Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Hertzog Boulevard - Civic Centre - Cape Town - 8001
Organization Type
GOVERNMENT
Published
28 Aug 2026
OCDS Reference
ocds-9t57fa-167230
The city of cape town invites bids for the appointment of a panel of service providers to manufacture, supply and deliver new trailers and to convert existing trailers. Bidders must complete specific goal declarations under the b-bbee preference point system and provide valid b-bbee verification or a commissioner of oaths declaration, along with audited financial statements where applicable.
Bidders must complete Table 2 (Specific Goals Declaration) declaring amounts and percentages for the specific goals claimed (SG1, SG2, SG3.1 or SG3.2).
A valid B-BBEE certificate as at the date of tender closing must be attached or made available on request; for Joint Ventures/Consortiums, a consolidated B-BBEE certificate is required.
If not B-BBEE verified and qualifying as a QSE or EME, Table 3 must be completed by a Commissioner of Oaths.
Amounts declared must be per the most recent Annual Financial Statements (not older than 12 months) and defined per the B-BBEE Act.
Companies required to be audited by legislation must submit audited financial statements not older than 12 months with the bid or on request.
All amounts disclosed must be as per the most recent Annual Financial Statements (not older than 12 months).
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Wednesday, 30 September 2026 - 10:00
Venue
Teams
Categories
Request for Bid(Open-Tender)
Hertzog Boulevard - Civic Centre - Cape Town - 8001
Recommended Certifications
Having these can improve your winning chances: SABS Product Certification, NRCS Certification
AI Document Analysis Stages
Evaluation Criteria
Source: Addendum 2 - 71R to 73R.pdf (unknown)28 Aug
2026
Tender Published
Tender was published
30 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Addendum 1 - 18R.pdf
The City of Cape Town is appointing a panel of service providers for the manufacture, supply and delivery of new trailers and the conversion of existing trailers. The tender uses the 80/20 preference point system, with 20 points allocated to specific goals including promotion of micro and small enterprises, enterprise and supplier development, socio-economic development, skills development, and employee share schemes.
052G_2025_26 - Panel Trailers_Notice 1 HDI replacement pages.pdf
The City of Cape Town is establishing a panel of service providers for the manufacture, supply, and delivery of new trailers, as well as the conversion of existing trailers. The tender is issued under reference 052G/2026/27, with a closing date of 30 September 2026.
52G_2026_27 - APPOINTMENT OF A PANEL OF SERVICE PROVIDERS FOR THE MANUFACTURE SUPPLY AND DELIVERY OF NEW TRAILERS AND THE CONVERSION rev5.pdf
The City of Cape Town is establishing a panel of service providers for the manufacture, supply and delivery of new trailers, and for the conversion of existing CCT trailers, on an ad-hoc basis over a 36-month contract period. The panel is split into two categories: one for manufacturing new trailers and one for converting existing trailers. Appointment to the panel does not guarantee work; work is allocated through a secondary competitive process.
Addendum 2 - 71R to 73R.pdf
The City of Cape Town is appointing a panel of service providers for the manufacture, supply and delivery of new trailers and the conversion of existing trailers. The tender includes specific goals for B-BBEE, with points allocated for enterprise and supplier development, socio-economic development, skills development, and employee share schemes.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Cape Town municipal contracts with AI Matching & Recommendations, green-smart procurement intelligence, document analysis, and full application support.
Contact
021-444-3196Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 1 963 921
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Specific goals are scored under the B-BBEE preference point system. Bidders must complete Table 2 declaring amounts and percentages for the specific goals claimed: SG1 Promotion of Micro and Small Enterprises (total turnover), SG2 Enterprise Supplier Development and Socio-Economic Development (total ESD expenditure, total SED expenditure, total expenditure), SG3.1 Skills Development (total skills development expenditure, total expenditure), or SG3.2 Employee Share Scheme (employee share scheme ownership percentage). Amounts must be per the most recent Annual Financial Statements (not older than 12 months) and defined per the B-BBEE Act. Verification: a B-BBEE certificate valid at tender closing must be attached or available on request; for Joint Ventures/Consortiums, consolidated amounts and a consolidated certificate are required. If not B-BBEE verified and qualifying as a QSE or EME, Table 3 must be completed by a Commissioner of Oaths. Audited financial statements (where applicable) must be attached or available on request to validate turnover and expenditure amounts.
