Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Proposal
Delivery Location
1 Jones Road - Kempton Park - Gauteng - 1632
Organization Type
GOVERNMENT
Published
04 Sept 2026
OCDS Reference
ocds-9t57fa-169048
Airports company south africa is procuring a design, supply, installation and commissioning contract to replace the fire water pump stations and the booster pump station at o.R. Tambo international airport, with a 104-week completion period. The contract is an nec3 engineering and construction contract (option a, priced contract with activity schedule) and includes staged key dates, a 5% performance bond, and a 5% retention. Bidders must be cidb-registered and able to work in a live airport environment, with the works to be completed within 104 weeks of the contract date.
Bidders must provide their CIDB registration number in the Form of Offer and Acceptance.
The contract is an NEC3 Engineering and Construction Contract (Option A, priced contract with activity schedule); the offered total of the Prices exclusive of VAT, VAT at 15%, and total inclusive of VAT must be stated.
A performance bond of 5% of the contract value (excluding VAT) must be submitted within 10 working days of notification of award, in the form set out in Annexure B.
The works must be completed within 104 weeks of the contract date, with key dates including: Stage 1 concept design accepted by 6 weeks, Stage 3 design by 16 weeks, Stage 4 issued-for-construction by 24 weeks, long-lead equipment procured by 52 weeks, main fire water pump station sectional completion by 88 weeks, and ATNS booster pump station sectional completion by 96 weeks.
The works will be conducted in a live airport environment at O.R. Tambo International Airport; access to site is subject to permits and approved access.
Retention of 5% of the invoiced amount applies, and delay damages are 0.05% of the contract value per day, up to a maximum of 10% of the contract value.
The Employer provides Contract Works, Contractors Public Liability (limit R100,000,000 per occurrence), and Removal of Lateral Support Liability insurance; the Contractor must maintain insurances as prescribed by the Compensation for Occupational Injuries and Diseases Act No. 130 of 1993.
Date & Time
Monday, 05 October 2026 - 12:00
Venue
https://teams.microsoft.com/meet/379380038252696?p=7M9ebRlAawklGZd1SX Meeting ID: 379 380 038 252 6
Request for Proposal
1 Jones Road - Kempton Park - Gauteng - 1632
04 Sept
2026
Tender Published
Tender was published
05 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
ORTIA 81602026RFP - WATER PUMP STATIONS AND THE BOOSTER PUMP STATION AT ORTIA.pdf
Airports Company South Africa is procuring a contractor to design, supply, install, and commission the replacement of the fire water pump stations and the booster pump station at O.R. Tambo International Airport (ORTIA), with a 24-month contract period. The tender is issued under reference ORTIA8160/2026/RFP and requires bidders to hold a CIDB contractor grading designation of 7ME or higher.
Continue with tenders sharing this issuer, category, or province.
Median Estimate
R 3 614 164
Range
Based on 20 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: Good Manufacturing Practice (GMP), SABS Product Certification, NRCS Certification
AI Document Analysis Stages
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Document being finalised: ORTIA 81602026RFP - WATER PUMP STATIONS AND THE BOOSTER PUMP STATION AT ORTIA.pdf. You don’t need to refresh — this page will pick up the updated review automatically.
Important Dates
Source: ORTIA 81602026RFP - WATER PUMP STATIONS AND THE BOOSTER PUMP STATION AT ORTIA.pdf (RFP){"briefingSession":"{"date":"14 September 2026","time":"10h00am","venue":"Microsoft Teams meeting","is_compulsory":true}"}
Contact Information
Source: ORTIA 81602026RFP - WATER PUMP STATIONS AND THE BOOSTER PUMP STATION AT ORTIA.pdf (RFP){"name":null,"email":"[email protected]","phone":"011 723 1400","department":"representatives after the approval of a","address":"BOOSTER PUMP STATION AT ORTIA FOR A PERIOD OF 24 MONTHS"}
Evaluation Criteria
Source: ORTIA 81602026RFP - WATER PUMP STATIONS AND THE BOOSTER PUMP STATION AT ORTIA.pdf (RFP)Bidders must be registered with the CIDB with a contractor grading designation of 7ME or higher. Joint ventures must have every member registered with the CIDB, with the lead partner meeting the grading requirement. Bidders must be tax compliant and provide a SARS Tax Compliance Status PIN or CSD number. Bidders must not be under any restriction preventing participation in the employer's procurement. Bidders must have the legal capacity to contract and must not be insolvent, in receivership, under business rescue, bankrupt, or subject to legal proceedings. Bidders must submit a completed and signed Form of Offer and Acceptance (C1.1) and meet the functionality threshold of 85/100. Bidders must provide proof of B-BBEE status or other specific goals claimed for preference points.
