Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Issuing Organization
South African National Biodiversity InstituteLocation
Western Cape
Closing Date
21 Sept 2026
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
21 Rhodes Ave - Newlands - Cape Town - 7708
Organization Type
GOVERNMENT
Published
28 Aug 2026
OCDS Reference
ocds-9t57fa-167288
Sanbi seeks a service provider to complete the dry room and minor repair work to the seedbank facility at kirstenbosch national botanical garden, cape town. The work involves mechanical HVAC installations, including air handling units, condensers, ducting, and associated electrical and building works. Bidders must hold a CIDB grading of 3me or higher, attend a compulsory site briefing, and submit a two-envelope tender with strict separation of financial and technical content.
CIDB registration: contractor grading designation of 3ME or higher (or capable of being so prior to evaluation); joint ventures must have every member registered with CIDB and lead partner graded 3ME or higher.
Compulsory site briefing: attend on 8 September 2026 at 12:00 at the Old Mutual Conference Centre (OMCC), Kirstenbosch National Botanical Garden; sign the attendance list.
Two-envelope submission: Original Document A (FINANCIAL ENVELOPE) with pricing only; Original Document B (TECHNICAL ENVELOPE) with no pricing, plus a USB copy of Document B; no pricing on USB or in technical envelope; envelopes sealed and marked as specified.
Returnable documents: CSD registration report, printed CIDB Active Contractor's Listing, COIDA Letter of Good Standing, fully completed and signed SBD forms, compulsory site briefing certificate, and completed Appendix E – Equipment Offered.
Key personnel: professional Construction Health & Safety Officer with valid SACPCMP registration (candidate registrations not accepted); professional Contract/Project Manager with valid SACPCMP or ECSA registration; Site Foreman/Refrigeration Mechanic with valid trade test certificate, SARACCA/SAQCC Gas registration, Category B registration, SANS 10147 refrigerant handling certification, and authority to issue Certificates of Conformity.
Tender validity: 90 days from closing date; closing date 21 September 2026 at 11:00; delivery to Biodiversity Centre, Pretoria National Botanical Garden, 2 Cussonia Avenue, Brummeria, Pretoria.
Enquiries: cut-off 14 September 2026 at 11:00; technical queries to [email protected] or [email protected]; SCM queries to [email protected].
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Monday, 21 September 2026 - 11:00
Venue
Old Mutual Conference Hall, Visitor Centre, Kirstenbosch National Botanical Garden, Rhodes Drive
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Categories
Request for Bid(Open-Tender)
21 Rhodes Ave - Newlands - Cape Town - 7708
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
Important Dates
Source: G587_2026 - COMPLETION OF THE DRY ROOM AND MINOR REPAIR.zip (TENDER)28 Aug
2026
Tender Published
Tender was published
21 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
G587_2026 - COMPLETION OF THE DRY ROOM AND MINOR REPAIR.zip
The South African National Biodiversity Institute (SANBI) is appointing a service provider to complete the dry room and carry out minor repair work to the seedbank facility at the Kirstenbosch National Botanical Garden in Cape Town. The works comprise the full supply, installation, testing, commissioning and handover of a refrigeration-based HVAC system for the dry room, including a condensing unit, DX air handling unit, ductwork, refrigeration pipework, electrical works, and associated repairs to VRV and freezer rooms, doors, plumbing, and a hydroboil replacement.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
South African National Biodiversity InstituteContact Person
Amjad Hendricks
Phone
012-002-5201
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 4 345 849
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
{"briefingSession":"{"date":"8 September 2026","time":"12:00","venue":"12:00 in the Old Mutual Conference","is_compulsory":true}"}
Contact Information
Source: G587_2026 - COMPLETION OF THE DRY ROOM AND MINOR REPAIR.zip (TENDER){"name":null,"email":null,"phone":null,"department":"46 - DERBY RANCH","address":null}
Evaluation Criteria
