The development bank of southern africa is seeking a professional service provider to design and construct monitor a shared services facility comprising a multi-centre and office building. Bidders must submit a fully completed bid with all compulsory returnable schedules, professional cvs for each required discipline, tax clearance, b‑bbee evidence and professional indemnity of at least r10 million. Attendance at the compulsory online briefing on 26 november 2026 is a mandatory pre‑qualifier, and failure to attend or to meet the pre‑qualifier criteria will disqualify the bid.
Key Requirements
Compulsory briefing: Bidders must attend the online MS Teams briefing on 26 November 2026 at 11:00, failure disqualifies
Professional registrations and CVs: Bidders must provide a detailed CV for each of the 14 required disciplines, showing years of experience and duties, and a valid professional registration document (or supplementary proof) for each resource
B‑BBEE evidence: Bidders must submit an original valid B‑BBEE status certificate (or auditor‑certified EME certificate) to claim the 20‑point B‑BBEE allocation; non‑submission disqualifies
Tax clearance and CSD registration: Bidders must provide a SARS tax pin and a CSD summary report confirming registration to do business with the DBSA
Professional indemnity: Bidders must hold professional indemnity cover of at least R10 million with no limit on claims, covering all disciplines
Closing deadline: Bidders must submit the bid by 23:55 on 09 December 2026 (Telkom time) via the OneDrive link; late submissions are disqualified
Mandatory returnable documents: All Annexures A through M must be completed, signed and uploaded in the prescribed order; any omission results in disqualification
APPOINTMENT OF A PROFESSIONAL SERVICE PROVIDER (PSP) FOR THE DESIGNING AND CONSTRUCTION MONITORING OF SHARED SERVICES FACILITY (MULTI-CENTRE / OFFICE BUILDING)
Tender context
Return to this tender’s issuing organisation, province, or category.
Appointment of a professional service provider (psp) for the designing and construction monitoring of shared services facility (multi-centre / office building)
Briefing SessionCompulsory
Date & Time
Wednesday, 09 December 2026 - 23:30
Venue
Microsoft Teams - Refer to DBSA Website for the link to register be able to join
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Professional Services & Consulting Industry Profile
Regulatory Bodies
SAGCSAICA
Tenders in this industry often require registration with these bodies.
Typical Documents
5 items
Company Registration (CIPC)
Tax Clearance Certificate
B-BBEE Certificate
CSD Registration
Company Profile
Recommended Certifications
Having these can improve your winning chances: CA(SA) - Chartered Accountant, PMI-PMP (Project Management Professional), Prince2 Practitioner, Six Sigma Certification
Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
Compliance review. The working summary is checked against South African procurement standards — PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement — so nothing critical is missed before you start your bid response.
DocumentAnnexure A - Health and Safety Specification.pdfReview complete
Description
Source: Annexure A - Health and Safety Specification.pdf
Important Dates
17 Nov
2026
PUBLICATION
Tender Published
Tender was published
09 Dec
2026
DEADLINE
Closing Date
Tender closing date
Procurement Rules & Compliance ContextThis tender may be governed by South African public procurement rules covering fairness, transparency, preferential procurement, anti-corruption, administrative justice and access to information.
7 rules
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Core procurement rules
These rules commonly apply to South African public-sector procurement.
7
Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
high
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Constitution of the Republic of South Africa, 1996 – Section 217
Act 108 of 1996 (s217)
high
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
The Department of Development Bank of Southern Africa (DBSA) in Gauteng requires a Professional Service Provider (PSP) to design and monitor the construction of a Multi‑Centre/Office Building shared services facility. This specification sets out health and safety, environmental and quality management requirements, including risk assessments, health and safety plans, construction permits and post‑completion handover. The tender closes on 9 December 2026 at 23:30 SAST.
Appointment of a professional service provider is required for the design and construction monitoring of a shared services facility, being a multi-centre or office building. The professional service provider will support the Development Bank of Southern Africa in that phase. The project is located in Gauteng and the closing date is 09 December 2026 at 23:30:00 GMT+0200.
