Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Lower Germiston Road - Rosherville - Germiston - 2020
Organization Type
GOVERNMENT
Published
28 Jul 2026
OCDS Reference
ocds-9t57fa-163752
ESKOM holdings soc ltd invites tenders for the supply and delivery of mechanical damper kits, including gaskets and seals, over a 5-year period. This open tender (e1826tsseri) targets suppliers capable of meeting strict quality, compliance, and technical standards for a long-term contract in gauteng.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Tuesday, 18 August 2026 - 10:00
Venue
https://teams.microsoft.com/meet/310794080305866 ?p=a8dm1impce9i6stMsa
Categories
Request for Bid(Open-Tender)
Lower Germiston Road - Rosherville - Germiston - 2020
Recommended Certifications
Having these can improve your winning chances: SABS Product Certification, NRCS Certification
AI Document Analysis Stages
Important Dates
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdf (unknown)28 Jul
2026
Tender Published
Tender was published
18 Aug
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
240-105658000 Supplier QM Spec Rev 3-QM 58.pdf
Eskom is inviting tenders for the supply and delivery of Mechanical Damper kits over a 5-year period. The tender emphasizes strict adherence to Eskom’s Supplier Quality Management (SQM) Specification (240-105658000/QM 58), which mandates compliance with ISO 9001 standards for Quality Management Systems (QMS). Suppliers must demonstrate capability in quality assurance, control, and continuous improvement, with detailed documentation, audits, and performance monitoring required throughout the contract duration.
Eskom Supplier Integrity Pact - 02 June 2023.pdf
The tender concerns the supply and delivery of Mechanical Damper kits for a 5‑year period by Eskom. Participation requires compliance with the Eskom Supplier Integrity Pact, which sets out ethical obligations, conflict‑of‑interest disclosures, gift limits, anti‑fraud and collusion prohibitions, confidentiality requirements, and reporting mechanisms.
Supplier Evaluation Pack Template for 01 March 2025 to 29 February 2026.xls
The tender document appears to be corrupted or improperly formatted, making it unreadable. However, based on the provided metadata, the tender is for the 'Supply and delivery of Mechanical Damper kit for 5 years' issued by ESKOM in Gauteng, South Africa, with a closing date of August 18, 2026.
Technical Evaluation.pdf
Tender for the supply and delivery of Mechanical Damper kits (Sprecher and Schuh HPF 512-2FS and HPF 515-2FS Circuit Breaker Spares for 132 kV – 275 kV) over a 5-year period, issued by ESKOM in Gauteng. Closing date is August 18, 2026.
Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.doc
The tender is for the supply and delivery of Mechanical Damper kits to Eskom over a 5-year period. The document primarily focuses on a PAYE (Pay As You Earn) questionnaire to determine the tax classification of contractors (e.g., Independent Contractor, Personal Service Provider, Labour Broker, or Dependent Contractor) supplying services or labor to Eskom. It includes detailed questions, affidavits, and declarations to assess compliance with South African tax legislation, particularly the Income Tax Act No. 58 of 1962.
Authority to submit a tender (Returnable Schedule) Template.docx
The tender is for the supply and delivery of Mechanical Damper kits to ESKOM in Gauteng over a 5-year period. Applicants must submit authorization documentation proving their legal capacity to sign tender-related documents, tailored to their business structure (e.g., company, close corporation, partnership, joint venture, or sole proprietor).
Annexure C 5 Environmental Tender Evaluation and Scoring Card (High, Medium and Low risk work).docx
Tender for the supply and delivery of Mechanical Damper kits to ESKOM in Gauteng over a 5-year period. The tender emphasizes compliance with Safety, Health, and Environmental (SHE) standards, including submission of environmental management plans, policies, and certifications based on risk categories (High, Medium, Low).
240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdf
Eskom is inviting tenders for the supply and delivery of Mechanical Damper kits over a 5-year period in Gauteng. The tender emphasizes compliance with ISO 9001 Quality Management System (QMS) requirements, documented processes, and customer-specific criteria.
240-68099512 Form A_Cat 4_ Rev 9.pdf
Eskom is inviting tenders for the supply and delivery of Mechanical Damper kits over a 5-year period in Gauteng. The tender emphasizes compliance with Eskom's Quality Requirements (Document 240-105658000) and ISO 9001 standards, including pre- and post-contract quality assessments, supplier capability evaluations, and ongoing performance monitoring.
OHS Tender Evaluation Template low risk work.docx
Eskom is inviting tenders for the supply and delivery of Mechanical Damper kits over a 5-year period in Gauteng. The tender emphasizes compliance with Occupational Health and Safety (OHS) standards, requiring documentation such as signed acknowledgments, OHS plans, risk assessments, and valid certifications like ISO 45001 or COIDA.
240-126469599 (Rev 2) - Method Statement - Template.docx
The tender is for the supply and delivery of Mechanical Damper kits to ESKOM in Gauteng over a 5-year period. The document outlines the method statement, scope of work, objectives, competencies, infrastructure, risk management, and relationship management requirements for potential suppliers.
SOW.pdf
ESKOM is inviting tenders for the supply and delivery of Mechanical Damper kits for Sprecher and Schuh HPF512-2FS and HPF515-2FS 132kV-275kV breakers over a 5-year period. The kits include specific O-rings, V-head damper gauge glass, screws, rubber components, and limb gauge glass components with precise dimensions.
INVITATION TO TENDER- SUPPLY AND DELIVERY OF MECHANICAL DAMPER KIT 28 July 2026.pdf
Eskom Holdings SOC Ltd invites tenders for the **Supply and Delivery of Mechanical Damper Kits** over a **5-year period**. The tender (E1826TSSERI) is an **open invitation** with a **closing date of 18 August 2026 at 10:00 UTC**. Submissions must be made electronically via the [Eskom Tender Bulletin](https://tenderbulletin.eskom.co.za/). The contract will be governed by **NEC 3 Supply Contract** terms, and pricing will be evaluated under the **80/20 PPPFA scoring system** (80 points for price, 20 for specific goals). A **non-compulsory clarification meeting** is scheduled for **05 August 2026 at 10:00 via MS Teams**.
Eskom - Standard Conditions of Tender - 30 January 2025 (G20 Logo).pdf
Eskom is inviting tenders for the supply and delivery of Mechanical Damper Kits over a 5-year period. The tender process is open, competitive, and governed by strict compliance, ethical, and procedural requirements as outlined in Eskom's Standard Conditions of Tender (Rev 12). The closing date is 18 August 2026, and submissions must adhere to detailed formatting, documentation, and legal obligations.
NEC SUPPLY CONTRACT MECHANICAL DAMPER.pdf
This tender is for the supply and delivery of Mechanical Damper Kits for 132kV and 275kV breakers (Sprecher and Schuh HPF512-2FS and HPF515-2FS) over a period of five (5) years. The contract is governed by the NEC3 Supply Contract (SC3) and includes specific technical, legal, and compliance requirements. The successful bidder will be responsible for delivering the kits to Eskom Rotek Industries' premises in Rosherville, Gauteng, with all associated costs included in the quoted price. The contract includes provisions for pricing, delivery schedules, defect liability, insurance, and compliance with South African laws and Eskom’s policies, including B-BBEE and safety standards.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 1 690 793
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Supplies: General. Unlock full pricing strategies, bid frequency, and historical win rates.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
{"closingDate":"17 October 2021"}
Contact Information
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdf (unknown){"name":null,"email":null,"phone":null,"department":"Supply Chain Management","address":null}
Evaluation Criteria
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdf (unknown)General
Quality
Legal
Technical Specifications
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdf (unknown)Title: Supplier Quality Management: Document Identifier: 240-105658000
Alternative Reference QM 58
Number:
Area of Applicability: Eskom Holdings SOC Ltd
Functional Area: Quality Management
Revision: 3
Total Pages: 28
Next Review Date: October 2024
Disclosure Controlled Disclosure
Classification:
Compiled by Supported by Functional Authorized by
Responsibility
SA Sambo P Dondashe L Meyer K Pather
Chief Advisor Middle Manager Acting Senior General Manager
Quality Quality Manager Quality Risk and
Management Management Management Sustainability
Date: 15/10/2021 Date: 15/10/2021 Date: 15/10/2021 Date: 17 October 2021
EDC TN Formatted 15.10.2021
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Content
. Introduction ............................................................................................................................... 3
2.1 Scope ............................................................................................................................... 3
2.1.1 Purpose ................................................................................................................. 3
2.1.2 Applicability ........................................................................................................... 3
2.1.3 Effective date ......................................................................................................... 3
2.2 Normative/Informative References ................................................................................... 3
2.2.1 Normative .............................................................................................................. 3
2.2.2 Informative............................................................................................................. 3
2.3 Definitions ........................................................................................................................ 4
2.4 Abbreviations ................................................................................................................... 5
2.5 Roles and Responsibilities ............................................................................................... 6
2.6 Process for Monitoring ...................................................................................................... 6
2.7 Related/Supporting Documents ........................................................................................ 6
3.1 Supplier and Sub-Supplier Quality Management System Requirements .......................... 7
3.2 Quality Plan ...................................................................................................................... 8
3.3 Contract Quality Plan........................................................................................................ 8
3.4 Quality Control Plan ....................................................................................................... 10
3.5 Pre-Contract Award: Quality Requirement ...................................................................... 13
3.6 Main Supplier and Sub-supplier Capability and Capacity Assessment ........................... 16
3.7 Post-Contract Award ...................................................................................................... 17
3.7.1 Contract Execution .............................................................................................. 17
3.7.2 Supplier Quality Performance Monitoring Phase ................................................. 18
3.7.3 Supplier Quality Audit .......................................................................................... 18
3.8 Standard Conditions ....................................................................................................... 19
3.8.1 Rights of Access .................................................................................................. 19
3.8.2 Eskom Rights to Information ................................................................................ 20
3.8.3 Preservation ........................................................................................................ 21
3.8.4 Quality Audits Related Conditions ....................................................................... 25
3.8.5 Management of Nonconformities and Nonconforming Outputs Identified by
Eskom ................................................................................................................. 25
3.8.6 Special Processes ............................................................................................... 26
Acceptance ............................................................................................................................. 27
Revisions ................................................................................................................................ 27
Development Team ................................................................................................................ 27
Acknowledgements ................................................................................................................ 28
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The intention of this specification is to specify and describe the minimum quality requirements for all
existing and potential Eskom suppliers and define the quality criteria for the selection, evaluation,
vendor registration, management, monitoring, assessment and auditing of suppliers. Eskom’s
position is to partner with suppliers who fully demonstrate commitment to the development,
implementation, and maintenance of a quality management system (QMS) that conforms to the
requirements of ISO 9001 standard. The priority is to encourage suppliers to continually improve
their QMS and enhance service delivery by implementing and conforming to the standard.
2.1 Scope
2.1.1 Purpose
The purpose of this specification is to outline the requirements according to which suppliers shall
develop,
implement,
maintain, and
continually improve
a quality management system (QMS) based on ISO 9001, which should form the basis for conformity
to Eskom quality requirements and continually adhere to them throughout the duration of a contract
2.1.2 Applicability
This specification shall apply throughout Eskom Holdings Limited divisions, its subsidiaries,
suppliers, and sub-suppliers and shall form part of all Eskom requests for information (RFI)/ requests
for quotation (RFQ)/ requests for proposal (RFP), including contracts for the procurement of products
and services.
2.1.3 Effective date
Date of authorisation of the specification
2.2 Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
[1] ISO 9001 Quality Management Systems – Requirements
[2] ISO 10005 Quality Management Systems – Guidelines for Quality Plans.
2.2.2 Informative
[3] ISO 9000 Quality Management Systems – Fundamentals and Vocabulary
[4] 32-727: Safety, Health, Environment, and Quality (SHEQ) Policy
[5] ISO 10006 Quality Management Systems – Guidelines for Quality Management in Projects
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
[6] ISO 9004 Quality Management – Quality of an Organisation – Guidance to Achieve Sustained
Success
[7] 32-1033: Eskom’s Procurement and Supply Chain Management Policy
[8] 32-1034: Eskom’s Procurement and Supply Chain Management Procedure
[9] PPPFA: Preferential Procurement Policy Framework Act, 2000 (Act No. )
[10] CIDB 1004: Best Practice Guideline A4: Evaluating Quality in Tender Submissions
[11] 240-12248652 Supplier Quality Management: List of Tender Returnables
[12] IAEA Safety Standard GS-R-3.1 Application of the Management System for Facilities and
Activities
[13] SANS 10845-1 Construction Procurement Part1: Processes, Methods and Procedures
2.3 Definitions
The vocabulary of ISO 9000 and the following definitions apply in the application of this specification.
2.3.1 Component: a constituent part of the product or sub-assembly of the product. The product
may comprise multiple individual components
2.3.2 Contract Quality Plan: a document of the supplier’s process for delivering the level of quality
required by the contract. It is a framework for the contractor’s process for delivering quality.
Purpose of a CQP is to outline how the results defined in the specifications will be achieved.
2.3.3 Hold Point: a predetermined stage in the quality control plan (QCP) beyond which work/
manufacturing shall not proceed without the attendance of, and written authorisation of, an
Eskom representative or Eskom inspection agency, whichever is applicable.
2.3.4 Intervention Points: those control points indicated by the various controlling bodies
concerned with the implementation of a specific QCP/ ITP. These can be in the form of
inspection, hold points, surveillances, witnesses, reviews and verifications.
2.3.5 Inspection Agency: an organisation or person appointed by Eskom for the purpose of
performing quality assurance/ quality control, monitoring, inspection and/ or expediting
services.
2.3.6 Level 1 Plant Items: equipment, whose failure has an effect on personnel safety and/ or
health, causes an environmental incident, cause a huge production loss or major equipment
damage. Equipment that are safety/ redundancy/ protective device or covered by statutory
regulations requirements.
2.3.7 Level 2 Plant Items: equipment, whose failure impacts plant availability and/or reliability,
causes significant costs or secondary damage.
2.3.8 Level 3 Plant Items: equipment that does not impact on personnel safety and/ or health,
environmental, cost, availability and/ or reliability of plant.
2.3.9 Nonconformity: a deficiency in material, composition, characteristic, or performance that
renders the quality of an item, component, or product unacceptable or indeterminate. The
term also covers a deficiency in, or deviation from/non-adherence to, the quality management
system requirements, prescribed production processes, and/or related documentation such
as procedures and instructions.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
2.3.10 Quality Plan: specification of the actions, responsibilities and associated resources to be
applied to a specific object.
2.3.11 Quality Control Plan: a document specifying the activities to be inspected throughout the
execution of the project, inclusive of test methods, procedures, and acceptance criteria (This
term is equivalent to QIP and ITP).
2.3.12 Requirement: the need or expectation that is stated, generally implied, or obligatory.
Requirements are generally specified in the purchase order and/or contract documentation,
but may not be limited to these.
2.3.13 Primary Plant (Power Plant): primary plant include High Voltage equipment situated inside
the control room (breakers, bus-bars, CT’s, VT’s and transformers).
2.3.14 Secondary Plant (Control Plant): secondary plant includes all equipment used to control
and protect the HV equipment on the primary plant side. (Protection, metering, AC/DC and
tele-control).
2.3.15 Special Process: is any production or service process which generates products or services
which cannot be measured, monitored, or verified prior to delivery and use.
2.3.16 Supplier: is a current or potential supplier, vendor, contractor, consultant, or service provider.
A supplier may be a natural or legal person and includes any employee acting within the
course and scope of his/her employment or any agent or manager acting for, or on behalf of,
or in the interests of, the person registered as supplier on the Eskom supplier database.