Technical Specifications
Source: Addendum 2 - 71R to 73R.pdf (unknown)Supplier Development Enterprise Supplier Development and
Compliance Requirements
Source: Addendum 2 - 71R to 73R.pdf (unknown)B-BBEE compliance is required. Bidders must complete Table 2 (Specific Goals Declaration) and, where applicable, Table 3 (verification by a B-BBEE Verification Agency or Commissioner of Oaths). A valid B-BBEE certificate must be attached or made available on request. For Joint Ventures/Consortiums, a consolidated B-BBEE certificate is required. Companies required to be audited by legislation must submit audited financial statements not older than 12 months.
B-BBEE Requirements
Source: Addendum 2 - 71R to 73R.pdf (unknown)Bidders must complete Table 2 to declare amounts and percentages for specific goals: SG1 Promotion of Micro and Small Enterprises (total turnover), SG2 Enterprise Supplier Development and Socio-Economic Development (total ESD expenditure, total SED expenditure, total expenditure), SG3.1 Skills Development (total skills development expenditure, total expenditure), or SG3.2 Employee Share Scheme (employee share scheme ownership percentage). Amounts must be per the most recent Annual Financial Statements (not older than 12 months) and defined per the B-BBEE Act. Verification: a B-BBEE certificate valid at tender closing must be attached or available on request; for Joint Ventures/Consortiums, consolidated amounts and a consolidated certificate are required. If not B-BBEE verified and qualifying as a QSE or EME, Table 3 must be completed by a Commissioner of Oaths. Audited financial statements (where applicable) must be attached or available on request to validate turnover and expenditure amounts.
Section
Source: Addendum 2 - 71R to 73R.pdfSpecific goals are scored under the B-BBEE preference point system. Bidders must complete Table 2 declaring amounts and percentages for the specific goals claimed: SG1 Promotion of Micro and Small Enterprises (total turnover), SG2 Enterprise Supplier Development and Socio-Economic Development (total ESD expenditure, total SED expenditure, total expenditure), SG3.1 Skills Development (total skills development expenditure, total expenditure), or SG3.2 Employee Share Scheme (employee share scheme ownership percentage). Amounts must be per the most recent Annual Financial Statements (not older than 12 months) and defined per the B-BBEE Act. Verification: a B-BBEE certificate valid at tender closing must be attached or available on request; for Joint Ventures/Consortiums, consolidated amounts and a consolidated certificate are required. If not B-BBEE verified and qualifying as a QSE or EME, Table 3 must be completed by a Commissioner of Oaths. Audited financial statements (where applicable) must be attached or available on request to validate turnover and expenditure amounts.
Description
Source: 52G_2026_27 - APPOINTMENT OF A PANEL OF SERVICE PROVIDERS FOR THE MANUFACTURE SUPPLY AND DELIVERY OF NEW TRAILERS AND THE CONVERSION rev5.pdfAppointment of a panel of service providers for the manufacture, supply and delivery of new trailers and the conversion of existing trailers for the City of Cape Town. Contract period: 36 months from commencement. The panel is split into two categories: manufacturing of new trailers and conversion of existing CCT trailers. Appointment to the panel does not guarantee any work; work is allocated through a secondary competitive process.
Important Dates
Source: 52G_2026_27 - APPOINTMENT OF A PANEL OF SERVICE PROVIDERS FOR THE MANUFACTURE SUPPLY AND DELIVERY OF NEW TRAILERS AND THE CONVERSION rev5.pdf (TENDER)Closing date: 30 September 2026 at 10:00 am.
Site visit/clarification meeting: 11 September 2026 at 10:00 am, held virtually via Microsoft Teams (link and dial-in details provided). Not compulsory but strongly recommended.
Tender advertised: 28 August 2026.
Clarification requests: must be submitted at least one week before the closing time.
Contact Information
Source: 52G_2026_27 - APPOINTMENT OF A PANEL OF SERVICE PROVIDERS FOR THE MANUFACTURE SUPPLY AND DELIVERY OF NEW TRAILERS AND THE CONVERSION rev5.pdf (TENDER)CCT Tender Representative: [email protected].
Submission address: Tender & Quotation Boxes Office, 2nd Floor (Concourse Level), Civic Centre, 12 Hertzog Boulevard, Cape Town. Tender box number 202.
