TRANSNET national ports authority requires a contractor to supply, remove and dispose of existing metal roof sheeting and install new 0.5 Mm chromadek ibr traffic green roof sheeting at the kombi substation building within the port of east london, over a six-week period. The most consequential requirement is the technical functionality evaluation, which carries 100 points and includes a mandatory minimum threshold of 60 points, with scoring based on company experience, key personnel qualifications, and a comprehensive method statement.
Bidders must submit a minimum of three (3) practical completion certificates or reference letters on the client's company letterhead demonstrating experience in installing roofs and associated cladding or similar work, with scoring from 0 to 100 points based on the number submitted.
The bidder must submit a detailed Curriculum Vitae (CV) for the Site Supervisor/Building Foreman with a relevant qualification in Construction, Building, or Civil Engineering (NQF Level 3 or higher) and at least three (3) years of relevant working experience, with scoring from 0 to 20 points.
The bidder must submit a detailed CV for the Health and Safety Officer with a relevant Health and Safety Management Qualification (NQF Level 3 or higher) and relevant working experience, with scoring from 0 to 20 points.
The bidder must submit a comprehensive method statement addressing all 8 critical aspects of the Scope of Work, including programme, technical approach, understanding of deliverables, and ability to meet all requirements, with scoring from 0 to 30 points.
The bidder must submit a SHE Management Plan addressing at least three (3) of the four required aspects: Health and Safety Management Plan, Environmental Management Plan, Project Risk Assessment based on the method statement, and a valid Letter of Good Standing with the Workmen's Compensation Fund, with scoring from 0 to 20 points.
The technical functionality evaluation has a minimum threshold of 60 points out of 100; bidders scoring below this threshold will be disqualified.
The closing date is 29 September 2026 at 16:00 (SAST), and the submission method and address are not specified in the available document.
Date & Time
Tuesday, 29 September 2026 - 16:00
Venue
A compulsory tender clarification session will be conducted physically at the following venue: EMD B
Categories
Request for Quotation
Hely Hutchinson road - Quigney - East London - 5201
11 Sept
2026
Tender Published
Tender was published
29 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
1. RFQ for Refurbishment of Kombi substation.pdf
Transnet National Ports Authority is procuring the supply, removal and disposal of existing metal roof sheeting, and the installation of new 0.5 mm Chromadek IBR traffic green roof sheeting at the Kombi Substation Building within the Port of East London, for a period of six weeks.
Continue with tenders sharing this issuer, category, or province.
Median Estimate
R 1 883 225
Range
Based on 16 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Document being finalised: 1. RFQ for Refurbishment of Kombi substation.pdf. You don’t need to refresh — this page will pick up the updated review automatically.
Description
Source: 5. C1.2 Contract Data ECC (Part 1 and 2).pdfThe tender is for the construction of a substation building within the Port of East London, for a period of six (6) weeks. The contract is based on NEC3 Engineering and Construction Contract (June 2005 with amendments June 2006 and April 2013). The Employer is Transnet National Ports Authority.
Contact Information
Source: 5. C1.2 Contract Data ECC (Part 1 and 2).pdf (RFQ){"name":"DR Zahn","email":"[email protected]","phone":"012 367 6023","department":null,"address":"THE PORT OF EAST"}
Evaluation Criteria
Source: 5. C1.2 Contract Data ECC (Part 1 and 2).pdf (RFQ)No specific eligibility criteria (e.g., CSD registration, tax clearance, B-BBEE level, CIDB grading) are stated in the provided document. Bidders must complete the Contract Data Part Two (Contractor's data) including key persons and pricing. The Employer reserves the right to conduct vetting through the State Security Agency (SSA) for security clearances. The contract includes clauses on collusion (tender rigging) and termination for non-performance.
Technical Specifications
Source: 5. C1.2 Contract Data ECC (Part 1 and 2).pdf (RFQ)Of works: supply, removal and disposal of existing metal roof sheeting, and installation of new
0.5 Mm chromadek ibr traffic green roof sheeting at the kombi substation building within the port of east
Pricing Schedule
Source: 5. C1.2 Contract Data ECC (Part 1 and 2).pdf11.2(20) The activityscheduleis in C2, Pricing data
11.2(30) The tendered total of the Prices is (in figures) :
(in words), excluding VAT..............
