Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Lethabo Power Station Situated ± 18 km South of Vereeniging on the Viljoensdrift-Deneysville Road, F - Deneysville - Vereeniging - 1930
Organization Type
GOVERNMENT
Published
28 Sept 2026
OCDS Reference
ocds-9t57fa-171963
ESKOM requires the once-off supply and delivery of instrumentation and control components to lethabo power station, including items such as CCTV cameras, fire alarm components, lvdt displacement sensors, temperature sensors, and metering orifices. The contract is a nec3 supply contract (sc3) with delivery to lethabo power station main stores, and the supplier is responsible for transport, loading, and unloading. Bidders must complete the nec3 pricing schedule and submit all required forms; the most consequential consideration is the performance bond of 10% of contract value, which may be required if the supplier is deemed financially unstable.
Closing: 16 October 2026 at 10:00. Submission method and address are not stated in the document.
Returnables: Complete and sign C1.1 Form of Offer and Acceptance (state total price excl. VAT, VAT at 15%, total incl. VAT), C1.2 Contract Data Part 2 (supplier's data), C1.3 Proforma Securities (performance bond if required), C2.2 Price Schedule, and Schedule of Deviations (if any).
Performance bond: 10% of contract value, issued by a bank acceptable to the Supply Manager, required before contract award if the supplier is deemed financially unstable.
Delivery: To Lethabo Power Station Main Stores; supplier must provide a roadworthy delivery vehicle, give notice of delivery, check packing/marking, contract and pay for transport, and load/unload the goods.
Payment: Within 30 days after assessment and receipt of undisputed tax invoice; assessment interval is between the 25th of each month. Note: Eskom's standard payment term for contracts above R50 million (incl. VAT) is 60 days.
Low performance damages: 1% per day for incorrect specification (material) and 1% per day for not meeting quality standards (including documents), capped at 10% per line item.
B-BBEE: Notify Eskom within 7 days of any change in B-BBEE status; submit updated verification certificate within 30 days. A decrease in status may lead to re-negotiation or termination.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Friday, 16 October 2026 - 10:00
Venue
null
Categories
Request for Bid(Open-Tender)
Lethabo Power Station Situated ± 18 km South of Vereeniging on the Viljoensdrift-Deneysville Road, F - Deneysville - Vereeniging - 1930
Recommended Certifications
Having these can improve your winning chances: SABS Product Certification, NRCS Certification
AI Document Analysis Stages
Description
Source: LFMS048 - OHS Specification C&I.pdf28 Sept
2026
Tender Published
Tender was published
16 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Expected Table of Content.pdf
Supply and delivery of Instrumentation & Control Components on a once-off basis at Lethabo Power Station. Bidders must quote at least 80% of the items on tender or be automatically disqualified. Submission is structured into commercial, technical and SDL&I folders.
Supplier Evaluation Pack Template for 01 March 2023 to 29 February 2024.pdf
Supply and delivery of Instrumentation & Control Components (once off) at Lethabo Power Station, issued by Eskom. The document provided is the PAYE Questionnaire for Service Contracts, used to determine the tax classification of contractors (individual, company, close corporation, or trust) for withholding purposes.
240-77471651 Annexure C1 OHS Tender Evaluation (High risk).pdf
Supply and delivery of Instrumentation & Control Components (once off) at Lethabo Power Station, issued by Eskom. The tender includes a high-risk OHS evaluation requiring bidders to submit specific health and safety documentation.
Category 2-Supply and Delivery of C&I Components.pdf
Supply and delivery of Instrumentation & Control Components on a once-off basis to Lethabo Power Station, for a period of three months on an as-and-when-required basis. The tender is issued by Eskom and includes quality management system requirements, a contract quality plan, and a quality control plan.
Annex-c_Local content Declaration-Summary Schedule.pdf
annex-e (Local content declaration).pdf
Eskom Standard Conditions of Tender.pdf
annex-d (Imported content declaration).pdf
Form A_Cat 2-Supply and Delivery of C&I Components.pdf
Supply and delivery of Instrumentation and Control Components on an as-and-when required basis to Lethabo Power Station for a period of three months. The contract is a once-off procurement by Eskom, subject to the organisation's supplier quality requirements and ISO 9001 standards.
BRA.pdf
Supply and delivery of instrumentation and control components to Lethabo Power Station in Gauteng, contracted once off for a period of three (3) months on an "as and when required" basis. The scope is road transport of the components, and the baseline risk assessment sets the occupational health and safety and road-traffic controls the contractor's drivers and vehicles must work to.
LFMS048 - OHS Specification C&I.pdf
Supply and delivery of instrumentation and control components to Lethabo Power Station on a once-off, as-and-when-required basis over a three-month period. The contract is governed by Eskom's OHS specification for high-risk activities, which sets the minimum health, safety and environmental requirements the successful bidder must meet for the duration of the contract.
Latest 240-105658000 Supplier Quality Management Specification (3).pdf
Supply and delivery of Instrumentation & Control Components (once off) at Lethabo Power Station, issued by Eskom. The tender is governed by Eskom's Supplier Quality Management specification (240-105658000), which sets out quality requirements for suppliers based on ISO 9001, including quality plans, quality control plans, and supplier capability assessments.
Invitation to Tender (ITT) Instrumentation and Control Components.pdf
Eskom Holdings SOC Ltd invites tenders for the once-off supply and delivery of Instrumentation and Control Components to Lethabo Power Station. The contract will be awarded to multiple service providers under an NEC3 Supply Contract, with evaluation based on price (80 points) and specific goals (20 points).
E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf
Supply and delivery of Instrumentation & Control Components (once off) at Lethabo Power Station, issued by Eskom. The tender requires bidders to acknowledge completion of e-Tendering self-training via a mandatory returnable form.
ANNEXURE B Eskom Acknowledgement Form for OHS legal.pdf
Supply and delivery of Instrumentation & Control Components (once off) at Lethabo Power Station for Eskom. Bidders must acknowledge and comply with Eskom's OHS legal and other requirements, including contractor health and safety standards and statutory Acts.
E-tendering Help Manual for supplier - 27 January 2025.pdf
Supply and delivery of Instrumentation & Control Components (once off) at Lethabo Power Station, issued by Eskom. The tender requires bidders to register on the Eskom eTendering system and submit their documents electronically before the closing date.
Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdf
Supply and delivery of Instrumentation & Control Components (once off) at Lethabo Power Station, issued by Eskom. The tender requires bidders to comply with Eskom's Supplier Integrity Pact, including signing an Integrity Declaration Form and adhering to ethical standards.
Authorisation_Form_-_08_November_2024.pdf
Supply and delivery of Instrumentation & Control Components (once off) at Lethabo Power Station, issued by Eskom. The tender requires bidders to complete an authorisation form certifying the authority of the signatory to bind the organisation.
SPECIFICATIONS.pdf
Supply and delivery of a once-off range of Instrumentation & Control Components for Lethabo Power Station, including disk drives, CCTV cameras and recorders, network switches, fire protection sprinklers and alarms, pressure and temperature gauges, sensors, transmitters, analyzers, and various electrical meters and controllers.
NEC3 supply and delivery of Instr Control.pdf
Supply and delivery of Instrumentation and Control Components on a once-off basis to Lethabo Power Station, under an NEC3 Supply Contract (SC3) with Eskom Holdings SOC Ltd. The contract covers the provision of goods, delivery to the power station's main stores, and associated documentation and guarantees.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 422 698
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Supply and delivery of Instrumentation and Control Components (once off) to Lethabo Power Station for a period of three (3) months on an 'as and when required' basis.
