Design, supply, installation and commissioning of an 11kv mini substation, perimeter and entrance lighting, and security fencing at culemborg for a period of eighteen (18) months
TRANSNET national ports authority requires the design, supply, installation and commissioning of an 11kv mini substation, perimeter and entrance lighting, and security fencing at culemborg in the port of cape town, over an 18-month contract period. The works aim to replace damaged fencing and add lighting to meet security and legislative compliance. Bidders must account for site constraints including an illegal community along the fence line, mandatory safety induction, and strict port access controls.
Key Requirements
Closing date and time: 30 October 2026 at 16:00.
Contract period: 18 months.
Scope: design, supply, installation and commissioning of an 11kV mini substation, perimeter and entrance lighting, and security fencing at Culemborg.
Site constraints: an illegal community occupies parts of the site; structures use the existing palisade fencing as support. The contractor must avoid disturbing these structures as far as possible and must inform the Employer before working adjacent to or near the community.
Access: the Port of Cape Town is security-regulated under ISPS Maritime Security Regulations 2004; all personnel must produce ID at the main gate, undergo safety induction, and carry induction permits. Vehicle permits must be obtained from the TNPA Permit Office.
Health and safety: mandatory induction before any site work (arranged at no cost); the Service Provider must provide its own first aid facilities and comply with the Employer's Health and Safety Standard.
Lost or unreturned access permits are replaced at R 360.00 per person, payable by the Service Provider.
The contractor must verify all underground utility drawings and confirm subsoil properties before construction; the Employer does not guarantee drawing accuracy.
DESIGN, SUPPLY, INSTALLATION AND COMMISSIONING OF AN 11KV MINI SUBSTATION, PERIMETER AND ENTRANCE LIGHTING, AND SECURITY FENCING AT CULEMBORG FOR A PERIOD OF EIGHTEEN (18) MONTHS
Tender context
Return to this tender’s issuing organisation, province, or category.
Design, supply, installation and commissioning of an 11kv mini substation, perimeter and entrance lighting, and security fencing at culemborg for a period of eighteen (18) months
Briefing SessionCompulsory
Date & Time
Friday, 30 October 2026 - 16:00
Venue
TNPA Procurement Boardroom, HR & Procurement Building, 34 South Arm Road, Port of Cape Town, V & A W
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Tenders in this industry often require registration with these bodies.
CIDB Registration
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Typical Documents
10 items
Company Registration (CIPC)
Tax Clearance Certificate
B-BBEE Certificate
CSD Registration
Company Profile
CIDB Registration Certificate
NHBRC Registration (if applicable)
Health & Safety Plan
Insurance Certificates
Previous Project Completion Certificates
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
Compliance review. The working summary is checked against South African procurement standards — PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement — so nothing critical is missed before you start your bid response.
DocumentNEC ECC_RFP for Culemborg Phase 1A rev3 final.pdfReview complete
Important Dates
Source: NEC ECC_RFP for Culemborg Phase 1A rev3 final.pdf (RFP)
Important Dates
02 Oct
2026
PUBLICATION
Tender Published
Tender was published
30 Oct
2026
DEADLINE
Closing Date
Tender closing date
Procurement Rules & Compliance ContextThis tender may be governed by South African public procurement rules covering fairness, transparency, preferential procurement, anti-corruption, administrative justice and access to information.
11 rules
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Core procurement rules
These rules commonly apply to South African public-sector procurement.
7
Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
high
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Constitution of the Republic of South Africa, 1996 – Section 217
Act 108 of 1996 (s217)
high
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
C3 Works Information - Culemborg Phase 1A Rev2.pdf
Design, supply, installation and commissioning of an 11kV mini substation, perimeter and entrance lighting, and security fencing at Culemborg for Transnet National Ports Authority over an 18-month period. The works include replacing the existing boundary fence with welded mesh fencing, installing 170 six-metre and four twelve-metre LED light poles, and supplying and installing a 200kVA mini substation with associated cabling and kiosks.
Design, supply, installation and commissioning of an 11kV mini substation, perimeter and entrance lighting, and security fencing at Culemborg, Port of Cape Town, is required by Transnet National Ports Authority (Transnet SOC Ltd) over an eighteen-month period. The work is let under the NEC3 Engineering and Construction Contract with associated skills development and enterprise development obligations.
C2 Part 2 Pricing Data Option B -Culemborg September rev02.pdf
Design, supply, installation and commissioning of an 11kV mini substation, perimeter and entrance lighting, and security fencing at Culemborg, for Transnet National Ports Authority, over an 18-month period. The contract is an NEC3 Engineering and Construction Contract Option B (remeasurement with a bill of quantities), requiring the contractor to price the bill and execute all civil, electrical and related works.
Design, supply, installation and commissioning of an 11kV mini substation, perimeter and entrance lighting, and security fencing at Culemborg in the Port of Cape Town for Transnet National Ports Authority, over eighteen months. The works replace damaged palisade and welded mesh fencing along the southern boundary and address the absence of perimeter and entrance lighting.
Secure Transnet tenders using AI Matching & Recommendations, logistics infrastructure intelligence, compliance analysis, and application support for rail, ports, and pipelines.
Similar Tenders
Matched by category & region
Supplier Readiness Hub
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Document read
Compliance review
Bid-ready summary
Compulsory clarification meeting / site visit:
Date: 12 October 2026
Time: 10:00 (starts punctually; information not repeated for late arrivals)
Venue: TNPA Procurement Boardroom, HR & Procurement Building, 34 South Arm Road, Port of Cape Town, V & A Waterfront
Duration: approximately 2 hours
Attendance is compulsory; failure to attend disqualifies the tender.
Tenderers must sign the attendance register and have T2.2-01 signed by the Employer's representative.
PPE required for site walk: safety shoes, goggles, long sleeve shirts, high visibility vests, hard hats. No PPE = no site access.
Breathalyser testing required; firearms prohibited; ID/passport/driver's licence required for access.
Closing date and time:
30 October 2026 at 16:00 (electronic submission via Transnet e-Tender Submission Portal).
Tender validity period: 12 weeks from closing date.
Contact Information
Source: NEC ECC_RFP for Culemborg Phase 1A rev3 final.pdf (RFP)
Register company profile, log intent to bid, and upload bid documents against the tender.
Upload limit: 30 MB per upload; multiple uploads permitted. Upload at least a day before closing to avoid technical issues.
Each company must submit under its own registered profile; no submissions on behalf of another company (including subsidiaries or holding companies). Joint ventures may submit via any member's profile.