Source: G587_2026 - COMPLETION OF THE DRY ROOM AND MINOR REPAIR.zip (TENDER)Bidders must be registered on the Central Supplier Database (CSD) and have a valid tax clearance (SARS TCS or tax pin). Bidders must comply with the B-BBEE requirements as per the PPPFA (80/20 or 90/10 system) and submit the relevant preference points claim form (SBD 6.1). Bidders must complete and submit all mandatory National Treasury standard forms, including SBD 1 (Invitation to Bid), SBD 4 (Declaration of Interest), SBD 6.1 (Preference Points Claim), SBD 6.2 (Declaration for Local Production and Content), SBD 8 (Declaration of Bidder's Past Supply Chain Management Practices), SBD 9 (Certificate of Independent Bid Determination), and any authority to sign or board resolution. Bidders must not offer second-hand equipment. Bidders must visit the site during the bid phase to familiarise themselves with site conditions; no claims for additional payment related to ignorance of site conditions will be accepted. Bidders must submit manufacturer's ratings for all equipment offered. Bidders must indicate whether their bid and/or equipment complies with the listed SABS standards or carries the SABS mark. Bidders must state the accredited South African agents for spare parts for units for which they are not accredited agents, and furnish undertakings from agents to carry spare parts. Bidders must comply with the Kyoto Protocol and Copenhagen Agreement regarding refrigerants; bids for equipment not complying must be clearly indicated in writing.
Technical Specifications
Source: G587_2026 - COMPLETION OF THE DRY ROOM AND MINOR REPAIR.zip (TENDER)2.1 The dimensions, weights, etc., shown on the drawings and mentioned in the specifications
shall be taken as the Republic of South Africa’s legal standard weights and measures.
3.1 All work is to be executed with materials of the best quality and in the most substantial
manner under the inspection and to the entire satisfaction of the Engineer.
3.2 The entire installation shall be in accordance with the following:
a. The national Building Regulations and Building Standards Act No. as amended in
1984 and all amendments thereafter.
b. The latest revision of SABS 0400: The Applications of the National Building Regulations, as
amended.
c. SABS Code of Practice for the Wiring of Premises No. , as amended.
d. The Machinery and Occupational Health and Safety Act No. .
e. Any other relevant by-laws of local or other authorities.
3.3 All apparatus, components, parts, fitting and materials supplied and/or installed whether
especially specified herein or not shall confirm in respect of quality, manufacture, tests and
performance with the requirements of the appropriate current South African (SABS) or British
Standard Specifications (BS) and Addenda thereto, except where otherwise required by this
specification or permitted by approval of the Engineer in writing. All materials and
workmanship which may, in the opinion of the Engineer be inferior to that specified for the
of 24
work will be condemned. All condemned material and workmanship must be replaced or
rectified as the case may be, to the satisfaction of the Engineer.
3.4 No second-hand equipment of any description may be offered for supply or installation.
3.5 If so required, the Engineer may call for samples of material and equipment for approval. Such
samples shall be submitted within 14 days of the request and if judged necessary by the
Engineer may only be returned after completion of the installation in order to ensure that the
quality of the installed product is the same as that of the approved sample.
3.6 Any fitting or item of equipment not specifically mentioned but obviously necessary for the
successful completion of the installation is to be included so as to form a complete working
installation.
4.1 The bid drawings issued with the Supplementary Specification are schematic and do not
necessarily purport to show the exact position, size or details of construction of equipment.
4.2 Bidders must satisfy themselves that the equipment offered by them can be accommodated
in the available space and positioned in such a way that access for maintenance, repairs or
removal is not obstructed.
4.3 Contractor’s drawings: Where indicated in the Supplementary Specification these drawings
are to be prepared by the Contractor at his/her expense in accordance with this document
and shall be on a scale of not less than 1:50. These drawings shall at least consist of:
a. Builder’s work drawings: These shall indicate all work to be done by others (bases,
foundations, holes in concrete and masonry, etc.) as well as the sizes, capacities and positions
of service connections (electrical, water, drainage, etc.) to be provided by others, all in
accordance with the Supplementary Specification.
b. General arrangement drawings: These shall indicate all equipment, distribution systems,
testing and inspection requirements as well as instrumentation positions and access
requirements. During their preparation, the Contractor shall take cognisance of all relevant
architectural, structural, electrical and other service drawings in order to properly co-ordinate
his/her layout. These drawings can be obtained via the Engineer. The drawings shall be
amended as required during the contract period, and up to date copies kept on site for
reference purposes.