Project address: Lethabo Power Station, Deneysville / Viljoensdrift Road, Private Bag X415, Vereeniging, 1930 SA.
Important Dates
Source: LFMS048 - OHS Specification C&I.pdf (unknown)Closing date: 16 October 2026 at 10:00 (from tender record).
No briefing session or site visit is stated in the document.
Contact Information
Source: LFMS048 - OHS Specification C&I.pdf (unknown)Project address:
Lethabo Power Station
Deneysville / Viljoensdrift Road
Private Bag X415
Vereeniging, 1930 SA
No named contacts are provided in the document.
Submission Guidelines
Source: LFMS048 - OHS Specification C&I.pdf (unknown)Returnable documents (all must be completed, signed and submitted with the bid):
Disqualification risks:
Evaluation Criteria
Source: LFMS048 - OHS Specification C&I.pdf (unknown)OHS tender evaluation is conducted for high-risk activities/services (Annexure C1).
The contractor must demonstrate compliance with the OHS specification, including:
No scoring split or minimum qualifying score is stated in the document.
Technical Specifications
Source: LFMS048 - OHS Specification C&I.pdf (unknown)Scope: Supply and delivery of Instrumentation and Control Components (once off) to Lethabo Power Station.
Contract period: Three (3) months, on an 'as and when required' basis.
Delivery location: Lethabo Power Station, Deneysville / Viljoensdrift Road, Private Bag X415, Vereeniging, 1930 SA.
The contractor is responsible for the health and safety of their employees and any appointed contractors.
The contractor must develop an OHS plan that meets the requirements of this specification and all applicable legislation.
The contractor must comply with all relevant legislation, including the OHS Act, National Environmental Management Act, National Water Act, and National Road Traffic Act.
The contractor must ensure all employees are familiar with relevant Eskom OHS documentation before work commences.
Methodology
Source: LFMS048 - OHS Specification C&I.pdfLive work must follow the High Voltage Live Working Standard, including adhering to minimum approach distances (MAD) and not mixing live and dead work on the same site at the same time.
Experience & Qualifications
Source: LFMS048 - OHS Specification C&I.pdfThe main contractor and appointed contractors must have appropriate qualifications and certificates.
Employees must always be under competent supervision.
The contractor health and safety officer must be trained in SAMTRAC, HIRA, incident investigation, legal liability, and have knowledge of ISO 45001, with a minimum of 2 years' work experience.
Quality Management
Source: LFMS048 - OHS Specification C&I.pdfThe contractor must maintain satisfactory standards through regular inspections, documenting results and keeping records.
A non-conformance procedure must be implemented, covering quality-related issues.
Failure to provide and enforce PPE use is treated as a transgression of legislative and Eskom requirements.
Pricing Schedule
Source: LFMS048 - OHS Specification C&I.pdfOHS costing must be itemised based on the overall scope of the project (e.g., training, PPE, safety equipment purchases).
No detailed pricing schedule is provided in this document.
Financial Requirements
Source: LFMS048 - OHS Specification C&I.pdf (unknown)OHS costing must be itemised based on the overall scope of the project (e.g., training, PPE, safety equipment purchases).
No bid security, guarantees, retention, or payment terms are stated in the document.
Compliance Requirements
Source: LFMS048 - OHS Specification C&I.pdf (unknown)COID registration: The main contractor and all appointed contractors must be registered with the Compensation Commissioner and hold a valid letter of good standing (LoG) for the entire contract period. The LoG must reflect the contractor's company name.
Section 37(2) agreement: Must be signed between Eskom and the main contractor, and between the main contractor and all appointed contractors. The original is retained by the contractor, a copy by the project manager/end user, and copies filed in OHS files.
SHEQ policy: Must be signed by the organisation's CE or Section 16(2) appointee, displayed prominently, and filed in the OHS file.
Covid-19 policy: Must be signed by the most senior person, displayed, and filed.
OHS plan: Must be submitted as a returnable.
Statutory appointments: Must appoint competent persons for roles including Section 16.2 appointee, incident investigator (GAR 9(2)), risk assessor (CR 9(1)), safety officer (CR 8(5)), construction vehicle and mobile plant inspector (CR 23(1)(d)), and stacking and storage (GSR 8(1)(a)).
Substance abuse: 0% alcohol and drug level; adherence to Eskom procedure 32-37.
Life-Saving Rules: All employees must sign the Life-saving Rule pledge before work commences.
No child labour: Prohibited in line with the Constitution and Basic Conditions of Employment Act.
B-BBEE: Minimum Level 2 (stated in the document).
Health & Safety
Source: LFMS048 - OHS Specification C&I.pdfThis is an OHS specification for high-risk activities/services (LFMS048 Rev 00).
The contractor must comply with the OHS Act and all regulations, including the Construction Regulations.
A Section 37(2) agreement must be signed between Eskom and the main contractor, and between the main contractor and all appointed contractors.
Child labour is prohibited.
The contractor must have a signed SHEQ policy and OHS plan.
A signed Covid-19 policy is required.
COID registration with a valid letter of good standing is mandatory.
Statutory appointments must be made (Section 16.2, incident investigator, risk assessor, safety officer, etc.).
Eskom's Life-Saving Rules apply: open/isolate/test/earth before touching, hook up at heights, buckle up, be sober, permit to work, safe live working, no cellphone use on site.
Substance abuse: 0% alcohol/drugs; ad hoc testing may occur.
Risk assessments (baseline and task-specific) must be conducted.
Safe work procedures and method statements are required.
Fire equipment and first aid must be provided and maintained.
Toolbox talks and pre-job meetings must be held.
OHS training and induction are required.
Site roads and vehicle management must comply with Eskom procedures.
Housekeeping, stacking and storage must be managed safely.
PPE must be provided and worn.
Incidents must be investigated and reported.
Emergency management plans must be in place.
OHS files must be maintained and available for audit.
Work stoppage may be enforced for non-compliance.
Eskom has the right to terminate the contract for OHS non-compliance.
Environmental
Source: LFMS048 - OHS Specification C&I.pdfThe contractor must comply with environmental legislation, including the National Environmental Management Act.
Waste must be temporarily stored in designated areas awaiting disposal.
Materials/objects must not be left unsecured in elevated areas to prevent falling-object injuries.
Contractual Terms
Source: LFMS048 - OHS Specification C&I.pdfThe contractor (main contractor) is accountable for the health and safety of their employees and appointed contractors.
The contractor must ensure all appointed contractors comply with the same OHS requirements.
Eskom has the right to terminate the contract for non-compliance with OHS requirements.
The contractor must implement a non-conformance procedure for issuing transgressions.
The contractor must maintain an OHS file for each work site, available for audit and inspection.
Work stoppage may be enforced for serious OHS non-compliance.
Contract sign-off is required at the end of the contract.
Section
Source: LFMS048 - OHS Specification C&I.pdfOHS tender evaluation is conducted for high-risk activities/services (Annexure C1).
The contractor must demonstrate compliance with the OHS specification, including a signed SHEQ policy, OHS plan, Covid-19 policy, COID letter of good standing, Section 37(2) agreements, competent staff, no child labour, and adherence to Life-Saving Rules.
No scoring split or minimum qualifying score is stated.
Submission Guidelines
Source: Expected Table of Content.pdf (TENDER)Returnable documents must be submitted in the following folders:
Disqualification risk: Bidders who do not quote at least 80% of the items on tender will be automatically disqualified from further evaluations.
