender - EV Infrastructure at Matimba Power Station for Gx Pilot for period of 6 months.pdfRequired personnel and Resource Capability qualifications for Civil Works
Pricing Schedule
Source: E3426GXLPMAT Invitation to Tender - EV Infrastructure at Matimba Power Station for Gx Pilot for period of 6 months.pdfPrices will be scored out of 80 points
Financial Requirements
Source: E3426GXLPMAT Invitation to Tender - EV Infrastructure at Matimba Power Station for Gx Pilot for period of 6 months.pdf (RFP)Payment Terms: payment terms as stipulated hereunder when submitting tenders and concluding contracts with Eskom. For contracts valued below R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying Suppliers within 30 days of receipt of undisputed invoices. For contracts valued above R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying suppliers within 60 days of receipt of undisputed invoices.
Health & Safety
Source: E3426GXLPMAT Invitation to Tender - EV Infrastructure at Matimba Power Station for Gx Pilot for period of 6 months.pdfOHS Requirement as per below.
Environmental
Source: E3426GXLPMAT Invitation to Tender - EV Infrastructure at Matimba Power Station for Gx Pilot for period of 6 months.pdfEnvironmental Requirements: Relative weight
Contractual Terms
Source: E3426GXLPMAT Invitation to Tender - EV Infrastructure at Matimba Power Station for Gx Pilot for period of 6 months.pdfThe conditions of the contract will be the NEC3 ECC (Engineering & Construction Contract)
Special Conditions
Source: E3426GXLPMAT Invitation to Tender - EV Infrastructure at Matimba Power Station for Gx Pilot for period of 6 months.pdf (RFP)The tenderer must comply with the NKP rules and must be clothed with correct PPE (hard hat, overalls, dust musk, gloves and ear plugs).
Requirements
Source: E3426GXLPMAT Invitation to Tender - EV Infrastructure at Matimba Power Station for Gx Pilot for period of 6 months.pdf (RFP)Tenderers (whether a single company or an incorporated or unincorporated joint venture or consortium) must meet the eligibility criteria stated in the Tender Data.
Section
Source: E3426GXLPMAT Invitation to Tender - EV Infrastructure at Matimba Power Station for Gx Pilot for period of 6 months.pdf1.1.9 *SBD 6.1 Preference Points Claim Form in terms of Annexure I Y
PPPFA 2022 regulations
1.1.11 Tax Evaluation questionnaire to determine whether a Attached Y
The minimum weighted final score (threshold) required for a tender to be considered from a technical
perspective is 70%.
3.13 Functionality requirements Functionality requirements are applicable
functionality criteria
Qualitative Technical Evaluation 100%
Threshold 70%
Tenderers who do not meet the threshold for functionality scoring will
Qualitative Technical Evaluation Criteria
3.18 Evaluation of Specific Goals Specific goals will be scored out of 20 points in accordance with the
If a tenderer fails to submit evidence of its points claim for a Specific
Goal, it will not be disqualified. However, it will be awarded 0 points
the 80/20 system. Eskom will add the score from Pricing and Specific
Contractual Requirements are not evaluation criteria. They will
be assessed after the evaluation and ranking of the tenders.
OHS will evaluate the suppliers that have passed functionality and mandatory. The suppliers who have
evaluation report will be submitted to procurement. This Safety requirements are for OHS (Occupational
Total Weight Score 100
The minimum weighted final score (threshold) required is
Quality requirements
Category 3: Quality Requirements Deliverables to be evaluated indicator
SECTION A: Quality Management A.1 QMS Manual or a document that defines 1
A.2 Quality Policy Approved by top 1
Description
Source: eTendering System Training manual.docxThe document is a supplier help manual for the Eskom eTendering system (Revision 3.0, dated 28 August 2023). It explains how suppliers register on the portal, verify email and OTP, log in, select a tender reference, create a submission, upload documents by category (Technical, Commercial, Finance, etc.), and finalise the submission. File size limits are 50 MB per file and 900 MB total. A confirmation email with submission ID is sent on completion. The manual also covers editing registration details, logging out, and password reset procedures. It does not contain the tender scope, specifications, or requirements for the EV Infrastructure at Matimba Power Station tender.
Contact Information
Source: eTendering System Training manual.docx (unknown)For system difficulties with Tender Bulletin, eTendering, or OpenText, contact the buyer responsible for the published tender. No specific SCM or technical contact names, emails, or phone numbers are provided in the document.
Submission Guidelines
Source: eTendering System Training manual.docx (unknown)Submission is electronic via the Eskom eTendering portal (https://eTendering.eskom.co.za). Suppliers must register on the portal before bidding; registration requires a valid CSD number, email verification, and OTP sent to both cell phone and email. After login, select the relevant tender reference number, click "Create New Submission", upload required documents under the correct categories (Technical, Commercial, Finance, etc.), and click "Finalize Submission". Individual file size limit is 50 MB; total upload limit is 900 MB. A confirmation email with submission ID is sent on finalisation; retain this email for future enquiries.
Evaluation Criteria
Source: eTendering System Training manual.docx (unknown)No tender-specific evaluation criteria, scoring split, minimum qualifying thresholds, or preference point system are stated in the document. The document only notes that a valid CSD number is required to access the eTendering system.
Technical Specifications
Source: eTendering System Training manual.docx (unknown)The document describes the eTendering system itself — a web-based portal for uploading tender documents — and the registration and submission workflow. It does not contain technical specifications, scope, deliverables, quantities, standards, service levels, or capacity requirements for the EV Infrastructure at Matimba Power Station tender.
Compliance Requirements
Source: eTendering System Training manual.docx (unknown)Suppliers must have a valid CSD (Central Supplier Database) number to register on and access the eTendering system. No other compliance requirements (tax status, B-BBEE, CIDB, CIPC, professional registrations, local content) are mentioned in the document.
Evaluation Criteria
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.docx (unknown)Bidders must complete and sign Form A. Quality requirements are evaluated across five categories, each with a score of 1 per deliverable: Section A (QMS documentation compliant with ISO 9001:2015, covering clauses 5.3, 7.5, 8.4, 8.7, and 10.2) scores 6; Section B (evidence of QMS in operation, including organization chart, responsibility matrix, and control of externally provided processes) scores 2; Section C (draft Contract Quality Plan specific to the scope) scores 1; Section D (Quality Control Plan or Inspection and Test Plan for similar work) scores 1; Section E (completed and signed Form A) scores 1. Total possible score is 11.
Technical Specifications
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.docx (unknown)The scope involves EV infrastructure at Matimba Power Station for a GX pilot over a 6-month period. Bidders must provide a draft Contract Quality Plan specific to the scope of work, and a Quality Control Plan or Inspection and Test Plan (ITP) demonstrating similar or previous work.
Compliance Requirements
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.docx (unknown)Bidders must provide objective evidence of a documented Quality Management System (QMS) that complies with ISO 9001:2015, including a QMS Manual, Quality Policy, Quality Objectives, control of documented information, control of nonconforming outputs, and nonconformity and corrective action procedures. Evidence of QMS in operation must include an organization chart and responsibility matrix, and a procedure for control of externally provided processes. Form A must be completed and signed.
Description
Source: NEC ECC3 EV Infrastructure at Matimba Power Station for Gx Pilot.docx (unknown)The Employer, identified in the Acceptance signature block, has solicited offers to enter into a contract for the procurement of:
Evaluation Criteria
Source: NEC ECC3 EV Infrastructure at Matimba Power Station for Gx Pilot.docx (unknown)Functionality
Criteria
Technical proposal and understanding of scope
Weight
70
Minimum Score
50
Price
Weight
30
Minimum Score
0
Technical Specifications
Source: NEC ECC3 EV Infrastructure at Matimba Power Station for Gx Pilot.docx (unknown)The Employer, identified in the Acceptance signature block, has solicited offers to enter into a contract for the procurement of:
Description
Source: SQM Risks_Quality Section.xlsx (unknown)Cell C2: SANS10228, transportation of chemicals, require pictograms and labelling. Tram card.
Evaluation Criteria
Source: SQM Risks_Quality Section.xlsx (unknown)Returnable documents are detailed in the tender, including the standard SBD forms (SBD 4, SBD 6.1, SBD 6.2, SBD 8, SBD 9), a letter of authority / resolution, and mandatory safety and quality documents. Bidders must be registered on the Central Supplier Database (CSD) and provide a valid tax clearance (SARS TCS or tax pin). Compliance with Eskom SHEQ and Life Saving Rules is required, with SHEQ documentation as a mandatory returnable. Proof of ISO 17025 accreditation is required for calibration services. For gas detector work, an OEM authorisation letter is required for repair, commissioning, and servicing. For chemical supply, product manufacturer authorisation, reseller, or distribution letters are required.
Technical Specifications
Source: SQM Risks_Quality Section.xlsx (unknown)The tender covers two main areas: chemical supply and passive fire protection, plus gas detector calibration and servicing. Specific technical requirements include:
Compliance Requirements
Source: SQM Risks_Quality Section.xlsx (unknown)Bidders must provide proof of quality management: documented information for control of externally provided products, chemical datasheets, preservation records if stored at supplier premises, and supplier capability assessment. For passive fire protection: method statements, QCPs, ITPs, and inspection/test plans must be approved before work starts; personnel competency must be verified (training records, certifications, experience). For calibration: ISO 17025 accreditation and valid calibration certificates are required. Contractor must respond to breakdowns within 48 hours, as per contractual requirement. Degreaser usage is capped at 500L, with proper containment and runoff water management.