1. RFP190.2026 - PSP FOR THE DESIGNING AND CONSTRUCTION MONITORING OF SHARED SERVICES FACILITY.pdf
The Development Bank of Southern Africa requires a professional service provider to design and monitor the construction of a shared services facility (multi-centre / office building) in Gauteng. The appointed PSP must field a full multidisciplinary team of professionally registered consultants to take the project from design through construction monitoring.
Secure DBSA tenders with AI Matching Engine, development finance intelligence, compliance analysis, and bid support for infrastructure and consulting.
Similar Tenders
Matched by category & region
Supplier Readiness Hub
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Publication of Names of Bidders in Respect of Advertised Competitive for the Appointment of a Specialist Quality Control Inspectorate (QCI) Service Provider for a Period of six (06) years.
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Document read
Compliance review
Bid-ready summary
The client requires a professional service provider to design and monitor construction of a shared services facility. The provider must address health, safety and environmental risks from design through construction. The specification sets baseline health and safety requirements and must be read with the Occupational Health and Safety Act and Construction Regulations 2014. Design work includes reviewing site plans, obtaining approvals, preparing coordinated detailed drawings, specifications and reports, and complying with SANS 10400, including XA.
Technical Specifications
Source: Annexure A - Health and Safety Specification.pdf (unknown)
Scope
The appointment covers design and construction monitoring of a shared services facility arranged as a multi-centre/office building.
The scope includes Stages 1 to 7, with Stage 1.1 strategic briefing, Stage 1.2 initiation/review, Stage 2 concept, and Stage 3 design development.
Stage 3 includes detailed design, a bill of quantities and full construction drawings.
Design deliverables
Review site development plans or schematic layouts and obtain statutory, funding or utility approvals required for the work package.
Prepare coordinated detailed design drawings and schedules, including architectural and engineering details, specifications, sizing and positioning of systems and components.
Prepare detailed design reports.
Designs and specifications must comply with SANS 10400, including XA, and follow client specification guidelines where relevant.
The design must avoid dangerous procedures or hazardous materials and allow future maintenance with minimum risk.
Construction monitoring
The provider must monitor construction, inspect design compliance, stop work that deviates from the design, and issue a completion certificate before commissioning.
The provider must review contractor drawings and witness tests and mock-ups on and off site.
Methodology
Source: Annexure A - Health and Safety Specification.pdf
Stage 1.1 requires attendance at a briefing meeting, signature of the client-provider contract, collection of locality and facility manager information, document templates and previous consultants' site development plans. The provider must compile a Project Execution Plan, obtain client approval and issue stage gate notification before proceeding. Stage 1.2 covers initiation/review. Stage 2 covers concept. Stage 3 covers design development, including detailed design, bill of quantities and full construction drawings.
Quality Management
Source: Annexure A - Health and Safety Specification.pdf
Quality management is tied to health and safety governance. The provider must maintain written appointments, reporting lines and communication through OHS committee or project meetings. Audit findings must be tracked through corrective action plans with actions, closure dates, signatures and photographic evidence. The health and safety file must contain appointment letters, competency evidence, risk assessments, method statements, induction records, medical certificates and audit reports.
Financial Requirements
Source: Annexure A - Health and Safety Specification.pdf (unknown)
Payment and financial control
Payment is supported by payment certificates and financial control reports.
Progressive accounts and draft final accounts are required.
Compliance Requirements
Source: Annexure A - Health and Safety Specification.pdf (unknown)
Legal framework
The project must comply with the Occupational Health and Safety Act, 1993, the Construction Regulations 2014 and the health and safety specification prepared under Construction Regulation 5(1)(b).
Labour legislation, including the Basic Conditions of Employment Act, forms part of the compliance system.
Environmental management must be considered alongside health and safety.