4.4 Positions and sizes of air grilles, louvered openings through reinforced concrete beams and
slabs, etc., as indicated on the bid drawings shall be adhered to as far as possible.
Amendments will only be considered if absolutely unavoidable.
a. Shop drawings: These shall be based on the General Arrangement drawings, and shall show
in detail the construction of all the parts of the works, method of assembly where applicable,
of 24
erection and construction materials and connections, welds, gaskets, sealants, fastenings,
reinforcing and all other necessary detail.
b. Electrical drawings: Electrical drawings shall comprise complete control and power wiring
diagrams, as well as front and side elevations giving major dimensions of control panels as
well as instrumentation and switch position layouts.
c. As-Built drawings and wiring diagrams: These are up-to-date approved drawings at the
completion of the contract. Bidders shall allow in their price for submitting to the Engineer a
sepia of each of the up-to-date general arrangement drawings, shop drawings, as well as
electrical drawings together with the O&M manuals specified herein.
4.5 Submission of contractor’s drawings: Drawings shall be submitted to the Engineer in an
orderly fashion commencing within the following time limits or as determined by the main
contract programme (where applicable):
Builders work drawings : within 2 weeks of bid acceptance.
General layout drawings : within 4 weeks of bid acceptance.
Shop drawings : within 6 weeks of bid acceptance.
Electrical drawings : within 6 weeks of bid acceptance.
As-built drawings : at completion before first hand-over.
By submitting drawings, the Contractor represents that he/she has determined and verified all site
measurements, site instruction criteria, materials, catalogue numbers and similar data, or will do so,
and that he/she has checked and co-ordinated each of his/her drawings with the requirements of the
works and the contract documents, taking into account drawings of all other relevant disciplines. At
the time of submission, the Contractor shall inform the Engineer in writing of any deviation in the
Contractor’s drawings from the requirements of the supplementary documents. After scrutiny the
Engineer may at his/her discretion and depending on the number of discrepancies, requires
amendment and resubmission prior to approval. Drawings shall be resubmitted until approved prior
to any portion of the works related to the drawings being commenced. Should the Contractor, during
drawing amendment, alter any portion of his/her drawings not specifically required by the Engineer,
he/she shall point this out in writing when resubmitting the drawing. Approval of the Contractor’s
drawings in no way indemnifies him/her from being responsible for the correctness of the drawings
and satisfactory operation of the installation.
4.6 If the Bidder wishes to submit alternative proposals, differing from the Engineer design,
drawings indicating such proposals comprehensively shall be submitted with this Bid.
of 24
5.1 It is the responsibility of the Bidder to visit the site during the bid phase and to familiarise
himself/herself with conditions related to it. If the location of the site is not indicated in the
Supplementary Specification, it can be obtained from the Engineer. No claim for additional
payment related to ignorance of site conditions will be accepted. By submitting a bid, it is
accepted that the Bidder is fully aware of all site conditions as well as the access to it, and has
allowed for this in his/her bid price.
6.1 No deviations or alterations from that of the specification, schedules or drawings shall be
made without first obtaining the written approval of the Engineer.
7.1 The contract works shall proceed concurrently with the building construction or in accordance
with an approved programme in all respects.
7.2 It is essential that the Contractor programmes his/her construction and all other work in
conjunction with the Main Contractor and the main contract programme in order to avoid
possible delays or clashes of trades.
7.3 For direct contracts the Contractor shall submit a detailed programme in the form of a bar
chart based on the contract period and the various activities and components of the
installation. This programme shall be submitted to the Engineer within two weeks of site
hand-over.