Description
Source: PG1740~1.PDFEskom Generation (Gx) is replacing its Internal Combustion Engine (ICE) fleet with Electric Vehicles (EVs) to reduce CO2 emissions. Matimba Power Station is a pilot site requiring a connection point for a charger and identification of parking bays for the charging station. The project covers supply, delivery, installation of EV charging infrastructure, associated power supply systems, and civil works for parking bays. Pilot duration: 6 months.
Contact Information
Source: PG1740~1.PDF (unknown){"name":null,"email":null,"phone":null,"department":"Supply Chain Management","address":null}
Submission Guidelines
Source: PG1740~1.PDF (unknown)Mandatory returnable documents:
Technical evaluation threshold: minimum 70% weighted final score.
All documents must be submitted as PDF.
Evaluation Criteria
Source: PG1740~1.PDF (unknown)Two-stage technical evaluation:
Scoring scale per sub-criterion: 5 = meets/exceeds all requirements, 4 = meets most with minor gaps, 2 = partial/non-compliant, 0 = totally deficient or non-responsive.
Unacceptable risks: Installation Electrician not registered with Dept of Employment & Labour; <2 years relevant experience for electrical/civil; experience not relevant to scope; organogram missing key personnel details; Site Agent not ECSA/SACPCMP registered, Electrical Engineer not ECSA registered.
Unacceptable exceptions: Failure to provide mandatory compliance documents; deviations from original scope of work.
Technical Specifications
Source: PG1740~1.PDF (unknown)Scope: Supply, delivery, and installation of EV charging infrastructure and construction of associated parking bays at Matimba Power Station (Limpopo). Includes EV charging infrastructure, associated power supply systems, and civil works. Pilot phase for 6 months.
Key technical requirements:
Applicable standards: Occupational Health and Safety Act; ISO 9001:2008; Eskom Generation Requirements for Control and Power Cables (240-56227443); Eskom Procurement and Supply Chain Management Policy (32-1033) and Procedure (32-1034); Technical Specification SP/174/003; Concept Design Report RT/174/003; Stakeholder Requirements Definition RT/174/004.
Methodology
Source: PG1740~1.PDFRequired submissions:
Experience & Qualifications
Source: PG1740~1.PDFCivil key personnel:
Electrical key personnel:
All certificates certified within 6 months. CVs with contactable references required.
Quality Management
Source: PG1740~1.PDFQuality requirements per ISO 9001:2008 and Eskom Guideline for Technical Assurance (240-51017652). Key personnel must have certified qualifications (within 6 months) and relevant experience. Site Agent requires ECSA/SACPCMP registration and 3–5 years' civil works experience with QA/QC. Construction methodology and programme must be fully detailed. Electrical works require ECSA-registered Engineer, registered Installation Electrician, and certified qualifications. Certificates of Compliance (CoCs) required for electrical installations.
Compliance Requirements
Source: PG1740~1.PDF (unknown)Mandatory compliance:
Health & Safety
Source: PG1740~1.PDFOccupational Health and Safety Act compliance mandatory. Health & Safety Officer must be SACPCMP-registered as Construction Health & Safety Officer (candidate acceptable) with 2–3 years' construction safety experience. Role includes safety file preparation, risk assessments, toolbox talks, OHS Act compliance. Unacceptable risk: Site Agent not ECSA/SACPCMP registered. Safety requirements integrated into civil works evaluation (personnel sub-criterion).
Environmental
Source: PG1740~1.PDFProject objective: reduce Eskom vehicle CO2 emissions by transitioning from ICE to EVs. EV charging infrastructure installation supports environmental sustainability. No specific environmental compliance requirements or impact assessments detailed in this evaluation strategy document.
Requirements
Source: PG1740~1.PDF (unknown)Scope: Supply, delivery, installation of EV charging infrastructure and construction of parking bays at Matimba Power Station. Includes EV charging infrastructure, power supply systems, civil works. Evaluation against mandatory (CIDB Grade 2 CE/GB) and qualitative criteria. No changes to evaluation criteria after approval. Applicable standards: OHSA, ISO 9001:2008, Eskom cable standards, Eskom SCM policy/procedure, project-specific technical specification (SP/174/003), concept design (RT/174/003), stakeholder requirements (RT/174/004).
Section
Source: PG1740~1.PDFTechnical evaluation threshold: 70% minimum weighted final score. Evaluation based on mandatory CIDB Grade 2 CE/GB registration and qualitative criteria across civil (resource capability 30%, construction methodology 30%, execution programme 10%) and electrical (resource capability 30% split across CVs 35%, qualifications 30%, methodology 35%) work packages. Scoring 5/4/2/0 per sub-criterion. Unacceptable risks and exceptions defined.
Description
Source: LOCAL CONTENT ANNEX C,D,E.xlsx (unknown)Tender for designated products with mandatory local content declaration in terms of SATS 1286:2011. The tenderer must complete Annex C (summary of local content), Annex D (declaration of imported content) and Annex E (local content calculation).
Submission Guidelines
Source: LOCAL CONTENT ANNEX C,D,E.xlsx (unknown)Bidders must complete and sign Annex C, Annex D, and Annex E. All cells are to be completed in accordance with the tender documents. The tender closing date and time are provided in the official tender listing; the submission method is not specified in the document excerpt.
Evaluation Criteria
Source: LOCAL CONTENT ANNEX C,D,E.xlsx (unknown)Bidders must complete and sign Annex C, Annex D, and Annex E. The tenderer must declare local content and imported content in accordance with SATS 1286.2011. The total imported content and foreign currency payments declared in Annex D (D53) must correspond with Annex C (C23), and the total local content in Annex E (E13) must correspond with Annex C (C24). Evaluation will consider the declared local content percentages.
Technical Specifications
Source: LOCAL CONTENT ANNEX C,D,E.xlsx (unknown)The tender involves designated products, for which the bidder must specify the local content percentage. The tenderer must declare, per item, the tender price (excluding VAT), exempted imported value, imported value, local value and the corresponding local content percentage. Imported content must be broken down into that imported directly by the tenderer and that imported by a third party and supplied to the tenderer, including foreign currency values, freight costs, landing costs and duties. Tender quantities and total tender values must be provided.
Financial Requirements
Source: LOCAL CONTENT ANNEX C,D,E.xlsx (unknown)The tenderer must declare all costs in South African Rand or the ticked foreign currency (Pula, Euro or GBP) as the Tender Exchange Rate, and provide a breakdown of imported content values including foreign currency values, freight costs, landing costs and duties, all exclusive of VAT.
Compliance Requirements
Source: LOCAL CONTENT ANNEX C,D,E.xlsx (unknown)Bidders must complete and sign Annex C, Annex D럴 Annex E in accordance with SATS 1286:2011. The declared totals must correspond across the annexes as specified: the total exempt imported value in Annex D (D19) must correspond with Annex C (C20); the total imported value in Annex D (D32) must correspond with Annex C (C21), and the total foreign currency payments declared by the tenderer and any third party (D52) must correspond with Annex C (C22). The total local content in Annex E (E13) must correspond with Annex C (C24).
Description
Source: PAYE Questionnaire for Service Contracts 2025_2026.doc (unknown)Eskom Holdings SOC Ltd Registration Number 2002/015527/00
Evaluation Criteria
Source: PAYE Questionnaire for Service Contracts 2025_2026.doc (unknown)Bidders must be either a resident of South Africa (or complete Appendix 9 if non-resident). Companies/CCs/Trusts must complete Evaluation Pack A; individuals must complete Evaluation Pack B. The classification outcome determines whether PAYE is withheld. Bidders must sign the required affidavits (e.g., Appendix 1 for employing 3+ non-connected full-time employees, Appendix 2 for no connected persons rendering services, Appendix 3 for services not mainly at Eskom premises, Appendix 4 for not receiving >80% income from one client, Appendix 5 for providing a service rather than people, Appendix 6 for labour broker declaration, Appendix 7 for dependent contractor/PSP declaration, Appendix 8 for independent contractor declaration, Appendix 9 for non-resident declaration). Failure to sign required affidavits results in PAYE being withheld from payments.
Technical Specifications
Source: PAYE Questionnaire for Service Contracts 2025_2026.doc (unknown)Eskom Holdings SOC Ltd Registration Number 2002/015527/00
Description
Source: 240-77471499 (2) Annexure B.docx (unknown)This tender covers the supply and installation of electric vehicle (EV) charging infrastructure at Matimba Power Station, as part of a GX pilot project. The scope includes work at an Eskom site, requiring compliance with Eskom's OHS and safety requirements.
Important Dates
Source: 240-77471499 (2) Annexure B.docx (unknown){
"closingDate": "2025-09-17T10:00:00.000Z",
"briefingSession": null,
"siteVisit": null,
"clarificationDeadline": null
}
Submission Guidelines
Source: 240-77471499 (2) Annexure B.docx (unknown)Tender reference: E3426GXLPMAT. Submission is via the designated Eskom tender process. Bidders must return the completed Annexure B (Acknowledgement Form for Eskom OHS and other Requirements) with their tender submission. The form must be duly signed and witnessed.
Evaluation Criteria
Source: 240-77471499 (2) Annexure B.docx (unknown)Bidders must sign and submit the Acknowledgement Form for Eskom OHS and other Requirements, confirming understanding and acceptance of the OHS obligations. The form must be signed by an authorised person (CEO, Director or Managing Director) and witnessed by two witnesses. Bidders must demonstrate the capacity to comply with Eskom's OHS requirements and all relevant legislation.
Technical Specifications
Source: 240-77471499 (2) Annexure B.docx (unknown)Bidders must acknowledge and accept Eskom's Occupational Health and Safety (OHS) requirements before commencing work at any Eskom site.
Description
Source: 240-68099512 Form A_Cat 3_ Rev 9.docx (unknown)NB: The tenderer must complete and sign this form to acknowledge and accept Eskom Supplier Quality Requirements as per 240-105658000 Specification and ISO 9001 Standard.
