Gauteng different sites - Johannesburg - Johannesburg - 0000
Organization Type
GOVERNMENT
Published
20 Jul 2026
OCDS Reference
ocds-9t57fa-162825
Summary
ESKOM is establishing multiple framework contracts for major electrical distribution (reticulation) projects within the gauteng cluster. This tender is for contractors to be appointed on an 'as and when required' basis for a period of three years to execute these works. The primary focus of the provided document is the comprehensive safety, health, and environment (she) specification that contractors must comply with.
Key Requirements
Contractors must develop and implement a SHE plan that meets Eskom's minimum requirements and all applicable legislation.
The principal contractor and all appointed subcontractors must be registered with the South African Council for the Project & Construction Management Professions (SACPCMP).
The principal contractor and all appointed subcontractors must be registered with the Compensation Commissioner and provide a valid Letter of Good Standing.
A Section 37(2) agreement under the OHS Act must be signed between Eskom and the principal contractor, and between the principal contractor and all appointed contractors.
The contractor must comply with a wide range of legislation including the Occupational Health and Safety Act, National Environmental Management Act, and Compensation for Occupational Injuries and Diseases Act.
The contractor must have a substance abuse programme aligned with the OHS Act and enforce Eskom's life-saving rules on site.
The principal contractor is responsible for notifying the Department of Labour of construction work as required and for coordinating all SHE compliance among appointed subcontractors.
THE PROVISION OF RETICULATION PROJECTS (MAJOR) FOR CONTRACTORS WITHIN GAUTENG CLUSTER TO ESTABLISH MULTIPLE CONTRACTS ON “AN AS AND WHEN REQUIRED” BASIS FOR A PERIOD OF THREE YEARS
Tender context
Return to this tender’s issuing organisation, province, or category.
The provision of reticulation projects (major) for contractors within gauteng cluster to establish multiple contracts on “an as and when required” basis for a period of three years
Review in progress · 4 of 23 documents being finalised
AI Document Analysis Stages
Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
Compliance review. The working summary is checked against South African procurement standards — PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement — so nothing critical is missed before you start your bid response.
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Documents being finalised: Annex-d_Imports Declaration-Supporting schedule to Annex C.pdf, Annex-e_Local Content Declaration-Supporting Schedule to Annex C.pdf, Annex-c_Local content Declaration-Summary Schedule - Copy.pdf and 1 more. You don’t need to refresh — this page will pick up the updated review automatically.
DocumentEnvironmental Spec for Major reticulation_2024.pdfReview complete
Important Dates
20 Jul
2026
PUBLICATION
Tender Published
Tender was published
07 Aug
2026
DEADLINE
Closing Date
Tender closing date
Procurement Rules & Compliance ContextThis tender may be governed by South African public procurement rules covering fairness, transparency, preferential procurement, anti-corruption, administrative justice and access to information.
10 rules
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Core procurement rules
These rules commonly apply to South African public-sector procurement.
7
Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
high
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Constitution of the Republic of South Africa, 1996 – Section 217
Act 108 of 1996 (s217)
high
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
This document is Eskom's Supplier Quality Management Specification (240-105658000, Rev 3), which defines the minimum quality management system (QMS) requirements for all suppliers and sub-suppliers. It mandates conformance to ISO 9001 and outlines detailed pre- and post-contract award quality processes, including the submission of quality plans, audits, and performance monitoring. The specification is part of a larger tender for 'Reticulation Projects (Major)' in Gauteng on an 'as and when required' basis for three years.
240-12248652 Category2- List of Tender Returnables Documents Rev 6.xlsx
Eskom is establishing multiple three-year 'as and when required' contracts for major reticulation projects in Gauteng. The tender focuses heavily on Quality Management Systems (QMS), requiring either ISO 9001 certification or documented evidence of a compliant QMS, alongside project-specific quality plans.
E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025 (G20 Logo).pdf
Eskom is establishing multiple contracts for major reticulation projects in Gauteng on an 'as and when required' basis for a three-year period. The document provided is a mandatory training acknowledgement form for e-tendering.
Environmental Spec for Major reticulation_2024.pdf
Eskom Gauteng Cluster tender for establishing multiple contracts on an 'as and when required' basis for major reticulation projects over three years. The document focuses on environmental management criteria, with a total weight of 100% across ten scored items.
Major Reticulation Standard BOQ Appendix 1_April2026 0.0.xls
Eskom Gauteng Cluster tender for major reticulation projects on an 'as and when required' basis over three years. The document is primarily a comprehensive Bill of Quantities (BoQ) and Bill of Activities (BoA) template, detailing pricing structures, material/labour rates, and a vast library of standardised work items for overhead and underground electrical distribution projects.
This document is Annexure C4: OHS Tender Evaluation Template for a high-risk construction tender issued by Eskom for reticulation projects in Gauteng. It outlines the Occupational Health and Safety (OHS) documentation and compliance requirements that tenderers must submit for evaluation. The tender is for establishing multiple contracts on an 'as and when required' basis for three years.
Eskom Gauteng Cluster tender for establishing multiple contracts for major reticulation projects on an 'as and when required' basis over three years. The document provides a comprehensive Contract Quality Plan template requiring detailed quality management systems aligned with SANS 466:2005/ISO 10005:2005 standards.
Eskom is establishing multiple three-year 'as and when required' contracts for major reticulation projects in Gauteng. The tender focuses heavily on quality management compliance with Eskom's Specification 240-105658000 and ISO 9001 standards.
Major Distribution SBD 6.2 local content certificate.pdf
Eskom tender for reticulation projects in Gauteng on an 'as and when required' basis over three years, with strict local content requirements and preferential procurement regulations.
Eskom tender for reticulation projects (major) in Gauteng cluster on an 'as and when required' basis for three years. This document focuses on Safety, Health, and Environment (SHE) compliance requirements and contractor management obligations.
This document is Eskom's Supplier Integrity Pact, a mandatory ethical compliance document for all suppliers participating in Eskom's procurement processes. It establishes a binding agreement between Eskom and its suppliers to uphold the highest standards of integrity, transparency, and fairness, and to prevent fraud, corruption, and collusion throughout the procurement lifecycle.
Eskom invites tenders for major reticulation projects in Gauteng on an 'as and when required' basis for a 3-year period. The tender is for establishing multiple contracts, with work to be called off as needed. The procurement process is electronic, with strict compliance and functionality requirements.
240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) Rev 2.docx
Eskom is establishing multiple contracts for major reticulation projects in Gauteng on an 'as and when required' basis for a three-year period. The tender focuses on quality control and inspection protocols for contractors, with a detailed Quality Control Plan (QCP) framework defining intervention points, testing requirements, and approval processes.
Eskom Gauteng Cluster tender for major reticulation projects on an 'as and when required' basis over three years, with strong emphasis on B-BBEE compliance, local content, skills development, job creation, and supplier development.
Eskom is establishing multiple contracts on an 'as and when required' basis for major reticulation projects in Gauteng over a three-year period. The tender process is governed by Eskom's Standard Conditions of Tender, emphasizing fairness, transparency, and compliance with South African procurement regulations.
Technical Evaluation Criteria for Major reticulation contractors.pdf
Eskom Gauteng Cluster tender for establishing multiple contracts for major reticulation projects on an 'as and when required' basis for three years. The tender involves technical evaluation of contractors' capabilities in MV/LV line construction, cable jointing, and related electrical infrastructure work.
E-tendering Help Manual for supplier - 27 January 2025 (G20 Logo).pdf
This document is not the actual tender specification but a user manual for Eskom's eTendering system. The tender itself is for establishing multiple contracts for major reticulation projects in Gauteng on an 'as and when required' basis for three years. The manual details the process for suppliers to register and submit tender documents electronically.
Eskom is soliciting tenders for the provision of major reticulation projects within the Gauteng cluster on an 'as and when required' basis for a three-year period. The document provided is primarily a Safety, Health, and Environment (SHE) specification, detailing the minimum legislative and Eskom requirements contractors must meet. It establishes a framework for contractor safety management but does not contain the full tender's commercial, technical, or pricing details.
NEC ECC_Major DX Networks Enquiry Contract_2026.pdf
Eskom is establishing a framework contract for major distribution network (reticulation) projects in Gauteng on an 'as and when required' basis for three years. The contract uses the NEC3 Engineering and Construction Contract (Option B: Priced contract with bill of quantities). It is a multi-contractor framework where specific projects will be issued via Purchase Orders.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Similar Tenders
Matched by category & region
Supplier Readiness Hub
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Based on 13 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Document read
Compliance review
Bid-ready summary
Description
Source: Environmental Spec for Major reticulation_2024.pdf
The scope includes detailed requirements for an Environmental Management Plan and Waste Management Plan for construction projects.
The Environmental Management Plan must cover: Access Control, Landowner liaison, Monitoring, Environmental Incident Log, Site establishment, Sanitation, Protection of water resources, Storm Water Management, Vegetation management, Fencing, Stockpiling, Erosion control, and Hazardous Substances Management.
