Kendal Power Station - Ogies/Balmoral - Witbank - 1035
Organization Type
GOVERNMENT
Published
26 Aug 2026
OCDS Reference
ocds-9t57fa-167038
This tender invites bids for the provision of a water dust suppression system for the ash dump at kendal power station, on an as-and-when-required basis over a five-year period. The service falls under professional services and is open to suppliers in mpumalanga. A compulsory briefing session will be held at the horticulture boardroom, kendal power station.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Monday, 14 September 2026 - 11:00
Venue
Horticulture Boardroom, Kendal Power Station
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Compulsory clarification meeting date: 03 september 2026 time: 11:00am till 12:00am venue: horticulture boardroom, kendal power station transport will depart kendal power station main gate at 10:30am ID document compulsory for entrance
Categories
Request for Bid(Open-Tender)
Kendal Power Station - Ogies/Balmoral - Witbank - 1035
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: CA(SA) - Chartered Accountant, PMI-PMP (Project Management Professional), Prince2 Practitioner, Six Sigma Certification
AI Document Analysis Stages
Compliance Requirements
Source: Signed Water Dust Suppression TES.pdf (unknown)26 Aug
2026
Tender Published
Tender was published
14 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Signed Water Dust Suppression TES.pdf
SDLI STRATEGY for Water dust suppression.pdf
Eskom is procuring a five-year, as-and-when-required service for an ash dump water dust suppression system at Kendal Power Station in Mpumalanga. The contract includes specific goals for B-BBEE preference points and SDL&I obligations covering transformation, local procurement, job creation, subcontracting, and skills development.
E3404GXMPKEN C0 TSC3 Contract cover pages ASH DUMP WATER DUST SUPPRESSON.zip
Eskom is procuring a five-year, as-and-when-required service for the supply, delivery, installation, and commissioning of a water dust suppression system at the Kendal Power Station ash dump. The contract is an NEC3 Term Service Contract (TSC3) Option A (priced contract with a price list), covering HDPE piping, sprinklers, hoses, and ancillary equipment, with installation and commissioning included.
BOQ Water Dust Suppression.pdf
This tender is for the provision of a water dust suppression system at Kendal Power Station, on an as-and-when-required basis for a period of five years. The contract is based on the NEC3 Engineering and Construction Contract, Option B (Priced contract with bill of quantities), and includes the supply and installation of HDPE piping and sprinkler sets.
Commercial - E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.zip
Eskom is procuring a five-year, as-and-when-required service for a water dust suppression system at the ash dump at Kendal Power Station in Mpumalanga. The tender requires bidders to register and submit documents through Eskom's eTendering system and to complete mandatory forms including an e-Tendering training acknowledgement and a non-disclosure agreement.
Invitation to Tender (ITT) Water dust suppression August 26.pdf
Eskom Holdings SOC Ltd is procuring a five-year, as-and-when-required contract for the provision of an ash dump water dust suppression system at Kendal Power Station. The contract will be governed by the NEC 3 Term Service Contract, with tenders submitted electronically via Eskom's e-tendering portal.
SOW Water Dust suppression.pdf
Eskom is procuring a contractor to supply, deliver, install, and commission a water-based dust suppression system (HDPE pipes, sprinklers, hoses) for the ash disposal facility at Kendal Power Station, and to supply replacement components on an as-and-when-required basis for five years.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Median Estimate
R 4 666 240
Range
Based on 7 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Insufficient searchable text - AI extraction recommended
Description
Source: SOW Water Dust suppression.pdfStation
Title: Kendal Power Station ADF Unique Identifier:
Sprinkler system
Alternative Reference Number: N/A
Area of Applicability: Kendal Power
station
Engineering
Documentation Type: Scope of Work
Revision: 1
Total Pages: 10
Next Review Date: N/A
Disclosure Classification: CONTROLLED
Disclosure
Compiled by Approved by Accepted by
Mfanelo Mkhize Mzwandile Gcaleka Phumelele Thanjekwayo
System Engineer Aux Eng Manager Coal and Ash manager
Date: ...................... 25/03/2026 Date: .......................26/03/2026 Date: .......................13.04.2026
Kendal Power Station ADF Sprinkler system Unique Identifier:
Revision: 1
Page:
Contents
. Introduction ................................................................................................................................................................... 3
2.1 Scope.................................................................................................................................................................................. 3
2.1.1 Purpose ................................................................................................................................................................................. 3
2.1.2 Applicability ........................................................................................................................................................................... 3
2.2 Normative/informative references ...................................................................................................................... 3
2.2.1 Normative .............................................................................................................................................................................. 3
2.2.2 Informative............................................................................................................................................................................. 5
2.3 Disclosure classification ........................................................................................................................................ 5
2.4 Abbreviations ................................................................................................................................................................. 5
2.5 Roles and responsibilities ....................................................................................................................................... 6
2.6 Process for monitoring ............................................................................................................................................ 6
2.7 Related/supporting documents ............................................................................................................................. 6
3.1. Supply and Delivery ...................................................................................................................................................................... 7
3.2. Installation and Commissioning ................................................................................................................................................... 8
3.3. Requirements.................................................................................................................................................................. 9
3.3.1 Deliverables .......................................................................................................................................................................... 9
3.3.2 Safety .................................................................................................................................................................................... 9
3.3.3 Warranty ................................................................................................................................................................................ 9
4 authorisation ............................................................................................................................................................... 10
5 revisions ......................................................................................................................................................................... 10
6 development team ...................................................................................................................................................... 10
7 acknowledgements ................................................................................................................................................... 10
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Kendal Power Station ADF Sprinkler system Unique Identifier:
Revision: 1
Page:
This document is necessary to outline the technical requirements of the ash dust suppression scope and
the area of exposed ash to be covered to prevent ash dust from spreading on the Ash Disposal Facility at
Kendal Power Station.
2.1 Scope
This document will cover the scope of work for dust suppression service provider. Detailing the technical
requirements of the dust suppression and the area of exposed ash to be covered to prevent ash dust at
Kendal Power Station Ash Disposal Facility. The scope covers the technical aspects, environmental and
safety only. This scope is divided into two sections, first section covers the supply of all required
equipment, installation and commissioning of a fully functional dust suppression system, the second
section covers the supply and delivery of components for a period of 60 months (5 years) on an as and
when required basis.
2.1.1 Purpose
The purpose of this document is to provide a scope of work for the sourcing of a Contractor for Kendal
ADF, for supplying, delivering and installation of water pipelines and sprinklers for dust suppression on
ash to prevent dust, which is in line with the National Dust Control Regulations (GNR 827).
2.1.2 Applicability
This document shall apply to Kendal Power Station- ADF.
2.2 Normative/informative references
Parties using this document shall apply the most recent edition of the documents listed in the following
paragraphs.
2.2.1 Normative
[1] ISO 9001 Quality Management Systems.
[2] Occupational Health and Safety Act (Act ) with applicable standards and regulations.
[3] 32-95 OHS Incident Management Procedure Rev 9.
[4] 32-136_Contractor Health and Safety Requirements
[5] 32- 421 Eskom Life Saving Rules.
[6] 32-726 Standard Contract and Contractor OHS Management Rev. 3
[7] 32-727 - Eskom Safety, Health, Environmental and Quality (SHEQ) Policy
[8] National Environmental Management: Air Quality Act (No. )
[9] Kendal Ash Disposal Facility Water Use License
[10] Kendal Ash Dump Waste License
[11] The National Water Act (Act ) and Regulation GN 704 including other applicable
regulations.
[12] Ash Dump Environmental Management Plan.
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Kendal Power Station ADF Sprinkler system Unique Identifier:
Revision: 1
Page:
[13] Ash Dump Operational and Maintenance Manual
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Kendal Power Station ADF Sprinkler system Unique Identifier:
Revision: 1
Page:
2.2.2 Informative
[1] Best Practice Guidelines (relevant and applicable).
2.3 Disclosure classification
Controlled disclosure: controlled disclosure to external parties (either enforced by law, or discretionary).
2.4 Abbreviations
Abbreviation Description
ADF Ash Disposal Facility
PPE Personal Protective Equipment
MSDS Materials Safety Data Sheets
HDPE High Density Polyethylene
UV Ultraviolet
PVC Polyvinyl Chloride
PPE Personal Protective Equipment
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Kendal Power Station ADF Sprinkler system Unique Identifier:
Revision: 1
Page:
2.5 Roles and responsibilities
Compiler: Responsible for compiling the document and ensuring that the content is integrated.
Contractor: The Contractor shall be responsible for the duties as defined in section 7, “Duties of the
Contractor” of the Construction Regulations and all duties as defined by Contract data.
Employer: Eskom Holdings is the owner of the plant and has the responsibility of providing reliable
electricity to the country.
Functional Responsible: The Functional Responsible person is responsible to approve the content of the
document and assure its correctness before the document is submitted for authorization.
Authorizer: The document Authorizer is responsible to ensure that the correct processes were followed
in developing this document and that the relevant stakeholders have been involved. The authorizer also
reviews the document for alignment to business strategy, policy, objectives and requirements. He/she shall
authorize the release and application of the document. Process for monitoring this document shall be
utilized as a baseline document during the validation of design documentation during the various,
subsequent design phases by using the Design Review Procedure and the Verification and Validation
(V&V) process. Should the document require modification, the appropriate Project Engineering Change
Procedure will be adhered to.
2.6 Process for monitoring
N/a
2.7 Related/supporting documents
N/a
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Kendal Power Station ADF Sprinkler system Unique Identifier:
Revision: 1
Page:
The Supplier shall be responsible for all aspects of the project as outlined below, from supply and delivery
to commissioning.
3.1. Supply and Delivery
The Supplier shall supply all necessary equipment in accordance with the specifications below. The
equipment must be delivered to the site, Kendal Power Station Ash Dump.
o Supply 110mm Nominal diameter HDPE pipe for connection from the cannons to the middle
of the slope where water sprinklers will be connected.
o Maximum Working pressure: 20 bar
o The length of the pipe will depend in the distance from the cannon to the middle of the slope
o The number of tap-off points for sprinkler connection will depend on the distance from the
cannon to the slope and the size of the area to be suppressed per cannon.
o Supply a minimum of 35 industrial-grade trolley water sprinklers.
o Sprinklers shall be impact-driven or gear-driven, suitable for high-flow applications.
o Throw diameter: 50m.
o Maximum working pressure: 20 bar
o Material: Corrosion-resistant, heavy-duty construction (e.g., brass, stainless steel, or durable
plastic).
o Nozzles: A selection of interchangeable nozzles must be provided to allow for adjustments to
flow rate and spray pattern
o Supply a minimum of 35 flexible hoses, each with a length of 100 meters.
o Hose diameter: 25mm nominal
o Material: Heavy-duty, abrasion-resistant, and UV-stabilized material suitable for industrial
and outdoor environments (e.g., PVC lay-flat or reinforced rubber).
o Working Pressure: Minimum of 6 bar.
o Fittings: Hoses shall be supplied with high-quality, corrosion-resistant fittings on both ends
for quick connection to the water source and sprinklers.
o 409m of 280mm NB HDPE pipes (sub-main). Assuming they come in 6m lengths, required
will be 70 off (2 spares)
o 440m of 110mm NB HDPE pipes (take-off). Assuming they come in 6m lengths, will need 75
off (2 spares).
o 25 sprinkler sets (couplings, isolation valves, flexible hoses, stands and sprinklers).
o 2x reducers (reducing from 280 to 110mm) HDPE
o 2 elbows 280mm HDPE
o 2x tee piece 110mm HDPE
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Kendal Power Station ADF Sprinkler system Unique Identifier:
Revision: 1
Page:
o 1500m of 110NB HDPE pipe with tap off points (t-piece and a stopper) every 100m to
run along 00ETK24
o 327m of 280mm NB HDPE pipe (sub-main). Assuming they come in 6m lengths, we will
need 56 off (1 spare)
o 4x tee-piece and stoppers for each tee
o 2 stoppers at the end.
o All components for the spreader side are 280mm diameter.
o Supply all required connectors, adapters, gaskets, clamps, valves, fittings and seals to
ensure a leak-proof and secure installation.
o Provide any required spanners or tools for the installation and operation of the hose fittings.