Submission Guidelines
Source: 240-68099512 Form A_Cat 3_ Rev 9.docx (unknown)Complete and sign Form A_Cat 3_ Rev 9 to acknowledge and accept Eskom Supplier Quality Requirements as per 240-105658000 specification and ISO 9001 standard. Indicate applicability with an X for each ISO 9001 clause (Sections A, B, C and D) — all clauses and quality principles are marked applicable (X) in this document. Sign Section D in the presence of Eskom's Quality Representative: Tshepo Matuludi, Senior Advisor Quality Control. Ensure all required quality clauses are accepted and signed.
Evaluation Criteria
Source: 240-68099512 Form A_Cat 3_ Rev 9.docx (unknown)Quality requirements form must be completed and signed; acceptance of ISO 9001 and Eskom requirements is part of tender compliance
Technical Specifications
Source: 240-68099512 Form A_Cat 3_ Rev 9.docx (unknown)NB: The tenderer must complete and sign this form to acknowledge and accept Eskom Supplier Quality Requirements as per 240-105658000 Specification and ISO 9001 Standard.
Important Dates
Source: 240-105658000 Supplier Quality Management Specification.pdf (unknown){"closingDate":"17 October 2021"}
Evaluation Criteria
Source: 240-105658000 Supplier Quality Management Specification.pdf (unknown)Quality Management
Supplier Quality Management per Eskom Specification 240-105658000. Suppliers must have a documented, implemented and reviewed quality management system complying with ISO 9001 or equivalent, unless specifically excluded. The QMS must cover design, manufacturing, maintenance, testing, delivery, installation, commissioning and project management if sub-suppliers are used.
Experience
Not specified
Functionality
Not specified
Price
Not specified
Technical Specifications
Source: 240-105658000 Supplier Quality Management Specification.pdf (unknown)Title: Supplier Quality Management: Document Identifier: 240-105658000
Alternative Reference QM 58
Number:
Area of Applicability: Eskom Holdings SOC Ltd
Functional Area: Quality Management
Revision: 3
Total Pages: 28
Next Review Date: October 2024
Disclosure Controlled Disclosure
Classification:
Compiled by Supported by Functional Authorized by
Responsibility
SA Sambo P Dondashe L Meyer K Pather
Chief Advisor Middle Manager Acting Senior General Manager
Quality Quality Manager Quality Risk and
Management Management Management Sustainability
Date: 15/10/2021 Date: 15/10/2021 Date: 15/10/2021 Date: 17 October 2021
EDC TN Formatted 15.10.2021
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Content
. Introduction ............................................................................................................................... 3
2.1 Scope ............................................................................................................................... 3
2.1.1 Purpose ................................................................................................................. 3
2.1.2 Applicability ........................................................................................................... 3
2.1.3 Effective date ......................................................................................................... 3
2.2 Normative/Informative References ................................................................................... 3
2.2.1 Normative .............................................................................................................. 3
2.2.2 Informative............................................................................................................. 3
2.3 Definitions ........................................................................................................................ 4
2.4 Abbreviations ................................................................................................................... 5
2.5 Roles and Responsibilities ............................................................................................... 6
2.6 Process for Monitoring ...................................................................................................... 6
2.7 Related/Supporting Documents ........................................................................................ 6
3.1 Supplier and Sub-Supplier Quality Management System Requirements .......................... 7
3.2 Quality Plan ...................................................................................................................... 8
3.3 Contract Quality Plan........................................................................................................ 8
3.4 Quality Control Plan ....................................................................................................... 10
3.5 Pre-Contract Award: Quality Requirement ...................................................................... 13
3.6 Main Supplier and Sub-supplier Capability and Capacity Assessment ........................... 16
3.7 Post-Contract Award ...................................................................................................... 17
3.7.1 Contract Execution .............................................................................................. 17
3.7.2 Supplier Quality Performance Monitoring Phase ................................................. 18
3.7.3 Supplier Quality Audit .......................................................................................... 18
3.8 Standard Conditions ....................................................................................................... 19
3.8.1 Rights of Access .................................................................................................. 19
3.8.2 Eskom Rights to Information ................................................................................ 20
3.8.3 Preservation ........................................................................................................ 21
3.8.4 Quality Audits Related Conditions ....................................................................... 25
3.8.5 Management of Nonconformities and Nonconforming Outputs Identified by
Eskom ................................................................................................................. 25
3.8.6 Special Processes ............................................................................................... 26
Acceptance ............................................................................................................................. 27
Revisions ................................................................................................................................ 27
Development Team ................................................................................................................ 27
Acknowledgements ................................................................................................................ 28
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The intention of this specification is to specify and describe the minimum quality requirements for all
existing and potential Eskom suppliers and define the quality criteria for the selection, evaluation,
vendor registration, management, monitoring, assessment and auditing of suppliers. Eskom’s
position is to partner with suppliers who fully demonstrate commitment to the development,
implementation, and maintenance of a quality management system (QMS) that conforms to the
requirements of ISO 9001 standard. The priority is to encourage suppliers to continually improve
their QMS and enhance service delivery by implementing and conforming to the standard.
2.1 Scope
2.1.1 Purpose
The purpose of this specification is to outline the requirements according to which suppliers shall
develop,
implement,
maintain, and
continually improve
a quality management system (QMS) based on ISO 9001, which should form the basis for conformity
to Eskom quality requirements and continually adhere to them throughout the duration of a contract
2.1.2 Applicability
This specification shall apply throughout Eskom Holdings Limited divisions, its subsidiaries,
suppliers, and sub-suppliers and shall form part of all Eskom requests for information (RFI)/ requests
for quotation (RFQ)/ requests for proposal (RFP), including contracts for the procurement of products
and services.
2.1.3 Effective date
Date of authorisation of the specification
2.2 Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
[1] ISO 9001 Quality Management Systems – Requirements
[2] ISO 10005 Quality Management Systems – Guidelines for Quality Plans.
2.2.2 Informative
[3] ISO 9000 Quality Management Systems – Fundamentals and Vocabulary
[4] 32-727: Safety, Health, Environment, and Quality (SHEQ) Policy
[5] ISO 10006 Quality Management Systems – Guidelines for Quality Management in Projects
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
[6] ISO 9004 Quality Management – Quality of an Organisation – Guidance to Achieve Sustained
Success
[7] 32-1033: Eskom’s Procurement and Supply Chain Management Policy
[8] 32-1034: Eskom’s Procurement and Supply Chain Management Procedure
[9] PPPFA: Preferential Procurement Policy Framework Act, 2000 (Act No. )
[10] CIDB 1004: Best Practice Guideline A4: Evaluating Quality in Tender Submissions
[11] 240-12248652 Supplier Quality Management: List of Tender Returnables
[12] IAEA Safety Standard GS-R-3.1 Application of the Management System for Facilities and
Activities
[13] SANS 10845-1 Construction Procurement Part1: Processes, Methods and Procedures
2.3 Definitions
The vocabulary of ISO 9000 and the following definitions apply in the application of this specification.
2.3.1 Component: a constituent part of the product or sub-assembly of the product. The product
may comprise multiple individual components
2.3.2 Contract Quality Plan: a document of the supplier’s process for delivering the level of quality
required by the contract. It is a framework for the contractor’s process for delivering quality.
Purpose of a CQP is to outline how the results defined in the specifications will be achieved.
2.3.3 Hold Point: a predetermined stage in the quality control plan (QCP) beyond which work/
manufacturing shall not proceed without the attendance of, and written authorisation of, an
Eskom representative or Eskom inspection agency, whichever is applicable.
2.3.4 Intervention Points: those control points indicated by the various controlling bodies
concerned with the implementation of a specific QCP/ ITP. These can be in the form of
inspection, hold points, surveillances, witnesses, reviews and verifications.
2.3.5 Inspection Agency: an organisation or person appointed by Eskom for the purpose of
performing quality assurance/ quality control, monitoring, inspection and/ or expediting
services.
2.3.6 Level 1 Plant Items: equipment, whose failure has an effect on personnel safety and/ or
health, causes an environmental incident, cause a huge production loss or major equipment
damage. Equipment that are safety/ redundancy/ protective device or covered by statutory
regulations requirements.
2.3.7 Level 2 Plant Items: equipment, whose failure impacts plant availability and/or reliability,
causes significant costs or secondary damage.
2.3.8 Level 3 Plant Items: equipment that does not impact on personnel safety and/ or health,
environmental, cost, availability and/ or reliability of plant.
2.3.9 Nonconformity: a deficiency in material, composition, characteristic, or performance that
renders the quality of an item, component, or product unacceptable or indeterminate. The
term also covers a deficiency in, or deviation from/non-adherence to, the quality management
system requirements, prescribed production processes, and/or related documentation such
as procedures and instructions.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
2.3.10 Quality Plan: specification of the actions, responsibilities and associated resources to be
applied to a specific object.
2.3.11 Quality Control Plan: a document specifying the activities to be inspected throughout the
execution of the project, inclusive of test methods, procedures, and acceptance criteria (This
term is equivalent to QIP and ITP).
2.3.12 Requirement: the need or expectation that is stated, generally implied, or obligatory.
Requirements are generally specified in the purchase order and/or contract documentation,
but may not be limited to these.
2.3.13 Primary Plant (Power Plant): primary plant include High Voltage equipment situated inside
the control room (breakers, bus-bars, CT’s, VT’s and transformers).
2.3.14 Secondary Plant (Control Plant): secondary plant includes all equipment used to control
and protect the HV equipment on the primary plant side. (Protection, metering, AC/DC and
tele-control).
2.3.15 Special Process: is any production or service process which generates products or services
which cannot be measured, monitored, or verified prior to delivery and use.