Supplier Management Unit (for CCT Supplier Database registration): 2nd Floor (Concourse Level), Civic Centre, 12 Hertzog Boulevard, Cape Town, Tel 021 400 9242/3/4/5.
Submission Guidelines
Source: 52G_2026_27 - APPOINTMENT OF A PANEL OF SERVICE PROVIDERS FOR THE MANUFACTURE SUPPLY AND DELIVERY OF NEW TRAILERS AND THE CONVERSION rev5.pdf (TENDER)Submission channel: sealed envelope deposited into Tender Box 202 at the Tender & Quotation Boxes Office, 2nd Floor (Concourse Level), Civic Centre, 12 Hertzog Boulevard, Cape Town, before the closing time. The envelope must show the tenderer's name and address, the tender number and description, the tender box number, and the closing date. Tenders submitted by fax or email are rejected. Late tenders are not considered.
Returnable documents (all must be completed, signed and submitted):
Disqualification risks:
Returnable Documents
Source: 52G_2026_27 - APPOINTMENT OF A PANEL OF SERVICE PROVIDERS FOR THE MANUFACTURE SUPPLY AND DELIVERY OF NEW TRAILERS AND THE CONVERSION rev5.pdf (TENDER)Returnable documents include: Schedule F.1 Contract Price Adjustment, F.2 Certificate of Authority for Partnerships/JV/Consortiums, F.3 Declaration for Procurement above R10 million, F.4 Preference Points Claim Form, F.5 Declaration of Interest – State Employees, F.6 Conflict of Interest Declaration, F.7 Declaration of Tenderer's Past SCM Practices, F.8 Authorisation for Deduction of Outstanding Amounts, F.9 Certificate of Independent Tender Determination, F.10 Proposed Deviations and Qualifications, F.11 List of Other Documents Attached, F.12 Record of Addenda, F.13.A and F.13.B Information to be Provided with Tender Submission, F.14 Appeal Application. Also required: MIB certificate, franchise/reseller agreements, tax compliance PIN, and other supporting documents as specified.
Evaluation Criteria
Source: 52G_2026_27 - APPOINTMENT OF A PANEL OF SERVICE PROVIDERS FOR THE MANUFACTURE SUPPLY AND DELIVERY OF NEW TRAILERS AND THE CONVERSION rev5.pdf (TENDER)Evaluation stages: responsiveness check first, then price and preference scoring. A responsive tender must comply in all respects with the tender conditions, specifications, pricing instructions and the contract.
Preference point system: 80/20 system applies (price 80 points, preference 20 points). Price points are calculated using the formula Ps = 80 x (1 - (Pt - Pmin)/Pmin).
Preference points for specific goals (80/20):
No minimum functionality score applies. The CCT may negotiate with preferred tenderers and may accept or reject any tender. The highest total adjudication points determine the winner.
Technical Specifications
Source: 52G_2026_27 - APPOINTMENT OF A PANEL OF SERVICE PROVIDERS FOR THE MANUFACTURE SUPPLY AND DELIVERY OF NEW TRAILERS AND THE CONVERSION rev5.pdf (TENDER)Scope: manufacture, supply and delivery of new trailer units (light, medium and heavy-duty industrial, including specialised and purpose-built) and conversion/refurbishment/repurposing of existing CCT trailers, on an ad-hoc basis. Exact specifications, quantities and delivery requirements are determined per works assignment under the panel contract; no guarantee of volume or frequency of work.
New trailers: must be National Road Traffic Act (RTA) compliant, with first registration in the name of the City of Cape Town (not 'second hand'). The service provider is responsible for all homologation requirements, including NRCS approval where required; all associated costs must be included in the proposal.
Conversions: all work must be RTA compliant, including approval of modifications, roadworthiness certification and re-registration where applicable. The service provider must determine whether re-homologation is required and ensure compliance with NRCS requirements; all associated costs included.
Registration plates: trailers must be fitted with SABS-compliant retro-reflective registration plates, secured by 4 mm rivets or 4 mm one-way screws, clearly visible even when the tailboard is lowered. No dealer name or branding in the plate surround.
Inspections: the City may inspect the service provider's premises. On completion of any conversion, a joint final inspection is conducted with the City representative; the service provider is liable for any damage or loss during the work.