8.1 All equipment such as fans, compressors, cooling towers, pumps, etc. shall be selected to be
operated well within the manufacturer’s ratings. Equipment offered for use beyond these
limits will not be considered.
8.2 Bidders must submit manufacturer’s ratings of all equipment offered. Ratings shall be given
in the SI system.
of 24
9.1 The Contractor shall supply and install all notices and warning signs that are required by the
appropriate laws or regulations and by these documents.
Revision 00
Employer consulting engineers
South african national biodiversity optimum engineering consultants
Institute (sanbi)
Rhodes dr, unit 46 - derby ranch
Newlands, 182 derby ranch
Cape town, 7735 northriding 2169
Document control
Project Name APPOINTMENT OF A SERVICE PROVIDER FOR THE COMPLETION OF
The dry room and minor repair work to the seedbank
Facility at the kirstenbosch national botanical garden,
Cape town
Project Number G587/2026
Client Name South African National Biodiversity (SANBI)
ECSA Project Stage Stage 4: General Specifications
Document Type Scope of work and Technical Specifications
Installations Mechanical
OPT File Number OPT19
Compiled reviewed signed approved
NAME T. C Mango D.P Manjonjo N. Muromba
Optimum Optimum Optimum
ORGANISATION Engineering Engineering Engineering
Consultants Consultants Consultants
DESIGNATION Design Engineer Project Engineer Principal Engineer
of 18
Scope of work and technical
Specificaitions for mechanical
Installations
Part 2
of 18
Scope of work and technical specifications for mechanical
Installations
Part 2
Contents
Document control ............................................................................................................................ 1
Scope of work ................................................................................................................................. 4
Applicable codes and standards ................................................................................................ 5
System design requirements ....................................................................................................... 6
Mechanical equipment specification ........................................................................................ 7
Refrigeration system specification ......................................................................................... 10
Electrical installation specification ...................................................................................... 11
Controls and instrumentation ............................................................................................... 12
Installation requirements ........................................................................................................ 13
Testing and commissioning ....................................................................................................... 14
Personnel competency requirements .................................................................................. 15
Quality control .......................................................................................................................... 17
Building works (making good) ............................................................................................... 17
Health, safety & environmental compliance ...................................................................... 17
of 18
1.1 The works comprise the complete supply, installation, testing, commissioning and handover
of a refrigeration-based HVAC system for the Dry Room in Seedbank at the Kirstenbosch,
including all labour, materials, equipment, tools, transport, supervision and specialist services
required for a fully functional installation.
1.2 The Contractor shall supply and install a commercial refrigeration condensing unit, matched
to a double-skin DX Air Handling Unit complete with cooling coil, electric heater bank, plug
fan, filters, HEPA filtration, heat recovery section, monitoring sensors, Carel controller,
terminal boxes, drip tray and all required supports.
1.3 The works include insulated ductwork tie-ins to the existing ducting network, including
flanges, gaskets, supports, suspension systems and testing, in accordance with approved
drawings and specifications.
1.4 Refrigeration works shall include copper pipework, insulation, pipe trays, refrigerant charge,
driers, valves, refnets, sight glass, solenoid valves, oil traps and all accessories required for a
complete, leak-free and serviceable system.
1.5 Electrical works shall include power cabling, isolators, circuit breakers, control panel DB, over-
/under-voltage protection, control wiring, interlocks and all wiring required for safe automatic
operation.
1.6 The Contractor shall allow for craneage, hoisting, rigging, positioning and installation of all
new equipment, including safe removal and disposal of existing AHU, condenser and
dehumidifier units.
1.7 Testing, commissioning, as-built drawings, manuals, end-user training and electrical and
refrigeration Certificates of Compliance shall form part of the handover.
1.8 Additional works include VRV and freezer room repairs, door repairs, plumbing installations,
hydroboil replacement, monitoring system installation and making good building works.
of 18
1.9 System Description
The system provides controlled low-temperature air to the Dry Laboratory to maintain
environmental conditions suitable for long-term seed storage and handling. Key equipment
includes:
All components must be new, unused, compliant with relevant SANS, ASME, EN, and ISO
standards, and installed in accordance with accepted engineering practice.