Errors or omissions in the specification must be reported promptly and do not entitle the provider to additional payment or an extension of time.
Health and safety planning
A site-specific health and safety plan must be prepared, approved, implemented and kept updated.
The plan must include risk assessments, standard working procedures and method statements.
A health and safety file must be kept on site and made available to inspectors, the client, the provider or contractors.
The provider must ensure the principal contractor implements the approved health and safety plan.
Known or anticipated hazards must be communicated to the contractor in writing, including when changes occur.
When design or construction changes occur, sufficient safety information and resources must be provided for safe execution.
Appointments and competence
Responsible persons must be appointed in writing, with duties, appointment periods and competency evidence kept in the health and safety file.
Statutory appointments cover construction management, health and safety officers, supervisors, risk assessors, fall protection, temporary works, excavation, demolition, scaffolding, lifting and hoisting, mobile plant, temporary electricity, hazardous substances, fire equipment, first aid, incident investigation, ladders, OHS committees and representatives, machinery, pressure equipment and welding.
The Construction Health and Safety Agent must be registered with the South African Council for the Project and Construction Management Professions where required.
Site controls
Construction work permit applications must be submitted for review, and the Department of Employment and Labour must be notified at least 30 days before work starts.
Workers and visitors must receive health and safety induction and suitable personal protective equipment.
Workers must hold valid medical certificates of fitness, issued by an occupational health practitioner, for the construction work.
Contractors must be registered and in good standing with the compensation fund or a licensed compensation insurer before work starts.
The principal contractor must keep an organogram of appointed contractors on site.
Monitoring and close-out
Health and safety audits and document checks must occur at least every 30 days.
Audit reports must be provided within 7 days after the audit.
Corrective action plans must be submitted within 7 days of receiving an audit and must include findings, actions, closure dates, signatures and photographic proof.
The construction manager must sign off corrective action plans before submission.
A consolidated health and safety file must be handed over at completion.
Health & Safety
Source: Annexure A - Health and Safety Specification.pdf
Health and safety controls
A site-specific health and safety plan is required before work starts and must be maintained throughout construction.
Risk assessments must identify hazards and define control measures, safe working procedures and method statements.
Written appointments are required for responsible persons, including construction management, supervision, health and safety officers, first aiders and health and safety representatives.
Workers and visitors must receive induction and suitable personal protective equipment.
Medical certificates of fitness are required for workers.
Audits must be conducted at least every 30 days, with reports and corrective action plans submitted within 7 days.
The health and safety file must be kept on site and handed over at completion.
Section
Source: Annexure A - Health and Safety Specification.pdf
No scoring, weighting or minimum qualifying score is stated. Project stages identified: Stage 1.1 strategic briefing; Stage 1.2 initiation/review; Stage 2 concept; Stage 3 design development, including detailed design, bill of quantities and full construction drawings.
DocumentAnnexure B - Baseline Risk Assessment.pdfReview complete
Description
Source: Annexure B - Baseline Risk Assessment.pdf
Annexure B provides the draft baseline risk assessment for the appointment of a professional service provider to design and monitor construction of a shared services facility (multi-centre/office building). It is prepared under Construction Regulation 5(1)(a) of the Construction Regulations, 2014.
Technical Specifications
Source: Annexure B - Baseline Risk Assessment.pdf (unknown)
Scope of procurement
Appointment of a professional service provider to design and monitor construction of a shared services facility, comprising a multi-centre/office building.
Baseline risk assessment
A baseline risk assessment must cover the full project lifecycle: initiation, concept and feasibility, design development, procurement, construction, commissioning and close-out.
It must identify health, safety, environmental and quality hazards, evaluate the level of risk, and define preventative measures and controls.
The results must inform the project Health and Safety Specification and be communicated to designers, professional service providers and the principal contractor.
Safety in design must be applied so that hazards are eliminated or reduced as far as reasonably practicable during design.
