Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Status: Closed — No Longer Accepting Submissions
This tender closed on 26 February 2026. Submissions are no longer accepted. The tender lifecycle continues — check the awards section for updates.
Tender Type
RFI
Delivery Location
522 Impala Road - Johannesburg - Johannesburg - 2058
Organization Type
GOVERNMENT
Published
04 Feb 2026
Rand water is seeking information from licensed independent power producers to form a panel that will design, build, operate and maintain power generation plants supplying reliable, sustainable electricity to its bulk water pumping and tertiary sites across gauteng. The RFI targets providers capable of delivering a mix of gas/coal, hydrogen, solar and hydro solutions with redundancy, competitive tariffs and compliance with south african energy regulations.
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Document being finalised: IPP Scope of work final rev 5.pdf. You don’t need to refresh — this page will pick up the updated review automatically.
Categories
RFI
522 Impala Road - Johannesburg - Johannesburg - 2058
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
IPP Scope of work final rev 5.pdf
Date & Time
Thursday, 26 February 2026 - 16:30
Venue
To follow
Rand Water is dependent on the National Power Supplier Eskom and Local Municipalities for
Category: technical
its power requirements. With the power grid stability posing a risk to Rand Water to supply its
Category: technical
Bulk Water to consumers necessitate Rand Water to source alternative Independent Power
Category: technical
Producers. Rand Water is a bulk Energy user of the National grid. Regular power failures at
Category: technical
04 Feb
2026
Tender Published
Tender was published
26 Feb
2026
Closing Date
Tender closing date
Pending
Learn how to submit a winning bid with these related articles
A technical guide to municipal electrical tenders. Covers CIDB EB grading, electrification projects (INEP), and maintenance of substations and mini-subs.
In 2026, General contractors in the Western Cape operate within an increasingly stringent compliance landscape, where B-BBEE (Broad-Based Black Economic Empowerment) visibility is non-negotiable. With 173 active General tenders in the province, procurement officers are under pressure to verify empowerment credentials meticulously. A misaligned or expired B-BBEE certificate can disqualify an otherwise competitive bid. Understanding how your B-BBEE level is calculated—and ensuring alignment with the Public Finance Management Act (PFMA) and Preferential Procurement Policy Framework Act (PPPFA)—is critical to securing public sector contracts.
For South African General contractors, the path to government procurement is paved with non-negotiable regulatory requirements. The most common barrier to entry is not a lack of capability, but a failure to master the foundational compliance frameworks that govern every bid. This complete regulatory guide to CSD and BBBEE compliance for General sector tender suppliers in South Africa demystifies the process. It provides a meticulous, step-by-step field manual for ensuring your company is fully compliant and audit-ready, enabling you to confidently access the R billions in opportunities across infrastructure maintenance, facilities management, and service delivery within the General sector.
As Gauteng’s security tender landscape intensifies in 2026, contractors must navigate a complex compliance environment where a single oversight can disqualify an entire bid. With over 300 active security tenders in the province, regulatory adherence—particularly PSIRA registration—remains the non-negotiable foundation for participation. This guide clarifies the legal obligations, verification processes, and documentation required to ensure your submission meets the strict standards of South African procurement law.
💡 Want more tendering tips and strategies?
Explore Our BlogWe refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Important Dates
Source: IPP Scope of work final rev 5.pdfClosing date: 2026‑02‑26 14:30. Compulsory clarification meeting will be held at Rand Water’s Rietvlei Head Office (date to be announced in the procurement notice).
Submission Guidelines
Source: IPP Scope of work final rev 5.pdfReturnable Documents: Provide the full proposal following the format outlined in the document (executive summary, company profile, technical description, financial information, risk analysis, etc.). Include all supporting documentation (e.g., licences, certifications, past project evidence, fuel supply agreements, environmental impact assessments). Submit the completed proposal to the address specified in the clarification meeting notice (Rand Water Rietvlei Head Office) by the closing date (2026‑02‑26 14:30). Disqualification risks: missing any required section, failing to attach required licences/approvals, or not adhering to the prescribed format.
Evaluation Criteria
Source: IPP Scope of work final rev 5.pdfTechnical evaluation will be based on the following qualifiers:
Technical Specifications
Source: IPP Scope of work final rev 5.pdfScope: Supply reliable, sustainable electricity to Rand Water’s bulk water pumping and tertiary sites (e.g., Zuikerbosch, Vereeniging, Lethabo, Panfontein, Amanzimtoti, Zwartkopjes, Eikenhof, Palmiet, etc.). Required plant capacities range from 22 MW (solar/hydro for smaller sites) to up to 216 MW (gas/coal for major nodes) by 2050. Plants must provide redundancy (N‑2 backup), flexible switching, and meet the following performance metrics:
Financial Requirements
Source: IPP Scope of work final rev 5.pdfProvide an indicative overall project cost estimate, financing plan, and credit references. Include a detailed cost‑benefit matrix and NPV analysis (±20%). State anticipated construction timeline and commercial operation date (assuming financial close by November 2023). Submit pricing in R/kWh for each year (2025‑2050) and guarantee minimum monthly energy production. All financial guarantees, escrow accounts or debt‑service coverage ratios required by lenders must be outlined.
Compliance Requirements
Source: IPP Scope of work final rev 5.pdfDemonstrate:
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 85 of 1993
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
To download these documents and access AI-powered analysis, visit the main tender page.
Local Municipalities destabilize water distribution to bulk consumers hence noncompliance to
Category: technical
National regulations as per the constitution. Contributing to the unstable grid is the
Category: technical
implementation of Load shedding putting the National grid under pressure posing high risk of
Category: technical
power failures.
Category: technical
3. Rand Water objectives
Category: technical
The objective for Rand Water is to have the IPP to supply power to the following pumping and
Category: technical
tertiary sites:
Category: technical
Sites Power production
Category: technical
Zuikerbosch, Vereeniging, Lethabo, Common Power plant (Mixed energy)
Category: technical
Panfontein, Amanzimtoti
Category: technical
Zwartkopjes, Eikenhof, Palmiet, Rietvlei, Common Power plant (Mixed energy)
Category: technical
Central Depot, Pipe manufacturing plant
Category: technical
Trichart, Bloemendal, Mapelton, Small Power plant per site with suitable
Category: technical
Roodepoort, Townlands, Cullinan, technologies
Category: technical
Mamelodi, Libanon, Ironside, Daleside
Category: technical
Reservoir sites Solar plant and or Other suitable
Category: technical
technologies
Category: technical
4. General approach and Strategy
Category: technical
The general strategy will be based on an in-depth understanding of Rand Water's need as
Category: technical
well as the macro-economic environment within which it operates. In developing the
Category: technical
strategy, the IPP's objectives will be substantially guided by the following:
Category: technical
a. Working collaboratively with Rand Water towards common objectives, delivering
Category: technical
added value to Rand Water through strategic partnering meeting the objectives.
Category: technical
b. A constant Willingness to be innovative and progressive.
Category: technical
c. Maximizing the use of leading-edge technology to improve the way in which the
Category: technical
IPP works together through knowledge transfer and training.
Category: technical
d. Working with Rand Water to identify and reduce exposure to technical, business,
Category: technical
and legal risks.
Category: technical
e. Working with Rand Water to define a set of performance metrics focused on
Category: technical
achieving the results Rand Water desires.
Category: technical
f. The fast tracking of the project implementation by to improve Rand Water's
Category: technical
security of electricity supply.
Category: technical
I. Minimizes the impact of exogenous factors.
Category: technical
II. Optimizes revenue potential.
Category: technical
g. Consider proposed IPP solutions that will provide Rand Water demonstrated
Category: technical
tangible value for money (electricity at fair price, an aggressive project
Category: technical
implementation time frame, minimization/elimination of cost over-runs).