2.3.17 Sub-supplier: an organisation that provides a product/service to the supplier and/or that
enters into a subcontract and assumes some of the obligations of the supplier or prime
contractor.
2.3.18 Witness Point: a predetermined stage in the quality control plan where and inspection
activity will take place. Work may proceed, provided Eskom or its inspection agency has been
formally notified and confirmed that inspection is waived.
2.4 Abbreviations
Abbreviation Explanation
AIA Approved Inspection Authority
CA Corrective Action
CQP Contract Quality Plan
FIDIC Federation Internationale Des Ingenieurs- Conseils
FMECA Failure Mode, Effects and Criticality Analysis
HAZOP Hazard and Operability Study
ISO International Organisation for Standardisation
ITP Inspection and Test Plan
NC Nonconformity
NDT Non Destructive Testing
PMI Positive Material Identification
QCP Quality Control Plan
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Abbreviation Explanation
QMS Quality Management System
PQP Project Quality Plan
RFI Request for Information
RFQ Request for Quotation
RFP Request for Proposal
SHEQ Safety, Health, Environment, and Quality
SETA Skills Education Training Authorities
WPS Welding procedure specifications
WQR Welder’s Qualification Record
2.5 Roles and Responsibilities
Eskom Quality representative/ professional will select applicable requirements for existing and
potential Eskom suppliers using Form A (Tender and Contract Quality Requirements for Supplier
Quality Management: Specification 240-105658000/ QM 58 and Quality Requirements for ISO 9001
Standard).
The existing and/ or potential suppliers must complete, sign and return Form A with the other
returnable as listed in the List of Tender Returnable document (240-12248652). Other roles and
responsibilities for this standard are defined within the text of this specification.
2.6 Process for Monitoring
The application of this specification throughout Eskom shall be audited as per the management
system audit schedule.
2.7 Related/Supporting Documents
The documents superseded by this specification: all divisional and business unit supplier quality
requirements standards and/or specifications.
Forms and templates:
[1] 240-68099512 Tender and Contract Quality Requirements for Supplier Quality Management
Specification 240-105658000/ QM 58 and Quality Requirements for ISO 9001 Standard (Form
A)
[2] 240-109253698 Template for a Typical Contract Quality Plan
[3] 240-109253302 Quality Control Plan/Inspection and Test Plan
[4] 240-126469599 Method Statement Template.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The quality assessment criteria and Form A of this specification will be selected and completed by
an Eskom Quality representative/ professional who will identify the applicable supplier quality
requirements to be met.
Form A of this specification must also be completed and signed by the supplier responding to an
Eskom invitation to tender, in order to acknowledge and accept Eskom Supplier Quality requirements
as per this specification and ISO 9001 Standard or any additional quality requirements specific to
the scope of work.
3.1 Supplier and Sub-Supplier Quality Management System Requirements
3.1.1 The supplier and sub-supplier shall develop, implement, maintain and improve a formal QMS
that conforms to the latest ISO 9001 standard or any applicable standard of QMS (latest
applicable revision) and in accordance with the requirements of this specification.
3.1.2 Such a formal system shall consist of the appropriate documented information required by
ISO 9001 and may include a quality manual, quality plans, work procedures, work
instructions, method statements, work flow documentation, etc., as the case may be. This
requirement constitutes the most basic QMS requirements.
3.1.3 Unless specifically excluded from the quality list of tender returnable, as per the categories of
quality requirements (Category 1, 2, 3, or 4), such a QMS shall carry a valid ISO 9001
certificate from an accredited certification body, as indicated in the applicable Eskom
invitation (this requirement applies equally to both the supplier and any/ all manufacturing
third-party organisations mentioned above).
3.1.4 Unless specifically excluded in the quality list of tender returnable, as per the categories of
quality requirements (Category 1, 2, 3, or 4), the supplier shall have a fully developed,
documented, implemented, reviewed and maintained QMS that complies with the
requirements of ISO 9001 standard or any applicable standard of QMS. In the event that the
main supplier invariably requires the assistance of a sub-supplier in order to realise its own
supply obligations. The aforementioned requirement applies equally in all cases where any
such sub-supplier’s scope of responsibility includes the provision of any of the following
activities, namely, design and development, manufacturing, maintenance, testing, storage,
delivery, installation, commissioning, and project management, or in the cases the supplier
name changes, mergers, acquisitions and/ or cessions. Eskom Quality department must
ensure that the changed entity can still fulfil the requirements as set out in the contract
documentation.
3.1.5 Eskom reserves the right to request and perform necessary assessments at sub-supplier
facilities.
3.1.6 The main supplier shall be responsible for defining and managing the specific quality
assurance and control elements applicable to the respective sub-supplier’s scope of
work/supply and ensure that its sub-supplier(s) quality programmes support Eskom
requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.1.7 The supplier shall inform Eskom of any proposed changes to the QMS or staff that will affect
the quality system prior to implementation of these changes.
3.1.8 The main supplier shall develop and implement a performance management programme for
their sub-supplier. The programme shall include, but not limited to:
Verification of the QMS
Audits and surveillances
Regular assessment of the CQPs and reviews of QCPs.
NC and Defect Management
Inspection and test plans
Risk management
3.2 Quality Plan
The information in this section constitutes the minimum requirements for a quality plan.
3.2.1 Where specified in the Evaluation Criteria and/ or quality list of tender returnables , as per the
categories of quality requirements (Category 1, 2, 3, or 4); all individual products, services
and processes shall have a documented, implemented, reviewed and maintained contract
quality plan and/or quality control plan (inspection and test plan).
3.2.2 Where specified in the evaluation criteria and/ or quality list of tender returnables. All
production and/ or service provision shall be carried out in accordance with a documented
and agreed contract quality plan (CQP) and/ or quality control plan (QCP)/ inspection and test
plan (ITP).
3.2.3 The supplier shall plan for the required quality-related activities and interfaces within the
supplier’s quality system in order to demonstrate its ability towards both controlling and
meeting specified Eskom requirements.
Note 1: Contract Quality Plan should address the quality assurance elements related to the scope
of work and/ or technical specification.
Note 2: Quality Control Plan (QCP)/ Inspection and Test Plan (ITP) should address the quality
control elements related to the scope of work and/ or technical specification.
3.3 Contract Quality Plan
The main supplier shall require sub-suppliers to submit project quality plans (PQPs)/ contract quality
plans (CQPs) and associated documentation in accordance with the requirements of project QMS
processes applicable to the sub-supplier’s scope of work.
The supplier shall, where applicable, based on scope of work criticality, ensure that procurement
documents clearly and unambiguously require sub-supplier submission of a sub-supplier CQP for
supplier and Eskom review.
The main supplier shall ensure that sub-supplier CQPs are developed and implemented in
accordance with the ISO 10005 Quality Management System Guidelines for Quality Plans. In
addition to the elements specified in ISO 10005, the supplier’s and/ or sub-suppliers’ CQPs shall
include the following (as applicable):
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.3.1 The management of records, including material tests, positive material identification (PMI)
testing, material certification, etc.
3.3.2 The provision for free and uninhibited access by the supplier and/or personnel at the time of
inspection.
3.3.3 The proposals for submission of final documentation, the final manufacturing data book, prior
to shipment.
3.3.4 The special processes related to welding: management of the welder’s qualification record
(WQR), welding procedure specifications (WPS), and procedures qualification records (PQR)
that will be used in the performance of work for supplier review and acceptance prior to
commencing manufacture. Welders shall be qualified to the specified Codes of Construction
for the applicable procedures. The requirements for qualification shall be specified by the
supplier, and welder records shall be maintained by sub-suppliers performing the work.
3.3.5 The special installation procedures and other required fabrication or manufacturing
procedures (that is, those required for post-weld heat treatment, tube rolling, coatings, etc.)
that will be used in the performance of work shall require supplier review and acceptance
prior to commencing manufacture. The personnel carrying out special processes (for
example, NDE, welding, coating, heat treatment, etc.) where the results cannot be fully
verified by subsequent inspection and test shall be suitably qualified and, where applicable,
registered with statutory bodies as legally required, that is, as radiographic workers to conduct
radiography. The requirements for the qualification shall be specified, and personnel records
shall be maintained in accordance with the Project Quality Personnel Qualification
Specification and, where applicable, legal requirements.
3.3.6 The personnel required to perform special processes shall be certified competent through a
certificate of competency in accordance with the company’s internal training management
and competency control procedures or an external certification body (for example, NDT)
through an accredited service provider as per Skills Education Training Authorities (SETA)
requirements.
3.3.7 All personnel who perform activities that affect quality shall have their training needs identified
and documented. The required training shall be implemented in accordance with the
company’s training management and competency control procedures. All the training
certificates shall meet the SETA requirements in terms of having the unit standard completed
and the accreditation number of the service providers.
3.3.8 Instructions and requirements for equipment and materials storage, preservation, and
maintenance, including identification of materials required for preservation and maintenance,
are to be provided sufficiently prior to receipt (prior to shipment or earlier) to ensure that
appropriate resources are available at the time of delivery.
3.3.9 Specific quality monitoring and verification activities are to be undertaken on the supplier’s
sub-suppliers by Eskom or it agent.
3.3.10 The CQP information need to include, but not limited to:
Spells out the aspects of the QMS to be applied within a specific Eskom project, and the
methods to be utilised to ensure quality.
Outline the resources, the communication channels, applicable documents and records to be
generated.
Management Authority and Responsibility from both supplier and client need to outline in the
Cqp.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
List of documents and records that will be used and submitted during the execution of the
project.
Communications channels should include contact person and contact details
Monitoring & measurement procedures for activities need to be indicated.
3.3.11 The main supplier and sub-supplier CQPs shall comply with the Eskom Quality Requirements
Specifications and shall be submitted prior to the initial scope of work kick-off or initial pre-
fabrication meeting and prior to commencement of manufacturing, whichever is earlier.
3.3.12 The Eskom template for CQP provided shall be used as guideline, where the supplier does
not have a CQP template.
3.4 Quality Control Plan
The supplier shall develop and implement processes and procedures that efficiently and effectively
monitor, verify and document the quality of the scope of work for deliverables.
The main supplier shall ensure that sub-supplier QCPs/ ITPs are prepared at a level of detail
sufficient to address all quality-control-related activities in a chronological order, from contract review
through materials verification, manufacturing, fabrication, assembly, final testing, commissioning,
hand-over documentation, and certification. In addition, the supplier shall ensure compliance with
the following requirements:
3.4.1 All stages of manufacturing, fabrication, assembly and installation shall be controlled by a
supplier’s QCP/ ITP that clearly and unambiguously identifies the quality verifications to be
performed and special attention to controls related to critical products and services.
3.4.2 QCP/ ITP shall be reviewed and accepted by Eskom, its inspection authority or agency, and
they shall allow for the insertion of Eskom specific requirements, including hold and witness
points prior to the commencement of work.
3.4.3 Subsequent changes to the Eskom accepted QCP/ ITP shall require Eskom, its inspection
authority or agency’s agreement prior to the commencement of work involving an activity
affected by such changes.
3.4.4 The ITPs should cover materials certification, fabrication works, in-process inspections, final
acceptance tests, packaging and pre- shipment/ transportation, shipping/ transportation
inspections where contracted, preservation, site acceptance tests, construction and erection
works, and pre-commissioning and commissioning tests.
3.4.5 All sub-supplier QCP/ ITP activity shall be performed using an Eskom-accepted supplier
Qcp/ itp.
3.4.6 All applicable codes, standards, and relevant acceptance criteria documents are available at
the work location, and Eskom representatives on site shall have on-going access to this
information. Workplace documentation shall be available in English and in any workforce-
appropriate language.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.4.7 Where activities subject to inspection and test procedures are to be undertaken by a sub-
supplier, the QCP/ ITP shall make reference to this fact and shall include descriptive details
of the sub-supplier’s involvement. A separate QCP/ ITP shall be required for each sub-
supplier scope of work.
3.4.8 The supplier shall be ultimately accountable and responsible for the development and proper
implementation of all sub-supplier QCPs/ ITPs, including those reviewed or developed by
sub-suppliers.
3.4.9 Eskom reserves the right to select intervention points on QCPs/ ITPs for Eskom oversight of
selected functions and to perform surveillance or audits of the work.
3.4.10 Once signed, the ITPs and QCPs become addendums to the main contract. These ITPs can
be reviewed at Eskom’s discretion based on its assessment of the supplier’s performance or
other risks.
3.4.11 A QCP/ ITP shall contain the following information:
Eskom contract number and title
The supplier’s order number
Identification of the area of works/contract
Description of the work, with components, item number, and activity date
QCP/ITP unique number
A list of the sequence of operations, including inspection and tests
The identification of the specification, drawing number, or procedure for each operation,
with reference to the relevant criticality risk rating
The acceptance criteria, with reference to the technical specification, in-house, national, or
international standard, with the relevant clause number for each operation
The inspection and test activities that the supplier has nominated for its intervention points
Provision for the inclusion of intervention points nominated by Eskom and/or its authority/
agency
Provision for intervention point acceptance by date and signature for all parties having
intervention in the plan
Inspection and test records to be generated by the supplier for each operation and an
indication of records to be provided to Eskom (as applicable)
3.4.12 The main supplier shall require sub-suppliers to submit QCPs/ ITPs and associated
documentation applicable to the sub-supplier scope of work. Any changes made to the QCP
after submission must be resubmitted to Eskom for further review. The supplier shall ensure
that all sub-supplier QCPs/ ITPs are in compliance with the Eskom Quality Requirements
Specifications, including, but not limited to, the following requirements:
Clear and unambiguous description of the equipment and location(s) at which each activity
will take place, including facility location(s)
Identification of quality verification activity and stage
The details of reference documents, procedures, or method statements to be utilised in
performance of the activity, including specific reference to actual sections and pages of
procedures, standards, instructions, specifications, etc.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Definition of acceptance criteria
Listing of certifying or verifying documents generated to provide evidence of compliance
with specified requirements; documents are to be provided using the proper Eskom
document numbering requirements
Identification of main supplier and sub-supplier (where applicable) third-party/approved
inspection authority (AIA) and Eskom inspection activities defined in terms of witness, hold,
document review, and verification monitoring points and provision for sign-off of each of the
above-mentioned parties for each intervention point
Qualification requirements for quality control inspectors, including any third-party/AIA
inspectors
Listing of all proposed test procedures
Acceptance criteria for each inspection or test in alignment with specified tolerances
A section for signed acceptance of the QC/ITP by the supplier, sub-supplier (where
applicable), and Eskom prior to commencement of work
Inspection or testing intervention points, including, but not limited to, factory acceptance test
and package acceptance test, witness, and hold points
3.4.13 A quality kick-off meeting will be held at the start of the contract and, if required, at the start
of each subsequent phase.
The supplier shall arrange coordination meetings with Eskom prior to placement of orders
for items or equipment to ensure that all technical and commercial requirements are clear
and understood. Fourteen days’ advance notice of meetings shall be given to Eskom.
Supplier inspection personnel, including inspection agency personnel, shall be competent
and qualified to perform inspection and testing assignments. Mobilisation of all such
personnel shall be in compliance with the Project Quality Personnel Qualification
Specification.