Note “SCC” means Schedule of Cost Components
Data for Schedules of Cost starting on of ECC, and “SSCC” means
61 in The hourly rates for Defined Cost of design
Compliance Requirements
Source: 5. C1.2 Contract Data ECC (Part 1 and 2).pdf (RFQ)joint venture agreement, and in the instance that the
Joint Venture agreement shall contain but
Health & Safety
Source: 5. C1.2 Contract Data ECC (Part 1 and 2).pdf (RFQ)Contractor must comply at minimum with the Compensation for Occupational Injuries and Diseases Act No. 130 of 1993 (as amended) for insurance in respect of death/bodily injury to employees.
Environmental
Source: 5. C1.2 Contract Data ECC (Part 1 and 2).pdf (RFQ)Weather monitoring data includes cumulative rainfall (mm), number of days with rainfall over 10mm, minimum air temperature below 0°C, and snow lying at 08:00. Recorded at the Contractor's site establishment area; historical data from South African Weather Service (012 367 6023).
Contractual Terms
Source: 5. C1.2 Contract Data ECC (Part 1 and 2).pdf (RFQ)The contract is subject to the NEC3 Engineering and Construction Contract (June 2005, amended 2006/2013), main Option A (Priced contract with activity schedule), dispute resolution Option W1, secondary Options X7 (Delay damages) and X18 (Limitation of liability). Employer is Transnet SOC Ltd; Project Manager Thabiso Ntsala; Port Engineer Zanele Ntantala. Completion date and key dates are to be provided by the Contractor. Access to the whole site is available. First programme due within 2 weeks of Contract Date. Defects date is 52 weeks after Completion; defect correction period is 2 weeks. Assessment interval is monthly on the 25th; payments in ZAR within the following month; interest at prime lending rate. Delay damages: R205.00 per day. Limitation of liability: nil for indirect/consequential loss; deductible of relevant insurance policy for property loss; cost of correcting Defect for employer's property; Total of the Prices for design defects; end of liability 36 months after Completion. Additional clauses on joint ventures (27.5, 27.6), termination grounds (business rescue R22, repudiation R23), and amendment of termination table. Additional Z-clauses: Z5 (SSA vetting for National Key Points), Z6 (collusion/blacklisting), Z7 (POPIA compliance).
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
5. C1.2 Contract Data ECC (Part 1 and 2).pdf
Supply, removal and disposal of existing metal roof sheeting, and installation of new 0.5 mm Chromadek IBR traffic green roof sheeting at the Kombi Substation Building within the Port of East London, for a period of six weeks, under an NEC3 Engineering and Construction Contract (Priced contract with activity schedule).
4. Part C3 Works Information.pdf
The works comprise the removal and disposal of the existing deteriorated metal roof sheeting and associated components, and the supply and installation of new 0.5 mm Chromadek IBR traffic green roof sheeting, at the Kombi Substation Building within the Port of East London. The contract also includes the assessment and replacement of damaged timber truss members, application of a liquid rubber waterproofing system to the concrete roof slab, replacement of fascia boards and rainwater goods, and making good of all disturbed areas. The contract period is six weeks.
3. C1.1 Form of Offer and Acceptance.pdf
Supply, removal and disposal of existing metal roof sheeting, and installation of new 0.5 mm Chromadek IBR traffic green roof sheeting at the Kombi Substation Building within the Port of East London, for a period of six weeks. The contract is for Transnet National Ports Authority, Port of East London, under an NEC3 Engineering and Construction Contract Option A (priced activity schedule).