Important Dates
Source: Environmental Spec for Major reticulation_2024.pdf (unknown)
Closing date for this environmental specification document: 11 June 2024.
Contact Information
Source: Environmental Spec for Major reticulation_2024.pdf (unknown)
Document compiled by: Luphumlo Masiza (date: 11 June 2024).
Document authorised by: Charmaine Mare (date: 11 June 2024).
Evaluation Criteria
Source: Environmental Spec for Major reticulation_2024.pdf (unknown)
Contractors must operate within Gauteng Cluster. 2. Must have comprehensive environmental management systems. 3. Senior management (MD/CEO) must sign off on environmental policy. 4. Must demonstrate competence through environmental training/certification. 5. Must have procedures for incident response, waste management, and corrective actions.
Technical Specifications
Source: Environmental Spec for Major reticulation_2024.pdf (unknown)
The bidder must provide an Environmental Management Plan covering:
Access Control.
Landowner liaison.
Monitoring.
Environmental Incident Log.
Site establishment.
Sanitation.
Protection of water resources.
Storm Water Management.
Vegetation management.
Fencing.
Stockpiling.
Erosion control.
Hazardous Substances Management and transportation of hazardous goods.
A Waste Management Plan is required, including:
A list and register of waste streams expected during construction.
A management plan for the storage and disposal of these waste streams.
An Environmental Method Statement for site rehabilitation is required, detailing approaches for different environments (e.g., near water courses, wetlands, slopes, road reserves).
A procedure for managing environmental non-conformances (NCRs) and corrective actions is required.
The company must have a documented environmental policy, which must:
Commit to compliance with all relevant environmental legislation.
Commit to pollution prevention and continual improvement.
Be signed off by a senior company member (MD/CEO).
Documented roles and responsibilities for environmental resources are required.
Evidence of environmental competence, training, and development is required (e.g., environmental law training or an environmentally related certificate/diploma/degree).
A plan for environmental communications within the organisation is required.
A system for the control of all organisational documents is required.
Compliance Requirements
Source: Environmental Spec for Major reticulation_2024.pdf (unknown)
The bidder must provide a signed appointment letter stating the responsibilities of environmental resources.
The bidder must have an Emergency Preparedness plan for responding to environmental incidents (e.g., bees, wildlife interaction, hydrocarbon spillages).
Health & Safety
Source: Environmental Spec for Major reticulation_2024.pdf
An Emergency Preparedness plan is required to respond to environmental incidents.
Environmental
Source: Environmental Spec for Major reticulation_2024.pdf
Environmental Management Policy (Weight: 20%): A company policy, signed by MD/CEO, committing to legal compliance, pollution prevention, and continual improvement.
Environmental Resources Roles & Responsibilities (Weight: 10%): Documented and signed appointment letters.
Competence, Training & Development (Weight: 5%): Evidence of environmental law training or an environmental certificate/diploma/degree.
Communication (Weight: 5%): A plan for environmental communications.
Control of Documents (Weight: 5%): A system to control all organisational documents.
Environmental Method Statement for Site Rehabilitation (Weight: 10%): A method statement for rehabilitating sites in various environments (near water, wetlands, slopes, road reserves).
Non-conformity & Corrective Action Procedure (Weight: 7%): A procedure for managing environmental non-conformances (NCRs).
Waste Management Plan (Weight: 15%): A list/register of construction waste streams and a plan for their storage and disposal.
Environmental Management Plan Details (Weight: 18%): Must include multiple specified control measures (see technicalSpecifications).
Source: Environmental Spec for Major reticulation_2024.pdf (unknown)
Document contact: Compiled by Luphumlo Masiza on 11 June 2024.
Authorisation contact: Authorised by Charmaine Mare on 11 June 2024.
DocumentAnnex-d_Imports Declaration-Supporting schedule to Annex C.pdfCompliance review in progress
Compliance Requirements
Source: Annex-d_Imports Declaration-Supporting schedule to Annex C.pdf (unknown)
Insufficient searchable text - AI extraction recommended
Document240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) Rev 2.docxReview complete
Submission Guidelines
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) Rev 2.docx (unknown)
Returnable Documents:
The document mentions a Quality Control Plan (QCP) template but does not specify submission address, deadline, or required forms.
Evaluation Criteria
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) Rev 2.docx (unknown)
Contractors must be qualified to work within Gauteng province, capable of executing major reticulation projects, and able to implement the detailed quality control framework outlined in the document. Specific eligibility details (financial, technical capacity, experience) are not explicitly stated in the provided excerpt but would typically be required in full tender documents.
Technical Specifications
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) Rev 2.docx (unknown)
Scope: Reticulation projects (major) within Gauteng cluster on an 'as and when required' basis for three years.
The document provides a detailed Quality Control Plan (QCP) template for inspection and testing.
The QCP includes intervention points (Hold, Witness, Document Review, Surveillance, Verification).
Inspection and test methods may include visual, microscopy, NDT, liquid/dye penetrant, magnetic particle, EDDY.
Acceptance criteria cover functionality, performance, regulatory compliance, and chemical tests.
Abbreviations: NOBO (Notification Body), TPI (Third Party Inspection).
Compliance Requirements
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) Rev 2.docx (unknown)
No specific requirements found
Document240-12248652 Category2- List of Tender Returnables Documents Rev 6.xlsxReview complete
Description
Source: 240-12248652 Category2- List of Tender Returnables Documents Rev 6.xlsx
The tender is for the provision of major reticulation projects within the Gauteng cluster, establishing multiple contracts on an as-and-when-required basis for three years.
Contact Information
Source: 240-12248652 Category2- List of Tender Returnables Documents Rev 6.xlsx (unknown)
Eskom Representative: Sipho A Sambo.
Document issued date: 10/11/2021.
Evaluation Criteria
Source: 240-12248652 Category2- List of Tender Returnables Documents Rev 6.xlsx (unknown)
Contractors must be operational within the Gauteng cluster. Primary eligibility is demonstrated through a robust Quality Management System, either ISO 9001 certified or fully documented to the ISO 9001 standard. The certification must be from an accredited body, valid, and scoped to relevant services.
Technical Specifications
Source: 240-12248652 Category2- List of Tender Returnables Documents Rev 6.xlsx (unknown)
The tender involves reticulation projects (major) within the Gauteng cluster on an as-and-when-required basis for three years.
Quality requirements are detailed in Category 2 of the tender returnables.
The scope references specification 240-105658000.
DocumentMajor Distribution SBD 6.2 local content certificate.pdfReview complete
Description
Source: Major Distribution SBD 6.2 local content certificate.pdf
The tender is for the provision of reticulation projects (major) on an 'as and when required' basis for three years.
Specific local content thresholds are listed for various commodities (e.g., Fabricated Steel 100%, Cables class 0 90%).
Bidders must declare any imported content and use the prescribed SARB exchange rate for calculation.
Important Dates
Source: Major Distribution SBD 6.2 local content certificate.pdf (TENDER)
The closing date for the bid is 2026-08-07 at 10:00.
For exchange rate calculation, use the SARB rate published at 12:00, one week (7 calendar days) prior to the closing date.
Contact Information
Source: Major Distribution SBD 6.2 local content certificate.pdf (TENDER)
The procurement authority/issuing institution is not specified in the provided document.
Submission Guidelines
Source: Major Distribution SBD 6.2 local content certificate.pdf (TENDER)
This SBD 6.2 declaration certificate must be submitted as part of the bid documentation.
Failure to submit this declaration certificate will result in disqualification.
The declaration must be duly signed by the Chief Financial Officer or other legally responsible person nominated in writing by the Chief Executive, or senior member/person with management responsibility.
The obligation to complete, sign, and submit this declaration cannot be transferred to an external authorized representative, auditor, or any other third party acting on behalf of the bidder.
Bidders must submit proof of the SARB exchange rates used if declaring imported content.
Returnable Documents
Source: Major Distribution SBD 6.2 local content certificate.pdf (TENDER)
The SBD 6.2 declaration certificate must be duly signed by the CFO or other legally responsible person as defined.
Bidders must submit proof of the SARB exchange rates used if applicable.
The declaration requires signatures and dates from the declarant and two witnesses.
Evaluation Criteria
Source: Major Distribution SBD 6.2 local content certificate.pdf (TENDER)
Bidders must meet stipulated local content thresholds per material category; declaration must be signed by CFO or authorized senior manager; subcontracting cannot reduce local content below thresholds.
Technical Specifications
Source: Major Distribution SBD 6.2 local content certificate.pdf (TENDER)
The tender involves the provision of reticulation projects (major) for contractors within the Gauteng cluster.
Specific local content thresholds are stipulated for various commodities:
Fabricated Steel: 100%
Cables class 0: 90%
Joining/Connecting components: 100%
Concrete works: 100%
Nails/Bolts: 100%
Cement: 100%
Concrete/Wood/steel poles: 100%
Cables Class1: 100%
Clamps/joints: 100%
Lone hardware (Listed Appendix A): 100%
PPE Textile/Leather/Clothing: 100%
Meters Prepaid/Post: 70%
Smart meter: 50%
Plastic pipes/Fitting: 100%
Transformer Shunts and reactors: 90%
Vermin Proofing (wire Fence): 100%
Bidders must declare if any portion of the goods/services/works offered has imported content (YES/NO).