Exclusions: heavy-duty 3-axle low bed trailers for abnormal loads (with rear stand-up ramps or detachable swan neck) are excluded for the duration of Contract 192G/2023/24. The City may exclude, defer or restrict any requirement to avoid overlap with existing contracts.
Methodology
Source: 52G_2026_27 - APPOINTMENT OF A PANEL OF SERVICE PROVIDERS FOR THE MANUFACTURE SUPPLY AND DELIVERY OF NEW TRAILERS AND THE CONVERSION rev5.pdfWork allocation: the panel is split into two categories — manufacturing of new trailers and conversion of existing CCT trailers. Work is allocated through a secondary competitive process; the highest ranked tenderer is offered the work first, and only if they refuse is it offered to the next highest ranked tenderer. Appointment to the panel does not guarantee any work. Refer to specification clause 7 for the allocation of work methodology.
A two-stage proposal procedure will not be followed.
Experience & Qualifications
Source: 52G_2026_27 - APPOINTMENT OF A PANEL OF SERVICE PROVIDERS FOR THE MANUFACTURE SUPPLY AND DELIVERY OF NEW TRAILERS AND THE CONVERSION rev5.pdfThe CCT will assess the tenderer's ability to fulfil the contract, including professional and technical qualifications, competence, financial resources, equipment, managerial capability, reliability, experience, reputation and personnel. The CCT may consider the tenderer's existing contracts with the CCT.
The tenderer must have the legal capacity to enter into the contract, must not be insolvent, in receivership, under business rescue, or subject to legal proceedings affecting its ability to perform.
Site visit/clarification meeting: tenderers should be represented by a duly authorised person suitably qualified and experienced to comprehend the implications of the work.
Quality Management
Source: 52G_2026_27 - APPOINTMENT OF A PANEL OF SERVICE PROVIDERS FOR THE MANUFACTURE SUPPLY AND DELIVERY OF NEW TRAILERS AND THE CONVERSION rev5.pdfQuality and compliance: all new trailers must be RTA compliant and first registered in the name of the City of Cape Town. The service provider is responsible for homologation and NRCS approval where required; all associated costs must be included.
Conversions must be RTA compliant, including approval of modifications, roadworthiness certification and re-registration where applicable. Re-homologation must be done if required.
Registration plates must comply with SABS standards for retro-reflective plates and be secured with 4 mm rivets or one-way screws.
Joint final inspection: on completion of any conversion, a joint inspection is conducted with the City representative to confirm all work is completed per scope and no damage or unauthorised modification occurred. Findings are signed off by both parties; the service provider is liable for any damages or losses.
Financial Requirements
Source: 52G_2026_27 - APPOINTMENT OF A PANEL OF SERVICE PROVIDERS FOR THE MANUFACTURE SUPPLY AND DELIVERY OF NEW TRAILERS AND THE CONVERSION rev5.pdf (TENDER)Pricing: tenderers must comply with all pricing instructions in the Price Schedule. The Price Schedule is part of the tender document.
Tender fee: R200 (non-refundable) for a hard copy of the tender document; not applicable for website downloads.
Arithmetical errors: the CCT will correct errors in a prescribed manner (amounts in words govern over figures; line item totals govern over unit rates; total of prices governs). Tenderers may be required to justify or amend rates or lump sums that are excessively low, high or unbalanced.
Tender validity: offers must remain valid for 120 days after closing, extendable to 12 months, with possible further extension up to 6 months by mutual agreement.
For transactions above R10 million (VAT inclusive), the CCT may request audited financial statements for the past 3 years, a certificate of no undisputed municipal debts, particulars of contracts with organs of state in the past 5 years, and a statement on foreign sourcing of goods/services.
Compliance Requirements
Source: 52G_2026_27 - APPOINTMENT OF A PANEL OF SERVICE PROVIDERS FOR THE MANUFACTURE SUPPLY AND DELIVERY OF NEW TRAILERS AND THE CONVERSION rev5.pdf (TENDER)CSD registration: tenderers must be registered on the National Treasury Central Supplier Database (CSD) when requested; applies individually to each JV partner.
CCT Supplier Database: tenderers must register on the CCT Supplier Database when requested; applies individually to each JV partner.
Tax compliance: tenderers must be registered with SARS and tax compliant, and must submit a valid Tax Compliance Status PIN (recorded on the Details of Tenderer pages). Each JV/consortium party submits a separate PIN. The CCT verifies tax status before award; a recommended bidder who is not tax compliant may be given 7 working days to provide proof of arrangements with SARS.