Category: technical
h. Develop legal documentation for the projects in such a manner that the risks are
Category: technical
identified.
Category: technical
i. Sufficiently raise capital on the best terms and conditions possible for investors
Category: technical
(tenor, interest rates, rates of return for investors).
Category: technical
a) Risk Management of the power production plant
Category: technical
I. Low voltage control systems
Category: technical
• Low voltage control systems will consist of N-2 backup system to ensure
Category: technical
alternative control to start up and control turbine systems.
Category: technical
▪ All auto control systems shall operate in the fail-safe mode to
Category: technical
secure continues control and protection of the operating
Category: technical
system.
Category: technical
II. Medium and High voltage systems
Category: technical
• The turbine system shall consist of N-2 backup to ensure continues power
Category: technical
production and instant recovery and stability of power in case of failure.
Category: technical
• All Pickup Sub Stations shall consist of N-2 backup for continues
Category: technical
operation and flexibility across the switching systems.
Category: technical
• Ring feed to be created to cater for the invent of transmission line failure
Category: technical
due to natural interference or unforeseen events to stabilize transmission
Category: technical
feed.
Category: technical
Typical Illustrative Power Plant Schematic
Category: technical
Grid ring feed
Category: technical
N-1 TR TR TR TR TR TR N-2
Category: technical
Tur Tur Tur Tur Tur
Category: technical
Tur
Category: technical
bin bin bin bin bin N-2N-1 bin e 2 e 3 e 4 e 5 e 6
Category: technical
e 1
Category: technical
LV LV
Category: technical
TR 400 Volt Control TR
Category: technical
Battery Charger
Category: technical
Solar plant Invertor Battery storage Generator
Category: technical
Figure 1: Power plant Illustration.
Category: technical
b) Rand Water overview of the large sites
Category: technical
Rand Water’s raw water is purchased from the Department of Water Affairs and is gravity fed to
Category: technical
the largest water purification plant, Zuikerbosch station, which is located on the borders of the
Category: technical
Three Rivers suburb in the east of Vereeniging. The Lethabo pumping station (on the bank of the
Category: technical
Vaal River behind the Eskom Lethabo Power Station) supplies most of the raw water to the smaller,
Category: technical
older Vereeniging pumping station, which is embedded in the south of Vereeniging. Both
Category: technical
Zuikerbosch and Vereeniging pumping stations have water treatment and potable water pumping
Category: technical
plant. Zuikerbosch, Vereeniging and Lethabo form the southern node of Rand Water’s major
Category: technical
operations.
Category: technical
The bulk of all treated potable water is pumped from the Zuikerbosch and Vereeniging pumping
Category: technical
stations to four ‘booster’ pumping stations on the southern and eastern outskirts of Johannesburg,
Category: technical
from where the water is pumped to multiple consumer destinations. These booster pumping
Category: technical
stations have potable water pumping plant loads, with minor water disinfection plants attached,
Category: technical
and they form the northern node of Rand Water’s operations.
Category: technical
Typically, Rand Water sites are on portions of land large enough to allow for expansion. In the
Category: technical
southern node, particularly Zuikerbosch Pumping Station with significant areas for sedimentation,
Category: technical
sand filtration, associated raw water, wash water and wastewater pumps. The largest loads are
Category: technical
those of the potable water pump motors in the main engine rooms. Some pumping stations utilize
Category: technical
Variable Speed Drives (VSDs) on the pump motors.
Category: technical
On all sites, motor loads are started sequentially, i.e., one pump set at a time, and, within that
Category: technical
pump set, one stage at a time, five seconds apart. To establish pipeline hydraulic equilibrium, there
Category: technical
is a pause between starting pump sets of between one and three minutes.
Category: technical
Table 1: Present maximum demands for the large sites.
Category: technical
SITE MAXIMUM DEMAND
Category: technical
Zuikerbosch 6.6kV 56.2MVA
Category: technical
Zuikerbosch 11kV 72.0MVA
Category: technical
Vereeniging 11kV 33.1MVA
Category: technical
Lethabo 6.6kV 12.1MVA
Category: technical
Total for Southern node 173.4MVA
Category: technical
Zwartkopjes 11kV 41.0MVA
Category: technical
Eikenhof 11kV 43.4MVA
Category: technical
Palmiet 11kV 50.0MVA
Category: technical
Ancillaries 14.0MVA
Category: technical
Total for Central node 148.3MVA
Category: technical
It is contemplated that Rand Water would have a generating plant for the central node, near the
Category: technical
Zwartkopjes station, with radial feeds via overhead lines to all four stations: or wheeling over the
Category: technical
Eskom transmission network and another generating plant for the southern node, in the proximity
Category: technical
of Zuikerbosch station, again with radial feeds to Zuikerbosch, Vereeniging and Lethabo pumping
Category: technical
Stations.
Category: technical
The IPP must conduct a feasibility studies and present proposals, for replacing present supply
MandatoryCategory: technical
authorities, with Power Plants of the required generating capacities.
MandatoryCategory: technical
The feasibility studies and proposals must address the following aspects, as a minimum:
MandatoryCategory: technical
The proposed power plant (plants) must:
MandatoryCategory: technical
• Ensure secure, reliable, and sustainable supply of electricity.
Category: technical
• Provide long term sustainability of Rand Water operations.
Category: technical
• Have minimal impact on the environment.
Category: technical
• Offer an attractive tariff, the tariff is based on capital and operational and
Category: technical
maintenance costs.
Category: technical
• Reduce electricity costs.
Category: technical
• Give Rand Water better control of its electricity supply and make it independent of
Category: technical
other electrical utilities.
Category: technical
• Have the necessary redundancy to allow for maintenance without compromising
Category: technical
power supply to Rand Water
Category: technical
• Have flexible switching capability on feeders to varies sites.
Category: technical
Table 2: Power generation plant requirements
Category: technical
Technology Rand Water Site System Size
Category: technical
2023 2050
Category: technical
Gas / Coal. / Zuikerbosch, Vereeniging, Lethabo, 173 MW 216 MW
Category: technical
Hydrogen / Panfontein, Amanzimtoti
Category: technical
New Eikenhof, Zwartkopies, Palmiet,
Category: technical
143 MW 184 MW Technologies Mapleton
Category: technical
Solar/Hydro All smaller sites 22 MW 37 MW
Category: technical
Amanzimtoti
Category: technical
Zuikerbosch
Category: technical
Sasolburg
Category: technical
Vaal Southern
Category: technical
Triangle Power Plant
Category: technical
Vereeniging
Category: technical
Panfontein
Category: technical
Lethabo Transmission line
Category: technical
Power plant
Category: technical
Figure 2: Proposed Southern Power Plant.
Category: technical
Sioenkop
Category: technical
Rietvlei
Category: technical
Central
Category: technical
Depot
Category: technical
Palmiet
Category: technical
Central Power
Category: technical
Eikenhof
Category: technical
plant
Category: technical
Pipeplant
Category: technical
Zwartkopjes
Category: technical
Daleside
Category: technical
Transmission line
Category: technical
Power plant
Category: technical
Figure 3: Proposed Central Power Plant.
Category: technical
Mamelodi
Category: technical
Power
Category: technical
Townlands Plant
Category: technical
Culinan
Category: technical
Power
Category: technical
Plant
Category: technical
Individual Power Power
Category: technical
Plant
Category: technical
plant per site due
Category: technical
to distance from
Category: technical
main power plants
Category: technical
Power
Category: technical
Power Plant
Category: technical
Plant
Category: technical
Bloemendal
Category: technical
Trichart
Category: technical
Power
Category: technical
Plant
Category: technical
Mapelton
Category: technical
Figure 3: Proposed Northen Power Plants.
