Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
01 IMPALA ROAD - PULLENSHOPE, HENDRINA POWER STATION - MIDDELBURG - 1096
Organization Type
GOVERNMENT
Published
30 Sept 2026
OCDS Reference
ocds-9t57fa-172259
ESKOM requires the supply and delivery of turbine auxiliaries off-the-shelf spares for a five-year contract period. The tender is evaluated on price and b-bbee preference points, with mandatory local content thresholds for designated components (pumps, valves, gaskets, bearings). Bidders must submit a valid b-bbee certificate or sworn affidavit as a condition for award, and must commit to sdl&i obligations including local procurement, job creation, and skills development, with penalties and invoice retention of 1-3% for non-compliance.
Closing date: 26 October 2026 at 10:00. Submission method and address are not stated in the document.
Local content thresholds are mandatory and a condition for award: pumps 70%, valves 70%, gaskets 60%, bearings 60%. SBD 6.2 and Annex C are returnable.
B-BBEE evidence is a condition for award: valid SANAS-accredited certificate, sworn affidavit (EME up to R10m revenue, QSE up to R50m if at least 51% black-owned), or CIPS affidavit, plus proof of ownership, certified ID copies of shareholders, and consolidated certificate for trusts/JVs.
B-BBEE improvement plan must be submitted within 30 days of contract signature. Level 4 bidders must reach Level 3 by end of year one; Levels 5-8 or non-compliant must reach Level 4 by end of year one and improve one level each subsequent year.
SDL&I obligations: 100% local procurement content target, job creation and retention proposals, and skills development for two occupations (Logistic Officer and Inventory Officer). Penalty of 1-3% of contract value and retention of 1-3% of each invoice (excl. VAT) apply for non-compliance.
SDL&I Implementation Schedule must be returned to the SDL&I representative for acceptance within 28 days of contract award.
No CIDB compulsory training applies; CSDG is not applicable. No briefing or site visit is mentioned.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Monday, 26 October 2026 - 10:00
Venue
MICROSOFT TEAMS
Categories
Request for Bid(Open-Tender)
01 IMPALA ROAD - PULLENSHOPE, HENDRINA POWER STATION - MIDDELBURG - 1096
Recommended Certifications
Having these can improve your winning chances: SABS Product Certification, NRCS Certification
AI Document Analysis Stages
Technical Specifications
30 Sept
2026
Tender Published
Tender was published
26 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
240-12248652_List of Tender Returnables_Cat 2_ (Quality 04).xlsx
Eskom requires the supply and delivery of turbine auxiliaries off-the-shelf spares, with bids evaluated on a quality scorecard weighted across five sections. Bidders must submit quality management documentation against ISO 9001:2015 requirements, a draft Contract Quality Plan and an Inspection and Test Plan aligned to the scope of work.
SDLI Strategy for supply and delivery of Turbine Auxilliary Off The Shelf spares for 5 years.pdf
Supply and delivery of turbine auxiliaries off-the-shelf spares for Eskom in Mpumalanga. Award goes to the bidder with the highest total of price points plus up to 10 points (90/10 system) or 20 points (80/20 system) scored for B-BBEE specific goals. Bids close on 26 October 2026 at 10:00.
Safety.pdf
Supply and delivery of turbine auxiliaries off-the-shelf spares for Eskom in Mpumalanga. Bidders must submit a set of occupational health and safety returnables, evaluated against a high-risk OHS tender evaluation template before contract award.
380-136358 R0 - Quality Control Plan TEMPLATE(Quality 01).pdf
Supply and delivery of turbine auxiliaries off-the-shelf spares for Eskom at Hendrina Power Station in the Eastern Cape. The quality control plan template sets intervention points and sign-off requirements for activities and final acceptance.
240-68099512 Form A_Cat 2_ Rev 9(Quality 03).pdf
Supply and delivery of off-the-shelf spares for turbine auxiliaries, procured by Eskom in the Eastern Cape. Bidders must accept and comply with Eskom's supplier quality requirements under specification 240-105658000 and the ISO 9001 standard.
240-109253698 CQP Template 2021(Quality 02).pdf
Supply and delivery of turbine auxiliaries off-the-shelf spares to Eskom in the Eastern Cape. Bidders must submit a completed Contract Quality Plan with their bid, setting out how quality will be managed across the contract scope.
Invitation to Tender_Turbine Auxilliary_Change.pdf
Eskom requires the supply and delivery of turbine auxiliaries off-the-shelf spares to Hendrina Power Station in Mpumalanga, under an NEC3 contract. The tender is open to bidders who meet a 70% functionality threshold and are evaluated on an 80/20 preference point system.
