Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Dale Road - Midrand - Johannesburg - 1685
Organization Type
GOVERNMENT
Published
14 Sept 2026
OCDS Reference
ocds-9t57fa-170333
Design, supply, installation, testing, commissioning, training and 12-month maintenance are required for 5 kw, 8 kw, 10 kw and 12 kw single-phase hybrid solar pv and battery energy storage systems serving ESKOM distribution residential customers with 20a to 60a supplies. The contractor must manage feasibility and structural assessments, ecsa-approved engineering, compliant equipment, smart metering where needed, factory and site acceptance testing, documentation and after-sales support; customers require internet access, or the contractor must propose a way to provide IT. the most consequential entry threshold is evidence of at least five comparable residential hybrid installations, backed by valid sapvia pv greencard or equivalent accreditation, doel-registered installation personnel and south african technical and spare-parts support; closing is 6 october 2026 at 10:00.
Scope and customer eligibility: Deliver complete 5 kW, 8 kW, 10 kW and 12 kW single-phase PV-BESS solutions for 20A–60A Eskom Distribution residences. Customers must have internet access; where they do not, the contractor must offer a means to provide it.
Mandatory credentials: The EPC contractor must hold valid SAPVIA PV GreenCard accreditation or equivalent. Installation must be carried out or supervised by GreenCard-qualified, DoEL-registered Electrical Contractors or Registered Persons, with at least one IE or Electrical Tester available to issue the CoC.
Engineering approval: Designs and structural elements must be checked and signed by ECSA-registered Pr.Eng or Pr.Tech.Eng personnel, including a competent structural engineer where required. Solar-resource design must use at least 10 years of meteorological data.
Track record and local support: Prove completion of at least five residential hybrid installations of similar capacity and provide evidence of South African technical support and spare-parts availability.
Compliance and acceptance: Supply compliant PV modules, LFP batteries, inverters and protection equipment, including an Eskom-compliant smart meter where required. Complete FAT and SAT, and hand over as-built drawings, O&M manuals, test certificates, CoC and asset-governance records.
Lifecycle support: Provide 12 months' support with at least two preventive visits, a 48-hour corrective response, remote support within 24 hours, the specified helpdesk arrangement and at least 98% uptime. Minimum warranties are 10 years for PV products, inverters and batteries; 25 years for PV performance; 20 years for mounting-structure materials and 25 years for their design life; and 1 year for civil works.
Closing: Bids close on 6 October 2026 at 10:00.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Tuesday, 06 October 2026 - 10:00
Venue
Microsoft Teams
Categories
Request for Bid(Open-Tender)
Dale Road - Midrand - Johannesburg - 1685
AI Document Analysis Stages
Description
14 Sept
2026
Tender Published
Tender was published
06 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Invitation to Tender (ITT) - E2392DXGOU1.pdf
NEC ECC3 Design Supply installation and commissioning of PV systemsRev2.doc
Eskom requires design, supply, installation, and commissioning of rooftop PV solutions for single-phase customers (20–60 Amps) across the Gauteng Distribution Division over a 3-year period under an NEC3 Engineering & Construction Contract.
Technical Schedule A & B - Customer PV Residential. Rev 1.xlsx
Supply and installation of rooftop PV systems for Eskom single-phase residential customers (20–60 Amps) in Gauteng, including design, equipment supply, installation, commissioning, and remote monitoring capability.
EPC Panel for PV + BESS Systems for Residential Customers Environmental Tender Evaluation (002).pdf
Eskom requires the design, supply, installation, and commissioning of a total rooftop PV solution for single-phase customers drawing between 20 and 60 Amps, under a medium-risk contract framework.
240-109253698 CQP Template 2021.docx
Eskom requires the design, supply, installation, and commissioning of total rooftop PV solutions for single-phase customers from 20 to 60 Amps in Gauteng.
RP_240-171000567_TECHNICAL EVALUATION CRITERIA FOR RESIDENTIAL SOLAR PHOTOVOLTAIC (PV) AND BATTERY ENERGY STORAGE SYSTEMS (BESS).pdf
Eskom requires the design, supply, installation, and commissioning of residential rooftop solar PV and battery energy storage systems (BESS) for single-phase customers (20–60 Amps). The evaluation follows a two-stage process: mandatory compliance checks followed by functional scoring against Eskom standards 240-171000418 and 240-171000566.
RP_240-171000566 _USER REQUIREMENT SPECIFICATION FOR RESIDENTIAL SOLAR PHOTOVOLTAIC (PV) AND BATTERY ENERGY STORAGE SYSTEMS (BESS).pdf
Eskom is procuring EPC contractor capability for the design, supply, installation, and commissioning of residential rooftop solar PV and Battery Energy Storage Systems (BESS) for single-phase customers rated 20A to 60A in Gauteng. The solutions cover 5kW, 8kW, 10kW, and 12kW single-phase configurations, with a closing date of 6 October 2026 at 10:00 UTC.
240-171000418 MAJOR EQUIPMENT PV AND BESS SSEG AND MICROGRIDS (Rev 2).pdf
Eskom requires the design, supply, installation, and commissioning of rooftop photovoltaic (PV) and battery energy storage system (BESS) solutions for single-phase residential customers with 20–60 Amp connections. The solution must comply with Eskom's technical standard for Microgrids and Small-Scale Embedded Generation (SSEG), covering hybrid inverters, PV panels, lithium iron phosphate batteries, SCADA integration, smart metering, physical security, fire suppression, and remote monitoring.
NEC TSC3_ support & maintenance and remote monitoring for residential customers.doc
The department requires the design, supply, installation and commissioning of a total rooftop PV solution for single‑phase customers with ratings from 20 A to 60 A, including support, maintenance and training for the MDMS and HES system, for a three‑year period in Eskom’s Distribution division.
240-105658000 Supplier Quality Management Specification (3).pdf
Eskom requires design, supply, installation, and commissioning of a total rooftop PV solution for single-phase customers rated 20–60 Amps, Gauteng province. The attached document is the Eskom Supplier Quality Management Specification (240-105658000/QM 58 Rev 3) that governs supplier quality requirements for this and other Eskom procurements.
240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP)-rev 3.docx
ESKOM is procuring design, supply, installation, and commissioning capabilities for total rooftop photovoltaic (PV) solutions serving single-phase customers with 20-60 Amp capacities in Gauteng province, with a closing date of Tuesday, October 6, 2026 at 10:00 GMT+0000.
SDLI Strategy Doc_ Bidders Template_Major Equipment Requirements For Distribution Solar PV And BESS SSEQ And Microgrids_ rev 1.docx
Analysis completed but response format was invalid
20251126_BESS-DX national-GX_Cat 2_ Rev 7.pdf
ESKOM in Gauteng is appointing a panel of accredited EPC contractors to deliver turnkey rooftop PV systems integrated with Battery Energy Storage Systems, after‑sales maintenance, warranty‑period support and remote monitoring for residential customers over a three‑year period.
