Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Peaking Power Stations - - Peaking Power Stations -
Organization Type
GOVERNMENT
Published
03 Sept 2026
OCDS Reference
ocds-9t57fa-168954
ESKOM is procuring gardening and vegetation services at five power stations (gourikwa, ankerlig, acacia, port rex, palmiet) for a period of five years. Bidders must complete the attached ESKOM paye questionnaire (attachment NO. 2) to determine their tax classification, which is a mandatory part of the bid submission.
Bidders must complete the Eskom PAYE Questionnaire (Attachment No. 2) truthfully and in full.
Bidders must sign the relevant affidavits and declarations (Appendices 1–9) as directed by the questionnaire flow; failure to sign required appendices will result in PAYE being withheld from payments.
Labour brokers must provide a valid IRP30 certificate to avoid PAYE withholding; otherwise, PAYE will be deducted at individual tax rates until a certificate is provided.
Non-resident bidders must sign Appendix 9 and submit the pack to the Eskom Group Tax Department.
For companies, close corporations or trusts, the questionnaire determines whether the entity is a Personal Service Provider; exemptions depend on number of employees, connected persons, income concentration, and place of work.
For individuals, the questionnaire determines whether the individual is a Dependent Contractor; exemptions depend on the service/people test, residence, employees, and place/control test.
Enquiries related to the PAYE Questionnaire can be directed to [email protected].
Date & Time
Friday, 02 October 2026 - 10:00
Venue
https://teams.microsoft.com/meet/358180069279881?p=6fwcR0e3xWEZegGvI7
Categories
Request for Bid(Open-Tender)
Peaking Power Stations - - Peaking Power Stations -
AI Document Analysis Stages
Description
03 Sept
2026
Tender Published
Tender was published
02 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
559-667439824 Generation Quality Control Plan Template.docx
Provision of gardening and vegetation services at five Eskom power stations (Goukriwa, Ankerlig, Acacia, Port Rex, and Palmiet) over a five-year period, under a national tender.
OHS Requirements Ankerlig_Acacia_Palmiet.pdf
Provision of gardening and vegetation management services at five Eskom power stations (Gourikwa, Ankerlig, Acacia, Port Rex and Palmiet) for a five-year contract period. The scope includes alien vegetation control, garden bed maintenance, weed control, firebreak maintenance, and cleaning of roads and hard surfaces, with detailed requirements for Ankerlig Power Station.
Attachment No. 7.pdf
Analysis completed but response format was invalid
Attachment No. 2.pdf
Provision of gardening and vegetation services at five Eskom power stations (Gourikwa, Ankerlig, Acacia, Port Rex, and Palmiet) for a five-year period.
Attachment No. 3b.pdf
Eskom is procuring vegetation management services (gardening and vegetation control) at Acacia, Ankerlig and Palmiet Power Stations under an NEC3 Term Service Contract (TSC3) for a five-year period. The contract is a priced contract with a price list (Option A), including task orders, low service damages, and price adjustment for inflation.
Attachment No. 6a.pdf
Provision of gardening and vegetation management services at five Eskom power stations (Gourikwa, Ankerlig, Acacia, Port Rex, and Palmiet) for a period of five years (60 months). The tender includes a preference point system for B-BBEE status and SDL&I objectives that become contractual obligations.
Invitation to Tender (ITT) - Vegetation & Garden Services - E3452GXPOU (Approved).pdf
Eskom is procuring gardening and vegetation services at five power stations (Gourikwa, Ankerlig, Acacia, Port Rex and Palmiet) for a five-year period, under an NEC3 Term Service Contract. The tender is open to all eligible suppliers and will be evaluated on functionality (minimum 70% threshold) and price (80 points) plus B-BBEE preference points (20 points).
Attachment No. 1.pdf
Provision of gardening and vegetation services at five Eskom power stations (Gourikwa, Ankerlig, Acacia, Port Rex and Palmiet) for a five-year period.
Attachment No. 5a.pdf
Provision of gardening and vegetation services at five Eskom power stations (Gourikwa, Ankerlig, Acacia, Port Rex, and Palmiet) for a five-year period. The contract requires strict compliance with Eskom's Occupational Health and Safety (OHS) requirements, including risk assessments, life-saving rules, incident management, and contractor management obligations.
Attachment No. 3a.pdf
Provision of gardening and vegetation management services at Gourikwa Power Station (and other named Eskom power stations) for a five-year period, under an NEC3 Term Service Contract (TSC3) with a priced contract (Option A). The contract includes task orders, low service damages, and extensive additional conditions covering health, safety, environment, ethics, and intellectual property.
240-12248652_List of Tender Returnables_Cat 3_ Rev 7.xlsx
Analysis completed but response format was invalid
Attachment No. 3c.pdf
Eskom is procuring vegetation management services at Port Rex Power Station under an NEC3 Term Service Contract (TSC3) for a five-year period. The contract is a priced contract with a price list (Option A), includes task orders, and requires the contractor to provide gardening and vegetation maintenance services.
240-105658000 Supplier Quality Management Specification (3).pdf
Eskom is procuring gardening and vegetation services at five power stations (Gourikwa, Ankerlig, Acacia, Port Rex, and Palmiet) for a five-year period. The tender is open to suppliers who can meet Eskom's supplier quality management requirements, which are detailed in the specification.
Attachment No. 6c.pdf
Provision of vegetation management services at Port Rex Gas Turbine Station, part of a broader Eskom tender covering gardening and vegetation services at Gourikwa, Ankerlig, Acacia, Port Rex and Palmiet Power Stations, for a period of five years (60 months).
Attachment No. 6b.pdf
Provision of vegetation management services at Acacia, Palmiet and Ankerlig power stations (with Gourikwa, Port Rex and Palmiet also named in the tender title) for a period of 60 months, issued by Eskom. The contract includes specific goals for B-BBEE preference points and SDL&I obligations covering transformation, local procurement, procurement from black-owned enterprises, and job creation.
Attachment No. 5b.pdf
Provision of gardening and vegetation services at five Eskom power stations (Gourikwa, Ankerlig, Acacia, Port Rex and Palmiet) for a five-year period. The contract covers grounds maintenance and vegetation control across these sites.
Attachment No. 4.pdf
Eskom is tendering for the provision of gardening and vegetation services at five power stations (Gourikwa, Ankerlig, Acacia, Port Rex and Palmiet) for a five-year period. The tender document specifies pre-contract award quality requirements under Category 3 of Eskom specification 240-105658000, and post-contract award obligations including contract execution, supplier quality performance monitoring, Eskom rights of access and information, preservation, quality audits, management of nonconformities, and special processes. The tenderer must complete and sign Form A to acknowledge and accept Eskom's Supplier Quality Requirements and the ISO 9001 standard.
240-109253698 CQP Template 2021.docx
Provision of gardening and vegetation services at five Eskom power stations (Gourikwa, Ankerlig, Acacia, Port Rex and Palmiet) for a five-year period. The contract requires the supplier to implement a Contract Quality Plan (CQP) aligned with SANS 466:2005 / ISO 10005:2005, covering quality management, communication, sub-supplier control, documentation, and post-delivery activities.
OHS Requirements Port Rex.pdf
Eskom Generation is procuring a five-year contract for gardening and vegetation management services at five power stations: Gourikwa, Ankerlig, Acacia, Port Rex, and Palmiet. The contractor will maintain flower beds, lawns, trees, roads, parking areas, and fire breaks, including mowing, pruning, weeding, pest control, and removal of garden waste. The contract is subject to extensive Occupational Health and Safety (OHS) requirements, including compliance with the OHS Act, Eskom Life-Saving Rules, and substance abuse testing.
OHS Requirements Gourikwa.pdf
Provision of gardening and vegetation management services at five Eskom power stations (Gourikwa, Ankerlig, Acacia, Port Rex, and Palmiet) for a five-year contract period. The work includes routine horticultural care, alien invasive species control, firebreak maintenance, and related vegetation management, with strict compliance to Eskom's Occupational Health and Safety (OHS) requirements.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubWe refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
This specification defines the minimum quality requirements for all existing and potential Eskom suppliers, covering selection, evaluation, vendor registration, management, monitoring, assessment and auditing of suppliers. It requires suppliers to develop, implement, maintain and continually improve a quality management system (QMS) conforming to ISO 9001, and applies to all Eskom divisions, subsidiaries, suppliers and sub-suppliers, forming part of all RFIs, RFQs, RFPs and contracts for procurement of products and services.
Important Dates
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Closing date: 2 October 2026 at 10:00. No other dates are stated in the document.
Contact Information
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)No specific contact details are stated in the document. The department is Supply Chain Management.
Submission Guidelines
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Returnable documents: Form A (Tender and Contract Quality Requirements for Supplier Quality Management Specification 240-105658000/QM 58 and ISO 9001) must be completed, signed and returned with the bid, along with the quality documentation applicable to the category (1, 2, 3 or 4) selected in Form A, as listed in the List of Tender Returnables (240-12248652).
Disqualification risks: Failure to complete and sign Form A, or to submit the required quality documentation for the applicable category, may disqualify the bid. Bidders must also inform Eskom of any proposed changes to their QMS or staff that affect the quality system prior to implementation.
Evaluation Criteria
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Bidders must have a formal Quality Management System (QMS) conforming to ISO 9001 (latest revision) or an applicable standard, unless specifically excluded by the quality category. For Category 1, a valid ISO 9001 certificate from an accredited certification body is required. Bidders must complete and sign Form A, acknowledging and accepting Eskom's Supplier Quality requirements. They must submit the required quality documentation as per the applicable category (1, 2, 3, or 4) as indicated in Form A and the List of Tender Returnables (240-12248652). Eskom may perform capability and capacity assessments prior to contract award. Sub-suppliers must also meet the same quality requirements. Bidders must inform Eskom of any proposed changes to their QMS or staff that affect the quality system.
Technical Specifications
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)The document is the Eskom Supplier Quality Management Specification (240-105658000, Revision 3), which applies to all Eskom divisions, subsidiaries, suppliers and sub-suppliers, and forms part of all RFIs, RFQs, RFPs and contracts for procurement of products and services. It defines minimum quality requirements for selection, evaluation, vendor registration, management, monitoring, assessment and auditing of suppliers. Suppliers must develop, implement, maintain and continually improve a QMS based on ISO 9001. The specification references ISO 9001, ISO 10005, ISO 9000, ISO 10006, ISO 9004, Eskom SHEQ Policy 32-727, Eskom Procurement and Supply Chain Management Policy 32-1033 and Procedure 32-1034, PPPFA, CIDB 1004, IAEA Safety Standard GS-R-3.1, and SANS 10845-1.
Experience & Qualifications
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Quality audits and related quality performance reviews shall be carried out by trained, accredited, and experienced personnel in accordance with procedures documented in the specification. Personnel required to perform special processes shall be certified competent through a certificate of competency in accordance with the company's internal training management and competency control procedures or an external certification body (for example, NDT) through an accredited service provider as per Skills Education Training Authorities (SETA) requirements. All personnel who perform activities that affect quality shall have their training needs identified and documented. The required training shall be implemented in accordance with the company's training management and competency control procedures. All the training certificates shall meet the SETA requirements in terms of having the unit standard completed and the accreditation number of the service providers.
Quality Management
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Suppliers and sub-suppliers must develop, implement, maintain and improve a formal QMS conforming to the latest ISO 9001 standard, including documented information such as quality manual, quality plans, work procedures, work instructions, method statements and workflow documentation. Unless excluded, the QMS must carry a valid ISO 9001 certificate from an accredited certification body. Suppliers must inform Eskom of any proposed changes to the QMS or staff affecting the quality system prior to implementation. The main supplier must develop and implement a performance management programme for sub-suppliers, including verification of QMS, audits, surveillances, regular assessment of CQPs, reviews of QCPs, nonconformity and defect management, inspection and test plans, and risk management. Where specified in the evaluation criteria or quality list of tender returnables, all individual products, services and processes shall have a documented, implemented, reviewed and maintained contract quality plan (CQP) and/or quality control plan (QCP)/inspection and test plan (ITP). The supplier shall plan for quality-related activities and interfaces within its quality system to demonstrate ability to control and meet specified Eskom requirements. CQPs must comply with ISO 10005 and include elements such as management of records, access for inspection, final documentation submission, special processes (welding, installation, fabrication), personnel qualification, training, equipment storage and preservation, quality monitoring activities, resources, communication channels, management authority and responsibility, and lists of documents and records. CQPs must be submitted prior to the initial scope of work kick-off or pre-fabrication meeting and prior to commencement of manufacturing, whichever is earlier. Eskom's CQP template may be used as a guideline. The supplier shall develop and implement processes and procedures to monitor, verify and document the quality of the scope of work. QCPs/ITPs must be prepared at a level of detail sufficient to address all quality-control-related activities in chronological order, from contract review through materials verification, manufacturing, fabrication, assembly, final testing, commissioning, hand-over documentation and certification. QCPs/ITPs must be reviewed and accepted by Eskom or its inspection authority, allow for insertion of Eskom-specific requirements including hold and witness points, and any subsequent changes require Eskom's agreement. QCPs/ITPs must cover materials certification, fabrication works, in-process inspections, final acceptance tests, packaging, pre-shipment/transportation, preservation, site acceptance tests, construction and erection works, and pre-commissioning and commissioning tests. All sub-supplier QCP/ITP activity shall be performed using an Eskom-accepted supplier QCP/ITP. Applicable codes, standards and acceptance criteria must be available at the work location. The supplier is ultimately accountable for proper implementation of all sub-supplier QCPs/ITPs. Eskom reserves the right to select intervention points and perform surveillance or audits. Once signed, ITPs and QCPs become addendums to the main contract. QCP/ITPs must contain specific information including contract number, description of work, sequence of operations, acceptance criteria, intervention points, and records to be generated. Sub-supplier QCPs/ITPs must comply with Eskom Quality Requirements Specifications. A quality kick-off meeting will be held at the start of the contract and, if required, at the start of each subsequent phase. The supplier shall arrange coordination meetings with Eskom prior to placement of orders, with fourteen days' advance notice. Supplier inspection personnel must be competent and qualified. Mandatory pre-inspection meetings will be convened by Eskom or its inspection agency. Eskom reserves the right to appoint resident quality inspectors at the supplier's or sub-supplier's premises, with workspace provided at no cost. Eskom may appoint any organisation to perform quality assurance and quality control activities, and the supplier may not object or hinder such organisation. Eskom's QCP/ITP template may be used as a guideline. Supplier capability and capacity assessments shall be performed prior to contract award on potential suppliers participating in Eskom Holdings procurement process to provide products and services with high risk to operational sustainability, work on critical plant and equipment, supply critical plant items or components, or provide special processes. Suppliers involved in manufacturing critical plant equipment, supplying commodities and providing specialised services shall be subjected to the capability and capacity assessment, including Generation Level 1 & 2 plant, Transmission and Distribution Power Plant & Control Plant, and Mega Projects. Post-contract award, the supplier shall submit, for Eskom review, documented processes for conducting project scope of work quality audits and related quality performance reviews. These processes shall be designed to address evaluation of progress towards completion of project functional area deliverables as well as final deliverable quality. The supplier shall provide a schedule of anticipated quality audits covering all functional areas and related quality performance reviews at the time of first post-contract award CQP submission. Special processes: The supplier shall ensure that all operators are suitably qualified for these processes in accordance with the procedures, processes and/or applicable standards/codes. Records of qualification of procedures, processes and operators shall be maintained by the supplier in accordance with the applicable procedure or code and made available to Eskom at all times.
Pricing Schedule
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)No pricing schedule, rates, bill of quantities or payment schedules are stated in the document.
Financial Requirements
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)No pricing format, bonds, guarantees, payment terms or financial capacity thresholds are stated in the document.
Compliance Requirements
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Bidders must have a formal QMS conforming to ISO 9001 (latest revision) or an applicable standard, unless excluded by the quality category. For Category 1, a valid ISO 9001 certificate from an accredited certification body is required. Bidders must complete and sign Form A (Tender and Contract Quality Requirements for Supplier Quality Management Specification 240-105658000/QM 58 and ISO 9001). Sub-suppliers must also meet the same quality requirements. The document references the PPPFA and CIDB 1004, but no specific B-BBEE level or CIDB grade is stated.
Health & Safety
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)The document references the Eskom Safety, Health, Environment, and Quality (SHEQ) Policy (32-727) as an informative reference, but no specific health and safety requirements are stated.
Contractual Terms
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Eskom has rights of access to the works and supplier's information as determined by applicable legislation, and reserves the right to oversee the supplier's audit programmes by participating in selected audits as an observer and assessing the supplier during key work stages. The supplier's preservation programme must ensure clear communication of pre-operation preservation of goods quality requirements to sub-suppliers, document processes for monitoring compliance, and address temporary, long-term and in-transit preservation requirements including protection against atmospheric conditions, procedures for coatings and coverings, electrical grounding, internal environment creation, protection against vibration, and structural integrity protection. Compliance monitoring shall commence with engineering instruction and continue until equipment or materials are incorporated in an operating system. Supplier engineering shall ensure preservation requirements are clearly documented and communicated to all project functional areas. The preservation programme shall address temporary, long-term and in-transit preservation, including protection against atmospheric conditions, sunlight, temperature, soil, dust, humidity, salt spray, corrosive atmospheres, procedures for coatings, coverings, fasteners, lines, electrical grounding or isolation, internal or external environment creation, protection against vibration, and structural integrity protection. Management of nonconformities: Should the supplier fail to respond and rectify nonconforming products within stipulated contractual conditions, the Project Manager should apply contractual remedies in accordance with FIDIC/NEC contract. Repeated nonconformities from the same supplier within a period of 6 months or less must be escalated to the management review committees of the BU/OU/Cluster/Divisions for adjudication, and if not resolved, escalated to the supplier review committee for recommendation.
Requirements
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Eskom supplier quality requirements are classified into four categories (1, 2, 3 and 4). Suppliers must prepare and submit quality documentation as per the tender selected category, using the list of tender returnables document. Only one category applies per procurement process. Category 1 requires completion and signing of Form A, a valid ISO 9001 certificate, latest internal and external audit reports, a draft contract quality plan specific to the scope of work, an example ITP/QCP, documented information for control of externally provided processes, products and services, documented information for roles, responsibilities and authorities, and documented information of management review meetings. Category 2 requires completion and signing of Form A, objective evidence of a developed, implemented and maintained QMS complying with ISO 9001, including QMS manual, quality policy, quality objectives, control of documented information, internal audit procedure, control of nonconforming outputs, and nonconformity and corrective action procedure, plus latest internal audit reports, draft contract quality plan, example ITP/QCP, documented information for control of externally provided processes, products and services, roles, responsibilities and authorities, and management review records. Category 3 requires completion and signing of Form A, objective evidence of a developed QMS complying with ISO 9001, including QMS manual, quality policy, quality objectives, control of documented information, internal audit procedure, control of nonconforming outputs, and nonconformity and corrective action procedure, plus draft contract quality plan, example ITP/QCP, documented information for control of externally provided processes, products and services, and roles, responsibilities and authorities. Category 4 requires completion and signing of Form A, a quality method statement based on ISO 9001 and specific to the scope of work, a signed/approved quality policy, quality objectives, documented information for control of externally provided processes, products and services, and documented information for roles, responsibilities and authorities specific to the project.
Description
Source: 240-109253698 CQP Template 2021.docx (unknown)The document provided is a Contract Quality Plan (CQP) template that the bidder must complete to demonstrate how it will meet Eskom's quality management expectations for the gardening and vegetation services contract. The template outlines the required structure and content of the CQP, including definitions, scope, communication, quality control, and documentation requirements.
Evaluation Criteria
Source: 240-109253698 CQP Template 2021.docx (unknown)No specific eligibility criteria are stated in the provided document. The CQP template requires the supplier to provide details on sub-suppliers and their selection criteria, but no mandatory pre-qualification thresholds (e.g., CSD registration, B-BBEE level, CIDB grading) are mentioned in the extracted content.
Technical Specifications
Source: 240-109253698 CQP Template 2021.docx (unknown)The tender requires the successful bidder to provide a Contract Quality Plan (CQP) for the gardening and vegetation services at Gourikwa, Ankerlig, Acacia, Port Rex and Palmiet Power Stations. The CQP must be prepared in accordance with SANS 466:2005 / ISO 10005:2005 and must address the following:
Compliance Requirements
Source: 240-109253698 CQP Template 2021.docx (unknown)No specific requirements found
Description
Source: Attachment No. 2.pdfThis document is a PAYE Questionnaire for service contracts with the Eskom Group of Companies, applicable from 1 March 2022 to 28 February 2023. It is used to determine whether a contractor (individual, company, close corporation, or trust) should be classified as an Independent Contractor, Personal Service Provider, Labour Broker, or Dependent Contractor for tax purposes, and whether Eskom must withhold Employees' Tax from payments.
Important Dates
Source: Attachment No. 2.pdf (unknown){"closingDate":"1 March 2022"}
Contact Information
Source: Attachment No. 2.pdf (unknown)Group Tax email: [email protected]
Evaluation Criteria
Source: Attachment No. 2.pdf (unknown)Bidders must complete the PAYE Questionnaire truthfully. The questionnaire determines tax classification (Independent Contractor, Personal Service Provider, Labour Broker, or Dependent Contractor) and whether PAYE must be withheld from payments. Residents must answer all applicable questions. Non-residents must sign Appendix 9 and submit the pack to Eskom Group Tax. For companies/CCs/trusts, exemptions may apply based on number of employees, connected persons, 80% income test, place/control/supervision test, and dominant impression test. For individuals, exemptions may apply based on service/people test, residence, number of employees, and place/control test. Signing of relevant affidavits (Appendices 1-8) is mandatory where applicable; failure to sign results in PAYE being withheld from payments.
Technical Specifications
Source: Attachment No. 2.pdf (unknown)The Fourth Schedule to the Income Tax Act (“the Act”) requires that Employees' Tax must be
withheld from "remuneration" paid by an "Employer" to an "Employee". This tool is intended to establish
whether an Individual, Close Corporation, Company or Trust should be classified as an Independent
Contractor, Personal Service Provider, Labour Broker or a Dependent Contractor, and the tax
consequences of such classification.
This Pack is applicable ONLY to Contractors who supply Eskom Holdings SOC Ltd (“Eskom”) and its
subsidiaries with services or Individual Contractors providing Eskom with labour.
The Contractor or its duly authorised representative must declare that all questions have been answered
truthfully.
Answering the questions will direct you to your next step.
Please note:
This Pack is based on tax legislation for the 2022/2023 tax year and is subject to change.
In the questions, any references to "you" refers to the Contractor.
In the questions, the term Contractor is used interchangeably with Individual/CC/Company/Trust.
Definitions as per the Income Tax Act are included in Appendix 10.
Any reference to “Eskom” refers to Eskom Holdings SOC Ltd and its subsidiaries:
Eskom Rotek Industries SOC Ltd
Eskom Enterprises SOC (Pty) Ltd
Escap SOC (Pty) Ltd
Eskom Finance Company SOC (Pty) Ltd
Eskom Foundation NPC
National Transmission Company SA
The Pack is based on legislation and case law applicable to the 2022/2023 tax year. We therefore
recommend that, if it is used outside of this period, you should first consult with your representative in
Eskom to refer it to Eskom’s Corporate Tax Department in Megawatt Park.
When you return the completed Pack; i.e. the signed summary sheet and signed affidavits to Eskom,
please copy Group Tax on Email address: [email protected]
The Contractor or its duly Authorised Representative acknowledges and accepts that:
ease of reading.
this Pack;
Disclaimer
Applicable to the 2022/2023 Tax Years
Eskom accepts no liability whatsoever for any loss or damages whatsoever and howsoever incurred, or
suffered, resulting, or arising, from the use of this Pack.
Contractor type
Supplier category
Please complete the following questionnaire for:
Company/Close Corporation/Trusts - EVALUATION PACK A on .
Individuals - EVALUATION PACK B on .
Applicable to the 2022/2023 Tax Years
Evaluation pack a
(To determine whether a Company, Close Corporation (CC) or Trust is a Personal
Service Provider)
Fields marked with an Asterisk (*) must be completed
Contractor’s details for a company or close corporation or
Trust
Contractor’s Name* Vendor No.
Duly Authorised Representative Name Representative Surname
Capacity Representative ID No.*
Representative Passport No. (if no RSA ID) Country of Passport Issue
VAT Registration No. Income Tax Registration No.*
CO/CC/Trust Registration No.* E-Mail Address
Telephone Number* Fax Number
Contractor’s Physical Business Address*
Unit No
Complex Name
Street Number
Street Name
Suburb
City/Town
Postal Code
Contractor’s Postal Business Address*
Same as above (Mark with an X)
Address TYPE (Delete where not applicable) P O Box/Private Bag/Street Address
P O Box/Private Bag/Street NUMBER
Street Name
Suburb
Town
Postal Code
Contractor’s Bank Details*
Account Number Bank Name
Branch Name Branch Number
Name of Account Holder Account Type (Delete where not applicable)
Current/ Savings/ Transmission/Credit Card/Bond
Account
Account Holder Relationship*
i.e. own, joint or 3rd party Own/Joint/3rd Party
Applicable to the 2022/2023 Tax Years
Please answer the following questions by marking the appropriate column with an
"X".
The term “You” will refer to the Company/CC/Trust in this Questionnaire.
Question 1(i)
Are you a Resident of the Republic of South Africa in terms of the Income Tax Act?
(Refer to Appendix 10 for the definition of a resident).
If the answer is Yes, go to Question 2(i).
If the answer is No:
Eskom to refer it to Eskom Group Tax Department in Megawatt Park.
Question 2(i)
Do you employ 3 (three) or more persons (excluding shareholders or members or
beneficiaries of the Company/CC/Trust)?
If the answer is Yes, go to Question 2(ii).
If the answer is No, go to Question 3(i).
Question 2(ii)
Are these employees employed:
If the answer is Yes, go to Question 2(iii).
If the answer is No, go to Question 3(i).
Question 2(iii)
Are the above 3 employees connected to the shareholders or the members or the
beneficiaries of the Company/CC/Trust?
If the answer is Yes, go to Question 3(i).
If the answer is No:
from your payments.
from your payments.
Corporation/Trust” at the end of the Evaluation Pack.
Applicable to the 2022/2023 Tax Years
Question 3(i)
Will/are any person who is a Connected person in relation to the Company/CC/Trust
render services personally to Eskom on behalf of the Company/CC/Trust? (Refer to
Appendix 10 for the definition of a Connected person).
If the answer is Yes, go to Question 4(i).
If the answer is No:
from your payments.
from your payments.
Corporation/Trust” at the end of the evaluation Pack.
Question 4(i)
During the current year of assessment:
received either directly or indirectly, from:
the definition of an Associated institution)
If the answer is Yes:
Corporation/Trust” at the end of the evaluation Pack.
If the answer is No:
from your payments.
Question 5(i)
Must your duties be performed /are your duties performed mainly (more than 50%) at
the premises of Eskom,
And
Will you be subject /are you subject to Eskom’s control or supervision as to the
manner in which your duties are to be performed?
If the answer is Yes to BOTH questions:
Corporation/Trust” at the end of the evaluation Pack.
If the answer is No:
from your payments.
Applicable to the 2022/2023 Tax Years
Question 6(i)
Do/will the payments by Eskom for services payable with reference to output or
certain agreed results, e.g. payment (be it a fixed fee or an hourly rate) be only due if
and when a specific deliverable has been completed?