NEC3 Supply nd Delivery of Turbine auxiliaries Off-The-Shelf spares.pdf
Supply and delivery of turbine auxiliaries off-the-shelf spares on an as-and-when-required basis to Eskom's Hendrina Power Station (Materials Management Department) over five years, under NEC3 Supply Contract (SC3).
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 137 573
Range
Based on 19 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Quality Control Plan (QCP) template for Hendrina Power Station.
Quality Management
Source: 380-136358 R0 - Quality Control Plan TEMPLATE(Quality 01).pdfQuality Control Plan (QCP) template for Hendrina Power Station.
Evaluation Criteria
Source: 240-68099512 Form A_Cat 2_ Rev 9(Quality 03).pdf (unknown)Quality compliance is the only stated evaluation criterion.
Technical Specifications
Source: 240-68099512 Form A_Cat 2_ Rev 9(Quality 03).pdf (unknown)The tender is for the supply and delivery of turbine auxiliaries off-the-shelf spares.
Methodology
Source: 240-68099512 Form A_Cat 2_ Rev 9(Quality 03).pdfThe tenderer must comply with ISO 9001 clauses 4 to 10 (context of the organisation, leadership, planning, support, operation, performance evaluations, improvement) and quality principles 1 to 7 (customer focus, leadership, engagement of people, process approach, improvement, evidence-based decision making, relationship management).
Quality Management
Source: 240-68099512 Form A_Cat 2_ Rev 9(Quality 03).pdfThe tenderer must complete and sign the quality requirements form to acknowledge and accept Eskom Supplier Quality Requirements per specification 240-105658000 and ISO 9001. The form includes pre-contract award quality requirements (categories 1-4, main supplier and sub-supplier capability and capacity assessment), post-contract award requirements (contract execution, supplier quality performance monitoring, Eskom rights of access and information, preservation, quality audits, management of nonconformities, special processes), and ISO 9001 clauses and quality principles.
Compliance Requirements
Source: 240-68099512 Form A_Cat 2_ Rev 9(Quality 03).pdf (unknown)No specific compliance requirements are stated beyond the quality requirements form (Form A) which must be completed and signed to accept Eskom Supplier Quality Requirements and ISO 9001.
Section
Source: 240-68099512 Form A_Cat 2_ Rev 9(Quality 03).pdfQuality compliance is the only stated evaluation criterion. The tenderer must complete and sign the quality requirements form to accept Eskom Supplier Quality Requirements per specification 240-105658000 and ISO 9001. ISO 9001 clauses 4 to 10 and quality principles 1 to 7 are marked applicable.
Quality Management
Source: 240-109253698 CQP Template 2021(Quality 02).pdfThe supplier must prepare a Contract Quality Plan (CQP) to demonstrate how quality expectations will be met, referencing SANS 466:2005 / ISO 10005:2005. The plan must cover: scope of work, communication channels with Eskom, an organogram showing QA/QC roles and responsibilities, interfacing documents (standards, codes, specifications), lists of suppliers and sub-suppliers, monitoring of sub-suppliers, items to be manufactured/refurbished/purchased, processes requiring special controls (e.g., welding, NDT), documented information to be submitted to Eskom (e.g., method statements, inspection reports, QCPs, certificates, databooks), record control and retention, concession and non-conformance management, databook management, management of tools and equipment, customer property handling per ISO 9001, product preservation, identification and traceability, and post-delivery activities including warranty and technical support.
Description
Source: Invitation to Tender_Turbine Auxilliary_Change.pdfEskom Holdings SOC Ltd invites tenders for the Supply and Delivery of Turbine Auxiliaries Off-The-Shelf Spares.
Important Dates
Source: Invitation to Tender_Turbine Auxilliary_Change.pdf (TENDER)Closing date and time: 26 October 2026 at 10:00.
Clarification meeting (non-compulsory): 12 October 2026 at 10:00 via Microsoft Teams (Clarification meeting for Turbine Aux Spares).
Clarification queries deadline: 5 working days before closing, i.e. 19 October 2026 at 16:00.
Tender validity period: 120 days from closing date and time.
Briefing Session
Source: Invitation to Tender_Turbine Auxilliary_Change.pdf (TENDER)Clarification meeting (non-compulsory):
Contact Information
Source: Invitation to Tender_Turbine Auxilliary_Change.pdf (TENDER)Eskom Representative (all queries):
Procurement Manager:
Fraud and corruption reporting:
Submission address: Eskom E-tendering site (TenderBulletin (eskom.co.za)).