Category: technical
Figure 4: Zwartkopjes power plant Geographical layout
Category: technical
Figure 5: Zuikerbosch(Southern) proposed Power Plant Geographical layout.
Category: technical
Site Power plant Distribution Sites Distance from plant (Km)
Category: technical
Panfontein 5.41
Category: technical
Zuikerbosch Lethabo 5.72
Category: technical
(Southern Power Plant) Vereeniging 9.52
Category: technical
Amanzimtoti 14.78
Category: technical
Sasolburg 22. 0
Category: technical
Central Depot 0.89
Category: technical
Palmiet 5.67
Category: technical
Zwartkopjes
Category: technical
Eikenhof 9.57
Category: technical
(Central Power Plant)
Category: technical
Spieonkop 16.29
Category: technical
Daleside 17.0
Category: technical
Rietvlei 9.50
Category: technical
Table 3: Site distance from proposed power plants.
Category: technical
Bloemendal 51.0
Category: technical
Mapelton 19.5
Category: technical
Zwartkopjes (Reference)
Category: technical
Cullinan 88.0 (Proposed sites for
Category: technical
individual Mamelodi 83.0
Category: technical
Power plant per site) Roodepoort 22.0
Category: technical
Libanon 44.0
Category: technical
Trichart 119.0
Category: technical
Townlands 118.0
Category: technical
Table 4: Site distance with reference from central proposed power plants.
Category: technical
Figure 6: Rand Water Area of supply layout.
Category: technical
Rand Water Electricity Network
Category: technical
Table 4: Below shows the existing respective electricity supplier per pumping station.
Category: technical
Electricity supplier Pumping Stations Booster-Pumping Stations
Category: technical
Eskom Zuikerbosch, Zwartkopjes, Palmiet Daleside, Libanon, Lethabo,
Category: technical
Trichardt, Bloemendal, Mamelodi,
Category: technical
Cullinan, Townlands, Ironside,
Category: technical
Zuurbekom
Category: technical
mfuleni Vereeniging Amanzimtoti
Category: technical
City of Eikenhof Roodepoort
Category: technical
Johannesburg
Category: technical
Ekurhuleni Mapleton
Category: technical
Metsimaholo - Sasolburg
Category: technical
Figure 7: Geographical layout of the raw water, booster, and tertiary pumping stations.
Category: technical
2023 2024 2035 2050 2023
Category: technical
Substation Calc Max Calc Max Calc Max Annual cost
Category: technical
2023 2035 2035
Category: technical
Transformer Capacity max Pumping max Pumping max Pumping Current
Category: technical
size, Qty,
Category: technical
Pump Station Supplier MVA MVA MW MLD MW MLD MW MLD Rands
Category: technical
Lethabo Eskom 2 x 10 20 11.4 1400 11.8 1450 11.8 1450 0
Category: technical
Zuikerbosch Stn 1 & 2 Eskom 40 19.5 900 19.5 900 19.5 900 0
Category: technical
Zuikerbosch Stn 3 Eskom 50 36.7 1100 36.7 1100 36.7 1100 0
Category: technical
Zuikerbosch Stn 4 A + B Eskom 80 58.5 1800 58.5 1800 58.5 1800 0
Category: technical
Zuikerbosch Stn 5 A + B Eskom - 13.3 400 40.0 1200 40.0 1200 0
Category: technical
Zuikerbosch Stn 6A 20.0 600 0
Category: technical
170 128.0 4200 154.6 5000 154.6 5000 1 181 767 854
Category: technical
Vereeniging PS (Vg site) Emfuleni 3 x 20 60 40.6 1200 47.4 1400 47.4 1400 456 472 185
Category: technical
WWTW (Sebokeng potentially) Emfuleni - - - 3.2 100 6.4 200 0
Category: technical
Amanzimtoti PS Emfuleni none 2.8 180 4.2 270 5.7 370 33 787 522
Category: technical
Sasolburg PS Eskom none 0.4 14 0.5 16 0.5 18 3 745 080
Category: technical
Palmiet PS Eskom 4x10, 2x20 80 51.0 1800 68.0 2400 85.0 3000 560 599 340
Category: technical
Northern treatment works
Category: technical
WWTW Various - - - 5.3 200 10.6 400 0
Category: technical
Olifantsfontein WWTW - - - 2.7 100 4.0 150 0
Category: technical
Kensington PS Eskom - - - 1.7 150 1.7 150 0
Category: technical
Mapleton PS Ekuruhleni 3 x 10 30 17.6 800 28.0 1200 35.0 1500 197 965 762
Category: technical
Mamelodi Eskom none 1.2 38 2.4 76 2.4 76 0
Category: technical
Cullinan Eskom none 0.7 25 1.5 50 1.5 50 27 236 215
Category: technical
Bloemendal Eskom 2 x 10 20 12.1 280 12.1 280 16.3 380 37 679 201
Category: technical
Trichardt Eskom none 0.3 15 0.4 18 0.4 18 2 923 837
Category: technical
City
Category: technical
Eikenhof Power 2 x 45 90 37.7 1330 43.3 1530 49.0 1730 718 636 734
Category: technical
Libanon Eskom none 0.0 0 1.6 70 2.5 100 887 530
Category: technical
City
Category: technical
Roodepoort Power none 2.5 150 3.7 225 4.8 290 38 391 023
Category: technical
Goudkoppies WTW - - - 2.0 80 2.0 80 0
Category: technical
Townlands Eskom 2 x 2 1 1.1 55 1.1 55 1.1 55 4 773 968
Category: technical
Zuurbekom Eskom 3 x 1 0.0 0 0.1 5 0.2 10 1 082 684
Category: technical
Zwartkopjes PS Eskom 3 x 20 38.4 700 43.9 800 49.4 900 318 121 937
Category: technical
Daleside Eskom 2 x 10 20 6.3 140 12.6 280 19.0 420 52 146 739
Category: technical
Spioenkop Eskom none 0.1 7 0.1 7 0.1 7 0
Category: technical
Ironside 0.0 0 0.0 0 0.0 0 31 621
Category: technical
Barrage - - - - - - 0
Category: technical
341 5,400 440 6,880 500 7,830 3 761 243 808
Category: technical
Table 5: Transformer size, bus voltages the maximum demand and Annual cost at each pumping station.
Category: technical
The maximum demand for the entire Rand Water network is estimated at 341MW, at full
Category: technical
pumping requirements; with a projected electricity usage of 440MW for 2024. This is based
Category: technical
on a combined maximum pumping from 6880ML/day.
Category: technical
Electricity network corridors within main Rand Water system.
Category: technical
Vereeniging-Zuikerbosch-Lethabo
Category: technical
Figure 8: Current Eskom 88kV and Emfuleni 88kV-network around Zuikerbosch,
Category: technical
Lethabo and Vereeniging.
Category: technical
Eikenhof-Palmiet-Zwartkopjes-Mapleton
Category: technical
Figure 9: Eskom 88kV Zwartkopjes and Palmiet network layout.
Category: technical
Figures 4 and 5 illustrates that the majority of Rand Water’s electricity supply is supplied
Category: technical
by Eskom; followed by the City of JHB, Emfuleni and Ekurhuleni. Table 2 shows that Rand
Category: technical
Water’s operations are mainly supplied at a HV voltage of 88kV, except for Libanon and
Category: technical
Bloemendal, which receive power at 44kV.
Category: technical
Figure 10: Zwartkopjes 88kV system and Palmiet 88kV system.
Category: technical
Table 6: Eikenhof 88/44kV system.
