Tender Type
Request for Bid(Open-Tender)
Delivery Location
1 Refinery Road - Prospecton - Isiphingo - 4001
Organization Type
GOVERNMENT
Published
27 Aug 2026
OCDS Reference
ocds-9t57fa-167213
Cef (pty) ltd invites tenders for the hire of compressors at the sanpc refinery in kwazulu-natal for a 36-month period. The tender will be evaluated on the 80/20 preference point system (price 80 points, specific goals 20 points).
Closing date: 16 September 2026 at 12:00 (South African time).
Preference point system: 80/20 — price 80 points, specific goals 20 points.
Specific goals and maximum points: Black ownership ≥51% (10 points), Women ownership ≥51% (5 points), Youth ownership ≥51% (3 points), Disability ownership ≥10% (2 points).
Mandatory returnable form: SBD 6.1 (Preference Points Claim Form) — must be completed, signed and submitted with supporting proof for any goals claimed; failure to submit proof means points are not claimed.
Bidders must be registered on the Central Supplier Database (CSD) and hold a valid SARS tax clearance certificate or tax compliance status pin.
The organ of state may require substantiation of any preference claim at any time; fraudulent claims may lead to disqualification, cost recovery, contract cancellation, restriction from state business for up to 10 years, and criminal prosecution.
Submission method and address: not stated in the provided document.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Wednesday, 16 September 2026 - 12:00
Venue
1 Refinery Road, Prospecton, Durban, 4001
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Categories
Request for Bid(Open-Tender)
1 Refinery Road - Prospecton - Isiphingo - 4001
AI Document Analysis Stages
Description
Source: 7. Pricing Schedule.xlsx27 Aug
2026
Tender Published
Tender was published
16 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
6. CEF KYC Questionnaires.pdf
CEF SOC Ltd is seeking a service provider to supply compressor hire services at the SANPC Refinery for a 36-month period.
2. Scope of work and evaluation criteria.pdf
CEF (Pty) Ltd seeks a service provider to hire mobile compressors for the SANPC Refinery for a 36-month period. The contract covers routine daily usage and project/shutdown/turnaround activities, requiring both normal and high-pressure compressors with associated equipment such as moisture traps, manifolds, and hoses. The service provider must supply, maintain, and support the equipment on-site in compliance with strict safety, technical, and operational standards.
7. Pricing Schedule.xlsx
CEF (Pty) Ltd invites tenders for the appointment of a service provider to supply compressor hire services at the SANPC Refinery for a 36-month period. The scope covers the hire of various diesel-driven compressors ranging from 260 CFM to 952 CFM at 25 Bar, large moisture traps, oil-injected manifolds, and associated high-pressure layflat hoses, together with mobilisation and demobilisation transport.
3. SBD1 - Invitation To Bid.pdf
CEF (Pty) Ltd invites bids for the appointment of a service provider to supply compressor hire services at the SANPC Refinery for a 36-month period. Bids must be submitted electronically by the specified closing date and time.
4. SBD 4 - Bidders disclosure.pdf
CEF (Pty) Ltd is seeking a service provider for compressors hire services at the SANPC Refinery for a 36-month period. The tender is a national request for tender (RFT) with a closing date of 16 September 2026.
5. SBD 6.1 - Preference points claim form.pdf
CEF (Pty) Ltd is appointing a service provider for compressors hire services at the SANPC Refinery for a period of 36 months.
1. RFP document.pdf
CEF (SOC) Ltd invites tenders for the hire of compressors at the SANPC Refinery in Durban for a 36-month period. The tender follows a three-phase evaluation: mandatory compliance, technical assessment, and price with specific goals.
To download these documents and access AI-powered analysis, visit the main tender page.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubNot enough data available to generate an estimate for this tender type.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Commercial bid breakdown pricing and bill of quantities for compressor hire services at SANPC Refinery over 36 months, detailing equipment types, quantities, hire rates per 24-hour period, annual operating days, and mobilisation/demobilisation costs.
Evaluation Criteria
Source: 7. Pricing Schedule.xlsx (unknown)No eligibility criteria specified
Technical Specifications
Source: 7. Pricing Schedule.xlsx (unknown)Compressor hire services required at SANPC Refinery for 36 months:
Mobilisation and demobilisation (return trips):
Note: Contract value calculation is for internal contract management only; not a guarantee of allocated work. SANPC Refinery accepts no liability for accuracy of quantities and will not entertain claims.
Financial Requirements
Source: 7. Pricing Schedule.xlsx (unknown)Pricing schedule requires rates per hired equipment (24 hours) for each item. Cost breakdown structured per year (Year One, Year Two, Year Three) with subtotal, VAT, and total contract amount including VAT. All rates to be quoted in the provided bill of quantities format.