Compliance Requirements
Source: ORTIA 81602026RFP - WATER PUMP STATIONS AND THE BOOSTER PUMP STATION AT ORTIA.pdf (RFP)No specific requirements found
B-BBEE Minimum Level: 1
Points Allocation: 80 points
B-BBEE Details: 0(1− )
Pmin
Where:
Ps = Points scored for price of tender under consideration
Pt = Price of tender under consideration
Pmin = Price of lowest acceptable tender
Evaluation of Preference
ACSA will score specific goals out of 20 in accordance with the PPP Regulations 2022/2023. If a
bidder fails to meet the Specific goals as outlined on the table below and to submit proof, the
bidder will score zero (0) out of 20 .ACSA will not disqualify the bidder. See below Specific goals
that must be achieved for this bid:
Paste applicable goal here:
Number of
Specific Goals points
(80/20 system)
B-BBEE Status Level 1 5
B-BBEE Status Level 2 4.5
B-BBEE Status Level 3 4
B-BBEE Status Level 4 3
of 74
Confidential
Confidential
B-BBEE Status Level 5 2
B-BBEE Status Level 6 0.5
B-BBEE Status Level 7 0.3
B-BBEE Status Level 8 0.1
Black youth majority-owned entities 5
Black women majority-owned entities 5
Company majority owned by people with disabilities 5
Non- compliant contributor 0
Bidder to provide proof to support The Preference Points being Claimed.
a)Provide original or certified copy Valid sworn Affidavit OR
b) B-BBEE Certificate from a SANAS accredited rating agency
accredited agency must be provided
as prescribed by the B-BBEE Act and its relevant/most recent Codes of Good Practice
a) Any other supporting information..
In order to score for preference points, bidder must provide
Supporting information (proof)that is relevant to the specific goals.
C.3.12 Insurance provided by the employer
Refer to Contract Data
C.3.13 C.3.13 Acceptance of tender offer
Accept the tender offer; if in the opinion of the employer, it does not present any risk and only
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
NEC Replacement of Fire Water Pump Stations and Booster Pump Station.pdf
Analysis completed but response format was invalid
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
Airports Company South Africa (ACSA)Contact Person
davis.mthethwa
Phone
010-207-2594
[email protected]
Address
1 Jones Road - Kempton Park - Gauteng - 1632
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
2
Last checked
08 Sept 2026
AI status
Enhanced
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Win ACSA tenders with AI Matching Engine, airport-infrastructure intelligence, compliance analysis, and application support for aviation operations.
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Description
Source: NEC Replacement of Fire Water Pump Stations and Booster Pump Station.pdfThe works are the design, supply, installation, and commissioning for the replacement of the fire water pump stations and the booster pump station at O.R. Tambo International Airport, as fully set out in the Works Information (Part C3). The service and works will be conducted in a live airport environment. The site boundaries are O.R. Tambo International Airport.
Contact Information
Source: NEC Replacement of Fire Water Pump Stations and Booster Pump Station.pdf (unknown)Buhle Mnguni: D: +27 (0)11 723 1400, M: +27 (0)74 535 9075, [email protected]. The Employer is Airports Company South Africa SOC Limited, registered office at OR Tambo International Airport, 3rd Floor ACSA North Wing Offices, Kempton Park, 1627.
Submission Guidelines
Source: NEC Replacement of Fire Water Pump Stations and Booster Pump Station.pdf (unknown)Returnable documents: the Form of Offer and Acceptance (C1.1) must be completed, signed, and submitted with the offered total of the Prices exclusive of VAT, VAT at 15%, and the total inclusive of VAT. The tenderer's CIDB registration number must be provided. A Schedule of Deviations must be attached if any deviations are proposed. The performance bond (Annexure B) must be submitted within 10 working days of notification of award. Failure to provide required securities, bonds, guarantees, proof of insurance, or other documentation within two weeks of receiving the completed agreement constitutes repudiation.
Evaluation Criteria
Source: NEC Replacement of Fire Water Pump Stations and Booster Pump Station.pdf (unknown)The evaluation criteria are not stated in the provided document. The contract is an NEC3 Engineering and Construction Contract with main Option A (priced contract with activity schedule). No scoring split, minimum qualifying thresholds, or preference point system is specified.
Technical Specifications
Source: NEC Replacement of Fire Water Pump Stations and Booster Pump Station.pdf (unknown)The works comprise the design, supply, installation, and commissioning for the replacement of the fire water pump stations and the booster pump station at O.R. Tambo International Airport, as set out in the Works Information (Part C3). The service and works will be conducted in a live airport environment. The site boundaries are O.R. Tambo International Airport. Key dates: Stage 1 confirmation, surveys, hydraulic design basis and coordinated Stage 2 concept design accepted within 6 weeks of Contract Date; Coordinated Stage 3 design, hydraulic model, discipline calculations, design-risk review and application/cloud architecture accepted within 16 weeks; Stage 4 issued-for-construction design, software/cloud documentation and construction readiness accepted within 24 weeks; Long-lead pumps, diesel systems, electrical, control, fire-protection and monitoring equipment procured and available for FAT or delivery within 52 weeks; Main fire water pump station permanent works installed and ready for site acceptance and performance testing within 80 weeks; Main fire water pump station Sectional Completion achieved within 88 weeks; ATNS booster pump station permanent works installed and ready for site acceptance and performance testing within 90 weeks; ATNS booster pump station Sectional Completion achieved within 96 weeks; Operations and maintenance training completed and complete handover dossier submitted within 100 weeks. The completion date for the whole of the works is 104 weeks after the Contract Date.
