Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Drakensberg Pumped Storage Schemes - - uThukela District Municipality -
Organization Type
GOVERNMENT
Published
04 Sept 2026
OCDS Reference
ocds-9t57fa-169050
ESKOM is procuring building and infrastructure maintenance services at the drakensberg pumped storage scheme on an as-and-when-required basis over a five-year period. The document provided is an ESKOM employee non-disclosure and confidentiality agreement (NDA) for the project
Comply with Eskom's Employees' Right of Refusal to Work in an Unsafe Situation procedure (Doc 240-43848327).
Comply with Eskom Personal Protective Equipment (PPE) standard (Doc 240-44175132)—all PPE must meet minimum requirements in clause 3.1.1 and must be supplied free of charge.
Employees have a duty to identify and report unsafe situations and to co-operate with the employer where safety is concerned.
PPE must not be used where it has expired or is damaged; old or unserviceable PPE must be destroyed on replacement.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Thursday, 01 October 2026 - 10:00
Venue
https://teams.microsoft.com/meet/359938769603162?p=2IKrfmeXGKd1stOCr2
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Categories
Request for Bid(Open-Tender)
Drakensberg Pumped Storage Schemes - - uThukela District Municipality -
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
Description
04 Sept
2026
Tender Published
Tender was published
01 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Invitation to Tender ITT Drankesberg PSS.pdf
Analysis completed but response format was invalid
Attachment 5 Technical Evaluation.pdf
No summary available
Attachment 6 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.xlsx
Provision of building and infrastructure maintenance services at the Drakensberg Pumped Storage Scheme on an as-and-when-required basis for a period of five years. The contract is issued by Eskom in KwaZulu-Natal, with a closing date of 1 October 2026 at 10:00.
Attachment 3 Scope of work Building Maintenance.pdf
Provision of building and infrastructure maintenance services on an as-and-when-required basis for Eskom's Peaking power stations, including Drakensberg, Ingula, Vanderkloof, Gariep, Port Rex and Gourikwa, for a period of five years. The scope covers preventative, corrective, reactive, emergency, refurbishment and minor construction services for buildings, civil infrastructure, utilities and support facilities.
Attachment 4 TSC3.pdf
Eskom is procuring building and infrastructure maintenance services at the Drakensberg Pumped Storage Scheme (and other peaking sites) on an as-and-when-required basis for five years, using an NEC3 Term Service Contract with Task Orders. The contract is a priced contract with a rate-based price list, and bidders must complete the pricing data and contract data parts.
Attachment 13 Eskom - Standard Conditions of Tender.pdf
Eskom is procuring building and infrastructure maintenance services at the Drakensberg Pumped Storage Scheme on an as-and-when-required basis for a five-year period. The tender is governed by Eskom's Standard Conditions of Tender, which set out strict submission, compliance, and evaluation requirements.
Attachment 8 240-105658000 Supplier Quality Management Specification.pdf
Analysis completed but response format was invalid
Attachment 12 Supplier Declaration of Interest Template (1).pdf
Eskom is procuring building and infrastructure maintenance services at the Drakensberg Pumped Storage Scheme on an as-and-when-required basis for a five-year period. The tender includes a Supplier Declaration of Interest form that bidders must complete and submit.
Attachment 1- Tax Evaluation questionnaire.pdf
Eskom is procuring building and infrastructure maintenance services at the Drakensberg Pumped Storage Scheme on an as-and-when-required basis for a five-year period. The tender is issued in KwaZulu-Natal with a closing date of 1 October 2026.
Attachment 9 Safety.pdf
Eskom is procuring building and infrastructure maintenance services at the Drakensberg Pumped Storage Scheme on an as-and-when-required basis for a five-year period. The contract covers maintenance work at the KwaZulu-Natal site, with services to be delivered under Eskom's occupational health and safety framework.
Attachment 11 Non-Disclosure Agreement (NDA) Generic Template - 06 August 2024.pdf
Provision of building and infrastructure maintenance services at the Drakensberg Pumped Storage Scheme on an as-and-when-required basis for a period of five years, issued by Eskom Holdings SOC Ltd. The contract covers maintenance work at Eskom peaking sites in KwaZulu-Natal.
Attachment 14 SDLI Strategy.pdf
This document is a tender for building and infrastructure maintenance services at the Drakensberg Pumped Storage Scheme, issued by Eskom. The contract is for a period of five years. The document outlines the scope of work, evaluation criteria, and requirements for bidders, including B-BBEE status and local production considerations.
Attachment 10 Peaking OHS Baseline risk assessment - Rev.6 2025.04.30.xlsx
No summary available
Attachment 2 - E-Tendering Training Acknowledgement Form.pdf
Provision of building and infrastructure maintenance services at the Drakensberg Pumped Storage Scheme on an as-and-when-required basis for a period of five years, issued by Eskom in KwaZulu-Natal.
Attachment 7 240-68099512 Form A_Cat 3_ Rev 9.docx
Eskom is procuring building and infrastructure maintenance services at the Drakensberg Pumped Storage Scheme on an as-and-when-required basis for a five-year period. The tenderer must acknowledge and accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001 standard.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 4 460 369
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
This specification defines the minimum quality requirements for all existing and potential Eskom suppliers, covering selection, evaluation, vendor registration, management, monitoring, assessment and auditing. It applies to all Eskom divisions, subsidiaries, suppliers and sub-suppliers, and forms part of all Eskom procurement processes. Suppliers must conform to ISO 9001 and continually improve their QMS.
Contact Information
Source: Attachment 8 240-105658000 Supplier Quality Management Specification.pdf (unknown){"name":null,"email":null,"phone":null,"department":"Supply Chain Management","address":null}
Submission Guidelines
Source: Attachment 8 240-105658000 Supplier Quality Management Specification.pdf (unknown)Returnable documents: Form A (Tender and Contract Quality Requirements for Supplier Quality Management Specification 240-105658000/QM 58 and ISO 9001) must be completed, signed and submitted with the bid. The List of Tender Returnables (240-12248652) specifies the exact quality documentation required for the applicable category (1, 2, 3 or 4).
Evaluation Criteria
Source: Attachment 8 240-105658000 Supplier Quality Management Specification.pdf (unknown)Quality assessment criteria are selected and completed by an Eskom Quality representative. Suppliers are evaluated against the quality requirements of this specification and ISO 9001. Supplier capability and capacity assessments are performed prior to contract award for suppliers providing products or services with high risk to operational sustainability, working on critical plant and equipment, supplying critical plant items, or providing special processes.
Technical Specifications
Source: Attachment 8 240-105658000 Supplier Quality Management Specification.pdf (unknown)This specification applies to all Eskom suppliers and sub-suppliers and forms part of all Eskom RFIs, RFQs and RFPs. Suppliers must develop, implement, maintain and continually improve a Quality Management System (QMS) based on ISO 9001. The QMS must conform to the latest ISO 9001 standard and include documented information such as a quality manual, quality plans, work procedures, work instructions, method statements and workflow documentation. Unless excluded by the quality category, the QMS must carry a valid ISO 9001 certificate from an accredited certification body. Suppliers must inform Eskom of any proposed changes to the QMS or staff that affect the quality system prior to implementation. Sub-suppliers must also comply with these requirements, and the main supplier is responsible for managing sub-supplier quality programmes.
Methodology
Source: Attachment 8 240-105658000 Supplier Quality Management Specification.pdfMethod statements: Suppliers must prepare method statements for quality-related activities. The QCP/ITP must include clear descriptions of equipment and locations, identification of quality verification activities and stages, reference documents and procedures, acceptance criteria, and certifying documents. Preservation work plans and execution performance evaluation are required for all parties involved in material transportation, handling, or storage.
Experience & Qualifications
Source: Attachment 8 240-105658000 Supplier Quality Management Specification.pdfQuality audits and quality performance reviews must be carried out by trained, accredited, and experienced personnel in accordance with documented procedures.
Quality Management
Source: Attachment 8 240-105658000 Supplier Quality Management Specification.pdfQuality Management System: Suppliers must develop, implement, maintain and improve a QMS conforming to ISO 9001. The QMS must include documented information such as a quality manual, quality policy, quality objectives, control of documented information, internal audit procedures, control of nonconforming outputs, and nonconformity and corrective action procedures. Suppliers must submit internal and external audit reports, a draft contract quality plan (CQP) specific to the scope of work, and, where applicable, an example inspection and test plan (ITP) or quality control plan (QCP). Contract Quality Plans must comply with ISO 10005 and include management of records, access for inspection, final documentation submission, special processes (welding, NDT, etc.), and training requirements. Quality Control Plans/ITPs must be reviewed and accepted by Eskom, include hold and witness points, and become addendums to the contract once signed. Quality kick-off meetings are held at the start of the contract, with 14 days' notice for coordination meetings. Mandatory pre-inspection meetings are convened by Eskom or its inspection agency. Eskom may appoint resident quality inspectors and may perform surveillance or audits. Suppliers must provide workspace at no cost for Eskom inspectors.
Compliance Requirements
Source: Attachment 8 240-105658000 Supplier Quality Management Specification.pdf (unknown)ISO 9001 certification: valid certificate from an accredited certification body required unless specifically excluded by the quality category. Form A (Tender and Contract Quality Requirements) must be completed and signed. Quality documentation per the applicable category (1, 2, 3 or 4) as specified in the List of Tender Returnables (240-12248652).
Health & Safety
Source: Attachment 8 240-105658000 Supplier Quality Management Specification.pdfReferences include Eskom's Safety, Health, Environment, and Quality (SHEQ) Policy (32-727) and IAEA Safety Standard GS-R-3.1. No specific health and safety requirements are detailed in this specification.
Contractual Terms
Source: Attachment 8 240-105658000 Supplier Quality Management Specification.pdfPreservation requirements: The supplier must implement a documented preservation management programme covering identification, preservation, and control of all physical assets, including valves, electrical motors, mechanical and rotating equipment, piping, instrumentation, flange faces, gaskets, coatings, insulation, and other materials. Preservation requirements must be clearly documented in purchase orders and work authorisations, and communicated to all project functional areas. Sub-supplier responsibilities for preservation must be clearly designated. Eskom has free and unrestricted access to all preservation records for inspection and audit.
Section
Source: Attachment 8 240-105658000 Supplier Quality Management Specification.pdfQuality criteria for selection and evaluation are defined by this specification. Suppliers are assessed on their QMS conformity to ISO 9001 and their capability and capacity to deliver the required quality. Capability and capacity assessments are performed prior to contract award for high-risk supplies or services.
Evaluation Criteria
Source: Attachment 10 Peaking OHS Baseline risk assessment - Rev.6 2025.04.30.xlsx (unknown)No eligibility criteria specified
Technical Specifications
Source: Attachment 10 Peaking OHS Baseline risk assessment - Rev.6 2025.04.30.xlsx (unknown)Cell A3: Occupational Health and Safety Baseline risk assessment template
Compliance Requirements
Source: Attachment 10 Peaking OHS Baseline risk assessment - Rev.6 2025.04.30.xlsx (unknown)No specific requirements found
Important Dates
Source: Attachment 13 Eskom - Standard Conditions of Tender.pdf (TENDER)Closing date and time: 2026-10-01T10:00:00.000Z (SAST). A site visit and/or clarification meeting may be compulsory; details are stated in the Tender Data. Failure to attend a compulsory meeting results in disqualification.
Contact Information
Source: Attachment 13 Eskom - Standard Conditions of Tender.pdf (TENDER)All communication must be directed to the Eskom Representative identified in the Invitation to Tender, in writing, in English. Queries must not be addressed to any other Eskom official. Responses to clarifications will be published on the Eskom Tender Bulletin and NT e-Tender Portal.
Submission Guidelines
Source: Attachment 13 Eskom - Standard Conditions of Tender.pdf (TENDER)Submission must be made via the Eskom Tender Bulletin e-tendering page or, if stated in the Tender Data, by depositing the original and one copy into the tender box at the specified address. Electronic submission must be finalised before the closing time; no late tenders are accepted. Paper tenders must be sealed in an outer package marked 'Confidential' with the tender number, tenderer details, and contact information. The original and copy must be in separate packages marked 'ORIGINAL' and 'COPY'. Tenders must be in English, completed in ink, and signed by an authorised signatory. Returnable forms must be fully completed and submitted by the closing time; mandatory returnables cannot be submitted later. The Acknowledgement Form must be completed and submitted. Proof of authority is required if an agent submits on behalf of a principal. Tenders must remain valid for the validity period stated in the Tender Data.
Evaluation Criteria
Source: Attachment 13 Eskom - Standard Conditions of Tender.pdf (TENDER)Evaluation follows the PPPFA 80/20 or 90/10 preference point system, with points for price and specific goals. Functionality may be scored if stated in the Tender Data, and tenderers must meet the minimum functionality threshold to proceed. B-BBEE level is scored from the CSD report or certificate/affidavit; if not provided at closing, the tenderer scores zero for B-BBEE points but is not disqualified. Specific goals are scored with reference to supporting documentation; failure to submit proof results in zero points for that element. Eskom will not measure a criterion twice (no double dipping). The tenderer with the highest combined price and preference points is ranked first, unless objective criteria are applied in accordance with Section 2(1)(f) of the PPPFA. Financial analysis may be conducted to assess risk; if risk is too high and no mitigating factors exist, the tenderer may not be considered for award.
Technical Specifications
Source: Attachment 13 Eskom - Standard Conditions of Tender.pdf (TENDER)The scope is the provision of building and infrastructure maintenance services at the Drakensberg Pumped Storage Scheme on an as-and-when-required basis for a period of five (5) years. Tenderers must not subcontract 100% of the scope of work; any tender based on 100% subcontracting is disqualified. Tenderers must comply with relevant legislation including CIDB regulations, PPPFA, B-BBEE Codes, COIDA, OHS Act, and Eskom's SHEQ requirements. Proof of SHEQ systems, policies, and capabilities must be provided. If CIDB grading is a criterion, registration is mandatory at closing or within 21 working days thereafter. Contract Skills Development Goals (CSDG) and Contract Participation Goals (CPG) may apply to the contract.
Quality Management
Source: Attachment 13 Eskom - Standard Conditions of Tender.pdfTenderers must provide proof of safety, health, environmental, and quality (SHEQ) systems, policies, and capabilities at closing or contract award. All costs and personnel associated with SHEQ must be reflected in the tender. Tenderers must comply with Eskom's SHEQ requirements and relevant legislation such as the OHS Act.
Pricing Schedule
Source: Attachment 13 Eskom - Standard Conditions of Tender.pdfPrices must be in South African Rand and include all duties, taxes (including VAT), and levies. Rates and prices are fixed for the contract duration unless otherwise stated. Tenderers must complete the pricing schedule or bill of quantities as specified. Arithmetical errors will be corrected; the amount in words prevails. Tenderers must not use correction fluid or tape. If security for performance is required, indicate at least two financial institutions. Eskom may conduct financial analysis to assess risk.
Financial Requirements
Source: Attachment 13 Eskom - Standard Conditions of Tender.pdf (TENDER)Prices must be in South African Rand and include all duties, taxes (including VAT), and levies applicable 14 days prior to closing. Rates and prices are fixed for the contract duration unless otherwise stated. Tenderers must provide rates and prices in the pricing schedule or bill of quantities as specified. If security for performance is required, tenderers must indicate at least two financial institutions they intend to approach. Eskom may conduct a financial analysis of the tenderer's statements to assess risk. Arithmetical errors will be corrected; the amount in words prevails over figures. Tenderers must not use correction fluid or tape on documents.
Compliance Requirements
Source: Attachment 13 Eskom - Standard Conditions of Tender.pdf (TENDER)Tenderers must be registered on the Central Supplier Database (CSD) and provide a valid B-BBEE certificate/affidavit or CSD report at closing. A valid SARS tax compliance status (tax pin or TCS) is required. Tenderers must not be under any restriction to do business with Eskom or State-Owned Companies. If CIDB grading is applicable, proof of CIDB registration is mandatory at closing; if only an application is available, submit it by closing and actual proof by contract award. Tenderers must complete and submit the SDL&I Undertaking by contract award. Returnable forms include: SBD 4 (Declaration of Interest), SBD 9 (Certificate of Independent Bid Determination), SBD 6.1 (Preference Points Claim), SBD 6.2 (Declaration for Local Production and Content), SBD 8 (Declaration of Bidder's Past Supply Chain Management Practices), and Authority to Sign / Board Resolution. Proof of authority to act as agent is required if applicable. Misrepresentation or falsification of information leads to disqualification and may be reported to the B-BBEE Commission.
Health & Safety
Source: Attachment 13 Eskom - Standard Conditions of Tender.pdfTenderers must provide proof of SHEQ systems, policies, and capabilities. Compliance with the OHS Act and Eskom's SHEQ requirements is mandatory. All SHEQ-related costs must be included in the tender. Contract Skills Development Goals (CSDG) and Contract Participation Goals (CPG) may apply, requiring engagement of targeted enterprises and skills development.
Contractual Terms
Source: Attachment 13 Eskom - Standard Conditions of Tender.pdfEskom may cancel the tender at any time before contract conclusion and will provide written reasons on request. Eskom may accept or reject any variation, deviation, or alternative tender, and may accept the whole or part of the tender. Eskom may enter into mandated negotiations with selected tenderers. The successful tenderer must sign the Form of Agreement. Tender validity must be maintained for the period stated; if validity expires before contract conclusion, the process is deemed concluded without award. Tenderers must treat all procurement matters as confidential and use documents only for preparing the tender. Tenderers must comply with all relevant legislation and Eskom's SHEQ requirements. The successful tenderer may be required to provide cataloguing information and label materials per Eskom specifications.
Section
Source: Attachment 13 Eskom - Standard Conditions of Tender.pdfEvaluation follows the PPPFA 80/20 or 90/10 system. Functionality may be scored if stated, with a minimum threshold to proceed. Specific goals are scored with supporting documentation; failure to submit proof results in zero points. Eskom will not measure a criterion twice. Price is evaluated per the Tender Data, considering factors like CPA, FOREX, and discounts. Arithmetical errors are corrected; the amount in words prevails. The highest combined price and preference points wins, unless objective criteria are applied.
Important Dates
Source: Invitation to Tender ITT Drankesberg PSS.pdf (TENDER)Closing Date: 01 October 2026 at 10:00 South African Standard Time. Compulsory Clarification Meeting: 14 September 2026 at 11:00 via Microsoft Teams. Tender validity period: 12 weeks from the closing date and time.
Contact Information
Source: Invitation to Tender ITT Drankesberg PSS.pdf (TENDER)Eskom Representative: Sinazo Sizani, Tel: 021 941 5763, E-mail: [email protected]. Procurement Manager: Ms. Zodidi Mavume. Fraud and corruption reporting: 0800 11 2722 / [email protected].
Submission Guidelines
Source: Invitation to Tender ITT Drankesberg PSS.pdf (TENDER)Tenders are to be submitted electronically via Eskom E-tendering site by the stipulated closing date and time. The tenderer must upload the tender via Eskom Tender bulletin site on the Eskom E-tendering page. The documents need to be uploaded under the folder Technical, Commercial, Financial, and other. All documents need to be submitted in a PDF format (The upload size per document is 500 megabytes and total submission is restricted to 4 gigabytes). The price list needs to be submitted in PDF. No Zip/condense files can be uploaded. No hard copy will be accepted. If for some reason you resubmit your tender, then the latest version of the tender submitted will only be accepted and all previous submission/s will be null and void. Please ensure that the submission status is indicated as complete. Supplier Help Manual guide and video can be found on Eskom E-Tendering.
Evaluation Criteria
Source: Invitation to Tender ITT Drankesberg PSS.pdf (TENDER)Functionality requirements are applicable. Tenderers who do not meet the threshold of 70% for functionality scoring will be disqualified. The following criteria will be applicable for this transaction under functionality criteria: The table below defines the Mandatory Technical Evaluation Criteria on Tender Evaluation. Tenderers shall submit all documentation and evidence as specified below. These criteria shall be evaluated on a compliance basis (Yes/No). Failure to meet any mandatory requirement shall result in disqualification from further evaluation. Tenderers who do not meet all mandatory criteria shall not proceed to the technical (qualitative) evaluation stage. Evaluation shall be based on a weighted scoring system and a minimum threshold score of 70% must be achieved to be considered technically acceptable. The table below defines all Qualitative Technical Evaluation Criteria to be submitted by the Contractor by the tender closing date. Should the Contractor fail to submit these criteria by the tender closing date, the Contractor will score zero for each of the criterion stipulated in the table below. Prices will be evaluated as follows: 1. Inclusive of VAT; 2. Corrected for arithmetical errors; 3. Excluding contingencies in any bill of quantities or activity schedule; 4. Adjusted for any other acceptable variations, deviations, or alternative tenders submitted; and 5. Making a comparison of the Net Present Value of each adjusted tender based on the tendered programme (if provided) and prices, on the estimated effect of Price Adjustment Factors and rate of exchange fluctuations (if applicable) and on other evaluation parameters relating to uncertainty and risk, where applicable. 6. Unconditional discounts will be taken into account for evaluation purposes. 7. Conditional discounts will not be taken into account for evaluation purposes but will be implemented when payment is effected. Prices will be scored out of 80/90 points. Specific goals will be scored out of 20/10 points in accordance with the PPPFA. If a tenderer fails to submit evidence of its points claim for a Specific Goal, it will not be disqualified. However, it will be awarded 0 points for that Specific Goal. Tenderers will be ranked by applying the preferential point scoring for the 80/20 OR 90/10 system. Eskom will add the score from Pricing and Specific Goals together and rank the suppliers from the highest to the lowest. A maximum of 20/10 points may be awarded to a tenderer for the specific goal specified for the tender. The points scored for the specific goal must be added to the points scored for price and the total must be rounded off to the nearest two decimal places. Subject to section 2(1)(f) of the Preferential Procurement Policy Framework Act, the contract must be awarded to the tenderer scoring the highest points. NB: The following documents are required to claim preference points: Valid B-BBEE certificate issued by a SANAS accredited verification agency / sworn affidavit / CIPC affidavit, Proof of ownership / shareholding (preferably CIPC documentation) inclusive of shareholding breakdown, Certified ID copies of shareholder(s), Proof of Disability (where applicable). Tenderer failing to provide documentation for the allocation of preference points will not be disqualified, but may only score point out of 80/90 for price and scores 0 points out of 20/10 for specific goals.