Compliance Requirements
Source: 7. Pricing Schedule.xlsx (unknown)No specific requirements found
Important Dates
Source: 1. RFP document.pdf (TENDER){"closingDate":"16 SEPTEMBER 2026","closingTime":"11:00AM","briefingSession":"{"date":"03 SEPTEMBER 2026","time":"11:00AM","venue":"E: 16 SEPTEMBER 2026 @12H00, MIDDAY","is_compulsory":true}"}
Contact Information
Source: 1. RFP document.pdf (TENDER){"name":null,"email":"[email protected]","phone":null,"department":", specific person for this RFT on any matter relating","address":"ereinafter"}
Submission Guidelines
Source: 1. RFP document.pdf (TENDER)Returnable Documents: Returnable Documents means all the documents, Parts and Annexures, as listed in the tables below., Returnable Documents Failure to submit Returnable Documents at the closing date and time of this tender may result in a bidder’s disqualification. Bidders are therefore urged to ensure that all these documents are returned with their Proposals. Please confirm submission of the Returnable Documents detailed below by so indicating [Yes or No] in the table below: RETURNABLE DOCUMENTS YES NO Valid SARS tax compliance status [Consortia / Joint Ventures must submit a separate Tax compliance status for each party] Valid BBBEE affidavit/certificate Lease Agreement / Municipal Utility Bills / Copy of local council letter / Local Royal council proof of address with business addresses. CSD Summary Report or CSD supplier number (MAAA....................) PART 3 : Proposal Form PART 4 : Signing Power - Resolution of Board of Directors of 16 RETURNABLE DOCUMENTS YES NO PART 5 : Certificate of Acquaintance with RFT Documents PART 6 : Certificate of Acquaintance with Scope of Work PART 7 : Breach of Law Form SBD 1 Invitation to bid SBD 4 Bidders disclosure SBD 6.1: Preference points claim form in terms of the preferential procurement regulations 2022 CONTINUED VALIDITY OF RETURNABLE DOCUMENTS The successful Bidder will be required to ensure the validity of all returnable documents, including but not limited to its Tax compliance status for the duration of any contract emanating from this RFT. Should the Bidder be awarded the contract [the Agreement] and fail to present CEF (SOC) Ltd with such renewals as and when they become due, CEF (SOC) Ltd shall be entitled, in addition to any other rights and remedies that it may have in terms of the eventual Agreement, to terminate such Agreement forthwith without any liability and without prejudice to any claims which CEF (SOC) Ltd may have for damages against the Bidder. By signing these RFT documents, the Bidder is deemed to acknowledge that he/she has made himself/herself thoroughly familiar with all the conditions governing this RFT, including those contained in any printed form stated to form part hereof, and CEF (SOC) Ltd SOC Ltd will recognise no claim for relief based on an allegation that the bidder overlooked any such condition or failed properly to take it into account for the purpose of calculating tendered prices or otherwise. of 16 PART 4: SIGNING POWER – RESOLUTION OF BOARD OF DIRECTORS NAME OF ENTITY: ______________________________________________ It was resolved at a meeting of the Board of Directors held on ____________ that FULL NAME(S) CAPACITY ________________________ ______________________________ ________________________ ______________________________ ________________________ ______________________________ _______________________ ______________________________ in his/her capacity as indicated above is/are hereby authorised to enter into, sign, execute and complete any documents relating to this Proposal and any subsequent Agreement for the provision of Services. A list of those person(s) authorised to negotiate on behalf of the abovementioned entity [if not the authorised signatories] is also submitted along with this Proposal together with their contact details. FULL NAME ________________________ __________________________ SIGNATURE CHAIRMAN FULL NAME _________________________ __________________________ SIGNATURE SECRETARY of 16 PART 5: CERTIFICATE OF ACQUAINTANCE WITH RFT DOCUMENTS NAME OF ENTITY: ___________________, I/We _____________________________________________________ do hereby certify that I/we acquainted myself/ourselves with all the documentation comprising this RFT and all conditions contained therein, as laid down by CEF (SOC) Ltd SOC Ltd for the carrying out of the proposed service for which I/we submitted my/our Proposal., I/we furthermore agree that CEF (SOC) Ltd shall recognise no claim from me/us for relief based on an allegation that I/we overlooked any RFT/contract condition or failed to take it into account for the purpose of calculating my/our offered prices or otherwise., I/We accept that an obligation rests on me/us to clarify any uncertainties regarding this Tender which I/we may have, before submitting the Tender. I/We agree that I/we will have no claim based on an allegation that any aspect of this RFT was unclear but in respect of which I/we failed to obtain clarity., I/we understand that the accompanying Tender will be disqualified if this Certificate is found not to be true and complete in every respect., For the purposes of this Certificate and the accompanying Tender, I/we understand that the word “competitor” shall include any individual or organisation, other than the Bidder, whether or not affiliated with the Bidder, who, Has been requested to submit a Tender in response to this Tender invitation., Could potentially submit a Tender in response to this Tender invitation, based on their qualifications, abilities or experience; and, Provides the same Services as the Bidder and/or is in the same line of business as the Bidder., The Bidder has arrived at the accompanying Tender independently from, and without consultation, communication, agreement or arrangement with of 16 any competitor. However, communication between partners in a joint venture or consortium will not be construed as collusive Tendering., In particular, without limiting the generality of paragraph 5 above, there has been no consultation, communication, agreement or arrangement with any competitor regarding, Geographical area where Services will be rendered [market allocation], Methods, factors or formulas used to calculate prices;, The intention or decision to submit or not to submit, a Tender;, The submission of a Tender which does not meet the scope of work and conditions of the RFT; or, Tendering with the intention of not winning the Tender., In addition, there have been no consultations, communications, agreements or arrangements with any competitor regarding the quality, quantity, scope of work and conditions or delivery particulars of the Services to which this RFT relates., The terms of the accompanying Tender have not been, and will not be, disclosed by the Bidder, directly or indirectly, to any competitor, prior to the date and time of the official Tender opening or of the awarding of the contract., I/We am/are aware that, in addition and without prejudice to any other remedy provided to combat any restrictive practices related to tenders and contracts, Tenders that are suspicious will be reported to the Competition Commission for investigation and possible imposition of administrative penalties in terms of Part 59 of the Competition Act No and/or may be reported to the National Prosecuting Authority [NPA] for criminal investigation and/or may be restricted from conducting business with the public sector for a period not exceeding 10 [ten] years in terms of the Prevention and Combating of Corrupt Activities Act No or any other applicable legislation. SIGNED at ___________________________ on this _____ day of 20 _____________________________ __________________ SIGNATURE OF WITNESS SIGNATURE OF BIDDER of 16 PART 6: CERTIFICATE OF ACQUAINTANCE WITH SCOPE OF WORK I/We ________________________________________________________ do hereby certify that I/we acquainted myself/ourselves with all the documentation comprising the Scope of Work for the carrying out of the proposed Services for which I/we submitted my/our Proposal. I/We furthermore agree that CEF (SOC) Ltd SOC Ltd shall recognise no claim from me/us for relief based on an allegation that I/we overlooked any provisions of the Scope of Work or failed to take it into account for the purpose of calculating my/our offered prices or otherwise. I/We confirm having been advised that a signed copy of this Schedule can be submitted in lieu of the Scope of Work as confirmation in terms of the Returnable Schedule. SIGNED at ___________________________ on this _____ day of 20 _____________________________ ___________________ SIGNATURE OF WITNESS SIGNATURE OF BIDDER of 16 PART 7: BREACH OF LAW FORM NAME OF ENTITY: ___________________________________________________ I/We do hereby certify that I/we have/have not been [delete as applicable] found guilty during the preceding 5 [five] years of a serious breach of law, including but not limited to a breach of the Competition Act, , by a court of law, tribunal or other administrative body. The type of breach that the Bidder is required to disclose excludes relatively minor offences or misdemeanours, e.g. traffic offences. Where found guilty of such a serious breach, please disclose: NATURE OF BREACH: _______________________________________________________________________________ _______________________________________________________________________________ ______________________________________________ DATE OF BREACH: ____________________________________________________________________ Furthermore, I/we acknowledge that CEF (SOC) Ltd SOC Ltd reserves the right to exclude any Bidder from the Tendering process, should that person or entity have been found guilty of a serious breach of law, tribunal or regulatory obligation. SIGNED at _____________________ on this _____ day of _____________________20 _____________________________ ___________________ SIGNATURE OF WITNESS SIGNATURE OF BIDDER of 16
Evaluation Criteria
Source: 1. RFP document.pdf (TENDER)Bidder must be registered on the Central Supplier Database (CSD). Valid SARS tax compliance status or tax verification PIN must be submitted (each JV/consortium party separately). Valid B-BBEE affidavit or certificate required. Proof of business address (lease agreement, municipal utility bill, or council letter) required. No serious breach of law (including Competition Act) in the preceding five years — declaration required in Part 7. Signing authority must be evidenced by a Board Resolution (Part 4). All returnable documents (Parts 3–7, SBD 1, SBD 4, SBD 6.1) must be submitted by closing date and time.