Delivery location for spares: Hendrina Power Station.
Submission Guidelines
Source: Invitation to Tender_Turbine Auxilliary_Change.pdf (TENDER)Submission method: electronic only via the Eskom E-tendering site on the Eskom Tender Bulletin (TenderBulletin (eskom.co.za)).
Returnable forms (disqualifiable if not fully completed, signed and submitted at closing):
Non-disqualifiable returnables (may be requested in writing within 5 working days if not submitted):
Returnables required at closing for evaluation (not requested later; failure scores zero):
JV/consortium additional documents:
Disqualification risks:
Returnable Documents
Source: Invitation to Tender_Turbine Auxilliary_Change.pdf (TENDER)Returnable documents are listed in submissionGuidelines. Key points:
Evaluation Criteria
Source: Invitation to Tender_Turbine Auxilliary_Change.pdf (TENDER)Evaluation stages:
7 days or no letter: 0 points.
Ranking: total = Price + Specific Goals; highest ranked wins.
Other:
Technical Specifications
Source: Invitation to Tender_Turbine Auxilliary_Change.pdf (TENDER)Scope: Supply and delivery of turbine auxiliaries off-the-shelf spares.
Quality requirements:
Environmental requirements (full details in Annexure S):
Methodology
Source: Invitation to Tender_Turbine Auxilliary_Change.pdfMethod statement requirement (functionality criterion 1.2):
Experience & Qualifications
Source: Invitation to Tender_Turbine Auxilliary_Change.pdfCompany experience (functionality criterion 1.1, 80% of functionality):
Key individuals (functionality criterion 2, 20% of functionality):
Quality Management
Source: Invitation to Tender_Turbine Auxilliary_Change.pdfQuality requirements:
Pricing Schedule
Source: Invitation to Tender_Turbine Auxilliary_Change.pdfPricing Schedule/BOQ (Annexure M):
Financial Requirements
Source: Invitation to Tender_Turbine Auxilliary_Change.pdf (TENDER)Payment terms:
Pricing schedule:
Security for performance:
Financial capacity:
Compliance Requirements
Source: Invitation to Tender_Turbine Auxilliary_Change.pdf (TENDER)Eligibility:
Basic compliance:
Mandatory contractual requirements (assessed after evaluation, before award):
Additional contractual requirements (if applicable):
Safety (South African tenderers only):
B-bbee:
Tax:
Employment Equity:
CIDB: Not applicable.
Contract Skills Development Goals: Not applicable.
Contract Participation Goals: Not applicable.
B-BBEE Requirements
Source: Invitation to Tender_Turbine Auxilliary_Change.pdf (TENDER)B-BBEE requirements:
Health & Safety
Source: Invitation to Tender_Turbine Auxilliary_Change.pdfSafety returnables (South African tenderers only):
Full details in Annexure Q.
Contractual Terms
Source: Invitation to Tender_Turbine Auxilliary_Change.pdfContract form: NEC3 Supply Contract (SC) with options:
Payment terms: 30 days for contracts below R50m (incl. VAT); 60 days for contracts above R50m (incl. VAT).
Subcontracting: discouraged with subsidiary companies (may be seen as fronting); must be declared if done.
Security: if performance bond or demand guarantee required, bidder must select at least two financial institutions from Eskom's approved list.
Cataloguing: successful bidder may need to provide cataloguing info per item and label materials per Eskom's specifications; pricing schedule must include a line item for cataloguing (Eskom pays).
Requirements
Source: Invitation to Tender_Turbine Auxilliary_Change.pdf (TENDER)Eligibility requirements:
Basic compliance:
Mandatory contractual requirements (assessed after evaluation):
Financial capacity:
Section
Source: Invitation to Tender_Turbine Auxilliary_Change.pdfEvaluation criteria are detailed in the main evaluationCriteria section. Summary:
Description
Source: 240-12248652_List of Tender Returnables_Cat 2_ (Quality 04).xlsxThe document is a template for listing tender returnables. Bidders must select the applicable category on the Cover tab by typing 1 in the relevant box; only one category may be selected. The applicable requirements for the selected category are automatically indicated on the Returnables tab. The completed template must be saved as PDF and signed, or signed and locked before sending to the buyer.