Quality Management
Source: NEC Replacement of Fire Water Pump Stations and Booster Pump Station.pdfThe Contractor must implement and maintain a quality management system with the requirements stated in the Works Information. A quality plan must be submitted for acceptance within 4 weeks of the Contract Date. The Project Manager may instruct the Contractor to correct a failure to comply with the quality plan; this instruction is not a compensation event. The defects date is 52 weeks after Completion, and the defect correction period is 2 weeks.
Financial Requirements
Source: NEC Replacement of Fire Water Pump Stations and Booster Pump Station.pdf (unknown)The contract is a priced contract with activity schedule (NEC3 Option A). The offered total of the Prices exclusive of VAT, VAT at 15%, and total inclusive of VAT must be stated in the Form of Offer and Acceptance. Payment assessments occur between the 7th calendar day of each successive month, with payment within 4 weeks of receipt of a valid tax invoice. Interest on late payment is 0.5% above the prime rate. A performance bond of 5% of contract value excluding VAT is required, to be submitted within 10 working days of notification of award. Retention of 5% of the invoiced amount applies. Delay damages are 0.05% of contract value per day, up to a maximum of 10% of contract value.
Compliance Requirements
Source: NEC Replacement of Fire Water Pump Stations and Booster Pump Station.pdf (unknown)The tenderer's CIDB registration number must be provided in the Form of Offer and Acceptance. The Contractor must maintain insurances as prescribed by the Compensation for Occupational Injuries and Diseases Act No. 130 of 1993, with a limit of indemnity of not less than R[●]. The Employer provides Contract Works, Contractors Public Liability (limit R100,000,000 per occurrence), and Removal of Lateral Support Liability insurance. No specific B-BBEE, CSD, or tax compliance requirements are stated in the provided document.
Health & Safety
Source: NEC Replacement of Fire Water Pump Stations and Booster Pump Station.pdfThe Employer provides Contract Works, Contractors Public Liability, and Removal of Lateral Support Liability insurance, with a Public Liability limit of R100,000,000 per occurrence. The Contractor must maintain insurances as prescribed by the Compensation for Occupational Injuries and Diseases Act No. 130 of 1993 and common law liability for employees, with a limit of indemnity of not less than R[●].
Environmental
Source: NEC Replacement of Fire Water Pump Stations and Booster Pump Station.pdf (unknown)Annexure A provides one-in-ten-year-return weather data from the SA Weather Bureau. If any of the listed weather measurements (cumulative rainfall, days with rain >10mm, days with min air temp <0°C, days with snow lying) are more adverse than stated, the Contractor may notify a compensation event.
Contractual Terms
Source: NEC Replacement of Fire Water Pump Stations and Booster Pump Station.pdfAnnexure D contains insurance clauses for landside construction contracts where the awarded contract value does not exceed R150 million, construction period does not exceed 36 months, and defects liability period does not exceed 24 months. The Employer effects and maintains principal controlled insurance in the joint names of the Employer, Contractor, and subcontractors, including Contract Works insurance for the full value of the works, with limitations for open trenches and exposed layer works. The Contractor must comply with claim procedures, including notifying the Employer of incidents, obtaining approval for settlements, and ensuring adequate insurance for off-site manufacturing.
Special Conditions
Source: NEC Replacement of Fire Water Pump Stations and Booster Pump Station.pdf (unknown)Annexure B provides a pro forma Performance Bond (demand guarantee) for use with Option X13. The bond is an unconditional, on-demand guarantee from a bank or insurer accepted by the Project Manager and Employer, for 5% of contract value excluding VAT, to be submitted within 10 working days of notification of award. The bond must remain valid until the end of the contract period, and if it expires earlier, the Contractor must extend it or the Employer may claim the full amount as cash security.
Section
Source: NEC Replacement of Fire Water Pump Stations and Booster Pump Station.pdfThe evaluation criteria are not stated in the provided document. The Schedule of Deviations is to be completed by the Employer prior to contract award, and only deviations permitted in terms of the Conditions of Tender are allowed. A tenderer's covering letter must not be included in the final contract document.
Data conflicts
None detected
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Repair and installation of machinery and equipment. Unlock full pricing strategies, bid frequency, and historical win rates.