Technical Specifications
Source: Invitation to Tender ITT Drankesberg PSS.pdf (TENDER)The scope of work includes the provision of building and infrastructure maintenance services at Drakensberg Pumped Storage Scheme on an as-and-when-required basis for a period of five (5) years. The NEC3 Term Service Contract (TSC3) will be used. The contractor must have a CIDB contractor grading of 6CE or 6GB or higher. The contractor must comply with the quality requirements including Category 3 Quality Criteria, Form A Category 3 Rev 9, and Supplier Quality Management specification 240-105658000 (previously QM 58). The contractor must comply with safety requirements including Annexure B H&S Acknowledgement Form, Annexure C1 High Risk OHS Tender Evaluation, Peaking OHS Baseline Risk Assessment, 32-726-02T High Risk OHS Requirements for Peaking Rev3, 32-37 Management of Substance Abuse in the Workplace, 32-95 Occupational Health and Safety Incident Management Procedure, 240-62946386 Driver and Vehicle Safety Management Procedure, Life-Saving Rules Standard Acknowledgement Form, Employees Right of Refusal to Work in Unsafe Situations Procedure, Eskom Personal Protective Equipment (PPE), PPE Non-Compliance Memo, Occupational Health and Safety Risk Assessment Procedure, and Work at height standard.
Pricing Schedule
Source: Invitation to Tender ITT Drankesberg PSS.pdfThe pricing schedule must be completed and submitted in the NEC3 Term Services Contract format. The price list must be submitted in PDF format.
Financial Requirements
Source: Invitation to Tender ITT Drankesberg PSS.pdf (TENDER)For contracts valued below R50,000,000 (Fifty Million Rand) including VAT, Eskom is committed to paying suppliers within 30 days of receipt of undisputed invoices. For contracts valued above R50,000,000 (Fifty Million Rand) including VAT, Eskom is committed to paying suppliers within 60 days of receipt of undisputed invoices. Tenderers must submit financial statements including a signed auditor's/reviewer's/compiler's/accounting officer's report, statement of financial position, statement of comprehensive income, statement of changes in equity, statement of cash flows, and notes to the financial statements. For unincorporated JV or a SPV, each partner in the JV or a SPV must submit its annual financial statements including all items listed above.
Compliance Requirements
Source: Invitation to Tender ITT Drankesberg PSS.pdf (TENDER)Tenderers must be registered on the Central Supplier Database (CSD). Tenderers must have a valid tax clearance certificate. Tenderers must have a valid B-BBEE status level certificate or sworn affidavit. Tenderers must have a valid CIDB contractor grading of 6CE or 6GB or higher. Tenderers must comply with the Employment Equity Act if applicable. Tenderers must have a valid COIDA certificate of good standing or proof of application issued by the Compensation Fund (COID) or a licensed compensation insurer. Tenderers must submit a completed SBD 4 (Declaration of Interest), SBD 9 (Certificate of Independent Bid Determination), and other mandatory returnables as specified in the tender document.
Contractual Terms
Source: Invitation to Tender ITT Drankesberg PSS.pdfThe contract will be the NEC3 Term Service Contract (TSC3). The employer is Eskom Holdings SOC Ltd. The tender validity period is 12 weeks. The contract duration is five (5) years. The contractor must provide a performance guarantee if applicable. The contractor must comply with the Eskom Standard Conditions of Tender.
Section
Source: Invitation to Tender ITT Drankesberg PSS.pdfThe evaluation will be based on functionality (technical) criteria with a minimum threshold of 70%, price (80/90 points), and specific goals (20/10 points). The contract will be awarded to the tenderer scoring the highest total points.
Description
Source: Attachment 4 TSC3.pdfProvision of building and infrastructure
Maintenance
Contact Information
Source: Attachment 4 TSC3.pdf (unknown)Service Manager: Rowan Francis, 15 Pasita Street, Rosenberg, Durbanville, 7550, email [email protected]. Telephone not stated (TBC).
Submission Guidelines
Source: Attachment 4 TSC3.pdf (unknown)Returnable documents:
Submission method: not stated in the source document.
Evaluation Criteria
Source: Attachment 4 TSC3.pdf (unknown)The document does not state the evaluation criteria, preference point system, or minimum qualifying scores. Bidders must complete the Form of Offer and Acceptance and Contract Data Part Two. The contract requires compliance with B-BBEE provisions — a change in B-BBEE status must be notified within 7 days, and a decrease may lead to renegotiation or termination. The contractor must not cede, delegate or assign rights without Eskom's written consent. Joint ventures are jointly and severally liable. The contractor must provide a tax invoice within one week of a payment certificate, and must include Eskom's VAT number 4740101508 on invoices. The contractor must comply with the ethics clause prohibiting corrupt, fraudulent, coercive, collusive or obstructive actions. The contractor must provide insurance certificates when requested. The contractor must not take images of the affected property without prior written consent.
Technical Specifications
Source: Attachment 4 TSC3.pdf (unknown)Scope: Building and infrastructure maintenance services on an 'as and when required' basis at Eskom Peaking Sites for a period of five years, including planned, preventative, corrective, reactive and emergency maintenance instructed through Task Orders.
Affected Property: Drakensberg Power Station, Ingula Pumped Storage Scheme, Gariep Power Station, Vanderkloof Power Station, Port Rex Power Station and Gourikwa Power Station, including buildings, associated infrastructure, utilities, internal roads, paved areas, drainage, fencing, gates, support facilities and other Employer property.
Work categories (from the Price List):
Mobilisation items: separate rates for planned, corrective, reactive and emergency mobilisation to each of the six sites (Drakensberg, Ingula, Vanderkloof, Gariep, Port Rex, Gourikwa).
Service Information is in Part C3: Scope of Work, including Annexure C3.1-E: Engineering Technical Scope and Requirements.
Experience & Qualifications
Source: Attachment 4 TSC3.pdf2 Name:
3 Available from Engineering Contract Strategies Tel 011 803 3008 Fax 086 5391902 or www.ecs.co.za
Part c1 agreements and contract data of 71 c.1.3 Proforma quarantees
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER ____________
Provision of building and infrastructure maintenance services on an 'as and when required' basis at ESKOM peaking
Sites for a period of five years
Job
Responsibilities:
CV's (and further key person's data including
CVs) are in .
A Priced contract with price list
11.2(12) The price list is in
11.2(19) The tendered total of the Prices is Not applicable, tendered rates contained in C2.2
Part c1 agreements and contract data of 71 c.1.3 Proforma quarantees
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Provision of building and infrastructure maintenance services on an 'as and when required' basis at ESKOM peaking
Sites for a period of five years
Part 2: pricing data
TSC3 Option A
Document Title No of
reference pages
C2.1 Pricing assumptions: Option A 4
C2.2 The price list 10
Part c2 pricing data of 71 tsc3 option a
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Provision of building and infrastructure maintenance services on an 'as and when required' basis at ESKOM peaking
Sites for a period of five years
C2.1 Pricing assumptions: Option A
How the service is priced
The contract uses main Option A: Priced contract with price list together with secondary Option X19: Task
Order.
The Price List in C2.2 is a schedule of tendered rates, lump sums and percentages used for pricing work
instructed through Task Orders and for the contract-level items expressly identified in the Price List.
No Employer quantities are stated in the Price List at tender stage. The Tenderer completes the applicable
Rate, Lump Sum or Fee fields in the Price List.
The inclusion of an item in the Price List does not constitute an instruction to carry out the work and does not
guarantee any minimum quantity, frequency, duration, number of Task Orders or value of work during the
service period.
Except for contract-level items expressly identified in the Price List, the Contractor is paid only for work
instructed through a Task Order and Provided in accordance with the Service Information and the applicable
Task Order.
Pricing of Task Orders
When a Task Order is prepared, the applicable work is priced using the tendered rates and percentages
contained in C2.2.
The priced list for a Task Order identifies, as applicable:
a. the relevant Price List item number and description;
b. the applicable unit;
c. the quantity, duration or other measurable unit applicable to the Task;
d. the applicable tendered rate; and
e. the resulting Price.
Where an applicable tendered rate exists, the Price for the item is calculated by multiplying the applicable
quantity or duration by the tendered rate.
Where an instructed item is not covered by an applicable tendered rate or Cost-Plus item, the item is priced
and assessed in accordance with Option X19 and the applicable provisions of the conditions of contract.
No work outside an issued Task Order is payable merely because a rate for that work appears in the Price
List.
Part c2 pricing data of 71 c2.1 Option a pricing assumptions
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Provision of building and infrastructure maintenance services on an 'as and when required' basis at ESKOM peaking
Sites for a period of five years
Function of the Price List
Information in the Price List is not Service Information.
The Contractor Provides the Service in accordance with:
a. the conditions of contract;
b. the Service Information;
c. Annexure C3.1-E: Engineering Technical Scope and Requirements;
d. the applicable drawings and technical information;
e. the Accepted Plan;
f. the accepted Task Order programme;
g. accepted quality and technical submissions; and
h. the applicable Task Order.
The descriptions in the Price List are pricing descriptions and do not prescribe the Contractor’s method,
sequence, number of personnel, resource allocation, Equipment, working-hour arrangements or
Subcontracting arrangements.
The Contractor determines the resources required to Provide the Service and remains responsible for
complying with all requirements of the contract.
Rates
Unless the Price List expressly states otherwise, each tendered rate includes everything necessary and
incidental to complete the item described in accordance with the contract, including, as applicable:
a. labour and employment-related costs;
b. normal supervision associated with carrying out the activity;
c. administration and coordination associated with the activity;
d. ordinary hand tools and Equipment normally required for the activity;
e. ordinary personal protective equipment;
f. ordinary consumables associated with the activity;
g. preparation, protection, housekeeping and ordinary reinstatement associated with the activity;
h. Task-specific Method Statements, Quality Control Plans and Inspection and Test Plans required for the
activity;
i. applicable inspections, testing, commissioning, records, certificates and warranties;
j. Contractor overheads; and
k. profit.
An item is not paid more than once.
Where a composite activity rate is used, the Contractor is not additionally paid for labour, supervision,
Equipment, travel, consumables, Plant and Materials or other resources already included in that activity rate
Part c2 pricing data of 71 c2.1 Option a pricing assumptions
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Provision of building and infrastructure maintenance services on an 'as and when required' basis at ESKOM peaking
Sites for a period of five years
unless the applicable Task Order expressly identifies the resource as separately payable and the Price List
permits separate payment.
A cost which is included in one tendered rate is not recovered again through another Price List item, Cost-
Plus item, labour rate, Equipment rate, mobilisation item or other pricing mechanism
Separately payable labour, supervision and Equipment
Labour, management, supervision and Contractor’s Equipment rates stated in the Price List are used only
where the applicable resource is expressly identified as separately payable in the relevant Task Order.
These rates may be used for variable, additional or unforeseen work for which an appropriate composite
activity rate is not available.
A labour, supervision or Equipment rate is not separately payable where the applicable cost is already
included in a composite activity rate or another Price List item.
Labour rates are paid only for actual authorised productive time, or other time expressly identified as payable
in the Task Order, supported by the records required by the Service Information.
Normal supervision associated with carrying out an activity is included in the applicable activity or labour rate
unless the Task Order expressly identifies a dedicated supervisory, management, technical, health and
safety or quality resource as separately payable.
Contractor’s Equipment rates apply only where the Equipment is expressly identified as separately payable
in the Task Order.
Unless the applicable Price List item states otherwise, an Equipment rate includes the cost of providing,
operating, maintaining, inspecting and controlling the Equipment for the authorised period of use.
Ordinary hand tools and Equipment normally required by a person to carry out an activity are included in the
applicable activity or labour rate and are not separately payable
Travel, accommodation and subsistence
The station-specific mobilisation rate includes the travel and transport expressly stated under the
mobilisation-rate basis and is not paid again under another Price List item.
Accommodation and subsistence are separately payable only where:
a. applicable rates are stated in the Price List;
b. the relevant Task Order expressly identifies them as separately payable; and
c. the authorised number of persons and period are stated or subsequently accepted by the Service
Manager.
Accommodation and subsistence are not payable merely because the Contractor elects to deploy personnel
who reside away from the applicable Peaking site.
Part c2 pricing data of 71 c2.1 Option a pricing assumptions
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Provision of building and infrastructure maintenance services on an 'as and when required' basis at ESKOM peaking
Sites for a period of five years
Additional travel, accommodation, subsistence or mobilisation arising from the Contractor’s own resource
planning, replacement of personnel, procurement arrangements, correction of Defects, failure of Contractor’s
Equipment or failure to complete an instructed attendance is not separately payable.
A cost included in a mobilisation rate, activity rate, labour rate or other Price List item is not recovered again
as travel, accommodation or subsistence
Application of Cost-Plus items
A Cost-Plus item is used only where the required Plant and Materials, part, spare or specialist external
service:
a. is required for an instructed Task;
b. is not already included in an applicable tendered rate; and
c. has been accepted by the Service Manager for procurement under the applicable Cost-Plus item,
except where prior acceptance is impracticable due to an authorised Emergency Maintenance Task.
The applicable Direct Fee or Subcontracted Fee is applied to the accepted net cost excluding VAT and after
deduction of all discounts, rebates, credits and similar benefits.
No additional Fee, handling charge, procurement charge, administration charge or other markup is added to
a cost already subject to the applicable Direct Fee or Subcontracted Fee.
Labour, supervision, Contractor’s Equipment, mobilisation, travel, accommodation, subsistence or other
resources which are separately payable under another Price List item are not included again in the Cost-Plus
calculation.
A cost already included in another tendered rate is not recoverable again through a Cost-Plus item.
Price adjustment
Option X1 applies to the tendered rates, lump sums and other adjustable Prices in the Price List in
accordance with the Contract Data.
Option X1 does not apply to verified net supplier, Subcontractor or third-party costs reimbursed under a
Cost-Plus item because those costs are assessed using the accepted current net cost.
The tendered Direct Fee and Subcontracted Fee percentages applied to Cost-Plus items remain the
percentages tendered unless changed in accordance with the conditions of contract.
.
Part c2 pricing data of 71 c2.1 Option a pricing assumptions
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Provision of building and infrastructure maintenance services on an 'as and when required' basis at ESKOM peaking
Sites for a period of five years
C2.2 the price list
Tendered Rate /
Item Category Description Unit
Fee (R excl. VAT)
Contract Preparation and submission of the first overall service plan Lump
A1
requirements required by the Service Information. Sum
Contract Preparation and submission of the initial contract Quality Lump
A2
requirements Plan required by the Service Information. Sum
Initial contract health, safety and access documentation Per
Contract
A3 required before Providing the Service, including applicable Power
Qualifications:
Experience:
2 Name:
3 Available from Engineering Contract Strategies Tel 011 803 3008 Fax 086 5391902 or www.ecs.co.za
Part c1 agreements and contract data of 71 c.1.3 Proforma quarantees
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER ____________
Qualifications:
Experience:
CV's (and further key person's data including
CVs) are in .
Quality Management
Source: Attachment 4 TSC3.pdfassistance that the Employer is able to provide for the purpose of contesting any such
claim or action.
Z13.10.3 Should it be held in any such action that any such protected rights have been infringed, as
definitely stated by a judgment of the court before which the action is brought, the
incidental to complete the item described in accordance with the contract, including, as applicable:
a. labour and employment-related costs;
b. normal supervision associated with carrying out the activity;
c. administration and coordination associated with the activity;
d. ordinary hand tools and Equipment normally required for the activity;
e. ordinary personal protective equipment;
f. ordinary consumables associated with the activity;
g. preparation, protection, housekeeping and ordinary reinstatement associated with the activity;
h. Task-specific Method Statements, Quality Control Plans and Inspection and Test Plans required for the
activity;
i. applicable inspections, testing, commissioning, records, certificates and warranties;
j. Contractor overheads; and
k. profit.
C1 inspection report, photographic evidence where authorised, No.
waterproofing
root-cause assessment and proposed remedial measures.
Pricing Schedule
Source: Attachment 4 TSC3.pdfContents: No of
pages
Part C1 Agreements & Contract Data 17
Part C2 Pricing Data 14
Part C3 Scope of Work 35
CONTRACT No. [Insert at award stage]
Tsc3 of 71 cover page
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _________
Value Added Tax @ 15% is
The offered total of the amount due inclusive of VAT is1 Rates Based
(in words) Rates Based
Part C1 Agreements and Contract Data, (which includes this Form of Offer and Acceptance)
Part C2 Pricing Data
Part C3 Scope of Work: Service Information
and drawings and documents (or parts thereof), which may be incorporated by reference into the above
listed Parts.
11.2(12) The price list is in
11.2(19) The tendered total of the Prices is Not applicable, tendered rates contained in C2.2
Part c1 agreements and contract data of 71 c.1.3 Proforma quarantees
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Part 2: pricing data
TSC3 Option A
reference pages
C2.1 Pricing assumptions: Option A 4
C2.2 The price list 10
Part c2 pricing data of 71 tsc3 option a
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
C2.1 Pricing assumptions: Option A
The Price List in C2.2 is a schedule of tendered rates, lump sums and percentages used for pricing work
instructed through Task Orders and for the contract-level items expressly identified in the Price List.
Part c2 pricing data of 71 c2.1 Option a pricing assumptions
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
a. the conditions of contract;
b. the Service Information;
c. Annexure C3.1-E: Engineering Technical Scope and Requirements;
d. the applicable drawings and technical information;
e. the Accepted Plan;
f. the accepted Task Order programme;
g. accepted quality and technical submissions; and
h. the applicable Task Order.
The descriptions in the Price List are pricing descriptions and do not prescribe the Contractor’s method,
sequence, number of personnel, resource allocation, Equipment, working-hour arrangements or
Part c2 pricing data of 71 c2.1 Option a pricing assumptions
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Labour, management, supervision and Contractor’s Equipment rates stated in the Price List are used only
where the applicable resource is expressly identified as separately payable in the relevant Task Order.
a. applicable rates are stated in the Price List;
b. the relevant Task Order expressly identifies them as separately payable; and
c. the authorised number of persons and period are stated or subsequently accepted by the Service
who reside away from the applicable Peaking site.
Part c2 pricing data of 71 c2.1 Option a pricing assumptions
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Option X1 applies to the tendered rates, lump sums and other adjustable Prices in the Price List in
accordance with the Contract Data.
Option X1 does not apply to verified net supplier, Subcontractor or third-party costs reimbursed under a
percentages tendered unless changed in accordance with the conditions of contract.
.
Part c2 pricing data of 71 c2.1 Option a pricing assumptions
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
A16 call-out
mobilisation – Station, including arrangements necessary to meet the
Part c2 pricing data of 71 c2.2 Option a pricing list
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
C6 Screed roof slab to required falls or repair local roof screed. m2
waterproofing
C7 Roofing / Repair and seal roof penetration. No.
Part c2 pricing data of 71 c2.2 Option a pricing list
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
E6 crane m3
deterioration.
infrastructure
F1 Walls / Repair damaged plaster, including preparation and m2
Part c2 pricing data of 71 c2.2 Option a pricing list
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
I3 Repair or replace valve. No.
water / sewer
Part c2 pricing data of 71 c2.2 Option a pricing list
Financial Requirements
Source: Attachment 4 TSC3.pdf (unknown)Pricing format: Main Option A – Priced contract with price list, together with secondary Option X19 (Task Order). The Price List (C2.2) is a schedule of tendered rates, lump sums and percentages. No Employer quantities are stated at tender stage; inclusion of an item does not guarantee any minimum quantity, frequency, duration, number of Task Orders or value of work.
Payment: The assessment interval is one month; assessment date is the 25th day of each month (or preceding working day). Payment is made within four weeks after the assessment date. The contractor must provide a tax invoice within one week of receiving a payment certificate, including Eskom's VAT number 4740101508. Interest on late payment is at the prime rate charged by Standard Bank (for Rand amounts).
Price adjustment: Option X1 applies to tendered rates, lump sums and other adjustable prices, with base date the month before the enquiry closed. Proportions: 0.45 CPI (all items), 0.35 Construction Materials Price Index, 0.10 CPI transport, 0.10 non-adjustable.
Insurance: The contractor provides insurances stated in Insurance Table A (loss/damage to Employer's property, Plant and Materials, Equipment; liability for property damage and bodily injury). The Employer provides insurances in Insurance Table B (Assets All Risk, Contract Works, Environmental Liability, General and Public Liability, Transportation, Motor Fleet, Terrorism, Cyber Liability, Nuclear Material Damage).
No bonds or guarantees are stated in the source document.
Compliance Requirements
Source: Attachment 4 TSC3.pdf (unknown)CIDB registration: The tenderer's CIDB registration number must be provided in the Form of Offer and Acceptance.