Submission Guidelines
Source: 240-12248652_List of Tender Returnables_Cat 2_ (Quality 04).xlsx (unknown)Returnable documents for Category 2 (selected for this tender):
Submission method: The completed template must be saved as PDF and signed, or signed and locked before sending to the buyer.
Evaluation Criteria
Source: 240-12248652_List of Tender Returnables_Cat 2_ (Quality 04).xlsx (unknown)Quality evaluation is weighted across five sections:
Section A offers two scoring options; bidders may choose only one:
Section B requires documented information for defined roles, responsibilities and authorities; control of externally provided processes, products and services; latest internal management system audit report; and records of management review meetings.
Section C requires a draft Contract Quality Plan specific to the scope of work (Ref ISO 10005).
Section D requires an example of an Inspection and Test Plan (ITP) or Quality Control Plan (QCP) on similar or previous work.
Section E requires Form A completed and signed, plus any additional requirements per the scope of work or specification.
Technical Specifications
Source: 240-12248652_List of Tender Returnables_Cat 2_ (Quality 04).xlsx (unknown)The tender is for the supply and delivery of turbine auxiliaries off-the-shelf spares. The scope of work is not detailed in this document; refer to the main tender documents for the full specification.
Compliance Requirements
Source: 240-12248652_List of Tender Returnables_Cat 2_ (Quality 04).xlsx (unknown)Bidders must select the applicable category on the Cover tab; only one category may be selected. For this tender, Category 2 applies, which requires an implemented Quality Management System (QMS) as described in the returnable documents.
Description
Source: NEC3 Supply nd Delivery of Turbine auxiliaries Off-The-Shelf spares.pdfSupply and delivery of turbine auxiliaries off-the-shelf spares on an 'as and when required' basis at Hendrina Power Station (Materials Management Department) for a period of 5 years. The contract is an NEC3 Supply Contract (SC3) with Parts C1 (Agreements & Contract Data), C2 (Pricing Data), and C3 (Scope of Work). Drawings are provided in Annexure C. The Purchaser's Goods Information (C3.1) provides detailed specifications for turbine auxiliaries spares including seals, bearings, filters, gauges, heat exchanger plates, etc.
Important Dates
Source: NEC3 Supply nd Delivery of Turbine auxiliaries Off-The-Shelf spares.pdf (unknown)Closing date: 26 October 2026 at 10:00 (from tender record). No other dates are stated in the document.
Contact Information
Source: NEC3 Supply nd Delivery of Turbine auxiliaries Off-The-Shelf spares.pdf (unknown)Supply Manager: Mr Sibusiso Khawula
Address: Hendrina Power Station
Telephone: +27 31 710 5356
Email: [email protected]
Purchaser: Eskom Holdings SOC Ltd
Address: Megawatt Park, Maxwell Drive, Sandton, Johannesburg, 2199
Submission Guidelines
Source: NEC3 Supply nd Delivery of Turbine auxiliaries Off-The-Shelf spares.pdf (unknown)Returnable documents: complete and sign the Form of Offer and Acceptance (C1.1), including the Schedule of Deviations if any. Submit the completed Contract Data (C1.2b) and Pricing Data (C2). Provide any securities, bonds, guarantees, proof of insurance and other documentation required by the Contract Data within two weeks of receiving the signed contract. Failure to do so constitutes repudiation. The offered total of the Prices (excl. VAT) must be stated. All documents must be submitted before the closing time.
Evaluation Criteria
Source: NEC3 Supply nd Delivery of Turbine auxiliaries Off-The-Shelf spares.pdf (unknown)No evaluation criteria are stated in the document. The contract is awarded on the basis of the tenderer's offer and acceptance by the Purchaser. No minimum qualifying score or preference point system is specified.
Technical Specifications
Source: NEC3 Supply nd Delivery of Turbine auxiliaries Off-The-Shelf spares.pdf (unknown)Scope: Supply and delivery of turbine auxiliaries off-the-shelf spares on an 'as and when required' basis at Hendrina Power Station (Materials Management Department) for a period of 5 years.
Goods: Turbine reverse engineered spares, including seals, bearings, filters, gauges, packing, and other items as listed in the Price Schedule (C2.2). Quantities range from 5 to 100 units per item.
Delivery: On an 'as and when required' basis as per batch order. Supplier must inform the Purchaser to inspect and accept all goods before delivery.
Documentation at delivery: All material certificates, all inspection reports (NDT, dimensional, etc.), detailed tax invoice, and QIP (Quality Inspection Plan) on items requested.
