Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
VARIOUS - KWAZULU NATAL - KWAZULU NATAL -
Organization Type
GOVERNMENT
Published
28 Aug 2026
OCDS Reference
ocds-9t57fa-167443
ESKOM requires a service provider to remove illegal electricity connections in the central east cluster of the kwazulu-natal operating unit on an 'as and when required' basis for 36 months under an nec term services contract. The single most consequential requirement is that the bidder must demonstrate, at submission, a fully compliant team and fleet: at least one trade-tested electrician, one orhvregs-authorised responsible person, one lv-authorised person, one company- or director-owned ldv, and one 10-ton-plus crane truck (owned with roadworthy certificate or leased with a letter of intent), all supported by certified copies and validation letters where applicable.
Closing date: 18 September 2026 (closing time and submission method not stated in this section; refer to main tender document).
Mandatory Part A criteria (all must be met to proceed): certified copy of Trade Tested Electrician certificate (minimum 1); valid DOEL Electrical Contractor registration certificate; certified ORHVREGS certificate (minimum 1); certified LV Authorisation LVOR001 (minimum 1); one LDV owned by company or director (licence disk); one ≥10-ton truck with crane (ownership proof with roadworthy licence copy, or letter of intent from bona fide leasing company); hired vehicles require letter on letterhead from reputable hire company.
Part B quantitative evaluation: minimum 80% score required; failure renders bid non-responsive.
Part B scoring personnel (must be different individuals from mandatory): additional Trade Tested Electrician (10 points); up to 2 additional ORHVREGS Authorisation Outcome 3 holders (5 points each, max 10); up to 2 additional LV Authorisation holders (5 points each, max 10); up to 2 Chain Saw Operator certificates (5 points each, max 10); up to 2 Working from Heights/Fall Arrester certificates (5 points each, max 10). All additional certifications require validation letter from training provider (no letter = zero score).
Required equipment with colour photographic evidence: fibre glass ladders (minimum 13 m); electrician hand toolbox with tools; safety shield, 1000 V rubber gloves, workwear PPE, safety shoes, hard hat (each item photographed); voltage tester (Duspol, up to 1000 V); truck detachable bucket; multi-meter tester; chain saw(s) (minimum 1, maximum 2); staff vehicle (minimum 7-seater, owned with valid licence disc and roadworthy or hired with leasing company letter); additional 2x4 LDV(s) (minimum 1, maximum 2, excluding mandatory LDV, 5 points each, max 10 points).
Enquiry number: E3314DXKZNOUR (contact details not provided in this section; refer to main tender document).
Standard compliance (CSD, tax clearance, B-BBEE, CIDB, CIPC, SBD/MBD forms) not detailed in this section; verify requirements in main tender document.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Friday, 18 September 2026 - 10:00
Venue
MS TEAMS
Categories
Request for Quotation
VARIOUS - KWAZULU NATAL - KWAZULU NATAL -
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Documents being finalised: Example on how to complete a QSE Sworn Affidavit.pdf, Ack. of E Tendering.pdf, Conditions of Tendering.pdf and 2 more. You don’t need to refresh — this page will pick up the updated review automatically.
28 Aug
2026
Tender Published
Tender was published
18 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Annexure C - Tenderer's Particulars (1).pdf
Eskom is procuring the removal of illegal electricity connections in the Central East Cluster of its KwaZulu-Natal Operating Unit, on an 'as and when required' basis for a 36-month period. The tender is open to individual tenderers, joint ventures, and other structures, and requires completion of Annexure C (Tenderer's Particulars) as part of the bid.
BEE_Affidavit-QSE-Gen.pdf
Eskom is procuring the removal of illegal electrical connections in the Central East Cluster of its KwaZulu-Natal operating unit on an as-and-when-required basis for a 36-month contract period.
Annexure G - SBD 6.1 Preference Points Claim Form in terms of The PPR 2022.pdf
Eskom seeks a contractor for the removal of illegal connections in the Central East Cluster, KwaZulu-Natal Operating Unit, on an as-and-when required basis for a period of 36 months.
Annexure H - SBD 4 - Tenderer's Disclosure - 20 April 2026.pdf
Eskom is procuring services for the removal of illegal electrical connections in the Central East Cluster of the KwaZulu-Natal operating unit, on an as-and-when-required basis for 36 months.
Copy of Removal of Illegal Connections BOQ_ (003).pdf
This tender is for the removal of illegal connections in the Central East Cluster of the KwaZulu-Natal Operating Unit, on an as-and-when-required basis over a 36-month period. The work involves labour and transport resources, including electricians, linesmen, semi-skilled and general workers, as well as various vehicles and an aerial device.
Example on how to complete a QSE Sworn Affidavit.pdf
Illegal connections tender evaluation form.pdf
Eskom is procuring the removal of illegal connections in the Central East Cluster - KZN Operating Unit on an 'as and when required' basis for a period of 36 months. The tender requires bidders to submit comprehensive OHS documentation, including a signed OHS legal requirements acknowledgement, an OHS organogram, an OHS plan, a baseline risk assessment, a valid letter of good standing (COID), an OHS policy, proof of training and appointments for key safety roles, medical fitness certificates, a fall protection plan, and a substance abuse procedure or policy.
SECTION 1 COMMERCIAL.pdf
Eskom is procuring a 36-month, as-and-when-required service for the removal of illegal electricity connections in the Central East Cluster of the KZN Operating Unit. The contract will be governed by an NEC 3 Term Service Contract, with tenders due by 10h00 on 18 September 2026.
Removal of illegal connections Contract NEC TSC.pdf
Example on how to complete an EME Sworn Affidavit.pdf
Supplier evaluation pack.pdf
Ack. of E Tendering.pdf
PART 5 - QUALITY.pdf
Analysis completed but response format was invalid
Conditions of Tendering.pdf
240-109253698 CQP Template 2021.pdf
Eskom is procuring the removal of illegal electricity connections in the Central East Cluster of its KZN Operating Unit, on an as-and-when-required basis over a 36-month period. The tender requires bidders to complete a Contract Quality Plan (CQP) using Eskom's template, demonstrating how they will meet quality management requirements throughout the contract.
KEY Elements when completing a Sworn Affidavit.pdf
ESKOM is procuring the removal of illegal connections in the Central East Cluster of KwaZulu-Natal on an as-and-when-required basis over a period of 36 months.
240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP)-rev 3 (003).pdf
Eskom is procuring services for the removal of illegal electricity connections in the Central East Cluster of its KwaZulu-Natal Operating Unit, on an as-and-when-required basis over a 36-month period. The tender is open to bidders who can provide the necessary labour, equipment, and quality control processes for this work.
SHE Specification - Maintenance Contract for Illegal Connections.pdf
Eskom is procuring a contractor to remove illegal electrical connections in the Central East Cluster – KZN Operating Unit on an 'as and when required' basis over a 36-month period. The contractor will disconnect supply, remove all connection material, tag and record removed items, and restore supply to legal customers, working under Eskom-appointed investigators and CNC staff.
Annexure B.pdf
Annexure_D_-_Integrity_Declaration_Form_-_29_July_2026.pdf
SECTION 4 - SAFETY.pdf
BEE_Affidavit-EME-Gen.pdf
2 Invitation to Tender (ITT) illegal connections (003).pdf
Eskom Holdings SOC Ltd is procuring services for the removal of illegal connections in the Central East Cluster - KZN Operating Unit, on an 'as and when required' basis for a period of 36 months. The tender will result in the appointment of three contractors, one per zone (Newcastle, Empangeni, and Pietermaritzburg), with each contractor required to have at least two teams.
Removal of Illegal Connections in EMP, PMB and Newcastle zone Environmental Tender Evaluation and Scoring Card.pdf
Eskom is procuring the removal of illegal connections in the Central East Cluster of its KwaZulu-Natal operating unit, on an 'as and when required' basis for a 36-month period. The work is categorised as medium risk, and bidders must meet specific environmental and safety requirements.
SECTION 6 - ENVIRONMENTAL.pdf
Eskom is procuring services for the removal of illegal connections in the Central East Cluster of the KwaZulu-Natal Operating Unit, on an 'as and when required' basis for a 36-month period, under an NEC 3 Term Services Contract.
240-68099512 Form A_Cat 3_ Removal of Illegal Connections.pdf
A 36-month as-and-when required contract for the removal of illegal connections in the Central East Cluster of Eskom's KwaZulu-Natal operating unit. The tenderer must accept Eskom's supplier quality requirements and ISO 9001 quality management standards.
240-12248652_List of Tender Returnables_Cat 3_ Removal of Illegal Connections.pdf
Eskom is procuring services for the removal of illegal connections in the Central East Cluster of the KwaZulu-Natal Operating Unit, on an as-and-when-required basis over a 36-month period.
Bidders Document - Removal of Illegal connections in 3 zones ie Empangeni Pietermaritzburg and Newcastle .pdf
Eskom is procuring the removal of illegal connections in the Central East Cluster of its KwaZulu-Natal Operating Unit, covering the Empangeni, Pietermaritzburg and Newcastle zones, on an 'as and when required' basis for 36 months. The tender includes specific goals for B-BBEE preference points and SDL&I obligations (transformation, local procurement, jobs, skills development) that become contractual commitments.
BRA 2026_Rev5.pdf
ESKOM is procuring services for the removal of illegal connections in the Central East Cluster of the KwaZulu-Natal Operating Unit, covering the Empangeni, Pietermaritzburg, and Newcastle zones, on an 'as and when required' basis for 36 months. The tender includes a comprehensive occupational health and safety baseline risk assessment that bidders must align with.
Non-Disclosure Agreement (NDA) Vendors Template .pdf
Eskom is procuring services for the removal of illegal connections in the Central East Cluster - KZN Operating Unit on an 'as and when required' basis for a period of 36 months. The tender requires bidders to enter into a Non-Disclosure Agreement (NDA) with Eskom before receiving confidential information related to the project.
Copy of Removal of Illegal Connections BOQ_ (003).xlsx
Removal of illegal electricity connections across the Central East Cluster in the KZN Operating Unit, on an as-and-when-required basis for 36 months, issued by Eskom.
240-105658000 Supplier Quality Management Specification (3).pdf
Eskom is procuring the removal of illegal connections in the Central East Cluster of the KZN Operating Unit on an 'as and when required' basis for a period of 36 months. The tender requires bidders to comply with Eskom's Supplier Quality Management specification (240-105658000, QM 58), which mandates a quality management system conforming to ISO 9001 and submission of quality-related tender returnables.
SDL I Check list_.pdf
This tender is for the removal of illegal connections in the Central East Cluster of the KZN Operating Unit, on an as-and-when-required basis over a 36-month period. Bidders must submit the listed documentation, including the SDL&I Bidder's Document, B-BBEE certificate or sworn affidavit, CIPC registration, identity documents, share certificates, financial statements, and SBD forms.
SECTION 3 - TECHNICAL.pdf
The removal of illegal connections in the Central East Cluster of the KZN Operating Unit on an as-and-when-required basis for a period of 36 months. The technical evaluation is conducted in two parts: mandatory criteria (Part A) and quantitative criteria (Part B). Bidders must meet all Part A criteria and achieve at least 80% in Part B to pass the technical evaluation.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 3 750 000
Range
Based on CIDB grading. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Important Dates
Source: SHE Specification - Maintenance Contract for Illegal Connections.pdf (unknown)No briefing sessions, site visits, or clarification deadlines are mentioned in the document. The only date referenced is the document compilation date of 25 August 2026. The tender record shows a closing date of 18 September 2026 at 10:00.
Contact Information
Source: SHE Specification - Maintenance Contract for Illegal Connections.pdf (unknown)Eskom contacts named in the document:
No email addresses, phone numbers, or submission addresses are provided.
Submission Guidelines
Source: SHE Specification - Maintenance Contract for Illegal Connections.pdf (unknown)No submission guidelines, closing date, submission method, or returnable forms are stated in the SHE specification document. The tender record indicates a closing date of 18 September 2026 at 10:00 and a Request for Quotation type, but the document itself contains no submission instructions.
Evaluation Criteria
Source: SHE Specification - Maintenance Contract for Illegal Connections.pdf (unknown)No evaluation criteria, scoring split, preference point system, or minimum qualifying thresholds are stated in the document. The document sets mandatory eligibility and compliance requirements (see complianceRequirements) but does not describe how bids will be scored or adjudicated.
Technical Specifications
Source: SHE Specification - Maintenance Contract for Illegal Connections.pdf (unknown)Scope of work: Removal of illegal electrical connections in the Central East Cluster, KZN Operating Unit, on an 'as and when required' basis for 36 months.
Key deliverables:
Mandatory personnel requirements:
Methodology
Source: SHE Specification - Maintenance Contract for Illegal Connections.pdf (unknown)Methodology requirements:
Quality Management
Source: SHE Specification - Maintenance Contract for Illegal Connections.pdf (unknown)Quality requirements are embedded in the SHE specification and personnel competency requirements. The Contractor must be registered with the Department of Labour as an Electrical Contractor. The official responsible for inspection and sign-off must hold a wireman's licence. Staff performing work on the Eskom network must be qualified electricians and must have passed Eskom courses at Mersey Training Centre (or Eskom Academy of Learning / approved provider) for ORLVS Regulations, LV Live Work, Prepaid Meters, and Test Instruments, with a completed Portfolio of Evidence (POE) related to their level of authorisation. Staff must be authorised for the specific work area by the Technical Support Department before contract commencement. The principal contractor must develop a SHE plan meeting Eskom's minimum requirements and all applicable legislation. The principal contractor must compile and maintain a SHE file per site compliant with OHS Act and regulations, and hand over a consolidated SHE file (including subcontractors' files) to the Eskom Project Manager on completion. All statutory and non-statutory appointments must be made in writing, with competent persons, and copies kept in SHE files. Organisational organograms must be provided and kept up to date. Resource schedules must align with Task Order employee lists. Construction supervisors must be present during all contracted work and the site-specific file must be approved by the Eskom Safety Officer before work starts. A full- or part-time Construction Safety Officer must be appointed in writing. The principal contractor must ensure all employees and subcontractor employees are trained in health and safety aspects and conversant with work procedures. Disciplinary processes must be followed for transgressions of SHE requirements.
Financial Requirements
Source: SHE Specification - Maintenance Contract for Illegal Connections.pdf (unknown)No pricing format, bonds, guarantees, payment terms, or financial capacity thresholds are stated in the document. The process for Cost Estimate and Purchase Order creation on SAP is described, but no financial requirements for bidders are specified.
Compliance Requirements
Source: SHE Specification - Maintenance Contract for Illegal Connections.pdf (unknown)Mandatory compliance requirements:
Health & Safety
Source: SHE Specification - Maintenance Contract for Illegal Connections.pdf (unknown)Comprehensive health and safety requirements per the Eskom SHE Specification (Unique Identifier 240-73198174, Project KZN 162).
Key obligations:
Environmental
Source: SHE Specification - Maintenance Contract for Illegal Connections.pdf (unknown)Environmental requirements per the Eskom SHE Specification:
Requirements
Source: SHE Specification - Maintenance Contract for Illegal Connections.pdf (unknown)Mandatory requirements for the principal contractor and appointed contractors:
Compliance Requirements
Source: Example on how to complete a QSE Sworn Affidavit.pdf (unknown)Insufficient searchable text - AI extraction recommended
Contact Information
Source: Non-Disclosure Agreement (NDA) Vendors Template .pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"mpany incorporated under the laws of"}
Evaluation Criteria
Source: Non-Disclosure Agreement (NDA) Vendors Template .pdf (unknown)Bidders must be legally incorporated entities with the authority to enter into the NDA. The NDA must be signed by a duly authorised representative. No other eligibility criteria are stated in the provided document.
Technical Specifications
Source: Non-Disclosure Agreement (NDA) Vendors Template .pdf (unknown)The scope is the removal of illegal connections in the Central East Cluster - KZN Operating Unit on an 'as and when required' basis for a period of 36 months.
Contractual Terms
Source: Non-Disclosure Agreement (NDA) Vendors Template .pdf (unknown)The NDA is a confidentiality agreement between Eskom Holdings SOC Ltd and the supplier/tenderer. It governs the disclosure and use of confidential information related to the project. Key obligations include: protecting confidential information with at least a reasonable standard of care, using it only for the project, not disclosing to third parties without consent, returning or destroying materials upon request, and indemnifying Eskom for unauthorized use or disclosure. The agreement commences upon disclosure and endures for 3 years after termination of the relationship. Breach must be remedied within 7 business days of written notice, failing which Eskom may seek legal remedies. The agreement is governed by South African law.
Important Dates
Source: SECTION 3 - TECHNICAL.pdf (unknown)Tender closing date: 18 September 2026. Closing time and any compulsory briefing or site visit dates are not stated in this section; refer to the main tender document.
Contact Information
Source: SECTION 3 - TECHNICAL.pdf (unknown)No SCM or technical contact names, emails, or phone numbers are provided in this section. Enquiry number: E3314DXKZNOUR. Refer to the main tender document for contact details.
Submission Guidelines
Source: SECTION 3 - TECHNICAL.pdf (unknown)Submission details (channel, format, address, closing time) are not provided in the technical section. Bidders must refer to the main tender document for submission instructions.
Returnable documents required with the bid:
Evaluation Criteria
Source: SECTION 3 - TECHNICAL.pdf (unknown)Technical evaluation is conducted in two stages:
Part A – Mandatory Criteria (all must be met to proceed to Part B):
Part B – Quantitative Criteria (minimum 80% required to pass; failure renders the bid non-responsive):
Technical Specifications
Source: SECTION 3 - TECHNICAL.pdf (unknown)Scope: Removal of illegal connections in the Central East Cluster, KZN Operating Unit, on an 'as and when required' basis for 36 months under an NEC Term Services Contract.