Category: technical
EIKENHOF SYSTEM
Category: technical
Power feed Site Service provider
Category: technical
Orlando 1 Eikenhof City of JHB
Category: technical
Orlando 2
Category: technical
Roodepoort Eskom 88kV
Category: technical
Nancefield Zuurbekom Eskom 88kV
Category: technical
Lenazia
Category: technical
Libanon Eskom 44kV
Category: technical
Townlands Eskom 88kV
Category: technical
Table 7: Mapleton 88/44kV system.
Category: technical
Site Service provider
Category: technical
Mapelton Ekurhuleni 88kV
Category: technical
Mamelodi Eskom 88kV
Category: technical
Cullinan Eskom 88kV
Category: technical
Bloemendal Eskom 44kV
Category: technical
Trichart Eskom 88kV
Category: technical
Table 8: Power generation plant requirements.
Category: technical
Technology Rand Water Site System Size
Category: technical
2023 2050
Category: technical
Gas / Coal. / Zuikerbosch, Vereeniging, Lethabo, 153 MW 216 MW
Category: technical
Hydrogen / Palmiet
Category: technical
New Eikenhof, Zwartkopies, Palmiet,
Category: technical
143 MW 184 MW
Category: technical
Technologies Mapleton
Category: technical
Solar/Hydro All smaller sites 22 MW 37 MW
Category: technical
Table 9: Proposed Power Utilities
Category: technical
Power Utility Rand Water Site System Size
Category: technical
2023 2050
Category: technical
Zuikerbosch, Vereeniging, Lethabo,
Category: technical
South Panfontein, Vaal triangle (External 214 MW + X 221 MW + X
Category: technical
consumers)
Category: technical
North Eikenhof, Zwartkopjies, Palmiet 127.1 MW 155.2 MW
Category: technical
Figure 11: Geographical layout for Zwartkopjes and Zuikerbosch
Category: technical
It is required that the successful Independent Power Producer have the resources,
MandatoryCategory: compliance
capacity and skills to Design, construct, Build, commission, operate and maintain the
MandatoryCategory: compliance
power utilities over long-term supply agreement to purchase power. Are financially
MandatoryCategory: compliance
sound to procure materials, resources, and skills to successfully execute projects for
MandatoryCategory: compliance
the delivery of reliable and sustainable power to Rand Water needs as the bulk
MandatoryCategory: compliance
consumer.
MandatoryCategory: compliance
Independent Power Producer to:
MandatoryCategory: compliance
Demonstrate necessary expertise to undertake the project and include
MandatoryCategory: compliance
details of previous projects undertaken.
MandatoryCategory: compliance
Provide indicative overall project cost estimate.
MandatoryCategory: compliance
Indicate anticipated timeframes to complete the project.
MandatoryCategory: compliance
Indicate any sole rights, intellectual property, and licences.
MandatoryCategory: compliance
Provide innovative solutions to meet the key deliverables.
MandatoryCategory: compliance
Provide alternatives and additions to the key deliverables.
MandatoryCategory: compliance
Incorporate 4IR technologies in designs analysis and management of plant
MandatoryCategory: compliance
and equipment.
MandatoryCategory: compliance
Interconnectivity to Rand Water networks for power monitoring and
MandatoryCategory: compliance
metering.
MandatoryCategory: compliance
Provide Fuel Supply Agreement (FSA) as part of deliverables.
MandatoryCategory: compliance
The IPP shall form long-term partnership with Gas / coal or other fuel producing entities for
MandatoryCategory: compliance
the delivery of sustainable supplies. Long term contractual agreements to produce gas,
MandatoryCategory: compliance
coal or other fuel need to be agreed upon, highlighting sustainable supply and capability to
MandatoryCategory: compliance
honour contractual obligation. Typical local producers and distributors such as Sasol or
MandatoryCategory: compliance
Linde are to be considered.
MandatoryCategory: compliance
Regulations and Environmental Compliance/Approvals
MandatoryCategory: compliance
All bidders are responsible for acquiring and maintaining government and local
MandatoryCategory: compliance
approvals, licenses, permits or variances, and the specific requirements or potential
MandatoryCategory: compliance
requirements necessary to construct and/or operate any facilities to generate and/or
MandatoryCategory: compliance
deliver energy to Rand Water sites.
MandatoryCategory: compliance
Rand Water will only consider bidders who demonstrate that their facilities are sited in
MandatoryCategory: compliance
an environmentally responsible and compliant manner and in compliance with
MandatoryCategory: compliance
applicable local and governmental laws and regulations in which a secure fuel supply
MandatoryCategory: compliance
is documented by the IPP. The cost for obtaining the Environmental and Governmental
MandatoryCategory: compliance
Approvals will be borne by the bidder.
MandatoryCategory: compliance
It is required that successful IPP bidder be following National and local governmental
MandatoryCategory: compliance
regulation and legation as set out by Government with respect to the following:
MandatoryCategory: compliance
Application and registration of Independent Power Production Plants with NERSA.
MandatoryCategory: compliance
The South African Grid Code
MandatoryCategory: compliance
Grid Connection Code for Renewable Power Plants (RPPs) connected to the
MandatoryCategory: compliance
Electricity Transmission System (TS) or Distribution (DS) in South Africa
MandatoryCategory: compliance
Standard for the Interconnection of Embedded Generation (Eskom)
MandatoryCategory: compliance
Government Immovable Asset Management Act, 2007
MandatoryCategory: compliance
Schedules to be based on the REIPPP project documents (as issued by the
MandatoryCategory: compliance
South African Government for its renewable energy independent power
MandatoryCategory: compliance
producers programme) but customised to suit the project.
MandatoryCategory: compliance
Environmental impact assessment to determine the EIA requirements for the
MandatoryCategory: compliance
sites.
MandatoryCategory: compliance
Include initiatives for the disposal or reuse of by-products of each type of
MandatoryCategory: compliance
technology where applicable.
MandatoryCategory: compliance
Power Purchase Agreement (PPA)
MandatoryCategory: compliance
Rand Water expects to enter into one or more PPA with the selected bidder(s) at a
MandatoryCategory: compliance
preferred agreement to supply power to Rand Water over long term . If a bidder wishes
MandatoryCategory: compliance
to enter into an agreement with different terms and conditions, an alternative proposal
MandatoryCategory: compliance
can be submitted for consideration and must be clearly labelled as an alternative
MandatoryCategory: compliance
proposal.
MandatoryCategory: compliance
The PPA(s) shall include provisions that:
MandatoryCategory: compliance
Require the supplier to comply with all applicable laws, rules and regulations
MandatoryCategory: compliance
that are in, or may come into, effect during the term of the contract.
MandatoryCategory: compliance
Prohibit the supplier from assigning the agreement without the prior consent of
MandatoryCategory: compliance
Rand Water.
MandatoryCategory: compliance
It underpins the project by providing the necessary liquidity related securities and
MandatoryCategory: compliance
guarantees required by the lenders (such as escrow accounts and debt service
MandatoryCategory: compliance
coverage ratios. It is aimed at mapping the way forward with the implementation of the
MandatoryCategory: compliance
project. The foregoing elements give both potential lenders, investors, and other
MandatoryCategory: compliance
stakeholders the required comfort and credibility, and improves their level of certainty
MandatoryCategory: compliance
that the project can be implemented.
MandatoryCategory: compliance
Format and content of the proposal
MandatoryCategory: compliance
Bidders are requested to follow format and content instructions when completing and
MandatoryCategory: compliance
submitting their proposals. Each section of this tender must be comprehensively
MandatoryCategory: compliance
addressed and supporting documentation must be attached accordingly. Doing so will
MandatoryCategory: compliance
allow the corporation to expedite the evaluation and selection processes.