Returnable Documents
Source: Expected Table of Content.pdf (TENDER)Returnable documents are organised into three folders:
Compliance Requirements
Source: Expected Table of Content.pdf (TENDER)Required evidence:
Requirements
Source: Expected Table of Content.pdf (TENDER)Bidders must quote at least 80% of the items on tender or be automatically disqualified from further evaluations.
Section
Source: Expected Table of Content.pdfBidders must quote at least 80% of the items on tender or be automatically disqualified from further evaluations.
Description
Source: Supplier Evaluation Pack Template for 01 March 2023 to 29 February 2024.pdfThis PAYE questionnaire is used to determine the tax classification of contractors supplying services or labour to Eskom Group of Companies. It applies to companies, close corporations, trusts, and individuals. The classification determines whether PAYE must be withheld from payments. The questionnaire is based on the Fourth Schedule of the Income Tax Act and is valid for the 2023/2024 tax year.
Contact Information
Source: Supplier Evaluation Pack Template for 01 March 2023 to 29 February 2024.pdf (unknown)Enquiries:
Submission Guidelines
Source: Supplier Evaluation Pack Template for 01 March 2023 to 29 February 2024.pdf (unknown)Returnable documents:
Submission method:
Returnable Documents
Source: Supplier Evaluation Pack Template for 01 March 2023 to 29 February 2024.pdf (unknown)Contractors must complete and return the signed summary sheet, signed affidavits (Appendices 1-9 as applicable), and the 'Particulars of person acting as representative' or 'Particulars of Individual' section. Completed packs must be submitted to the contractor's representative in Eskom, with a copy to Group Tax at [email protected].
Evaluation Criteria
Source: Supplier Evaluation Pack Template for 01 March 2023 to 29 February 2024.pdf (unknown)The questionnaire determines the contractor's tax classification (Independent Contractor, Personal Service Provider, Labour Broker, or Dependent Contractor) through a series of tests. The classification affects whether PAYE is withheld from payments. Key tests include:
Technical Specifications
Source: Supplier Evaluation Pack Template for 01 March 2023 to 29 February 2024.pdf (unknown)This is a PAYE questionnaire for service contracts with Eskom Group of Companies. It applies to contractors supplying services or labour to Eskom Holdings SOC Ltd and its subsidiaries. The questionnaire establishes whether a contractor is classified as an Independent Contractor, Personal Service Provider, Labour Broker, or Dependent Contractor for tax purposes. It is based on tax legislation for the 2023/2024 tax year.
Pricing Schedule
Source: Supplier Evaluation Pack Template for 01 March 2023 to 29 February 2024.pdfPAYE withholding rules:
Financial Requirements
Source: Supplier Evaluation Pack Template for 01 March 2023 to 29 February 2024.pdf (unknown)PAYE withholding:
Compliance Requirements
Source: Supplier Evaluation Pack Template for 01 March 2023 to 29 February 2024.pdf (unknown)Contractors must complete the relevant evaluation pack (Pack A for companies/CCs/trusts, Pack B for individuals) and sign the required affidavits and declarations. The pack is based on tax legislation for the 2023/2024 tax year and is subject to change.
Section
Source: Supplier Evaluation Pack Template for 01 March 2023 to 29 February 2024.pdfThe evaluation is a series of tests to determine the contractor's tax status. The tests include residence, number of employees, connected persons, 80% income, place/control/supervision, and dominant impression. The outcome determines whether the contractor is independent or a personal service provider/employee, and whether PAYE is withheld.
Contact Information
Source: 240-77471651 Annexure C1 OHS Tender Evaluation (High risk).pdf (unknown)Eskom OHS Representative (signatory on the evaluation template).
Development Team: Diane Maunatlala.
Submission Guidelines
Source: 240-77471651 Annexure C1 OHS Tender Evaluation (High risk).pdf (unknown)Returnable OHS documents (all must be submitted, signed where required):
Evaluation Criteria
Source: 240-77471651 Annexure C1 OHS Tender Evaluation (High risk).pdf (unknown)OHS evaluation is a pass/fail assessment. Bidders must submit all listed OHS returnables. The outcome is a recommendation of 'Recommended' or 'Not Recommended'. No other eligibility criteria (e.g., CSD, B-BBEE, tax clearance) are stated in the provided document.
Technical Specifications
Source: 240-77471651 Annexure C1 OHS Tender Evaluation (High risk).pdf (unknown)Scope of work: Supply and delivery of Instrumentation & Control Components (once off) at Lethabo Power Station. OHS requirements are high-risk, requiring a project-specific Health and Safety Plan and Baseline Risk Assessment.
Experience & Qualifications
Source: 240-77471651 Annexure C1 OHS Tender Evaluation (High risk).pdfOHS competency evidence required: CVs, qualifications and certificates relevant to the scope of work, risks, and OHS plan. Specific competencies to be listed by the bidder.
Compliance Requirements
Source: 240-77471651 Annexure C1 OHS Tender Evaluation (High risk).pdf (unknown)OHS compliance requirements (as per Annexure C1):
Health & Safety
Source: 240-77471651 Annexure C1 OHS Tender Evaluation (High risk).pdfOHS requirements (high risk):
Description
Source: E-tendering Help Manual for supplier - 27 January 2025.pdfThe document is the Eskom eTendering System Suppliers Help Manual. It explains how suppliers register and submit tender documents electronically, replacing physical submission. It does not describe the specific tender for Instrumentation & Control Components.
Important Dates
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)Closing date and time: 16 October 2026 at 10:00 (from the tender record). No other dates are stated in the document.
Contact Information
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)For problems with the Tender Bulletin, eTendering, or OpenText systems, contact the buyer responsible for the published tender. No specific contact details are provided in the document.
Submission Guidelines
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)Submission is electronic only via the Eskom eTendering system.
Evaluation Criteria
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)No evaluation criteria are stated in the provided document. The document is a user manual for the eTendering system, not the tender-specific evaluation criteria.
Technical Specifications
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)The document is a user manual for the Eskom eTendering system. It does not contain technical specifications for the supply and delivery of Instrumentation & Control Components.
Compliance Requirements
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)A CSD number is required to access the eTendering system and submit a bid.
Special Conditions
Source: E-tendering Help Manual for supplier - 27 January 2025.pdf (TENDER)The eTendering system is compatible with most web browsers, but Microsoft Edge is recommended.
Important Dates
Source: Authorisation_Form_-_08_November_2024.pdf (unknown)Closing date: 08 November 2024
Submission Guidelines
Source: Authorisation_Form_-_08_November_2024.pdf (unknown)Returnable documents:
Evaluation Criteria
Source: Authorisation_Form_-_08_November_2024.pdf (unknown)Eligibility is limited to the legal entity types recognised by the Authorisation Form: company, close corporation, partnership, joint venture, sole proprietor, or trust. The authorised signatory must be properly authorised by the relevant resolution or agreement, and the required certified supporting documents must be attached.
Compliance Requirements
Source: Authorisation_Form_-_08_November_2024.pdf (unknown)Joint ventures must attach a certified copy of the Joint Venture Agreement that includes a statement that all members are jointly and severally liable for contract execution, identifies the lead member, and sets out the ratios for dividing work and payment. A power of attorney signed by the legally authorised signatories of all joint venture members must also be attached.
Description
Source: Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdfThe Eskom Supplier Integrity Pact is a binding agreement between Eskom and its suppliers that prescribes ethical behaviour. It applies to all Eskom Holdings SOC Ltd and its wholly owned subsidiaries, and to all existing and potential suppliers. The pact requires suppliers to read, complete, sign and submit the Integrity Declaration Form whenever they participate in any Eskom procurement process. It commits both parties to refrain from dishonesty, fraud, corruption, and anti-competitive practices such as under-pricing, collusion and bid rigging.