1.10 Contractor Responsibilities
The Contractor shall:
data
2.1 Refrigeration Standards
SANS 10147 – Refrigeration and Air-Conditioning Installations
EN 378 – Safety Requirements for Refrigerating Systems
ISO 5149 – Refrigeration Safety Standard
of 18
2.2 Electrical Standards
SANS 10142-1 – Wiring of Premises
IEC 60364 – Low Voltage Installations
2.3 Mechanical Standards
ASME B31.5 – Refrigeration Piping & Heat Transfer Components
ISO 559 – Copper & Copper Alloy Tubes
SMACNA Ductwork Standards
2.4 Quality & Compliance
ISO 9001 – Quality Management
ISO 14001 – Environmental Management
OHS Act & Construction Regulations
3.1 Environmental Performance Targets
The HVAC-refrigeration system shall achieve the following:
Parameter Requirement
AHU Airflow 303 L/s
Cooling Duty (DX Coil) ≥20.89 kW
Off-coil Temperature –10.4°C
Refrigerant Type R410A
Total Refrigerant Charge ~18.5 kg (as per model calculation)
Evaporating Temperature –27°C
Ambient Design Condition 32°C
3.2 Operating Conditions
of 18
The system must maintain stable cooling performance under variable load with inverter regulation,
ensuring:
Continuous operation from –45°C to +10°C evaporating temperature
High subcool degrees as per model tables
Safe oil return under all running conditions
Proper superheat and subcooling tuning during commissioning
4.1 Condensing Unit – Model LREQ20BY1
A low-temperature condensing unit incorporating:
Scroll compressors (hermetically sealed)
Variable-speed inverter capacity control
R410A refrigerant
Sound pressure approx. 63 dBA
Operating range: –45°C to +10°C evaporating temperature
Ambient operating range per model table
High subcooling characteristics (as per technical table)
Mechanical Construction Requirements:
Weather-resistant coated steel casing
Cross-fin coil heat exchanger
Propeller fans with direct drive motors
Integrated electronic control module
Refrigerant receiver where required
Anti-vibration mounts
Performance Requirements:
of 18
Subcool degrees per published matrix
COP values in accordance with model performance tables
4.2 DX Air Handling Unit – Model MAH C
Factory-built double-skin AHU including:
Double-skin 50 mm insulated panels
Supply airflow: 303 L/s
DX cooling coil (8 rows/8 fins)
Electric heater bank: 9 kW
Plug fan: 1 x K3G310P
Primary, secondary, and HEPA filters
Drain pan and drainage connections
Access doors, lighting, manometers, and inspection panels
Materials:
Stainless steel frame 304 for coil housing
Copper tubes with aluminium fins
Condensate tray in stainless steel
Powder-coated external surfaces
4.3 Cooling Coil Specification
Type: DX
Cooling duty: 20.89 kW
Face velocity: 2.16 m/s
Air-in: 25.5°C DB / 18°C WB
Air-out: approx. –10.4°C DB
Coil configuration: 8 rows × 8 fins
Tube diameter: 9.53 mm
Fin spacing: 14 FPI
Refrigerant velocities: ~13.40 m/s gas / 0.13 m/s liquid
of 18
4.4 Electric Heater Bank
Duty: 9 kW
Stainless steel sheathed elements
Over-temperature cut-out
Stage or proportional control capability
4.5 Filtration Section
Primary filter: EU4, 50 mm
Secondary filter: included
HEPA filter: included
Pressure drop: 25 Pa (clean), 150 Pa (dirty)
Manometer and gauge assembly included
4.6 Fan Section
Plug fan, electronically commutated
Airflow: 303 L/s
External static pressure: 250 Pa
Smooth performance curve with low vibration
4.7 Drainage
Sloped stainless steel drain tray
25 mm drain connection
Trap included
of 18
5.1 Piping Requirements
Copper pipework per ASME B31.5:
Liquid line: hard-drawn copper, matching sizes from design
Suction line: hard-drawn copper, matching the design
All bends to be long-radius
Refnet installation:
o Liquid lines: horizontal
o Suction lines: 45° downward to evaporator branch