2. Technical Evaluation Criteria Kombi Substation.pdf
Supply, removal and disposal of existing metal roof sheeting, and installation of new 0.5 mm Chromadek IBR traffic green roof sheeting at the Kombi Substation Building within the Port of East London, for a period of six weeks, for Transnet SOC Ltd.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
TransnetContact Person
Xolelwa Gwele
Phone
0313088384
[email protected]
Website
www.transnet.net/
Address
Level 200, Carlton Centre, 150 Commissioner St, Cbd, Johannesburg, 2001, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
5
Last checked
12 Sept 2026
AI status
Enhanced
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Secure Transnet tenders using AI Matching & Recommendations, logistics infrastructure intelligence, compliance analysis, and application support for rail, ports, and pipelines.
subsidiary of Transnet
Key Personnel
Provinces Active
Industries
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubImportant Dates
Source: 1. RFQ for Refurbishment of Kombi substation.pdf (RFQ){"briefingSession":"{"date":"18 SEPTEMBER 2026","time":"11H00AM","venue":"11H00AM","is_compulsory":true}"}
Contact Information
Source: 1. RFQ for Refurbishment of Kombi substation.pdf (RFQ){
"name": "Xolelwa Gwele",
"email": "[email protected]",
"phone": null,
"department": "Employer's Agent",
"address": null
}
Submission Guidelines
Source: 1. RFQ for Refurbishment of Kombi substation.pdf (RFQ)Submit electronically via Transnet's e-Tender Submission Portal. Register on the portal, log an intent to bid, and upload the bid before the closing date and time. Bids must be submitted by the bidding company itself; no company may submit on behalf of another. Joint ventures may use any party's registered profile. Telephonic, telegraphic, facsimile or e-mailed offers will not be accepted. Bidders are advised to submit at least a day before closing to avoid technical issues. Tenders must be marked with the tender number and description, for the attention of the Employer's Agent.
Evaluation Criteria
Source: 1. RFQ for Refurbishment of Kombi substation.pdf (RFQ)Evaluation follows a multi-stage process: Stage 1 includes administrative compliance, substantive responsiveness checks (mandatory priced offer, CIDB requirement), and functionality evaluation. Functionality criteria include previous company experience (signed reference letters), key personnel qualifications and experience, method statement, and SHE management plan. Bidders must achieve a minimum threshold to proceed. Thereafter, the 80/20 preference points system applies. Transnet may not award if the price is not market-related. Post-tender negotiations may be conducted.
Compliance Requirements
Source: 1. RFQ for Refurbishment of Kombi substation.pdf (RFQ)No specific requirements found
B-BBEE Minimum Level: 5
Points Allocation: 60 points
B-BBEE Details: SPONDENTS BE IN ORDER, OR THAT SATISFACTORY ARRANGEMENTS HAVE
Been made with south african revenue service (SARS) to meet the respondents tax obligations.
O
Tcp pin r csd NO
Supplier compliance status
Yes
O bbeee status
R level sworn
No AFFIDAVIT
If Yes, Who was the Certificate issued by?
An accounting officer as contemplated in an accounting officer as contemplated in the close corporation act (cca)
The close corporation act (cca) and name a verification agency accredited by the south african accreditation system (sanas)
The applicable in the tick box
A registered auditor
Name:
[A B-BBEE STATUS LEVEL VERIFICATION CERTIFICATE/ SWORN AFFIDAVIT (FOR EMES & QSEs) MUST BE SUBMITTED FOR
Purposes of compliance with the b-bbee act]
Are you a
Foreign based
Supplier forare you the accredited representative
The goods
In south africa for the goods /services
Yes No /SERVICES Yes No
/Works offered? /Works
[If yes enclose proof] offered? [If yes, answer
Questionaire below ]
Signature of the Bidder Date: ..............................
................................. ...
Questionnaire to bidding foreign suppliers
Is the bidder a resident of the republic of south africa (RSA)? yes NO
Does the bidder have a branch in the RSA? yes NO
Does the bidder have a permanent establishment in the RSA? yes NO
Does the bidder have any source of income in the RSA? yes NO
If the answer is “NO” to all of the above, then IT is not a requirement to register for a tax compliance status system
Pin code from the south african revenue service (SARS) and if not register as per 1.3 Below.