Quality system: Supplier must implement and maintain a quality system to the Purchaser's satisfaction, accepted prior to contract signing, and subject to periodic audits.
Methodology
Source: NEC3 Supply nd Delivery of Turbine auxiliaries Off-The-Shelf spares.pdf (unknown)Supplier to submit a first programme for acceptance within 2 weeks of Contract Date. Supplier to submit revised programmes at intervals no longer than 4 weeks. Delivery process: Supplier informs Purchaser to come and inspect and accept all goods before effecting delivery. Goods supplied on an 'as and when required' basis as per batch order.
Quality Management
Source: NEC3 Supply nd Delivery of Turbine auxiliaries Off-The-Shelf spares.pdfSupplier must provide all material certificates, all inspection reports (NDT, dimensional, etc.), detailed tax invoice, and QIP (Quality Inspection Plan) on items requested at time of delivery. Quality of deliverables is included in the Risk Register. Defect correction period is 1 week (negotiable).
Pricing Schedule
Source: NEC3 Supply nd Delivery of Turbine auxiliaries Off-The-Shelf spares.pdfPricing assumptions: The contract is a priced contract where Prices are derived from a list of items of goods and services priced as lump sums or as expected quantities multiplied by a rate, or a mix. The Price Schedule is only a pricing document; it does not contain instructions. Supplier must read SC3 Guidance Notes pages 8, 11, 12 and Appendix 5. Prices must include correction of Defects (core clause 43.1), spread cost of work not listed as separate items, and account for no adjustment to lump sum prices if quantity changes. Changes to Prices only via compensation events.
Price Schedule (C2.2): List of spares with stock numbers, short descriptions, UMC, and quantities (e.g., Kit Seal repair EA 10; Seal Type Pressure 57 ID x 65 OD x 10 THK EA 100; Bolt Assy M20 LG 225 EA 100; etc.).
Price adjustment for inflation (X1): Base date is month prior to enquiry closing date; proportions to be calculated with 15% non-adjustable.
Financial Requirements
Source: NEC3 Supply nd Delivery of Turbine auxiliaries Off-The-Shelf spares.pdf (unknown)Pricing: Priced contract; prices are derived from the Price Schedule (C2.2) as lump sums or quantities multiplied by rates. The total of the Prices is assumed to be fully inclusive of everything necessary to provide the goods and services.
Payment: Assessment interval is after each delivery and acceptance of spares. Payment period is 30 days. Interest on late payment at the publicly quoted prime rate of Standard Bank (for Rands) or LIBOR (for other currencies).
Tax invoice: Supplier must provide a tax invoice within one week of receiving a payment certificate. Include Eskom's VAT number 4740101508 on each invoice.
Liability: Supplier's liability for indirect or consequential loss is limited to R0.0. Liability for loss or damage to Purchaser's property is limited to the deductible, e.g., R15 million for Generation Division property.
Insurance: Supplier must provide insurances per Insurance Table A; Purchaser provides per Insurance Table B.
Delay damages: 0.5% of batch order value per calendar day late, up to 10% of batch order value.
Compliance Requirements
Source: NEC3 Supply nd Delivery of Turbine auxiliaries Off-The-Shelf spares.pdf (unknown)B-BBEE: Supplier must notify the Purchaser within 7 days of any change in B-BBEE status, and submit an updated verification certificate within 30 days. If B-BBEE status decreases, the Purchaser may renegotiate or terminate the contract.
Tax: Supplier must comply with VAT Act and include Eskom's VAT number on invoices.
Joint ventures: If a joint venture, all parties are jointly and severally liable; must notify the Supply Manager of the key person authorised to bind within two weeks of Contract Date.
Ethics: Prohibited actions (coercive, collusive, corrupt, fraudulent, obstructive) may lead to termination.
No cession, delegation or assignment without written consent.
Confidentiality: Supplier must keep information confidential; images of goods require prior written consent.
B-BBEE Requirements
Source: NEC3 Supply nd Delivery of Turbine auxiliaries Off-The-Shelf spares.pdf (unknown)Supplier must notify the Purchaser within 7 days of any change in its B-BBEE status. It must submit an updated B-BBEE verification certificate and supporting documentation to the Supply Manager within 30 days of notification or as instructed. If B-BBEE status decreases since Contract Date, Purchaser may renegotiate or terminate the Supplier's obligation to provide goods/services. Failure to notify may constitute a reason for termination.