20251126_BESS- Form A_Cat 2.docx
ESKOM is seeking appointment of accredited EPC contractors to design, supply, install, and commission total rooftop photovoltaic systems with battery energy storage integration for single-phase residential customers (20-60 Amps) in Gauteng province, including three-year post-contract maintenance and remote monitoring.
SHE Requirements.docx
A top-up procurement requires design, supply, installation and commissioning capability for complete rooftop PV solutions for Eskom's single-phase customers rated from 20 to 60 Amps in Gauteng. The closing time is 06 October 2026 at 10:00 GMT.
240-77471499 Annexure B.docx
Eskom requires contractors to design, supply, install, and commission total rooftop PV solutions for single-phase customers rated from 20 to 60 Amps. The scope covers the full turnkey delivery of rooftop solar photovoltaic systems for residential and small commercial customers in Gauteng.
BOQ Residential PV 15.12.2025.xlsx
Supply and installation of complete rooftop PV systems with battery energy storage for single-phase customers across four system sizes (5kW, 8kW, 10kW, 12kW), including design, engineering, commissioning, after-sales support, training and remote monitoring connectivity. The scope covers end-to-end delivery from site assessment through to extended maintenance for ESKOM in Gauteng.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 1 725 000
Range
Based on CIDB grading. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Eskom User Requirement Specification (URS) for residential solar PV and BESS installations (20A–60A single-phase) within Eskom Distribution Division. Defines minimum functional, technical, operational, and support requirements for EPC Contractors. Covers feasibility study, site assessment, structural assessment, system design, procurement, installation, testing, commissioning, training, operation and maintenance, and after-sales support. Solutions offered: 5 kW, 8 kW, 10 kW, 12 kW single-phase hybrid systems. Only customers with internet access considered; Contractor must provide connectivity solution where absent. Applicable normative references include ISO 9001, SANS 10142-1, NRS 097-2-1:2024, and numerous Eskom internal standards for equipment, corrosion protection, metering, cyber security, LV protection, and commissioning.
Technical Specifications
Source: RP_240-171000566 _USER REQUIREMENT SPECIFICATION FOR RESIDENTIAL SOLAR PHOTOVOLTAIC (PV) AND BATTERY ENERGY STORAGE SYSTEMS (BESS).pdf (unknown)Scope: Design, supply, installation, testing, commissioning, training, and maintenance of residential solar PV and BESS for single-phase 20A–60A supplies within Eskom Distribution.
System sizes: 5 kW, 8 kW, 10 kW, and 12 kW single-phase hybrid solutions.
Feasibility study: Contractor must conduct customer feasibility analysis (on-site, remote, or combined) with energy yield and savings estimation.
Site assessment: Physical inspection, GPS coordinates, roof orientation, tilt, shading, grid connection verification, load profile analysis, and preliminary go/no-go recommendation.
Structural assessment: Contractor selects mounting structure, performs structural analysis (or engages ECSA-registered structural engineer), and prepares module allocation plan with hook positions, cable routing, and roof penetrations.
System design: Complete electrical, civil, and integration designs including single-line diagrams, layout drawings, equipment schedules, bill of materials, cable routing, earthing, and communication networks. Designs must use ≥10 years meteorological data, industry-standard software, and be signed off by ECSA-registered Pr.Eng or Pr.Tech.Eng.
Equipment requirements: PV modules, batteries (LFP), inverters, AC/DC protection devices per Eskom standards 240-171000418 and 240-170000103. All wiring to SANS 10142-1. Outdoor combiner/fuse boxes IP65, 25-year design life, corrosion-resistant (3CR12 stainless steel ≥2 mm). Surge protection on DC and AC sides. Enclosures: vermin-proof, reinforced, four-point locking, earth stud M8, neutral-earth bond for off-grid mode.
Steel structures: SANS 50025-2 for structural steel, landing tests for imported steel, welding per 240-75883830.
Installation: Per approved designs, OHS Act and Eskom safety standards, fall-arrest for roof work, cable burial ≥600 mm (HDPE protection), concentric service cable 6 mm² for 20A supplies per 240-61704085.
Testing and commissioning: Factory Acceptance Testing and Site Acceptance Testing per Eskom commissioning standard 240-103407540.
Handover and training: User and maintenance training for Eskom OU personnel, submission of as-built drawings, O&M manuals, test certificates, CoC, asset governance documentation.
Maintenance and operational support: 12-month period with ≥2 preventive maintenance visits, 48-hour corrective response, remote support within 24 hours, helpdesk (business hours or 24/7 per Technical Schedule), performance guarantee ≥98% uptime, monthly performance reports.
After-sales support: Technical assistance, system monitoring, customer training, documentation (O&M manual, warranty certificates, CoC, escalation contacts). Extended service agreements offered at end of support period.
Quality Management
Source: RP_240-171000566 _USER REQUIREMENT SPECIFICATION FOR RESIDENTIAL SOLAR PHOTOVOLTAIC (PV) AND BATTERY ENERGY STORAGE SYSTEMS (BESS).pdfQuality management references: ISO 9001 Quality Management Systems; Eskom Supplier Quality Management Specification (240-105658000); Eskom Maintenance Engineering Standard for Batteries and Chargers (240-61182045); Eskom Services Standard (240-75661043). Contractor must develop and deliver Maintenance Engineering Strategies (MES), Maintenance Implementation Standards (MIS), and associated documentation for all asset classes. Eskom provides templates and guidance. Contractor responsible for capacity building, training, and knowledge transfer to Eskom M&O staff. All M&O activities per Eskom Dx standard processes (work management, dispatching) for seamless handover. Contractor facilitates SAP material numbers, Buyers Guides, and DDTs.
Financial Requirements
Source: RP_240-171000566 _USER REQUIREMENT SPECIFICATION FOR RESIDENTIAL SOLAR PHOTOVOLTAIC (PV) AND BATTERY ENERGY STORAGE SYSTEMS (BESS).pdf (unknown)Equipment warranties (minimum):
Performance guarantee: System uptime ≥98% during support period (force majeure excluded). Monthly performance reports on request.
Maintenance: At least two scheduled preventive maintenance visits in 12-month period. Corrective maintenance response within 48 hours. Remote support within 24 hours.
No bid security, bonds, guarantees, retention, payment terms, or turnover thresholds stated in this document.
Compliance Requirements
Source: RP_240-171000566 _USER REQUIREMENT SPECIFICATION FOR RESIDENTIAL SOLAR PHOTOVOLTAIC (PV) AND BATTERY ENERGY STORAGE SYSTEMS (BESS).pdf (unknown)Mandatory accreditations and registrations:
Experience: Proven completion of at least five (5) residential hybrid installations of similar capacity.
Local capability: Evidence of local technical support and spare part availability within South Africa.
Statutory compliance: Full adherence to SANS, NRS, IEC, Eskom standards, OHS Act, and all required permits, licences, and certifications before work begins.
CSD registration, tax clearance, B-BBEE level, CIDB grading, and local content percentages are not specified in this document.