In addition to the above, the supply shall, for a period of 5 years, on an as and when required basis
supply and deliver the items below:
o 1500m of 280ND HDPE pipe
o 3000m of 110NB HDPE pipe
o 50 sprinklers set (couplings, isolation valves, flexible hoses, stands and sprinklers)
3.2. Installation and Commissioning
The Supplier shall be responsible for the full installation and commissioning of the system at the Kendal ash
dump location.
for the water points and sprinkler deployment.
o Connect the HDPE pipe to the existing water supply points (at the cannons).
o Have tap- off points with manual valves along the HDPE pipe for the connection of
sprinklers. This will be connected according to the client’s discretion.
o Install the supplied sprinklers at the end of each hose.
o Secure all connections to prevent leaks and ensure stability under pressure.
o Conduct a full system test to verify proper operation of all sprinklers and hoses.
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Kendal Power Station ADF Sprinkler system Unique Identifier:
Revision: 1
Page:
o Check for any leaks at all connections and fittings.
o Ensure each sprinkler is delivering the correct flow rate and spray pattern as per
specifications.
o The Supplier shall provide a brief demonstration and training to the Client’s nominated
personnel on the correct operation, connection, and disconnection of the system.
3.3. Requirements
3.3.1 Deliverables
Upon completion of the work, the Supplier shall provide:
3.3.2 Safety
The Supplier must adhere to all site-specific safety regulations and industry standards. All personnel must
always wear appropriate Personal Protective Equipment (PPE) while on site.
Eskom premises.
with access control.
operational site.
3.3.3 Warranty
The Supplier shall provide a minimum 12-month warranty on all supplied equipment and the installation
work, covering defects in materials and workmanship.
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Kendal Power Station ADF Sprinkler system Unique Identifier:
Revision: 1
Page:
4 authorisation
This document has been seen and accepted by:
Name & Surname Designation
M. Gcaleka Aux Eng Manager
P. Thanjekwayo Ash and Coal Manager (Acting)
S. Mashele Ash & Coal Snr Supervisor
S. Mazibuko Ash & Coal Snr Supervisor
5 revisions
Date Rev. Compiler Remarks
October 2025 0 M Mkhize
6 development team
The following people were involved in the development of this document:
7 acknowledgements
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Kendal Power Station ADF Sprinkler system Unique Identifier:
Revision: 1
Page:
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Evaluation Criteria
Source: SOW Water Dust suppression.pdf (unknown)Compliance with the Occupational Health and Safety Act and Eskom safety procedures (including 32-95, 32-136, 32-421, 32-726, 32-727). Adherence to National Dust Control Regulations (GNR 827), National Environmental Management: Air Quality Act, National Water Act, and relevant licenses. Equipment must be inspected and accepted by Eskom Safety Department. Personnel must be vetted by Eskom Security and hold access control. Contractor must provide adequate PPE for personnel.
Technical Specifications
Source: SOW Water Dust suppression.pdf (unknown)Station
Title: Kendal Power Station ADF Unique Identifier:
Sprinkler system
Alternative Reference Number: N/A
Area of Applicability: Kendal Power
station
Engineering
Documentation Type: Scope of Work
Revision: 1
Total Pages: 10
Next Review Date: N/A
Disclosure Classification: CONTROLLED
Disclosure
Compiled by Approved by Accepted by
Mfanelo Mkhize Mzwandile Gcaleka Phumelele Thanjekwayo
System Engineer Aux Eng Manager Coal and Ash manager
Date: ...................... 25/03/2026 Date: .......................26/03/2026 Date: .......................13.04.2026
Kendal Power Station ADF Sprinkler system Unique Identifier:
Revision: 1
Page:
Contents
. Introduction ................................................................................................................................................................... 3
2.1 Scope.................................................................................................................................................................................. 3
2.1.1 Purpose ................................................................................................................................................................................. 3
2.1.2 Applicability ........................................................................................................................................................................... 3
2.2 Normative/informative references ...................................................................................................................... 3
2.2.1 Normative .............................................................................................................................................................................. 3
2.2.2 Informative............................................................................................................................................................................. 5
2.3 Disclosure classification ........................................................................................................................................ 5
2.4 Abbreviations ................................................................................................................................................................. 5
2.5 Roles and responsibilities ....................................................................................................................................... 6
2.6 Process for monitoring ............................................................................................................................................ 6
2.7 Related/supporting documents ............................................................................................................................. 6
3.1. Supply and Delivery ...................................................................................................................................................................... 7
3.2. Installation and Commissioning ................................................................................................................................................... 8
3.3. Requirements.................................................................................................................................................................. 9
3.3.1 Deliverables .......................................................................................................................................................................... 9
3.3.2 Safety .................................................................................................................................................................................... 9
3.3.3 Warranty ................................................................................................................................................................................ 9
4 authorisation ............................................................................................................................................................... 10
5 revisions ......................................................................................................................................................................... 10
6 development team ...................................................................................................................................................... 10
7 acknowledgements ................................................................................................................................................... 10
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Kendal Power Station ADF Sprinkler system Unique Identifier:
Revision: 1
Page:
This document is necessary to outline the technical requirements of the ash dust suppression scope and
the area of exposed ash to be covered to prevent ash dust from spreading on the Ash Disposal Facility at
Kendal Power Station.
2.1 Scope
This document will cover the scope of work for dust suppression service provider. Detailing the technical
requirements of the dust suppression and the area of exposed ash to be covered to prevent ash dust at
Kendal Power Station Ash Disposal Facility. The scope covers the technical aspects, environmental and
safety only. This scope is divided into two sections, first section covers the supply of all required
equipment, installation and commissioning of a fully functional dust suppression system, the second
section covers the supply and delivery of components for a period of 60 months (5 years) on an as and
when required basis.
2.1.1 Purpose
The purpose of this document is to provide a scope of work for the sourcing of a Contractor for Kendal
ADF, for supplying, delivering and installation of water pipelines and sprinklers for dust suppression on
ash to prevent dust, which is in line with the National Dust Control Regulations (GNR 827).
2.1.2 Applicability
This document shall apply to Kendal Power Station- ADF.
2.2 Normative/informative references
Parties using this document shall apply the most recent edition of the documents listed in the following
paragraphs.
2.2.1 Normative
[1] ISO 9001 Quality Management Systems.
[2] Occupational Health and Safety Act (Act ) with applicable standards and regulations.
[3] 32-95 OHS Incident Management Procedure Rev 9.
[4] 32-136_Contractor Health and Safety Requirements
[5] 32- 421 Eskom Life Saving Rules.
[6] 32-726 Standard Contract and Contractor OHS Management Rev. 3
[7] 32-727 - Eskom Safety, Health, Environmental and Quality (SHEQ) Policy
[8] National Environmental Management: Air Quality Act (No. )
[9] Kendal Ash Disposal Facility Water Use License
[10] Kendal Ash Dump Waste License
[11] The National Water Act (Act ) and Regulation GN 704 including other applicable
regulations.
[12] Ash Dump Environmental Management Plan.
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Kendal Power Station ADF Sprinkler system Unique Identifier:
Revision: 1
Page:
[13] Ash Dump Operational and Maintenance Manual
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Kendal Power Station ADF Sprinkler system Unique Identifier:
Revision: 1
Page:
2.2.2 Informative
[1] Best Practice Guidelines (relevant and applicable).
2.3 Disclosure classification
Controlled disclosure: controlled disclosure to external parties (either enforced by law, or discretionary).
2.4 Abbreviations
Abbreviation Description
ADF Ash Disposal Facility
PPE Personal Protective Equipment
MSDS Materials Safety Data Sheets
HDPE High Density Polyethylene
UV Ultraviolet
PVC Polyvinyl Chloride
PPE Personal Protective Equipment
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Kendal Power Station ADF Sprinkler system Unique Identifier:
Revision: 1
Page:
2.5 Roles and responsibilities
Compiler: Responsible for compiling the document and ensuring that the content is integrated.
Contractor: The Contractor shall be responsible for the duties as defined in section 7, “Duties of the
Contractor” of the Construction Regulations and all duties as defined by Contract data.
Employer: Eskom Holdings is the owner of the plant and has the responsibility of providing reliable
electricity to the country.
Functional Responsible: The Functional Responsible person is responsible to approve the content of the
document and assure its correctness before the document is submitted for authorization.
Authorizer: The document Authorizer is responsible to ensure that the correct processes were followed
in developing this document and that the relevant stakeholders have been involved. The authorizer also
reviews the document for alignment to business strategy, policy, objectives and requirements. He/she shall
authorize the release and application of the document. Process for monitoring this document shall be
utilized as a baseline document during the validation of design documentation during the various,
subsequent design phases by using the Design Review Procedure and the Verification and Validation
(V&V) process. Should the document require modification, the appropriate Project Engineering Change
Procedure will be adhered to.
2.6 Process for monitoring
N/a
2.7 Related/supporting documents
N/a
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Kendal Power Station ADF Sprinkler system Unique Identifier:
Revision: 1
Page:
The Supplier shall be responsible for all aspects of the project as outlined below, from supply and delivery
to commissioning.