If imported content is declared, the SARB exchange rate from one week before the closing date must be used for local content calculation.
Pricing Schedule
Source: Major Distribution SBD 6.2 local content certificate.pdf
The bidder must declare the bid price (excluding VAT) and the imported content value.
The local content percentage must be calculated and declared using the SATS 1286 formula and the prescribed exchange rates.
If bidding for multiple products, attach a schedule showing local content by product.
Financial Requirements
Source: Major Distribution SBD 6.2 local content certificate.pdf (TENDER)
The bid price must be stated excluding Value Added Tax (VAT).
The local content percentage must be calculated using the formula in SATS 1286.
The calculation requires the bid price (excluding VAT) and the imported content value.
Imported content costs must be converted to ZAR using the SARB exchange rate from one week prior to the closing date.
Compliance Requirements
Source: Major Distribution SBD 6.2 local content certificate.pdf (TENDER)
The bid is subject to the Preferential Procurement Regulations, 2011, which promote local production and content.
For designated sectors, only bids meeting the stipulated minimum local content threshold will be considered.
The local content (LC) must be calculated as per the SABS technical specification SATS 1286:201x.
Bidders must achieve the stipulated minimum local content thresholds for each commodity listed.
Failure to meet the minimum thresholds or failure to submit the SBD 6.2 declaration certificate will result in disqualification.
Contractors awarded in a designated sector cannot subcontract in a way that reduces the overall local content below the minimum threshold.
The declaration must be verified as per SATS 1286, and submission of incorrect or unverifiable data may lead to penalties under Regulation 13.
B-BBEE Requirements
Source: Major Distribution SBD 6.2 local content certificate.pdf (TENDER)
The SBD 6.2 form is a mandatory declaration for local content, which is interlinked with B-BBEE considerations in a potential two-stage evaluation.
The Preferential Procurement Regulations, 2011 promote local production and content.
For designated sectors, only bids meeting minimum local content thresholds are considered.
Local content is calculated as per SATS 1286.
'Designated sector', 'imported content', 'local content', and 'stipulated minimum threshold' are defined in relation to these regulations.
A two-stage process may evaluate local content first, then price and B-BBEE.
Awarded contractors cannot subcontract in a way that reduces the contract's overall local content below the minimum threshold.
Contractual Terms
Source: Major Distribution SBD 6.2 local content certificate.pdf
A 'contract' is the agreement resulting from the acceptance of a bid by an organ of state.
'Sub-contract' refers to the primary contractor assigning work to another person for part of the project.
Penalties under Regulation 13 of the Preferential Procurement Regulations, 2011 may apply for incorrect data submission.
Imported content costs must be converted to ZAR using the SARB exchange rate from one week before the closing date.
Disqualification occurs if the bidder fails the local content threshold or does not submit the SBD 6.2 declaration.
Requirements
Source: Major Distribution SBD 6.2 local content certificate.pdf (TENDER)
A 'bid' includes advertised competitive bids, written price quotations, or proposals.
Section
Source: Major Distribution SBD 6.2 local content certificate.pdf
A two-stage bidding process may be used.
Stage 1: Evaluation against a minimum threshold for local production and content.
Stage 2: Evaluation of price and B-BBEE status.
DocumentTechnical Evaluation Criteria for Major reticulation contractors.pdfReview complete
Description
Source: Technical Evaluation Criteria for Major reticulation contractors.pdf
This document sets out Eskom's technical evaluation criteria for Major Reticulation Contractors in the Gauteng Cluster.
It covers minimum criteria for evaluating contractors for major reticulation works on an 'as and when required' basis.
The scope includes requirements for both desktop and site technical evaluations.
Applicable standards and references include ISO 9001, Eskom guidelines, and procurement policies.
Submission Guidelines
Source: Technical Evaluation Criteria for Major reticulation contractors.pdf (unknown)
Prepare a separate technical file or section labelled 'technical' and index it logically.
Submit all mandatory gatekeeper documents. If any are omitted, your tender will be disqualified without a chance to submit missing items.
Mandatory returnables include: Training certificates for MV line construction (3 resources), LV line construction (3 resources), MV/LV cable jointing & termination (2 resources), truck-mounted crane operators (2 resources), ORHVS (MV) and ORLVS (LV) training certificates, a completed and signed vehicle register (Annexure C), a completed and signed tools register (Annexure D), a valid DoL electrical contractor registration, and a fully completed Company Declaration (Annexure G).
All certificates and affidavits must be certified by a commissioner of oaths, with signatures and dates not older than three months from the tender issue date.
The vehicle register must prove ownership of at least one bakkie and one truck-mounted crane; if no proof, immediate disqualification.
For accredited external training facilities, email [email protected].
Evaluation Criteria
Source: Technical Evaluation Criteria for Major reticulation contractors.pdf (unknown)
Registered electrical contractor with Department of Labor. Must employ minimum required trained personnel with valid affidavits confirming employment. Must have valid vehicle registration documents in company/owner name. Tools and equipment must be owned or hired from bona fide companies with proper documentation. All certificates must be certified by commissioner of oaths and not older than three months from tender issue date.
Technical Specifications
Source: Technical Evaluation Criteria for Major reticulation contractors.pdf (unknown)
Scope: Desktop and site technical evaluations for Major Reticulation Services contracts in the Gauteng Cluster.
Desktop evaluation assesses: Skills, experience, vehicles, and tools & equipment against competency requirements.
Site evaluation (if required) verifies physical evidence: vehicles, tools, equipment, and original documentation.
Normative References: Contractors must apply the most recent editions of ISO 9001, Eskom Guideline 240 (Portfolio of Evidence), and QM 58 – Supplier Contract Quality Requirements Specifications.
Key deliverables involve MV and LV line construction, cable jointing and termination, and related reticulation/electrification projects.
Contractor must demonstrate experience via completed project templates (Annexure E), showing alignment with MV/LV line construction scope.
Experience & Qualifications
Source: Technical Evaluation Criteria for Major reticulation contractors.pdf
Company experience is evaluated via a project experience template (Annexure E), showing a maximum of 2 completed MV & LV projects.
Projects must demonstrate completion of works aligning with MV and LV Line Construction for Reticulation or Electrification.
Supporting evidence such as appointment letters and completion certificates must be submitted for each project.
The evaluation assesses the risk of using an inexperienced contractor for critical electrification tasks.
Quality Management
Source: Technical Evaluation Criteria for Major reticulation contractors.pdf
Contractors must apply the most recent editions of referenced documents, including ISO 9001 (Quality Management Systems).
Other key references: Eskom Guideline 240 (Portfolio of Evidence), QM 58 (Supplier Contract Quality Requirements), and Eskom procurement policies and procedures.
Compliance Requirements
Source: Technical Evaluation Criteria for Major reticulation contractors.pdf (unknown)
Mandatory Registration: You must be registered as an electrical contractor with the Department of Labour (DoL). Provide a certified, valid copy of the registration letter.
The DoL registration must be in the correct company/trading name, valid at contract award, and maintained for the contract duration.
If the registered person leaves or the letter expires, you must reapply with the DoL.
Technical submission must be in a separate, logically indexed 'technical' file.
All training certificates and affidavits require certification by a commissioner of oaths, with signatures/dates not older than three months from tender issue.
Vehicle and tool registers must be completed using Eskom templates (Annexures C & D), signed, and submitted. Unsigned registers are invalid.
Contractors must obtain required Eskom authorizations (Gauteng Cluster MV Outcome 3 and LV Outcome 2) prior to contract award.
Health & Safety
Source: Technical Evaluation Criteria for Major reticulation contractors.pdf
Vehicle and tool registers are mandatory for safety and compliance verification.
The vehicle register must be signed; an unsigned register is invalid. Vehicle registration (license disc) must not be older than twelve months.
Proof of ownership for at least one bakkie and one truck-mounted crane is mandatory; lack of proof leads to disqualification.
Tools register must be signed and not older than three months. Use the provided Eskom template (Annexure D).
Hiring of vehicles from bona fide companies requires a formal agreement or affidavit with specific details.
Contractual Terms
Source: Technical Evaluation Criteria for Major reticulation contractors.pdf
Successful contractors must submit contractual requirements documentation within three months of notification.
One objective requirement is valid registration for Eskom's PDE website, with confirmation letter submitted at contract award.
Specific technical requirements exist for MV/LV cable jointing and termination certificates, including required unit standards.
Certificates must be valid at tender closure and certified by a commissioner of oaths.
Section
Source: Technical Evaluation Criteria for Major reticulation contractors.pdf
The evaluation process consists of three stages: Gatekeepers (Stage 1), Functional Requirements (Stage 2), and Site Assessments (Stage 3).
Stage 1 involves mandatory pass/fail checks of submitted documentation.
Stage 2 is a desktop functional evaluation with a minimum score threshold of 75%.