Health & Safety
Source: RP_240-171000566 _USER REQUIREMENT SPECIFICATION FOR RESIDENTIAL SOLAR PHOTOVOLTAIC (PV) AND BATTERY ENERGY STORAGE SYSTEMS (BESS).pdfOccupational Health and Safety Act compliance mandatory. Eskom safety standards and guidelines must be adhered to during installation and on-site assessments. Fall-arrest and working-at-height measures required for roof work. All regulations for elevated platforms must be followed. Enclosures: IP65 ingress protection (SANS 60529), vermin/insect proof, reinforced with handling facilities per ISO standards, corrosion protection per 240-75655504. Earth stud M8 35 mm stainless steel, neutral-earth bond for off-grid mode, earth connections short and uncoiled. Cable glands supplied. Doors recessed, reinforced with diagonal steel members, heavy-duty stainless steel hinges, four-point locking with 8 mm padlock, lock protection box. Outdoor enclosures include condensation prevention. Steel structures: SANS 50025-2 compliance, landing tests for imported steel, welding per 240-75883830. Trench bedding free of stones/sharp objects; backfill free of rocks. Concentric service cable per 240-61704085 with HDPE protection.
Environmental
Source: RP_240-171000566 _USER REQUIREMENT SPECIFICATION FOR RESIDENTIAL SOLAR PHOTOVOLTAIC (PV) AND BATTERY ENERGY STORAGE SYSTEMS (BESS).pdfSystems must cater to diverse residential environments: grid-connected urban, rural, and unelectrified dwellings (off-grid operation). Design must consider site-specific environmental and operational conditions. Corrosion protection for outdoor equipment per 240-75655504 (25-year design life). Enclosures IP65 rated, condensation prevention, vermin proof. No specific environmental impact assessment or sustainability requirements stated beyond compliance with applicable standards.
Contractual Terms
Source: RP_240-171000566 _USER REQUIREMENT SPECIFICATION FOR RESIDENTIAL SOLAR PHOTOVOLTAIC (PV) AND BATTERY ENERGY STORAGE SYSTEMS (BESS).pdfMaintenance and operational support period: 12 months (as per Technical Schedule).
Preventive maintenance: Minimum two scheduled visits to inspect, clean, and verify system integrity.
Corrective maintenance: Response to failures or malfunctions within 48 hours of notification.
Remote support: Within 24 hours of request.
On-site intervention: Within 48 hours if required.
Helpdesk: Dedicated customer support line (phone/email) during business hours or 24/7 as stipulated in Technical Schedule, with emergency support for critical failures.
Performance guarantee: System uptime ≥98% during support period (force majeure excluded). Monthly performance reports upon request.
Documentation to customer: O&M manual, warranty certificates for all components, support escalation contacts, Certificate of Compliance (CoC).
Training: Initial training on system operation, safety procedures, and monitoring tools at handover.
End of support: Options for extended service agreements and performance monitoring offered.
Equipment warranties (minimum years): PV module product 10, PV module performance 25, mounting structures materials 20, mounting structures design life 25, inverter 10, batteries 10, civil works 1. Warranties do not limit or negate other warranties; manufacturer warranties passed to customer.
Description
Source: Technical Schedule A & B - Customer PV Residential. Rev 1.xlsxThe document details the technical evaluation process for the tender, including mandatory requirements and functional evaluation criteria with weighted scoring across two categories: Major Equipment Specification (60%) and User Requirement Specification (40%).
Important Dates
Source: Technical Schedule A & B - Customer PV Residential. Rev 1.xlsx (unknown)Closing date: 6 October 2026 at 10:00
No compulsory briefing or site visit mentioned in the document.
Evaluation Criteria
Source: Technical Schedule A & B - Customer PV Residential. Rev 1.xlsx (unknown)Mandatory technical criteria (pass/fail):
Functional evaluation (weighted scoring):
Technical Specifications
Source: Technical Schedule A & B - Customer PV Residential. Rev 1.xlsx (unknown)Scope: Design, supply, installation, and commissioning of rooftop PV solutions for single-phase residential customers (20–60 Amps).
Applicable standards: Eskom Standard 240-171000418 (Major Equipment Requirements for Distribution Solar PV and BESS) and Specification 240-171000566 (User Requirement Specification for Residential Solar PV and BESS).
Major equipment requirements:
Compliance Requirements
Source: Technical Schedule A & B - Customer PV Residential. Rev 1.xlsx (unknown)Mandatory returnable documents (failure to meet any disqualifies the bid):
No CIDB grading, B-BBEE level, CSD registration, tax clearance, CIPC registration, professional body registration, or local content percentage specified in this document.
Description
Source: SHE Requirements.docxThe document specifies the OHS tender returnable documents required as per the scope of work for the rooftop PV solution project.
Submission Guidelines
Source: SHE Requirements.docx (unknown)Required OHS tender returnable documents (must be submitted with the bid):
Submission method, address, number of copies and closing time are not specified in this document; refer to the main tender document.
Compliance Requirements
Source: SHE Requirements.docx (unknown)OHS compliance requirements (from SHE Requirements document):
Other compliance requirements (CSD registration, tax clearance, B-BBEE, CIDB) are not detailed in this document.
Important Dates
Source: NEC ECC3 Design Supply installation and commissioning of PV systemsRev2.doc (unknown)Closing date: 6 October 2026 at 10:00.
Compulsory briefing or site visit: not stated.
Clarification deadline: not stated.
Contract period: 3 years from starting date (starting date to be advised).
Defects period: 52 weeks after completion of the whole works.
First programme submission: within one week of Contract Date.
Revised programmes: at intervals no longer than four weeks.
Contact Information
Source: NEC ECC3 Design Supply installation and commissioning of PV systemsRev2.doc (unknown)Employer: Eskom Holdings SOC Ltd (reg no: 2002/015527/30).
Employer address: Megawatt Park, Maxwell Drive, Sandton, Johannesburg.
Project Manager: to be advised.
Supervisor: to be advised.
Enquiries contact: not stated in the document.
Submission address: not stated in the document.
Service delivery sites: various sites across Eskom Distribution Division (specific sites per Project Specific Agreement).
Submission Guidelines
Source: NEC ECC3 Design Supply installation and commissioning of PV systemsRev2.doc (unknown)Closing date and time: 6 October 2026 at 10:00.
Submission method and address: not stated in the document.
Returnable documents: Form of Offer and Acceptance (C1.1), Schedule of Deviations, and any other returnable schedules referenced in the Tender Data.
Post-award obligations: within two weeks of receiving a fully signed agreement, the successful bidder must deliver securities, bonds, guarantees, proof of insurance, and any other documentation required by the conditions of contract.
Disqualification risks: failure to submit a completed and signed Form of Offer and Acceptance; submission after the closing time; omission of required returnable documents.
Evaluation Criteria
Source: NEC ECC3 Design Supply installation and commissioning of PV systemsRev2.doc (unknown)Contract type: NEC3 Engineering and Construction Contract (ECC3), Option B – priced contract with bill of quantities.