Health & Safety
Source: NEC3 Supply nd Delivery of Turbine auxiliaries Off-The-Shelf spares.pdfSupplier must take all reasonable precautions to maintain health and safety of persons in and about provision of goods and services. Prices must include sufficient amount for compliance with all applicable health & safety laws, regulations, rules, guidelines and procedures. Supplier must ensure subcontractors, employees and others under its direction comply.
Asbestos: Purchaser ensures ambient air conforms to asbestos standard; OEL 0.2 regulated asbestos fibres per ml as 4-hour TWA, short term 0.6 per ml over 10 minutes. Purchaser certifies conditions on request. If asbestos identified, risk assessment and control measures. Supplier personnel may stop work and leave contaminated area until declared safe. Removal and disposal by registered asbestos contractor at Purchaser's expense.
Environmental
Source: NEC3 Supply nd Delivery of Turbine auxiliaries Off-The-Shelf spares.pdfSupplier must comply with all applicable environmental laws, regulations, rules, guidelines and procedures and ensure subcontractors, employees and others under its direction comply. Removal and disposal of asbestos, asbestos containing materials and waste is done by a registered asbestos contractor in line with South African legislation.
Contractual Terms
Source: NEC3 Supply nd Delivery of Turbine auxiliaries Off-The-Shelf spares.pdfContract law: Republic of South Africa. Language: English. Period for reply: 2 working days.
Delivery: On an 'as and when required' basis. Supplier must not bring goods to the Delivery Place more than one week before the Delivery Date; Supplier informs Purchaser to inspect and accept all goods before delivery.
Defects: Defect correction period is 1 week (negotiable based on criticality). Defects access period to be negotiated.
Payment: Assessment after each delivery and acceptance. Payment period 30 days. Interest at prime rate (Standard Bank) or LIBOR.
Liability: Supplier's liability for indirect/consequential loss limited to R0.0. Liability for loss/damage to Purchaser's property limited to deductibles (e.g., R15 million for Generation Division property). End of liability date: until product is utilised; warranty commences from date of use/installation.
Dispute resolution: Adjudicator from ICE-SA Division of SAICE; if not agreed, appointed by AFSA. Tribunal: arbitration under Association of Arbitrators (Southern Africa) rules. Place: South Africa.
Compensation events: Change in law after Contract Date is a compensation event. Delay damages: 0.5% of batch order value per day late, up to 10%. Low performance damages as stated in goods information.
Insurance: Supplier provides per Insurance Table A; Purchaser per Insurance Table B.
Tax invoice: Within one week of payment certificate; include VAT number 4740101508.
Termination: Includes business rescue order; termination if delay damages reach limit.
Nuclear liability: Purchaser indemnifies Supplier for nuclear damage, waives recourse, protection until Koeberg decommissioned.
Special Conditions
Source: NEC3 Supply nd Delivery of Turbine auxiliaries Off-The-Shelf spares.pdf (unknown)Additional conditions of contract Z1 to Z15 apply. Z1: No cession/delegation/assignment without Purchaser's written consent; Purchaser may cede to subsidiaries/divisions. Z2: Joint ventures are jointly and severally liable; must notify key person authorised to bind within 2 weeks; no change in composition without consent. Z4: Confidentiality obligations. Z5: No waiver/estoppel unless in writing. Z7: Tax invoice requirements and VAT number 4740101508. Z8: Notifying compensation events. Z9: Purchaser's liability for indirect/consequential loss limited to R0.00. Z10: Termination includes business rescue order. Z11: Termination for delay damages reaching limit. Z12: Ethics - prohibits coercive, collusive, corrupt, fraudulent, obstructive actions; Purchaser may terminate. Z14: Nuclear liability - Purchaser is operator of Koeberg, indemnifies Supplier for nuclear damage, waives recourse. Z15: Asbestos - definitions and procedures for safe handling, exposure limits, control measures, disposal by registered asbestos contractor.
Section
Source: NEC3 Supply nd Delivery of Turbine auxiliaries Off-The-Shelf spares.pdfNo evaluation criteria are stated. The Risk Register includes delays on delivery and quality of deliverables.
Submission Guidelines
Source: Safety.pdf (unknown)Returnable documents (each must be completed, signed and submitted):
Additional OHS returnables applicable to the scope may be required and evaluated prior to contract award.
Evaluation Criteria
Source: Safety.pdf (unknown)Each OHS returnable is evaluated as Yes, No or Not applicable, with a recommendation outcome. Bidders must hold a valid Letter of Good Standing (COIDA or equivalent) and an OHS policy signed by the CEO that complies with Section 7 of the OHS Act. OHS competency must be demonstrated through CVs and qualifications/certificates relevant to the scope of work and its risks.