Technical Specifications
Source: 1. RFP document.pdf (TENDER)Appointment of service provider for
Compressors hire services
Compliance Requirements
Source: 1. RFP document.pdf (TENDER)Tax compliance status and / or proof of
tax compliance
tax compliance status [Consortia / Joint Ventures must
Tax compliance status for each party]
Tax compliance status for the duration
power of attorney to sign any contract, which
particular, please note that CEF (SOC) Ltd reserves the right to
NB: Links will not be accepted, it will lead to disqualification.
B-BBEE Details: he documents, Parts and Annexures, as listed in
the tables below.
a) Returnable Documents
Failure to submit Returnable Documents at the closing date and time of this
tender may result in a bidder’s disqualification. Bidders are therefore urged
to ensure that all these documents are returned with their Proposals.
Please confirm submission of the Returnable Documents detailed below by
so indicating [Yes or No] in the table below:
Returnable documents yes NO
Valid SARS tax compliance status [Consortia / Joint Ventures must
submit a separate Tax compliance status for each party]
Valid BBBEE affidavit/certificate
Lease Agreement / Municipal Utility Bills / Copy of local council letter
/ Local Royal council proof of address with business addresses.
CSD Summary Report or CSD supplier number (MAAA....................)
PART 3 : Proposal Form
PART 4 : Signing Power - Resolution of Board of Directors
of 16
Returnable documents yes NO
PART 5 : Certificate of Acquaintance with RFT Documents
PART 6 : Certificate of Acquaintance with Scope of Work
PART 7 : Breach of Law Form
SBD 1 Invitation to bid
SBD 4 Bidders disclosure
SBD 6.1: Preference points claim form in terms of the preferential
procurement regulations 2022
Continued validity of returnable documents
The successful Bidder will be required to ensure the validity of all returnable
documents, including but not limited to its Tax compliance status for the duration
of any contract emanating from this RFT.
Should the Bidder be awarded the contract [the Agreement] and fail to present
CEF (SOC) Ltd with such renewals as and when they become due, CEF (SOC) Ltd
shall be entitled, in addition to any other rights and remedies that it may have in
terms of the eventual Agreement, to terminate such Agreement
Health & Safety
Source: 1. RFP document.pdfyour Proposal.
shall be deemed to be offers. Any exceptions to this statement must be
clearly and specifically indicated.
be in full and complete compliance with all applicable laws and
regulations.
CEF (SOC) Ltd will utilise the following methodology and criteria in selecting a
preferred Service Provider, if so required:
Phase 1: Mandatory requirements.
Phase 2: Technical evaluation requirements.
Phase 3: Evaluation on Price and specific goals.
of 16
Part 3: proposal form
I/We____________________________________________________________________
[name of entity, company, close corporation or partnership]
of [full address]
carrying on business trading/operating as
represented by_____________________________________________________________
in my capacity as ___________________________________________________________
being duly authorised thereto by a Resolution of the Board of Directors or Members
or Certificate of Partners hereby offer to provide the abovementioned Services at
the prices quoted in the schedule of prices in accordance with the terms set forth
in the documents listed in the accompanying schedule of RFT documents.
I/We agree to be bound by those conditions in CEF (SOC) Ltd’s:
(i) Contract Conditions (to be available for the successful Bidder
I/We accept that unless CEF (SOC) Ltd should otherwise decide and so inform
me/us in the letter of appointment, this Proposal [and, if any, its Annexures and
Appendices], together with CEF (SOC) Ltd’s acceptance thereof shall constitute a
binding contract between CEF (SOC) Ltd and me/us.
Should CEF (SOC) Ltd decide that a formal contract should be signed and so
inform me/us in a letter of appointment, this Proposal, Purchase Order [and, if any,
its Annexures and Appendices] shall constitute a binding contract between CEF
(SOC) Ltd and me/us until the formal contract is signed.