Preference point system: not explicitly stated; assume 80/20 or 90/10 per PPPFA.
Minimum qualifying score: not stated.
Key evaluation factors: price (bill of quantities), B-BBEE status (preference points), CIDB registration, tax compliance, and financial capacity (parent company guarantee and performance bond only if Financial Analysis recommends).
B-BBEE status decrease during contract may trigger re-negotiation or termination.
No minimum CIDB grade, B-BBEE level, or turnover thresholds disclosed in the extracted text.
Technical Specifications
Source: NEC ECC3 Design Supply installation and commissioning of PV systemsRev2.doc (unknown)Scope: design, supply, installation, and commissioning of total rooftop PV solutions for single-phase customers (20–60 Amps) across Eskom Distribution Division.
Contract duration: 3 years.
Works Information: contained in Part C3 (Scope of Work) and referenced documents/drawings.
Site boundaries: various sites across Eskom Distribution Division; exact locations per Project Specific Agreement.
Risk register items: consumer resistance, external security threats, theft and vandalism, technological failures.
Weather measurements required: cumulative rainfall (mm), days with rainfall >10 mm, days with minimum air temperature <0°C, days with snow lying at 09:00 SAST; data from nearest South African Weather Service station.
Health and safety: Contractor may be appointed Principal Contractor under Construction Regulations 2014; must warrant that prices include sufficient provision for H&S compliance; must comply with all applicable health, safety, and environmental laws and regulations.
Environmental compliance: Contractor and subcontractors must comply with all applicable environmental laws, regulations, and project-specific procedures.
Quality: defect correction period one week upon notification; defects date 52 weeks after completion.
Programme: first programme within one week of Contract Date; revised programmes at maximum four-week intervals.
Sectional completion: dates specified per Project Specific Agreement.
Delay damages: amounts specified per Project Specific Agreement.
Low performance damages: per Annexure A (not provided).
Financial Requirements
Source: NEC ECC3 Design Supply installation and commissioning of PV systemsRev2.doc (unknown)Pricing format: rates-based contract with bill of quantities (Option B).
Currency: South African Rand.
Price adjustment for inflation (Option X1): base date one month prior to tender closing date; proportions and indices to be negotiated prior to award per Eskom CPA guideline.
Payment terms:
Assessment interval: between 15th and 20th day of each month.
Interest on late payment: prime rate of Standard Bank of South Africa (365-day year).
Retention: 5% on Labour Purchase Orders only; retention-free for material purchases, transport, preliminaries and generals.
Performance bond (Option X13): amount to be advised at contract award, only if Financial Analysis recommends.
Parent company guarantee (Option X4): only if Financial Analysis recommends; must be provided within four weeks of Contract Date if required.
Limitation of liability (Option X18):
Tax invoices: must be submitted within one week of payment certificate; must include Eskom VAT number 4740101508.
VAT: 15% applied to offered total.
Compliance Requirements
Source: NEC ECC3 Design Supply installation and commissioning of PV systemsRev2.doc (unknown)CIDB registration: required (grade not specified).
B-BBEE: valid certificate or sworn affidavit required; status change must be notified within 7 days and updated certificate submitted within 30 days; decrease may trigger re-negotiation or termination; failure to notify may constitute grounds for termination.
Tax compliance: valid SARS tax compliance status (TCS pin) required.
VAT registration: required; Eskom VAT number 4740101508 must appear on invoices.
CSD registration: implied mandatory (standard for all government tenders).
Joint ventures: if bidding as JV/consortium, joint and several liability applies; must notify key authorised person within two weeks of Contract Date; composition changes require Employer written consent.
Health and safety: compliance with Construction Regulations 2014, OHS Act 85 of 1993, and all applicable H&S laws; Contractor warrants prices include sufficient H&S provision.
Environmental: compliance with all applicable environmental laws and regulations.
Confidentiality: no disclosure of contract information without Project Manager consent; images of works require prior written consent.
Ethics: prohibitions against corrupt, collusive, coercive, and fraudulent practices (per Z12 definitions).
Insurance: proof of insurance required post-award per conditions of contract.
Professional registrations: not specified.
Description
Source: EPC Panel for PV + BESS Systems for Residential Customers Environmental Tender Evaluation (002).pdfEPC panel for residential-scale solar PV and BESS installations within Eskom's distribution network. Environmental evaluation covers construction activities (trenching, foundations) and public safety.
Submission Guidelines
Source: EPC Panel for PV + BESS Systems for Residential Customers Environmental Tender Evaluation (002).pdf (unknown)Returnable documents required with the bid:
All documents must satisfy minimum requirements; a score of 0 is given if a document is missing or non-compliant, and 1 if submitted and compliant.
Evaluation Criteria
Source: EPC Panel for PV + BESS Systems for Residential Customers Environmental Tender Evaluation (002).pdf (unknown)Evaluation is pass/fail on environmental compliance documentation. Each required document is scored 0 (not submitted or does not meet minimum requirements) or 1 (submitted and meets minimum requirements). No price/preference point split (80/20 or 90/10), minimum qualifying score, or functional weighting is specified in this section. The overall outcome is Approved or Not Approved based on the total score.
Technical Specifications
Source: EPC Panel for PV + BESS Systems for Residential Customers Environmental Tender Evaluation (002).pdf (unknown)Scope: EPC panel for residential-scale solar PV and Battery Energy Storage Systems (BESS) within Eskom's distribution network.
Environmental requirements:
Methodology
Source: EPC Panel for PV + BESS Systems for Residential Customers Environmental Tender Evaluation (002).pdfMethodology for determining environmental aspect and impact ratings based on the scope of work must be included in the Environmental Aspects and Impacts Identification document.
Compliance Requirements
Source: EPC Panel for PV + BESS Systems for Residential Customers Environmental Tender Evaluation (002).pdf (unknown)Mandatory environmental compliance documents:
No CSD registration, tax clearance, B-BBEE level, CIDB grading, CIPC registration, professional body registration, or local content thresholds are mentioned in this document.
Health & Safety
Source: EPC Panel for PV + BESS Systems for Residential Customers Environmental Tender Evaluation (002).pdfEnvironmental Management Plan must address: compliance with environmental obligations, vegetation management, access control, construction activities (trenching, foundations), public safety, and environmental communication and awareness. Signed acknowledgement of Eskom's SHE rules (Annexure B) is a pre-requisite.
Environmental
Source: EPC Panel for PV + BESS Systems for Residential Customers Environmental Tender Evaluation (002).pdfRequired environmental documentation:
Scoring: 0 = missing or non-compliant; 1 = submitted and compliant. Overall result: Approved or Not Approved.
Description
Source: 240-109253698 CQP Template 2021.docxContract Quality Plan template for the design, supply, installation, and commissioning of total rooftop PV solutions for single-phase customers (20–60 Amps). The template guides the supplier in identifying and planning to meet Eskom's quality management expectations and contract requirements, referencing SANS 466:2005 and ISO 10005:2005.