Part b
Terms and conditions for bidding
1.1 Bidders must ensure compliance with their tax obligations.
1.2 Bidders are required to submit their unique persona
Description
Source: 3. C1.1 Form of Offer and Acceptance.pdfThe tender is for the supply, removal and disposal of existing metal roof sheeting at the Port of East London. The works are defined in the Works Information and Site Information, and the contract will be governed by the Conditions of Contract identified in the Contract Data.
Contact Information
Source: 3. C1.1 Form of Offer and Acceptance.pdf (RFQ){"name":null,"email":null,"phone":null,"department":null,"address":"n the conditionsofcontract identified"}
Evaluation Criteria
Source: 3. C1.1 Form of Offer and Acceptance.pdf (RFQ)Bidders must complete and sign the Form of Offer and Acceptance. Bidders must provide their CIDB registration number. Bidders must submit prices electronically and manually, with amounts corresponding. Bidders must comply with the Conditions of Tender and any deviations must be recorded in the Schedule of Deviations. No other eligibility criteria are stated in the provided document.
Pricing Schedule
Source: 3. C1.1 Form of Offer and Acceptance.pdfPart C1 Agreements and Contract Data, (which includes this Form of Offer and Acceptance)
Part C2 Pricing Data
Part C3 Works Information
Part C4 Site Information
and drawings and documents (or parts thereof), which may be incorporated by reference into the above listed
London, for a period of six (6) weeks
Part 2: pricing data
Of east london, for a period of six (6) weeks
C2.1 Pricing instructions: Option A 1
C2.2 Activity Schedule 2
Cpm 2026 rev01
Contract C2
Part C2: Pricing Data Cover
London, for a period of six (6) weeks
C2.1 Pricing Instructions: Option A
covered by immediately following work.
1.2. Measurement and Payment
1.2.1 The Activity Schedule provides the basis of all valuations of the Price for Work Done to Date, payments
in multiple currencies, price adjustments for inflation and general progress monitoring.
1.2.2 The amount due at each assessment date is based on completed activities and/or milestones
as indicated on the Activity Schedule.
1.2.3 The short descriptions in the Activity Schedule are for identification purposes only. All work described
in the Works Information is deemed included in the activities.
1.2.4 The Activity Schedule is integrated with the Prices, Accepted Programme and where required the
forecast rate of payment schedule.
1.2.5 The tendered total of the prices as stated in the Contract Data is obtained from the Activity Schedule
summary. The tendered total of the prices includes for all direct and indirect costs, overheads, profits,
risks, liabilities and obligations relative to the Contract.
Contract Part C2: Pricing Data
CPM 2020 Rev 01 C2.1: Pricing instructions ECC Option A
according to specifications on the concrete
C1.1 m2 140
slab. 1 coat of primer and 2 coats of liquid
rubber waterproof.
Contract C2.2
Part C2: Pricing Data Activity Schedule
Contract C2.2
Part C2: Pricing Data Activity Schedule
Compliance Requirements
Source: 3. C1.1 Form of Offer and Acceptance.pdf (RFQ)No specific requirements found
Contractual Terms
Source: 3. C1.1 Form of Offer and Acceptance.pdfof Deviations (if any), contact the Employer’s agent (whose details are given in the Contract Data) to arrange
the delivery of any securities, bonds, guarantees, proof of insurance and any other documentation to be
provided in terms of the conditionsofcontract identified in the Contract Data at, or just after, the date this
agreement comes into effect. Failure to fulfil any of these obligations in accordance with those terms shall
constitute a repudiation of this agreement.
Description
Source: 2. Technical Evaluation Criteria Kombi Substation.pdfThe scope includes roof replacement work at Kombi Substation, including associated cladding or similar work. The bidder must submit a method statement, key personnel details, and SHE management plan.
Contact Information
Source: 2. Technical Evaluation Criteria Kombi Substation.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"l completion certificates that meet the requirements have been submitted."}
Evaluation Criteria
Source: 2. Technical Evaluation Criteria Kombi Substation.pdf (unknown)Bidders must meet the minimum functionality threshold of 60.00 points. Bidders must submit the required number and type of reference letters or practical completion certificates. Bidders must provide the specified key personnel qualifications and experience. Bidders must submit a method statement addressing all 8 critical elements. Bidders must submit at least three (3) of the four SHE documents listed.