Contractual Terms
Source: 1. RFP document.pdfPart 1: notice to bidders .......................................................................................................................... 4
1 invitation to tender .......................................................................................................................... 4
2 briefing session .................................................................................................................................. 4
3 delivery instructions for rft ........................................................................................................... 4
4 communication ................................................................................................................................ 4
5 instructions for completing the rft .............................................................................................. 5
6 repudiations ....................................................................................................................................... 5
7 reasons for disqualification ......................................................................................................... 6
8 legal review ....................................................................................................................................... 6
Part 2: background, overview and scope of requirements .............................................................. 7
Background of the project/scope of work ............................................................................... 7
General service provider obligations .......................................................................................... 7
Evaluation methodology ............................................................................................................... 7
Part 3: proposal form .............................................................................................................................. 8
Part 4: signing power – resolution of board of directors ............................................................. 12
Part 5: certificate of acquaintance with rft documents ................................................................ 13
Part 6: certificate of acquaintance with scope of work ............................................................... 15
Part 7: breach of law form ................................................................................................................... 16
Bidders are hereby advised that CEF (SOC) Ltd is not committed to any course of
action as a result of its issuance of this RFT and/or its receipt of proposals. In
particular, please note that CEF (SOC) Ltd reserves the right to:
changes.
work which are detailed herein.
date];
Not necessarily accept the lowest priced proposal or an alternative tender.
Reject all proposals, if it so decides.
Withdraw the RFT on good cause shown.
Award a contract in connection with this proposal at any time after the RFT’s
closing date.
reflected in the scope of this RFT.
Split the award of the contract between more than one bidder; or
Make no award of a contract.
Remove or add scope of work during the contract period.
In addition, CEF (SOC) Ltd reserves the right to exclude any bidder from the
tendering process who has been found guilty of a serious breach of law during the
preceding 5 [five] years, including but not limited to breaches of the Competition
the past 5 [five] years in Part 7 [Breach of Law].
of 16
Furthermore, CEF (SOC) Ltd reserves or its authorised representatives to conduct a
“due diligence” on tender(s) regarding the Bidder’s legal and empowerment
status, technical ability, creditworthiness, security clearance, etc. By submitting a
tender, bidder (s) undertakes to co-operate fully in this regard, within two days of
receiving notification from CEF (SOC) Ltd.
CEF (SOC) Ltd reserves the right to undertake post-tender negotiations [PTN] with
selected bidders or any number of short-listed bidders, such PTN to include, at CEF
(SOC) Ltd’s option, any evaluation criteria listed in this RFT document.
CEF (SOC) Ltd reserves the right to award the business to the highest scoring
bidder/s unless objective criteria justify the award to another bidder.
Kindly note that CEF (SOC) Ltd will not reimburse any bidder for any preparatory
costs or other work performed in connection with its proposal, whether or not the
bidder is awarded a contract.
terms of this RFT, including those mentioned above, will constitute a material
breach of contract and provide CEF (SOC) Ltd with cause for cancellation.
PART 5 : Certificate of Acquaintance with RFT Documents
PART 6 : Certificate of Acquaintance with Scope of Work
PART 7 : Breach of Law Form
SBD 1 Invitation to bid
SBD 4 Bidders disclosure
SBD 6.1: Preference points claim form in terms of the preferential
procurement regulations 2022
documents, including but not limited to its Tax compliance status for the duration
of any contract emanating from this RFT.
Should the Bidder be awarded the contract [the Agreement] and fail to present
CEF (SOC) Ltd with such renewals as and when they become due, CEF (SOC) Ltd
shall be entitled, in addition to any other rights and remedies that it may have in
terms of the eventual Agreement, to terminate such Agreement forthwith without
any liability and without prejudice to any claims which CEF (SOC) Ltd may have for
damages against the Bidder.
of 16
Part 7: breach of law form
Name of entity: ___________________________________________________
I/We_______________________________________________________________
do hereby certify that I/we have/have not been [delete as applicable] found guilty
during the preceding 5 [five] years of a serious breach of law, including but not
limited to a breach of the Competition Act, , by a court of law, tribunal
or other administrative body. The type of breach that the Bidder is required to
disclose excludes relatively minor offences or misdemeanours, e.g. traffic offences.
Furthermore, I/we acknowledge that CEF (SOC) Ltd SOC Ltd reserves the right to
exclude any Bidder from the Tendering process, should that person or entity have
been found guilty of a serious breach of law, tribunal or regulatory obligation.
SIGNED at _____________________ on this _____ day of
_____________________20
Section
Source: 1. RFP document.pdfAnnexure B: Evaluation criteria
SBD 6.1: Preference points claim form in terms of the preferential
or arrangements with any competitor regarding the quality, quantity, scope
Phase 2: Technical evaluation requirements.
Phase 3: Evaluation on Price and specific goals.
Submission Guidelines
Source: 4. SBD 4 - Bidders disclosure.pdf (TENDER)Returnable forms — all must be completed, signed and submitted with the bid:
Compliance Requirements
Source: 4. SBD 4 - Bidders disclosure.pdf (TENDER)Mandatory disclosures required with the bid:
Contact Information
Source: 2. Scope of work and evaluation criteria.pdf (unknown){"name":null,"email":null,"phone":null,"department":") before","address":null}
Evaluation Criteria
Source: 2. Scope of work and evaluation criteria.pdf (unknown)Bidders must comply with all mandatory requirements: submit valid inspection and testing records for pressure relief valves and pressure vessels (air receivers) for all listed compressors, signed off by a registered Approved Inspection Authority (AIA); provide a valid Compensation Fund certificate; and submit a valid Technician Trade Test certificate from an approved institution. Technical evaluation requires a minimum 70% score based on: reference letters (5 max) from refineries or MHI manufacturing firms (2020–present) for mobile compressor hire; assigned technician’s CV showing compressor repair experience (6+ years for full points); and a submitted SLA defining critical breakdown response times. Failure to meet any mandatory requirement or the 70% technical threshold results in disqualification.
Technical Specifications
Source: 2. Scope of work and evaluation criteria.pdf (unknown)1.1 The scope of work covers the hire of mobile compressors to support
operational activities planned by SANPC Refinery. Works will include all
major and minor maintenance and project related activities where
compressed air is required.
1.2 The service will be provided for SANPC Refinery and its sub-contractor
companies with whom SANPC Refinery has contracted.
1.3 Coordination of compressors at SANPC Refinery is the responsibility of SANPC
Zone Planner who will coordinate movements of the equipment on site, as
well as keep abreast of utilisation of the equipment. During turnarounds (TA),
the organization will manage the compressor requirements but informs
compressor lead with status and updates.
1.4 The contractor must be in a possession of a valid permit to transport
compressors on public roads.