MIB registration (mandatory eligibility): bidders must be registered body builders/manufacturers with an active Manufacturer/Importer/Builder (MIB) certificate under the National Road Traffic Act. Franchises/subsidiaries must submit the parent/holding company's MIB certificate plus a formal letter or franchise agreement. Authorised resellers must submit the manufacturer's MIB certificate plus a formal letter or agreement confirming reseller status. Non-responsive if MIB status is not active, cancelled or suspended.
B-BBEE: preference points claimed under the 80/20 system; documentary proof (e.g., B-BBEE certificate, CSD report) required to support claims for specific goals.
Returnable declarations: Schedule F.5 (Declaration of Interest – State Employees), F.6 (Conflict of Interest), F.7 (Past SCM Practices), F.8 (Authorisation for Deduction of Outstanding Amounts), F.9 (Certificate of Independent Tender Determination) — all must be completed and signed; non-compliance may render the tender non-responsive.
Health & Safety
Source: 52G_2026_27 - APPOINTMENT OF A PANEL OF SERVICE PROVIDERS FOR THE MANUFACTURE SUPPLY AND DELIVERY OF NEW TRAILERS AND THE CONVERSION rev5.pdfCompliance with the Occupational Health and Safety Act is mandatory. Tenderers must allow for all costs of compliance in their pricing.
Upon written request, the tenderer must submit a Health and Safety Plan demonstrating the necessary competencies and resources to deliver the goods/services in accordance with the Act, Regulations and Health and Safety Specification.
All work on fleet assets in the bays must comply with the General Safety Regulations, including mandatory use of PPE and protective screens where necessary.
Schedule C.3 (Occupational Health and Safety Agreement) must be signed upon acceptance, committing the service provider to comply with OHSA and its regulations.
Contractual Terms
Source: 52G_2026_27 - APPOINTMENT OF A PANEL OF SERVICE PROVIDERS FOR THE MANUFACTURE SUPPLY AND DELIVERY OF NEW TRAILERS AND THE CONVERSION rev5.pdfContract period: 36 months from commencement. The contract is subject to the CCT's Supply Chain Management Policy. Abuse of the SCM system may lead to rejection, cancellation, restriction, or other remedies.
Tender validity: 120 days after closing, extendable to 12 months, with possible further extension up to 6 months by mutual agreement. Withdrawal of a tender may incur liability for additional expenses.
The CCT may cancel the tender before award under certain conditions (changed circumstances, no funds, no acceptable tenders, material irregularity, failure to negotiate market-related pricing).
Disputes and appeals: objections/complaints must be lodged within 14 days of the decision; appeals under Section 62 of the Systems Act within 21 days of notification. An appeal administration fee of R300 applies, with a possible surcharge for vexatious or frivolous appeals.
Standby bidder: the CCT may nominate a standby bidder at award, who may be considered if the contract is terminated.
Special Conditions
Source: 52G_2026_27 - APPOINTMENT OF A PANEL OF SERVICE PROVIDERS FOR THE MANUFACTURE SUPPLY AND DELIVERY OF NEW TRAILERS AND THE CONVERSION rev5.pdf (TENDER)The contract is for a panel of service providers. Work is allocated via secondary competitive process; highest ranked tenderer gets first offer. Standby bidder may be nominated. The City reserves the right to exclude, defer or restrict any requirement to avoid overlap with existing contracts (e.g., Contract 192G/2023/24 for heavy-duty low bed trailers).
Requirements
Source: 52G_2026_27 - APPOINTMENT OF A PANEL OF SERVICE PROVIDERS FOR THE MANUFACTURE SUPPLY AND DELIVERY OF NEW TRAILERS AND THE CONVERSION rev5.pdf (TENDER)Eligibility criteria: tenderers must comply with all conditions, including submitting a clear, irrevocable offer; completing required declarations (Details of Tenderer, Certificate of Authority for JV/consortium, Declaration of Interest – State Employees, Conflict of Interest, Past SCM Practices, Certificate of Independent Bid Determination, Authorisation for Deduction of Outstanding Amounts); not being restricted under SCM Policy; tax compliance with SARS; no conflict of interest; not involved with bid specification committee; not guilty of contravening the Competition Act.