3.4.14 Where QCP/ ITP is applicable, the supplier shall ensure that sub-suppliers are provided with
comprehensive, clearly written, and unambiguous inspection and testing protocols, including
processes, procedures, and methods that shall include, but not be limited to, the following:
Requirements for inspection checklists and inspection assignments, with lists of items to be
inspected
An inspection and testing report format, report content, schedule for report processing and
distribution, and report retention requirements
Inspection and test report results response tracking (log) and resolution of nonconformity in
inspection and test processes, procedures, or methods and nonconformity identified in
inspection and test results
Associated Failure Mode, Effects and Criticality Analysis (FMECA) reports relating to the
equipment and sub-systems (if applicable)
Hazard and Operability Study (HAZOP) report, as applicable
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.4.15 The supplier shall establish processes and procedures for formal assessment of sub-supplier
inspection and testing programmes. These shall include review of sub-supplier inspection
reports and other quality control documentation. Additional formal assessment of
manufacturing, fabrication, and assembly facility operations shall be conducted by the
supplier to ensure continuing suitability, adequacy, and effectiveness of the sub-supplier’s
inspection and testing programmes. Assessment frequency shall be established in
consideration of the sub-supplier scope of work, criticality of scope of work deliverables, and
performance information. The assessment scope and schedule shall be developed in
consultation with Eskom.
3.4.16 Supplier processes and procedures for verification of supplier and sub-supplier purchased
product compliance with specifications shall obtain document return/review status prior to
implementation.
3.4.17 The objective is to finalise any outstanding procedural or other issues before proceeding to
deliver the works.
3.4.18 Eskom, in consultation with the supplier, develops an agenda for the meeting, and Eskom will
keep minutes of these meetings.
3.4.19 Mandatory pre-inspection meetings will be convened by Eskom or its inspection agency or
AIA to be attended by the supplier’s and sub-supplier’s representatives, including their quality
representatives who will be involved in the works, and records are to be kept.
3.4.20 Eskom reserves the right to appoint resident quality inspectors who can be based at the
supplier’s or sub-supplier’s premises and on site where the work is being performed. The
supplier is expected to provide workspace at no cost to Eskom for the inspector, as required.
3.4.21 Eskom may appoint any organisation it prefers to perform quality assurance and quality
control activities, either in the capacity as an AIA or inspection agency, on the works
contracted to the supplier, and the supplier or its sub-suppliers may not object, prevent,
hinder, undermine, circumvent, question, discredit, or in any way make it impossible for such
organisation to carry out its work on behalf of Eskom.
3.4.22 The Eskom template for QCP/ ITP provided shall be used as guideline, where the supplier
does not have a QCP/ ITP template.
3.5 Pre-Contract Award: Quality Requirement
3.5.1 Main Supplier and Sub-supplier Categories
Eskom supplier quality requirements for all existing and potential suppliers and sub-suppliers are
classified into four categories (category 1, 2, 3 and 4). Suppliers must prepare and submit quality
documentation as per the tender selected category (indicated in Form A) using the list of tender
returnables document.
NOTE: Only one (1) category must be applicable per procurement process e.g. [Eskom requests for
information (RFI)/ requests for quotation (RFQ)/ requests for proposal (RFP), including contracts for
the procurement of products and services].
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The following are the minimum returnable documentation for Categories 1 to 4:
3.5.2 Category 1: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit a valid copy of ISO 9001 or any applicable certificate of a QMS (the
latest applicable revision). The QMS should drive the supplier’s business management
processes to ensure that all of Eskom’s requirements are fully met on a consistent basis.
The supplier shall submit the latest copy of the management system internal and external
audit reports. The audit reports must include, if applicable, nonconformity identified, and the
resulting remedial actions (correction and/ or corrective action reports).
The supplier shall submit a draft contract quality plan that is specific to the scope of work as
described in the tender documents. The plan must address the minimum requirements as per
Iso 10005.
Where applicable; the supplier shall submit a draft, or an example of an inspection and test
plan (ITP) or quality control plan (QCP) on similar and/ or previous work done.
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of documented information for roles, responsibilities and
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals, procedures.
The supplier shall submit documented information retained (records) of management review
meetings that include agenda, meeting minutes, attendance registers, reports, presentations,
etc.
Note: specific requirements per tender will be selected using the List of Tender Returnable
documents (240-12248652).
3.5.3 Category 2: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit objective evidence of a developed, implemented and maintained QMS
that complies with ISO 9001 or any applicable standard of quality management system (the latest
applicable revision). The following documents (approved/ signed copies) shall be submitted:
Quality Management System manual or a documented information that have defines and
describes the QMS and its scope
Quality Policy, aligned with the supplier’s strategic direction (documented information)
Quality Objectives (documented information)
Control of documented information (both maintain and retain documented information )
Internal audit procedure (documented information)
Control of nonconforming outputs (documented information)
Nonconformity and Corrective action procedure (documented information)
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The QMS should drive all the supplier’s business management processes to ensure that all of
Eskom’s requirements are fully met on a consistent basis.
The supplier shall submit the latest copy of the management system internal audit reports. The
audit reports must include, if applicable, nonconformity identified, and the resulting remedial
actions (correction and/ or corrective action reports).
The supplier shall submit a draft contract quality plan that is specific to the scope of work as
described in the tender documents. The plan must address the minimum requirements as per
Iso 10005.
Where applicable; the supplier shall submit an example of inspection and test plan (ITP) or
quality control plan (QCP) on similar or previous work done.
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of documented information for roles, responsibilities and
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals, procedures.
The supplier shall submit documented information retained (records) of management review
meetings that include agenda, meeting minutes, attendance registers, reports, presentations,
etc.
Note: specific requirements per tender will be selected using the List of Tender Returnable
document (240-12248652).
3.5.4 Category 3: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit objective evidence of a developed QMS that complies with ISO 9001
(or the latest applicable revision). The following documented information (approved/ signed
copies) shall be submitted:
o Quality management system manual or a (documented information) that have
defines and describes the QMS and its scope
o Quality Policy, aligned with the supplier’s strategic direction (documented
information)
o Quality Objectives (documented information)
o Control of documented information (both maintain and retain documented
information )
o Internal audit procedure (documented information)
o Control of nonconforming outputs (documented information)
o Nonconformity and Corrective action procedure (documented information)
The QMS should drive all the supplier’s business management processes to ensure that all of
Eskom’s requirements are fully met on a consistent basis.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The supplier shall submit a draft contract quality plan that is specific to the scope of work as
described in the tender documents. The plan must address the minimum requirements as per
Iso 10005.
Where applicable; the supplier shall submit an example inspection and test plan (ITP) or
quality control plan (QCP).
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of documented information for roles, responsibilities and
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals, procedures.
NB: specific requirements per tender will be selected using the List of Tender Returnables
document (240-12248652).
3.5.5 Category 4: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit a quality method statement based on ISO 9001 and specific to the
scope of work.
The quality method statement should address all the supplier’s business management
processes to ensure that all of Eskom’s requirements are fully met on a consistent basis.
The supplier shall submit a signed/ approved quality policy (aligned with the supplier’s strategic
direction). (documented information)
The supplier shall submit a copy of quality objectives. (documented information)
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of the documented information for roles, responsibilities and
authorities, specific to the project/ scope of work/ technical requirements. Examples of relevant
documented information are; organization charts, job descriptions, work instructions, duty
statements, manuals, procedures.
Note: specific requirements per tender will be selected using the List of Tender Returnables
document (240-12248652).
3.6 Main Supplier and Sub-supplier Capability and Capacity Assessment
Supplier capability and capacity assessments shall be performed prior to contract award on potential
suppliers participating in Eskom Holdings procurement process to:
provide products and services with high risk to operational sustainability
work on critical plant and equipment
supply of critical plant items or components
provide special processes
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
All sub-suppliers used by the main supplier/ contractor, performing work on Eskom critical plant
equipment, supplying commodities and providing specialised services shall be subjected to the
capability and capacity assessment.
Critical plant includes the following:
Generation Level 1 & 2 plant
Transmission and Distribution Power Plant & Control Plant
Mega Projects
All potential quality risks identified will be included in the assessment report provided for the tender
evaluation.
Note: Form A (Enquiry/ Contract/ Quality Requirements for Supplier Quality Management:
Specification 240-105658000/ QM 58 and ISO 9001) will be used to select and indicate whether
capability and capacity assessment will be conducted.
3.7 Post-Contract Award
3.7.1 Contract Execution
The supplier shall submit the following documents within 30 days or as per stated timeline after the
contract date, prior to the commencement of work, for acceptance by Eskom:
The supplier shall complete a QCP before contract award. This shall be reviewed and
signed off by Eskom within 30 days or as per stated timeline after contract award.
The supplier shall complete a quality control plan and ITP(s) for review and acceptance by
Eskom prior to the commencement of any work, inclusive of subcontracted work, within 30
days or as per stated timeline after contract award.
The sub-supplier QCP/ ITP shall be submitted for review and comment by the supplier and
by Eskom within 30 days or as per stated timeline after the award of the tender. All supplier
and Eskom comments shall be resolved prior to commencing work.
The equipment lists and an indication of pressurised components and systems.
Note: These plans are to be compiled in line with Eskom’s requirements and will have to be
discussed with, and approved by, Eskom prior to any work commencing.
Correspondence shall be directed to the project manager, and periodic quality review
meetings shall be convened by Eskom with the supplier.
The mandatory quality review meetings are to be convened by the nominated project quality
manager or his/her representative for the contract.
Monthly quality performance and management reports are to be prepared by the supplier
during contract execution. The content of these reports shall be agreed by Eskom when
submitted to Eskom on a monthly basis.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.7.2 Supplier Quality Performance Monitoring Phase
During the contract execution phase, suppliers shall be monitored by Eskom for performance on
quality-related aspects.
The outcomes of such monitoring will enable Eskom to take any appropriate actions pertaining to
the supplier.
The monitoring shall be carried out periodically by Eskom or at predetermined intervals during the
execution of a contract using agreed key performance indicators. The monitored key performance
areas include the following:
CQP and QCP /ITP
Delivery
Design
Cost
Management system
Subsequent key performance indicators associated with these areas will include the following:
Nonconformity monitoring
Audit and assessment evaluation scoring
Management system compliance and accreditation
Achievement of delivery targets as per contractual agreements
Process improvements
Correction and corrective action response and closure
3.7.3 Supplier Quality Audit
3.7.3.1 Quality audits and related quality performance reviews are intended to provide an objective
evaluation of compliance with performance expectations defined in this specification, in the
supplier contract quality plan (CQP), and in any other project scope of work specification.
3.7.3.2 Quality audits and related quality performance reviews include, but are not limited to, any
quality or other project functional area audits, assessments, verification of compliance
reviews, surveillance, inspections, or other interim or final assessments of scope of work
deliverables provided by the supplier or sub-suppliers
3.7.3.3 Quality audits and related quality performance reviews are intended to provide an objective
evaluation of compliance with performance expectations defined in this specification, in the
supplier contract quality plan (CQP), and in any other project scope of work specification.
3.7.3.4 Quality audits and related quality performance reviews include, but are not limited to, any
quality or other project functional area audits, assessments, verification of compliance
reviews, surveillance, inspections, or other interim or final assessments of scope of work
deliverables provided by the supplier or sub-suppliers.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.7.3.5 Quality audits and related quality performance reviews shall be carried out by trained,
accredited, and experienced personnel in accordance with procedures documented in the
Cqp.
3.7.3.6 The supplier shall submit, for Eskom review, documented processes for conducting project
scope of work quality audits and related quality performance reviews. Supplier quality audits
and related quality performance review processes shall be designed to address evaluation
of progress towards completion of project functional area deliverables as well as final
deliverable quality.
3.7.3.7 The supplier shall provide a schedule of anticipated quality audits covering all functional
areas and related quality performance reviews at the time of first post-contract award CQP
submission.
3.8 Standard Conditions
3.8.1 Rights of Access
Eskom:
3.8.1.1 shall be granted electronic and hard-copy access to all quality plans, procedures,
documentation, and other quality records relating to the work, including, but not limited to,
data extracts;
3.8.1.2 reserves the right to review, inspect, and audit any or all parts of the supplier’s QMS, as well
as any documentation, materials, or equipment associated with the work, at any time or
project work location; and
3.8.1.3 reserves the right to carry out assessments and audits on all new suppliers and sub-
suppliers.
The supplier:
3.8.1.4 shall support Eskom’s effort to monitor, verify, and/or witness any activities associated with
the work at any time;
3.8.1.5 shall cooperate with Eskom requests for documentation, records, and inspection and
witnessing. Eskom participation in audits, appraisals, assessment of plans, and verification
shall be conducted at no extra cost to Eskom;
3.8.1.6 shall ensure that a sub-supplier provides access to Eskom to all work procedures, records,
and supporting documentation through provision of access to view and photocopy, as
required, to support verification of scope of work requirements. Access shall include the
ability to photograph Eskom equipment, systems, system components, materials, etc.;
3.8.1.7 shall provide access to all quality-related information pertaining to activities performed by
itself or sub-suppliers, where Eskom might not have participated in the witnessing of their
quality assurance or control (this refers to inspections, audits, etc. performed by the supplier
on its own sub-suppliers);
3.8.1.8 shall allow Eskom to assess, audit, approve, or reject any sub-suppliers employed by
Eskom’s suppliers to assist with the product and/or service delivery to Eskom; and
3.8.1.9 shall ensure that the above requirements flow down to sub-suppliers.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.2 Eskom Rights to Information
3.8.2.1 To expect that the works will be conducted in accordance with the contract between the
parties.
3.8.2.2 To have access to the supplier’s information as determined by applicable legislation.
3.8.2.3 Eskom reserves the right to oversee the supplier’s audit programmes by participating in
selected audits as an observer and by assessing the supplier during key work stages.
Eskom will coordinate with the supplier to develop an oversight schedule aligned with the
supplier’s audit schedule.
3.8.2.4 To obtain access to any audit reports of audits performed by the supplier reflected in the
audit programme.
3.8.2.5 To conduct independent quality audits during all phases of the contract, and the supplier
shall provide all resources to support these activities.
3.8.2.6 Eskom shall have the right to participate in, or request that, a technical investigation be
launched and conducted at the supplier’s and sub-suppliers’ premises or other sites when
risk to Eskom products or service deliverables is identified.
3.8.2.7 To participate in, and/or lead, investigations related to incidents involving its products.
3.8.2.8 To require from suppliers to be responsible for the cost of re-inspections.
3.8.2.9 To withhold payment from suppliers as a result of outstanding nonconformities, irrespective
of the agreed payment schedule and in accordance with the conditions of contract.
3.8.2.10 Shall be granted electronic and hard-copy access to all quality plans, procedures,
documentation, and other quality records relating to the work, including, but not limited to,
data extracts.
3.8.2.11 Reserves the right to review, inspect, and audit any or all parts of the supplier’s QMS, as
well as any documentation, materials, or equipment associated with the work, at any time or
project work location.
3.8.2.12 Shall carry out assessments and audits on all new suppliers and sub-suppliers.
3.8.2.13 Reserves the right to appoint resident quality inspectors who can be based at the supplier’s
or sub-supplier’s premises and on site where the work is being performed.
3.8.2.14 Reserves the right to select intervention points within all developed supplier QCPs/ ITPs
for Eskom oversight of selected functions and to perform surveillance or audits of the work.
3.8.2.15 Shall be given access at all reasonable times before, during, and after manufacture and
before delivery, construction, erection, and commissioning to measure, test, and inspect the
products and workmanship, as necessary, at the supplier’s premises and at Eskom sites.
3.8.2.16 Reserves the right to suspend any pending deliveries by the issuing of a cease delivery
order at any time and for any portion of the work that is not being performed in accordance
with the specified/agreed requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.3 Preservation
The supplier shall develop and implement a comprehensive preservation programme consisting of
plans, processes, procedures and actions undertaken for the purpose of planning for and
maintenance of material deliverables quality. The supplier preservation programme scope includes,
but is not limited to, the following:
3.8.3.1 Engagement of personnel suitably qualified for oversight of, and (as required) direct
implementation of, preservation programme requirements.