Stage 3 involves potential site verification of certificates, vehicles, tools, and equipment.
DocumentAnnex-c_Local content Declaration-Summary Schedule - Copy.pdfCompliance review in progress
Source: NEC ECC_Major DX Networks Enquiry Contract_2026.pdf
This is a contract for the provision of major distribution networks (reticulation projects) for contractors within the Gauteng Cluster.
The contract establishes multiple agreements on an 'as and when required' basis for a period of three years.
Submission Guidelines
Source: NEC ECC_Major DX Networks Enquiry Contract_2026.pdf (unknown)
Submit the completed C1.1 Form of Offer and Acceptance as a returnable document.
Ensure the form is signed by a duly authorised representative of the tenderer.
The offer may be accepted by the Employer signing the Acceptance part and returning a copy.
Failure to provide required securities, bonds, guarantees, or proof of insurance within two weeks of receiving the signed agreement constitutes a repudiation of the agreement.
Evaluation Criteria
Source: NEC ECC_Major DX Networks Enquiry Contract_2026.pdf (unknown)
Contractors must be capable of executing major distribution network projects within the Gauteng Cluster. They must have (or provide upon award) a valid CIDB registration number (if applicable). They must agree to the contract's financial terms (rates-based), the dispute resolution mechanism (Adjudication via ICE-SA/Arbitration via AFSA), and the extensive risk allocation (including specific Employer's risks). Compliance with South African law, including Broad-Based Black Economic Empowerment (B-BBEE) requirements, is mandatory.
Technical Specifications
Source: NEC ECC_Major DX Networks Enquiry Contract_2026.pdf (unknown)
Scope: Provision of Major Distribution Networks (reticulation projects) for contractors within the Gauteng Cluster.
Works involve construction of major distribution networks at various sites across Gauteng Province.
Detailed Works Information is contained in Part C3: Scope of Work and referenced drawings.
Site Information is provided in Part C4.
The contract uses the NEC3 Engineering and Construction Contract (ECC3) Option B (Priced contract with bill of quantities).
Key deliverables include site establishment, bush clearing, digging holes for stays, struts, and poles (wood, concrete, free-standing), and associated foundations.
Specific tasks include back-actor/hand digging, compressor work, and hard rock drilling for various pole types and depths.
Environmental, health, and safety compliance is mandatory as per contract clauses.
Experience & Qualifications
Source: NEC ECC_Major DX Networks Enquiry Contract_2026.pdf
The Contractor must provide details of key persons, including names, jobs, responsibilities, qualifications, and experience.
CVs for key persons must be appended to the tender schedule.
The Contractor must submit a first programme for acceptance within 4 weeks of the contract date.
The bill of quantities is the primary pricing document, with rates for labour, equipment, and overheads.
Quality Management
Source: NEC ECC_Major DX Networks Enquiry Contract_2026.pdf
The Contractor must ensure work is without defects that would delay following work.
Defects discovered after completion are subject to a defects correction period (within 1 week of notification).
Quality inspections are to be conducted reasonably; additional inspections do not increase responsibility.
Pricing Schedule
Source: NEC ECC_Major DX Networks Enquiry Contract_2026.pdf
Pricing is based on NEC3 ECC Option B (Priced contract with bill of quantities).
The bill of quantities contains measured items with rates; it is a re-measurement contract.
The tenderer must enter rates for items including site establishment, bush clearing, digging holes for various pole types, and foundations.
Prices are fully inclusive of all work, risks, overheads, and profit.
Quantities are not final; payment is based on assessed quantities at each payment interval.
Detailed bill items cover preliminaries, bush clearing, digging for stays/struts, wood poles, concrete poles, heavy conductor foundations, and free-standing poles.
Financial Requirements
Source: NEC ECC_Major DX Networks Enquiry Contract_2026.pdf (unknown)
Pricing is based on Option B: Priced contract with bill of quantities.
The tenderer must provide rates in the bill of quantities; the total of the Prices is 'Rates Only'.
VAT at 15% applies to the offered total.
Payment terms: Payment is made within 4 weeks upon submission of a tax-compliant invoice and a Goods Receipt issued by Eskom.
The Contractor must provide a tax invoice within one week of receiving a payment certificate.
Interest on late payments is based on Standard Bank's publicly quoted prime rate.
Prices are fixed for the first 12 months; thereafter, contract price adjustment (CPA) for inflation applies.
Retention: 5% of the remaining value (Labour and Preliminaries & General items) is held, with specific provisions for SDL & I on affected projects.
Compliance Requirements
Source: NEC ECC_Major DX Networks Enquiry Contract_2026.pdf (unknown)
B-BBEE: The Contractor must notify Eskom within seven days of any change in B-BBEE status and submit an updated verification certificate within thirty days. A decrease in B-BBEE status may lead to contract re-negotiation or termination.
Joint ventures/consortia are jointly and severally liable.
Confidentiality: The Contractor must not disclose contract-related information without consent.
Health, Safety, and Environment: The Contractor must comply with all applicable laws, including the Construction Regulations 2014, and may be appointed as Principal Contractor.
Insurance: The Contractor must provide insurances as specified in Insurance Table A (e.g., for works, equipment, public liability).
Tax Compliance: The Contractor must comply with VAT Act requirements and include Eskom's VAT number (4740101508) on invoices.
Ethical conduct is required, with prohibitions against corrupt, fraudulent, coercive, collusive, or obstructive actions.
Health & Safety
Source: NEC ECC_Major DX Networks Enquiry Contract_2026.pdf
The Contractor must take all reasonable precautions for health and safety on site.
Eskom may appoint the Contractor as the 'Principal Contractor' under the Construction Regulations 2014.
The Contractor's pricing must include costs for full compliance with health and safety laws.
Specific asbestos exposure limits apply: 0.2 regulated asbestos fibres/ml as a 4-hour TWA and 0.6 fibres/ml as a 10-minute TWA.
If asbestos is identified, a risk assessment must be conducted, and workers may stop work until the area is declared safe.
Asbestos removal must be done by a registered asbestos contractor at Eskom's expense.
Environmental
Source: NEC ECC_Major DX Networks Enquiry Contract_2026.pdf
The Contractor must comply with all applicable environmental laws, regulations, and contract guidelines.
This obligation extends to subcontractors and employees.
Specific environmental management items are included in the bill of quantities (e.g., Environmental Management).
Asbestos removal and disposal must be conducted in line with South African legislation.
Contractual Terms
Source: NEC ECC_Major DX Networks Enquiry Contract_2026.pdf
Contract Duration: Three-year framework agreement on an 'as and when required' basis.
Governing Law: Republic of South Africa.
Contract Language: English.
Dispute Resolution: Adjudication via ICE-SA panel, with arbitration as the tribunal.
Delay Damages: Applicable as per Project Specific Agreements, capped at 10% of Purchase Order Value.
Limitation of Liability: Contractor's liability for indirect/consequential loss is limited to the total of Purchase Orders issued.
Defects Liability Period: 52 weeks after completion.
Termination: Employer may terminate for reasons including a decrease in B-BBEE status, prohibited actions, or business rescue.
Additional Conditions: Include clauses on cession, confidentiality, health/safety/environment, insurance, nuclear liability, and asbestos management.
Section
Source: NEC ECC_Major DX Networks Enquiry Contract_2026.pdf
Evaluation includes a Risk Assessment Procedure.
Quality Management is a scored criterion (percentage-based).
Document240-68099512 Form A 2020 Cat-2 Rev 8.docxReview complete
Description
Source: 240-68099512 Form A 2020 Cat-2 Rev 8.docx
The tenderer must complete and sign the form to acknowledge and accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001 Standard.
Submission Guidelines
Source: 240-68099512 Form A 2020 Cat-2 Rev 8.docx (unknown)
Returnable Documents: The tenderer must complete and sign the form to acknowledge and accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001 Standard.
Evaluation Criteria
Source: 240-68099512 Form A 2020 Cat-2 Rev 8.docx (unknown)
Contractors must be within Gauteng cluster. Must meet Category 2 quality requirements per Specification 240-105658000. Must have ISO 9001 compliant quality management system. Must agree to Eskom's rights of access, information, and quality audits. Must undergo supplier site assessment. Only one quality category may be selected (Category 2 is specified as applicable).
DocumentEvaluation criteria.pdfReview complete
Description
Source: Evaluation criteria.pdf
The tender involves high-risk construction work for reticulation projects. Key requirements include submission of Annexure B (acknowledgement of Eskom SHE rules) and an OHS plan applicable to high-risk work.
Submission Guidelines
Source: Evaluation criteria.pdf (unknown)
Returnable Documents: Ensure all required documents are submitted as per the evaluation criteria.
Evaluation Criteria
Source: Evaluation criteria.pdf (unknown)
To be eligible for evaluation, contractors must operate within the Gauteng cluster and provide all specified OHS documentation. Key eligibility hinges on valid professional registrations (e.g., SACPCMP for SHE Officer), statutory compliance (COIDA Letter of Good Standing), and management-signed policies and plans. Failure to submit any required document or failure to meet the minimum requirements for any item results in a score of 0 for that KPI, potentially leading to overall disqualification.