Question 6(ii)
Does/Will Eskom have the contractual right to control the tools or equipment, staff,
raw materials, routines, patents or technology used in the provision of the services?
Question 6(iii)
Are you/will you prohibited from rendering services to any other employers/clients
during the period of service to Eskom?
Question 6(iv)
Do/will you have the right to sub-contract work?
Question 6(v)
Are you personally or will you personally be at risk for the quality of the work done or
to be done (risk for poor quality; time over-runs, project not producing income)?
Question 6(vi)
Are/will you or the person rendering the service be obliged to be present and perform
the work at Eskom regardless of whether work is available or not?
Question 6(vii)
Is Eskom’s business or will Eskom’s business be critical to your financial/economic
survival?
Question 6(viii)
Does/will your position form part of Eskom’s organisational structure?
Question 6(ix)
Does/will Eskom provide you with any of the following:
Question 6(x)
Does/will Eskom provide you with an office?
Question 6(xi)
Does/will Eskom provide you with any equipment, tools, stationery and material?
Please go to the next section to establish your tax status.
Applicable to the 2022/2023 Tax Years
To establish your tax status, you need to summarise the “Yes” and “No” as
answered on Question 6(i) to 6(xi) in the column below:
Question Yes No
6(i) Independent PSP
6(ii) PSP Independent
6(iii) PSP Independent
6(iv) Independent PSP
6(v) Independent PSP
6(vi) PSP Independent
6(vii) PSP Independent
6(viii) PSP Independent
6(ix) PSP Independent
6(x) PSP Independent
6(xi) PSP Independent
Decision
Independent
Psp
If you have answered “PSP” to any of the following questions 6 (i), 6(iii), 6(v), 6(vi),
6(ix);
or
If you have answered more than 50% “PSP” to questions 6(ii), 6(iv), 6(vii), 6(viii),
6(x), 6(xi):
and will be coded as 3601 on your IRP5 certificate.
Corporation/Trust” at the end of the evaluation Pack.
Alternatively:
If you have already signed Appendix 7 on Questions 4 or 5:
disclosed on the IRP5 for payments received.
If you have not signed Appendix 7 on Questions 4 or 5:
from your payments.
Corporation/Trust” at the end of the evaluation Pack.
Applicable to the 2022/2023 Tax Years
Summary for ID No. Vendor No:
Company/Close Corporation/Trust Summary
Please sign
he
following
Questions Answer Appendix
(Appendices
)
1(i) Are you a Resident of the Republic of South Africa in terms of the Income
Tax Act?
2(i) Do you employ 3 (three) or more persons (excluding shareholders or
members or beneficiaries of the Company/CC/Trust and connected
persons in relation to the shareholder or member or beneficiaries)?
2(i ) Are these employees employed on a full time basis and are they engaged
in the business of the Company/CC/Trust?
2(iii) Are the above 3 employees connected to the shareholders or the members
or beneficiaries of the Company/CC/Trust?
3(i) Will/are any person who is a Connected person in relation to the
Company/CC/Trust render services personally to Eskom on behalf of the
Compa y/CC Trust?
4(i) During the current year of assessment will more than 80% of your income
or is it likely that more than 80% of your income will consist of amounts
received either directly or indirectly from any one client, or an Associated
institution in relation to that client?
5(i) Must your duties be performed / are your duties performed mainly (more
than 50%) at the premises of Eskom AND will you be /are you subject to
Eskom’s control or supervision as to the manner in which your duties are
performed or to the hours of work?
6( ) Do/will the payments by Eskom for services payable with reference to
output or certain agreed results, e.g. payment (be a fixed fee or an hourly
rate) be only due if and when a specific deliverable has been completed?
6(ii) Does/Will Eskom have the contractual right to control the tools or
equipment, staff, raw materials, routines, patents or technology used in the
provision of the services?
6(iii) Are you/will you prohibited from rendering services to any other
employers/clients during the period of service to Eskom?
6(iv) Do/will you have the right to sub-contract work?
6(v) Are you personally or will you personally be at risk for the quality of the
work done or to be done (risk for poor quality; time over-runs, project not
producing income)?
6(vi) Are/will you or the person rendering the service be obliged to be present
and perform the work at Eskom regardless of whether work is available or
not?
6(vii) Is Eskom’s business or will Eskom’s business be critical to your
financial/economic survival?
6(viii) Does/will your position form part of Eskom’s organisational structure?
6(ix) Does/will Eskom provide you with any of the following:
Pension fund / Provident fund / Retirement Annuity Fund; medical aid,
leave of any nature, salary increases, bonuses or any allowances.
6(x) Does/will Eskom provide you with an office?
6(xi) Does/will Eskom provide you with any equipment, tools, stationery and
material?
Tax Status
Particulars of person acting as representative of the company/close
Corporation/trust
I, the undersigned, confirm that the information provided above is accurate, and that the Company/CC/Trust will,
while contracted to Eskom, inform Eskom of any changes that take place pertaining to the information provided
above. Eskom shall be entitled to withhold from any payments to be made to the Company/CC/Trust, any taxes,
interest and penalties that it may be required to pay to SARS as a result of the above information being inaccurate.
Representative's Full Names Capacity Contact No.
Signature Date
Applicable to the 2022/2023 Tax Years
Evaluation pack b
(To determine whether an Individual is a Dependent Contractor)
Fields marked with an Asterisk (*) must be completed
Contractor’s details for an individual*
Trading Name* Vendor No.
First Names* Initials*
Surname* ID Number*
Passport No. (if no RSA ID) Country of Passport Issue
VAT Registration No. Income Tax Registration No.*
Date of Birth* E-Mail Address
Telephone Number* Fax Number
Contractor’s Physical Business Address*
Unit No
Complex Name
Street Number
Street Name
Suburb
City/Town
Postal Code
Contractor’s Postal Business Address*
Same as above (Mark with an X)
Address TYPE (Delete where not applicable) P O Box/Private Bag/Street Address
P O Box/Private Bag/Street NUMBER
Street Name
Suburb
Town
Postal Code
Contractor’s Bank Details*
Account Number Bank Name
Branch Name Branch Number
Name of Account Holder Account Type (Delete where not applicable)
Current/ Savings/ Transmission/Credit Card/Bond
Account
Account Holder Relationship*
i.e. own, joint or 3rd party Own/Joint/3rd Party
Applicable to the 2022/2023 Tax Years
Please answer the following questions by marking the appropriate column with an
"X".
Question 1(i)
Do/will you provide Eskom with a service or people?
If the answer is “Service”:
PAYE will be withheld from your payments.
If the answer is “People”, go to Question 2(i).
Question 2(i)
Do you provide Eskom with People and will these people be paid by you?
If the answer is Yes, go to Question 2(ii).
If the answer is No, go to Question 3(i).
Question 2(ii)
Are you in possession of an IRP30 exemption certificate which is valid for the period
under review?
If the answer is Yes:
from your payments.
provided, PAYE will be withheld from your payments until such time
the IRP30 certificate is provided.
Pack.
If the answer is No:
IRP30 certificate is provided.
Pack.
Question 3(i)
Are you a Resident of the Republic of South Africa in terms of the Income Tax Act?
(Refer to Appendix 10 for the definition of a Resident).
If the answer is Yes, go to Question 4(i).
If the answer is No:
Eskom to refer it to Eskom Group Tax Department in Megawatt.
Applicable to the 2022/2023 Tax Years
Question 4(i)
Do you employ:
If the answer is Yes, go to Question 4(ii).
If the answer is No, go to Question 5(i).
Question 4(ii)
Are these employees employed:
If the answer is Yes, go to Question 4(iii).
If the answer is No, go to Question 5(i).
Question 4(iii)
Are any of these employees Connected persons in respect of the Individual, e.g.
spouse, parent, adoptive parent, child, grandparent, cousin, etc.? (Refer to
Appendix 10 for the definition of Connected person).
If the answer is Yes, go to Question 5(i).
If the answer is No:
from your payments.
withheld from your payments.
Pack.
Question 5(i)
Must your duties be performed mainly (i.e. more than 50%) at premises of Eskom?
If the answer is Yes, go to Question 5(ii).
If the answer is No, go to Question 5(ii).
Question 5(ii)
Will you be /are you subject to Eskom’s control or supervision as to the manner in
which your duties are to be performed or as to the hours of work?
If the answers in both Questions 5(1) and 5(ii) are Yes:
If the answer is No:
from your payments.
Applicable to the 2022/2023 Tax Years
Question 6(i)
Do/will the payments by Eskom for services payable with reference to output or
certain agreed results, e.g. payment (be it a fixed fee or an hourly rate) be only due
if and when a specific deliverable has been completed?
Question 6(ii)
Does/Will Eskom have the contractual right to control the tools or equipment, staff,
raw materials, routines, patents or technology used in the provision of the services?
Question 6(iii)
Are you/will you prohibited from rendering services to any other employers/clients
during the period of service to Eskom?
Question 6(iv)
Do/will you have the right to sub-contract work?
Question 6(v)
Are you personally / will you personally be at risk for the quality of the work done or
to be done (risk for poor quality; time over-runs, project not producing income)?
Question 6(vi)
Are/will you or the person rendering the service be obliged to be present and
perform the work at Eskom regardless of whether work is available or not?
Question 6(vii)
Is Eskom’s business or will Eskom’s business be critical to your financial/economic
survival?
Question 6(viii)
Does/will your position form part of Eskom’s organisational structure?
Question 6(ix)
Does/will Eskom provide you with any of the following:
Question 6(x)
Does/will Eskom provide you with an office?
Question 6(xi)
Does/will Eskom provide you with any equipment, tools, stationery and material?
Please go to the next section to establish your tax status.
Applicable to the 2022/2023 Tax Years
To establish your tax status, you need to summarise the “Yes” and “No” as
answered on Question 6(i) to 6(xi) in the column below:
Question Yes No
6(i) Independent Employee
6(ii) Employee Independent
6(iii) Employee Independent
6(iv) Independent Employee
6(v) Independent Employee
6(vi) Employee Independent
6(vii) Employee Independent
6(viii) Employee Independent
6(ix) Employee Independent
6(x) Employee Independent
6(xi) Employee Independent
Decision
Independent
Psp
If you have answered “Employee” to any of the following questions 6 (i), 6(iii), 6(v),
6(vi), 6(ix);
or
If you have answered more than 50% “Employee” to questions 6(ii), 6(iv), 6(vii),
6(viii), 6(x), 6(xi):
Alternatively:
If you have already signed Appendix 7 on Questions 5:
disclosed on the IRP5 for payments received.
If you have not signed Appendix 7 on Questions 5:
withheld from your payments.
Corporation/Trust” at the end of the evaluation Pack.
Applicable to the 2022/2023 Tax Years
Summary for ID No. Vendor No:
Company/Close Corporation/Trust Summary
Please si n
the following
Pricing Schedule
Source: Attachment No. 2.pdfThe pricing schedule is not a standard bill of quantities. The document specifies PAYE withholding rules based on the contractor's tax classification and whether a valid IRP30 certificate is provided. Labour brokers and dependent contractors have specific PAYE withholding and IRP5/IT3(a) coding rules.
Financial Requirements
Source: Attachment No. 2.pdf (unknown)If a valid IRP30 certificate is provided, no Employees' Tax is withheld and an IT3(a) certificate with code 3617 is issued. If no valid IRP30 certificate is provided, Employees' Tax is withheld at individual tax rates until a valid IRP30 certificate is provided, and an IRP5 certificate with code 3617 is issued. Labour brokers and dependent contractors have specific PAYE withholding rules as per the questionnaire.
Compliance Requirements
Source: Attachment No. 2.pdf (unknown)Bidders must complete the PAYE Questionnaire (Attachment No. 2) to determine their tax classification. The questionnaire includes affidavits and declarations (Appendices 1-9) that must be signed where applicable. Non-residents must sign Appendix 9. Labour brokers must provide a valid IRP30 certificate or PAYE will be withheld.
Section
Source: Attachment No. 2.pdfThe evaluation is a self-assessment questionnaire. Bidders answer a series of yes/no questions to determine their tax classification. The classification determines whether PAYE is withheld and the disclosure code on the IRP5/IT3(a) certificate.
Contact Information
Source: Attachment No. 3a.pdf (unknown)Engineering Contract Strategies (ECS) — supplier of the NEC3 Term Service Contract documents: Tel 011 803 3008, Fax 086 539 1902, www.ecs.co.za.
Submission Guidelines
Source: Attachment No. 3a.pdf (unknown)Returnable documents: C1.1 Form of Offer and Acceptance (signed offer and acceptance, including Schedule of Deviations if any), C1.2b Contract Data provided by the Contractor (completed with contractor details, key people, price list reference, tendered total), and the completed price list (C2.2).
Submission: The offer must be signed by a duly authorised representative. The tenderer's CIDB registration number must be stated on the Form of Offer and Acceptance. Alternative tenders require a separate copy of the Form of Offer and Acceptance.
Disqualification risks: Failure to complete and sign all returnable documents; any deviation from tender documents not recorded in the Schedule of Deviations.
Evaluation Criteria
Source: Attachment No. 3a.pdf (unknown)Preference point system: The tender is subject to the PPPFA 80/20 or 90/10 preference point system (SBD 6.1). Bidders must claim B-BBEE points on SBD 6.1.
Evaluation stages: Bidders must be registered on the Central Supplier Database (CSD) and have a valid tax clearance (SARS TCS or tax pin). Bidders must have a valid B-BBEE certificate. Bidders must not have any director or shareholder employed by the state (SBD 4 declaration). Bidders must not have been found guilty of prohibited actions (corrupt, fraudulent, collusive, coercive, obstructive) and must not have had a business rescue order granted against them.
B-BBEE status change: If a bidder's B-BBEE status changes after award, the contractor must notify the Employer within seven days and submit an updated verification certificate within thirty days. A decrease in B-BBEE status may lead to renegotiation or termination.
Technical Specifications
Source: Attachment No. 3a.pdf (unknown)Scope: Vegetation management at Gourikwa Power Station for a period of five years. Services include:
Staffing and equipment: Contractor must provide labour (semi-skilled and supervisor), safety officer, PPE, and site establishment. All staff must be trained in safe handling of herbicides and equipment, wear appropriate PPE, and comply with safety, environmental, and operational standards.
Contractor's plan: A first plan for the service must be submitted for acceptance within two weeks of the Contract Date. The plan must show how operations relate to price list items.
Methodology
Source: Attachment No. 3a.pdf (unknown)Contractor's plan: The Contractor submits a first plan for acceptance within two weeks of the Contract Date. The plan must show how operations relate to price list items to ensure satisfactory cash flow.
Experience & Qualifications
Source: Attachment No. 3a.pdf (unknown)Contractor's key people: The Contractor must provide details of key personnel including name, job, responsibilities, qualifications, and experience, with CVs.
Quality Management
Source: Attachment No. 3a.pdf (unknown)assistance that the Employer is able to provide for the purpose of contesting any such
claim or action.
Z13.10.3 Should it be held in any such action that any such protected rights have been infringed, as
definitely stated by a judgment of the court before which the action is brought, the
across 400m2 lawn area, including
2.4 Month
inspection, repairs, seasonal
programming, and backflow testing 12
Part 3: Scope of Work ...................................................................................................................................... 27
C3.1: Employer’s Service Information ............................................................................................................. 28
1.1. Executive overview............................................................................................................................ 30
1.2. Employer’s requirements for the service ........................................................................................... 30
1.2.1. Normative ....................................................................................................................................... 30
1.2.1. Informative ...................................................................................................................................... 30
1.3. Gourikwa Power Station .................................................................................................................... 30
1.3.1. Supply and Installation ............................................................................................................... 31
1.3.2. Lawn Care Services ................................................................................................................... 31
1.3.3. Plant, Shrub and Flower Bed Maintenance ............................................................................... 31
1.3.4. Tree Care Services .................................................................................................................... 31
1.3.5. Irrigation System Maintenance .................................................................................................. 31
1.3.6. Fertilization & Soil Treatment ..................................................................................................... 32
1.3.7. Clean-up and Waste Removal ................................................................................................... 32
1.3.8. Alien Vegetation Control, Removal ............................................................................................ 32
1.3.9. Other Site Care services: ........................................................................................................... 32
1.3.10. Firebreaks:.............................................................................................................................. 32
1.3.11. General ................................................................................................................................... 33
1.4. Staffing, Equipment, Storage and Waste Management .................................................................... 33
1.5. Interpretation and terminology .......................................................................................................... 34
1.5.1. Definitions ...................................................................................................................................... 34
1.5.2. Abbreviations ................................................................................................................................. 36
2.1. The Contractor’s plan for the service ................................................................................................ 38
2.2. Management meetings ...................................................................................................................... 38
2.3. Contractor’s management, supervision and key people ................................................................... 39
2.4. Documentation control ...................................................................................................................... 39
2.4.1. General ...................................................................................................................................... 39
2.4.2. Minimum requirements .............................................................................................................. 40
2.4.3. Use of standard forms ................................................................................................................ 40
2.4.4. Communication .......................................................................................................................... 40
2.5. Invoicing and payment ...................................................................................................................... 40
2.5.1. Invoice submission ..................................................................................................................... 40
2.5.2. How to submit invoices ................................................................................................................. 41
a) General Submission Information .......................................................................................................... 41
b) CPA ............................................................................................................................................... 41
2.5.2. Payment Queries ....................................................................................................................... 41
2.5.3. Eskom information ..................................................................................................................... 41
2.5.4. Avoid Payment Delays ............................................................................................................... 41
2.6. Contract change management .......................................................................................................... 42
2.7. Records of Defined Cost to be kept by the Contractor ..................................................................... 42
2.8. Insurance provided by the Employer................................................................................................. 42
2.9. Things provided at the end of the service period for the Employer’s use ......................................... 42
Equipment ................................................................................................................................................ 42
Information and other things ..................................................................................................................... 42
2.10. Management of work done by Task Order .................................................................................... 43
3.1. Occupational Health and Safety ........................................................................................................ 44
3.2. Key Performance Indicators .............................................................................................................. 46
3.3. Contract completion and sign off....................................................................................................... 47
3.4. Environmental constraints and management .................................................................................... 47
Part c3 scope of work of 53 c3.1 Employer’s service information
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
Vegetation management at gourikwa power station for a period of 5 years
3.5. Quality assurance requirements ....................................................................................................... 48
3.5.1. Quality Control Plan ................................................................................................................... 48
4.1. People ............................................................................................................................................... 49
4.1.1. Minimum requirements of people employed .............................................................................. 49
4.1.2. BBBEE and preferencing scheme ............................................................................................. 49
4.1.3. Supplier Development, Localisation and Industrialisation (SDL&I) ........................................... 49
4.2. Subcontracting .................................................................................................................................. 49
4.2.1. Preferred subContractors ........................................................................................................... 49
4.2.2. Subcontract documentation, and assessment of subcontract tenders ...................................... 49
4.2.3. Limitations on subcontracting .................................................................................................... 49
4.2.4. Attendance on subContractors .................................................................................................. 49
4.3. Plant and Materials............................................................................................................................ 49
4.3.1. Specifications ............................................................................................................................. 49
4.3.2. Correction of defects .................................................................................................................. 49
4.3.3. Contractor’s procurement of Plant and Materials ...................................................................... 50
4.3.4. Tests and inspections before delivery ....................................................................................... 50
4.3.5. Plant & Materials provided “free issue” by the Employer ........................................................... 50
4.3.6. Cataloguing requirements by the Contractor ............................................................................. 50
5.1. Employer’s site entry and security control, permits, and site regulations ......................................... 51
5.2. People restrictions, hours of work, conduct and records .................................................................. 51
5.3. Health and safety facilities on the Affected Property ........................................................................ 51
5.4. Environmental controls, fauna & flora ............................................................................................... 51
5.5. Cooperating with and obtaining acceptance of Others ..................................................................... 51
5.6. Records of Contractor’s Equipment .................................................................................................. 51
5.7. Equipment provided by the Employer ............................................................................................... 51
5.8. Site services and facilities ................................................................................................................. 51
5.8.1. Provided by the Employer .......................................................................................................... 51
5.8.2. Provided by the Contractor ........................................................................................................ 51
5.9. Control of noise, dust, water and waste ............................................................................................ 52
5.10. Tests and inspections .................................................................................................................... 52
5.10.1. Description of tests and inspections ....................................................................................... 52
6.1. Documents issued by the Employer .................................................................................................. 53
Part c3 scope of work of 53 c3.1 Employer’s service information
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
Vegetation management at gourikwa power station for a period of 5 years
Pricing Schedule
Source: Attachment No. 3a.pdf (unknown)(Reg No. 2002/015527/30)
and [Insert at award stage]
(Reg No. ___________ )
for Vegetation Management at Gourikwa Power Station
for a Period of 5 Years
Contents: No of
pages
Part C1 Agreements & Contract Data [●]
Part C2 Pricing Data [●]
Part C3 Scope of Work [●]
CONTRACT No. [Insert at award stage]
Tsc3 of 53 cover page
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _________
Vegetation management at gourikwa power station for a period of 5 years
Part c1: agreements & contract data
Contents: No of
pages
C1.1 Form of Offer and Acceptance [●]
[to be inserted from Returnable Documents at award
stage]
C1.2a Contract Data provided by the Employer [●]
C1.2b Contract Data provided by the Contractor [●]
[to be inserted from Returnable Documents at award
stage]
Part c1 of 53 agreements & contract data
ESKOM HOLDINGS SOC Ltd. CONTRACT NUMBER ______________
Vegetation management at gourikwa power station for a period of 5 years
C1.1 Form of Offer & Acceptance
and Acceptance the tenderer offers to perform all of the obligations and liabilities of the Contractor under the
contract including compliance with all its terms and conditions according to their true intent and meaning for
an amount to be determined in accordance with the conditions of contract identified in the Contract Data.
Options A The offered total of the Prices exclusive of VAT is R [●]
Sub total R [●]
Value Added Tax @ 15% is R [●]
The offered total of the amount due inclusive of VAT is1 R [●]
(in words) [●] Rates Based
Part C1 Agreements and Contract Data (which includes this Form of Offer and Acceptance)
Part C2 Pricing Data
Part C3 Scope of Work: Service Information
and drawings and documents (or parts thereof), which may be incorporated by reference into the above
listed Parts.
clauses
X1 Price adjustment for inflation
X1.1 The base date for indices is One month before tender closure. Rates are
fixed and firm for the first 12 months.
11.2(12) The price list is in
11.2(19) The tendered total of the Prices is R
Part c1 agreements and contract data of 53 c.1.2B Contract data part 2
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Vegetation management at gourikwa power station for a period of 5 years
Part 2: pricing data
TSC3 Option A
reference pages
C2.1 Pricing assumptions: Option A 2
C2.2 The price list 2
Part c2 pricing data of 53 tsc3 option a
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Vegetation management at gourikwa power station for a period of 5 years
C2.1 Pricing assumptions: Option A
Part c2 pricing data of 53 c2.1 Option a pricing assumptions
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Vegetation management at gourikwa power station for a period of 5 years
incidental to Providing the Service in accordance with the Service Information, as it was at the
time of tender, as well as correct any Defects not caused by an Employer’s risk;
listed items in order to fulfil the obligation to complete the service for the tendered total of the
provided, a unit of time is stated in the Unit column and the expected length of time (as a quantity of the
stated units of time) is stated in the Expected Quantity column.
Part c2 pricing data of 53 c2.1 Option a pricing assumptions
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Vegetation management at gourikwa power station for a period of 5 years
C2.2 the price list
chemical eradication of declared Cycle
Category 1a, 1b, 2 & 3 invasive alien
2.5
plants, including alien vegetation
clearing, mechanical cutting, cut-stump
herbicide application, follow-up spot 2
Part c2 pricing data of 53 c2.2 Option a price list
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Vegetation management at gourikwa power station for a period of 5 years
spraying and biomass management
Across the designated 60 ha area
The total of the Prices for 5 Years
Part c2 pricing data of 53 c2.2 Option a price list
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
Vegetation management at gourikwa power station for a period of 5 years
Part 3: scope of work
Financial Requirements
Source: Attachment No. 3a.pdf (unknown)Pricing: Option A priced contract with price list. Prices are either lump sums or quantities multiplied by rates. Lump sum items are not adjusted if quantities change; only compensation events can change the Prices.
Price list items include: site establishment and de-establishment (sum), safety file (sum), PPE once off (sum), travelling fee (per month), labour semi-skilled (per month), labour supervisor (per month), safety officer fee (per month), routine maintenance items (weekly, monthly, quarterly, bi-annual cycles).
Payment: Assessment interval is between the 25th and 30th day of each month, or 1 to 3 days on completion of a Task Order. Payment is due within 30 days of the contractor providing a compliant tax invoice. Interest on late payment at the prime rate.
Price adjustment: Rates are fixed and firm for the first 12 months. Thereafter, price adjustment for inflation applies using SEIFSA indices (85% variable, 15% fixed), with semi-annual adjustment.
Tax invoice: Contractor must include Eskom's VAT number 4740101508 on each invoice. Contractor must comply with the Employer's Vendor Management System requirements to ensure timely payment.
Insurance: Contractor must provide insurances as per Insurance Table A (loss/damage to Employer's property, Plant and Materials, Equipment, third-party liability, employee liability). Employer provides insurances per Insurance Table B (Assets All Risk, Contract Works, Environmental Liability, General and Public Liability, etc.).
Compliance Requirements
Source: Attachment No. 3a.pdf (unknown)CSD registration: Bidders must be registered on the Central Supplier Database (CSD).
Tax clearance: Bidders must have a valid tax clearance (SARS TCS or tax pin).
B-BBEE: Bidders must have a valid B-BBEE certificate and claim preference points on SBD 6.1. Changes in B-BBEE status must be notified to the Employer within seven days, with updated verification certificate within thirty days.
CIDB: Tenderer's CIDB registration number must be stated on the Form of Offer and Acceptance.
Returnable forms: SBD 1 (Invitation to Bid), SBD 3.1/3.2/3.3 (Pricing Schedule), SBD 4 (Declaration of Interest), SBD 6.1 (Preference Points Claim), SBD 6.2 (Declaration for Local Production and Content), SBD 7.1/7.2 (Contract Form), SBD 8 (Declaration of Bidder's Past SCM Practices), SBD 9 (Certificate of Independent Bid Determination), and Authority to Sign/Board Resolution.
Ethics: Bidders must not have been found guilty of prohibited actions (corrupt, fraudulent, collusive, coercive, obstructive).
Business rescue: Bidders must not have had a business rescue order granted against them.
Joint ventures: If bidding as a joint venture, all parties are jointly and severally liable. The key person with authority to bind the JV must be notified to the Service Manager within two weeks of the Contract Date. Composition of the JV cannot be altered without the Employer's written consent.
Health & Safety
Source: Attachment No. 3a.pdf (unknown)signature of Date
witness
Note: If a tenderer wishes to submit alternative tenders, use another copy of this Form of Offer and
10.1 The Service Manager is (name): [●]
Address [●]
Tel [●]
Fax [●]
e-mail [●]
11.2(2) The Affected Property is Gourikwa Power Station
2 Available from Engineering Contract Strategies Tel 011 803 3008 Fax 086 539 1902 www.ecs.co.za
Part c1 agreements and contract data of 53 c.1.2A Contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Vegetation management at gourikwa power station for a period of 5 years
11.2(13) The service is Vegetation Management at Gourikwa Power
Station for a Period of 5 Years
11.2(14) The following matters will be included in None
the Risk Register
11.2(15) The Service Information is in Part 3: Scope of Work and all documents and
drawings to which it makes reference.