Mandatory personnel:
Mandatory vehicles:
Scoring personnel (additional, different individuals from mandatory):
All additional certifications require a validation letter from the training service provider.
Required equipment and tools (colour photographic evidence required):
Methodology
Source: SECTION 3 - TECHNICAL.pdf (unknown)Equipment and tools required for execution (all require colour photographic evidence):
Experience & Qualifications
Source: SECTION 3 - TECHNICAL.pdf (unknown)Personnel qualifications:
Compliance Requirements
Source: SECTION 3 - TECHNICAL.pdf (unknown)Mandatory compliance documents:
Standard forms (SBD/MBD) and general compliance (CSD registration, tax clearance, B-BBEE, CIDB, CIPC) are not mentioned in this section; refer to the main tender document.
Health & Safety
Source: SECTION 3 - TECHNICAL.pdfHealth and safety requirements (evidenced by certification and photographic proof):
Requirements
Source: SECTION 3 - TECHNICAL.pdf (unknown)Mandatory requirements (Part A):
Scoring requirements (Part B, minimum 80% to pass):
Section
Source: SECTION 3 - TECHNICAL.pdfTechnical evaluation in two parts:
Part A – Mandatory Criteria (all must be satisfied):
Part B – Quantitative Criteria (minimum 80% score required):
Important Dates
Source: Annexure H - SBD 4 - Tenderer's Disclosure - 20 April 2026.pdf (RFP)Closing date and time: 18 September 2026 at 10:00 (from the tender record).
The date "21 February 2025" appearing in the form header is the form template effective date, not the tender closing date.
No compulsory briefing or site visit is mentioned in the extracted text.
Contact Information
Source: Annexure H - SBD 4 - Tenderer's Disclosure - 20 April 2026.pdf (RFP)Fraud and corruption reporting (not a tender enquiry channel):
No SCM or technical contact names, enquiry emails, phone numbers, or physical submission address are provided in the extracted text. Those details will be in the invitation to tender or the main tender document.
Submission Guidelines
Source: Annexure H - SBD 4 - Tenderer's Disclosure - 20 April 2026.pdf (RFP)Returnable forms — all must be completed, signed and submitted with the tender:
Disqualification risks:
Evaluation Criteria
Source: Annexure H - SBD 4 - Tenderer's Disclosure - 20 April 2026.pdf (RFP)The document provided is the SBD 4 disclosure form only. It does not contain the evaluation methodology, price/preference split (80/20 or 90/10), functionality criteria, minimum qualifying scores, or any technical evaluation stages. Those details will be in the main tender document and the invitation to tender.
Technical Specifications
Source: Annexure H - SBD 4 - Tenderer's Disclosure - 20 April 2026.pdf (RFP)Supply chain management system should this
Declaration prove to be false.
.............................. .....................................................
Signature Date
.............................. ......................................................
Position Name of bidder
Controlled Disclosure
Anonymously report fraud, corruption a
Compliance Requirements
Source: Annexure H - SBD 4 - Tenderer's Disclosure - 20 April 2026.pdf (RFP)Mandatory compliance items inferred from the SBD 4 declaration and standard Eskom practice:
Important Dates
Source: Ack. of E Tendering.pdf (unknown)Closing date and time: 18 September 2026 at 10:00. Submission method and address not stated in the available text.
Technical Specifications
Source: Ack. of E Tendering.pdf (unknown)Scope: Removal of illegal electrical connections in the Central East Cluster, KwaZulu-Natal Operating Unit, on an 'as and when required' basis. Contract period: 36 months.
Technical Specifications
Source: Annexure B.pdf (unknown)appointment of contractors or suppliers for the commencement
of work
Compliance Requirements
Source: Annexure B.pdf (unknown)OHS compliance requirements for the contract:
a. Eskom Contractor Health and Safety Requirements Standards (32-136)
b. OHS specification/requirements provided by Eskom
c. Occupational Health and Safety Act
d. Compensation for Occupational Diseases and Illnesses Act
e. Plant Safety Regulations
f. Eskom Vehicle Safety Specification (32-345)
g. Eskom Occupational Health and Safety Incident Management Procedure (32-95)
Health & Safety
Source: Annexure B.pdfOHS legal and other requirements (Annexure B, Effective Date May 2021):
a. Eskom Contractor Health and Safety Requirements Standards (32-136)
b. OHS specification/requirements provided by Eskom
c. Occupational Health and Safety Act
d. Compensation for Occupational Diseases and Illnesses Act
e. Plant Safety Regulations
f. Eskom Vehicle Safety Specification (32-345)
g. Eskom Occupational Health and Safety Incident Management Procedure (32-95)
Important Dates
Source: BEE_Affidavit-EME-Gen.pdf (unknown){"closingDate":"27 April 1994"}
Contact Information
Source: BEE_Affidavit-EME-Gen.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"t on its behalf"}
Compliance Requirements
Source: BEE_Affidavit-EME-Gen.pdf (unknown)B-BBEE Exempted Micro Enterprise (EME) sworn affidavit required. The affidavit declares annual total revenue of R10 million or less, black ownership percentage, black female ownership percentage, black designated group ownership percentage with breakdown (youth, disabled, unemployed, rural, military veterans), and B-BBEE level contributor (Level 1 for 100% black owned, Level 2 for at least 51% black owned, Level 4 for less than 51% black owned). Affidavit valid for 12 months from date signed by commissioner of oaths.
Important Dates
Source: Conditions of Tendering.pdf (unknown)Closing date: 2026-09-18 at 10:00 (local time).
Submission Guidelines
Source: Conditions of Tendering.pdf (unknown)Returnable documents: none specified in the available document text.
Description
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP)-rev 3 (003).pdf (unknown)Quality Control Plan / Inspection and Test Plan (QCP/ITP) template for the removal of illegal connections in the Central East Cluster, KZN Operating Unit. Defines approval workflow, intervention points, inspection/test methods, acceptance criteria, and record-keeping requirements. Document identifier 240-109253302 Rev 3, effective August 2025, review August 2030. Uncontrolled when downloaded; user must verify against authorised version on Eskom document management system.
Evaluation Criteria
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP)-rev 3 (003).pdf (unknown)Bidders must be able to provide a QCP/ITP that meets Eskom's quality control requirements. The document does not specify additional eligibility criteria such as CSD registration, tax clearance, B-BBEE level, CIDB grading, or financial thresholds.
Technical Specifications
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP)-rev 3 (003).pdf (unknown)Quality Control Plan / Inspection and Test Plan (QCP/ITP) requirements for the removal of illegal connections in the Central East Cluster:
Quality Management
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP)-rev 3 (003).pdf (unknown)Quality management requirements per QCP/ITP template:
Compliance Requirements
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP)-rev 3 (003).pdf (unknown)No specific requirements found
Section
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP)-rev 3 (003).pdf (unknown)Evaluation will consider the bidder's ability to provide a QCP/ITP meeting Eskom's quality control requirements, including defined inspection and test methods (Visual, Microscopy, NDT, Liquid/Dye Penetrant, Magnetic Particle, Eddy Current, etc.) and acceptance criteria (Functionality requirements, Performance Measures, Regulatory Compliance, Chemical tests, etc.).
Important Dates
Source: 240-109253698 CQP Template 2021.pdf (unknown){"closingDate":"01 April 2021"}
Contact Information
Source: 240-109253698 CQP Template 2021.pdf (unknown){"name":null,"email":null,"phone":null,"department":"ies.","address":null}
Evaluation Criteria
Source: 240-109253698 CQP Template 2021.pdf (unknown)No eligibility or pre-qualification criteria are stated in the provided document. Bidders must complete the Contract Quality Plan template, which is a mandatory returnable. The document does not specify CSD registration, tax clearance, B-BBEE level, CIDB grading, or other standard Eskom requirements.
Technical Specifications
Source: 240-109253698 CQP Template 2021.pdf (unknown)The Contract Quality Plan template requires the supplier to define the scope of work across categories: Design, Manufacturing, Supply and Delivery/Transportation, Construction/Installation/Maintenance, Commissioning, Professional services, and Other. Communication channels for quality issues must be established, including emails, minutes of meetings, fixed contract meetings, and weekly progress meetings. An organogram showing QA/QC functions, personnel roles, responsibilities, qualifications, and work verification responsibilities is required. An index of interfacing documents (processes, standards, codes, specifications, work instructions, policies, procedures, drawings) must be provided. A list of suppliers and sub-suppliers for materials/components and outsourced activities with selection criteria is required. Monitoring of suppliers/contractors via inspection reports, surveillance/audit reports, inspection plans, and material verification checklists must be described. Interface of sub-suppliers with the supplier's QMS must be detailed. An index of items manufactured, refurbished, or purchased with descriptions, production schedules, and in-house/outsource status is required. Items/activities requiring QCP/ITP (offsite and onsite) must be identified. Scope areas requiring special controls per manufacturing/fabrication codes (e.g., welding, NDT/NDE) with QC activities must be described. Documented information submission schedule: pre-commencement (QCP/ITP from suppliers, certificates of compliance, index of ITP/QCP/PQP, databook index, risk register, offsite/offshore inspections); during and at completion (method statements/safe working procedures/PQRs/repair procedures, QCP/ITP/PQP, final databook, quality manual, quality policy, risk register, audit findings registers, consolidated inspection registers, monthly inspection analysis reports, updated procedure registers, NC/defect/punch item registers, databook status registers, inspection rejection rate). Record control and retention system with indexing and cross-referencing must be established. Concession and non-conformance management processes (concession, defects/repair/rework, inspection management) must be described. Databook management process with review, acceptance, and purchase orders for quality-critical items is required. Management of working tools/equipment with calibration/maintenance/test status must be listed. Customer property handling per ISO 9001 must be described. Product preservation process flow (identification, handling, contamination control, packaging, storage, transportation, protection) is required. Identification and traceability methods for statutory/regulatory requirements must be indicated. Commissioning and post-delivery activities (warranty period/conditions, customer satisfaction measurement, technical support, defect correction period/retention funds) must be addressed.
Methodology
Source: 240-109253698 CQP Template 2021.pdf (unknown)Method statements, safe working procedures, PQRs, and repair procedures must be submitted to Eskom during and at completion of the contract. Audit findings registers, updated procedure registers (PQRs, method statements, repair procedures), NC/defect/punch item registers with analysis reports, and databook status registers with monthly analysis reports (milestone-based) are required as documented information.
Experience & Qualifications
Source: 240-109253698 CQP Template 2021.pdf (unknown)The organogram must include team members' responsibilities and qualifications necessary to fulfil stated duties, with work verification responsibilities (who carries out a task and who checks the work). The index of interfacing documents must list supplier's core processes, work instructions, processes, policies, procedures, industry standards, specifications, and drawings applicable to the scope of work.
Quality Management
Source: 240-109253698 CQP Template 2021.pdf (unknown)The Contract Quality Plan template is based on SANS 466:2005 Edition 1 / ISO 10005:2005 Edition 2 guidelines. It requires definitions of Quality Management System, Quality Plan, Quality Assurance, Quality Control, Supplier, Sub-suppliers, Subcontractor, Quality Objectives, Quality Policy, Risk Management, Documented Information, and Method Statements. The plan must cover scope of work categories, communication channels, organogram with QA/QC functions, interfacing documents index, supplier/sub-supplier lists with selection criteria, supplier monitoring methods, sub-supplier QMS interface, manufactured/refurbished/purchased items index, QCP/ITP requirements for offsite/onsite activities, special controls per manufacturing/fabrication codes, documented information submission schedule (pre-commencement and during/completion), record control and retention, concession and non-conformance management, databook management, tools/equipment management with calibration status, customer property handling per ISO 9001, product preservation, identification and traceability, and commissioning/post-delivery activities.
Compliance Requirements
Source: 240-109253698 CQP Template 2021.pdf (unknown)The Contract Quality Plan template references compliance with SANS 466:2005 Edition 1 / ISO 10005:2005 Edition 2 guidelines for quality plans. Quality management system must align with ISO 9001 requirements for customer property handling. Statutory and regulatory requirements for identification and traceability must be met. Post-delivery activities must consider statutory, regulatory, and scope of work requirements.
Health & Safety
Source: 240-109253698 CQP Template 2021.pdf (unknown)Method statements must describe in a logical sequence how a job is to be carried out in a safe manner without risks to health/safety, including all risks identified in the risk assessment and measures to control those risks. This allows the job to be properly planned and resourced.
Contractual Terms
Source: 240-109253698 CQP Template 2021.pdf (unknown)Commissioning and post-delivery activities must address warranty period and conditions, customer satisfaction measurement, technical support, and defect correction period/retention funds. These must consider statutory, regulatory, and scope of work requirements.
Important Dates
Source: Annexure C - Tenderer's Particulars (1).pdf (TENDER)Document effective date: 21 February 2025. Document review date: February 2030. Tender closing date and time are not stated in this document; refer to the main tender invitation (reference E3314DXKZNOUR, closing 18 September 2026 at 10:00). No compulsory briefing or site visit dates are mentioned.
Contact Information
Source: Annexure C - Tenderer's Particulars (1).pdf (TENDER)Fraud and corruption reporting (not a tender enquiry channel):
No SCM or technical contacts, submission address, or tender enquiry details are provided in this document.
Submission Guidelines
Source: Annexure C - Tenderer's Particulars (1).pdf (TENDER)Returnable document: Annexure C – Tenderer's Particulars must be completed, signed and submitted with the tender. It requires:
Submission method and address are not stated in this document; refer to the main tender invitation.
Returnable Documents
Source: Annexure C - Tenderer's Particulars (1).pdf (TENDER)Annexure C – Tenderer's Particulars is the sole returnable document in this extract. It must be fully completed and signed. It captures:
Evaluation Criteria
Source: Annexure C - Tenderer's Particulars (1).pdf (TENDER)No evaluation criteria, scoring methodology, price/preference split, or minimum qualifying thresholds are stated in this document. The document only collects tenderer particulars and compliance declarations.
Compliance Requirements
Source: Annexure C - Tenderer's Particulars (1).pdf (TENDER)Mandatory compliance items:
Description
Source: PART 5 - QUALITY.pdf (TENDER)Scope: The removal of illegal connections in the Central East Cluster - KZN Operating Unit on an 'as and when required' basis for 36 months. Enquiry number: E3314DXKZNOUR. Supplier Quality Unique Identifier: 240-12248652. Specification: 240-105658000. Category 3: Deliverables to be evaluated indicator = 1.
Important Dates
Source: PART 5 - QUALITY.pdf (TENDER)Closing date: 18 September 2026 at 10h00.
Contact Information
Source: PART 5 - QUALITY.pdf (TENDER){"name":null,"email":"[email protected]","phone":null,"department":"on an 'as and when required' basis for a","address":null}
Evaluation Criteria
Source: PART 5 - QUALITY.pdf (TENDER)Quality evaluation is based on compliance with the Quality Management System requirements detailed in Part 5. Sections A to E are scored with a total of 10 points: Section A (QMS Manual and related documents) – 5 points, Section B (Evidence of QMS in operation) – 2 points, Section C (Draft Contract Quality Plan) – 1 point, Section D (Quality Control Plan / ITP) – 1 point, Section E (Form A completed and signed) – 1 point.
Quality Management
Source: PART 5 - QUALITY.pdf (TENDER)Summary of quality requirements: Bidders must submit a documented QMS (not necessarily certified) complying with ISO 9001:2015, including a QMS manual, quality policy, document control, nonconformity and corrective action, internal audit, organization chart, responsibility matrix, control of externally provided processes, a draft Contract Quality Plan, a draft ITP or QCP, and completed Form A. These are evaluated and scored.
Compliance Requirements
Source: PART 5 - QUALITY.pdf (TENDER)Bidders must demonstrate a documented Quality Management System that complies with ISO 9001:2015, including:
This is a Category 3 deliverable to be evaluated.
Section
Source: PART 5 - QUALITY.pdf (TENDER)Quality evaluation criteria: The tenderer's quality management system is scored across five sections (A to E) with a total of 10 points. Section A (QMS Manual and related documents) – 5 points. Section B (Evidence of QMS in operation) – 2 points. Section C (Draft Contract Quality Plan) – 1 point. Section D (Quality Control Plan / ITP) – 1 point. Section E (Form A completed and signed) – 1 point.
Description
Source: Bidders Document - Removal of Illegal connections in 3 zones ie Empangeni Pietermaritzburg and Newcastle .pdf (unknown)The tender is for the removal of illegal connections in three zones: Empangeni, Pietermaritzburg, and Newcastle, within the KZN Operating Unit, on an 'as and when required' basis for 36 months. No further scope details are provided.
Important Dates
Source: Bidders Document - Removal of Illegal connections in 3 zones ie Empangeni Pietermaritzburg and Newcastle .pdf (unknown)Closing date: 18 September 2026 at 10:00 (as per tender record). No other dates (briefings, site visits, clarification deadlines) are stated in the document.
Contact Information
Source: Bidders Document - Removal of Illegal connections in 3 zones ie Empangeni Pietermaritzburg and Newcastle .pdf (unknown)No specific contact names, emails, or phone numbers are provided in the document. The business unit is KwaZulu-Natal Operating Unit (Eskom).
Submission Guidelines
Source: Bidders Document - Removal of Illegal connections in 3 zones ie Empangeni Pietermaritzburg and Newcastle .pdf (unknown)Returnable forms and documents must be completed, signed and submitted with the quotation. Required documents include: a valid B-BBEE certificate (SANAS-accredited, or sworn affidavit for EMEs with revenue ≤ R10m, or CIPC-issued certificate for EMEs, or joint venture certificate), proof of ownership/shareholding (CIPC registration with shareholding breakdown), ID copies of shareholders/owners, and proof of disability where applicable. Supporting documents may be requested during evaluation. The tender document must be filled and signed. Failure to provide preference point documentation does not disqualify but limits scoring to price only.