B-BBEE: The contractor must notify the Employer within seven days of any change in B-BBEE status, and submit an updated verification certificate within thirty days. A decrease in B-BBEE status may lead to renegotiation or termination.
Health and safety: The contractor must comply with the Construction Regulations 2014 (under the Occupational Health and Safety Act) and may be appointed as Principal Contractor. The prices must include sufficient amount for health and safety compliance.
Asbestos: The contractor must comply with the Asbestos Regulations (GNR February 2002). The occupational exposure limit for asbestos is 0.2 fibres/ml (4-hour TWA) and short-term 0.6 fibres/ml (10-minute TWA). Asbestos removal and disposal must be done by a registered asbestos contractor instructed by the Employer at the Employer's expense.
Ethics: The contractor must not engage in corrupt, fraudulent, coercive, collusive or obstructive actions. The Employer may terminate for such actions.
Confidentiality: The contractor must not disclose confidential information, and must obtain prior written consent to take images of the Affected Property.
Intellectual property: All Foreground Intellectual Property vests in the Employer; the contractor must provide manufacturing documents and designs to the Employer on completion.
Tax: The contractor must comply with the Value Added Tax Act and include Eskom's VAT number 4740101508 on invoices.
Joint ventures: If the contractor is a joint venture, all members are jointly and severally liable, and must notify the Service Manager of the key person with authority to bind within two weeks of the Contract Date.
Health & Safety
Source: Attachment 4 TSC3.pdfsignature of Date
witness
Note: If a tenderer wishes to submit alternative tenders, use another copy of this Form of Offer and
including planned, preventative, corrective,
reactive and emergency maintenance instructed
through Task Orders.
11.2(14) The following matters will be included in
the Risk Register
concealed services/incomplete asset
information;
11.2(15) The Service Information is in Part C3: Scope of Work, C3.1 Employer’s
Service Information, including Annexure C3.1-E:
service period, requires the prior written consent of the Service Manager. All rights in and to all
such images vests exclusively in the Employer.
Z4.5 The Contractor ensures that all his subcontractors abide by the undertakings in this clause.
Z5 Waiver and estoppel: Add to core clause 12.3:
Z5.1 Any extension, concession, waiver or relaxation of any action stated in this contract by the
not give rise to an estoppel unless the Parties agree otherwise and confirm such agreement in
writing.
Z6 Health, safety and the environment: Add to core clause 27.4
Part c1 agreements and contract data of 71 c.1.2A Contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Z6.1 The Contractor undertakes to take all reasonable precautions to maintain the health and safety
of persons in and about the execution of the service. Without limitation the Contractor:
provided for under the Construction Regulations 2014 (promulgated under the Occupational
Health & Safety Act ) (“the Construction Regulations”) for the Affected Property;
proper compliance with the Construction Regulations, all applicable health & safety laws
and regulations and the health and safety rules, guidelines and procedures provided for in
this contract and generally for the proper maintenance of health & safety in and about the
execution of the service; and
regulations published in GNR February 2002, under the Occupational Health and Safety
Act, 1993 (Act ) (“Asbestos Regulations”). The OEL for asbestos is 0.2 regulated
asbestos fibres per millilitre of air as a 4-hour TWA, averaged over any continuous period of four
hours, and the short term exposure limit of 0.6 regulated asbestos fibres per millilitre of air as a 10-
minute TWA, averaged over any 10 minutes, measured in accordance with HSG248 and
monitored according to HSG173 and OESSM.
Z14.2 Upon written request by the Contractor, the Employer certifies that these conditions prevail. All
measurements and reporting are effected by an independent, competent, and certified
occupational hygiene inspection body, i.e. a SANAS accredited and Department of Employment
and Labour approved AAIA. The Contractor may perform Parallel Measurements and related
control measures at the Contractor’s expense. For the purposes of compliance the results
generated from Parallel Measurements are evaluated only against South African statutory limits as
detailed in clause Z14.1. Control measures conform to the requirements stipulated in the AAIA-
approved asbestos work plan.
Z14.3 The Employer manages asbestos and ACM according to the Standard.
Z14.4 In the event that any asbestos is identified while Providing the Services, a risk assessment is
conducted and if so required, with reference to possible exposure to an airborne concentration of
Part c1 agreements and contract data of 71 c.1.2A Contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
statement however other clauses may also use the same data.
selected. Click on the form field once and type in the data. Otherwise complete by hand and in ink.
unless the Task Order expressly identifies a dedicated supervisory, management, technical, health and
safety or quality resource as separately payable.
Contractor’s Equipment rates apply only where the Equipment is expressly identified as separately payable
in the Task Order.
service:
a. is required for an instructed Task;
b. is not already included in an applicable tendered rate; and
c. has been accepted by the Service Manager for procurement under the applicable Cost-Plus item,
except where prior acceptance is impracticable due to an authorised Emergency Maintenance Task.
A3 required before Providing the Service, including applicable Power
requirements
statutory appointments and safety-file documentation. Station
C3 compatible replacement sheeting, fixings, laps and local m2
waterproofing
weatherproofing.
G7 m2
windows / applicable safety requirements.
Part c2 pricing data of 71 c2.2 Option a pricing list
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Environmental
Source: Attachment 4 TSC3.pdfguidelines and procedures otherwise provided for under this contract and ensures that his
Subcontractors, employees and others under the Contractor’s direction and control,
likewise observe and comply with the foregoing.
Z6.2 The Contractor, in and about the execution of the service, complies with all applicable
environmental laws and regulations and rules, guidelines and procedures otherwise provided
for under this contract and ensures that his Subcontractors, employees and others under the
Contractor’s direction and control, likewise observe and comply with the foregoing.
Z7 Provision of a Tax Invoice and interest. Add to core clause 51
Z7.1 Within one week of receiving a payment certificate from the Service Manager in terms of core
clause 51.1, the Contractor provides the Employer with a tax invoice in accordance with the
if applicable.
Z14.6 The Contractor continues to Provide the Services, without additional control measures presented,
on presentation of Safe Levels. The contractually agreed dates to Provide the Services, including
the Completion Date, are adjusted accordingly. The contractually agreed dates are extended by
the notification periods required by regulations 3 and 21 of the Asbestos Regulations, 2001.
Z14.7 Any removal and disposal of asbestos, asbestos containing materials and waste, is done by a
registered asbestos contractor, instructed by the Employer at the Employer’s expense, and
conducted in line with South African legislation.
Part c1 agreements and contract data of 71 c.1.2A Contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER ____________
Contractual Terms
Source: Attachment 4 TSC3.pdfLoss of or damage caused by The replacement cost where not covered by the
the Contractor to the Employer’s insurance.
Employer’s property
The Employer’s policy deductible as at Contract
Date, where covered by the Employer’s insurance.
Loss of or damage to Plant and The replacement cost where not covered by the
Materials Employer’s insurance.
The Employer’s policy deductible as at Contract
Date, where covered by the Employer’s insurance.
Loss of or damage to The replacement cost where not covered by the
Equipment Employer’s insurance.
The Employer’s policy deductible as at Contract
Date, where covered by the Employer’s insurance.
The Contractor’s liability for Loss of or damage to property
loss of or damage to property The replacement cost
(except the Employer’s
property, Plant and Materials
and Equipment) and liability for Bodily injury to or death of a person
bodily injury to or death of a The amount required by the applicable law.
person (not an employee of the
Contractor) arising from or in
connection with the
Contractor’s Providing the
Service
Liability for death of or bodily The amount required by the applicable law
injury to employees of the
Contractor arising out of and in
the course of their employment
in connection with this contract
Z __12.2 Replace core clause 86 with the following:
Insurance 86
by the
Employer
86.1 The Employer provides the insurances stated in the Insurance Table B
Part c1 agreements and contract data of 71 c.1.2A Contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Provision of building and infrastructure maintenance services on an 'as and when required' basis at ESKOM peaking
Sites for a period of five years
Insurance table b
Insurance against or name Minimum amount of cover or minimum lim
of policy of indemnity
Assets All Risk Per the insurance policy document
Contract Works insurance Per the insurance policy document
Environmental Liability Per the insurance policy document
General and Public Liability Per the insurance policy document
Transportation (Marine) Per the insurance policy document
Motor Fleet and Mobile Plant Per the insurance policy document
Terrorism Per the insurance policy document
Cyber Liability Per the insurance policy document
Nuclear Material Damage and Per the insurance policy document
Business Interruption
Nuclear Material Damage Per the insurance policy document
Terrorism
Z13 Intellectual Property – Eskom owning Intellectual Property
“Intellectual means (a) patents, trade marks, service marks, rights in designs, trade names, trade secrets, know
Property” copyrights and topography rights, in each case whether registered or not; (b) applications for registrat
any of them; (c) rights under licences and consents in relation to any of them; (d) all forms of protection
similar nature or having equivalent or similar effect to any of them which may subsist anywhere in the wo
“Backgroun means any and all Intellectual Property rights that are not Foreground Intellectual Property,
d Intellectual and are owned or controlled by the relevant party or licensed to the relevant party prior to
Property" or outside of the services but required for the purposes of the services .
“Foreground means all Intellectual Property rights and other matter capable of being the subject of
Intellectual intellectual property rights that is conceived, first reduced to practice or writing or
Property” developed in whole or in substantial part in the course of the execution of the services
and rights which are developed substantially as a result of the services . Any services
that will be developed, changed, modified and/or improved specifically for the Purposes will
be Foreground Intellectual Property. Any data or any other information relating to
Employer’s proprietary information generated from the use of the Contractor’s Background
Intellectual Property.
Z13.1 The Contractor retains ownership of all Background Intellectual Property rights made by or
on behalf of the Contractor as part of the services in information or material it uses in
carrying out the services .
Z13.2 All Foreground Intellectual Property rights, contained in any developed materials which are
created by the Contractor or on behalf of the Contractor, for the purposes of and in support
of the execution of the services (Employer’s IP) vest with the Employer.
Z13.3 Any data or any other information relating to Employer’s proprietary information generated
from the use of the Contractor’s Background Intellectual Property, the copyright therein
shall be owned by the Employer.
Z13.4 The Contractor acknowledges that all rights, title, and interest in and to the Foreground
Intellectual Property that may result or originate from or be developed in execution of the
services vests in the Employer and that the Contractor has no claim of any nature in and to
Part c1 agreements and contract data of 71 c.1.2A Contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Provision of building and infrastructure maintenance services on an 'as and when required' basis at ESKOM peaking
Sites for a period of five years
the Foreground Intellectual Property.
Z13.5 The Contractor ensures that a copyright notice is incorporated or embossed or labelled on
the Foreground Intellectual Property, where the Employer is reflected as the owner of the
Foreground Intellectual Property.
Z13.6 The Contractor is obliged to provide Foreground Intellectual Property manufacturing
documents, designs, processes and/or specifications to the Employer before/on the
completion date.
Z13.7 The Contractor procures that each Sub-Contractor executes all and any services , and
takes all and any other actions as may be required, in order to give effect to this
Agreement.
Z13.8 The Employer retains all Background Intellectual Property rights in all documents made by
or on behalf of the Employer including all documents and requirements provided prior to or
during the execution of the services . The Contractor does not, without the written
consent, of the Employer, copy, use or issue to a third party any of the Employer’s
Background Intellectual Property documents and requirements except for the purposes of
executing the services .
Z13.9 Either party procures that any third party executes confidentiality undertakings not to
disclose to any other third parties, any of the Employer’s Background Intellectual Property
and IP documents and requirements at all, in respect of the Employer, or the Background
Intellectual Property, in respect of the Contractor.
Z13.10 Third Party Claims:
Z13.10.1 In the event of any claims being made or actions brought against the Employer, on the
ground that the Contractor infringed any patent, trade mark or copyright, the Contractor is
notified thereof and at its own expense, conducts all negotiations in consultation with the
Employer for the settlement of the claim and litigation that may arise from such alleged
infringement, provided that the Employer will not bear any financial burden or losses.
Z13.10.2 Save where the Contractor fails to take over the conduct of the negotiation or litigation
within a reasonable time of the notification of the alleged infringement, the Employer does
not make any admission which might be prejudicial to the Contractor’s position. The
Employer, at the request and the cost of the Contractor affords it all reasonable technical
assistance that the Employer is able to provide for the purpose of contesting any such
claim or action.
Z13.10.3 Should it be held in any such action that any such protected rights have been infringed, as
definitely stated by a judgment of the court before which the action is brought, the
Contractor, at its own expense and in consultation with the Employer, either:
a. procures for Employer the right to continue to use the affected item or design, or
b. replaces the said affected item or design with a non-infringing item, or
c. provides a design of equivalent quality or modify such affected item or design so as
to make it non-infringing without affecting the quality.
Z13.10.4 Notwithstanding anything contained in this contract, the foregoing sets forth the entire
responsibility of Contractor with respect to claims relating to infringement.
Z13.10.5 Where it is alleged that the Employer has committed an infringement as intended vis-à-vis
the Contractor as set out in the third party intellectual property infringement clause, the
Employer has the same rights and obligations as the Contractor, mutatis mutandis, as
regards such alleged infringement.
Z13.10.6 The Contractor herewith indemnifies the Employer and undertakes to keep the Employer
indemnified against all claims of whatsoever nature, real or imagined, which may be made
against the Employer arising from the infringement of any third party intellectual property
rights.
Part c1 agreements and contract data of 71 c.1.2A Contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Provision of building and infrastructure maintenance services on an 'as and when required' basis at ESKOM peaking
Sites for a period of five years
Z14 Asbestos
For the purposes of this Z-clause, the following definitions apply:
AAIA means approved asbestos inspection authority.
ACM means asbestos containing materials.
AL means action level, i.e. a level of 50% of the OEL, i.e. 0.1 regulated asbestos fibres
per ml of air measured over a 4 hour period. The value at which proactive actions is
required in order to control asbestos exposure to prevent exceeding the OEL.
Ambient Air means breathable air in area of work with specific reference to breathing zone, which
is defined to be a virtual area within a radius of approximately 30cm from the nose
inlet.
Compliance means compliance sampling used to assess whether or not the personal exposure of
Monitoring workers to regulated asbestos fibres is in compliance with the Standard’s requirements
for safe processing, handling, storing, disposal and phase-out of asbestos and
asbestos containing material, equipment and articles.
OEL means occupational exposure limit.
Parallel means measurements performed in parallel, yet separately, to existing measurements
Measurements to verify validity of results.
Safe Levels means airborne asbestos exposure levels conforming to the Standard’s requirements
for safe processing, handling, storing, disposal and phase-out of asbestos and
asbestos containing material, equipment and articles.
Standard means the Employer’s Asbestos Standard 32-303: Requirements for Safe Processing,
Handling, Storing, Disposal and Phase-out of Asbestos and Asbestos Containing
Material, Equipment and Articles.
SANAS means the South African National Accreditation System.
TWA means the average exposure, within a given workplace, to airborne asbestos fibres,
normalised to the baseline of a 4 hour continuous period, also applicable to short term
exposures, i.e. 10-minute TWA.
Z14.1 The Employer ensures that the Ambient Air in the area where the Contractor will Provide the
Services conforms to the acceptable prescribed South African standard for asbestos, as per the
regulations published in GNR February 2002, under the Occupational Health and Safety
Act, 1993 (Act ) (“Asbestos Regulations”). The OEL for asbestos is 0.2 regulated
asbestos fibres per millilitre of air as a 4-hour TWA, averaged over any continuous period of four
hours, and the short term exposure limit of 0.6 regulated asbestos fibres per millilitre of air as a 10-
minute TWA, averaged over any 10 minutes, measured in accordance with HSG248 and
monitored according to HSG173 and OESSM.
Z14.2 Upon written request by the Contractor, the Employer certifies that these conditions prevail. All
measurements and reporting are effected by an independent, competent, and certified
occupational hygiene inspection body, i.e. a SANAS accredited and Department of Employment
and Labour approved AAIA. The Contractor may perform Parallel Measurements and related
control measures at the Contractor’s expense. For the purposes of compliance the results
generated from Parallel Measurements are evaluated only against South African statutory limits as
detailed in clause Z14.1. Control measures conform to the requirements stipulated in the AAIA-
approved asbestos work plan.
Z14.3 The Employer manages asbestos and ACM according to the Standard.
Z14.4 In the event that any asbestos is identified while Providing the Services, a risk assessment is
conducted and if so required, with reference to possible exposure to an airborne concentration of
Part c1 agreements and contract data of 71 c.1.2A Contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Provision of building and infrastructure maintenance services on an 'as and when required' basis at ESKOM peaking
Sites for a period of five years
above the AL for asbestos, immediate control measures are implemented and relevant air
monitoring conducted in order to declare the area safe.
Z14.5 The Contractor’s personnel are entitled to stop working and leave the contaminated area forthwith
until such time that the area of concern is declared safe by either Compliance Monitoring or an
AAIA approved control measure intervention, for example, per the emergency asbestos work plan,
if applicable.
Z14.6 The Contractor continues to Provide the Services, without additional control measures presented,
on presentation of Safe Levels. The contractually agreed dates to Provide the Services, including
the Completion Date, are adjusted accordingly. The contractually agreed dates are extended by
the notification periods required by regulations 3 and 21 of the Asbestos Regulations, 2001.
Z14.7 Any removal and disposal of asbestos, asbestos containing materials and waste, is done by a
registered asbestos contractor, instructed by the Employer at the Employer’s expense, and
conducted in line with South African legislation.
Part c1 agreements and contract data of 71 c.1.2A Contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER ____________
Provision of building and infrastructure maintenance services on an 'as and when required' basis at ESKOM peaking
Sites for a period of five years
C1.2 Contract Data
Part two - Data provided by the Contractor
[Instructions to the contract compiler: (delete this notes before issue to tenderers with an enquiry)
Whenever a cell is shaded in the left hand column it denotes this data is optional and would be required in
relation to the option selected. In the event that the option is not required select and delete the whole row.]
Notes to a tendering contractor:
Guidance Notes (TSC3-GN)3 in order to understand the implications of this Data which the tenderer
is required to complete.
statement however other clauses may also use the same data.
selected. Click on the form field once and type in the data. Otherwise complete by hand and in ink.
Completion of the data in full, according to Options chosen, is essential to create a complete contract.
Clause Statement Data
10.1 The Contractor is (Name):
Address
Tel No.
Fax No.
11.2(8) The direct fee percentage is Direct Fee as stated in Contract Data Part Two
%
The subcontracted fee percentage is Subcontracted Fee as stated in Contract Data
Part Two. %
11.2(14) The following matters will be included in
the Risk Register
11.2(15) The Service Information for the
Contractor’s plan is in:
21.1 The plan identified in the Contract Data is
contained in:
24.1 The key people are:
1 Name:
Job:
Responsibilities:
of Deviations (if any), contact the Employer’s agent (whose details are given in the Contract Data) to arrange
the delivery of any securities, bonds, guarantees, proof of insurance and any other documentation to be
provided in terms of the conditions of contract identified in the Contract Data at, or just after, the date this
agreement comes into effect. Failure to fulfil any of these obligations in accordance with those terms shall
constitute a repudiation of this agreement.
clauses and the clauses for main Option:
A: Priced contract with price list
dispute resolution Option W1: Dispute resolution procedure
and secondary Options
X1: Price adjustment for inflation
X2 Changes in the law
X17: Low service damages
X19: Task Order
Z: Additional conditions of contract
of the NEC3 Term Service Contract April
20132 (tsc3)
10.1 The Employer is (name): Eskom Holdings SOC Ltd (reg no:
2002/015527/30), a state owned company
incorporated in terms of the company laws of
the Republic of South Africa
51.1 The currency of this contract is the South African Rand
51.2 The period within which payments are
made is Four (4) weeks after the assessment date.
51.4 The interest rate is the publicly quoted prime rate of interest
(calculated on a 365 day year) charged by from
time to time by the Standard Bank of South
Africa Limited (as certified, in the event of any
dispute, by any manager of such bank, whose
appointment it shall not be necessary to prove)
for amounts due in Rands and
(ii) the LIBOR rate applicable at the time for
amounts due in other currencies. LIBOR is the
6 month London Interbank Offered Rate quoted
under the caption “Money Rates” in The Wall
no rate is quoted for the currency in question
then the rate for United States Dollars, and if no
such rate appears in The Wall Street Journal
then the rate as quoted by the Reuters Monitor
Money Rates Service (or such service as may
replace the Reuters Monitor Money Rates
Service) on the due date for the payment in
question, adjusted mutatis mutandis every 6
months thereafter (and as certified, in the event
of any dispute, by any manager employed in the
foreign exchange department of The Standard
dispute to him. (see www.ice-sa.org.za). If the
Z3.2 The Contractor is required to submit an updated verification certificate and necessary
supporting documentation confirming the change in his B-BBEE status to the Service Manager
within thirty days of the notification or as otherwise instructed by the Service Manager.
Z3.3 Where, as a result, the Contractor’s B-BBEE status has decreased since the Contract Date the
Employer may either re-negotiate this contract or alternatively, terminate the Contractor’s
obligation to Provide the Service.
Z3.4 Failure by the Contractor to notify the Employer of a change in its B-BBEE status may
constitute a reason for termination. If the Employer terminates in terms of this clause, the
procedures on termination are P1, P2 and P4 as stated in clause 92, and the amount due is A1
and A3 as stated in clause 93.