Technical Specifications
Source: Evaluation criteria.pdf (unknown)
Scope involves high-risk construction work for reticulation projects.
Tenderers must submit Annexure B: signed acknowledgement of Eskom's SHE rules and requirements.
An OHS plan is required, covering: OHS organization, SHE incident management, work activity planning, PPE, emergency planning, vehicle safety, contractor management, design specifications, permits, competency training, communication, and COVID-19 management.
A Baseline Risk Assessment (BRA) must identify, assess, and manage SHE risks, with methodology provided.
Additional requirements: fall protection plan, valid Letter of Good Standing (COIDA or equivalent), valid medical certificates (at least 2), SHE policy signed by CEO/MD complying with OHS Act Section 7 and OSHAS 18001.
Appointment letters and SHE competency certificates needed for: First aider (level 2), SHE Officer (SACPCMP registered), Fall Protection planner/developer, and working at heights and rescue personnel.
Compliance Requirements
Source: Evaluation criteria.pdf (unknown)
B-BBEE Minimum Level: 2.
Health and safety compliance is critical: submit signed acknowledgement of Eskom SHE rules, OHS plan, Baseline Risk Assessment, fall protection plan, valid Letter of Good Standing (COIDA), medical certificates, SHE policy, and appointment letters with qualifications.
Specific appointments require: First aider (level 2), SHE Officer (SACPCMP registered), Fall Protection planner/developer, and working at heights and rescue competency.
Health & Safety
Source: Evaluation criteria.pdf
Appointment letters and SHE competency certificates required for: First aider (level 2), SHE Officer (SACPCMP registered), Fall Protection planner/developer, and working at heights and rescue personnel.
Section
Source: Evaluation criteria.pdf
Scoring: 0 if document not submitted or fails minimum requirements, 1 if submitted and meets minimum requirements.
DocumentMajor Reticulation Standard BOQ Appendix 1_April2026 0.0.xlsReview complete
Description
Source: Major Reticulation Standard BOQ Appendix 1_April2026 0.0.xls
The tender is for the provision of major reticulation projects within the Gauteng cluster. It aims to establish multiple contracts on an 'as and when required' basis for a period of three years. The work involves extensive electrical infrastructure construction, maintenance, and installation services for Eskom's distribution network.
Evaluation Criteria
Source: Major Reticulation Standard BOQ Appendix 1_April2026 0.0.xls (unknown)
Contractors must be based within the Gauteng Cluster. Must have capacity for major reticulation projects. Requires permanent staff for site work. Must comply with Construction Regulations (e.g., Part-time Health and Safety Officer registered with SACPCMP). Financial and technical capability for multi-year framework is implied.
Technical Specifications
Source: Major Reticulation Standard BOQ Appendix 1_April2026 0.0.xls (unknown)
The tender covers major reticulation projects in the Gauteng cluster on an 'as and when required' basis for three years. The scope includes a wide range of electrical construction and installation activities, as detailed in the Bill of Quantities and Bill of Activities. Key activities involve:
Excavation, trenching, and backfilling for cable laying.
Installation of wooden, concrete, and steel poles of various specifications and heights.
Stringing of conductors (e.g., Fox, Mink, Hare, Chickadee, Kingbird).
Assembly of MV and LV overhead structures (e.g., delta, vertical, H-pole configurations).
Installation of transformers, reclosers, sectionalizers, capacitor banks, CT/VT units, and other equipment.
Underground cable installation for MV and LV systems.
Service connection installations for customers.
Cable jointing and termination.
Equipment testing, earthing, and commissioning.
Bush clearing, tree felling, and site rehabilitation.
Supply and installation of ancillary items like meter kiosks, fencing, and security measures.
Dismantling and removal of existing electrical infrastructure.
Contractors must complete all activities applicable to a specific job and modify activity descriptions to reflect actual dimensions or quantities as required.
DocumentSDL&I Undertaking Major Distribution rev 1.pdfReview complete
Description
Source: SDL&I Undertaking Major Distribution rev 1.pdf
Contract for Major Distribution reticulation projects within the Gauteng Cluster.
Duration: 36 months on an “as and when required” basis.
Important Dates
Source: SDL&I Undertaking Major Distribution rev 1.pdf (unknown)
Closing date: 11 June 2024.
Contact Information
Source: SDL&I Undertaking Major Distribution rev 1.pdf (unknown)
Contact person: Mosa Makhubo.
Phone: 011 800 3809.
Department: Gauteng Cluster Document 1.
Compiled date: 11 June 2024.
Submission Guidelines
Source: SDL&I Undertaking Major Distribution rev 1.pdf (unknown)
Suppliers must report progress on SDL&I obligations quarterly.
Failure to meet SDL&I obligations incurs a 2% penalty at contract end.
Panel suppliers awarded task orders must submit SDL&I performance reports using the SDL&I Data Collection Template.
Eskom reviews reports within 15 days and notifies suppliers of any shortfalls.
Suppliers must implement corrective measures if SDL&I obligations are not met.
All SD&L commitments form part of the NEC contract and are monitored throughout the contract duration.
Returnable Documents
Source: SDL&I Undertaking Major Distribution rev 1.pdf (unknown)
Submit table showing proportion of local procurement subcontracted to designated black-owned enterprises.
Declaration Certificates for Local Production and Content (SBD 6.2).
For subcontracting: proof of sub-contract agreement, CSD report of subcontractors, B-BBEE certificate/sworn affidavit.
For skills development: completion certificate, training program, signed contract with candidates.
Indicate number of jobs created/retained in SD&L Compliance Matrices.
Evaluation Criteria
Source: SDL&I Undertaking Major Distribution rev 1.pdf (unknown)
Companies with 51%+ Black ownership preferred (B-BBEE Level 1-3). Valid B-BBEE certificate mandatory. Must operate within Gauteng. Non-Black-owned companies may bid but must subcontract 20% to Black-owned EMEs or form qualifying joint ventures. All materials/services must meet South African local content thresholds (30% overall, up to 100% for specific commodities).
Technical Specifications
Source: SDL&I Undertaking Major Distribution rev 1.pdf (unknown)
Scope: Major Distribution reticulation projects within the Gauteng Cluster.
Contract type: “As and when required” basis.
Duration: 36 months (three years).
Compliance Requirements
Source: SDL&I Undertaking Major Distribution rev 1.pdf (unknown)
Mandatory contribution to six SD&L elements: B-BBEE, Localisation, Industrialisation, Skills Development, Job Creation, Supplier Development.
B-BBEE: Preference for >50% Black Owned companies (including BWO, BYO, BPLwD). B-BBEE level 1-3 required; suppliers below level 1-3 must submit a migration plan.
Valid B-BBEE certificate mandatory for contracting.
Localisation: Minimum 30% local content for South Africa; specific local content thresholds apply for designated materials (e.g., Fabricated Steel 100%, Cables class 0 90%).
Declaration Certificates (SBD 6.2) required for local production and content.
Industrialisation: No requirement as all resources sourced locally.
Subcontracting: Mandatory for contracts above R30 million—minimum 30% subcontracting to designated groups (EME/QSE with ≥51% black ownership, youth, women, disabilities, rural areas, cooperatives, military veterans).
Subcontracting limited to 25% to entities with lower B-BBEE status, unless subcontracting to a capable EME.
Skills Development: Obligation to train 1 candidate per R1.5 million cumulated task order value; candidates from previously disadvantaged groups; training via SETA-accredited providers.
Skills types include Artisan, Engineers, Project Managers, Safety Officers.
Job Creation/Retention: Suppliers propose number of jobs created/retained; targets include 100% General workers local-to-site, 30% Semi-skilled, 50% Skilled.
Supplier Development: Contractor must initiate programs to address subcontracting gaps.
B-BBEE Requirements
Source: SDL&I Undertaking Major Distribution rev 1.pdf (unknown)
This is a template for a Contract Quality Plan (CQP). Its purpose is to assist the supplier in identifying and planning how to meet the client's (Eskom's) quality expectations and requirements for the contract.
Contractors must operate within Gauteng province; demonstrate capability to execute major reticulation projects; implement quality management systems compliant with SANS 466:2005/ISO 10005:2005; provide detailed organizational structure with qualified personnel; establish robust supplier monitoring processes; maintain comprehensive documentation and reporting systems.
The tender requires a Contract Quality Plan (CQP). The plan must:
Follow guidelines from SANS 466:2005 or ISO 10005:2005.
Detail how the supplier will meet Eskom's quality expectations.
Include a structured index covering definitions, scope of work, communication channels, organogram, and interfaces.
List all suppliers, sub-suppliers, and items to be manufactured, refurbished, or purchased.
Specify monitoring processes for suppliers and sub-suppliers.
Outline quality control points (QCP/ITP) for both offsite and onsite activities.
Identify work areas requiring special controls (e.g., welding, NDT).
List all documented information to be submitted to Eskom during the project (e.g., method statements, inspection reports, certificates).