3.8.3.2 Development and implementation of preservation programme training appropriate to work
need.
3.8.3.3 Eskom may make use of its appointed service provider tasked to provide a full suite of
services encompassing an online monitoring system and asset tracking during, but not
limited to the following stages: inspections, testing, shipping, transportation, storage, and
commissioning. The supplier is to enable full access during all of these stages in order to
allow the installation of the devices on Eskom-identified products and equipment, which
include the sub-supplier’s testing facilities, processing plant, and any other processes
deemed important towards effective and efficient quality control.
3.8.3.4 Eskom seeks cooperation between the supplier’s designers and those of Eskom’s service
provider in ensuring seamless installation of the device and other associated installations.
Moreover, there is also a need to integrate data flows and systems between Eskom and the
supplier. Further details are included in the Eskom specifications and works information.
3.8.3.5 Review and tracking of compliance with Eskom and supplier engineering specification of
preservation requirements.
3.8.3.6 Review and tracking of compliance with sub-supplier provided preservation requirements
and recommendations.
3.8.3.7 Evaluation of prospective temporary and longer-term material storage sites for consistency
with preservation programme expectations.
3.8.3.8 Preservation work plan development and plan execution performance evaluation of all
parties engaged for provision of material transportation, handling, or storage services.
3.8.3.9 Oversight of material quality preservation plan preparation and plan execution performance
at all work locations.
3.8.3.10 Development of a preservation programme records management process, in compliance
with Eskom information management requirements, which comprehensively addresses
generation, maintenance, and ready access by Eskom to all preservation programme
records.
3.8.3.11 The supplier shall deploy a clearly defined documented programme providing for
identification of all physical asset pre-operation preservation of quality requirements. In this
reference, the term “physical assets” should be understood to include bulk materials,
including consumable items, equipment systems, system components, and any other
procured or supplied materials or equipment transferred to project control, but not deployed
for operational purposes.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.3.12 Where the project responsibility for equipment and materials management has been
formally delegated, the supplier’s preservation programme shall ensure clear and
unambiguous communication of pre-operation preservation of goods quality requirements
to sub-suppliers.
3.8.3.13 The supplier’s preservation programme shall clearly and unambiguously document
processes and procedures for efficient and effective monitoring of compliance with
programme requirements.
3.8.3.14 Compliance monitoring shall commence with ensuring comprehensive consideration of
preservation requirements in the engineering instruction and subsequent inclusion of said
instruction in procurement documentation and shall be applicable until such time as
equipment or materials have been incorporated in an operating or operational system or
structure.
3.8.3.15 Compliance evaluation frequency shall anticipate transfer of tactical-level responsibility for
management of preservation responsibilities between project functional areas, for example,
procurement to logistics, logistics to fabrication, fabrication to logistics, logistics to
construction, etc., and shall, in similar fashion, anticipate transfer of support for tactical-level
responsibility between various subcontracted service providers.
3.8.3.16 Supplier engineering shall ensure that preservation requirements for scope of work
systems, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented and that preservation requirements are efficiently and
effectively communicated to project procurement, logistics, construction management,
quality, security, and other project functional areas, as required, for efficient and effective
implementation of preservation requirements. This shall take the form of a preservation
programme applicable to all systems, system components, equipment, materials, customer-
supplied materials, and other goods procured or managed under the scope of work.
3.8.3.17 The supplier’s preservation management programme shall clearly and unambiguously
address temporary, long-term, and in-transit preservation requirements, including, but not
limited to:
requirements for protection against, or insulation from, atmospheric conditions,
sunlight, temperature, soil, dust, humidity, salt spray, corrosive atmospheres, or
other physical environment conditions;
detailed procedures for application, use, monitoring, and maintenance of coatings,
coverings, fasteners, lines, and other components for internal and external weather
proofing;
requirements for electrical grounding or isolation;
requirements for internal or external environment creation, for example, inert gas
charging, heating, cooling, etc., inclusive of gas storage, electric power supply, etc.;
detailed procedures for initial set-up, charging, activation, and maintenance of
internal atmosphere generation, regeneration, monitoring, and relieving systems, for
example, inert gas management systems;
requirements for protection against, or insulation from, vibration or long-period
cyclical motion in transit, for example, wave-generated movement during sea
transport;
internal and external structural integrity protection, for example, internal and external
bracing, padding, framing, chocking, etc.;
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
support structure requirements, for example, stools, pads, or other devices,
substrates, or support required to ensure in-storage and in-transit stability of
systems, system components, equipment, and material, or other discrete units or
items;
provision for physical separation and/or barriers to prevent airborne or direct
transmittal of contaminants between work areas or between work areas and storage
areas, for example, prevention of carbon steel grinding or cutting debris impact on
stainless steel elements, airborne drift of blast aggregate into vessels or machinery,
etc.;
provision for, and final disposition of, temporary and longer-term storage or transit
required supports and related binding devices, for example, stools, stands, sea
fasteners, platforms, chocks, spacers, cabling, etc.;
provision of requirements for temporary work platforms or other support structures
required to ensure provision of preservation services, for example, provision of a
self-elevating work platform for periodic access to elevated fittings, gauges, man-
ways, etc.;
requirements for protection against, or insulation from, contact with other objects, for
example, padding or other protection for external tubing, fittings, or other impact-
sensitive structures or components;
clear physical delineation of temporary and longer-term storage areas supplemented
by hard and soft barriers, as required, to maintain a protective perimeter;
documented agreements with storage facility and transportation provider
management regarding security management, including, but not limited to, facility
access and egress control and control of access to project goods and materials
within facility boundaries or aboard vehicles or vessels; and
detailed procedures for inspection and testing to verify performance of preservation
procedures and to provide for timely notice and corrective action to maintain
preservation status.
3.8.3.18 The supplier’s preservation management programme scope shall encompass
management of preservation requirements, from initial transfer of ownership or management
responsibility to project scope of responsibility, through any period of temporary or longer-
term storage and through any period of transit, including transit for final delivery at point of
active use or installation.
3.8.3.19 The supplier’s preservation management programme shall clearly and unambiguously
address processes and procedures to ensure that storage and control of materials are
accomplished in accordance with manufacturer recommendations, specifications, and
project-specific requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.3.20 The supplier’s preservation management programme shall incorporate special precautions
to address preservation and control of valves, electrical motors and components,
mechanical and rotating equipment, piping and fittings, instrumentation, flange faces,
gaskets, coatings, insulation, and other materials. Special precautions include, but are not
limited to, supplier-specified maintenance procedures related to engines, electric motors,
pumps, compressors, etc., such as periodic shaft rotation, engine turnover, lubrication, etc.
3.8.3.21 The supplier shall ensure that clear and unambiguous requirements for preservation of the
system, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented in purchase orders, work authorisations, and other
communications between the supplier and sub-suppliers.
3.8.3.22 Where sub-supplier expertise is utilised in determination of the preservation protocol,
supplier procurement processes shall ensure clear and unambiguous documentation of sub-
supplier input into preservation management programme requirements.
3.8.3.23 Supplier procurement shall ensure that preservation requirements for scope of work
systems, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented and that preservation requirements are efficiently and
effectively communicated to project logistics, construction management, quality, security,
and other project functional areas, as required, for efficient and effective implementation of
preservation requirements.
3.8.3.24 The supplier shall ensure comprehensive, clear, and unambiguous designation of sub-
supplier responsibility for execution of all preservation management programme elements,
including, but not limited to, all systems, processes, procedures, methods, ready access to
records, and provision of equipment, tools, or services essential to efficient and effective
execution of the preservation management programme.
3.8.3.25 The supplier shall ensure that preservation management programme responsibilities are
clearly and unambiguously defined within the project team and efficiently and effectively
implemented at all project scope of work locations. Inclusion of supplier and sub-supplier
scope of work in the development and implementation of a preservation management
programme shall be considered essential to efficient and effective preservation
management programme execution.
3.8.3.26 The supplier shall ensure clear and unambiguous designation of project team responsibility
for oversight and management of preservation management programme elements during
every stage of project development.
3.8.3.27 The supplier shall ensure that Eskom has free and unrestricted access to all preservation
records for inspection and audit.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.4 Quality Audits Related Conditions
3.8.4.1 The supplier shall maintain an accurate quality audit and related quality performance review
schedule and shall incorporate the current schedule as an attachment to the supplier CQP.
3.8.4.2 The supplier’s quality audit and related quality performance review schedule development
process shall be designed to incorporate consideration of information generated by
previously conducted audits and reviews, by input from project risk management evaluations
(risk register), or from Eskom or sub-supplier subject matter expertise.
3.8.4.3 Eskom reserves the right to oversee supplier audit programmes by participating in selected
audits as an observer and by assessing the supplier during key work stages. Eskom will
coordinate with the supplier to develop an oversight schedule aligned with the supplier’s
audit schedule.
3.8.4.4 Eskom will have the right to obtain access to any audit reports of audits performed by the
supplier reflected in the audit programme.
3.8.4.5 Eskom reserves the right to conduct independent quality audits, scheduled and
unscheduled, during all phases of the contract. The supplier shall provide all resources to
support these activities.
3.8.4.6 Eskom shall be given access at all reasonable times before, during, and after manufacture
and before delivery, construction, erection, and commissioning to measure, test, and inspect
the products and workmanship, as necessary, at the supplier’s premises and at Eskom sites.
3.8.4.7 The supplier shall obtain access for Eskom to measure, test, witness tests, and inspect
products that are being manufactured by any sub-supplier. This includes surveillances.
3.8.4.8 The assessments and audits shall be carried out on all new suppliers and their sub-
suppliers.
3.8.4.9 Eskom shall have the right to participate in, or request that, a technical investigation be
launched and conducted at the supplier’s and sub-suppliers’ premises or other sites when
risk to Eskom products or service deliverables is identified.
3.8.4.10 Qualification requirements for supplier and sub-supplier personnel engaged in conducting
quality audits and related quality performance reviews shall be defined in the supplier CQP
and shall be in compliance with the Project Quality Personnel Qualification Specification.
3.8.5 Management of Nonconformities and Nonconforming Outputs Identified by Eskom
3.8.5.1 Nonconformity reports raised by Eskom and issued against the supplier shall be investigated
by the supplier as a matter of urgency in order to determine the root cause, corrective action
measures, as required, with implementation time frames.
3.8.5.2 A formal response shall be prepared in respect of the defined criteria and submitted to
Eskom for its review, evaluation, and acceptance, within a maximum of 14 calendar days
from the date of issue of the nonconformity and should be aligned with the site
requirements/procedure.
3.8.5.3 Eskom may, at its discretion, request a response sooner and, in any case, before the
supplier proceeding with any pending/further intervention or corrective action, as may be
required by Eskom.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.5.4 Should Eskom or its inspection authority/agency identify any nonconforming products during
the conduct of its audits/surveillances/inspections, the supplier shall be deemed to be in
breach of contract and shall be held liable for any repair, rework, and/or associated
replacement costs. The supplier may, in such instances, also be held liable for the full costs
associated with the conducting of follow-up audits/surveillances/inspections.
3.8.5.5 The nature, magnitude, and/or frequency of nonconformity and inspection defect/rejection
reports raised by Eskom or its appointed inspection authority/agency shall form the basis of
any action to rescind/withdraw the supplier’s qualification status.
3.8.5.6 Nonconforming outputs identified by Eskom shall be documented via a NC Report and
issued to the suppliers via the contract communication protocol. The suppliers shall
investigate the matter and respond in writing to Eskom of disposition within the stated
contractual conditions.
Note: The dates for the disposition should align to contractual conditions.
3.8.5.7 Eskom shall identify repeat deficiencies as systematic failures of the supplier’s QMS and
shall notify the supplier of the trends. Eskom can initiate an internal audit to highlight the
system failures. The supplier with raise a Corrective Action Report and undertake Root
Cause Analysis. In such cases, QMS rectification and/ or update measures shall be taken
immediately.
3.8.5.8 Should the Supplier fail to respond and rectify nonconforming products within stipulated
contractual conditions. The Project Manager should apply contractual remedies in
accordance with Fidic/ NEC contract.
3.8.5.9 Repeated Nonconformities; if there are any identified repeat nonconformities from the same
supplier within a period of 6 months or less. This must then be escalated to the management
review committees of the BU/ OU/ Cluster/ or Divisions for adjudication. If not resolved, then
the matter must be escalated to the supplier review committee for recommendation.
3.8.6 Special Processes
The following requirements shall be applicable as well as additional requirements as specified in the
scope of work for the provision of the following special process services:
3.8.6.1 The supplier shall ensure that all processes which require that procedures be pre-qualified
or work methods and operators tested and qualified are controlled and all steps followed
before the work can commence.
3.8.6.2 This typically covers such activities as welding, non-destructive testing, special fabrication
techniques, coating, painting, etc.
3.8.6.3 All special processes (procedures and processes) shall be submitted for review and
acceptance by Eskom, accredited or certified agency. No work shall commence until these
are accepted.
3.8.6.4 Where applicable, a relevant Management System for the special process shall be certified
or approved by an accredited body and proof of certification shall be submitted to Eskom for
review. An example for this will be the Welding Management System based on ISO 3834.
3.8.6.5 Where samples are required for acceptance, these shall be submitted to Eskom for review
and acceptance.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.6.6 The supplier shall ensure that all operators are suitably qualified for these processes in
accordance with the procedures, processes and/ or applicable standards/ codes.
3.8.6.7 The records of qualification of procedures, processes and operators shall be maintained by
the supplier in accordance with the applicable procedure or code and these made available
to Eskom at all times.
This document has been seen and accepted by:
Name Designation
Kerseri Pather General Manager: Risk and Sustainability
Lenock Meyer Acting Senior Manager: Quality Management
Pamela Dondashe Middle Manager: Quality Assurance
Mandla Mkhwanazi Middle Manager: SHEQ Procurement and Supply Chain Management
Suzette Manthe Senior Advisor: Quality Performance and Planning
Lorna Ndlela Middle Manager: Eskom Document and Records Management
Date Rev. Compiler Remarks
October 2021 3 SA Sambo Specification was due for revision and in addition, to
align the requirements with the latest Eskom business
processes and systems.
October 2018 2 SA Sambo Specification reviewed to be aligned with the
requirements of ISO 9001:2015
March 2016 1 SA Sambo Specification was due for revision and also to
repackage the requirements and tender returnable
documents into four categories.
December 2011 0 A Hunter New document
The following people were involved in the development of this document:
Andrew Else
Bongi Tshabalala
Feziwe Mogamisi
Lesego Garegae
Patrick Thwane
Xolani Zuma
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Eskom Operational Quality Forum Members
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Section
Source: 240-105658000 Supplier QM Spec Rev 3-QM 58.pdfSupplier Quality Management: Specification Unique Identifier: 240-105658000
The intention of this specification is to specify and describe the minimum quality requirements for all
existing and potential Eskom suppliers and define the quality criteria for the selection, evaluation,
implementation, and maintenance of a quality management system (QMS) that conforms to the
a quality management system (QMS) based on ISO 9001, which should form the basis for conformity
to Eskom quality requirements and continually adhere to them throughout the duration of a contract
[1] ISO 9001 Quality Management Systems – Requirements
[2] ISO 10005 Quality Management Systems – Guidelines for Quality Plans.
