Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Issuing Organization
South African Nuclear Energy Corporation LimitedLocation
National
Closing Date
20 Jan 2027
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
R104 Elias Motsoaledi Street (Church Street West Ext) - Pelindaba - Madibeng Municipality - 0240
Organization Type
GOVERNMENT
Published
19 Nov 2026
OCDS Reference
ocds-9t57fa-178902
The south african nuclear energy corporation (necsa) requires a probabilistic seismic hazard assessment (psha) report for its proposed multi-purpose reactor (mpr) site at pelindaba. The work covers phase 1 deliverables—an inception package, a requirement evaluation log, and draft/final reports with a handover package—each priced as a lump sum in ZAR excluding VAT, with optional items (new field investigations, dsha, ground-motion analyses, peer review) priced separately and excluded from the base total unless instructed. Bidders must price the unpriced bill of quantities and clearly state assumptions, exclusions, key personnel, and programme; the most consequential consideration is that the boq does not prescribe applicable nuclear safety or licensing standards, so the consultant must identify and justify these in consultation with necsa and authorities.
Closing: 20 January 2027 at 09:00; submission method and address not stated in the source.
Pricing: complete the unpriced BOQ with lump-sum rates and amounts in ZAR excluding VAT; state VAT at 15% separately in the summary; optional/provisional items must be priced separately and excluded from the base total unless NECSA instructs otherwise in writing.
Scope: deliver the five Phase 1 items—inception package, requirement evaluation log, draft and final reports, and handover package—each as a lump sum with quantity 1.
Assumptions: bidder must state assumptions, exclusions, proposed key personnel and qualifications, programme, document-volume limits, number of meetings, review cycles, and required inputs from NECSA.
Costs: clearly identify as included or excluded—site access, security induction, permits, travel, accommodation, fieldwork, equipment, laboratory tests, data licences, and third-party costs.
Standards: the BOQ does not prescribe or confirm applicable nuclear safety, licensing, regulatory, or technical standards; the consultant must identify and justify applicable requirements in consultation with NECSA and relevant authorities.
Returnable documents: no forms specified beyond the completed, signed BOQ; any additional forms named in the full tender pack are not provided in the source.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Date & Time
Wednesday, 20 January 2027 - 11:00
Venue
Ms Teams
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Request for Bid(Open-Tender)
R104 Elias Motsoaledi Street (Church Street West Ext) - Pelindaba - Madibeng Municipality - 0240
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: CA(SA) - Chartered Accountant, PMI-PMP (Project Management Professional), Prince2 Practitioner, Six Sigma Certification
AI Document Analysis Stages
Description
19 Nov
2026
Tender Published
Tender was published
20 Jan
2027
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
2. SBD.docx
Necsa requires a Probabilistic Seismic Hazard Assessment (PSHA) report for the proposed Multi-Purpose Reactor (MPR) site. The work is procured under bid FIN-SCM-TEN-0262 and priced against an unpriced bill of quantities issued with the bid pack.
Copy of NECSA_MPR_Probablistic Seismic_Hazard_Assesment_BOQ_Unpriced (002).xlsx
Provision of a Probabilistic Seismic Hazard Assessment (PSHA) report for the proposed Multi-Purpose Research Reactor (MPR) at NECSA's Phelindaba site. The priced scope is structured as a Phase 1 package covering an inception package, a requirement evaluation log, and draft/final reports with handover, with hazard calculation work carried as optional provisional items.
6. SHEQ-INS-5450-REV5.0.pdf
5. SHEQ-INS-0100 Rev 9.0_NECSA Safety, Health and Environmental Policy.pdf
4. Necsa Confidentiality Agreement.pdf
1.Main.docx
Probabilistic Seismic Hazard Assessment (PSHA) for MPR Siting – Scope of Work.pdf
Necsa requires a Probabilistic Seismic Hazard Assessment (PSHA) for the proposed Multi-Purpose Reactor site at Pelindaba. The work produces the PSHA chapter for the Site Safety Report and an addendum covering the NEMA requirements for the Environmental Impact Assessment, drawing on the site's existing seismic, geotechnical and geophysical records.