3.1. Supply and Delivery
The Supplier shall supply all necessary equipment in accordance with the specifications below. The
equipment must be delivered to the site, Kendal Power Station Ash Dump.
o Supply 110mm Nominal diameter HDPE pipe for connection from the cannons to the middle
of the slope where water sprinklers will be connected.
o Maximum Working pressure: 20 bar
o The length of the pipe will depend in the distance from the cannon to the middle of the slope
o The number of tap-off points for sprinkler connection will depend on the distance from the
cannon to the slope and the size of the area to be suppressed per cannon.
o Supply a minimum of 35 industrial-grade trolley water sprinklers.
o Sprinklers shall be impact-driven or gear-driven, suitable for high-flow applications.
o Throw diameter: 50m.
o Maximum working pressure: 20 bar
o Material: Corrosion-resistant, heavy-duty construction (e.g., brass, stainless steel, or durable
plastic).
o Nozzles: A selection of interchangeable nozzles must be provided to allow for adjustments to
flow rate and spray pattern
o Supply a minimum of 35 flexible hoses, each with a length of 100 meters.
o Hose diameter: 25mm nominal
o Material: Heavy-duty, abrasion-resistant, and UV-stabilized material suitable for industrial
and outdoor environments (e.g., PVC lay-flat or reinforced rubber).
o Working Pressure: Minimum of 6 bar.
o Fittings: Hoses shall be supplied with high-quality, corrosion-resistant fittings on both ends
for quick connection to the water source and sprinklers.
o 409m of 280mm NB HDPE pipes (sub-main). Assuming they come in 6m lengths, required
will be 70 off (2 spares)
o 440m of 110mm NB HDPE pipes (take-off). Assuming they come in 6m lengths, will need 75
off (2 spares).
o 25 sprinkler sets (couplings, isolation valves, flexible hoses, stands and sprinklers).
o 2x reducers (reducing from 280 to 110mm) HDPE
o 2 elbows 280mm HDPE
o 2x tee piece 110mm HDPE
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Kendal Power Station ADF Sprinkler system Unique Identifier:
Revision: 1
Page:
o 1500m of 110NB HDPE pipe with tap off points (t-piece and a stopper) every 100m to
run along 00ETK24
o 327m of 280mm NB HDPE pipe (sub-main). Assuming they come in 6m lengths, we will
need 56 off (1 spare)
o 4x tee-piece and stoppers for each tee
o 2 stoppers at the end.
o All components for the spreader side are 280mm diameter.
o Supply all required connectors, adapters, gaskets, clamps, valves, fittings and seals to
ensure a leak-proof and secure installation.
o Provide any required spanners or tools for the installation and operation of the hose fittings.
In addition to the above, the supply shall, for a period of 5 years, on an as and when required basis
supply and deliver the items below:
o 1500m of 280ND HDPE pipe
o 3000m of 110NB HDPE pipe
o 50 sprinklers set (couplings, isolation valves, flexible hoses, stands and sprinklers)
3.2. Installation and Commissioning
The Supplier shall be responsible for the full installation and commissioning of the system at the Kendal ash
dump location.
for the water points and sprinkler deployment.
o Connect the HDPE pipe to the existing water supply points (at the cannons).
o Have tap- off points with manual valves along the HDPE pipe for the connection of
sprinklers. This will be connected according to the client’s discretion.
o Install the supplied sprinklers at the end of each hose.
o Secure all connections to prevent leaks and ensure stability under pressure.
o Conduct a full system test to verify proper operation of all sprinklers and hoses.
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Kendal Power Station ADF Sprinkler system Unique Identifier:
Revision: 1
Page:
o Check for any leaks at all connections and fittings.
o Ensure each sprinkler is delivering the correct flow rate and spray pattern as per
specifications.
o The Supplier shall provide a brief demonstration and training to the Client’s nominated
personnel on the correct operation, connection, and disconnection of the system.
3.3. Requirements
3.3.1 Deliverables
Upon completion of the work, the Supplier shall provide:
3.3.2 Safety
The Supplier must adhere to all site-specific safety regulations and industry standards. All personnel must
always wear appropriate Personal Protective Equipment (PPE) while on site.
Eskom premises.
with access control.
operational site.
3.3.3 Warranty
The Supplier shall provide a minimum 12-month warranty on all supplied equipment and the installation
work, covering defects in materials and workmanship.
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Kendal Power Station ADF Sprinkler system Unique Identifier:
Revision: 1
Page:
4 authorisation
This document has been seen and accepted by:
Name & Surname Designation
M. Gcaleka Aux Eng Manager
P. Thanjekwayo Ash and Coal Manager (Acting)
S. Mashele Ash & Coal Snr Supervisor
S. Mazibuko Ash & Coal Snr Supervisor
5 revisions
Date Rev. Compiler Remarks
October 2025 0 M Mkhize
6 development team
The following people were involved in the development of this document:
7 acknowledgements
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Kendal Power Station ADF Sprinkler system Unique Identifier:
Revision: 1
Page:
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Quality Management
Source: SOW Water Dust suppression.pdfdump location.
for the water points and sprinkler deployment.
o Connect the HDPE pipe to the existing water supply points (at the cannons).
o Have tap- off points with manual valves along the HDPE pipe for the connection of
sprinklers. This will be connected according to the client’s discretion.
o Install the supplied sprinklers at the end of each hose.
o Secure all connections to prevent leaks and ensure stability under pressure.
o Conduct a full system test to verify proper operation of all sprinklers and hoses.
Compliance Requirements
Source: SOW Water Dust suppression.pdf (unknown)No specific requirements found
Health & Safety
Source: SOW Water Dust suppression.pdfsafety only. This scope is divided into two sections, first section covers the supply of all required
equipment, installation and commissioning of a fully functional dust suppression system, the second
section covers the supply and delivery of components for a period of 60 months (5 years) on an as and
when required basis.
2.1.1 Purpose
paragraphs.
2.2.1 Normative
[1] ISO 9001 Quality Management Systems.
[2] Occupational Health and Safety Act (Act ) with applicable standards and regulations.
[3] 32-95 OHS Incident Management Procedure Rev 9.
[4] 32-136_Contractor Health and Safety Requirements
[5] 32- 421 Eskom Life Saving Rules.
[6] 32-726 Standard Contract and Contractor OHS Management Rev. 3
[7] 32-727 - Eskom Safety, Health, Environmental and Quality (SHEQ) Policy
[8] National Environmental Management: Air Quality Act (No. )
[9] Kendal Ash Disposal Facility Water Use License
[10] Kendal Ash Dump Waste License
[11] The National Water Act (Act ) and Regulation GN 704 including other applicable
regulations.
[12] Ash Dump Environmental Management Plan.
Revision: 1
Page:
2.5 Roles and responsibilities
Compiler: Responsible for compiling the document and ensuring that the content is integrated.
Contractor: The Contractor shall be responsible for the duties as defined in section 7, “Duties of the
Contractor” of the Construction Regulations and all duties as defined by Contract data.
Employer: Eskom Holdings is the owner of the plant and has the responsibility of providing reliable
electricity to the country.
Functional Responsible: The Functional Responsible person is responsible to approve the content of the
document and assure its correctness before the document is submitted for authorization.
Authorizer: The document Authorizer is responsible to ensure that the correct processes were followed
in developing this document and that the relevant stakeholders have been involved. The authorizer also
reviews the document for alignment to business strategy, policy, objectives and requirements. He/she shall
authorize the release and application of the document. Process for monitoring this document shall be
utilized as a baseline document during the validation of design documentation during the various,
subsequent design phases by using the Design Review Procedure and the Verification and Validation
(V&V) process. Should the document require modification, the appropriate Project Engineering Change
Revision: 1
Page:
o 1500m of 110NB HDPE pipe with tap off points (t-piece and a stopper) every 100m to
run along 00ETK24
o 327m of 280mm NB HDPE pipe (sub-main). Assuming they come in 6m lengths, we will
need 56 off (1 spare)
o 4x tee-piece and stoppers for each tee
o 2 stoppers at the end.
o All components for the spreader side are 280mm diameter.
o Supply all required connectors, adapters, gaskets, clamps, valves, fittings and seals to
ensure a leak-proof and secure installation.
o Provide any required spanners or tools for the installation and operation of the hose fittings.
In addition to the above, the supply shall, for a period of 5 years, on an as and when required basis
supply and deliver the items below:
o 1500m of 280ND HDPE pipe
o 3000m of 110NB HDPE pipe
o 50 sprinklers set (couplings, isolation valves, flexible hoses, stands and sprinklers)
3.2. Installation and Commissioning
3.3.2 Safety
always wear appropriate Personal Protective Equipment (PPE) while on site.
Contractual Terms
Source: SOW Water Dust suppression.pdf. Introduction ................................................................................................................................................................... 3
2.1 Scope.................................................................................................................................................................................. 3
2.1.1 Purpose ................................................................................................................................................................................. 3
2.1.2 Applicability ........................................................................................................................................................................... 3
2.2 Normative/informative references ...................................................................................................................... 3
2.2.1 Normative .............................................................................................................................................................................. 3
2.2.2 Informative............................................................................................................................................................................. 5
2.3 Disclosure classification ........................................................................................................................................ 5
2.4 Abbreviations ................................................................................................................................................................. 5
2.5 Roles and responsibilities ....................................................................................................................................... 6
2.6 Process for monitoring ............................................................................................................................................ 6
2.7 Related/supporting documents ............................................................................................................................. 6
3.1. Supply and Delivery ...................................................................................................................................................................... 7
3.2. Installation and Commissioning ................................................................................................................................................... 8
3.3. Requirements.................................................................................................................................................................. 9
3.3.1 Deliverables .......................................................................................................................................................................... 9
3.3.2 Safety .................................................................................................................................................................................... 9
3.3.3 Warranty ................................................................................................................................................................................ 9
4 authorisation ............................................................................................................................................................... 10
5 revisions ......................................................................................................................................................................... 10
6 development team ...................................................................................................................................................... 10
7 acknowledgements ................................................................................................................................................... 10
with access control.
operational site.
3.3.3 Warranty
The Supplier shall provide a minimum 12-month warranty on all supplied equipment and the installation
work, covering defects in materials and workmanship.
Section
Source: SOW Water Dust suppression.pdf[1] ISO 9001 Quality Management Systems.
[7] 32-727 - Eskom Safety, Health, Environmental and Quality (SHEQ) Policy
[8] National Environmental Management: Air Quality Act (No. )
[11] The National Water Act (Act ) and Regulation GN 704 including other applicable
Important Dates
Source: Commercial - E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.zip (TENDER){"closingDate":"23Aug2022","closingTime":"3:42pm"}
Contact Information
Source: Commercial - E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.zip (TENDER){"name":null,"email":"[email protected]","phone":null,"department":null,"address":"ls before they can be granted access to the eTendering system. An"}
Evaluation Criteria
Source: Commercial - E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.zip (TENDER)Bidders must have a CSD number to access the eTendering system. The e-Tendering training acknowledgement form is mandatory and must be fully completed and submitted; failure to do so will result in disqualification. The NDA must be signed. Bidders must complete the applicable PAYE questionnaire (Pack A for companies/CCs/trusts, Pack B for individuals).
Technical Specifications
Source: Commercial - E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.zip (TENDER)eTendering system is a web-based system that allows suppliers bidding for various tenders advertised
on Tender Bulletin system to “upload” their tender documents. Currently the tenderers or suppliers
submit tender documents at various Eskom tender offices. eTendering system replaces the manual or
physical submission of tender documents at various Eskom tender offices. eTendering system in a
nutshell is an electronic box where tender documents can be “dropped” or “uploaded”. Suppliers will
be required to register their details before they can be granted access to the eTendering system. An
OTP (one time pin) will be sent to both their cell phone and email address.
Quick and direct access is also available by using the following links:
of the public, to view and access Eskom published tenders. eTendering hyperlink will be found
on this site. Members of the public may follow prompt instructions once they have clicked on
the eTendering link (https://eTendering.eskom.co.za). This link will allow them to upload the
required tender documentation.
members of the public, to view information about published tenders and submit their tender
documents.
eTendering system.
2 Problems
A channel of communication has been created in case users of the system experiences a problem
with the system. In a case users come across some difficulties in using Tender bulletin, eTendering
and OpenText systems they need to contact the buyer responsible for the published tender.