[3] ISO 9000 Quality Management Systems – Fundamentals and Vocabulary
[4] 32-727: Safety, Health, Environment, and Quality (SHEQ) Policy
[5] ISO 10006 Quality Management Systems – Guidelines for Quality Management in Projects
[6] ISO 9004 Quality Management – Quality of an Organisation – Guidance to Achieve Sustained
[9] PPPFA: Preferential Procurement Policy Framework Act, 2000 (Act No. )
[10] CIDB 1004: Best Practice Guideline A4: Evaluating Quality in Tender Submissions
[11] 240-12248652 Supplier Quality Management: List of Tender Returnables
2.3.2 Contract Quality Plan: a document of the supplier’s process for delivering the level of quality
required by the contract. It is a framework for the contractor’s process for delivering quality.
2.3.3 Hold Point: a predetermined stage in the quality control plan (QCP) beyond which work/
2.3.4 Intervention Points: those control points indicated by the various controlling bodies
inspection, hold points, surveillances, witnesses, reviews and verifications.
performing quality assurance/ quality control, monitoring, inspection and/ or expediting
Title: Supplier Quality Management: Document Identifier: 240-105658000
Functional Area: Quality Management
Quality Quality Manager Quality Risk and
Contact Information
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.doc (unknown)Group Tax Department at Megawatt Park. Email: [email protected]
Evaluation Criteria
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.doc (unknown)Residency
Contractors must be residents of South Africa (as per the Income Tax Act) or declare non-residency (Appendix 9).
Employee Requirement
Companies/Close Corporations/Trusts must employ **3+ full-time employees** who are **not connected persons** (e.g., shareholders, members, or beneficiaries) to avoid PAYE withholding (Appendix 1).
Income Test
No more than **80% of income** should come from Eskom or an associated institution (Appendix 4).
Control Test
Services must **not** be performed mainly at Eskom’s premises or under Eskom’s control/supervision (Appendix 3).
Connected Persons
No connected persons (as defined in Appendix 10) may render services personally to Eskom on behalf of the contractor (Appendix 2).
Compliance Requirements
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.doc (unknown)Bidders must complete the PAYE Questionnaire to determine tax classification (Independent Contractor, Personal Service Provider, Labour Broker, or Dependent Contractor). Required affidavits and declarations must be signed and submitted to avoid PAYE withholding. Key requirements include:
Submission Guidelines
Source: OHS Tender Evaluation Template low risk work.docx (unknown)Submit the following returnable documents: 1. Signed acknowledgement of Eskom's OHS legal and other requirements form (Annexure B). 2. OHS plan addressing project/scope OHS risks, aligned with health and safety specifications. 3. Baseline OHS Risk Assessment (BRA) with methodology, identifying and managing OHS risks. 4. Valid Letter of Good Standing (COIDA or equivalent). 5. OHS policy signed by CEO, compliant with OHS Act Section 7. 6. ISO 45001 certificate or equivalent (if applicable).
Evaluation Criteria
Source: OHS Tender Evaluation Template low risk work.docx (unknown)Mandatory
Preferred
Compliance Requirements
Source: OHS Tender Evaluation Template low risk work.docx (unknown)OHS compliance requirements: 1. Valid Letter of Good Standing (COIDA or equivalent). 2. OHS policy signed by CEO, compliant with OHS Act Section 7. 3. ISO 45001 certification or equivalent (if applicable).
Submission Guidelines
Source: Annexure C 5 Environmental Tender Evaluation and Scoring Card (High, Medium and Low risk work).docx (unknown)Returnable Documents: Signed acknowledgement of Eskom's SHE rules and requirements form (Annexure B) must be attached to the tender submission.
Evaluation Criteria
Source: Annexure C 5 Environmental Tender Evaluation and Scoring Card (High, Medium and Low risk work).docx (unknown)Mandatory Submissions
Risk Specific
High Risk
Medium Risk
Low Risk
Compliance Requirements
Source: Annexure C 5 Environmental Tender Evaluation and Scoring Card (High, Medium and Low risk work).docx (unknown)Mandatory compliance documents:
Contact Information
Source: NEC SUPPLY CONTRACT MECHANICAL DAMPER.pdf (unknown){"name":null,"email":null,"phone":"011 629 4895","department":null,"address":"n the conditions of contract identified in"}
Submission Guidelines
Source: NEC SUPPLY CONTRACT MECHANICAL DAMPER.pdf (unknown)Returnable Documents: C1.1 Form of Offer and Acceptance [.], C1.1 Form of Offer & Acceptance, By the representative of the tenderer, deemed to be duly authorised, signing this part of this Form of Offer, This Offer may be accepted by the Purchaser by signing the Acceptance part of this Form of Offer and
Evaluation Criteria
Source: NEC SUPPLY CONTRACT MECHANICAL DAMPER.pdf (unknown)General
B-BBEE
Technical
Technical Specifications
Source: NEC SUPPLY CONTRACT MECHANICAL DAMPER.pdf (unknown)Supply Contract (SC3)
Between ESKOM ROTEK INDUSTRIES SOC Ltd
(Reg No. 1990/006897/30)
and
Commented [TM1]: Lets populate the name of the Supplier
and Registration Number
for THE SUPPLY AND DELIVERY OF MECHANICAL
DAMPER KITS FOR 132kV and 275kV BREAKERS
For a period of three (3) years
Contents: No of
pages
Part C1 Agreements & Contract Data [.]
Part C2 Pricing Data [.]
Part C3 Scope of Work
Quality Management
Source: NEC SUPPLY CONTRACT MECHANICAL DAMPER.pdfthere are any specific requirements they could be stated here.
N/a
Factory acceptance testing (FAT)
Specify minimum requirements for the Supplier’s Quality Plan and Work Procedures if required and not
already covered in the specifications for the goods. State whether ISO compliance is a condition and if so
which ISO standard shall apply.
Pricing Schedule
Source: NEC SUPPLY CONTRACT MECHANICAL DAMPER.pdf(Reg No. 1990/006897/30)
and
Commented [TM1]: Lets populate the name of the Supplier
and Registration Number
for THE SUPPLY AND DELIVERY OF MECHANICAL
DAMPER KITS FOR 132kV and 275kV BREAKERS
For a period of three (3) years
Contents: No of
pages
Part C1 Agreements & Contract Data [.]
Part C2 Pricing Data [.]
Part C3 Scope of Work [.]
and Acceptance the tenderer offers to perform all of the obligations and liabilities of the Supplier under the
contract including compliance with all its terms and conditions according to their true intent and meaning for
an amount to be determined in accordance with the conditions of contract identified in the Contract Data.
The offered total of the Prices exclusive of VAT is Commented [TM2]: Since no Price Schedule is attached
under C2.2, I am unsure if this is Rate Based or Total of the
Value Added Tax @ 15% is Prices.
Part C1 Agreements and Contract Data, (which includes this Form of Offer and Acceptance)
Part C2 Pricing Data
Part C3 Scope of Work: Goods Information including Supply Requirements
and drawings and documents (or parts thereof), which may be incorporated by reference into the above
listed Parts.
10.1 The Supplier is (Name):
including all required information under Contract Data by
Address
Tel No.
11.2(8) The Goods Information for the Supplier’s The document called ‘Goods Information’ in
design is in: Part 3 of this contract.
11.2(11) The tendered total of the Prices is R..,
11.2(12) The price schedule is in: Attached under Pricing Data
11.2(14) The following matters will be included in Incorrect or inferior Components Delivered.
the Risk Register Delay in deliveries.
25.2 The restrictions to access for the Supply N/A
for this contract are
30.1 The delivery date of the goods and
services is: goods and services delivery date
1 [●] [●]
2 [●] [●]
3 [●] [●]
31.1 The programme identified in the Contract
Data is contained in: As per accepted programme.
63.2 The percentage for overheads and profit
added to the Defined Cost is N/A
C2.1 Pricing assumptions
Clause 11 in NEC3 Supply Contract, (SC3) core clauses states:
Identified and 11
defined terms 11.2 (11) The Prices are the amounts stated in the price column of the Price Schedule. Where a
quantity is stated for an item in the Price Schedule, the Price is calculated by multiplying the
quantity by the rate.
(12) The Price Schedule is the price schedule unless later changed in accordance with this
contract.
Assessing the 50.2 The amount due is
amount due
completed,
multiplying the quantity which the Supplier has completed by the rate,
Clause 53.1 states: “Information in the Price Schedule is not Goods Information”. This confirms that instructions to do work or
how it is to be done are not included in the Price Schedule but in the Goods Information. This is further confirmed by Clause
20.1 which states, “The Supplier Provides the Goods and Services in accordance with the Goods Information”. Hence the
items which he considers necessary. Whichever party provides the items in the price schedule the total of the Prices is
assumed to be fully inclusive of everything necessary to Provide the Goods and Services as described at the time of entering
into this contract.
this unless the Defect is due to a Supplier’s risk;
and rates in order to fulfil the obligation to Provide the Goods and Services for the tendered total of the Prices;
within that lump sum item later turns out to be different to that which the Supplier estimated at time of tender. The
only basis for a change to the Prices is as a result of a compensation event per clause 60.1;
a compensation event.
Entries in the first four columns in the price schedule in section C2.2 are made either by the Purchaser or the tendering supplier.
provided, a unit of time is stated in the Unit column and the length of time (as a quantity of the stated units of time) is stated in
the Quantity column.
C2.2 the price schedule CommentedPlease populate[TM6]:the completeThe PricingPricingScheduleScheduleis not attached.
C3.1: Purchaser’s goods information
These services may include training of the Purchaser’s staff in the use of the goods, supervision of
installation of the goods on the Purchaser’s property and post Delivery commissioning and monitoring of the
goods in use. Ensure that all items of service specified can be related to an item in the Price Schedule
information:
Add procedures for invoice submission and payment (e. g. electronic payment instructions)
Financial Requirements
Source: NEC SUPPLY CONTRACT MECHANICAL DAMPER.pdf (unknown)Payment Terms: payment certificate from the Supply Manager in terms of core
clause 51.1, the Supplier provides the Purchaser with a tax invoice in accordance with the
Purchaser's procedures stated in the Goods Information, showing the amount due for payment
equal to that stated in the payment certificate.
Z7.2 If the Supplier does not provide a tax invoice in the form and by t
Compliance Requirements
Source: NEC SUPPLY CONTRACT MECHANICAL DAMPER.pdf (unknown)C1.1 Form of Offer and Acceptance [.]
C1.1 Form of Offer & Acceptance
By the representative of the tenderer, deemed to be duly authorised, signing this part of this Form of Offer
B-BBEE Details: deemed to be jointly
and severally liable to the Purchaser for the performance of this contract.
Z2.2 Unless already notified to the Purchaser, the persons or organisations notify the Supply
Manager within two weeks of the Contract Date of the key person who has the authority to bind
the Supplier on their behalf.
Z2.3 The Supplier does not alter the composition of the joint venture, consortium or other
unincorporated grouping of two or more persons without the consent of the Purchaser having
been given to the Supplier in writing.
Z3 Change of Broad Based Black Economic Empowerment (B-BBEE) status
Z3.1 Where a change in the Supplier’s legal status, ownership or any other change to his business
composition or business dealings results in a change to the Supplier’s B-BBEE status, the
Supplier notifies the Purchaser within seven days of the change.
Z3.2 The Supplier is required to submit an updated verification certificate and necessary supporting
documentation confirming the change in his B-BBEE status to the Supply Manager within thirty
days of the notification or as otherwise instructed by the Supply Manager.
Z3.3 Where, as a result, the Supplier’s B-BBEE status has decreased since the Contract Date the
Purchaser may either re-negotiate this contract or alternatively, terminate the Supplier’s
obligation to Provide the Goods and Services.
Z3.4 Failure by the Supplier to notify the Purchaser of a change in its B-BBEE status may constitute
a reason for termination. If the Purchaser terminates in terms of this clause, the procedures on
termination are P1, P2 and P3 as stated in clause 92, and the amount due is A1 and A3 as
stated in clause 93.
Z4 Confidentiality
Z4.1 The Supplier does not disclose or make any information arising from or in conn
Health & Safety
Source: NEC SUPPLY CONTRACT MECHANICAL DAMPER.pdfsignature of Date
witness
Note: If a tenderer wishes to submit alternative tenders, use another copy of this Form of Offer and
of Germiston Road, Rosherville, Cleveland,
Johannesburg, 2001
Rosherville, Cleveland, Johannesburg, 2001
10.1 The Supply Manager is (name): [:] Commented [TM3]: Name of the Supply Manager?
Address [:] Lower Germiston Road Rosherville,
Cleveland, Johannesburg, 2001
Tel [:] 011 629 4895
e-mail [:]
11.2(13) The goods are Mechanical Damper Kits for 132kV and 275kV
11.2(14) The following matters will be included in Delay in delivery
the Risk Register
11.2(15) The Goods Information is in Part 3: Scope of Work and all documents and
drawings to which it makes reference.
1 Available from Engineering Contract Strategies Tel 011 803 3008 Fax 086 539 1902, www.ecs.co.za.
11.2(15) The Supply Requirements as part of the Annexure A to this Contract Data
not give rise to an estoppel unless the Parties agree otherwise and confirm such agreement in
writing.
Z6 Health, safety and the environment: Add to core clause 25.4
Z6.1 In carrying out its obligations to the Employer in terms of this Contract; in providing the Contract
Works; in using Plant, Materials and Equipment; and while at the Site for any reason, the
agents, Contractors and mandataries with:
all regulations in force from time to time in terms of that Act (“the OHSA”); and
attached to the Works Information (as amended from time to time) and such other
will be provided in writing to the Contractor. The Contractor must comply with the
provisions of the latest written version of the Eskom Regulations with which it has been
provided; and
regard to compliance with the SHEQ Requirements, the Contractor shall furthermore not
consider itself to be a subordinate or under the supervision of the Employer in respect of these
matters. The Contractor shall at all times be responsible for the supervision its employees,
agents, Contractors and mandataries and shall take full responsibility and accountability for
ensuring they are competent, aware of the SHEQ Requirements and execute the Contract
the regulations published in GNR February 2002, under the Occupational Health
and Safety Act, 1993 (Act ) (“Asbestos Regulations”). The OEL for asbestos is 0.2
regulated asbestos fibres per millilitre of air as a 4-hour TWA, averaged over any continuous
period of four hours, and the short term exposure limit of 0.6 regulated asbestos fibres per
millilitre of air as a 10-minute TWA, averaged over any 10 minutes, measured in accordance
with HSG248 and monitored according to HSG173 and OESSM.
Z15.2 Upon written request by the Supplier, the Purchaser certifies that these conditions prevail. All
measurements and reporting are effected by an independent, competent, and certified
occupational hygiene inspection body, i.e. a SANAS accredited and Department of
and related control measures at the Supplier’s expense. For the purposes of compliance the
results generated from Parallel Measurements are evaluated only against South African
statutory limits as detailed in clause Z15.1. Control measures conform to the requirements
stipulated in the AAIA-approved asbestos work plan.
Z15.3 The Purchaser manages asbestos and ACM according to the Standard.
Z15.4 In the event that any asbestos is identified while Providing the Services, a risk assessment is
conducted and if so required, with reference to possible exposure to an airborne concentration
of above the AL for asbestos, immediate control measures are implemented and relevant air
monitoring conducted in order to declare the area safe.
Z15.5 The Supplier’s personnel are entitled to stop working and leave the contaminated area
forthwith until such time that the area of concern is declared safe by either Compliance
emergency asbestos work plan, if applicable.
Z15.6 The Supplier continues to Provide the Services, without additional control measures
presented, on presentation of Safe Levels. The contractually agreed dates to Provide the
when entering the premises.
o Dimensional drawings and/or Nameplate
The conditions of contract (e.g., Clause 16.2) require and other sections of the Goods Information (e.g.,
safety risk management) may require (mandate) that a meeting shall be held. However, the intention of all
risk register meeting (Clause 16.2). This could be used to discuss safety, compensation events,
subcontracting, overall co-ordination and other matters of a general nature. Separate meetings for specialist
activities such as programming, engineering, and design management, may also be warranted.
additional requirements particular to the goods and the location where they are to be delivered for this
contract. This is a requirement of clause 25.4.