The assessment must be reviewed and updated if the project scope, design or construction methodology changes significantly.
Risk methodology
Risks must be assessed using consequence, likelihood, financial impact, environmental impact and probability/frequency factors.
Each risk must receive an initial rating, control measures and a residual rating.
Controls must follow the hierarchy of controls, with personal protective equipment used only where higher-order controls are not practicable.
Project stages to be addressed
Initiation: appoint competent health and safety and SACPCMP-registered professionals, define scope and approvals, compile legal and site information, prepare a draft risk profile and engage affected communities.
Feasibility: assess demand, capacity, environmental approvals, water availability, electricity availability and hydrogeological conditions.
Design: define user requirements, specifications, SANS/SABS compliance, signed drawings, design risk assessments, stakeholder input and temporary works.
Construction and close-out: control construction documentation, work permits, contractor competencies, site establishment, plant and equipment, excavation, commissioning and handover.
Methodology
Source: Annexure B - Baseline Risk Assessment.pdf
Methodology requirements
Construction methodology and planning must be considered during tender and design stages to inform costing, sequencing and risk control.
Work methods must be documented in method statements and safe working procedures.
Excavation and work near mobile plant must be controlled through competent supervision, exclusion zones, spotters and traffic management plans.
Only competent operators may operate machinery, and plant movements must be managed to prevent collisions with personnel or underground services.
Experience & Qualifications
Source: Annexure B - Baseline Risk Assessment.pdf
Experience and qualifications
The professional service provider and construction health and safety agent must be competent and appropriately qualified for the project.
Key personnel must hold relevant experience, qualifications and statutory registrations, including registration with the South African Council for the Project and Construction Management Professions where required.
Competency must be verified through professional registration and project-specific appointment records.
Quality Management
Source: Annexure B - Baseline Risk Assessment.pdf
Quality management is addressed through the identification of quality-related hazards, risk evaluation, and the definition of preventative measures and controls. Design and construction must meet specified standards, including SANS and SABS requirements, and quality controls must be reflected in specifications, drawings, method statements and the Health and Safety Specification.
Financial Requirements
Source: Annexure B - Baseline Risk Assessment.pdf (unknown)
Costing and pricing
Health and safety requirements must be included in the project cost estimate, Bill of Quantities and tender pricing so that contractors can price compliance.
Compliance Requirements
Source: Annexure B - Baseline Risk Assessment.pdf (unknown)
Statutory and professional compliance
The professional service provider and construction health and safety agent must be competent and registered with the South African Council for the Project and Construction Management Professions where required.
The appointment must comply with the Construction Regulations, 2014 issued under the Occupational Health and Safety Act, including Construction Regulation 5(1)(a) and Construction Regulation 6.
Section 18(1)(c) of the Project and Construction Management Professions Act, 2000 applies to the appointment of competent professionals.
Environmental approvals must be obtained under the National Environmental Management Act and the National Environmental Management: Protected Areas Act where relevant.
Design and construction must comply with the National Building Regulations, SANS standards and SABS-approved products where specified.
Contractors must provide valid COID registration or a letter of good standing, competency records, medicals and work permits where required.
The construction health and safety agent must submit the baseline risk assessment and Construction Work Permit documentation to the Department of Employment and Labour at least 30 days before planned commencement.
The principal contractor must notify the Department of Employment and Labour at least 7 days before construction starts.
Construction work must not begin before the Construction Work Permit is issued and the required risk assessments and method statements are approved.
Health & Safety
Source: Annexure B - Baseline Risk Assessment.pdf
Health and safety requirements
A Construction Work Permit is required before construction starts. The construction health and safety agent must submit the baseline risk assessment and permit documentation to the Department of Employment and Labour at least 30 days before planned commencement.
The principal contractor must notify the Department of Employment and Labour at least 7 days before starting work.
Contractors must provide valid COID registration or a letter of good standing, competency records, medicals and work permits where applicable.