Technical Specifications
Source: 240-109253698 CQP Template 2021.docx (unknown)Scope: Design, supply, installation, and commissioning of total rooftop PV solutions for single-phase customers (20–60 Amps).
Quality management: Contractor must prepare and maintain a Contract Quality Plan (CQP) aligned with SANS 466:2005 / ISO 10005:2005 covering:
Contact Information
Source: NEC TSC3_ support & maintenance and remote monitoring for residential customers.doc (unknown)Employer: Eskom Holdings SOC Ltd
Address: Megawatt Park, Maxwell Drive, Sandton, Johannesburg
Service Manager: To be advised
Technical Specifications
Source: NEC TSC3_ support & maintenance and remote monitoring for residential customers.doc (unknown)Scope: Support, maintenance and training for total rooftop PV solution for single phase customers (20–60 Amps, MDMS and HES) across Eskom Distribution division sites.
Contract period: 3 years.
Contract type: Rates-based (Option A: Priced contract with price list).
Contractor obligations: Submit first plan within 1 week of Contract Date; submit Task Order programme within 5 days of receiving Task Order.
Service levels: Defined in Annexure A (Schedule of deviations) – low service damages apply.
Risk register includes: Data privacy concerns, Operational challenges.
Price adjustment: Base date one month prior to tender closing date; proportions to be negotiated per Eskom CPA guideline.
Multiple currencies option available (Option X3).
Performance bond amount to be advised at contract award.
Parent company guarantee required if financial analysis recommends.
Limitation of liability: Contractor’s indirect/consequential liability limited to R0; liability for loss/damage to Employer’s property limited to deductibles; total liability limited to total of Prices at Contract Date (excluding additional excluded matters).
End of liability date: 52 months after end of service period.
Insurance: Contractor must maintain insurances per Insurance Table A (cover for loss/damage to Employer’s property, Plant and Materials, Equipment, third-party property damage and bodily injury, employee injury). Employer provides insurances per Insurance Table B (Assets All Risk, Contract Works, Environmental Liability, General and Public Liability, Transportation, Motor Fleet, Terrorism, Cyber Liability, Nuclear Material Damage).
Health and safety: Contractor appointed as Principal Contractor under Construction Regulations 2014; must comply with OHS Act and all health & safety laws; prices must include sufficient amount for compliance.
Environmental: Contractor must comply with all applicable environmental laws and regulations.
Confidentiality: Contractor must not disclose information arising from contract; prior written consent required for images of Affected Property.
Ethics: Prohibited actions (corrupt, fraudulent, collusive, coercive, obstructive) grounds for termination.
B-BBEE: Contractor must notify Employer within 7 days of any change in B-BBEE status; submit updated verification certificate within 30 days; decrease in status may lead to renegotiation or termination.
Joint ventures: Joint and several liability; must notify key person authorised to bind JV within 2 weeks of Contract Date; composition changes require Employer consent.
Cession: Contractor may not cede, delegate or assign rights without Employer written consent.
Tax invoices: Contractor must provide tax invoice within 1 week of payment certificate; include Employer VAT number 4740101508.
Compensation events: Must notify within 8 weeks of becoming aware.
Dispute resolution: Option W1 – Adjudication via ICE-SA panel, then arbitration under Association of Arbitrators (Southern Africa) rules, seat Sandton, South Africa.
Governing law: Republic of South Africa.
Language: English.
Period for reply: 1 week.
Financial Requirements
Source: NEC TSC3_ support & maintenance and remote monitoring for residential customers.doc (unknown)Pricing format: Rates-based contract with price list (Option A).
Payment terms: Assessment interval between 15th and 20th day of each month. Payment within 30 days for contracts ≤ R50 million (incl. VAT), 60 days for contracts > R50 million, upon submission of tax compliant invoice with GR number to Eskom Financial Shared Services.
Interest on late payment: Prime rate of Standard Bank of South Africa (365-day year).
Performance bond: Amount to be advised at contract award (Option X13).
Parent company guarantee: Required only if financial analysis recommends (Option X4).
Insurance: Contractor must provide insurances per Insurance Table A (minimum cover: replacement cost for Employer’s property, Plant and Materials, Equipment; replacement cost for third-party property damage; statutory amounts for bodily injury/death). Employer provides insurances per Insurance Table B (various policies per policy documents).
No bid security or retention mentioned in this document.
Price adjustment for inflation (Option X1): Base date one month prior to tender closing; proportions and indices to be negotiated per Eskom CPA guideline.
Multiple currencies (Option X3): Items payable in other currencies as agreed; exchange rates per published source; payments to foreign bank account or SARB-approved CFC account; all foreign exposure hedged per Eskom Foreign Exchange Policy.
Limitation of liability: Contractor’s indirect/consequential liability capped at R0; liability for single event limited to relevant deductibles; total liability limited to total of Prices at Contract Date (excluding additional excluded matters).
Compliance Requirements
Source: NEC TSC3_ support & maintenance and remote monitoring for residential customers.doc (unknown)CIDB registration: Tenderer must provide CIDB registration number on Form of Offer and Acceptance (grade not specified in this document).
B-BBEE: Contractor must notify Employer within 7 days of any change in B-BBEE status; submit updated verification certificate and supporting documentation within 30 days. A decrease in B-BBEE status may result in renegotiation or termination. Failure to notify may constitute grounds for termination.
Tax compliance: Contractor must be VAT registered and include Employer VAT number 4740101508 on all invoices. Tax compliant invoice required for payment.
Health and safety: Contractor must comply with Construction Regulations 2014 (OHS Act 85 of 1993) and all applicable health & safety laws; prices must include sufficient amount for compliance; Contractor may be appointed as Principal Contractor.
Environmental: Contractor must comply with all applicable environmental laws and regulations.
Insurance: Contractor must maintain insurances per Insurance Table A from starting date until Completion or termination. Employer provides insurances per Insurance Table B.
Ethics: Contractor and its parties must not engage in prohibited actions (corrupt, fraudulent, collusive, coercive, obstructive). Employer may terminate for prohibited actions without court conviction.
Joint ventures: If bidding as JV, partners are jointly and severally liable; must notify key authorised person within 2 weeks of Contract Date; changes to JV composition require Employer written consent.
Confidentiality: Contractor must not disclose contract information; prior written consent required for images of Affected Property.
Cession: Contractor may not cede, delegate or assign rights without Employer written consent.
Compensation events: Must notify within 8 weeks of awareness.
Dispute resolution: Adjudication (ICE-SA panel) then arbitration (Association of Arbitrators rules, seat Sandton).
Governing law: South Africa.
Language: English.