12.2 The law of the contract is the law of the Republic of South Africa
13.1 The language of this contract is English
13.3 The period for reply is
phase
2 The Contractor’s main Data required by this section of the core
responsibilities clauses is also provided by the Contractor in
Part 2 and terms in italics used in this section
are identified elsewhere in this Contract Data
21.1 The Contractor submits a first plan for
acceptance within Two (2) weeks of the Contract Date
width. Failure to trim hedges/shrubs as
specified. Failure to remove alien or apply
herbicide vegetation as specified.
General appearance 1.5% of Task order value Limited to 10% of task
Garden areas not kept tidy (tools left, uneven per week order value
finish, unsafe conditions)
Contractor’s Health and Safety file: 1.5% of Task order value Limited to 10% of task
Submission of SHE file two (2) weeks before per week order value
start of work. Also, at intervals as required by
the Employer’s Safety Department.
service period, requires the prior written consent of the Service Manager. All rights in and to all
such images vests exclusively in the Employer.
Z4.5 The Contractor ensures that all his subContractors abide by the undertakings in this clause.
Z5 Waiver and estoppel: Add to core clause 12.3:
Z5.1 Any extension, concession, waiver or relaxation of any action stated in this contract by the
not give rise to an estoppel unless the Parties agree otherwise and confirm such agreement in
writing.
Z6 Health, safety and the environment: Add to core clause 27.4
Z6.1 The Contractor undertakes to take all reasonable precautions to maintain the health and safety
of persons in and about the execution of the service. Without limitation the Contractor:
safety and environmental laws and regulations;
requirements;
proper compliance with all applicable health, safety and environmental laws and regulations
and the health and safety rules, guidelines and procedures provided for in this contract and
generally for the proper maintenance of health & safety in and about the execution of the
service; and
safety and environmental laws and regulations and rules, guidelines and procedures
otherwise provided for under this contract and ensures that his SubContractors, employees
and others under the Contractor’s direction and control, likewise observe and comply with
Part c1 agreements and contract data of 53 c.1.2A Contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Vegetation management at gourikwa power station for a period of 5 years
the foregoing.
necessary for the execution of the service.
Z6.2 The Contractor, in and about the execution of the service, complies with all applicable
environmental laws and regulations and rules, guidelines and procedures otherwise provided
for under this contract and ensures that his SubContractors, employees and others under the
Contractor’s direction and control, likewise observe and comply with the foregoing.
Z7 Provision of a tax invoice, payment and interest
The Contractor (if registered in South Africa in terms of the Companies Act) is required to
Z7.1 comply with the requirements of the Value Added Tax Act, (Act (as amended)) and
to include the Employer’s VAT number 4740101508 on each invoice submitted for payment.
Z7.2 Within one week of receiving a payment certificate from the Service Manager or the Employer’s
acceptance or correction of the Contractor’s assessment or application for payment, the
regulations published in GNR February 2002, under the Occupational Health and Safety
Act, 1993 (Act ) (“Asbestos Regulations”). The OEL for asbestos is 0.2 regulated
asbestos fibres per millilitre of air as a 4-hour TWA, averaged over any continuous period of four
hours, and the short term exposure limit of 0.6 regulated asbestos fibres per millilitre of air as a 10-
minute TWA, averaged over any 10 minutes, measured in accordance with HSG248 and
monitored according to HSG173 and OESSM.
Z14.2 Upon written request by the Contractor, the Employer certifies that these conditions prevail. All
measurements and reporting are effected by an independent, competent, and certified
occupational hygiene inspection body, i.e. a SANAS accredited and Department of Employment
and Labour approved AAIA. The Contractor may perform Parallel Measurements and related
control measures at the Contractor’s expense. For the purposes of compliance the results
generated from Parallel Measurements are evaluated only against South African statutory limits as
detailed in clause Z14.1. Control measures conform to the requirements stipulated in the AAIA-
approved asbestos work plan.
Z14.3 The Employer manages asbestos and ACM according to the Standard.
Z14.4 In the event that any asbestos is identified while Providing the Services, a risk assessment is
conducted and if so required, with reference to possible exposure to an airborne concentration of
Part c1 agreements and contract data of 53 c.1.2A Contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Vegetation management at gourikwa power station for a period of 5 years
above the AL for asbestos, immediate control measures are implemented and relevant air
monitoring conducted in order to declare the area safe.
Z14.5 The Contractor’s personnel are entitled to stop working and leave the contaminated area forthwith
until such time that the area of concern is declared safe by either Compliance Monitoring or an
statement however other clauses may also use the same data.
selected. Click on the form field once and type in the data. Otherwise complete by hand and in ink.
(From the example given in an Appendix within the TSC3 Guidance Notes)
Entries in the first four columns in the price list in section C2.2 are made either by the Employer or the
tendering Contractor.
1.1 Site establishment and de-establishment Sum 1
1.2 Safety File Sum 1
1.3 PPE once off Sum 1
1.4 Travelling Fee per month Month 12
1.5 Labour – Semi-Skilled Month 12
1.6 Labour - Supervisor Month 12
1.7 Safety Officer Fee Month 12
highest safety, environmental, and operational standards.
supports:
hazards.
herbicides and equipment, wear appropriate PPE, and comply with the Occupational Health and
Safety Act (OHSA), the Conservation of Agricultural Resources Act (CARA, Act ), the
National Environmental Management: Biodiversity Act (NEMBA, Act ), and Eskom’s
Environmental Management Plan (EMP).
1.2. Employer’s requirements for the service
The Contractor shall provide all labour, equipment, tools, materials, supervision, supplies (including
herbicide) and transportation necessary to perform the supply and services described below.
extras arising from these matters will be subsequently entertained or admitted.
1.2.1. Normative
[1] ISO 9001 Quality Management Systems
[2] ISO 14001 – Environmental management Systems – Requirements with guidance for use.
[3] National Environmental Management Act (NEMA), Act
[4] National Environmental Management: Biodiversity Act (NEMBA), Act
[5] Alien and Invasive Species Regulations, 2014
[6] National Veld and Forest Fire Act, Act
[7] Occupational Health and Safety Act (OHSA), Act
[8] Eskom SHEQ Policy and Environmental Management Procedures
1.2.1. Informative
[9] The South African National Biodiversity Institute (SANBI) Alien Plant Control Guidelines
1.3. Gourikwa Power Station
aesthetics.
Part c3 scope of work of 53 c3.1 Employer’s service information
Contractual Terms
Source: Attachment No. 3a.pdf (unknown)Loss of or damage caused by The replacement cost where not covered by the
the Contractor to the Employer’s insurance.
Employer’s property
The Employer’s policy deductible as at Contract
Date, where covered by the Employer’s insurance.
Loss of or damage to Plant and The replacement cost where not covered by the
Materials Employer’s insurance.
The Employer’s policy deductible as at Contract
Date, where covered by the Employer’s insurance.
Loss of or damage to The replacement cost where not covered by the
Equipment Employer’s insurance.
The Employer’s policy deductible as at Contract
Date, where covered by the Employer’s insurance.
The Contractor’s liability for Loss of or damage to property
loss of or damage to property The replacement cost
(except the Employer’s
property, Plant and Materials
and Equipment) and liability for Bodily injury to or death of a person
bodily injury to or death of a The amount required by the applicable law.
person (not an employee of the
Contractor) arising from or in
connection with the
Contractor’s Providing the
Service
Liability for death of or bodily The amount required by the applicable law
injury to employees of the
Contractor arising out of and in
the course of their employment
in connection with this contract
Z 12.2 Replace core clause 86 with the following:
Insurance 86
by the
Employer
86.1 The Employer provides the insurances stated in the Insurance Table B
Part c1 agreements and contract data of 53 c.1.2A Contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Vegetation management at gourikwa power station for a period of 5 years
Insurance table b
Insurance against or name Minimum amount of cover or minimum lim
of policy of indemnity
Assets All Risk Per the insurance policy document
Contract Works insurance Per the insurance policy document
Environmental Liability Per the insurance policy document
General and Public Liability Per the insurance policy document
Transportation (Marine) Per the insurance policy document
Motor Fleet and Mobile Plant Per the insurance policy document
Terrorism Per the insurance policy document
Cyber Liability Per the insurance policy document
Nuclear Material Damage and Per the insurance policy document
Business Interruption
Nuclear Material Damage Per the insurance policy document
Terrorism
Z13 Intellectual Property – Eskom owning Intellectual Property
“Intellectual means (a) patents, trademarks, service marks, rights in designs, trade names, trade
Property” secrets, know how, copyrights and topography rights, in each case whether registered or
not; (b) applications for registration of any of them; (c) rights under licences and consents
in relation to any of them; (d) all forms of protection of a similar nature or having equivalent
or similar effect to any of them which may subsist anywhere in the world.
“Backgroun means any and all Intellectual Property rights that are not Foreground Intellectual Property
d Intellectual and are owned or controlled by the relevant party or licensed to the relevant party prior to
Property" or outside of the services but required for the purposes of the services.
“Foreground means all Intellectual Property rights and other matter capable of being the subject of
Intellectual intellectual property rights that is conceived, first reduced to practice or writing or
Property” developed in whole or in substantial part in the course of the execution of the services and
rights which are developed substantially as a result of the services. Any services that will
be developed, changed, modified and/or improved specifically for the Purposes will be
Foreground Intellectual Property. Any data or any other information relating to Employer’s
proprietary information generated from the use of the Contractor’s Background Intellectual
Property.
Z13.1 The Contractor retains ownership of all Background Intellectual Property rights made by or
on behalf of the Contractor as part of the services in information or material it uses in
carrying out the services.
Z13.2 All Foreground Intellectual Property rights, contained in any developed materials which are
created by the Contractor or on behalf of the Contractor, for the purposes of and in support
of the execution of the services Employer’s IP) vest with the Employer.
Z13.3 Any data or any other information relating to Employer’s proprietary information generated
from the use of the Contractor’s Background Intellectual Property, the copyright therein
shall be owned by the Employer.
Z13.4 The Contractor acknowledges that all rights, title, and interest in and to the Foreground
Intellectual Property that may result or originate from or be developed in execution of the
services vests in the Employer and that the Contractor has no claim of any nature in and to
the Foreground Intellectual Property.
Part c1 agreements and contract data of 53 c.1.2A Contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Vegetation management at gourikwa power station for a period of 5 years
Z13.5 The Contractor ensures that a copyright notice is incorporated or embossed or labelled on
the Foreground Intellectual Property, where the Employer is reflected as the owner of the
Foreground Intellectual Property.
Z13.6 The Contractor is obliged to provide Foreground Intellectual Property manufacturing
documents, designs, processes and/or specifications to the Employer before/on the
[completion date].
Z13.7 The Contractor procures that each Sub-Contractor executes all and any services and takes
all and any other actions as may be required, in order to give effect to this Agreement.
Z13.8 The Employer retains all Background Intellectual Property rights in all documents made by
or on behalf of the Employer including all documents and requirements provided prior to or
during the execution of the services. The Contractor does not, without the written consent,
of the Employer, copy, use or issue to a third party any of the Employer’s Background
Intellectual Property documents and requirements except for the purposes of executing the
services.
Z13.9 Either party procures that any third party executes confidentiality undertakings not to
disclose to any other third parties, any of the [Employer’s Background Intellectual Property
and IP documents and requirements at all, in respect of the Employer], or the Background
Intellectual Property, in respect of the Contractor.
Z13.10 Third Party Claims:
Z13.10.1 In the event of any claims being made or actions against the Employer, on the ground that
the Contractor infringed any patent, trade mark or copyright, the Contractor is notified
thereof and at its own expense, conducts all negotiations in consultation with the Employer
for the settlement of the claim and litigation that may arise from such alleged infringement,
provided that the Employer will not bear any financial burden or losses.
Z13.10.2 Save where the Contractor fails to take over the conduct of the negotiation or litigation
within a reasonable time of the notification of the alleged infringement, the Employer does
not make any admission which might be prejudicial to the Contractor’s position. The
Employer, at the request and the cost of the Contractor, affords it all reasonable technical
assistance that the Employer is able to provide for the purpose of contesting any such
claim or action.
Z13.10.3 Should it be held in any such action that any such protected rights have been infringed, as
definitely stated by a judgment of the court before which the action is brought, the
Contractor, at its own expense and in consultation with the Employer, either:
a. procures for [Employer/Client/Purchaser] the right to continue to use the affected
item or design, or
b. replaces the said affected item or design with a non-infringing item, or
c. provides a design of equivalent quality or modify such affected item or design so as
to make it non-infringing without affecting the quality.
Z13.10.4 Notwithstanding anything contained in this contract, the foregoing sets forth the entire
responsibility of the Contractor with respect to claims relating to infringement.
Z13.10.5 Where it is alleged that the Employer has committed an infringement as intended vis-à-vis
the Contractor as set out in the third-party intellectual property infringement clause, the
Employer has the same rights and obligations as the Contractor, mutatis mutandis, as
regards such alleged infringement.
Z13.10.6 The Contractor herewith indemnifies the Employer and undertakes to keep the Employer
indemnified against all claims of whatsoever nature, real or imagined, which may be made
against the Employer arising from the infringement of any third-party intellectual property
rights.
Part c1 agreements and contract data of 53 c.1.2A Contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Vegetation management at gourikwa power station for a period of 5 years
Z14 Asbestos
For the purposes of this Z-clause, the following definitions apply:
AAIA means approved asbestos inspection authority.
ACM means asbestos containing materials.
AL means action level, i.e. a level of 50% of the OEL, i.e. 0.1 regulated asbestos fibres
per ml of air measured over a 4-hour period. The value at which proactive actions is
required in order to control asbestos exposure to prevent exceeding the OEL.
Ambient Air means breathable air in area of work with specific reference to breathing zone, which
is defined to be a virtual area within a radius of approximately 30cm from the nose
inlet.
Compliance means compliance sampling used to assess whether or not the personal exposure of
Monitoring workers to regulated asbestos fibres is in compliance with the Standard’s requirements
for safe processing, handling, storing, disposal and phase-out of asbestos and
asbestos containing material, equipment and articles.
OEL means occupational exposure limit.
Parallel means measurements performed in parallel, yet separately, to existing measurements
Measurements to verify validity of results.
Safe Levels means airborne asbestos exposure levels conforming to the Standard’s requirements
for safe processing, handling, storing, disposal and phase-out of asbestos and
asbestos containing material, equipment and articles.
Standard means the Employer’s Asbestos Standard 32-303: Requirements for Safe Processing,
Handling, Storing, Disposal and Phase-out of Asbestos and Asbestos Containing
Material, Equipment and Articles.
SANAS means the South African National Accreditation System.
TWA means the average exposure, within a given workplace, to airborne asbestos fibres,
normalised to the baseline of a 4-hour continuous period, also applicable to short term
exposures, i.e. 10-minute TWA.
Z14.1 The Employer ensures that the Ambient Air in the area where the Contractor will Provide the
Services conforms to the acceptable prescribed South African standard for asbestos, as per the
regulations published in GNR February 2002, under the Occupational Health and Safety
Act, 1993 (Act ) (“Asbestos Regulations”). The OEL for asbestos is 0.2 regulated
asbestos fibres per millilitre of air as a 4-hour TWA, averaged over any continuous period of four
hours, and the short term exposure limit of 0.6 regulated asbestos fibres per millilitre of air as a 10-
minute TWA, averaged over any 10 minutes, measured in accordance with HSG248 and
monitored according to HSG173 and OESSM.
Z14.2 Upon written request by the Contractor, the Employer certifies that these conditions prevail. All
measurements and reporting are effected by an independent, competent, and certified
occupational hygiene inspection body, i.e. a SANAS accredited and Department of Employment
and Labour approved AAIA. The Contractor may perform Parallel Measurements and related
control measures at the Contractor’s expense. For the purposes of compliance the results
generated from Parallel Measurements are evaluated only against South African statutory limits as
detailed in clause Z14.1. Control measures conform to the requirements stipulated in the AAIA-
approved asbestos work plan.
Z14.3 The Employer manages asbestos and ACM according to the Standard.
Z14.4 In the event that any asbestos is identified while Providing the Services, a risk assessment is
conducted and if so required, with reference to possible exposure to an airborne concentration of
Part c1 agreements and contract data of 53 c.1.2A Contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Vegetation management at gourikwa power station for a period of 5 years
above the AL for asbestos, immediate control measures are implemented and relevant air
monitoring conducted in order to declare the area safe.
Z14.5 The Contractor’s personnel are entitled to stop working and leave the contaminated area forthwith
until such time that the area of concern is declared safe by either Compliance Monitoring or an
AAIA approved control measure intervention, for example, per the emergency asbestos work plan,
if applicable.
Z14.6 The Contractor continues to Provide the Services, without additional control measures presented
on presentation of Safe Levels. The contractually agreed dates to Provide the Services, including
the Completion Date, are adjusted accordingly. The contractually agreed dates are extended by
the notification periods required by regulations 3 and 21 of the Asbestos Regulations, 2001.
Z14.7 Any removal and disposal of asbestos, asbestos containing materials and waste, is done by a
registered asbestos Contractor, instructed by the Employer at the Employer’s expense, and
conducted in line with South African legislation.
Part c1 agreements and contract data of 53 c.1.2A Contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Vegetation management at gourikwa power station for a period of 5 years
C1.2 Contract Data
Part two - Data provided by the Contractor
Notes to a tendering Contractor:
Guidance Notes (TSC3-GN)3 in order to understand the implications of this Data which the tenderer
is required to complete.
statement however other clauses may also use the same data.
selected. Click on the form field once and type in the data. Otherwise complete by hand and in ink.
Completion of the data in full, according to Options chosen, is essential to create a complete contract.
Clause Statement Data
10.1 The Contractor is (Name):
Address
Tel No.
Fax No.
11.2(8) The direct fee percentage is %
The subcontracted fee percentage is %
11.2(14) The following matters will be included in
the Risk Register
11.2(15) The Service Information for the
Contractor’s plan is in:
21.1 The plan identified in the Contract Data is
contained in:
24.1 The key people are:
1 Name:
Job:
Responsibilities:
of Deviations (if any), contact the Employer’s agent (whose details are given in the Contract Data) to arrange
the delivery of any securities, bonds, guarantees, proof of insurance and any other documentation to be
provided in terms of the conditions of contract identified in the Contract Data at, or just after, the date this
agreement comes into effect. Failure to fulfil any of these obligations in accordance with those terms shall
constitute a repudiation of this agreement.
clauses and the clauses for main Option:
A: Priced contract with price list
dispute resolution Option W1: Dispute resolution procedure
and secondary Options
X1: Price adjustment for inflation
X2 Changes in the law
X17: Low service damages
X18: Limitation of liability
X19: Task Order
X20: Key performance indicators
Z: Additional conditions of contract
of the NEC3 Term Service Contract April
20132 (tsc3)
10.1 The Employer is (name): Eskom Holdings SOC Ltd (reg no:
2002/015527/30), a state-owned company
incorporated in terms of the company laws of
the Republic of South Africa
due for payment equal to that certified,
accepted, or corrected by the Service Manager,
or decided by the Adjudicator or awarded by the
tribunal, as applicable.
51.4 The interest rate is the publicly quoted prime rate of interest
(calculated on a 365 day year) charged by from
time to time by the Standard Bank of South
Africa Limited (as certified, in the event of any
dispute, by any manager of such bank, whose
Part c1 agreements and contract data of 53 c.1.2A Contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Vegetation management at gourikwa power station for a period of 5 years
appointment it shall not be necessary to prove)
for amounts due in Rands and
(ii) the LIBOR rate applicable at the time for
amounts due in other currencies. LIBOR is the
6 month London Interbank Offered Rate quoted
under the caption “Money Rates” in The Wall
no rate is quoted for the currency in question
then the rate for United States Dollars, and if no
such rate appears in The Wall Street Journal
then the rate as quoted by the Reuters Monitor
Money Rates Service (or such service as may
replace the Reuters Monitor Money Rates
Service) on the due date for the payment in
question, adjusted mutatis mutandis every 6
months thereafter (and as certified, in the event
of any dispute, by any manager employed in the
foreign exchange department of The Standard
dispute to him. (see www.ice-sa.org.za). If the
the timing of the service
X18 Limitation of liability
X18.1 The Contractor’s liability to the Employer
for indirect or consequential loss is limited
to R0.0 (zero Rand)
X18.2 For any one event, the Contractor’s the amount of the deductibles relevant to the
liability to the Employer for loss of or event
damage to the Employer’s property is
limited to
X18.3 The Contractor’s liability for Defects due to The greater of
his design of an item of Equipment is limited
to
and
from the Employer’s insurance (other than
the resulting physical damage to the
Employer’s property which is not excluded)
plus the applicable deductibles
X18.4 The Contractor’s total liability to the the total of the Prices other than for the
in connection with this contract, other than
the excluded matters, is limited to The Contractor’s total liability for the additional
excluded matters is not limited.
for which the Contractor is liable under this
contract for
Part c1 agreements and contract data of 53 c.1.2A Contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Vegetation management at gourikwa power station for a period of 5 years
specification,
outside the Affected Property,
the Employer’s property, Plant and
Materials),
right.
X18.5 The end of liability date is 12 months after the end of the service period.
X19 Task Order
X19.5 The Contractor submits a Task Order
programme to the Service Manager within Three (3) days of receiving the Task Order
Z3.2 The Contractor is required to submit an updated verification certificate and necessary
supporting documentation confirming the change in his B-BBEE status to the Service Manager
within thirty days of the notification or as otherwise instructed by the Service Manager.
Z3.3 Where, as a result, the Contractor’s B-BBEE status has decreased since the Contract Date the
Employer may either re-negotiate this contract or alternatively, terminate the Contractor’s
obligation to Provide the Service.
Part c1 agreements and contract data of 53 c.1.2A Contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Vegetation management at gourikwa power station for a period of 5 years
Z3.4 Failure by the Contractor to notify the Employer of a change in its B-BBEE status may
constitute a reason for termination. If the Employer terminates in terms of this clause, the
procedures on termination are P1, P2 and P4 as stated in clause 92, and the amount due is A1
and A3 as stated in clause 93.
Z4 Confidentiality
Z4.1 The Contractor does not disclose or make any information arising from or in connection with
this contract available to Others. This undertaking does not, however, apply to information
which at the time of disclosure or thereafter, without default on the part of the Contractor, enters
the public domain or to information which was already in the possession of the Contractor at the
time of disclosure (evidenced by written records in existence at that time). Should the
Contractor disclose information to Others in terms of clause 25.1, the Contractor ensures that
the provisions of this clause are complied with by the recipient.
Z4.2 If the Contractor is uncertain about whether any such information is confidential, it is to be
regarded as such until notified otherwise by the Service Manager.
Z4.3 In the event that the Contractor is, at any time, required by law to disclose any such information
which is required to be kept confidential, the Contractor, to the extent permitted by law prior to
disclosure, notifies the Employer so that an appropriate protection order and/or any other action
can be taken if possible, prior to any disclosure. In the event that such protective order is not,
or cannot, be obtained, then the Contractor may disclose that portion of the information which it
is required to be disclosed by law and uses reasonable efforts to obtain assurances that
confidential treatment will be afforded to the information so disclosed.
Z4.4 The taking of images (whether photographs, video footage or otherwise) of the Affected
contract, and this contract, including in accordance with any requirements and procedures
stated in the Service Information, and showing the amount due for payment equal to that stated
in the payment certificate, or that accepted or corrected assessment or application for payment.
Z7.3 If the Contractor does not provide a tax invoice in the form to be legally compliant, reflecting the
certified, accepted or corrected amount and by the time required by this contract, the time by
when the Employer is to make a payment, and the date from which interest is assessed for the
certified, accepted or corrected amount, is extended by a period equal in time to the delayed
submission of the legally compliant tax invoice.
Z7.4 The Contractor’s provision of a tax invoice reflecting the certified, accepted or corrected amount
does not affect the Parties’ rights in terms of this contract, including with respect to disputed
amounts.
The Contractor at all times complies with Employer’s Vendor Management System
Z7.5 requirements to ensure invoices are processed and paid timeously. It is the Contractor’s
responsibility to ensure that the Employer is informed of any changes in its organisation that
would affect its vendor status, and to ensure that the necessary actions and due diligences are
taken to ensure compliance with the Employer’s Vendor Management System. The Employer
will not be liable for a delay in payment of invoices as a result of the Contractor’s non-compliant
status on the Employer’s Vendor Management System and no interest will be claimable in this
instance.
Z8 Notifying compensation events
Z8.1 Delete the last paragraph of core clause 61.3 and replace with:
the event, he is not entitled to a change in the Prices.
Z9 Employer’s limitation of liability
Z9.1 The Employer’s liability to the Contractor for the Contractor’s indirect or consequential loss is
limited to R0.00 (zero Rand)
Z9.2 The Contractor’s entitlement under the indemnity in 82.1 is provided for in 60.1(12) and the
Employer’s liability under the indemnity is limited to compensation as provided for in core
clause 63 and X19.11 if Option X19 Task Order applies to this contract.
Part c1 agreements and contract data of 53 c.1.2A Contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Vegetation management at gourikwa power station for a period of 5 years
Termination: Add to core clause 91.1, at the second main bullet point, fourth sub-bullet
Z10
point, after the words "against it":
Z10.1 or had a business rescue order granted against it.
Z11 Ethics
appropriate action to prevent or remedy the situation, without limiting any other rights or
remedies the Employer has. It is not required that the Committing Party had to have been
found guilty, in court or in any other similar process, of such Prohibited Action before the
Employer can terminate the Contractor’s obligation to Provide the Services for this reason.
Z11.3 If the Employer terminates the Contractor’s obligation to Provide the Services for this reason,
the amounts due on termination are those intended in core clauses 92.1 and 92.2.
Z11.4 A Committing Party co-operates fully with any investigation pursuant to alleged Prohibited
Z12 Insurance
Z 12.1 Replace core clause 83 with the following:
Part c1 agreements and contract data of 53 c.1.2A Contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Vegetation management at gourikwa power station for a period of 5 years
Insurance cover 83
83.1 When requested by a Party, the other Party provides certificates from his insurer
or broker stating that the insurances required by this contract are in force.
83.2 The Contractor provides the insurances stated in the Insurance Table A from the
starting date until the earlier of Completion and the date of the termination
certificate.
the Contractor to the Employer’s insurance.
Employer’s property
The Employer’s policy deductible as at Contract
Date, where covered by the Employer’s insurance.
Materials Employer’s insurance.
The Employer’s policy deductible as at Contract
Date, where covered by the Employer’s insurance.
Equipment Employer’s insurance.
The Employer’s policy deductible as at Contract
Date, where covered by the Employer’s insurance.