Evaluation Criteria
Source: Bidders Document - Removal of Illegal connections in 3 zones ie Empangeni Pietermaritzburg and Newcastle .pdf (unknown)Evaluation uses the 80/20 preference point system (price 80 points, specific goals 20 points) or the 90/10 system (price 90 points, specific goals 10 points) depending on the tender value. Specific goals points are awarded based on B-BBEE status level: Level 1 = 20 points (80/20) or 10 points (90/10); Level 2 = 18 or 9; Level 3 = 14 or 6; Level 4 = 12 or 5; Level 5 = 8 or 4; Level 6 = 6 or 3; Level 7 = 4 or 2; Level 8 = 2 or 1; Non-compliant = 0. The contract is awarded to the tenderer scoring the highest total points. Objective criteria (designated sectors, CIDB skills development, NIPP, mandatory subcontracting) are all marked 'Not Applicable'.
Technical Specifications
Source: Bidders Document - Removal of Illegal connections in 3 zones ie Empangeni Pietermaritzburg and Newcastle .pdf (unknown)Scope of work: Removal of illegal connections in three zones: Empangeni, Pietermaritzburg, and Newcastle, within the KZN Operating Unit. The work is on an 'as and when required' basis for a period of 36 months. No quantities, standards, or service levels are specified in the document.
Methodology
Source: Bidders Document - Removal of Illegal connections in 3 zones ie Empangeni Pietermaritzburg and Newcastle .pdf (unknown)No specific methodology or execution plan is required in the document. The content provided relates to skills development obligations, not methodology.
Pricing Schedule
Source: Bidders Document - Removal of Illegal connections in 3 zones ie Empangeni Pietermaritzburg and Newcastle .pdf (unknown)Pricing must be submitted in the Price Schedule included with the tender documents. For contracts with a combination of local and imported goods/services, the tender response must be separated into components as per the Price Schedule. Local procurement content is total spending minus the imported component.
Financial Requirements
Source: Bidders Document - Removal of Illegal connections in 3 zones ie Empangeni Pietermaritzburg and Newcastle .pdf (unknown)Pricing must be submitted in the Price Schedule included with the tender documents. For contracts involving a combination of local and imported goods/services, the tender response must be separated into components as per the Price Schedule. Local procurement content is total spending minus the imported component. SDL&I obligations: Eskom will retain 2.5% of every invoice (excluding VAT) as security for fulfilment of SDL&I obligations; a penalty of 2.5% of contract value applies for failure to meet SDL&I obligations. Retained amounts are released upon receipt of SDL&I progress reports, fulfilment of all SDL&I obligations, and submission of an approved compliance report.
Compliance Requirements
Source: Bidders Document - Removal of Illegal connections in 3 zones ie Empangeni Pietermaritzburg and Newcastle .pdf (unknown)B-BBEE: A valid B-BBEE certificate or sworn affidavit is a condition for contract award. EMEs (revenue ≤ R10m) may submit a sworn affidavit; QSEs (revenue ≤ R50m) must comply with QSE scorecard elements unless at least 51% black owned, in which case a sworn affidavit is acceptable; entities with revenue above R50m must submit a valid B-BBEE certificate. Sworn affidavits must meet validity requirements (e.g., deponent details, designation, enterprise registration, black ownership percentages, total revenue, financial year end, B-BBEE status level, empowering supplier status, signatures and commissioner of oath).
CIPC: Proof of ownership/shareholding (CIPC registration documentation) inclusive of shareholding breakdown is required.
Designated sectors, CIDB skills development, NIPP, and mandatory subcontracting are all 'Not Applicable'.
Health & Safety
Source: Bidders Document - Removal of Illegal connections in 3 zones ie Empangeni Pietermaritzburg and Newcastle .pdf (unknown)No health and safety requirements are stated in the document. The content provided relates to B-BBEE sworn affidavit validity requirements, not health and safety.
Section
Source: Bidders Document - Removal of Illegal connections in 3 zones ie Empangeni Pietermaritzburg and Newcastle .pdf (unknown)Specific goals: A maximum of 20 points may be awarded for specific goals (B-BBEE status level). Points for specific goals are added to price points, and the total is rounded to two decimal places. The contract is awarded to the highest scoring tenderer. B-BBEE points table: Level 1 = 20 (80/20) or 10 (90/10); Level 2 = 18 or 9; Level 3 = 14 or 6; Level 4 = 12 or 5; Level 5 = 8 or 4; Level 6 = 6 or 3; Level 7 = 4 or 2; Level 8 = 2 or 1; Non-compliant = 0. Tenderers failing to provide preference point documentation may only score price points (out of 90/80) and 0 for specific goals.
Briefing Session
Source: 2 Invitation to Tender (ITT) illegal connections (003).pdf (TENDER)A non-compulsory clarification meeting will be held on 4 September 2026 at 09h00 AM via Microsoft Teams. The meeting will include a presentation to assist service providers in complying with Eskom's tender requirements. Technical requirements will be discussed; site visits can be arranged with a Technical Representative upon request. Tenderers must confirm attendance with the Eskom Representative, stating name, position, and contact details of each attendee. Meeting link: https://teams.microsoft.com/meet/340978080718411?p=6E2hsaIdyeWaPLfgLB, Meeting ID: 340 978 080 718 411, Passcode: xs9Fq3wE, Phone conference ID: 739 000 821#.
Contact Information
Source: 2 Invitation to Tender (ITT) illegal connections (003).pdf (TENDER)Eskom Representative: Anita Rickhoff
Tel: 031 710 5436
Email: [email protected]
All queries and clarifications must be addressed in writing to the Eskom Representative. Clarification answers published on Eskom Tender Bulletin and National Treasury e-Tender Portal.
Submission Guidelines
Source: 2 Invitation to Tender (ITT) illegal connections (003).pdf (TENDER)Submit electronically via Eskom e-Tendering site (https://eTendering.eskom.co.za) before closing date and time. No hard copies accepted. Upload documents under folders: Technical, Commercial, and other. Max upload size per document 500 MB, total submission 4 GB. No zip/condensed files. If resubmitting, only the latest version is accepted. Ensure submission status is marked complete. Late tenders will not be accepted. Required returnable forms (must be completed, signed, and submitted):
Disqualification risks:
Returnable Documents
Source: 2 Invitation to Tender (ITT) illegal connections (003).pdf (TENDER)Mandatory returnables required at tender closing (disqualifiable if not submitted): meet eligibility criteria, electronic submission via Eskom e-tendering, price list priced in entirety (PDF mandatory, Excel optional), acceptance of NEC3 Term Service Contract terms. Commercial mandatory returnables (non-disqualifiable, 5 working days to correct): Authorisation form (Annex A), Acknowledgement form (Annex B), Tenderer's particulars (Annex C), Integrity Declaration form (Annex D), SBD1 (Annex E), SBD 6.1 (Annex F), SBD 4 (Annex G), E-tendering acknowledgement form. Required prior to contract award: CSD registration. Also required: Technical Criteria, JV/consortium documents if applicable, tax clearance certificates for certain suppliers, Employment Equity report for designated employers, completed NEC3 Term Services Contract, and skills development returnables.
Evaluation Criteria
Source: 2 Invitation to Tender (ITT) illegal connections (003).pdf (TENDER)Evaluation stages:
Functionality:
Price and Preference:
Technical Specifications
Source: 2 Invitation to Tender (ITT) illegal connections (003).pdf (TENDER)Scope: Removal of illegal connections in the Central East Cluster - KZN Operating Unit on an 'as and when required' basis for 36 months.
Appointment: 3 contractors, one per zone: Newcastle, Empangeni, Pietermaritzburg.
Each contractor must have a minimum of 2 teams (2 authorised persons, 1 per team) with LV/HV Regs per zone.
Mandatory technical criteria (Part A):
Part B quantitative criteria (additional points):
Transport costs paid only in excess of 60km round trip from Home Centre.
Methodology
Source: 2 Invitation to Tender (ITT) illegal connections (003).pdf (TENDER)Methodology: The 80/20 preference points scoring will be used to evaluate responsive submissions. Evaluation steps: Step 1 Basic Compliance/Commercial, Step 2 Functionality, Step 3 Price and Preference, Step 4 Drawing of lots (if applicable), Step 5 Contractual Requirements. Skills development: Successful suppliers must deliver on 1 skill (ORHVS Training, N3 Electrical Engineering, SAMTRAC Training) for every R3,000,000 invoiced to Eskom. Skills development candidates must be from KwaZulu-Natal and representative of South African population demographics. Tenderers bear full cost of skills development; Eskom makes no financial contribution. Tenderers may approach SETAs for grants and SARS for tax rebates.
Quality Management
Source: 2 Invitation to Tender (ITT) illegal connections (003).pdf (TENDER)Quality management requirements: Category 3 deliverables to be evaluated, quality indicator = 1. Quality documents must be submitted and satisfy minimum requirements to score 1; otherwise score 0.
Pricing Schedule
Source: 2 Invitation to Tender (ITT) illegal connections (003).pdf (TENDER)Three price lists are issued, one per zone. Tenderers must price all activities in the price schedule; partial bids will not be considered. Failure to price all line activities results in disqualification. Price list must be submitted in PDF format (mandatory) and Excel format (optional). Transport costs will only be paid in excess of a 60km round trip from the Home Centre.
Financial Requirements
Source: 2 Invitation to Tender (ITT) illegal connections (003).pdf (TENDER)Pricing format: Three price lists issued, one per zone. Tenderers must price all activities in the price schedule; partial bids not considered. Failure to price all line activities results in disqualification. Price list must be submitted in PDF (mandatory) and Excel (optional).
Price evaluation: Inclusive of VAT, corrected for arithmetical errors, excluding contingencies, adjusted for variations, NPV comparison, unconditional discounts considered, conditional discounts applied at payment.
Payment terms: For contracts valued below R50M including VAT, Eskom pays within 30 days of receipt of undisputed invoices. For contracts valued above R50M including VAT, Eskom pays within 60 days.
No bonds or guarantees specified.
Compliance Requirements
Source: 2 Invitation to Tender (ITT) illegal connections (003).pdf (TENDER)CSD Registration: Valid CSD (MAAA......) number required prior to contract award.
Tax: Tax Evaluation questionnaire to determine if company/CC/Trust is a personal service provider for PAYE (refer to commercial folder).
B-BBEE: SBD 6.1 Preference Points Claim Form (Annex F) required. Valid BBBEE certificate from SANAS accredited agency, sworn affidavit, or CIPC certificate for EMEs. For JVs, certificate in JV name.
Eligibility: Must not be under restriction to do business with Eskom or State-Owned Companies. Ineligible if: nationality of country on international sanctions list; submitting more than one tender (except e-tendering size limits); JV/consortium agreement lacking joint and several liability; conflict of interest; tender signed by non-authorized persons; restricted by National Treasury; on Tender Defaulters list; restricted by Eskom; subcontracting 100% of scope.
Safety: High risk category tender returnables (see health_safety section).
Quality: Quality documents per ISO 9001 requirements (see quality_management section).
Environmental: Environmental policy and documents as per scope.
B-BBEE Requirements
Source: 2 Invitation to Tender (ITT) illegal connections (003).pdf (TENDER)Preference points: B-BBEE status level of contributor points under 80/20 system: Level 1=20, 2=18, 3=14, 4=12, 5=8, 6=6, 7=4, 8=2, Non-compliant=0. Documents required to claim preference points: valid BBBEE certificate from SANAS accredited agency, sworn affidavit, or CIPC certificate for EMEs; for JVs, certificate in JV name. Supporting documents may be requested: proof of ownership/shareholding, ID copies of shareholders, proof of disability. Failure to submit evidence results in 0 points for specific goals but not disqualification.
Health & Safety
Source: 2 Invitation to Tender (ITT) illegal connections (003).pdf (TENDER)Safety high risk category tender returnables: signed acknowledgement of Eskom's OHS legal requirements (Annexure B) by CEO/MD and 2 witnesses; OH&S organogram with names and appointment references approved by CEO/MD; OHS plan addressing project risks aligned with SHE specification, signed by CEO/MD with next review date; Baseline Risk Assessment including driving, with methodology and risk matrix, signed by CEO/Director; valid Letter of Good Standing (COID) stating relevant services; OHS policy signed by CEO complying with OHS Act Section 7; OHS competency training certificates and appointment letters for various roles (Section 17 rep, First Aid, Fire fighters, Risk Assessor, Construction Supervisor, Safety Officer, Fall Protection planner, Fall Rescuer, Incident Investigator, Competent person for Excavation); Medical Fitness Certificates (minimum 3); Fall Protection Plan with rescue plan and fall risks; Substance Abuse Procedure/Policy signed by CEO/MD; Costing for Health and Safety management broken down, not lump sum.
Environmental
Source: 2 Invitation to Tender (ITT) illegal connections (003).pdf (TENDER)Environmental requirements (documents that may be required as per scope of work):
Contractual Terms
Source: 2 Invitation to Tender (ITT) illegal connections (003).pdf (TENDER)Contractual requirements: Recommended contractors must meet contractual requirements; if not, they have 7 working days to correct shortcomings. Failure results in being deemed unacceptable. Conditions of contract will be NEC3 Term Services Contract. The contract is an 'as and when' contract, low risk, contractors not required to supply material, only labour. Subcontracting with subsidiaries must be declared to avoid fronting interpretation.
Requirements
Source: 2 Invitation to Tender (ITT) illegal connections (003).pdf (TENDER)Eligibility criteria: Tenderers must not be under any restriction to do business with Eskom or State-Owned Companies. Ineligible if: (1) nationality of a country on international sanctions list; (2) submitting more than one tender individually or as a JV partner (except e-tendering size limits); (3) JV/consortium agreement does not state joint and several liability; (4) conflict of interest (e.g., common controlling partner, access to other tenderer's information); (5) tender signed by non-authorized persons; (6) restricted by National Treasury; (7) on Tender Defaulters list; (8) restricted by Eskom; (9) subcontracting 100% of scope. Tenderers must meet all mandatory technical criteria: proof of Electrician (Trade Tested) minimum 1, valid company registration with DOEL, valid ORHVREGS minimum 1, valid LV Authorisation minimum 1, and vehicles (1 x LDV and 1 x 10-ton truck with crane).
Section
Source: 2 Invitation to Tender (ITT) illegal connections (003).pdf (TENDER)Evaluation steps: Step 1 Basic Compliance/Commercial, Step 2 Functionality, Step 3 Price and Preference, Step 4 Drawing of lots (if applicable), Step 5 Contractual Requirements. Functionality: Technical evaluation in two parts. Part A mandatory criteria (must meet all to proceed). Part B quantitative criteria, minimum qualifying score 80%. Price scored out of 80 points, Specific Goals out of 20 points under 80/20 system. Price evaluation: inclusive of VAT, corrected for arithmetical errors, excluding contingencies, adjusted for variations, NPV comparison, unconditional discounts considered, conditional discounts applied at payment. Specific goals: B-BBEE status level points (Level 1=20, 2=18, 3=14, 4=12, 5=8, 6=6, 7=4, 8=2, non-compliant=0). Deadlock broken by highest specific goals points, then drawing of lots. Ranking by total points from highest to lowest.
Contact Information
Source: Removal of Illegal Connections in EMP, PMB and Newcastle zone Environmental Tender Evaluation and Scoring Card.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"ed and a copy"}
Submission Guidelines
Source: Removal of Illegal Connections in EMP, PMB and Newcastle zone Environmental Tender Evaluation and Scoring Card.pdf (unknown)Returnable documents: signed Annexure B (acknowledgement of Eskom's SHE rules and requirements) must be attached to the tender submission. The Environmental Management Plan, signed Environmental/SHE/SHEQ policy, and ISO 14001 certificate (if applicable) must also be submitted. Failure to submit any required document, or submitting a document that does not meet minimum requirements, results in a score of 0 and the tender being marked 'Not Approved'.
Evaluation Criteria
Source: Removal of Illegal Connections in EMP, PMB and Newcastle zone Environmental Tender Evaluation and Scoring Card.pdf (unknown)Evaluation is a pre-requisite pass/fail on medium-risk environmental and safety criteria. Each required document is scored 0 or 1: 0 if not submitted or does not satisfy minimum requirements, 1 if submitted and content satisfies minimum requirements. The tender is approved only if all pre-requisites are met. No price/functionality split is stated in this document.
Technical Specifications
Source: Removal of Illegal Connections in EMP, PMB and Newcastle zone Environmental Tender Evaluation and Scoring Card.pdf (unknown)Scope: removal of illegal connections in the Central East Cluster (EMP, PMB and Newcastle zones) of the KZN Operating Unit, on an 'as and when required' basis for 36 months. The work is classified as medium risk. No quantities or service levels are stated in this document.
Compliance Requirements
Source: Removal of Illegal Connections in EMP, PMB and Newcastle zone Environmental Tender Evaluation and Scoring Card.pdf (unknown)Mandatory documents: signed Annexure B (acknowledgement of Eskom's SHE rules and requirements). Environmental Management Plan covering waste management (reduction, re-use, recycling, disposal), environmental induction, environmental incident management, and emergency planning for environmental incidents. Environmental (or SHE/SHEQ) policy signed by Company Owner/CEO/MD, committing to compliance with environmental compliance obligations and environmental duty of care. ISO 14001 Environmental Management Standard certificate (alternative to the above environmental documents).