No activity may begin without an approved, site-specific risk assessment and method statement.
Risk assessments must be prepared by competent persons, communicated to affected employees, and reviewed when conditions, scope or management change.
Only competent, appointed operators may use plant and machinery. Excavators, TLBs and similar equipment require authorised operators and supervision.
Excavation work must be supervised by a competent person and supported by checklists, method statements and safe working procedures.
Site establishment, traffic management, lifting plans, spotters and exclusion zones must be used to control vehicle and plant movements.
Trucks must be loaded within safe capacity and movement controlled by trained spotters.
Health and safety costs must be included in the Bill of Quantities and tender pricing.
Environmental
Source: Annexure B - Baseline Risk Assessment.pdf
Environmental requirements
Environmental approvals and authorisations must be obtained under applicable environmental legislation, including the National Environmental Management Act and the National Environmental Management: Protected Areas Act, before project approval where required.
The assessment must consider impacts on fauna, flora and surrounding communities, and avoid uncontrolled or incompatible development.
Water and electricity availability must be assessed, including hydrogeological surveys and consultation with Eskom where relevant.
Environmental risks must be rated and controlled throughout design, construction and operation.
Contractual Terms
Source: Annexure B - Baseline Risk Assessment.pdf
OHS requirements must be provided to each principal contractor or contractor. Contractors must submit copies of letters of good standing and valid competency records. Non-compliant contractors may be subject to termination.
Document1. RFP190.2026 - PSP FOR THE DESIGNING AND CONSTRUCTION MONITORING OF SHARED SERVICES FACILITY.pdfReview complete
Description
Source: 1. RFP190.2026 - PSP FOR THE DESIGNING AND CONSTRUCTION MONITORING OF SHARED SERVICES FACILITY.pdf
The DBSA requires a professional service provider to design and monitor the construction of a shared services facility comprising a multi-centre and office building. The appointment is governed by the CIDB Standard Professional Services Contract (July 2009) Edition 3, CIDB Document 1014, read with the Scope of Work issued with the RFP.
Important Dates
Source: 1. RFP190.2026 - PSP FOR THE DESIGNING AND CONSTRUCTION MONITORING OF SHARED SERVICES FACILITY.pdf (RFP)
Compulsory briefing (attendance is a pre-qualifier)
Date: 26 November 2026
Time: 11:00 to 12:00
Venue: online MS Teams webinar; the link is issued with the invitation
Clarification questions
Deadline for written questions: 30 November 2026
One consolidated questions email per bidder is encouraged; no questions accepted after this date
DBSA consolidated responses issued: 01 December 2026
Closing
Date: 09 December 2026
Time: 23:55
Bid validity
Bids must remain open for acceptance for 90 days from the closing time, extendable by written agreement.
Contact Information
Source: 1. RFP190.2026 - PSP FOR THE DESIGNING AND CONSTRUCTION MONITORING OF SHARED SERVICES FACILITY.pdf (RFP)
Stage 2: price and preference, scored on the 80/20 system.
Stage 3: functionality — not applicable to this RFP.
Stage 4: risk analysis and objective criteria.
Post-tender negotiation for a best and final offer may be requested before final award.
Stage 1 pre-qualifiers (any failure is immediate disqualification)
Attendance of the compulsory online briefing session.
Completed and signed Declaration of Default and Termination.
Form of Offer signed by the bidder and priced in figures or words.
A detailed CV and valid professional registration document for each of the 14 disciplines, with a supplementary letter from the regulatory body where first-registration date or validity is not shown.
Only one CV per discipline is assessed; CVs must state years of experience and duties and must be legible.
Stage 1 clarification responses (48 hours)
Acceptance of the standard conditions of tender without deviation, qualification or alternative.
Returnable documents completed and signed.
CSD summary report confirming registration to do business with the DBSA.
SARS tax pin.
Professional indemnity cover of R10 000 000.00 with no limit on the number of claims, covering all disciplines.