1.5 The contractor shall supply all labour, supervision, consumables, materials,
equipment, instruments, tools, services and transport required for performing
the works. With the exception of the works that may deviate from this norm,
the scope of that work will be more specifically described in each work
order.
1.6 The contractor must be compliant with the OHSA regulations as well as the
relevant SANS codes requirements which include SANS 12100: 2013 and
SANS 347.
1.7 Work performed and/or services rendered will be measured and
remuneration shall be based on the Schedule of prices.
1.8 The contractor shall not, without the prior written consent of SANPC Refinery
make any alteration or addition to this Scope of Work.
2.1 The contractor services comprise the provision of compressors for both routine
daily usage and project/shutdown/turnaround usage. Both normal pressure
and high pressure compressors are required.
2.2 The contractor shall have the technical support and expertise to supply
of 13
professional advice and to design and approve special requirements on an ad
hoc basis.
2.3 A maintenance support crew, conversant with all faults related to the
contractors mobile compressors supplied, must be available, with a
contingency plan in place in the event of absenteeism.
2.4 The contractor will be expected to have a turnaround time of 24 hours on
machine delivery, unless there is an upfront discussion on supply constraints to
be agreed to by both parties.
2.5 All mobile compressors must be inspected by EMS (Fire Department) before
being allowed on site and must then display the relevant colour coded
inspection sticker.
2.6 All mobile compressors must have an exhaust system that is in good working
order. Exhaust pipes shall be at least 30 cm long and vent straight up i.e. not
bent or curved. A spark arrestor with certification must be fitted to the exhaust.
2.7 Compressors to have no fuel or oil leaks.
2.8 All machine guards are to be in place.
2.9 Double pole battery isolator must be fitted with the battery enclosed.
2.10 Air intake shut off valve to be present.
2.11 Safety devices to be fitted to avoid overpressure.
2.12 Proof of certification of the pressurized vessel components of the compressor to
be available upon request.
2.13 Proof of certification of the pressurized hoses to be available upon request.
2.14 The contractor is responsible for planning and co-ordinating the servicing of
compressors on site. Replacement units are expected to be in place before
removal off site to maintain continuity of supply.
2.15 All hose connections shall be fitted with “hose restrainers”. All hoses including
diesel hoses to be crimped (no jubilee clamps)
2.16 Drip trays must be provided under all machine parts that could leak fuel or oil.
2.17 Whenever possible the machine shall be placed down wind of the people to
protect them from exposure to the exhaust fumes.
2.18 An emergency stop button must be easily accessible and visible to shut down
the machine in case of an emergency.
2.19 Machines should be a roadworthy condition with all tyres in a good condition
and lights operable.
2.20 The equipment is to be prevented from accidental movement by adequate
brakes and chocking blocks.
2.21 Any decanting of fuel into equipment shall be done using approved metal
funnels, fuel cans, and hoses with electrical continuity. Prevent static electricity
by earthing the machine to ground, by earthing the container to the machine
or by placing the container on the ground (recorded in the Method statement
& Risk Assessment).
2.22 The contractor will be notified telephonically and or via email of machine
demobilisation. The hiring cost of the machine stops immediately after the
notification and the contractor is expected to collect the machine within 24
hours after that point.
of 13
2.23 In the event of a compressor on SANPC Refinery site breaking down, the
contractor is expected to send a qualified mechanic to resolve the issue within
4 hours or to send a replacement machine with the same time period.
2.24 The following is the number of compressors and related equipment:
No Description Quantity Estimated Number of days
the item will be used.
1 d260 cfm 5 240
2 d400 cfm 2 200
3 d800 cfm 3 50
4 LMT (Large Moisture Trap ) over 400 CFM to
1200Cfm 3 200
5 OIM( Oil injected manifold -3/4 x6 puls 2 x 2 Outlet 1 240
6 H952 CFM/25 Bar (Oil Injected Compressor -Diesel
7 XH 2 Inch /LF (Hoses - 2 Inc Oroflex X 15 m Layflat
Hose 1 100
8 OFH 2 Inch (Oil free Hoses - 2Inch x 5m HhIGH Press
Layflat Hose 6 100
3 scope of the works - general
3.1 The work as generally described may be carried out in various areas across
SANPC Refinery site and mainly consists of but not limited to the following:
3.1.1 South Tank Farm (STF)
3.1.2 Northern Tank Farm (NTF)
3.1.3 Bitumen
3.1.4 Solvents
3.1.5 LPG Gas
3.1.6 Process Plants (NZ, SZ, CZ)
3.1.7 Oil Movements
3.1.8 Utilities
3.1.9 Offsites
However, SANPC Refinery may require the contractor to carry out work outside
the SANPC Refinery precinct such as along the path of SANPC Refinery transfer
lines to the Island View Terminal.
3.2 Workflow
The description given below defines the general requirements particular to
the scope of the works and is to be read in conjunction with the other
of 13
documents forming the Tender and/or the agreement as the case may
be. Procedures for job car d shall follow the sequence of events as per
Central Planning Workflow and as outlined in 3.1.1 to 3.1.10 below:
3.2.1
a) SANPC Refinery normally uses individual job card numbers to apportion
the works. The contractor will be required to use the job card system for
call-offs (pricing) and the SANPC Refinery job card system for progress
reporting of the works in conjunction with the duly authorised SANPC
Refinery Zone Supervisor. SANPC Refinery will provide the level 1 schedule
(overall schedule – early start and late finish) for the contractors planning
and execution.
b) The contractor is required to provide man-hours expended to execute
the work from the schedule of prices, and compare against those listed
in the man-hour norms for the job. The overall schedule will be
compared against the initially agreed schedule.
c) This information will be used in the KPI measures.
3.2.2 The SANPC Refinery Area Engineer or the duly authorised person , together
with the Zone Supervisor identifies the required maintenance work, where
after a priority is placed against each maintenance activity.
Maintenance prioritisation table
Priority priority/risk level start date initial completion period
C Routine Request Date + 30 days 3 Months
B Routine Request Date + 14 days 1 Month
A Schedule Breaker Request Date + 1 days 1 Week
E Emergency Immediate ASAP + Overtime
Priorities A, B, C & E are scoped by the respective Zone Scooper or the discipline Artisan.