7. SHEQ-INS-0102 Rev 4.0 Alcohol & Drugs Control Procedures.pdf
3. NECSA TERMS AND CONDITIONS OF CONTRACT REV 3 ..pdf
NECSA requires the provision of a Probabilistic Seismic Hazard Assessment (PSHA) Report for the proposed Multi-Purpose Reactor (MPR) site. The work is contracted under NECSA's standard terms and conditions of contract, with deliverables accepted against a schedule agreed in a Service Level Agreement. Bids close on 20 January 2027 at 11:00.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
South African Nuclear Energy Corporation LimitedSecure NECSA tenders with AI Matching & Recommendations, nuclear-science intelligence, compliance analysis, and structured support for research and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubWe refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
The department requires a Probabilistic Seismic Hazard Assessment (PSHA) report for the proposed Multi-Purpose Reactor (MPR) site at Pelindaba, South Africa. The work covers Phase 1 deliverables: inception, requirement evaluation, and draft/final reports with handover.
Important Dates
Source: Copy of NECSA_MPR_Probablistic Seismic_Hazard_Assesment_BOQ_Unpriced (002).xlsx (unknown)Closing: 20 January 2027 at 09:00.
Submission Guidelines
Source: Copy of NECSA_MPR_Probablistic Seismic_Hazard_Assesment_BOQ_Unpriced (002).xlsx (unknown)Returnable documents: none specified beyond the completed, signed BOQ and any forms named in the full tender pack (not provided here).
Submission method: not stated in the source.
Closing time: 09:00 on 20 January 2027 (from tender record).
Technical Specifications
Source: Copy of NECSA_MPR_Probablistic Seismic_Hazard_Assesment_BOQ_Unpriced (002).xlsx (unknown)Scope: Probabilistic Seismic Hazard Assessment (PSHA) report for the proposed Multi-Purpose Reactor (MPR) site at Pelindaba, South Africa.
Deliverables (Phase 1, each priced as a lump sum):
Optional/provisional items (price separately, exclude from base total unless instructed): additional work arising from the requirement evaluation, new field investigations, new seismicity catalogue development, DSHA, PSHA, ground-motion/site-response analyses, peer review.
The BOQ is a procurement schedule only; it does not establish site suitability or design-basis ground motion.
Financial Requirements
Source: Copy of NECSA_MPR_Probablistic Seismic_Hazard_Assesment_BOQ_Unpriced (002).xlsx (unknown)Pricing basis: lump sum per defined activity, in ZAR excluding VAT.
Bidder must enter rates and amounts in the unpriced BOQ.
VAT at 15% must be stated separately in the BOQ summary.
Base tender price excludes optional/provisional items unless NECSA instructs otherwise in writing.
Bidder must state assumptions, exclusions, programme, document-volume limits, number of meetings, review cycles, and required inputs from NECSA.
Site access, security induction, permits, travel, accommodation, fieldwork, equipment, laboratory tests, data licences and third-party costs must be clearly identified as included or excluded.
Compliance Requirements
Source: Copy of NECSA_MPR_Probablistic Seismic_Hazard_Assesment_BOQ_Unpriced (002).xlsx (unknown)No specific compliance requirements stated in the source. The consultant must identify and justify applicable nuclear safety, licensing, regulatory and technical standards in consultation with NECSA and relevant authorities.
Evaluation Criteria
Source: 3. NECSA TERMS AND CONDITIONS OF CONTRACT REV 3 ..pdf (unknown)Pricing Schedule
Source: 3. NECSA TERMS AND CONDITIONS OF CONTRACT REV 3 ..pdfFees are set out in the Pricing Schedule (Annexure E of the SLA) and are payable for full and complete performance of the services.