The Contractor’s liability for Loss of or damage to property
loss of or damage to property The replacement cost
(except the Employer’s
property, Plant and Materials
and Equipment) and liability for Bodily injury to or death of a person
bodily injury to or death of a The amount required by the applicable law.
person (not an employee of the
Contractor) arising from or in
connection with the
Contractor’s Providing the
the course of their employment
in connection with this contract
Z 12.2 Replace core clause 86 with the following:
Insurance 86
by the
86.1 The Employer provides the insurances stated in the Insurance Table B
Part c1 agreements and contract data of 53 c.1.2A Contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Vegetation management at gourikwa power station for a period of 5 years
Transportation (Marine) Per the insurance policy document
Z13 Intellectual Property – Eskom owning Intellectual Property
“Intellectual means (a) patents, trademarks, service marks, rights in designs, trade names, trade
Property” secrets, know how, copyrights and topography rights, in each case whether registered or
not; (b) applications for registration of any of them; (c) rights under licences and consents
in relation to any of them; (d) all forms of protection of a similar nature or having equivalent
or similar effect to any of them which may subsist anywhere in the world.
“Backgroun means any and all Intellectual Property rights that are not Foreground Intellectual Property
d Intellectual and are owned or controlled by the relevant party or licensed to the relevant party prior to
Property" or outside of the services but required for the purposes of the services.
“Foreground means all Intellectual Property rights and other matter capable of being the subject of
Property” developed in whole or in substantial part in the course of the execution of the services and
rights which are developed substantially as a result of the services. Any services that will
be developed, changed, modified and/or improved specifically for the Purposes will be
Foreground Intellectual Property. Any data or any other information relating to Employer’s
proprietary information generated from the use of the Contractor’s Background Intellectual
Z13.1 The Contractor retains ownership of all Background Intellectual Property rights made by or
on behalf of the Contractor as part of the services in information or material it uses in
carrying out the services.
Z13.2 All Foreground Intellectual Property rights, contained in any developed materials which are
created by the Contractor or on behalf of the Contractor, for the purposes of and in support
of the execution of the services Employer’s IP) vest with the Employer.
Z13.3 Any data or any other information relating to Employer’s proprietary information generated
from the use of the Contractor’s Background Intellectual Property, the copyright therein
shall be owned by the Employer.
Z13.4 The Contractor acknowledges that all rights, title, and interest in and to the Foreground
services vests in the Employer and that the Contractor has no claim of any nature in and to
the Foreground Intellectual Property.
Part c1 agreements and contract data of 53 c.1.2A Contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Vegetation management at gourikwa power station for a period of 5 years
Z13.5 The Contractor ensures that a copyright notice is incorporated or embossed or labelled on
the Foreground Intellectual Property, where the Employer is reflected as the owner of the
Z13.6 The Contractor is obliged to provide Foreground Intellectual Property manufacturing
documents, designs, processes and/or specifications to the Employer before/on the
[completion date].
Z13.7 The Contractor procures that each Sub-Contractor executes all and any services and takes
all and any other actions as may be required, in order to give effect to this Agreement.
Z13.8 The Employer retains all Background Intellectual Property rights in all documents made by
or on behalf of the Employer including all documents and requirements provided prior to or
during the execution of the services. The Contractor does not, without the written consent,
of the Employer, copy, use or issue to a third party any of the Employer’s Background
services.
Z13.9 Either party procures that any third party executes confidentiality undertakings not to
disclose to any other third parties, any of the [Employer’s Background Intellectual Property
and IP documents and requirements at all, in respect of the Employer], or the Background
a. procures for [Employer/Client/Purchaser] the right to continue to use the affected
item or design, or
b. replaces the said affected item or design with a non-infringing item, or
c. provides a design of equivalent quality or modify such affected item or design so as
to make it non-infringing without affecting the quality.
Z13.10.4 Notwithstanding anything contained in this contract, the foregoing sets forth the entire
responsibility of the Contractor with respect to claims relating to infringement.
Z13.10.5 Where it is alleged that the Employer has committed an infringement as intended vis-à-vis
the Contractor as set out in the third-party intellectual property infringement clause, the
regards such alleged infringement.
Z13.10.6 The Contractor herewith indemnifies the Employer and undertakes to keep the Employer
indemnified against all claims of whatsoever nature, real or imagined, which may be made
against the Employer arising from the infringement of any third-party intellectual property
rights.
Part c1 agreements and contract data of 53 c.1.2A Contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Vegetation management at gourikwa power station for a period of 5 years
Z14 Asbestos
Description
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.xlsx (unknown)Cell D3: Type 1 in the block to select the applicable type of Category
Submission Guidelines
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.xlsx (unknown)Returnable documents: A completed Standard Bidding Document (SBD) form, the Invitation to Bid, and the completed Bidder's Disclosure. The invitation is administered through Eskom's tender process. Bidders must complete and submit the prescribed returnable document(s) as specified in the tender.
Evaluation Criteria
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.xlsx (unknown)Bid evaluation consists of two stages: (a) 90/10 preference point scoring under the Preferential Procurement Policy Framework Act, and (b) functionality evaluation.
Technical Specifications
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.xlsx (unknown)Cell D3: Type 1 in the block to select the applicable type of Category
Compliance Requirements
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.xlsx (unknown)Unable to extract from available source.
Description
Source: 559-667439824 Generation Quality Control Plan Template.docx (unknown)The tender is for the provision of gardening and vegetation services at five Eskom power stations (Gourikwa, Ankerlig, Acacia, Port Rex, Palmiet) over a five-year period. The supplied document is a Quality Control Plan template, indicating that quality control documentation and records management are part of the service requirements.
Technical Specifications
Source: 559-667439824 Generation Quality Control Plan Template.docx (unknown)The tender covers gardening and vegetation services at Gourikwa, Ankerlig, Acacia, Port Rex and Palmiet Power Stations for a five-year period. The extracted document is a Generation Quality Control Plan (QCP) template. After completing the Databook, an authorised copy of the form must be sent to the site Documentation Control Centre for archiving and uploading to OpenText (Records Management).
Description
Source: Invitation to Tender (ITT) - Vegetation & Garden Services - E3452GXPOU (Approved).pdf (RFP)The tender is for the provision of gardening and vegetation services at five Eskom power stations: Gourikwa, Ankerlig, Acacia, Port Rex and Palmiet, for a period of five years. The contract will be based on the NEC3 Term Service Contract. The Scope of Work is referenced in the NEC document. Tenderers must not subcontract 100% of the scope of work. Specific SDL&I objectives are applicable for Acacia, Palmiet and Ankerlig Power Stations, Gourikwa Hydro Station, and Port Rex Power Station.
Important Dates
Source: Invitation to Tender (ITT) - Vegetation & Garden Services - E3452GXPOU (Approved).pdf (RFP)Closing date and time: 02 October 2026 at 10:00 AM South African Standard Time.
Clarification meeting (non-compulsory): 09 September 2026 at 10:00 AM via Microsoft Teams. Meeting ID: 358 180 069 279 881, Passcode: 6Zr3cY2a. Join link: https://teams.microsoft.com/meet/358180069279881?p=6fwcR0e3xWEZegGvI7
Clarification queries must be submitted at least 5 working days before the tender submission deadline.
Tender validity period: 150 days from the closing date.
Contact Information
Source: Invitation to Tender (ITT) - Vegetation & Garden Services - E3452GXPOU (Approved).pdf (RFP)Eskom Representative: Siyabulela Kekana, Tel: 021 941 5762, Email: [email protected]. All queries and clarifications must be addressed in writing to the Eskom Representative only. Fraud and corruption can be reported anonymously at 0800 11 2722 or [email protected].
Submission Guidelines
Source: Invitation to Tender (ITT) - Vegetation & Garden Services - E3452GXPOU (Approved).pdf (RFP)Tenders must be submitted electronically via the Eskom E-tendering site by 02 October 2026 at 10:00 AM South African Standard Time. No late tenders will be accepted. All documents must be uploaded in PDF format under the folders Technical, Commercial, Financial, and Other. The price list must be submitted in PDF and is disqualifiable if not received at submission. No zipped or compressed files are allowed; no hard copies will be accepted. If a tender is resubmitted, only the latest version is accepted. The submission status must be indicated as complete. Upload size per document is 500 megabytes; total submission is restricted to 4 gigabytes. Tenders must be signed by authorised persons; tenders signed by non-authorised persons are disqualified. Alternative tenders are not allowed. Returnable forms required at closing (disqualifiable if not submitted): Annexure A (Authorisation Form), Annexure B (Acknowledgement Form), Annexure C (Tenderer's Particulars), Annexure D (Integrity Pact Declaration), Annexure E (CPA for Local Goods/Services), Annexure H (SBD 1 - Invitation to Bid), Annexure I (SBD 6.1 - Preference Points Claim Form), Annexure J (SBD 4 - Bidders Disclosure), and the completed pricing schedule in PDF. Proof of valid CSD registration is mandatory. Non-disqualifiable returnables (if not submitted at closing, must be provided within 5 working days of written request) include the Tax Evaluation Questionnaire, Employment Equity compliance proof (if designated employer), and COIDA letter of good standing. Specific Goals evidence is required at closing for evaluation; failure to submit results in zero points but not disqualification. Tax clearance certificate required if not registered on CSD or no SARS e-filing PIN provided. Foreign suppliers with no South African footprint must complete SBD 1 but no tax compliance proof required. JV/consortium must submit letter of intent or valid JV agreement, confirmation of single business entity, and details of single designated bank account. E-tendering Help Manual acknowledgement form must be submitted.
Evaluation Criteria
Source: Invitation to Tender (ITT) - Vegetation & Garden Services - E3452GXPOU (Approved).pdf (RFP)Evaluation uses the 80/20 preferential point system. Price is scored out of 80 points; Specific Goals (B-BBEE level) are scored out of 20 points. Tenderers must achieve a weighted technical score of 70% or more to qualify for further evaluation. Mandatory Technical Evaluation Criteria (gatekeepers) are assessed on a Yes/No basis; a 'No' on any criterion disqualifies the tenderer. Qualitative Technical Evaluation Criteria are weighted; the minimum weighted final score is 70%. Prices are evaluated inclusive of VAT, corrected for arithmetical errors, excluding contingencies, adjusted for acceptable variations, and compared on Net Present Value. Unconditional discounts are considered; conditional discounts are not considered for evaluation but applied at payment. If a tenderer fails to submit evidence for a Specific Goal, it is not disqualified but scores zero for that goal. Tenderers are ranked by total points (Price + Specific Goals). Eskom reserves the right to award to a single or multiple suppliers.
Technical Specifications
Source: Invitation to Tender (ITT) - Vegetation & Garden Services - E3452GXPOU (Approved).pdf (RFP)Scope: Provision of gardening and vegetation services at Gourikwa, Ankerlig, Acacia, Port Rex and Palmiet Power Stations for a period of five (5) years. The contract will be governed by the NEC3 Term Service Contract. The Scope of Work is referenced in the NEC document. Tenderers must not subcontract 100% of the scope of work. Specific SDL&I objectives are applicable for Acacia, Palmiet and Ankerlig Power Stations, Gourikwa Hydro Station, and Port Rex Power Station. Additional documents may be required (ECSA/SACPCMP/CVs/permits/licenses/specific registration documents) if applicable to the scope of work.
Experience & Qualifications
Source: Invitation to Tender (ITT) - Vegetation & Garden Services - E3452GXPOU (Approved).pdf (RFP)Tenderers must provide CVs and qualifications for personnel participating in the activity. OHS competency must be demonstrated, considering scope of work, risks, OHS plan, and applicability. The Baseline Risk Assessment (BRA) must include the methodology used. The OHS policy must be signed by the CEO and comply with OHS Act Section 7.
Pricing Schedule
Source: Invitation to Tender (ITT) - Vegetation & Garden Services - E3452GXPOU (Approved).pdf (RFP)The completed pricing schedule is included in the NEC3 Term Services Contract and must be submitted in PDF. The price list must be submitted in PDF; it is disqualifiable if not received at submission. Upload size per document is 500 megabytes; total submission is restricted to 4 gigabytes. Prices are evaluated inclusive of VAT, corrected for arithmetical errors, excluding contingencies, adjusted for acceptable variations, and compared on Net Present Value. Unconditional discounts are considered; conditional discounts are not considered for evaluation but applied at payment. Prices are scored out of 80 points.
Financial Requirements
Source: Invitation to Tender (ITT) - Vegetation & Garden Services - E3452GXPOU (Approved).pdf (RFP)Payment terms: For contracts valued below R50,000,000 (including VAT), Eskom pays within 30 days of receipt of undisputed invoices. For contracts valued above R50,000,000 (including VAT), Eskom pays within 60 days of receipt of undisputed invoices. Financial analysis of the recommended supplier will be conducted prior to contract award; audited financial statements (18 months) may be required. The pricing schedule is included in the NEC3 Term Services Contract and must be submitted in PDF. Prices are evaluated inclusive of VAT. No security for performance is required (not applicable).
Compliance Requirements
Source: Invitation to Tender (ITT) - Vegetation & Garden Services - E3452GXPOU (Approved).pdf (RFP)Mandatory: Proof of valid and current CSD registration (CSD number/CSD report).
South African tenderers must provide a valid COIDA letter of good standing (original certificate or proof of application).
Tax clearance: Certified copy of tax clearance certificate required from foreign tenderers with a footprint in South Africa not registered on CSD or without SARS e-filing PIN, and from local tenderers without SARS e-filing PIN or CSD profile. Foreign suppliers with no South African footprint complete SBD 1 but no tax compliance proof required.
B-BBEE: Proof of B-BBEE status level certificate issued by an authorised body, or sworn affidavit as prescribed by the B-BBEE Codes of Good Practice, or other requirement per the B-BBEE Act. Specific Goals (B-BBEE level) are scored out of 20 points.
Employment Equity: If a designated employer, proof of compliance with the Employment Equity Act, including submission of the Employment Equity report to the Department of Labour (South African tenderers only).
Tax Evaluation Questionnaire: Must be submitted to determine if the company, close corporation, or trust is a personal service provider for PAYE purposes.
Quality: Category 3 quality criteria listing all returnables, Category 3 Form A for section E, CQP and QCP templates for sections C & D, Supplier QM specification (QM 58) for reference.
SHE: Annexure B (Acknowledgement of Eskom OHS Requirements), OHS plan, Baseline Risk Assessment (BRA), valid COIDA letter of good standing, SHE policy signed by CEO, PPE Memo Compliance.
Environmental: Proof of valid Pest Control Operating License.
CIDB: Not applicable.
CSDG and CPG: Not applicable.
Health & Safety
Source: Invitation to Tender (ITT) - Vegetation & Garden Services - E3452GXPOU (Approved).pdf (RFP)Mandatory SHE returnables: Annexure B (Acknowledgement of Eskom OHS Requirements), OHS plan addressing scope of work risks and aligned with health and safety requirements, detailed costing for OHS (broken down, not lump sum), Baseline Risk Assessment (BRA) with methodology, valid COIDA letter of good standing, OHS policy signed by CEO complying with OHS Act Section 7, OHS competency (CVs and qualifications for personnel), and PPE Memo Compliance. South African tenderers must provide original certificate of good standing or proof of application from the Compensation Fund or licensed compensation insurer.
Environmental
Source: Invitation to Tender (ITT) - Vegetation & Garden Services - E3452GXPOU (Approved).pdf (RFP)Proof of a valid Pest Control Operating License is required. SDL&I objectives are applicable for the power stations. Due diligence/financial analysis requires latest approved annual financial statements (no drafts or management accounts) of the tendering company, including background, signed director's report, signed auditor's/reviewer's/compiler's/accounting officer's report, statement of financial position, statement of comprehensive income, statement of changes in equity, statement of cash flows, and notes to the financial statements. For unincorporated JV or SPV, each partner must submit its annual financial statements.
Contractual Terms
Source: Invitation to Tender (ITT) - Vegetation & Garden Services - E3452GXPOU (Approved).pdf (RFP)The contract will be the Eskom NEC3 Term Service Contract. Tenderers must meet eligibility criteria: not be under any restriction to do business with Eskom or State-Owned Companies; not have nationality of a country on international sanctions lists; not submit more than one tender (unless as a JV with joint and several liability); not have a conflict of interest; not be restricted by National Treasury or on the Tender Defaulters list; not be restricted by Eskom; and not subcontract 100% of the scope of work. Eskom reserves the right to negotiate with preferred bidders if tendered prices are not market-related. Main contractors are discouraged from subcontracting with subsidiary companies; if they do, it must be declared. Payment terms: below R50 million (incl. VAT) paid within 30 days; above R50 million paid within 60 days of undisputed invoices.
Evaluation Criteria
Source: Attachment No. 5a.pdf (unknown)Bidders must sign the Acknowledgement Form for Eskom OHS legal and other requirements (Annexure B, Eskom Identifier 240-43921804 Rev 5, Document 240-77471499 Rev 3), confirming they have obtained copies of the listed OHS documents and understand the consequences of non-compliance. The form must be signed by an authorised person (CEO/Director/Managing Director) and witnessed by two witnesses. No other eligibility criteria are stated in the provided document.
Technical Specifications
Source: Attachment No. 5a.pdf (unknown)appointment of contractors or suppliers for the
commencement of work
Quality Management
Source: Attachment No. 5a.pdf (unknown)Work stoppages initiated due to OHS issues do not warrant any financial compensation claim against Eskom. Financial penalties are enforced on the principal contractor for non-conformances (identified for the main supplier and/or its sub-contractor and/or supplier) pertaining to Eskom or statutory OHS requirements. All employees (contractors/suppliers) must undergo the relevant Eskom induction.
Compliance Requirements
Source: Attachment No. 5a.pdf (unknown)Bidders must comply with Eskom OHS requirements, including the following procedures and standards: Occupational Health & Safety Risk Assessment Procedure 32-520; Life Saving Rules Procedure 240-62196227 and Life Saving Rules Acknowledgment Form 240-4392180; Incident Management Procedure 32-95; Employees Right of Refusal to Work in an Unsafe Situation Procedure 240-43848327; Vehicle and Driver Safety Management Procedure 240-62946386; Personal Protective Equipment (PPE) 240-44175132; Substance Abuse 32-37; Work at Heights 32-418; plus project-specific requirements such as Project Baseline Risk Assessment (BRA) and PPE Non-Compliance Memo. After contract award, the supplier must fully align its processes to Eskom's OHS requirements. Penalties will be enforced for non-conformance to Eskom or statutory OHS requirements. Work stoppages due to OHS issues do not warrant financial compensation claims. All employees (contractors/suppliers) must undergo the relevant Eskom induction. The main contractor must manage its contractors/suppliers: demonstrate selection criteria, notify Eskom before appointment, ensure adequate resources and competencies, monitor OHS compliance through audits, and deal with non-conformances directly. Eskom may verify compliance and request testimonials/references and client contact details for similar work.
Contractual Terms
Source: Attachment No. 5a.pdf (unknown)The main supplier must provide grounds for termination of work done by its contractors or suppliers. All non-conformances or non-compliance by contractors/suppliers (all tiers) are dealt with directly with the main contractor/supplier through performance and penalty processes. Eskom reserves the right to verify compliance and may require copies of testimonials/references and contact details of clients (including Eskom) for similar work.
Description
Source: Attachment No. 4.pdf (unknown)The tenderer must complete the tender and quality requirements form (Form A) to declare acceptance of the quality clauses. The form includes selection of applicable quality category and indication of compliance with each specific quality clause.
Submission Guidelines
Source: Attachment No. 4.pdf (unknown)Bidders must complete and sign the Eskom Supplier Quality Requirements form (Form A). Select the applicable quality category from Category 1 to 4 — the tender requires Category 3. The form is part of the tender returnables. Submission must be made in accordance with the tender returnable documents.
Evaluation Criteria
Source: Attachment No. 4.pdf (unknown)Bidders are required to select the applicable quality category (Category 1 to 4) and indicate whether a site assessment is applicable. The selected category must be in accordance with clause 3.5 of the Eskom quality specification. Bidders must also indicate acceptance of the pre-contract quality requirements, post-contract award requirements, and the ISO 9001 standard. The tenderer must complete and sign the quality requirements form, which forms part of the evaluation of the tender.
Technical Specifications
Source: Attachment No. 4.pdf (unknown)The tenderer must comply with Eskom's Supplier Quality Requirements as per specification 240-105658000 and the ISO 9001 Standard. The quality requirements include pre-contract award quality requirements (selecting the applicable category), post-contract award requirements (contract execution and supplier quality performance monitoring), and ongoing quality audits related conditions. The tenderer must indicate acceptance of each requirement by marking with an X where applicable.
Methodology
Source: Attachment No. 4.pdf (unknown)CLAUSE 4 Context of the Organisation X PRINCIPLE 1 Customer focus X
CLAUSE 5 Leadership X PRINCIPLE 2 Leadership X
CLAUSE 6 Planning X PRINCIPLE 3 Engagement of people X(ESKOM)
C CLAUSE 7 Support X PRINCIPLE 4 Process approach X
CLAUSE 8 Operation X PRINCIPLE 5 Improvement X
CLAUSE 9 Evidence based decision
Performance Evaluations X PRINCIPLE 6 XSECTION making
CLAUSE 10 Improvement X PRINCIPLE 7 Relationship Management X
Quality Management
Source: Attachment No. 4.pdf (unknown)Authorisation Date January 2022
240-105658000 and
QUALITY REQUIREMENTS FOR ISO 9001 Review Date January 2027
Eskom Rights of Access (refer to clause 3.8.-105658000) X
Eskom Rights to Information (refer to clause 3.8.-105658000) X
Preservation (refer to clause 3.8.-105658000) X
Quality Audits Related Conditions (refer to clause 3.8.-105658000) X
Management of Nonconformities and Nonconforming Outputs Identified by Eskom (refer to clause 3.8.-
Special processes (refer to clause 3.8.-105658000) x
Clauses of iso iso 9001 standard indicate with an quality iso 9001 standard indicate with an
9001 standard clause description (x) as applicable principles principle description (x) as applicable
Or (-) if not or (-) if not
Representativesection (tenderer)
NB: The tenderer must complete and sign this form to acknowledge and accept Eskom Supplier Quality Requirements as per 240-
105658000 Specification and ISO 9001 Standard.
Section
Source: Attachment No. 4.pdf (unknown)Ard indicate with an quality iso 9001 standard indicate with an
Performance Evaluations X PRINCIPLE 6 XSECTION making
Eskom’s quality
NB: The tenderer must complete and sign this form to acknowledge and accept Eskom Supplier Quality Requirements as per 240
TENDER & CONTRACT QUALITY Document Identifier 240-68099512 Rev 9
QUALITY REQUIREMENTS FOR ISO 9001 Review Date January 2027
Pre-contract award quality requirements x
B Contract Execution (refer to clause 3.7.-105658000) X CLAUSE Supplier Quality Performance Monitoring Phase (refer to clause 3.7.-105658000) X
Quality Audits Related Conditions (refer to clause 3.8.-105658000) X
Clauses of iso iso 9001 standard indicate with an quality iso 9001 standard indicate with an
Description
Source: Attachment No. 3c.pdf (unknown)The service is Vegetation Management at Port Rex Power Station for a period of 5 years. The Affected Property is Port Rex Power Station. The service period is five years. The starting date is to be confirmed (TBC). The service includes maintenance of vegetation within the power station, excluding the HV yard, including flower beds, grass cutting, garden waste removal, and weeding to keep vegetation, roads, and parking areas neat and tidy.
Contact Information
Source: Attachment No. 3c.pdf (unknown)The Service Manager details (name, address, tel, fax, email) are to be provided in the Contract Data. The Employer is Eskom Holdings SOC Ltd (Reg No. 2002/015527/30), registered office at Megawatt Park, Maxwell Drive, Sandton, Johannesburg. For signing documents, the address is 15 Pasita Street, Rosenpark, 7550. The phone number 011 803 3008 is for Engineering Contract Strategies (the NEC3 TSC3 publisher), not a tender contact.
Submission Guidelines
Source: Attachment No. 3c.pdf (unknown)Returnable documents: C1.1 Form of Offer and Acceptance (signed offer, including offered total of Prices exclusive of VAT, VAT at 15%, and inclusive total; CIDB registration number required); C1.2b Contract Data provided by the Contractor (company details, fee percentages, risk register matters, key people with CVs, tendered total of Prices); Schedule of Deviations (if any). All must be completed and signed. The tenderer's covering letter must not be included in the final contract document. Failure to provide required securities, bonds, guarantees, proof of insurance within two weeks of receiving the completed agreement constitutes repudiation.
Evaluation Criteria
Source: Attachment No. 3c.pdf (unknown)The contract is a priced contract with a price list (NEC3 TSC3 Option A). The tenderer must submit a completed Form of Offer and Acceptance with the offered total of Prices. The tenderer must provide Contract Data Part Two including key people and CVs. The tenderer must have a CIDB registration number. B-BBEE status is relevant; changes in status must be notified. Joint ventures are jointly and severally liable. The tenderer must comply with the ethics clause (Z11) prohibiting coercive, collusive, corrupt, fraudulent, or obstructive actions. Insurance certificates must be provided as required.
Technical Specifications
Source: Attachment No. 3c.pdf (unknown)The service is vegetation management at Port Rex Power Station for a period of five years. The Affected Property is Port Rex Power Station. The service includes: weeding, grassed areas, control of disease and insect pests, pruning, replacement of dead or damaged plants, cutting of grass. The employer requires the garden service company to maintain vegetation within the power station, excluding the HV yard, by upkeeping flower beds, cutting grass, removing garden waste, and weeding to keep vegetation, roads, and parking areas neat and tidy. Specific tasks include: mowing, edging (grass height <25 mm), weeding, pruning, pest/disease treatment, plant replacement, and off-site garden waste disposal. The service also includes chemical spraying and weeding across station paved surfaces, roads, parking areas, and between operational units (5200 m2 entire footprint), and clearing and maintaining a continuous 2m width vegetation-free strip on the outside of the 380 meter perimeter boundary fence line for security patrols. The service must comply with normative standards: ISO 9001, ISO 14001, National Environmental Management Act (NEMA), National Environmental Management: Biodiversity Act (NEMBA), Alien and Invasive Species Regulations 2014, National Veld and Forest Fire Act, Occupational Health and Safety Act (OHSA), and Eskom SHEQ Policy and Environmental Management Procedures. Informative reference: SANBI Alien Plant Control Guidelines.
Experience & Qualifications
Source: Attachment No. 3c.pdf (unknown)The Contractor must provide key people data in Contract Data Part Two, including names, jobs, responsibilities, qualifications, and experience, with CVs. The key people must be identified and their CVs submitted. The Contractor must provide a plan for the service within two weeks of the Contract Date. The Contractor must have a CIDB registration number as indicated in the Form of Offer and Acceptance.
Quality Management
Source: Attachment No. 3c.pdf (unknown)The service must comply with ISO 9001 (Quality Management Systems) and ISO 14001 (Environmental Management Systems). The Contractor must submit a Quality Control Plan as part of the service information. The Contractor must maintain quality assurance requirements as per the Scope of Work. The Contractor must provide a plan for the service within two weeks of the Contract Date. Key Performance Indicators (KPIs) are part of the contract (Option X20).