A job card number is assigned to the scope and job card is issued to the contractor
Emergency Status Classification will be the ‘A’ and ‘E’ priority jobs. In such a case the Area
Engineer agrees upon the staffing and general planning requirements with his execution Team
(Scoper, Planner, Zone Supervisor and the Contractor). The Area Engineer confirms
the release of the works and identifies which lower priority job(s) can be postponed to
accommodate the Emergency priority job.
a) An ‘E’ priority job is supposed to commence immediately and shift work is to
be effected, and an ‘A’ priority job will require the contractor to commence
within 24hrs of receiving the scoping form and order number. An ‘A’ priority
of 13
job may require extended hours to be undertaken by the dayshift crew.
b) In the event that the contractor resources in the Zone are insufficient for the
Emergency Job, then the Area Engineer is to be consulted as he/she has
overview of all resources and is in the position of suggesting what jobs across
site could be postponed to accommodate the ‘E’ priority job.
c) For an ‘E’ priority job after hours, the Planner is to immediately issue a Manual
job card for the work to start. In the event the ‘E’ priority job occurs outside
of normal working hours, the system generated job card with a valid job card
number will be issued at the beginning of the next normal working day.
d) The contractor is expected to obtain the necessary permits and proceed
with the works. The workflow from here shall proceed in the same manner as
for normal priority works.
3.2.3 For (A, B, C & E) priority work a scope of work package, in the form of a
Contractor Work Request (CWR), is generated in SAGE by the Area Scoper.
A job cardis generated by the Zone Scoper and followed up with a manual
scoping form to the contractor. The contractor estimates the cost and man
hours for a CWR, in accordance with the Schedule of prices, and returns
the estimated CWR in electronic format to the Area Engineer. The Area
Engineer evaluates and awards the contractors estimated CWR.
a) When awarded, the contractor compiles a Work Pack which includes the
relevant drawings and Material Take-off’s (MTO’s) etc.
b) The Contractor’s supervisor is required to facilitate the generation of the
Safety Certificate.
3.2.4 After confirmation with all relevant parties in the Weekly planning meeting,
the Planner issues a seven day look-ahead level 1 schedule. From that
schedule, job cards will be issued to the relevant contractor. The seven day
schedule will be extracted from the monthly schedule.
a) The contractor is to ensure that permits are obtained at the latest by close
of business of the day prior to the planned start date.
c) Thereafter the contractor is to get daily clearances for each activity from
the respective Maintenance Services Focal Point (MSFP) before
commencing with the works.
3.2.5 In the event of any variations to the scope of the works, SANPC Refinery
Authorised person (Area Engineer, the Zone Planner, the Zone Scoper) and
the contractor shall identify such variation/s and this must be recorded. The
contractor shall include such variations into the work pack. A variation order
(VO) shall be raised and approval by the Area Engineer before the extra
of 13
work commences.
Execution of works without a job cards will not be accepted.
3.2.6 The contractor must submit the job cards to the Planner for progress
reporting. These job cards must be signed by the Discipline Supervisor as
verification that the work is completed to the required standard and to
process payments.
3.2.7 The Planner updates all progress and also closes off the work upon issue of
the handover/takeover certificate from the contractor .
3.3 SANPC Refinery may require the contractor to prepare a workpack prior to
commencement of the works, which may include:
3.3.1 Health, Safety and Environment Action Plan;
3.3.2 Method Statement;
3.3.3 Completion of the SANPC Refinery Risk Assessment Method Statement
(“Rams”)
4 safety
4.1 Contractor personnel appointments must be in accordance with the
Occupational Health and Safety Act (Act 85, 1993) and form part of the
Contractors HSSE File.
4.2 The contractor will also comply with the SANPC REFINERY rules and
regulations.
4.3 All incidents to be reported to the relevant clearance issuers and
maintenance supervisors.
5.1 Meetings
5.1.1 The contractor’s representative to attend weekly look-ahead meetings as
directed by Area Engineer and/or the Zone Planner when any work is in
progress.
5.1.2 The Site Manager to attend:
a) KPI review meeting
b) Quarterly performance and safety review meetings or as directed by the
Ccm.
5.2 Planning and Progress
5.2.1 SANPC Refinery shall provide the contractor with a 30 day look-a-head
schedule outlining planned windows for activities. The contractor is to manage
and administer the manpower resources as such to enable him to comply with
of 13
the defined service levels and meet the required works order completion dates,
irrespective of absenteeism or leave. The contractor must ensure these
objectives are fully understood and that management structures and
procedures are in place to ensure timeous and successful execution under the
above-mentioned constraints.
5.2.2 The contractor is to arrange and coordinate with the required SANPC Refinery
personnel, all RAMS sessions in order to ensure that work starts timeously.
5.2.3 The operations of SANPC Refinery and interconnecting facilities in outlying
areas will be carried out continuously during the period of this agreement, and
the contractor shall allow for working in close proximity to and in liaison with
other contractors in order to minimise inconvenience and shall plan for flexibility
in labour resources input and any other factors in complying with these
restrictions.
5.2.4 Restrictions may be imposed upon the contractor in his execution of the works
as a result of SANPC Refinery ’s operations. The contractor is to immediately
notify SANPC Refinery (Area Engineer and the CCM in writing, of such an
interruption. The contractor along with the Area Engineer shall re-coordinate
the manpower to other available sections, areas, items of equipment in order
to minimise standing time.
5.2.5 The contractor shall, at all times, demonstrate positive and proactive
participation in the efficient execution of the works in order to achieve
satisfactory levels of productivity.
5.2.6 The contractor is to note that whilst the overall scope of works must be
completed in the required time, the contractor must ensure that by proper
preparation and quality execution the planned man-hours are not exceeded.
5.2.7 The contractor’s attention is drawn to the fact that the works to be executed
may be in the vicinity of insulated pipework, equipment and electrical and
instrument installations. The contractor shall be held responsible for any
damage caused to these or any other installations by his operations. If
damages are identified prior to commencing work, the Area Engineer or the
Supervisor must be notified of such damages immediately.