MandatoryCategory: compliance
Executive summary
MandatoryCategory: compliance
This section must include an executive summary discussing the highlights of the
MandatoryCategory: compliance
proposal. If the proposal includes multiple sites or different energy sources at these
MandatoryCategory: compliance
site as, each should be described as a separate project.
MandatoryCategory: compliance
Introduction
MandatoryCategory: compliance
In this section, provide any information that your company wishes to submit about the
MandatoryCategory: compliance
nature of
MandatoryCategory: compliance
your business and primary business focus. Include information about what makes your
MandatoryCategory: compliance
company.
MandatoryCategory: compliance
(Not the product) different from your competitors.
MandatoryCategory: compliance
Company profile
MandatoryCategory: compliance
Please include the following information about your company: the nature of your
MandatoryCategory: compliance
business and
MandatoryCategory: compliance
primary business focus, your company’s major differentiator (i.e., what makes your
MandatoryCategory: compliance
company
MandatoryCategory: compliance
different from your competitors), the mailing address and contact information for your
MandatoryCategory: compliance
head office.
MandatoryCategory: compliance
In-house skill sets facilities and capabilities.
MandatoryCategory: compliance
Describe in-house skill sets and capabilities.
MandatoryCategory: compliance
Past-project experience
MandatoryCategory: compliance
In this section, include a brief description of completed IPP projects that are
MandatoryCategory: compliance
similar in nature and size as those expected to result from this project,
MandatoryCategory: compliance
a few pictures of the installations can be included in not more than 2-
MandatoryCategory: compliance
pages of the proposal.
MandatoryCategory: compliance
Project technical description
MandatoryCategory: compliance
This section should include a detailed description of the project, including:
MandatoryCategory: compliance
Location of the project and site
MandatoryCategory: compliance
Provide details about where the project will be located and list Rand Water sites which
MandatoryCategory: compliance
will receive electricity from that power generation plant.
MandatoryCategory: compliance
Size of power generation plant in MW and description of its
MandatoryCategory: compliance
respective generation equipment
MandatoryCategory: compliance
Provide the size of the proposed power plants in MW and its energy source. Describe
MandatoryCategory: compliance
the type of equipment that will be used, how it will be operated and maintained and
MandatoryCategory: compliance
include any other relevant equipment information.
MandatoryCategory: compliance
Energy analysis
MandatoryCategory: compliance
This section should be based on the maximum pumping requirements at each of the
MandatoryCategory: compliance
Rand Water sites and consider the motor start-up requirements for pumping. The
MandatoryCategory: compliance
energy production from each power plant, based on the availability of the energy
MandatoryCategory: compliance
source especially the renewable energy sources, must be shown as follows:
MandatoryCategory: compliance
o A calculation of gross monthly and annual energy production
MandatoryCategory: compliance
in MWh.
MandatoryCategory: compliance
o A calculation of energy losses, all sources of losses
MandatoryCategory: compliance
considered should be listed and individually quantified.
MandatoryCategory: compliance
o A calculation of projected net energy output monthly.
MandatoryCategory: compliance
o A guaranteed monthly net megawatt hour energy
MandatoryCategory: compliance
production.
MandatoryCategory: compliance
o A calculation power capacity on site and the balance
MandatoryCategory: compliance
between externally and self-generated power.
MandatoryCategory: compliance
o Determine the capital, operational, maintenance and
MandatoryCategory: compliance
eventual disposal costs per technology and the plant life
MandatoryCategory: compliance
cycle.
MandatoryCategory: compliance
o Explore other alternatives that have not yet been
MandatoryCategory: compliance
considered: HEP, solar diesel/HFO hybrid technologies.
MandatoryCategory: compliance
o Indicate investment opportunity and risks of IPPI rental
MandatoryCategory: compliance
options vs. owner operated power plant.
MandatoryCategory: compliance
o Calculate the return on investment considering the savings
MandatoryCategory: compliance
on energy costs from Eskom/City Power/Other and the
MandatoryCategory: compliance
survival as a going concern due to the substantial costs
MandatoryCategory: compliance
which may be involved.
MandatoryCategory: compliance
Siting issues
MandatoryCategory: compliance
Provide a brief description of any siting issues/concerns and any plans of assessing
MandatoryCategory: compliance
local community siting issues.
MandatoryCategory: compliance
Transmission plans
MandatoryCategory: compliance
Provide a description of the means of delivering the energy to the transmission system,
MandatoryCategory: compliance
including any distribution system related issues, if applicable. This should include the
MandatoryCategory: compliance
location, route, and voltage level of the transmission and/or distribution facilities. The
MandatoryCategory: compliance
design shall be in accordance with NRS 034, NRS 069, Occupational Health & Safety
MandatoryCategory: compliance
Act and all power transmission regulations and standards.
MandatoryCategory: compliance
The bidder must ensure that the current power distribution network within Rand Water
MandatoryCategory: compliance
and
MandatoryCategory: compliance
respective electricity suppliers (Eskom and Municipalities) are not compromised. The
MandatoryCategory: compliance
bidder will be responsible for all costs involved in interconnecting with the local utility
MandatoryCategory: compliance
or transmission system, and transmitting the energy to Rand Water or to such point
MandatoryCategory: compliance
where energy can be delivered to Rand Water via network transmission service with
MandatoryCategory: compliance
ESKOM or municipalities. The purpose of the project is to allow for independence to
MandatoryCategory: compliance
Eskom or municipalities electricity supplies, thus preference will be given to proposals
MandatoryCategory: compliance
with minimal transmission lines and no connection onto the current supplier’s electricity
MandatoryCategory: compliance
network.
MandatoryCategory: compliance
Should the tenderer wish to submit bids for power plants located at multiple sites, a
MandatoryCategory: compliance
separate project technical description is required per site. Furthermore, if the proposal
MandatoryCategory: compliance
covers multiple types of energy sources (i.e., Solar, Hydro, Gas) at a site, a project
MandatoryCategory: compliance
technical description is required for each type of power plant for this site.
MandatoryCategory: compliance
Indicate the distribution routes to the sites to be supplied and possible wheeling
MandatoryCategory: compliance
arrangements with Eskom/Others.
MandatoryCategory: compliance
Regulatory and Environmental compliance
MandatoryCategory: compliance
Provide information on regulatory and environmental compliance for each proposal
MandatoryCategory: compliance
submitted.
MandatoryCategory: compliance
The bidder is exclusively and entirely responsible for meeting and satisfying all
MandatoryCategory: compliance
regulatory and
MandatoryCategory: compliance
environmental approvals, permits, licenses, approvals and/or variances that are
MandatoryCategory: compliance
currently, or
MandatoryCategory: compliance
become in the future, required for the operation of the power generation plant and the
MandatoryCategory: compliance
delivery of energy in accordance with the Power Purchase Agreement (PPA). Please
MandatoryCategory: compliance
list all the
MandatoryCategory: compliance
abovementioned documents that may be required for the project and status regarding
MandatoryCategory: compliance
the
MandatoryCategory: compliance
progress to obtain the documentation.
MandatoryCategory: compliance
Financial Information
MandatoryCategory: compliance
Please provide the following information
MandatoryCategory: compliance
Describe how you will finance the project.
MandatoryCategory: compliance
Are there any past, current, threatened, or proposed lawsuits
MandatoryCategory: compliance
related to your IPP plants or your ability to deliver power under a
MandatoryCategory: compliance
PPA?
MandatoryCategory: compliance
Has your company/organization or any of the principals ever
MandatoryCategory: compliance
declared bankruptcy?
MandatoryCategory: compliance
Credit references including the Institution, Address, Contact Name,
MandatoryCategory: compliance
Phone number.