Health & Safety
Source: Removal of Illegal Connections in EMP, PMB and Newcastle zone Environmental Tender Evaluation and Scoring Card.pdf (unknown)Mandatory: signed Annexure B acknowledging Eskom's SHE rules and requirements. The Environmental Management Plan must address waste management (reduction, re-use, recycling, disposal), environmental induction, environmental incident management, and emergency planning for environmental incidents. An Environmental (or SHE/SHEQ) policy signed by the Company Owner/CEO/MD is required, committing to compliance with environmental compliance obligations and environmental duty of care.
Contact Information
Source: 240-12248652_List of Tender Returnables_Cat 3_ Removal of Illegal Connections.pdf (TENDER)Eskom representative: Noxolo Mngadi (named on the returnables list). No email or phone provided.
Submission Guidelines
Source: 240-12248652_List of Tender Returnables_Cat 3_ Removal of Illegal Connections.pdf (TENDER)Returnable documents: Form A must be completed and signed. The tender returnables list also requires quality management documentation as detailed in the quality sections. Bids must be submitted by the closing date and time; late submissions are disqualified.
Evaluation Criteria
Source: 240-12248652_List of Tender Returnables_Cat 3_ Removal of Illegal Connections.pdf (TENDER)Quality requirements are evaluated as pass/fail with a score of 1 per applicable section. Sections A–E must be met. Section A: QMS documentation (ISO 9001:2015) – score option 2, total 5. Section B: Evidence of QMS in operation – score 2. Section C: Draft Contract Quality Plan – score 1. Section D: Quality Control Plan/ITP – score 1. Section E: Form A completed and signed – score 1. No price/functionality split or preference point system is stated in the provided document.
Technical Specifications
Source: 240-12248652_List of Tender Returnables_Cat 3_ Removal of Illegal Connections.pdf (TENDER)Scope: removal of illegal connections in the Central East Cluster – KZN Operating Unit, on an 'as and when required' basis for 36 months. Quality deliverables include: documented QMS (ISO 9001:2015), organization chart and responsibility matrix, control of externally provided processes, draft contract quality plan, and quality control plan/inspection and test plan (ITP) for similar work.
Quality Management
Source: 240-12248652_List of Tender Returnables_Cat 3_ Removal of Illegal Connections.pdf (TENDER)Bidders must provide documented evidence of a quality management system (ISO 9001:2015), including a quality manual, quality policy, control of documented information, nonconformity and corrective action, internal audit, organization chart and responsibility matrix, and control of externally provided processes. A draft contract quality plan and a quality control plan/inspection and test plan (ITP) for similar work are required. Form A must be completed and signed.
Compliance Requirements
Source: 240-12248652_List of Tender Returnables_Cat 3_ Removal of Illegal Connections.pdf (TENDER)Form A must be completed and signed. No CSD, tax, B-BBEE, or CIDB requirements are stated in the provided document.
Section
Source: 240-12248652_List of Tender Returnables_Cat 3_ Removal of Illegal Connections.pdf (TENDER)Quality requirements are scored per section: Section A (QMS documentation) – 5 points; Section B (evidence of QMS in operation) – 2 points; Section C (draft contract quality plan) – 1 point; Section D (quality control plan/ITP) – 1 point; Section E (Form A completed and signed) – 1 point. All sections must be met.
Description
Source: SECTION 6 - ENVIRONMENTAL.pdf (TENDER)The tender is for the removal of illegal connections in the Central East Cluster – KZN Operating Unit, on an 'as and when required' basis for a period of 36 months.
Important Dates
Source: SECTION 6 - ENVIRONMENTAL.pdf (TENDER)Closing date: 18 September at 10h00.
Contact Information
Source: SECTION 6 - ENVIRONMENTAL.pdf (TENDER)Fraud and corruption reporting: 0800 11 2722, [email protected].
Evaluation Criteria
Source: SECTION 6 - ENVIRONMENTAL.pdf (TENDER)No eligibility criteria specified
Technical Specifications
Source: SECTION 6 - ENVIRONMENTAL.pdf (TENDER)Contract type: NEC 3 Term Services Contract. Scope: removal of illegal connections in the Central East Cluster – KZN Operating Unit, on an 'as and when required' basis for 36 months.
Important Dates
Source: 240-68099512 Form A_Cat 3_ Removal of Illegal Connections.pdf (unknown)Closing date: 29 June 2026 (per document; note tender record shows 2026-09-18T10:00:00.000Z — verify). No other dates stated.
Submission Guidelines
Source: 240-68099512 Form A_Cat 3_ Removal of Illegal Connections.pdf (unknown)Complete and sign Form A (Tender & Contract Quality Requirements) to acknowledge and accept Eskom Supplier Quality Requirements per specification 240-105658000 and ISO 9001. Submit the signed form with the quotation before the closing time.
Evaluation Criteria
Source: 240-68099512 Form A_Cat 3_ Removal of Illegal Connections.pdf (unknown)Pre-contract award quality requirements apply. Category 3 selected (refer to clause 3.5 of 240-105658000). No scoring split or minimum qualifying thresholds stated in the available document.
Technical Specifications
Source: 240-68099512 Form A_Cat 3_ Removal of Illegal Connections.pdf (unknown)Scope: removal of illegal connections in the Central East Cluster, KZN Operating Unit, on an 'as and when required' basis for 36 months. Category 3 quality requirements apply. Site assessment applicability must be indicated on Form A.
Methodology
Source: 240-68099512 Form A_Cat 3_ Removal of Illegal Connections.pdf (unknown)The ISO 9001 clauses and quality principles are listed as applicable (e.g., context, leadership, planning, support, operation, performance evaluation, improvement). No specific method statement or execution plan is described in the available document.
Quality Management
Source: 240-68099512 Form A_Cat 3_ Removal of Illegal Connections.pdf (unknown)Eskom Supplier Quality Requirements per specification 240-105658000 and ISO 9001 apply. Post-contract award conditions include: contract execution, supplier quality performance monitoring, Eskom rights of access and information, preservation, quality audits, management of nonconformities, and special processes. The tenderer must complete and sign Form A to accept these requirements.
Compliance Requirements
Source: 240-68099512 Form A_Cat 3_ Removal of Illegal Connections.pdf (unknown)Form A (Tender & Contract Quality Requirements) must be completed and signed. No other compliance requirements (e.g., CSD, tax, B-BBEE) are stated in the available document.
Section
Source: 240-68099512 Form A_Cat 3_ Removal of Illegal Connections.pdf (unknown)Pre-contract award quality requirements apply. Category 3 selected. No scoring details provided in the available document.
Important Dates
Source: Copy of Removal of Illegal Connections BOQ_ (003).pdf (unknown)Closing date: 18 September 2026 at 10:00 (as per tender record). No other dates are stated in the document.
Contact Information
Source: Copy of Removal of Illegal Connections BOQ_ (003).pdf (unknown){"name":null,"email":null,"phone":null,"department":"Rate","address":null}
Submission Guidelines
Source: Copy of Removal of Illegal Connections BOQ_ (003).pdf (unknown)Returnable documents: the completed Bill of Quantities (BOQ) must be signed by the Quantity Surveyor and the End-user. No other submission details are stated in the document.
Technical Specifications
Source: Copy of Removal of Illegal Connections BOQ_ (003).pdf (unknown)Scope: removal of illegal connections in the Central East Cluster, KZN Operating Unit, on an 'as and when required' basis for 36 months. The BOQ lists labour categories (electrician, linesman, semi-skilled labour with minimum training at EAL Training Centre, general worker), transport (LDV 4x4, LDV 2x4, 4-ton truck, 4-ton truck with crane, 8-ton truck, 8-ton truck with crane, aerial device), data capture on supplied Excel file, and accommodation per person per night.
Pricing Schedule
Source: Copy of Removal of Illegal Connections BOQ_ (003).pdf (unknown)Pricing must be provided on the itemized BOQ for: labour (electrician, linesman, semi-skilled labour with minimum training at EAL Training Centre, general worker), transport (LDV 4x4, LDV 2x4, 4-ton truck, 4-ton truck with crane, 8-ton truck, 8-ton truck with crane, aerial device), capturing info on supplied Excel file, and accommodation per person per night. The BOQ must be signed by the Quantity Surveyor and the End-user.
Financial Requirements
Source: Copy of Removal of Illegal Connections BOQ_ (003).pdf (unknown)Pricing must be submitted on the itemized BOQ with rates for each labour, transport, data capture, and accommodation item. No bonds, guarantees, or payment terms are stated.
Contact Information
Source: Illegal connections tender evaluation form.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"am- Including names and appointment"}
Submission Guidelines
Source: Illegal connections tender evaluation form.pdf (unknown)Returnable documents: all OHS tender returnables listed in Annexure C4 must be completed, signed, and submitted with the quotation. Missing or unsigned returnables will likely disqualify the bid.
Evaluation Criteria
Source: Illegal connections tender evaluation form.pdf (unknown)The document is an OHS tender evaluation template (Annexure C4) for high-risk category work. It lists mandatory OHS returnables that are evaluated; absence of any is likely to disqualify. No scoring split, minimum qualifying thresholds, or preference point system is stated.
Technical Specifications
Source: Illegal connections tender evaluation form.pdf (unknown)Scope: removal of illegal connections in the Central East Cluster, KZN Operating Unit, on an 'as and when required' basis for 36 months. The document focuses on OHS requirements for high-risk electrical work, including MV/LV line construction and excavation.
Financial Requirements
Source: Illegal connections tender evaluation form.pdf (unknown)Costing for health and safety management must be provided as a detailed breakdown, not a lump sum, based on the overall scope of work.
Compliance Requirements
Source: Illegal connections tender evaluation form.pdf (unknown)Mandatory OHS returnables (Annexure C4):
Section
Source: Illegal connections tender evaluation form.pdf (unknown)The evaluation is based on the OHS Tender Evaluation Template (Annexure C4) for high-risk category. All listed OHS returnables are mandatory; failure to provide any is likely to disqualify.
Description
Source: BRA 2026_Rev5.pdf (unknown)The document is a baseline risk assessment for the removal of illegal connections in EMP, PMB and Newcastle zones. It lists hazards and controls for activities such as driving, working in the field, use of ladders, working at heights, and material handling. No general scope description beyond the tender title is provided.
Important Dates
Source: BRA 2026_Rev5.pdf (unknown)Closing date: 29 June 2026 (as stated in the document; note the tender record lists 2026-09-18T10:00:00.000Z — the document text shows 29 June 2026, which is taken as the closing date).
Evaluation Criteria
Source: BRA 2026_Rev5.pdf (unknown)Bidders must comply with the Occupational Health and Safety Act, 1993, and Eskom's safety procedures. They must have qualified first-aiders and emergency plans in place. No specific pre-qualification thresholds (e.g., CIDB grading, B-BBEE level) are stated in the provided document. Bidders must ensure their staff hold valid driver's licenses and Eskom driver's permits where applicable.
Technical Specifications
Source: BRA 2026_Rev5.pdf (unknown)The scope is the removal of illegal connections in the Central East Cluster – KZN Operating Unit, covering EMP, PMB and Newcastle zones, on an 'as and when required' basis for 36 months. The document provided is a baseline risk assessment (BRA) for the work, listing hazards and controls. No detailed technical specifications (quantities, standards, service levels) are provided in the extracted text.
Quality Management
Source: BRA 2026_Rev5.pdf (unknown)The document does not specify quality management requirements. It includes office ergonomics and vehicle-mounted crane safety controls, but no QA/QC standards.
Compliance Requirements
Source: BRA 2026_Rev5.pdf (unknown)No specific compliance requirements (e.g., CSD registration, tax clearance, B-BBEE level, CIDB grading) are stated in the provided document. The document is a safety risk assessment, not a tender compliance document.
Health & Safety
Source: BRA 2026_Rev5.pdf (unknown)The document is a comprehensive baseline risk assessment (BRA) covering hazards such as driving, parking, low-level bridges, stray animals, slippery surfaces, bee stings, snake bites, ladder use, storage of flammables, computer use, hydroboil use, emergency preparedness, inclement weather, community protest, waste storage, working at heights, planting poles, hand tools, physical material handling, vehicle-mounted crane, loading/off-loading, excavation, stairways, and COVID-19 exposure. Controls include PPE, training, supervision, risk assessments, and adherence to OHS Act and Eskom procedures. Bidders must comply with the OHS Act and Eskom safety procedures, ensure qualified first-aiders, and have emergency plans.
Environmental
Source: BRA 2026_Rev5.pdf (unknown)The document identifies environmental risks from storage of flammables (oil, petrol, diesel, thinners, paint) which can cause ground, air, and water pollution. Controls include waste management training, safe working procedures, applicable PPE, and medical surveillance.
Section
Source: BRA 2026_Rev5.pdf (unknown)The document does not contain evaluation criteria. It references driver safety and vehicle procedures but no scoring or qualification thresholds.
Description
Source: Copy of Removal of Illegal Connections BOQ_ (003).xlsx (unknown)The work is the removal of illegal connections, called off as needed over 36 months. The BOQ lists labour categories (electrician, linesman, semi-skilled, general worker) with hourly rates; transport items (LDV 4x4, LDV 2x4, 4-ton truck, 4-ton truck with crane, 8-ton truck, 8-ton truck with crane, aerial device) with per-km or per-each rates; data capture per each; and accommodation per person per night. Semi-skilled labour must have completed minimum training at the EAL Training Centre.
Technical Specifications
Source: Copy of Removal of Illegal Connections BOQ_ (003).xlsx (unknown)The scope involves the removal of illegal connections in the Central East Cluster of KZN on an as-and-when required basis for 36 months. The BOQ covers labour (electrician, linesman, semi-skilled, general worker), transport (LDV, trucks, aerial device), data capture, and accommodation. Semi-skilled labour must have minimum training at the EAL Training Centre.
Financial Requirements
Source: Copy of Removal of Illegal Connections BOQ_ (003).xlsx (unknown)Pricing is submitted via a schedule of rates on a Bill of Quantities (BOQ). Rates are required per hour for labour, per km for transport, per each for aerial device and data capture, and per person per night for accommodation.
Description
Source: SECTION 1 COMMERCIAL.pdf (TENDER)NEC 3 Term Service Contract for the removal of illegal electrical connections in the Central East Cluster, KwaZulu-Natal Operating Unit, on an 'as and when required' basis for a period of 36 months. Enquiry number: E3314DXKZNOUR. Effective date of tender document: 7 June 2024; review date: June 2029.
Submission Guidelines
Source: SECTION 1 COMMERCIAL.pdf (TENDER)Submission method: bids must be delivered to the bid box at the address stated in SBD 1 (street address not populated in the document) by the closing date and time. Late bids will not be accepted. All bids must be submitted on the official forms provided (not re-typed) or online. Mandatory returnable documents (Commercial Mandatory Returnables) must be fully completed, signed and submitted with the tender at closing. If any are missing, Procurement Practitioners will request them in writing; they must be submitted within 5 working days of the request or the tender will be disqualified. Returnable forms required: Annexure A (Authorisation Form with supporting board resolution / members' resolution / power of attorney), Annexure D (Integrity Declaration Form covering declaration of interest, fair tendering practices and shareholding information), SBD 1 (Invitation to Bid), SBD 4 (Tenderer's Disclosure), SBD 6.1 (Preference Points Claim Form). Bidders must be registered on the Central Supplier Database (CSD) and provide SARS Tax Compliance Status PIN or CSD number. B-BBEE certificate or sworn affidavit must be submitted to qualify for preference points. Foreign suppliers must complete the questionnaire in SBD 1 Part B.
Returnable Documents
Source: SECTION 1 COMMERCIAL.pdf (TENDER)Commercial Mandatory Returnables (non-disqualifiable if submitted within 5 working days of written request): Annexure A – Authorisation Form (organisational status certificate with board resolution/members' resolution/power of attorney, plus authorised signatory table); Annexure D – Integrity Declaration Form (declaration of interest, fair tendering practices, shareholding information); SBD 1 – Invitation to Bid (Part A and Part B); SBD 4 – Tenderer's Disclosure; SBD 6.1 – Preference Points Claim Form. B-BBEE certificate or sworn affidavit. Proof of CSD registration and SARS tax compliance (PIN/TCS/CSD number).
Evaluation Criteria
Source: SECTION 1 COMMERCIAL.pdf (TENDER)Preference point system: 80/20 for requirements with a Rand value up to R50 million (all taxes included); 90/10 for requirements above R50 million. The organ of state must select the applicable system (options a, b or c in SBD 6.1). Points are awarded for Price and Specific Goals, totalling 100 points. Price scoring formulae: for goods/services Ps = 80(1-(Pt-Pmin)/Pmin) or 90(1-(Pt-Pmin)/Pmin); for disposal/leasing/income-generating Ps = 80(1+(Pt-Pmax)/Pmax) or 90(1+(Pt-Pmax)/Pmax). Specific goals and points allocation to be completed by the organ of state for both 80/20 and 90/10 systems. Failure to submit proof for specific goals means points are not claimed. The organ of state reserves the right to require substantiation of any preference claim. Mandatory eligibility: CSD registration, valid tax compliance (SARS PIN/TCS/CSD number), not listed on National Treasury's Database of Restricted Suppliers or Register for Tender Defaulters, no fraud/corruption convictions in procurement in the past five years, no history of failing contractual obligations with the state or state-owned entities, no bid rigging/collusion or abuse of Eskom's procurement process. B-BBEE certificate or sworn affidavit required to claim preference points.
Technical Specifications
Source: SECTION 1 COMMERCIAL.pdf (TENDER)Scope: Removal of illegal electrical connections in the Central East Cluster, KwaZulu-Natal Operating Unit, on an 'as and when required' basis for a period of 36 months. Contract type: NEC 3 Term Service Contract. No detailed service information, quantities, standards or service levels are provided in the commercial section; these are expected in Part C3 Scope of Work: Service Information (referenced but not included in the extracted text).