Z4 Confidentiality
Z4.1 The Contractor does not disclose or make any information arising from or in connection with
this contract available to Others. This undertaking does not, however, apply to information
which at the time of disclosure or thereafter, without default on the part of the Contractor, enters
the public domain or to information which was already in the possession of the Contractor at the
time of disclosure (evidenced by written records in existence at that time). Should the
Contractor disclose information to Others in terms of clause 25.1, the Contractor ensures that
the provisions of this clause are complied with by the recipient.
Z4.2 If the Contractor is uncertain about whether any such information is confidential, it is to be
regarded as such until notified otherwise by the Service Manager.
Z4.3 In the event that the Contractor is, at any time, required by law to disclose any such information
which is required to be kept confidential, the Contractor, to the extent permitted by law prior to
disclosure, notifies the Employer so that an appropriate protection order and/or any other action
can be taken if possible, prior to any disclosure. In the event that such protective order is not,
or cannot, be obtained, then the Contractor may disclose that portion of the information which it
is required to be disclosed by law and uses reasonable efforts to obtain assurances that
confidential treatment will be afforded to the information so disclosed.
Z4.4 The taking of images (whether photographs, video footage or otherwise) of the Affected
the event, he is not entitled to a change in the Prices.
Z9 Employer’s limitation of liability
Z9.1 The Employer’s liability to the Contractor for the Contractor’s indirect or consequential loss is
limited to R0.00 (zero Rand)
Z9.2 The Contractor’s entitlement under the indemnity in 82.1 is provided for in 60.1(12) and the
Employer’s liability under the indemnity is limited to compensation as provided for in core
clause 63 and X19.11 if Option X19 Task Order applies to this contract.
Termination: Add to core clause 91.1, at the second main bullet point, fourth sub-bullet
Z10
point, after the words "against it":
Part c1 agreements and contract data of 71 c.1.2A Contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
appropriate action to prevent or remedy the situation, without limiting any other rights or
remedies the Employer has. It is not required that the Committing Party had to have been
found guilty, in court or in any other similar process, of such Prohibited Action before the
Employer can terminate the Contractor’s obligation to Provide the Services for this reason.
Z11.3 If the Employer terminates the Contractor’s obligation to Provide the Services for this reason,
the amounts due on termination are those intended in core clauses 92.1 and 92.2.
Z11.4 A Committing Party co-operates fully with any investigation pursuant to alleged Prohibited
Z12 Insurance
Z 12.1 Replace core clause 83 with the following:
Insurance cover 83
83.1 When requested by a Party, the other Party provides certificates from his insurer
or broker stating that the insurances required by this contract are in force.
Part c1 agreements and contract data of 71 c.1.2A Contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
83.2 The Contractor provides the insurances stated in the Insurance Table A from the
starting date until the earlier of Completion and the date of the termination
certificate.
the Contractor to the Employer’s insurance.
Employer’s property
The Employer’s policy deductible as at Contract
Date, where covered by the Employer’s insurance.
Materials Employer’s insurance.
The Employer’s policy deductible as at Contract
Date, where covered by the Employer’s insurance.
Equipment Employer’s insurance.
The Employer’s policy deductible as at Contract
Date, where covered by the Employer’s insurance.
The Contractor’s liability for Loss of or damage to property
loss of or damage to property The replacement cost
(except the Employer’s
property, Plant and Materials
and Equipment) and liability for Bodily injury to or death of a person
bodily injury to or death of a The amount required by the applicable law.
person (not an employee of the
Contractor) arising from or in
connection with the
Contractor’s Providing the
the course of their employment
in connection with this contract
Z __12.2 Replace core clause 86 with the following:
Insurance 86
by the
86.1 The Employer provides the insurances stated in the Insurance Table B
Part c1 agreements and contract data of 71 c.1.2A Contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Transportation (Marine) Per the insurance policy document
Z13 Intellectual Property – Eskom owning Intellectual Property
“Intellectual means (a) patents, trade marks, service marks, rights in designs, trade names, trade secrets, know
Property” copyrights and topography rights, in each case whether registered or not; (b) applications for registrat
any of them; (c) rights under licences and consents in relation to any of them; (d) all forms of protection
similar nature or having equivalent or similar effect to any of them which may subsist anywhere in the wo
“Backgroun means any and all Intellectual Property rights that are not Foreground Intellectual Property,
d Intellectual and are owned or controlled by the relevant party or licensed to the relevant party prior to
Property" or outside of the services but required for the purposes of the services .
“Foreground means all Intellectual Property rights and other matter capable of being the subject of
Property” developed in whole or in substantial part in the course of the execution of the services
and rights which are developed substantially as a result of the services . Any services
that will be developed, changed, modified and/or improved specifically for the Purposes will
be Foreground Intellectual Property. Any data or any other information relating to
Employer’s proprietary information generated from the use of the Contractor’s Background
Z13.1 The Contractor retains ownership of all Background Intellectual Property rights made by or
on behalf of the Contractor as part of the services in information or material it uses in
carrying out the services .
Z13.2 All Foreground Intellectual Property rights, contained in any developed materials which are
created by the Contractor or on behalf of the Contractor, for the purposes of and in support
of the execution of the services (Employer’s IP) vest with the Employer.
Z13.3 Any data or any other information relating to Employer’s proprietary information generated
from the use of the Contractor’s Background Intellectual Property, the copyright therein
shall be owned by the Employer.
Z13.4 The Contractor acknowledges that all rights, title, and interest in and to the Foreground
the Foreground Intellectual Property.
Z13.5 The Contractor ensures that a copyright notice is incorporated or embossed or labelled on
the Foreground Intellectual Property, where the Employer is reflected as the owner of the
Z13.6 The Contractor is obliged to provide Foreground Intellectual Property manufacturing
documents, designs, processes and/or specifications to the Employer before/on the
completion date.
Z13.7 The Contractor procures that each Sub-Contractor executes all and any services , and
takes all and any other actions as may be required, in order to give effect to this
Z13.8 The Employer retains all Background Intellectual Property rights in all documents made by
or on behalf of the Employer including all documents and requirements provided prior to or
during the execution of the services . The Contractor does not, without the written
consent, of the Employer, copy, use or issue to a third party any of the Employer’s
executing the services .
Z13.9 Either party procures that any third party executes confidentiality undertakings not to
disclose to any other third parties, any of the Employer’s Background Intellectual Property
and IP documents and requirements at all, in respect of the Employer, or the Background
a. procures for Employer the right to continue to use the affected item or design, or
b. replaces the said affected item or design with a non-infringing item, or
c. provides a design of equivalent quality or modify such affected item or design so as
to make it non-infringing without affecting the quality.
Z13.10.4 Notwithstanding anything contained in this contract, the foregoing sets forth the entire
responsibility of Contractor with respect to claims relating to infringement.
Z13.10.5 Where it is alleged that the Employer has committed an infringement as intended vis-à-vis
the Contractor as set out in the third party intellectual property infringement clause, the
regards such alleged infringement.
Z13.10.6 The Contractor herewith indemnifies the Employer and undertakes to keep the Employer
indemnified against all claims of whatsoever nature, real or imagined, which may be made
against the Employer arising from the infringement of any third party intellectual property
rights.
Part c1 agreements and contract data of 71 c.1.2A Contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
guarantee any minimum quantity, frequency, duration, number of Task Orders or value of work during the
service period.
Description
Source: Attachment 5 Technical Evaluation.pdfThe contract covers planned, preventative, corrective, reactive and emergency building and infrastructure maintenance services on an 'as and when required' basis across six Peaking Generation sites (Drakensberg, Ingula, Gariep, Vanderkloof, Port Rex, Gourikwa) for a period of five (5) years. Scope includes maintenance and repair of buildings, roofing and waterproofing systems, roads and civil infrastructure, plumbing and sewer systems, electrical building services, fencing and security infrastructure, fire protection systems, and associated facilities required to maintain asset integrity and operational readiness.
Important Dates
Source: Attachment 5 Technical Evaluation.pdf (unknown)Closing date: 1 October 2026 at 10:00 (as per tender record).
Compulsory clarification meeting: conducted virtually via Microsoft Teams. Physical attendance at site is not required. Attendance is mandatory; failure to attend results in disqualification. Date and time not stated in the document.
Submission Guidelines
Source: Attachment 5 Technical Evaluation.pdf (unknown)Returnable documents must be completed, signed and submitted with the bid:
Disqualification risks:
Evaluation Criteria
Source: Attachment 5 Technical Evaluation.pdf (unknown)Technical evaluation uses a weighted scorecard. Tenderers must achieve a minimum overall score of 70% to be considered technically acceptable.
Mandatory Technical Evaluation Criteria are gatekeepers, evaluated on a Yes/No basis and not scored. Failure to meet any mandatory criterion results in disqualification and the tender does not proceed to qualitative evaluation.
Qualitative Technical Evaluation Criteria are applied only to tenderers that meet all mandatory criteria. These are weighted and a minimum weighted score of 70% is required.
Scoring guideline (no scores of 1 or 3 allowed):
Qualitative criteria weights:
Qualitative criteria must be submitted by the tender closing date; failure to submit results in a score of zero for each missing criterion.
Acceptable technical risks:
Unacceptable technical risks:
Acceptable technical exceptions/conditions:
Unacceptable technical exceptions/conditions:
Technical Specifications
Source: Attachment 5 Technical Evaluation.pdf (unknown)Scope: Provision of planned, preventative, corrective, reactive and emergency building and infrastructure maintenance services on an 'as and when required' basis across six Peaking Generation sites for a period of five (5) years.
Sites: Drakensberg Power Station, Ingula Pumped Storage Scheme, Gariep Power Station, Vanderkloof Power Station, Port Rex Power Station, Gourikwa Power Station.
Work areas include:
Services must be delivered in accordance with Eskom standards, applicable legislation, relevant SANS requirements and contract obligations.
Methodology
Source: Attachment 5 Technical Evaluation.pdfMethodology is a qualitative evaluation criterion (35% of total). Bidders must submit method statements covering:
Scoring: 0 if no method statement submitted or non-compliant; 2 if addresses less than 50% of required activities; 4 if addresses at least 75% of listed activities; 5 if addresses all listed activities and includes execution methodology, quality controls and safety controls for each activity.
For Emergency Maintenance Strategy: 0 if not submitted; 2 if missing one or more of call-out procedure, response time commitments, escalation matrix, or resource allocation plan; 4 if includes documented call-out procedure, defined response time commitments, escalation matrix, and identified resources; 5 if includes all requirements for a score of 4 plus 24/7 call-out availability, response time commitments for different incident priorities, named roles or dedicated resources for emergency response, and escalation matrix with defined escalation levels and contacts.
Experience & Qualifications
Source: Attachment 5 Technical Evaluation.pdfExperience and qualifications are evaluated under qualitative criteria:
Scoring for Contractor Experience: 0 if no experience or not related; 2 if less than three similar projects and/or limited scope similarity; 4 if three similar projects covering most maintenance disciplines; 5 if four or more similar projects covering building, civil, roads, plumbing, electrical, security and fire protection maintenance works.
Scoring for Client References: 0 if no references; 2 if less than three references and/or incomplete information; 4 if three acceptable references with all required information; 5 if four or more acceptable references with all required information and directly relevant scope.
Scoring for Multi-Site Experience: 0 if no evidence; 2 if limited to a single site or limited evidence; 4 if evidence of successful execution across 2-3 geographically dispersed sites concurrently; 5 if evidence of successful execution across 4 or more geographically dispersed sites concurrently.
Scoring for Key Personnel: 0 if not submitted or major omissions; 2 if CVs submitted for less than 75% of required positions and/or personnel do not meet minimum qualification or experience; 4 if CVs submitted for at least 75% of positions and all meet minimum requirements with three years' experience; 5 if CVs submitted for 100% of positions and all meet minimum requirements with three years' experience.
Scoring for Plant & Equipment: 0 if no schedule; 2 if includes less than 75% of minimum required equipment categories; 4 if includes at least 75%; 5 if includes all minimum required categories.
Scoring for Organogram: 0 if not submitted; 2 if addresses only 1 or 2 of head office support, site support, multi-site resource deployment, escalation structure; 4 if addresses at least 3; 5 if comprehensive structure demonstrating all four.
Quality Management
Source: Attachment 5 Technical Evaluation.pdfQuality Management is a qualitative evaluation criterion (15% of total). Bidders must submit:
Scoring for QCPs: 0 if no QCP submitted; 2 if fewer than three required elements addressed; 4 if at least three elements addressed; 5 if all required elements addressed (activities, inspection/hold/witness points, check sheets, records).
Scoring for Inspection & Test Strategy: 0 if not submitted; 2 if only 1 or 2 of the four elements addressed; 4 if at least 3 elements addressed with documented procedures; 5 if all 4 elements addressed including documented inspection activities, test procedures and acceptance criteria, handover requirements, and a defined defect management process with responsibilities and close-out requirements.
Pricing Schedule
Source: Attachment 5 Technical Evaluation.pdfNo pricing schedule, rates, bill of quantities or payment schedules are stated in the document. Bidders must provide proof of ownership, availability or valid lease/hire agreements for key plant and access equipment.
Financial Requirements
Source: Attachment 5 Technical Evaluation.pdf (unknown)No pricing format, bonds, guarantees, payment terms or financial capacity thresholds are stated in the document. Bidders must provide proof of ownership, availability or valid lease/hire agreements for key plant and access equipment.
Compliance Requirements
Source: Attachment 5 Technical Evaluation.pdf (unknown)Mandatory technical criteria (gatekeepers, evaluated Yes/No):
Qualitative criteria require submission of:
Health & Safety
Source: Attachment 5 Technical Evaluation.pdfMethod statements must include safety controls for each activity. The document states that methodology must be delivered safely and in accordance with Eskom standards, applicable legislation and relevant SANS requirements. No specific OHS plan or HSE compliance requirements are detailed beyond this.
Environmental
Source: Attachment 5 Technical Evaluation.pdfNo specific environmental impact or sustainability requirements are stated in the document. The scope notes that assets deteriorate due to environmental exposure, water ingress, corrosion and drainage failures, but no environmental compliance obligations are imposed on bidders.
Contractual Terms
Source: Attachment 5 Technical Evaluation.pdfContract duration: five (5) years. Services are provided on an 'as and when required' basis. No other contractual terms, termination conditions or penalties are stated in the document.
Requirements
Source: Attachment 5 Technical Evaluation.pdf (unknown)Mandatory technical criterion on tender closing: The Tenderer must attend a compulsory clarification meeting conducted virtually via Microsoft Teams. Physical attendance at site is not required. Attendance register serves as evidence. Failure to attend results in disqualification.
Section
Source: Attachment 5 Technical Evaluation.pdfAdditional evaluation details:
Description
Source: Attachment 6 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.xlsxThis document is the List of Tender Returnables and Quality Evaluation Scorecard for the tender. It defines the quality documentation bidders must submit and how it will be evaluated. The actual scope of work is referenced in other tender documents.
Submission Guidelines
Source: Attachment 6 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.xlsx (unknown)Returnable documents: complete and sign Form A. Select the applicable category on the Cover tab (only one category). Complete the required details on the Returnables tab, save as PDF and sign, or sign and lock the sheet before sending. Un-applicable requirements may be hidden.
Evaluation Criteria
Source: Attachment 6 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.xlsx (unknown)Quality evaluation is weighted across five sections: Section A (Quality Management System Requirements, 25%), Section B (Evidence of QMS in operation, 25%), Section C (Contract Quality Plan, 20%), Section D (Quality Control Plan, 20%), Section E (User defined additional requirements, 10%). For Section A, bidders may choose Option 1 (valid ISO 9001:2015 certificate by an accredited body with relevant scope) or Option 2 (evidence of QMS in operation, including QMS manual, quality policy, quality objectives, control of documented information, control of nonconforming outputs, nonconformity and corrective action, and internal audit). Section B requires documented information for roles, responsibilities and authorities, control of externally provided processes, and may include internal/external audit reports and management review records. Section C requires a draft Contract Quality Plan specific to the scope of work. Section D requires a QCP/ITP as per scope of works. Section E requires Form A completed and signed, plus any additional requirements per scope. No minimum qualifying score is stated.
Technical Specifications
Source: Attachment 6 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.xlsx (unknown)The tender is for building and infrastructure maintenance services at Drakensberg Pumped Storage Scheme on an as-and-when-required basis for five years. The document is a list of tender returnables and quality evaluation scorecard; it does not specify detailed technical scope, quantities, or service levels.
Compliance Requirements
Source: Attachment 6 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.xlsx (unknown)No specific compliance requirements are stated in this document.
Description
Source: Attachment 7 240-68099512 Form A_Cat 3_ Rev 9.docxThe tenderer must complete and sign the form to acknowledge and accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001.
Evaluation Criteria
Source: Attachment 7 240-68099512 Form A_Cat 3_ Rev 9.docx (unknown)Bidders must accept Eskom Supplier Quality Requirements as per specification 240-105658000 and the ISO 9001 standard. Category 3 (clause 3.5.4 of the specification) applies. Contract execution (clause 3.7.1) and supplier quality performance monitoring (clause 3.7.2) apply. Standard conditions include Eskom's rights of access and information, preservation, quality audits, management of nonconformities, and special processes.
Technical Specifications
Source: Attachment 7 240-68099512 Form A_Cat 3_ Rev 9.docx (unknown)The tenderer must complete and sign the form to acknowledge and accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001.
Compliance Requirements
Source: Attachment 7 240-68099512 Form A_Cat 3_ Rev 9.docx (unknown)Bidders must accept and comply with Eskom Supplier Quality Requirements (specification 240-105658000) and ISO 9001 quality management standard.
Description
Source: Attachment 1- Tax Evaluation questionnaire.pdfThis PAYE questionnaire is used by Eskom to determine whether a contractor (individual, company, close corporation or trust) should be classified as an Independent Contractor, Personal Service Provider, Labour Broker or Dependent Contractor for tax purposes. The pack applies to contractors supplying services or labour to Eskom Holdings SOC Ltd and its subsidiaries. The contractor must answer all questions truthfully; the answers determine which affidavits and declarations must be signed.
Important Dates
Source: Attachment 1- Tax Evaluation questionnaire.pdf (unknown)The pack applies from 1 March 2022 to 28 February 2023 and is subject to changes in tax legislation.
Contact Information
Source: Attachment 1- Tax Evaluation questionnaire.pdf (unknown)Group Tax email: [email protected]
Submission Guidelines
Source: Attachment 1- Tax Evaluation questionnaire.pdf (unknown)Returnable documents — the completed PAYE questionnaire pack, including the signed summary sheet and all required signed affidavits/declarations, must be returned to Eskom. A copy must be emailed to [email protected].
Which pack applies:
Consequences of non-compliance:
Returnable Documents
Source: Attachment 1- Tax Evaluation questionnaire.pdf (unknown)The completed pack, including the signed summary sheet and signed affidavits, must be returned to Eskom, with a copy to Group Tax at [email protected]. The pack includes Evaluation Pack A for companies/close corporations/trusts and Evaluation Pack B for individuals, with various appendices (affidavits and declarations) to be signed depending on the contractor's classification.
Evaluation Criteria
Source: Attachment 1- Tax Evaluation questionnaire.pdf (unknown)The questionnaire determines the contractor's tax classification: Independent Contractor, Personal Service Provider, Labour Broker, or Dependent Contractor. This classification dictates whether PAYE is withheld from payments and the IRP5/IT3(a) code used.
For companies/CCs/trusts (Evaluation Pack A), classification as a Personal Service Provider (PSP) depends on tests including residence, number of employees, connected persons, more than 80% of income from one client, place/control/supervision, and a dominant impression test. If classified as PSP, PAYE is withheld and coded 3601 or 3616 on the IRP5.
For individuals (Evaluation Pack B), classification as a Dependent Contractor or Employee follows similar tests. If classified as such, PAYE is withheld and coded 3601 or 3616.
Non-residents must sign Appendix 9 and have the pack referred to Eskom Group Tax Department.
Technical Specifications
Source: Attachment 1- Tax Evaluation questionnaire.pdf (unknown)The Fourth Schedule to the Income Tax Act (“the Act”) requires that Employees' Tax must be
withheld from "remuneration" paid by an "Employer" to an "Employee". This tool is intended to establish
whether an Individual, Close Corporation, Company or Trust should be classified as an Independent
Contractor, Personal Service Provider, Labour Broker or a Dependent Contractor, and the tax
consequences of such classification.
This Pack is applicable ONLY to Contractors who supply Eskom Holdings SOC Ltd (“Eskom”) and its
subsidiaries with services or Individual Contractors providing Eskom with labour.
The Contractor or its duly authorised representative must declare that all questions have been answered
truthfully.
Answering the questions will direct you to your next step.
Please note:
This Pack is based on tax legislation for the 2022/2023 tax year and is subject to change.
In the questions, any references to "you" refers to the Contractor.
In the questions, the term Contractor is used interchangeably with Individual/CC/Company/Trust.
Definitions as per the Income Tax Act are included in Appendix 10.
Any reference to “Eskom” refers to Eskom Holdings SOC Ltd and its subsidiaries:
Eskom Rotek Industries SOC Ltd
Eskom Enterprises SOC (Pty) Ltd
Escap SOC (Pty) Ltd
Eskom Finance Company SOC (Pty) Ltd
Eskom Foundation NPC
National Transmission Company SA
The Pack is based on legislation and case law applicable to the 2022/2023 tax year. We therefore
recommend that, if it is used outside of this period, you should first consult with your representative in
Eskom to refer it to Eskom’s Corporate Tax Department in Megawatt Park.