MandatoryCategory: compliance
Provide a matrix determining the costs of all options +/-20% NPV.
MandatoryCategory: compliance
Provide cost benefit matrix based on the proposed power
MandatoryCategory: compliance
solutions.
MandatoryCategory: compliance
Power supply contract duration, pricing and time
MandatoryCategory: compliance
This section should include the following information:
MandatoryCategory: compliance
Energy generation
MandatoryCategory: compliance
This section should state the amount of energy generated by the power generation
MandatoryCategory: compliance
plant proposed as follows:
MandatoryCategory: compliance
Anticipated amount of energy capable of being delivered annually
MandatoryCategory: compliance
in MWh/year.
MandatoryCategory: compliance
Anticipated amount of energy to be delivered per month in MWh;
MandatoryCategory: compliance
and
MandatoryCategory: compliance
Anticipated guaranteed minimum energy production per month in
MandatoryCategory: compliance
MWh.
MandatoryCategory: compliance
Energy delivery and pricing
MandatoryCategory: compliance
Rand Water receives electricity from Eskom at different tariff rates and from various
MandatoryCategory: compliance
municipalities at an escalated rate. In this section state the bid price in R/kWh. This is
MandatoryCategory: compliance
a competitive bidding process and preference will be given to bidders that will bid at a
MandatoryCategory: compliance
tariff lower than the projected target cost of electricity in R/kWh.
MandatoryCategory: compliance
Using the format shown in table 3 below, indicate the monthly energy production and
MandatoryCategory: compliance
energy prices in year of occurrence. Minimum energy production values must be
MandatoryCategory: compliance
shown as the guaranteed energy production.
MandatoryCategory: compliance
Monthly Energy Production
MandatoryCategory: compliance
Month Projected Guaranteed
MandatoryCategory: compliance
(MWh) (MWh)
MandatoryCategory: compliance
January
MandatoryCategory: compliance
February
MandatoryCategory: compliance
March
MandatoryCategory: compliance
April
MandatoryCategory: compliance
May
MandatoryCategory: compliance
June
MandatoryCategory: compliance
July
MandatoryCategory: compliance
August
MandatoryCategory: compliance
September
MandatoryCategory: compliance
October
MandatoryCategory: compliance
November
MandatoryCategory: compliance
December
MandatoryCategory: compliance
Annual
MandatoryCategory: compliance
Prices in year of occurrence
MandatoryCategory: compliance
Year R/kWh Year R/kWh
MandatoryCategory: compliance
2025 2038
MandatoryCategory: compliance
2025 2039
MandatoryCategory: compliance
2026 2040
MandatoryCategory: compliance
2027 2041
MandatoryCategory: compliance
2028 2041
MandatoryCategory: compliance
2029 2042
MandatoryCategory: compliance
2030 2043
MandatoryCategory: compliance
2031 2044
MandatoryCategory: compliance
2032 2045
MandatoryCategory: compliance
2033 2046
MandatoryCategory: compliance
2034 2047
MandatoryCategory: compliance
2035 2048
MandatoryCategory: compliance
2036 2049
MandatoryCategory: compliance
2037 2050
MandatoryCategory: compliance
2038
MandatoryCategory: compliance
Table 8: Energy generation and pricing
MandatoryCategory: compliance
Commercial date of operation
MandatoryCategory: compliance
The bidder must provide the anticipated duration for construction and date of
MandatoryCategory: compliance
commercial operation assuming that financial close is reached by November 2023.
MandatoryCategory: compliance
Other information
MandatoryCategory: compliance
Provide any other information that is relevant to the project.
MandatoryCategory: compliance
Risk analysis
MandatoryCategory: compliance
Provide the following information regarding risk taking in consideration all Legal,
MandatoryCategory: compliance
regulatory and partnerships.
MandatoryCategory: compliance
Identification and description of the risks
MandatoryCategory: compliance
Consequences of the risks
MandatoryCategory: compliance
Possible mitigations
MandatoryCategory: compliance
Residual risk after mitigation
MandatoryCategory: compliance
Project risk
MandatoryCategory: compliance
Evaluation criteria
MandatoryCategory: compliance
In addition to other pre-qualifiers and other qualifiers listed in the document the
MandatoryCategory: compliance
proposal will be selected based on the following technical qualifiers:
MandatoryCategory: compliance
Low cost of energy in R/kWh - LCOE
MandatoryCategory: compliance
Compliance to all relevant standards and codes such as IEC, SANS,
MandatoryCategory: compliance
and ISO.
MandatoryCategory: compliance
Economical, feasible and viable options for meeting Rand Water’s
MandatoryCategory: compliance
energy needs.
MandatoryCategory: compliance
Duration to commercial date of operation.
MandatoryCategory: compliance
Energy generation (kWh/year), power plants with high energy yield
MandatoryCategory: compliance
will be preferred.
MandatoryCategory: compliance
Other Project Agreements
MandatoryCategory: compliance
Agreements the IPP's entered with third parties to implement the project:
MandatoryCategory: compliance
These include, but are not limited to:
MandatoryCategory: compliance
Construction Contract (EPC)
MandatoryCategory: compliance
Fuel Supply Agreement (FSA)
MandatoryCategory: compliance
Operation and Maintenance Contract (O&M Contract)
MandatoryCategory: compliance
Finance Documents of agreements
MandatoryCategory: compliance
Should it be necessary and only if requested by Rand Water, the Technical Advisor
MandatoryCategory: compliance
(TA) may assist the Preferred Bidder to negotiating and conclude some of these
MandatoryCategory: compliance
agreements.
MandatoryCategory: compliance
Project prioritization
MandatoryCategory: compliance
Project prioritization shall be based on amongst others:
MandatoryCategory: compliance
o Rand Water's strategic objectives.
MandatoryCategory: compliance
o The cost effectiveness of the proposed solutions.
MandatoryCategory: compliance
o The availability of fuel sources.
MandatoryCategory: compliance
o Project readiness of bids received.
MandatoryCategory: compliance
Legal advice.
MandatoryCategory: compliance
IPP to appoint independent legal advisor to assist with:
MandatoryCategory: compliance
Electrical Regulatory issues
MandatoryCategory: compliance
Compliance with Governmental regulations and IPP regulations
MandatoryCategory: compliance
Heritages issues
MandatoryCategory: compliance
Geo-tech issues
MandatoryCategory: compliance
Land ownership
MandatoryCategory: compliance
Land use rights
MandatoryCategory: compliance
Regulatory framework
MandatoryCategory: compliance
Consents, authorities, and signatories
MandatoryCategory: compliance
Operational matters
MandatoryCategory: compliance
Environmental matters
MandatoryCategory: compliance
Competition matters
MandatoryCategory: compliance
Assets currently owned by ESKOM and Municipalities on Rand Water
MandatoryCategory: compliance
sites
MandatoryCategory: compliance
Presently, Rand Water is being supplied from Eskom and local municipalities and has
MandatoryCategory: compliance
contractual obligations towards these entities, regarding investments made to upgrade
MandatoryCategory: compliance
or augment existing infrastructure on site.
MandatoryCategory: compliance
The IPP should negotiate with these entities for the purchase of this infrastructure or
MandatoryCategory: compliance
make provision for the construction of new. All necessary steps must be taken to reach
MandatoryCategory: compliance
normal agreement or compensation agreements.