Description
Source: 20251126_BESS- Form A_Cat 2.docxThis document (Form A, Category 2) is a quality compliance acknowledgement form for the Eskom tender: Appointment of a panel of accredited EPC contractors to deliver turnkey rooftop PV systems integrated with Battery Energy Storage Systems (BESS), after-sales maintenance for the warranty period, and remote monitoring for residential customers for three years as and when required. The tenderer must complete and sign this form to accept Eskom Supplier Quality Requirements per specification 240-105658000 and ISO 9001:2015. Category 2 (single-phase 20–60 Amps) is selected. All pre-contract award, post-contract award, standard conditions, ISO 9001 clauses 4–10, and seven Quality Principles are marked applicable. Eskom's Quality Representative is Lesego Garegae, Senior Advisor - QA (signed 25 November 2025). The tenderer must provide their Quality Representative details in Section E.
Contact Information
Source: 20251126_BESS- Form A_Cat 2.docx (unknown)Eskom Quality Representative:
No SCM or technical enquiry contacts, submission address, or service delivery address are stated in this extract.
Submission Guidelines
Source: 20251126_BESS- Form A_Cat 2.docx (unknown)Returnable document: Form A (Category 2) — must be completed and signed to acknowledge and accept Eskom Supplier Quality Requirements per specification 240-105658000 and ISO 9001. Tenderer must designate a Quality Representative (name, designation, date, signature) in Section E. No submission method, closing time, or packaging instructions are stated in this extract.
Evaluation Criteria
Source: 20251126_BESS- Form A_Cat 2.docx (unknown)Pre-contract award quality assessment applies. Mandatory requirements:
Post-contract award compliance required for:
Standard conditions (all marked applicable):
ISO 9001 clauses 4–10 and all seven Quality Principles must be satisfied. No scoring split, minimum qualifying score, or preference point system is stated in this extract.
Technical Specifications
Source: 20251126_BESS- Form A_Cat 2.docx (unknown)Scope: Appointment of a panel of accredited EPC contractors to deliver turnkey rooftop PV systems integrated with Battery Energy Storage Systems (BESS), after-sales maintenance for the warranty period, and remote monitoring for residential customers for a period of three years as and when required.
Category 2 applies (clause 3.5.3 of 240-105658000) — single-phase customers from 20–60 Amps.
Quality system must comply with Eskom specification 240-105658000 and ISO 9001:2015 (clauses 4–10).
All seven ISO 9001 Quality Principles apply: Customer focus, Leadership, Engagement of people, Process approach, Improvement, Evidence-based decision making, Relationship management.
Special processes per clause 3.8.6 of 240-105658000 must be addressed.
Compliance Requirements
Source: 20251126_BESS- Form A_Cat 2.docx (unknown)Mandatory:
No CIDB grade, local content percentage, or professional registration is stated in this extract.
Description
Source: BOQ Residential PV 15.12.2025.xlsxDescription: The tender covers the design, supply, installation, and commissioning of complete rooftop PV solutions for single-phase residential customers (20–60 A). The Bill of Quantities defines four system sizes (5 kW, 8 kW, 10 kW, 12 kW) with minimum PV and battery capacities. Work includes site assessment, feasibility study, detailed engineering, SSEG registration, equipment supply (PV modules ≥550 W, mounting, hybrid inverters, LFP batteries, balance of system), installation, testing, commissioning with CoC, 12-month after-sales support, optional extended O&M to 36 months, installer training, remote connectivity provisions, travel, accommodation, and site establishment.
Technical Specifications
Source: BOQ Residential PV 15.12.2025.xlsx (unknown)Scope: Design, supply, installation, and commissioning of rooftop PV systems for single-phase customers (20–60 A).
System sizes: 5 kW, 8 kW, 10 kW, 12 kW.
Minimum PV capacity: 4.4 kWp (5 kW), 7.7 kWp (8 kW), 8.8 kWp (10 kW), 9.9 kWp (12 kW).
Minimum battery storage: 5 kWh, 8 kWh, 10 kWh, 12 kWh respectively.
Key work packages:
Description
Source: 240-105658000 Supplier Quality Management Specification (3).pdfSupplier Quality Management Specification (240-105658000, QM 58, Revision 3) applies to all Eskom Holdings SOC Ltd divisions, subsidiaries, suppliers and sub-suppliers. It defines minimum quality requirements for supplier selection, evaluation, registration, monitoring, assessment and auditing. Suppliers must develop, implement, maintain and continually improve a QMS based on ISO 9001. Effective from date of authorisation (17 October 2021). Normative references: ISO 9001, ISO 10005. Informative references: ISO 9000, Eskom SHEQ Policy (32-727), ISO 10006, ISO 9004, PPPFA, CIDB 1004, List of Tender Returnables (240-12248652), IAEA GS-R-3.1, SANS 10845-1.
Important Dates
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Closing date: 6 October 2026 at 10:00 (from tender record).
No compulsory briefing or site visit dates stated in this specification.
Specification effective date: date of authorisation (17 October 2021).
Next review date: October 2024.
Submission Guidelines
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Returnable forms:
Category 1: valid ISO 9001 certificate, latest internal/external audit reports with corrective actions, draft Contract Quality Plan specific to scope, example ITP/QCP from similar work, documented information for control of externally provided processes, roles/responsibilities/authorities (org charts, job descriptions), management review records.
Category 2: objective evidence of ISO 9001-compliant QMS (manual, policy, objectives, document control, internal audit procedure, nonconformity control, corrective action procedure), audit reports, draft CQP, example ITP/QCP, control of externally provided processes, roles/responsibilities, management review records.
Category 3: developed QMS evidence (manual, policy, objectives, document control, internal audit, nonconformity control, corrective action), draft CQP, example ITP/QCP, control of externally provided processes, roles/responsibilities.
Category 4: quality method statement per ISO 9001 and scope, signed quality policy, quality objectives, control of externally provided processes, roles/responsibilities specific to project.
Disqualification risks:
Returnable Documents
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Mandatory returnables per quality category (Form A always required):
Category 1: ISO 9001 certificate, internal/external audit reports, draft CQP, example ITP/QCP, control of externally provided processes docs, roles/responsibilities docs, management review records.
Category 2: QMS evidence (manual, policy, objectives, document control, internal audit, nonconformity control, corrective action), audit reports, draft CQP, example ITP/QCP, control of externally provided processes, roles/responsibilities, management review records.
Category 3: similar to Category 2 but QMS evidence may be less mature.
Category 4: quality method statement, quality policy, quality objectives, control of externally provided processes, roles/responsibilities.
Specific returnables selected via List of Tender Returnables (240-12248652).
Evaluation Criteria
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Quality evaluation:
Methodology
Source: 240-105658000 Supplier Quality Management Specification (3).pdfQuality Control Plan/Inspection Test Plan methodology: chronological sequence from contract review through materials verification, manufacturing, fabrication, assembly, final testing, commissioning, handover documentation. Includes hold/witness points, acceptance criteria per specifications/standards, inspection records, sub-supplier involvement, FMECA, HAZOP where applicable. Method statements for special processes (welding, coating, heat treatment) required prior to manufacture. Preservation work plan development and execution. Quality kick-off and pre-inspection meetings (14 days' notice).