When you return the completed Pack; i.e. the signed summary sheet and signed affidavits to Eskom,
please copy Group Tax on Email address: [email protected]
The Contractor or its duly Authorised Representative acknowledges and accepts that:
ease of reading.
this Pack;
Disclaimer
Applicable to the 2022/2023 Tax Years
Eskom accepts no liability whatsoever for any loss or damages whatsoever and howsoever incurred, or
suffered, resulting, or arising, from the use of this Pack.
Contractor type
Supplier category
Please complete the following questionnaire for:
Company/Close Corporation/Trusts - EVALUATION PACK A on .
Individuals - EVALUATION PACK B on .
Applicable to the 2022/2023 Tax Years
Evaluation pack a
(To determine whether a Company, Close Corporation (CC) or Trust is a Personal
Service Provider)
Fields marked with an Asterisk (*) must be completed
Contractor’s details for a company or close corporation or
Trust
Contractor’s Name* Vendor No.
Duly Authorised Representative Name Representative Surname
Capacity Representative ID No.*
Representative Passport No. (if no RSA ID) Country of Passport Issue
VAT Registration No. Income Tax Registration No.*
CO/CC/Trust Registration No.* E-Mail Address
Telephone Number* Fax Number
Contractor’s Physical Business Address*
Unit No
Complex Name
Street Number
Street Name
Suburb
City/Town
Postal Code
Contractor’s Postal Business Address*
Same as above (Mark with an X)
Address TYPE (Delete where not applicable) P O Box/Private Bag/Street Address
P O Box/Private Bag/Street NUMBER
Street Name
Suburb
Town
Postal Code
Contractor’s Bank Details*
Account Number Bank Name
Branch Name Branch Number
Name of Account Holder Account Type (Delete where not applicable)
Current/ Savings/ Transmission/Credit Card/Bond
Account
Account Holder Relationship*
i.e. own, joint or 3rd party Own/Joint/3rd Party
Applicable to the 2022/2023 Tax Years
Please answer the following questions by marking the appropriate column with an
"X".
The term “You” will refer to the Company/CC/Trust in this Questionnaire.
Question 1(i)
Are you a Resident of the Republic of South Africa in terms of the Income Tax Act?
(Refer to Appendix 10 for the definition of a resident).
If the answer is Yes, go to Question 2(i).
If the answer is No:
Eskom to refer it to Eskom Group Tax Department in Megawatt Park.
Question 2(i)
Do you employ 3 (three) or more persons (excluding shareholders or members or
beneficiaries of the Company/CC/Trust)?
If the answer is Yes, go to Question 2(ii).
If the answer is No, go to Question 3(i).
Question 2(ii)
Are these employees employed:
If the answer is Yes, go to Question 2(iii).
If the answer is No, go to Question 3(i).
Question 2(iii)
Are the above 3 employees connected to the shareholders or the members or the
beneficiaries of the Company/CC/Trust?
If the answer is Yes, go to Question 3(i).
If the answer is No:
from your payments.
from your payments.
Corporation/Trust” at the end of the Evaluation Pack.
Applicable to the 2022/2023 Tax Years
Question 3(i)
Will/are any person who is a Connected person in relation to the Company/CC/Trust
render services personally to Eskom on behalf of the Company/CC/Trust? (Refer to
Appendix 10 for the definition of a Connected person).
If the answer is Yes, go to Question 4(i).
If the answer is No:
from your payments.
from your payments.
Corporation/Trust” at the end of the evaluation Pack.
Question 4(i)
During the current year of assessment:
received either directly or indirectly, from:
the definition of an Associated institution)
If the answer is Yes:
Corporation/Trust” at the end of the evaluation Pack.
If the answer is No:
from your payments.
Question 5(i)
Must your duties be performed /are your duties performed mainly (more than 50%) at
the premises of Eskom,
And
Will you be subject /are you subject to Eskom’s control or supervision as to the
manner in which your duties are to be performed?
If the answer is Yes to BOTH questions:
Corporation/Trust” at the end of the evaluation Pack.
If the answer is No:
from your payments.
Applicable to the 2022/2023 Tax Years
Question 6(i)
Do/will the payments by Eskom for services payable with reference to output or
certain agreed results, e.g. payment (be it a fixed fee or an hourly rate) be only due if
and when a specific deliverable has been completed?
Question 6(ii)
Does/Will Eskom have the contractual right to control the tools or equipment, staff,
raw materials, routines, patents or technology used in the provision of the services?
Question 6(iii)
Are you/will you prohibited from rendering services to any other employers/clients
during the period of service to Eskom?
Question 6(iv)
Do/will you have the right to sub-contract work?
Question 6(v)
Are you personally or will you personally be at risk for the quality of the work done or
to be done (risk for poor quality; time over-runs, project not producing income)?
Question 6(vi)
Are/will you or the person rendering the service be obliged to be present and perform
the work at Eskom regardless of whether work is available or not?
Question 6(vii)
Is Eskom’s business or will Eskom’s business be critical to your financial/economic
survival?
Question 6(viii)
Does/will your position form part of Eskom’s organisational structure?
Question 6(ix)
Does/will Eskom provide you with any of the following:
Question 6(x)
Does/will Eskom provide you with an office?
Question 6(xi)
Does/will Eskom provide you with any equipment, tools, stationery and material?
Please go to the next section to establish your tax status.
Applicable to the 2022/2023 Tax Years
To establish your tax status, you need to summarise the “Yes” and “No” as
answered on Question 6(i) to 6(xi) in the column below:
Question Yes No
6(i) Independent PSP
6(ii) PSP Independent
6(iii) PSP Independent
6(iv) Independent PSP
6(v) Independent PSP
6(vi) PSP Independent
6(vii) PSP Independent
6(viii) PSP Independent
6(ix) PSP Independent
6(x) PSP Independent
6(xi) PSP Independent
Decision
Independent
Psp
If you have answered “PSP” to any of the following questions 6 (i), 6(iii), 6(v), 6(vi),
6(ix);
or
If you have answered more than 50% “PSP” to questions 6(ii), 6(iv), 6(vii), 6(viii),
6(x), 6(xi):
and will be coded as 3601 on your IRP5 certificate.
Corporation/Trust” at the end of the evaluation Pack.
Alternatively:
If you have already signed Appendix 7 on Questions 4 or 5:
disclosed on the IRP5 for payments received.
If you have not signed Appendix 7 on Questions 4 or 5:
from your payments.
Corporation/Trust” at the end of the evaluation Pack.
Applicable to the 2022/2023 Tax Years
Summary for ID No. Vendor No:
Company/Close Corporation/Trust Summary
Please sign
he
following
Questions Answer Appendix
(Appendices
)
1(i) Are you a Resident of the Republic of South Africa in terms of the Income
Tax Act?
2(i) Do you employ 3 (three) or more persons (excluding shareholders or
members or beneficiaries of the Company/CC/Trust and connected
persons in relation to the shareholder or member or beneficiaries)?
2(i ) Are these employees employed on a full time basis and are they engaged
in the business of the Company/CC/Trust?
2(iii) Are the above 3 employees connected to the shareholders or the members
or beneficiaries of the Company/CC/Trust?
3(i) Will/are any person who is a Connected person in relation to the
Company/CC/Trust render services personally to Eskom on behalf of the
Compa y/CC Trust?
4(i) During the current year of assessment will more than 80% of your income
or is it likely that more than 80% of your income will consist of amounts
received either directly or indirectly from any one client, or an Associated
institution in relation to that client?
5(i) Must your duties be performed / are your duties performed mainly (more
than 50%) at the premises of Eskom AND will you be /are you subject to
Eskom’s control or supervision as to the manner in which your duties are
performed or to the hours of work?
6( ) Do/will the payments by Eskom for services payable with reference to
output or certain agreed results, e.g. payment (be a fixed fee or an hourly
rate) be only due if and when a specific deliverable has been completed?
6(ii) Does/Will Eskom have the contractual right to control the tools or
equipment, staff, raw materials, routines, patents or technology used in the
provision of the services?
6(iii) Are you/will you prohibited from rendering services to any other
employers/clients during the period of service to Eskom?
6(iv) Do/will you have the right to sub-contract work?
6(v) Are you personally or will you personally be at risk for the quality of the
work done or to be done (risk for poor quality; time over-runs, project not
producing income)?
6(vi) Are/will you or the person rendering the service be obliged to be present
and perform the work at Eskom regardless of whether work is available or
not?
6(vii) Is Eskom’s business or will Eskom’s business be critical to your
financial/economic survival?
6(viii) Does/will your position form part of Eskom’s organisational structure?
6(ix) Does/will Eskom provide you with any of the following:
Pension fund / Provident fund / Retirement Annuity Fund; medical aid,
leave of any nature, salary increases, bonuses or any allowances.
6(x) Does/will Eskom provide you with an office?
6(xi) Does/will Eskom provide you with any equipment, tools, stationery and
material?
Tax Status
Particulars of person acting as representative of the company/close
Corporation/trust
I, the undersigned, confirm that the information provided above is accurate, and that the Company/CC/Trust will,
while contracted to Eskom, inform Eskom of any changes that take place pertaining to the information provided
above. Eskom shall be entitled to withhold from any payments to be made to the Company/CC/Trust, any taxes,
interest and penalties that it may be required to pay to SARS as a result of the above information being inaccurate.
Representative's Full Names Capacity Contact No.
Signature Date
Applicable to the 2022/2023 Tax Years
Evaluation pack b
(To determine whether an Individual is a Dependent Contractor)
Fields marked with an Asterisk (*) must be completed
Contractor’s details for an individual*
Trading Name* Vendor No.
First Names* Initials*
Surname* ID Number*
Passport No. (if no RSA ID) Country of Passport Issue
VAT Registration No. Income Tax Registration No.*
Date of Birth* E-Mail Address
Telephone Number* Fax Number
Contractor’s Physical Business Address*
Unit No
Complex Name
Street Number
Street Name
Suburb
City/Town
Postal Code
Contractor’s Postal Business Address*
Same as above (Mark with an X)
Address TYPE (Delete where not applicable) P O Box/Private Bag/Street Address
P O Box/Private Bag/Street NUMBER
Street Name
Suburb
Town
Postal Code
Contractor’s Bank Details*
Account Number Bank Name
Branch Name Branch Number
Name of Account Holder Account Type (Delete where not applicable)
Current/ Savings/ Transmission/Credit Card/Bond
Account
Account Holder Relationship*
i.e. own, joint or 3rd party Own/Joint/3rd Party
Applicable to the 2022/2023 Tax Years
Please answer the following questions by marking the appropriate column with an
"X".
Question 1(i)
Do/will you provide Eskom with a service or people?
If the answer is “Service”:
PAYE will be withheld from your payments.
If the answer is “People”, go to Question 2(i).
Question 2(i)
Do you provide Eskom with People and will these people be paid by you?
If the answer is Yes, go to Question 2(ii).
If the answer is No, go to Question 3(i).
Question 2(ii)
Are you in possession of an IRP30 exemption certificate which is valid for the period
under review?
If the answer is Yes:
from your payments.
provided, PAYE will be withheld from your payments until such time
the IRP30 certificate is provided.
Pack.
If the answer is No:
IRP30 certificate is provided.
Pack.
Question 3(i)
Are you a Resident of the Republic of South Africa in terms of the Income Tax Act?
(Refer to Appendix 10 for the definition of a Resident).
If the answer is Yes, go to Question 4(i).
If the answer is No:
Eskom to refer it to Eskom Group Tax Department in Megawatt.
Applicable to the 2022/2023 Tax Years
Question 4(i)
Do you employ:
If the answer is Yes, go to Question 4(ii).
If the answer is No, go to Question 5(i).
Question 4(ii)
Are these employees employed:
If the answer is Yes, go to Question 4(iii).
If the answer is No, go to Question 5(i).
Question 4(iii)
Are any of these employees Connected persons in respect of the Individual, e.g.
spouse, parent, adoptive parent, child, grandparent, cousin, etc.? (Refer to
Appendix 10 for the definition of Connected person).
If the answer is Yes, go to Question 5(i).
If the answer is No:
from your payments.
withheld from your payments.
Pack.
Question 5(i)
Must your duties be performed mainly (i.e. more than 50%) at premises of Eskom?
If the answer is Yes, go to Question 5(ii).
If the answer is No, go to Question 5(ii).
Question 5(ii)
Will you be /are you subject to Eskom’s control or supervision as to the manner in
which your duties are to be performed or as to the hours of work?
If the answers in both Questions 5(1) and 5(ii) are Yes:
If the answer is No:
from your payments.
Applicable to the 2022/2023 Tax Years
Question 6(i)
Do/will the payments by Eskom for services payable with reference to output or
certain agreed results, e.g. payment (be it a fixed fee or an hourly rate) be only due
if and when a specific deliverable has been completed?
Question 6(ii)
Does/Will Eskom have the contractual right to control the tools or equipment, staff,
raw materials, routines, patents or technology used in the provision of the services?
Question 6(iii)
Are you/will you prohibited from rendering services to any other employers/clients
during the period of service to Eskom?
Question 6(iv)
Do/will you have the right to sub-contract work?
Question 6(v)
Are you personally / will you personally be at risk for the quality of the work done or
to be done (risk for poor quality; time over-runs, project not producing income)?
Question 6(vi)
Are/will you or the person rendering the service be obliged to be present and
perform the work at Eskom regardless of whether work is available or not?
Question 6(vii)
Is Eskom’s business or will Eskom’s business be critical to your financial/economic
survival?
Question 6(viii)
Does/will your position form part of Eskom’s organisational structure?
Question 6(ix)
Does/will Eskom provide you with any of the following:
Question 6(x)
Does/will Eskom provide you with an office?
Question 6(xi)
Does/will Eskom provide you with any equipment, tools, stationery and material?
Please go to the next section to establish your tax status.
Applicable to the 2022/2023 Tax Years
To establish your tax status, you need to summarise the “Yes” and “No” as
answered on Question 6(i) to 6(xi) in the column below:
Question Yes No
6(i) Independent Employee
6(ii) Employee Independent
6(iii) Employee Independent
6(iv) Independent Employee
6(v) Independent Employee
6(vi) Employee Independent
6(vii) Employee Independent
6(viii) Employee Independent
6(ix) Employee Independent
6(x) Employee Independent
6(xi) Employee Independent
Decision
Independent
Psp
If you have answered “Employee” to any of the following questions 6 (i), 6(iii), 6(v),
6(vi), 6(ix);
or
If you have answered more than 50% “Employee” to questions 6(ii), 6(iv), 6(vii),
6(viii), 6(x), 6(xi):
Alternatively:
If you have already signed Appendix 7 on Questions 5:
disclosed on the IRP5 for payments received.
If you have not signed Appendix 7 on Questions 5:
withheld from your payments.
Corporation/Trust” at the end of the evaluation Pack.
Applicable to the 2022/2023 Tax Years
Summary for ID No. Vendor No:
Company/Close Corporation/Trust Summary
Please si n
the following
Pricing Schedule
Source: Attachment 1- Tax Evaluation questionnaire.pdfThe questionnaire determines the tax treatment of payments. Labour brokers with a valid IRP30 certificate receive payments without Employees' Tax withheld, and an IT3(a) with code 3617 is issued. Without a valid IRP30, Employees' Tax is withheld at individual tax rates until the certificate is provided, and an IRP5 with code 3617 is issued. Dependent contractors or personal service providers have PAYE withheld at prevailing tax rates, coded 3601 or 3616 on the IRP5.
Financial Requirements
Source: Attachment 1- Tax Evaluation questionnaire.pdf (unknown)PAYE implications:
Compliance Requirements
Source: Attachment 1- Tax Evaluation questionnaire.pdf (unknown)The contractor must complete the PAYE questionnaire and sign the required affidavits/declarations based on their classification. Required forms include:
Non-residents must sign Appendix 9 and have the pack referred to Eskom Group Tax Department.
Contractual Terms
Source: Attachment 1- Tax Evaluation questionnaire.pdf (unknown)The contractor must notify Eskom of any changes to the information provided. Eskom may withhold from payments any taxes, interest and penalties that SARS may impose due to inaccurate information.
Special Conditions
Source: Attachment 1- Tax Evaluation questionnaire.pdf (unknown)Eskom accepts no liability for any loss or damages arising from the use of this pack. The contractor is responsible for the accuracy and completeness of all information provided. The pack will not be automatically updated with changes in legislation. If used outside the 2022/2023 tax year, the contractor should consult Eskom's Corporate Tax Department.
Requirements
Source: Attachment 1- Tax Evaluation questionnaire.pdf (unknown)The contractor must complete the applicable evaluation pack (A for companies/CCs/trusts, B for individuals) and sign the required appendices based on their answers. The pack is based on the 2022/2023 tax year legislation and is subject to change. If used outside this period, the contractor should consult Eskom's Corporate Tax Department.
Section
Source: Attachment 1- Tax Evaluation questionnaire.pdfThe questionnaire's evaluation determines the contractor's tax status. For companies/CCs/trusts, a Personal Service Provider (PSP) classification results if the contractor answers 'PSP' to any of questions 6(i), 6(iii), 6(v), 6(vi), 6(ix), or more than 50% 'PSP' to questions 6(ii), 6(iv), 6(vii), 6(viii), 6(x), 6(xi). For individuals, an 'Employee' classification follows similar criteria. The classification affects PAYE withholding and IRP5 codes.
Description
Source: Attachment 14 SDLI Strategy.pdfProvision of building and infrastructure maintenance services at Drakensberg Pumped Storage Scheme on an as-and-when-required basis for a period of five (5) years. Duration: 60 months. CIDB grading: 6 CE/GB.
Important Dates
Source: Attachment 14 SDLI Strategy.pdf (TENDER)Closing date: 01 October 2026 at 10:00 (from tender record). The document does not state a mandatory briefing or site visit.
Submission Guidelines
Source: Attachment 14 SDLI Strategy.pdf (TENDER)Returnable documents: SBD 6.2 Declaration Form and Annex C (Local Content Declaration – Summary Schedule) are mandatory tender returnables. Bidders must also submit a valid B-BBEE certificate (or sworn affidavit/CIPC affidavit for qualifying entities), proof of ownership/shareholding (preferably CIPC documentation) with shareholding breakdown, certified ID copies of shareholders, and proof of disability where applicable. Failure to provide preference point documentation does not disqualify the bid but limits scoring to price only.
Evaluation Criteria
Source: Attachment 14 SDLI Strategy.pdf (TENDER)Evaluation follows the Preferential Procurement Policy Framework Act (PPPFA) 80/20 or 90/10 point system. A maximum of 10 points (90/10 system) or 20 points (80/20 system) may be awarded for specific goals (B-BBEE status level). Points for specific goals are added to price points, and the total is rounded to two decimal places. The contract is awarded to the tenderer scoring the highest total points. Bidders failing to provide preference point documentation score 0 for specific goals and only score out of 90/80 for price. Objective criteria (designated sectors and CIDB skills development) are conditions for contract award; failure to meet them may lead to the second-ranked tenderer being recommended for award.
Technical Specifications
Source: Attachment 14 SDLI Strategy.pdf (TENDER)Scope: Provision of building and infrastructure maintenance services at Drakensberg Pumped Storage Scheme on an as-and-when-required basis. Duration: 60 months (5 years). CIDB grading: 6 CE/GB (as indicated in the document).
Financial Requirements
Source: Attachment 14 SDLI Strategy.pdf (TENDER)Pricing must be separated into components as per the Price Schedule included in the tender documents. Local procurement content is total spending minus the imported component. Eskom will retain 1.5% of every invoice (excluding VAT) as security for SDL&I obligations; the retained amount is released upon full fulfilment of SDL&I obligations. A penalty of 1.5% of the Contract Value applies for failure to meet SDL&I obligations.
Compliance Requirements
Source: Attachment 14 SDLI Strategy.pdf (TENDER)B-BBEE: Valid B-BBEE certificate issued by a SANAS accredited verification agency, or sworn affidavit/CIPC affidavit for qualifying entities (EMEs with revenue ≤ R10 million, QSEs with revenue ≤ R50 million and at least 51% black owned). Bidders with revenue above R50 million must submit a valid B-BBEE certificate. Local Content: Minimum thresholds for designated sectors must be achieved in full: Steel Products and Steel Components – 100%; Cement – 100%; Electrical and Telecom Cables – 90%; Valves and Actuators – 70%; Pumps and Medium Voltage Motors – 70%. CIDB Skills Development: Mandatory Construction Skills Development Goal (CSDG) of 0.375% of the Acceptable Contract Amount; failure to meet this renders the tender non-responsive. SBD 6.2 Declaration Form and Annex C are mandatory returnables.
Special Conditions
Source: Attachment 14 SDLI Strategy.pdf (TENDER)Eskom will apply a penalty of 1.5% of the Contract Value for failure to meet SDL&I obligations. For the duration of the contract, Eskom will retain 1.5% of every invoice (excluding VAT) as security for the fulfilment of all SDL&I obligations. The retained amounts will only be released to the Contractor upon full fulfilment of all SDL&I obligations.
Requirements
Source: Attachment 14 SDLI Strategy.pdf (TENDER)Objective criteria: Designated sectors with minimum local content thresholds must be achieved in full: Steel and Steel Components – 100%; Cement – 100%; Electrical and Telecom Cables – 90%; Valves – 70%; Pumps and Medium Voltage Motors – 70%. SBD 6.2 Declaration Form and Annex C are mandatory returnables. CIDB Skills Development: Mandatory Construction Skills Development Goal (CSDG) of 0.375% of the Acceptable Contract Amount; failure to meet this renders the tender non-responsive.