Technical Specifications
Source: 2. Technical Evaluation Criteria Kombi Substation.pdf (unknown)construction projects, or similar work
Methodology
Source: 2. Technical Evaluation Criteria Kombi Substation.pdf (unknown)Method Statement (T2.2-05, 30 points): Bidder must submit a comprehensive method statement responding directly to the Scope of Work, including programme, technical approach, understanding of deliverables, and ability to meet requirements. Minimum critical elements (8 aspects): 1) Project Organogram detailing responsibilities; 2) Equipment/Tools/Manpower/Materials; 3) Site Establishment; 4) Roof Scaffolding Access Systems; 5) Removal of existing roof sheeting; 6) Waterproofing system; 7) Installation of 0.5 mm Chromadek IBR Roof Sheeting; 8) Programme schedule from Site Mobilisation to Client Handover. Scoring: 0 = no method statement; 20 = addresses fewer than 7 aspects with minimal detail; 40 = addresses at least 7 aspects but lacks depth or clarity; 60 = all 8 aspects adequately addressed; 80 = all 8 aspects well articulated with good understanding; 100 = all 8 aspects addressed comprehensively with innovation and added value.
Experience & Qualifications
Source: 2. Technical Evaluation Criteria Kombi Substation.pdfKey Personnel Qualifications (T2.2-03, 15 points): Site Supervisor/Building Foreman must have relevant qualification in Construction, Building, or Civil Engineering. Scoring: 0 = no qualification; 20 = N1; 40 = N2; 60 = N3; 80 = N4; 100 = N6.
Key Personnel Experience (T2.2-04, 15 points): Site Supervisor/Building Foreman must have minimum three (3) years relevant working experience in roof installations, associated cladding, or similar work. Scoring: 0 = no experience; 20 = 1 year; 40 = 2 years; 60 = 3 years; 80 = 4 years; 100 = 5 years or more.
Compliance Requirements
Source: 2. Technical Evaluation Criteria Kombi Substation.pdf (unknown)completion certificate/s are submitted, OR the reference letter/s or practical completion
completion certificates or
completion certificate that meets the requirements has been submitted
completion certificates that meet the requirements have been submitted
completion certificates or reference letters must be on the client's company letterhead
Completion Certificates
The Bidders must provide evidence of their company's previous experience installing roofing, 0 = No reference letter/s or practical completion certificate/s are submitted, OR the reference letter/s or practical completion
The bidder must submit a minimum of three (3) practical completion certificates or
20 = ONE [1] reference letter or practical completion certificate that meets the requirements has been submitted.
40 = TWO [2] reference letters or practical completion certificates that meet the requirements have been submitted.
work. The completion certificates or reference letters must be on the client's company letterhead.
60 = THREE [3] reference letters or practical completion certificates that meet the requirements have been submitted.
(1) Project Description 80 = FOUR [4] or more reference letters or practical completion certificates that meet the requirements have been submitted.
(2) Valid Client's Contact details (Client's name, e-mail address, physical address, telephone 100 = FIVE [5] or more reference letters or practical completion certificates that meet the requirements have been submitted.
2 Key Personnel Experiences & Qualifications 30.00
0 = No qualification certificates submitted, or submitted qualification is invalid.
B-BBEE Minimum Level: 3
Health & Safety
Source: 2. Technical Evaluation Criteria Kombi Substation.pdfThe method statement must include the programme, technical approach, understanding of 20 points - Method statement is submitted, but only addresses fewer than 7 aspects with minimal detail or relevance.
deliverables, and demonstrate the bidder’s ability to meet all requirements.
Minimum Critical Elements (must be addressed in the method statement): 40effectivepoints execution.- Method statement addresses at least 7 aspects but lacks depth or clarity; missing important details for safe or
3.1 Method Statement 30 1) Project Organogram detailing responsibilities A Comprehensive Method Statement 60 points - All 8 critical aspects of the method statement are included and adequately addressed; meets minimum technical
acceptability.