Late tenders will not be accepted.
Telephonic, telegraphic, facsimile or email tenders will not be accepted.
No alternative tender offers will be considered.
Tender offers must be in English.
Documents must be marked with the tender number, description, and for the attention of the Employer's Agent (Mcebo Mhlanga).
Returnable documents (all must be completed and signed where required):
T2.2-01: Certificate of attendance at compulsory briefing (signed by Employer's representative).
T2.2-02: CIDB registration (7EP or higher).
T2.2-03: Signed Form of Offer and Acceptance (C1.1) and fully completed Bill of Quantities (C2.2).
T2.2-04: Authority to submit tender.
T2.2-05: Record of addenda to tender documents.
T2.2-06: Letter of Good Standing (Workmen's Compensation Fund).
T2.2-07: Risk Elements.
T2.2-08: Availability of equipment and other resources.
T2.2-09: Schedule of proposed subcontractors.
T2.2-10: Site Establishment requirements.
T2.2-11: CIDB SFU Annex G Compulsory Enterprise Questionnaire, plus SBD 6.1 (Preference Points Claim) and SBD 4 (Declaration of Interest).
T2.2-12: Non-Disclosure Agreement.
T2.2-13: RFP Declaration Form.
T2.2-14: RFP – Breach of Law declaration.
T2.2-15: Certificate of Acquaintance with Tender Document.
T2.2-16: Service Provider Integrity Pact.
T2.2-17: Supplier Code of Conduct.
T2.2-18: Domestic Prominent Influential Persons (DPIP) or Foreign Prominent Public Officials (FPPO) declaration.
T2.2-23: Form of Intent to provide a Performance Guarantee.
T2.2-24: Forecast Rate of Invoicing.
T2.2-25: Three most recent years' audited / independently reviewed annual financial statements.
Disqualification risks: failure to attend compulsory briefing; missing or unsigned returnable documents; late submission; submitting under another company's profile; failure to meet eligibility criteria.
Evaluation Criteria
Source: NEC ECC_RFP for Culemborg Phase 1A rev3 final.pdf (RFP)
Evaluation stages:
Stage One – Test for Responsiveness (eligibility):
Stage 1.1: Attendance at compulsory clarification meeting (authorised representative or JV representative).
Stage 1.2: CIDB registration 7EP or higher (or capable of being so before evaluation).
Stage 1.3: Signed and completed Form of Offer and Acceptance (C1.1).
Stage 1.4: Fully completed Bill of Quantities (C2.2).
Stage 1.5: Prequalification – previous experience and key personnel CVs (see below).
Stage Two – Evaluation of Final Weighted Score:
Price: up to 80 points (if lowest responsive tender ≤ R50 million inclusive of VAT) or up to 90 points (if > R50 million).
Specific goals (preference points): up to 20 or 10 points.
Total score: 100.
Stage Three – Risk Assessment (before award, per CIDB Standard Conditions of Tender C.3.13).
Prequalification requirements (Stage 1.5):
Previous experience: at least 4 reference letters from previous clients for area lighting engineering designs and construction, including LV network reticulation. Letters must be on client letterhead, signed by client, and include project name/description, value, responsibility/works undertaken, location, status, and client contact details.
Key personnel (six CVs with qualifications and certifications):
Electrical Engineer/Technologist: Pr.Eng/Pr.Tech (ECSA) in Electrical Engineering, minimum 5 years' experience in electrical lighting systems and area illumination.
Civil Engineer/Technologist: Pr.Eng/Pr.Tech (ECSA) in Civil Engineering, minimum 5 years' experience in minor concrete foundation design, earthworks and excavations.
Project Manager: SACPCMP Pr.CPM/PMP registered, engineering or project management diploma/degree, minimum 5 years' experience in similar construction projects.
Quality Officer: quality or technical diploma, ISO 9001:2015 QMS training certificates, minimum 3 years' quality experience in construction.
Construction Manager: SACPCMP Pr.CM registered, engineering or built environment diploma/degree, minimum 5 years' experience in similar projects.
Construction Health and Safety Officer/Manager: SACPCMP CHSO/CHSM registered, BTech/National Diploma in Safety Management or Environmental Health, minimum 5 years' experience in similar projects.
Failure to meet any eligibility criterion renders the tender unacceptable.
Preference points (specific goals):
B-BBEE Status Level of Contributor 1 or 2: 8 points (80/20) or 4 points (90/10).
Promotion of supplier development through subcontracting minimum 30% of contract value to South African EMEs/QSEs that are black-owned: 12 points (80/20) or 6 points (90/10).
Bidders with no verification score zero preference points.
Transnet may independently audit scorecard components at any stage.
Technical Specifications
Source: NEC ECC_RFP for Culemborg Phase 1A rev3 final.pdf (RFP)
Scope of works: Design, supply, installation and commissioning of an 11kV mini substation, perimeter and entrance lighting, and security fencing at Culemborg.
Contract period: 18 months.
Contract form: NEC3 Engineering and Construction Contract.
The works include area lighting engineering designs and construction, including LV network reticulation (as per prequalification experience requirement).
Site: Culemborg, Western Cape (Port of Cape Town area).
The successful tenderer must comply with the CIDB B.U.I.L.D Programme conditions:
Contract Skills Development Goals (CSDG) per CIDB Standard for Developing Skills through Infrastructure Contracts (GN 43495, 3 July 2020).
Contract Participation Goals (CPG) for indirect targeting of enterprise development – CPG for this contract is 30% (per CIDB Standard for Indirect Targeting, GN February 2013).
Site information and works information are provided in Part C3 and C4 of the tender documents.
Financial Requirements
Source: NEC ECC_RFP for Culemborg Phase 1A rev3 final.pdf (RFP)
Pricing: Bill of Quantities (C2.2) must be fully completed and submitted.
Pricing instructions in Part C2.1.
No alternative tender offers considered.
Transnet may request audited financial statements for due diligence.
Transnet may conduct risk analysis on preferred tenderer, including unduly high or low rates.
Transnet may not award to a low offer that poses unacceptable commercial risk.
Stand-by contractor arrangement: Transnet may appoint a stand-by contractor at the same time as the main contractor; the stand-by contract only becomes effective if the main contractor cannot complete the works. The stand-by contractor will only be paid for the remainder of works measured per contract, and will not be reimbursed for any preparatory expenditure.
Performance guarantee: Form of Intent to provide a Performance Guarantee (T2.2-23) is required.
Insurance: Contractor must provide insurance (T2.2-22).