Section
Source: Attachment 14 SDLI Strategy.pdfSpecific goals: maximum 10/20 points for B-BBEE status level. Points are added to price points and total rounded to two decimal places. Contract awarded to highest total points. Bidders failing to provide preference point documentation score 0 for specific goals and only score out of 90/80 for price.
Important Dates
Source: Attachment 9 Safety.pdf (unknown){"closingDate":"21 October 2022"}
Evaluation Criteria
Source: Attachment 9 Safety.pdf (unknown)No specific eligibility criteria (e.g., CSD registration, tax clearance, B-BBEE level, CIDB grading) are stated in the provided document content. Bidders must comply with the referenced Eskom safety procedures and PPE standard as part of contract execution.
Technical Specifications
Source: Attachment 9 Safety.pdf (unknown)Eskom is committed to health and safety excellence, which forms an integral part of its operations.
Eskom and its subsidiaries will conduct business with respect and care for people to ensure that no
operating condition or urgency of service endangers the life of anyone or causes injury or damage
to the environment.
Although the Bill of Rights entrenched in the South African Constitution makes no specific reference
to health and safety in the workplace, the rights relevant to health and safety in the workplace include
the right to life, the right to a safe and healthy environment, and labour rights.
Employees have a duty to take reasonable care of their health and safety and the health and safety
of other persons, to cooperate with the employer, to carry out lawful orders, to report unsafe
situations and incidents, and engage in a manner following the behavioural safety observations
elements (SMAT), which will ensure that unsafe behaviour does not continue or repeat itself.
The aim of this Procedure is to ensure that an environment is created that promotes Zero Harm by
empowering employees and contractors to take responsibility for their own safety and that of others.
2.1 Scope
This Procedure shall apply to all Eskom sites with the intention of promoting a safe working
environment for all Eskom employees (permanent, non-permanent, employees placed by a
Temporary Employee Services provider (TES), learners, and bursary students), agents, consultants,
and contractors.
2.1.1 Purpose
This Procedure clarifies Eskom’s intention to ensure that no one is exposed to unsafe conditions or
is in a position, with respect to any behaviour, that can result in serious risk at the workplace.
2.1.2 Applicability
This Procedure shall apply throughout Eskom Holdings SOC Ltd divisions and subsidiaries.
2.1.3 Effective date
1 July 2015.
2.2 Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
[1] Occupational Health and Safety Act .
[2] 32-727: Eskom, Safety, Health, Environment and Quality Policy.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Employees’ Right of Refusal to Work in an Unique Identifier: 240-43848327
Unsafe Situation Procedure Revision: 1
Page:
[3] 32-407 Behavioural Observation Procedure.
2.2.2 Informative
[4] DPC 34-846: Operating Regulations for High-voltage Systems.
[5] GGR 0992: Plant Safety Regulations (Low-voltage Regulations).
[6] GGR 0568: Pulverised Fuel Firing Regulations.
[7] ISO 9001 Quality Management Systems.
[8] NEMA 107: National Environmental Management Act.
[9] MHSA: Mine Health and Safety Act.
2.3 Definitions
2.3.1 Absolute (or strict) requirement: A requirement designed for a safe working environment,
which means that the particular duty must be complied with, irrespective of cost or likelihood
of injury.
2.3.2 Unsafe situation: Any situation involving an unsafe act from an individual or an unsafe
condition.
2.3.3 Safety rules: Rules designed to prevent accidents and injuries when followed.
2.3.4 Contractor: Any employer formally contracted (directly or indirectly) by Eskom and who
performs work or supplies a service, product, equipment, or material for the purposes of
advancing Eskom’s business and other interests. This includes personal
contractors/consultants and third-party contractors (vendors, suppliers, agents, joint
ventures, principal contractors and subcontractors).
2.3.5 Suppliers: Any person or organisation that supplies any product, equipment, or material;
and this includes courier services.
2.3.6 Agents: Any person who acts as a representative for Eskom (as the client), as defined in
the OHS Act. (With specific reference to the Construction Regulations).
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Employees’ Right of Refusal to Work in an Unique Identifier: 240-43848327
Unsafe Situation Procedure Revision: 1
Page:
2.3.7 Joint ventures: An entity formed through a decision and agreement to work together
between two or more persons, parties, and/or organisations to undertake an economic
activity together and which entity is managed by means of this agreement. The parties
agree to create a new entity by both contributing equity, and they then share in the
revenues, expenses, and control of the enterprise.
2.3.8 Treat: to apply/administer a process to improve or remedy a risk/hazard/unsafe condition(s)
or situation(s).
2.3.9 Mitigate: to control/prevent a hazard from causing harm and to reduce a risk/hazard/unsafe
condition(s) or situation(s).
2.3.10 Eliminate: to remove/eradicate a risk/hazard/unsafe condition(s) or situation(s).
2.3.11 Workplace: Any premises or place where a person performs work in the course of his
employment.
2.3.12 Behavioural Safety Observation (SMAT): Technique use to assess and address the
actual safe and unsafe behaviours of people in the workplace; as well as workplace
conditions - which are caused by the actions or non-actions of employees, contractors or
their supervisors.
2.4 Abbreviations
Abbreviation Explanation
BU Business Unit
EDC Eskom Documentation Centre
ExCo Executive Committee
H&S Health and safety
OH&S Occupational Health and Safety
OU Operating Unit
TES Temporary Employee Services
SMAT Safety Management Audit Technique
2.5 Roles and Responsibilities
2.5.1 The Risk and Sustainability Division (OHS): The OHS Department shall review the
Procedure every five years or as required by the OHS Steering Committee.
2.5.2 Group and divisional executives: Group and divisional executives are responsible for
ensuring adherence to this procedure within their respective groups/divisions.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Employees’ Right of Refusal to Work in an Unique Identifier: 240-43848327
Unsafe Situation Procedure Revision: 1
Page:
2.5.3 Operating units/ Business units: The management at Business Unit level shall be
responsible for:
importance of compliance with this Procedure; and the consequences of non-compliance.
This includes communicating duty of care and refusal to perform an unsafe task to all new
employees and new contractors;
duty of care and refusal to perform an unsafe task; and
2.6 Process for Monitoring
Compliance with the requirements of this Procedure has to be audited by the Operating/Business
Unit,
Service Function and/or Strategic function at least annually as part of an internal review process. All
records have to be audited by Assurance and Forensics Department or any person appointed by it
to do so, on its behalf, at its discretion and at a frequency determined by it.
The focus areas of such monitoring will include the following:
2.7 Related/Supporting Documents
2.7.1 Refusal to work in an unsafe workplace. (Unique identifier 240-53716047).
3.1 General
The employer has the duty to inform each person of his or her right to refuse unsafe work, which
includes that every employee shall, at work:
a) take reasonable care of his or her own health and safety and that of any other person who may
be affected by his or her acts or omissions;
b) co-operate in order to enable that any duty or requirement, including absolute (or strict)
requirements imposed on the employer in order to achieve a safe workplace, are performed and
complied with;
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Employees’ Right of Refusal to Work in an Unique Identifier: 240-43848327
Unsafe Situation Procedure Revision: 1
Page:
c) carry out any lawful order given to him or her and obey the health and safety rules and procedures
laid down by his or her employer or by anyone authorised to do so by the employer in the interest
of health and safety;
d) if any situation that is unsafe or unhealthy comes to his or her attention, as soon as practicable
take immediate preventative and corrective action and report such situation to his or her
employer or to the health and safety representative for his or her workplace or section thereof,
as the case may be, who shall, in turn, report it to the employer; and
e) exercise the duty so as not to interfere with, damage, misuse or intentionally or recklessly
interfere with anything that is provided in the interest of health or safety.
3.2 Standard Procedure for when an Employee Exercises his or her Right of Refusal to
Work in the case of an Unsafe Work Situation
Where an employee is directed, required, or instructed to perform a task in relation to equipment, a
machine, device, thing, or physical condition and he or she reasonably believes in good faith that
the:
a) equipment, machine, device, or thing; or
b) physical condition of the workplace;
c) is in contravention of any health and safety requirement, may endanger, endangers, causes an
undue hazard, or may cause an undue hazard to his or her health and safety, (collectively
referred to as an unsafe work condition) or those of his or her co-worker or any person, such an
employee has the right to refuse to perform such a task until such time as it has been corrected
and made safe.
d) The employee may refuse to return to perform such a task until the unsafe work condition(s)
has/have been mitigated, treated or eliminated.
e) An employee cannot refuse to work when high-risk work condition(s) and processes form part
of his or her normal contractual duties, where following approved safe work procedures will
ensure a safe working environment. (Example: a live line worker involved in live line work
following safe work procedures).
f) Should any employee at any time reasonably believe, in good faith, that the performance of work
or a task is unsafe, the following procedures shall apply:
Stage 1:
condition or unsafe act. The supervisor shall give the situation immediate attention.
available, the applicable health and safety representative the reasons for believing that the
work to be performed is unsafe. The employee has the right to invite his/her union
representative.
The employee(s) shall remain in a safe place.
The supervisor shall investigate the unsafe situation together with the applicable employee
and the applicable health and safety representative responsible for that particular area.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Employees’ Right of Refusal to Work in an Unique Identifier: 240-43848327
Unsafe Situation Procedure Revision: 1
Page:
outline the corrective actions in order to mitigate/treat/eliminate the unsafe situation.
Alternatively, if it is found that the perceived threat is unfounded, the supervisor shall give a
clearance notice to the employee, co-signed by the applicable employee, indicating that the
identified perceived threat has been thoroughly investigated and that the situation has been
declared to be safe. (See form referenced in Paragraph 2.7.1.)
threat to employees or any other person, only qualified and properly instructed employees or
persons will be permitted to correct such unsafe condition. Every possible effort must be
made to control the hazard while this is being done.
employee shall return to work. If the issue has not been resolved, proceed to the following
stage.
Stage 2:
The manager of that section or, if not readily available, any other person with the necessary
knowledge, skills, and experience who understands the task and associated risks must then
review the risk assessment and mitigation plans and, where necessary, make changes to further
reduce/treat/eliminate the risk. If the issue is resolved and the appropriate corrective action has
been taken, the employee shall return to work.
If the issue has not been resolved, then the work will be considered as unsafe and cannot
continue until the applicable Responsible Manager (BU/OU Manager) have introduced all steps
to ensure the work place is safe as defined in the Occupational Health and Safety Act, Eskom’s
policies, procedures and best practices.
Stage 3:
In a case, wherein, the employee is still unsatisfied or refuses to acknowledge the resolution of the
threat, the matter shall be brought to the OU/BU Manager for resolution. If the matter cannot be
resolved internally, the OU/BU Manager shall immediately notify the Provincial Inspector at the
Department of Employment and Labour.
3.3 Participation by Subject-Matter Specialist
If a supervisor requests that a subject-matter specialist should participate in the resolution of an
issue, the BU Responsible Manager:
a) must ensure the appointment of the appropriate subject-matter specialist to enter the workplace
for the purpose of participating;
b) must give every reasonable assistance necessary to enable participation by the subject-matter
specialist; and
c) shall:
i.ensure that the necessary steps are taken to make the workplace healthy and safe; and
ii. jointly advise the employees of the steps that are being taken
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Employees’ Right of Refusal to Work in an Unique Identifier: 240-43848327
Unsafe Situation Procedure Revision: 1
Page:
3.4 Report
The supervisor, together with the subject-matter specialist (if applicable), must prepare a report as
stipulated in form referenced in Paragraph 2.7.1, which must be tabled and discussed at the next
Statutory Health and Safety Committee meeting. The chairperson of the Health and Safety
Committee must enter the refusal to work into the register and ensure that all events involving any
person exercising his or her right of refusal to work in unsafe situations have been recorded in the
minutes of the Health and Safety Committee.
3.5 Victimisation Prohibited
Employees who exercise their right to refuse to work in accordance with the steps set out in this
Procedure are protected by the Occupational Health and Safety Act. Therefore, no employer or
person acting on behalf of an employer shall:
a) dismiss or threaten to dismiss an employee;
b) discipline or suspend or threaten to discipline or suspend an employee;
c) impose any penalty on an employee; or
d) intimidate or coerce an employee
Solely because the employee has acted in compliance with the applicable requirements set out in
this Procedure.
Notwithstanding this, any employee who without good reason refuses to work and who fails to follow
this Procedure may be dealt with in terms of Eskom’s applicable policies and procedures.
This document has been seen and accepted by:
Name Designation
M Moahlodi Senior Manager-
Phillip Mashego Senior Manager Human Resources
OHS Steering Committee
Date Rev. Compiler Remarks
October 2022 2 S Mqanto Stage 3 of reporting added
June 2015 1 SN Middel Confirmed still valid. Revision date
updated
August 2013 0 SN Middel
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Employees’ Right of Refusal to Work in an Unique Identifier: 240-43848327
Unsafe Situation Procedure Revision: 1
Page:
The following people were involved in the development of this document:
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the
expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
Standard
Title: Eskom Personal Protective Document Identifier: 240-44175132
Equipment (PPE)
Alternative Reference N/A
Number:
Area of Applicability: Eskom Holdings SOC Ltd
Functional Area: Occupational Health and
Safety
Revision: 2
Total Pages: 56
Next Review Date: March 2028
Disclosure Controlled Disclosure
Classification:
Compiled by Functional Responsibility Authorized by
Ntokozo Ngubane Miranda Moahlodi Kerseri Pather
Senior Advisor OHS Senior Manager OHS General Manager
Risk and Sustainability Risk and Sustainability Risk and Sustainability
Date: 05 April 2023 Date: 10 April 2023 Date: 10 April 2023
Document Template 32-4 Revision 7
Eskom Personal Protective Equipment (PPE) Unique Identifier: 240-44175132
Revision: 2
Page:
Content
. Introduction ............................................................................................................................... 4
2.1 Scope ............................................................................................................................... 4
2.1.1 Purpose ................................................................................................................. 4
2.1.2 Applicability ........................................................................................................... 4
2.1.3 Effective Date ........................................................................................................ 5
2.2 Normative/Informative References ................................................................................... 5
2.2.1 Normative .............................................................................................................. 5
2.2.2 Informative............................................................................................................. 6
2.3 Definitions ........................................................................................................................ 6
2.4 Abbreviations ................................................................................................................... 7
2.5 Roles and Responsibilities ............................................................................................... 8
2.6 Process for Monitoring ...................................................................................................... 9
3.1 General ............................................................................................................................ 9
3.2 General Garments or Work Wear Specification .............................................................. 11
3.3 Minimum Standard Specifications for Boiler Suits/Overalls - One Piece (Figure 2 on
diagram: drg.10332 SANS 434) and two piece (Figure 4 on diagram: drg.15289da on
SANS 434) work wear suits ........................................................................................... 12
3.4 Minimum Standard Specifications for Dust Coats ........................................................... 16
3.5 Minimum Standard Specifications for Shirts ................................................................... 17
3.6 Minimum Standard Specifications for Ladies Shirts And Pants ...................................... 18
3.7 Minimum Standard Specifications Thermal Jackets (Winter Jackets) ............................ 19
3.8 Minimum Standard Specifications for Rain Protection (Rain Suits) ................................. 20
3.9 Minimum Standard Specifications for Chemical Protection (Chemical Suits) .................. 20
3.10 Minimum Standard Specifications for Reflective Vests and Bibs .................................. 21
3.11 Minimum Standard Specifications for Cold Weather Protection ................................... 22
3.12 Minimum Standard Specifications for Aprons ................................................................ 23
3.13 Minimum Standard Specifications for Head Protection ................................................. 23
3.14 Minimum Standard Specifications for Eye/Face Protection ............................................. 25
3.15 Minimum Standard Specifications for Hearing Protection .............................................. 28
3.16 Minimum Standard Specifications for Foot Protection .................................................... 28
3.17 Minimum Standard Specifications for Hand and Arm Protection .................................... 31
3.18 Minimum Standard Specifications for Skin Protection ..................................................... 32
3.19 Minimum Standard Specifications for Respirators ...................................................... 34
3.20 Minimum Standard Specifications for Protective Clothing for Users of Hand-Held Chain
Saws ......................................................................................................................... 36
3.21 Minimum Standard Specifications for Tog Bags ............................................................. 36
4.1 Head Protection .............................................................................................................. 37
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Personal Protective Equipment (PPE) Unique Identifier: 240-44175132
Revision: 2
Page:
4.2 Eye/Face Protection – Goggles, Eyeglasses, Welding Helmets, and Face Shields ........ 39
4.3 Hearing Protection .......................................................................................................... 40
4.4 Foot Protection ............................................................................................................... 40
4.5 Garments (Clothing) ....................................................................................................... 42
4.6 Chemical Protection ...................................................................................................... 44
4.7 Reflective Vests and Bibs ............................................................................................... 45
4.8 Hand and Arm Protection ............................................................................................... 45
4.9 Respirators and Dust Masks........................................................................................... 46
4.10 Cold-Weather Protection (Freezer Wear) ....................................................................... 46
4.11 Skin Protection ............................................................................................................... 47
4.12 Tog Bags ........................................................................................................................ 47
Acceptance ............................................................................................................................. 47
Revisions ................................................................................................................................ 48
Development Team ................................................................................................................ 48
Acknowledgements ................................................................................................................ 48
Annex A – Personal Protective Clothing – Standard Sizes ............................................................ 49
Annex B – Standard Nomenclature for Stitches, Seams and Stitching (Informative) ..................... 52
Annex C – Material Specification for T006 (Shirts) and all Garment Labels .......................... 53
Annex D – Flame Retardant Retro Reflective Material Sewing on Garments ................................ 54
Annex E – For Rain Wear Sizes and Chemical Chart Specs ......................................................... 55
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Personal Protective Equipment (PPE) Unique Identifier: 240-44175132
Revision: 2
Page:
The Occupational Health and Safety Act places an obligation on employers and/or users
of machinery to evaluate all the risks attached to any condition or situation that may arise from their
activities and to which persons at work may be exposed to and to take necessary steps to make
such condition or situation safe.
Where it is not possible to do so, the employer shall, free of charge, provide and maintain, in a good
and clean condition, safety equipment and facilities and ensure that any person exposed to any such
condition or situation is rendered safe. The employer is required to instruct or train his/her employees
in the proper use, maintenance, and limitations of the safety equipment and facilities provided and
to document such training. This document was compiled to provide minimum requirements for
generic Personal Protective Equipment (PPE) to be used in Eskom and its subsidiaries and how to
care for it. This in turn will ensure the protection of the health and safety of Eskom employees and
compliance with the relevant legal requirements.
2.1 Scope
2.1.1 Purpose
The purpose of this document is to prescribe the minimum requirements for generic Personal
Protective Equipment used in Eskom and provide guidance with regards to the process for the
selection, use, care, and maintenance of personal protective equipment (PPE).
This standard does not cover the requirements for specialised work such as Live Work, Fall Arrest
Systems and any other specialised equipment that is not included herein. The requirements for
specialised work disciplines are covered in their respective standards and/or specifications.
In the case where a particular PPE requirement is not covered in this standard, the onus is on the
Division/OU/Cluster/ BU to ensure that all safety requirements are complied with in accordance with
the relevant standards, regulations, or codes of practices for that specific PPE requirement.
2.1.2 Applicability
This document shall apply throughout Eskom Holdings SOC Limited divisions and subsidiaries.
The Operating/Business Units or Clusters may determine additional PPE requirements to suit their
own needs or working conditions, provided that the minimum requirements as set out in this
specification are met as well as the relevant legislation. Such additional requirements should not
expose the employee to any risk. This can be determined through a comprehensive activity-related
OHS risk assessment.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Personal Protective Equipment (PPE) Unique Identifier: 240-44175132
Revision: 2
Page:
2.1.3 Effective Date
This document will be effective from the day of authorization. Implementation of this document shall
be monitored after a period of six months from the authorisation date to allow the business to properly
transition to new requirements.
2.2 Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
[1] Occupational Health and Safety Act No. .
[2] 240-62196227 Eskom Life-saving Rules.
[3] 240-62582234 OHS Roles and Responsibilities and Statutory Appointments.
[4] 240-43848327 Employees’ Right of Refusal to Work in Unsafe Situations.
[5] 32-245 Eskom Waste Management Standard.
[6] 32-520 Occupational Health and Safety Risk Assessment Procedure.
[7] SANS ISO 9001:2015 Quality Management Systems.
[8] SANS ISO 9001 Quality Management Systems.
[9] SANS 416 Chemical resistant gloves.
[10] SANS 434 Boiler Suits and Work Wear suits.
[11] SANS 1362 Sewing threads.
[12] SANS 1387-4, 6, 7 Woven cotton and similar apparel fabrics.
[13] SANS 1397 Industrial Safety Helmet.
[14] SANS 1400 Equipment (including oculars) for eye, face and neck protection against non-ionizing
radiation arising during welding and similar operations - Welding helmets, hand shields, goggles,
and welding spectacles.
[15] SANS 1404 Eye-protectors for industrial and non-industrial use.
[16] SANS 1423-1 Performance requirements for textile fabrics of low flammability.
[17] SANS 1451-1 Hearing protectors Part 1 Earmuffs.
[18] SANS 1451-2 Hearing protectors Part 2 Ear plugs.
[19] SANS 1451-3 Hearing protectors Part 3 Earmuffs attached to an industrial safety helmet.
[20] SANS 1822 Slide (zip) fasteners.
[21] SANS 10101 Standard nomenclature for stitches, seams, and stitching.