Important Dates
Source: Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdf (unknown)Closing date: 16 October 2026 at 10:00 (from tender record). No other dates are stated in the document.
Contact Information
Source: Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdf (unknown)Reporting unethical behaviour:
Submission Guidelines
Source: Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdf (unknown)Returnable documents:
Disqualification risks:
Evaluation Criteria
Source: Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdf (unknown)Bidders must comply with the Eskom Supplier Integrity Pact. Non-compliance may lead to supplier discipline, including suspension from the Eskom Vendor Database and referral to National Treasury for inclusion on the List of Restricted Suppliers. No scoring or preference point system is stated in this document.
Technical Specifications
Source: Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdf (unknown)This document is the Eskom Supplier Integrity Pact, applicable to all Eskom Holdings SOC Ltd and its wholly owned subsidiaries. It applies to all existing and potential suppliers. It sets out ethical behaviour obligations, not technical specifications for the supply of goods or services.
Pricing Schedule
Source: Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdfNo pricing schedule or payment terms are stated in this document.
Financial Requirements
Source: Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdf (unknown)No financial requirements are stated in this document.
Compliance Requirements
Source: Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdf (unknown)Suppliers must:
Contractual Terms
Source: Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdfThe Integrity Pact is governed by South African law. The actions stipulated are without prejudice to any civil or criminal proceedings. The pact remains valid until replaced. If any provision is invalid, the remainder remains valid. Suppliers may be subject to a supplier discipline process and sanctions if found guilty of misconduct, including suspension from the Eskom Vendor Database and referral to National Treasury for inclusion on the List of Restricted Suppliers.
Special Conditions
Source: Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdf (unknown)Suppliers must complete and submit the Integrity Declaration Form with every Eskom procurement participation. They must maintain an impeachable standard of integrity, avoid conflicts of interest, not disclose confidential information without consent, not misrepresent information, avoid relationships with Eskom employees/directors that may be perceived as contrary to fairness, not offer gifts exceeding R1,500, not engage in unethical dealings with evaluators, not collude with other tenderers, and report any dishonest behaviour to the Eskom Ethics office. Eskom undertakes to treat all tenderers fairly and transparently, requires employees to complete annual Declarations of Interest, and will implement a Supplier Discipline Process for contraventions, including suspension from the Vendor Database and referral to National Treasury.
Section
Source: Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdfNo additional evaluation criteria beyond the integrity obligations are stated in this document.
Description
Source: Invitation to Tender (ITT) Instrumentation and Control Components.pdfSupply and delivery of Instrumentation and Control Components (once-off) at Lethabo Power Station. Tender number E3594GXGPLET. Issue date 28 September 2026. Closing 16 October 2026 at 10:00. Validity 120 days.
Important Dates
Source: Invitation to Tender (ITT) Instrumentation and Control Components.pdf (RFP)Closing date: 16 October 2026 at 10:00
Tender validity: 120 days from closing date
Clarification deadline: 5 working days before tender closing
Briefing/site visit: not applicable
Contact Information
Source: Invitation to Tender (ITT) Instrumentation and Control Components.pdf (RFP)Eskom Representative (all queries):
Fraud/corruption reporting:
Submission: via Eskom Tender Bulletin on Eskom E-tendering page (electronic only).
Submission Guidelines
Source: Invitation to Tender (ITT) Instrumentation and Control Components.pdf (RFP)Submission method: electronic only, via the Eskom Tender Bulletin on the Eskom E-tendering page. No hard copies accepted. Upload documents under folders Technical, Commercial, Financial, and Other. All documents in PDF format; price list in PDF and Excel. Upload size per document 500 MB, total submission 4 GB. No zip/condensed files. If resubmitting, the latest version is accepted; previous submissions become null and void. Ensure submission status is marked complete.
Returnable forms (disqualifiable if not submitted by closing):
Returnable at closing (non-disqualifiable, 5 working days to cure):
Disqualification risks:
Evaluation Criteria
Source: Invitation to Tender (ITT) Instrumentation and Control Components.pdf (RFP)Evaluation stages:
Price evaluation:
Specific goals points (80/20 system):
Ranking: total of price + specific goals, highest wins. Eskom may award to a tenderer other than the highest scorer if objective criteria justify.
Objective criteria (designated local content thresholds):
Technical Specifications
Source: Invitation to Tender (ITT) Instrumentation and Control Components.pdf (RFP)Scope: Supply and delivery of Instrumentation and Control Components (once-off) at Lethabo Power Station.
Key requirements:
Designated local content thresholds apply (see evaluation criteria).
Methodology
Source: Invitation to Tender (ITT) Instrumentation and Control Components.pdfPerformance security: if required, tenderer must select at least two financial institutions from Eskom's pre-approved list.
Pricing Schedule
Source: Invitation to Tender (ITT) Instrumentation and Control Components.pdfPricing schedule/BOQ to be submitted in PDF and Excel. Prices evaluated inclusive of VAT, corrected for arithmetical errors, excluding contingencies, adjusted for variations, compared on Net Present Value. Unconditional discounts considered; conditional discounts applied at payment.
Cataloguing line item to be quoted if applicable.
Financial Requirements
Source: Invitation to Tender (ITT) Instrumentation and Control Components.pdf (RFP)Payment terms:
Security for performance:
SDL&I financial obligations:
Pricing:
Compliance Requirements
Source: Invitation to Tender (ITT) Instrumentation and Control Components.pdf (RFP)Mandatory:
Additional (if applicable):
Eligibility:
B-BBEE Requirements
Source: Invitation to Tender (ITT) Instrumentation and Control Components.pdf (RFP)B-BBEE proof: valid certificate (SANAS accredited), sworn affidavit, or CIPS affidavit. Documents to claim preference points: B-BBEE certificate/affidavit, proof of ownership/shareholding (preferably CIPC), certified ID copies of shareholders, proof of disability where applicable.
Affidavit validity requirements: deponent name and ID, designation, enterprise name and address, ownership percentages, total revenue and basis, financial year end, B-BBEE status level, empowering supplier status, same date signatures by deponent and Commissioner of Oaths, Commissioner must be independent.
SDL&I: B-BBEE improvement/retention plan within 30 days of contract signature. Level 4 must reach Level 3 by end of Year 1; Level 5-8 or non-compliant must reach Level 4 by end of Year 1. Local content target 100%. Jobs created/retained proposals required. Penalty 1% of contract value for non-compliance; 1% invoice retention.
Health & Safety
Source: Invitation to Tender (ITT) Instrumentation and Control Components.pdfSHEQ requirements apply as per scope. See SHEQ Folder on the bulletin for required documents.
COIDA certificate of good standing or proof of application required (South African tenderers only).
Safety/quality/environmental documents as required per scope of works – see SHEQ Folder.
Contractual Terms
Source: Invitation to Tender (ITT) Instrumentation and Control Components.pdfContract conditions: NEC3 SC (Supply Contract).
Payment terms: below R50m incl. VAT – 30 days; above R50m – 60 days from undisputed invoice.
Eskom may negotiate with preferred bidders if prices not market-related.
Subcontracting with subsidiaries discouraged; must be declared if done.
Tender validity: 120 days from closing.
Alternative tenders not allowed.
Cataloguing: successful tenderer may be required to provide cataloguing info; materials labelled per Eskom specs; cataloguing line item to be quoted.