An unincorporated trust, consortium or joint venture qualifies using a consolidated B-BBEE scorecard prepared for each bid.
Highest total out of 100 wins, subject to the DBSA's right to cancel the RFP.
Stage 4 risk and objective criteria
Re-verification of tax compliance and CSD registration at recommendation stage.
No misrepresentation in the bid information.
No listing on the Register of Tender Defaulters.
No conflict of interest; compulsory enterprise questionnaire completed.
No fraud or corruption conviction; no removal from an organ of state contract for non-performance.
Exclusion possible where a DBSA award was terminated for non-performance in the 18 months before closing, or a written non-performance notice was received in the 12 months before award.
Financial health assessment using receivables and payables turnover, liquidity and solvency ratios.
Financial risk analysis of tendered rates against market averages and the DBSA quantity surveyor estimate; distorted rates may disqualify.
PEP and Procure Check screening; online verification of professional registrations.
Documented independent evidence of authenticity may be demanded within 48 hours, with a contactable reference by email and telephone.
Technical Specifications
Source: 1. RFP190.2026 - PSP FOR THE DESIGNING AND CONSTRUCTION MONITORING OF SHARED SERVICES FACILITY.pdf (RFP)
Scope
Appointment of a professional service provider for the design and construction monitoring of a shared services facility comprising a multi-centre and office building.
The appointment covers the full professional services scope set out in the CIDB Scope of Work forming Annexure M.
The contract form is the CIDB Standard Professional Services Contract (July 2009) Edition 3, CIDB Document 1014.
Multidisciplinary team required (one CV per discipline)
Construction Project Manager / Team Leader: SACPCMP Pr. CPM, 10 years post-registration.
Professional Architect or Senior Architectural Technologist: SACAP Pr. Arch / Sr. Tech, 10 years post-registration.
Quantity Surveyor: SACQSP, 10 years post-registration.
Structural Engineer or Technologist: ECSA Pr. Eng / Pr. Tech, 10 years post-registration.
Civil Engineer or Technologist: ECSA Pr. Eng / Pr. Tech, 10 years post-registration.
Electrical Engineer or Technologist: ECSA Pr. Eng / Pr. Tech, 10 years post-registration.
Mechanical Engineer or Technologist: ECSA Pr. Eng / Pr. Tech, 10 years post-registration.
Construction Health and Safety Agent: SACPCMP Pr. CHSA, 5 years' experience.
Land Surveyor: SAGC Pr., 5 years post-registration.
Town Planner: SACPLAN Pr. Pln., 5 years post-registration.
Geotechnical Engineer: ECSA Pr. Eng / Pr. Tech Eng, 10 years post-registration.
Environmental Assessment Practitioner: EAPASA Reg. EAP, 10 years post-registration.
Social Facilitator: 10 years on infrastructure development projects, with a national diploma or degree in social science, human sciences, social work or public relations.
Clerk of Works: 10 years in the built environment (civil or building).
CV requirements
Each CV must state the number of years of work experience and describe the role and duties.
The discipline for which each CV is offered must be clearly identified; a CV is assessed only for that discipline.
Documents must be legible and supported by valid professional registration certificates.
Experience & Qualifications
Source: 1. RFP190.2026 - PSP FOR THE DESIGNING AND CONSTRUCTION MONITORING OF SHARED SERVICES FACILITY.pdf
Each of the 14 disciplines must be represented by a named resource with a detailed CV and a valid professional registration document.
Experience thresholds
10 years post-registration: Construction Project Manager (Team Leader), Architect or Senior Architectural Technologist, Quantity Surveyor, Structural Engineer or Technologist, Civil Engineer or Technologist, Electrical Engineer or Technologist, Mechanical Engineer or Technologist, Geotechnical Engineer, Environmental Assessment Practitioner.
10 years' experience: Social Facilitator, who must also hold a national diploma or degree in social science, human sciences, social work or public relations; and Clerk of Works, in the built environment (civil or building).