Financial Requirements
Source: 3. NECSA TERMS AND CONDITIONS OF CONTRACT REV 3 ..pdf (unknown)Compliance Requirements
Source: 3. NECSA TERMS AND CONDITIONS OF CONTRACT REV 3 ..pdf (unknown)Contractual Terms
Source: 3. NECSA TERMS AND CONDITIONS OF CONTRACT REV 3 ..pdfSection
Source: 3. NECSA TERMS AND CONDITIONS OF CONTRACT REV 3 ..pdfReports and deliverables are subject to a 7-day evaluation period after submission. If a nonconformity is found, the service provider must correct it at its own expense, after which NECSA has a further 7-day verification period. If NECSA does not notify the service provider of acceptance, the deliverables are deemed accepted after the evaluation or verification period expires.
Description
Source: Probabilistic Seismic Hazard Assessment (PSHA) for MPR Siting – Scope of Work.pdfThe purpose of this scope of work is to define the tasks, deliverables, responsibilities, and requirements for the Probabilistic Seismic Hazard Assessment (PSHA) of the proposed Multi-Purpose Reactor (MPR) site. The work will inform design-basis inputs for the reactor design, Site Safety Report (SSR), Environmental Impact Assessment (EIA), and Public Information Document (PID).
Important Dates
Source: Probabilistic Seismic Hazard Assessment (PSHA) for MPR Siting – Scope of Work.pdf (unknown)Final reports and handover package must be completed within 12 weeks from commencement. No specific dates are provided.
Contact Information
Source: Probabilistic Seismic Hazard Assessment (PSHA) for MPR Siting – Scope of Work.pdf (unknown)No contact details are provided in the scope of work document.
Submission Guidelines
Source: Probabilistic Seismic Hazard Assessment (PSHA) for MPR Siting – Scope of Work.pdf (unknown)Submission method and address are not stated in the scope of work document. Bidders must submit the returnable documents as required by the tender pack. The scope of work requires reports and registers in editable Word and Excel formats, with final signed PDF copies.
Evaluation Criteria
Source: Probabilistic Seismic Hazard Assessment (PSHA) for MPR Siting – Scope of Work.pdf (unknown)Evaluation is based on the proposed team's qualifications and relevant experience in PSHA for nuclear or similarly regulated sites. Bidders must demonstrate compliance with the listed regulatory and standards requirements. No scoring split or minimum qualifying score is stated.
Technical Specifications
Source: Probabilistic Seismic Hazard Assessment (PSHA) for MPR Siting – Scope of Work.pdf (unknown)Scope of work: Provide a Probabilistic Seismic Hazard Assessment (PSHA) for the proposed Multi-Purpose Reactor (MPR) site at Necsa Pelindaba. The assessment will inform design-basis inputs for the reactor design, Site Safety Report (SSR), Environmental Impact Assessment (EIA), and Public Information Document (PID).
Deliverables:
Experience & Qualifications
Source: Probabilistic Seismic Hazard Assessment (PSHA) for MPR Siting – Scope of Work.pdfBidders must provide evidence of the proposed team's qualifications and relevant experience in PSHA for nuclear or similarly regulated sites.
Quality Management
Source: Probabilistic Seismic Hazard Assessment (PSHA) for MPR Siting – Scope of Work.pdfThe following existing reports will be made available as inputs to the successful service provider:
Financial Requirements
Source: Probabilistic Seismic Hazard Assessment (PSHA) for MPR Siting – Scope of Work.pdf (unknown)Bidders must provide a priced breakdown covering mobilisation, specialist personnel, reporting, disbursements, and applicable taxes. No work outside the approved scope may be charged without prior written authorisation. No bid security, bonds, or guarantees are stated.
Compliance Requirements
Source: Probabilistic Seismic Hazard Assessment (PSHA) for MPR Siting – Scope of Work.pdf (unknown)Bidders must demonstrate compliance with the following regulations and standards, as applicable:
No CSD, tax, B-BBEE, or CIDB requirements are stated in the scope of work.