5.2 Insulation
Suction: min. 3/4" (≈32 mm) wall
Liquid: min. 3/8" wall
Closed-cell elastomeric insulation
UV-resistant covering for outdoor sections
5.3 Refrigeration Accessories
Mandatory components:
Liquid line drier (molecular sieve type)
Suction line drier with replaceable core
Sight glass
Liquid line solenoid before expansion device
Electronic expansion valve or TX valve per design
Oil traps at 5 m vertical intervals
Isolation valves at each evaporator
of 18
5.4 Leak Testing
Nitrogen pressure test to manufacturer design pressure
Bubble test on all joints
Test duration: min. 24 hours
5.5 Vacuum Requirements
As per advanced commissioning guidelines:
Vacuum target: ≤500 microns
Decay test: vacuum must not rise more than 100 microns in 60 minutes
Vacuum measured at liquid service valve
Evacuation via suction line
5.6 Refrigerant Charging
Per model calculation:
Total additional charge: 6.4 kg
Base charge: 11.5 kg
Total system charge: ~18.5 kg
Refrigerant type: R410A
Gwp: 2087.5
6.1 Power Supply
380–415 V, 3-phase, 50 Hz
Dedicated circuit breakers
Separate isolators per major component
Voltage monitoring required
6.2 Control Panel
A fully populated and factory-wired panel including:
of 18
Control transformers if required
Protection relays
Contactor logic
Phase-failure and undervoltage protection
Terminals for:
o Sensors
o Solenoid valves
o P1/P2 communication
o E-stop circuit
6.3 Control Wiring
Includes:
P1/P2 communication pair
Sensor wiring (temperature, humidity, CO2)
Safety cut-out wiring
Relay interlock between condensing unit and solenoid valves
6.4 Earthing
SANS 10142-1 compliant earth bonding
Earth continuity testing
7.1 Sensors
Temperature sensors at AHU coil inlet/outlet
Hygrometer for relative humidity
CO2 sensor for air quality
Differential pressure sensors for filters
7.2 Safety Controls
of 18
Heater over-temperature protection
Fan motor overload protection
Emergency stop
7.3 Environmental Controls
The system shall automatically regulate:
Cooling capacity
Heater capacity
Fan speed
Airflow monitoring
Refrigerant flow via EEV/TXV
8.1 Mechanical Installation
AHU installed level with proper access
Condensing unit on vibration-isolated plinth
Pipe supports per manufacturer spacing
No crushing or deformation of copper tubes
Brazing with nitrogen purge mandatory
8.2 Electrical Installation
Cable trays and conduits neatly routed
All terminations ferruled and labelled
Isolators installed within 1.5 m of equipment
8.3 Workmanship
All workmanship must be:
Neat, aligned, and free of defects
In accordance with SANS standards
Subject to inspection at each stage
of 18
9.1 Mechanical Testing
Pressure testing
Leak testing
Vacuum testing
Refrigerant charging
Oil return verification
9.2 Airflow Testing
Fan speed verification
Air balancing to 303 L/s
Filter pressure drop measurement
9.3 Electrical Testing
Insulation resistance
Earth continuity
Phase rotation
Control logic verification
9.4 Functional Testing
Cooling performance tests
Heater tests
Defrost cycle (if applicable)
Sensor calibration
Alarm testing
9.5 Performance Validation
The system must demonstrate:
Cooling duty ≥20.89 kW
Stable off-coil temperature –10.4°C
of 18
9.6 Handover
Deliver:
Commissioning report
Refrigerant log sheet
COC (Electrical)
COC (Refrigeration)
O&M manuals
As-built drawings
Training certificate
A minimum of one Category B Refrigeration Mechanic shall serve as Site Foreman and must:
Be registered with SAQCC Gas (SARACCA)
Be authorised for Refrigerant Groups A1 and A3
Hold a Trade Test qualification
Be verifiable on the SAQCC Gas registry
Be authorised to issue electronic COCs as per the requirements in the letter 24 February 2023