Forecast Rate of Invoicing (T2.2-24) required.
Financial statements: Three most recent years' audited / independently reviewed annual financial statements (T2.2-25).
No bid security (bid bond) mentioned in the document.
Compliance Requirements
Source: NEC ECC_RFP for Culemborg Phase 1A rev3 final.pdf (RFP)
CSD registration: Mandatory on National Treasury's Central Supplier Database (https://secure.csd.gov.za). Provide supplier number and unique registration reference number. Foreign suppliers with no local registered entity are exempt.
Tax compliance: Valid Tax Clearance Certificate (TCS) from SARS and a TCS PIN. For JVs/consortia/subcontractors, each party must submit its own TCS certificate/PIN/CSD number. Failure to provide may render the bid invalid.
B-BBEE: Valid B-BBEE certificate from a SANAS-accredited verification agency, or CIPC B-BBEE certificate per DTIC guidelines, or sworn affidavit for EMEs and QSEs with 51% or more black ownership. Bidders with no verification score zero preference points.
CIDB: Registration at 7EP or higher (or capable of being so before evaluation). Joint ventures: all members CIDB registered; lead partner graded no lower than one level below required class with required recognition status; combined grading at least 7EP; certified copy of signed JV agreement required; incorporated JV must provide Memorandum of Incorporation within 4 weeks of contract date.
Workmen's Compensation: Letter of Good Standing from the Workmen's Compensation Fund (or separate letters for each JV member).
Statutory declarations: Must indicate on T2.2-14 whether the bidder or any director has been convicted of a serious breach of law (including Competition Act) in the preceding 5 years.
Acceptance conditions: Not listed on Register of Tender Defaulters (Prevention and Combating of Corrupt Activities Act, 2004), Transnet's restricted list, or National Treasury's tender defaulters list. Must complete Compulsory Enterprise Questionnaire (T2.2-11) without conflicts of interest. Must have legal capacity to contract.
Local content: Not explicitly stated, but CIDB B.U.I.L.D Programme applies (CSDG and CPG).
DocumentC3 Works Information - Culemborg Phase 1A Rev2.pdfReview complete
Description
Source: C3 Works Information - Culemborg Phase 1A Rev2.pdf (RFP)
Transnet National Ports Authority (TNPA) requires the design, supply, installation and commissioning of an 11kV mini substation, perimeter and entrance lighting, and security fencing at Culemborg, for a period of eighteen (18) months.
The existing perimeter consists of steel palisade and welded mesh fencing approximately 2.5m high, which is damaged in several areas and no longer serves as an effective physical barrier. The Culemborg area currently has no perimeter lighting; the only lighting comes from streetlights along the N1 Highway. The main security entrance has no designated lighting.
The works aim to:
Replace the existing boundary fence with new welded mesh fencing.
Install new 6m light poles with LED fixtures along the entire Culemborg boundary.
Install new 12m light poles with LED fixtures at the main entrance.
Design, supply and install a 200kVA Type B 11.75/0.400 kV mini substation with 2R2B Ring Main Unit to supply power to the lighting.
These measures are intended to ensure compliance with the National Ports Act, Maritime Security Regulations, and other relevant legislation, and to address security concerns and risks.
Important Dates
Source: C3 Works Information - Culemborg Phase 1A Rev2.pdf (RFP)
Closing date: 30 October 2026 at 16:00 (as per tender record).
No briefing or site visit dates are stated in the document.
Contact Information
Source: C3 Works Information - Culemborg Phase 1A Rev2.pdf (RFP)
No contact details are stated in the document.
Submission Guidelines
Source: C3 Works Information - Culemborg Phase 1A Rev2.pdf (RFP)
Submission method: as per the tender record (RFP). The Contractor's design must be submitted as part of the tender submission and is evaluated at the Technical Evaluation stage.
Returnable documents (all must be completed, signed and submitted):
SBD 1 (Invitation to Bid): bidder and contact details, signed as the offer cover page.
SBD 3.1 (Pricing Schedule – firm): priced schedule of rates for the works.
SBD 4 (Declaration of Interest): discloses whether any director or shareholder is employed by the state or connected to anyone at TNPA.
SBD 6.1 (Preference Points Claim): claims B-BBEE points under the PPPFA.
SBD 6.2 (Declaration for Local Production and Content): declares local content percentages.
SBD 8 (Declaration of Bidder's Past Supply Chain Management Practices): discloses any prior SCM irregularities.
SBD 9 (Certificate of Independent Bid Determination): certifies the price was set independently, with no collusion.
Authority to Sign / Board Resolution: authorises the named signatory to bind the bidder.
Detailed drawings of the proposed design (fence and all fixtures).
Disqualification risks:
Any returnable form left unsigned or omitted.
Bids received after the closing time.
Failure to comply with site entry and security control requirements.
Failure to submit the design as part of the tender submission.
Evaluation Criteria
Source: C3 Works Information - Culemborg Phase 1A Rev2.pdf (RFP)
Evaluation stages:
Technical Evaluation – the Contractor's design is evaluated against the Employer's requirements and specifications. The design must be submitted as part of the tender submission.
Preference points – B-BBEE points claimed under the PPPFA (80/20 or 90/10 system, as applicable).
Minimum qualifying score: not stated in the document.
Technical requirements that will be assessed:
Design must be authenticated and authorised by ECSA-registered professional engineers or technologists.
Design must comply with all relevant legislation, SANS standards, and the Employer's specifications.
Design must include lighting simulation/model (ReLUX at minimum), illumination studies, and electrical Certificate of Compliance.
Technical Specifications
Source: C3 Works Information - Culemborg Phase 1A Rev2.pdf (RFP)
Scope of work – design, supply, installation and commissioning of:
Perimeter fencing:
Replace existing steel palisade and welded mesh fencing with new welded mesh fencing, matching existing on the northern boundary.
Fence must be anti-climb, anti-cut, anti-burrow, and coated for corrosion protection in the coastal environment.
Secure to existing concrete foundations; repair or construct new foundations where required.
Provide as-built drawings for the new fencing.
Perimeter lighting:
Supply and install 170 x 6m planted galvanised steel streetlight poles, spaced at minimum 30m apart.
Poles treated and coated for marine environment.
Install luminaires equal or similar to Genlux LUXMO I LED 4x6 Type Street Light, 107W, 5000K, with bottom entry spigot (1 luminaire per pole).