Pricing Schedule
Source: Attachment No. 3c.pdf (unknown)The pricing structure is a priced contract with a price list (Option A of NEC3 TSC3). The price list includes items such as: 1.1 Site establishment and de-establishment (Sum), 1.2 Safety File (Sum), 1.3 PPE once off (Sum), 1.4 Travelling Fee per month (Month, 12), 1.5 Labour – Semi-Skilled (Month, 12), 1.6 Labour - Supervisor (Month, 12), 1.7 Safety Officer Fee (Month, 12), 2.1 Monthly service fee for vegetation management (Month, 24) - lawn and garden care twice per month including mowing, edging (grass height <25 mm), weeding, pruning, pest/disease treatment, plant replacement, and off-site garden waste disposal (excluding HV yard) 3181 m2 total garden area, 2.2 Garden maintenance (Month, 24) - flower bed maintenance, plant pruning, wound dressing, insect pest/disease treatment, and plant bed weeding 3181 m2 total garden area, 2.3 Chemical spraying and weeding across station paved surfaces, roads, parking areas, and between operational units (Month, 24) 5200m2 entire footprint, 2.4 Perimeter Security Inspection Strip (Month, 12) - clearing and maintaining a continuous 2m width vegetation-free strip on the outside of the 380 meter perimeter boundary fence line for security patrols, 3.1 Additional Cost markup percentage (%). Prices are derived from a list of service items, priced as lump sums or expected quantities multiplied by a rate. The total of the Prices for 5 years must be stated.
Financial Requirements
Source: Attachment No. 3c.pdf (unknown)Pricing is a priced contract with a price list (NEC3 TSC3 Option A). The tenderer must complete the price list with items such as: site establishment and de-establishment (sum), safety file (sum), PPE once off (sum), travelling fee per month, labour (semi-skilled and supervisor) per month, safety officer fee per month, routine maintenance items (monthly service fee for vegetation management, garden maintenance, chemical spraying and weeding, perimeter security inspection strip), and an additional cost markup percentage. Prices are derived from a list of service items, priced as lump sums or expected quantities multiplied by a rate. The offered total of Prices exclusive of VAT, VAT at 15%, and inclusive total must be stated. Rates are fixed and firm for the first 12 months; price adjustment for inflation applies thereafter (85% variable linked to SEIFSA indices, 15% fixed). Payment: assessment interval between the 25th-30th day of each month or 1-3 days on completion of Task Order; payments due 30 days from when the Contractor provides a tax invoice; interest at the prime rate (or LIBOR for other currencies). The Contractor must prepare forecasts of the final total of Prices at intervals no longer than four weeks. The Contractor must provide a tax invoice within one week of receiving a payment certificate, including Eskom's VAT number 4740101508. The Contractor must comply with Eskom's Vendor Management System requirements for invoice processing.
Compliance Requirements
Source: Attachment No. 3c.pdf (unknown)C1.1 Form of Offer and Acceptance: signed offer, includes CIDB registration number. C1.2b Contract Data provided by the Contractor: company details, key people, CVs. B-BBEE: changes in status must be notified within 7 days, updated verification certificate within 30 days; a decrease may lead to renegotiation or termination. Joint ventures: parties jointly and severally liable; composition cannot be altered without written consent. Ethics (Z11): prohibits coercive, collusive, corrupt, fraudulent, or obstructive actions; termination possible for such actions. Insurance: Contractor must provide insurances as per Insurance Table A (replacement cost for loss/damage to Employer's property, Plant and Materials, Equipment; liability for property damage, bodily injury, death of employees). VAT: must be registered and include Eskom's VAT number on invoices. Health and safety: comply with OHSA and Eskom rules; maintain safety documentation. Asbestos (Z14): comply with asbestos regulations; OEL 0.2 fibres/ml; contractor may stop work if unsafe; asbestos removal by registered contractor at Employer's expense.
Health & Safety
Source: Attachment No. 3c.pdf (unknown)The Contractor must comply with the Occupational Health and Safety Act and all applicable health, safety and environmental laws and regulations, and with all Employer health, safety and environmental rules, procedures and site requirements. The Contractor warrants that the total of the Prices includes sufficient amount for proper compliance with health and safety laws. The Contractor must maintain all required safety documentation, certifications and compliance records. The Contractor must submit a SHE file two weeks before start of work, and at intervals as required by the Employer's Safety Department. Failure to submit the SHE file on time attracts low service damages of 1.5% of Task order value per week, limited to 10% of task order value. Asbestos provisions (Z14): ambient air must conform to prescribed standards; OEL for asbestos is 0.2 regulated asbestos fibres per ml of air as a 4-hour TWA, short-term exposure limit 0.6 fibres/ml as a 10-minute TWA; measurements by SANAS accredited and Department of Employment and Labour approved AAIA; Contractor may perform parallel measurements at its own expense; Contractor personnel may stop working and leave contaminated area until declared safe; asbestos removal and disposal done by a registered asbestos contractor instructed by the Employer at the Employer's expense.
Environmental
Source: Attachment No. 3c.pdf (unknown)The Contractor must comply with all applicable environmental laws and regulations, including the National Environmental Management Act (NEMA), National Environmental Management: Biodiversity Act (NEMBA), Alien and Invasive Species Regulations 2014, and National Veld and Forest Fire Act. The Contractor must comply with Eskom SHEQ Policy and Environmental Management Procedures. The service includes eradication and removal of invader species. The Contractor must manage environmental constraints as per the Scope of Work. Asbestos provisions (Z14) require compliance with the Employer's Asbestos Standard 32-303 and safe handling, storage, disposal and phase-out of asbestos and asbestos containing materials.
Contractual Terms
Source: Attachment No. 3c.pdf (unknown)The contract is the NEC3 Term Service Contract April 2013 (TSC3) with main Option A (priced contract with price list), dispute resolution Option W1, and secondary options X1 (price adjustment for inflation), X2 (changes in law), X17 (low service damages), X18 (limitation of liability), X19 (Task Order), X20 (key performance indicators), and Z (additional conditions Z1-Z14). The law of the contract is South African law; language is English. Period for reply: immediately for health and safety matters, 1 week during planning phase, 3 working days during execution phase. The Contractor submits a first plan for acceptance within two weeks of the Contract Date. Payment: assessment interval between 25th-30th day of each month or 1-3 days on completion of Task Order; currency ZAR; payments due 30 days from invoice; interest at prime rate or LIBOR. The Contractor prepares forecasts of the final total of Prices at intervals no longer than four weeks. Dispute resolution: Adjudicator from ICE-SA (or AFSA if not agreed); tribunal is arbitration in Cape Town under Association of Arbitrators rules. Price adjustment: base date one month before tender closure; rates fixed for first 12 months; 85% variable (70% SEIFSA C-3 labour, 15% SEIFSA L-1(B) transport, 15% SEIFSA D-2 CPI), 15% fixed; CPA frequency semi-annual. Low service damages: 1.5% of Task order value per week, limited to 10% of task order value, for failure to cut grass to specified height/width, failure to trim hedges/shrubs, failure to remove alien or apply herbicide vegetation, general appearance (garden areas not kept tidy), Contractor's Health and Safety file submission delay (SHE file two weeks before start), submission delays (2% per week), delay in completing Task (2% per week), resource delay (2% per week). Limitation of liability: Contractor's liability for indirect/consequential loss limited to R0; liability for loss/damage to Employer's property limited to deductibles; liability for defects due to design limited to the greater of total Prices or amounts unrecoverable from Employer's insurance; total liability for all matters (except additional excluded matters) limited to total of Prices; additional excluded matters (defects due to design, manufacture/fabrication outside Affected Property, loss/damage to property other than Employer's, death/injury to person, IP infringement) unlimited; end of liability date 12 months after end of service period. Task Order programme to be submitted within 3 days of receiving Task Order. Additional conditions Z1-Z14 always apply: Z1 cession/delegation/assignment requires Employer written consent; Employer may cede/delegate to subsidiaries; Z2 joint venture parties jointly and severally liable; key person to be notified within two weeks; composition cannot be altered without consent; Z3 change in B-BBEE status - notify within 7 days, updated verification certificate within 30 days, Employer may renegotiate or terminate if status decreases; Z4 confidentiality - no disclosure without consent, images of Affected Property require prior written consent, rights vest in Employer; Z5 waiver and estoppel - no waiver unless in writing; Z6 health, safety, environment - comply with OHSA and Employer rules, maintain safety documentation; Z7 tax invoice - include Employer's VAT number 4740101508, provide within one week of payment certificate, comply with Vendor Management System; Z8 compensation events - notify within 8 weeks of becoming aware, otherwise no change in Prices; Z9 Employer's liability for indirect/consequential loss limited to R0; Z10 termination if business rescue order granted; Z11 ethics - no coercive, collusive, corrupt, fraudulent, or obstructive actions; termination possible; Z12 insurance - Contractor provides insurances per Insurance Table A (replacement cost for loss/damage to Employer's property, Plant and Materials, Equipment; liability for property damage, bodily injury, death of employees); Employer provides insurances per Insurance Table B (Assets All Risk, Contract Works, Environmental Liability, General and Public Liability, Transportation (Marine), Motor Fleet and Mobile Plant, Terrorism, Cyber Liability, Nuclear Material Damage and Business Interruption, Nuclear Material Damage Terrorism); Z13 intellectual property - Foreground IP vests in Employer, Background IP retained by owner, Contractor indemnifies Employer against third-party IP claims; Z14 asbestos - OEL 0.2 fibres/ml, short-term 0.6 fibres/ml, Employer certifies ambient air, Contractor may stop work if unsafe, asbestos removal/disposal by registered contractor at Employer's expense.
Special Conditions
Source: Attachment No. 3c.pdf (unknown)Special conditions of contract (Z clauses): Z1 Cession, delegation and assignment - Contractor must not cede, delegate or assign without written consent; Employer may cede/delegate to subsidiaries. Z2 Joint ventures - parties jointly and severally liable; key person to be notified within two weeks; composition cannot be altered without consent. Z3 Change of B-BBEE status - notification within 7 days, updated verification certificate within 30 days, Employer may renegotiate or terminate if status decreases. Z4 Confidentiality - no disclosure without consent, images of Affected Property require prior written consent, rights vest in Employer. Z5 Waiver and estoppel - no waiver unless in writing. Z6 Health, safety and environment - comply with OHSA and Employer rules, maintain safety documentation. Z7 Tax invoice - include Employer's VAT number 4740101508, provide within one week of payment certificate, comply with Vendor Management System. Z8 Compensation events - notify within 8 weeks of becoming aware, otherwise no change in Prices. Z9 Employer's limitation of liability - indirect/consequential loss limited to R0. Z10 Termination - if business rescue order granted. Z11 Ethics - no coercive, collusive, corrupt, fraudulent, or obstructive actions; termination possible. Z12 Insurance - Contractor provides insurances per Insurance Table A; Employer provides insurances per Insurance Table B. Z13 Intellectual property - Foreground IP vests in Employer, Background IP retained by owner, Contractor indemnifies Employer against third-party IP claims. Z14 Asbestos - comply with asbestos regulations, OEL 0.2 fibres/ml, Contractor may stop work if unsafe, asbestos removal by registered contractor at Employer's expense.
Description
Source: Attachment No. 7.pdf (unknown)This section covers the technical evaluation of tenderers for gardening and vegetation services at Eskom's peaking power stations. It describes the criteria used to assess bidders' capability, including their experience, equipment, pest control methods, and personnel qualifications. Mandatory and qualitative evaluation criteria apply.
Evaluation Criteria
Source: Attachment No. 7.pdf (unknown)Qualifying threshold — Tenderers must achieve a weighted technical score of 70% or more to be considered technically compliant.
Evaluation approach: a weighted score-card evaluates technical compliance against the specification.
Mandatory criteria are assessed on a Yes/No basis (pass or fail); qualitative criteria are weighted to rank the highest technically ranked tenderer.
Technical Specifications
Source: Attachment No. 7.pdf (unknown)Scoring weights among qualitative criteria: 20%, 30%, 20%, 10% — applied to criteria including relevant experience, equipment, and methods.
Qualitative criteria scored include: company experience (e.g., 15%, 10%, 5%, or 0% depending on years of similar contract work), equipment suitable for work (e.g., lawnmowers, blowers, grass cutters, sprayers, sweepers), vegetation control methods (e.g., alien weed eradication), and personnel/supervisor qualifications.
Experience & Qualifications
Source: Attachment No. 7.pdf (unknown)Experience and qualifications are evaluated for both the contractor and supervisors. The company must demonstrate relevant experience, with points scored based on years of similar vegetation and alien weed eradication work. Supervisors must have relevant qualifications and experience, including basic herbicide application knowledge. Assessment is done through CVs and per-project responsibilities.
Health & Safety
Source: Attachment No. 7.pdf (unknown)The scoring criteria include a component on safety in vegetation control activities. Tenderers are assessed on their safety procedures, safe work methods, and related activities. Specific safety-related weights or exact requirements are not clearly detailed in the available text.
Section
Source: Attachment No. 7.pdf (unknown)The technical evaluation uses a weighted score-card approach. Tenderers must achieve a minimum weighted score of 70% overall to pass the technical threshold. Mandatory criteria are assessed on a Yes/No basis, and qualitative criteria are weighted to rank tenderers. The final qualitative score must be 70% or more for a tenderer to be considered credible.
Description
Source: OHS Requirements Gourikwa.pdf (unknown)The project involves vegetation management at Gourikwa Power Station, located on the N2 next to Petrosa Mossel Bay. The contractor will be responsible for the full scope of gardening and vegetation services as detailed in the technical specifications.
Important Dates
Source: OHS Requirements Gourikwa.pdf (unknown){"briefingSession":"{"date":null,"time":null,"venue":"ion reports to the relevant management.","is_compulsory":false}"}
Evaluation Criteria
Source: OHS Requirements Gourikwa.pdf (unknown)Bidders must be registered with the Compensation Commissioner and provide a valid Letter of Good Standing (COID) for the duration of the contract. They must comply with the Occupational Health and Safety Act (Act 85 of 1993) and all relevant regulations, including Section 37(2) agreements. Bidders must have a signed SHEQ policy, statutory appointments in place, and an organisational organogram signed by the CEO or Section 16(2) appointee. They must also comply with the National Environmental Management Act, National Water Act, and other applicable legislation. No child labour is permitted. Bidders must ensure all employees are trained and inducted, and must sign Eskom's Life-Saving Rules pledge. The document does not specify B-BBEE requirements, CIDB grading, or other pre-qualification criteria.
Technical Specifications
Source: OHS Requirements Gourikwa.pdf (unknown)The scope of work includes routine care of landscaped areas, gardens, and buffer zones; lawn mowing, trimming, edging, and fertilization; planting and pruning of trees, shrubs, and hedges; irrigation system installation, monitoring, and repairs; identification and removal of alien invasive plant species; mechanical and chemical control methods using approved products; safe disposal of biomass; rehabilitation with indigenous species; clearing vegetation around fence lines and stormwater channels; maintaining firebreaks; ensuring vegetation does not obstruct access roads, signage, or equipment; provision of trained personnel with appropriate PPE; execution of work with minimal disruption to power station operations; compliance with site safety protocols and emergency procedures; monthly inspections and routine reports; quarterly progress reports with photographic evidence; annual performance review and summary reporting; training of Gourikwa's staff on irrigation operations; maintaining paved areas and building edges free of weeds; general weeding around buildings, HV fence, and roads; upkeep of pot plants including watering, fertilization, pruning, and replacement of diseased or damaged specimens; cleaning and painting of pots; establishing and maintaining firebreaks to prevent veldfires.
Methodology
Source: OHS Requirements Gourikwa.pdf (unknown)The contractor must provide a method statement for the work, including risk assessments and safe work procedures. The scope includes routine care of landscaped areas, gardens, and buffer zones; lawn mowing, trimming, edging, and fertilization; planting and pruning of trees, shrubs, and hedges; irrigation system installation, monitoring, and repairs; identification and removal of alien invasive plant species; mechanical and chemical control methods using approved products; safe disposal of biomass; rehabilitation with indigenous species; clearing vegetation around fence lines and stormwater channels; maintaining firebreaks; ensuring vegetation does not obstruct access roads, signage, or equipment; provision of trained personnel with appropriate PPE; execution of work with minimal disruption to power station operations; compliance with site safety protocols; monthly inspections and reports; quarterly progress reports with photographic evidence; annual performance review; training of Gourikwa's staff on irrigation operations; maintaining paved areas and building edges free of weeds; upkeep of pot plants; establishing and maintaining firebreaks to prevent veldfires.
Experience & Qualifications
Source: OHS Requirements Gourikwa.pdf (unknown)The main contractor and appointed contractors must have appropriate qualifications and certificates. Employees must always be under competent supervision.
Quality Management
Source: OHS Requirements Gourikwa.pdf (unknown)Contractors must maintain satisfactory standards of work and document inspection results. Tools and equipment must be regularly inspected and maintained. Hand tools must be recorded on a register and inspected monthly by the construction supervisor and prior to use by users. Equipment with mushroom heads is not permitted.
Health & Safety
Source: OHS Requirements Gourikwa.pdf (unknown)Contractors must comply with Eskom's OHS requirements, including legal compliance (OHS Act, Section 37(2) agreement, child labour prohibition), SHEQ policy, COID registration, statutory appointments, Eskom Life-Saving Rules (open/isolate/test/earth, working at heights, seatbelts, sobriety, permit to work, safe live working), substance abuse policy (0% alcohol/drug level), contractor organisational structure, roles and responsibilities of main and appointed contractors, risk assessments, safe work procedures/method statements, fire equipment, first aid, OHS communication, toolbox talks, OHS training, site establishment, vehicle management, housekeeping, signage, tools and equipment, ladders, auditing, smoking, cellular phones, occupational health and hygiene, working at heights, PPE, incident investigation, emergency management, non-conformance, OHS files, work stoppage, hours of work, omissions, contractor performance monitoring, security clearance, contract sign-off, and Eskom's right to terminate.
Environmental
Source: OHS Requirements Gourikwa.pdf (unknown)Contractors must comply with environmental legislation and Eskom's duty of care to the environment. Materials and objects must not be left unsecured in elevated areas. Waste must be disposed of in designated areas.
Section
Source: OHS Requirements Gourikwa.pdf (unknown)The evaluation criteria are not detailed in this document. Bidders must comply with the OHS requirements and provide the necessary documentation as part of the evaluation process.
Description
Source: OHS Requirements Port Rex.pdf (unknown)The contract is for vegetation management at Port Rex Power Station. The power station does not have a horticulture department, so a garden service company is required to service and maintain vegetation within the station, excluding the HV yard. Work includes upkeeping flower beds, cutting grass, removing garden waste, weeding, and maintaining plants, plant beds, trees and lawns. This includes periodic cleaning, weeding, disease and insect pest control, mowing, edge cutting, pruning, wound dressing, replacement of unacceptable material, straightening plants, adjusting plants, eradication and removal of invader species, and removal of garden cuttings and waste. Roads and grounds within the power station and the fire break around the outer perimeter must be kept neat, clean, and cleared of all foreign objects and rubble.
Contact Information
Source: OHS Requirements Port Rex.pdf (unknown){"name":null,"email":null,"phone":null,"department":"to look after the","address":"Identifier ev"}
Evaluation Criteria
Source: OHS Requirements Port Rex.pdf (unknown)Bidders must be registered with the Compensation Commissioner and provide a valid Letter of Good Standing (COID). They must comply with the Occupational Health and Safety Act and all relevant legislation (e.g., National Environmental Management Act, National Road Traffic Act). A Section 37(2) agreement must be signed with Eskom. The contractor must provide an organogram and statutory appointments. No child labour may be used. Bidders must be able to meet the OHS requirements, including substance abuse testing and Life-Saving Rules compliance. The document does not specify B-BBEE level, CIDB grading, or financial turnover requirements.
Technical Specifications
Source: OHS Requirements Port Rex.pdf (unknown)The scope of work is vegetation management at Port Rex Power Station, excluding the HV yard. Services include: upkeeping flower beds, cutting grass, removing garden waste, weeding, maintaining plants, plant beds, trees and lawns, periodic cleaning, disease and insect pest control, mowing lawns, cutting edges, pruning, wound dressing, replacing unacceptable material, straightening leaning or sagging plants, adjusting plants settled or planted too low, eradicating and removing invader species, removing garden cuttings and waste, and any other procedure consistent with good horticultural practice. Roads and grounds within the power station and the fire break around the outer perimeter must be kept neat, clean, and cleared of all foreign objects and rubble.
Quality Management
Source: OHS Requirements Port Rex.pdf (unknown)Contractors must comply with the Department of Employment and Labour inspection and enforcement services. Substance abuse is prohibited: the allowable alcohol and drug level is 0%. Contractors must follow Eskom's Substance Abuse Procedure (32-37) and Life-Saving Rule 4 (Be Sober). Ad hoc alcohol testing may be conducted on site. Contractors must maintain satisfactory standards, document inspection results, and keep records. Tools and equipment must be regularly inspected; hand tools must be recorded on a register and inspected monthly by the construction supervisor and by users prior to use. Ladders must be inspected before each use. The contractor's OHS plan will be audited against a compliance checklist; approval is granted only when compliant. Eskom will conduct OHS audits on the main contractor and appointed contractors every 6 months, with regular inspections. Contractors must audit their own and appointed contractors' implementation of the OHS plan monthly or when scope changes, and submit findings and corrective actions to the Eskom project manager within one week.
Health & Safety
Source: OHS Requirements Port Rex.pdf (unknown)This document is Eskom Generation's OHS requirements for the contract. It lists legislative and Eskom requirements that must be met by the contractor, including compliance with the OHS Act, Section 37(2) agreements, hazardous work by children prohibitions, SHEQ policy, COID registration, statutory appointments, Eskom Life-Saving Rules, substance abuse testing, contractor organisational structure, roles and responsibilities, risk assessments, safe work procedures, fire equipment, first aid, OHS communication, toolbox talks, OHS training, site establishment, vehicle management, housekeeping, signage, tools and equipment, ladders, auditing, smoking, cellular phones, occupational health, working at heights, PPE, incident investigation, emergency management, non-conformance, OHS files, work stoppage, hours of work, omissions, performance monitoring, security clearance, contract sign off, and Eskom's right to terminate.
Environmental
Source: OHS Requirements Port Rex.pdf (unknown)The contractor must comply with environmental legislation, including the National Environmental Management Act. The scope of work includes maintaining vegetation, which involves eradicating invader species and removing garden waste. Materials and objects must not be left unsecured in elevated areas, as falling objects may cause injuries or fatalities. Waste must be temporarily stored in a designated waste area awaiting disposal.
Section
Source: OHS Requirements Port Rex.pdf (unknown)The OHS plan must be submitted for evaluation prior to the start of work. The OHS department will issue the Section 37(2) agreement to the project manager/end user, who will facilitate signing by Eskom and contractor representatives.
Important Dates
Source: Attachment No. 6a.pdf (unknown){"closingDate":"01 April 2023"}
Contact Information
Source: Attachment No. 6a.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"tion)."}
Evaluation Criteria
Source: Attachment No. 6a.pdf (unknown)B-BBEE preference points are allocated under either the 90/10 or 80/20 system, with the table listing points by B-BBEE status level (Level 1 earns 10 or 20 points; Level 8 earns 1 or 2 points; non-compliant earns 0). A maximum of 10/20 points may be awarded for specific goals, added to price points and rounded to two decimals. The contract goes to the tenderer with the highest combined score. Bidders who fail to submit the required B-BBEE documentation will not be disqualified, but may only score on price (out of 90/80) and receive zero points for specific goals (out of 10/20). SDL&I objectives do not form part of scoring but become contractual obligations once committed.
Technical Specifications
Source: Attachment No. 6a.pdf (unknown)Provision of vegetation management services at Gourikwa Hydro Station. The project duration is 60 months (five years).
Pricing Schedule
Source: Attachment No. 6a.pdf (unknown)Tender responses must be separated into their components according to the Price Schedule included with the tender documents. Local procurement content is total spending minus the imported component.
Financial Requirements
Source: Attachment No. 6a.pdf (unknown)SDL&I penalties and performance security: Eskom will apply a penalty of 1.5% of the Contract Value for failure to meet SDL&I obligations. For the contract duration, Eskom will retain 1.5% of every invoice (excluding VAT) as security for fulfilment of SDL&I obligations, released only upon full compliance.
Compliance Requirements
Source: Attachment No. 6a.pdf (unknown)B-BBEE evidence to claim preference points: a valid B-BBEE certificate issued by a SANAS accredited verification agency, or a sworn affidavit / CIPC affidavit. Bidders must also provide proof of ownership/shareholding (preferably CIPC documentation) with a shareholding breakdown, certified ID copies of shareholders, and proof of disability where applicable. A valid B-BBEE certificate or sworn affidavit is a condition for contract award. Bidders with annual total revenue of R10 million or less (Exempted Micro Enterprise) may submit a sworn affidavit; those with revenue of R50 million or less (Qualifying Small Enterprise) must comply with all QSE scorecard elements unless at least 51% black owned, in which case a sworn affidavit is required; those with revenue above R50 million must submit a valid B-BBEE certificate. Bidders must ensure sworn affidavits are completed fully and correctly, with all required fields and signatures (including the Commissioner of Oath) in accordance with the stated validity requirements.
Section
Source: Attachment No. 6a.pdf (unknown)Specific goals: a maximum of 10 or 20 points may be awarded for the specified specific goal, added to price points, and the total is rounded to two decimal places. B-BBEE status level determines points: Level 1 gets 10 (90/10 system) or 20 (80/20 system), Level 2 gets 9 or 18, Level 3 gets 6 or 14, Level 4 gets 5 or 12, Level 5 gets 4 or 8, Level 6 gets 3 or 6, Level 7 gets 2 or 4, Level 8 gets 1 or 2, non-compliant gets 0. Documentation required to claim preference points includes a valid B-BBEE certificate, sworn affidavit, or CIPC affidavit, proof of ownership/shareholding, certified ID copies, and proof of disability where applicable. Bidders failing to provide preference point documentation will not be disqualified; they may only score out of 90/80 for price and score zero out of 10/20 for specific goals.
Description
Source: Attachment No. 6c.pdf (unknown)Provision of vegetation management services at Port Rex Gas Turbine Station, for a duration of 60 months.
Returnable Documents
Source: Attachment No. 6c.pdf (unknown)Sworn Affidavits must meet validity requirements: deponent names and ID as per ID document; designation of deponent as director, owner or member; enterprise name and business address as per CIPC registration; percentage of black ownership, black female ownership and designated group (no blank spaces); total revenue for the year under review and whether based on audited financial statements or management accounts; financial year end (day/month/year); a single B-BBEE status level; empowering supplier status for QSEs; identical signing dates by deponent and Commissioner of Oath; Commissioner of Oath cannot be an employee or ex officio of the enterprise.
Evaluation Criteria
Source: Attachment No. 6c.pdf (unknown)Specific goals (B-BBEE status) carry a maximum of 10 points under the 90/10 system or 20 points under the 80/20 system. Points for the specific goal are added to price points and the contract is awarded to the highest total scorer per section 2(1)(f) of the PPPFA. B-BBEE points table: Level 1 = 10/20, Level 2 = 9/18, Level 3 = 6/14, Level 4 = 5/12, Level 5 = 4/8, Level 6 = 3/6, Level 7 = 2/4, Level 8 = 1/2, Non-compliant = 0/0. To claim preference points bidders must submit a valid B-BBEE certificate from a SANAS accredited agency, or a sworn/CIPC affidavit where applicable, plus proof of ownership/shareholding with breakdown, certified ID copies of shareholders, and proof of disability where applicable. Bidders who fail to provide the documentation are not disqualified but score only on price (out of 90/80) and 0 points for the specific goal. SDL&I objectives do not form part of scoring but commitments become contractual obligations.