Special Conditions
Source: Invitation to Tender (ITT) Instrumentation and Control Components.pdf (RFP)SDL&I obligations: B-BBEE improvement/retention plan within 30 days of contract signature. Level 4 must reach Level 3 by end of Year 1; Level 5-8 or non-compliant must reach Level 4 by end of Year 1. Local content target 100%. Jobs created/retained proposals required. Penalty 1% of contract value for non-compliance; 1% invoice retention. Quarterly SDL&I reports required. SDL&I Implementation Schedule to be returned within 28 days after award.
Requirements
Source: Invitation to Tender (ITT) Instrumentation and Control Components.pdf (RFP)Eligibility: not under restriction to do business with Eskom/SOEs; not from sanctions-list country; no multiple tenders; no conflict of interest; signed by authorised person; not restricted by National Treasury or on Tender Defaulters list; not restricted by Eskom; no 100% subcontracting. JV/consortium must have joint and several liability agreement.
Section
Source: Invitation to Tender (ITT) Instrumentation and Control Components.pdfFunctionality: datasheets for all items, lead time per item, quote on ≥80% of items. Price scored out of 80. Specific goals out of 20 (80/20 system). B-BBEE points: Level 1:20, 2:18, 3:14, 4:12, 5:8, 6:6, 7:4, 8:2, non-compliant:0. Ranking by total. Objective criteria: designated local content thresholds – Instrument Transformers 15%, Busbars 5%, Housing 25%, Switching Devices 5%.
Description
Source: SPECIFICATIONS.pdfSupply of various items including disk drives, cameras, recorders, switches, fire protection equipment, sensors, gauges, meters, analyzers, transmitters, controllers, and related components.
Submission Guidelines
Source: SPECIFICATIONS.pdf (unknown)Returnable documents: none specified beyond the datasheets and lead times noted under evaluation criteria.
Submission method: not stated in the specification document.
Closing time: 10:00 on 16 October 2026 (per tender record).
Evaluation Criteria
Source: SPECIFICATIONS.pdf (unknown)Functionality requirements:
Technical Specifications
Source: SPECIFICATIONS.pdf (unknown)The scope is the supply and delivery of a wide range of instrumentation and control components for Lethabo Power Station. The specification lists detailed technical requirements for each item, including:
Each item is identified by a unique material code (e.g., 0179411, 0553808) and must be supplied in the specified quantity (EA = each).
Vendors are responsible for ensuring they are performing against the correct drawing revision number where applicable.
Compliance Requirements
Source: SPECIFICATIONS.pdf (unknown)No specific compliance requirements (e.g., CSD, tax, B-BBEE, CIDB) are stated in the specification document.
Health & Safety
Source: SPECIFICATIONS.pdfNo health and safety requirements are stated in the specification document.
Contractual Terms
Source: SPECIFICATIONS.pdfNo contractual terms are stated in the specification document. The document only provides item specifications and functionality requirements.
Requirements
Source: SPECIFICATIONS.pdf (unknown)Functionality requirements: Submission of datasheet is required for all items quoted; evaluation will take place for acceptance of datasheets. Lead time to be indicated on each item quoted. Tenders must quote on at least 80% of the items or will be automatically disqualified from further evaluations.
Section
Source: SPECIFICATIONS.pdfFunctionality requirements: Bidders must quote on at least 80% of the items or be automatically disqualified from further evaluations. Datasheets must be submitted for all items quoted; evaluation will take place for acceptance of the datasheets. Lead time must be indicated on each item quoted.
Description
Source: NEC3 supply and delivery of Instr Control.pdfScope of Work: Supply and delivery of Instrumentation and Control Components on a once-off order to Lethabo Power Station. Delivery place is Lethabo Power Station Main Stores. Transport requirements: roadworthy delivery vehicle appropriate to deliver material. Supplier gives notice of delivery, checks packing, contracts transport, pays costs, loads and unloads goods; Purchaser arranges access. Supplier provides packing lists, invoice, delivery note, test results, maintenance manuals. For international procurement, supplier handles export/import requirements and provides relevant documents.
Contact Information
Source: NEC3 supply and delivery of Instr Control.pdf (unknown)Purchaser: Eskom Holdings SOC Ltd
Registered office: Megawatt Park, Maxwell Drive, Sandton, Johannesburg, 2199
Telephone: 011 800 8111
Supply Manager: Lethabo Power Station
Address: Private Bag X 415, Vereeniging, 1830
Telephone: +27 16 457 5267
Email: not stated
Submission Guidelines
Source: NEC3 supply and delivery of Instr Control.pdf (unknown)Returnable documents (all must be completed, signed and submitted):
Submission method: not stated in the document. Closing time: 10:00 on 16 October 2026 (from tender record).
Evaluation Criteria
Source: NEC3 supply and delivery of Instr Control.pdf (unknown)The document does not describe the evaluation method, scoring split, or minimum qualifying score. The contract is a NEC3 Supply Contract (SC3) and the price schedule is the basis for payment. Low performance damages apply: 1% per day for delivery of incorrect specification (material) and 1% per day for not meeting quality standards including documents, up to a maximum of 10% per line item.
Technical Specifications
Source: NEC3 supply and delivery of Instr Control.pdf (unknown)Scope: Supply and delivery of Instrumentation and Control Components on a once-off order to Lethabo Power Station.
Delivery place: Lethabo Power Station Main Stores.
Transport: Supplier must use a roadworthy delivery vehicle appropriate for the material.
Supplier responsibilities: give notice of delivery, check packing and marking before dispatch, contract and pay for transport, load and unload the goods.
Purchaser responsibility: arrange access to the delivery place.
Documents to be provided by the supplier: packing lists, copy of invoice, delivery note, test results and maintenance manuals.
For international procurement: supplier handles export/import requirements and provides licences, air waybill or bill of lading, bill of entry, customs worksheets, clearing agent invoice, and other import documents.
Price schedule items include (quantities in brackets):
Pricing Schedule
Source: NEC3 supply and delivery of Instr Control.pdfPrice schedule items include disk drives, CCTV cameras, network video recorder, fire alarm box glass, audible visual alarm, fusible plug, fire call point, fire sprinklers, siren/strobe light, LVDT displacement sensors, electronic tachometer, metering orifice, temperature sensors, and vacuum gauge. Quantities range from 2 to 50 per item. Vendors are responsible for providing correct drawing revision numbers where applicable.
Financial Requirements
Source: NEC3 supply and delivery of Instr Control.pdf (unknown)Pricing: The Prices are the amounts stated in the price column of the Price Schedule. Where a quantity is stated, the Price is calculated by multiplying the quantity by the rate. The amount due includes the Price for each lump sum item completed, plus other amounts, less amounts retained. Any tax required by law is included.
Payment terms: Payment within 30 days after assessment and receipt of an undisputed tax invoice. Assessment interval is between the 25th day of each successive month.
Note: Eskom's standard payment term for contracts valued above R50 000 000 (including VAT) is 60 days.
Interest rate: publicly quoted prime rate of interest charged by Standard Bank of South Africa Limited.
Performance bond: 10% of the Contract Value, required if the supplier is deemed financially unstable. The bond must be issued by a bank acceptable to the Supply Manager before contract award.
Insurance: Supplier must provide insurance as per Insurance Table A (loss/damage to goods, liability for property damage, bodily injury, etc.). Purchaser provides insurance as per Insurance Table B.
Supplier's liability for indirect or consequential loss is limited to R0.00. Total liability limited to the value of the contract price.