The Supplier shall comply with the health and safety requirements [stated here or contained in Annexure
C3.1_________ to this Goods Information].
Environmental
Source: NEC SUPPLY CONTRACT MECHANICAL DAMPER.pdfZ15.7 Any removal and disposal of asbestos, asbestos containing materials and waste, is done by a
registered asbestos contractor, instructed by the Purchaser at the Purchaser’s expense, and
conducted in line with South African legislation.
Annexure A: Supply Requirements
Describe or cross refer to environmental constraints applicable to the Supplier’s design of the goods if not
already included in the Purchaser’s URS.
The Supplier shall comply with the environmental criteria and constraints [stated here or contained in
Annexure Z6____ ]
Contractual Terms
Source: NEC SUPPLY CONTRACT MECHANICAL DAMPER.pdfPart c1: agreements & contract data
Contents: No of
pages
C1.1 Form of Offer and Acceptance [.]
[to be inserted from Returnable Documents at award
stage]
C1.2a Contract Data provided by the Purchaser [.]
C1.2b Contract Data provided by the Supplier [.]
[to be inserted from Returnable Documents at award
stage]
C1.3 Proforma Guarantees [.]
C1.1 Form of Offer & Acceptance
of Deviations (if any), contact the Purchaser’s agent (whose details are given in the Contract Data) to
arrange the delivery of any securities, bonds, guarantees, proof of insurance and any other documentation to
be provided in terms of the conditions of contract identified in the Contract Data at, or just after, the date this
agreement comes into effect. Failure to fulfil any of these obligations in accordance with those terms shall
constitute a repudiation of this agreement.
insurance
80.1 These are additional Purchaser’s risks 1. Incorrect or inferior quality
components delivered.
88.1 The Supplier’s liability to the Purchaser for
indirect or consequential loss, including
loss of profit, revenue and goodwill is
limited to R0.0 (zero Rand)
88.2 For any one event, the Supplier’s liability (1) for the Purchaser’s existing and
to the Purchaser for loss of or damage to surrounding property in the care, custody and
the Purchaser’s property is limited to control of the Supplier the amount of the
deductible (first amount payable) relevant to
the event
and
(2) for all other existing Purchaser’s property
the applicable deductible as at contract date.
88.3 The Supplier’s liability for Defects due to his Total value of the contract amount.
design which are not notified before the last
defects date is limited to:
88.4 The Supplier’s total liability to the Total value of the contract amount.
in connection with this contract, other than
the excluded matters, is limited to
88.5 The end of liability date is 1 year after Delivery of the whole of the goods
and services.
Z3.2 The Supplier is required to submit an updated verification certificate and necessary supporting
documentation confirming the change in his B-BBEE status to the Supply Manager within thirty
days of the notification or as otherwise instructed by the Supply Manager.
Z3.3 Where, as a result, the Supplier’s B-BBEE status has decreased since the Contract Date the
Purchaser may either re-negotiate this contract or alternatively, terminate the Supplier’s
obligation to Provide the Goods and Services.
Z3.4 Failure by the Supplier to notify the Purchaser of a change in its B-BBEE status may constitute
a reason for termination. If the Purchaser terminates in terms of this clause, the procedures on
termination are P1, P2 and P3 as stated in clause 92, and the amount due is A1 and A3 as
stated in clause 93.
Z4 Confidentiality
Z4.1 The Supplier does not disclose or make any information arising from or in connection with this
contract available to Others. This undertaking does not, however, apply to information which at
the time of disclosure or thereafter, without default on the part of the Supplier, enters the public
domain or to information which was already in the possession of the Supplier at the time of
disclosure (evidenced by written records in existence at that time). Should the Supplier
disclose information to Others in terms of clause 23.1, the Supplier ensures that the provisions
of this clause are complied with by the recipient.
Z4.2 If the Supplier is uncertain about whether any such information is confidential, it is to be
regarded as such until notified otherwise by the Supply Manager.
Z4.3 In the event that the Supplier is, at any time, required by law to disclose any such information
which is required to be kept confidential, the Supplier, to the extent permitted by law prior to
disclosure, notifies the Purchaser so that an appropriate protection order and/or any other
action can be taken if possible, prior to any disclosure. In the event that such protective order is
not, or cannot, be obtained, then the Supplier may disclose that portion of the information which
it is required to be disclosed by law and uses reasonable efforts to obtain assurances that
confidential treatment will be afforded to the information so disclosed.
Z4.5 The Supplier ensures that all his subcontractors abide by the undertakings in this clause.
Z5 Waiver and estoppel: Add to core clause 12.3:
Z5.1 Any extension, concession, waiver or relaxation of any action stated in this contract by the
assumption”.
Z9 Purchaser’s limitation of liability
Z9.1 The Purchaser’s liability to the Supplier for the Supplier’s indirect or consequential loss is
limited to R0.00 (zero Rand)
Z9.2 The Supplier’s entitlement under the indemnity in 83.1 is provided for in 60.1(12) and the
Purchaser’s liability under the indemnity is limited.
Termination: Add to core clause 91.1, at the second main bullet point, fourth sub-bullet
Z10
point, after the words "against it":
Z10.1 or had a business rescue order granted against it.
Z11 Addition to secondary Option X7 Delay damages (if applicable in this contract)
Z11.1 If the amount due for the Supplier’s payment of delay damages reaches the limits stated in this
Contract Data for Option X7, the Purchaser may terminate the Supplier’s obligation to Provide
the Goods and Services using the same procedures and payment on termination as those
applied for reasons R1 to R15 or R18 stated in the Termination Table.
Z12 Ethics
court or in any other similar process, of such Prohibited Action before the Purchaser can
terminate the Supplier’s obligation to Provide the Services for this reason.
Z12.3 If the Purchaser terminates the Supplier’s obligation to Provide the Services for this reason,
the amounts due on termination are those intended in core clauses 92.1 and 92.2.
Z12.4 A Committing Party co-operates fully with any investigation pursuant to alleged Prohibited
Z13 Insurance
Z __13.1 Replace core clause 84 with the following:
Insurance cover 84
84.1 When requested by a Party, the other Party provides certificates from
his insurer or broker stating that the insurances required by this
contract are in force.
84.2 The Supplier provides the insurances stated in the Insurance Table A
for events which are at the Supplier’s risk from the starting date until
the last defects date or a termination certificate has been issued.
goods, plant and materials Purchaser’s insurance.
The Purchaser’s policy deductible as at
Purchaser’s insurance.
damage to property Purchaser’s property
(except the goods, plant The replacement cost where not covered by the
and materials and Purchaser’s insurance.
equipment) and liability for
bodily injury to or death of The Purchaser’s policy deductible as at
a person (not an employee Contract Date, where covered by the
of the Supplier) caused by Purchaser’s insurance.
activity in connection with
this contract Other property
bodily injury to employees
of the Supplier arising out
of and in the course of
their employment in
connection with this
contract
Z _13.2 Replace core clause 87 with the following:
Insurance by 87
the Purchaser
87.1 The Purchaser provides the insurances stated in the Insurance Table B
Transportation (Marine) Per the insurance policy document
Z14 Nuclear Liability
Z14.1 The Purchaser is the operator of the Koeberg Nuclear Power Station (KNPS), a nuclear
installation, as designated by the National Nuclear Regulator of the Republic of South Africa,
and is the holder of a nuclear licence in respect of the KNPS.
Z14.2 The Purchaser is solely responsible for and indemnifies the Supplier or any other person
against any and all liabilities which the Supplier or any person may incur arising out of or
resulting from nuclear damage, as defined in Act , save to the extent that any
liabilities are incurred due to the unlawful intent of the Supplier or any other person or the
presence of the Supplier or that person or any property of the Supplier or such person at or in
the KNPS or on the KNPS site, without the permission of the Purchaser or of a person acting
on behalf of the Purchaser.
Z14.3 Subject to clause Z14.4 below, the Purchaser waives all rights of recourse, arising from the
aforesaid, save to the extent that any claims arise or liability is incurred due or attributable to
the unlawful intent of the Supplier or any other person, or the presence of the Supplier or that
person or any property of the Supplier or such person at or in the KNPS or on the KNPS site,
without the permission of the Purchaser or of a person acting on behalf of the Purchaser.
Z14.4 The Purchaser does not waive its rights provided for in section 30 (7) of Act , or any
replacement section dealing with the same subject matter.
Z14.5 The protection afforded by the provisions hereof shall be in effect until the KNPS is
decommissioned.
Z15 Asbestos
insurance requirements incidental to the supply and transport of the goods from Supplier to Purchaser.
For each of the thirteen terms, Incoterms set out obligations of the seller (the Supplier) in ten paragraphs
identified as A1 to A10 and the corresponding obligations of the buyer (the Purchaser) in paragraphs B1 to
B10. These obligations cover the following subjects:
A The Supplier’s obligations B The Purchaser’s obligations
A1 Provision of goods in conformity with B1 Payment of the price
contract
A2 Licences, authorisations and formalities B2 Licences, authorisations and formalities
A3 Contracts of carriage and insurance B3 Contracts of carriage and insurance
A4 Delivery B4 Taking delivery
A5 Transfer of risks B5 Transfer of risks
A6 Division of costs B6 Division of costs
A7 Notice to the buyer B7 Notice to the seller
A8 Proof of delivery, transport document or B8 Proof of delivery, transport document or
equivalent electronic message equivalent electronic message
A9 Checking - packing - marking B9 Inspection of goods
A10 Other obligations B10 Other obligations
[Should there be a need to amplify any of the published obligations listed above for the chosen INCOTERM,
add them here.]
First read SC3 Core Clause 84.1 and then add anything necessary for the management of insurance related
issues such as a cross reference to where procedures for making claims can be found. Also provide contact
details for persons capable of being able to answer any insurance related queries the Supplier may have, as
well as to whom the information required by any Marine Insurance may be addressed.
Important Dates
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (G20 Logo).pdf (TENDER){"closingTime":"2.2","briefingSession":"{"date":null,"time":null,"venue":"tend a site visit and/or clarification meeting that is stipulated as being","is_compulsory":true}"}
Evaluation Criteria
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (G20 Logo).pdf (TENDER)General
Documentation
Compliance
Financial
Technical Specifications
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (G20 Logo).pdf (TENDER)Supply Chain
Management Procedure 32-1034. Any addenda to an issued Invitation to Tender will be
published or issued in the same way as the Invitation to Tender was and will form part of the
Invitation to Tender documents.
Communication 1.5 Every communication between Eskom and a tenderer shall be made to or from the Eskom
Representative only, in w
Quality Management
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (G20 Logo).pdfof a tenderer.
Cost of tendering 2.6 Accept that Eskom will not compensate the tenderer for any costs incurred in the preparation
and submission of a tender, including the costs of any testing necessary to demonstrate that
aspects of the tender satisfy the evaluation criteria, or the negotiation of any contract.
Submitting a tender 2.7 Check the Invitation to Tender documents on receipt and notify the Eskom representative of
any discrepancy or omitted documents. The Acknowledgement Form must be completed
and submitted with the tender and must clearly state if the tender is for the whole or part of
the works, services or supply identified in the specification and/or works information by
Pricing Schedule
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (G20 Logo).pdfreasonable time for tenderers to make consequential adjustments to their tenders before
the closing date and time for submission.
In writing’ means hand-written, typed, type-written, printed or electronically made, and that
results in a permanent record.
Insurance 2.17 The extent (if any) of insurance provided by Eskom may not be for the full cover required in
the conditions of contract. The tenderer is advised to seek qualified advice regarding
insurance.
Pricing the tender 2.18 Include in the rates, prices, and the tendered total of the Prices all duties, taxes (including
VAT), and other levies payable by the tenderer if successful. Such duties, taxes and levies
are those applicable 14 (fourteen) days prior to the closing date and time for tender
submission.
2.19 Provide rates and Prices that are fixed for the duration of the contract and are not subject to
contract price adjustment except as provided for in the Invitation to Tender.
2.20 State the rates and Prices in South African Rand unless instructed otherwise in the Invitation
to Tender. The selected conditions of contract may provide for part payment in other
currencies. Therefore, submit Rates/Prices in Rands in accordance with the exchange rate
and base date as stipulated in the Invitation to tender.
Alterations to 2.21 May not make any alterations or additions to the tender documents, other than for purposes
documents of complying with instructions issued by the Eskom Representative or if necessary to correct
errors made by the tenderer. All such alterations shall be initialed by all signatories to the
tender. Corrections may not be made using correction fluid, correction tape or the like.
Alternative tenders 2.22 Submit alternative tenders only if a main tender is also submitted, and only if the submission
of alternative tenders is permitted by the Invitation to Tender. Accept that an alternative
tender may be based only on the criteria stated in the Tender Data.
Clarification and 2.23 Provide clarification and documents as may be required by the Eskom Representative
correction of Prices during the evaluation of tenders. However, documents identified as mandatory tender
after tender returnables that are required to be submitted at the closing date and time for tender
submission submission will not be requested and may not be submitted after the closing date and time.
phases, as this is regarded as ‘double dipping’.
Designated 3.12 Tenderers are also required to submit information on designated material and
materials and thresholds no later than contract award. If this information is not completed and
thresholds submitted as indicated in the Invitation to Tender, your tender will not be considered for
contract award
Functionality 3.13 If functionality is a criterion, tenderers will be scored against the functionality criteria and
requirements will be required meet the minimum threshold stated in the Tender Data to proceed to
further evaluation.
Financial analysis 3.14 Eskom has to determine the risk of doing business with a supplier who may pose a
(if applicable) financial risk to Eskom in the execution of the contract. During evaluation of a tenderer’s
financial statements, Eskom will attempt to identify mitigating factors or requirements for
the tenderer to meet, if such factors/requirements exist in the tender’s context. However,
should suitable mitigating factors not exist in the tender’s context or should mitigating
factors exist but be insufficient or if the risk is considered to be too high or should the
tenderer not agree with the mitigating factors, the tenderer will not be considered for
award.
Evaluation of Price 3.15 Evaluate the Price in accordance with the criteria/requirements in the Tender Data. Factors
such as CPA, FOREX, commodity exposure, unconditional discounts, technical
adjustment, PV and forecasted rates of invoicing are taken into account when determining
the evaluation Price.
Arithmetical errors 3.16 Check responsive tenders for arithmetical errors. If there is a discrepancy between an
amount in figures and the amount in words, the amount in words shall prevail.
Check the highest-ranked tenders for the following errors or omissions: -
(a) the misplacement of the decimal point in any unit rate; or
(b) omissions in completing the pricing schedule or bill of quantities, or
(c) arithmetical errors in line-item totals that are the result of the incorrect multiplication
of a unit rate and a quantity in a bill of quantities or schedule of prices; or
(d) arithmetical errors that are the result of the incorrect addition of the prices.
will request the tenderer to either confirm the prices as tendered or to accept the
corrected prices.
Where the tenderer elects to confirm the prices as tendered; Eskom will correct the error
as follows: -
(a) If a bill of quantities or pricing schedule applies and there is an error in the line-item
total that is the result of an error in multiplying the unit rate and the quantity, the line-
item total shall prevail, and the rate shall be corrected.
(b) Where there is a misplacement of the decimal point in the unit rate, the line-item total
as quoted shall prevail, and the unit rate shall be corrected.