of 18
of 18
Supply: Cap: Cap: 54 1 Power: Supply: Cap: Cap: 32 m2 3Ph Outdoor 50Hz 1Ph 9.0kW / / Cassette 27.2kWT 24.4kWT Unit Watts 8.0kWT 7.1kWT PASSAGE
220-240 (DVMs 380-415V
/ /
ECO) 50Hz 50Hz
5 m2
2 LADIES m2 GENTS
m2 GERMINATION
m2 OFFICE
900 900
H. C. 230
Power: Supply: Cap: Cap: AC:
32 1Ph / Cassette Watts 8.0kWT 7.1kWT
220-240 (DVMs
/
ECO) 50Hz 20 7
m2 OFFICE
m2 OFFICE
m2 STORE
9 5. 6. 3. 2. 4. UP . 761 11. 10. 1000 2401 2100 All TO 3P 1P P*S T TO TO project
Appointment of a service provider for the
Completion of the dry room and minor repair work
Appointment of a service provider for the
Completion of the dry room and minor repair work
Financial Requirements
Source: G587_2026 - COMPLETION OF THE DRY ROOM AND MINOR REPAIR.zip (TENDER)Bid Bond: Form of guarantee ..................................................................................................................... 85 - 89
C1.4 Occupational Health & Safety Agreement 37(2) ....................................................................... 90 - 91
Part C2 Pricing data
C2.1 Pricing inst
Compliance Requirements
Source: G587_2026 - COMPLETION OF THE DRY ROOM AND MINOR REPAIR.zip (TENDER)No specific requirements found
B-BBEE Details: Opening of tender submissions
C.3.4.1 Unless the two-envelope system is to be followed, open valid tender submissions in the presence of
tenderers’ agents who choose to attend at the time and place stated in the tender data. Tender
submissions for which acceptable reasons for withdrawal have been submitted will not be opened.
C.3.4.2 Announce at the meeting held immediately after the opening of tender submissions, at a venue
indicated in the tender data, the name of each tenderer whose tender offer is opened and, where
applicable, the total of his prices, number of points claimed for specific goals and time for completion
for the main tender offer only.
C.3.4.3 Make available the record outlined in C.3.4.2 to all interested persons upon request.
Any reference to words “Bid” or Bidder” herein and/or in any other documentation shall be construed to have the same meaning as the words
“Tender” or “Tenderer”.
of 119
South African National Biodiversity Institute
Appointment a of Service Provider for the completion of the dry room and minor repair work to the seedbank facility at the Kirstenbosch National
Botanical Garden, Cape Town.
Sanbi G587/2026
C.3.5 Two-envelope system
C.3.5.1 Where stated in the tender data that a two-envelope system is to be followed, open only the technical
proposal of valid tenders in the presence of tenderers’ agents who choose to attend at the time and
place stated in the tender data and announce the name of each tenderer whose technical proposal
is opened.
C.3.5.2 Evaluate functionality of the technical proposals offered by tenderers, then advise tenderers who
remain in contention for the award of the contract of the time and place when the financial proposals
will be opened. Open only the financial proposals of tendere
Section
Source: G587_2026 - COMPLETION OF THE DRY ROOM AND MINOR REPAIR.zip (TENDER)Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Address
2 Cussonia Ave, Brummeria, Pretoria, 0184, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
1
Last checked
28 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Contact
012-002-5201[email protected]www.sanbi.org2 Cussonia Ave, Brummeria, Pretoria, 0184, South Africa
Key Personnel
Get deep intelligence on Construction. Unlock full pricing strategies, bid frequency, and historical win rates.
Learn how to submit a winning bid with these related articles
💡 Want more tendering tips and strategies?
Explore Our Blog