Describe how records will be controlled, retained, and retrieved.
Include processes for concession and non-conformance management.
If applicable, detail databook management and submission.
List tools and equipment to be used, including calibration status.
Describe processes for handling customer property, product preservation, and identification/traceability.
Outline commissioning and post-delivery activities, including warranty and technical support.
DocumentE-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025 (G20 Logo).pdfReview complete
Important Dates
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025 (G20 Logo).pdf (unknown)
Closing date: 27 January 2025.
Contact Information
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025 (G20 Logo).pdf (unknown)
Contact person: To be filled in by the bidder on the acknowledgement form.
Email: To be filled in by the bidder on the acknowledgement form.
Phone (landline and cell): To be filled in by the bidder on the acknowledgement form.
Submission Guidelines
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025 (G20 Logo).pdf (unknown)
You must submit a fully completed 'ACKNOWLEDGEMENT FORM – E-TENDERING TRAINING'.
This form is a mandatory returnable document.
Failure to fully complete and submit the form to Eskom within the prescribed period will render your tender non-responsive and you will be disqualified.
Returnable Documents
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025 (G20 Logo).pdf (unknown)
You must complete and return the 'ACKNOWLEDGEMENT FORM – E-TENDERING TRAINING'.
The form requires your business name/JV, contact person details (landline, cellphone, email), and an acknowledgment paragraph.
You must sign the form, provide your designation, and date it.
This is a mandatory returnable. Incomplete forms or failure to submit on time will result in disqualification.
Evaluation Criteria
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025 (G20 Logo).pdf (unknown)
Contractors must be within the Gauteng cluster. The tenderer must be responsive by submitting the fully completed acknowledgement form within the prescribed period. No specific technical or financial criteria are detailed in this excerpt.
Technical Specifications
Source: E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025 (G20 Logo).pdf (unknown)
This document pertains to the E-Tendering Training Acknowledgement process.
Bidders must acknowledge they have undergone self-training via the e-Tendering Noddy Guide, video, or a clarification meeting.
Bidders must confirm they are satisfied with their training and able to operate the E-Tendering Solution.
DocumentAnnexure B.pdfReview complete
Description
Source: Annexure B.pdf
The tender involves the appointment of contractors or suppliers for the commencement of work.
Submission Guidelines
Source: Annexure B.pdf (unknown)
Returnable Documents: The tenderer must submit the completed Annexure B Acknowledgement Form for Document 240-77471499 Rev 2 (Eskom SHE Rules).
Evaluation Criteria
Source: Annexure B.pdf (unknown)
Contractors must operate within Gauteng cluster. Must have understanding and capability to comply with extensive SHE requirements. Must have management systems for subcontractor oversight. Must provide references/testimonials from previous similar work when requested. Must have authorized person (CEO/Director/Managing Director) sign acknowledgement form.
Technical Specifications
Source: Annexure B.pdf (unknown)
The main supplier must notify Eskom prior to appointing any contractors or suppliers for work commencement.
The main supplier must ensure contractors and suppliers possess adequate resources and competencies.
The main supplier is accountable for managing its contractors/suppliers to ensure compliance with legal and Eskom requirements.
The main supplier must monitor contractors/suppliers through audits and assessments for SHE compliance during work execution.
Eskom reserves the right to verify the main supplier's processes and may request copies of testimonials/references and client contact details for previous similar work.
Quality Management
Source: Annexure B.pdf
Financial penalties will be enforced on the main supplier for non-conformances (identified for the main supplier and/or its sub-contractor/supplier) pertaining to Eskom and/or Statutory SHE requirements.
Ensure all employees (contractors/suppliers) undergo relevant Eskom induction and the company’s induction.
Compliance Requirements
Source: Annexure B.pdf (unknown)
The supplier must comply with Eskom's SHE requirements and statutory laws, including:
Eskom contractor Health and Safety requirements standards 32-136.
Occupational Health and Safety Incident Management Procedure 32-95.
Provided SHE specification.
Occupational Health and Safety Act.
Mine Health and Safety Act (where applicable).
Compensation for Occupational Diseases and Illnesses Act.
National Environmental Management Act.
After contract award, the supplier must fully align its processes to Eskom’s SHE requirements (policies, procedures, standards).
The main supplier must demonstrate to Eskom the process and selection criteria used when appointing contractors and suppliers.
All non-conformances/non-compliance by contractors/suppliers (all tiers) will be dealt with directly with the main supplier under performance and penalty processes.
Health & Safety
Source: Annexure B.pdf
The tenderer must understand and comply with the listed SHE requirements when submitting the tender returnable.
Mandatory compliance documents include:
Eskom contractor Health and Safety requirements standards 32-136.
Occupational Health and Safety Incident Management Procedure 32-95.
Provided SHE specification.
Occupational Health and Safety Act.
Mine Health and Safety Act (where applicable).
Compensation for Occupational Diseases and Illnesses Act.
National Environmental Management Act.
After contract award, the supplier must fully align its processes to Eskom’s SHE requirements (policies, procedures, standards).
Work stoppages initiated due to SHE-related issues shall not warrant any financial compensation claims against Eskom.
The tenderer acknowledges understanding the SHE requirements and consequences of non-compliance via Annexure B Acknowledgement Form.
Contractual Terms
Source: Annexure B.pdf
The main supplier must demonstrate to Eskom the process and selection criteria applied when appointing contractors and suppliers.
The main supplier must provide notification to Eskom prior to appointing contractors or suppliers for work commencement.
The main supplier must ensure contractors and suppliers possess adequate resources and competencies.
The main supplier is accountable for managing its contractors/suppliers to ensure compliance with applicable legal and Eskom requirements.
The main supplier shall monitor contractors/suppliers through audits and assessments regarding SHE compliance during work execution.
The main supplier must provide grounds for termination of work done by contractors and suppliers.
All non-conformances/non-compliance by contractors/suppliers (all tiers) will be dealt with directly with the main supplier under performance and penalty processes.
Eskom reserves the right to verify this when necessary and may instruct the contractor to provide copies of testimonials/references and client contact details (including Eskom) for previous similar work.
All suppliers must read, complete, sign, and submit the Integrity Declaration Form when participating in any Eskom procurement process.
Ensure all submitted information is accurate; misrepresentation, false certifications, or forged documents can lead to disqualification and disciplinary action.
The Integrity Pact requires adherence to ethical standards throughout the procurement process, including contract execution.
The Integrity Pact applies to all existing and potential suppliers to Eskom Holdings SOC Ltd (including subsidiaries), defined as any natural or juristic person doing or tendering to do business with Eskom, including consultants, contractors, and service providers. There are no explicit financial or technical thresholds; it is a universal prerequisite for participation in any Eskom tender/RFQ/RFP process.
Suppliers must comply with the Eskom Supplier Integrity Pact and all relevant Commercial and Ethics policies/codes/procedures.
Suppliers must adhere to South African laws and constitutional principles of fairness, transparency, equity, cost-effectiveness, and competitiveness.
Suppliers are subject to a supplier discipline process for misconduct, which can lead to suspension from the Eskom Vendor Database and listing on the National Treasury Restricted Suppliers database.
Suppliers may be subject to a supplier discipline process for misconduct, with potential sanctions including suspension from the Eskom Vendor Database.
Suppliers must report any dishonest/fraudulent behaviour by Eskom personnel to the Ethics office ([email protected]), Forensic ([email protected]), or hotline 0800 11 27 22.
Eskom undertakes to treat all tenderers fairly, transparently, equitably, cost-effectively, and competitively.
Eskom employees/directors must declare interests annually and additional declarations if involved in procurement.
Gifts received by employees must be declared, recorded, and authorised; no inducements may be accepted from tenderers.
Employees/directors with a conflict of interest will be excluded from the relevant tender evaluation/negotiation.
The tenderer (or joint venture) must be eligible to do business with Eskom and not be restricted. Must comply with eligibility criteria in the Tender Data. Must be registered with the CIDB (or capable of registration within 21 days) if applicable. Must not propose 100% subcontracting. Must meet any pre-qualification criteria specified.
This is the Supplier Quality Management Specification (Document Identifier: 240-105658000, Revision 3). It specifies minimum quality requirements for all existing and potential Eskom suppliers. The document defines quality criteria for supplier selection, evaluation, registration, management, monitoring, assessment, and auditing. Eskom seeks to partner with suppliers demonstrating commitment to a QMS conforming to ISO 9001. The specification applies across Eskom divisions and to all procurement requests (RFI/RFQ/RFP).
Closing date: 17 October 2021. This is the date of authorisation for the specification document. Note: This date is from the specification document and may not be the tender closing date. Refer to the tender record for the official closing date.
Returnable Documents: Suppliers must complete, sign, and return Form A (Tender and Contract Quality Requirements for Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001) with other returnables as listed in the List of Tender Returnable document (240-12248652). The specific quality documentation required depends on the tender category (1, 2, 3, or 4) indicated in Form A. Categories define minimum returnable documentation, including ISO 9001 certificates, audit reports, draft contract quality plans, inspection/test plans, and documented QMS information. Refer to the List of Tender Returnables for exact requirements per tender.