Tax invoice: Supplier must provide a tax invoice within one week of receiving a payment certificate. Include Eskom's VAT number 4740101508 on each invoice.
Compliance Requirements
Source: NEC3 supply and delivery of Instr Control.pdf (unknown)B-BBEE: Supplier must notify the Purchaser within 7 days of any change in B-BBEE status. Updated verification certificate and supporting documentation must be submitted within 30 days of notification. If B-BBEE status decreases, the Purchaser may re-negotiate or terminate the contract. Failure to notify may constitute grounds for termination.
Joint ventures: If the supplier is a joint venture or consortium, all members are jointly and severally liable. The key person with authority to bind the supplier must be notified to the Supply Manager within two weeks of the Contract Date. Composition may not be altered without written consent.
Cession/assignment: Supplier may not cede, delegate or assign rights or obligations without written consent.
Confidentiality: Supplier must not disclose contract information, and images of the goods require prior written consent.
Ethics: Supplier must not engage in coercive, collusive, corrupt, fraudulent or obstructive actions. The Purchaser may terminate if such action is taken.
Health, safety and environment: Supplier must comply with all applicable health, safety and environmental laws and regulations, and ensure subcontractors do the same.
Asbestos: If asbestos is encountered, the Purchaser manages it. Supplier personnel may stop work and leave the area until declared safe. Removal/disposal is done by a registered asbestos contractor at the Purchaser's expense.
Nuclear liability: Purchaser indemnifies supplier against nuclear damage (Koeberg), except in cases of unlawful intent or unauthorised presence.
No specific CSD, tax clearance, CIDB, or CIPC requirements are stated in the document.
Health & Safety
Source: NEC3 supply and delivery of Instr Control.pdfSupplier must take all reasonable precautions to maintain health and safety of persons. Prices must include sufficient amount for compliance with health and safety laws and regulations. Supplier must comply with all applicable health and safety laws, rules, guidelines and procedures, and ensure subcontractors and others under its control do the same.
Asbestos: If asbestos is identified, a risk assessment is conducted. If exposure above the action level is possible, immediate control measures and air monitoring are implemented. Supplier personnel may stop work and leave the contaminated area until declared safe. Removal and disposal of asbestos is done by a registered asbestos contractor at the Purchaser's expense.
Environmental
Source: NEC3 supply and delivery of Instr Control.pdfSupplier must comply with all applicable environmental laws and regulations, and ensure subcontractors and others under its control do the same. Asbestos removal and disposal must be done by a registered asbestos contractor in line with South African legislation.
Contractual Terms
Source: NEC3 supply and delivery of Instr Control.pdfContract Data Part 1: Purchaser is Eskom Holdings SOC Ltd (reg no: 2002/015527/30). Supply Manager at Lethabo Power Station. Law of contract: Republic of South Africa. Language: English. Period for reply: two working days. Starting date: TBC. Delivery date as stipulated on purchase order. First programme within one week after kick-off meeting; revised programmes at intervals no longer than one week. Defects date: 52 weeks after delivery of each purchase order. Defect correction period: 1 week or as agreed. Payment assessment interval: between 25th day of each successive month. Currency: South African Rand. Payment within 30 days after assessment and receipt of undisputed tax invoice. Interest rate: publicly quoted prime rate of Standard Bank. Additional Purchaser's risks: obsolete goods, preservation, change in works information. Supplier's liability for indirect/consequential loss limited to R0.0. Total liability limited to value of contract price. End of liability date: one year after delivery. Adjudicator from ICE-SA panel, appointed by AFSA if no agreement. Tribunal: arbitration in Johannesburg under Association of Arbitrators rules. Delay damages: 2% per day per line item, capped at 10%. Performance bond: 10% of contract value if financially unstable. Low performance damages: 1% per day for incorrect specification or not meeting quality standards, up to 10%. Additional conditions Z1-Z15 apply.
Section
Source: NEC3 supply and delivery of Instr Control.pdfThe document does not describe the evaluation method or scoring. Low performance damages apply: 1% per day for delivery of incorrect specification (material) and 1% per day for not meeting quality standards including documents, up to a maximum of 10% per line item.
Description
Source: Latest 240-105658000 Supplier Quality Management Specification (3).pdfThe document is the Eskom Supplier Quality Management Specification (240-105658000, Rev 3), which sets minimum quality requirements for all existing and potential Eskom suppliers.
It defines quality criteria for selection, evaluation, vendor registration, management, monitoring, assessment and auditing of suppliers.
Eskom aims to partner with suppliers who demonstrate commitment to developing, implementing and maintaining a QMS conforming to ISO 9001.
The specification applies throughout Eskom Holdings Limited divisions, its subsidiaries, suppliers, and sub-suppliers, and forms part of all RFI/RFQ/RFP and contracts for procurement of products and services.
Important Dates
Source: Latest 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Closing date: 16 October 2026 at 10:00 (from tender record).
No briefing or site visit dates are stated.
Contact Information
Source: Latest 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)No named contacts are provided in the document.
Department: Supply Chain Management (from tender record).
Submission Guidelines
Source: Latest 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Returnable documents (all must be completed, signed and submitted with the bid):
Submission method and address: not stated in the document.
Evaluation Criteria
Source: Latest 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Bidders must be registered on the Eskom supplier database.
Quality requirements are classified into four categories (1, 2, 3 or 4); only one category applies per procurement process, as indicated in Form A.
Category 1: submit a valid ISO 9001 certificate, latest internal and external audit reports, a draft contract quality plan, an example ITP/QCP, documented information for control of externally provided processes, roles/responsibilities/authorities, and management review records.
Category 2: submit objective evidence of a developed, implemented and maintained QMS conforming to ISO 9001, including QMS manual, quality policy, quality objectives, control of documented information, internal audit procedure, control of nonconforming outputs, nonconformity and corrective action procedure, latest internal audit reports, draft CQP, example ITP/QCP, and other documented information.
Category 3: submit objective evidence of a developed QMS conforming to ISO 9001, including similar documented information as Category 2, draft CQP, example ITP/QCP, and other documented information.
Category 4: submit a quality method statement based on ISO 9001, signed/approved quality policy, quality objectives, documented information for control of externally provided processes, and roles/responsibilities/authorities specific to the project.
Supplier capability and capacity assessments may be performed prior to contract award for high-risk products, critical plant work, or special processes.
No scoring split or minimum qualifying score is stated.
Technical Specifications
Source: Latest 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Scope: Supply and delivery of Instrumentation & Control Components (once off) at Lethabo Power Station.
The document is the Eskom Supplier Quality Management Specification (240-105658000, Rev 3), which sets minimum quality requirements for all suppliers.
Suppliers must develop, implement, maintain and continually improve a quality management system (QMS) based on ISO 9001.
The specification applies to all Eskom divisions, subsidiaries, suppliers and sub-suppliers, and forms part of all RFI/RFQ/RFP and contracts.
Quality requirements are categorised into four levels (1 to 4) as selected by Eskom in Form A.
Sub-suppliers must meet the same quality requirements as the main supplier.
The main supplier is responsible for managing sub-supplier quality, including performance management programmes.
Eskom reserves rights of access to supplier facilities and information, and may appoint inspection agencies or resident quality inspectors.
Suppliers must manage nonconformities and nonconforming outputs as per the specification.
Preservation of goods and materials must be managed per the specification's preservation programme requirements.
Methodology
Source: Latest 240-105658000 Supplier Quality Management Specification (3).pdfThe supplier must develop and implement processes and procedures to monitor, verify and document the quality of the scope of work for deliverables.