2.3.16 Supplier: is a current or potential supplier, vendor, contractor, consultant, or service provider.
A supplier may be a natural or legal person and includes any employee acting within the
course and scope of his/her employment or any agent or manager acting for, or on behalf of,
or in the interests of, the person registered as supplier on the Eskom supplier database.
2.3.17 Sub-supplier: an organisation that provides a product/service to the supplier and/or that
enters into a subcontract and assumes some of the obligations of the supplier or prime
contractor.
2.3.18 Witness Point: a predetermined stage in the quality control plan where and inspection
activity will take place. Work may proceed, provided Eskom or its inspection agency has been
formally notified and confirmed that inspection is waived.
2.4 Abbreviations
Abbreviation Explanation
AIA Approved Inspection Authority
CA Corrective Action
CQP Contract Quality Plan
FIDIC Federation Internationale Des Ingenieurs- Conseils
FMECA Failure Mode, Effects and Criticality Analysis
HAZOP Hazard and Operability Study
ISO International Organisation for Standardisation
ITP Inspection and Test Plan
NC Nonconformity
NDT Non Destructive Testing
PMI Positive Material Identification
QCP Quality Control Plan
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Abbreviation Explanation
QMS Quality Management System
PQP Project Quality Plan
RFI Request for Information
RFQ Request for Quotation
RFP Request for Proposal
SHEQ Safety, Health, Environment, and Quality
SETA Skills Education Training Authorities
WPS Welding procedure specifications
WQR Welder’s Qualification Record
2.5 Roles and Responsibilities
Eskom Quality representative/ professional will select applicable requirements for existing and
potential Eskom suppliers using Form A (Tender and Contract Quality Requirements for Supplier
Quality Management: Specification 240-105658000/ QM 58 and Quality Requirements for ISO 9001
Standard).
The existing and/ or potential suppliers must complete, sign and return Form A with the other
returnable as listed in the List of Tender Returnable document (240-12248652). Other roles and
responsibilities for this standard are defined within the text of this specification.
2.6 Process for Monitoring
The application of this specification throughout Eskom shall be audited as per the management
system audit schedule.
2.7 Related/Supporting Documents
The documents superseded by this specification: all divisional and business unit supplier quality
requirements standards and/or specifications.
Forms and templates:
[1] 240-68099512 Tender and Contract Quality Requirements for Supplier Quality Management
Specification 240-105658000/ QM 58 and Quality Requirements for ISO 9001 Standard (Form
A)
[2] 240-109253698 Template for a Typical Contract Quality Plan
[3] 240-109253302 Quality Control Plan/Inspection and Test Plan
[4] 240-126469599 Method Statement Template.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The quality assessment criteria and Form A of this specification will be selected and completed by
an Eskom Quality representative/ professional who will identify the applicable supplier quality
requirements to be met.
Form A of this specification must also be completed and signed by the supplier responding to an
Eskom invitation to tender, in order to acknowledge and accept Eskom Supplier Quality requirements
as per this specification and ISO 9001 Standard or any additional quality requirements specific to
the scope of work.
3.1 Supplier and Sub-Supplier Quality Management System Requirements
3.1.1 The supplier and sub-supplier shall develop, implement, maintain and improve a formal QMS
that conforms to the latest ISO 9001 standard or any applicable standard of QMS (latest
applicable revision) and in accordance with the requirements of this specification.
3.1.2 Such a formal system shall consist of the appropriate documented information required by
ISO 9001 and may include a quality manual, quality plans, work procedures, work
instructions, method statements, work flow documentation, etc., as the case may be. This
requirement constitutes the most basic QMS requirements.
3.1.3 Unless specifically excluded from the quality list of tender returnable, as per the categories of
quality requirements (Category 1, 2, 3, or 4), such a QMS shall carry a valid ISO 9001
certificate from an accredited certification body, as indicated in the applicable Eskom
invitation (this requirement applies equally to both the supplier and any/ all manufacturing
third-party organisations mentioned above).
3.1.4 Unless specifically excluded in the quality list of tender returnable, as per the categories of
quality requirements (Category 1, 2, 3, or 4), the supplier shall have a fully developed,
documented, implemented, reviewed and maintained QMS that complies with the
requirements of ISO 9001 standard or any applicable standard of QMS. In the event that the
main supplier invariably requires the assistance of a sub-supplier in order to realise its own
supply obligations. The aforementioned requirement applies equally in all cases where any
such sub-supplier’s scope of responsibility includes the provision of any of the following
activities, namely, design and development, manufacturing, maintenance, testing, storage,
delivery, installation, commissioning, and project management, or in the cases the supplier
name changes, mergers, acquisitions and/ or cessions. Eskom Quality department must
ensure that the changed entity can still fulfil the requirements as set out in the contract
documentation.
3.1.5 Eskom reserves the right to request and perform necessary assessments at sub-supplier
facilities.
3.1.6 The main supplier shall be responsible for defining and managing the specific quality
assurance and control elements applicable to the respective sub-supplier’s scope of
work/supply and ensure that its sub-supplier(s) quality programmes support Eskom
requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.1.7 The supplier shall inform Eskom of any proposed changes to the QMS or staff that will affect
the quality system prior to implementation of these changes.
3.1.8 The main supplier shall develop and implement a performance management programme for
their sub-supplier. The programme shall include, but not limited to:
Verification of the QMS
Audits and surveillances
Regular assessment of the CQPs and reviews of QCPs.
NC and Defect Management
Inspection and test plans
Risk management
3.2 Quality Plan
The information in this section constitutes the minimum requirements for a quality plan.
3.2.1 Where specified in the Evaluation Criteria and/ or quality list of tender returnables , as per the
categories of quality requirements (Category 1, 2, 3, or 4); all individual products, services
and processes shall have a documented, implemented, reviewed and maintained contract
quality plan and/or quality control plan (inspection and test plan).
3.2.2 Where specified in the evaluation criteria and/ or quality list of tender returnables. All
production and/ or service provision shall be carried out in accordance with a documented
and agreed contract quality plan (CQP) and/ or quality control plan (QCP)/ inspection and test
plan (ITP).
3.2.3 The supplier shall plan for the required quality-related activities and interfaces within the
supplier’s quality system in order to demonstrate its ability towards both controlling and
meeting specified Eskom requirements.
Note 1: Contract Quality Plan should address the quality assurance elements related to the scope
of work and/ or technical specification.
Note 2: Quality Control Plan (QCP)/ Inspection and Test Plan (ITP) should address the quality
control elements related to the scope of work and/ or technical specification.
3.3 Contract Quality Plan
The main supplier shall require sub-suppliers to submit project quality plans (PQPs)/ contract quality
plans (CQPs) and associated documentation in accordance with the requirements of project QMS
processes applicable to the sub-supplier’s scope of work.
The supplier shall, where applicable, based on scope of work criticality, ensure that procurement
documents clearly and unambiguously require sub-supplier submission of a sub-supplier CQP for
supplier and Eskom review.
The main supplier shall ensure that sub-supplier CQPs are developed and implemented in
accordance with the ISO 10005 Quality Management System Guidelines for Quality Plans. In
addition to the elements specified in ISO 10005, the supplier’s and/ or sub-suppliers’ CQPs shall
include the following (as applicable):
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.3.1 The management of records, including material tests, positive material identification (PMI)
testing, material certification, etc.
3.3.2 The provision for free and uninhibited access by the supplier and/or personnel at the time of
inspection.
3.3.3 The proposals for submission of final documentation, the final manufacturing data book, prior
to shipment.
3.3.4 The special processes related to welding: management of the welder’s qualification record
(WQR), welding procedure specifications (WPS), and procedures qualification records (PQR)
that will be used in the performance of work for supplier review and acceptance prior to
commencing manufacture. Welders shall be qualified to the specified Codes of Construction
for the applicable procedures. The requirements for qualification shall be specified by the
supplier, and welder records shall be maintained by sub-suppliers performing the work.
3.3.5 The special installation procedures and other required fabrication or manufacturing
procedures (that is, those required for post-weld heat treatment, tube rolling, coatings, etc.)
that will be used in the performance of work shall require supplier review and acceptance
prior to commencing manufacture. The personnel carrying out special processes (for
example, NDE, welding, coating, heat treatment, etc.) where the results cannot be fully
verified by subsequent inspection and test shall be suitably qualified and, where applicable,
registered with statutory bodies as legally required, that is, as radiographic workers to conduct
radiography. The requirements for the qualification shall be specified, and personnel records
shall be maintained in accordance with the Project Quality Personnel Qualification
Specification and, where applicable, legal requirements.
3.3.6 The personnel required to perform special processes shall be certified competent through a
certificate of competency in accordance with the company’s internal training management
and competency control procedures or an external certification body (for example, NDT)
through an accredited service provider as per Skills Education Training Authorities (SETA)
requirements.
3.3.7 All personnel who perform activities that affect quality shall have their training needs identified
and documented. The required training shall be implemented in accordance with the
company’s training management and competency control procedures. All the training
certificates shall meet the SETA requirements in terms of having the unit standard completed
and the accreditation number of the service providers.
3.3.8 Instructions and requirements for equipment and materials storage, preservation, and
maintenance, including identification of materials required for preservation and maintenance,
are to be provided sufficiently prior to receipt (prior to shipment or earlier) to ensure that
appropriate resources are available at the time of delivery.
3.3.9 Specific quality monitoring and verification activities are to be undertaken on the supplier’s
sub-suppliers by Eskom or it agent.
3.3.10 The CQP information need to include, but not limited to:
Spells out the aspects of the QMS to be applied within a specific Eskom project, and the
methods to be utilised to ensure quality.
Outline the resources, the communication channels, applicable documents and records to be
generated.