[22] SANS 50136 Respiratory protective devices – Full face masks - Requirements, testing, marking
[23] SANS 50140 Respiratory protective devices – Half masks and quarter masks – Requirements,
testing and marking.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Personal Protective Equipment (PPE) Unique Identifier: 240-44175132
Revision: 2
Page:
[24] SANS 50142 Respiratory protective devices – Mouthpiece assemblies - Requirements, testing
and marking.
[25] SANS 50143 Respiratory protective devices – Particle filters - Requirements, testing and
marking.
[26] SANS 50149 Respiratory protective devices – Filtering half masks to protect against particles –
Requirements, testing, marking.
[27] SANS 50381-2 Protective clothing for users of hand-held chain saws Part 2: Test methods for
leg protectors.
[28] SANS 50381-5 Protective clothing for users of hand-held chain saws Part 5: Requirements for
leg protectors.
[29] SANS 50471 High-visibility warning clothing for professional use - Test methods and
requirements.
[30] 240-47859177 Generation Policy on the Control of Clean Conditions When Working on
Generators.
2.2.2 Informative
[31] 32-109 Brand Architecture and Corporate Identity Policy.
[32] 32-288 Policy Procurement and Supply Chain Management Standard.
[33] 32-599 Standard Procurement and Supply Chain Management Standard.
[34] 32-727SHEQ Policy.
2.3 Definitions
2.3.1 Danger: Anything that may cause injury or damage to persons or property.
2.3.2 Employee: Any person who is employed by or works for an employer and who receives or
is entitled to receive any remuneration or who works under direction or supervision of an
employer or any other person.
2.3.3 Hazard: A potential source of harm or a source of, or exposure to, danger.
2.3.4 Hem: Free edge of a garment that is folded over and sewn down.
2.3.5 Lining: Layer of fabric sewn to the inside of a garment to give the garment a neat finish.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Personal Protective Equipment (PPE) Unique Identifier: 240-44175132
Revision: 2
Page:
2.3.6 PPE-Free Zone: An area of a work site where employees are not required to wear certain
types of PPE. This includes offices and walkways.
2.3.7 Pleat: A feature on a garment that makes provision for extra ease and formed by folding
fabric onto itself.
2.3.8 Risk Assessment: Overall process of hazard identification, risk analysis, and risk evaluation.
2.3.9 Seam: Joint consisting of a sequence of stitches uniting material or materials.
2.3.10 Syce: An armhole (or occasionally, a leg hole) in tailoring or dressmaking.
2.3.11 Yoke: Part of a shirt or jacket that is positioned at the shoulder area and joined to the lower
section with a seam.
2.4 Abbreviations
Abbreviation Explanation
ATPV Arc Thermal Performance Value
BS British Standard
BU Business Unit
Cal/cm2 Calories per square centimetre
dB Decibel
EN European Norms
g/m2 Grams per square meter
MAG Metal active gas (welding)
MIG Metal inert gas (welding)
MSDS Material safety data sheet
NRR Noise reduction rate
OU Operating Unit
OHS Act The Occupational Health and Safety Act, Act .
PPE Personal Protective Equipment
PU Polyurethane
PVC Polyvinyl chloride
SABS South African Bureau of Standards
SANS South African National Standard
SNR Signal to noise rate
TIG Tungsten inert gas welding
PPE Personal Protective Equipment
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Personal Protective Equipment (PPE) Unique Identifier: 240-44175132
Revision: 2
Page:
2.5 Roles and Responsibilities
2.5.1 Duties of Employer/Line Managers
PPE is identified as a control measure.
risk assessment document and the relevant PPE Matrix.
on the usage of any PPE is provided to all the applicable employees before its use. This shall
include the limitations of identified/specific work wear/accessory.
the employees are exposed to by ensuring that risk assessments are performed before
identification of PPE.
issued with the required personal protective equipment and makes proper use thereof.
cannot be eliminated or mitigated by the issuing of PPE.
contaminants, such as HBAs and HCAs, it becomes the responsibility of the employer to
clean the PPE.
2.5.2 Duties of Employees
Employees shall:
injury where required to.
modify any PPE issued.
emergencies and overtime.
by risk assessment, procedures, or any relevant requirements.
where the possibility exists that cleaning and maintenance will result in the spread of
contaminants. Then it becomes the responsibility of the employer.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Personal Protective Equipment (PPE) Unique Identifier: 240-44175132
Revision: 2
Page:
constraints shall approach their employer, through their health and safety representative or
manager, occupational health practitioner, or occupational hygienist, to arrange for specially
manufactured PPE to be purchased (for example, outsize shoes or boiler suits/overalls).
should not be shared with other employees.
responsibility of the issuer to ensure that it is properly cleaned or disinfected before storage
and use.
manufacturer’s specification.
2.5.3 OHS Department
The OHS Department shall:
2.6 Process for Monitoring
Compliance to this document shall be monitored and audited by the SHEQ department and Line
management. Where possible SHEQ department and/or line managers shall inspect procured PPE
to ensure compliance with this document and risk assessments.
3.1 General
3.1.1 Minimum Requirements
All PPE shall meet the following minimum requirements:
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Personal Protective Equipment (PPE) Unique Identifier: 240-44175132
Revision: 2
Page:
adequate protection and reduce exposure to the specific hazards in the workplace.
specifications for the identified PPE.
depend on the condition of the equipment due to wear and tear or as specified by the
Responsible manager. (Each business unit to enforce their own site-specific
procedure/process).
3.1.2 Issuing of PPE
charge.
assessment and exposure assessment results.
needs shall be determined by the risk assessment.
every three months or according to guidance from the manufacturer or applicable legislation
or standards and codes.
schedule based on risk assessment and operational needs.
3.1.3 Replacement of PPE
items or based on fair wear and tear based on use and operational requirements.
items of PPE. Old clothing handed in shall be disfigured or cut up to prevent further use (that
is, wearing or using for exchange).
Standard (32-245). It is encouraged that waste management principles, such as reuse or
recycle, be adopted before disposal.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Personal Protective Equipment (PPE) Unique Identifier: 240-44175132
Revision: 2
Page:
appropriate Eskom disciplinary procedures shall be followed.
with Eskom. These items shall remain Eskom’s property and responsibility. The responsible
line manager shall monitor this process within the scope of the existing processes for the
issuing and replacement of PPE.
3.1.4 Special Circumstances
Employees who cannot perform their duties due to physical, medical, or ergonomic constraints that
prevent them from using appropriate protective equipment may be permitted to purchase specially
manufactured equipment (in terms of the Eskom procurement process), provided that a written
document from a specialist on such constraints is submitted to the employer via the health and safety
representative, Occupational health practitioner, Occupational Hygiene Practitioner, or manager.
3.1.5 PPE-Free Zones
that PPE is not a requirement in that area, and it is safe to be in that work area without
wearing PPE.
3.2 General Garments or Work Wear Specification
shall be free from defect that affect their appearance or may affect their serviceability (or
both) and free from marks, spots and stains incurred during the manufacturing process.
stitching shall be free of twists, pleats, and puckers and shall be sufficiently extensible to
obviate seams cracking and undue shrinkage in use.
tacked.
activities, garments without reflective strips shall be worn. This shall be supported by a proper
risk assessment.
the composition of these garments.
given in 5.3.1.2 (see figure 6(a) and figure 6(b)) of SANS 434.
the fabric confirming that the fabric complies with the SANS and EN specifications,
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Personal Protective Equipment (PPE) Unique Identifier: 240-44175132
Revision: 2
Page:
3.3 Minimum Standard Specifications for Boiler Suits/Overalls - One Piece (Figure 2 on
diagram: drg.10332 SANS 434) and two piece (Figure 4 on diagram: drg.15289da on
SANS 434) work wear suits
SANS 1387-4, material type of D59, flame retardant finish that complies with SANS 1423–1,
class C category 1.
polyester/viscose fabric in accordance with SANS 1387-3 and shall have acid resistant finish.
Pantone 19_6110TC.
Must be intact front and back of garments.
fabric with which the slide fastener is used.
Corporate Identity.
accordance with Eskom’s Corporate Identity.
sleeves’ circumference on the inner upper arm, and reflective strips on both legs at the knee
height , with an exception for conditions stated in 3.2. bullet point 5.
NB: Chemical (bottle green) boiler suits are acid treated only and are not flame treated.
3.3.1 Minimum Standard Specifications for Boiler Suits/Overalls (One Piece)
One Piece Boiler suits/overalls shall be in accordance with SANS 434.
at waist level.
at waist level.
least 80 mm and the steps shall be of width at least 35 mm.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Personal Protective Equipment (PPE) Unique Identifier: 240-44175132
Revision: 2
Page:
be turned in and stitched. Fly front shall fasten with a slide fastener as per SANS 1822 Figure
4 two-way fastener type A.
of the pocket with pencil pocket. Pocket mouths shall be finished with a hem that is deep
enough to accommodate the attachment of a fastening and shall be adequately secured.
with two rows of stitching of at least 2 mm and a maximum 10 mm respectively.
securely bar-tacked.
patternmaking practice.
acceptable patternmaking practice and at least 60 mm from the waist seam.
shall have an inside patch pocket of outer material.
depth of the breast pocket and shall be positioned at the centre front end of breast pocket.
buttonhole.
the ends.
least 10 mm above the pocket mouth and securely tacked at each end.
follows: If four-hole plastics buttons are used, a shirt type buttonhole may be used.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Personal Protective Equipment (PPE) Unique Identifier: 240-44175132
Revision: 2
Page:
3.3.2 Minimum Standard Specifications Boiler Suits/Overalls (Two Piece)
3.3.2.1 Minimum Standard Specifications for Pants (chemical and flame)
accordance with SANS 1387-4, Material Type D 59- flame retardant SANS 1423-1 class C
category 1.
polyester/viscose fabric in accordance with SANS 1387-3 and shall have acid resistant finish.
two-piece Personal Protective Clothing).
pocket.
front and one (1) button on the front of the waistband and a plain bottom.
chemical treated pants.
embroidered on the right back pocket.
material.
accordance with Eskom’s Corporate Identity.
conditions stated in 3.2. bullet point 5.
3.3.2.2 Minimum Standard Specifications for Clean Condition Pants
4, flame retardant class C category 1.
cord 10mm cotton belt string for fastening and without zip on the front no metal attachments.
Eskom’s Corporate Identity.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Personal Protective Equipment (PPE) Unique Identifier: 240-44175132
Revision: 2
Page:
with Eskom’s Corporate Identity.
on the inner upper leg.
3.3.2.3 Minimum Standard Specifications for Jackets (chemical and flame)
finished.
hem.
patternmaking and garment construction practice.
for chemical treated jackets.
40 mm and the full depth of the breast pocket and shall be positioned at the centre front end
of breast pocket.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Personal Protective Equipment (PPE) Unique Identifier: 240-44175132
Revision: 2
Page:
button and buttonhole.
ends.
mm above the pocket mouth and shall be securely tacked at each end; the bottom of a jacket
shall be finished with a plain hem.
3.3.2.4 Minimum Standard Specifications for Clean Condition Jacket
1387-4, Flame Retardant class C category 1.
accordance with Eskom’s Corporate Identity.
with Eskom’s Corporate Identity.
circumference on the inner upper arm.
3.4 Minimum Standard Specifications for Dust Coats
SANS 1457.
40 mm and the full depth of the breast pocket and shall be positioned at the centre front end
of breast pocket.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Personal Protective Equipment (PPE) Unique Identifier: 240-44175132
Revision: 2
Page:
top.
width at least 10 mm, shall be securely sewn in with the collar at the back neck on the inside.
width at least 15 mm.
and Zero Harm identification shall appear on the right side of the sleeve and shall be in
accordance with Eskom’s Corporate Identity.
3.5 Minimum Standard Specifications for Shirts
flame-retardant finish that complies with SANS 1423-1, class C category 1.
separate the cuff with button closure of non-conductive buttons. Sleeve opening bound with
binding.
accordance with Eskom’s Corporate Identity.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Personal Protective Equipment (PPE) Unique Identifier: 240-44175132
Revision: 2
Page:
3.6 Minimum Standard Specifications for Ladies Shirts And Pants
3.6.1 Ladies Shirts
with a flame-retardant finish that complies with SANS 1423-1, class C category 1.
conductive.
accordance with Eskom’s Corporate Identity.
3.6.2 Ladies Pants
SANS 1387-4, Material Type D59, flame retardant SANS 1423-1, class C category 1.
front and one (1) button on the front of the waistband and a plain bottom.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Personal Protective Equipment (PPE) Unique Identifier: 240-44175132
Revision: 2
Page:
embroidered on the right back pocket of the pants.
material.
accordance with Eskom’s Corporate Identity.
conditions stated in 3.2. bullet point 5.
3.7 Minimum Standard Specifications Thermal Jackets (Winter Jackets)
flammable material, the inner material shall be a tartan lining, 100% cotton of a darkish colour,
with the outer covering be pre-shrunk 100% soft woven fabric in accordance with SANS
1387-4, Material Type D59, flame retardant. (SANS 1423-1), class C category 1.
bellows type with a side entry into another separate pocket and shall be 22 cm deep and 21
cm wide.
conductive press studs.
well as a non-conductive zip complying with SANS 1822 and be intact front and back.
the size can be adjusted.
(Pantone 19_3920 as per corporate colour code.
inner upper arms.
accordance with Eskom’s Corporate Identity.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Eskom Personal Protective Equipment (PPE) Unique Identifier: 240-44175132
Revision: 2
Page:
3.8 Minimum Standard Specifications for Rain Protection (Rain Suits)
the face side 100% polyester, plain weave with 170 threads per square inch and coated with
a water-resistant coating.
to 50kN/m2). The lining to be 80% polyester and 20% cotton. All sizing benchmark to SANS
434 see size chart Annexure E for rain wear and chemical chart specification.
press-studs and shall comply with SANS 1822 type 5(auto lock alloy sliders).
rain entering the sleeve.
upper arm, reflective strips on both legs above the knees
accordance with Eskom’s Corporate Identity.
the front and on the back.
shall be 150 mm high.
3.9 Minimum Standard Specifications for Chemical Protection (Chemical Suits)
Coated Polyester, Tear strength weft 40N and warp 30N, burst strength weft 655N/50mm,
warp1232N/50mm, and coating adhesive 15N/50mm.
16 by 14.5.
rainwear.
welded.
resistant press-studs and shall comply with SANS 1822 type 5(auto lock alloy sliders).
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Health & Safety
Source: Attachment 9 Safety.pdfContractors must comply with Eskom's safety procedures, including the Employees' Right of Refusal to Work in an Unsafe Situation procedure and the Eskom Personal Protective Equipment (PPE) standard. PPE must be issued free of charge to employees, be suitable and fit for purpose, and be maintained in good condition. Employees have the right to refuse unsafe work without victimisation, following a staged reporting and resolution process. Eskom-branded PPE must be returned on termination of employment.
Description
Source: Attachment 3 Scope of work Building Maintenance.pdfScope of work for building and infrastructure maintenance services on an 'as and when required' basis for Eskom Peaking power stations (Drakensberg, Ingula, Vanderkloof, Gariep, Port Rex, Gourikwa). The scope covers preventative, corrective, reactive, emergency, refurbishment, and minor construction services to keep buildings, civil infrastructure, utilities and support facilities safe, functional, reliable, compliant and fit-for-purpose. It addresses routine maintenance and asset health risks, focusing on water ingress, waterproofing failures, deteriorated finishes, drainage deficiencies, roofing defects, flooring failures, structural deterioration, sewage defects, access systems and building envelope degradation.
General building maintenance includes planned, corrective, reactive, emergency maintenance, minor refurbishment and construction works, condition assessments, inspection services, repair and replacement of defective components. Work performed upon instruction from Service Manager. Response times: emergency 2 hours on site, risk eliminated same day; reactive 48 hours, completion in 10 working days or per programme; corrective per Task Order date; planned per frequency. Planned maintenance schedule: buildings general cleaning 6 monthly, roads cleaning 6 monthly, roofing silver coating annually, gutters and downpipes cleaning 6 monthly, stormwater drainage cleaning annually before rainy season, drainage (powerhouse and building) cleaning 6 monthly, sewage treatment plant cleaning and infrastructure repairs annually at Drakensberg PS.
Building envelope and structural repairs: roofing and waterproofing services include repairing roof leaks, replacing damaged roof sheeting and tiles, repairing flashings, waterproofing systems, screeding roof slabs, repairing roof penetrations, cladding, gutters and downpipes, roof cleaning. Specific areas: water ingress remediation at Drakensberg Visitors Center and Admin Building, Machine Hall Building waterproofing at Gariep PS, building water ingress defects at Gourikwa PS, water ingress defects at Port Rex PS (Control Room). Walls, masonry and concrete: repair wall cracks, concrete deterioration, damaged plaster, structural and non-structural masonry, seal water penetration paths, repair damp-proofing defects, retaining walls, concrete floors and slabs, sealing walls around air-conditioning vent covers. Painting and corrosion protection: internal/external painting, structural steel painting, window frame painting, door and fence painting, corrosion treatment, application/renewal of protective coating systems per manufacturer specifications.
Doors, windows and access systems: repair and/or replace doors, door frames, locks and ironmongery, emergency exit systems, roller shutter doors, replace glazing and broken windows, repair/replace blinds and weather seals. Specific focus on damaged external doors and access doors at Gourikwa and Drakensberg PS. Flooring and ceilings: repair/replace floor finishes, replace damaged carpets, repair timber floors, raised flooring systems, anti-slip strips, install ramps, repair/replace water-damaged ceilings, floor epoxy coating. Attention to heaving floor tiles at Gariep and Drakensberg PS, false floor defects and ceiling upgrades at Drakensberg PS Control & Communication Room, floor covering deterioration at Vanderkloof PS, water-damaged ceilings at multiple stations. Heaving tiles to be removed and floors replaced with epoxy coating system.
Plumbing, water and sewer systems: repair leaks, replace valves, repair/replace toilets, urinals, wash basins, geysers, hydroboils, water reticulation systems, water dispensers, sewer systems, unblock drains, repair/replace manholes. Particular focus on sewer backflow defects at Gourikwa PS, sewage plant deficiencies at Gariep PS, water ingress related to plumbing failures across all stations. Electrical building services: repair/replace lighting systems, socket outlets, distribution boards, earth leakage units, access control power supplies, reroute power and control cables, repair/replace gate motor electrical systems, repair UPS systems, perform testing, issue CoCs where required.
Roads and civil infrastructure: repair potholes using cold mix or hot mix asphalt, repair internal and external roads, repair/install paved surfaces, paint/repaint road markings, repair/install kerbs, repair stormwater drainage systems, repair parking areas, walkways, concrete pavement joints including joint resealing and spall repair, repair bridge and culvert components (expansion joints, bearings, parapets/guardrails, deck waterproofing and drainage), clean and clear stormwater drains and culverts along access roads, provide survey services as and when required. Fencing, gates and security infrastructure: repair/replace perimeter and electric fencing components, gate motors, sliding gates, security barriers, access automation systems, security doors. Fire protection infrastructure: service fire extinguishers, hose reels, repair fire doors, fire signage, maintain fire detection devices, repair associated building fire protection systems. Note: stations have existing fire detection and protection service contracts; related services will be adhoc.
Defect specific work per station: Drakensberg PS – water ingress, roof sheet damage, ceiling defects, building waterproofing, floor defects, overhead crane/crawl beams. Ingula PS – storm damage repairs, building envelope degradation, power and control cables rerouting, removal of redundant cable racks. Gariep PS – roof waterproofing failures, building cladding, effluent spillages, floor tile failures, building corrosion. Vanderkloof PS – water ingress, waterproofing deterioration, floor covering defects, concrete deterioration. Port Rex PS – water ingress, building envelope deterioration. Gourikwa PS – water ingress, roof defects, damaged doors, sewer defects, cracked walls and deteriorated finishes.
Submission Guidelines
Source: Attachment 3 Scope of work Building Maintenance.pdf (unknown)Returnable documents: the standard Eskom tender forms (SBD/MBD equivalents) must be completed, signed and submitted with the bid. These include the Declaration of Interest (SBD 4), Preference Points Claim (SBD 6.1), Declaration for Local Production and Content (SBD 6.2), Declaration of Bidder's Past Supply Chain Management Practices (SBD 8), Certificate of Independent Bid Determination (SBD 9), and Authority to Sign / Board Resolution. Bids must be submitted before the closing time; late submissions are disqualified. All required forms must be signed; omission of any returnable form may disqualify the bid.
Evaluation Criteria
Source: Attachment 3 Scope of work Building Maintenance.pdf (unknown)Bidders must comply with the Occupational Health and Safety Act and Construction Regulations 2014, SANS 10400 National Building Regulations, applicable SANS standards, Eskom Safety, Health and Environmental Standards, Eskom Civil Engineering Standards, ISO 9001 Quality Management Systems, and applicable municipal by-laws.
Before commencing any works, bidders must submit for acceptance: method statements, quality control plans (QCPs), inspection and test plans (ITPs), product specifications, and material data sheets.
For roof waterproofing replacement exceeding 10% dead load, bidders must engage an ECSA-registered professional structural engineer to conduct structural assessment and produce a report.
Bidders must provide workmanship and material guarantees for roof repair and waterproofing works, and submit roof-access methodologies and fall-protection plans before working at height.
For painting works, bidders must obtain approved colour swatches, submit product data sheets and safety data sheets, and comply with Eskom Corporate Identity Standards.