All stages of manufacturing, fabrication, assembly and installation must be controlled by a supplier's QCP/ITP that clearly identifies quality verifications and special attention to controls related to critical products and services.
QCP/ITPs must be reviewed and accepted by Eskom, and must allow for insertion of Eskom-specific requirements, including hold and witness points.
ITPs should cover materials certification, fabrication works, in-process inspections, final acceptance tests, packaging and pre-shipment/transportation, shipping/transportation inspections, preservation, site acceptance tests, construction and erection works, and pre-commissioning and commissioning tests.
All sub-supplier QCP/ITP activity must be performed using an Eskom-accepted supplier QCP/ITP.
Applicable codes, standards, and acceptance criteria documents must be available at the work location.
The supplier must ensure that sub-suppliers are provided with comprehensive inspection and testing protocols, including inspection checklists, report formats, and nonconformity resolution processes.
The supplier must establish processes and procedures for formal assessment of sub-supplier inspection and testing programmes.
Supplier processes and procedures for verification of purchased product compliance must obtain document return/review status prior to implementation.
The supplier's preservation management programme must address temporary, long-term, and in-transit preservation requirements, including protection against atmospheric conditions, coatings, electrical grounding or isolation, internal or external environment creation, protection against vibration, and structural integrity protection.
Experience & Qualifications
Source: Latest 240-105658000 Supplier Quality Management Specification (3).pdfQuality audits and related quality performance reviews must be carried out by trained, accredited, and experienced personnel in accordance with documented procedures.
Personnel performing special processes (e.g., NDE, welding, coating, heat treatment) must be suitably qualified and, where applicable, registered with statutory bodies.
All personnel who perform activities that affect quality must have their training needs identified and documented, and training must be implemented in accordance with the company's training management and competency control procedures.
Training certificates must meet SETA requirements, including unit standard completion and accreditation number of service providers.
Quality Management
Source: Latest 240-105658000 Supplier Quality Management Specification (3).pdfThe supplier and sub-supplier must develop, implement, maintain and improve a formal QMS conforming to the latest ISO 9001 standard or any applicable standard.
The QMS must include documented information required by ISO 9001, such as quality manual, quality plans, work procedures, work instructions, and method statements.
Unless specifically excluded, the QMS must carry a valid ISO 9001 certificate from an accredited certification body.
The main supplier is responsible for defining and managing quality assurance and control elements applicable to sub-supplier scope of work.
The supplier must inform Eskom of any proposed changes to the QMS or staff that affect the quality system prior to implementation.
The main supplier must develop and implement a performance management programme for sub-suppliers, including verification of QMS, audits and surveillances, regular assessment of CQPs and reviews of QCPs, NC and defect management, inspection and test plans, and risk management.
Where specified, all individual products, services and processes must have a documented, implemented, reviewed and maintained contract quality plan (CQP) and/or quality control plan (QCP)/inspection and test plan (ITP).
CQPs must be developed in accordance with ISO 10005 and include management of records, free access for inspection, final documentation submission, special processes (welding, installation, etc.), personnel qualification, training needs, equipment and materials storage/preservation/maintenance instructions, and specific quality monitoring and verification activities.
QCP/ITPs must be reviewed and accepted by Eskom, and must allow for insertion of Eskom-specific requirements, including hold and witness points.
Once signed, ITPs and QCPs become addendums to the main contract.
A quality kick-off meeting will be held at the start of the contract and, if required, at the start of each subsequent phase.
The supplier must arrange coordination meetings with Eskom prior to placement of orders, with 14 days' advance notice.
Mandatory pre-inspection meetings will be convened by Eskom or its inspection agency or AIA.
Eskom reserves the right to appoint resident quality inspectors at the supplier's or sub-supplier's premises, with workspace provided at no cost to Eskom.
Eskom may appoint any organisation to perform quality assurance and quality control activities, and the supplier may not object or hinder such organisation.
Supplier capability and capacity assessments may be performed prior to contract award for high-risk products, critical plant work, or special processes.
The supplier must submit documented processes for conducting project scope of work quality audits and related quality performance reviews, and provide a schedule of anticipated quality audits at the time of first post-contract award CQP submission.
Pricing Schedule
Source: Latest 240-105658000 Supplier Quality Management Specification (3).pdfNo pricing schedule, rates, bill of quantities, or payment schedules are stated in this document.
Financial Requirements
Source: Latest 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)No pricing format, bid security, guarantees, retention, payment terms or financial capacity thresholds are stated in the document.
Compliance Requirements
Source: Latest 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Bidders must be registered on the Eskom supplier database.
Bidders must complete and sign Form A (Tender and Contract Quality Requirements for Supplier Quality Management Specification 240-105658000/QM 58 and ISO 9001).
Depending on the category, bidders must submit a valid ISO 9001 certificate (Category 1) or documented evidence of a QMS conforming to ISO 9001 (Categories 2-4).
Bidders must submit quality documentation as per the List of Tender Returnables (240-12248652).
Sub-suppliers must also meet the same quality requirements.
No B-BBEE level, CIDB grade, CSD registration, tax clearance or local content requirements are stated in the document.
Health & Safety
Source: Latest 240-105658000 Supplier Quality Management Specification (3).pdfThe specification references Eskom's Safety, Health, Environment, and Quality (SHEQ) Policy (32-727) as an informative reference.
No specific health and safety requirements are stated in this document.
Contractual Terms
Source: Latest 240-105658000 Supplier Quality Management Specification (3).pdfEskom has rights of access to the supplier's information as determined by applicable legislation.
Eskom may oversee the supplier's audit programmes by participating in selected audits as an observer and by assessing the supplier during key work stages.
The supplier must ensure all operators are suitably qualified for special processes, and maintain records of qualification of procedures, processes and operators, available to Eskom at all times.
If the supplier fails to respond and rectify nonconforming products within stipulated contractual conditions, the Project Manager may apply contractual remedies in accordance with FIDIC/NEC contract.
Repeated nonconformities from the same supplier within 6 months or less must be escalated to management review committees of the BU/OU/Cluster/Divisions for adjudication; if unresolved, escalated to the supplier review committee for recommendation.
The supplier's preservation management programme must address preservation of valves, electrical motors, mechanical and rotating equipment, piping, instrumentation, flange faces, gaskets, coatings, insulation, and other materials, including special precautions such as periodic shaft rotation, engine turnover, and lubrication.
Preservation requirements must be clearly documented in purchase orders, work authorisations, and communications with sub-suppliers.
The supplier must ensure clear designation of sub-supplier responsibility for execution of all preservation management programme elements.
Eskom must have free and unrestricted access to all preservation records for inspection and audit.
Requirements
Source: Latest 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Suppliers must develop, implement, maintain and continually improve a QMS based on ISO 9001.
The specification applies throughout Eskom Holdings Limited divisions, its subsidiaries, suppliers, and sub-suppliers, and forms part of all RFI/RFQ/RFP and contracts.
Suppliers must complete and sign Form A (Tender and Contract Quality Requirements for Supplier Quality Management Specification 240-105658000/QM 58 and ISO 9001) and return it with other returnables as listed in the List of Tender Returnables document (240-12248652).
Eskom supplier quality requirements are classified into four categories (1, 2, 3 and 4); only one category applies per procurement process.
Category 1 requires submission of a valid ISO 9001 certificate, latest internal and external audit reports, draft contract quality plan, example ITP/QCP, documented information for control of externally provided processes, roles/responsibilities/authorities, and management review records.