5 years: Construction Health and Safety Agent, Land Surveyor, Town Planner.
Registration bodies
SACPCMP (Pr. CPM, Pr. CHSA), SACAP (Pr. Arch, Sr. Tech), SACQSP, ECSA (Pr. Eng, Pr. Tech, Pr. Tech Eng), SAGC (Pr.), SACPLAN (Pr. Pln.), EAPASA (Reg. EAP).
Evidence
Where the registration certificate omits the first-registration date or validity period, a supplementary document from the same regulatory body must be supplied.
CVs must state years of experience and describe duties, must be legible, and must identify the discipline offered. Only one CV per discipline is assessed.
Pricing Schedule
Source: 1. RFP190.2026 - PSP FOR THE DESIGNING AND CONSTRUCTION MONITORING OF SHARED SERVICES FACILITY.pdf
Pricing rules
The Form of Offer must be signed and priced in figures or words.
The pricing instructions in the RFP must be followed exactly; failure renders the offer non-compliant.
Unpriced cost items will be queried for a reason only; no cost may be added or amended afterwards.
Rates that are unduly high or unduly low may be treated as distorted and disqualify the bid, assessed against market averages excluding outliers and the DBSA quantity surveyor estimate, in line with CIDB Inform Practice Note #5.
Capacity and award
Order book limits: R60 million at CIDB Level 6, R120 million at CIDB Level 7, no limit at Levels 8 and 9.
Five active awards or orders with outstanding value may bar an award, unless the outstanding value is 10% or less or practical completion has been reached.
Joint ventures and consortia are assessed on participation percentage for the order book test, with the joint award counted as one for the active-award test.
The DBSA may award the full scope or part of it subject to budget availability, retender excluded items, and negotiate to secure value for money.
Financial Requirements
Source: 1. RFP190.2026 - PSP FOR THE DESIGNING AND CONSTRUCTION MONITORING OF SHARED SERVICES FACILITY.pdf (RFP)
Professional indemnity
Minimum cover: R10 000 000.00
No limit on the number of claims
Cover must extend to all professional disciplines, either through the firm's policy or through each professional's own policy
Pricing
The Form of Offer must be signed and priced in figures or words.
Pricing instructions must be followed exactly; non-adherence renders the offer non-compliant.
Where a cost item is left unpriced, the DBSA will seek clarification but will not permit costs to be added or amended afterwards.
Unduly high or unduly low rates may be treated as distorted and disqualify the bid, measured against market averages and the DBSA quantity surveyor estimate.
Capacity limits
The DBSA may decline to award where the bidder's cumulative order book reaches R60 million at CIDB Level 6 or R120 million at CIDB Level 7; no limit applies at Levels 8 and 9.
The DBSA may decline to award where the bidder holds five active awards or orders with outstanding value, unless the outstanding value is 10% or less or the project has reached practical completion.
For joint ventures and consortia, the order book test applies by participation percentage and the active-award test counts the joint award as one.
Financial health may be assessed on receivables and payables turnover, liquidity and solvency.
Award
The DBSA may award the full scope or part of it, subject to budget availability, and may retender excluded items.
The DBSA may negotiate to protect value for money.
Compliance Requirements
Source: 1. RFP190.2026 - PSP FOR THE DESIGNING AND CONSTRUCTION MONITORING OF SHARED SERVICES FACILITY.pdf (RFP)
Statutory and registration
Registration on the National Treasury Central Supplier Database, with a CSD summary report submitted.
SARS tax pin submitted with the bid; tax status re-verified at recommendation stage.
CIPC company registration documents listing all members and their percentages (close corporations), or latest share certificates (companies).
Financial statements submitted as Annexure J.
B-bbee
Bidders with annual total revenue of R6 million or less (EME) must submit a certificate from a registered independent auditor, who must not be the bidder or part of the bidder, or from an accredited verification agency.