Experience & Qualifications
Source: 240-105658000 Supplier Quality Management Specification (3).pdfCapability and capacity assessment (clause 3.6) for suppliers providing high-risk products/services, working on critical plant, supplying critical plant items/components, or providing special processes. Quality audits performed by trained, accredited, experienced personnel (clause 3.7.3.5). Personnel performing special processes must be certified competent per internal training or external certification (SETA). Welder qualifications per applicable codes.
Quality Management
Source: 240-105658000 Supplier Quality Management Specification (3).pdfPre-contract award quality requirements summary: suppliers must meet ISO 9001 QMS requirements per category (1–4), submit Form A, provide QMS documentation (manual, policy, objectives, procedures), draft Contract Quality Plan per ISO 10005, example ITP/QCP, control of externally provided processes, roles/responsibilities documentation, management review records. Category 4 requires quality method statement, quality policy, quality objectives.
Pricing Schedule
Source: 240-105658000 Supplier Quality Management Specification (3).pdfNot covered in this specification. Pricing format, rates, bill of quantities, payment schedules are defined in the specific tender invitation.
Compliance Requirements
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Mandatory compliance per this specification:
Health & Safety
Source: 240-105658000 Supplier Quality Management Specification (3).pdfReferences Eskom SHEQ Policy (32-727) and IAEA Safety Standard GS-R-3.1. Preservation programme includes safety precautions for equipment handling. Special processes require qualified personnel per statutory requirements (e.g., radiographic workers). No detailed HSE plan requirements in this specification; refer to tender invitation.
Environmental
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Environmental impact considerations referenced via SHEQ Policy (32-727) and preservation programme requirements for material handling, storage, coatings, insulation. No specific environmental management plan requirements in this specification.
Contractual Terms
Source: 240-105658000 Supplier Quality Management Specification (3).pdfPreservation programme (clause 3.8.3): supplier must establish preservation management programme covering all equipment, materials, components; special precautions for valves, motors, rotating equipment, piping, instrumentation, flange faces, gaskets, coatings, insulation; maintenance procedures (shaft rotation, engine turnover, lubrication); documentation in purchase orders; sub-supplier input; communication to project functions; responsibility designation; Eskom access to preservation records.
Special Processes (clause 3.8.6): processes where results cannot be verified prior to delivery (e.g., welding, NDE, coating, heat treatment). Personnel must be qualified/certified per applicable codes and SETA requirements. Welder qualification records (WQR), welding procedure specifications (WPS), procedure qualification records (PQR) required.
Eskom rights: may appoint resident inspectors and approved inspection authorities; supplier must provide workspace at no cost. Eskom has free access to supplier/sub-supplier premises for inspection/audit (3.8.1) and to all quality records (3.8.2). Nonconformities identified by Eskom must be corrected within agreed timeframe (3.8.5).
Special Conditions
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Preservation programme (3.8.3) and Special Processes (3.8.6) as detailed in contractual_terms. Eskom rights of access (3.8.1): free access to supplier/sub-supplier premises for inspection/audit. Eskom rights to information (3.8.2): access to all quality records. Management of nonconformities (3.8.5): Eskom may identify nonconformities; supplier must correct within agreed timeframe. Quality audits conditions (3.8.4): Eskom may conduct audits; supplier must facilitate.
Section
Source: 240-105658000 Supplier Quality Management Specification (3).pdfQuality evaluation uses Form A completed by Eskom quality representative to select applicable quality category (1–4). Suppliers must submit quality documentation per category. Assessment includes ISO 9001 certification, QMS documentation, draft Contract Quality Plan, example ITP/QCP, audit reports, and management review records. Preference points per PPPFA; CIDB 1004 guideline for evaluating quality in tender submissions. Minimum scores and weightings defined in specific tender invitation.
Description
Source: SDLI Strategy Doc_ Bidders Template_Major Equipment Requirements For Distribution Solar PV And BESS SSEQ And Microgrids_ rev 1.docxThis document is the SDL&I (Supplier Development, Localisation & Industrialisation) Strategy Setting Template for bidders. It outlines Eskom's transformation, localisation, and supplier development requirements for the procurement of major equipment for Distribution Solar PV, BESS, SSEQ, and Microgrids. The template captures bidder commitments on B-BBEE improvement, local procurement content, job creation, skills development, and mandatory subcontracting to designated groups. These commitments become contractual obligations but do not form part of the evaluation scoring.
Contact Information
Source: SDLI Strategy Doc_ Bidders Template_Major Equipment Requirements For Distribution Solar PV And BESS SSEQ And Microgrids_ rev 1.docx (unknown)DTIC contacts for local content exemption applications:
No Eskom SCM or technical contacts provided in this document.
Evaluation Criteria
Source: SDLI Strategy Doc_ Bidders Template_Major Equipment Requirements For Distribution Solar PV And BESS SSEQ And Microgrids_ rev 1.docx (unknown)Preference point system: 90/10 or 80/20 (price/specific goals).
Specific goals (B-BBEE): maximum 10 points (90/10) or 20 points (80/20).
Price points: 90 (90/10) or 80 (80/20).
Bidders without valid B-BBEE certificate/sworn affidavit/CIPC affidavit score 0 for specific goals but are not disqualified.
SDL&I objectives (local content, subcontracting, job creation, skills development) do not form part of scoring but become contractual obligations.
No minimum qualifying score stated.
Technical Specifications
Source: SDLI Strategy Doc_ Bidders Template_Major Equipment Requirements For Distribution Solar PV And BESS SSEQ And Microgrids_ rev 1.docx (unknown)Scope: Design, supply, installation, and commissioning of total rooftop PV solution for single-phase customers (20–60 Amps).
Major equipment requirements for Distribution Solar PV and BESS: SSEQ and Microgrids.
Contract duration: 3 years.
Pre-qualification criteria for set-aside procurement: not applicable.
Financial Requirements
Source: SDLI Strategy Doc_ Bidders Template_Major Equipment Requirements For Distribution Solar PV And BESS SSEQ And Microgrids_ rev 1.docx (unknown)Retention: 2.5% of invoice amount (excluding VAT) held for failure to submit quarterly SDL&I performance reports or failure to meet SDL&I obligations.
Retention released upon positive compliance assessment; retained upon non-compliance.
Skills development: tenderer bears full cost; one candidate per R3 million cumulative spend via purchase orders.
No bid security, performance bond, or guarantee percentages specified.
Payment terms not detailed in this document.
Compliance Requirements
Source: SDLI Strategy Doc_ Bidders Template_Major Equipment Requirements For Distribution Solar PV And BESS SSEQ And Microgrids_ rev 1.docx (unknown)B-BBEE: valid SANAS-accredited certificate, sworn affidavit, or CIPC affidavit required to claim preference points; electronic signatures on affidavits not accepted.
Revenue thresholds: ≤R10 million (EME) – sworn affidavit; ≤R50 million (QSE) – applicable certificate or affidavit (if ≥51% black owned); >R50 million – valid B-BBEE certificate.