Category 2 requires objective evidence of a developed, implemented and maintained QMS, including QMS manual, quality policy, quality objectives, control of documented information, internal audit procedure, control of nonconforming outputs, nonconformity and corrective action procedure, latest internal audit reports, draft CQP, example ITP/QCP, and other documented information.
Category 3 requires objective evidence of a developed QMS, including similar documented information as Category 2, draft CQP, example ITP/QCP, and other documented information.
Category 4 requires a quality method statement based on ISO 9001, signed/approved quality policy, quality objectives, documented information for control of externally provided processes, and roles/responsibilities/authorities specific to the project.
Submission Guidelines
Source: Form A_Cat 2-Supply and Delivery of C&I Components.pdf (unknown)Returnable documents: complete and sign the tender document, including the quality requirements form (Form A Cat 2).
Evaluation Criteria
Source: Form A_Cat 2-Supply and Delivery of C&I Components.pdf (unknown)Quality requirements as per 240-105658000 Specification and ISO 9001 Standard. Pre-contract award quality requirements apply.
Compliance Requirements
Source: ANNEXURE B Eskom Acknowledgement Form for OHS legal.pdf (unknown)OHS compliance is mandatory for all suppliers/contractors/tenderers working at or rendering services to Eskom. The supplier must understand and comply with the following documents (not limited to):
After contract award, the supplier is responsible for fully aligning its processes with Eskom's OHS requirements (policies, procedures, standards).
Penalties will be enforced on the main supplier for any non-conformance to Eskom or statutory OHS requirements, whether identified for the main supplier or its contractors/suppliers.
All employees (contractors/suppliers) must undergo the relevant Eskom induction.
The main contractor/supplier must:
Eskom reserves the right to verify compliance when deemed necessary. The contractor may be instructed to provide copies of testimonials/references and contact details of clients (including Eskom) for whom the company has done previous similar work.
The Acknowledgement Form (Annexure B) must be signed by an authorised person (CEO/Director/Managing Director) and witnessed by two witnesses, confirming that the supplier has obtained copies of the above documents and understands them and the consequences of non-compliance.
Health & Safety
Source: ANNEXURE B Eskom Acknowledgement Form for OHS legal.pdfOHS compliance is mandatory for all suppliers/contractors/tenderers working at or rendering services to Eskom. The supplier must understand and comply with the following documents (not limited to):
After contract award, the supplier is responsible for fully aligning its processes with Eskom's OHS requirements (policies, procedures, standards).
Penalties will be enforced on the main supplier for any non-conformance to Eskom or statutory OHS requirements, whether identified for the main supplier or its contractors/suppliers.
All employees (contractors/suppliers) must undergo the relevant Eskom induction.
The main contractor/supplier must:
Eskom reserves the right to verify compliance when deemed necessary. The contractor may be instructed to provide copies of testimonials/references and contact details of clients (including Eskom) for whom the company has done previous similar work.
Contractual Terms
Source: ANNEXURE B Eskom Acknowledgement Form for OHS legal.pdfThe main contractor/supplier must:
Eskom reserves the right to verify compliance when deemed necessary. The contractor may be instructed to provide copies of testimonials/references and contact details of clients (including Eskom) for whom the company has done previous similar work.
Important Dates
Source: BRA.pdf (unknown)Closing date: 31 August 2026
Compliance Requirements
Source: BRA.pdf (unknown)Occupational Health and Safety: The bidder must complete and submit the Eskom Baseline Risk Assessment (BRA) template, referencing procedure 32-520, covering all activities including delivery, travel, and on-site work. The BRA must be authorised by the designated person by 31 August 2026.
Health & Safety
Source: BRA.pdfThe bidder must complete the Eskom Baseline Risk Assessment (BRA) template, referencing procedure 32-520. The BRA must identify hazards and controls for all activities, including:
Required controls include: vehicle roadworthiness checks, driver training, adherence to speed limits, emergency panic buttons, safety awareness, fatigue management, use of hands-free devices, adherence to life-saving rules, and K53 stop principle.
The BRA must be authorised by the designated person by 31 August 2026.
Description
Source: Category 2-Supply and Delivery of C&I Components.pdfSupply and delivery of Instrumentation and Control (I&C) components, once off, to Lethabo Power Station. The contract period is three (3) months on an 'as and when required' basis.
Evaluation Criteria
Source: Category 2-Supply and Delivery of C&I Components.pdf (TENDER)Quality requirements are evaluated as Category 2 deliverables. Bidders must meet the Supplier Quality Management requirements (Revision 7) per specification 240-105658000. Two options are accepted for Section A:
Section B (score 4): Evidence of QMS in operation, including an organisation chart and responsibility matrix, control of externally provided processes, an internal audit report, and management review records.
Section C (score 1): A draft Contract Quality Plan specific to the scope of work.
Section D (score 1): A draft or example of an Inspection and Test Plan (ITP) or Quality Control Plan (QCP) from similar previous work.
Section E (score 2): Form A completed and signed, plus any additional requirements per the scope.
Total possible score: 19.
Quality Management
Source: Category 2-Supply and Delivery of C&I Components.pdf (TENDER)Bidders must complete and sign Form A as part of the quality requirements.
Compliance Requirements
Source: Category 2-Supply and Delivery of C&I Components.pdf (TENDER)Bidders must complete and sign Form A as part of the quality requirements.
Section
Source: Category 2-Supply and Delivery of C&I Components.pdfQuality requirements are evaluated as Category 2 deliverables. Bidders must meet the Supplier Quality Management requirements (Revision 7) per specification 240-105658000. Two options are accepted for Section A:
Section B (score 4): Evidence of QMS in operation, including an organisation chart and responsibility matrix, control of externally provided processes, an internal audit report, and management review records.
Section C (score 1): A draft Contract Quality Plan specific to the scope of work.
Section D (score 1): A draft or example of an Inspection and Test Plan (ITP) or Quality Control Plan (QCP) from similar previous work.
Section E (score 2): Form A completed and signed, plus any additional requirements per the scope.
Total possible score: 19.
Important Dates
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf (unknown)Closing date: 27 January 2025
Submission Guidelines
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf (unknown)Mandatory returnable: E-Tendering Training Acknowledgement Form. It must be fully completed, signed, and submitted to Eskom within the prescribed period. Failure to submit it will render the bidder non-responsive and disqualified.
Returnable Documents
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf (unknown)Mandatory returnable: E-Tendering Training Acknowledgement Form. It must be fully completed, signed, and submitted to Eskom within the prescribed period. Failure to submit it will render the bidder non-responsive and disqualified.
Evaluation Criteria
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf (unknown)Submission of the fully completed E-Tendering Training Acknowledgement Form is mandatory. Failure to submit within the prescribed period results in disqualification.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Lethabo Power Station Situated ± 18 km South of Vereeniging on the Viljoensdrift-Deneysville Road, F - Deneysville - Vereeniging - 1930
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
20
Last checked
01 Oct 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
A guide for general suppliers. Understanding the RFQ process (under R1 million), local content for furniture, and the 'Commodity Checklist'.
Guide to general commodities procurement in South Africa. Covers furniture, cleaning materials, uniform supply tenders, local content rules, and managing quality and cash flow.
Not every job is a 'tender.' Learn how to access the high-volume world of small orders (RFQs) and how to get invited to bid on jobs under R200k.
A high-stakes guide to food procurement. Learn about R638 compliance, cold chain logistics, and how to win provincial hospital supply contracts.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Supplies: General. Unlock full pricing strategies, bid frequency, and historical win rates.