Management Authority and Responsibility from both supplier and client need to outline in the
Cqp.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
List of documents and records that will be used and submitted during the execution of the
project.
Communications channels should include contact person and contact details
Monitoring & measurement procedures for activities need to be indicated.
3.3.11 The main supplier and sub-supplier CQPs shall comply with the Eskom Quality Requirements
Specifications and shall be submitted prior to the initial scope of work kick-off or initial pre-
fabrication meeting and prior to commencement of manufacturing, whichever is earlier.
3.3.12 The Eskom template for CQP provided shall be used as guideline, where the supplier does
not have a CQP template.
3.4 Quality Control Plan
The supplier shall develop and implement processes and procedures that efficiently and effectively
monitor, verify and document the quality of the scope of work for deliverables.
The main supplier shall ensure that sub-supplier QCPs/ ITPs are prepared at a level of detail
sufficient to address all quality-control-related activities in a chronological order, from contract review
through materials verification, manufacturing, fabrication, assembly, final testing, commissioning,
hand-over documentation, and certification. In addition, the supplier shall ensure compliance with
the following requirements:
3.4.1 All stages of manufacturing, fabrication, assembly and installation shall be controlled by a
supplier’s QCP/ ITP that clearly and unambiguously identifies the quality verifications to be
performed and special attention to controls related to critical products and services.
3.4.2 QCP/ ITP shall be reviewed and accepted by Eskom, its inspection authority or agency, and
they shall allow for the insertion of Eskom specific requirements, including hold and witness
points prior to the commencement of work.
3.4.3 Subsequent changes to the Eskom accepted QCP/ ITP shall require Eskom, its inspection
authority or agency’s agreement prior to the commencement of work involving an activity
affected by such changes.
3.4.4 The ITPs should cover materials certification, fabrication works, in-process inspections, final
acceptance tests, packaging and pre- shipment/ transportation, shipping/ transportation
inspections where contracted, preservation, site acceptance tests, construction and erection
works, and pre-commissioning and commissioning tests.
3.4.5 All sub-supplier QCP/ ITP activity shall be performed using an Eskom-accepted supplier
Qcp/ itp.
3.4.6 All applicable codes, standards, and relevant acceptance criteria documents are available at
the work location, and Eskom representatives on site shall have on-going access to this
information. Workplace documentation shall be available in English and in any workforce-
appropriate language.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.4.7 Where activities subject to inspection and test procedures are to be undertaken by a sub-
supplier, the QCP/ ITP shall make reference to this fact and shall include descriptive details
of the sub-supplier’s involvement. A separate QCP/ ITP shall be required for each sub-
supplier scope of work.
3.4.8 The supplier shall be ultimately accountable and responsible for the development and proper
implementation of all sub-supplier QCPs/ ITPs, including those reviewed or developed by
sub-suppliers.
3.4.9 Eskom reserves the right to select intervention points on QCPs/ ITPs for Eskom oversight of
selected functions and to perform surveillance or audits of the work.
3.4.10 Once signed, the ITPs and QCPs become addendums to the main contract. These ITPs can
be reviewed at Eskom’s discretion based on its assessment of the supplier’s performance or
other risks.
3.4.11 A QCP/ ITP shall contain the following information:
Eskom contract number and title
The supplier’s order number
Identification of the area of works/contract
Description of the work, with components, item number, and activity date
QCP/ITP unique number
A list of the sequence of operations, including inspection and tests
The identification of the specification, drawing number, or procedure for each operation,
with reference to the relevant criticality risk rating
The acceptance criteria, with reference to the technical specification, in-house, national, or
international standard, with the relevant clause number for each operation
The inspection and test activities that the supplier has nominated for its intervention points
Provision for the inclusion of intervention points nominated by Eskom and/or its authority/
agency
Provision for intervention point acceptance by date and signature for all parties having
intervention in the plan
Inspection and test records to be generated by the supplier for each operation and an
indication of records to be provided to Eskom (as applicable)
3.4.12 The main supplier shall require sub-suppliers to submit QCPs/ ITPs and associated
documentation applicable to the sub-supplier scope of work. Any changes made to the QCP
after submission must be resubmitted to Eskom for further review. The supplier shall ensure
that all sub-supplier QCPs/ ITPs are in compliance with the Eskom Quality Requirements
Specifications, including, but not limited to, the following requirements:
Clear and unambiguous description of the equipment and location(s) at which each activity
will take place, including facility location(s)
Identification of quality verification activity and stage
The details of reference documents, procedures, or method statements to be utilised in
performance of the activity, including specific reference to actual sections and pages of
procedures, standards, instructions, specifications, etc.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Definition of acceptance criteria
Listing of certifying or verifying documents generated to provide evidence of compliance
with specified requirements; documents are to be provided using the proper Eskom
document numbering requirements
Identification of main supplier and sub-supplier (where applicable) third-party/approved
inspection authority (AIA) and Eskom inspection activities defined in terms of witness, hold,
document review, and verification monitoring points and provision for sign-off of each of the
above-mentioned parties for each intervention point
Qualification requirements for quality control inspectors, including any third-party/AIA
inspectors
Listing of all proposed test procedures
Acceptance criteria for each inspection or test in alignment with specified tolerances
A section for signed acceptance of the QC/ITP by the supplier, sub-supplier (where
applicable), and Eskom prior to commencement of work
Inspection or testing intervention points, including, but not limited to, factory acceptance test
and package acceptance test, witness, and hold points
3.4.13 A quality kick-off meeting will be held at the start of the contract and, if required, at the start
of each subsequent phase.
The supplier shall arrange coordination meetings with Eskom prior to placement of orders
for items or equipment to ensure that all technical and commercial requirements are clear
and understood. Fourteen days’ advance notice of meetings shall be given to Eskom.
Supplier inspection personnel, including inspection agency personnel, shall be competent
and qualified to perform inspection and testing assignments. Mobilisation of all such
personnel shall be in compliance with the Project Quality Personnel Qualification
Specification.
3.4.14 Where QCP/ ITP is applicable, the supplier shall ensure that sub-suppliers are provided with
comprehensive, clearly written, and unambiguous inspection and testing protocols, including
processes, procedures, and methods that shall include, but not be limited to, the following:
Requirements for inspection checklists and inspection assignments, with lists of items to be
inspected
An inspection and testing report format, report content, schedule for report processing and
distribution, and report retention requirements
Inspection and test report results response tracking (log) and resolution of nonconformity in
inspection and test processes, procedures, or methods and nonconformity identified in
inspection and test results
Associated Failure Mode, Effects and Criticality Analysis (FMECA) reports relating to the
equipment and sub-systems (if applicable)
Hazard and Operability Study (HAZOP) report, as applicable
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.4.15 The supplier shall establish processes and procedures for formal assessment of sub-supplier
inspection and testing programmes. These shall include review of sub-supplier inspection
reports and other quality control documentation. Additional formal assessment of
manufacturing, fabrication, and assembly facility operations shall be conducted by the
supplier to ensure continuing suitability, adequacy, and effectiveness of the sub-supplier’s
inspection and testing programmes. Assessment frequency shall be established in
consideration of the sub-supplier scope of work, criticality of scope of work deliverables, and
performance information. The assessment scope and schedule shall be developed in
consultation with Eskom.
3.4.16 Supplier processes and procedures for verification of supplier and sub-supplier purchased
product compliance with specifications shall obtain document return/review status prior to
implementation.
3.4.17 The objective is to finalise any outstanding procedural or other issues before proceeding to
deliver the works.
3.4.18 Eskom, in consultation with the supplier, develops an agenda for the meeting, and Eskom will
keep minutes of these meetings.
3.4.19 Mandatory pre-inspection meetings will be convened by Eskom or its inspection agency or
AIA to be attended by the supplier’s and sub-supplier’s representatives, including their quality
representatives who will be involved in the works, and records are to be kept.
3.4.20 Eskom reserves the right to appoint resident quality inspectors who can be based at the
supplier’s or sub-supplier’s premises and on site where the work is being performed. The
supplier is expected to provide workspace at no cost to Eskom for the inspector, as required.
3.4.21 Eskom may appoint any organisation it prefers to perform quality assurance and quality
control activities, either in the capacity as an AIA or inspection agency, on the works
contracted to the supplier, and the supplier or its sub-suppliers may not object, prevent,
hinder, undermine, circumvent, question, discredit, or in any way make it impossible for such
organisation to carry out its work on behalf of Eskom.
3.4.22 The Eskom template for QCP/ ITP provided shall be used as guideline, where the supplier
does not have a QCP/ ITP template.
3.5 Pre-Contract Award: Quality Requirement
3.5.1 Main Supplier and Sub-supplier Categories
Eskom supplier quality requirements for all existing and potential suppliers and sub-suppliers are
classified into four categories (category 1, 2, 3 and 4). Suppliers must prepare and submit quality
documentation as per the tender selected category (indicated in Form A) using the list of tender
returnables document.
NOTE: Only one (1) category must be applicable per procurement process e.g. [Eskom requests for
information (RFI)/ requests for quotation (RFQ)/ requests for proposal (RFP), including contracts for
the procurement of products and services].
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The following are the minimum returnable documentation for Categories 1 to 4:
3.5.2 Category 1: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit a valid copy of ISO 9001 or any applicable certificate of a QMS (the
latest applicable revision). The QMS should drive the supplier’s business management
processes to ensure that all of Eskom’s requirements are fully met on a consistent basis.
The supplier shall submit the latest copy of the management system internal and external
audit reports. The audit reports must include, if applicable, nonconformity identified, and the
resulting remedial actions (correction and/ or corrective action reports).
The supplier shall submit a draft contract quality plan that is specific to the scope of work as
described in the tender documents. The plan must address the minimum requirements as per
Iso 10005.