Supply and install lighting kiosk capable of managing minimum 9 lighting fixtures, with earthing, marine-grade enclosure, locking feature, back-to-back doors, distribution board, stainless steel 3CR12 enclosure, powder coated Avo Green, padlock lockable, on concrete plinth, with five-sided cage structure (mild steel, hot dip galvanised per SANS 121/BS EN ISO 1461).
Cabling: 16mm2 4Core ECC from poles to kiosk inside 160mm2 UPVC sleeve; 95mm2 4Core ECC from closest LV kiosk to lighting kiosk inside 160mm2 UPVC sleeve.
New earthing and lightning protection; hot-dip galvanised finials and bonding of perimeter poles to ground.
Test installation in presence of Employer's Engineers and issue electrical Certificate of Compliance (COC).
Entrance lighting:
Supply and install 4 x 12m GRP street light poles, treated and coated for marine environment, spaced at minimum 30m apart.
Install luminaires equal or similar to Genlux LUXMO II LED 32 Street Light, 140W, 5000K, with bottom entry spigot (2 luminaires per pole).
Supply and install lighting kiosk capable of managing minimum 8 lighting fixtures, with same specifications as perimeter kiosk.
Cabling: 16mm2 4Core ECC from poles to kiosk inside 160mm2 UPVC sleeve; 95mm2 4Core ECC from closest LV kiosk to lighting kiosk inside 160mm2 UPVC sleeve.
New earthing and lightning protection; hot-dip galvanised finials and bonding of poles to ground.
Test installation and issue electrical Certificate of Compliance (COC).
11kV Mini Substation:
Design, supply, deliver and install 200kVA Type B 11.75/0.400 kV, 50 Hz, Dyn 11, 5% impedance, fault level 30kA on MV side, 50kA on LV bus-bar, oil cooled ONAN, coastal type avocado green 'C12' mini-substation, complete with MV and LV switchgear compartments, protection relays, current transformers, earthing material, relay and communication compartment, BTU, and all accessories.
Include 2R2B RMU with fault protection.
Supply cable runs from existing 11kV Mini Substation at main entrance to Culemborg.
Design, supply, deliver, offload and install 185mm2, 3 core, Cu, SWA, 6.35/11kV XLPE cable from existing Minisub to new location (where old LV kiosk was situated). Verify cable dimensions with fault and voltage drop calculations per SANS 10142.
Cable trace existing MV cable from existing Minisub towards Train Lighting Substation to verify location and operation as alternative to new supply cable.
Design, supply and install concrete plinth base for Minisub, with five-sided cage structure (mild steel, hot dip galvanised per SANS 121/BS EN ISO 1461), secured with approved padlock entry system. Clearances: minimum 1m on sides, 2m on front and back for door opening.
Design, supply and install any alterations to existing Minisub's RMU and LV distribution boards to ensure operation with new Minisub.
Sleeves for electrical cabling:
Supply, deliver and install 110mm2 UPVC sleeves in ground along perimeter and to entrance lighting (spare sleeves).
Supply, deliver and install 160mm2 UPVC sleeves in ground along perimeter and from closest LV kiosk to lighting kiosk (main cable runs).
Supply and install draw wire in all sleeves.
Supply and install electrical cable marking tape above all sleeves.
Manholes:
Supply, deliver and install minimum 6 precast concrete manholes, 1m diameter by 1m deep, with lockable lids, at major corners of the perimeter.
As-built documentation:
Provide single line diagrams of all electrical circuits and updated electrical service drawing showing newly installed lighting fixtures, kiosks and cables.
General requirements:
Contractor is responsible for all design coordination, integration and liaison.
All calculations must be authenticated by ECSA-registered professional engineers or technologists.
Contractor must appoint suitably qualified, experienced, and professionally registered engineers and designers, approved by the Employer.
Contractor must comply with all site entry and security control requirements for the designated security area.
Normal working hours: Monday to Friday 07h00–17h00. Extended hours require formal request and approval.
Contractor must keep daily records of people and equipment on site.
Contractor must remove all plant, materials, equipment, stores and temporary accommodation within 14 days after completion.
Contractor must attend a mandatory inspection of infrastructure and adjacent buildings before site establishment.
Contractor must give at least 48 hours' notice before covering up any work.
Contractor must submit all data packs, quality assurance records and as-built drawings within 30 days after completion date.
Methodology
Source: C3 Works Information - Culemborg Phase 1A Rev2.pdf (RFP)
Design submission and approval process:
The Contractor's design must be submitted as part of the tender submission and is evaluated at the Technical Evaluation stage.
The Contractor must submit detailed drawings of the design, including the proposed fence and all fixtures.
All design documentation must be issued to the Project Manager under cover of a Contractor's Transmittal Note stating all contract references, document number, revision, title and chronological listing.
Electronic documentation in Adobe Acrobat (PDF) and native file format; drawings in 'rvt', 'dgn', 'dxf', 'dwg' or similar approved formats.
The Contractor must submit designs to the Project Manager for approval before commencing any manufacturing or construction.
The Project Manager has two weeks to review and respond to submissions.
The Contractor must resubmit revised documentation within two weeks of receipt of comments.
Re-submittals not incorporating comments will be returned; corrections must be re-issued within two working days.
Method statements must be issued in advance; work does not commence until the Supervisor has accepted the relevant method statement.
The Contractor must undertake design safety reviews with the Project Manager, NEC Supervisor, Employer's Engineers, Health and Safety Officers, Environmental Officers, QA/QC Officers and any other specialists.
The Contractor must comply with the Contractor Document Submittal Requirements (Annexure B: DOC-STD-0001).
Construction methodology:
The Contractor must establish a well-planned site management system, including a comprehensive work method and schedule, and a detailed risk assessment for approval.
The Contractor must develop a traffic management plan.
The Contractor must plan delivery of equipment and materials to site, minimising the amount on site.
The Contractor must obtain all necessary work permits before starting any excavations.
The Contractor must give at least 48 hours' notice before covering up any work.
The Contractor must notify the Supervisor of elements to be covered up: all excavations for posts, blinding under base plates, before casting ground beams, and all reinforcement and shuttering prior to concreting.
The Contractor must appoint a registered surveyor to set out the works and survey the site before and after installation for as-built documentation.
The Contractor must verify survey reference points within two weeks after site handover and report any discrepancies in writing.
The Contractor must protect property beacons, trigonometrical survey beacons, and setting-out beacons; any displaced or destroyed beacons must be replaced by a registered land surveyor at the Contractor's cost.
Coordinates on drawings relate to the WGS 84 survey system; a local system using Lo25 has been used for this project.