(c) Where there is an error in the total of the prices that is the result either of other
corrections required by the checking process or in the tenderer’s addition of prices,
the total of the prices shall prevail, and the tenderer shall be asked to revise the
selected item prices (and their rates if a bill of quantities applies) to result in the
tendered total of the prices.
documentation by closing date and time of tender submission, the tenderer will not be
disqualified if otherwise evaluated as acceptable in all other criteria; however, the tenderer
will score zero points for Specific Goals within the 90/10 or 80/20 allocation of points.
Ranking of tenders 3.19 According to the PPPFA, Eskom will add the score for Pricing and the Specific Goals
together and rank the suppliers from the highest to the lowest.
Objective criteria 3.20 A contract may be awarded to a tenderer that did not score the highest points only in
accordance with Section 2(1) (f) of the Preferential Procurement Policy Framework Act,
must stipulate the Objective Criteria in the Invitation to Tender. Functionality and any
element of the B-BBEE scorecard may not be used as Objective Criteria.
Compliance Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (G20 Logo).pdf (TENDER)CSD report or as per certificate/affidavit provided
CSD number/CSD report) must be provided at the closing date and time for
CSD number or B-BBEE certificate/affidavit will need to be
B-BBEE Details: kom Representative and
Agreement to sign the contract documents.
Proof of authority 2.25 Where an agent submits a tender on behalf of a principal, an authenticated copy of the
to act as agent authority to act as an agent of the tenderer must be submitted as a tender returnable.
Compliance with 2.26 Comply with relevant legislation and regulatory instruments such as Instruction Notes issued
relevant legislation by National Treasury, CIDB Regulations for construction works; materials designated for local
(NT instructions, content and/or production by the dtic, PPPFA Regulations; Amended B-BBEE Codes, COIDA;
CIDB, PPPFA etc) OHS Act; Eskom’s requirements for Safety, Health, Environment and Quality (SHEQ) and any other
applicable legislation or regulatory instruments indicated in the Invitation to Tender.
Proof of Safety, 2.27 Tenderers are required to provide proof to the satisfaction of Eskom that safety, health,
Health, environmental and quality (SHEQ) systems, policies and capabilities are in place at the
Environment and closing date and time for tender submission stipulated in the Invitation to Tender and/or
Quality Contract Award. All costs and personnel associated with SHEQ must be reflected in the
requirements tender.
CIDB 2.28 Where the Tender Data has stipulated CIDB grading/s as a qualification criterion, tenderers
are required to be registered with the Construction Industry Development Board at the
closing date and time for submission of tenders or to be capable of being so registered
within twenty-one (21) working days from the closing date and time for submission of
tenders.
Where CIDB is applicable; proof of registration on CIDB is mandatory at the closing date
and time for tender submission. Should this not be received as stipulated
Health & Safety
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (G20 Logo).pdftenderers that Eskom has identified. A sole source and a single source are regarded as a
tenderer that meets the requirements stated in the Eskom Procurement and Supply Chain
Management Procedure 32-1034. Any addenda to an issued Invitation to Tender will be
published or issued in the same way as the Invitation to Tender was and will form part of the
Proof of authority 2.25 Where an agent submits a tender on behalf of a principal, an authenticated copy of the
to act as agent authority to act as an agent of the tenderer must be submitted as a tender returnable.
Compliance with 2.26 Comply with relevant legislation and regulatory instruments such as Instruction Notes issued
relevant legislation by National Treasury, CIDB Regulations for construction works; materials designated for local
(NT instructions, content and/or production by the dtic, PPPFA Regulations; Amended B-BBEE Codes, COIDA;
CIDB, PPPFA etc) OHS Act; Eskom’s requirements for Safety, Health, Environment and Quality (SHEQ) and any other
applicable legislation or regulatory instruments indicated in the Invitation to Tender.
Proof of Safety, 2.27 Tenderers are required to provide proof to the satisfaction of Eskom that safety, health,
Health, environmental and quality (SHEQ) systems, policies and capabilities are in place at the
requirements tender.
CIDB 2.28 Where the Tender Data has stipulated CIDB grading/s as a qualification criterion, tenderers
are required to be registered with the Construction Industry Development Board at the
closing date and time for submission of tenders or to be capable of being so registered
within twenty-one (21) working days from the closing date and time for submission of
tenders.
Where CIDB is applicable; proof of registration on CIDB is mandatory at the closing date
and time for tender submission. Should this not be received as stipulated in the Invitation to
Tender; the tender will be disqualified. However, in the event that, at the closing date and
time for tender submission, only proof of application for registration on CIDB is available,
then this must be submitted by the closing date and time for tender submission, while the
actual proof of CIDB registration (printout from CIDB database) must be submitted by
contract award
Contract Skills 2.29 If the tenderer is awarded a contract, it, as Contractor, shall achieve in the performance of
Development Goal the contract the Contract Skills Development Goals (CSDG) established in the CIDB
(CSDG) Standard for Developing Skills through Infrastructure Contract (published in GN 1779,
Government Gazette No. April 2023)
that has a duration of 12 months or more, and to:
a contract of R5 million or more, in the case of a professional service or service contract
or an order issued in terms of such a contract; or
a CIDB grading designation of grade 7 or higher, in case of an engineering and
construction works, or design and build contract or an order issued in terms of such a
contract.
Contract 2.30 The Contractor shall achieve in the performance of the contract the Contract Participation
Participation Goals Goals (CPG) relating to the engagement of targeted enterprises as established in the CIDB
(CPG) standard for indirect targeting for enterprise development through Construction works
contracts (published in Government Gazette No. February 2013).
enterprises as established in the aforesaid standard applies to:
construction works contracts in the General Building (GB) and to Civil Engineering (CE)
classes of construction works;
construction works contracts of an estimated minimum project duration of 6 months; and
construction works contracts in which at least 25% of the main contract could reasonably
be expected to be subcontracted out in one or more of the following CIDB classes of
construction works:
Civil Engineering (CE)
Electrical Engineering Work (EB)
) General Building Works (GB)
) Mechanical Engineering (ME)
2.31 Eskom may disqualify a tender if it is found that the tenderer has misrepresented or
falsified any information, certificate, affidavit or document. Eskom will report any fraud
in relation to a tenderer’s B-BBEE certificate/affidavit, or evidence of ‘fronting’ as
defined in the B-BBEE Act , as amended, to the B-BBEE Commission. The
tenderer will be suspended from business with any State-Owned Company for up to 10
years and may even be sentenced to jail.
2.32 Tenderers are also required to complete fully and submit the SDL&I Undertaking
(annexure to the Invitation to Tender) by no later than contract award. If the SDL&I
Respond 3.1 Respond to a request for clarification that Eskom receives before the closing date for
clarification clarification or queries. Eskom’s responses will be published to all tenderers in the same
manner the Invitation to Tender documents were issued. It is the tenderers’ responsibility
to check the Eskom Tender Bulletin and NT e-Tender Portal regularly for updated
responses to clarifications.
Issue Addenda 3.2 If necessary and prior to the closing date and time for tender submission, amend, amplify, or
add to the Invitation to Tender documents by way of Addenda published in the same
platform that the Invitation to Tender was issued. It is the tenderers’ responsibility to
check the Eskom Tender Bulletin and NT e-Tender Portal regularly for Addenda.
electronically. The Eskom Representative will publish the names of all tenderers received
on the Eskom Tender Bulletin and NT e-Tender Portal.
Tender Prices 3.5 Eskom will announce the names of the tenderers. Prices may be announced if so, stated
in the Tender Data.
Non-disclosure 3.6 Unless required by law, Eskom will not disclose information relating to the evaluation and
comparison of tenders and recommendations for the award of a contract to tenderers or to
any other person not officially concerned with the tender process until after the tender
award.
Grounds for 3.7 Reject a tender if Eskom establishes that there is proof that the tenderer influenced the
rejection processing of tenders or the awarding of the contract, the existence of collusion and/or bid
rigging, and/or that the tenderer has participated in any fraudulent/illegal activity in
connection with the Invitation to Tender.
Clarification of a 3.8 Obtain clarification from a tenderer in respect of any matter in the tender that may not be
tender clear or that could give rise to ambiguity in a contract arising from this tender if the matter
were not to be clarified. A document that the Invitation to Tender identifies as a mandatory
tender returnable that is required to be submitted at the closing date and time for tender
submission will not be requested, but Eskom may seek clarity on it.
may utilise reverse e-auction in certain Enquiries. Where reverse e-auction will be utilised,
this will be indicated in the respective Invitation to Tender and the reverse e-auction
supporting documents will be issued in the Invitation to Tender. Tenderers will be required
to submit a complete tender that does not contain Prices. If a tenderer has included prices
in its tender, the prices will not be considered.
Acceptance of 3.22 Notify Eskom's acceptance to the successful tender before the expiry of the validity period
tender or agreed additional validity period. Inform the successful and unsuccessful tenderers only
once approval has been granted by the Eskom Adjudication Authority. For open tenders,
this notification must be published on the Eskom Tender Bulletin and NT e-Tender Portal
Prepare contract 3.23 Revise the contract documents issued by Eskom in the Invitation to Tender documents to
documents take account of:
Addenda issued during the tender period;
inclusion of returnables stipulated in the Invitation to Tender;
inclusion of changes agreed in contract negotiations; and
Other revisions or documents agreed to between Eskom and the successful
tenderer during negotiations,
Sign Form of 3.24 Arrange for authorised signatories of both parties to complete and sign the original and one
Contractual Terms
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (G20 Logo).pdfincluding the Eskom Representative shall not be liable for any losses, claims or damages of
whatsoever nature or howsoever arising that may be sustained by a tenderer or any other
person as a result of its participation in the tender or from any amendment, termination or
suspension of the process set out in the Invitation to Tender or from its exclusion from
participating in the tender process at any point.
Eskom’s right to 1.7 Eskom reserves the right to enter into mandated negotiations with any, one or more selected
negotiate tenderer(s) in accordance with Eskom’s approved procurement policies and procedures.
240-62044728 Rev 12 Eskom Standard Identifier
Conditions of Tender Effective Date 01 February 2025
Review Date January 2030
Disclaimer 1.8 While Eskom takes all reasonable measures to ensure that all information contained in the
regarding accuracy tender documents is correct and complete, Eskom does not, however, make any
of tender representations or warranties, express or implied, as to the accuracy or completeness of
documents such information and Eskom expressly disclaims any, and all liability for such
representations, warranties or statements.
Tenderer’s 2. The tenderer shall comply with the following obligations when submitting a tender and shall:
Tender validity 2.12 Hold the tender(s) valid for acceptance by Eskom at any time within the validity period after
the closing date and time for tender submission. Extend the validity period for a specified
additional period if Eskom requests the tenderer to do so. A tenderer that agrees to extend
the validity of its tender will not be required or permitted to modify its tender. A tenderer that
does not agree to extend the validity of its tender will be excluded from further
consideration. Tenderers will be requested to extend the validity of their tenders until a
contract(s) have been concluded with one or more tenderers. A request that a tenderer
extend the validity of its tender is not a representation that the tender is an acceptable
tender or that Eskom will seek to negotiate or conclude a contract with the tenderer. If the
validity of tenders expires before contracts have been concluded, the procurement process
is deemed to have concluded without an award.
Confidentiality and 2. 13 Treat as confidential all matters that arise in connection with the procurement. Use and copy
copyright of the documents provided by Eskom only for the purpose of preparing and submitting a tender
documents in response to this Invitation to Tender.
Standardised 2.14 Obtain and familiarise themselves with, if required for the purposes of submitting a tender,
specifications and the latest revision of standardised specifications and/or other documents that have been
other publications incorporated by reference into the Invitation to Tender documents by reference.
Site visit and / or 2.15 Tenderers must attend a site visit and/or clarification meeting that is stipulated as being
clarification compulsory in order to familiarise themselves with the proposed work, services, supply,
meeting location or similar. Failure to attend a clarification meeting or site visit that is identified as
compulsory will result in disqualification from participation.
Details of the meeting(s) are stated in the Tender Data. Tenderers are entitled to ask
correction of errors as required above.
Evaluation of 3.17 Score the B-BBEE level as stated on the CSD report or as per certificate/affidavit provided.
B-BBEE If the B-BBEE level is a pre-qualification criterion; then the proof of the B-BBEE level
(certificate/CSD number/CSD report) must be provided at the closing date and time for
tender submission; or the tender will be disqualified. If sub-contracting to designated groups
pre-qualification criteria are utilized (selected/mandatory) in terms of the PPPFA
Regulation, then Eskom will apply the PPPFA requirements for sub-contractors’ B-BBEE
status and the sub-contractors’ CSD number or B-BBEE certificate/affidavit will need to be
provided at the closing date and time for tender submission. Should the
information/documents provided indicate that the level is in dispute (fraudulent/ expired)
then the tender will be disqualified.
However, for the purposes of PPPFA point allocation: if no B-BBEE certificate/affidavit is
provided at Tender closing date and time for tender submission, or the
information/documents provided are fraudulent or have expired; then the tenderer will not
be disqualified (if otherwise deemed to be responsive and acceptable in all other aspects)
but will score zero under PPPFA point allocation.
Evaluation of 3.18 Score the Specific Goals with reference to the supporting documentation in the tender. If a
Section
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (G20 Logo).pdfare submitted and accessible for downloading/evaluation without any challenges as well as
It must be noted that Eskom will not measure a criterion twice in the different evaluation
Functionality 3.13 If functionality is a criterion, tenderers will be scored against the functionality criteria and
further evaluation.
(if applicable) financial risk to Eskom in the execution of the contract. During evaluation of a tenderer’s
Evaluation of Price 3.15 Evaluate the Price in accordance with the criteria/requirements in the Tender Data. Factors
the evaluation Price.
but will score zero under PPPFA point allocation.
Evaluation of 3.18 Score the Specific Goals with reference to the supporting documentation in the tender. If a
Specific Goals tenderer fails to meet Specific Goals and/or to submit the required proof/supporting
will score zero points for Specific Goals within the 90/10 or 80/20 allocation of points.
Ranking of tenders 3.19 According to the PPPFA, Eskom will add the score for Pricing and the Specific Goals
Objective criteria 3.20 A contract may be awarded to a tenderer that did not score the highest points only in
must stipulate the Objective Criteria in the Invitation to Tender. Functionality and any
element of the B-BBEE scorecard may not be used as Objective Criteria.
Reverse e-Auction 3.21 Reverse e-auction is an electronic system that utilises the 90/10 and 80/20 Price and
Preference point systems, and which is intended to achieve competitive pricing. Eskom
(NT instructions, content and/or production by the dtic, PPPFA Regulations; Amended B-BBEE Codes, COIDA;
CIDB, PPPFA etc) OHS Act; Eskom’s requirements for Safety, Health, Environment and Quality (SHEQ) and any other
Health, environmental and quality (SHEQ) systems, policies and capabilities are in place at the
Quality Contract Award. All costs and personnel associated with SHEQ must be reflected in the
However, for the purposes of PPPFA point allocation: if no B-BBEE certificate/affidavit is
Description
Source: 240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdfSupply and delivery of mechanical damper kits for five years.
Contact Information
Source: 240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdf (unknown)Eskom Representative: Annah Serite. Document issued on 23/07/2026.
Submission Guidelines
Source: 240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdf (unknown)Submit the following returnable documents: Form A (completed and signed).
Returnable Documents
Source: 240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdf (unknown)Form A must be completed and signed.
Evaluation Criteria
Source: 240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdf (unknown)Qms Compliance
Must have a documented QMS compliant with ISO 9001:2015 (certification optional).
Documentation
Must submit all required returnable documents (e.g., method statement, policy, objectives, organizational charts).
Form A
Form A must be submitted as part of the tender.
Technical Compliance
Must meet technical specifications outlined in Specification 240-105658000.