All other bidders must submit an original valid B-BBEE status level verification certificate or a certified copy.
B-BBEE status carries 20 of the 100 evaluation points; failure to submit the required evidence may disqualify the bid.
Professional registrations
Valid registration with SACPCMP, SACAP, SACQSP, ECSA, SAGC, SACPLAN or EAPASA as applicable to each discipline.
Where the registration document does not show the first-registration date or validity period, a supplementary document from the same regulatory body must be provided.
Registrations are verified online and may be subject to independent authenticity checks.
Declarations and undertakings
SBD 4 declaration of interest, disclosing any state employment or connection to the DBSA.
SBD 6.1 preference point claim supported by the B-BBEE certificate.
SBD 8 declaration of past supply chain management practices.
SBD 9 certificate of independent bid determination.
Signed Declaration of Default and Termination (Annexure L).
Contract Skills Development Goal undertaking (Annexure K).
Signed CIDB Standard Professional Services Contract and Scope of Work (Annexure M).
Conduct
No communication with DBSA staff outside the Tender Manager during the process.
No collusion or anti-competitive conduct between bidders.
Any conflict of interest must be disclosed immediately; failure to do so may result in disqualification.
Health & Safety
Source: 1. RFP190.2026 - PSP FOR THE DESIGNING AND CONSTRUCTION MONITORING OF SHARED SERVICES FACILITY.pdf
Construction Health and Safety Agent
Registration: SACPCMP Pr. CHSA
Minimum experience: five years
A detailed CV and valid professional registration document must be submitted with the bid
Environmental
Source: 1. RFP190.2026 - PSP FOR THE DESIGNING AND CONSTRUCTION MONITORING OF SHARED SERVICES FACILITY.pdf
Environmental Assessment Practitioner
Registration: EAPASA Reg. EAP
Minimum experience: 10 years post professional registration
A detailed CV and valid registration document must be submitted with the bid
Contractual Terms
Source: 1. RFP190.2026 - PSP FOR THE DESIGNING AND CONSTRUCTION MONITORING OF SHARED SERVICES FACILITY.pdf
Contract form
CIDB Standard Professional Services Contract (July 2009) Edition 3, CIDB Document 1014, together with the Scope of Work.
Bid status
Each bid is an irrevocable offer and must remain open for acceptance for 90 days from the closing time, extendable by written agreement.
A bid may not be conditional on board approval, due diligence, regulatory consent, third-party approval or a wish to negotiate commercial terms; conditional bids may be disregarded.
Selection as a preferred bidder creates no contract until a written contract is signed by the DBSA.
DBSA rights
Amend or add to the RFP before closing, suspend or terminate the process, accept a bid in whole or in part, negotiate, or decline to appoint if no compliant bid is received or funds are unavailable.
Seek clarification, hold discussions, request presentations, panel interviews, site visits or references.
Conduct an optional debriefing for successful and unsuccessful bidders.
Bidder obligations
Keep the RFP contents confidential and use them only to prepare the bid.
Bear all bid preparation costs.
Notify the DBSA promptly of any error in a submitted bid and of any conflict of interest that arises after submission.
All submitted bids become DBSA property, while intellectual property remains with the bidder and is licensed to the DBSA for evaluation.
Section
Source: 1. RFP190.2026 - PSP FOR THE DESIGNING AND CONSTRUCTION MONITORING OF SHARED SERVICES FACILITY.pdf
Four-stage evaluation: administrative responsiveness, then price and preference on the 80/20 system, functionality is not applicable, and finally risk analysis and objective criteria. Price carries 80 points using the comparative price formula, and B-BBEE status carries 20 points. The highest total out of 100 is recommended for award, subject to the DBSA's right to cancel or negotiate.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
1258 Lever Rd, Headway Hill, Midrand, 1685, South Africa
Document-Backed
Recently Synced
Source Snapshot Available
AI Enhanced
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
4
Last checked
18 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.