Pricing Schedule
Source: SECTION 1 COMMERCIAL.pdf (TENDER)Pricing structure: rates-based (Part C2 Pricing Data). VAT at 15% must be included in the total offered price. Detailed bill of quantities or pricing schedule not provided in the commercial section; expected in Part C2. No payment schedule or milestone details in extracted text.
Financial Requirements
Source: SECTION 1 COMMERCIAL.pdf (TENDER)Pricing format: rates-based (document references 'RATES BASED' and Part C2 Pricing Data). VAT at 15% applies; total offered amount must be inclusive of VAT. No explicit bond, guarantee or insurance amounts stated in the commercial section; contract data may require securities, bonds, guarantees and proof of insurance (referenced in Form of Offer & Acceptance). Payment terms not detailed in the extracted text. Financial capacity / turnover thresholds not specified.
Compliance Requirements
Source: SECTION 1 COMMERCIAL.pdf (TENDER)Mandatory compliance: Central Supplier Database (CSD) registration with mandatory information uploaded (business registration, directorship/membership, identity numbers, tax compliance status, banking information). SARS Tax Compliance Status PIN or TCS or CSD number required; each party in a consortium/JV/sub-contractor must submit separate proof. B-BBEE Status Level Verification Certificate (SANAS-accredited verification agency, accounting officer, or registered auditor) or Sworn Affidavit (for EMEs/QSEs) must be submitted to qualify for preference points. Not listed on National Treasury's Database of Restricted Suppliers or Register for Tender Defaulters. No convictions for fraud/corruption in procurement in past five years. No prohibition from doing business with international financial institutions. No history of failing contractual obligations with the state or state-owned entities. Declaration of interest required for any relationship with Eskom employees/directors involved in specification, evaluation, adjudication or negotiation. Declaration of fair tendering practices (no bid rigging, collusion, fraud). Shareholding information declaration (individuals and entities with identity/registration numbers and percentages). Authorisation Form (Annexure A) with supporting resolution/power of attorney for the authorised signatory. Integrity Declaration Form (Annexure D) covering all above. SBD 1, SBD 4, SBD 6.1 must be completed and signed. Foreign suppliers must complete questionnaire in SBD 1 Part B to determine South African tax obligations.
B-BBEE Requirements
Source: SECTION 1 COMMERCIAL.pdf (TENDER)B-BBEE Status Level Verification Certificate (issued by SANAS-accredited verification agency, accounting officer under Close Corporations Act, or registered auditor) or Sworn Affidavit (for EMEs and QSEs) must be submitted to qualify for preference points under the PPPFA 2022 regulations. SBD 6.1 Preference Points Claim Form applies. Specific goals and points allocation to be completed by the organ of state for both 80/20 and 90/10 systems. Sworn Affidavit template for Qualifying Small Enterprise referenced (12-month validity, black ownership percentages, designated group breakdown, empowering supplier status).
Contractual Terms
Source: SECTION 1 COMMERCIAL.pdf (TENDER)Contract form: NEC 3 Term Service Contract. Offer and Acceptance (C1.1): bidder submits offer by completing and signing the Form of Offer & Acceptance including Schedule of Deviations (if any). Employer: Eskom Holdings SOC Ltd, represented by Brenda Cebekhulu (Senior Manager – Business Enablement Acting), 25 Valley View Road, New Germany, 3610. Acceptance: employer returns one signed copy to the bidder before the end of the validity period; contract comes into effect on acceptance. No amendments valid unless recorded in the Schedule of Deviations. Successful bidder must deliver securities, bonds, guarantees, proof of insurance and any other documentation required by the Contract Data at or just after the agreement date; failure constitutes repudiation. Contract duration: 36 months. General Conditions of Contract (GCC) and Preferential Procurement Policy Framework Act 2000 and Regulations 2017 apply. Special conditions of contract may apply (referenced but not detailed in extracted text).
Requirements
Source: SECTION 1 COMMERCIAL.pdf (TENDER)Tax compliance: bidders must submit SARS PIN or Tax Compliance Status (TCS) or CSD number; each party in consortia/JVs/sub-contractors must submit separate proof. Foreign suppliers must complete questionnaire in SBD 1 Part B to determine if South African tax compliance is required. CSD registration mandatory for mandatory information upload (business registration, directorship, tax compliance, banking). B-BBEE certificate or sworn affidavit must be submitted to bidding institution. Declaration of interest, fair tendering practices and shareholding information via Annexure D. Authorisation Form (Annexure A) with supporting resolution/power of attorney. SBD 1, SBD 4, SBD 6.1 completion mandatory.
Section
Source: SECTION 1 COMMERCIAL.pdf (TENDER)Preference point system: 80/20 for requirements up to R50 million, 90/10 above R50 million (all taxes included). Points awarded for Price and Specific Goals (total 100 points). Price scoring formulae: goods/services Ps = 80(1-(Pt-Pmin)/Pmin) or 90(1-(Pt-Pmin)/Pmin); disposal/leasing/income-generating Ps = 80(1+(Pt-Pmax)/Pmax) or 90(1+(Pt-Pmax)/Pmax). Organ of state to complete specific goals table for both systems. Failure to submit proof for specific goals means points not claimed. Organ of state may require substantiation of claims. Mandatory disqualification grounds: listed on National Treasury restricted suppliers/defaulters registers, fraud/corruption convictions in past five years, international debarment, contractual failures with state, bid rigging/collusion, abuse of procurement process.
Important Dates
Source: Removal of illegal connections Contract NEC TSC.pdf (unknown)Closing date and time: 18 September 2026 at 10:00 (from tender record). Starting date: to be advised (TBA). Service period: 36 months from the starting date. Contractor must submit first plan within 2 weeks of Contract Date. Task Order programme due within 1 week of receiving a Task Order. Price adjustment base date: one month prior to tender closing date; rates fixed and firm for first 12 months, thereafter adjustable annually. No compulsory briefing or site visit dates are stated in the document.
Contact Information
Source: Removal of illegal connections Contract NEC TSC.pdf (unknown)Employer: Eskom Holdings SOC Ltd (Reg No. 2002/015527/30), Registered office: Megawatt Park, Maxwell Drive, Sandton, Johannesburg. Service Manager: Lwazi Nzama, Address: 25 Valley View Drive, New Germany, Tel: 031 710 5328, Email: [email protected]. Engineering Contract Strategies (contract documentation source): Tel 011 803 3008, Fax 086 539 1902, www.ecs.co.za.
Submission Guidelines
Source: Removal of illegal connections Contract NEC TSC.pdf (unknown)Submission method and address are not stated in the document. The tender uses the NEC3 Term Service Contract (TSC3) Form of Offer and Acceptance (C1.1) which must be completed, signed by the duly authorised representative, and submitted with the Schedule of Deviations (if any). Returnable documents required at award stage: C1.1 Form of Offer and Acceptance, C1.2b Contract Data provided by the Contractor, C1.3 Proforma Guarantees (Performance Bond for Option X13, Parent Company Guarantee for Option X4, ASGI-SA Guarantee if applicable). All returnable forms must be completed in full and signed. A tender may be disqualified if any returnable form is omitted or left unsigned, or if the offer is received after the closing time.
Returnable Documents
Source: Removal of illegal connections Contract NEC TSC.pdf (unknown)Returnable documents: Form of Offer and Acceptance (C1.1), Contract Data provided by Contractor (C1.2b), Proforma Guarantees (C1.3), Performance Bond (Option X13), Parent Company Guarantee (Option X4), ASGI-SA Guarantee (if applicable), Tax invoices with Employer's VAT number 4740101508, Updated B-BBEE verification certificate upon status change, Insurance certificates per Tables A and B, Key personnel CVs, Contractor's first plan within 2 weeks of Contract Date, Task Order programme within 1 week of receiving Task Order.
Evaluation Criteria
Source: Removal of illegal connections Contract NEC TSC.pdf (unknown)The document does not specify an evaluation methodology, scoring split, minimum functionality threshold, or preference point system (80/20 or 90/10). The contract is a NEC3 TSC3 Option A (Priced contract with price list) with secondary Options X1, X2, X13, X18, X19, W1, and Z1-Z14. Award will be based on the offered total of the Prices (exclusive of VAT) and compliance with the Conditions of Tender, but the specific evaluation criteria are not detailed in the provided text.
Technical Specifications
Source: Removal of illegal connections Contract NEC TSC.pdf (unknown)Scope: Removal of illegal electrical connections in the Central East Cluster, KZN Operating Unit, on an 'as and when required' basis for 36 months. Service area: Various sites within the cluster. Contractor must comply with Construction Regulations 2014 (OHS Act) and may be appointed as Principal Contractor. Health and safety: prices must include full compliance with Construction Regulations and all applicable H&S laws; subcontractors must comply. Environmental: comply with all applicable environmental laws, regulations, and procedures; subcontractors must comply. Asbestos: Employer ensures ambient air meets SA standards (OEL 0.2 fibres/ml 4-hour TWA, STEL 0.6 fibres/ml 10-minute TWA); monitoring per HSG248/HSG173/OESSM by SANAS-accredited AAIA; Contractor may perform parallel measurements; risk assessment and immediate control measures if asbestos identified above action level (0.1 fibres/ml); Contractor may stop work until area declared safe; asbestos removal by registered asbestos contractor at Employer's expense; contract dates extended for regulatory notification periods. Nuclear: Employer operates Koeberg Nuclear Power Station; indemnifies Contractor for nuclear damage except unlawful intent or unauthorised presence; protection effective until KNPS decommissioned. Key personnel: minimum two key people with names, job titles, responsibilities, qualifications, experience, and CVs to be provided. Contractor must submit first plan within 2 weeks of Contract Date linking Price List items to operations. Task Order programme due within 1 week of receipt. Contractor's CIDB registration number required.
Methodology
Source: Removal of illegal connections Contract NEC TSC.pdf (unknown)Methodology: Contractor submits first plan for acceptance within 2 weeks of Contract Date; plan must link Price List items to operations; Task Order programme submitted within 1 week of receiving Task Order; Contractor provides information showing how each Price List item relates to operations on submitted plans.
Experience & Qualifications
Source: Removal of illegal connections Contract NEC TSC.pdf (unknown)Key personnel requirements: Names, job titles, responsibilities, qualifications, and experience for key people (minimum 2 listed); CVs to be provided. Contractor's CIDB registration number required.
Quality Management
Source: Removal of illegal connections Contract NEC TSC.pdf (unknown)Quality management: Asbestos compliance monitoring per SANAS-accredited AAIA; compliance sampling to assess worker exposure against Standard 32-303; parallel measurements allowed for verification; control measures per AAIA-approved asbestos work plan; area declared safe via compliance monitoring or AAIA intervention.
Financial Requirements
Source: Removal of illegal connections Contract NEC TSC.pdf (unknown)Pricing structure: Option A (Priced contract with price list) or Option E (Cost reimbursable). Offered total of Prices exclusive of VAT: R [●]. First forecast of total Defined Cost plus Fee exclusive of VAT: R [●]. Subtotal: R [●]. VAT @ 15%: R [●]. Total inclusive of VAT: R [●]. Price list location: [●]. Tendered total of Prices: R [●]. Direct fee percentage: [%]. Subcontracted fee percentage: [%]. Contractor prepares price forecasts at intervals no longer than [●] weeks. Price adjustment: rates fixed for first 12 months; thereafter 15% fixed, 60% labour (SEIFSA C3A), 25% transport (SEIFSA L2B) adjustable annually on contract anniversary. Assessment interval: 25th day of each month. Payment period: 4 weeks from payment certificate. Interest rate: Standard Bank prime rate (Rands) or LIBOR (other currencies). Tax invoice: Contractor must provide tax invoice within 1 week of receiving payment certificate, showing Employer's VAT number 4740101508; late invoice delays payment by equal period. Performance Bond (Option X13): amount [●] (demand guarantee on bank letterhead). Parent Company Guarantee (Option X4): unconditional guarantee on parent company letterhead. ASGI-SA Guarantee if applicable. Insurance: Contractor provides per Table A (Employer's property, Plant/Materials, Equipment, third party property, bodily injury, employee injury) at replacement cost or statutory limits; Employer provides per Table B (Assets All Risk, Contract Works, Environmental Liability, General/Public Liability, Transportation, Motor Fleet, Terrorism, Cyber, Nuclear) per policy documents. Contractor's liability for indirect/consequential loss: R0. Liability for Employer's property damage limited to R2 million deductible. Liability for design defects: greater of total Prices at Contract Date or insurance exclusions plus deductibles. Total liability limited to total of Prices (excluded matters unlimited). End of liability: 6 months after service period.
Compliance Requirements
Source: Removal of illegal connections Contract NEC TSC.pdf (unknown)Mandatory registrations and compliance: CSD registration (implied for state-owned entity procurement); valid SARS tax compliance status (tax PIN); B-BBEE verification certificate (status changes must be notified within 7 days, updated certificate submitted within 30 days; decreased status allows renegotiation or termination); CIDB registration (contractor's CIDB registration number required on Form of Offer); CIPC registration (company registration number). Returnable forms: C1.1 Form of Offer and Acceptance (signed by authorised representative); C1.2b Contract Data provided by Contractor; C1.3 Proforma Guarantees (Performance Bond for Option X13, Parent Company Guarantee for Option X4, ASGI-SA Guarantee if applicable). Insurance certificates per Tables A and B. Key personnel CVs. Contractor's first plan within 2 weeks of Contract Date. Task Order programme within 1 week of receiving Task Order. Tax invoices with Employer's VAT number 4740101508. Confidentiality obligations (Z4): no disclosure of contract information; images require prior written consent; subcontractors bound. Ethics (Z11): no prohibited actions (coercive, collusive, corrupt, fraudulent, obstructive); termination for prohibited action without court finding; cooperation with investigations. Joint venture requirements (Z2): joint and several liability; key person notification within 2 weeks; no composition change without Employer consent. Cession: no cession without Employer written consent (Z1).
B-BBEE Requirements
Source: Removal of illegal connections Contract NEC TSC.pdf (unknown)B-BBEE requirements: Contractor must notify Employer within 7 days of any change in B-BBEE status due to legal status, ownership, or business composition changes; submit updated verification certificate and supporting documentation within 30 days; decreased B-BBEE status allows Employer to renegotiate or terminate; failure to notify may constitute grounds for termination.
Health & Safety
Source: Removal of illegal connections Contract NEC TSC.pdf (unknown)Health and safety: Contractor accepts appointment as Principal Contractor under Construction Regulations 2014; warrants prices include H&S compliance; must comply with Construction Regulations and all applicable H&S laws; ensure subcontractors comply. Environmental: comply with all applicable environmental laws and regulations; ensure subcontractors comply. Asbestos: Employer ensures ambient air meets SA standards (OEL 0.2 fibres/ml 4hr TWA, STEL 0.6 fibres/ml 10-min TWA); monitoring per HSG248/HSG173/OESSM by SANAS-accredited AAIA; Contractor may perform parallel measurements; risk assessment and control measures if asbestos identified; Contractor may stop work until area declared safe; asbestos removal by registered contractor at Employer's expense; contract dates extended for regulatory notification periods.
Environmental
Source: Removal of illegal connections Contract NEC TSC.pdf (unknown)Environmental compliance: Contractor must comply with all applicable environmental laws, regulations, rules, guidelines and procedures; ensure subcontractors comply. Nuclear liability: Employer operates Koeberg Nuclear Power Station; indemnifies Contractor for nuclear damage except unlawful intent or unauthorized presence; Employer waives recourse rights except section 30(7) of Nuclear Act; protection effective until KNPS decommissioned.
Contractual Terms
Source: Removal of illegal connections Contract NEC TSC.pdf (unknown)Contract type: NEC3 Term Service Contract (TSC3). Options selected: Main Option A (Priced contract with price list), dispute resolution Option W1, secondary Options X1 (Price adjustment for inflation), X2 (Changes in the law), X13 (Performance Bond), X18 (Limitation of liability), X19 (Task Order), and Z (Additional conditions of contract Z1-Z14). Law of contract: Republic of South Africa. Language: English. Period for reply: 4 weeks. Starting date: TBA. Service period: 36 months. Assessment interval: 25th day of each month. Currency: South African Rand. Payment period: 4 weeks. Interest rate: Standard Bank prime rate (Rands) or LIBOR (other currencies). Adjudicator from ICE-SA Panel; arbitration under Association of Arbitrators (Southern Africa) rules. Price adjustment: rates fixed for first 12 months, thereafter 15% fixed, 60% labour (SEIFSA C3A), 25% transport (SEIFSA L2B). Performance bond amount: [●]. Contractor's liability for indirect/consequential loss: R0. Liability for Employer's property damage limited to R2 million deductible. Liability for design defects: greater of total Prices at Contract Date or insurance exclusions plus deductibles. Total liability limited to total of Prices (excluded matters unlimited). End of liability: 6 months after service period. Task Order programme due within 1 week. Z1: No cession without Employer consent; Employer may cede to subsidiaries. Z2: Joint ventures jointly and severally liable; key person notification within 2 weeks; no composition change without consent. Z3: B-BBEE status change notification within 7 days; updated certificate within 30 days; decreased status allows renegotiation or termination. Z4: Confidentiality obligations; no disclosure without consent; images require prior written consent; subcontractors bound. Z5: Waiver/estoppel requires written agreement. Z6: Health, safety, environment compliance; Contractor may be appointed Principal Contractor; prices include H&S compliance; Construction Regulations 2014 apply. Z7: Tax invoice within 1 week of payment certificate; late invoice delays payment; VAT number 4740101508 required. Z8: Compensation event notification within 8 weeks. Z9: Employer's liability for indirect/consequential loss limited to R0. Z10: Termination includes business rescue orders. Z11: Ethics - prohibited actions (coercive, collusive, corrupt, fraudulent, obstructive); termination for prohibited action without court finding; cooperation with investigations. Z12: Insurance - Contractor provides per Table A (Employer's property, Plant/Materials, Equipment, third party property, bodily injury, employee injury); Employer provides per Table B (Assets All Risk, Contract Works, Environmental Liability, General/Public Liability, Transportation, Motor Fleet, Terrorism, Cyber, Nuclear). Z13: Nuclear liability - Employer indemnifies Contractor for nuclear damage at Koeberg except unlawful intent/unauthorized presence. Z14: Asbestos - Employer ensures ambient air meets SA standards (OEL 0.2 fibres/ml 4hr TWA); independent SANAS-accredited AAIA monitoring; Contractor may stop work if above action level (0.1 fibres/ml); removal by registered asbestos contractor at Employer's expense.