Technical Specifications
Source: 240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdf (unknown)Supply and delivery of mechanical damper kits for a period of five years.
Compliance Requirements
Source: 240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdf (unknown)Quality Management System (QMS) compliance with ISO 9001:2015 (documented but not necessarily certified). Additional customer-specific requirements may apply as per scope or specification.
Requirements
Source: 240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdf (unknown)Additional requirements may apply as per the scope of work or specification.
Section
Source: 240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdfEvaluation is based on quality requirements with a total score of 7 points.
Evaluation Criteria
Source: Supplier Evaluation Pack Template for 01 March 2025 to 29 February 2026.xls (unknown)Unable to extract specific eligibility criteria due to unreadable document content. Common criteria may include legal registration, technical capabilities, financial stability, and compliance with ESKOM's supplier requirements.
Submission Guidelines
Source: Authority to submit a tender (Returnable Schedule) Template.docx (unknown)Submit the following returnable documents: A completed and signed 'Authority to Submit a Tender' certificate for your organisation type (Company, Close Corporation, Partnership, Joint Venture, or Sole Proprietor). Alternatively, attach a certified copy of a company/organisation document providing the same information as the certificate.
Evaluation Criteria
Source: Authority to submit a tender (Returnable Schedule) Template.docx (unknown)Legal Status
Applicant must be a legally registered entity (company, close corporation, partnership, joint venture, or sole proprietor).
Authority Proof
Must provide valid proof of authorization for the signatory to commit to the tender and contract.
Compliance
All documents must be certified or notarized where applicable (e.g., company resolutions, partnership agreements).
Contact Information
Source: 240-68099512 Form A_Cat 4_ Rev 9.pdf (unknown)Eskom Quality Officer: Annah Serite (Signatory as of 23/07/2026).
Submission Guidelines
Source: 240-68099512 Form A_Cat 4_ Rev 9.pdf (unknown)Submit the completed and signed Form A (240-68099512 Rev 9) to acknowledge acceptance of Eskom Supplier Quality Requirements as per 240-105658000 Specification and ISO 9001 Standard. Ensure only one applicable category is selected (Category 4 marked as applicable in this tender).
Evaluation Criteria
Source: 240-68099512 Form A_Cat 4_ Rev 9.pdf (unknown)General
Open to all eligible suppliers (public tender).
Quality Compliance
Must meet ISO 9001 and Eskom’s specified quality clauses (e.g., Clauses 4-10 of ISO 9001, including customer focus, leadership, process approach, and improvement).
Capacity Assessment
Must pass Category 4 capability and capacity assessment for main and sub-suppliers.
Legal
No reproduction of the document without Eskom’s consent; compliance with copyright and contractual terms.
Technical Specifications
Source: 240-68099512 Form A_Cat 4_ Rev 9.pdf (unknown)Pre-contract award quality requirements apply (Category 4 selected). Post-contract award includes Contract Execution and Supplier Quality Performance Monitoring Phase. Eskom retains rights of Access, Information, Preservation, and Quality Audits. Management of Nonconformities and Special Processes are mandatory as per clause 3.8 of 240-105658000.
Methodology
Source: 240-68099512 Form A_Cat 4_ Rev 9.pdfMethodology must align with ISO 9001 principles: Context of the Organisation, Leadership, Planning, Support, Operation, Performance Evaluations (Evidence-based decision making), and Improvement (Relationship Management).
Compliance Requirements
Source: 240-68099512 Form A_Cat 4_ Rev 9.pdf (unknown)Compliance with ISO 9001 Standard and Eskom Supplier Quality Requirements (240-105658000 Specification) is mandatory. Bidders must complete and sign Form A to confirm adherence.
Section
Source: 240-68099512 Form A_Cat 4_ Rev 9.pdfEvaluation based on ISO 9001 Standard principles: Customer focus, Leadership, Engagement of people, Process approach, Improvement, Evidence-based decision making, and Relationship Management. Post-contract evaluation includes Contract Execution and Supplier Quality Performance Monitoring Phase.
Submission Guidelines
Source: 240-126469599 (Rev 2) - Method Statement - Template.docx (unknown)Returnable Documents: Not explicitly specified in the provided document. Suppliers should prepare a Method Statement as per the template, including: scope of work, objectives, customer focus, competency requirements, infrastructure (PPE, tools, equipment), leadership details, risk management, process improvements, data analysis, and relationship management.
Evaluation Criteria
Source: 240-126469599 (Rev 2) - Method Statement - Template.docx (unknown)General
Applicants must be legally registered entities capable of supplying and delivering Mechanical Damper kits.
Technical
Must demonstrate technical capability to meet ESKOM’s specifications and compliance requirements (e.g., NEC document standards).
Experience
Proven track record in supplying similar products to large organizations, preferably in the energy sector.
Compliance
Compliance with South African regulatory and safety standards, including PPE and equipment requirements.
Financial
Financial stability to fulfill a 5-year contract, including capacity for large-scale supply and delivery.
Technical Specifications
Source: 240-126469599 (Rev 2) - Method Statement - Template.docx (unknown)Scope of Work: Supply and delivery of Mechanical Damper kits for 5 years, as outlined in the Works Information of the NEC document/RFQ.
Requirements for Method Statement:
Compliance Requirements
Source: 240-126469599 (Rev 2) - Method Statement - Template.docx (unknown)No specific compliance requirements found in the provided document.
Description
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdfThis document is Eskom’s Supplier Integrity Pact (Unique Identifier: 240-113650212), applicable to Eskom Holdings SOC Ltd and all subsidiaries. It governs ethical behavior for suppliers in procurement processes, supplementing Eskom’s commercial and ethics policies. Suppliers must read, sign, and submit the Integrity Declaration Form for all bids. The pact prohibits corruption, fraud, collusion, and conflicts of interest, and aligns with South African laws and constitutional principles (fairness, transparency, equity, cost-effectiveness, competitiveness).
Important Dates
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)Closing date for Integrity Pact compliance: 27 June 2023 (as referenced in document).
Contact Information
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)Submission Guidelines
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)Suppliers must complete, sign, and submit the Integrity Declaration Form for every Eskom procurement process. Required returnables include:
Disqualification risks:
Suppliers must report unethical behavior by Eskom staff via:
Returnable Documents
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)Required documents for submission:
Evaluation Criteria
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)Open to any natural or juristic person that is an existing or potential supplier registered with Eskom, provided they have no undisclosed conflicts of interest, agree to comply with the Integrity Pact and all relevant South African laws, and are willing to submit the necessary integrity declarations.
Compliance Requirements
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)Mandatory compliance requirements:
Non-compliance may result in:
B-BBEE Requirements
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)Suppliers must align with Eskom’s employment equity and ethical standards, as per the Employment Equity Act. This includes fair treatment of employees and non-discrimination in the workplace.
Contractual Terms
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdfThe Integrity Pact remains valid until replaced. It is governed by South African law, and its provisions are enforceable alongside any civil or criminal proceedings arising from breaches.
Special Conditions
Source: Eskom Supplier Integrity Pact - 02 June 2023.pdf (unknown)Special conditions for suppliers:
Evaluation Criteria
Source: Technical Evaluation.pdf (unknown)Mandatory
Preferred
Technical Specifications
Source: Technical Evaluation.pdf (unknown)Scope: Supply and delivery of Sprecher and Schuh HPF 512-2FS and HPF 515-2FS Circuit Breaker Spares for 132 kV – 275 kV systems.
Key Requirements:
Quality Management
Source: Technical Evaluation.pdfQuality requirements:
Compliance Requirements
Source: Technical Evaluation.pdf (unknown)Compliance requirements include:
Description
Source: SOW.pdfSupply and delivery of a Mechanical Damper kit for Sprecher and Schuh HPF512-2FS and HPF515-2FS 132kV-275kV breakers. The kit must include the following components:
Evaluation Criteria
Source: SOW.pdf (unknown)General
Technical
Technical Specifications
Source: SOW.pdf (unknown)Supply and delivery of a Mechanical Damper kit for Sprecher and Schuh HPF512-2FS and HPF515-2FS 132kV-275kV breakers. The kit must include the following components:
Description
Source: INVITATION TO TENDER- SUPPLY AND DELIVERY OF MECHANICAL DAMPER KIT 28 July 2026.pdfScope: Supply and delivery of Mechanical Damper Kit (including gaskets and seals) for a 5-year period. Contract terms: NEC 3 Supply Contract. Tender validity: 120 days from closing date. Eskom reserves the right to award to multiple tenderers for optimal service delivery and value for money.
Important Dates
Source: INVITATION TO TENDER- SUPPLY AND DELIVERY OF MECHANICAL DAMPER KIT 28 July 2026.pdf (TENDER)Closing date and time: 18 August 2026 at 10:00. Non-compulsory clarification meeting: 05 August 2026 at 10:00 via MS Teams (link: https://teams.microsoft.com/meet/310794080305866?p=a8dm1impc e9i6stMsa). Clarification queries must be submitted at least 5 working days before the tender deadline. Tender validity period: 120 days from closing date.
Contact Information
Source: INVITATION TO TENDER- SUPPLY AND DELIVERY OF MECHANICAL DAMPER KIT 28 July 2026.pdf (TENDER)Eskom Representative: Zenie Bota. Tel: 011 629 4414. Email: [email protected]. Submission portal: https://tenderbulletin.eskom.co.za/. Fraud/corruption reporting: 0800 11 2722 or [email protected].
Submission Guidelines
Source: INVITATION TO TENDER- SUPPLY AND DELIVERY OF MECHANICAL DAMPER KIT 28 July 2026.pdf (TENDER)Submit tenders electronically via the Eskom E-Tendering portal: https://tenderbulletin.eskom.co.za/ by the closing date and time. No hard copies or zipped files are accepted. All documents must be in PDF format (except the pricing schedule, which requires both PDF and Excel). Maximum upload size per document: 500MB; total submission: 4GB. Late submissions are not accepted. If resubmitting, only the latest version is valid. Ensure submission status is marked as 'complete'. Mandatory returnables (e.g., Annexures A-J, SBD forms) must be submitted by the deadline to avoid disqualification. Non-disqualifiable returnables may be requested within 5 working days if missing or incomplete. Alternative tenders are not allowed.
Evaluation Criteria
Source: INVITATION TO TENDER- SUPPLY AND DELIVERY OF MECHANICAL DAMPER KIT 28 July 2026.pdf (TENDER)General
Joint Ventures
Foreign Suppliers
Technical Specifications
Source: INVITATION TO TENDER- SUPPLY AND DELIVERY OF MECHANICAL DAMPER KIT 28 July 2026.pdf (TENDER)Scope: Supply and delivery of Mechanical Damper Kit (including gaskets and seals) for 5 years. Quality standards: Supply Quality Management Specification 240-105658000, Form A (Tender and Contract Quality Requirements for 240-105658000), ISO9001 Standard 240-68099512, Supplier Quality Management List of Tender Returnable Documents 240-12248652, Method Statement 240-126469599. Cataloguing may be required post-award, with materials labelled per Eskom specifications. Pricing Schedule/BOQ must be submitted in PDF and Excel.
Pricing Schedule
Source: INVITATION TO TENDER- SUPPLY AND DELIVERY OF MECHANICAL DAMPER KIT 28 July 2026.pdfPricing Schedule/BOQ must be submitted in PDF and Excel. Include a line item for cataloguing if required. Pricing must be inclusive of VAT, corrected for errors, and exclude contingencies. Cataloguing information may be required post-award, with materials labelled per Eskom specifications.
Financial Requirements
Source: INVITATION TO TENDER- SUPPLY AND DELIVERY OF MECHANICAL DAMPER KIT 28 July 2026.pdf (TENDER)Payment terms: Contracts below R50M (incl. VAT) paid within 30 days of undisputed invoice receipt. Contracts above R50M (incl. VAT) paid within 60 days. Pricing must be inclusive of VAT, corrected for errors, and exclude contingencies. Performance security (bond or demand guarantee) may be required; select at least 2 Eskom-approved financial institutions. Pricing Schedule must include a line item for cataloguing if applicable. Unconditional discounts are evaluated; conditional discounts applied at payment.
Compliance Requirements
Source: INVITATION TO TENDER- SUPPLY AND DELIVERY OF MECHANICAL DAMPER KIT 28 July 2026.pdf (TENDER)Mandatory: CSD registration (CSD number/report). Required returnables: Authorisation Form (Annexure A), Acknowledgement Form (Annexure B), Tenderer’s Particulars (Annexure C), Integrity Declaration Form (Annexure D), CPA for Local Goods/Services (Annexure E), CPA(IG) for Foreign Goods/Services (Annexure F, if applicable), SBD 6.2 (Local Production and Content, Annexures G1-G4 if designated materials are included), SBD 1 (Invitation to Bid, Annexure H), SBD 6.1 (Preference Points Claim Form, Annexure I), SBD 4 (Bidders Disclosure, Annexure J). Tax Clearance Certificate required for local tenderers (or foreign tenderers with a SA footprint). COIDA certificate (South African tenderers only). Employment Equity compliance proof (South African designated employers only). B-BBEE status proof (certificate, affidavit, or other prescribed requirement). Financial statements: Latest approved annual statements (no drafts) including director’s report, auditor’s report, and all required schedules. For JVs/SPVs, each partner must submit financials. CIDB grading proof (if applicable).
Health & Safety
Source: INVITATION TO TENDER- SUPPLY AND DELIVERY OF MECHANICAL DAMPER KIT 28 July 2026.pdfSHEQ requirements: Tenders returnable evaluated per Annexures C3 and C5. Mandatory: COIDA certificate of good standing or proof of application (South African tenderers only). Additional safety/quality documents may be required per scope of work. Contractor must comply with Eskom’s SHE standards.
Contractual Terms
Source: INVITATION TO TENDER- SUPPLY AND DELIVERY OF MECHANICAL DAMPER KIT 28 July 2026.pdfContract type: NEC 3 Supply Contract. Tender validity: 120 days from closing date. No public tender opening; tenders downloaded electronically. Prices will not be read out. Eskom reserves the right to award to multiple tenderers. Performance security (bond or demand guarantee) may be required; select at least 2 Eskom-approved financial institutions. Payment terms: 30 days for contracts ≤ R50M (incl. VAT); 60 days for contracts > R50M (incl. VAT). Subcontracting with subsidiaries must be declared to avoid fronting allegations.
Section
Source: INVITATION TO TENDER- SUPPLY AND DELIVERY OF MECHANICAL DAMPER KIT 28 July 2026.pdfScoring: 80 points for pricing (inclusive of VAT, corrected for errors, excluding contingencies, adjusted for deviations, evaluated on Net Present Value). 20 points for Specific Goals (PPPFA). Minimum functionality threshold: 80% (failure results in disqualification). Unconditional discounts are evaluated; conditional discounts applied at payment. Objective criteria: SHE (Annexures C3 and C5), Quality (ISO9001, Supply Quality Management), Finance (3-year audited financial statements). Negotiations may occur with highest-ranked supplier if prices are not market-related.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Lower Germiston Road - Rosherville - Germiston - 2020
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
15
Last checked
28 Jul 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Dominant Impression Test
Contractors must pass the Dominant Impression Test (Questions 6(i)-6(xi)) to determine if they are Independent Contractors or Personal Service Providers.
Labour Brokers
Labour brokers must provide a valid **IRP30 exemption certificate** to avoid PAYE withholding (Appendix 6).
Scoring
Documents are scored as 0 (non-compliant) or 1 (compliant). Non-submission or failure to meet minimum requirements results in a score of 0.
Financial
Ethical
Quality Management
Evidence of a quality management system focused on meeting and exceeding customer expectations.
Local Suppliers