Suppliers must have a QMS conforming to ISO 9001. For Categories 1 & 2, a valid ISO 9001 certificate from an accredited body is required unless specifically excluded. All suppliers (and applicable sub-suppliers) must demonstrate capability and capacity, especially for high-risk, critical, or special process work. Eligibility is contingent on the full and correct submission of all returnable documents specified for the applicable Category in the tender.
Scope: This specification outlines minimum quality requirements for all existing and potential Eskom suppliers. It applies throughout Eskom Holdings divisions, subsidiaries, suppliers, and sub-suppliers, forming part of all RFI/RFQ/RFP and procurement contracts. Purpose: Suppliers must develop, implement, maintain, and continually improve a QMS based on ISO 9001 to ensure conformity to Eskom quality requirements throughout contract duration. Key Requirements: Suppliers and sub-suppliers must have a formal QMS conforming to the latest ISO 9001 standard. Where specified, suppliers must provide documented contract quality plans (CQPs) and quality control plans (QCPs)/inspection and test plans (ITPs). Plans must address quality assurance and control elements related to the scope of work, including management of records, access for inspection, special processes (e.g., welding), personnel qualifications, and preservation programmes. Eskom reserves rights to audit, assess, and appoint inspection agencies.
Quality Control Plan (QCP) Details: QCPs/ITPs must clearly describe equipment, locations, quality verification stages, reference documents, procedures, and acceptance criteria. Preservation Programme Execution: The supplier must review and track compliance with preservation requirements, evaluate storage sites, develop preservation work plans, oversee preservation plan execution, and maintain a records management process for preservation programme documentation.
Personnel Qualifications: Quality audits and related performance reviews must be carried out by trained, accredited, and experienced personnel in accordance with procedures documented in the contract quality plan (CQP).
Core Requirement: Suppliers and sub-suppliers must develop, implement, maintain, and improve a formal QMS conforming to the latest ISO 9001 standard. Where specified, suppliers must provide documented contract quality plans (CQPs) and quality control plans (QCPs)/inspection and test plans (ITPs). Plans must address quality assurance and control elements, including management of records, access for inspection, special processes (e.g., welding, NDT), personnel qualifications, and training aligned with SETA requirements. Eskom reserves rights to audit, assess facilities, and appoint inspection agencies. Suppliers are classified into four categories (1-4) with tiered documentation requirements.
B-BBEE: Preferential Procurement Policy Framework Act (PPPFA) is referenced as an informative document. No specific B-BBEE level or details are provided. Other Compliance: References are made to CIDB 1004 (construction procurement), SANS 10845-1, and Eskom's Procurement and Supply Chain Management Policy and Procedure. The specification mandates ISO 9001 QMS compliance. No explicit mention of CSD, tax, CIDB grading, CIPC, professional registrations, or local content.
References: The document lists Eskom's Safety, Health, Environment, and Quality (SHEQ) Policy (32-727) as an informative reference. No specific health and safety requirements are detailed in the extracted text.
Preservation Programme Requirements: The supplier must implement a preservation programme for materials and equipment. This includes special precautions for valves, motors, piping, instrumentation, coatings, and insulation. Requirements must be clearly documented in purchase orders and work authorisations. The supplier must ensure sub-supplier responsibility is defined and that Eskom has free access to all preservation records for audit.
Quality evaluation criteria focus on supplier QMS conformance to ISO 9001. References include ISO 9001, ISO 10005, CIDB 1004 Best Practice Guideline A4, and Eskom's SHEQ Policy. Key concepts evaluated include contract quality plans (CQPs), hold points, intervention points, and inspection agency roles.
DocumentE-tendering Help Manual for supplier - 27 January 2025 (G20 Logo).pdfReview complete
Description
Source: E-tendering Help Manual for supplier - 27 January 2025 (G20 Logo).pdf
This is a user manual for Eskom's eTendering system.
The system is a web-based platform for suppliers to electronically upload tender documents.
It replaces the physical submission of documents at Eskom tender offices.
Access requires registration, a CSD number, email verification, and OTP authentication.
You must register on the system with your details and verify your email address.
An OTP (one-time pin) will be sent to your registered cellphone and email for login.
Upload tender documents by clicking 'Add file', naming the file, selecting the correct document type (e.g., Technical, Commercial, Finance), and uploading.
Individual file size must not exceed 50MB. Total submission size must not exceed 900MB.
Verify all required documents are uploaded before clicking 'Finalize Submission'.
After final submission, you will receive a confirmation email with a submission ID. Save this email for future reference.
You can view your submissions under the 'My Submissions' menu.
Returnable Documents
Source: E-tendering Help Manual for supplier - 27 January 2025 (G20 Logo).pdf (TENDER)
Upload documents by selecting the correct file type category (e.g., Technical, Commercial, Finance).
Ensure all required documents are uploaded before finalizing.
File size limits: 50MB per file, 900MB total submission.
You can review submitted documents in the 'My Submissions' section.
Evaluation Criteria
Source: E-tendering Help Manual for supplier - 27 January 2025 (G20 Logo).pdf (TENDER)
The primary eligibility criterion specified in the manual is that suppliers must have a valid Central Supplier Database (CSD) number to register and gain access to the eTendering system. The tender title indicates the work is for contractors within the Gauteng cluster, implying geographical eligibility. Specific project experience, financial, and technical criteria would be detailed in the actual tender specification document, which is not provided here.
Technical Specifications
Source: E-tendering Help Manual for supplier - 27 January 2025 (G20 Logo).pdf (TENDER)
The tender requires the use of Eskom's web-based eTendering system for all submissions.
The system replaces manual submission at Eskom offices.
Suppliers must have internet access and a compatible web browser (Microsoft Edge recommended).
The process involves registration, email verification, OTP authentication, document upload, and final submission.
Section
Source: E-tendering Help Manual for supplier - 27 January 2025 (G20 Logo).pdf
The document references 'closed tenders' for pre-selected suppliers who meet specific criteria.
These suppliers are invited via email to bid privately.
DocumentInvitation to Tender (ITT) - Major Retic.pdfReview complete
Description
Source: Invitation to Tender (ITT) - Major Retic.pdf
Tender for major reticulation projects in Gauteng cluster on an 'as and when required' basis for three years.
Multiple contracts to be established.
Key annexures include Authorisation Form, Acknowledgement Form, Tenderer’s Particulars, Integrity Declaration, CPA forms for local/foreign goods, SBD 6.2 for local content, SBD 1, SBD 6.1 for preference points, SBD 4.
Important Dates
Source: Invitation to Tender (ITT) - Major Retic.pdf (TENDER)
Tender closing: 07 August 2026 at 10h00 SAST.
Clarification meeting (non-compulsory): 28 July 2026 at 10:00 via MS Teams (link provided). Confirm attendance with Eskom Representative.
Deadline for clarification queries: 5 working days before tender submission deadline.
Tender validity period: 90 days from closing date.
Contact Information
Source: Invitation to Tender (ITT) - Major Retic.pdf (TENDER)
Deadline: 07 August 2026 at 10h00 SAST. Late submissions will not be accepted.
Upload documents in PDF format (price list also in Excel). Maximum upload size per document is 500 MB; total submission restricted to 4 GB.
Do not submit zip/compressed files. No hard copies accepted.
Ensure submission status is marked as complete.
Mandatory returnables (disqualifiable if missing at closing): Authorisation Form (Annexure A), Acknowledgement Form (Annexure B), Tenderer’s Particulars (Annexure C), Integrity Declaration Form (Annexure D), CPA for local/foreign goods/services (Annexure E/F if applicable), SBD 6.2 for local content (Annexure G1-G4 if applicable), SBD 1 (Annexure H), SBD 6.1 Preference Points Claim Form (Annexure I), SBD 4 (Annexure J).
Non-disqualifiable returnables (if incomplete, you have 5 working days to correct): E-tendering Help Manual acknowledgement, reverse e-auction training acknowledgement (if applicable).
For joint ventures: submit letter of intent or valid JV agreement, confirmation of single business entity, and details of a single designated bank account.
Tender validity period is 90 days from closing date.
Evaluation Criteria
Source: Invitation to Tender (ITT) - Major Retic.pdf (TENDER)
Must not be on international sanctions lists; no conflict of interest; not restricted by National Treasury/Eskom; cannot subcontract 100% of work; must meet CIDB 4EP requirement; cannot submit multiple tenders (except for size limits); joint ventures must show joint/several liability; must have valid tax clearance (local) or complete SBD1 (foreign with no SA footprint); not on tender defaulters list.
Technical Specifications
Source: Invitation to Tender (ITT) - Major Retic.pdf (TENDER)
Scope: Provision of major reticulation projects within Gauteng cluster on an "as and when required" basis for three years.
Contract form: NEC 3 - ECC conditions.
CIDB requirement: Estimated contractor grading of 4EP or higher.
Key deliverables: Scope of Work (Annexure 1.1.18), Bill of Quantities (BOQ) provided.