Technical Specifications
Source: Attachment No. 6c.pdf (unknown)Provision of vegetation management services at Port Rex Gas Turbine Station. Project duration is 60 months.
Pricing Schedule
Source: Attachment No. 6c.pdf (unknown)The tender response must be separated into local and imported components as per the Price Schedule included with the tender documents. Local procurement content is total spending minus the imported component.
Financial Requirements
Source: Attachment No. 6c.pdf (unknown)The tender response must separate local and imported components as per the Price Schedule included with the tender documents. Local procurement content is total spending minus the imported component. Eskom will retain 1.5% of every invoice (excluding VAT) as security for fulfilment of SDL&I obligations, released only upon full fulfilment. A penalty of 1.5% of the Contract Value applies for failure to meet SDL&I obligations.
Compliance Requirements
Source: Attachment No. 6c.pdf (unknown)A valid B-BBEE certificate or Sworn Affidavit is a condition of contract award. Bidders with annual total revenue of R10 million or less qualify as Exempted Micro Enterprises and may submit a Sworn Affidavit; those with revenue of R50 million or less qualify as Qualifying Small Enterprises and must comply with the QSE scorecard unless at least 51% black-owned, in which case a Sworn Affidavit is required; those above R50 million must submit a valid B-BBEE certificate. B-BBEE improvement milestones are non-negotiable: bidders at Level 4 at award must achieve Level 3 by the end of the first year and improve one level each year thereafter; bidders at Levels 5-8 or non-compliant must achieve Level 4 by the end of the first year and improve at least one level each year from the second year. A B-BBEE Improvement or Retention Plan must be submitted within 30 days of signing the contract. Sworn Affidavits must meet validity requirements including deponent details, designation, enterprise registration details, ownership percentages, total revenue, financial year end, B-BBEE status level, empowering supplier status, and identical signing dates by deponent and Commissioner of Oath (who cannot be an employee or ex officio of the enterprise).
Contractual Terms
Source: Attachment No. 6c.pdf (unknown)Eskom will apply a penalty of 1.5% of the Contract Value for failure to meet SDL&I obligations. Eskom will retain 1.5% of every invoice (excluding VAT) as security for fulfilment of all SDL&I obligations; the retained amounts are released only upon full fulfilment of those obligations.
Requirements
Source: Attachment No. 6c.pdf (unknown)SDL&I objectives in line with RDP goals: (1) Transformation - B-BBEE Improvement or Retention Plan: bidders must maintain (if Level 1) or improve/maintain their B-BBEE status over the contract period. Level 4 bidders must achieve Level 3 by end of first year and improve one level each year thereafter; Levels 5-8 or non-compliant must achieve Level 4 by end of first year and improve at least one level each year from the second year. The B-BBEE Improvement Plan is an essential document to be submitted within 30 days of signing the contract. (2) Local Procurement Content: target is 100%; local vs imported components must be separated per the Price Schedule. (3) Procurement spend on entities with minimum 51% black ownership: targets are 4.0% for Black Owned enterprises and 1.0% for Black Persons with Disability, covering indirect expenses and direct subcontractor spend; proposals must be submitted in the provided tables. (4) Jobs: bidders must propose the type and number of jobs to be created and retained in South Africa as a direct result of the contract.
Section
Source: Attachment No. 6c.pdf (unknown)A maximum of 10/20 points may be awarded for the specific goal (B-BBEE status). Points for the specific goal are added to price points and the contract is awarded to the highest total scorer. Bidders failing to provide documentation for preference points are not disqualified but may only score out of 90/80 for price and score 0 points out of 10/20 for specific goals.
Important Dates
Source: Attachment No. 5b.pdf (unknown){"closingDate":"9 May 2025","briefingSession":"{"date":null,"time":null,"venue":"any designated area. Eskom reserves the right to conduct screening","is_compulsory":false}"}
Contact Information
Source: Attachment No. 5b.pdf (unknown){"name":null,"email":null,"phone":null,"department":"Employees","address":null}
Evaluation Criteria
Source: Attachment No. 5b.pdf (unknown)No specific eligibility criteria (e.g., CSD registration, B-BBEE level, CIDB grading) are stated in the available document. Bidders must comply with Eskom's substance abuse policy as a condition of working on site.
Technical Specifications
Source: Attachment No. 5b.pdf (unknown)Eskom is committed to protecting the safety, health, and well-being of all employees and others in
the workplace. To this end, Eskom has adopted an Occupational Health and Safety (OHS) Strategy
and the Zero Harm value.
Eskom acknowledges that substance abuse poses a threat to the business and is therefore, entitled
to take reasonable steps to ensure that persons who are intoxicated and/or under the influence of
any substances are identified and prevented from entering or working on any Eskom premises and/or
operating any of Eskom’s equipment or vehicles. Substance abuse has serious implications for
employees’ health and safety.
2 Supporting clauses
2.1 Scope
2.1.1 Purpose
The purpose of this procedure is to set out the process for the management of substance abuse in
Eskom to achieve the following:
a) Comply with the relevant statutory requirements.
b) Provide a healthy and safe working environment.
c) Identify, control and prevent substance abuse in the workplace.
d) Prevent and reduce losses and incidents and improve productivity.
e) Identify a need for rehabilitation and offer employee assistance.
f) Prevent the abuse of intoxicating substances.
g) Encourage employees to live a healthy lifestyle that is free of substance abuse.
2.1.2 Applicability
a) This document shall apply throughout Eskom Holdings Limited Divisions.
b) This procedure applies to any person (Eskom employees, contractors and their employees,
consultants, and visitors) while on duty or reporting for duty at any Eskom premises or an Eskom
work site or on Eskom business or just visiting. Line managers must ensure that all consultants
and contractors adhere to the requirements of applicable statutes as set out in this document.
c) This procedure further applies to all employees who drive vehicles on Eskom business, operate
equipment or machinery, or perform any tasks on Eskom sites, premises, or workplaces.
2.1.3 Effective date
This procedure is effective from the date of authorisation.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Management of Substance Abuse in the Workplace Unique Identifier: 32-37
Revision: 5
Page:
2.2 Normative/Informative references
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs:
2.2.1 Normative
[1] ISO 9001 Quality Management Systems
[2] Employment Conditions for Managerial Levels
[3] Conditions of Service for Bargaining Unit Employees
[4] 32-1114: Grievance Procedure
[5] 32-727: Safety, Health, Environment and Quality Policy
[6] 32-1113: Disciplinary Procedure
[7] 32-1112: Disciplinary Code Standard
[8] 240-62196227 Eskom Life-Saving Rules
[9] 32-1250 Process Control Manual for Level 4 Health and Wellness
[10] 32-95 Occupational Health and Safety Incident Management Procedure
[11] 240 – 76618189 Management of employees with substance abuse problems
[12] 240 – 62946386 Vehicle and Driver Safety Management Procedure
[13] 240-128157536 Talent Discovery Procedure
[14] 240-64454610 Alcohol Test Report
[15] 240-64455308 Drug Test Report
[16] 240-64454411 Alcohol Screening Register
[17] 240-64453117 Identification of alcohol abuse by observation
[18] 240-64453445 Identification of drug abuse by observation.
[19] 559-169475702 Appointment of a Substance Abuse Screener
[20] 240-91330262 Appointment of a Substance Abuse Tester
2.2.2 Informative
[21] Occupational Health and Safety Act , as amended
[22] Labour Relations Act , as amended
[23] Employment Equity Act , as amended
[24] Mine Health and Safety Act
[25] National Road Traffic Act
[26] Drugs and Drug Trafficking Act
[27] Compensation for Occupational Injuries and Diseases Act
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Management of Substance Abuse in the Workplace Unique Identifier: 32-37
Revision: 5
Page:
[28] Prevention and Treatment of Substance Abuse Act
[29] Code of Good Practice published in the Government Gazette 11405 on 15 February 2022. Vol
681 Number 46043.
2.3 Definitions
Definition Explanation
When a person no longer has control over what he/she is doing, taking, Addiction
or using. Addictions do not only include physical things that we
consume, such as drugs and alcohol, but may include virtually anything,
from abstract things, such as gambling or pornography, to seemingly
harmless products, such as chocolate. Addiction has a negative impact
on a person’s ability to conduct daily activities.
The concentration of alcohol in a person’s breath: milligrams per 1000 Breath alcohol
millilitres expressed as percentage BAC. concentration (BAC)
Determines how much alcohol is in a person’s breath by measuring the Breath alcohol test
amount of alcohol in the air when you breathe out (exhale).
The inspection of, and adjustment, where necessary, to the reading Calibration
displayed on a breath alcohol detector, so that the reading equals the
value of the alcohol concentration of an alcohol standard of known
concentration.
Someone with the knowledge, skills and practical training in screening Competency/Compete
and/or testing substance abuse in the workplace. nt person
Substance abuse testing is performed regularly on all employees, Compulsory testing
contractors, and consultants performing any tasks or driving vehicles.
A laboratory test is a medical procedure that involves testing a sample Confirmation
of blood, urine, tissues, body fluids, or other substances from the body. substance test
A task that, based on severity, frequency, probability, and potential to Critical task
cause serious loss, is identified by Eskom as being critical.
A social worker or psychologist working for or under contract to Eskom. EAP practitioner
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Management of Substance Abuse in the Workplace Unique Identifier: 32-37
Revision: 5
Page:
Definition Explanation
Employees This is any person who has entered into, or works under, a contract of
service, apprenticeship, or learnership with an employer, whether the
contract is explicit or implicit, oral or in writing, who receives or is entitled
to receive any remuneration and includes a case where such a person
is under the control, instruction, and supervision of his/her employer,
namely, the following as defined in the Talent Discovery Procedure:
a) Permanent employee, which includes the following:
A full-time employee
A part-time employee
b) Non-permanent employee, which includes the following:
A temporary employment service employee
A fixed-term contract employee
A vacation student
Third-party contractor employees
A person under a learnership contract
c) A bursary holder while under the supervision and/or direction of an
employer.
Note 1: An employee only has one employer at any time. The employer
is the person with whom he/she is in a contractual relationship of
employment, even when he/she performs his/her contractual
obligations for another person.
Any person who employs or provides work for any person and Employer
remunerates that person, or expressly or tacitly undertakes to
remunerate him/her.
The collection and analysis of blood, urine, saliva or any other specimen Illegal or legal drugs or
from the body to evaluate for the presence of an illegal or legal controlled substance
drug/controlled substance using approved non-laboratory methods. screening test
These are legal drugs or medications that are prescribed by a medical Legal
practitioner and may be abused by the user. substances/medication
This abuse happens when the user does not adhere to the prescribed
dosage as indicated by the medical practitioner or pharmacist. When an
individual overuses or overconsumes lawful/prescribed medication,
he/she is “under the influence” of such a substance.
Unless the context dictates otherwise, it shall be construed as the Line manager
supervisor or the manager in a department or at a work site, whichever
may be applicable.
Unless the context dictates otherwise, it shall be construed to mean Occupational health
either an occupational health nursing practitioner or an occupational practitioner
medicine practitioner.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Management of Substance Abuse in the Workplace Unique Identifier: 32-37
Revision: 5
Page:
Definition Explanation
Any employee or visitor as defined in this procedure. Person
As defined in the OHSA, it includes any building, vehicle, vessel, train, Premises/site
or aircraft in which a person performs work or any place where Eskom
business activity is carried out.
A urine test is done randomly on any employee who might have been Random multi-drug
chosen on a particular day. testing
A person with the necessary competency to conduct substance abuse Screener
screening and so appointed in terms of this procedure.
Determines the presence of alcohol in a person’s breath sample. Screening
Screening results are not required to be documented.
An analytic procedure to determine whether an employee may have a
prohibited concentration of alcohol in a breath specimen.
An officer appointed within Eskom as an employee or contractor for all Security Officer
security-related functions and who is responsible for the
protection/safeguarding of Eskom and its subsidiaries, assets,
personnel, and information.
The excessive use of a substance, especially alcohol or a drug, that Substance abuse
adversely alters the mind and physical coordination.
A form of testing that will detect the presence of drugs or alcohol in a
person’s body; this process uses some biological matter taken from an
Substance testing individual to determine the amount of illegal/controlled substance
present at the time of the test. (This can be breath, saliva, urine or
blood.)
A segment of work that requires a set of specific and distinct actions for Task
its completion.
A person with the necessary competency to conduct substance abuse Tester
testing and/or screening, and so appointed in terms of this procedure,
to conduct substance abuse testing and/or screening.
Under the influence/Intoxicated: the use of alcohol, drugs, and/or a Under the influence/
controlled substance to the extent that: intoxicated
a) the individual’s senses are in any way impaired by the consumption
or use of the aforesaid substances;
b) the individual is unable to perform in a safe, productive manner;
c) the individual’s alcohol/drug reading is positive at the time of testing
in line with Eskom’s Life-Saving Rules; or
d) the individual is and/or appears to be under the influence of
alcohol/drugs, and/or his/her blood, urine, saliva, and/or breath alcohol
concentration registers a positive reading.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Management of Substance Abuse in the Workplace Unique Identifier: 32-37
Revision: 5
Page:
Definition Explanation
Any individual who has come to visit or spend time at Eskom for any Visitor
purpose.
Any premises or place where an employee is authorised to perform Workplace
work during his/her employment, including a private home or portion of
it.
On Eskom property, the boundaries of the workplace include the area Workplace boundaries
where a person enters through any defined first point of entry, for
example, entrance, gate, boom, etc. The actual point of entry/exit will
be the point where Eskom actively exercises control over such site,
entrance/exit area, gate, or boom.
In the case of a lease agreement, the first access point where a person
enters through any defined first point of entry, for example, entrance,
gate, boom, etc., will be regarded as the boundary of the leased
premises.
In the absence of the above, any area up to the point where the
employee’s actual workplace boundary will be where the employee
enters or leaves his/her vehicle or public transport.
2.4 Abbreviations
Abbreviation Explanation
BAC Breath Alcohol Concentration
CCF Central Consultative Forum
COS Conditions of Service
EAP Employee Assistance Programme
OHP Occupational Health Practitioner
OHSA Occupational Health and Safety Act
SHEQ Safety, Health, Environment, and Quality
UN Unique Number
SHEQS Safety, Health, Environment, Quality, and Security
TES Temporary Employed Staff
SHE Safety, Health and Environment
2.5 Roles and responsibilities
2.5.1 Line management
Line management:
a) shall be responsible for the implementation of the procedure in their area of responsibility;
b) shall carry the cost of substance abuse testing;
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Management of Substance Abuse in the Workplace Unique Identifier: 32-37
Revision: 5
Page:
c) shall provide fair and consistent treatment in the screening and testing of persons for substance
abuse;
d) shall ensure that testers and screeners have the necessary competency on how to conduct
substance abuse testing and/or screening, are trained to use the testing and/or screening
instrument and supporting equipment, in accordance with the Management of Substance Abuse
in the Workplace Procedure (32-37) criteria and have been formally appointed as either a tester
or screener. Refresher training must be conducted every two years.
e) shall ensure that all testing and/or screening equipment which the tester or screener uses in the
course of testing and screening for substance abuse is calibrated and maintained in accordance
with the manufacturer’s specifications, including general checks, e.g. condition, battery status,
etc..
f) on an ad hoc basis, by way of conducting job observations, for example, shall monitor the work
of alcohol screeners and testers, ensuring they follow the proper procedures and maintain
professional standards;
g) shall ensure an adequate supply of testing and screening equipment required per site or business
unit;
h) shall, where possible, ensure that contractors, consultants, and visitors (within his/her area of
operation) are made aware of the procedure;
i) shall ensure that a maintenance and calibration register is maintained for all equipment used for
testing and screening;
j) shall ensure that persons under the influence or intoxicated are not permitted access to work
sites or are removed from their work environments and safely transported to their place of
residence;
k) shall ensure that processes required for the various methods for the identification of persons
under the influence or intoxicated are implemented in accordance with the procedures as
directed by the business unit SHEQS/Safety risk managers or OHS representatives;
l) shall ensure that the drug and alcohol test register is correctly completed and available for the
division/business unit SHEQS/safety risk manager/line manager when requested by him/her.
m) if a person reports any potential impact on his/her capability to perform work safely due to the
consumption of medicinal substances, the line manager shall refer the employee to the OHP to
ensure that a fitness-for-duty assessment is performed;
n) shall ensure that employees voluntarily requesting help relating to any form of substance abuse
are referred to an EAP and/or OHP for assistance in line with Procedure 240 – 76618189:
Management of employees with substance abuse problems and monitoring the progress of any
referred employees to support where necessary/required.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Management of Substance Abuse in the Workplace Unique Identifier: 32-37
Revision: 5
Page:
2.5.2 The occupational health practitioner (OHP)
a) Assists managers and security personnel with the referral process and laboratory request forms
for employees under the influence of a substance, including information about the nearest
laboratory and the required laboratory forms.
NB! A confirmation substance test should only be conducted where the screening results are
disputed by the employee or the employee’s union representative. However, remember that Eskom
has zero tolerance for being under the influence of substances in the workplace.
i. The specimen should be conducted at the laboratory to avoid further disputes.
ii. There is no need to refer a person under the influence to the medical centre for a fitness-for-duty
assessment because such an employee is not allowed to enter Eskom premises. Medical centres
are inside Eskom premises, and a person who is under the influence, as identified through
behavioural observation and a positive screening test, is a risk to OHNPs.
b) Assist the employee with substance abuse problems in line with Procedure 240 – 76618189:
Management of employees with substance abuse problems.
c) Maintain the medical records of the employees who have declared they are on medication.
2.5.3 EAP practitioners
EAP is available to employees with substance abuse problems.
The EAP practitioner shall:
a) assist the employee who has substance abuse problems in line with Procedure 240 – 76618189:
Management of employees with substance abuse problems;
b) inform the line manager where the employee has been formally referred;
c) receive feedback and progress from the external service provider or institution where the
employee is receiving treatment; and
d) monitor and evaluate the treatment intervention and provide a progress report, where required;
e) arrange aftercare service for the employee to facilitate a smooth reintegration following
institutionalisation, if there is a need to do so; and
f) educate/advise managers and supervisors on how to manage and/or refer employees with
substance abuse problems.
2.5.4 Divisional/Business Unit SHEQS/Safety risk managers
The SHEQS/Safety risk manager shall be responsible for:
a) keeping copies of BU test registers and calibration certificates;
b) monitoring compliance with this procedure;
c) consolidating site test results and providing feedback to line managers and supervisors;
d) analysing and presenting the test results to the relevant forums;
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Management of Substance Abuse in the Workplace Unique Identifier: 32-37
Revision: 5
Page:
e) assisting line management with testing protocols, where necessary.
2.5.5 Security management
The security officers shall:
a) assist line management in carrying out daily and/or random alcohol screening and/or breath
alcohol testing;
b) ensure that testing will be done at points/locations best suited to enable confidentiality and non-
disruption of traffic and/or services; and
c) inform line management of the test results in their area of responsibility.
2.5.6 Employees
a) Employees who are identified through the organisational screening and testing procedures for
substance abuse or who know that they have a problem are encouraged to seek assistance from
the EAP advisors.
b) If a person consumes any substances/medication (prescribed or not) likely to impair his/her
faculties/judgement or ability to perform work safely, he/she shall inform the OHP and/or line
manager accordingly.
2.5.7 Testers
a) Only commence testing or screening in accordance with Eskom’s Management of Substance
Abuse in the Workplace Procedure (32-37) once they have the necessary competence to do so,
have been trained to use the testing or screening instrument and supporting equipment, and are
appointed as a tester.
b) Before conducting any testing and/or screening, ensure that the instrument or any other
equipment to be used has been calibrated in accordance with the manufacturer’s specifications,
including general checks, e.g. condition, battery status, etc.
c) If a person is under the influence, the tester shall immediately report the test results to the
person’s manager and/or occupational health practitioner.
d) Maintain the test register of the test instrument.
e) On a monthly basis, forward to the SHEQS manager/safety risk manager, the test register of
each instrument and a copy of the test register shall be kept by the tester on file.
2.5.8 Screeners
a) Only commence screening in accordance with Eskom’s Management of Substance Abuse in the
Workplace Procedure (32-37) once they have the necessary competence to do so, have been
trained to use the screening instrument and supporting equipment, and are appointed as a
screener.
b) Only use a substance abuse screening instrument or supporting equipment with a valid
calibration certificate.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Management of Substance Abuse in the Workplace Unique Identifier: 32-37
Revision: 5
Page:
c) Only conduct screening in the area(s) assigned to the screener.
d) If a screening reflects a positive result, the screener shall immediately report the screening result
to an appointed substance abuse tester.
2.6 Process for monitoring
Compliance with this procedure will be monitored through the BU internal audit processes.
2.7 Related/Supporting documents
[1] 32-37 Management of Substance Abuse in the Workplace Rev 4
[2] 559-169475702 Appointment of a Substance Abuse Screener
[3] 240-91330262 Appointment of a Substance Abuse Tester
3 Substance Abuse Procedure
3.1 The rules concerning Eskom employees, contractors, consultants, and visitors are as
follows:
a) A person shall not be allowed access to the Eskom workplace for duty or continue with his/her
duties if he/she is under the influence or intoxicated.
b) A person shall not consume alcohol or drugs/controlled substances (unless prescribed) while on
Eskom premises or while on Eskom business.
c) A person shall not engage in any improper or unlawful activity related to alcohol or
drugs/controlled substances while on Eskom’s premises or while on Eskom business.
d) A person shall not permit another person to consume or engage in any improper or unlawful
activity related to alcohol or drugs/controlled substances while on Eskom premises or while on
Eskom business.
e) A person may not permit another person to work if it is suspected that the other person is under
the influence or intoxicated.
f) A person shall not bring, sell, and/or store alcohol or drugs/controlled substances while on Eskom
premises or Eskom business unless authorised by Eskom.
g) If a person is using a legal substance/medication (prescribed or not) that is likely to impair his/her
faculties/judgement or ability to perform work safely, that person is obligated to inform the line
manager for referral to the OHP to ensure that a fitness-for-duty assessment is performed.
h) Persons shall comply with requests to undergo random or specific substance or alcohol
screening or testing. Refusal to comply with such a request may result in an adverse inference
being drawn that the person is under the influence or intoxicated.
i) Where substance or alcohol testing is being conducted at a unit/department, the testing shall
take precedence over all other planned activities.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Management of Substance Abuse in the Workplace Unique Identifier: 32-37
Revision: 5
Page:
j) No person is permitted to leave the confines of the unit/department without the express
permission of the supervisor, manager, or their delegated stand-in in consultation with the tester,
while testing is being conducted.
k) Adverse inference shall be drawn against a person if he/she leaves the confines of the
unit/department without express permission and may lead to disciplinary action being considered
against the person.
l) EAP services will not be a substitution for discipline or the management of misconduct where an
employee has been found under the influence of alcohol or drugs.
NOTE: Alcohol testing of customers falls outside the ambit of what is permissible for members of the
public who enter Eskom sites. Customers will not be subjected to screening and testing.
However, they may be refused access to Eskom premises should there be a suspicion that
the person is or may be under the influence of alcohol or drugs, for the safety of other
customers and Eskom personnel.
3.2 Management of persons under the Influence of any substance
a) Screening may be done at any time by an appointed tester or screener at the designated area
on any Eskom premises/site. If a person is found positive in terms of the screening process,
he/she will be sent immediately for a test (with reading). NB: The screening and testing process
uses two different instruments. If at a location where there is no handheld testing unit, a second
screening device can be utilised to do the first and second confirmation tests, after which an
informed decision can be made.
b) If the person tests positive, a second test is done immediately after 30 minutes have elapsed. If
the second test result is anything above 0.000mg per 1000ml, the person will be regarded as
being under the influence.
c) If the test result is above the legal limit (0.24mg per 1,000ml – breath alcohol concentration),
he/she will have to get someone to come and fetch him/her at work, or the person will have to
stay in a designated location until the BAC levels are below the legal limit, at which point he/she
will be allowed to drive home.
d) No person under the influence or intoxicated will be permitted to enter or remain on Eskom
premises or in control of an Eskom vehicle/equipment.
e) If a person is identified as being under the influence or intoxicated, the tester shall inform the
person’s line manager or any other line manager on site in the absence of the person’s line
manager.
f) The line manager (or his/her delegate) of any person under the influence shall ensure that the
person is safely transported to their residence and instructed to report for duty at the
commencement of the next working shift. If the person’s line manager is not on site, any other
line manager shall ensure that the person who is under the influence or intoxicated leaves the
work site and is safely transported to their residence.
g) Employees will not be remunerated for the period not worked as a result of being under the
influence. Contractor management and consultants are encouraged to adopt a similar stance
regarding their employees.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Management of Substance Abuse in the Workplace Unique Identifier: 32-37
Revision: 5
Page:
h) Whenever an Eskom employee tests positive, he/she will be subjected to disciplinary action in
line with Eskom’s Disciplinary Procedure for the contravention of a Life-Saving Rule.
i) When a contractor or visitor presents a positive result, his/her manager or organisation will be
required to make the necessary transport arrangements when they are notified of the result.
3.3 Identification of persons who are under the influence/intoxicated
3.3.1 Breath alcohol screening: process to perform alcohol screening at Eskom sites or
contractor sites
This is the preferred method to indicate whether a person is under the influence of alcohol.
This process establishes the steps to be followed in implementing the Eskom alcohol screening
requirements, including:
how alcohol screening will be conducted;
the actions to be followed in response to alcohol screening, including immediate responses
and follow-up actions; and
Note: Should there be any questions or uncertainty regarding the maintenance/testing/usage or
calibration of equipment, please refer to the manufacturer’s specifications and guidance.
3.3.1.1 Selection process for screening
(a) Timing
Alcohol screening will typically be undertaken at the start of the working day, start of shifts, following
breaks, during site visits and at any designated area. Eskom reserves the right to conduct screening
at any time during the working day/shift period. Screening may also be undertaken after hours, during
weekends, or on public holidays.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Management of Substance Abuse in the Workplace Unique Identifier: 32-37
Revision: 5
Page:
(b) Candidate selection
All Eskom employees, contractors, and/or visitors to an Eskom or contractor site could be subjected
to alcohol screening when arriving at the workplace. Candidates entering sites/offices as pedestrians
could be required to undertake alcohol screening in public. All candidates entering the workplace in
a vehicle could be tested while in the vehicle.
Candidates with a positive reading will not be allowed to enter the workplace. He/she will be
requested to proceed to a dedicated testing area to undertake a confirmation alcohol test, as
specified in this procedure.
3.3.1.2 Procedure for alcohol screening
a) All alcohol screening will be done by people trained and appointed to operate the handheld
screening equipment. The screening equipment will be calibrated and maintained as per the
manufacturer’s specifications.
b) The person being screened must supply an air sample from his/her lungs directed into an
approved breath analysis instrument (mobile hand unit). The sample shall be sufficient to obtain
a valid reading on the instrument.
c) If the instrument indicates a positive result, the testing process will be immediately implemented
by way of a confirmation alcohol test. (see paragraph 3.5.1)
3.3.1.3 Identification of alcohol abuse by observation
This method of identification shall be followed with all persons while on Eskom premises who are
unable to provide an adequate breath sample if the necessary test instrument to measure alcohol is
not available, or who are behaving erratically or demonstrating erratic behaviour. The checklist for
identifying alcohol abuse by observation, Unique Identifier: 240-64453117 shall be completed during
observation.