B-BBEE improvement/retention plan due within 30 days of contract signature:
Local content: 70% threshold for designated products; DTIC exemption letter required if importing raw materials/inputs.
Mandatory subcontracting: up to 30% of purchase orders ≥R30 million to designated groups (EME/QSE ≥51% black owned, youth, women, disabilities, rural/township, cooperatives, military veterans).
Subcontracting documents required before contract award: sub-contract agreement, subcontractor CSD report, subcontractor B-BBEE certificate/affidavit.
CSD registration implied.
CIDB: not applicable.
NIPP: not applicable.
Description
Source: 20251126_BESS-DX national-GX_Cat 2_ Rev 7.pdfAppointment of a panel of accredited EPC contractors to deliver turnkey rooftop PV systems integrated with Battery Energy Storage Systems (BESS), and after-sales maintenance for warranty period and remote monitoring for residential customers for a period of three years as and when required. Specific capability required: design, supply, installation, and commissioning of total rooftop PV solution for single-phase customers from 20–60 Amps.
Important Dates
Source: 20251126_BESS-DX national-GX_Cat 2_ Rev 7.pdf (TENDER)Tender closing: 6 October 2026 at 10:00
Document issued: 26 November 2025
No compulsory briefing or site visit dates stated in this document
Contact Information
Source: 20251126_BESS-DX national-GX_Cat 2_ Rev 7.pdf (TENDER)Eskom representative: Lesego Garegae (for Khutso Sebea)
Role: Not specified
Email: Not provided in this document
Telephone: Not provided in this document
Submission Guidelines
Source: 20251126_BESS-DX national-GX_Cat 2_ Rev 7.pdf (TENDER)Closing date: 6 October 2026 at 10:00
Returnable documents:
Submission method and address not specified in this document
Returnable Documents
Source: 20251126_BESS-DX national-GX_Cat 2_ Rev 7.pdf (TENDER)Form A: must be completed and signed
Evaluation Criteria
Source: 20251126_BESS-DX national-GX_Cat 2_ Rev 7.pdf (TENDER)Quality requirements evaluation (Category 2) scored as follows:
Option 1 (valid ISO 9001 certification): 4 points
Option 2 (documented QMS complying with ISO 9001 without certification): 7 points
Includes roles/responsibilities matrix, control of external providers, latest internal audit report, management review records
Failure to provide required ISO 9001 evidence, draft Contract Quality Plan, Quality Control Plan/ITP, completed Form A, and up-to-date internal audit reports results in disqualification
Technical Specifications
Source: 20251126_BESS-DX national-GX_Cat 2_ Rev 7.pdf (TENDER)Scope: Appointment of a panel of accredited EPC contractors to deliver turnkey rooftop PV systems integrated with Battery Energy Storage Systems (BESS), including after-sales maintenance for warranty period and remote monitoring for residential customers for a period of three years as and when required
Specific capability: Design, supply, installation, and commissioning of total rooftop PV solution for single-phase customers from 20–60 Amps
Quality requirements:
Compliance Requirements
Source: 20251126_BESS-DX national-GX_Cat 2_ Rev 7.pdf (TENDER)Quality management compliance:
Standard compliance requirements (CSD registration, tax clearance, B-BBEE, CIDB) not detailed in this document
Contractual Terms
Source: 20251126_BESS-DX national-GX_Cat 2_ Rev 7.pdfContract period: three years
Appointment type: panel of accredited EPC contractors
Scope: turnkey rooftop PV systems integrated with BESS
Includes: after-sales maintenance for warranty period and remote monitoring for residential customers
Basis: as and when required
Description
Source: 240-77471499 Annexure B.docxAnnexure B: Acknowledgement Form for Eskom OHS legal and other requirements. The form requires the bidder to acknowledge understanding of and compliance with Eskom OHS standard 32-136, the Occupational Health and Safety Act 85 of 1993, and the Compensation for Occupational Diseases and Illnesses Act 130 of 1993. It confirms the bidder will align company processes to Eskom OHS requirements after award, accept penalties for non-conformance, ensure all employees and contractors undergo Eskom and company inductions, and manage subcontractors in accordance with Eskom OHS requirements. The form must be signed by the CEO, Director or Managing Director and witnessed by two witnesses.
Submission Guidelines
Source: 240-77471499 Annexure B.docx (unknown)Returnable documents:
Evaluation Criteria
Source: 240-77471499 Annexure B.docx (unknown)Bidders must sign and return Annexure B acknowledging understanding of and compliance with Eskom OHS legal requirements, including standard 32-136, the OHS Act 85 of 1993, and the Compensation for Occupational Diseases and Illnesses Act 130 of 1993. The authorised signatory must be the CEO, Director, or Managing Director, with two witnesses required on the acknowledgement form.
Technical Specifications
Source: 240-77471499 Annexure B.docx (unknown)Scope: Design, supply, installation, and commissioning of total rooftop PV solutions for single-phase customers from 20–60 Amps.
OHS compliance requirements:
Compliance Requirements
Source: 240-77471499 Annexure B.docx (unknown)Mandatory:
Technical Specifications
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP)-rev 3.docx (unknown)Quality Control Plan (QCP) / Inspection Test Plan (ITP) for rooftop PV solution (single phase, 20–60 Amps)
Intervention points defined: Hold Point, Witness Point, Document Review (AP/IN), Surveillance (S), Verification (V)
Testing categories: T1 (100% Testing), T2 (Sample Testing)
Inspection categories: A1 (100% Inspection), A2 (Sample Inspection)
Witness categories: W1 (100% Witness), W2 (Sample Witness)
Document review categories: R1 (100% Document Review), R2 (Sample Document Review)
Approvals required from Contractor/Supplier, Subcontractor (where applicable), Eskom, and Approved Inspection Authority (AIA) where applicable
Inspection and test methods to be specified per activity (e.g. Visual, Microscopy, NDT, Liquid/Dye Penetrant, Magnetic Particle, EDDY)
Acceptance criteria to be defined per activity (e.g. Functionality requirement, Performance Measures, Regulatory Compliance, Chemical test)
Records to be maintained for each inspection/test activity
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 46 of 2000
Relevant where professional engineering services or regulated engineering work may be required.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Address
Dale Road - Midrand - Johannesburg - 1685
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
17
Last checked
25 Sept 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
A technical guide to municipal electrical tenders. Covers CIDB EB/EP grading, electrification projects (INEP), substation maintenance panels, and COC compliance.
How mechanical and electrical engineers, contractors, and consultants can win public sector contracts in South Africa — HVAC, plumbing, fire systems, electrical infrastructure, ECSA registration, CIDB ME designation, and tender documentation essentials.
How small electrical contractors use Joint Ventures to combine EP grading, win Eskom and municipal infrastructure projects, and compete for renewable energy installations.
How small office supplies, stationery, and general goods suppliers use Joint Ventures to win government procurement contracts by combining inventory with B-BBEE credentials.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Services: Electrical. Unlock full pricing strategies, bid frequency, and historical win rates.