5.2.8 Access to and from the worksite is by means of existing hard roads or temporary
access roads and will be through such gates and by such routes as will be
defined by SANPC Refinery. The contractor is to operate his own vehicles with
minimum of inconvenience to other traffic at the refinery sites.
5.2.9 All electrical equipment brought on site for work execution must be inspected
and approved by the SANPC Refinery electrical department.
of 13
5.3 Contractor Organisation and Training
5.3.1 SANPC Refinery will not pay for trainees. All contractor workers are to undergo
training through a SETA approved Training facility.
5.3.2 In the event that a contractor employee is found to be not coping with the
work, SANPC Refinery reserves the right to insist on change for a more suitable
person.
5.4 Staff Issues
5.4.1 As a control system the contractor is to supply a full organogram with functions
and names of resources to SANPC Refinery. SANPC Refinery reserves the right
to assess all contractor supervisors before they report for work at the SANPC
Refinery sites.
5.4.2 Only approved resources may be used by the contractor. Changes in resource
staff shall be justified to and approved by the SANPC Refinery CCM, whose
approval will not be unreasonably withheld. (This includes non-recoverable
resources).
Definitions:
E Execute
P Participate
A Approve
S Supply
M Maintain
6.1 Division of Responsibilities - Work Descriptions
The following work descriptions define the division of responsibilities with respect to the
work required and exclusions from the agreement scope of work:-
Work Description By CONTRACTOR By Others By SANPC Refinery
Timeous Application for Work PermE P
Issue of daily work permits A/E
Gas Testing E
Quality Checking E P/A
6.2 Division of Responsibilities - Provision of Construction and associated Equipment
of 13
The following defines the division of responsibility with respect to the provision of
construction and associated equipment for the implementation of the agreement work:
Equipment Description By CONTRACTOR By Others By SANPC Refinery
Transportation S
Site huts, ablution facilities, storage a M S
where required services
Lighting – General S/M
Required protective clothing S/M
and equipment include. B
Compressor
Cranage S/M
Lifting gear, ropes, slings a S/M
shackles
Safety Equipment S/M
Firefighting facilities S/M
Resuscitator S/M
Standby B.A. set S/M
6.3 Division of Responsibilities - Supply of Installed Equipment and Materials
The following defines the division of responsibility with respect to the supply of installed
equipment and materials required for the agreement work:
Task Description By CONTRACTOR By Others By SANPC Refinery
Identify work and raise Job card E/A
Prepare and issue detailed scope S/P A
work
Price E A
Rates for non bill items E A
Plan sequence of work E A
Carry out the work E
Progress reporting E A
of 13
Task Description By CONTRACTOR By Others By SANPC Refinery
Prepare V.O P E/A
Handover (ready to use) E A
The above noted items are intended to be indicative of the categories of work to be
undertaken. They are not intended as a comprehensive list of the same.
7.1 Drawings/ sketches may be issued by SANPC Refinery as required to clarify written
instructions given.
of 13
Compliance Requirements
Source: 2. Scope of work and evaluation criteria.pdf (unknown)CV of the 5 20%
B-BBEE Minimum Level: 1
Section
Source: 2. Scope of work and evaluation criteria.pdfAt this phase service providers must submit the required supporting documents to
substantiate compliance to the requirements below. It must be noted that if the service
provider does not meet any of the requirements, the service provider will be disqualified
and not be evaluated further.
Mandatory Requirements Comply Not
Comply
Inspection and testing of pressure relief valve to avoid
overpressure.
Bidder to provide copies of documents verifying last
inspection and testing of safety relief valves for all
compressors listed in the schedule of rates.
Records of pressure vessel(air receiver).
Bidder to submit copies of valid inspection documents
verifying last pressure vessel inspection records for all
compressors listed in the schedule of rates sign-off by
registered Approved Inspection Authority (AIA).
Compensation fund certificate
Submit a valid copy of the compensation fund certificate.
Technician Trade Test Certificate
Bidder to submit a valid trade test certificate for the
approved training authority/institution.
of 13
Bidders will be evaluated according to the below technical evaluation criteria. Minimum
Technical Threshold is 70%. It must be noted that if the Bidder does not meet the 70%
minimum threshold, the bidder will be disqualified and not be evaluated further.
References
The bidder must provide signed and dated reference letters on clients letterhead from previous and
current clients detailing mobile air compressors hire for Refineries or Manufacturing firms (MHI -Major
Hazard Installations). The letter should indicate clearly when the work was executed.
The assignments/contracts/projects completed must be in the Refineries or Manufacturing firms (MHI -
Major Hazard Installations) clients in the past 5 years (2020-to date).
Evaluation Criteria Document as Score Weighting
Evidence %
Bidder submitted 5 relevant reference letters Reference letters 5
50% Bidder submitted 4 relevant reference letters 4
Bidder submitted 3 relevant reference letters 3
Bidder submitted 2 relevant reference letters 2
Bidder submitted 1 relevant reference letter 1
Bidder did not provide any relevant reference letters 0
Technician Experience
The technician that will be assigned to SANPC Refinery must have experience in repairing compressors.
Evaluation Criteria Document as Score Weighting %
Evidence
CV of the 5 20%
6 and more years of experience: Proposed
technician
5 years of experience clearly listing
the name of 4
4 years of experience clients and
number of 3
3 years of experience years. 2
2 years of experience 1
Less than 2 years of experience
of 13
Company Response times
Bidder must provide response times for compressor breakdowns or callouts.
Evaluation Criteria Document as Evidence Weighting
%
Service provider to provide their Bidder to submit Service level
response times Agreement (SLA) that specifies 30%
turnaround times for critical
breakdowns.
of 13
Important Dates
Source: 3. SBD1 - Invitation To Bid.pdf (TENDER)Closing date: 16 September 2026. Closing time: 12:00. No compulsory briefing or site visit is mentioned in the invitation.
Contact Information
Source: 3. SBD1 - Invitation To Bid.pdf (TENDER)Bidding procedure and technical enquiries: Tisetso Radebe, telephone 010 201 4724, email [email protected]. Bid submissions: [email protected].