Experience & Qualifications
Source: C3 Works Information - Culemborg Phase 1A Rev2.pdf (RFP)
Key personnel requirements:
The Contractor must appoint suitably qualified, experienced, and professionally registered engineers and designers, approved by the Employer, to carry out detailed designs for permanent and temporary works.
All calculations must be authenticated and authorised by professional engineers and/or technologists registered with the Engineering Council of South Africa (ECSA).
The Contractor must appoint a registered surveyor, approved by the Employer, to set out the works.
The Contractor's ECSA-registered engineers shall be held accountable and responsible for the design aspects of the Works for the lifetime duration of the Works.
The Contractor must appoint a Construction Manager (CM), a Contractor's Industrial Relations Practitioner (CIRP), an Environmental Officer (EO), and a Quality Officer, as required by the Works Information.
The Contractor must provide training workshops and technology transfer as per Section 5.8 of the Works Information.
No specific years of experience or reference projects are stated in the document.
Quality Management
Source: C3 Works Information - Culemborg Phase 1A Rev2.pdf (RFP)
Quality assurance requirements (Section 5.5 of the Works Information):
The Contractor must prepare a Project Quality Plan.
The Contractor must prepare a Quality Manual.
The Contractor must appoint a Quality Officer.
The Contractor must prepare a Quality Control Plan.
Subcontractors must comply with the same quality requirements.
The Contractor must comply with the General Quality Requirements for Contractors and Suppliers (Annexure F: QAL-STD-0001).
Documentation control:
All documentation must be submitted under cover of a Contractor's Transmittal Note stating contract references, document number, revision, title and chronological listing.
Electronic documentation in Adobe Acrobat (PDF) and native file format; drawings in 'rvt', 'dgn', 'dxf', 'dwg' or similar approved formats.
The Project Manager has two weeks to review and respond to submissions.
The Contractor must resubmit revised documentation within two weeks of receipt of comments.
Re-submittals not incorporating comments will be returned; corrections must be re-issued within two working days.
Method statements must be issued in advance and work does not commence until the Supervisor has accepted them.
As-built documentation:
Provide as-built/final/data packs in PDF and native formats as requested by the Project Manager.
Provide operating manuals in PDF, well-indexed with table of contents.
Provide original brochures with specific item, catalogue or model numbers cross-referenced to tag numbers.
Financial Requirements
Source: C3 Works Information - Culemborg Phase 1A Rev2.pdf (RFP)
Pricing format: schedule of rates for the various items captured in the pricing document.
Costs to be included in the tendered price:
Site entry security compliance, including labour transport, access requirements and maintaining access cards for staff.
Obtaining necessary permits for staff, subcontractors and suppliers.
Port induction for all people working within the Port (minimum one day).
Medical examinations for employees, as applicable.
Police clearance certificates for each employee.
Provision of portable toilets for Project Manager and Supervisor.
Housing and transport of employees (no housing permitted within port boundaries).
Connection of electricity power supply to work site; water tariffs as charged by Local Authority to the Port.
Any additional cost for coordination and cooperation with Others – no claims for extra costs will be entertained.
Cost of replacing any beacons displaced or destroyed without consent of the Employer.
Cost of repairs to any damage caused to Transnet's or others' property by the Contractor's staff.
Cost of extended working hours, if approved, may be for the Contractor's account.
No bid security, bonds, guarantees, retention or payment terms are stated in the document.
Compliance Requirements
Source: C3 Works Information - Culemborg Phase 1A Rev2.pdf (RFP)
CSD registration: not stated in the document.
Tax clearance: not stated in the document.
B-BBEE: not stated in the document.
CIDB grading: not stated in the document.
CIPC registration: not stated in the document.
Professional registrations:
All design calculations must be authenticated and authorised by professional engineers and/or technologists registered with the Engineering Council of South Africa (ECSA).
Contractor must appoint suitably qualified, experienced, and professionally registered engineers and designers, approved by the Employer.
Site-specific compliance:
All people working within the Port must undergo an induction on the port's health and safety, security, and general procedures. Cost for the Contractor's account.
Each employee must have a valid police clearance certificate.
Each employee must undergo a medical examination certifying fitness for assigned tasks.
Minimum PPE: hard hats, safety vests, safety boots; additional PPE as per risk assessment or as advised by the Employer.
Contractor must obtain necessary entry permits for all staff and issue identification cards.
Contractor must comply with all requirements of the Occupational Health and Safety Act and Construction Regulations (CR 13).
Excavations deeper than 1.5m must be shored or battered back to a safe angle.
No excavations without written permit from port authorities and other relevant parties.
Contractor must comply with the Health and Safety Specification (Annexure C: TNPA965-02-HS-SP-0001).
Contractor must comply with the Minimum Environmental Requirements for Construction (Annexure D: 009-TCC-CLO-SUS-11385) and the Standard Operating Procedure for Construction Environmental Management (Annexure E).
Contractor must comply with the General Quality Requirements for Contractors and Suppliers (Annexure F: QAL-STD-0001).
Contractor must comply with the Industrial Relations Policy and Management Plan (Annexure G: ACM-IR-POL-001).
Health & Safety
Source: C3 Works Information - Culemborg Phase 1A Rev2.pdf (RFP)
Health and safety requirements:
The Contractor must comply with the Occupational Health and Safety Act and the Construction Regulations (CR 13).
The Contractor must comply with the Health and Safety Specification (Annexure C: TNPA965-02-HS-SP-0001).
All people working within the Port must undergo an induction on the port's health and safety, security, and general procedures. Cost for the Contractor's account; allow minimum one day.
Each employee must undergo a medical examination certifying fitness for assigned tasks.
Each employee must have a valid police clearance certificate.
Minimum PPE: hard hats, safety vests, safety boots; additional PPE (ear protection, eye protection, dust masks, safety harnesses, life jackets) as per risk assessment or as advised by the Employer.
Excavations deeper than 1.5m must be shored or battered back to a safe angle, approved by a competent person.
No excavations without written permit from port authorities and other relevant parties.
The Contractor must provide a comprehensive work method and schedule, followed by a detailed risk assessment for approval.
The Contractor must develop a traffic management plan.
The Contractor must provide adequate transport for staff between site and yard, and to and from work.
Access to the working area is restricted to construction traffic only; no private vehicles or public transport.
Staff, with the exemption of security personnel, shall not remain on site overnight without the agreement of the Project Manager.
The Contractor is responsible for the security of the works until completion and hand-over.