MandatoryCategory: compliance
Project Objectives
MandatoryCategory: compliance
It is for the IPP to consider a phased approach on implementation of the project where
MandatoryCategory: compliance
phase one will be the two proposed Power Stations and phase two the Solar or best
MandatoryCategory: compliance
technology for Reservoirs and small stations. The second phase may be implemented
MandatoryCategory: compliance
partial parallel to phase one. The above-mentioned phased approach is to meet Rand
MandatoryCategory: compliance
Water objectives to mitigate loss of power at its sites. The critical part will be the phase
MandatoryCategory: compliance
one of the project to be implemented to reach commercial operation of plant.
MandatoryCategory: compliance
PART C4: SITE INFORMATION
MandatoryCategory: compliance
Site Long Lat
MandatoryCategory: compliance
Airfield Break Pressure Tank Site 28° 13' 18.466"" E 26° 8' 33.152"" S
MandatoryCategory: compliance
Amanzimtoti Pumping Station 27° 53' 50.410"" E 26° 35' 48.840"" S
MandatoryCategory: compliance
Barnardsvlei Reservoir Site 27° 30' 44.255"" E 25° 46' 27.346"" S
MandatoryCategory: compliance
Barrage Site 27° 40' 51.824"" E 26° 45' 52.812"" S
MandatoryCategory: compliance
Benoni Reservoir Site no.1 28° 18' 38.215"" E 26° 9' 39.051"" S
MandatoryCategory: compliance
Benoni Reservoir Site no.2 28° 18' 29.461"" E 26° 9' 47.707"" S
MandatoryCategory: compliance
Bloemendal Pumping Station 28° 34' 0.775"" E 26° 20' 34.413"" S
MandatoryCategory: compliance
Blyvooruitzicht Reservoir Site 27° 24' 32.570"" E 26° 22' 40.715"" S
MandatoryCategory: compliance
Borehole ZM30 27° 47' 24.983"" E 26° 19' 16.705"" S
MandatoryCategory: compliance
Brakfontein Reservoir Site 28° 9' 40.655"" E 25° 55' 27.833"" S
MandatoryCategory: compliance
Bronberg Reservoir Site 28° 20' 30.620"" E 25° 47' 34.161"" S
MandatoryCategory: compliance
Buffelshoek Break Pressure Tank Site 27° 33' 54.348"" E 25° 48' 32.119"" S
MandatoryCategory: compliance
Cullinan Pumping Station 28° 31' 44.252"" E 25° 40' 48.885"" S
MandatoryCategory: compliance
Daleside Reservoir Site 28° 1' 58.728"" E 26° 30' 31.080"" S
MandatoryCategory: compliance
Driefontein Reservoir Site 27° 26' 33.635"" E 26° 24' 43.764"" S
MandatoryCategory: compliance
Eikenhof Pumping Station 27° 58' 28.167"" E 26° 18' 32.971"" S
MandatoryCategory: compliance
Esselen Park Break Pressure Tank & Re28° 15' 21.743"" E 26° 1' 8.457"" S
MandatoryCategory: compliance
Forest Hill No1 & No3 Res. Sites 28° 2' 28.850"" E 26° 15' 43.795"" S
MandatoryCategory: compliance
Forest Hill Res. Site No 2 28° 2' 34.063"" E 26° 15' 28.625"" S
MandatoryCategory: compliance
Germiston Reservoir Site 28° 8' 59.990"" E 26° 11' 12.603"" S
MandatoryCategory: compliance
Hartebeesthoek Reservoir 28° 4' 50.176"" E 25° 40' 29.202"" S
MandatoryCategory: compliance
Ironsyde Pumping Station 27° 54' 46.831"" E 26° 29' 22.363"" S
MandatoryCategory: compliance
Isando Reservoir Site 28° 12' 8.685"" E 26° 7' 57.800"" S
MandatoryCategory: compliance
Klipfontein Reservoir Site 28° 11' 11.863"" E 26° 4' 41.943"" S
MandatoryCategory: compliance
Klipriviersberg Reservoir Site 28° 4' 13.784"" E 26° 16' 13.592"" S
MandatoryCategory: compliance
Krugersdorp Reservoir Site 27° 48' 30.098"" E 26° 6' 43.510"" S
MandatoryCategory: compliance
Langerand Reservoir Site 27° 52' 56.631"" E 26° 35' 9.015"" S
MandatoryCategory: compliance
Lethabo Pumping Station & Barrier 27° 59' 34.900"" E 26° 43' 52.302"" S
MandatoryCategory: compliance
Libanon Reservoir Site 27° 37' 32.927"" E 26° 21' 35.780"" S
MandatoryCategory: compliance
Mamelodi Booster Pumping Station 28° 26' 14.410"" E 25° 41' 10.908"" S
MandatoryCategory: compliance
Mapleton Pumping Station 28° 15' 21.959"" E 26° 21' 36.957"" S
MandatoryCategory: compliance
Meredale Reservoir Site 27° 58' 27.475"" E 26° 16' 59.742"" S
MandatoryCategory: compliance
Meyer's Hill Reservoir Site 28° 4' 53.221"" E 26° 15' 30.189"" S
MandatoryCategory: compliance
Modderfontein East Reservoir Site 28° 25' 26.481"" E 26° 10' 36.729"" S
MandatoryCategory: compliance
Northridge Reservoir Site 28° 11' 1.499"" E 26° 10' 10.975"" S
MandatoryCategory: compliance
Olifantsfontein- Pretoria -Anode Site 28° 14' 28.763"" E 25° 49' 11.040"" S
MandatoryCategory: compliance
Palmiet Pumping Station 28° 5' 21.492"" E 26° 18' 22.227"" S
MandatoryCategory: compliance
Panfontein Sludge Disposal Site 28° 2' 45.261"" E 26° 43' 6.724"" S
MandatoryCategory: compliance
Roodepoort Booster Pumping Station 27° 55' 41.802"" E 26° 11' 45.955"" S
MandatoryCategory: compliance
Sasolburg Reservoir Site 27° 50' 33.719"" E 26° 48' 45.975"" S
MandatoryCategory: compliance
Spioenkop Reservoir Site 27° 55' 18.998"" E 26° 25' 39.231"" S
MandatoryCategory: compliance
Townlands 27° 13' 21.322"" E 25° 36' 44.905"" S
MandatoryCategory: compliance
Trichardt Pumping Station 29° 14' 10.322"" E 26° 27' 35.325"" S
MandatoryCategory: compliance
Vereeniging Pump Station 27° 54' 33.278"" E 26° 41' 14.423"" S
MandatoryCategory: compliance
Vereeniging Pumping Station 27° 54' 54.156"" E 26° 41' 18.387"" S
MandatoryCategory: compliance
Vlakfontein Reservoir Site 28° 22' 15.656"" E 26° 8' 35.895"" S
MandatoryCategory: compliance
Waterkloof Break Pressure Tank Site 27° 39' 56.253"" E 25° 57' 57.970"" S
MandatoryCategory: compliance
Waterval Reservoir Site 27° 57' 14.076"" E 26° 9' 38.541"" S
MandatoryCategory: compliance
Wildebeestfontein Reservoir Site 29° 9' 4.196"" E 26° 26' 55.109"" S
MandatoryCategory: compliance
Witpoortjie Reservoir Site 27° 47' 30.813"" E 26° 9' 20.696"" S
MandatoryCategory: compliance
Zuikerbosch Control Works 28° 4' 38.124"" E 26° 49' 37.555"" S
MandatoryCategory: compliance
Zuikerbosch Pumping Station 28° 1' 0.904"" E 26° 41' 13.519"" S
MandatoryCategory: compliance
Zuurbekom No. 2 PS-Borehole Pumpho27° 47' 29.662"" E 26° 18' 48.490"" S
MandatoryCategory: compliance
Zwartkopjes Pumping Station 28° 4' 36.465"" E 26° 22' 39.023"" S
MandatoryCategory: compliance
Sites with capacities smaller than 10 MW
MandatoryCategory: compliance
Power plant (Solar /
MandatoryCategory: compliance
Site Hydro potential)
MandatoryCategory: compliance
Airfield Break Pressure Tank Site Solar / Hydro
MandatoryCategory: compliance
Barnardsvlei Reservoir Site Solar / Hydro
MandatoryCategory: compliance
Barrage Site Solar / Hydro
MandatoryCategory: compliance
Benoni Reservoir Site no.1 Solar
MandatoryCategory: compliance
Benoni Reservoir Site no.2 Solar
MandatoryCategory: compliance
Blyvooruitzicht Reservoir Site Solar
MandatoryCategory: compliance
Borehole ZM30 Solar
MandatoryCategory: compliance
Brakfontein Reservoir Site Solar / Hydro
MandatoryCategory: compliance
Bronberg Reservoir Site Solar
MandatoryCategory: compliance
Buffelshoek Break Pressure Tank Site Solar / Hydro
MandatoryCategory: compliance
Cullinan Pumping Station Solar
MandatoryCategory: compliance