Additional eligibility: must be a registered body builder/manufacturer with active MIB registration (or be a franchise/subsidiary of such, or an authorised reseller with supporting documentation). Non-responsive if MIB status is not active, cancelled or suspended. Complete Schedule F.13B in full.
Section
Source: 52G_2026_27 - APPOINTMENT OF A PANEL OF SERVICE PROVIDERS FOR THE MANUFACTURE SUPPLY AND DELIVERY OF NEW TRAILERS AND THE CONVERSION rev5.pdfThe 80/20 preference point system applies. Price points calculated using formula Ps = 80 x (1 - (Pt - Pmin)/Pmin). Preference points for specific goals: Enterprise Supplier Development and Socio-Economic Development (up to 6 points based on percentage of total expenditure), Skills Development or Employee Share Scheme (up to 6 points based on percentage of total profit or employee ownership). Total preference points: 20. Risk analysis and negotiation with top three tenderers if needed.
Description
Source: 052G_2025_26 - Panel Trailers_Notice 1 HDI replacement pages.pdfThe tender seeks to appoint a panel of service providers for the manufacture, supply and delivery of new trailers and the conversion of existing trailers for the City of Cape Town.
Important Dates
Source: 052G_2025_26 - Panel Trailers_Notice 1 HDI replacement pages.pdf (TENDER)Closing date: 30 September 2026. Notice to Tenderers No. 1 issued 25 August 2026.
Contact Information
Source: 052G_2025_26 - Panel Trailers_Notice 1 HDI replacement pages.pdf (TENDER)Supply Chain Management, City of Cape Town. Email: [email protected]. Address: Civic Centre, 12 Hertzog Boulevard, Cape Town 8001; P O Box 655, Cape Town 8000.
Submission Guidelines
Source: 052G_2025_26 - Panel Trailers_Notice 1 HDI replacement pages.pdf (TENDER)Notice to Tenderers No. 1 (25 August 2026) amends the tender document and must be bound into the contract document and returned with the tender. Tenderers must acknowledge receipt of this addendum by emailing [email protected]. The notice amends Clause 2.3.10.3.4 (Applicable Formula for Preference Points) per Addendum 1, Tender Replacement R, and replaces Schedule F.4 (Preference Points Claim Form) pages 71-73 with Addendum 2, Tender Replacement Pages 71R-73R.
Evaluation Criteria
Source: 052G_2025_26 - Panel Trailers_Notice 1 HDI replacement pages.pdf (TENDER)Preference points will be claimed under the Preferential Procurement Regulations 2022. Bidders must complete the amended Schedule F.4 (Preference Points Claim Form) as replaced by Addendum 2. No other evaluation criteria are stated in the document.
Technical Specifications
Source: 052G_2025_26 - Panel Trailers_Notice 1 HDI replacement pages.pdf (TENDER)The tender is for the appointment of a panel of service providers for the manufacture, supply and delivery of new trailers and the conversion of existing trailers for the City of Cape Town. No further technical specifications are provided in this document.
Compliance Requirements
Source: 052G_2025_26 - Panel Trailers_Notice 1 HDI replacement pages.pdf (TENDER)Bidders must complete and submit the amended Schedule F.4 (Preference Points Claim Form) in terms of the Preferential Procurement Regulations 2022. No other compliance requirements are stated in the document.
Special Conditions
Source: 052G_2025_26 - Panel Trailers_Notice 1 HDI replacement pages.pdf (TENDER)Notice to Tenderers No. 1 (25 August 2026) amends the tender document: Clause 2.3.10.3.4 (Applicable Formula for Preference Points) is amended and amplified per Addendum 1, Tender Replacement R; and Schedule F.4 (Preference Points Claim Form in terms of the Preferential Procurement Regulations 2022) pages 71-73 are replaced by Addendum 2, Tender Replacement Pages 71R-73R. This notice forms an integral part of the contract and must be bound into the contract document and returned with the tender.