The Contractor must be in constant consultation with the Port's security operations.
The Contractor must take all adequate precautions to protect against injury to persons and damage to surrounding structures and existing assets.
The Contractor is liable for any third-party damage caused by its operations or equipment.
The Contractor must attend a mandatory inspection of infrastructure and adjacent buildings before site establishment, and records/photographs will be taken as benchmark.
Environmental
Source: C3 Works Information - Culemborg Phase 1A Rev2.pdf (RFP)
Environmental management requirements:
The Contractor must comply with the Minimum Environmental Requirements for Construction (Annexure D: 009-TCC-CLO-SUS-11385) and the Standard Operating Procedure for Construction Environmental Management (Annexure E).
The Contractor must prepare a Construction Environmental Management Plan (CEMP) and Project Environmental Specifications (PES).
The Contractor must provide dust suppression as per the CEMP, PES and SES documents to minimise dust from construction traffic.
The control of water during construction, including dewatering of deep excavations, must be managed in accordance with approved method statements that include measures to remove or mitigate adverse environmental impacts.
The Contractor must dispose of all waste products at an appropriately licensed and registered waste disposal site, approved by the Project Manager, and provide written proof that all permits are in place. Waste may not be disposed of at the designated stockpile area.
The Contractor must have due regard for the environment and environmental management practices in all areas.
The Contractor must take measures to protect fauna and flora and deal with objects of historical interest as per the environmental specifications.
Contractual Terms
Source: C3 Works Information - Culemborg Phase 1A Rev2.pdf (RFP)
Contract form: NEC3 Engineering and Construction Contract (ECC).
Contract period: eighteen (18) months.
Design responsibility:
The Contractor is wholly responsible for all design coordination, integration and liaison.
The Contractor must appoint ECSA-registered professional engineers/technologists for all designs.
The Contractor indemnifies the Project Manager and Employer against any claims arising from the design and construction of permanent and temporary works.
Intellectual property:
The Contractor grants the Employer a licence to use the copyright in all design data for any purpose connected with the works, transferable to third parties without the Contractor's consent.
Full title to intellectual property and copyright in design data vests in the Employer.
The Contractor grants the Employer a non-exclusive licence under Section 22 of the Copyright Act 1978 to copy, use, modify and provide copies of any document/calculation to third parties.
Cooperation with Others:
The Contractor must liaise with Transnet Operating Divisions, Eskom, Telkom, and other service/utility owners to ascertain impacts, develop mitigation measures, and protect their infrastructure.
No claims for extra costs for coordination and cooperation with Others will be entertained.
Completion:
All data packs, quality assurance records and as-built drawings must be submitted within 30 days after the completion date.
The Contractor must remove all plant, materials, equipment, stores, temporary accommodation and any other assets within 14 days after completion, and leave the site tidy.
Subcontracting:
The Contractor manages all persons executing the works, including subcontractors/OEMs and suppliers.
Industrial action:
The Contractor is responsible for managing industrial action by its employees.
Invoicing:
The Contractor's invoices are subject to the contract terms (Section 7 of the Works Information).
Special Conditions
Source: C3 Works Information - Culemborg Phase 1A Rev2.pdf (RFP)
Special conditions of contract:
The Culemborg Site is a designated security area; all access is strictly controlled. The Contractor must comply with all site entry requirements, and the cost of compliance (labour transport, access requirements, maintaining access cards) must be included in the tendered price.
The Contractor must obtain necessary entry permits for all staff and issue identification cards detailing name and identity number.
The Contractor is responsible for the security of the works until completion and hand-over.
The Contractor must be in constant consultation with the Port's security operations.
The Contractor's staff shall be confined to the working area and defined access routes; disobeying this will result in disciplinary action.
The Contractor must interface with the activities of others to avoid delays and ensure safe access. Due care must be taken when dealing with areas where illegal communities traverse the fence line.
The Contractor must not advertise the contract or project on notice boards, in any advertising media, or reveal any details to the public.
The Contractor must make arrangements for the connection of electricity power supply to the work site. Water supply connection points, if available, will be indicated by the Project Manager. There is no water-borne sewage facility available.
The Employer provides the site and access for the duration of the works, and yard/laydown areas as indicated under Part C4. Temporary storage outside designated areas is at the Contractor's sole risk.
The Contractor must provide portable toilets for the Project Manager and Supervisor, and maintain them in a clean and sanitary condition.
No housing is permitted within the Contractor's laydown area or anywhere else within the port boundaries.
The Contractor must appoint a registered surveyor to set out the works and survey the site before and after installation.
The Contractor must verify survey reference points within two weeks after site handover and report any discrepancies in writing.
The Contractor must protect property beacons, trigonometrical survey beacons, and setting-out beacons; any displaced or destroyed beacons must be replaced by a registered land surveyor at the Contractor's cost.
Excavations deeper than 1.5m must be shored or battered back to a safe angle, approved by a competent person.
No excavations without written permit from port authorities and other relevant parties.
The Contractor must give at least 48 hours' notice before covering up any work.
The Contractor must submit all data packs, quality assurance records and as-built drawings within 30 days after completion date.
Section
Source: C3 Works Information - Culemborg Phase 1A Rev2.pdf (RFP)
The Contractor's design is evaluated at the Technical Evaluation stage in line with the Employer's requirements and specifications. The design must be submitted as part of the tender submission.
Technical evaluation will consider:
Compliance with the Employer's requirements and specifications.
Design must be authenticated by ECSA-registered professional engineers or technologists.
Design must include lighting simulation/model (ReLUX at minimum), illumination studies, and electrical Certificate of Compliance.
Preference points: B-BBEE points claimed under the PPPFA (80/20 or 90/10 system, as applicable).
Minimum qualifying score: not stated in the document.
DocumentC4 Site Information (1).pdfReview complete
Description
Source: C4 Site Information (1).pdf (RFP)
TNPA is mandated to protect its assets, customers, employees and port facilities against terrorism, sabotage, stowaways/illegal immigrants, armed robbery, etc. The works aim to replace and upgrade security fencing, perimeter lighting and entrance lighting at Culemborg to ensure compliance with relevant legislation and regulatory standards, and to address security concerns from the current condition of the facilities.
Contact Information
Source: C4 Site Information (1).pdf (RFP)
No contact information is provided in this document.
Submission Guidelines
Source: C4 Site Information (1).pdf (RFP)
Returnable documents: none specified in this document.
Submission method: not stated in this document.
Closing time: 30 October 2026 at 16:00 (per tender record).