3 What’s New
A new functionality to “add closed tenders”. Closed tenders refers to the tenders which are not listed
on Tenderbulletin as normal tenders, but are tenders sent directly to the relevant and potential
suppliers who meet the selection and evaluation criteria to offer what the buyer needs. These
suppliers will be sent a link via email to bid privately.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
4 Getting Started
To gain access to eTendering portal
Open your web browser
Type TenderBulletin (eskom.co.za) or https://eTendering.eskom.co.za
eTendering system login page will be displayed:
Fig 1
Registration Form Steps to follow
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Plus prefix e.g +27
capture picture to validate that you
are not a robot.
click on register button
the registerer to verify the email sent to
the provided email address.
click on “Resend Verification Email”
button
on link provided on
the email.
etendering site with a login screen
displayed, now complete the login
with your verified email address and
password
Fig1.1
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Fig2a.
Fig2b.
Fig3.
OTP page will be displayed
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
OTP sent to the registered cellphone number and email address
Insert the otp number then click “Verify OTP” button, to resend OTP click on “Resend OTP”
button
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Landing page once OTP is verified
Select the preferred “Ref No”
A page with the preferred Tender information is displayed before tender documentation can
be submitted.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Click on “Create New Submission” button to submit required Tender documents
Landing page once clicked on “Create New Submission” button. Take note of the
mentioned disclaimers.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
To submit tender documents, click on “Add file” button
Upload required tender documents by:
Giving the file a name
Select the listed file type e.g.: Technical, commercial, finance and etc
Choose the file you need to upload
Then click on “Upload” button, Fig5.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Fig4.
Fig5.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Continue to submit all the required documents under the correct category ,i.e: Technical
should be selected if technical documentation is uploaded and etc. Verify all required
documents are uploaded before making ‘Final Submission’ by clicking on ‘Finalize
Submission’ button.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
all uploaded files should not exceed 900MB.
will pop-up
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
If not all documents were submitted or still wish to add or submit more documents, click on
“No, continue adding files” button.
submission and closed time and date timestamp at the bottom.
submitted tenders will be displayed.
If you want to view or verify the submitted documents, click on “View Submission” button
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
submitted documents on email,Fig6.This is the final step for the submitter or tenderer.
It is vital to save the email with the submission ID for future enquiry if need be.
--------Originalmessage--------
From:Eskom E-Tender Document Submission 28 [email protected]
Date:Tue,23Aug2022,3:42pm
Subject: Response To Submitter
Eskom E-Tender Document Submission 28
Hi Monalisa
You have finalized a new submission with submission id:14 on tender #MPKUS10086PS
closing date : 2022-11-30 10:00:00.
Have started the submission from 2022-08-23 14:28:33 and finalized at 2022-08-23
15:42:28
Tender Description:
Award for Provision of Office Cleaning and Janitorial Services at Kusile Power Station
Project
Files Submitted:
ID Original Name Title Size Type
38 Test7.pdf testingCom 33141 Commercial
40 Test1.pdf testingTech 33502 Technical
41 Test15.pdf testingFin 33141 Finance
Thanks,
Eskom E-Tender Document Submission 28 Automated Mail
© 2022 Eskom E-Tender Document Submission 28. All rights reserved.
NB: This Email and its contents are subject to the Eskom Holdings SOC Ltd EMAIL
LEGAL NOTICE which can be viewed at
http://www.eskom.co.za/Pages/Email_Legal_Spam_Disclaimer.aspx
Fig6.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
5 Edit Registration
To edit already registered information such as Name, Organization, CSD and cell phone number
select “Edit Registration” on the drop down, Fig1. New window with information that needs to be
updated pop ups,Fig2. Click on “Update” button to update registration details.
Fig1.
Fig2.
6 Log off Button
To logout, click “Log out” on the dropdown next to your name
Fig1.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
7 Password reset
To reset a forgotten password, click “Forgot your password” Fig1. and a new screen will
pop up to enter an alternative email where the new password will be sent Fig2.Confirmation
message will be sent to the user, Fig3.
Fig1.
Fig2.
Fig3.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
An email confirming password reset will be sent to the email provided.
Click on the link or “Reset Password” button to reset the password.
Fig4.
A new window will pop up to reset and confirm the new password, Fig5.Enter new
password and confirm then click on “Reset Password” button.
Fig5.
OTP window will pop up, type in the OTP sent to either the cell phone or email address.
Fig6.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
OTP successfully goes through and lands on the below screen, password is successfully
reset.
Fig7.
8 General
This system is compatible to most web browsers however we recommend Ms Edge.
The end.
© 2023 Eskom of 19
Provision of coal and auxiliary plant
Project
The Fourth Schedule to the Income Tax Act (“the Act”) requires that Employees' Tax must be
withheld from "remuneration" paid by an "Employer" to an "Employee". This tool is intended to establish
whether an Individual, Close Corporation, Company or Trust should be classified as an Independent
Contractor, Personal Service Provider, Labour Broker or a Dependent Contractor, and the tax
consequences of such classification.
This Pack is applicable ONLY to Contractors who supply Eskom Holdings SOC Ltd (“Eskom”) and its
subsidiaries with services or Individual Contractors providing Eskom with labour.
The Contractor or its duly authorised representative must declare that all questions have been answered
truthfully.
Answering the questions will direct you to your next step.
Please note:
This Pack is based on tax legislation for the 2025/2026 tax year and is subject to change.
In the questions, any references to "you" refers to the Contractor.
In the questions, the term Contractor is used interchangeably with Individual/CC/Company/Trust.
Definitions as per the Income Tax Act are included in Appendix 10.
Any reference to “Eskom” refers to Eskom Holdings SOC Ltd and its subsidiaries:
Eskom Rotek Industries SOC Ltd
Eskom Enterprises SOC (Pty) Ltd
Escap SOC (Pty) Ltd
Eskom Finance Company SOC (Pty) Ltd
Eskom Foundation NPC
Eskom National Transmission Company SA
The Pack is based on legislation and case law applicable to the 2025/2026 tax year. We therefore
recommend that, if it is used outside of this period, you should first consult with your representative in
Eskom to refer it to Eskom’s Corporate Tax Department in Megawatt Park.
When you return the completed Pack; i.e. the signed summary sheet and signed affidavits to Eskom,
please copy Group Tax on Email address: [email protected]
The Contractor or its duly Authorised Representative acknowledges and accepts that:
ease of reading.
this Pack;
Disclaimer
Applicable to the 2025/2026 Tax Years
Eskom accepts no liability whatsoever for any loss or damages whatsoever and howsoever incurred, or
suffered, resulting, or arising, from the use of this Pack.
Contractor type
Supplier category
Please complete the following questionnaire for:
Company/Close Corporation/Trusts - EVALUATION PACK A on .
Individuals - EVALUATION PACK B on .
Applicable to the 2025/2026 Tax Years
Evaluation pack a
(To determine whether a Company, Close Corporation (CC) or Trust is a Personal
Service Provider)
Fields marked with an Asterisk (*) must be completed
Contractor’s details for a company or close corporation or
Trust
Contractor’s Name* Vendor No.
Duly Authorised Representative Name Representative Surname
Capacity Representative ID No.*
Representative Passport No. (if no RSA ID) Country of Passport Issue
VAT Registration No. Income Tax Registration No.*
CO/CC/Trust Registration No.* E-Mail Address
Telephone Number* Fax Number
Contractor’s Physical Business Address*
Unit No
Complex Name
Street Number
Street Name
Suburb
City/Town
Postal Code
Contractor’s Postal Business Address*
Same as above (Mark with an X)
Address TYPE (Delete where not applicable) P O Box/Private Bag/Street Address
P O Box/Private Bag/Street NUMBER
Street Name
Suburb
Town
Postal Code
Contractor’s Bank Details*
Account Number Bank Name
Branch Name Branch Number
Name of Account Holder Account Type (Delete where not applicable)
Current/ Savings/ Transmission/Credit Card/Bond
Account
Account Holder Relationship*
i.e. own, joint or 3rd party Own/Joint/3rd Party
Applicable to the 2025/2026 Tax Years
Please answer the following questions by marking the appropriate column with an
"X".
The term “You” will refer to the Company/CC/Trust in this Questionnaire.
Question 1(i)
Are you a Resident of the Republic of South Africa in terms of the Income Tax Act?
(Refer to Appendix 10 for the definition of a resident).
If the answer is Yes, go to Question 2(i).
If the answer is No:
Eskom to refer it to Eskom Group Tax Department in Megawatt Park.
Question 2(i)
Do you employ 3 (three) or more persons (excluding shareholders or members or
beneficiaries of the Company/CC/Trust)?
If the answer is Yes, go to Question 2(ii).
If the answer is No, go to Question 3(i).
Question 2(ii)
Are these employees employed:
If the answer is Yes, go to Question 2(iii).
If the answer is No, go to Question 3(i).
Question 2(iii)
Are the above 3 employees connected to the shareholders or the members or the
beneficiaries of the Company/CC/Trust?
If the answer is Yes, go to Question 3(i).
If the answer is No:
from your payments.
from your payments.
Corporation/Trust” at the end of the Evaluation Pack.
Applicable to the 2025/2026 Tax Years
Question 3(i)
Will/are any person who is a Connected person in relation to the Company/CC/Trust
render services personally to Eskom on behalf of the Company/CC/Trust? (Refer to
Appendix 10 for the definition of a Connected person).
If the answer is Yes, go to Question 4(i).
If the answer is No:
from your payments.
from your payments.
Corporation/Trust” at the end of the evaluation Pack.
Question 4(i)
During the current year of assessment:
received either directly or indirectly, from:
the definition of an Associated institution)
If the answer is Yes:
Corporation/Trust” at the end of the evaluation Pack.
If the answer is No:
from your payments.
Question 5(i)
Must your duties be performed /are your duties performed mainly (more than 50%) at
the premises of Eskom,
And
Will you be subject /are you subject to Eskom’s control or supervision as to the
manner in which your duties are to be performed?
If the answer is Yes to BOTH questions:
Corporation/Trust” at the end of the evaluation Pack.
If the answer is No:
from your payments.
Applicable to the 2025/2026 Tax Years
Question 6(i)
Do/will the payments by Eskom for services payable with reference to output or
certain agreed results, e.g. payment (be it a fixed fee or an hourly rate) be only due if
and when a specific deliverable has been completed?
Question 6(ii)
Does/Will Eskom have the contractual right to control the tools or equipment, staff,
raw materials, routines, patents or technology used in the provision of the services?
Question 6(iii)
Are you/will you prohibited from rendering services to any other employers/clients
during the period of service to Eskom?
Question 6(iv)
Do/will you have the right to sub-contract work?
Question 6(v)
Are you personally or will you personally be at risk for the quality of the work done or
to be done (risk for poor quality; time over-runs, project not producing income)?
Question 6(vi)
Are/will you or the person rendering the service be obliged to be present and perform
the work at Eskom regardless of whether work is available or not?
Question 6(vii)
Is Eskom’s business or will Eskom’s business be critical to your financial/economic
survival?
Question 6(viii)
Does/will your position form part of Eskom’s organisational structure?
Question 6(ix)
Does/will Eskom provide you with any of the following:
Question 6(x)
Does/will Eskom provide you with an office?
Question 6(xi)
Does/will Eskom provide you with any equipment, tools, stationery and material?
Please go to the next section to establish your tax status.