Where applicable; the supplier shall submit a draft, or an example of an inspection and test
plan (ITP) or quality control plan (QCP) on similar and/ or previous work done.
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of documented information for roles, responsibilities and
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals, procedures.
The supplier shall submit documented information retained (records) of management review
meetings that include agenda, meeting minutes, attendance registers, reports, presentations,
etc.
Note: specific requirements per tender will be selected using the List of Tender Returnable
documents (240-12248652).
3.5.3 Category 2: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit objective evidence of a developed, implemented and maintained QMS
that complies with ISO 9001 or any applicable standard of quality management system (the latest
applicable revision). The following documents (approved/ signed copies) shall be submitted:
Quality Management System manual or a documented information that have defines and
describes the QMS and its scope
Quality Policy, aligned with the supplier’s strategic direction (documented information)
Quality Objectives (documented information)
Control of documented information (both maintain and retain documented information )
Internal audit procedure (documented information)
Control of nonconforming outputs (documented information)
Nonconformity and Corrective action procedure (documented information)
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The QMS should drive all the supplier’s business management processes to ensure that all of
Eskom’s requirements are fully met on a consistent basis.
The supplier shall submit the latest copy of the management system internal audit reports. The
audit reports must include, if applicable, nonconformity identified, and the resulting remedial
actions (correction and/ or corrective action reports).
The supplier shall submit a draft contract quality plan that is specific to the scope of work as
described in the tender documents. The plan must address the minimum requirements as per
Iso 10005.
Where applicable; the supplier shall submit an example of inspection and test plan (ITP) or
quality control plan (QCP) on similar or previous work done.
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of documented information for roles, responsibilities and
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals, procedures.
The supplier shall submit documented information retained (records) of management review
meetings that include agenda, meeting minutes, attendance registers, reports, presentations,
etc.
Note: specific requirements per tender will be selected using the List of Tender Returnable
document (240-12248652).
3.5.4 Category 3: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit objective evidence of a developed QMS that complies with ISO 9001
(or the latest applicable revision). The following documented information (approved/ signed
copies) shall be submitted:
o Quality management system manual or a (documented information) that have
defines and describes the QMS and its scope
o Quality Policy, aligned with the supplier’s strategic direction (documented
information)
o Quality Objectives (documented information)
o Control of documented information (both maintain and retain documented
information )
o Internal audit procedure (documented information)
o Control of nonconforming outputs (documented information)
o Nonconformity and Corrective action procedure (documented information)
The QMS should drive all the supplier’s business management processes to ensure that all of
Eskom’s requirements are fully met on a consistent basis.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The supplier shall submit a draft contract quality plan that is specific to the scope of work as
described in the tender documents. The plan must address the minimum requirements as per
Iso 10005.
Where applicable; the supplier shall submit an example inspection and test plan (ITP) or
quality control plan (QCP).
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of documented information for roles, responsibilities and
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals, procedures.
NB: specific requirements per tender will be selected using the List of Tender Returnables
document (240-12248652).
3.5.5 Category 4: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit a quality method statement based on ISO 9001 and specific to the
scope of work.
The quality method statement should address all the supplier’s business management
processes to ensure that all of Eskom’s requirements are fully met on a consistent basis.
The supplier shall submit a signed/ approved quality policy (aligned with the supplier’s strategic
direction). (documented information)
The supplier shall submit a copy of quality objectives. (documented information)
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of the documented information for roles, responsibilities and
authorities, specific to the project/ scope of work/ technical requirements. Examples of relevant
documented information are; organization charts, job descriptions, work instructions, duty
statements, manuals, procedures.
Note: specific requirements per tender will be selected using the List of Tender Returnables
document (240-12248652).
3.6 Main Supplier and Sub-supplier Capability and Capacity Assessment
Supplier capability and capacity assessments shall be performed prior to contract award on potential
suppliers participating in Eskom Holdings procurement process to:
provide products and services with high risk to operational sustainability
work on critical plant and equipment
supply of critical plant items or components
provide special processes
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
All sub-suppliers used by the main supplier/ contractor, performing work on Eskom critical plant
equipment, supplying commodities and providing specialised services shall be subjected to the
capability and capacity assessment.
Critical plant includes the following:
Generation Level 1 & 2 plant
Transmission and Distribution Power Plant & Control Plant
Mega Projects
All potential quality risks identified will be included in the assessment report provided for the tender
evaluation.
Note: Form A (Enquiry/ Contract/ Quality Requirements for Supplier Quality Management:
Specification 240-105658000/ QM 58 and ISO 9001) will be used to select and indicate whether
capability and capacity assessment will be conducted.
3.7 Post-Contract Award
3.7.1 Contract Execution
The supplier shall submit the following documents within 30 days or as per stated timeline after the
contract date, prior to the commencement of work, for acceptance by Eskom:
The supplier shall complete a QCP before contract award. This shall be reviewed and
signed off by Eskom within 30 days or as per stated timeline after contract award.
The supplier shall complete a quality control plan and ITP(s) for review and acceptance by
Eskom prior to the commencement of any work, inclusive of subcontracted work, within 30
days or as per stated timeline after contract award.
The sub-supplier QCP/ ITP shall be submitted for review and comment by the supplier and
by Eskom within 30 days or as per stated timeline after the award of the tender. All supplier
and Eskom comments shall be resolved prior to commencing work.
The equipment lists and an indication of pressurised components and systems.
Note: These plans are to be compiled in line with Eskom’s requirements and will have to be
discussed with, and approved by, Eskom prior to any work commencing.
Correspondence shall be directed to the project manager, and periodic quality review
meetings shall be convened by Eskom with the supplier.
The mandatory quality review meetings are to be convened by the nominated project quality
manager or his/her representative for the contract.
Monthly quality performance and management reports are to be prepared by the supplier
during contract execution. The content of these reports shall be agreed by Eskom when
submitted to Eskom on a monthly basis.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.7.2 Supplier Quality Performance Monitoring Phase
During the contract execution phase, suppliers shall be monitored by Eskom for performance on
quality-related aspects.
The outcomes of such monitoring will enable Eskom to take any appropriate actions pertaining to
the supplier.
The monitoring shall be carried out periodically by Eskom or at predetermined intervals during the
execution of a contract using agreed key performance indicators. The monitored key performance
areas include the following:
CQP and QCP /ITP
Delivery
Design
Cost
Management system
Subsequent key performance indicators associated with these areas will include the following:
Nonconformity monitoring
Audit and assessment evaluation scoring
Management system compliance and accreditation
Achievement of delivery targets as per contractual agreements
Process improvements
Correction and corrective action response and closure
3.7.3 Supplier Quality Audit
3.7.3.1 Quality audits and related quality performance reviews are intended to provide an objective
evaluation of compliance with performance expectations defined in this specification, in the
supplier contract quality plan (CQP), and in any other project scope of work specification.
3.7.3.2 Quality audits and related quality performance reviews include, but are not limited to, any
quality or other project functional area audits, assessments, verification of compliance
reviews, surveillance, inspections, or other interim or final assessments of scope of work
deliverables provided by the supplier or sub-suppliers
3.7.3.3 Quality audits and related quality performance reviews are intended to provide an objective
evaluation of compliance with performance expectations defined in this specification, in the
supplier contract quality plan (CQP), and in any other project scope of work specification.
3.7.3.4 Quality audits and related quality performance reviews include, but are not limited to, any
quality or other project functional area audits, assessments, verification of compliance
reviews, surveillance, inspections, or other interim or final assessments of scope of work
deliverables provided by the supplier or sub-suppliers.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.7.3.5 Quality audits and related quality performance reviews shall be carried out by trained,
accredited, and experienced personnel in accordance with procedures documented in the
Cqp.
3.7.3.6 The supplier shall submit, for Eskom review, documented processes for conducting project
scope of work quality audits and related quality performance reviews. Supplier quality audits
and related quality performance review processes shall be designed to address evaluation
of progress towards completion of project functional area deliverables as well as final
deliverable quality.
3.7.3.7 The supplier shall provide a schedule of anticipated quality audits covering all functional
areas and related quality performance reviews at the time of first post-contract award CQP
submission.
3.8 Standard Conditions
3.8.1 Rights of Access
Eskom:
3.8.1.1 shall be granted electronic and hard-copy access to all quality plans, procedures,
documentation, and other quality records relating to the work, including, but not limited to,
data extracts;
3.8.1.2 reserves the right to review, inspect, and audit any or all parts of the supplier’s QMS, as well
as any documentation, materials, or equipment associated with the work, at any time or
project work location; and
3.8.1.3 reserves the right to carry out assessments and audits on all new suppliers and sub-
suppliers.
The supplier:
3.8.1.4 shall support Eskom’s effort to monitor, verify, and/or witness any activities associated with
the work at any time;
3.8.1.5 shall cooperate with Eskom requests for documentation, records, and inspection and
witnessing. Eskom participation in audits, appraisals, assessment of plans, and verification
shall be conducted at no extra cost to Eskom;
3.8.1.6 shall ensure that a sub-supplier provides access to Eskom to all work procedures, records,
and supporting documentation through provision of access to view and photocopy, as
required, to support verification of scope of work requirements. Access shall include the
ability to photograph Eskom equipment, systems, system components, materials, etc.;
3.8.1.7 shall provide access to all quality-related information pertaining to activities performed by
itself or sub-suppliers, where Eskom might not have participated in the witnessing of their
quality assurance or control (this refers to inspections, audits, etc. performed by the supplier
on its own sub-suppliers);
3.8.1.8 shall allow Eskom to assess, audit, approve, or reject any sub-suppliers employed by
Eskom’s suppliers to assist with the product and/or service delivery to Eskom; and
3.8.1.9 shall ensure that the above requirements flow down to sub-suppliers.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.2 Eskom Rights to Information
3.8.2.1 To expect that the works will be conducted in accordance with the contract between the
parties.