Evaluation Criteria
Source: C4 Site Information (1).pdf (RFP)
No evaluation criteria are specified in this document.
Technical Specifications
Source: C4 Site Information (1).pdf (RFP)
Scope of works:
Design, supply, installation and commissioning of an 11kV mini substation.
Perimeter and entrance lighting at Culemborg.
Security fencing at Culemborg.
Contract period: 18 months.
Site details:
Existing perimeter fencing is a combination of steel palisade and welded mesh, approximately 2.5m high, with damaged sections and gaps.
No perimeter lighting currently exists; only street lighting along the N1 Highway.
Main security entrance has no dedicated lighting.
Works to replace and upgrade fencing, perimeter lighting and entrance lighting to comply with legislation and security standards.
Fencing installation runs along the southern boundary, adjacent to an IRT lane.
Site constraints:
An illegal community is scattered along the site, with structures using the existing palisade fencing as support. The contractor must avoid disturbing these structures as far as possible and must inform the Employer before working adjacent to or near the community.
Existing buildings, structures, machinery and railway lines are present; works must not affect existing infrastructure.
An existing mini-substation (owned and operated by the Employer) supplies a 400V supply kiosk.
Underground services:
Drawings for underground utilities can be requested from the Project Manager after appointment, but accuracy is not guaranteed.
The contractor must verify all drawings and confirm subsoil material and properties before construction.
Access:
Access to the Port via Duncan Road, Christiaan Barnard Street and South Arm Road.
Access to Culemborg Precinct via the main entrance on Jack Craig Street.
The Port is security-regulated under ISPS Maritime Security Regulations 2004.
All personnel must produce ID at the main gate; vehicles, persons and goods may be searched.
Random breathalyser testing applies; no alcohol permitted on site.
Visitors must sign in; electronic access cards may be obtained from TNPA.
Safety induction is mandatory for all personnel; induction permits must be carried and are renewable yearly.
A vehicle permit must be obtained from the TNPA Permit Office for the duration of the work.
PPE minimum: steel-toe boots, hard-hat, high-visibility vest; additional PPE may be required.
Work can be scheduled during and after normal hours, subject to arrangement with the Project Manager and Operations Supervisors.
Quality Management
Source: C4 Site Information (1).pdf (RFP)
No quality management requirements are specified in this document.
Pricing Schedule
Source: C4 Site Information (1).pdf (RFP)
No pricing schedule details are provided in this document.
Financial Requirements
Source: C4 Site Information (1).pdf (RFP)
Access permit replacement cost: R 360.00 per person, payable by the Service Provider if a permit is lost or not returned at project completion.
Compliance Requirements
Source: C4 Site Information (1).pdf (RFP)
Health and safety:
Mandatory induction before entering site or undertaking work; arranged by Port staff at no cost.
The Service Provider must provide its own first aid facilities as per the Health and Safety Specifications.
Compliance with the Employer's Health and Safety Standard issued with the Works Information.
The Employer has conducted a Basic Risk Assessment; the Service Provider must familiarise itself and implement all recommended risk mitigation measures.
Access and security:
Compliance with the Employer's security and SHEQ requirements and regulations.
No alcohol permitted on site or on TNPA property.
All personnel must undergo safety induction and carry induction permits.
Vehicle permits required from the TNPA Permit Office.
PPE requirements as specified.
Health & Safety
Source: C4 Site Information (1).pdf (RFP)
Health and safety requirements:
Mandatory induction before entering site or undertaking work; arranged by Port staff at no cost.
The Service Provider must provide its own first aid facilities as per the Health and Safety Specifications.
Compliance with the Employer's Health and Safety Standard issued with the Works Information.
The Employer has conducted a Basic Risk Assessment; the Service Provider must familiarise itself and implement all recommended risk mitigation measures.
All personnel must undergo safety induction and carry induction permits (renewable yearly).
Vehicle permits required from the TNPA Permit Office.
PPE minimum: steel-toe boots, hard-hat, high-visibility vest; additional PPE may be required.
No alcohol permitted on site or on TNPA property.
Random breathalyser testing applies.
Environmental
Source: C4 Site Information (1).pdf (RFP)
No specific environmental requirements are stated in this document.
Special Conditions
Source: C4 Site Information (1).pdf (RFP)
Special conditions:
Working hours: Normal TNPA staff hours are 08:00 to 16:30, Monday to Friday, but the port operates 24/7.
Access permits: Card access system; lost or unreturned permits cost R 360.00 per person, payable by the Service Provider.
No laydown area will be provided by the Employer.
Site constraints: Illegal community structures along the fence line must not be disturbed; the contractor must inform the Employer before working near them.
Existing infrastructure (buildings, machinery, railway lines) must not be affected.
The contractor must verify all drawings and subsoil conditions before construction.
Access to the Port via Duncan Road, Christiaan Barnard Street and South Arm Road; to Culemborg via Jack Craig Street.
Security: ID checks, searches, breathalyser testing, no alcohol.
Work can be scheduled during and after normal hours, subject to arrangement with the Project Manager and Operations Supervisors.
DocumentC2 Part 2 Pricing Data Option B -Culemborg September rev02.pdfReview complete
Description
Source: C2 Part 2 Pricing Data Option B -Culemborg September rev02.pdf (RFP)
The works comprise the design, supply, installation and commissioning of an 11kV mini substation, perimeter and entrance lighting, and security fencing at Culemborg, over an 18-month period. This document is Part 2: Pricing Data, containing pricing instructions and the Bill of Quantities.
Submission Guidelines
Source: C2 Part 2 Pricing Data Option B -Culemborg September rev02.pdf (RFP)
Returnable documents: the priced Bill of Quantities (C2.2) and the completed pricing instructions (C2.1). All monetary amounts must be algebraically accurate and fully inclusive of all costs. No other returnable forms are specified in this part of the tender pack.
Evaluation Criteria
Source: C2 Part 2 Pricing Data Option B -Culemborg September rev02.pdf (RFP)
No explicit evaluation criteria (e.g., CIDB grade, B-BBEE level, CSD registration) are stated in this pricing data document. The contract is a re-measurement contract under NEC3 ECC Option B; the priced Bill of Quantities is the basis for payment. The Enterprise Development (CIDB B.U.I.L.D) items are mandatory and must be priced. Bidders must be able to execute the full scope including all SHERQ and legal requirements.
Technical Specifications
Source: C2 Part 2 Pricing Data Option B -Culemborg September rev02.pdf (RFP)
Scope of works: design, supply, installation and commissioning of an 11kV mini substation, perimeter and entrance lighting, and security fencing at Culemborg.