Evaluation Criteria
Source: Addendum 1 - 18R.pdf (unknown)The tender uses the 80/20 preference points system for awards above R750,000 and up to R50 million (VAT inclusive). A total of 20 preference points are allocated to specific goals under the Reconstruction and Development Programme (RDP):
Technical Specifications
Source: Addendum 1 - 18R.pdf (unknown)construction and Development Programme (RDP) as
publishedinGovernmentGazette
1 PromotionofMicroandSmallEnterprises 8
MicrowithaturnoveruptoR20millionandSmallwithaturnoverupto
R80millionasperNationalSmallEnterpriseAct,1996(ActNo.102of
SMEpartnership,sub-contracting,jointventureorconsortiums
2 Enterprise Supplier Development and Socio Economic 6
Deve
Compliance Requirements
Source: Addendum 1 - 18R.pdf (unknown)Bidders must be registered on the Central Supplier Database (CSD) and have a valid tax clearance (SARS TCS or tax pin).
Returnable forms (all must be completed and signed):
B-BBEE Requirements
Source: Addendum 1 - 18R.pdf (unknown)Preference points under the 80/20 system are allocated to specific goals: Promotion of Micro and Small Enterprises (8 points) – Micro with turnover up to R20 million and Small with turnover up to R80 million as per the National Small Enterprise Act, 1996; includes SME partnership, sub-contracting, joint venture or consortiums. Enterprise Supplier Development and Socio Economic Development (6 points) – points based on percentage of total expenditure: >15% = 6, >12% up to 15% = 5, >9% up to 12% = 4, >6% up to 9% = 3, >3% up to 6% = 2, >=1% up to 3% = 1, <1% = 0. Skills Development OR Employee Share Scheme (6 points) – Skills Development: >5% = 6, >4% up to 5% = 5, >3% up to 4% = 4, >2% up to 3% = 3, >1% up to 2% = 2, >=0.5% up to 1% = 1, <0.5% = 0. OR Employee Share Scheme: >15% employee ownership = 6, >12% up to 15% = 5, >9% up to 12% = 4, >6% up to 9% = 3, >3% up to 6% = 2, >=1% to 3% = 1, <1% = 0. Total points: 20.
Section
Source: Addendum 1 - 18R.pdfThe 80/20 preference points system applies. Specific goals and points: Promotion of Micro and Small Enterprises (8 points), Enterprise Supplier Development and Socio Economic Development (6 points), Skills Development OR Employee Share Scheme (6 points). Total 20 points. Points for ESD/SED and Skills Development are awarded on sliding scales based on percentage of total expenditure; Employee Share Scheme points based on percentage of employee ownership.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Hertzog Boulevard - Civic Centre - Cape Town - 8001
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
4
Last checked
28 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Learn how to submit a winning bid with these related articles
Your meticulously crafted General sector tender submission can be disqualified for a single, seemingly minor compliance oversight. The reality for South African contractors is that technical competence is no longer sufficient; it is underpinned by a non-negotiable framework of documentary compliance. This regulatory guide: mastering CSD and BBBEE compliance for general sector tenders in south africa provides a comprehensive, step-by-step breakdown of the mandatory registrations and certificates you must secure and present. We detail the precise requirements for CSD, BBBEE, SARS TCS, CIPC, and COIDA, explaining their function within the procurement ecosystem governed by the PFMA and PPPFA. Learn the actionable steps to prepare your business, avoid the most common disqualifying errors, and leverage technology to streamline your compliance process for successful bidding in 2026 and beyond.
For South African General contractors, the path to government procurement is paved with non-negotiable regulatory requirements. The most common barrier to entry is not a lack of capability, but a failure to master the foundational compliance frameworks that govern every bid. This complete regulatory guide to CSD and BBBEE compliance for General sector tender suppliers in South Africa demystifies the process. It provides a meticulous, step-by-step field manual for ensuring your company is fully compliant and audit-ready, enabling you to confidently access the R billions in opportunities across infrastructure maintenance, facilities management, and service delivery within the General sector.
Everything South African general contractors need to know about how to write a winning tender proposal without an in-house bid team in gauteng — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
This definitive guide provides General sector contractors with the precise, actionable steps required to achieve and maintain CSD and BBBEE compliance for South African public tenders in 2026. Authored by Dr. Sarah Mokwena, a Legal Compliance Specialist, it meticulously walks through the regulatory framework, mandatory registrations, and the critical documentation needed to avoid disqualification. We dissect the common, costly errors made during submission and provide a clear checklist to ensure your bid is responsive and competitive. Learn how to navigate the Central Supplier Database, validate your BBBEE status, and integrate compliance into your tender preparation process.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Supplies: General. Unlock full pricing strategies, bid frequency, and historical win rates.