The following evidence regarding the person’s appearance and/or conduct may provide reasonable
and sufficient grounds to believe that the person is under the influence or intoxicated:
a) Slurred speech
b) Unintelligible speech
c) Unsteady gait
d) Abusive language
e) Unsteady on feet
f) Smell of alcohol/drugs
g) Aggressive behaviour
h) Bloodshot/glazed eyes
i) General appearance
j) State of alertness/falling asleep
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Management of Substance Abuse in the Workplace Unique Identifier: 32-37
Revision: 5
Page:
k) Vomiting
l) Inability to carry out simple instructions/tasks that he/she can generally do.
NOTE: For detection purposes, both procedures (breath alcohol screening or testing and
identification of alcohol abuse by observation) do not have to be carried out; one is sufficient.
3.3.2 Drug screening: process to perform drug screening at Eskom sites or contractor
sites
a) Drug screening is typically conducted by way of the observation process. If someone is
suspected to be under the influence of drugs, based on the observation process, he or she will
be tested according to the requirements specified in this document.
b) The line manager shall initiate testing and arrange for an appointed tester to conduct it in a
designated area.
c) The tester shall make the necessary arrangements for the test and obtain the person’s express
consent verbally or, where required, in writing.
3.3.2.1 Identification of drug abuse by observation
In addition to being used as a screening tool, this method of identification shall be followed with all
persons while on Eskom premises who are unable to provide an adequate saliva/urine sample or if
the necessary testing equipment or instrument to measure drug usage is not available. The checklist
for identifying drug abuse by observation, Unique Identifier: 240-64453445, shall be completed
during observation.
This technique also needs to be applied when an employee’s screening result is positive, and the
line manager is awaiting the confirmation of substance test results. This will determine whether the
employee should be allowed to perform his/her duties.
The following evidence regarding the person’s appearance and/or conduct may provide reasonable
and sufficient grounds to indicate that the person is under the influence of drugs:
a) Slurred speech
b) Runny nose
c) Profuse sweating
d) Lack of facial expression or animation
e) Strange gait
f) Poor muscle control
g) Aggressive behaviour
h) Bloodshot eyes
i) Sleepy eyes
j) Uncontrollable moods
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Management of Substance Abuse in the Workplace Unique Identifier: 32-37
Revision: 5
Page:
k) Unnatural thirst or hunger
l) Dry mouth
m) Stains on hands
n) Needle prick scars on open or visible skin
o) Talkative or giggling
3.4 Substance abuse testing
3.4.1 Testing requirements
a) All testing for substance abuse in terms of this procedure shall be done in accordance with the
applicable legislation.
b) Testing will be done at points/locations best suited to enable confidentiality and non-disruption
of traffic and/or services; and
c) Any testing shall be done with due cognisance of and consideration for privacy.
3.4.2 Pre-placement testing
Pre-employment substance abuse testing will be applicable where freedom from substance abuse
and/or dependency has been identified as an inherent job requirement, or the person performs a
critical task and where the law allows such testing (Occupational Health and Safety Act
and Employment Equity Act ).
The test information shall be confidential between the applicant for employment and the occupational
health practitioners.
3.4.3 Compulsory testing
All persons entering Eskom premises and/or required to perform any tasks or to drive vehicles may
be required to undertake a drug and/or breath alcohol test before commencing their duties and,
where necessary, on a periodic or random basis.
The tester shall be responsible for ensuring that the person is tested in accordance with the testing
procedures. If a person is found to be under the influence, the tester shall immediately report the
test results to the person’s manager.
3.4.4 Post-accident, near miss or incident
In all cases of accidents, near misses, or incidents, the injured person and/or the persons who were
involved in the accident, near miss, or incident may be required, where circumstances permit, to
undergo a breath alcohol or other substance test. Testing shall be following the identified procedures
set out in this document.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Management of Substance Abuse in the Workplace Unique Identifier: 32-37
Revision: 5
Page:
3.4.5 Reasonable suspicion
When a person appears to be under the influence of alcohol or other substances, the person who
has observed this shall report it to the person’s immediate line manager or another line manager if
the immediate line manager is not available. If the line manager confirms the suspicion, the person
shall be tested in accordance with the identified procedures set out in this document.
3.4.6 Ad hoc screening/testing
Persons may, where necessary, be screened/tested randomly, in a non-discriminatory manner,
following the respective procedures for testing as outlined in this document.
3.4.7 Return to work
a) Any employee undergoing rehabilitation may be required to undergo regular screening/testing.
The nature and frequency of the screening/testing will be determined by the person’s counsellor
and/or an occupational health practitioner.
b) The tester shall be responsible for ensuring that the person is tested in accordance with such
requirements.
c) If an employee is found to be under the influence, the employee’s line manager shall
immediately report the test results to the person’s counsellor or an occupational health
practitioner.
3.4.8 Follow-up testing
a) Any person who has been disciplined for being under the influence or who has been disciplined
in terms of this procedure may be required to undergo a regular urine or saliva drug and/or
breath alcohol test for a specified period. Such period shall be clearly stated under “corrective
measures” on the disciplinary report form.
b) The tester shall be responsible for ensuring that the person is tested following the agreed-upon
requirements.
c) The tester shall immediately report the test results to the person’s manager if the person is
under the influence. Further disciplinary action may be taken against the person.
3.5 Testing procedure
3.5.1 Alcohol testing process
a) Should the confirmation alcohol test reflect a positive result, a second confirmation test must be
conducted 30 minutes after the first confirmation test. Both confirmation tests will be conducted
using a calibrated handheld testing unit and performed by a trained and appointed tester
according to the requirements specified in this procedure.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Management of Substance Abuse in the Workplace Unique Identifier: 32-37
Revision: 5
Page:
b) The person being tested must refrain from taking any fluid or substance during the waiting period;
this includes smoking. Should the person need to take anything (to control diabetes, for example)
within the 30-minute waiting period, it must be declared upfront.
c) If an employee reflects a positive screening result at a location with no handheld testing unit, the
employee’s supervisor must arrange for him/her to be transported to a site with the appropriate
equipment to conduct the confirmation testing if it is within a 30-minute driving distance. Should
this option not be available, a second screening device can be utilised to do the first and second
confirmation tests, after which an informed decision can be made.
d) If any confirmation test result reflects a negative result, the person may return to his/her normal
duties. No further action will be required.
e) If the second confirmation test result is above 0.000 mg/1000 ml BAC, a positive result will be
recorded. The tester will notify the employee’s supervisor, who will commence the actions
outlined in the procedure.
3.5.1.1 Equipment requirements: Breathalyser screening or testing instruments
Shall meet the following requirements:
a) Shall be portable.
b) Shall have a minimum measuring range of 0 to 1.50 mg/L or 0.000 to 0.300% BAC.
c) Should be able to operate in the following conditions:
i) Temperature: -5 to +40oC.
ii) Pressure: 600 to 1 300 mbar.
iii) Humidity: 20 to 95% RH.
d) Shall comply with the specification requirements stipulated by recognised international standards
laboratories.
e) It should be ready to do the test within 30 seconds after switching on. If the reading is below 0.19
mg/L, it should be ready for the next test within 30 seconds.
f) Shall reflect the breath alcohol concentration (BAC) level.
g) Shall perform at least 500 tests from an alkaline (battery) power supply.
h) The sensor shall use an electrochemical fuel cell specific to ethanol and shall not respond to
other substances normally found in the breath.
i) Shall be simple to use, and its operational procedure shall be automatic and fail-safe.
j) Shall be microprocessor-controlled to ensure repeatability.
k) The automatic sampling procedure shall be capable of being overridden and operated manually
in the case of uncooperative subjects or those with weak exhalation.
l) Shall indicate that it is operational and when it is ready to perform a test.
m) Shall produce an audible beep to indicate an adequate breath sample.
n) Should indicate an incomplete breath sample.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Management of Substance Abuse in the Workplace Unique Identifier: 32-37
Revision: 5
Page:
o) Internal instrument calibration shall be simple, with the option to be externally calibrated at a local
calibration laboratory.
p) It should not be possible for an unauthorised person to change the settings of the instrument.
q) Calibration personnel shall be trained and certified by the supplier.
r) All equipment used in Eskom while testing for substance abuse shall be calibrated in accordance
with the manufacturer’s prescription, not less than every six months, or as per minimum criteria
from manufacturer and/ or supplier specifications, even if the calibration check is within
acceptable limits, and a complete record of such calibration shall be kept in a dedicated register.
s) Under no circumstances shall an instrument that has not been calibrated within the specified
period be used.
t) The sensor should have a warranty period of at least 24 months.
u) Shall be well maintained according to manufacturer and/or supplier specifications, with internal
status checks to be done at a set frequency.
v) To be submitted for maintenance/repairs and/ or calibration, when determined to be faulty,
damaged or delivering invalid results.
w) To be stored in a safe and sound location, as per manufacturer and/or supplier specifications.
x) To be legibly marked with unique identification and registered accordingly on an equipment
register/ inventory.
y) To be for the sole use of the certified tester.
3.5.2 Drug testing process
a) The preferred method to establish whether a person is under the influence of drugs is the urine
sample test. Should a division/BU already use the saliva testing methodology, it will be allowed
to continue until an alternative/improved method is available or the procedure specifies different
requirements.
b) The testing method will be either a saliva or urine sample.
c) The tester shall complete and sign the drug test report (Unique Identifier: 240-64455308).
d) All drug testing and screening will be done by people trained and appointed to operate the testing
and screening equipment. The equipment (testing device or screening kit) will be maintained and
calibrated (as applicable) per the manufacturer’s specifications.
e) The person being tested or screened will be required to supply a saliva/urine sample. The sample
shall be sufficient to obtain a valid reading on the instrument.
f) If the urine sample indicates a positive result, it will be sent to a laboratory for analysis and
confirmation, ensuring no contamination in the process.
g) Should the confirmation drug test reflect a positive result, the necessary corrective measures will
need to be implemented.
Note: Should there be any questions or uncertainty regarding the maintenance/testing/usage or
calibration of equipment please refer to the manufacturer’s specification for guidance.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Management of Substance Abuse in the Workplace Unique Identifier: 32-37
Revision: 5
Page:
3.5.2.1 Equipment requirements: Urine and saliva drug instruments
a) Shall be portable.
b) The sealed sampling/testing kits should be opened in the presence of the person to be tested
and used once only.
c) The test instrument shall cover a minimum of six different drug components, which are:
i. Amphetamine (AMP),
ii. Benzodiazepines (BZO),
iii. Cocaine (COC)
iv. Marijuana (THC),
v. Methamphetamine (MET),
vi. Opiate (OPI 2000).
d) It should be able to operate at a temperature of -5 to +40°C.
e) Shall comply with the specification requirements stipulated by recognised international standards
laboratories.
f) Should indicate an invalid urine or saliva sample.
g) Testers shall be trained and certified by the supplier.
h) All instruments used in Eskom to test for substance abuse shall be kept under the manufacturer’s
prescription.
i) Shall be well maintained according to manufacturer and/or supplier specifications, with internal
status checks to be done at a set frequency.
j) To be submitted for maintenance/repairs and/or calibration when determined to be faulty,
damaged or delivering invalid results.
k) To be stored in a safe and sound location, as per manufacturer and/ or supplier specifications.
l) To be legibly marked with unique identification and registered accordingly on an equipment
register/inventory.
m) To be for the sole use of the certified tester.
n) The same/similar calibration criteria should apply, as mentioned, for the above instrumentation.
3.5.3 Conducting the test and recording the results
The tester shall conduct the test and record the result following the procedure for testing as set out
in this document.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Management of Substance Abuse in the Workplace Unique Identifier: 32-37
Revision: 5
Page:
3.5.4 Interpretation and feedback
a) The tester shall interpret the test results and explain them to the relevant line manager, including
specific reference to the presence of drugs in the sample.
b) If the line manager receives evidence of substance abuse in contravention of Eskom’s Life-
Saving Rules, a disciplinary process shall be instituted following Eskom’s Disciplinary Procedure.
3.6 Refusal to undergo testing or failure to provide an adequate testing sample
a) Cooperation with the testing process allows the person to prove compliance with the procedure.
b) A person who is suspected of being under the influence or who is selected for testing in terms of
this procedure and who refuses to undergo appropriate testing or who fails to provide an
adequate breath, urine, or saliva sample shall be removed from the work site immediately and
shall not be remunerated for the period not worked.
c) Refusal by a person to undergo a substance abuse test or to provide an adequate breath, urine,
or saliva sample may result in an adverse inference being drawn against the person’s version
and shall lead to a situation which may result in disciplinary action taken. In the case of a
contractor, such refusal may result in excluding that contractor from Eskom’s workplaces.
3.7 Procedure for call-out and standby persons
3.7.1 Call-out (not on standby)
a) A call-out (not on standby) for this procedure is where, without prior notice or arrangement, a
person is requested to report for duty outside of his/her normal hours of work.
b) A person must declare when he/she is called out, whether or not he/she has been drinking
alcohol or using any drugs or controlled substances since his/her last period of duty.
c) A person reporting for a call-out who is under the influence of alcohol, or drugs/controlled
substances will not be allowed to enter the site or perform any task.
3.7.2 Standby
a) Standby, for the purposes of this procedure, is when a person is paid a standby
allowance/premium to make his/her services available outside normal work hours over a pre-
agreed period (for example, a standby roster).
b) Persons shall not use alcohol, drugs, or controlled substances while on standby. In any event,
persons on standby shall ensure that they are not under the influence, as defined in this
procedure, at any time during the standby period.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Management of Substance Abuse in the Workplace Unique Identifier: 32-37
Revision: 5
Page:
3.8 Disciplinary process
Being under the influence, consuming alcohol or drugs/controlled substances, and/or engaging in
improper or unlawful activity related to alcohol or drugs/controlled substances while on Eskom’s
premises or Eskom business constitutes serious misconduct, and a person will be subject to the
disciplinary process in terms of Eskom’s Disciplinary Procedure.
3.9 Rehabilitation for substance abuse (alcohol or any type of drugs)
a) When substance abuse has become a problem to the extent that an employee’s functioning is
impaired and he/she finds it difficult to carry out and perform his/her normal day-to-day work-
related duties, the employee may seek evaluation and rehabilitation.
b) Rehabilitation is among the best options in the treatment of substance abuse and addictions,
where an individual is admitted to an approved institution specialising in the treatment of such
for a set period.
c) Persons who voluntarily seek evaluation and rehabilitation before they are found to be under the
influence at work are assured that they will not be dismissed because they participated in a
rehabilitation programme, although they will not be exempt from disciplinary action arising from
other conduct.
d) Persons who did not voluntarily seek evaluation and rehabilitation and were found to be under
the influence at work will be subject to disciplinary action. Depending on the circumstances of
each case, such persons may be referred for substance abuse rehabilitation following such
misconduct.
e) All assistance is confidential, and it will not impact the person’s future at Eskom.
f) Eskom intends to assist, not punish, employees who voluntarily seek treatment and rehabilitation
before they are found to be under the influence at work. However, employees who only admit to
substance dependency at the time of the commission of misconduct or thereafter will be subject
to disciplinary action.
g) It is best to deal with the problem before it becomes a disciplinary matter.
3.9.1 Process to follow
a) Where the initiator is the employee, the employee should contact anyone in the health and
wellness team of professionals (for example, the Eskom medical practitioner, occupational health
nurse practitioner, employee assistance practitioner, or wellness practitioner) in his/her work
area.
b) Where the initiator is either a line manager, supervisor, or colleague, the reasons for referral
should be discussed with the employee concerned, and the employee should agree to the
referral. NOTE: This excludes TES employees, contractors and their employees, consultants,
and visitors.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Management of Substance Abuse in the Workplace Unique Identifier: 32-37
Revision: 5
Page:
3.10 Confidentiality
When an employee voluntarily seeks treatment or is advised by the occupational health
practitioner/EAP practitioner that he/she requires treatment, all information will be treated
confidentially between the practitioner and the employee. When management refers an employee
for assessment or treatment, the employee’s medical details will remain confidential.
If, in the opinion of an occupational health practitioner, a situation arises where an employee could
endanger himself/herself and/or fellow workers, the employee’s manager shall be advised. The
employee’s manager shall also be advised if, in the opinion of an occupational health practitioner,
an employee is unfit to perform the task or tasks assigned to him/her.
NOTE: this excludes TES employees, contractors and their employees, consultants, and visitors.
4 Acceptance
This document has been seen and accepted by:
Name Designation
Miranda Moahlodi Senior Manager: Corporate Hygiene and Safety
Kerseri Pather General Manager: Risk and Sustainability Division
Risk and Sustainability Division Mancom
OHS Steering Committee
Human Resources Policies and Procedures Committee
Risk and Sustainability OHS Mancom
Penny Mkalipe Senior Manager: Human Resources, Health and Wellness
Nomsa Spaumer Senior Manager: Security
5 Revisions
Date Rev. Compiler Remarks
Christinah
December 2008 1 Revised and updated 32-37
Maphanga
Revised and updated to align
July 2014 2 Metse Mphelo with Eskom requirements and
the Life-Saving Rules Standard
Revised and updated with input
from FTHSRs, and more
direction was provided
May 2016 3 Alex Stramrood
regarding drug testing. Content
and changes shared at CCF
during August 2017
Revised and updated in line with
August 2023 4 Mike Townsend
the review date
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Management of Substance Abuse in the Workplace Unique Identifier: 32-37
Revision: 5
Page:
Date Rev. Compiler Remarks
Incorporation of a definition for
screener and tester and a
April 2025 5 Mike Townsend section under roles and
responsibilities for each of these
roles.
6 Development Team
The following people were involved in the development of this document:
7 Acknowledgements
Risk and Sustainability OHS staff
Organised Labour at divisional level and CCF
Individuals across the divisions that, over a period of time, raised concerns and made suggestions
on how to improve the content of the procedure.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Procedure
Title: Occupational Health and Safety Document Identifier: 32-95
Incident Management Procedure
Alternative Reference Not Applicable
Number:
Area of Applicability: Eskom Holdings SOC Ltd
Functional Area: Occupational Health and
Safety
Revision: 9
Total Pages: 30
Next Review Date: March 2027
Disclosure Controlled Disclosure
Classification:
Compiled by Functional Authorized by
Responsibility
p/p
Mthoko Zondi Miranda Moahlodi Kerseri Pather
Senior Advisor OHS Senior Manager–OHS General Manager
Sustainability Sustainability Sustainability
Systems Systems Systems
Date: 30 March 2021 Date: 30 March 2021 Date: 30 March 2021
File name: 32-95 - OHS Incident Management Pocedure - Rev 9 - 30 March 2021
Template ID: 32-4 (Rev 11) Document template (for procedures, manuals, standards, instructions, etc.
Formatted by: EDC_LM_17.03.2021
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
Content
. Introduction .................................................................................................................................... 3
2.1 Scope .................................................................................................................................... 3
2.1.1 Purpose...................................................................................................................... 3
2.1.2 Applicability ................................................................................................................ 3
2.1.3 Effective date ............................................................................................................. 4
2.2 Normative/Informative References ....................................................................................... 4
2.2.1 Normative .................................................................................................................. 4
2.2.2 Informative ................................................................................................................. 5
2.3 Definitions ............................................................................................................................. 5
2.4 Abbreviations ........................................................................................................................ 9
2.5 Roles and Responsibilities.................................................................................................. 10
2.6 Process for Monitoring ........................................................................................................ 10
2.7 Related/Supporting Documents .......................................................................................... 10
3.1 Incident Identification .......................................................................................................... 11
3.2 Initiation and Execution of Emergency Response ............................................................. 11
3.3 Notification and Reporting .................................................................................................. 12
3.4 Incident Prioritisation .......................................................................................................... 14
3.5 Classification and Recording of Incidents .......................................................................... 15
3.6 Incident investigation .......................................................................................................... 17
3.7 Management of Corrective Actions (Safety Measures) ......................................................... 25
3.8 Incident close-out ................................................................................................................. 26
3.9 Incident Communication ....................................................................................................... 26
Guidance to chairpersons during disciplinary hearings related OHS incident management..... 27
Acceptance ................................................................................................................................. 29
Revisions ..................................................................................................................................... 29
Development Team ..................................................................................................................... 29
Acknowledgements ..................................................................................................................... 30
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
Eskom’s SHEQ Policy sets out principles and rules that underpin the way in which Eskom
approaches occupational health and safety, the environment and quality.
Incident management is an integral function of risk management. The aims and objectives of
incident management are as follows:
a) Reduce risk and prevent any recurrence of incidents.
b) Ensure that incidents are managed effectively.
c) Ensure that incidents are classified and recorded accurately.
d) Ensure prompt and appropriate investigation.
e) Promote the proactive use and value of near-miss incident reporting.
f) Improve the quality of occupational health and safety by learning from incidents, including
near-misses.
g) Share incident information.
h) Report to internal and external stakeholders, as required.
i) Promote the analysis of trends, and review practices accordingly.
j) Involve and communicate information to all stakeholders.
Incident management is not a mechanism for assigning blame or monitoring staff performance, but
rather a way of identifying and addressing areas for improvement in order to reduce future risks.
Eskom is committed to Zero Harm as a value, this value forms an integral part of Eskom’s
operations.
2.1 Scope
2.1.1 Purpose
This document describes the high-level intention and requirements for the effective management of
incidents that occur during the course of Eskom’s business that result in, or could result in, near
misses, property damage, injuries, occupational diseases/illnesses or fatalities.
2.1.2 Applicability
This document shall apply throughout Eskom Holdings SOC Ltd, its groups/ divisions, subsidiaries,
and entities in which Eskom has a controlling interest. Where Eskom does not have a controlling
interest, this procedure shall apply if no such similar document exists.
This document is applicable to Eskom employees, contractors (unless it is explicitly mentioned
otherwise in this document) and members of the public affected by activities of, or on behalf of,
Eskom.
For the purpose of Eskom benchmarking with other organisations, the applicable Responsible
Manager may use the relevant classification criteria required for such benchmarking process.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
In the case where a site consists of multiple employers, this procedure must be complied with for
Eskom reporting purposes.
For the interpretation of requirements related to occupational health and safety incidents, this
document will supersede any other procedures and instructions. This procedure is supported by
sup[ported by Standard – “Occupational Health and Safety Incident Management Definitions and
Classification Parameters: 240-131838225”.
2.1.3 Effective date
The document is applicable as of 1 April 2021.
2.2 Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
[1] 240-62582234: OHS Roles and Responsibilities and Statutory Appointments Standard.
[2] 32-727: Eskom, Safety, Health, Environment, and Quality Policy.
[3] 32-123: Eskom Emergency Planning Procedure.
[4] 32-124: Eskom Fire Risk Management Standard.
[5] 32-256: Emergency Response Procedure – Communications.
[6] 240-51122806: Process Control Manual (PCM) for Incident Management.
[7] 240-49308149: Process Control Manual (PCM) for Occupational Health and Safety
Management.
[8] Aviation Act, No. .
[9] Occupational Health and Safety Act, No. .
[10] Labour Relations Act, No. .
[11] Medicine and Related Substance Control Act, No. .
[12] Mine Health and Safety Act, No. .
[13] Compensation for Occupational Injuries and Diseases Act, No. .
[14] Basic Conditions of Employment Act, No. .
[15] National Health Act, No. .
[16] 240-62946386: Vehicle and Driver Safety Procedure.
[17] 240-84733329: Medical Surveillance Procedure.
[18] 32-425: Hearing Conservation Procedure.
[19] COIDA Occupational Disease 2 Form – as per COIDA.
[20] 240-131838225: Occupational Health and Safety Incident Management Definitions and
Classification Parameters.
[21] 240-58554227: Health & Safety Agreement.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: 32-95Occupational Health and Safety Incident
Management Procedure Revision: 9
Page:
2.2.2 Informative
[22] I240-47560170: Process Control Manual (PCM) for Quality Management.
[23] 240-51367318: Process Control Manual (PCM) for Assurance and Advisory Audits.
[24] 32-450: Safety and Occupational Hygiene Performance Management.
[25] ISO 9001 Quality Management Systems.
[26] ISO 45001 Occupational Health and Safety Management Systems.
[27] OHSAS 18001 Occupational Health and Safety Systems.
[28] EPM0060: Measurement Specification Document for Headcount.
[29] Criminal Procedures Act, No. .
[30] Electricity Act, No. .
[31] Explosives Act, No. .
[32] Inquest Act, No. .
[33] Law of Evidence Amendment Act, No. .
[34] National Road Traffic Act, No. .
[35] 240-75512977: Noise-Induced Hearing Loss Investigation Form.
[36] 240-75512947: Noise-Induced Hearing Loss Notification Form.
[37] 240-154786986: COVID-19 Investigation Form.
The list of legislation and documents for further information is not exhaustive and/or not limited to
the legislation and documents listed above.
2.3 Definitions
2.3.1 Accident: Any unplanned event, arising out of, and in the course of, an Eskom or
contractor employee’s employment and resulting in human injury, illness, or death of the
employee, as well as death of, or injury to, any member of the public or damage to property.
2.3.2 Fatality: an incident occurring at work, or arising out of, or in connection with, the activities
of persons at work, or in connection with the use of plant or machinery, o r direct or
indirect exposure to Eskom’s product or activities, in consequence of which, any person
(that is, employee, contractor, or member of the public) dies, regardless of the time
intervening between the injury and/or exposure to the date of death. The date of the
incident will reflect the date on which the incident occurred, irrespective of the date of
death.
Note: Incidents related to the death of a person (employee or contractor employee) while
at the workplace and on duty who dies as a consequence of any activity or cause not
directly related to the course and scope of the deceased’s employment (for example, death
from natural causes, etc.) will not be regarded as a work related incident.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Compliance Requirements
Source: Attachment No. 5b.pdf (unknown)No specific requirements found
B-BBEE Minimum Level: 4
Description
Source: Attachment No. 3b.pdf (unknown)Vegetation Management for Acacia, Ankerlig and Palmiet Power Stations for a period of five years. The service includes vegetation management at these three Eskom power stations, with tasks such as grass cutting, weed control, alien vegetation control, pruning, firebreak maintenance, tree removal, and garden maintenance. Contract is for a five-year period.
Contact Information
Source: Attachment No. 3b.pdf (unknown){"name":null,"email":null,"phone":"011 803 3008","department":null,"address":"conditions of contract identified in"}
Submission Guidelines
Source: Attachment No. 3b.pdf (unknown)Returnable Documents: C1.1 Form of Offer and Acceptance [●], C1.1 Form of Offer & Acceptance, By the representative of the tenderer, deemed to be duly authorised, signing this part of this Form of Offer and, This Offer may be accepted by the Employer by signing the Acceptance part of this Form of Offer and
Evaluation Criteria
Source: Attachment No. 3b.pdf (unknown)The document does not specify pre-qualification criteria such as CSD registration, tax clearance, B-BBEE level, or CIDB grading. Bidders must be able to provide the required insurances, comply with the Occupational Health and Safety Act, and accept the contract terms including low service damages and liability limitations. The form of offer requires a CIDB registration number to be stated. Bidders must sign the Form of Offer and Acceptance and complete the Schedule of Deviations if any.