4 T2.2-06 Health,managemetEnviroment and Safety 10.00
0 = No SHE Management Plan submitted, or the submitted document is irrelevant, incomplete, or does not address the project
scope and SHE requirements.
Detailed health, safety & environmental management plans, risk assessment specific to the 20 points = A SHE Management Plan is submitted but addresses only one (1) of the required aspects.
project, and a letter of good standing. The bidder must submit at least three (3) of the 40 points= The SHE Management Plan is submitted but addresses only two (2) of the required aspects
following documents:
4.1 Health,plan Enviroment and Safety managemet 10 1) Health and Safety Management Plan A detailed SHE Management plan that meets the requirements. 60 points= The SHE Management Plan adequately addresses three (3) of the required aspects.
80 points= The SHE Management Plan addresses all four (4) aspects in good detail, clearly demonstrating understanding of the
scope, risk management, and coordination of SHE activities specific to the work.
100 points= Bidder submitted all 4 documents with a comprehensive and project-specific SHE Management Plan with exceptional
depth, innovation, and foresight. The plan provides clear added value through proactive risk control measures, compliance
monitoring, and continuous improvement mechanisms.
Minimum Threshold is 60.00 100.00
Section
Source: 2. Technical Evaluation Criteria Kombi Substation.pdfTechnical Evaluation Criteria (100 points):
Minimum threshold is 60 points.
Description
Source: 4. Part C3 Works Information.pdfThe works involve the supply and installation of roof sheeting and waterproofing systems at the Port of East London. The Contractor is responsible for the design of certain parts of the works, as specified in the contract. The Contractor must provide as-built drawings, operating manuals, and maintenance schedules. The Contractor must also provide product warranties for roof sheeting and waterproofing systems. The Contractor must not advertise the contract or communicate with the media without the Project Manager's consent. The Contractor must provide progress photographs weekly in PDF or Word format.
Evaluation Criteria
Source: 4. Part C3 Works Information.pdf (RFQ)The Contractor must be registered as a Contractor with the Employer's security department. All personnel must carry valid identification and access permits. The Contractor must comply with all TNPA security procedures. The Contractor must submit a Health and Safety Plan before commencing work. The Contractor must have a Quality Management System conforming to ISO 9001 (or equivalent). The Contractor must provide a bond or guarantee as required by the conditions of contract, as stated in Part 1 Agreements and Contract Data, document C1.3, Sureties. The Contractor must comply with the requirements of the IRCC involving engineering construction Contractors engaged by the Employer. The Contractor must be liable for any loss or damage caused by strikes, riots, lockouts or any labour disputes by and/or confined to the Contractor's employees. The Contractor must provide a Contingency Strike Handling Plan, updated on a three-monthly basis. The Contractor must submit an Industrial Action Report within two hours of the commencement of any industrial action by its employees.
Methodology
Source: 4. Part C3 Works Information.pdf (RFQ)3.1.19 Sequences of construction: 1. Site establishment and barricading. 2. Access scaffolding installation. 3. Removal of existing roof sheeting and rainwater goods. 4. Repair and replacement of damaged timber members. 5. Waterproofing application. 6. Installation of new roof sheeting. 7. Installation of fascia boards, gutters, and downpipes. 8. Site clean-up and demobilisation.
Experience & Qualifications
Source: 4. Part C3 Works Information.pdf (RFQ)5.7 Contractor's management, supervision and key people: Employ a Construction Supervisor (CM) and a Construction Health, Safety, and Environmental Officer (CSHEO) as key persons. The Supervisor ensures health and safety policy, compliance with legislation, programme monitoring, and claims management. The CSHEO ensures CEMP implementation, conducts inspections, reports incidents, and submits checklists.
Quality Management
Source: 4. Part C3 Works Information.pdf (RFQ)5.5 Quality assurance requirements: Contractor shall have and maintain a documented Quality Management System conforming to ISO 9001 or equivalent. Submit Quality Plan, Quality Policy, Index of Procedures, and schedule of audits. Maintain a register of documents and comply with review/acceptance procedures.