Description
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Eskom Supplier Quality Management Specification (240-105658000, QM 58, Revision 3) defines the minimum quality requirements for all existing and potential suppliers and sub-suppliers across Eskom Holdings SOC Ltd. It forms part of all Eskom RFIs, RFQs, RFPs and contracts for products and services. The specification requires suppliers to develop, implement, maintain and continually improve a QMS based on ISO 9001. Suppliers are classified into four quality categories (1–4) per procurement, each with defined returnable documentation requirements. The specification covers pre-contract award quality requirements (QMS, quality plans, QCPs/ITPs, capability assessments), post-contract award execution (quality performance monitoring, audits), and standard conditions (rights of access, rights to information, preservation, audit conditions, nonconformity management, special processes). Normative references: ISO 9001, ISO 10005. Informative references include ISO 9000, ISO 10006, ISO 9004, Eskom SHEQ Policy (32-727), Eskom Procurement Policy/Procedure (32-1033/32-1034), PPPFA, CIDB 1004, List of Tender Returnables (240-12248652), IAEA GS-R-3.1, SANS 10845-1. Effective date: date of authorisation (17 October 2021). Next review: October 2024.
Important Dates
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)This specification (Revision 3) was authorised on 17 October 2021. The next review date is October 2024. The closing date for the specific tender (E3314DXKZNOUR) is 18 September 2026 at 10:00. No mandatory briefing or site visit dates are stated in this specification; any such dates will be in the specific tender invitation.
Contact Information
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Eskom Quality Management function (Chief Advisor Quality Management, Middle Manager Quality Management, Acting Senior General Manager Quality Risk and Sustainability) as per the document control sheet. Specific SCM and technical contacts for the tender E3314DXKZNOUR are not provided in this specification; they will be in the tender invitation.
Submission Guidelines
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Submission is governed by the specific Eskom RFQ/RFP/RFI that references this specification. Bidders must complete and sign Form A (Tender and Contract Quality Requirements for Supplier Quality Management Specification 240-105658000/QM 58 and ISO 9001) and return it with the other documents listed in the List of Tender Returnables (document 240-12248652). The applicable quality category (1, 2, 3 or 4) will be indicated in Form A for each procurement; only one category applies per tender. All returnable documents must be submitted by the closing date and time stated in the specific tender invitation.
Evaluation Criteria
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Suppliers are evaluated against the quality category assigned in Form A for the specific procurement:
Eskom may perform capability and capacity assessments prior to award for high-risk, critical plant, critical components, or special processes. Sub-suppliers must meet the same quality requirements. The List of Tender Returnables (240-12248652) specifies the exact documents required per tender.
Technical Specifications
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Scope: Minimum quality requirements for all existing and potential Eskom suppliers and sub-suppliers across all divisions and subsidiaries. Applies to all Eskom RFIs, RFQs, RFPs, and contracts for products and services.
Key requirements:
Methodology
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown) Clear and unambiguous description of the equipment and location(s) at which each activity
will take place, including facility location(s)
Identification of quality verification activity and stage
The details of reference documents, procedures, or method statements to be utilised in
performance of the activity, including specific reference to actual sections and pages of
procedures, standards, instructions, specifications, etc.
supplier. Further details are included in the Eskom specifications and works information.
3.8.3.5 Review and tracking of compliance with Eskom and supplier engineering specification of
preservation requirements.
3.8.3.6 Review and tracking of compliance with sub-supplier provided preservation requirements
and recommendations.
3.8.3.7 Evaluation of prospective temporary and longer-term material storage sites for consistency
with preservation programme expectations.
3.8.3.8 Preservation work plan development and plan execution performance evaluation of all
parties engaged for provision of material transportation, handling, or storage services.
3.8.3.9 Oversight of material quality preservation plan preparation and plan execution performance
at all work locations.
3.8.3.10 Development of a preservation programme records management process, in compliance
with Eskom information management requirements, which comprehensively addresses
generation, maintenance, and ready access by Eskom to all preservation programme
records.
3.8.3.11 The supplier shall deploy a clearly defined documented programme providing for
identification of all physical asset pre-operation preservation of quality requirements. In this
reference, the term “physical assets” should be understood to include bulk materials,
including consumable items, equipment systems, system components, and any other
procured or supplied materials or equipment transferred to project control, but not deployed
for operational purposes.
Experience & Qualifications
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.7.3.5 Quality audits and related quality performance reviews shall be carried out by trained,
accredited, and experienced personnel in accordance with procedures documented in the
Quality Management
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown). Introduction ............................................................................................................................... 3
2.1 Scope ............................................................................................................................... 3
2.1.1 Purpose ................................................................................................................. 3
2.1.2 Applicability ........................................................................................................... 3
2.1.3 Effective date ......................................................................................................... 3
2.2 Normative/Informative References ................................................................................... 3
2.2.1 Normative .............................................................................................................. 3
2.2.2 Informative............................................................................................................. 3
2.3 Definitions ........................................................................................................................ 4
2.4 Abbreviations ................................................................................................................... 5
2.5 Roles and Responsibilities ............................................................................................... 6
2.6 Process for Monitoring ...................................................................................................... 6
2.7 Related/Supporting Documents ........................................................................................ 6
3.1 Supplier and Sub-Supplier Quality Management System Requirements .......................... 7
3.2 Quality Plan ...................................................................................................................... 8
3.3 Contract Quality Plan........................................................................................................ 8
3.4 Quality Control Plan ....................................................................................................... 10
3.5 Pre-Contract Award: Quality Requirement ...................................................................... 13
3.6 Main Supplier and Sub-supplier Capability and Capacity Assessment ........................... 16
3.7 Post-Contract Award ...................................................................................................... 17
3.7.1 Contract Execution .............................................................................................. 17
3.7.2 Supplier Quality Performance Monitoring Phase ................................................. 18
3.7.3 Supplier Quality Audit .......................................................................................... 18
3.8 Standard Conditions ....................................................................................................... 19
3.8.1 Rights of Access .................................................................................................. 19
3.8.2 Eskom Rights to Information ................................................................................ 20
3.8.3 Preservation ........................................................................................................ 21
3.8.4 Quality Audits Related Conditions ....................................................................... 25
3.8.5 Management of Nonconformities and Nonconforming Outputs Identified by
Eskom ................................................................................................................. 25
3.8.6 Special Processes ............................................................................................... 26
Acceptance ............................................................................................................................. 27
Revisions ................................................................................................................................ 27
Development Team ................................................................................................................ 27
Acknowledgements ................................................................................................................ 28
existing and potential Eskom suppliers and define the quality criteria for the selection, evaluation,
vendor registration, management, monitoring, assessment and auditing of suppliers. Eskom’s
position is to partner with suppliers who fully demonstrate commitment to the development,
implementation, and maintenance of a quality management system (QMS) that conforms to the
requirements of ISO 9001 standard. The priority is to encourage suppliers to continually improve
their QMS and enhance service delivery by implementing and conforming to the standard.
develop,
implement,
maintain, and
continually improve
a quality management system (QMS) based on ISO 9001, which should form the basis for conformity
to Eskom quality requirements and continually adhere to them throughout the duration of a contract
2.1.2 Applicability
following paragraphs.
2.2.1 Normative
[1] ISO 9001 Quality Management Systems – Requirements
[2] ISO 10005 Quality Management Systems – Guidelines for Quality Plans.
2.2.2 Informative
[3] ISO 9000 Quality Management Systems – Fundamentals and Vocabulary
[4] 32-727: Safety, Health, Environment, and Quality (SHEQ) Policy
[5] ISO 10006 Quality Management Systems – Guidelines for Quality Management in Projects
[13] SANS 10845-1 Construction Procurement Part1: Processes, Methods and Procedures
2.3 Definitions
The vocabulary of ISO 9000 and the following definitions apply in the application of this specification.
2.3.1 Component: a constituent part of the product or sub-assembly of the product. The product
may comprise multiple individual components
2.3.2 Contract Quality Plan: a document of the supplier’s process for delivering the level of quality
required by the contract. It is a framework for the contractor’s process for delivering quality.
2.3.3 Hold Point: a predetermined stage in the quality control plan (QCP) beyond which work/
manufacturing shall not proceed without the attendance of, and written authorisation of, an
2.3.4 Intervention Points: those control points indicated by the various controlling bodies
concerned with the implementation of a specific QCP/ ITP. These can be in the form of
inspection, hold points, surveillances, witnesses, reviews and verifications.
2.3.5 Inspection Agency: an organisation or person appointed by Eskom for the purpose of
performing quality assurance/ quality control, monitoring, inspection and/ or expediting
services.
2.3.6 Level 1 Plant Items: equipment, whose failure has an effect on personnel safety and/ or
health, causes an environmental incident, cause a huge production loss or major equipment
damage. Equipment that are safety/ redundancy/ protective device or covered by statutory
regulations requirements.
2.3.7 Level 2 Plant Items: equipment, whose failure impacts plant availability and/or reliability,
causes significant costs or secondary damage.
2.3.8 Level 3 Plant Items: equipment that does not impact on personnel safety and/ or health,
environmental, cost, availability and/ or reliability of plant.
2.3.9 Nonconformity: a deficiency in material, composition, characteristic, or performance that
renders the quality of an item, component, or product unacceptable or indeterminate. The
term also covers a deficiency in, or deviation from/non-adherence to, the quality management
system requirements, prescribed production processes, and/or related documentation such
as procedures and instructions.
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
2.3.10 Quality Plan: specification of the actions, responsibilities and associated resources to be
applied to a specific object.
2.3.11 Quality Control Plan: a document specifying the activities to be inspected throughout the
execution of the project, inclusive of test methods, procedures, and acceptance criteria (This
term is equivalent to QIP and ITP).
2.3.12 Requirement: the need or expectation that is stated, generally implied, or obligatory.
course and scope of his/her employment or any agent or manager acting for, or on behalf of,
or in the interests of, the person registered as supplier on the Eskom supplier database.
2.3.17 Sub-supplier: an organisation that provides a product/service to the supplier and/or that
enters into a subcontract and assumes some of the obligations of the supplier or prime
contractor.
2.3.18 Witness Point: a predetermined stage in the quality control plan where and inspection
activity will take place. Work may proceed, provided Eskom or its inspection agency has been
formally notified and confirmed that inspection is waived.
2.4 Abbreviations
potential Eskom suppliers using Form A (Tender and Contract Quality Requirements for Supplier
Quality Management: Specification 240-105658000/ QM 58 and Quality Requirements for ISO 9001
Standard).
[1] 240-68099512 Tender and Contract Quality Requirements for Supplier Quality Management
Specification 240-105658000/ QM 58 and Quality Requirements for ISO 9001 Standard (Form
A)
[2] 240-109253698 Template for a Typical Contract Quality Plan
[3] 240-109253302 Quality Control Plan/Inspection and Test Plan
[4] 240-126469599 Method Statement Template.
as per this specification and ISO 9001 Standard or any additional quality requirements specific to
the scope of work.
3.1 Supplier and Sub-Supplier Quality Management System Requirements
3.1.1 The supplier and sub-supplier shall develop, implement, maintain and improve a formal QMS
that conforms to the latest ISO 9001 standard or any applicable standard of QMS (latest
applicable revision) and in accordance with the requirements of this specification.
3.1.2 Such a formal system shall consist of the appropriate documented information required by
ISO 9001 and may include a quality manual, quality plans, work procedures, work
instructions, method statements, work flow documentation, etc., as the case may be. This
requirement constitutes the most basic QMS requirements.
3.1.3 Unless specifically excluded from the quality list of tender returnable, as per the categories of
quality requirements (Category 1, 2, 3, or 4), such a QMS shall carry a valid ISO 9001
certificate from an accredited certification body, as indicated in the applicable Eskom
invitation (this requirement applies equally to both the supplier and any/ all manufacturing
third-party organisations mentioned above).
3.1.4 Unless specifically excluded in the quality list of tender returnable, as per the categories of
quality requirements (Category 1, 2, 3, or 4), the supplier shall have a fully developed,
documented, implemented, reviewed and maintained QMS that complies with the
requirements of ISO 9001 standard or any applicable standard of QMS. In the event that the
main supplier invariably requires the assistance of a sub-supplier in order to realise its own
supply obligations. The aforementioned requirement applies equally in all cases where any
such sub-supplier’s scope of responsibility includes the provision of any of the following
activities, namely, design and development, manufacturing, maintenance, testing, storage,
delivery, installation, commissioning, and project management, or in the cases the supplier
name changes, mergers, acquisitions and/ or cessions. Eskom Quality department must
ensure that the changed entity can still fulfil the requirements as set out in the contract
documentation.
3.1.5 Eskom reserves the right to request and perform necessary assessments at sub-supplier
facilities.
3.1.6 The main supplier shall be responsible for defining and managing the specific quality
assurance and control elements applicable to the respective sub-supplier’s scope of
work/supply and ensure that its sub-supplier(s) quality programmes support Eskom
requirements.
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.1.7 The supplier shall inform Eskom of any proposed changes to the QMS or staff that will affect
the quality system prior to implementation of these changes.
3.1.8 The main supplier shall develop and implement a performance management programme for
their sub-supplier. The programme shall include, but not limited to:
Verification of the QMS
Audits and surveillances
Regular assessment of the CQPs and reviews of QCPs.
NC and Defect Management
Inspection and test plans
Risk management
3.2 Quality Plan
3.2.1 Where specified in the Evaluation Criteria and/ or quality list of tender returnables , as per the
categories of quality requirements (Category 1, 2, 3, or 4); all individual products, services
and processes shall have a documented, implemented, reviewed and maintained contract
quality plan and/or quality control plan (inspection and test plan).
3.2.2 Where specified in the evaluation criteria and/ or quality list of tender returnables. All
production and/ or service provision shall be carried out in accordance with a documented
and agreed contract quality plan (CQP) and/ or quality control plan (QCP)/ inspection and test
plan (ITP).
3.2.3 The supplier shall plan for the required quality-related activities and interfaces within the
supplier’s quality system in order to demonstrate its ability towards both controlling and
meeting specified Eskom requirements.
Note 1: Contract Quality Plan should address the quality assurance elements related to the scope
of work and/ or technical specification.
Note 2: Quality Control Plan (QCP)/ Inspection and Test Plan (ITP) should address the quality
control elements related to the scope of work and/ or technical specification.
3.3 Contract Quality Plan
The main supplier shall require sub-suppliers to submit project quality plans (PQPs)/ contract quality
plans (CQPs) and associated documentation in accordance with the requirements of project QMS
processes applicable to the sub-supplier’s scope of work.
accordance with the ISO 10005 Quality Management System Guidelines for Quality Plans. In
addition to the elements specified in ISO 10005, the supplier’s and/ or sub-suppliers’ CQPs shall
include the following (as applicable):
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.3.1 The management of records, including material tests, positive material identification (PMI)
testing, material certification, etc.
3.3.2 The provision for free and uninhibited access by the supplier and/or personnel at the time of
inspection.
3.3.3 The proposals for submission of final documentation, the final manufacturing data book, prior
to shipment.
3.3.4 The special processes related to welding: management of the welder’s qualification record
(WQR), welding procedure specifications (WPS), and procedures qualification records (PQR)
that will be used in the performance of work for supplier review and acceptance prior to
commencing manufacture. Welders shall be qualified to the specified Codes of Construction
for the applicable procedures. The requirements for qualification shall be specified by the
supplier, and welder records shall be maintained by sub-suppliers performing the work.
3.3.5 The special installation procedures and other required fabrication or manufacturing
procedures (that is, those required for post-weld heat treatment, tube rolling, coatings, etc.)
that will be used in the performance of work shall require supplier review and acceptance
prior to commencing manufacture. The personnel carrying out special processes (for
example, NDE, welding, coating, heat treatment, etc.) where the results cannot be fully
verified by subsequent inspection and test shall be suitably qualified and, where applicable,
registered with statutory bodies as legally required, that is, as radiographic workers to conduct
radiography. The requirements for the qualification shall be specified, and personnel records
shall be maintained in accordance with the Project Quality Personnel Qualification
fabrication meeting and prior to commencement of manufacturing, whichever is earlier.
3.3.12 The Eskom template for CQP provided shall be used as guideline, where the supplier does
not have a CQP template.
3.4 Quality Control Plan
sufficient to address all quality-control-related activities in a chronological order, from contract review
through materials verification, manufacturing, fabrication, assembly, final testing, commissioning,
hand-over documentation, and certification. In addition, the supplier shall ensure compliance with
the following requirements:
3.4.1 All stages of manufacturing, fabrication, assembly and installation shall be controlled by a
supplier’s QCP/ ITP that clearly and unambiguously identifies the quality verifications to be
performed and special attention to controls related to critical products and services.