Technical Specifications
Source: Safety.pdf (unknown)Scope of work: supply and delivery of turbine auxiliaries off-the-shelf spares. OHS requirements are high risk, so the Health and Safety Plan must address the specific OHS risks of the scope and align with the health and safety specification.
Experience & Qualifications
Source: Safety.pdfOHS competency must be demonstrated through CVs and qualifications/certificates relevant to the scope of work, risks, OHS plan and applicability.
Financial Requirements
Source: Safety.pdf (unknown)OHS costing must be broken down and not provided as a lump sum. The costing must be based on the overall scope of work/service to be performed; the scope of work and the risk assessment may serve as a guideline.
Compliance Requirements
Source: Safety.pdf (unknown)Valid Letter of Good Standing (COIDA or equivalent) is required. OHS policy must be signed by the CEO and comply with OHS Act Section 7. Explanatory notes for OHS requirements are provided in Annexure A: Supplier Risk Category (240-77433139).
Health & Safety
Source: Safety.pdfOHS costing must be broken down and not provided as a lump sum. The submitted OHS policy must comply with OHS Act Section 7. Explanatory notes for the listed OHS requirements are provided in Annexure A: Supplier Risk Category (240-77433139). Additional OHS tender returnables applicable to the scope of work, to be evaluated prior to contract award, may be populated; this section is to be deleted if not applicable.
Section
Source: Safety.pdfEvaluation uses Annexure C 1: OHS Tender Evaluation Template (High risk), Document Identifier 240-77471651 Rev 3.
Description
Source: SDLI Strategy for supply and delivery of Turbine Auxilliary Off The Shelf spares for 5 years.pdfSupply and delivery of turbine auxiliaries off-the-shelf spares for a 5-year period.
Important Dates
Source: SDLI Strategy for supply and delivery of Turbine Auxilliary Off The Shelf spares for 5 years.pdf (TENDER)Closing date: 26 October 2026 at 10:00 (from tender record).
No briefing or site visit mentioned in the document.
Contact Information
Source: SDLI Strategy for supply and delivery of Turbine Auxilliary Off The Shelf spares for 5 years.pdf (TENDER)No contact information is provided in the document.
Submission Guidelines
Source: SDLI Strategy for supply and delivery of Turbine Auxilliary Off The Shelf spares for 5 years.pdf (TENDER)Returnable documents:
Disqualification risks:
Evaluation Criteria
Source: SDLI Strategy for supply and delivery of Turbine Auxilliary Off The Shelf spares for 5 years.pdf (TENDER)Evaluation is based on price and specific goals (B-BBEE preference points). The contract is awarded to the tenderer scoring the highest total points, rounded to two decimal places.
Preference points system: 80/20 or 90/10 (the document does not specify which applies). Points for B-BBEE status level:
If a tenderer fails to provide documentation for preference points, they are not disqualified but may only score points out of 90/80 for price and 0 points out of 10/20 for specific goals.
Objective criteria (local content thresholds) are a condition for contract award. If not met, the second-ranked tenderer may be recommended for award.
Minimum qualifying score: not stated.
Technical Specifications
Source: SDLI Strategy for supply and delivery of Turbine Auxilliary Off The Shelf spares for 5 years.pdf (TENDER)Supply and delivery of turbine auxiliaries off-the-shelf spares.
Contract period: 5 years (from file name).
Designated components and local content thresholds:
Methodology
Source: SDLI Strategy for supply and delivery of Turbine Auxilliary Off The Shelf spares for 5 years.pdfSkills development: tenderers must submit proposals for developing skills of unemployed candidates, addressing Eskom's core, scarce and critical skills. Targets include Logistic Officer (Matric or equivalent diploma) and Inventory Officer (Matric or equivalent certificate). Candidates must be from all provinces and representative of SA demographics. Excludes Eskom employees and registered learners. Tenderers bear full cost; Eskom makes no financial contribution. Tenderers may approach SETAs for grants and SARS for tax rebates.
Financial Requirements
Source: SDLI Strategy for supply and delivery of Turbine Auxilliary Off The Shelf spares for 5 years.pdf (TENDER)SDL&I penalty: 1-3% of contract value for failure to meet SDL&I obligations.
Retention: 1-3% of every invoice (excluding VAT) retained as security for SDL&I obligations, released upon fulfilment.
Pricing: tender response must be separated into components as per the Price Schedule included with the tender documents.