3.8.2.2 To have access to the supplier’s information as determined by applicable legislation.
3.8.2.3 Eskom reserves the right to oversee the supplier’s audit programmes by participating in
selected audits as an observer and by assessing the supplier during key work stages.
Eskom will coordinate with the supplier to develop an oversight schedule aligned with the
supplier’s audit schedule.
3.8.2.4 To obtain access to any audit reports of audits performed by the supplier reflected in the
audit programme.
3.8.2.5 To conduct independent quality audits during all phases of the contract, and the supplier
shall provide all resources to support these activities.
3.8.2.6 Eskom shall have the right to participate in, or request that, a technical investigation be
launched and conducted at the supplier’s and sub-suppliers’ premises or other sites when
risk to Eskom products or service deliverables is identified.
3.8.2.7 To participate in, and/or lead, investigations related to incidents involving its products.
3.8.2.8 To require from suppliers to be responsible for the cost of re-inspections.
3.8.2.9 To withhold payment from suppliers as a result of outstanding nonconformities, irrespective
of the agreed payment schedule and in accordance with the conditions of contract.
3.8.2.10 Shall be granted electronic and hard-copy access to all quality plans, procedures,
documentation, and other quality records relating to the work, including, but not limited to,
data extracts.
3.8.2.11 Reserves the right to review, inspect, and audit any or all parts of the supplier’s QMS, as
well as any documentation, materials, or equipment associated with the work, at any time or
project work location.
3.8.2.12 Shall carry out assessments and audits on all new suppliers and sub-suppliers.
3.8.2.13 Reserves the right to appoint resident quality inspectors who can be based at the supplier’s
or sub-supplier’s premises and on site where the work is being performed.
3.8.2.14 Reserves the right to select intervention points within all developed supplier QCPs/ ITPs
for Eskom oversight of selected functions and to perform surveillance or audits of the work.
3.8.2.15 Shall be given access at all reasonable times before, during, and after manufacture and
before delivery, construction, erection, and commissioning to measure, test, and inspect the
products and workmanship, as necessary, at the supplier’s premises and at Eskom sites.
3.8.2.16 Reserves the right to suspend any pending deliveries by the issuing of a cease delivery
order at any time and for any portion of the work that is not being performed in accordance
with the specified/agreed requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.3 Preservation
The supplier shall develop and implement a comprehensive preservation programme consisting of
plans, processes, procedures and actions undertaken for the purpose of planning for and
maintenance of material deliverables quality. The supplier preservation programme scope includes,
but is not limited to, the following:
3.8.3.1 Engagement of personnel suitably qualified for oversight of, and (as required) direct
implementation of, preservation programme requirements.
3.8.3.2 Development and implementation of preservation programme training appropriate to work
need.
3.8.3.3 Eskom may make use of its appointed service provider tasked to provide a full suite of
services encompassing an online monitoring system and asset tracking during, but not
limited to the following stages: inspections, testing, shipping, transportation, storage, and
commissioning. The supplier is to enable full access during all of these stages in order to
allow the installation of the devices on Eskom-identified products and equipment, which
include the sub-supplier’s testing facilities, processing plant, and any other processes
deemed important towards effective and efficient quality control.
3.8.3.4 Eskom seeks cooperation between the supplier’s designers and those of Eskom’s service
provider in ensuring seamless installation of the device and other associated installations.
Moreover, there is also a need to integrate data flows and systems between Eskom and the
supplier. Further details are included in the Eskom specifications and works information.
3.8.3.5 Review and tracking of compliance with Eskom and supplier engineering specification of
preservation requirements.
3.8.3.6 Review and tracking of compliance with sub-supplier provided preservation requirements
and recommendations.
3.8.3.7 Evaluation of prospective temporary and longer-term material storage sites for consistency
with preservation programme expectations.
3.8.3.8 Preservation work plan development and plan execution performance evaluation of all
parties engaged for provision of material transportation, handling, or storage services.
3.8.3.9 Oversight of material quality preservation plan preparation and plan execution performance
at all work locations.
3.8.3.10 Development of a preservation programme records management process, in compliance
with Eskom information management requirements, which comprehensively addresses
generation, maintenance, and ready access by Eskom to all preservation programme
records.
3.8.3.11 The supplier shall deploy a clearly defined documented programme providing for
identification of all physical asset pre-operation preservation of quality requirements. In this
reference, the term “physical assets” should be understood to include bulk materials,
including consumable items, equipment systems, system components, and any other
procured or supplied materials or equipment transferred to project control, but not deployed
for operational purposes.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.3.12 Where the project responsibility for equipment and materials management has been
formally delegated, the supplier’s preservation programme shall ensure clear and
unambiguous communication of pre-operation preservation of goods quality requirements
to sub-suppliers.
3.8.3.13 The supplier’s preservation programme shall clearly and unambiguously document
processes and procedures for efficient and effective monitoring of compliance with
programme requirements.
3.8.3.14 Compliance monitoring shall commence with ensuring comprehensive consideration of
preservation requirements in the engineering instruction and subsequent inclusion of said
instruction in procurement documentation and shall be applicable until such time as
equipment or materials have been incorporated in an operating or operational system or
structure.
3.8.3.15 Compliance evaluation frequency shall anticipate transfer of tactical-level responsibility for
management of preservation responsibilities between project functional areas, for example,
procurement to logistics, logistics to fabrication, fabrication to logistics, logistics to
construction, etc., and shall, in similar fashion, anticipate transfer of support for tactical-level
responsibility between various subcontracted service providers.
3.8.3.16 Supplier engineering shall ensure that preservation requirements for scope of work
systems, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented and that preservation requirements are efficiently and
effectively communicated to project procurement, logistics, construction management,
quality, security, and other project functional areas, as required, for efficient and effective
implementation of preservation requirements. This shall take the form of a preservation
programme applicable to all systems, system components, equipment, materials, customer-
supplied materials, and other goods procured or managed under the scope of work.
3.8.3.17 The supplier’s preservation management programme shall clearly and unambiguously
address temporary, long-term, and in-transit preservation requirements, including, but not
limited to:
requirements for protection against, or insulation from, atmospheric conditions,
sunlight, temperature, soil, dust, humidity, salt spray, corrosive atmospheres, or
other physical environment conditions;
detailed procedures for application, use, monitoring, and maintenance of coatings,
coverings, fasteners, lines, and other components for internal and external weather
proofing;
requirements for electrical grounding or isolation;
requirements for internal or external environment creation, for example, inert gas
charging, heating, cooling, etc., inclusive of gas storage, electric power supply, etc.;
detailed procedures for initial set-up, charging, activation, and maintenance of
internal atmosphere generation, regeneration, monitoring, and relieving systems, for
example, inert gas management systems;
requirements for protection against, or insulation from, vibration or long-period
cyclical motion in transit, for example, wave-generated movement during sea
transport;
internal and external structural integrity protection, for example, internal and external
bracing, padding, framing, chocking, etc.;
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
support structure requirements, for example, stools, pads, or other devices,
substrates, or support required to ensure in-storage and in-transit stability of
systems, system components, equipment, and material, or other discrete units or
items;
provision for physical separation and/or barriers to prevent airborne or direct
transmittal of contaminants between work areas or between work areas and storage
areas, for example, prevention of carbon steel grinding or cutting debris impact on
stainless steel elements, airborne drift of blast aggregate into vessels or machinery,
etc.;
provision for, and final disposition of, temporary and longer-term storage or transit
required supports and related binding devices, for example, stools, stands, sea
fasteners, platforms, chocks, spacers, cabling, etc.;
provision of requirements for temporary work platforms or other support structures
required to ensure provision of preservation services, for example, provision of a
self-elevating work platform for periodic access to elevated fittings, gauges, man-
ways, etc.;
requirements for protection against, or insulation from, contact with other objects, for
example, padding or other protection for external tubing, fittings, or other impact-
sensitive structures or components;
clear physical delineation of temporary and longer-term storage areas supplemented
by hard and soft barriers, as required, to maintain a protective perimeter;
documented agreements with storage facility and transportation provider
management regarding security management, including, but not limited to, facility
access and egress control and control of access to project goods and materials
within facility boundaries or aboard vehicles or vessels; and
detailed procedures for inspection and testing to verify performance of preservation
procedures and to provide for timely notice and corrective action to maintain
preservation status.
3.8.3.18 The supplier’s preservation management programme scope shall encompass
management of preservation requirements, from initial transfer of ownership or management
responsibility to project scope of responsibility, through any period of temporary or longer-
term storage and through any period of transit, including transit for final delivery at point of
active use or installation.
3.8.3.19 The supplier’s preservation management programme shall clearly and unambiguously
address processes and procedures to ensure that storage and control of materials are
accomplished in accordance with manufacturer recommendations, specifications, and
project-specific requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.3.20 The supplier’s preservation management programme shall incorporate special precautions
to address preservation and control of valves, electrical motors and components,
mechanical and rotating equipment, piping and fittings, instrumentation, flange faces,
gaskets, coatings, insulation, and other materials. Special precautions include, but are not
limited to, supplier-specified maintenance procedures related to engines, electric motors,
pumps, compressors, etc., such as periodic shaft rotation, engine turnover, lubrication, etc.
3.8.3.21 The supplier shall ensure that clear and unambiguous requirements for preservation of the
system, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented in purchase orders, work authorisations, and other
communications between the supplier and sub-suppliers.
3.8.3.22 Where sub-supplier expertise is utilised in determination of the preservation protocol,
supplier procurement processes shall ensure clear and unambiguous documentation of sub-
supplier input into preservation management programme requirements.