Daleside Reservoir Site Solar (12MW) Note*
MandatoryCategory: compliance
Driefontein Reservoir Site Solar
MandatoryCategory: compliance
Esselen Park Break Pressure Tank & Reservoir depot
MandatoryCategory: compliance
Site Solar / Hydro
MandatoryCategory: compliance
Forest Hill No1 & No3 Res. Sites Solar
MandatoryCategory: compliance
Forest Hill Res. Site No 2 Solar
MandatoryCategory: compliance
Germiston Reservoir Site Solar
MandatoryCategory: compliance
Hartebeesthoek Reservoir Solar / Hydro
MandatoryCategory: compliance
Ironsyde Pumping Station Solar
MandatoryCategory: compliance
Isando Reservoir Site Solar
MandatoryCategory: compliance
Klipfontein Reservoir Site Solar / Hydro
MandatoryCategory: compliance
Klipriviersberg Reservoir Site Solar
MandatoryCategory: compliance
Krugersdorp Reservoir Site Solar
MandatoryCategory: compliance
Langerand Reservoir Site Solar
MandatoryCategory: compliance
Libanon Reservoir Site Solar
MandatoryCategory: compliance
Mamelodi Booster Pumping Station Solar
MandatoryCategory: compliance
Meredale Reservoir Site Solar
MandatoryCategory: compliance
Meyer's Hill Reservoir Site Solar
MandatoryCategory: compliance
Modderfontein East Reservoir Site Solar
MandatoryCategory: compliance
Northridge Reservoir Site Solar
MandatoryCategory: compliance
Olifantsfontein- Pretoria -Anode Site Solar
MandatoryCategory: compliance
Sasolburg Reservoir Site Solar
MandatoryCategory: compliance
Spioenkop Reservoir Site Solar
MandatoryCategory: compliance
Townlands Solar
MandatoryCategory: compliance
Trichardt Pumping Station Solar
MandatoryCategory: compliance
Vlakfontein Reservoir Site Solar
MandatoryCategory: compliance
Waterkloof Break Pressure Tank Site Solar / Hydro
MandatoryCategory: compliance
Waterval Reservoir Site Solar
MandatoryCategory: compliance
Wildebeestfontein Reservoir Site Solar
MandatoryCategory: compliance
Witpoortjie Reservoir Site Solar
MandatoryCategory: compliance
Zuikerbosch Control Works Solar / Hydro
MandatoryCategory: compliance
Zuurbekom No. 2 PS-Borehole Pumphouse Solar
MandatoryCategory: compliance
Rand Water thus invites IPPs and/or interested parties to put forward proposals to supply
MandatoryCategory: compliance
electrical power to the afore-mentioned stations.
MandatoryCategory: compliance
Queries will be discussed at a compulsory clarification meeting to be held at Rand Water’s
MandatoryCategory: compliance
Rietvlei Head Office as advised by the Procurement function.
MandatoryCategory: compliance
The Bidder must refer to ANNEXURE A - Scope of Work (including drawings, where
MandatoryCategory: compliance
applicable and related available information) provided with this bid document.
MandatoryCategory: compliance
The Bidder must refer to C4: Site Information provided with this bid document.
MandatoryCategory: compliance
PROCUREMENT (in relation to in the Standard for Developing Skills through
MandatoryCategory: compliance
Infrastructure Contracts (published in GN March 2020):
MandatoryCategory: compliance
The successful contractor may employ part/full occupational qualification
MandatoryCategory: compliance
learners, trade qualification learners, work integrated learners or
MandatoryCategory: compliance
candidates directly or through a Skills Development Agency (SDA), (A1 -
MandatoryCategory: compliance
List of cidb accredited SDAs).
MandatoryCategory: compliance
The successful contractor shall ensure that no single method shall
MandatoryCategory: compliance
contribute more than 75% of the CSDG for the contract.
MandatoryCategory: compliance
The successful contractor may only place 33% employed employees or
MandatoryCategory: compliance
that of his subcontractors contributing to the CSDG.
MandatoryCategory: compliance
The successful contractor must employ at least 60% of the learners from
MandatoryCategory: compliance
an FET / TVET college should the contractor select to have part/full
MandatoryCategory: compliance
occupational qualification learners and trade qualification learners
MandatoryCategory: compliance
contributing to the CSDG.
MandatoryCategory: compliance
The successful contractor shall employ at least (0.25%) from eligible
MandatoryCategory: compliance
part/full occupational qualification learners, work integrated learners or
MandatoryCategory: compliance
candidates in the employment of the employer.
MandatoryCategory: compliance
MANAGEMENT (in relation to in the Standard for Developing Skills through
MandatoryCategory: compliance
Infrastructure Contracts (published in GN March 2020):
MandatoryCategory: compliance
The successful contractor must keep site records regarding the part/full
MandatoryCategory: compliance
occupational qualification learners’, work integrated learners’ or
MandatoryCategory: compliance
candidates’ progress, site attendance, hours worked and other relevant
MandatoryCategory: compliance
information as required by the Standard.
MandatoryCategory: compliance
The successful contractor shall provide the required number of
MandatoryCategory: compliance
appropriately qualified mentors to the maximum number of part/full
MandatoryCategory: compliance
occupational qualification learners, trade qualification learners, work
MandatoryCategory: compliance
integrated learners in the proportion as specified in the Standard.
MandatoryCategory: compliance
The successful contractor shall provide a supervisor to manage the training
MandatoryCategory: compliance
of the part/full occupational qualification learners, work integrated learners,
MandatoryCategory: compliance
candidates.
MandatoryCategory: compliance
Awaiting Award of Contract
This tender has not yet been awarded. The contracting authority is expected to publish the award notice in due course.
26 Feb
2026
Submissions Closed
No further submissions were accepted after this date.
Organization
Rand WaterRand Water is the largest water utility in Africa, supplying bulk potable water to Gauteng and surrounding regions.
Contact Person
Sandisile Zulu
Phone
011-682-0708
[email protected]
Website
www.randwater.co.za/
Address
522 Impala Rd, Dikole Section, Johannesburg South, 2058, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
1
Last checked
05 Jun 2026
AI status
Enhanced
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Rand Water is the largest water utility in Africa, supplying bulk potable water to Gauteng and surrounding regions.
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 46 of 2000
Relevant where professional engineering services or regulated engineering work may be required.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Data conflicts
None detected
522 Impala Rd, Dikole Section, Johannesburg South, 2058, South Africa
Median Estimate
R 3 234 375
Range
Based on CIDB grading. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Get deep intelligence on Services: Electrical. Unlock full pricing strategies, bid frequency, and historical win rates.