Compliance Requirements
Source: SDLI Strategy for supply and delivery of Turbine Auxilliary Off The Shelf spares for 5 years.pdf (TENDER)B-bbee:
Local content: SBD 6.2 and Annex C returnable; thresholds as per technical specifications.
CIDB: No compulsory training indicated; CSDG not applicable.
Sworn affidavit validity requirements: deponent name and ID number, designation, enterprise name and address, black ownership percentages, total revenue and basis, financial year end, single B-BBEE status level, empowering supplier status, same signature dates for deponent and Commissioner of Oaths, Commissioner must not be employee or ex officio of the enterprise.
B-BBEE Requirements
Source: SDLI Strategy for supply and delivery of Turbine Auxilliary Off The Shelf spares for 5 years.pdf (TENDER)B-BBEE preference points table: Level 1 = 20/10, Level 2 = 18/9, Level 3 = 14/6, Level 4 = 12/5, Level 5 = 8/4, Level 6 = 6/3, Level 7 = 4/2, Level 8 = 2/1, Non-compliant = 0/0. Documents to claim points: valid B-BBEE certificate or sworn affidavit, proof of ownership/shareholding, certified ID copies of shareholders, proof of disability where applicable, consolidated certificate for trusts/consortia/JVs. Local content thresholds: Pumps 70%, Valves 70%, Gaskets 60%, Bearings 60%. Transformation: B-BBEE improvement or retention plan within 30 days of contract signature. Level 4 must reach Level 3 by end of first year; Levels 5-8 or non-compliant must reach Level 4 by end of first year and improve one level each subsequent year. Valid B-BBEE certificate or sworn affidavit is condition for award; EME (≤R10m) can submit sworn affidavit; QSE (≤R50m) must comply with QSE scorecard unless 51% black-owned; above R50m requires valid certificate. Local procurement content defined as value added in South Africa. Job creation and retention commitments required. Skills development for unemployed candidates. Sworn affidavit validity requirements as detailed.
Contractual Terms
Source: SDLI Strategy for supply and delivery of Turbine Auxilliary Off The Shelf spares for 5 years.pdf (TENDER)SDL&I obligations form part of contractual commitments. Eskom reviews SDL&I reports within 30 days of receipt and notifies suppliers in writing if obligations not met. Suppliers must implement corrective measures before the next report, failing which retention clauses are invoked. An SDL&I Implementation Schedule must be completed and returned for acceptance 28 days after contract award.
Special Conditions
Source: SDLI Strategy for supply and delivery of Turbine Auxilliary Off The Shelf spares for 5 years.pdf (TENDER)SDL&I objectives in line with RDP Goals: Tenderers who complete and submit objectives but do not meet Eskom's targets will not be disqualified. SDL&I objectives do not form part of scoring but commitments will form part of contractual obligations.
Requirements
Source: SDLI Strategy for supply and delivery of Turbine Auxilliary Off The Shelf spares for 5 years.pdf (TENDER)CIDB Skills Development: No CIDB compulsory training is indicated, so the Construction Skills Development Goal (CSDG) is not applicable. If it were applicable, failure to meet the mandatory percentage would render the tender non-responsive.
Section
Source: SDLI Strategy for supply and delivery of Turbine Auxilliary Off The Shelf spares for 5 years.pdfA maximum of 10/20 points may be awarded for specific goals. Points for specific goal added to points for price, rounded to two decimals. Contract awarded to tenderer scoring highest points. Tenderer failing to provide documentation for preference points will not be disqualified but may only score points out of 90/80 for price and scores 0 points out of 10/20 for specific goals. Objective criteria: inclusion is not mandatory but a condition for contract award; if not met, second-ranked tenderer may be recommended for award.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
01 IMPALA ROAD - PULLENSHOPE, HENDRINA POWER STATION - MIDDELBURG - 1096
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
8
Last checked
01 Oct 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
A guide for general suppliers. Understanding the RFQ process (under R1 million), local content for furniture, and the 'Commodity Checklist'.
Guide to general commodities procurement in South Africa. Covers furniture, cleaning materials, uniform supply tenders, local content rules, and managing quality and cash flow.
Not every job is a 'tender.' Learn how to access the high-volume world of small orders (RFQs) and how to get invited to bid on jobs under R200k.
A high-stakes guide to food procurement. Learn about R638 compliance, cold chain logistics, and how to win provincial hospital supply contracts.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Supplies: General. Unlock full pricing strategies, bid frequency, and historical win rates.