Financial Requirements
Source: 4. Part C3 Works Information.pdf (RFQ)Payment Terms: payment certificates and records of the corresponding work done.
5.10 The Contractor’sInvoices
5.10.1 When the Project Manager certifies payment (see ECC Clause 51.1) following an assessment
date, the Contractorcomplies with the Employer’sprocedure for invoice submission.
5.10.2 The invoice must correspond to the Project Manager’s assessment of the amount due to
Health & Safety
Source: 4. Part C3 Works Information.pdf (RFQ)5.3 Safety risk management: Submit a Health and Safety Plan before commencing work, maintain a safety file on Site, conduct toolbox talks, ensure compliance with OHS Act requirements, and ensure all personnel attend TNPA safety induction.
Environmental
Source: 4. Part C3 Works Information.pdf3.1.7 Environmental controls, fauna & flora, dealing with objects of historical interest
Contractor’s cost where caused by the Contractor.
3.1.18 Control of noise, dust, water, and waste.
Maintain clean working areas.
Remove waste regularly.
Prevent excessive dust generation.
Limit noise disruption.
Dispose of waste at approved disposal sites.
of 21
aware of the environmental specifications on Site.
of 21
Contractual Terms
Source: 4. Part C3 Works Information.pdfof 21
2.5 Other requirements of the Contractor’sdesign
2.5.1 The Contractor’s design complies with the following:
2.6 Use of Contractor’sdesign
2.6.1 The Contractor grants the Employer a licence to use the copyright in all design data presented
to the Employerin relation to the worksfor any purpose in connection with the construction, re-
construction, refurbishment, repair, maintenance, and extension of the works.
2.6.2 The Contractorvests in the Employerfull title guarantee in the intellectual property and copyright
in the design data created in relation to the works.
2.7 Design of Equipment
2.7.1 The Contractor submits his design details for the following categories of his proposed principal
5.8 Provision of bonds and guarantees
5.8.1 The form in which a bond or guarantee required by the conditions of contract (if any) is to be
provided by the Contractor is given in Part 1 Agreements and Contract Data, document C1.3,
5.8.2 The Contractor provides a bond or guarantee as required by the conditions of contract
concurrently with the execution by the Parties of the form of agreement for the ECC contract.
5.9 Records of Defined Cost, payments & assessments of compensation events kept by
strikes, riots, lockouts or any labour disputes by and/or confined to the Contractor’semployees,
which loss will include any indirect or consequential damages;
The Contractor warrants that no negotiations or feedback meetings by the Contractor’s
employees shall take place on Transnet premises, whether owned or rented by Transnet.
The Contractor shall give notice to Transnet of any industrial action by the Contractor’s
employees immediately upon becoming aware of any actual or contemplated action that is or
may be carried out on Transnet’s premises, whether owned or rented, and shall notify Transnet
of all matters associated with such action that may potentially affect Transnet.
with personnel identified by Transnet to discuss the industrial action, settlement of the industrial
action, security issues and the impact on delivery under the contract.
The resolution of any disputes or industrial action by the Contractor’s employees is the sole
responsibility of the Contractor.
Section
Source: 4. Part C3 Works Information.pdfThe evaluation criteria are not explicitly stated in the provided text. However, compliance with the conditions of contract, including the provision of a bond or guarantee, and the approval of the Quality Management System, are likely to be considered.
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Data conflicts
None detected
Level 200, Carlton Centre, 150 Commissioner St, Cbd, Johannesburg, 2001, South Africa
Learn how to submit a winning bid with these related articles
A practical guide for small and medium building contractors on winning government tenders for schools, clinics, housing, and municipal buildings in South Africa.
How established construction firms use Joint Ventures with EMEs and QSEs to meet B-BBEE preferential procurement targets and access set-aside contracts.
Everything South African construction contractors need to know about how procurement officers verify cidb grades: what gauteng contractors must ensure is correct — april 2026 update — covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
How small and medium construction contractors use Joint Ventures to combine CIDB grades, win larger infrastructure projects, and grow beyond their current grading ceiling.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Construction of buildings. Unlock full pricing strategies, bid frequency, and historical win rates.