Contract period: 18 months.
Key quantities (from Bill of Quantities):
Remove 1,500 m of 2.4 m steel palisade fencing and 2,000 m of 2.7 m high security welded mesh fencing, including breaking out concrete bases and disposal.
Site clearance: 7,000 m² of rubbish, debris, vegetation and trees up to 200 mm girth; strip 150 mm topsoil over 7,000 m².
Supply and install 5,000 m of 110 mm dia UPVC pipes, 5,000 m of 160 mm dia UPVC pipes, 10,000 m of cable draw wire, 5,000 m of cable marking tape.
Protect, remove or realign 300 m of underground power cables; temporary and permanent protection of other services.
Design, supply and install 3,500 m of 2.4 m high security welded mesh fence with 2.7 m intermediate posts and 300 mm overhead spikes.
Earthworks: 140 m³ excavation for bases, 1,300 m³ pipe trenches, 200 m³ light pole/manhole foundations, 300 m³ hand excavation to expose cables (soft and hard material), 600 m³ imported bedding, 900 m³ backfill, 200 m³ disposal, compaction to 90%, 93% and 100% Mod AASHTO.
Concrete: 140 m³ 25 MPa/19 mm concrete for bases, 350 m² rough formwork to sides of bases, 70 concrete test cubes (150x150x150 mm).
Manholes: 10 precast 1 m diameter, 1 m deep manholes with lockable lids; 40 m³ sub-base G5 and 40 m³ sub-base G3 material.
Preliminaries: site establishment, offices, ablutions, tools, water/power/communications, site security (24/7 for 18 months), supervision, environmental officer, health and safety compliance, environmental management compliance.
Methodology
Source: C2 Part 2 Pricing Data Option B -Culemborg September rev02.pdf (RFP)
The Bill of Quantities follows the NEC approach to Preliminary and General items, using method-related charges for equipment, fixed charges for equipment required throughout construction, time-related charges for supervisory staff, and lump sums for other facilities. The Model Preambles for Trades (2008 edition) published by the Association of South African Quantity Surveyors are incorporated, with supplementary preambles taking precedence.
Quality Management
Source: C2 Part 2 Pricing Data Option B -Culemborg September rev02.pdf (RFP)
The Contractor must prepare and maintain a Quality Control Plan (QCP) as a fixed charge item. Concrete test cubes must be made, stored and tested in accordance with SANS 5861, SANS 5862 and SANS 5863, with acceptance per SANS 2001-CC1 clause 5.1.2. Testing must be done by an independent firm approved by the Engineer. 70 test cubes (150x150x150 mm) are required, 3 cubes per load.
Pricing Schedule
Source: C2 Part 2 Pricing Data Option B -Culemborg September rev02.pdf (RFP)
The pricing schedule is a Bill of Quantities under NEC3 ECC Option B (re-measurement contract). The Employer provides the Bill of Quantities, which the Contractor prices. The contract price is the sum of lump sums and rates multiplied by quantities. Quantities are provisional and subject to remeasurement; payment is based on measured work certified by the Project Manager. Prices must be fully inclusive of all work, risks, liabilities, obligations, overheads, profit, and everything necessary. Escalation provision under Clause X1 is provisional and subject to adjustment. The Bill includes sections for Preliminaries (fixed and time-related items), Civil Works (alterations, demolitions, earthworks, concrete), and enterprise development items under the CIDB B.U.I.L.D program.
Financial Requirements
Source: C2 Part 2 Pricing Data Option B -Culemborg September rev02.pdf (RFP)
Pricing format: NEC3 ECC Option B re-measurement contract with a priced Bill of Quantities. The contract price is the sum of lump sums and rates multiplied by quantities. Quantities are provisional and subject to remeasurement; payment is based on measured work certified by the Project Manager.
Prices must be fully inclusive of all work, risks, liabilities, obligations, overheads, profit, and everything necessary to carry out the item.
Escalation: an allowance for contract price escalation is included in the Final Summary under Clause X1; it is provisional and subject to adjustment based on actual cost index fluctuations, certified by the NEC Project Manager. It is not a guaranteed payment.
Fixed preliminary items are valued and paid on a proven cost basis up to the total value.
Time-related items (e.g., supervision, plant, site security) are measured in months (18 months).
Enterprise Development (CIDB B.U.I.L.D) items are to be priced as provisional sums.
Compliance Requirements
Source: C2 Part 2 Pricing Data Option B -Culemborg September rev02.pdf (RFP)
No specific compliance requirements (e.g., CIDB grade, B-BBEE level, CSD registration) are stated in this pricing data document. The contract requires compliance with the NEC3 ECC Option B conditions, including the provision of a priced Bill of Quantities. The Enterprise Development (CIDB B.U.I.L.D) requirements are mandatory and must be priced. Bidders must be capable of providing on-site security services for the full 18-month period.
Health & Safety
Source: C2 Part 2 Pricing Data Option B -Culemborg September rev02.pdf (RFP)
The Contractor must comply with the Occupational Health and Safety Act, Construction Regulations 2003, and the Health and Safety Specification. A Health and Safety File must be maintained and closed out at project end. Health and safety compliance includes PPE, harnesses, etc. On-site security services must be provided 24/7 for the duration of the contract. An Onsite Environmental Officer is required for the 18-month period.
Environmental
Source: C2 Part 2 Pricing Data Option B -Culemborg September rev02.pdf (RFP)
The Contractor must comply with the TNPA CEMP, SES and environmental legislation. An Onsite Environmental Officer is required for the 18-month period. Environmental management compliance is a fixed charge item.
Contractual Terms
Source: C2 Part 2 Pricing Data Option B -Culemborg September rev02.pdf (RFP)
The contract is NEC3 Engineering and Construction Contract (June 2005 and 2013) Option B (re-measurement with Bill of Quantities). The Bill of Quantities is a pricing document only; the Contractor Provides the Works in accordance with the Works Information. Prices and rates may be used as a basis for assessing compensation events (Clause 63.13). Escalation provision under Clause X1 is provisional and subject to adjustment based on actual cost index fluctuations, certified by the NEC Project Manager.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Level 200, Carlton Centre, 150 Commissioner St, Cbd, Johannesburg, 2001, South Africa
Document-Backed
Recently Synced
Source Snapshot Available
AI Enhanced
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
4
Last checked
04 Oct 2026
AI status
Enhanced
Data conflicts
None detected