Technical Specifications
Source: Attachment 3 Scope of work Building Maintenance.pdf (unknown)Scope covers building and infrastructure maintenance services on an as-and-when-required basis for six Eskom Peaking power stations: Drakensberg, Ingula, Vanderkloof, Gariep, Port Rex, and Gourikwa.
Services include planned, corrective, reactive, emergency maintenance, minor refurbishment, minor construction, condition assessments, inspections, and repair/replacement of defective components.
Work is performed upon instruction from the Service Manager. Response times: emergency 2 hours on site, risk eliminated same day; reactive 48 hours, completion in 10 working days or per accepted programme; corrective per Task Order date; planned per frequency.
Planned maintenance schedule: buildings general cleaning 6 monthly; roads cleaning 6 monthly; roofing silver coating annually; gutters and downpipes cleaning 6 monthly; stormwater drainage cleaning annually before rainy season; drainage (powerhouse and building) cleaning 6 monthly; sewage treatment plant cleaning and infrastructure repairs annually at Drakensberg PS.
Building envelope and structural repairs include roofing and waterproofing (repair leaks, replace sheeting/tiles, flashings, waterproofing systems, screeding, penetrations, cladding, gutters, downpipes, cleaning), walls/masonry/concrete (repair cracks, deterioration, plaster, masonry, seal water penetration, damp-proofing, retaining walls, floors/slabs), and painting/corrosion protection (internal/external, structural steel, window frames, doors, fences, corrosion treatment, protective coatings).
Specific focus areas: water ingress remediation at Drakensberg Visitors Center and Admin Building; Machine Hall Building waterproofing at Gariep PS; building water ingress defects at Gourikwa PS; water ingress defects at Port Rex PS (Control Room); damaged external doors and access doors at Gourikwa and Drakensberg PS; heaving floor tiles at Gariep and Drakensberg PS; false floor defects and ceiling upgrades at Drakensberg PS Control & Communication Room; floor covering deterioration at Vanderkloof PS; sewer backflow defects at Gourikwa PS; sewage plant deficiencies at Gariep PS.
Doors, windows and access systems: repair/replace doors, frames, locks, ironmongery, emergency exit systems, roller shutter doors, glazing, blinds, weather seals.
Flooring and ceilings: repair/replace floor finishes, carpets, timber floors, raised flooring, anti-slip strips, ramps, water-damaged ceilings, epoxy coating. Heaving tiles to be removed and floors replaced with epoxy coating system.
Plumbing, water and sewer: repair leaks, replace valves, toilets, urinals, wash basins, geysers, hydroboils, water reticulation, dispensers, sewer systems, unblock drains, repair manholes.
Electrical building services: repair/replace lighting, socket outlets, distribution boards, earth leakage units, access control power supplies, reroute power/control cables, gate motor electrical systems, UPS systems, testing, issue CoCs where required.
Roads and civil infrastructure: repair potholes (cold/hot mix asphalt), internal/external roads, paved surfaces, road markings, kerbs, stormwater drainage, parking areas, walkways, concrete pavement joints, bridge/culvert components, clean stormwater drains and culverts along access roads, provide survey services as required.
Fencing, gates and security: repair/replace perimeter and electric fencing, gate motors, sliding gates, security barriers, access automation, security doors.
Fire protection: service fire extinguishers, hose reels, repair fire doors, fire signage, maintain fire detection devices, repair associated building fire protection systems. Note: stations have existing fire detection/protection contracts; related services will be adhoc.
Defect-specific work per station: Drakensberg PS – water ingress, roof sheet damage, ceiling defects, building waterproofing, floor defects, overhead crane/crawl beams; Ingula PS – storm damage repairs, building envelope degradation, power/control cables rerouting, removal of redundant cable racks; Gariep PS – roof waterproofing failures, building cladding, effluent spillages, floor tile failures, building corrosion; Vanderkloof PS – water ingress, waterproofing deterioration, floor covering defects, concrete deterioration; Port Rex PS – water ingress, building envelope deterioration; Gourikwa PS – water ingress, roof defects, damaged doors, sewer defects, cracked walls and deteriorated finishes.
Technical service requirements include leak detection, roof inspection and waterproofing (inspect roofs, gutters, flashings, waterproofing, HVAC ducts, penetrations; assess roof slopes and gutter sizing; submit inspection reports with root cause analysis; carry out approved repairs; clean and repaint gutters; flood/rain penetration testing per SANS 10400-K; provide guarantees; notify of additional defects). For replacement waterproofing, dead load must not exceed existing by more than 10%; otherwise engage ECSA-registered professional for structural assessment.
Painting and corrosion protection: apply two coats of acrylic PVA paint unless otherwise specified; select paint systems for site conditions; match Eskom Corporate Identity colours (Plascon Pale Linen, Veldrift, Stone Wash, Waxen Tint); prepare surfaces by removing loose paint, rust, oil, grease, mould; feather edges; repair defects; apply coatings per manufacturer specifications for coverage, film thickness, overcoating intervals, environmental conditions.
Machine Hall crane beam at Drakensberg PS: address corrosion of crane rails, rail clips, fixing systems, support structures, crane girders, access walkways, structural steel caused by water ingress from bedrock seepage. Identify seepage points, assess corrosion, design/install water diversion measures, bunds, drains, containment; repair water-damaged concrete; seal leakage pathways. Inspect crane rail systems, perform condition assessments, dimensional checks, assess alignment and fastening systems. Works include rail clip replacement, fastener replacement, structural steel repair, corrosion rehabilitation, rail alignment reinstatement, concrete rehabilitation.
Walls, masonry and concrete repairs: repair cracked walls, water-damaged walls, masonry defects, concrete defects, penetrations, damp walls, plaster failures, retaining wall defects, building envelope deterioration. Assess structural vs non-structural, active vs dormant movement, relationship to water ingress; report structural defects before repairs. Major structural repairs, underpinning, structural strengthening require separate engineering instructions. General concrete repairs: saw-cut perimeters to 10mm depth, remove defective concrete, treat corroded reinforcement, apply approved mortars, cure for minimum 7 days. For depths over 100mm use micro-concrete or structural replacement concrete. Crack repairs: classify cracks as structural/non-structural, moving/non-moving; use epoxy injection, cementitious grout, flexible sealant, routing and sealing, or surface treatments. Repair cracks greater than 0.2mm. For dormant cracks open groove 20-30mm wide, up to 50mm deep; for dry horizontal cracks form V-groove 10mm deep, fill with low-viscosity epoxy. Ensure repaired cracks provide watertightness, durability, long-term serviceability, structural integrity.
Doors, windows and access systems: includes external/internal doors, security doors, fire-rated doors, aluminium/timber/steel doors and frames, window glazing, blinds, tinting, door closers, panic bars, hinges, locks, latches, access control, magnetic locks, electric strikes, door seals, weather strips. Replace broken glazing with safety glazing per SANS; match tinting. Verify correct operation of access systems after completion; change security settings only with Service Manager approval.
Flooring and ceilings: includes ceramic/porcelain tiles, concrete floors, timber floors, vinyl floors, epoxy flooring, carpets, raised access flooring, suspended ceilings, ceiling grids, ceiling boards, bulkheads, cornices, access panels. Inspect support pedestals and framing, replace unstable floor panels, ensure floor loading capacities maintained. Replace raised floor in Control Room at Drakensberg PS with new. For ceilings, assess entire ceiling and remaining panels, replace damaged panels with accepted new panels, handle asbestos-containing material per regulations with accredited contractor. For access floor, ensure panels have four corrosion-resistant captured fasteners, pedestal heads with locating tabs, stringers from 20-gauge steel, high pressure laminate or static control linoleum finishes. Loading performance specifications: Type 1/2/3 concentrated loads 2.7/4.5/5.5 kN, maximum deflection 2.00mm, axial load 22.5 kN, rolling load tests as specified.
Floor tiles (underground works – Machine Hall and Valve Hall) at Drakensberg and Gariep PS: remove existing floor tiles and prepare and apply heavy-duty epoxy floor coating system suitable for industrial power station applications. Surface assessment and preparation: remove loose coatings, dirt, dust, laitance, grease and contaminants; remove oil with approved degreasers; mechanically prepare concrete surfaces using diamond grinding, shot blasting, scarifying or mechanical abrasion to achieve open textured surface. Concrete repairs: repair surface defects, voids and honeycombing with materials compatible with coating system. Epoxy coating system: apply solvent-free or low VOC epoxy primer to prepared surfaces.
Methodology
Source: Attachment 3 Scope of work Building Maintenance.pdfFor replacement waterproofing, the dead load must not exceed the existing system by more than 10%. If exceeded, bidders must engage an ECSA-registered professional structural engineer/technologist to conduct a structural assessment, perform structural calculations, confirm adequacy of the existing structure, and produce a structural assessment report and methodology statement.
Technical service requirements for leak detection, roof inspection and roof waterproofing: investigate, assess, repair and maintain roofing systems to eliminate water ingress. Includes inspecting roofs, gutters, flashings, waterproofing, HVAC ducts and penetrations; assessing roof slopes and gutter sizing; submitting inspection reports with root cause analysis; carrying out approved repairs; cleaning and repainting gutters; flood/rain penetration testing per SANS 10400-K; providing guarantees; notifying of additional defects. Submit method statements, QCPs, ITPs, product specifications and material data sheets before commencement.
Painting and corrosion protection: undertake painting, coating and corrosion protection for buildings and associated infrastructure including walls, ceilings, structural steel, doors, window frames, gates, fencing, gutters, downpipes, fascia boards, exposed steelwork and roof support structures. Apply two coats of acrylic PVA paint unless otherwise specified; select paint systems for site conditions; match Eskom Corporate Identity colours (Plascon Pale Linen, Veldrift, Stone Wash, Waxen Tint). Prepare surfaces by removing loose paint, rust, oil, grease, mould; feather edges; repair defects. Apply coatings per manufacturer specifications for coverage, film thickness, overcoating intervals and environmental conditions. Submit method statements, QCPs, ITPs, product specifications and material data sheets before commencement.
Machine Hall crane beam at Drakensberg PS: address corrosion of crane rails, rail clips, fixing systems, support structures, crane girders, access walkways and structural steel caused by water ingress from bedrock seepage. Identify seepage points, assess corrosion, design and install water diversion measures, bunds, drains and containment; repair water-damaged concrete; seal leakage pathways. Inspect crane rail systems, perform condition assessments, dimensional checks, assess alignment and fastening systems. Works include rail clip replacement, fastener replacement, structural steel repair, corrosion rehabilitation, rail alignment reinstatement and concrete rehabilitation. Repair spalled, delaminated, cracked, water-damaged and corrosion-affected concrete per Section 4.3.1.
Walls, masonry and concrete repairs: repair cracked walls, water-damaged walls, masonry defects, concrete defects, penetrations, damp walls, plaster failures, retaining wall defects and building envelope deterioration. Assess whether defects are structural or non-structural, whether movement is active or dormant, and relationship to water ingress; report structural defects before repairs. Remove loose material to sound substrate; ensure repair materials are compatible. Major structural repairs, underpinning and structural strengthening require separate engineering instructions. General concrete repairs include spalling, cracking, corrosion damage, exposed reinforcement, delamination and loss of cover. Saw-cut perimeters to 10mm depth, remove defective concrete, treat corroded reinforcement, apply approved mortars, cure for minimum 7 days. For depths over 100mm use micro-concrete or structural replacement concrete. Crack repairs: classify cracks as structural/non-structural, moving/non-moving; use epoxy injection, cementitious grout, flexible sealant, routing and sealing, or surface treatments. Repair cracks greater than 0.2mm. For dormant cracks open groove 20-30mm wide, up to 50mm deep; for dry horizontal cracks form V-groove 10mm deep, fill with low-viscosity epoxy. Ensure repaired cracks provide watertightness, durability, long-term serviceability and structural integrity. Submit method statements, QCPs, ITPs, product specifications and material data sheets before commencement.
Doors, windows and access systems: inspect, maintain, repair, replace and install doors, windows, frames, glazing, ironmongery, roller shutter doors, access control systems and associated infrastructure. Includes external/internal doors, security doors, fire-rated doors, aluminium/timber/steel doors and frames, window glazing, blinds, tinting, door closers, panic bars, hinges, locks, latches, access control, magnetic locks, electric strikes, door seals and weather strips. Assess defective components, repair or replace damaged items, replace broken glazing with safety glazing per SANS, ensure doors/windows operate freely, adjust and test magnetic locks and electric strikes, repair roller shutters, maintain fire-rated doors and emergency exits. For glazing, comply with SANS, use safety glazing where required, match tinting. For access systems, verify correct operation after completion; change security settings only with Service Manager approval. Submit method statements, QCPs, ITPs, product specifications and material data sheets before commencement.
Flooring and ceilings: maintain, repair and replace flooring systems, suspended ceilings, raised access floors and associated finishes. Includes ceramic/porcelain tiles, concrete floors, timber floors, vinyl floors, epoxy flooring, carpets, raised access flooring, suspended ceilings, ceiling grids, ceiling boards, bulkheads, cornices and access panels. Inspect support pedestals and framing, replace unstable floor panels, ensure floor loading capacities maintained. Replace raised floor in Control Room at Drakensberg PS with new. For ceilings, assess entire ceiling and remaining panels, replace damaged panels with accepted new panels, handle asbestos-containing material per regulations with accredited contractor. For access floor, ensure panels have four corrosion-resistant captured fasteners, pedestal heads with locating tabs, stringers from 20-gauge steel, high pressure laminate or static control linoleum finishes. Loading performance specifications: Type 1/2/3 concentrated loads 2.7/4.5/5.5 kN, maximum deflection 2.00mm, axial load 22.5 kN, rolling load tests as specified.
Floor tiles (underground works – Machine Hall and Valve Hall) at Drakensberg and Gariep PS: remove existing floor tiles and prepare and apply heavy-duty epoxy floor coating system suitable for industrial power station applications. Surface assessment and preparation: remove loose coatings, dirt, dust, laitance, grease and contaminants; remove oil with approved degreasers; mechanically prepare concrete surfaces using diamond grinding, shot blasting, scarifying or mechanical abrasion to achieve open textured surface. Concrete repairs: repair surface defects, voids and honeycombing with materials compatible with coating system. Epoxy coating system: apply solvent-free or low VOC epoxy primer to prepared surfaces.
Quality Management
Source: Attachment 3 Scope of work Building Maintenance.pdfMonitoring includes monthly contract review meetings, defect tracking, quality inspections, system health monitoring, service level monitoring, annual review of contract performance, and reporting on outstanding and completed defects.
Bidders must submit method statements, quality control plans (QCPs), inspection and test plans (ITPs), product specifications, and material data sheets for acceptance before commencing any roofing, waterproofing, painting, concrete, or door/window works.
Financial Requirements
Source: Attachment 3 Scope of work Building Maintenance.pdf (unknown)Pricing: The contract is on an as-and-when-required basis, with work performed upon instruction from the Service Manager via Task Orders. The pricing schedule (SBD 3.1/3.2/3.3) must be completed. No specific bond, guarantee, or insurance requirements are stated in the scope of work. Payment terms are not specified in the provided document.
Compliance Requirements
Source: Attachment 3 Scope of work Building Maintenance.pdf (unknown)Bidders must comply with the Occupational Health and Safety Act and Construction Regulations 2014.
Must comply with SANS 10400 National Building Regulations and applicable SANS standards.
Must comply with Eskom Safety, Health and Environmental Standards and Eskom Civil Engineering Standards.
Must comply with ISO 9001 Quality Management Systems.
Must comply with applicable municipal by-laws.
For roof waterproofing replacement exceeding 10% dead load, must engage an ECSA-registered professional structural engineer.
Must provide workmanship and material guarantees for roof repair and waterproofing works.
Must submit roof-access methodologies and fall-protection plans before working at height.
Must supply product data sheets, technical specifications and warranty certificates for waterproofing systems.
Must obtain approved colour swatches from an approved supplier for painting works.
Must submit product data sheets and safety data sheets for painting works.
Health & Safety
Source: Attachment 3 Scope of work Building Maintenance.pdfBidders must comply with the Occupational Health and Safety Act and Construction Regulations 2014.
Bidders must comply with Eskom Safety, Health and Environmental Standards.
Bidders must submit roof-access methodologies and fall-protection plans before working at height.
Bidders must provide workmanship and material guarantees for roof repair and waterproofing works.
Environmental
Source: Attachment 3 Scope of work Building Maintenance.pdfPaint systems must be selected to suit site environmental conditions and exposure classifications.
Two coats of acrylic PVA paint are applied to internal and external wall surfaces unless otherwise specified.
Contractual Terms
Source: Attachment 3 Scope of work Building Maintenance.pdfBidders must submit roof-access methodologies and fall-protection plans before working at height.
Bidders must investigate water ingress pathways before any repair work.
Bidders must not conceal wet, unstable or unsound substrates without treatment and acceptance.
Replacement roofing materials, sealants and fixings must be fully compatible with the existing roofing system.
Waterproofing systems must be applied strictly per manufacturer specifications.
Bidders must supply all product data sheets, technical specifications and warranty certificates.
Major roof replacement, structural modifications and asbestos-containing roofing systems are excluded from ordinary maintenance works and are only conducted following specific instruction by the Employer.
Contact Information
Source: Attachment 2 - E-Tendering Training Acknowledgement Form.pdf (unknown){"name":"__________________________________________________________","email":null,"phone":null,"department":null,"address":null}
Submission Guidelines
Source: Attachment 2 - E-Tendering Training Acknowledgement Form.pdf (unknown)Returnable documents: the E-Tendering Training Acknowledgement Form (Annexure 1) must be completed, signed and submitted with the bid. Bids must be submitted electronically via the E-Tendering Solution.
Important Dates
Source: Attachment 12 Supplier Declaration of Interest Template (1).pdf (unknown){"closingDate":"01 February 2015"}
Contact Information
Source: Attachment 12 Supplier Declaration of Interest Template (1).pdf (unknown){"name":null,"email":null,"phone":null,"department":"s, Eskom Divisions, Eskom","address":"e/s of Contact person/s and contact details"}
Submission Guidelines
Source: Attachment 12 Supplier Declaration of Interest Template (1).pdf (unknown)Returnable documents: the completed Supplier Declaration of Interest (Eskom form 240-59385360 Rev 3) must be submitted with the tender. The declaration must be signed under oath by the signatory, who must state their capacity and the supplier's full legal name and registration number. False declarations may result in action against the supplier.
Evaluation Criteria
Source: Attachment 12 Supplier Declaration of Interest Template (1).pdf (unknown)Submission of the Supplier Declaration of Interest is mandatory. Bidders must truthfully declare any interests or relationships that could create a conflict of interest; false declarations may result in action against the supplier.
Technical Specifications
Source: Attachment 12 Supplier Declaration of Interest Template (1).pdf (unknown)supplying entity AND their company registration
number] ..........................................................................., certify under oath that, to the best of my
knowledge, the information furnished herein is true and correct. I accept that Eskom reserves its right to act
against the supplier named above or me personally in terms hereof, should this declaration prove to be false.
Eskom employees and directors that engage in private work
Compliance Requirements
Source: Attachment 12 Supplier Declaration of Interest Template (1).pdf (unknown)Supplier Declaration of Interest (Eskom form 240-59385360 Rev 3): must be completed and submitted. It requires the bidder to declare whether any shareholder, director, member, partner, line manager, or fellow employee is employed by Eskom or serves as a director at Eskom; whether any such person is a close family member or associate of an Eskom employee or director involved in the procurement; whether any such relationship exists between persons acting for the supplier and Eskom personnel; and whether any business courtesy has been given or received in the last 12 months. If providing services as a consultant, the bidder must also declare other services rendered to Eskom business units, divisions, subsidiaries, suppliers of primary energy or strategic commodities, and key industrial customers.
Important Dates
Source: Attachment 11 Non-Disclosure Agreement (NDA) Generic Template - 06 August 2024.pdf (unknown){"closingDate":"06 August 2024"}
Evaluation Criteria
Source: Attachment 11 Non-Disclosure Agreement (NDA) Generic Template - 06 August 2024.pdf (unknown)Bidders must complete and submit the Non-Disclosure and Confidentiality Agreement (NDA) as part of the tender. The NDA requires the bidder's employee to acknowledge confidentiality obligations and is governed by South African law. No other eligibility criteria (e.g., CSD registration, tax clearance, B-BBEE, CIDB grading) are stated in the provided document.
Contractual Terms
Source: Attachment 11 Non-Disclosure Agreement (NDA) Generic Template - 06 August 2024.pdfThe agreement defines confidential information broadly, including all project-related documentation, specifications, know-how, trade secrets, and computer data. It excludes information already in the public domain, information that becomes public through no fault of the employee, and information legally disclosed by a third party. The employee may only share confidential information with other Eskom employees who have signed confidentiality agreements. The agreement replaces any prior non-disclosure agreements and can only be varied in writing signed by both parties.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Address
Drakensberg Pumped Storage Schemes - - uThukela District Municipality -
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
15
Last checked
08 Sept 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
How established construction firms use Joint Ventures with EMEs and QSEs to meet B-BBEE preferential procurement targets and access set-aside contracts.
Everything South African construction contractors need to know about how procurement officers verify cidb grades: what gauteng contractors must ensure is correct — april 2026 update — covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
A practical guide for small and medium building contractors on winning government tenders for schools, clinics, housing, and municipal buildings in South Africa.
How small and medium construction contractors use Joint Ventures to combine CIDB grades, win larger infrastructure projects, and grow beyond their current grading ceiling.
💡 Want more tendering tips and strategies?