3.4.2 QCP/ ITP shall be reviewed and accepted by Eskom, its inspection authority or agency, and
they shall allow for the insertion of Eskom specific requirements, including hold and witness
points prior to the commencement of work.
3.4.3 Subsequent changes to the Eskom accepted QCP/ ITP shall require Eskom, its inspection
authority or agency’s agreement prior to the commencement of work involving an activity
affected by such changes.
3.4.4 The ITPs should cover materials certification, fabrication works, in-process inspections, final
acceptance tests, packaging and pre- shipment/ transportation, shipping/ transportation
inspections where contracted, preservation, site acceptance tests, construction and erection
works, and pre-commissioning and commissioning tests.
3.4.5 All sub-supplier QCP/ ITP activity shall be performed using an Eskom-accepted supplier
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.4.7 Where activities subject to inspection and test procedures are to be undertaken by a sub-
supplier, the QCP/ ITP shall make reference to this fact and shall include descriptive details
of the sub-supplier’s involvement. A separate QCP/ ITP shall be required for each sub-
supplier scope of work.
3.4.8 The supplier shall be ultimately accountable and responsible for the development and proper
implementation of all sub-supplier QCPs/ ITPs, including those reviewed or developed by
sub-suppliers.
3.4.9 Eskom reserves the right to select intervention points on QCPs/ ITPs for Eskom oversight of
selected functions and to perform surveillance or audits of the work.
3.4.10 Once signed, the ITPs and QCPs become addendums to the main contract. These ITPs can
be reviewed at Eskom’s discretion based on its assessment of the supplier’s performance or
other risks.
3.4.11 A QCP/ ITP shall contain the following information:
Eskom contract number and title
The supplier’s order number
Identification of the area of works/contract
Description of the work, with components, item number, and activity date
QCP/ITP unique number
A list of the sequence of operations, including inspection and tests
The identification of the specification, drawing number, or procedure for each operation,
with reference to the relevant criticality risk rating
The acceptance criteria, with reference to the technical specification, in-house, national, or
international standard, with the relevant clause number for each operation
The inspection and test activities that the supplier has nominated for its intervention points
Provision for the inclusion of intervention points nominated by Eskom and/or its authority/
agency
Provision for intervention point acceptance by date and signature for all parties having
intervention in the plan
Inspection and test records to be generated by the supplier for each operation and an
indication of records to be provided to Eskom (as applicable)
3.4.12 The main supplier shall require sub-suppliers to submit QCPs/ ITPs and associated
documentation applicable to the sub-supplier scope of work. Any changes made to the QCP
after submission must be resubmitted to Eskom for further review. The supplier shall ensure
that all sub-supplier QCPs/ ITPs are in compliance with the Eskom Quality Requirements
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Definition of acceptance criteria
Listing of certifying or verifying documents generated to provide evidence of compliance
with specified requirements; documents are to be provided using the proper Eskom
document numbering requirements
Identification of main supplier and sub-supplier (where applicable) third-party/approved
inspection authority (AIA) and Eskom inspection activities defined in terms of witness, hold,
document review, and verification monitoring points and provision for sign-off of each of the
above-mentioned parties for each intervention point
Qualification requirements for quality control inspectors, including any third-party/AIA
inspectors
Listing of all proposed test procedures
Acceptance criteria for each inspection or test in alignment with specified tolerances
A section for signed acceptance of the QC/ITP by the supplier, sub-supplier (where
applicable), and Eskom prior to commencement of work
Inspection or testing intervention points, including, but not limited to, factory acceptance test
and package acceptance test, witness, and hold points
3.4.13 A quality kick-off meeting will be held at the start of the contract and, if required, at the start
of each subsequent phase.
The supplier shall arrange coordination meetings with Eskom prior to placement of orders
for items or equipment to ensure that all technical and commercial requirements are clear
and understood. Fourteen days’ advance notice of meetings shall be given to Eskom.
Supplier inspection personnel, including inspection agency personnel, shall be competent
and qualified to perform inspection and testing assignments. Mobilisation of all such
personnel shall be in compliance with the Project Quality Personnel Qualification
3.4.14 Where QCP/ ITP is applicable, the supplier shall ensure that sub-suppliers are provided with
comprehensive, clearly written, and unambiguous inspection and testing protocols, including
processes, procedures, and methods that shall include, but not be limited to, the following:
Requirements for inspection checklists and inspection assignments, with lists of items to be
inspected
An inspection and testing report format, report content, schedule for report processing and
distribution, and report retention requirements
Inspection and test report results response tracking (log) and resolution of nonconformity in
inspection and test processes, procedures, or methods and nonconformity identified in
inspection and test results
Associated Failure Mode, Effects and Criticality Analysis (FMECA) reports relating to the
equipment and sub-systems (if applicable)
Hazard and Operability Study (HAZOP) report, as applicable
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.4.15 The supplier shall establish processes and procedures for formal assessment of sub-supplier
inspection and testing programmes. These shall include review of sub-supplier inspection
reports and other quality control documentation. Additional formal assessment of
manufacturing, fabrication, and assembly facility operations shall be conducted by the
supplier to ensure continuing suitability, adequacy, and effectiveness of the sub-supplier’s
inspection and testing programmes. Assessment frequency shall be established in
consideration of the sub-supplier scope of work, criticality of scope of work deliverables, and
performance information. The assessment scope and schedule shall be developed in
consultation with Eskom.
3.4.16 Supplier processes and procedures for verification of supplier and sub-supplier purchased
product compliance with specifications shall obtain document return/review status prior to
implementation.
3.4.17 The objective is to finalise any outstanding procedural or other issues before proceeding to
deliver the works.
3.4.18 Eskom, in consultation with the supplier, develops an agenda for the meeting, and Eskom will
keep minutes of these meetings.
3.4.19 Mandatory pre-inspection meetings will be convened by Eskom or its inspection agency or
AIA to be attended by the supplier’s and sub-supplier’s representatives, including their quality
representatives who will be involved in the works, and records are to be kept.
3.4.20 Eskom reserves the right to appoint resident quality inspectors who can be based at the
supplier’s or sub-supplier’s premises and on site where the work is being performed. The
supplier is expected to provide workspace at no cost to Eskom for the inspector, as required.
3.4.21 Eskom may appoint any organisation it prefers to perform quality assurance and quality
control activities, either in the capacity as an AIA or inspection agency, on the works
contracted to the supplier, and the supplier or its sub-suppliers may not object, prevent,
hinder, undermine, circumvent, question, discredit, or in any way make it impossible for such
organisation to carry out its work on behalf of Eskom.
3.4.22 The Eskom template for QCP/ ITP provided shall be used as guideline, where the supplier
does not have a QCP/ ITP template.
3.5 Pre-Contract Award: Quality Requirement
3.5.1 Main Supplier and Sub-supplier Categories
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The following are the minimum returnable documentation for Categories 1 to 4:
3.5.2 Category 1: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit a valid copy of ISO 9001 or any applicable certificate of a QMS (the
latest applicable revision). The QMS should drive the supplier’s business management
processes to ensure that all of Eskom’s requirements are fully met on a consistent basis.
The supplier shall submit the latest copy of the management system internal and external
audit reports. The audit reports must include, if applicable, nonconformity identified, and the
resulting remedial actions (correction and/ or corrective action reports).
The supplier shall submit a draft contract quality plan that is specific to the scope of work as
described in the tender documents. The plan must address the minimum requirements as per
Iso 10005.
Where applicable; the supplier shall submit a draft, or an example of an inspection and test
plan (ITP) or quality control plan (QCP) on similar and/ or previous work done.
The supplier shall submit documented information for Control of Externally Provided Processes,
The supplier shall submit a copy of documented information for roles, responsibilities and
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals, procedures.
The supplier shall submit documented information retained (records) of management review
meetings that include agenda, meeting minutes, attendance registers, reports, presentations,
etc.
Note: specific requirements per tender will be selected using the List of Tender Returnable
documents (240-12248652).
3.5.3 Category 2: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit objective evidence of a developed, implemented and maintained QMS
that complies with ISO 9001 or any applicable standard of quality management system (the latest
applicable revision). The following documents (approved/ signed copies) shall be submitted:
Quality Management System manual or a documented information that have defines and
describes the QMS and its scope
Quality Policy, aligned with the supplier’s strategic direction (documented information)
Quality Objectives (documented information)
Control of documented information (both maintain and retain documented information )
Internal audit procedure (documented information)
Control of nonconforming outputs (documented information)
Nonconformity and Corrective action procedure (documented information)
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The QMS should drive all the supplier’s business management processes to ensure that all of
Eskom’s requirements are fully met on a consistent basis.
The supplier shall submit the latest copy of the management system internal audit reports. The
audit reports must include, if applicable, nonconformity identified, and the resulting remedial
actions (correction and/ or corrective action reports).
The supplier shall submit a draft contract quality plan that is specific to the scope of work as
described in the tender documents. The plan must address the minimum requirements as per
Iso 10005.
Where applicable; the supplier shall submit an example of inspection and test plan (ITP) or
quality control plan (QCP) on similar or previous work done.
The supplier shall submit documented information for Control of Externally Provided Processes,
The supplier shall submit a copy of documented information for roles, responsibilities and
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals, procedures.
The supplier shall submit documented information retained (records) of management review
meetings that include agenda, meeting minutes, attendance registers, reports, presentations,
etc.
Note: specific requirements per tender will be selected using the List of Tender Returnable
document (240-12248652).
3.5.4 Category 3: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit objective evidence of a developed QMS that complies with ISO 9001
(or the latest applicable revision). The following documented information (approved/ signed
copies) shall be submitted:
o Quality management system manual or a (documented information) that have
defines and describes the QMS and its scope
o Quality Policy, aligned with the supplier’s strategic direction (documented
information)
o Quality Objectives (documented information)
o Control of documented information (both maintain and retain documented
information )
o Internal audit procedure (documented information)
o Control of nonconforming outputs (documented information)
o Nonconformity and Corrective action procedure (documented information)
The QMS should drive all the supplier’s business management processes to ensure that all of
Eskom’s requirements are fully met on a consistent basis.
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The supplier shall submit a draft contract quality plan that is specific to the scope of work as
described in the tender documents. The plan must address the minimum requirements as per
Iso 10005.
Where applicable; the supplier shall submit an example inspection and test plan (ITP) or
quality control plan (QCP).
The supplier shall submit documented information for Control of Externally Provided Processes,
The supplier shall submit a copy of documented information for roles, responsibilities and
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals, procedures.
NB: specific requirements per tender will be selected using the List of Tender Returnables
document (240-12248652).
3.5.5 Category 4: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit a quality method statement based on ISO 9001 and specific to the
scope of work.
The quality method statement should address all the supplier’s business management
processes to ensure that all of Eskom’s requirements are fully met on a consistent basis.
The supplier shall submit a signed/ approved quality policy (aligned with the supplier’s strategic
direction). (documented information)
The supplier shall submit a copy of quality objectives. (documented information)
The supplier shall submit documented information for Control of Externally Provided Processes,
evaluation.
Note: Form A (Enquiry/ Contract/ Quality Requirements for Supplier Quality Management:
Specification 240-105658000/ QM 58 and ISO 9001) will be used to select and indicate whether
capability and capacity assessment will be conducted.
3.7 Post-Contract Award
3.7.1 Contract Execution
The supplier shall submit the following documents within 30 days or as per stated timeline after the
contract date, prior to the commencement of work, for acceptance by Eskom:
The supplier shall complete a QCP before contract award. This shall be reviewed and
signed off by Eskom within 30 days or as per stated timeline after contract award.
The supplier shall complete a quality control plan and ITP(s) for review and acceptance by
Eskom prior to the commencement of any work, inclusive of subcontracted work, within 30
days or as per stated timeline after contract award.
The sub-supplier QCP/ ITP shall be submitted for review and comment by the supplier and
by Eskom within 30 days or as per stated timeline after the award of the tender. All supplier
and Eskom comments shall be resolved prior to commencing work.
The equipment lists and an indication of pressurised components and systems.
Note: These plans are to be compiled in line with Eskom’s requirements and will have to be
discussed with, and approved by, Eskom prior to any work commencing.
Correspondence shall be directed to the project manager, and periodic quality review
meetings shall be convened by Eskom with the supplier.
The mandatory quality review meetings are to be convened by the nominated project quality
manager or his/her representative for the contract.
Monthly quality performance and management reports are to be prepared by the supplier
during contract execution. The content of these reports shall be agreed by Eskom when
submitted to Eskom on a monthly basis.
execution of a contract using agreed key performance indicators. The monitored key performance
areas include the following:
CQP and QCP /ITP
Delivery
Design
Cost
Management system
Nonconformity monitoring
Audit and assessment evaluation scoring
Management system compliance and accreditation
Achievement of delivery targets as per contractual agreements
Process improvements
Correction and corrective action response and closure
3.7.3 Supplier Quality Audit
3.7.3.1 Quality audits and related quality performance reviews are intended to provide an objective
evaluation of compliance with performance expectations defined in this specification, in the
supplier contract quality plan (CQP), and in any other project scope of work specification.
3.7.3.2 Quality audits and related quality performance reviews include, but are not limited to, any
quality or other project functional area audits, assessments, verification of compliance
reviews, surveillance, inspections, or other interim or final assessments of scope of work
deliverables provided by the supplier or sub-suppliers
3.7.3.3 Quality audits and related quality performance reviews are intended to provide an objective
evaluation of compliance with performance expectations defined in this specification, in the
supplier contract quality plan (CQP), and in any other project scope of work specification.
3.7.3.4 Quality audits and related quality performance reviews include, but are not limited to, any
quality or other project functional area audits, assessments, verification of compliance
reviews, surveillance, inspections, or other interim or final assessments of scope of work
deliverables provided by the supplier or sub-suppliers.
3.8.1.1 shall be granted electronic and hard-copy access to all quality plans, procedures,
documentation, and other quality records relating to the work, including, but not limited to,
data extracts;
3.8.1.2 reserves the right to review, inspect, and audit any or all parts of the supplier’s QMS, as well
as any documentation, materials, or equipment associated with the work, at any time or
project work location; and
3.8.1.3 reserves the right to carry out assessments and audits on all new suppliers and sub-
suppliers.
3.8.1.4 shall support Eskom’s effort to monitor, verify, and/or witness any activities associated with
the work at any time;
3.8.1.5 shall cooperate with Eskom requests for documentation, records, and inspection and
witnessing. Eskom participation in audits, appraisals, assessment of plans, and verification
shall be conducted at no extra cost to Eskom;
3.8.1.6 shall ensure that a sub-supplier provides access to Eskom to all work procedures, records,
and supporting documentation through provision of access to view and photocopy, as
required, to support verification of scope of work requirements. Access shall include the
ability to photograph Eskom equipment, systems, system components, materials, etc.;
3.8.1.7 shall provide access to all quality-related information pertaining to activities performed by
itself or sub-suppliers, where Eskom might not have participated in the witnessing of their
quality assurance or control (this refers to inspections, audits, etc. performed by the supplier
on its own sub-suppliers);
3.8.1.8 shall allow Eskom to assess, audit, approve, or reject any sub-suppliers employed by
Eskom’s suppliers to assist with the product and/or service delivery to Eskom; and
3.8.1.9 shall ensure that the above requirements flow down to sub-suppliers.
supplier’s audit schedule.
3.8.2.4 To obtain access to any audit reports of audits performed by the supplier reflected in the
audit programme.
3.8.2.5 To conduct independent quality audits during all phases of the contract, and the supplier
shall provide all resources to support these activities.
3.8.2.6 Eskom shall have the right to participate in, or request that, a technical investigation be
launched and conducted at the supplier’s and sub-suppliers’ premises or other sites when
risk to Eskom products or service deliverables is identified.
3.8.2.7 To participate in, and/or lead, investigations related to incidents involving its products.
3.8.2.8 To require from suppliers to be responsible for the cost of re-inspections.
3.8.2.9 To withhold payment from suppliers as a result of outstanding nonconformities, irrespective
of the agreed payment schedule and in accordance with the conditions of contract.
3.8.2.10 Shall be granted electronic and hard-copy access to all quality plans, procedures,
documentation, and other quality records relating to the work, including, but not limited to,
data extracts.
3.8.2.11 Reserves the right to review, inspect, and audit any or all parts of the supplier’s QMS, as
well as any documentation, materials, or equipment associated with the work, at any time or
project work location.
3.8.2.12 Shall carry out assessments and audits on all new suppliers and sub-suppliers.
3.8.2.13 Reserves the right to appoint resident quality inspectors who can be based at the supplier’s
or sub-supplier’s premises and on site where the work is being performed.
3.8.2.14 Reserves the right to select intervention points within all developed supplier QCPs/ ITPs
for Eskom oversight of selected functions and to perform surveillance or audits of the work.
3.8.2.15 Shall be given access at all reasonable times before, during, and after manufacture and
before delivery, construction, erection, and commissioning to measure, test, and inspect the
products and workmanship, as necessary, at the supplier’s premises and at Eskom sites.
3.8.2.16 Reserves the right to suspend any pending deliveries by the issuing of a cease delivery
order at any time and for any portion of the work that is not being performed in accordance
with the specified/agreed requirements.
plans, processes, procedures and actions undertaken for the purpose of planning for and
maintenance of material deliverables quality. The supplier preservation programme scope includes,
but is not limited to, the following:
3.8.3.1 Engagement of personnel suitably qualified for oversight of, and (as required) direct
implementation of, preservation programme requirements.
3.8.3.2 Development and implementation of preservation programme training appropriate to work
need.