Applicable to the 2025/2026 Tax Years
To establish your tax status, you need to summarise the “Yes” and “No” as
answered on Question 6(i) to 6(xi) in the column below:
Question Yes No
6(i) Independent PSP
6(ii) PSP Independent
6(iii) PSP Independent
6(iv) Independent PSP
6(v) Independent PSP
6(vi) PSP Independent
6(vii) PSP Independent
6(viii) PSP Independent
6(ix) PSP Independent
6(x) PSP Independent
6(xi) PSP Independent
Decision
Independent
Psp
If you have answered “PSP” to any of the following questions 6 (i), 6(iii), 6(v), 6(vi),
6(ix);
or
If you have answered more than 50% “PSP” to questions 6(ii), 6(iv), 6(vii), 6(viii),
6(x), 6(xi):
and will be coded as 3601 on your IRP5 certificate.
Corporation/Trust” at the end of the evaluation Pack.
Alternatively:
If you have already signed Appendix 7 on Questions 4 or 5:
disclosed on the IRP5 for payments received.
If you have not signed Appendix 7 on Questions 4 or 5:
from your payments.
Corporation/Trust” at the end of the evaluation Pack.
Applicable to the 2025/2026 Tax Years
Summary for ID No. Vendor No:
Company/Close Corporation/Trust Summary
Please sign
he following
Compliance Requirements
Source: Commercial - E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.zip (TENDER)No specific requirements found
CSD number to gain access to
Section
Source: Commercial - E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.zipA new functionality to “add closed tenders”. Closed tenders refers to the tenders which are not listed
suppliers who meet the selection and evaluation criteria to offer what the buyer needs. These
Important Dates
Source: E3404GXMPKEN C0 TSC3 Contract cover pages ASH DUMP WATER DUST SUPPRESSON.zip (unknown){"briefingSession":"{"date":null,"time":null,"venue":"ion, inspection and verification of the Employer’s intervention points","is_compulsory":false}"}
Contact Information
Source: E3404GXMPKEN C0 TSC3 Contract cover pages ASH DUMP WATER DUST SUPPRESSON.zip (unknown){"name":null,"email":null,"phone":null,"department":"for the","address":null}
Evaluation Criteria
Source: E3404GXMPKEN C0 TSC3 Contract cover pages ASH DUMP WATER DUST SUPPRESSON.zip (unknown)The document does not state explicit eligibility criteria such as CSD registration, tax clearance, B-BBEE level, CIDB grading, or local content requirements. However, the bidder must complete the Contract Data Part 2 (C1.2b) including name, address, fee percentages, risk register matters, key people, and pricing data. The bidder must sign the Form of Offer and Acceptance (C1.1) and complete the Schedule of Deviations. The bidder must comply with B-BBEE status change notification requirements (Z3). The bidder must not cede, delegate, or assign rights without Eskom's written consent (Z1). Joint ventures must be jointly and severally liable and cannot change composition without consent (Z2). The bidder must comply with ethics provisions (Z11) and insurance requirements (Z12). The bidder must provide a tax invoice with Eskom's VAT number (Z7). The bidder must adhere to confidentiality (Z4) and health, safety, and environmental requirements (Z6). The bidder must comply with asbestos provisions (Z14).
Technical Specifications
Source: E3404GXMPKEN C0 TSC3 Contract cover pages ASH DUMP WATER DUST SUPPRESSON.zip (unknown)appointment it shall not be necessary to prove)
for amounts due in Rands
6 Compensation events All Compensation Events are to be managed as
per core clause 6 of the NEC3 TSC
7 Use of Equipment Plant and To be managed as per core clause 7 of the
Materials NEC3 TSC
8 Risks and insurance To be managed as per core clause 8 of the
Nec3 tsc
80.1 These are a
(17) The Price for Services Provided to Date is the total of
of the service ........................................................................................................................... 3
1.1 Executive overview .......................................................................................................................... 3
1.2 Employer’s requirements for the service ........................................ Error! Bookmark not defined.
1.3 Interpretation and terminology ........................................................................................................ 7
2 Management strategy and start up. ....................................................................................................... 7
2.1 The Contractor’s plan for the service .............................................................................................. 7
2.2 Management meetings .......................................................................................................................... 7
2.3 Contractor’s management, supervision and key people ....................................................................... 8
2.4 Provision of bonds and guarantees ..................................................
Financial Requirements
Source: E3404GXMPKEN C0 TSC3 Contract cover pages ASH DUMP WATER DUST SUPPRESSON.zip (unknown)Payment Terms: payment certificate from the Service Manager in terms of core clause 51.1,
the Contractor provides the Employer with a tax invoice showing the amount due for payment equal to that
stated in the Service Manager’s payment certificate.
The Contractor shall address the tax invoice to the Employer and include on each invoice the following
information:
Compliance Requirements
Source: E3404GXMPKEN C0 TSC3 Contract cover pages ASH DUMP WATER DUST SUPPRESSON.zip (unknown)No specific requirements found
Manager via an early warning and/or followed by a claim for compensation event with a quotation.
compensation event accordingly. All claims will not necessarily be approved as a compensation event nor do
B-BBEE Details: ronmental constraints and management ........................................................................................ 9
3.3 Quality assurance requirements ............................................................................................................ 9
3.3.3 Reliability and Availability................................................................................................................. 11
4.1 People .................................................................................................................................................. 12
4.1.1 BBBEE and preferencing scheme ................................................................................................... 12
4.2 Subcontracting ..................................................................................................................................... 12
4.2.1 Preferred subcontractors ................................................................................................................. 12
Part c3: scope of work 2 c3 tsc3 cover page
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
Ash dump water dust suppression on as when required basis for a period
Of 60 months
1.1 Executive overview
The Supplier shall be responsible for all aspects of the project as outlined below, from supply and
delivery to commissioning.
1.1. Supply and Delivery
The Supplier shall supply all necessary equipment in accordance with the specifications below.
The equipment must be delivered to the site, Kendal Power Station Ash Dump.
o Supply
Section
Source: E3404GXMPKEN C0 TSC3 Contract cover pages ASH DUMP WATER DUST SUPPRESSON.zip (unknown)quotes have to be accepted unchanged since the Service Manager performs an evaluation and approves
3.3 Quality assurance requirements
quality requirements.
Some quality assurance requirements are listed below
a. The Contractor complies with the Employer’s quality and technical requirements including those
listed in the Employer’s specification document QM58 (Quality Management Specification 240
3.3.1 Quality Management documents requirements
The Contractor will supply the Employer with a QCP which will detail the Contractor’s organisation, quality
assurance and quality control procedures spec
3.3 Quality assurance requirements ............................................................................................................ 9
o The number of tap-off points for sprinkler connection will depend on the distance
Important Dates
Source: SDLI STRATEGY for Water dust suppression.pdf (unknown){"closingDate":"01 April 2023"}
Contact Information
Source: SDLI STRATEGY for Water dust suppression.pdf (unknown){"name":null,"email":null,"phone":null,"department":"Gx Kendal Power Station","address":null}
Evaluation Criteria
Source: SDLI STRATEGY for Water dust suppression.pdf (unknown)Bidders must provide a valid B-BBEE certificate or sworn affidavit (depending on annual revenue: EME if ≤ R10 million, QSE if ≤ R50 million, or full certificate if > R50 million). Bidders must provide proof of ownership/shareholding (preferably CIPC documentation) and certified ID copies of shareholders. For trusts, consortia, or joint ventures, a consolidated B-BBEE certificate is required. Bidders who fail to provide documentation for preference points will not be disqualified but will score 0 out of 10 for specific goals and may only score out of 90 for price. Bidders must comply with the B-BBEE improvement milestones: Level 4 at award must achieve Level 3 by end of first year; Level 5-8 or non-compliant must achieve Level 4 by end of first year and improve one level each subsequent year. Bidders must submit a B-BBEE improvement plan within 30 days of contract signing. Bidders must be willing to subcontract at least 10% of the scope to Black-owned EME/QSE (at least 51% black-owned), preferably local to site, and not part of the main contractor's subsidiaries.
Technical Specifications
Source: SDLI STRATEGY for Water dust suppression.pdf (unknown)Provision of Ash Dump Water Dust Suppression System
Work
Methodology
Source: SDLI STRATEGY for Water dust suppression.pdfthrough their supply network. In certain cases, the SETA’s accredited training providers can be
approached to participate in developing critical and scarce skills.
Note: That these targets for skills development candidates categorically exclude Eskom employees
and registered learners. The tenderers are required to take full responsibility for the total cost of
developing the requisite skills, and Eskom shall not make any financial contribution towards the
fulfilment of this obligation. Tenderers also are advised to approach their relevant SETAs to access
grants, subsidies, and incentives as well as South African Revenue Services for tax rebates that are
earmarked for skills development initiatives
Pricing Schedule
Source: SDLI STRATEGY for Water dust suppression.pdftender response must be separated into its components as per the Price Schedule included with
the tender documents. Local procurement content is total spending minus the imported component.
Health & Safety
Source: SDLI STRATEGY for Water dust suppression.pdffollowing key pointers to ensure their validity:
know that person is duly authorised to depose of an affidavit. (Mark the applicable option).
applicable, and enterprise business address.
specialised enterprises as per Statement 004, the percentage of black beneficiaries must be
reflected. (No blank spaces to be left).
statements or management account. (Mark the applicable option).
determine the total revenue. (Financial year end to be stipulated by day/month/year).
for the empowering supplier status.
Section
Source: SDLI STRATEGY for Water dust suppression.pdfSection 1: Specific Goals
A maximum of 10 points may be awarded to a tenderer for the specific goal specified for the
tender. The points scored for the specific goal must be added to the points scored for price and the
B-BBEE Status Level of Number of points Number of points
Contributor (90/10 system) (80/20 system)
NB: The following documents are required to claim preference points,
Tenderer failing to provide documentation for the allocation of preference points will not be
Tenderer/s will be allocated points in terms of a preference
Tenderer/s will be allocated points in terms o
Evaluation Criteria
Source: BOQ Water Dust Suppression.pdf (unknown)Bidders must complete the Form of Tender and submit the priced Bill of Quantities. The contract is based on NEC3, and bidders must be able to comply with the contract data and scope of works. No specific eligibility criteria (e.g., CIDB grading, B-BBEE level, tax clearance) are stated in the provided document.