Experience & Qualifications
Source: Attachment No. 3b.pdf (unknown)2 Name:
Job
Responsibilities:
3 Available from Engineering Contract Strategies Tel 011 803 3008 Fax 086 5391902 or www.ecs.co.za
Part c1 agreements and contract data of 66 c.1.2B Contract data part 2
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Vegetation management for acacia, ankerlig and palmiet power stations for a period of five years.
CV's (and further key person's data including
CVs) are in .
A Priced contract with price list
11.2(12) The price list is in
11.2(19) The tendered total of the Prices is R
Part c1 agreements and contract data of 66 c.1.2B Contract data part 2
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Vegetation management for acacia, ankerlig and palmiet power stations for a period of five years.
Part 2: pricing data
TSC3 Option A
Document Title No of
reference pages
C2.1 Pricing assumptions: Option A 2
C2.2 The price list 6
Part c2 pricing data of 66 tsc3 option a
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Vegetation management for acacia, ankerlig and palmiet power stations for a period of five years.
C2.1 Pricing assumptions: Option A
Clause 11 in NEC3 Term Service Contract (TSC3) core clauses and Option A states:
Identified and 11
defined terms 11.2 (12) The Price List is the price list unless later changed in accordance with
this contract.
(17) The Price for Services Provided to Date is the total of
has completed and
calculated by multiplying the quantity which the Contractor has
completed by the rate.
(19) The Prices are the amounts stated in the Price column of the Price List.
Where a quantity is stated for an item in the Price List, the Price is calculated
by multiplying the quantity by the rate.
This confirms that Option A is a priced contract where the Prices are derived from a list of items of service
which can be priced as lump sums or as expected quantities of service multiplied by a rate or a mix of both.
Clause 54.1 in Option A states: “Information in the Price List is not Service Information”. This confirms that
instructions to do work or how it is to be done are not included in the Price List but in the Service Information.
This is further confirmed by Clause 20.1 which states, “The Contractor Provides the Service in accordance
with the Service Information”. Hence the Contractor does not Provide the Service in accordance with the Price
List. The Price List is only a pricing document.
Clause 21.4 states “The Contractor provides information which shows how each item description on the
Price List relates to the operations on each plan which he submits for acceptance”. Hence when compiling
the price list, the tendering Contractor needs to develop his first clause 21.2 plan in such a way that
operations shown on it can be priced in the price list and result in a satisfactory cash flow in terms of clause
11.2(17).
Before preparing the price list, both the Employer and tendering Contractors should read the TSC3 Guidance
Notes pages 14 and 15. In an Option A contract, either Party may have entered items into the price list
either as a process of offer and acceptance (tendering) or by negotiation depending on the nature of the
service to be provided. Alternatively, the Employer, in his Instructions to Tenderers or in a Tender Schedule,
may have listed some items that he requires the Contractor to include in the price list to be prepared and
priced by him.
It is assumed that in preparing or finalising the price list the Contractor:
Part c2 pricing data of 66 c2.1 Option a pricing assumptions
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Vegetation management for acacia, ankerlig and palmiet power stations for a period of five years.
to Providing the Service in accordance with the Service Information, as it was at the time of tender,
as well as correct any Defects not caused by an Employer’s risk;
items in order to fulfil the obligation to complete the service for the tendered total of the Prices.
within that item later turns out to be different to that which the Contractor estimated at time of tender.
The only basis for a change to the (lump sum) Prices is as a result of a compensation event.
(From the example given in an Appendix within the TSC3 Guidance Notes)
Entries in the first four columns in the price list in section C2.2 are made either by the Employer or the
tendering Contractor.
If the Contractor is to be paid an amount for the item which is not adjusted if the quantity of work in the
item changes, the tendering Contractor enters the amount in the Price column only, the Unit, Expected
Quantity and Rate columns being left blank.
If the Contractor is to be paid an amount for an item of work which is the rate for the work multiplied by
the quantity completed, the tendering Contractor enters the rate which is then multiplied by the Expected
Quantity to produce the Price, which is also entered.
If the Contractor is to be paid a Price for an item proportional to the length of time for which a service is
provided, a unit of time is stated in the Unit column and the expected length of time (as a quantity of the
stated units of time) is stated in the Expected Quantity column.
Part c2 pricing data of 66 c2.1 Option a pricing assumptions
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Vegetation management for acacia, ankerlig and palmiet power stations for a period of five years.
C2.2 the price list
Item nr Description Unit Expected Rate Price
Quantity
per year
1 P & G's
1.1 Site establishment and de-establishment Sum 1
1.2 Safety File Sum 1
1.3 PPE once off Sum 1
1.4 Travelling Fee per month Month 12
1.5 Labour – Semi-Skilled Month 12
1.6 Labour - Supervisor Month 12
1.7 Safety Officer Fee Month 12
2 Routine Maintenance
Monthly lawn care - Lawn mowing, edging,
weeding plant beds, leaf & cutting removal,
including clean up and green waste Month
removal.
2.1 Across Area 1, 2 & 3, total footprint 8 140m2 12
Monthly Flower/Shrub bed maintenance
Month 2.2 Across Area 1, 2 & 3, total footprint 2 140m2 12
Monthly chemical weed and pest control on
curbs, paved areas, and grassed areas
Month across grounds (using approved herbicides)
2.3 Across Area 1, 2 & 3, total footprint 8 140m2 12
Quarterly Fertilisation and soil treatment
Quarter 2.4 Across Area 1, 2 & 3, total footprint 8 140m2 4
Quarterly Alien Vegetation Control –
eradication and removal Quarter
2.5 Across Area 1, 2 & 3, total footprint 8 140m2 4
Quarterly Pruning and shaping of shrubs –
Tree and plant pruning, low hanging branch
Quarter removal, and tree care
2.6 Across Area 1, 2 & 3, total footprint 2 140m2 4
Yearly supply of 1 indigenous tree for Service
2.7 annual Arbor Day celebration Cycle 1
Yearly supply and maintain topsoil and Service
2.8 mulch Cycle 1
Part c2 pricing data of 66 c2.2 Option a price list
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Vegetation management for acacia, ankerlig and palmiet power stations for a period of five years.
Across Area 1, 2 & 3, total footprint 8 140m2
Firebreak Maintenance - Perimeter
Firebreak & Safety Clearing cutting and
maintaining 200m x 5 m wide continuous
clear firebreak strip along outer perimeter
2.9 fence
Edgemead Ambient Air Quality
2.11. Monitoring Station (ERF31008)
Cut grass, remove clippings, clear growth
around monitoring instruments, and clear Service
2.11.1 weeds – Biannually across 360m2 footprint Cycle 2
Pruning/trimming trees or plants impacting
monitoring station site - Biannually across Service
2.11.2 360m2 footprint Cycle 2
3 Once off rate for ad-hoc service
Ad Hoc Tree removal (Stump included) as 2
3.1 Each
and when required
The total of the Prices
The total of the Prices for 5 Years
Part c2 pricing data of 66 c2.2 Option a price list
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Vegetation management for acacia, ankerlig and palmiet power stations for a period of five years.
Item nr Description Unit Expected Rate Price
Quantity
per year
1 P & G's
1.1 Site establishment and de-establishment Sum 1
1.2 Safety File Sum 1
1.3 PPE once off Sum 1
1.4 Travelling Fee per month Month 12
1.5 Labour – Semi-Skilled Month 12
1.6 Labour - Supervisor Month 12
1.7 Safety Officer Fee Month 12
2 Routine Maintenance
Declared Alien Vegetation Eradication
every February, August and November
2.1
Across Outside Station Footprint at 44
Ha
Scouting, hand-pulling, tree-popper alien Service
2.1.2. 3
plant removal Cycle
Cut-stump herbicide application for
Service
2.1.2. regrowth on older stumps across outside 3
Cycle
area
2.2 Weed Control Herbicide
Quarterly non-selective & pre-emergence
herbicide spraying on open areas, chip
2.2.1 Month 4
stone footprint & security fence –
Across Inner Areas Full Cover 40 ha
Continuous clear weed/vegetation control
strip spraying along security fence line,
2.2.2 Including dams Monthly 12
1m wide across 4000 meters
Yearly supply of 1 indigenous tree for Service
2.3 1
annual Arbor Day celebration Cycle
Full cleaning of internal roads, hard
surfaces and roadsides, culverts, tunnels,
2.4 drains etc. Including roadside litter Month 12
removal on outside station roadsides
Across 827 294m2 footprint
Garden Beds & Soft Landscaping
2.5
Maintenance
Maintain and develop beds Medium / Low Service
2.5.1 3
Impact Gardens 210 000m2 Cycle
Part c2 pricing data of 66 c2.2 Option a price list
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Vegetation management for acacia, ankerlig and palmiet power stations for a period of five years.
Monthly maintenance and development
2.5.2 Month 12
beds Medium – High impact of 30 950 m2
Annual application of fertilizer on High Service
2.5.3 1
Impact Garden beds of 30 950 m2 Cycle
Biannual mulching of High Impact Garden Service
2.5.4 2
beds with organic mulch of 30 950 m2 Cycle
Monthly irrigation system repairs and
2.5.5 Month 12
routine maintenance
Firebreak Maintenance & Boundary
2.6
Vegetation Clearing
Construct/maintain a 5-meter-wide
continuous fire break along perimeter of Service
2.6.1 3
the site including dumping at a registered Cycle
dumping site across 4 000 m
Maintain continuous 10-meter firebreak
Service
2.6.2 between Ankerlig and Mondi Plastic 3
Cycle
Containers (NE Side) 700 m
Fence line vegetation clearing – Red Zone Service
2.6.3 3
2 500 m length Cycle
Fence line vegetation clearing – Yellow Service
2.6.4 3
Zone 822 m length Cycle
Fence line vegetation clearing – Purple Service
2.6.5 3
Zone 606 m length Cycle
Fence line vegetation clearing – Blue Service
2.6.6 3
Zone 74 m length Cycle
Fence line vegetation clearing – Green Service
2.6.7 3
Zone 2 900 m length Cycle
3 Once off rate for ad-hoc service
Supply of Irrigation system for high impact
3.1
gardens 30 950 m2
3.2 Additional Cost markup % %
The total of the Prices
The total of the Prices for 5 Years
Part c2 pricing data of 66 c2.2 Option a price list
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Vegetation management for acacia, ankerlig and palmiet power stations for a period of five years.
Item nr Description Unit Expected Rate Price
Quantity
per year
1 P & G's
1.1 Site establishment and de-establishment Sum 1
1.2 Safety File Sum 1
1.3 PPE once off Sum 1
1.4 Travelling Fee per month Month 12
1.5 Labour – Semi-Skilled Month 12
1.6 Labour - Supervisor Month 12
1.7 Safety Officer Month 12
2 Routine Maintenance
Visitors Centre Grounds Maintenance
2.1
(Figure 8)
Bi-Weekly lawn care including
Service
2.1.1 maintenance, de-weeding, and organic
Cycle mulching of flower beds – 3 998 m2 26
Chemical weed control on paved/parking Service
2.1.2 areas using approved herbicides Cycle 26
Removal of stones, litter, and debris from Service
2.1.3 roads and carparks Cycle 26
Biweekly cutting of grass along N2 access
Service road to Visitor Centre (800 meters) both
Cycle sides) and around facilities for 3 998 m2 26
Main Station Area & Operational Hard
2.2 Surfaces (Figures 6 & 7)
Monthly Flower bed maintenance and
2.2.1 weeding, Plant/Shrub and Flower Care Month
Station – 15 809 m2 12
Monthly Weed and pest control at the
Station, paved areas, electric fence
2.2.2 Month perimeter, parking areas, internal and
access roads 15 809 m2 12
Clear continuous 1 meter vegetation strip
2.2.3 outside 900 m outer security fence Month
(excluding Eastern fence/dam area) 12
Removal of declared alien vegetation Month
between servitude fences and extending up
2.3
to 8 m from N2 access road verges – 4.7
km + 5.7km 12
Part c2 pricing data of 66 c2.2 Option a price list
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Vegetation management for acacia, ankerlig and palmiet power stations for a period of five years.
Cutting of grass along N2 access road to Month
Power Station and Surge shaft (both sides)
2.4
and around facilities. Sweep stones/debris
off surface – 4.7 km + 5.7km 12
Chemical weed control on N2 access road Month 2.5
surface - 4.7 km + 5.7km 12
Cut grass/bushes to road verge on both Month
sides along headrace road, sweep debris,
2.6
and spray weeds in stormwater channels –
5.7 km 12
Cut grass, control weeds, and remove alien Month
vegetation within complete Surge Tower
fence footprint area – 7 430 m2 + 3 266 m2 12
Clear continuous 1 meter walkway/strip Month
2.7 around outside of Surge Tower 250 m
perimeter fence 12
Full cleaning of Hard Surfaces and Roads /
2.8 Month Roadsides / Culverts, Tunnels, Drains etc. 12
Yearly supply of 5 indigenous trees and 5
Service
2.9 indigenous shrubs for annual Arbor Day
Cycle celebration 1
2.10 Clean-up and Garden Waste Removal Month 12
3 Once off rate for ad-hoc service
Service
3.1 Adhoc tree removal 5
cycles
3.2 Additional Cost markup % %
The total of the Prices
The total of the Prices for 5 Years
Part c2 pricing data of 66 c2.2 Option a price list
Qualifications:
Experience:
2 Name:
Qualifications:
3 Available from Engineering Contract Strategies Tel 011 803 3008 Fax 086 5391902 or www.ecs.co.za
Part c1 agreements and contract data of 66 c.1.2B Contract data part 2
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Experience:
CV's (and further key person's data including
CVs) are in .
Pricing Schedule
Source: Attachment No. 3b.pdf (unknown)Contents: No of
pages
Part C1 Agreements & Contract Data [●]
Part C2 Pricing Data [●]
Part C3 Scope of Work [●]
CONTRACT No. [Insert at award stage]
Tsc3 of 66 cover page
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _________
Part C1 Agreements and Contract Data, (which includes this Form of Offer and Acceptance)
Part C2 Pricing Data
Part C3 Scope of Work: Service Information
and drawings and documents (or parts thereof), which may be incorporated by reference into the above listed
clauses
X1 Price adjustment for inflation
X1.1 The base date for indices is One month before tender closure. Rates are
fixed and firm for the first 12 months.
Part 2: pricing data
TSC3 Option A
reference pages
C2.1 Pricing assumptions: Option A 2
C2.2 The price list 6
Part c2 pricing data of 66 tsc3 option a
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
C2.1 Pricing assumptions: Option A
Part c2 pricing data of 66 c2.1 Option a pricing assumptions
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
to Providing the Service in accordance with the Service Information, as it was at the time of tender,
as well as correct any Defects not caused by an Employer’s risk;
items in order to fulfil the obligation to complete the service for the tendered total of the Prices.
within that item later turns out to be different to that which the Contractor estimated at time of tender.
The only basis for a change to the (lump sum) Prices is as a result of a compensation event.
provided, a unit of time is stated in the Unit column and the expected length of time (as a quantity of the
stated units of time) is stated in the Expected Quantity column.
Part c2 pricing data of 66 c2.1 Option a pricing assumptions
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
2.8 mulch Cycle 1
Part c2 pricing data of 66 c2.2 Option a price list
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
The total of the Prices for 5 Years
Part c2 pricing data of 66 c2.2 Option a price list
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
2.5.1 3
Impact Gardens 210 000m2 Cycle
Part c2 pricing data of 66 c2.2 Option a price list
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
The total of the Prices for 5 Years
Part c2 pricing data of 66 c2.2 Option a price list
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
between servitude fences and extending up
2.3
to 8 m from N2 access road verges – 4.7
km + 5.7km 12
Part c2 pricing data of 66 c2.2 Option a price list
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
The total of the Prices for 5 Years
Part c2 pricing data of 66 c2.2 Option a price list
Financial Requirements
Source: Attachment No. 3b.pdf (unknown)Payment Terms: payment certificate from the Service Manager or the Employer’s
acceptance or correction of the Contractor’s assessment or application for payment, the
Contractor provides the Employer with a tax invoice in the form required by the law of the
contract, and this contract, including in accordance with any requirements and procedures
stated in the Service Information
Compliance Requirements
Source: Attachment No. 3b.pdf (unknown)C1.1 Form of Offer and Acceptance [●]
C1.1 Form of Offer & Acceptance
By the representative of the tenderer, deemed to be duly authorised, signing this part of this Form of Offer and
B-BBEE Details: ed to be jointly
and severally liable to the Employer for the performance of this contract.
Z2.2 Unless already notified to the Employer, the persons or organisations notify the Service
Manager within two weeks of the Contract Date of the key person who has the authority to bind
the Contractor on their behalf.
Z2.3 The Contractor does not alter the composition of the joint venture, consortium or other
unincorporated grouping of two or more persons without the consent of the Employer having
been given to the Contractor in writing.
Z3 Change of Broad Based Black Economic Empowerment (B-BBEE) status
Z3.1 Where a change in the Contractor’s legal status, ownership or any other change to his business
composition or business dealings results in a change to the Contractor’s B-BBEE status, the
Contractor notifies the Employer within seven days of the change.
Z3.2 The Contractor is required to submit an updated verification certificate and necessary
supporting documentation confirming the change in his B-BBEE status to the Service Manager
within thirty days of the notification or as otherwise instructed by the Service Manager.
Z3.3 Where, as a result, the Contractor’s B-BBEE status has decreased since the Contract Date the
Employer may either re-negotiate this contract or alternatively, terminate the Contractor’s
obligation to Provide the Service.
Z3.4 Failure by the Contractor to notify the Employer of a change in its B-BBEE status may
constitute a reason for termination. If the Employer terminates in terms of this clause, the
procedures on termination are P1, P2 and P4 as stated in clause 92, and the amount due is A1
and A3 as stated in clause 93.
Z4 Confidentiality
Part c1 agreements and contract data of 66 c.1.2A Contract data part 1
ESKOM hold
Health & Safety
Source: Attachment No. 3b.pdf (unknown)Z6: Contractor must comply with Occupational Health and Safety Act and Employer's safety rules, maintain safety documentation, and take reasonable precautions. Z14: Asbestos management - employer must provide safe ambient air, contractor may stop work if asbestos risk is identified, and asbestos removal is done by registered contractors.
Environmental
Source: Attachment No. 3b.pdf (unknown)Z14.6 The Contractor continues to Provide the Services, without additional control measures presented
on presentation of Safe Levels. The contractually agreed dates to Provide the Services, including
the Completion Date, are adjusted accordingly. The contractually agreed dates are extended by
the notification periods required by regulations 3 and 21 of the Asbestos Regulations, 2001.
Z14.7 Any removal and disposal of asbestos, asbestos containing materials and waste, is done by a
registered asbestos Contractor, instructed by the Employer at the Employer’s expense, and
conducted in line with South African legislation.
Part c1 agreements and contract data of 66 c.1.2A Contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
weeding plant beds, leaf & cutting removal,
including clean up and green waste Month
removal.
2.1 Across Area 1, 2 & 3, total footprint 8 140m2 12
2.9 indigenous shrubs for annual Arbor Day
Cycle celebration 1
2.10 Clean-up and Garden Waste Removal Month 12
Contractual Terms
Source: Attachment No. 3b.pdf (unknown)Contract Data Part One (provided by the Employer) sets out the contract terms: applicable law is South African law, language is English, dispute resolution via Option W1 (adjudication then arbitration in Cape Town), payment terms (30 days from invoice), interest rate as prime rate from Standard Bank, price adjustment for inflation (Option X1) with formulae, low service damages (Option X17) for various failure types, limitation of liability (Option X18), task order provisions (Option X19), and additional conditions (Z clauses) covering cession, joint ventures, B-BBEE status changes, confidentiality, waivers, health/safety/environment, tax invoices, compensation events, employer liability, ethics, insurance, intellectual property, and asbestos.
Description
Source: OHS Requirements Ankerlig_Acacia_Palmiet.pdf (unknown)The project involves vegetation management at Ankerlig Power Station, including control of alien vegetation, maintenance of garden beds, weed control management, cleaning of roads and hard surfaces, and maintenance of fire breaks. The work is required as part of an Environmental Record of Decision and includes scheduled interventions (February, August, November) and maintenance of defined zones.
Contact Information
Source: OHS Requirements Ankerlig_Acacia_Palmiet.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"MENTS FOR 192-4295 1"}
Submission Guidelines
Source: OHS Requirements Ankerlig_Acacia_Palmiet.pdf (unknown)Returnable documents: bidders must submit a completed and signed SBD 1 (Invitation to Bid), SBD 4 (Declaration of Interest), SBD 6.1 (Preference Points Claim), SBD 8 (Declaration of Bidder's Past SCM Practices), SBD 9 (Certificate of Independent Bid Determination), and a valid tax compliance status PIN. Bids must be submitted in the required format and channel before the closing time; late bids will be disqualified.
Evaluation Criteria
Source: OHS Requirements Ankerlig_Acacia_Palmiet.pdf (unknown)Bidders must comply with the Occupational Health and Safety Act and all applicable legislation, including the Constitution of South Africa, National Environmental Management Act, National Water Act, National Road Traffic Act, and Compensation for Occupational Injuries and Diseases Act. Bidders must sign a Section 37(2) agreement with Eskom and with any appointed contractors. Bidders must be registered with the Compensation Commissioner and provide a valid Letter of Good Standing (LoG) that remains valid throughout the contract. Bidders must have a SHEQ policy signed by the CEO or Section 16(2) appointee. Bidders must comply with Eskom's Life-Saving Rules, including zero tolerance for alcohol and drugs (0% allowable level). Bidders must provide an organisational organogram and appoint competent persons for statutory roles. Bidders must not use child labour in accordance with the Basic Conditions of Employment Act and OHS Act Regulations on Hazardous Work by Children.
Technical Specifications
Source: OHS Requirements Ankerlig_Acacia_Palmiet.pdf (unknown)Scope of work at Ankerlig Power Station includes:
Quality Management
Source: OHS Requirements Ankerlig_Acacia_Palmiet.pdf (unknown)Quality control: The contractor must compile a quality control sheet for approval by the employer, detailing month, team supervisor, Eskom representative, date on site, signatures, and maintenance zones. The site is divided into zones for scheduled maintenance to improve quality control. The contractor must provide annual schedules of all planned interventions, such as weed control and alien vegetation control.
Compliance Requirements
Source: OHS Requirements Ankerlig_Acacia_Palmiet.pdf (unknown)Bidders must be registered on the CSD and hold a valid tax compliance status PIN. Bidders must have a B-BBEE level 2 or better. Bidders must be registered with the Compensation Commissioner and provide a valid Letter of Good Standing (LoG) that remains valid throughout the contract. Bidders must have a SHEQ policy signed by the CEO or Section 16(2) appointee. Bidders must comply with the OHS Act, including Section 37(2) agreements, and all applicable legislation. Bidders must not use child labour in accordance with the Basic Conditions of Employment Act and OHS Act Regulations on Hazardous Work by Children.
Health & Safety
Source: OHS Requirements Ankerlig_Acacia_Palmiet.pdf (unknown)OHS requirements include compliance with the Occupational Health and Safety Act, including section 37(2) agreements, prohibition of child labour, statutory appointments, adherence to Eskom's Life-Saving Rules, substance abuse testing, contractor organisational structure, and various safety procedures covering risk assessments, method statements, first aid, training, incident investigation, and emergency management. Statutory appointments must be made by qualified individuals, and all contractors must comply with relevant legislation and maintain COID letters of good standing.
Environmental
Source: OHS Requirements Ankerlig_Acacia_Palmiet.pdf (unknown)The contractor must comply with the National Environmental Management Act and other environmental legislation. The scope includes control of alien vegetation as part of an Environmental Record of Decision, rehabilitation of disturbed areas, and duty of care to prevent pollution or degradation.
Contact Information
Source: Attachment No. 1.pdf (unknown){"name":"__________________________________________________________","email":null,"phone":null,"department":null,"address":null}
Submission Guidelines
Source: Attachment No. 1.pdf (unknown)Bidders must submit their bid electronically through Eskom's E-Tendering Solution. The Acknowledgement Form for E-Tendering Training (Annexure 1) must be completed, signed, and submitted with the bid, confirming that the bidder has undergone self-training via the E-Tendering Noddy Guide, video, or clarification meeting and is able to operate the E-Tendering Solution.
Evaluation Criteria
Source: Attachment No. 1.pdf (unknown)No eligibility criteria specified
Evaluation Criteria
Source: Attachment No. 6b.pdf (unknown)Specific goals: A maximum of 10/20 points may be awarded for the specific goal. Points are added to price points and rounded to two decimal places. Award to highest scorer per PPPFA. B-BBEE status level points table: Level 1: 10 (90/10) or 20 (80/20); Level 2: 9 or 18; Level 3: 6 or 14; Level 4: 5 or 12; Level 5: 4 or 8; Level 6: 3 or 6; Level 7: 2 or 4; Level 8: 1 or 2; Non-compliant: 0. Documents required to claim preference points: valid B-BBEE certificate (SANAS accredited) or sworn affidavit/CIPC affidavit, proof of ownership/shareholding (preferably CIPC) with breakdown, certified ID copies of shareholders, proof of disability where applicable. Failure to provide documentation: may only score out of 90/80 for price, scores 0 for specific goals.
Technical Specifications
Source: Attachment No. 6b.pdf (unknown)Provision of Vegetation Management Services at Acacia, Palmiet and Ankerlig Stations. Duration of the Project: 60 Months.
Compliance Requirements
Source: Attachment No. 6b.pdf (unknown)Valid B-BBEE certificate or Sworn Affidavit is a condition for contract award. If annual Total Revenue is R10 Million or less, qualify as Exempted Micro Enterprise and can submit Sworn Affidavit. If annual Total Revenue is R50 Million or less, qualify as Qualifying Small Enterprise and must comply with QSE scorecard unless at least 51% Black owned, then Sworn Affidavit. If annual Total Revenue is above R50m, submit a Valid B-BBEE certificate. B-BBEE Improvement Plan is an essential document within 30 days of signing the contract.
B-BBEE Requirements
Source: Attachment No. 6b.pdf (unknown)General Information on Validity of Sworn Affidavits: Tenderers submitting B-BBEE Sworn Affidavits must ensure validity: name of deponent as per ID and ID number; designation (director, owner, member) indicated; name of enterprise as per CIPC registration and business address; percentage of black ownership, black female ownership, designated group (for specialised enterprises, black beneficiaries); total revenue for year under review and basis (audited or management accounts); financial year end; B-BBEE status level (only one); empowering supplier status (for QSEs, basis selected); date signed and Commissioner of Oath date must be same; Commissioner of Oath cannot be employee or ex officio of enterprise.
Special Conditions
Source: Attachment No. 6b.pdf (unknown)Reporting and Monitoring: Suppliers must submit quarterly reports to Eskom per Data Collection Template on compliance with SDL&I obligations. Eskom reviews reports within 30 days and notifies in writing if obligations not met. Upon notification, suppliers must implement corrective measures before next report, failing which retention clauses invoked. Every contract accompanied by SDL&I Implementation Schedule, completed and returned to SDL&I representative for acceptance 28 days after contract award. Used for monitoring, measuring, reporting progress.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Peaking Power Stations - - Peaking Power Stations -
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
20
Last checked
04 Sept 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
💡 Want more tendering tips and strategies?
Explore Our BlogMedian Estimate
R 184 230
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Get deep intelligence on Services: General. Unlock full pricing strategies, bid frequency, and historical win rates.