Submission Guidelines
Source: 3. SBD1 - Invitation To Bid.pdf (TENDER)Submission method: email only to [email protected]. Bids must be received by the stipulated closing date and time; late bids will not be accepted. All bids must be submitted on the official forms provided (not re-typed) or in the manner prescribed in the bid document. The successful bidder will be required to complete and sign a written contract form (SBD 7). Proof of authority to sign (e.g., company resolution) must be submitted with the bid.
Evaluation Criteria
Source: 3. SBD1 - Invitation To Bid.pdf (TENDER)This tender is subject to the Preferential Procurement Policy Framework Act, 2000 and the Preferential Procurement Regulations, the General Conditions of Contract (GCC), and any applicable special conditions of contract. The specific price/functionality split, minimum qualifying scores, and preference point system (80/20 or 90/10) are not stated in the invitation document.
Compliance Requirements
Source: 3. SBD1 - Invitation To Bid.pdf (TENDER)Mandatory compliance requirements:
Returnable forms (standard):
Section
Source: 3. SBD1 - Invitation To Bid.pdf (TENDER)Bidding procedure and technical enquiries: Tisetso Radebe, telephone 010 201 4724, email [email protected]. Bid submissions to be emailed to [email protected].
Description
Source: 6. CEF KYC Questionnaires.pdfCEF Group requires mandatory completion of this KYC questionnaire as part of its third-party due diligence process for all prospective business counterparties. The questionnaire covers corporate details, shareholders, executive management, banking, experience, sanctions, data protection, competition, ethics & integrity, financial standing and litigation. A scanned, signed copy with all required supporting documents must be returned to CEF Group nominated personnel.
Contact Information
Source: 6. CEF KYC Questionnaires.pdf (unknown)CEF SOC Ltd
152 Ann Crescent, Block C, Upper Grayston Office Park, Strathavon, Sandton
PO Box 786141, Sandton 2146
Tel: +27 10 201-4700
Fax: +27 10 201-4900
Submission Guidelines
Source: 6. CEF KYC Questionnaires.pdf (unknown)The CEF KYC Questionnaire is mandatory and must be completed in full. Bidders may use additional pages where necessary. A scanned, signed copy must be returned to the CEF Group nominated personnel. All required supporting documents listed in the questionnaire must be attached.
Evaluation Criteria
Source: 6. CEF KYC Questionnaires.pdf (unknown)Bidders are evaluated on integrity, compliance and financial standing. Disqualifying factors include: insolvency or business rescue proceedings; liquidation; failure to submit tax returns consistently for the last three years; operation from or ties to sanctioned countries; convictions or pending investigations for fraud, bribery, corruption, sanctions breaches, or competition/anti-trust violations; directors or key employees who are government public officials; government ownership or control of the company; absence of a written employee code of conduct, anti-bribery and corruption policy, and fraud/bribery reporting policy (with confirmatory certificate from the Company Secretariat); absence of a data protection policy with certificate from the appointed Information Officer; prior debarment from government contracts in any country; pending litigation with regulators or listed companies/government institutions.
Technical Specifications
Source: 6. CEF KYC Questionnaires.pdf (unknown)Bidders must provide: years of experience in the industry; licences held (name, registration number, issuing authority/regulator); intellectual property, patents or relevant technology owned (patent number, issuing body, expiry, description); details of on-going projects (project name, type, infrastructure, commencement date, status, value, owner/lease arrangement).
Experience & Qualifications
Source: 6. CEF KYC Questionnaires.pdf (unknown)Bidders must state years of experience in the industry. List all licences held (name, registration number, issuing authority/regulator). Disclose any intellectual property, patents or relevant technology owned (patent number, issuing body, expiry, description). Provide details of on-going projects: project name, type, infrastructure, commencement date, status, value, owner/lease arrangement.
Financial Requirements
Source: 6. CEF KYC Questionnaires.pdf (unknown)Bidders must disclose tax status and confirm that all financial returns have been submitted to tax authorities consistently for the last three years. A written confirmation certificate from the appointed finance manager is required (financial statements are not requested). Bidders must confirm they are not insolvent, declared insolvent, under liquidation, or subject to business rescue proceedings. Banking details are required: bank name, SWIFT code, IBAN/routing code, account manager name.
Compliance Requirements
Source: 6. CEF KYC Questionnaires.pdf (unknown)Mandatory compliance declarations and supporting certificates:
Contact Information
Source: 5. SBD 6.1 - Preference points claim form.pdf (TENDER){"name":null,"email":null,"phone":null,"department":null,"address":"............................................................"}
Evaluation Criteria
Source: 5. SBD 6.1 - Preference points claim form.pdf (TENDER)Preference point system: 80/20 (price 80 points, specific goals 20 points).
Specific goals and points:
Bidders must complete and submit SBD 6.1 (Preference Points Claim Form) with supporting proof for any specific goals claimed. Failure to submit proof means points for specific goals are not claimed. The organ of state may require substantiation of any claim at any time.
Technical Specifications
Source: 5. SBD 6.1 - Preference points claim form.pdf (TENDER)income-generating contracts)
Compliance Requirements
Source: 5. SBD 6.1 - Preference points claim form.pdf (TENDER)Returnable form: SBD 6.1 (Preference Points Claim Form) — must be completed, signed and submitted with the tender. Signing certifies that claimed points are true, correct and in accordance with the Preferential Procurement Regulations 2022, and that the bidder may be required to furnish documentary proof. Fraudulent claims may lead to disqualification, cost recovery, contract cancellation, restriction from state business for up to 10 years, and criminal prosecution.
Section
Source: 5. SBD 6.1 - Preference points claim form.pdfPreference point system: 80/20 (price 80 points, specific goals 20 points).
Specific goals and points:
Bidders must complete and submit SBD 6.1 (Preference Points Claim Form) with supporting proof for any specific goals claimed. Failure to submit proof means points for specific goals are not claimed. The organ of state may require substantiation of any claim at any time.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
152 Ann Cres, Strathavon, Sandton, 2031, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
7
Last checked
27 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Contact
+27 10 201 4700[email protected]www.cefgroup.co.za/contact-us152 Ann Cres, Strathavon, Sandton, 2031, South Africa