Technical Specifications
Source: BOQ Water Dust Suppression.pdf (unknown)Employers Objectives
29 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Over view of the works
30 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Extent of the works
31 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Location of the works
32 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Temporay Works
33 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
Water dust suppression system
-8-
Brought Forward R
Preparation of as Built Drawings
34 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Preferential procurement deliverables
35 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Provide employment and skills development
opportunities to targeted labour
36 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Partiicapation goals
37 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Social and economic deliverables
38 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Work specifications
39 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Applicable SANS 2001 standards
40 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Applicable national and interantional standards
41 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Particular / generic specifications
42 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
Water dust suppression system
-9-
Brought Forward R
Materials, samples and shop drawings
43 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Instruction manuals and guarantees
44 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Training staff of the employer
45 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Construction equipment
46 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Existing Services
47 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Dimensional accuracy
48 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Treatment of existing services
49 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Use of detection equipment for the location of
underground services
50 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Damage of services
51 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
Water dust suppression system
-10-
Brought Forward R
Reinstate of services and structures damaged
during construction
52 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Site Establishment
53 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Service - Electricity
54 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Service - Water
55 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Ablution facilities
56 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Facilities provided by the contractor
57 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Storage and laboratory facilities provided by
the contractor
58 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Telecommunication facilities
59 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Security of the works
60 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
Water dust suppression system
-11-
Brought Forward R
Security of the works
61 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Compliance with manufacturers instructions
62 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Protection/ islolation of existing/sectional
occupied works
63 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Notice Boards
64 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Notice before covering works
65 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Site usage
66 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Permits and way leaves
67 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Inspection of adjoining properties
68 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Water for construction purposes
69 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
Water dust suppression system
-12-
Brought Forward R
Management of the works
70 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Recording of weather
71 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Site Meetings and procedures
72 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Health & safety requirements
73 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Protection of the public
74 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Aids Awareness
75 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Daywork
76 Artisan 8
77 Labourer 8
78 Supervisor 8
79 Contractor's manager 8
Carried to Final Summary R
Section No. 1
Bill No. 1
Preliminaries
Water dust suppression system
-13-
Section summary - preliminaries
Bill Page Amount
No No
Part C2.2 BILL OF PROVISIONAL
Quantities
1 preliminaries 13
Section 1
Preliminaries
Notes
The NEC3 Engineering and Construction Contract
(Third edition of June 2005 with amendments
June 2006) in conjunction with the Contract Data
is taken to be incorporated herein
The Tenderer is deemed to have taken cognizance
of the abovementioned documents for the full
intent and meaning of each clause. These clauses
are referred to by clause number and heading only
Where standard clauses or options are not
applicable to this contract such modifications,
corrections or supplements as are necessary, are
given under each relevant clause
Where any items are not used for this specific
contract such items are nevertheless listed but
marked not applicable in the amount column
The amount of the Preliminaries to be included in
each monthly payment certificate shall be assessed
as an amount prorated to the value of the work
duly executed in the same ratio as the
preliminaries bears to the total of prices excluding
any contingency sum, the amount for the
Preliminaries and any amount in respect of
contract price adjustment provided for in the
contract
Where the initial contract period is extended, the
monthly charge shall be calculated on the basis as
set out in (v) but taking into account the revised
period for completing the works
Carried Forward R
Section No. 1
Water dust suppression system
-14-
Section summary - preliminaries
Bill Page Amount
No No
Brought Forward R
The amount or the items of the Preliminaries are
adjusted to take account of the theoretical
financial effect which changes in time or value (or
both) have on this section. Such adjustments are
based on adjustments in the following categories
as recorded in the Bill of Quantities:
a) an amount which is not varied, namely fixed
b) an amount which is varied in proportion to the
contract value, namely Value Related; and
c) an amount which is varied in proportion to the
construction period as compared to the initial
construction period excluding revisions to the
construction period for which the contractor is not
entitled to adjustment in terms of the contract,
namely Time Related
Where no provision is made in the Bill of
Quantities to indicate which of the three
categories in (vii) apply or where no
selection is made, the adjustments shall be
based on the following breakdown:
a) 10 percent is Fixed:
b) 15 percent is Value related
c) 75 percent is Time Related
The adjustment of the Preliminaries shall apply
notwithstanding the actual employment of
resources in the execution of the works. The
contract value used for the adjustment of the
Preliminaries shall exclude any contingency sum,
the amount for the Preliminaries and any amount
in respect of contract price adjustment provided for
in the contract. Adjustments in respect of any
staged or sectional completion shall be prorated to
the value of each section.
Items not priced in these preliminaries are deemed
to be included elsewhere in this bill of quantities
Carried Forward R
Section No. 1
Water dust suppression system
-15-
Section summary - preliminaries
Bill Page Amount
No No
Brought Forward R
Section a: core clauses
General (a1)
Clause 1.0
Clause 11.2(4) is amended by replacing it with
the following:
The Contract Date is the date when the contractor
receives one fully completed signed copy of this
document, including the schedule of deviations (if
any) as contained in the the Form of Offer and
Acceptance
Fixed:....................... Value Related:.......................
Time Related:....................... Item
The contractor's main responsibilities
(A2)
Clause 2.0
The contractor must provide and keep a copy of
the NEC3 Engineering and Construction Contract -
Option B: Priced contract with bill of quantities
applicable to this contract and a copy of the
Procurement Document on the site, to which the
Project Manager and Supervisor have access at all
times
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Time (a3)
Clause 3.0
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Testing and defects (a4)
Carried Forward R
Section No. 1
Water dust suppression system
-16-
Section summary - preliminaries
Bill Page Amount
No No
Brought Forward R
Clause 4.0
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Payment (a5)
Clause 5.0
Clause 50.0 is amended by the addition of the
following clause:
Materials and goods stored off site are not included
in the amount authorised for payment
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Compensation events (a6)
Clause 6.0
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Title (a7)
Clause 7.0
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Risks and insurance (a8)
Clause 8.0
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Termination (a9)
Clause 9.0
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Carried Forward R
Section No. 1
Water dust suppression system
-17-
Section summary - preliminaries
Bill Page Amount
No No
Brought Forward R
Section b: main option clauses
Priced contract with bill of
Quantities (b1)
Clause 10.0
The quantities in provisional bills of quantities are
an indication of the works to be executed and are
subject to remeasurement
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Section c: dispute resolution
Option w1 (c1)
Clause 11.0
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Section d: secondary option
Clauses
X1 price adjustment for inflation
(D1)
Clause 12.0
Fixed:....................... Value Related:.......................
Time Related:....................... Item
X2 changes in the law (d2)
Clause 13.0
Fixed:....................... Value Related:.......................
Time Related:....................... Item
X3 multiple currencies (d3)
Carried Forward R
Section No. 1
Water dust suppression system
-18-
Section summary - preliminaries
Bill Page Amount
No No
Brought Forward R
Clause 14.0
Fixed:....................... Value Related:.......................
Time Related:....................... Item
X4 parent company guarantee (d4)
Clause 15.0
Fixed:....................... Value Related:.......................
Time Related:....................... Item
X5 sectional completion (d5)
Clause 16.0
Fixed:....................... Value Related:.......................
Time Related:....................... Item
X6 bonus for early completion (d6)
Clause 17.0
Fixed:....................... Value Related:.......................
Time Related:....................... Item
X7 delay damages (d7)
Clause 18.0
Fixed:....................... Value Related:.......................
Time Related:....................... Item
X12 partnering (d8)
Clause 19.0
Fixed:....................... Value Related:.......................
Time Related:....................... Item
X13 performance bond (d9)
Clause 20.0
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Carried Forward R
Section No. 1
Water dust suppression system
-19-
Section summary - preliminaries
Bill Page Amount
No No
Brought Forward R
X14 advanced payment to the
Contractor (d10)
Clause 21.0
Fixed:....................... Value Related:.......................
Time Related:....................... Item
X15 limitation of the contractor's
Liability for his design to
Reasonable skill and care (d11)
Clause 22.0
Fixed:....................... Value Related:.......................
Time Related:....................... Item
X16 retention (d12)
Clause 23.0
Fixed:....................... Value Related:.......................
Time Related:....................... Item
X17 low performance damages (d13)
Clause 24.0
Fixed:....................... Value Related:.......................
Time Related:....................... Item
X18 limitation of liability (d14)
Clause 25.0
Fixed:....................... Value Related:.......................
Time Related:....................... Item
X20 key performance indicators
(D15)
Carried Forward R
Section No. 1
Water dust suppression system
-20-
Section summary - preliminaries
Bill Page Amount
No No
Brought Forward R
Clause 26.0
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Z additional conditions of
Contract (d16)
Clause 27.0
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Section e: contract data
Contract data (e1)
Clause 28.0
Tenderers are referred to Part C1.2 Contract Data
for variables pertaining to this contract
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Employers Objectives
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Over view of the works
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Extent of the works
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Carried Forward R
Section No. 1
Water dust suppression system
-21-
Section summary - preliminaries
Bill Page Amount
No No
Brought Forward R
Location of the works
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Temporay Works
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Preparation of as Built Drawings
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Preferential procurement deliverables
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Provide employment and skills development
opportunities to targeted labour
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Partiicapation goals
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Social and economic deliverables
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Work specifications
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Applicable SANS 2001 standards
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Carried Forward R
Section No. 1
Water dust suppression system
-22-
Section summary - preliminaries
Bill Page Amount
No No
Brought Forward R
Applicable national and interantional standards
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Particular / generic specifications
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Materials, samples and shop drawings
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Instruction manuals and guarantees
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Training staff of the employer
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Construction equipment
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Existing Services
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Dimensional accuracy
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Treatment of existing services
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Carried Forward R
Section No. 1
Water dust suppression system
-23-
Section summary - preliminaries
Bill Page Amount
No No
Brought Forward R
Use of detection equipment for the location of
underground services
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Damage of services
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Reinstate of services and structures damaged
during construction
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Site Establishment
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Service - Electricity
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Service - Water
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Ablution facilities
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Facilities provided by the contractor
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Carried Forward R
Section No. 1
Water dust suppression system
-24-
Section summary - preliminaries
Bill Page Amount
No No
Brought Forward R
Storage and laboratory facilities provided by
the contractor
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Telecommunication facilities
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Security of the works
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Security of the works
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Compliance with manufacturers instructions
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Protection/ islolation of existing/sectional
occupied works
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Notice Boards
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Notice before covering works
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Site usage
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Carried Forward R
Section No. 1
Water dust suppression system
-25-
Section summary - preliminaries
Bill Page Amount
No No
Brought Forward R
Permits and way leaves
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Inspection of adjoining properties
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Water for construction purposes
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Management of the works
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Recording of weather
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Site Meetings and procedures
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Health & safety requirements
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Protection of the public
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Aids Awareness
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Carried to Final Summary R
Section No. 1
Water dust suppression system
-26-
Item Quantity Rate Amount
No
Section NO. 2
Bill NO. 2
Water suppression
Supplementary preambles
High density polyethylene (HDPE)
High density polyethylene (HDPE) piping shall be of
approved manufacture complying with SANS
Specification 533 and shall be of the class
specified, laid and jointed in accordance with the
manufacturer’s instructions. Piping must be
jointed with compression fittings with compression
rings and coupling nuts.
High Density Polyethylene / Polypropylene /
Multilayed piping shall be of approved
manufacture, complying with SANS Specification
15875-1-2004 & 2/2003 & 1315, laid and jointed
in accordance with the manufacturer’s
instructions.
All pipes shall be jointed and fixed strictly in
accordance with the manufacturer's instructions
All pipe diameters are nominal external
Reducing fittings
Where fittings have reducing ends or branches
they are described as "reducing". In the case of
pipes with diameters not exceeding 60mm only the
largest end or branch size is given. Should the
contractor wish to use other fittings and bushes or
reducers he may do so on the understanding that
no claim in this regard will be entertained. In the
case of pipes with diameters exceeding 60mm all
sizes are given and no claim for extra bushes,
reducers, etc will be entertained
Carried Forward R
Section No. 2
Bill No. 1
Water suppression
Water dust suppression system
-27-
Brought Forward R
User note:
Dependent on soil or environmental conditions
laps may require to be increased to a maximum of
55% (which results in a double layer)
Stacker cleaning
1 280mm diameter HDPE pipe, max pressure:20bar
m 1 500
2 110mm diameter HDPE pipe, max pressure:20bar
m 3 000
Extra over HDPE pipes for
3 280mm Bend No 50
4 110mm Bend No 50
Overall Dust suppression
5 Vrysa 86 Sprinkler sets including couplings,
isolation valves, flexible hoses, stands and
sprinklers.