Environmental
Source: Probabilistic Seismic Hazard Assessment (PSHA) for MPR Siting – Scope of Work.pdfThe PSHA work must provide an addendum to cover NEMA requirements for the Environmental Impact Assessment (EIA). The EIA Addendum Report must close identified gaps on NEMA requirements.
Description
Source: 2. SBD.docxThe tender is for the provision of a Probabilistic Seismic Hazard Assessment (PSHA) Report for the proposed Multi-Purpose Reactor (MPR) site. The report must be delivered as per the specifications and the unpriced bill of quantities.
Important Dates
Source: 2. SBD.docx (unknown)Closing date: 20 January 2027 at 11:00
Contact Information
Source: 2. SBD.docx (unknown)Bidding procedure enquiries:
Submission address:
Necsa Gate 3
R104 Elias Motsoaledi Street (Church Street West Ext)
Pelindaba
Submission Guidelines
Source: 2. SBD.docx (unknown)Submission method: deposit the bid in the bid box at Necsa Gate 3, R104 Elias Motsoaledi Street (Church Street West Ext), Pelindaba, before the closing time. Late bids will not be accepted. Bids must be submitted on the official forms provided and not re-typed. The successful bidder must complete and sign the SBD 7.1 contract form.
Returnable forms (all must be completed and signed):
Disqualification risks:
Evaluation Criteria
Source: 2. SBD.docx (unknown)Preference point system: 90/10 or 80/20, to be determined by the lowest acceptable tender once bids are received.
Technical Specifications
Source: 2. SBD.docx (unknown)The scope is the provision of a Probabilistic Seismic Hazard Assessment (PSHA) Report for the proposed Multi-Purpose Reactor (MPR) site. The pricing schedule references the unpriced bill of quantities file: Necsa_MPR_Probabilistic_Seismic_and_Hazard_AssessmentBOQ_Unpriced.xls. Bidders may add or remove activities on the pricing table as necessary, referencing that file.
Financial Requirements
Source: 2. SBD.docx (unknown)Pricing must be submitted on SBD 3.1, with all applicable taxes included. The offer must remain valid for a stated number of days from the closing date. No bid security, bonds, guarantees, retention, or payment terms are specified in the provided document.
Compliance Requirements
Source: 2. SBD.docx (unknown)Tax compliance: submit a SARS Tax Compliance Status PIN or a printed TCS certificate. If no TCS PIN is available, provide a CSD number. For consortia, joint ventures, and subcontractors, each party must submit a separate TCS certificate, PIN, or CSD number.
B-BBEE: a B-BBEE status level verification certificate or sworn affidavit (for EMEs and QSEs) must be submitted to qualify for preference points.
State employment: bids from persons in the service of the state, or companies/close corporations with directors/members in the service of the state, will not be considered.
Register for Tender Defaulters / List of Restricted Suppliers: bidders listed are automatically disqualified.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
R104 Elias Motsoaledi Street (Church Street West Ext) - Pelindaba - Madibeng Municipality - 0240
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
9
Last checked
20 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Learn how to submit a winning bid with these related articles
Win consulting, legal, accounting, and engineering service contracts with government. Learn registration requirements and proposal strategies.
Comprehensive guide to Institute of IT Professionals South Africa membership. Certification levels, requirements for ICT professionals, and how IITPSA membership enhances credibility for SITA and government IT tenders.
A strategic guide to getting listed on government consultancy, legal, and engineering panels. Learn why panels are the gateway to steady public sector work.
Master the art of the consulting bid. How to structure your methodology, price your services competitively, and score maximum evaluation points.
💡 Want more tendering tips and strategies?
Explore Our BlogMedian Estimate
R 795 166
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Get deep intelligence on Other professional, scientific and technical activities. Unlock full pricing strategies, bid frequency, and historical win rates.