3.8.3.3 Eskom may make use of its appointed service provider tasked to provide a full suite of
services encompassing an online monitoring system and asset tracking during, but not
limited to the following stages: inspections, testing, shipping, transportation, storage, and
commissioning. The supplier is to enable full access during all of these stages in order to
allow the installation of the devices on Eskom-identified products and equipment, which
include the sub-supplier’s testing facilities, processing plant, and any other processes
deemed important towards effective and efficient quality control.
3.8.3.4 Eskom seeks cooperation between the supplier’s designers and those of Eskom’s service
provider in ensuring seamless installation of the device and other associated installations.
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
support structure requirements, for example, stools, pads, or other devices,
substrates, or support required to ensure in-storage and in-transit stability of
systems, system components, equipment, and material, or other discrete units or
items;
provision for physical separation and/or barriers to prevent airborne or direct
transmittal of contaminants between work areas or between work areas and storage
areas, for example, prevention of carbon steel grinding or cutting debris impact on
stainless steel elements, airborne drift of blast aggregate into vessels or machinery,
etc.;
provision for, and final disposition of, temporary and longer-term storage or transit
required supports and related binding devices, for example, stools, stands, sea
fasteners, platforms, chocks, spacers, cabling, etc.;
provision of requirements for temporary work platforms or other support structures
required to ensure provision of preservation services, for example, provision of a
self-elevating work platform for periodic access to elevated fittings, gauges, man-
ways, etc.;
requirements for protection against, or insulation from, contact with other objects, for
example, padding or other protection for external tubing, fittings, or other impact-
sensitive structures or components;
clear physical delineation of temporary and longer-term storage areas supplemented
by hard and soft barriers, as required, to maintain a protective perimeter;
documented agreements with storage facility and transportation provider
management regarding security management, including, but not limited to, facility
access and egress control and control of access to project goods and materials
within facility boundaries or aboard vehicles or vessels; and
detailed procedures for inspection and testing to verify performance of preservation
procedures and to provide for timely notice and corrective action to maintain
preservation status.
3.8.3.18 The supplier’s preservation management programme scope shall encompass
management of preservation requirements, from initial transfer of ownership or management
responsibility to project scope of responsibility, through any period of temporary or longer-
term storage and through any period of transit, including transit for final delivery at point of
active use or installation.
3.8.3.19 The supplier’s preservation management programme shall clearly and unambiguously
address processes and procedures to ensure that storage and control of materials are
accomplished in accordance with manufacturer recommendations, specifications, and
project-specific requirements.
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.4 Quality Audits Related Conditions
3.8.4.1 The supplier shall maintain an accurate quality audit and related quality performance review
schedule and shall incorporate the current schedule as an attachment to the supplier CQP.
3.8.4.2 The supplier’s quality audit and related quality performance review schedule development
process shall be designed to incorporate consideration of information generated by
previously conducted audits and reviews, by input from project risk management evaluations
(risk register), or from Eskom or sub-supplier subject matter expertise.
3.8.4.3 Eskom reserves the right to oversee supplier audit programmes by participating in selected
audits as an observer and by assessing the supplier during key work stages. Eskom will
coordinate with the supplier to develop an oversight schedule aligned with the supplier’s
audit schedule.
3.8.4.4 Eskom will have the right to obtain access to any audit reports of audits performed by the
supplier reflected in the audit programme.
3.8.4.5 Eskom reserves the right to conduct independent quality audits, scheduled and
unscheduled, during all phases of the contract. The supplier shall provide all resources to
support these activities.
3.8.4.6 Eskom shall be given access at all reasonable times before, during, and after manufacture
and before delivery, construction, erection, and commissioning to measure, test, and inspect
the products and workmanship, as necessary, at the supplier’s premises and at Eskom sites.
3.8.4.7 The supplier shall obtain access for Eskom to measure, test, witness tests, and inspect
products that are being manufactured by any sub-supplier. This includes surveillances.
3.8.4.8 The assessments and audits shall be carried out on all new suppliers and their sub-
suppliers.
3.8.4.9 Eskom shall have the right to participate in, or request that, a technical investigation be
launched and conducted at the supplier’s and sub-suppliers’ premises or other sites when
risk to Eskom products or service deliverables is identified.
3.8.4.10 Qualification requirements for supplier and sub-supplier personnel engaged in conducting
quality audits and related quality performance reviews shall be defined in the supplier CQP
and shall be in compliance with the Project Quality Personnel Qualification Specification.
3.8.5 Management of Nonconformities and Nonconforming Outputs Identified by Eskom
3.8.5.1 Nonconformity reports raised by Eskom and issued against the supplier shall be investigated
by the supplier as a matter of urgency in order to determine the root cause, corrective action
measures, as required, with implementation time frames.
3.8.5.2 A formal response shall be prepared in respect of the defined criteria and submitted to
Eskom for its review, evaluation, and acceptance, within a maximum of 14 calendar days
from the date of issue of the nonconformity and should be aligned with the site
requirements/procedure.
3.8.5.3 Eskom may, at its discretion, request a response sooner and, in any case, before the
supplier proceeding with any pending/further intervention or corrective action, as may be
required by Eskom.
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.5.4 Should Eskom or its inspection authority/agency identify any nonconforming products during
the conduct of its audits/surveillances/inspections, the supplier shall be deemed to be in
breach of contract and shall be held liable for any repair, rework, and/or associated
replacement costs. The supplier may, in such instances, also be held liable for the full costs
associated with the conducting of follow-up audits/surveillances/inspections.
3.8.5.5 The nature, magnitude, and/or frequency of nonconformity and inspection defect/rejection
reports raised by Eskom or its appointed inspection authority/agency shall form the basis of
any action to rescind/withdraw the supplier’s qualification status.
3.8.5.6 Nonconforming outputs identified by Eskom shall be documented via a NC Report and
issued to the suppliers via the contract communication protocol. The suppliers shall
investigate the matter and respond in writing to Eskom of disposition within the stated
contractual conditions.
Note: The dates for the disposition should align to contractual conditions.
3.8.5.7 Eskom shall identify repeat deficiencies as systematic failures of the supplier’s QMS and
shall notify the supplier of the trends. Eskom can initiate an internal audit to highlight the
system failures. The supplier with raise a Corrective Action Report and undertake Root
scope of work for the provision of the following special process services:
3.8.6.1 The supplier shall ensure that all processes which require that procedures be pre-qualified
or work methods and operators tested and qualified are controlled and all steps followed
before the work can commence.
3.8.6.2 This typically covers such activities as welding, non-destructive testing, special fabrication
techniques, coating, painting, etc.
3.8.6.3 All special processes (procedures and processes) shall be submitted for review and
acceptance by Eskom, accredited or certified agency. No work shall commence until these
are accepted.
3.8.6.4 Where applicable, a relevant Management System for the special process shall be certified
or approved by an accredited body and proof of certification shall be submitted to Eskom for
review. An example for this will be the Welding Management System based on ISO 3834.
3.8.6.5 Where samples are required for acceptance, these shall be submitted to Eskom for review
and acceptance.
Kerseri Pather General Manager: Risk and Sustainability
Lenock Meyer Acting Senior Manager: Quality Management
Pamela Dondashe Middle Manager: Quality Assurance
Mandla Mkhwanazi Middle Manager: SHEQ Procurement and Supply Chain Management
Suzette Manthe Senior Advisor: Quality Performance and Planning
Lorna Ndlela Middle Manager: Eskom Document and Records Management
October 2021 3 SA Sambo Specification was due for revision and in addition, to
align the requirements with the latest Eskom business
processes and systems.
October 2018 2 SA Sambo Specification reviewed to be aligned with the
requirements of ISO 9001:2015
March 2016 1 SA Sambo Specification was due for revision and also to
repackage the requirements and tender returnable
documents into four categories.
December 2011 0 A Hunter New document
Financial Requirements
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)No pricing format, bonds, guarantees, payment terms, or financial capacity thresholds are specified in this specification. These will be defined in the specific tender invitation and contract.
Compliance Requirements
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Mandatory:
Health & Safety
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)The specification references Eskom's SHEQ Policy (32-727) and IAEA Safety Standard GS-R-3.1 as informative references. Specific health and safety requirements are not detailed in this specification; they are governed by the referenced policies, applicable legislation, and the specific tender/contract scope. Suppliers performing special processes (e.g., radiography) must have personnel registered with statutory bodies as legally required.
Contractual Terms
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.3.20 The supplier’s preservation management programme shall incorporate special precautions
to address preservation and control of valves, electrical motors and components,
mechanical and rotating equipment, piping and fittings, instrumentation, flange faces,
gaskets, coatings, insulation, and other materials. Special precautions include, but are not
limited to, supplier-specified maintenance procedures related to engines, electric motors,
pumps, compressors, etc., such as periodic shaft rotation, engine turnover, lubrication, etc.
3.8.3.21 The supplier shall ensure that clear and unambiguous requirements for preservation of the
system, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented in purchase orders, work authorisations, and other
communications between the supplier and sub-suppliers.
3.8.3.22 Where sub-supplier expertise is utilised in determination of the preservation protocol,
supplier procurement processes shall ensure clear and unambiguous documentation of sub-
supplier input into preservation management programme requirements.
3.8.3.23 Supplier procurement shall ensure that preservation requirements for scope of work
systems, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented and that preservation requirements are efficiently and
effectively communicated to project logistics, construction management, quality, security,
and other project functional areas, as required, for efficient and effective implementation of
preservation requirements.
3.8.3.24 The supplier shall ensure comprehensive, clear, and unambiguous designation of sub-
supplier responsibility for execution of all preservation management programme elements,
including, but not limited to, all systems, processes, procedures, methods, ready access to
records, and provision of equipment, tools, or services essential to efficient and effective
execution of the preservation management programme.
3.8.3.25 The supplier shall ensure that preservation management programme responsibilities are
clearly and unambiguously defined within the project team and efficiently and effectively
implemented at all project scope of work locations. Inclusion of supplier and sub-supplier
scope of work in the development and implementation of a preservation management
programme shall be considered essential to efficient and effective preservation
management programme execution.
3.8.3.26 The supplier shall ensure clear and unambiguous designation of project team responsibility
for oversight and management of preservation management programme elements during
every stage of project development.
3.8.3.27 The supplier shall ensure that Eskom has free and unrestricted access to all preservation
records for inspection and audit.
Section
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Evaluation is based on the quality category assigned in Form A for each procurement. Categories 1–4 have escalating documentation requirements:
All categories require completed and signed Form A. Eskom may conduct capability and capacity assessments for high-risk/critical scopes. Sub-suppliers are assessed to the same standard. The List of Tender Returnables (240-12248652) defines exact requirements per tender. PPPFA preference points apply per the specific tender.
Important Dates
Source: Annexure_D_-_Integrity_Declaration_Form_-_29_July_2026.pdf (RFP){"closingDate":"21 February 2025"}
Contact Information
Source: Annexure_D_-_Integrity_Declaration_Form_-_29_July_2026.pdf (RFP)Fraud and corruption reporting (anonymous):
Submission Guidelines
Source: Annexure_D_-_Integrity_Declaration_Form_-_29_July_2026.pdf (RFP)Returnable forms — all must be completed, signed and submitted with the tender:
Disqualification risks:
Evaluation Criteria
Source: Annexure_D_-_Integrity_Declaration_Form_-_29_July_2026.pdf (RFP)evaluation/tender adjudication/negotiation.
Technical Specifications
Source: Annexure_D_-_Integrity_Declaration_Form_-_29_July_2026.pdf (RFP)appointment or election of,
directors of that company who control a majority of the votes at a meeting of the board;
(b) in the case of a juristic person that is a close corporation, that first person owns the majority
of the members’ interest, or controls directly, or has the right to control, the majority of
members’ votes in the close corporation;
C
Compliance Requirements
Source: Annexure_D_-_Integrity_Declaration_Form_-_29_July_2026.pdf (RFP)Mandatory declarations and disclosures:
Description
Source: SECTION 4 - SAFETY.pdfNEC Term Services Contract for the removal of illegal connections in the Central East Cluster, KZN Operating Unit on an 'as and when required' basis for 36 months
Contact Information
Source: SECTION 4 - SAFETY.pdf (unknown){"name":null,"email":null,"phone":null,"department":"on an 'as and when required' basis for a","address":null}
Health & Safety
Source: SECTION 4 - SAFETY.pdfSection 4 – Safety Requirements (detailed safety requirements not provided in extracted text)
Submission Guidelines
Source: SDL I Check list_.pdf (TENDER)Returnable documents required with the bid:
Forms marked N/a (SBD 6.2, Annexures C, D, E) are not required for this tender.
Returnable Documents
Source: SDL I Check list_.pdf (TENDER)Returnable documents required with the bid:
Forms marked N/a (SBD 6.2, Annexures C, D, E) are not required for this tender.
Evaluation Criteria
Source: SDL I Check list_.pdf (TENDER)Bidders must be registered on CIPC and provide a valid B-BBEE certificate or sworn affidavit. Shareholders' identity documents and share certificates are required. Financial statements must be submitted. Sub-contractor agreements and B-BBEE certificates are required if sub-contractors are used.
Compliance Requirements
Source: SDL I Check list_.pdf (TENDER)Mandatory compliance documents:
Evaluation Criteria
Source: BEE_Affidavit-QSE-Gen.pdf (unknown)Bidders qualifying as B-BBEE Qualifying Small Enterprises (annual total revenue between R10,000,000 and R50,000,000) must complete and submit the sworn affidavit, declaring black ownership percentages, black designated group ownership, and B-BBEE level.
Compliance Requirements
Source: BEE_Affidavit-QSE-Gen.pdf (unknown)B-BBEE Qualifying Small Enterprise sworn affidavit (General) must be completed and submitted. The affidavit requires declaration of: black ownership percentage (flow-through principle), black female ownership percentage, black designated group ownership percentage with breakdown (youth, disabled, unemployed, rural, military veterans), confirmation that annual total revenue is between R10,000,000 and R50,000,000 based on latest financial year-end, and applicable B-BBEE level (Level One for 100% black owned with 135% procurement recognition; Level Two for at least 51% black owned with 125% procurement recognition). Affidavit must be signed by deponent and commissioned by a Commissioner of Oaths; valid for 12 months from date of commissioning.
Submission Guidelines
Source: Annexure G - SBD 6.1 Preference Points Claim Form in terms of The PPR 2022.pdf (TENDER)Returnable Documents: File name: Annexure G - SBD 6.1 Preference Points Claim Form in terms of The PPR 2022.docx
Evaluation Criteria
Source: Annexure G - SBD 6.1 Preference Points Claim Form in terms of The PPR 2022.pdf (TENDER)Preference point system: 80/20 for contracts up to R50 million (all taxes included); 90/10 for contracts above R50 million. The specific system applicable to this tender is not indicated in the form — the organ of state must select option (a), (b) or (c) in clause 1.2. Total points for Price and Specific Goals = 100. Points for price calculated per standard formula (80 or 90 points maximum). Points for Specific Goals allocated per Table 1 (not completed in this form). Failure to submit proof/documentation for Specific Goals means no points are claimed for those goals. The organ of state may require substantiation of any preference claim at any time.
Technical Specifications
Source: Annexure G - SBD 6.1 Preference Points Claim Form in terms of The PPR 2022.pdf (TENDER)income-generating contracts) shall be
Compliance Requirements
Source: Annexure G - SBD 6.1 Preference Points Claim Form in terms of The PPR 2022.pdf (TENDER)Returnable form: SBD 6.1 (Preference Points Claim Form in terms of the Preferential Procurement Regulations 2022) — must be completed, signed and submitted with the tender. The form requires the tenderer to declare company/firm name, registration number, entity type, and certify that claimed preference points are true, correct and in accordance with the tender's specific goals. False claims may lead to disqualification, cost recovery, contract cancellation, restriction from state business for up to 10 years, and criminal prosecution.
Contractual Terms
Source: Annexure G - SBD 6.1 Preference Points Claim Form in terms of The PPR 2022.pdfSBD 6.1 declaration: tenderer must provide company/firm name, registration number, and entity type (partnership/JV/consortium, sole proprietor, close corporation, public company, personal liability company, (Pty) Ltd, trust, non-profit company, state-owned company). The authorised signatory certifies that claimed preference points are true, correct and in accordance with the tender's specific goals. If a contract is awarded, the contractor may be required to furnish documentary proof of claims. Fraudulent claims or failure to fulfil contract conditions may result in disqualification, recovery of costs/losses/damages, contract cancellation with damages, restriction from state business for up to 10 years (after audi alteram partem), and criminal prosecution.
Contact Information
Source: KEY Elements when completing a Sworn Affidavit.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"able)."}
Compliance Requirements
Source: KEY Elements when completing a Sworn Affidavit.pdf (unknown)B-BBEE Sworn Affidavit validity requirements:
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 46 of 2000
Relevant where professional engineering services or regulated engineering work may be required.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Address
VARIOUS - KWAZULU NATAL - KWAZULU NATAL -
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
34
Last checked
29 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
A technical guide to municipal electrical tenders. Covers CIDB EB/EP grading, electrification projects (INEP), substation maintenance panels, and COC compliance.
How mechanical and electrical engineers, contractors, and consultants can win public sector contracts in South Africa — HVAC, plumbing, fire systems, electrical infrastructure, ECSA registration, CIDB ME designation, and tender documentation essentials.
How small electrical contractors use Joint Ventures to combine EP grading, win Eskom and municipal infrastructure projects, and compete for renewable energy installations.
How small office supplies, stationery, and general goods suppliers use Joint Ventures to win government procurement contracts by combining inventory with B-BBEE credentials.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Services: Electrical. Unlock full pricing strategies, bid frequency, and historical win rates.