No 50
Carried to Final Summary R
Section No. 2
Bill No. 1
Water suppression
Water dust suppression system
-28-
Final summary
Section Page Amount
No No
1 preliminaries 26
2 water suppression (5 year contract) 28
SUB-TOTAL excluding Value Added Tax (VAT) R
Value-added Tax R
Carried to Form of Tender R
Water dust suppression system
-29-
Quality Management
Source: BOQ Water Dust Suppression.pdftimes
2 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Time (a3)
Clause 3.0
3 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Testing and defects (a4)
Clause 4.0
4 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Payment (a5)
times
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Time (a3)
Clause 3.0
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Testing and defects (a4)
Pricing Schedule
Source: BOQ Water Dust Suppression.pdfThe NEC3 Engineering and Construction Contract
(Third edition of June 2005 with amendments
June 2006) in conjunction with the Contract Data
is taken to be incorporated herein
adjusted to take account of the theoretical
financial effect which changes in time or value (or
both) have on this section. Such adjustments are
based on adjustments in the following categories
as recorded in the Bill of Quantities:
a) an amount which is not varied, namely fixed
b) an amount which is varied in proportion to the
contract value, namely Value Related; and
c) an amount which is varied in proportion to the
construction period as compared to the initial
construction period excluding revisions to the
construction period for which the contractor is not
entitled to adjustment in terms of the contract,
namely Time Related
to be included elsewhere in this bill of quantities
Section a: core clauses
the NEC3 Engineering and Construction Contract -
Option B: Priced contract with bill of quantities
applicable to this contract and a copy of the
The NEC3 Engineering and Construction Contract
(Third edition of June 2005 with amendments
June 2006) in conjunction with the Contract Data
is taken to be incorporated herein
adjusted to take account of the theoretical
financial effect which changes in time or value (or
both) have on this section. Such adjustments are
based on adjustments in the following categories
as recorded in the Bill of Quantities:
a) an amount which is not varied, namely fixed
b) an amount which is varied in proportion to the
contract value, namely Value Related; and
c) an amount which is varied in proportion to the
construction period as compared to the initial
construction period excluding revisions to the
construction period for which the contractor is not
entitled to adjustment in terms of the contract,
namely Time Related
to be included elsewhere in this bill of quantities
the NEC3 Engineering and Construction Contract -
Option B: Priced contract with bill of quantities
applicable to this contract and a copy of the
Contractual Terms
Source: BOQ Water Dust Suppression.pdfin the amount authorised for payment
5 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Compensation events (a6)
Clause 6.0
6 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Title (a7)
Clause 7.0
7 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Risks and insurance (a8)
Clause 8.0
8 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Termination (a9)
Clause 9.0
9 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Section b: main option clauses
an indication of the works to be executed and are
subject to remeasurement
10 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Section c: dispute resolution
Option w1 (c1)
Clause 11.0
11 Fixed:....................... Value Related:.......................
Time Related:....................... Item
Section d: secondary option
X1 price adjustment for inflation
(D1)
Clause 12.0
12 Fixed:....................... Value Related:.......................
Time Related:....................... Item
X2 changes in the law (d2)
Clause 13.0
13 Fixed:....................... Value Related:.......................
Time Related:....................... Item
X3 multiple currencies (d3)
Clause 14.0
14 Fixed:....................... Value Related:.......................
Time Related:....................... Item
X4 parent company guarantee (d4)
Reasonable skill and care (d11)
Clause 22.0
22 Fixed:....................... Value Related:.......................
Time Related:....................... Item
X16 retention (d12)
Clause 23.0
23 Fixed:....................... Value Related:.......................
Time Related:....................... Item
X17 low performance damages (d13)
Clause 24.0
24 Fixed:....................... Value Related:.......................
Time Related:....................... Item
X18 limitation of liability (d14)
Clause 25.0
25 Fixed:....................... Value Related:.......................
Time Related:....................... Item
X20 key performance indicators
(D15)
Clause 26.0
26 Fixed:....................... Value Related:.......................
Time Related:....................... Item
in the amount authorised for payment
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Compensation events (a6)
Clause 6.0
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Title (a7)
Clause 7.0
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Risks and insurance (a8)
Clause 8.0
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Termination (a9)
Clause 9.0
Fixed:....................... Value Related:.......................
Time Related:....................... Item
an indication of the works to be executed and are
subject to remeasurement
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Section c: dispute resolution
Option w1 (c1)
Clause 11.0
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Section d: secondary option
Clause 14.0
Fixed:....................... Value Related:.......................
Time Related:....................... Item
X4 parent company guarantee (d4)
Clause 15.0
Fixed:....................... Value Related:.......................
Time Related:....................... Item
X5 sectional completion (d5)
Clause 16.0
Fixed:....................... Value Related:.......................
Time Related:....................... Item
X6 bonus for early completion (d6)
Clause 17.0
Fixed:....................... Value Related:.......................
Time Related:....................... Item
X7 delay damages (d7)
Clause 18.0
Fixed:....................... Value Related:.......................
Time Related:....................... Item
X12 partnering (d8)
Clause 19.0
Fixed:....................... Value Related:.......................
Time Related:....................... Item
X13 performance bond (d9)
Clause 20.0
Fixed:....................... Value Related:.......................
Time Related:....................... Item
Reasonable skill and care (d11)
Clause 22.0
Fixed:....................... Value Related:.......................
Time Related:....................... Item
X16 retention (d12)
Clause 23.0
Fixed:....................... Value Related:.......................
Time Related:....................... Item
X17 low performance damages (d13)
Clause 24.0
Fixed:....................... Value Related:.......................
Time Related:....................... Item
X18 limitation of liability (d14)
Clause 25.0
Fixed:....................... Value Related:.......................
Time Related:....................... Item
X20 key performance indicators
(D15)
Important Dates
Source: Invitation to Tender (ITT) Water dust suppression August 26.pdf (TENDER){"closingDate":"07 April 2026","closingTime":"11:00am","briefingSession":"{"date":"03 September 2026","time":"11h00 am","venue":"ion A compulsory clarification meeting with representatives of Eskom","is_compulsory":true}"}
Contact Information
Source: Invitation to Tender (ITT) Water dust suppression August 26.pdf (TENDER){"name":null,"email":"[email protected]","phone":"013 647 6815","department":null,"address":"r which"}
Evaluation Criteria
Source: Invitation to Tender (ITT) Water dust suppression August 26.pdf (TENDER)Tenderers must meet eligibility criteria: not be under any restriction to do business with Eskom or State-Owned Companies; not have nationality of a country on international sanctions lists; not submit more than one tender (except for e-tendering size limits); JV/consortium agreements must state joint and several liability; no conflict of interest; tenders must be signed by authorised persons; not be restricted by National Treasury, on the Tender Defaulters list, or restricted by Eskom; not subcontract 100% of the scope. Mandatory returnables at closing (disqualifiable): Annexure A (Authorisation Form), Annexure B (Acknowledgement Form), Annexure C (Tenderer's Particulars), Annexure D (Integrity Pact Declaration), Annexure H (SBD 1 – Invitation to Bid), Annexure J (SBD 4 – Bidders Disclosure), E-tendering Help Manual acknowledgement, and the completed pricing schedule. Non-disqualifiable returnables (5 working days to submit): Annexure E (CPA for local goods), Annexure F (CPA for imported goods), Annexure G1-G4 (SBD 6.2 – Declaration for Local Production and Content), Tax Clearance Certificate (if applicable), Employment Equity compliance (if designated employer), and NEC contract. Specific goals (B-BBEE) require valid B-BBEE certificate or sworn affidavit, proof of ownership/shareholding, certified ID copies, and consolidated certificate for JV/consortium. Mandatory contractual requirement: CSD registration. Additional contractual requirements: COIDA letter of good standing, Health and Safety documentation, Quality Management System (ISO 9001), Environmental documentation, and financial statements (if applicable).
Technical Specifications
Source: Invitation to Tender (ITT) Water dust suppression August 26.pdf (TENDER)Annexure Attached (Y /
N / n/a)
1.1.1 *Authorisation Form Annexure A Y
1.1.2 *Acknowledgement form Annexure B Y
1.1.3 *Tenderer’s particulars Annexure C Y
1.1.4 *Integrity Declaration Form (Suppliers are required to Annexure D Y
download and read the Supplier Integrity Pact. It is
accessible on the Eskom Tender Bulletin via Eskom
Supplier Integrity Pact (eskom.co.za) link)
1.1.5 *CPA Requirements for Local Goods/Services Annexure E Y
1.1.6 *CPA(IG) for Foreign Goods/Services (if applicable) Annexure F Y
1.1.7 SBD 6.2 Declaration Certificate for Local Production Annexure G1 Y
and Local Content (only applicable if designated
materials are included and then Tenderers will be
required to complete and submit Annexures G1 to
G4 as evidence of compliance with this
requirement).
Annexure C Local Content Declaration- Summary Annexure G2 Y
Schedule
Annexure D Imported Content Declaration – Supporting Annexure G3 Y
Schedule to Annexure C
Annexure E Local Content Declaration- Supporting Annexure G4 Y
Schedule to Annexure C
1.1.8 *SBD 1 Invitation to Bid must be filled out by all Annexure H Y
tenderers and submitted with the tender at tender
submission deadline
1.1.9 *
Experience & Qualifications
Source: Invitation to Tender (ITT) Water dust suppression August 26.pdfDescription Returnable (%) [intermediate % will be interpolated]
with background that is Contractor shall provide a Company inclusive of work aligning brief company background profile and with the SOW (5/5) and brief experience that is background
inclusive of work done in
conjunction with the SOW. aligning with SOW 1 10% only(4/5)
and no background
aligning to SOW (2/5)
Assessing
of three verifiable references for reference done within
previously done work related to for similar the past five
work done. supplying, installing and years
commissioning HDPE pipe systems, submitted with
3 or more work done within the past 5 years.
traceable
valid purchase order, signed (5/5)
completion letter or signed delivery
note.
done within
The authenticity of recent previous the past 5
and similar work done is vital to show years
company experience. submitted with
less than 3
traceable
references (4/5)
more than 5 years ago
submitted with either
with 3, more or less
than 3 traceable
references (2/5)
Quality Management
Source: Invitation to Tender (ITT) Water dust suppression August 26.pdffor Proposal Effective Date 07 April 2026
Review Date April 2031
Reference Returnable From Suppliers at at **
closing (Non- prior Award. required required closing. required Tender (disqualifiable)* Contract disqualifiable)
to Tender Returnable Returnable Returnable
quality management system (the latest applicable
revision ISO 9001:2015).
The following documents (approved/ signed
copies) shall be submitted:
✓ Quality Management System manual or a
documented information that have defines and
describes the QMS and its scope.
✓ Quality Policy, aligned with the supplier’s
strategic direction (documented information)
✓ Quality Objectives (documented information)
✓ Control of documented information (i.e.
document and record control)
✓ Control of nonconforming outputs
(documented information)
✓ Nonconformity and Corrective action
procedure (documented information)
✓ Internal audit procedure (documented
information)
✓ The supplier shall submit a copy of
documented information for roles,
responsibilities, and authorities in relation to
the QMS.