Quality/Environmental/Safety documentation may be required per scope, including Quality Control Plan (QCP/ITP), Environmental Method Statement, Waste Management Plan, Environmental Management Plan.
Cataloguing: Successful tenderer may be required to provide cataloguing information post-award; include line item in pricing schedule.
Tools, equipment, and vehicle requirements specified under functionality criteria.
Methodology
Source: Invitation to Tender (ITT) - Major Retic.pdf
Tenderer must select at least two Eskom-approved financial institutions for performance security if required.
No public opening of tenders; downloaded electronically.
Prices will not be read out.
Basic compliance requires meeting eligibility criteria, submitting complete tender with commercial/financial/technical information, and mandatory returnables by deadlines.
Quality Management
Source: Invitation to Tender (ITT) - Major Retic.pdf
Quality documentation may include: Quality Control Plan (QCP) or Inspection Test Plan (ITP), Supplier Quality Management Specification, CQP Template.
Refer to Eskom document numbers: 240-109253302 (QCP/ITP), 240-109253698 (CQP Template).
Quality requirements are part of additional contractual requirements (SHEQ).
Pricing Schedule
Source: Invitation to Tender (ITT) - Major Retic.pdf
Pricing schedule/BOQ must be completed and submitted in PDF and Excel.
Cataloguing: If required, include a line item in pricing schedule; Eskom will pay for cataloguing.
Alternative tenders not allowed.
Clarification queries deadline: 5 working days before tender submission.
Financial Requirements
Source: Invitation to Tender (ITT) - Major Retic.pdf (TENDER)
Payment terms: For contracts below R50 million (incl. VAT), payment within 30 days of undisputed invoice. For contracts above R50 million, payment within 60 days.
Financial capacity: Submission of latest 2 years comparative financial statements (not older than 18 months) required for financial analysis.
For subsidiaries without own financials: Holding company must provide signed guarantee letter.
Parent Company Guarantee (PCG) or Performance Bond from bank may be required (on approved template).
Performance security: If required, tenderer must select at least two Eskom-approved financial institutions.
Pricing schedule/BOQ must be completed and submitted in PDF and Excel formats.
Compliance Requirements
Source: Invitation to Tender (ITT) - Major Retic.pdf (TENDER)
Mandatory: CSD registration (CSD number/report).
B-BBEE: Submit proof of B-BBEE status level (certificate, sworn affidavit, or as per B-BBEE Act). Use SBD 6.1 Preference Points Claim Form.
Tax compliance: Tax clearance certificate required for local tenderers not providing SARS e-filing PIN/CSD profile, and foreign tenderers with SA footprint. Foreign suppliers with no footprint complete SBD1 only.
CIDB: Valid proof of grading 4EP or higher required at tender closing or within 21 working days if agreed.
Employment Equity: If a designated employer, provide proof of compliance and submission of report to Department of Labour.
Safety: COIDA certificate of good standing or proof of application (SA tenderers only).
Local content: If designated materials included, complete SBD 6.2 and annexures G1-G4.
Integrity: Complete Integrity Declaration Form and download Supplier Integrity Pact.
Health & Safety
Source: Invitation to Tender (ITT) - Major Retic.pdf
Safety requirements include COIDA certificate of good standing or proof of application (SA tenderers only).
SHEQ (Safety, Health, Environment, Quality) is an additional contractual requirement.
Refer to Eskom documents: 240-12248652 (List of Tender Returnables), 240-68099512 (Form A), 240-105658000 (Supplier Quality Management Specification).
Environmental
Source: Invitation to Tender (ITT) - Major Retic.pdf
Environmental documentation may include: Environmental Method Statement for site rehabilitation, Non-conformity and Corrective Action procedure, Waste Management Plan, Environmental Management Plan.
Required as part of scope-specific deliverables.
Contractual Terms
Source: Invitation to Tender (ITT) - Major Retic.pdf
Tenderers must not be from countries on international sanctions lists.
Submitting more than one tender is prohibited except due to E-tendering size limits.
Payment terms: Below R50 million (incl. VAT) – 30 days; above R50 million – 60 days.
Subsidiaries without own financials require a signed guarantee letter from holding company.
Parent Company Guarantee or Performance Bond may be required.
Section
Source: Invitation to Tender (ITT) - Major Retic.pdf
This is a Safety, Health and Environment (SHE) specification document.
It outlines Eskom's minimum requirements for contractors for the duration of the contract.
The contractor is expected to develop a SHE plan meeting these requirements and all applicable legislation.
Eskom does not assume the contractor's legal responsibilities.
The document provides standardised SHE specifications for Eskom contracts, standards, and NEC3 contracts.
It is applicable to any contracting organisation tendering for the contract.
Contact Information
Source: SHE Spec (1).pdf (unknown)
Eskom Contract's Manager: Donovan Kumkaran.
Eskom's Health and Safety Manager: Kith Maitisa.
Eskom's Procurement Manager: Salebona Kutumela.
Eskom's Safety Officer: Kgomotso Tlale.
Project Address: Gauteng Cluster.
Evaluation Criteria
Source: SHE Spec (1).pdf (unknown)
The document implies eligibility requires: 1) Registration as a contractor capable of major reticulation projects. 2) Proven ability to meet stringent SHE standards as per the specification. 3) Registration of construction professionals (e.g., with SACPCMP). 4) A valid Compensation Commissioner Letter of Good Standing. 5) Operational presence and capability within the Gauteng cluster. Specific financial, technical, or B-BBEE eligibility criteria are not present in the provided excerpt.
Technical Specifications
Source: SHE Spec (1).pdf (unknown)
This is a Safety, Health and Environment (SHE) specification document outlining minimum requirements for contractors.
The contractor must develop a SHE plan that meets these requirements and all applicable legislation.
Eskom does not assume the contractor's legal responsibilities.
The specification lists legislative and Eskom requirements, including any pertaining to Local Authorities/Municipal by-laws/Environmental legislation.
Scope of work includes, but is not limited to: bush clearing, excavations, installation/relocation of poles and structures, conductor stringing, equipment dismantling, labelling, physical security measures, and quality control/testing.
The awarded contractor is the 'principal contractor'; any subcontractor they appoint is an 'appointed contractor'.
Quality Management
Source: SHE Spec (1).pdf
The contractor must ensure quality control, including testing and as-built documentation.
The contractor must address non-conformances, corrective actions, audits, and inspection schedules.
The contractor must comply with Department of Labour requirements.
Eskom may conduct breathalyser and drug testing on any person entering or on an Eskom work site.
Compliance Requirements
Source: SHE Spec (1).pdf (unknown)
The contractor must comply with all relevant legislation, including: the Constitution of the Republic of South Africa, Occupational Health and Safety Act, National Environmental Management Act, Environment Conservation Act, National Water Act, Civil and Building Work Act, National Road Traffic Act, Compensation for Occupational Injuries and Diseases Act, and applicable SANS standards.
The principal contractor and all appointed contractors must be registered as professionals with the South African Council for the Project & Construction Management Professions (SACPCMP). This includes SHE professionals, Construction Managers, and Construction Agents.
The principal contractor and all appointed contractors must be registered with the Compensation Commissioner and have a valid Letter of Good Standing.
A Section 37(2) agreement under the OHS Act must be signed between Eskom and the principal contractor, and between the principal contractor and all appointed contractors.
The principal contractor must notify the Department of Labour of construction work as per Construction Regulation 4.
The contractor must have a substance abuse programme in line with the OHS Act.
The contractor must have an organisational SHE policy signed by the Chief Executive or appointed assistant.
Health & Safety
Source: SHE Spec (1).pdf
The contractor must ensure a safe working environment in line with Eskom's SHEQ Policy and legislative obligations.
Key requirements include: statutory appointments (e.g., Construction Manager, Safety Officer), risk assessments, safe work procedures/method statements, SHE training (induction, site-specific, task-specific), personal protective equipment (PPE), incident investigation, emergency management, and substance abuse controls.
The contractor must establish health and safety committees and hold regular meetings.
The contractor must comply with Eskom's Life-Saving Rules.
Specific hazards addressed include: working at heights, roof work, construction sites, fire equipment, flammable liquids, first aid, tools and equipment, ladders, scaffolding, and occupational health.
Alcohol and intoxicating substances are prohibited on work sites.
Environmental
Source: SHE Spec (1).pdf
The contractor must comply with requirements pertaining to Local Authorities/Municipal by-laws and Environmental legislation.
The contractor should implement an Environmental Management Plan to enhance positive impacts and limit negative environmental impacts during the project lifecycle.
This plan should form part of Eskom's Environmental Management System.
Section
Source: SHE Spec (1).pdf
The contractor must comply with Eskom's Safety, Health, Environmental and Quality Policy and all legislative obligations.
The contractor remains accountable for the quality and execution of their health and safety programme.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Gauteng different sites - Johannesburg - Johannesburg - 0000
Document-Backed
Recently Synced
Source Snapshot Available
AI Enhanced
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
23
Last checked
20 Jul 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.