3.8.3.23 Supplier procurement shall ensure that preservation requirements for scope of work
systems, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented and that preservation requirements are efficiently and
effectively communicated to project logistics, construction management, quality, security,
and other project functional areas, as required, for efficient and effective implementation of
preservation requirements.
3.8.3.24 The supplier shall ensure comprehensive, clear, and unambiguous designation of sub-
supplier responsibility for execution of all preservation management programme elements,
including, but not limited to, all systems, processes, procedures, methods, ready access to
records, and provision of equipment, tools, or services essential to efficient and effective
execution of the preservation management programme.
3.8.3.25 The supplier shall ensure that preservation management programme responsibilities are
clearly and unambiguously defined within the project team and efficiently and effectively
implemented at all project scope of work locations. Inclusion of supplier and sub-supplier
scope of work in the development and implementation of a preservation management
programme shall be considered essential to efficient and effective preservation
management programme execution.
3.8.3.26 The supplier shall ensure clear and unambiguous designation of project team responsibility
for oversight and management of preservation management programme elements during
every stage of project development.
3.8.3.27 The supplier shall ensure that Eskom has free and unrestricted access to all preservation
records for inspection and audit.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.4 Quality Audits Related Conditions
3.8.4.1 The supplier shall maintain an accurate quality audit and related quality performance review
schedule and shall incorporate the current schedule as an attachment to the supplier CQP.
3.8.4.2 The supplier’s quality audit and related quality performance review schedule development
process shall be designed to incorporate consideration of information generated by
previously conducted audits and reviews, by input from project risk management evaluations
(risk register), or from Eskom or sub-supplier subject matter expertise.
3.8.4.3 Eskom reserves the right to oversee supplier audit programmes by participating in selected
audits as an observer and by assessing the supplier during key work stages. Eskom will
coordinate with the supplier to develop an oversight schedule aligned with the supplier’s
audit schedule.
3.8.4.4 Eskom will have the right to obtain access to any audit reports of audits performed by the
supplier reflected in the audit programme.
3.8.4.5 Eskom reserves the right to conduct independent quality audits, scheduled and
unscheduled, during all phases of the contract. The supplier shall provide all resources to
support these activities.
3.8.4.6 Eskom shall be given access at all reasonable times before, during, and after manufacture
and before delivery, construction, erection, and commissioning to measure, test, and inspect
the products and workmanship, as necessary, at the supplier’s premises and at Eskom sites.
3.8.4.7 The supplier shall obtain access for Eskom to measure, test, witness tests, and inspect
products that are being manufactured by any sub-supplier. This includes surveillances.
3.8.4.8 The assessments and audits shall be carried out on all new suppliers and their sub-
suppliers.
3.8.4.9 Eskom shall have the right to participate in, or request that, a technical investigation be
launched and conducted at the supplier’s and sub-suppliers’ premises or other sites when
risk to Eskom products or service deliverables is identified.
3.8.4.10 Qualification requirements for supplier and sub-supplier personnel engaged in conducting
quality audits and related quality performance reviews shall be defined in the supplier CQP
and shall be in compliance with the Project Quality Personnel Qualification Specification.
3.8.5 Management of Nonconformities and Nonconforming Outputs Identified by Eskom
3.8.5.1 Nonconformity reports raised by Eskom and issued against the supplier shall be investigated
by the supplier as a matter of urgency in order to determine the root cause, corrective action
measures, as required, with implementation time frames.
3.8.5.2 A formal response shall be prepared in respect of the defined criteria and submitted to
Eskom for its review, evaluation, and acceptance, within a maximum of 14 calendar days
from the date of issue of the nonconformity and should be aligned with the site
requirements/procedure.
3.8.5.3 Eskom may, at its discretion, request a response sooner and, in any case, before the
supplier proceeding with any pending/further intervention or corrective action, as may be
required by Eskom.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.5.4 Should Eskom or its inspection authority/agency identify any nonconforming products during
the conduct of its audits/surveillances/inspections, the supplier shall be deemed to be in
breach of contract and shall be held liable for any repair, rework, and/or associated
replacement costs. The supplier may, in such instances, also be held liable for the full costs
associated with the conducting of follow-up audits/surveillances/inspections.
3.8.5.5 The nature, magnitude, and/or frequency of nonconformity and inspection defect/rejection
reports raised by Eskom or its appointed inspection authority/agency shall form the basis of
any action to rescind/withdraw the supplier’s qualification status.
3.8.5.6 Nonconforming outputs identified by Eskom shall be documented via a NC Report and
issued to the suppliers via the contract communication protocol. The suppliers shall
investigate the matter and respond in writing to Eskom of disposition within the stated
contractual conditions.
Note: The dates for the disposition should align to contractual conditions.
3.8.5.7 Eskom shall identify repeat deficiencies as systematic failures of the supplier’s QMS and
shall notify the supplier of the trends. Eskom can initiate an internal audit to highlight the
system failures. The supplier with raise a Corrective Action Report and undertake Root
Cause Analysis. In such cases, QMS rectification and/ or update measures shall be taken
immediately.
3.8.5.8 Should the Supplier fail to respond and rectify nonconforming products within stipulated
contractual conditions. The Project Manager should apply contractual remedies in
accordance with Fidic/ NEC contract.
3.8.5.9 Repeated Nonconformities; if there are any identified repeat nonconformities from the same
supplier within a period of 6 months or less. This must then be escalated to the management
review committees of the BU/ OU/ Cluster/ or Divisions for adjudication. If not resolved, then
the matter must be escalated to the supplier review committee for recommendation.
3.8.6 Special Processes
The following requirements shall be applicable as well as additional requirements as specified in the
scope of work for the provision of the following special process services:
3.8.6.1 The supplier shall ensure that all processes which require that procedures be pre-qualified
or work methods and operators tested and qualified are controlled and all steps followed
before the work can commence.
3.8.6.2 This typically covers such activities as welding, non-destructive testing, special fabrication
techniques, coating, painting, etc.
3.8.6.3 All special processes (procedures and processes) shall be submitted for review and
acceptance by Eskom, accredited or certified agency. No work shall commence until these
are accepted.
3.8.6.4 Where applicable, a relevant Management System for the special process shall be certified
or approved by an accredited body and proof of certification shall be submitted to Eskom for
review. An example for this will be the Welding Management System based on ISO 3834.
3.8.6.5 Where samples are required for acceptance, these shall be submitted to Eskom for review
and acceptance.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.6.6 The supplier shall ensure that all operators are suitably qualified for these processes in
accordance with the procedures, processes and/ or applicable standards/ codes.
3.8.6.7 The records of qualification of procedures, processes and operators shall be maintained by
the supplier in accordance with the applicable procedure or code and these made available
to Eskom at all times.
This document has been seen and accepted by:
Name Designation
Kerseri Pather General Manager: Risk and Sustainability
Lenock Meyer Acting Senior Manager: Quality Management
Pamela Dondashe Middle Manager: Quality Assurance
Mandla Mkhwanazi Middle Manager: SHEQ Procurement and Supply Chain Management
Suzette Manthe Senior Advisor: Quality Performance and Planning
Lorna Ndlela Middle Manager: Eskom Document and Records Management
Date Rev. Compiler Remarks
October 2021 3 SA Sambo Specification was due for revision and in addition, to
align the requirements with the latest Eskom business
processes and systems.
October 2018 2 SA Sambo Specification reviewed to be aligned with the
requirements of ISO 9001:2015
March 2016 1 SA Sambo Specification was due for revision and also to
repackage the requirements and tender returnable
documents into four categories.
December 2011 0 A Hunter New document
The following people were involved in the development of this document:
Andrew Else
Bongi Tshabalala
Feziwe Mogamisi
Lesego Garegae
Patrick Thwane
Xolani Zuma
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Eskom Operational Quality Forum Members
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Section
Source: 240-105658000 Supplier Quality Management Specification.pdf (unknown)Supplier Quality Management: Specification Unique Identifier: 240-105658000
The intention of this specification is to specify and describe the minimum quality requirements for all
existing and potential Eskom suppliers and define the quality criteria for the selection, evaluation,
implementation, and maintenance of a quality management system (QMS) that conforms to the
a quality management system (QMS) based on ISO 9001, which should form the basis for conformity
to Eskom quality requirements and continually adhere to them throughout the duration of a contract
[1] ISO 9001 Quality Management Systems – Requirements
[2] ISO 10005 Quality Management Systems – Guidelines for Quality Plans.
[3] ISO 9000 Quality Management Systems – Fundamentals and Vocabulary
[4] 32-727: Safety, Health, Environment, and Quality (SHEQ) Policy
[5] ISO 10006 Quality Management Systems – Guidelines for Quality Management in Projects
[6] ISO 9004 Quality Management – Quality of an Organisation – Guidance to Achieve Sustained
[9] PPPFA: Preferential Procurement Policy Framework Act, 2000 (Act No. )
[10] CIDB 1004: Best Practice Guideline A4: Evaluating Quality in Tender Submissions
[11] 240-12248652 Supplier Quality Management: List of Tender Returnables
2.3.2 Contract Quality Plan: a document of the supplier’s process for delivering the level of quality
required by the contract. It is a framework for the contractor’s process for delivering quality.
2.3.3 Hold Point: a predetermined stage in the quality control plan (QCP) beyond which work/
2.3.4 Intervention Points: those control points indicated by the various controlling bodies
inspection, hold points, surveillances, witnesses, reviews and verifications.
performing quality assurance/ quality control, monitoring, inspection and/ or expediting
Title: Supplier Quality Management: Document Identifier: 240-105658000
Functional Area: Quality Management
Quality Quality Manager Quality Risk and
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Address
Matimba Power Station - Lephalale - Lephalale - 0555
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
15
Last checked
25 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.