✓ The supplier shall submit documented
information for Control of Externally Provided
✓ Draft Contract /Project Quality Plan in line with
the scope
✓ The supplier shall submit an example of
inspection and test plan (ITP) or quality control
plan (QCP) on similar or previous work
done.
and certifications,
certifications and CVs for Personnel supervisors and project
welders specifically trained for Expertise manager all meeting the
welding HDPE and QC
requirements, signed
3 personnel with signed QCPs 15% QCPs and organogram
for similar work (QCPs in line
submitted (5/5)
with submitted proof of
experience).
certifications (in line with manager’s and supervisors CV
HDPE welding) and detailing at least 5 and 3 years
relevant QCPs with no of experience respectively in
organogram (4/5) the working with hydraulic
infrastructure and specifically
(in line with HDPE welding) detailed organogram specific to
with organogram but no the SOW.
relevant signed QCPs. (2/5)
Tenderer shall submit proof of
quality control plan for welding, testing plan but not signed
inspection and cooling times (general QCP) (4/5)
(signed in line with previous work
done provided in section 2)
only(2/5)
Testing and commissioning: A
clear plan for testing to ensure no
leaks before plant is handed over.
Financial Requirements
Source: Invitation to Tender (ITT) Water dust suppression August 26.pdf (TENDER)Payment Terms: payment terms as stipulated hereunder when
submitting tenders and concluding contracts with Eskom:
For contracts valued below R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying
Suppliers within 30 days of receipt of undisputed invoices.
For contracts valued above R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed
Compliance Requirements
Source: Invitation to Tender (ITT) Water dust suppression August 26.pdf (TENDER)ADDITIONAL CONTRACTUAL REQUIREMENTS SUPPORTING EVIDENCE Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 74 File name: Invitation to Tender (ITT) Water dust suppression 26 August Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 28 Invitation to Tender/ Request Identifier for Proposal Effective Date 07 April 2026 Review Date April 2031 Reference Returnable From Suppliers at at ** closing (Non- prior Award. required required closing. required Tender (disqualifiable)* Contract disqualifiable) to Tender Returnable Returnable Returnable Safety COIDA - Original certificate of good standing or proof √ of application issued by the Compensation Fund (COID) or a licensed compensation insurer (South African tenderers only) Health and Safety Tender Evaluation Annexure C1 - High Risk
Health and Safety Plan (must address the project /scope of work OHS risk(s) and aligned with the health and safety specification or requirements) As per SHE Spec 240- 73416879 and 32-726 Eskom Contractor H&S Requirement.
Baseline OHS Risk Assessment (BRA) - Identification, assessment, and management of OHS risks related to the scope of work. The methodology used for the risk assessment must be provided together with the BRA. The Covid 19 added as a Hazard on BRA.
Valid Letter of Good Standing (COIDA or equivalent)
OHS policy signed by CEO
Health and safety management costing- ( broken down, not a lump sum)
Proof of OHS competency Quality The supplier shall submit objective evidence of a √ developed, implemented and maintained QMS that complies with ISO 9001 or any applicable standard of Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 74 File name: Invitation to Tender (ITT) Water dust suppression 26 August Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 28 Invitation to Tender/ Request Identifier for Proposal Effective Date 07 April 2026 Review Date April 2031 Reference Returnable From Suppliers at at ** closing (Non- prior Award. required required closing. required Tender (disqualifiable)* Contract disqualifiable) to Tender Returnable Returnable Returnable quality management system (the latest applicable revision ISO 9001:2015). The following documents (approved/ signed copies) shall be submitted
Quality Management System manual or a documented information that have defines and describes the QMS and its scope.
Quality Policy, aligned with the supplier’s strategic direction (documented information)
Quality Objectives (documented information)
Control of documented information (i.e. document and record control)
Control of nonconforming outputs (documented information)
Nonconformity and Corrective action procedure (documented information)
Internal audit procedure (documented information)
The supplier shall submit a copy of documented information for roles, responsibilities, and authorities in relation to the QMS.
The supplier shall submit documented information for Control of Externally Provided Processes, Products and Services.
Draft Contract /Project Quality Plan in line with the scope
The supplier shall submit an example of inspection and test plan (ITP) or quality control plan (QCP) on similar or previous work done. Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 74 File name: Invitation to Tender (ITT) Water dust suppression 26 August Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 28 Invitation to Tender/ Request Identifier for Proposal Effective Date 07 April 2026 Review Date April 2031 Reference Returnable From Suppliers at at ** closing (Non- prior Award. required required closing. required Tender (disqualifiable)* Contract disqualifiable) to Tender Returnable Returnable Returnable
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for Supplier NB The QMS should drive the supplier’s business management processes to ensure that all of Eskom’s requirements are fully met on a consistent basis. The supplier will be expected to comply with the ISO: 9001 requirements as per the relevant category Other safety/quality √ documents as required per scope of works Environmental √
B-BBEE Minimum Level: 0
Points Allocation: 0 points
B-BBEE Details: Number of points Number of points B-BBEE Status Level of
Contributor (90/10 system) (80/20 system)
1 10 20
2 9 18
3 6 14
4 5 12
5 4 8
6 3 6
7 2 4
8 1 2
Non-compliant contributor 0 0
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 74
File name: Invitation to Tender (ITT) Water dust suppression 26 August
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 28
Invitation to Tender/ Request Identifier
for Proposal Effective Date 07 April 2026
Review Date April 2031
Clause Number from Standard
Tender Data
Conditions of Tender
NB: The following documents are required to claim preference points,
agency / sworn affidavit / CIPS affidavit
inclusive of shareholding breakdown
incorporated consortia and joint ventures),a consolidated B-BBEE
status level verification certificate.
Tenderer failing to provide documentation for the allocation of
preference points will not be disqualified, but’
Health & Safety
Source: Invitation to Tender (ITT) Water dust suppression August 26.pdf10h30
applicable:
(financial analysis is compulsory as a contractual requirement
for CIDB-related transactions from R30 000 excluding VAT);
and/or
for Proposal Effective Date 07 April 2026
Review Date April 2031
Reference Returnable From Suppliers at at **
closing (Non- prior Award. required required closing. required Tender (disqualifiable)* Contract disqualifiable)
to Tender Returnable Returnable Returnable
Safety COIDA - Original certificate of good standing or proof √
of application issued by the Compensation Fund
(COID) or a licensed compensation insurer (South
African tenderers only)
Health and Safety Tender Evaluation Annexure C1 -
✓ Annexure B
✓ Health and Safety Plan (must address the
project /scope of work OHS risk(s) and aligned
with the health and safety specification or
requirements) As per SHE Spec 240-
73416879 and 32-726 Eskom Contractor H&S
✓ Baseline OHS Risk Assessment (BRA) -
of OHS risks related to the scope of work. The
methodology used for the risk assessment
must be provided together with the BRA. The
Covid 19 added as a Hazard on BRA.
✓ Valid Letter of Good Standing (COIDA or
equivalent)
✓ OHS policy signed by CEO
✓ Health and safety management costing- (
broken down, not a lump sum)
✓ Proof of OHS competency
Quality The supplier shall submit objective evidence of a √
developed, implemented and maintained QMS that
complies with ISO 9001 or any applicable standard of
ISO: 9001 requirements as per the relevant
category
Other safety/quality √
documents as
required per scope
of works
Environmental √
✓ A signed Environmental (or SHE / SHEQ)
Policy, aligned with ISO 14001:2015
principles. The policy shall be signed by the
addressing potential environmental incidents,
including:
✓ Chemical spillage, vehicle hazardous
substance spillages
✓ The plan shall include Spill response
procedures, availability of spill kits, incident
reporting and remediation processes
Sheets (SDS) – Where Applicable
for Proposal Effective Date 07 April 2026
Review Date April 2031
Reference Returnable From Suppliers at at **
closing (Non- prior Award. required required closing. required Tender (disqualifiable)* Contract disqualifiable)
to Tender Returnable Returnable Returnable
Sheets (SDS) for all hazardous substances supplied
or handled
✓ Proof of environmental awareness training for
employees involved in activities with potential
environmental impact.
✓ Where applicable, proof of spill response or
hazardous material handling training.
legislation
procedures
environmental requirements
incidents caused by their activities
Due
contributors to B-BBEE will not qualify for preference points for B-BBEE however will not be
disqualified from the tender process. Such a tenderer will score points out of 90 for price and
points out of 10 for B-BBEE.
1.5.3 Stage 3 – Contractual Obligation (SHEQ), Commercial and SDL & I:
for Proposal Effective Date 07 April 2026
Review Date April 2031
1.5.3.1 Health and Safety Requirements
1.5.3.2 Quality Requirements
1.5.3.3 Environmental Requirements
1.5.3.4 Commercial Requirements
1.5.3.5 Supplier Development, Localisation and Industrialisation (SDL & I) Undertaking
Section 1: Specific Goals
A maximum of 10/20 points may be awarded to a tenderer for the specific goal specified for the tender.
Contractual Terms
Source: Invitation to Tender (ITT) Water dust suppression August 26.pdfsanctions list. A tenderer shall be found to have the nationality
of a country if the tenderer is a national or is constituted,
incorporated, or registered and operates in conformity with the
provisions of the laws of that country. This criterion shall also
apply to the determination of the nationality of proposed
subcontractors or suppliers for any part of the Contract including
related services.
individually or as a partner in a joint venture (JV) or consortium,
except on an E-Tendering system where there is a limit size
(The upload size per document is 500 megabytes and total
submission is restricted to 4 gigabytes).
submitting tenders and concluding contracts with Eskom:
For contracts valued below R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying
Suppliers within 30 days of receipt of undisputed invoices.
For contracts valued above R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying
suppliers within 60 days of receipt of undisputed invoices.
Section
Source: Invitation to Tender (ITT) Water dust suppression August 26.pdf1.1.9 *SBD 6.1 Preference Points Claim Form in terms of Annexure I Y
PPPFA 2022 regulations
1.1.11 Tax Evaluation questionnaire to determine whether a Y
3.13 Functionality requirements Functionality requirements are applicable.
functionality criteria
Threshold 70%
Tenderers who do not meet the threshold for functionality scoring will
3.15 Evaluation of Price Prices will be evaluated as follows
evaluation parameters relating to uncertainty and risk, where
evaluation purposes but will be implemented when payment is
Prices will be scored out of [80 or 90] points
3.18 Evaluation of Specific Goals Specific goals will be scored out of [20 or 10] points in accordance
with the PPPFA.
If a tenderer fails to submit evidence of its points claim for a Specific
Goal, it will not be disqualified. However, it will be awarded 0 points
Specific Goals
Number of points Number of points B-BBEE Status Level of
Contributor (90/10 system) (80/20 system)
NB: The following documents are required to claim preference points,
preference points will not be disqualified, but’
the 90/10 or 80/20 system. Eskom will add the score from Pricing and
Specific Goals together and rank the suppliers from the highest to the
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Kendal Power Station - Ogies/Balmoral - Witbank - 1035
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
7
Last checked
26 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Services: Professional. Unlock full pricing strategies, bid frequency, and historical win rates.